Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Agenda
Wednesday, January 2, 2013
7:00 PM
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes December 5, 2012
- Acknowledge Receipt of New Applications
- Subdivision Plans
- Land Development Plans New Kent Apartments; Goshen Meadows Apartments
- Conditional Uses and Variances MARS Drinks North America (V)
- Ordinance Amendments
- Old Business
- New Business
- Any Other Matter
- Liaison Reports
- Meeting Dates of Importance Date Event Time Jan 01, 2013 Office Closed New Year's Day Jan 02, 2013 Planning Commission 7:00 PM Jan 03, 2013 Winter Farmer's Market 3:30-6:00 PM Jan 03, 2013 Winter Recreation Programs Begin Check Township Website Jan 03, 2013 Park Commission 7:00 PM Jan 07, 2013 Board of Supervisors Annual Reorganization (Formal Meeting to follow) 7:00 PM Jan 08, 2013 Board of Auditors Reorganization 7:00 PM Jan 09, 2013 Conservancy Board 7:00 PM Jan 10, 2013 Historical Commission 7:00 PM Jan 12, 2013 2013 Planning Session 8:00 AM Jan 14, 2013 Municipal Authority 7:00 PM Jan 15, 2013 Board of Supervisors 7:00 PM Jan 17, 2013 Police Commission WEGO Police Dept. 8:00 AM Jan 17, 2013 Winter Farmer's Market 3:30-6:00 PM Jan 17, 2013 Zoning Hearing Board MARS Drinks 7:30 PM
- Correspondence
- Goals
- Adjournment
Bold Items indicate new information to review for that topic.
F:\Data\Shared Data\Agendas\Planning Commission\2013\PC AGENDA 01022013.doc
Planning Commission Application Tracking Log
| Application Name | Application (CU,LD,O, SD,V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Yerkes/Consultant | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| New Kent Apartments | LD | P/F | 10/23/2012 | 11/7/2012 | 10/24/2012 | 10/24/2012 | 10/24/2012 | 1 | 2/6/2013 | 3/5/2013 | NA | 3/7/2013 |
| Goshen Meadows | LD | P/F | 11/16/2012 | 12/5/2012 | 11/19/2012 | 11/19/2012 | 11/20/2012 | 2/15/2013 | 3/5/2013 | NA | 3/5/2013 | |
| Mars Drinks North America | V | SK | 11/27/2012 | 12/5/2012 | NA | NA | 11/28/2012 | 1/2/2012 | 1/15/2012 | 1/17/2013 | 1/26/2013 |
Bold = New Application or PC action required
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2013\PC Tracking Log for 01022013.xls
12/20/2012
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
December 5, 2012
The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, December 5, 2012 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Susan Carty, Dan Daley, George Martynick, Jim McRee, Adam Knox, Al Zuccarello and Nathan Cline. Also present were Mark Gordon, Township Zoning Officer; Monica Close, Historical Commission; Erich Meyer, Park and Recreation Commission; and Ginnie Newlin, Conservancy Board.
A. WORKSESSION – 7:00 PM
- Sue reminded the Commission that they have to discuss their goals for 2013.
- PPL – Pipeline notice – Sue commented that they may have to review where the pipeline comes through the township. George feels the infrastructure is getting old but has been impressed by how quickly they respond to a problem with the pipeline. Mark explained some of the things they do to maintain the pipeline.
B. FORMAL SESSION – 7:15 PM
- Sue called the meeting to order at 7:15 pm and led the Pledge of Allegiance. There was a moment of silence to remember our armed forces. Sue asked if anyone would be recording the meeting. There was no response.
- Minutes – Sue noted that the minutes of the November 7, 2012 meeting were approved as corrected.
- Public Comment on non-agenda items – Ginnie asked the Commission members to turn on their microphones so they can be heard by everyone.
- Land Development Plan – New Kent Apartments, N. Chester Rd and Boot Rd – Neal Fisher reported that they received the letter from the Township engineers and will comply with it. George asked about building on the swale. Neal said the large detention basin will be reconfigured to accommodate the volume. He gave a brief explanation of the project. Adam and Ginnie asked about impervious coverage. Neal said they are just under the 40% allowed. They will retain an area for future additional parking. Mark mentioned that in the last New Kent project, they did use pervious paving in one area and Mark went out during a rain storm to watch it work.
- Renehan Sketch Plan for Subdivision of 1515 Colonial Lane - The applicant was represented by James M. Renehan, President & CEO of Renehan Building Group, and Nicholas L. Vastardis, President of Vastardis Consulting Engineers. Nick explained that this is a 5.5 acre property that they want to subdivide into 4 lots. There will be public sewer and private wells. Jim mentioned that road improvements will be done. They will use the existing barn for storage during the construction but all existing structures will be removed. George mentioned that development of this area has been discussed for a long time. Since there is only one way in and out, the ability of fire trucks to get in there was always a concern. Sue asked about the area of steep slopes. Jim responded that they haven’t looked at soil yet but he is a small, local developer and will be sure to watch soil, erosion, storm water, etc. They will use propane gas. Adam is concerned about the traffic on Rt. 352. Jim McRee pointed out that the house on Lot #1 is close to the side boundaries. He suggested changing the orientation of the house keeping in mind any additions owners may want to make in the future. Dan asked about trees. Jim wants to save as many as possible. One neighbor mentioned to him that there are some dead trees on the property line. Jim said they will clean that out but he feels the trees are an important part of this neighborhood.
F:\Data\Shared Data\Minutes\Planning Commission\2012\PC 12-05-12 draft.docx
1
Public Comment:
John Hertzog, 940 A Cornwallis – He is concerned about the traffic, the cul-de-sac, school buses, and future development of the Parakis property on the other side of Rt. 352.
