Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Workshop Agenda
Wednesday, February 2, 2011
7:00 PM
- Call to Order / Pledge of Allegiance
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine Need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes January 5, 2011; January 19, 2011
- Acknowledge Receipt of New Applications
- Subdivision Plans
- Land Development Plans
- Conditional Uses, Variances & Special Exceptions Del Vacchio Holdings, 922 N. Chester Rd. (McGinty’s Nursery) (SE)
- Ordinance Amendments Multiple Use Building / Parking Ordinance; Wireless Communications Ord.
- Old Business
- New Business
- Any Other Matter
- Meeting Dates of Importance February 3, 2011 Park & Recreation 7:00 pm February 8, 2011 Board of Supervisors 7:00 pm February 9, 2011 Conservancy Board 7:00 pm February 10, 2011 Zoning Hearing Board Ivey (cont.) / Del Vacchio Holdings 7:30 pm February 10, 2011 Historical Commission 7:00 pm February 15, 2011 Board of Supervisors 7:00 pm February 21, 2011 President's Day – Office Closed February 22, 2011 Board of Supervisors 7:00 pm February 24, 2011 Zoning Hearing Board Liberty Towers (cont.) 7:30 pm February 28, 2011 Deer Committee 7:00 pm
- Correspondence
- Goals
- Adjournment
• Bold Items indicates new information to review for that application.
REMINDER – Newsletter Article Submission Due Date:
| Article Due Date | Delivery Date |
|---|---|
| February 9, 2011 | April 1, 2011 |
F:\Data\Shared Data\Agendas\Planning Commission\2011\PC AGENDA 02022011.docx
Planning Commission Application Tracking Log
1/28/2011
| Application Name | Application (CU,LD,O, SD,V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Yerkes/Consultant | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Del Vacchio Holdings, 922 N. Chester Rd. (McGinty's) | ZHB / SE | S | 12/27/10 | 12/27/10 | n/a | n/a | 12/30/10 | 2/2/11 | 2/2/11 | 2/10/11 | 2/25/11 |
Bold = New Application or PC action required
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2011\PC Tracking Log for 02022011.xls
Draft REV 1
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
January 5, 2011
The East Goshen Township Planning Commission held their regularly scheduled meeting on January 5, 2011 at the East Goshen Township building. Members present were: Chairman George Martynick, Susan Carty, Peter Mylonas, Dan Daley, Jim McRee, Megann Hedgecock and Al Zuccarello. Also present were Township Zoning Officer Mark Gordon, Don McConathy (Supervisor), and Chris Reardon (Historical Commission)..
WORKSHOP SESSION – 7:00pm
A. The minutes of December 1, 2010 were reviewed. A motion will be passed in the formal session.
B. The various agenda items were reviewed.
FORMAL SESSION
A. Pledge of Allegiance & Announcements
George called the meeting to order at 7:30 pm and led those in attendance in the Pledge of Allegiance. There was a moment of silence to remember our armed forces.
George asked if anyone would be recording the meeting. There was no response.
George announced that there would be no workshop this month unless required.
George asked those in attendance if there were any non-agenda items to be discussed.
B. Approval of Minutes
Megann made a motion to approve the minutes of December 1, 2010 as corrected. Dan seconded the motion. The motion passed unanimously.
C. Acknowledge Receipt of New Applications
1. George acknowledged receipt of an application from Del Vacchio Holdings, 922 N. Chester Rd. (McGinty’s Nursery).
D. Subdivision/Land Development Plans – None
E. Conditional Use and Variances
1. Del Vacchio Holdings, 922 N. Chester Rd. (McGinty’s Nursery) (SE) The applicant was represented by Brian Nagle, Attorney and Mr. Vincent Del Vacchio. Del Vacchio Holdings is a local landscape business with similar use as the previous owner of the property. On the property is one residence, greenhouses, accessory buildings, garages and sheds. This is a Special Exception application because McGinty’s Nursery is a legal non-conforming use. The applicant proposes to continue that use with some alterations. Mr. Nagle explained that the definition of alteration is any significant changes. The proposed changes are:
a. Removal of some existing buildings
b. Replace with a 5,000 SF building
c. Pave some unpaved areas
d. Restore the rear of the property into a meadow
e. Remove the current residence
f. Build a new residence at the rear of the property
g. Pave a driveway to access the new residence.
01/05/2011
PC MINUTES
Page 1 of 4
Mr. Nagle explained that the construction of the new residence is in Phase 2 which would be 2-3 years from now. The existing housing would be used by employees. They are requesting approval now for the building so that only a building permit will be needed in the future.
Mr. Del Vacchio presented satellite photos of the property. He has been in business for 10 years and does not anticipate large growth. He is renting space in Edgemont and will move the entire business to East Goshen. Currently there are 10 parking spaces for the retail business, but he will get into the retail business slowly since he is not currently running a retail operation. In Phase 1, pavement, sales building, residence and 2 shade structures will remain. Everything else will be removed. A “barn” will be erected to store equipment. He will extend the landscape buffering along the property line. Vehicles that are used in the business are 6 trucks and 4 trailers. He may add 1 more dump truck. They will only do preventive maintenance on the equipment at this site. There are no CDL trucks. In the summer season there are 9 – 10 employees, only three employees in the winter. Their hours will be 7:00 am to 5:30 pm. There will be bins behind the barn for mulch. He only uses 2 types of mulch and only small amounts. Most would be used for the off-site landscape business. The barn will be about 5,000 sq. ft. with offices and shop in the front and storage in the rear. There will be no basement or 2nd floor. The office operation will consist of himself, 1 assistant, 1 manager and 1 designer. There is some current outdoor lighting. He will not over use lights or go off the property with lighting. There will be no change in the size of the sign. The property has public sewer and 2 wells for water. One well is near the house, the other at the rear of the property. The well at the rear of the property may need a cover/shed so the pipes won’t freeze.
Jim pointed out that he will need 10 parking spaces for employees, since that is his largest shift. Mr. Del Vacchio feels the employees will be able to park in the spaces for the business vehicles. Jim is concerned about the noise from dumping stone. Mr. Del Vacchio explained that most of the time stone will be delivered to the project site, not here.
