Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Pipeline\2025\2025-07-15 Pipeline Task Force Agenda v1.docx

East Goshen Township Pipeline Task Force Meeting Agenda

Tuesday, July 15, 2025 East Goshen Township Building

10:00 AM Join Zoom Meeting

Link: https://us02web.zoom.us/j/83708910471 Dial In Number: 1 929 205 6099 Meeting ID: 837 0891 0471

1. Call to Order (10:00 AM)

2. Ask if anyone is recording the meeting

3. Approval of Minutes (10:05 AM to 10:10 AM) a. May 19, 2025

4. Public Comment (10:10 AM to 10:15 AM)

5. Chairperson’s Report (10:15 AM to 10:30 AM)

6. Old Business (10:30 AM to 11:00 AM) a. Hydrogen Pipelines Ordinance. b. Update on formal request to PennDOT for guard railing on Paoli Pike at the Williams natural

gas valve station. c. Update on jet fuel pipeline leak in Upper Makefield Township.

7. New Business (11:00 AM to 11:45 AM) a. PTF article for next township newsletter. b. PA House Bill 502. c. Inviting our local legislators to future PTF meetings.

8. Reports / Legislative Update (11:45 PM to 11:50 AM)

9. Liaison Reports (11:50 AM to 11:55 AM)

10. Correspondence / Any Other Matter (11:55 AM to 12:00 PM)

11. Next Meeting Scheduled for Tuesday September 16, 2025 at 10:00 AM.

12. Adjournment (12:00 PM)

May 19, 2025 1

PIPELINE TASK FORCE 1 Tuesday May 19, 2025 2 East Goshen Township Building 3 DRAFT MINUTES 4 5 6 Members Present are highlighted 7 Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo 8 9 Others Present are highlighted 10 Township Supervisor: Barbara Emery; Township Manager: Derek Davis; Office 11 Administrator: Ashley Nowak 12 13 COMMON ACRONYMS: 14

15 Call to Order 16 Gerry called the meeting to order at 10:08 am. 17 18 Recording 19 The meeting was not being recorded. 20 21 Approval of Minutes 22 The draft minutes from March 18, 2025 were approved as is. 23 24

ACOE Army Core of Engineers BI&E BOS

Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission

May 19, 2025 2

Public Comment 1 None. 2 3 Chairperson’s Report 4 Gerry discussed an article on research into a hybrid solar distillation – water electrolysis 5 device. This technology produces low cost green hydrogen and drinking water using 6 natural sunlight and seawater. 7 8 Old Business 9 Hydrogen Pipelines 10 The group discussed the latest version of the draft hydrogen pipelines ordinance and the 11 associated appendix. These documents were approved by the PTF with minor comments. 12 Gerry will make these changes and forward the documents to Ashley for conversion from 13 Word to PDF. Gerry will then send the PDFs to Derek for inclusion on the agenda of the 14 BOS meeting on 06/17/2025. [PMN: All of these tasks were completed.] 15 16 Protection of Williams natural gas valve station on Paoli Pike from vehicle strike 17 After consulting with the township engineering firm (Pennoni), Derek informed Gerry 18 that EGT will send a formal request to PennDOT for guard railing on Paoli Pike at the 19 Williams natural gas valve station. Ashley will follow up with Derek on the current status 20 of this request. 21 22 Update on jet fuel pipeline leak in Upper Makefield Township 23 The group discussed the current status. The Upper Makefield Township BOS voted to 24 allow Energy Transfer to put three recovery wells at site of the leak. Residents continue 25 to voice concerns regarding these cleanup efforts. 26 27 New Business 28 PTF article for next township newsletter 29 The group agreed to table this item and discuss it at the next meeting. 30 31 Reports / Legislative Update 32 None. 33 34 Liaison Reports 35 Judi attended the CCEA meeting on 05/03/2025 and provided a summary. 36 37 Correspondence / Any Other Matter 38 The group talked about possibly inviting our local legislators to future PTF meetings. This 39 will be discussed in more detail at the next meeting. 40 41 Next meeting 42 The next meeting is scheduled for Tuesday, July 15, 2025 at 10:00am. 43 44 Adjournment 45 The meeting was adjourned at 11:32pm. 46

May 19, 2025 3

1 Respectfully submitted, 2 Ashley Nowak, Office Administrator 3 4 F:\Data\Shared Data\Minutes\Pipeline Task Force\2025\Pipeline TF Mins 5-19-2025 DRAFT v2.docx 5