Ron Woodward, 1550 Colonial Lane – He feels that the sewer line should tie into the existing line on Cornwallis and widening the road should come off of the other side of the street. He is more concerned about the additional wells which may make his well go dry. His well is 44 ft deep and draws 3 gallons/minute.
Mark commented that there are some very saturated areas there. He is not aware of any wells going dry and feels that the creek is close enough to handle the new wells. Adam mentioned that wells being drilled now are going deeper than 44 ft.
Ron mentioned that he did call the water company about getting public water a few years ago and they need 70% of the homes to participate before they would bring in public water.
Mike Juskalian, 935 Cornwallis – He asked about the equipment coming in during construction.
Jim responded that they will be using Colonial.
Jim reported that he had meetings with Township staff which were very helpful. He understands what the Township requires. They will be meeting with the owner of the property and hope to start the plans soon. He invited anyone with questions to contact him at his office in Malvern.
- Land Development Plan – Goshen Meadows, 1325 West Chester Pike – The applicant was represented by Dennis F. O’Neill, Engineer. He did a brief review of the plan. They made some revisions based on conditions and recommendations from the Planning Commission, Historical Commission and Conservancy Board. The Smith house will have 2 apartments instead of 4. The extra space will be the leasing office for the entire complex. The current leasing office will be converted to a rental. A fitness center will be put in the garage. They met with PennDOT and will lengthen the turning lanes on West Chester Pike. A traffic study shows that the eastbound turning lane on West Chester Pike was used mostly for U-turns. There are 9 proposed sub-surface infiltration units. One unit will flow into the West Chester Pike system. Dennis explained how these units will work. The engineer is reviewing this plan. They will extend the buffer on the eastside of the property as closed to West Chester Pike as they can go. As requested by the Historical Commission, they removed some parking from around the Smith house. All buildings are sprinklered with a fire department connection. A significant number of trees will be removed but they have a significant landscape plan. They will meet with the Conservancy Board and Historical Commission next week to show them the plan and explain the conditions. George mentioned that the residents along Reservoir Road were concerned about people walking through their property. Dennis pointed out that there is a dense buffer on the north side of the property. On the southeast side they have to keep the emergency access road open. Off to the side of that road, they will create an embankment with a good buffer. Dan pointed out that there are some easements along the east side. Dennis commented that Goshen Meadows has always maintained their property and is aware of the maintenance that will need to be done. There will be mostly shrubs in the buffer. The emergency access road will be pavers with grass. The Fire Marshall is reviewing that plan. Dennis said they are waiting for the engineers review. At the January Planning Commission meeting they will provide a revised plan with response to the Township engineer’s review and input from the Conservancy Board and Historical Commission.
- Variance Request – Mars Drinks, 1301 Wilson Drive. The applicant was represented by Jonathan Zangwill, Project Engineering Manager, and Robert F. Adams, Attorney. Bob explained that they are seeking relief from the requirement to screen certain rooftop structures. The visibility from the street is very limited since this is a very big building.
F:\Data\Shared Data\Minutes\Planning Commission\2012\PC 12-05-12 draft.docx
2
Jonathan reported that Phase I – warehouse – has started. An important part is the exterior. Screening could cost $300,000 under current requirements. One of his associates went on the roof with a yellow ribbon on the end of a 10 foot pole to see what the impact would be. He provided photos and a roof top plan. The solar panels will have the latest anti-glare technology. Bob explained where they don’t want to put a screen. Jim wondered how the requirements should be defined for this variance. They should not be so restrictive that they have to come back for every change they make. Thinking ahead – they may have to install a larger chiller. Perhaps define height in zones on the roof.
Bob mentioned that the lower roof should also be included in the relief.
Mark will work on a letter to the Board of Supervisors and a draft recommendation for the January 2, 2013 Planning Commission meeting.
- Ordinance Review – The Commission reviewed Article VII – Nonconforming Uses; Article VIII – Administration and Enforcement; and Article IX – General Provisions. Dan led a discussion on Article VII, page 1, A lot with no structure; and page 3, line 8, alteration or expansion to nonconforming structure. On Article VIII, page 1, line 6, 45 days to issue or refuse a permit; and page 4, line 3, occupancy permit. Mark will take his notes and work on a draft for the Board of Supervisors.
C. ADJOURNMENT
The next meeting will be held on Wednesday, January 2, 2013 at 7:00 pm. There being no further business, a motion to adjourn the meeting was made by George and seconded by Nate. The meeting adjourned at 10:00 pm.
Respectfully submitted,
____________________________________
Ruth Kiefer, Recording Secretary
F:\Data\Shared Data\Minutes\Planning Commission\2012\PC 12-05-12 draft.docx
3
[Logo: EBW]
EDWARD B. WALSH & ASSOCIATES, INC.
Complete Civil Engineering Design / Consultation Services
Lionville Professional Center
125 Dowlin Forge Road
Exton, PA 19341
December 14, 2012
Planning Commission
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: New Kent Apartments – Boot Road
Land Development Plan Review
Dear Commission Members:
We have revised the Land Development Plan for New Kent Apartments in accordance with Yerkes Associates, Inc. letter dated December 3, 2012. Listed below is an itemization of the changes. Headings and subheadings match those of the review letter.
Zoning Ordinance
- No response required.
- The parking green space calculation has been updated per the new plan. The green space areas have also been hatched on the plan for reference.
- The impervious area table has been updated per my conversation with the Township Engineer.
- The Open Space area shown on Sheet 1 has been modified as requested.