Also, Jim pointed out that the driveway to the new residence is shown going through the retail parking. Mr. Del Vacchio would prefer to keep the drive to the house separate from the commercial area. Peter doesn’t want 2 curb cuts, however, PennDOT would be involved in this. Mr. Nagle said a condition could be added to clarify that the driveway would have to comply with PennDOT, Township Engineer and Township requirements.
Sue asked if there would be an impact to the historic property next to this property. Mr. Nagle didn’t feel there would be any impact because of the long standing use. Mark didn’t feel they would have to do a study because it is a legal use and the proposed barn is a typical historic type building.
Dan voiced concern about the backup alarms on vehicles scooping materials from bins into the trucks and on trucks making deliveries. Also, could he rent the existing house? Mark said yes.
Dan also asked if they plow snow. Mr. Del Vacchio said they do plow in the winter. They do not use bulk salt. Two people plow and take the trucks home at night. Mr. Nagle verified that McGinty did have plow vehicles and snow plowing is considered part of a landscape business.
Peter pointed out that in Mark’s 12/21/2010 email to Mr. Nagle, Mark mentions 4,988 sq. ft. plus square footage for the garage. On the Phase 1 plan, the total proposed building coverage is shown as 9,259 sq. ft. which looks like the applicant is expanding the use. Peter feels there is a discrepancy between the proposed sq. ft. and what the Township has approved in the past. After a quick review of the numbers, Mark agreed there are some math errors. Mr. Nagle suggested that the Commission include a condition. However, Peter is concerned that there were expansions in the past that weren’t legal. He wants to have the numbers clarified. Mr. Nagle said the 4,988 sq. ft. is the number of sq. ft. of approved buildings that will be replaced by the proposed barn. Mark said that the variances approved in 1994 are the starting point.
Public Comment:
1. Don McConathy, Township Supervisor – He wants the Commission to be sure of the facts. He has concerns about the number of vehicles, trucks and employee cars and retail customers. He is concerned about the noise and additional lighting.
2. Tom McCafferty, 918 N. Chester Road – He lives adjacent to the property and there is no buffer between the properties, so he would like to have that as a requirement. McGinty’s did not have plow trucks. They had pickups with plows. He is concerned about the extra driveway, and the smell of the mulch. He would like to have times stipulated for deliveries. There were buildings in the back that weren’t apparent. He would like to
01/05/2011
PC MINUTES
Page 2 of 4
see what the barn will look like. He is concerned about the growth of the business and whether Mr. Del Vacchio will actually build a residence in the future.
3. Mark Wahn, 936 Cornwallis Drive – He is concerned that sometime in the future Mr. Del Vacchio may purchase an adjacent property to expand the business. Mr. Wahn commented about the problems residents are having in Willistown Township with Main Line Gardens. Deliveries are made very early in the morning and there is the smell of mulch, lots of dust and noise of trucks. McGinty was a mom and pop business. If there were 5 cars there it was a lot. He lived and worked there and promised not to impact the neighbors.
4. Gary Moore, 930 N. Chester Road – He asked how many days a week they work. Mr. Del Vacchio said 5.
5. Bob Coup, 916 N. Chester Road – He lives in the historic property and is concerned about the difference between the non-conforming use of McGinty’s and that of the applicant.
6. Joe Grosso, 941 Cornwallis Drive – His property is behind McGinty’s and has had problems with runoff from the property. He is concerned about how it will look. He is also concerned about noise from the fans in the greenhouse, working on the equipment (air tools), chemicals, tires, etc.
7. Paula Moore, 930 N. Chester Road – She commented that McGinty was very nice but there were cars parked all over the property. She feels this will be an improvement.
8. Vince Del Vacchio, 1520 N. Ridley Creek Road, Media, Pa. - He is the father of the applicant. He came with him to look at the property. This has been a dream of his son’s to find a place to run his business and have control. He understands what the concerns of the residents are but assured them that he doesn’t want to make it into a large commercial business.
Brian Nagle spoke to the residents about the applicant whom he has represented for 10 years and reviewed the use of the property and ordinance requirements. He pointed out that the property will be sold and may be sold to someone who wants to do more than his applicant.
Brian Nagle spoke to the Planning Commission. The lighting is for security only. The plow trucks will be pickup trucks. He has no problem with conditions to stipulate delivery times or the height of the building.
9. Kay Coup, 916 N. Chester Rd. – The residents aren’t saying that Mr. Del Vacchio isn’t a good person but they feel this is a big change from what it used to be. There wasn’t as much traffic as they fear there will be with this use.
Peter urged the residents to follow this application through the entire process and attend meetings, especially the Board of Supervisors and the Zoning Hearing Board, which is the final decision.
10. Tom McCafferty, 918 N. Chester Road – He thought that part of the variance for McGinty was that the owner had to live on the property. He watched McGinty add to the business but the residents had reached a point where they were going to protest if it went any further.
Jim suggested that residents write down what they remember about the use of the property.
Peter pointed out that they may have to testify at the Zoning Hearing Board.
The Planning Commission members decided to hold a workshop on Wednesday, January 19, 2011 to discuss this matter further.
01/05/2011
PC MINUTES
Page 3 of 4
F. Old Business
1. The Annual ABC planning meeting will be held this Saturday, January 8th at 8:00 am.
G. Any Other Matter
H. Adjournment
Motion to adjourn the meeting was made by Sue and seconded by George. The meeting adjourned at 9:40 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Planning Commission\PC 2011\PC 01052011 draft rev1.doc
01/05/2011
PC MINUTES
Page 4 of 4
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION WORKSHOP MEETING
January 19, 2011
The East Goshen Township Planning Commission held a workshop meeting on January 19, 2011 at the East Goshen Township building. Members present were: Chairman George Martynick, Susan Carty, Peter Mylonas, Dan Daley, Jim McRee, Megann Hedgecock and Al Zuccarello. Also present were Township Zoning Officer Mark Gordon, and Don McConathy (Township Supervisor).
