The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.
| Board Members | Term Expiration Date |
| Gerald Sexton, Chair | 2027 |
| Mary McCloskey, Vice Chair | 2028 |
| Judi DiFonzo | 2026 |
| David Shuey | 2028 |
| Vacant | 2027 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Documents
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Pipeline\2025\2025-09-16 Pipeline Task Force Agenda v1.docx
East Goshen Township Pipeline Task Force Meeting Agenda
Tuesday, September 16, 2025 East Goshen Township Building
10:00 AM Join Zoom Meeting
Registration Link: https://us02web.zoom.us/meeting/register/0-zUb55KRWqhlUCjC1acfQ Please note in order to participate via zoom we are now requiring zoom attendees to pre- register for the meetings. You must register via the link for each meeting in order to attend
by zoom. 1. Call to Order (10:00 AM)
2. Ask if anyone is recording the meeting
3. Approval of Minutes (10:05 AM to 10:10 AM) a. July 15, 2025
4. Public Comment (10:10 AM to 10:15 AM)
5. Chairperson’s Report (10:15 AM to 10:30 AM)
6. Old Business (10:30 AM to 11:15 AM) a. Update on formal request to PennDOT for guard railing on Paoli Pike at the Williams natural
gas valve station. b. Update on jet fuel pipeline leak in Upper Makefield Township. c. Update on MACH2. d. Update on Chester County Emergency Planning – EGT Pipeline Incident Annex.
7. New Business (11:15 AM to 11:45 AM) a. PTF article for next township newsletter. b. Plans to invite our local legislators to future PTF meetings.
8. Reports / Legislative Update (11:45 PM to 11:50 AM)
9. Liaison Reports (11:50 AM to 11:55 AM)
10. Correspondence / Any Other Matter (11:55 AM to 12:00 PM)
11. Next Meeting Scheduled for Tuesday November 18, 2025 at 10:00 AM.
12. Adjournment (12:00 PM)
July 15, 2025 1
PIPELINE TASK FORCE 1 Tuesday July 15, 2025 2 East Goshen Township Building 3 DRAFT MINUTES 4 5 6 Members Present are highlighted 7 Chair: Gerry Sexton; Vice Chair: Mary McCloskey; Members: Judi DiFonzo 8 9 Others Present are highlighted 10 Township Supervisor: Barbara Emery; Township Manager: Derek Davis; Office 11 Administrator: Ashley Nowak 12 13 COMMON ACRONYMS: 14
15 Call to Order 16 Gerry called the meeting to order at 10:07 am. 17 18 Recording 19 The meeting was not being recorded. 20 21 Approval of Minutes 22 The draft minutes from May 19, 2025 were approved as is. 23 24
ACOE Army Core of Engineers BI&E BOS
Bureau of Investigation and Enforcement Board of Supervisors CCATO Chester County Association of Township Officials CCPC Chester County Planning Commission DCNR Department of Conservation and Natural Resources DEP Department of Environmental Protection DES Department of Emergency Services EGT East Goshen Township ET Energy Transfer FEMA Federal Emergency Management Agency HDD Horizontal Directional Drilling IR Inadvertent Return MACH2 Mid-Atlantic Clean Hydrogen Hub ME1 Mariner East 1 ME2 Mariner East 2 NGL Natural Gas Liquids PHMSA Pipeline Hazard Materials and Safety Administration PMN Post Meeting Note PTF Pipeline Task Force PUC Public Utility Commission
July 15, 2025 2
Public Comment 1 Russ Frank had questions about the proposed hydrogen hub MACH2. Gerry responded. 2 3 Chairperson’s Report 4 Gerry summarized an article he read about planting trees to offset carbon emissions from 5 fossil fuels. Researchers in the UK performed calculations to determine the practicality of 6 this methodology. They started by estimating the potential carbon dioxide emissions 7 from the fossil fuel reserves of the 200 largest oil, gas, and coal fuel companies. They then 8 determined the ability and cost of planting trees to remove carbon through 9 photosynthesis. They concluded that trees would have to cover the entire land mass of 10 North and Central America to capture this amount of carbon dioxide. The cost to plant 11 that many trees would be $10.8 trillion, which is more than the entire combined market 12 valuation of $7.01 trillion for these companies. This article makes the point that it is 13 financially impossible to offset enough carbon to compensate for future fossil fuel 14 burning. 15 16 He also shared another article about a startup company using bacteria to turn carbon 17 dioxide into commercial-grade compounds. By using carbon dioxide that would have 18 otherwise entered the atmosphere, this technology can reduce greenhouse gas emissions. 19 20 Old Business 21 Hydrogen Pipelines Ordinance 22 The BOS voted on June 17, 2025 to advertise the Hydrogen Pipeline Ordinance. It is on 23 the BOS meeting agenda to be voted on for passage at their meeting tonight. [PMN: The 24 BOS approved this ordinance on July 15, 2025.] 25 26 Update on formal request to PennDOT for guard railing on Paoli Pike at the 27 Williams natural gas valve station 28 The formal request was submitted to PennDOT by Pennoni. It is typically a 4 to 6 week 29 turnaround time for a reply. 30 31 Update on jet fuel pipeline leak in Upper Makefield Township 32 Judi had previously asked if water quality testing by Aqua would have detected the 33 compounds from this leak. Gerry reviewed the Aqua 2024 Water Quality Report for the 34 Main System in the West Chester area for some guidance. There is testing for certain 35 volatile organic contaminants. However, it is unclear if typical water quality testing 36 protocols would have detected the compounds in question. Also, the affected wells were 37 private water sources which are not routinely tested by a municipal water authority. DEP 38 has scheduled a town hall in Upper Makefield Township building tonight to provide 39 updates. 40 41 New Business 42 PTF article for next township newsletter 43 The group discussed ideas for the next article. Ashley will talk with Jessica Wilhelmy 44 about the due date. This item will be on the agenda for the next PTF meeting. 45 46
July 15, 2025 3
1 PA House Bill 502 2 The bill was tabled by the PA House Energy Committee. It was noted that the West 3 Whiteland Township BOS sent a letter to Senator Comitta and Representative Howard 4 stating their opposition to this bill. 5 6 Inviting our local legislators to future PTF meetings 7 Mary will email our state legislators (Kristine Howard, Chris Pielli, and Carolyn Comitta) 8 advising them of our future PTF meetings. She will determine if they would be interested 9 in attending. 10 11 Reports / Legislative Update 12 None. 13 14 Liaison Reports 15 None. 16 17 Correspondence / Any Other Matter 18 None. 19 20 Next meeting 21 The next meeting is scheduled for Tuesday, September 16, 2025 at 10:00am. 22 23 Adjournment 24 The meeting was adjourned at 11:32am. 25 26 Respectfully submitted, 27 Ashley Nowak, Office Administrator 28 29 F:\Data\Shared Data\Minutes\Pipeline Task Force\2025\Pipeline TF Mins 7-15-2025 DRAFT v2.docx 30