- The future reserved parking arrangement shall be made part of the Land Development Agreement.
Subdivision and Land Development Ordinance
- The Planning Commission recommended the Preliminary/Final waiver at their December 5th meeting.
- An updated stage storage chart has been included with this submission.
- The traffic impact will be incorporated into the Land Development agreement.
General Comments
- A copy of the stormwater test results have been submitted as part of this submission. The stormwater management routings have been updated accordingly.
- The orange protection fence has been added around the recharge bed, and labeled accordingly.
- The applicant will verify that the fire marshal has reviewed the plan.
- The porous paving reference has been removed from the construction sequence.
REGISTERED PROFESSIONAL ENGINEERS & LAND SURVEYORS
Pennsylvania, New Jersey, Delaware, Maryland & North Carolina
610-903-0060 FAX 610-903-0080
www.ebwalshinc.com
Established 1985
December 14, 2012
RE: New Kent Apartments II
Page 2 of 2
- A Riprap apron has been added to Endwall #1 and #2 (the relocated existing endwall). The riprap aprons have been sized according to the existing conditions.
- The following notes have been added to the construction sequence and recharge bed detail. “The recharge facility shall be constructed under the supervision of a geotechnical engineer. Where fill is required to achieve the recharge bed bottom - the top 12" of the existing grade shall be scarified/chisel plowed. Amended soils shall borrowed from the excavated portion of the recharge bed, and be placed over the scarified material, under the supervision of the geotechnical engineer. Soil tests shall be performed once the recharge bed bottom grading is complete, in order to verify minimum percolation rates, according to the original test results.”
- Inlet protection has been added to the E&S plan view and construction sequence.
- Lighting: A light pole base detail has been added to the plan.; The proposed pole locations have been adjusted accordingly.; The future lighting has been added.; Night control has been added to the plan.
- The requested tree and shrub planting details have been added to Sheet 5.; Retention basin seeding spec's have been added to Sheet 5. The construction sequence has been revised accordingly.
- The plans have been submitted to the Chester County Conservation District for an NPDES permit.
Very Truly Yours,
Edward B. Walsh & Associates, Inc.
[Signature: John M. Robinson]
John M. Robinson, P.E.
cc: Neal Fisher
THE HANKIN GROUP
Date: December 12, 2012
East Goshen Township Board of Supervisors
1580 Paoli Pike
West Chester, PA 19380
Re: New Kent Apartments II Extension of Review Period
Dear Board of Supervisors,
In regard to the above noted plan I authorize a 30 day extension to the review period. I understand that this extension doesn’t mean that the application referenced will be approved within this period; it solely allows East Goshen Township additional time to review the application.
Applicant: [Signature: Neal Fisher]
Neal Fisher, P.E.
Vice President of Engineering
707 Eagleview Boulevard • P.O. Box 562 • Exton, PA 19341 • 610.458.1900 • Fax: 610.458.0764
[Illustration of tree branches and foliage framing the top and right margin]
EAST GOSHEN
CONSERVANCY
December 17, 2012
East Goshen Township
Planning Commission
1580 Paoli Pike
West Chester, Pa. 19380
Re: New Kent Land Development Application / 1 New Building (12 Units)
Landscaping
Dear Commission Members:
At their meeting on December 12, 2012 the Conservancy Board voted in favor of the following motion:
Madame Chairman, I move that we recommend that the Planning Commission accept the Landscaping plans for the New Kent Land Development application with the following conditions:
- Eastern white pines shall be used to a lesser extent than indicated and other approved evergreen trees species shall be listed in the planting list.
- The Final Landscape Plan should identify the evergreen buffer plantings to be planted within the buffer yard area along the northern property line as suggested by the Township staff and agreed to by the applicant and said plantings shall be diversified evergreen trees.
The applicant agreed to these conditions.
It was also suggested that the applicant investigate the possibility of planting grass varieties in the lowest part of the basin area that will not need to be mowed however this was not a condition of the recommendation.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\2012 Land Development (1 Building)\CB Rec to PC 12172012.doc
1580 PAOLI PIKE, WEST CHESTER, PA. 19380
[Seal: SEAL OF CHESTER COUNTY PENNSYLVANIA] [Seal: WILLIAM PENN PROPRIETOR AND GOVENOR CHESTER]
THE COUNTY OF CHESTER
COMMISSIONERS
Terence Farrell
Kathi Cozzone
Ryan A. Costello
Ronald T. Bailey, AICP
Executive Director
PLANNING COMMISSION
Government Services Center, Suite 270
601 Westtown Road
P.O. Box 2747
West Chester, PA 19380-0990
(610) 344-6285 Fax: (610) 344-6515
December 14, 2012
[Stamp: RECEIVED DEC 18 2012]
Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Preliminary/Final Subdivision - Goshen Meadows Investors, L.P.
# SD-11-12-7056 - East Goshen Township
Dear Mr. Smith:
A preliminary/final subdivision plan entitled “Goshen Meadows Investors, L.P.,” prepared by Consulting Engineers and Surveyors, Inc., and dated October 17, 2012, was received by this office on November 19, 2012. The subdivision is situated on the north side of West Chester Pike (Route 3) west of Reservoir Road involves the consolidation of two existing parcels totaling 19.4 acres (UPI # 53-6-565, and 53-6-6.1) into one parcel. The project site, which is served by public water and sewer, is located in the C-4 Planned Highway Commercial and Business zoning district.
This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code (MPC). This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. We offer the following comments on the proposed subdivision for your consideration:
ADMINISTRATIVE NOTES:
- The applicant also proposes the construction of 60 apartment units in five new buildings, the conversion of an existing residence into four apartment units, and 160 parking spaces, on the 19.4 acre project site. This land development plan submission is addressed by the Commission in a separate review (CCPC# LD-11-12-7057, dated December 14, 2012).