A. Pledge of Allegiance & Announcements
George called the meeting to order at 7:00 pm and led those in attendance in the Pledge of Allegiance. There was a moment of silence to remember our armed forces.
George asked if anyone would be recording the meeting. There was no response.
George asked those in attendance if there were any non-agenda items to be discussed.
B. Approval of Minutes - None
C. Acknowledge Receipt of New Applications - None
D. Subdivision/Land Development Plans – None
E. Conditional Use and Variances
1. Del Vacchio Holdings, 922 N. Chester Rd. (McGinty’s Nursery) (SE) The applicant was represented by Brian Nagle, Attorney and Mr. Vincent Del Vacchio. Mr. Nagle reported that the original proposal for a 5,000 sq. ft. building has been modified to 3,560 sq. ft. He said that Mark Gordon has researched the history and has a spreadsheet showing that the numbers match.
Peter asked Mark for an overview of what has transpired since the last meeting.
Mark provided copies of the spreadsheet showing the structures and their size that were approved in 1983 and 1994. The total square footage in 1994 was 6,272 which included a new sales building, a garage, 3 greenhouses and a work shed. The total proposed square footage is 5,296, which includes the sales building and new proposed barn style building. The garage, greenhouses and work shed will be removed. Mark reported that the township solicitor has reviewed the proposed plan and compared it to the current non-conforming legal use and concurs that the use is the same. The intensification of the use is a normal evolution of changes over time in this type of business.
Mr. Nagle referred to some PA Supreme Court case decisions that stated the proposed use must only be similar to the existing use. Some examples were: a take out pizza shop became a restaurant seating 40 people; a day camp and swim club became an amusement park.
Megann asked about the driveway to the proposed residence. Mr. Nagle said the business drive will be the same as the existing drive. Any other drive to the residence would have to conform to township and PennDOT rules.
Parking for retail customers will remain the same. Currently employee and business vehicles were parked on a hard pack area. The proposal is to pave this area at the rear of the sales building.
Jim asked if they considered the amount of space needed for large delivery trucks to turn around. Mr. Del Vacchio confirmed that this was taken into consideration.
Sue commented that alterations could lead to changes in impact but could also be an improvement. Will the paving be considered impervious? Mr. Nagle stated that pervious paving is very expensive and requires lots of maintenance so it would not work in this case. The square footage of the paved area is less in the proposal than the current use which will improve storm runoff. Also, the property is being studied for contaminants. If anything is found, it will have to be addressed before the final sale of the property. Mark said the township will
01/19/2011
PC MINUTES
Page 1 of 4
be notified too. Also, the applicant will need a grading permit to clear the property and prepare for paving, so Mark will be visiting the site.
Peter asked what would happen if in the future they want to subdivide. Mark will check with the solicitor.
Noise, odors and dust were discussed. Mr. Del Vacchio said the location he currently rents is hard packed dirt and stone. Paving at this new location could be cleaned and water could be used to control dust. He commented that adding a condition for time of deliveries was already discussed. Mark will be involved in measuring noise levels if needed.
Al is concerned about the noise of snow plows leaving during the night. Mr. Nagle said the employees take the trucks home with them when snow is expected during the night.
Mr. Del Vacchio said he would agree to a condition excluding storage of manure.
Parking - Peter asked if there could be a condition limiting the number of employee and business vehicles. Mark feels this would limit growth which can’t be done. Mr. Nagle said the proposal is designed to accommodate the business now and in the future. Dan is concerned that employees may park in the retail parking now which may cause problems in the future. Mark suggested a condition to require signage for “retail parking only”.
Jim is concerned about salt spillage and possible stormwater contamination because the residents have wells. Mr. Del Vacchio is currently using bagged salt but would use covered bins with proper drainage. He isn’t sure if salt is considered a contaminant. Jim is concerned about the impact over 20+ years to wells of residents who trusted the township to consider this possibility.
George stated that the Commission understands the rights of the applicant and thanks him for his cooperation, but the Commission wants to be cautious and have things in place to control any future owners.
Jim agreed that the applicant has been cooperative. He pointed out that in 1983 the township worked the best they could with what they had and he wants to be sure this application request will be okay for the next 20+ years.
Public Comment:
1. Don McConathy, Township Supervisor – He asked Mark if there was a building permit in 1970 for 2 greenhouses. Mark said no. He asked if the conditions made in 1994 will still apply. Mark stated that the solicitor advised that they would apply but don’t have to be specifically listed. He asked about lighting. Mr. Nagle said there is proposed lighting only on the building. There is no plan for separate pole lighting. Don viewed their website and the list of projects they offer. He asked about construction materials. Mr. Del Vacchio said most construction materials are delivered to the construction site.
2. Mark Wahn, 936 Cornwallis Drive – He had the opportunity to speak to Mr. Del Vacchio and his father. He is concerned about noise and odors and that sometime in the future Mr. Del Vacchio may purchase an adjacent property to expand the business. He commented about the problems residents are having in Willistown Township with Main Line Gardens. He suggested that this be considered a home business. In the section under “home occupations” in the ordinance there are rules for noise etc.
Mark responded that the Special Exception is for this property only. If he purchased an additional property to expand the business, he feels the township would oppose it. Mr. Nagle commented that the owner would have to get a variance and demonstrate a hardship which would be difficult to do. Mr. Wahn doesn’t want to give the impression he is opposed. He likes the plan and only wanted to voice some concerns.
3. Marita Malloy Hutchinson, Attorney, 1197 Wilmington Pike, West Chester – She was Mrs. McGinty’s attorney. Mrs. McGinty had ideas for her property. She lived there for 41 years and had 9 children. They worked the property and had plans to pass it on to someone who would continue this business. Before she died, she had several proposals for the property but they had plans to expand and/or divide the property. She reviewed Mr. Del Vacchio’s plan and was pleased with this opportunity to carryon the business.
4. Kay Coup, 916 N. Chester Road – She asked if Mr. Del Vacchio plans to live there. He responded yes.
There was no further public comment.