- A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.
E-mail: ccplanning@chesco.org • www.landscapes2.org • Web site: www.chesco.org/planning
Page: 2
December 14, 2012
Re: Preliminary/Final Subdivision - Goshen Meadows Investors, L.P.
# SD-11-12-7056 - East Goshen Township
RECOMMENDATION: The Chester County Planning Commission has no planning issues with this subdivision application. All Township requirements should be satisfied before action is taken on this subdivision plan.
Sincerely,
[Signature: Ronald T. Bailey]
Ronald T. Bailey, AICP
Secretary
RTB/PF
cc: Metropoiitan Management Corporation
Goshen Meadows Investors, L.P.
Consulting Engineers and Surveyors, Inc.
Rich Avicolli, District Permits Manager, PennDOT
Francis J. Hanney, P.E., PennDOT
Chester County Conservation District
[Seal: SEAL OF CHESTER COUNTY PENNSYLVANIA] [Seal: WILLIAM PENN PROPRIETOR AND GOVENOR CHESTER]
THE COUNTY OF CHESTER
COMMISSIONERS
Terence Farrell
Kathi Cozzone
Ryan A. Costello
Ronald T. Bailey, AICP
Executive Director
PLANNING COMMISSION
Government Services Center, Suite 270
601 Westtown Road
P.O. Box 2747
West Chester, PA 19380-0990
(610) 344-6285 Fax: (610) 344-6515
December 14, 2012
[Stamp: RECEIVED DEC 18 2012]
Louis F. Smith, Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Preliminary/Final Land Development - Goshen Meadows Investors, L.P.
# LD-11-12-7057 - East Goshen Township
Dear Mr. Smith:
A preliminary/final land development plan entitled “Goshen Meadows Investors, L.P.,” prepared by Consulting Engineers and Surveyors, Inc., and dated October 17, 2012, was received by this office on November 19, 2012. The land development is situated on the north side of West Chester Pike (Route 3) west of Reservoir Road and involves the construction of 60 apartment units in five new buildings, the conversion of an existing residence into four apartment units, and 160 parking spaces, on a 19.4 acre site (UPI #53-6-56 and #53-6-56.1). The project site, which is served by public water and sewer, is located in the C-4 Planned Highway Commercial and Business zoning district.
This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code (MPC). This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. We offer the following comments on the proposed land development for your consideration:
BACKGROUND:
- The County Planning Commission previously reviewed a land development plan submission for UPI# 53-6-56 (5.7 acres). CCPC# 11762, dated March 25, 2005, addressed the construction of 22 townhouse units and 17 parking spaces. According to our records, this land development plan submission has not been approved by the Township.
LANDSCAPES:
- The project site is located within the Suburban Landscape designation of Landscapes2 , the 2009 County Comprehensive Plan. The location of the proposed land development is consistent with the guidelines of the Suburban Landscape .
WATERSHEDS
- Watersheds , An Integrated Water Resources Plan for Chester County and Its Watersheds, was adopted in 2002 as the water resources component of Landscapes . Watersheds indicates that the proposed development activity is located within the East Branch subbasin of the Chester Creek watershed. The highest priority management objectives identified in Watersheds for
E-mail: ccplanning@chesco.org • www.landscapes2.org • Web site: www.chesco.org/planning
Page: 2
December 14, 2012
Re: Preliminary/Final Land Development - Goshen Meadows Investors, L.P.
# LD-11-12-7057 - East Goshen Township
consideration in land development and land use planning within the Chester Creek watershed include: reduce stormwater runoff, restore water quality of “impaired” streams, and protect vegetated riparian corridors.
It is recommended that these concerns and conditions be taken into consideration in final site design decisions. Specific strategies for implementation to effectively address these items can be found in Part 8 of Watersheds. A more detailed listing of water resources management needs and resources to be protected within the Chester Creek watershed can be found in Part 10 of Watersheds. The applicant should also comply with the applicable provisions of the Chester Creek Act 167 Plan approved by the PA Department of Environmental Protection on March 31, 2003.
PRIMARY ISSUES:
- We endorse the provision of an emergency access driveway for the proposed apartment units (primary vehicular access will be provided from the existing boulevard-style entrance on Route 3).
- We recommend that the applicant provide direct pedestrian access from the proposed units to the recreational areas on the existing Goshen Meadows apartment complex site.
ADMINISTRATIVE NOTES:
- The applicant also proposes the consolidation of the two parcels that comprise the project site into a single 19.4 acre parcel. This subdivision plan submission is addressed by the Commission in a separate review (CCPC# SD-11-12-7056, dated December 14, 2012).
- The plan indicates that the applicant obtained conditional use approval for this project on September 4, 2012, with 10 conditions of approval, pertaining to the construction of apartment units in the C-4 zoning district, along with the adaptive reuse of an historic resource (the conversion of the existing residence into four units). Prior to granting final plan approval, the Township should verify that all applicable conditions of approval are incorporated into the final plan. The County Planning Commission endorses the adaptive reuse of historic resources.
- The Township Fire Marshal should verify the design and location of all proposed fire-protection facilities.
- The items on the attached agency contact list should be addressed and reflected in the proposed land development.
- A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.
Page: 3
December 14, 2012
Re: Preliminary/Final Land Development - Goshen Meadows Investors, L.P.
# LD-11-12-7057 - East Goshen Township
RECOMMENDATION: The Commission recommends that the issues raised in this letter be addressed and all East Goshen Township requirements be satisfied before action is taken on this plan.
Sincerely,
[Signature: Ronald T. Bailey]
Ronald T. Bailey, AICP
Secretary
RTB/PF
Attachment
cc: Metropolitan Management Corporation
Goshen Meadows Investors, L.P.
Consulting Engineers and Surveyors, Inc.
Rich Avicolli, District Permits Manager, PennDOT
Francis J. Hanney, P.E., PennDOT
Chester County Conservation District
THE COUNTY OF CHESTER
Chester County Planning Commission
601 Westtown Road, Suite 270
P.O. Box 2747
West Chester, PA 19380-0990
[Seal: SEAL OF CHESTER COUNTY PENNSYLVANIA]
Board of County Commissioners
Chester County, Pennsylvania
| Field | Value |
|---|---|
| MUNICIPALITY | East Goshen Township |
| CCPC FILE # | LD-11-12-7057 |
| DATE | December 14, 2012 |
The following agencies should be contacted regarding this subdivision or land development:
- [×] Pennsylvania Department of Transportation (PennDOT): A PennDOT permit is required for new or revised access and should be identified on the final plan as required by Section 508(6) of the Municipalities Planning Code.
- [ ] U.S. Army Corps of Engineers and Pennsylvania Department of Environmental Protection (DEP): Placement of fill in wetlands is regulated by the Corps of Engineers in accordance with Section 404 of the Clean Water Act (1977) with DEP under Chapter 105 Rules and Regulations for the Bureau of Dams and Waterway Management. The applicant should contact these agencies to determine if the proposed activity will require a permit and provide the municipality with documentation of this contact and of any subsequent permit(s) before action on this plan is taken.
- [ ] Pennsylvania Department of Environmental Protection (DEP): The applicant should contact DEP to determine whether a stream encroachment permit is necessary for the proposed road, driveway, or sanitary sewer line crossing in accordance with Section 205.293 of its rules and regulations and provide the municipality with documentation of this contact and the requirements of DEP before action on this plan is taken.
- [ ] Chester County Health Department (CCHD): A copy of the plan should be submitted to the CCHD for their review and comment on the proposed sewage disposal and/or water supply. The municipality from the appropriate authority and company prior to final plan approval, if applicable, should receive confirmation on the availability of sufficient sewer and water capacity.
- [×] Chester County Conservation District (CCCD): The applicant should contact the office of the CCCD for information and clarification on erosion control measures. The provisions of the Commonwealth Erosion Control Regulations may apply to the project and may require an Earth Disturbance Permit or a National Pollutant Discharge Elimination System permit for discharge of stormwater from construction activities.
[Logo: Yerkes]
Yerkes Associates, Inc.
Consulting Engineers / Landscape Architects / Surveyors
December 19, 2012
East Goshen Township
1580 Paoli Pike
West Chester, Pennsylvania 19380
Attn: Mark Gordon, Township Zoning Officer
Re: Goshen Meadows Investors – West Chester Pike
Land Development Plan Review
Dear Mark:
The following plans and report prepared by Herbert E. MacCombie, Jr., P.E. Consulting Engineers and Surveyors, Inc. have been submitted to this office for review:
| Sheet No. | Title |
|---|---|
| 1 of 16 | Plan of Consolidation / Land Development Plan |
| 2 of 16 | Plan of Proposed Improvements |
| 3 of 16 | E & S Control Plan |
| 4 of 16 | Lighting Plan |
| 5 of 16 | Sanitary Sewer Profile |
| 6 and 7 of 16 | Storm Sewer Profiles |
| 8 of 16 | Storm Sewer Details |
| 9 of 16 | Sanitary Sewer & Water Details |
| 10 of 16 | Miscellaneous Construction Details |
| 11 and 12 of 16 | E & S Control Details |
| 13 of 16 | Project Narrative |
| 14 of 16 | Existing Tree Inventory Plan |
| 15 of 16 | Tree Removal Plan |
| 16 of 16 | Planting Plan, dated November 15, 2012 |
Erosion and Sediment Control Report, dated October 26, 2012
Post-Construction Stormwater Management Drainage Analysis, dated October 30, 2012
Unless noted otherwise, all plans are dated October 17, 2012. The plans depict the proposed planned apartment development on tax map parcel 53-6-56. The 5.115 acre (net) parcel is located on the northeast corner of the Mary Fran Drive intersection with West Chester Pike. The parcel contains an historic dwelling, a barn, specimen trees, steep slopes along the West Chester Pike frontage, and driveway access to Mary Fran Drive. The proposed development consists of 64 apartment units. Five new buildings will contain 12 units each and the existing dwelling is to be converted into four units. Site access is to be provided by an access driveway to Mary Fran Drive and an emergency vehicle access to westbound West Chester Pike. The plans note that the apartments are to be served by public water and public sewer.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Goshen Meadows Investors – West Chester Pike
December 19, 2012
Page 2 of 6
The parcel (tax map parcel 53-6-56) is to be combined with the adjoining 13.636 acre (net) Goshen Meadows apartment development (tax map parcel 53-6-56.1) to the north and is situated within the C-4 Planned Highway Commercial District. Conditional use approval was granted on September 4, 2012 to allow the development of a 64 unit planned apartment development that includes the adaptive reuse of the historic dwelling.
The following comments are offered for consideration:
September 4, 2012 Conditional Use Decision
- Condition 3 – The Applicant shall provide landscaping that will sufficiently buffer the Matlack House, owned by the Middle Department Inspection Agency (tax map parcel 53-6-85.1) from the new apartment units. The landscape plan needs to be amended to provide the required buffer landscaping for the Matlack House.