01/19/2011
PC MINUTES
Page 2 of 4
Megann thanked Mark for all the work he has done on this application.
F. Old Business - None
G. Any Other Matter
H. Adjournment
Motion to adjourn the meeting was made by Peter and seconded by Megann. The meeting adjourned at 9:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
C:\Documents and Settings\Owner\My Documents\My Word\Planning Commission\PC 2011\PC 01192011 draft.doc
01/19/2011
PC MINUTES
Page 3 of 4
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 1/28/2011
To: Planning Commission
From: Mark Gordon, Zoning Officer
Re: Del Vacchio Holdings / 922 N. Chester Rd. / McGinty’s Nursery
Dear Commissioners,
I have worked with the applicant in drafting these conditions for your consideration
DRAFT MOTION:
Mr. Chairman, I move that we recommend that the Board of Supervisors support the Special Exception application of Del Vacchio Holdings who is seeking an alteration to the existing legal nonconforming use with the following conditions:
- The buildings identified on the plan and during the testimony as buildings to be removed shall be removed prior to the issuance of a use and occupancy certificate for the new barn style building.
- The new barn style building (having maximum footprint 4000 sq. ft.) may be erected as a replacement for the existing permitted buildings that are part of the legal non-conformity as shown on the plans that were submitted by the applicant. The applicant shall post a bond to insure that the existing permitted buildings are removed.
- The proposed barn style building shall have a wooden exterior and be similar in appearance to the existing sales building.
- The rear of the property (the area of the property west of the bins) shall be returned to a grass and/or wild flower meadow condition as shown on the plans. The existing trees shall remain to the maximum extent practical. Should Township regulations require, a grading plan shall be submitted to the Township and a permit issued prior to any earth disturbance in the rear of the property.
- The applicant may build the Phase II single family dwelling provided that the existing residential structure is removed prior to the issuance of a use and occupancy permit for the Phase II dwelling. The applicant shall post a bond to insure that the existing residential dwelling is removed.
F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Draft Motion 01282011.doc
- All stormwater controls required by the Township Ordinances for the Phase II single family dwelling shall be installed in conjunction with the Phase II dwelling.
- The Phase I landscaping be installed prior to the issuance of a Use and Occupancy Certificate for the new Barn Building. The Phase II landscape screening shall be installed prior to the Issuance of a building permit for the new single family home. Applicant agrees to maintain all landscaping in perpetuity.
- Retail sales of mulch and the delivery of mulch and other landscape materials to the property shall be limited to the hours between 9 AM and 5 PM Monday through Saturday.
- The loading and unloading of landscape materials and equipment onto trucks or trailers shall not occur before 7am and not after 10 pm.
- Upon the completion of Phases I and II, as shown on the plans, no additional expansion of buildings shall be permitted unless approved by the Township Zoning Hearing Board.
- Lighting shall be limited to safety and security lighting subject to the approval of the Township Zoning Officer or Township Engineer.
- All vehicle maintenance shall be conducted inside of the new barn building.
- The storage bins having a total square footage of 1,400 sq ft shall be constructed as depicted on the plan.
- A maximum of one material storage bin (not to exceed 250 sq ft) may be covered with a roof and that area shall be included in the building coverage area.
- As depicted on the plan all business vehicles and employee parking shall be located to the rear of the existing single family home in a area not to exceed 10,250 square feet.
- Business vehicles having a gross vehicle weight in excess of 33,000 pounds shall not be permitted to be parked or stored on the property.
- The applicant agrees not to store or display any hardscaping materials (i.e. brick pavers, stone, etc.) in front of the existing sales building.
- The rubber tire or track loader used for retail sales shall be equipped with a bucket having a maximum size of one cubic yard.
- The applicant will follow all applicable Federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted on the plan or use of the existing buildings on the property.
- The owner shall be permitted to maintain two fuel tanks on the property with a maximum capacity of 300 gallons each; one for diesel and one for gasoline. The tanks shall be located as shown on the plan. The purpose of such tanks shall be to fuel
F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Draft Motion 01282011.doc
business vehicles and equipment only. Fuel delivery tot eh property shall occur only between the hours of 9 a.m. and 5 p.m. Monday through Saturday.
- Employee parking shall be permitted in parking area depicted on the plans to the rear of the sales building.
- The customer parking in front of the existing single family home shall not be increased in size and shall be signed for customer parking only.
- Prior to the issuance of the permit for the new barn building the applicant shall demonstrate that the proposed total impervious area on the property is less than the total impervious area shown on the existing conditions plan.
- The conditions outlined in the previous Zoning Hearing Board decisions for this property still apply.
- The existing shade structures as shown on the plans, may remain, provided that they are only covered with a porous fabric. These structures shall not be considered buildings for the purpose of calculating building coverage.