- Condition 4 – The mitigation methods outlined in the Historic Resource Impact Study will need to be satisfactorily addressed: Rehabilitate the exterior of the historic dwelling;; Incorporate to the extent possible certain interior features in the dwelling, such as window surrounds, baseboards, doors, and possibly balustrades;; Install landscaping to buffer and soften the impact of the new development on the historic resource. A variety of deciduous and evergreen trees and shrubs should be provided for screening and buffering of the historic dwelling;; Consider design elements such as stucco surfaces, shutters, cornices and mansard roofs in the development of the new apartment buildings to blend with the architecture of the historic resource.
- Condition 5 - The plans will need to be reviewed by the Township Fire Marshall for compliance with the recommendations in the correspondence dated June 28, 2012 and August 16, 2012.
- Condition 6 - Applicant shall install the buffer yard required by sections 240-27.C.2 and .3. Buffer yards are required to be provided as part of any new or expanded apartment development along any lot line contiguous to lots within a residential development. The buffer yard shown on the landscape plan needs to be revised to provide a completely planted visual barrier or landscape screen composed of mostly evergreen shrubs and trees arranged to form both a low-level and high-level screen.
- Condition 7 – Applicant shall comply with section 240-29.C.10 and provide recreation / common open space areas equal to at least 200 square feet per dwelling unit. Section 240-29.C.10 notes that all recreation / common open space areas shall be located where suitable for outdoor active or passive recreation (such as outdoor relaxation, walking, and / or gardening). The following limitations are noted for the designated existing and proposed recreation / open space areas:
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Goshen Meadows Investors – West Chester Pike
December 19, 2012
Page 3 of 6
- The designated area on the east side of Building ‘F’ is a stormwater management basin.
- The designated area along the Goshen Meadows northern property boundary line is inaccessible, overgrown, and contains a tennis court that is unplayable.
- The designated area on the Smith parcel is situated within a shallow depression for stormwater basin ‘D’ and the unprotected adjoining steep slope area that grades down to West Chester Pike creates a potentially unsafe play area for young children
- Condition 8 – The construction sequence should note that the renovations to the historic resource are to be completed prior to the issuance of a Use and Occupancy Certificate for the last of the new apartment buildings.
Zoning Ordinance
- Section 240-24.F – The sewage facilities planning module exemption request will need to be reviewed and approved by the Township and PADEP.
- Section 240-24.H – It is noted that the isoluminance plot on sheet 4 is based on a light fixture mounting height of 35 feet. The isolux pattern shown should be adjusted for the proposed light fixture mounting height of 20 feet. It is recommended that a minimum illumination level of 0.3 footcandles be provided in any area and increased illumination be provided for areas with steps and mailboxes. The plan should also identify the uniformity ratio, identify the designated night light controlled fixtures, and address conflicts with tree plantings.
- Section 240-27.C.1.c – A minimum of five percent of a parking area shall be landscaped and continually maintained as such. The parking area perimeter shall not be considered as part of this required area. The required landscape area for the proposed parking lot should be identified on the landscape plan.
- Section 240-27.C.1.e – The plans need to identify a satisfactory method of landscape irrigation. Wall mounted hose bibs are acceptable.
- Section 240-27.D.2.b – The developer shall be responsible for the installation and cost for traffic improvement required by PADOT or determined by the Board of Supervisors to be necessary for the reasonable ingress and egress to the development . Sheet 1 notes that the West Chester Pike eastbound left turn lane is to be extended 125 feet in length (plus appropriate taper) and the westbound left turn lane is to be extended 150 feet in length (plus appropriate taper). The PennDOT Highway Occupancy Permit application plans will need to be reviewed and approved by the Township Traffic Engineer and the Developer will need to post escrow with PennDOT for completion of the traffic improvements.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Goshen Meadows Investors – West Chester Pike
December 19, 2012
Page 4 of 6
- Section 240-29.C.7.c – Each building with three or fewer stories shall be separated from each other building by at least 1.5 times the height of the tallest building. The height of the proposed buildings should be noted on sheet 1.
- Section 240-33.C.2 – Parking areas shall be arranged and marked for orderly safe movement. The plan should provide a description or detail and indicate the location of all traffic control signs and pavement markings.
Subdivision and Land Development Ordinance
- Section 205-31.A – A waiver request to allow the plan to be submitted as a preliminary / final plan will need to be discussed with the Planning Commission. We have no objection to the waiver request.
- Section 205-31.A.1 – The final plan shall be clearly and legibly drawn to a scale of one inch equals 50 feet or larger. The plan should note a waiver request to allow sheet 1 to be drawn at a scale of one inch equals 60 feet. We have no objection to the waiver request.
- Sections 205-33.A.3 and B.17 – The plan to be recorded should include plan approval blocks and a notarized plan acknowledgment statement from the property owner.
- Section 205-33.A.5 – The plans should note the deed book and page number for the identified abutting property owners.
- Section 205-33.B.7 – The plan of consolidation should note or indicate that the existing property boundary markers along the boundary line between tax map parcel 53-6-56 and parcel 53-6-56.1 are to be removed.
- Section 205-37.C.6 – Storm sewer design calculations need to be provided.
- Section 205-61 – Neither portions of tree masses nor specimen trees shall be cleared unless absolutely necessary. Applicants shall make all reasonable efforts to harmonize their plans in order to preserve existing trees. It is our understanding that the tree removal plan is being reviewed by the Conservancy Board. To the extent possible, the Applicant should incorporate the Conservancy Board's recommendations.
- Section 205-56 – Sidewalk access will need to be provided from the handicapped parking spaces adjacent to the historic dwelling. Pedestrian access to the recreation / open space areas also needs to be addressed.