F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Draft Motion 01282011.doc
| Structures | Dimensions | 1983 Variance (Legal Nonconforming) Area (s.f.) | 1994 Special Exception (Legal Nonconforming) Area (s.f.) | Proposed Phase I, 2011 Special Exception Area (s.f.) | Proposed Phase II, 2011 SE(~ 2014) Area (s.f.) |
|---|---|---|---|---|---|
| Conforming Structures | |||||
| Existing Residential Dwelling | ~24X36 + porches | 890 | 890 | 890 | 0 |
| New Home (Proposed for ~ 2014-15, Phase II) | ~ 60X50 | 0 | 0 | 0 | 3000 |
| TOTALS (s.f.) | 890 | 890 | 890 | 3000 | |
| Structures associated with the legal nonconforming use | |||||
| Accessory Building (Original Sales Building) | 14X24 | 336 | - | - | - |
| Sales Building (1994) | 36X36 | - | 1,296 | 1,296 | 1,296 |
| Garage | 24X36 | 864 | 864 | - | - |
| Greenhouse | 10X12 | 120 | 120 | - | - |
| Greenhouse | 14X76 | 1,064 | 1,064 | - | - |
| Greenhouse | 28X96 | 2,688 | 2,688 | - | - |
| Work shed | 12X20 | 240 | 240 | - | - |
| Proposed Barn Style Building (2011, Phase I), incl covered storage, covered walkway, & utility area | 4,000 | 4,000 | |||
| Covered topsoil bin | 250 | 250 | |||
| TOTALS (s.f.) | 5312 | 6272 | 5546 | 5546 | |
-726 -12%
| Impervious Cover | Existing | Phase I | Phase II |
|---|---|---|---|
| Pergolas | 2,073 | 2,073 | 2,073 |
| Sales Building | 864 | 864 | 864 |
| Greenhouses | 19,106 | - | - |
| Garage | 864 | - | - |
| Work shed | 240 | - | - |
| Driving/Parking Areas (paved & hardpack) | 12,680 | 16,000 | 17,200 |
| Display Area (front of sales building) | 727 | 1,096 | 1,096 |
| Material Storage (including soil bin) | 1,500 | 1,400 | 1,400 |
| Proposed Barn Style Building (2011, Phase I) | - | 4,000 | 4,000 |
| Residence - Home | 890 | 890 | 3,000 |
| Residence - Driveway | - | - | 6,200 |
| TOTALS (s.f.) | 38,944 | 26,323 | 35,833 |
| % of Impervious Cover | 22.35% | 15.11% | 20.57% |
-3,111 -8%
Conceptual Drawings Phase 2
922 North Chester Road, West Chester, PA 19382
Site plan for Phase 2 conceptual layout at 922 North Chester Road along RT 352, prepared by Del Vacchio Landscapes, Inc., showing proposed buildings, storage bins, parking spaces, driveway, and relocated residence.
Title Block
- Date: 01-05-2011
- Revisions: 01-19-2011; 01-24-2011
- Project: Conceptual Drawings, Phase 2, 922 North Chester Road, West Chester, PA 19382
- Firm: Del Vacchio Landscapes, Inc., P.O. Box 237, Edgemont, PA 19028, P. 610-353-5643, F. 610-355-2494, www.delvacchiolandscapes.com
- Designed By: Vince Del Vacchio
- Scale: 1" = 50'
Plan Labels and Features
- LAWN AREA
- RELOCATE RESIDENCE w PHASE II
- NURSERY STOCK AREA
- RELOCATE PERGOLA
- COVERED STORAGE 450 SQ FT
- BARN STYLE BUILDING & COVERED WALKWAY BETWEEN BUILDINGS 3,400 SQ FT
- UTILITY PAD 150 SQ FT
- EXISTING SALES BUILDING
- DISPLAY AREA
- EXISTING PERGOLA
- FUEL STORAGE
- SOIL
- MULCH (two bins)
- STONE
- SAND
- PARKING SPACES TO BE ADDED WITH PHASE II (Spaces numbered 1 through 5 and 6 through 18)
- EXISTING HOME FOOTPRINT
- DRIVEWAY ORIENTATION TBD
- RT 352
- EXISTING SIGN BED
Storage Bin Detail
922 North Chester Road, West Chester, PA 19382
Architectural detail drawing showing the Plan View and Front View of a five-bay storage bin structure with a covered soil bin, prepared by Del Vacchio Landscapes, Inc.
Title Block
- Date: 01-25-2011
- Revisions: (none listed)
- Project: Storage Bin Detail, 922 North Chester Road, West Chester, PA 19382
- Firm: Del Vacchio Landscapes, Inc., P.O. Box 237, Edgemont, PA 19028, P. 610-353-5643, F. 610-355-2494, www.delvacchiolandscapes.com
- Designed By: Vince Del Vacchio
- Scale: 1" = 10'
Plan View
- Overall Dimensions: 70' 0" width by 20' 0" depth
- Interior Bay Widths (left to right): 10', 10', 10', 16', 12'
- Labels: PARKING LOT, COVERED SOIL BIN
Front View
- Uncovered Bin Wall Height (left bays): 8' 0"
- Covered Soil Bin Wall Height (right bay): 12' 0"
- Covered Soil Bin Total Height (to top of hoop): 20' 6"
- Structure Note: METAL HOOP STRUCTURE COVERED WITH FABRIC TOP, FRONT, AND BACK
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 1/27/2011
To: Planning Commission
From: Mark Gordon, Township Zoning Officer
Re: Ordinance Amendments (Wireless / Parking)
Dear Commissioners:
At our Workshop on 1/19 I provided all of you with a copy of the revised Multiple Use Building / Parking Ordinance and I have enclosed the new wireless Communication Ordinance for your review, please bring that document with you to discuss at the February meeting.
As you all know the Multiple Use / Parking ordinance amendment has evolved over the last year and I believe this is the final amendment. A draft motion is included which recommends that the BOS approve this amendment.
The Staff has been working on a revision to the Wireless Communication Ordinance with the Solicitor and Don McConathy and I have enclosed the proposed Zoning Ordinance amendment for your review and comment. Because of the sizable formatting and structure changes to the ordinance t is provide in a clean format so you will need to refer to the existing code to see the current version. The main thinking here was to split the ordinance into the two main categories, Towers and antennas mounted on existing structures. I have provided a draft motion to recommend that the Board of Supervisors approve the Zoning Ordinance amendment for Wireless Communications Facilities for your use and consideration.
Draft Motion: Multiple Use / Parking
Mr. Chairman, I move that we recommend that the Board of Supervisors approve the proposed amendment to the Zoning Ordinance which will establish a definition for Multiple Use buildings and effectively improve the parking requirements for Multiple use buildings.
Draft Motion: Wireless Communication Facilities
Mr. Chairman, I move that we recommend that the Board of Supervisors approve the proposed amendment to the Zoning Ordinance amending the Wireless Communications ordinance.
F:\Data\Shared Data\Admin Dept\Township Code\Wireless Communications 2010\Memo to PC 01272011.doc
Section 240-31.
(h) Wireless communications facilities.
[1] Purpose. The purpose of this subsection and the standards established herein are to govern the use, construction and siting of wireless communications facilities in recognition of the nature of wireless communications systems and the Federal Telecommunications Act of 1996, as amended from time to time. These regulations are intended to:
[a] Accommodate the need for wireless communications facilities while regulating their location and number so as to ensure the provision for necessary services.
[b] Minimize the adverse visual effects and the number of such facilities through proper design, siting, screening, material, color and finish, and by requiring that competing providers of wireless communications services collocate their commercial communications antennae and related facilities on existing towers if possible.
[c] Ensure the structural integrity of commercial communications antenna support structures through compliance with applicable industry standards and regulations, including the Township’s Building Code.
[d] Promote the health, safety and welfare of the Township's residents.
[2] Standards for commercial communications antenna erected on a commercial communications support structure. All applicants seeking to construct, erect, relocate or alter a commercial communications support structure shall comply with the following regulations. A written narrative that addresses how the applicant will meet each of the regulations listed below shall be submitted with the conditional use application.
[a] Location and height.
[i] Permissible Locations. Wireless communications facilities must be located on property within the following zoning districts where permitted as a conditional use and only in such location within that district and at a minimum height necessary to satisfy their function in the applicant's wireless communications system. The zoning districts in which wireless communications facilities are permitted by conditional use are the BP and I-1 Districts, and on any property owned by East Goshen Township, regardless of the zoning district. [Discussion item]
1
[ii] Maximum heights. No commercial communications antenna support structure serving a single provider shall be taller than 120 feet, measured from undisturbed ground level, unless the applicant proves that another provider of wireless communications services has agreed to collocate commercial communications antenna(e) on the applicant's commercial communications antenna support structure. In such case, the commercial communications antenna support structure shall not exceed 150 feet. No applicant shall have the right under these regulations to erect a tower to the maximum height specified, unless it proves the necessity for such height. The applicant shall demonstrate that the proposed height of the commercial communications antenna support structure and the commercial communications antennae intended to be attached thereto is the minimum height required to provide satisfactory service for wireless communications.
[b] Conditional Use Application.
[i] Site plan. A site plan shall be submitted with the conditional use application which shows all existing and proposed structures and improvements, including but not limited to the commercial communications antenna(e), commercial communications antenna support structure, building, fencing, landscaping, parking, ingress and egress. In addition, the site plan shall show each of the contiguous properties, identified by tax parcel number and owner, depicting all buildings and structures located on such properties and their principal and/or accessory uses. The plan shall comply with the requirements for a final plan as set forth in Chapter 205, Subdivision and Land Development.
[ii] Miscellaneous Information and Reports. The conditional use application shall be accompanied by the following:
[a] A propagation study demonstrating that there is a substantial gap in coverage for the provider;
[b] A description of the type and manufacturer of the proposed transmission/radio equipment;
[c] A study demonstrating compliance with the noise standards in Section 240-24 of this chapter. In instances where there are multiple carriers or multiple equipment boxes proposed to be built on one site, the
2
applicant must demonstrate that the cumulative noise from all carriers' equipment shall comply with the noise standards in this chapter;
[d] The name, address and contact information for the primary and secondary contact person responsible for the facility operation and maintenance;
[e] A report which addresses the potential impacts associated with constructing the facility and possible mitigation measures if negative impacts are expected to occur on surrounding properties;
[f] A report from a registered professional engineer that confirms that the radiofrequency emissions from the proposed facility will comply with the Federal Communications Commission standards ;
[g] A certificate of insurance issued to the owner/operators, evidencing that there is or will be adequate current liability insurance in effect insuring against liability for personal injuries and death and property damage caused by the land site and the proposed facilities;
[h] A copy of the lease or other written agreement with the property owner confirming that Applicant has standing to file the application and maintain the proposed facility on the subject property.
[iii] Licensing and applicable regulations. If the applicant is a commercial wireless communications company, it must demonstrate that it is licensed by the Federal Communications Commission (FCC) and submit with the conditional use application copies of all FCC permits and licenses. All such information shall be accompanied by a certification signed by an officer of the applicant providing that, after due inquiry, the information being supplied is true and correct to the best of their knowledge, information and belief.
[iv] Section 106. The applicant shall provide proof to the Township that it has complied with Section 106 of the National Historic Preservation Act, 16 U.S.C. § 470f, as amended, and has reviewed the effects of the proposed wireless communications facilities on local historic resources
3
that are included in or eligible for inclusion in the National Register of Historic Properties.
[v] Maintenance. During the conditional use hearing, the applicant shall describe anticipated maintenance needs, including frequency of service, personnel needs, equipment needs and the traffic safety and noise impacts of such maintenance. If approved, the applicant shall be responsible for maintaining the commercial facility in the manner described in the hearing or as required by the Board as part of the conditional use approval.
[vi] Collocation. Prior to the Board's approval of a conditional use authorizing the construction and installation of a commercial communications antenna support structure (tower) it shall be incumbent upon the applicant to prove to the reasonable satisfaction of the Board that the applicant cannot adequately extend or infill its communications system by the use of equipment such as repeaters, antenna(e) and other similar equipment installed on existing structures, such as utility poles, existing commercial communications support structures, and other available tall structures. The applicant shall demonstrate that it has contacted the owners of structures of suitable location and height within a one-mile radius of the site proposed, has asked for permission to install the commercial communications antenna(e) on those structures and has been denied such permission. The Board of Supervisors may deny an application to construct a new commercial communications antenna support structure if the applicant has not made a good faith effort to mount the commercial communications antenna(e) on an existing structure as set forth in this subsection.
[c] Building Permit Required. Upon approval of the conditional use application, the applicant shall apply for and obtain a building permit prior to the erection of the commercial communications support structure.
[i] Soil report. A soil report complying with the standards of Geotechnical Investigations, ANSI/EIA-222-E, as amended, shall be submitted to the Township Engineer to document and verify the design specifications of the foundation for the commercial communications antenna support structure, and anchors for the guy wires, if used.