- Section 205-62 – Street trees shall be installed on 40 foot centers and shall consist of the varieties identified by this section. The landscape plan should be amended as necessary to address street tree requirements along the West Chester Pike frontage.
- Section 205-71.C – The plans should note that the sanitary sewer system is to be constructed in accordance with East Goshen Municipal Authority standards.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Goshen Meadows Investors – West Chester Pike
December 19, 2012
Page 5 of 6
Stormwater Management Ordinance 129-M-03
- Section 304.B.18 – The plans should note that the property owner is responsible for maintenance of the drainage and stormwater management facilities. The plans should also include a list and schedule of maintenance tasks to be performed.
- Section 304.D.3 – The plans should identify the location of all stormwater management soil percolation test sites.
- Section 404.A.1 – Infiltration facilities shall be provided in areas that are suitable for infiltration and runoff from impervious surfaces shall be directed into those infiltration facilities. The volume of storage to be provided shall be no less than the net increase in runoff from the 2-year storm event or one inch of runoff from the total area draining to the infiltration facility, whichever is greater. The stormwater management report will need to demonstrate that the water quality requirements as outlined by this section have been satisfactorily addressed.
- Section 406.B – A copy of the PennDOT permit approval will need to be provided to the Township for the proposed storm pipe connection from stormwater management basin ‘I’ to the existing storm sewer inlet located along the north side of West Chester Pike.
General Comments
- Existing features to be relocated, removed, or demolished should be identified on sheet 14.
- The manhole #34 outlet control detail on sheet 8 should be amended to address how the structure is to be installed within the manhole.
- Clean-out or observation ports within the underground infiltration basins should be provided for the storage pipe end sections.
- The turf paver detail on sheet 11 should be amended to include a seeding specification for establishment of the turf ground cover.
- Landscaping to screen visibility and headlight glare should be provided between the proposed row of parking spaces and existing building ‘C’.
- The overall landscape plan only features three types of shrubs. For overall site enhancement, the landscape plan should be amended to include a variety of evergreen and deciduous trees and shrubs.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
Goshen Meadows Investors – West Chester Pike
December 19, 2012
Page 6 of 6
34. Since the proposed limit of disturbance exceeds one acre, the erosion and sediment control plan will need to be submitted to the Chester County Conservation District for review and approval. A letter of adequacy from the Chester County Conservation District and an NPDES Permit are required for final plan approval.
The plan submission should be revised in accordance with the above comments. Please contact our office if you have any questions concerning this review letter.
Sincerely,
YERKES ASSOCIATES, INC.
Thomas H. Kummer, R.L.A.
Michael Conrad, P.E.
Cc: Dennis O’Neill, P.E.
Professional services since 1874
1444 Phoenixville Pike, P.O. Box 1568, West Chester, PA 19380-0078 / Tel: 610-644-4254 / Fax: 610-640-0771
[Illustration: Sketch of historic building titled "The Blacksmith Shop", dated December 17, 2012]
Historical Commission
East Goshen Township
Chester County, Pennsylvania
1580 Paoli Pike ✦ West Chester, PA 19380 ✦ 610-692-7171
East Goshen Township
Planning Commission
1580 Paoli Pike
West Chester, Pa. 19380
Re: Goshen Meadows Land Development
Adaptive re-use of Historic Resource
Dear Commission Members:
At their meeting on December 13, 2012 the Historical Commission reviewed the plans submitted for the renovation and restoration of the historic resource located at 1325 West Chester Pike.
Goshen meadows investors has presented an architectural plan titled “Proposed floor plans” by PZS Architects dated 10/16/2012, as part of their Land Development Submission for the Apartment Community they propose to construct at 1325 West Chester Pike and pursuant to Condition 4 of the Conditional Use approval for the Planned Apartment Community. The applicant proposes to convert the existing residential dwelling into two, two bedroom units, a leasing office for the community and a fitness room. The applicant will incorporate the historic features of the interior in to the renovation and will repair and restore the exterior features. The applicant also agreed to use historically correct colors on the exterior of the historic resource.
The commission unanimously voted in favor of the following motion:
“Mr. Chairman, I move that we accept the architectural drawings of the adaptive reuse of the Historic Resource presented in the plans titled “Proposed floor plans” by PZS Architects dated 10/16/2012 with the following conditions:
1. The applicant will use historically correct colors on the exterior of the house during the restoration.
2. The applicant agrees to allow the Historical Commission to tour the house and take pictures prior to the start of renovations.”
It should also be noted that applicant needs to demonstrate that the new apartment buildings will incorporate design elements that blend with the architecture of the Historic resource, as outlined in condition 4(d) of the Conditional Use decision.
Sincerely,
Mark A. Gordon
Zoning Officer
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Land Development 2012\HC Rec to PC 12202012.doc
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 12/20/2012
To: Planning Commission
From: Mark Gordon, Zoning Officer
Re: Mars Drinks Variance request
Dear Commissioners,
I have prepared this draft motion for your consideration:
DRAFT MOTION:
Madame Chairman, the applicant has presented a Zoning Hearing Board application to the Planning Commission for a variance from §240-19.F.(2). They seek relief from the requirement to screen all roof top structures from view.
The applicant has presented drawings and exhibits that show new rooftop equipment and structures to be added or relocated as a result of an extensive renovation to their facility at 1301 Wilson Drive. This renovation will include modernization of their manufacturing processes, warehousing and the business offices in order to accommodate their new global training center at their East Goshen Township location. The applicant has agreed to screen several pieces of roof top equipment that would be visible. However the applicant has demonstrated that some of the new and relocated roof top equipment and structures will be placed in locations where they will not be visible from several vantage points around the property, except for the new solar panels. Essentially these equipment and structures will be screened from view because of the height of the building and the setback from the edge of the building provides the required.