4
[ii] Certification by engineer. Prior to the Township's issuance of a permit authorizing construction and erection of a commercial communications antenna support structure, a structural engineer registered in Pennsylvania shall issue to the Township a written certification of its ability to meet the structural standards offered by either the Electronic Industries Association or the Telecommunication Industry Association, and certify the proper construction of the foundation and the erection of the commercial communications antenna support structure.
[d] Wireless communications equipment building or pad. Either one single-story wireless communications equipment building not exceeding 500 square feet in area, or a concrete pad not exceeding 500 square feet in area that houses the equipment necessary for the proper functioning of the tower and commercial communications antenna(s) may be located on the property where the tower is located. This pad must be setback a minimum of ten feet from any property line and the combined height of the pad and any structures erected on such pad may not exceed eight feet. Each unrelated company sharing commercial communications antenna(e) space on the tower may have its own building or pad provided that the total area of all buildings or pads on the site shall not exceed 500 square feet, unless otherwise approved by the Board.
[e] Other facilities. With the exception of the wireless communications equipment building or pad housing the equipment necessary for the proper functioning of the tower and commercial communications antenna(s), all other uses ancillary to commercial communications antenna(s) and commercial communications antenna support structures, including but not limited to a business office, mobile telephone switching office, maintenance depot and vehicular storage area shall not be located on any land site, unless otherwise permitted by the applicable district regulations in which the site is located.
[f] Utilities. All utilities required for the facility shall be located underground.
[g] Setbacks from tower base. The minimum setback for the tower base shall comply with the minimum setbacks established for the zoning district in which the tower is located.
[h] Antenna support structure safety. The applicant shall demonstrate that the proposed commercial communications antenna(e) and commercial communications antenna support structure are designed and constructed in accordance with all applicable building standards for such facilities and structures, including but not limited to the standards developed by the Electronics Industry Association, the Institute of Electrical and Electronics Engineer, the Telecommunications Industry Association, the American National Standards Institute, the Electrical Industry Association and the
5
Township’s applicable Building Code. The applicant shall demonstrate that the proposed wireless communications facility is designed in such a manner so that no part of the facility will attract/deflect lightning onto adjacent properties.
[i] Fencing. A security fence having a minimum height of six (6) feet shall be required around the antenna support structure and other equipment.
[j] Landscaping. Unless prohibited by federal or state laws, the following landscaping shall be required to screen as much of a newly constructed commercial communications antenna support structure as possible. The Board of Supervisors may permit any combination of existing vegetation, topography, walls, decorative fences or other features instead of landscaping, if, in the discretion of the Board of Supervisors, they achieve the same degree of screening as the required landscaping.
[i] An evergreen screen shall be required to surround the commercial communications antenna support structure. The screen can be either a hedge planted three feet on center maximum or a row of evergreen trees planted 10 feet on center maximum. The evergreen screen shall be a minimum planted height of six feet at planting and shall be capable of growing to a minimum of 15 feet at maturity.
[ii] Existing vegetation on and around the land site shall be preserved to the greatest extent possible.
[iii] The landscaping shall be maintained by the applicant for as long as the facility is in operation.
[k] Design. In order to reduce the number of commercial communications antenna support structures in the Township in the future, the proposed commercial communications antenna structure shall be designed to accommodate other potential communication users, including but not limited to commercial wireless communication companies, local police, fire and ambulance companies.
[l] Proof of annual inspection.
[i] Annually, the owner of a commercial communications antenna support structure shall submit to the Township proof of the annual inspection of the commercial communications antenna support structure and commercial communications antenna(e) by an independent professional engineer as required by the ANSI/EIA/TIA-222-E Code. Based upon the results of such inspection, the Board of Supervisors may
6
require removal or repair of the wireless communications facility.
[ii] In the event that the annual inspection referred to above is not performed in a timely manner or if the owner of the wireless communications facility fails to make the necessary repairs or to remove the facility when directed by the Board the owner shall be subject to civil enforcement proceedings in accordance with § 240-54.
[m] Required parking. If the wireless communication facility is fully automated, a minimum of two spaces shall be provided unless the applicant demonstrates to the satisfaction of the Board of Supervisors that adequate parking is available. If the wireless communication facility is not fully automated, the number of required parking spaces shall equal the number of employees present at the wireless communication facility during the largest shift.
[n] Visual appearance. Commercial communications antenna support structures shall be painted silver, or another color approved by the Board, or shall have a galvanized finish. All wireless communications equipment buildings and other accessory facilities shall be aesthetically and architecturally compatible with the surrounding environment and shall maximize the use of a like facade to blend with the existing surroundings and neighboring buildings to the greatest extent possible.
[o] Signs. No sign or other structure shall be mounted on the wireless communications facility, except as may be required by the FCC, FAA or other governmental agency.
[p] Lighting. Commercial communications antenna support structures shall meet all Federal Aviation Administration (FAA) regulations. No commercial communications antenna support structure may be artificially lighted except when required by the FAA or other governmental authority. When lighting is required by the FAA or other governmental authority, it shall be limited to the minimum lumens and number of lights so required and it shall be oriented inward so as not to project onto surrounding properties. The applicant shall promptly report any outage or malfunction of FAA mandated lighting to the appropriate governmental authorities and to the Township Secretary.
[q] Abandonment. If use of the wireless communications facility is abandoned, or if the wireless communications facility is not in use for a period of six months or longer, the owner shall demolish and/or remove the wireless communications facility from the land site within six months of such abandonment and/or nonuse. All costs of demolition and/or removal shall be borne by the owner of the wireless communications facility. In the event that the demolition and/or removal referred to above is not performed in a timely manner, the owner shall be subject to civil enforcement proceedings in accordance with § 240-54C.
7
[r] Interference. In the event that the wireless communications facility causes interference with the radio or television reception of any Township resident for a period of three continuous days, the resident shall notify the applicant of such interference and the applicant, at the applicant's sole expense, shall thereafter ensure that any interference problems are promptly corrected. In the event that the interference is not corrected in a timely manner, the applicant shall be subject to the civil enforcement proceedings in accordance with § 240-54C.