The applicant has presented evidence and testimony to the Planning Commission regarding the extraordinary expense that would be incurred by the applicant to install roof top screening to screen equipment and structures that cannot be seen from the borders of the property. This evidence would indicate that a variance is warranted.
The solar panels, which are permitted by the Zoning Ordinance, will be used to heat domestic water used in the facility. The panels are proposed to be installed in the Southwest corner of the building because the water heaters for the facility are located directly below the panels and thermal energy collected needs to be transferred to the domestic water system in the most efficient manner possible, in order to achieve the most benefit. Although the proposed solar panels will be visible from the industrially used property to the west of the building; the process of capturing solar energy would be defeated by the installation of roof
F:\Data\Shared Data\Property Management\53-3\53-3-1.6 (1301 Wilson Drive)\2012 Variance\PC Draft Motion 12202012.doc
screening. It would appear that the requirement to screen roof mounted solar creates a conflict in the ordinance, which the Commission should address.
Upon our review of the application and the presentations made to the Planning Commission I move that we recommend that the Board of Supervisors support the zoning variance request of Mars Drinks North America for relief from the roof top screening requirement for the solar panels indicated on the plan submitted along with the other roof top structures for the reasons aforementioned. In addition I would note that the granting of this variance can be supported pursuant to section 240-58. B.(4) and (5).
F:\Data\Shared Data\Property Management\53-3\53-3-1.6 (1301 Wilson Drive)\2012 Variance\PC Draft Motion 12202012.doc
LAMB | McERLANEPC
ATTORNEYS AT LAW
Mark P. Thompson
Voice 610-430-8000
Fax 610-692-6210
mthompson@lambmcerlane.com
December 11, 2012
RECEIVED
BY:
DEC 12 2012
Mark A. Gordon
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Goshen Meadows Investors, LP Conditional Use Application
1325 West Chester Pike, Tax Parcel No. 53-6-56
Dear Mark:
Please find enclosed an architectural elevation of the Hoopes House on the Smith property as proposed to be improved by Goshen Meadows Investors, LP pursuant to the Township’s September 4, 2012 Conditional Use Decision and Order. Also enclosed are proposed floor plans for the three stories of the house showing two apartments and a rental office for the proposed planned apartment development. These materials are being submitted in order to demonstrate compliance with Condition No. 4 in the Conditional Use Decision. I would request that you review these materials and provide a determination on their compliance with Condition No. 4.
Very truly yours,
LAMB McERLANE PC
By: Mark P. Thompson
Cc: A. Scott Fagan
Dennis O’Neill, P.E.
David Polatnick
Kristin Camp, Esquire
Lamb McErlane | 24 E. Market St. PO Box 565 | West Chester PA 19381 | Phone 610.430.8000 | fax 610.692.0877 | www.lambmcerlane.com
[Architectural Drawing: Proposed Floor Plans for First Floor and Second Floor by PZS Architects, Project # 2011-10A, Sheet SK-1, Date 10/16/2012]
1 FIRST FLOOR PLAN
Scale: 1/4" = 1'-0"
- LEASING / SALES AREA: 808 SF
- FITNESS CENTER: 602 SF
- Labels: BATHROOM 107 (47 SF), FITNESS CENTER 105 (455 SF), FITNESS CENTER 106 (147 SF), BATHROOM 102 (60 SF), KITCHENETTE 108 (65 SF), STORAGE 103 (27 SF), MANAGER'S OFFICE 104 (70 SF), FOYER / HALLWAY 100 (6'-6" X 17'-6"), LEASING OFFICE 101 (468 SF), NEW RAMP, COVERED PORCH
2 SECOND FLOOR PLAN
Scale: 1/4" = 1'-0"
- 2-BEDROOM APARTMENT: 1,005 SF
- Labels: OPEN TO BELOW, MASTER BATHROOM 206 (7'-6" x 10'-10"), W.I.C., MASTER BEDROOM 205 (16'-8" x 14'-3"), KITCHEN 201 (10'-0" x 10'-7"), MECH., LAUNDRY 204, LIVING / DINING 200 (15'-5" x 16'-2"), CL., BATHROOM #2 203 (11'-6" x 5'-1"), LIN., BEDROOM #2 202 (10'-1" x 10'-1")
Drawing Information
Title: PROPOSED FLOOR PLANS
Architect: PZS ARCHITECTS
Sheet #: SK-1
Scale: AS NOTED
Date: 10/16/2012
Drawn by: DB
Checked by: EP
Project #: 2011-10A
[Architectural Drawing: Proposed Floor Plans for Third Floor by PZS Architects, Project # 2011-10A, Sheet SK-2, Date 10/16/2012]
1 THIRD FLOOR PLAN
Scale: 1/4" = 1'-0"
- 2-BEDROOM APARTMENT: 1,100 SF
- Labels: BEDROOM #2 305 (13'-7" x 10'-0"), BATHROOM #2 304 (9'-0" x 7'-2"), W.I.C., MECH., MASTER BEDROOM 302 (14'-5" x 12'-8"), MASTER BATHROOM 303 (9'-0" x 6'-7"), W.I.C., LIVING / DINING 300 (23'-11" x 14'-3"), CL., KITCHEN 301 (14'-10" x 6'-3")
Drawing Information
Title: PROPOSED FLOOR PLANS
Architect: PZS ARCHITECTS
Sheet #: SK-2
Scale: AS NOTED
Date: 10/16/2012
Drawn by: DB
Checked by: DP
Project #: 2011-10A