[s] Annual report. In January of each year, the owner of any wireless communications facility shall pay the registration fee as established from time to time by resolution of the Board of Supervisors and shall provide the Township with the following information.
[i] The names and addresses of the owner of the wireless communications facility and any organizations utilizing the wireless communications facility and telephone numbers of the appropriate contact person in case of emergency.
[ii] The name and address of the property owner on which the wireless communications facility is located.
[iii] The location of the wireless communications facility by geographic coordinates, indicating the latitude and longitude.
[iv] Output frequency of the transmitter.
[v] The type of modulation, digital format and class of service.
[vi] Commercial communications antenna(e) gain.
[vii] The effective radiated power of the commercial communications antenna(e).
[viii] The number of transmitters, channels and commercial communications antenna(e).
[ix] A copy of the owner's or operator's FCC authorization.
[x] Commercial communications antenna(e) height.
[xi] Power input to the commercial communications antenna(e).
[xii] Distance to nearest base station.
8
[xiii] A certification signed by an officer of the applicant that the wireless communications facility is continuing to comply with this chapter and all applicable governmental regulations, including but not limited to output and emission limits established by the FCC.
[xiv] A certificate of insurance issued to the owner/operators, evidencing that there is adequate current liability insurance in effect insuring against liability for personal injuries and death and property damage caused by the land site and the wireless communications facilities.
[xv] Changes occurring with respect to any of the information required above shall be reported to the Township, in writing, within 10 days of the effective date of such changes. The failure to supply the annual report by the close of January shall result in the issuance of an enforcement notice in accordance with § 240-54.
[3] Standards for commercial communications antenna erected on an existing structure. All applicants seeking to construct, erect, relocate or alter a commercial communications antenna on an existing structure shall comply with the following regulations. A written narrative that addresses how the applicant will meet each of the regulations listed below shall be submitted with the conditional use application.
[a] Location and height.
[i] The commercial communications antenna must be located on an existing structure. For purposes of this Subsection, in order to constitute an existing structure, the structure must be one that was constructed and/or erected prior to April 7, 1998.
[ii] Steeple exception to existing structure requirement. The applicant may, upon conditional use approval being granted by the Board of Supervisors, install a commercial communications antenna in any zoning district, in accordance with the provision of this section provided the commercial communications antenna shall be located entirely within a steeple located on a place of worship and no portion of the antenna shall be visible from the outside.
[iii] Limitations on Height. In no event shall mounted commercial communications antenna(e) extend more than 25 feet above the height of the existing structure. The applicant shall demonstrate that the proposed height of the
9
commercial communications antenna is the minimum height required to provide satisfactory service for wireless communications.
[b] Conditional Use.
[i] Site plan. A site plan shall be submitted with the conditional use application which shows all existing and proposed structures and improvements, including but not limited to the commercial communications antenna(e), the existing structure to which the commercial communications antenna(e) will be attached, building, fencing, landscaping, parking, ingress and egress. In addition, the site plan shall show each of the contiguous properties, identified by tax parcel number and owner, depicting all buildings and structures located on such properties and their principal and/or accessory uses. The plan shall comply with the requirements for a final plan as set forth in Chapter 205, Subdivision and Land Development.
[ii] Miscellaneous Information and Reports. The conditional use application shall be accompanied by the following:
[a] A propagation study demonstrating that there is a substantial gap in coverage for the provider;
[b] A description of the type and manufacturer of the proposed transmission/radio equipment;
[c] A study demonstrating compliance with the noise standards in Section 240-24 of this chapter. In instances where there are multiple carriers or multiple equipment boxes proposed to be built on one site, the applicant must demonstrate that the cumulative noise from all carriers' equipment shall comply with the noise standards in this chapter;
[d] The name, address and contact information for the primary and secondary contact person responsible for the facility operation and maintenance;
[e] A report from a registered professional engineer that confirms that the radiofrequency emissions from the proposed facility will comply with the Federal Communications Commission standards.
10
[f] A certificate of insurance issued to the owner/operators, evidencing that there is or will be adequate current liability insurance in effect insuring against liability for personal injuries and death and property damage caused by the land site and the proposed wireless communications facilities;
[g] A copy of the lease or other written agreement with the property owner confirming that Applicant has standing to file the application and maintain the proposed facility on the subject property.
[iii] Licensing and applicable regulations. If the applicant is a commercial wireless communications company, it must demonstrate that it is licensed by the Federal Communications Commission (FCC) and submit with the conditional use application copies of all FCC permits and licenses. All such information shall be accompanied by a certification signed by an officer of the applicant providing that, after due inquiry, the information being supplied is true and correct to the best of their knowledge, information and belief.
[iv] Section 106. The applicant shall provide proof to the Township that it has complied with Section 106 of the National Historic Preservation Act, 16 U.S.C. § 470f, as amended, and has reviewed the effects of the proposed wireless communications facilities on local historic resources that are included in or eligible for inclusion in the National Register of Historic Properties.
[v] Maintenance. During the conditional use hearing, the applicant shall describe anticipated maintenance needs, including frequency of service, personnel needs, equipment needs and the traffic safety and noise impacts of such maintenance. If approved, the applicant shall be responsible for maintaining the commercial communications antenna(e) in the manner described in the hearing or as required by the Board as part of the conditional use approval.
[c] Building Permit Required. Upon approval of the conditional use application the applicant shall apply for and obtain a building permit prior to the erection of the commercial communications antenna on an existing structure. Prior to the Township's issuance of a permit authorizing construction and erection of a commercial communications antenna, a structural engineer registered in Pennsylvania shall issue to
11
the Township a written certification that confirms that the existing structure can support the load of the proposed antenna and all cables associated therewith.
[d] Wireless communications equipment. A concrete pad not exceeding 10 feet by 20 feet in area that contains up to three metal boxes housing the equipment necessary for the proper functioning of the antenna may be located on the property where the commercial communications antenna will be located. This pad must be setback a minimum of ten feet from any property line and the combined height of the pad and boxes may not exceed eight feet. Each unrelated company having an antenna on the existing structure may have its own concrete pad provided that the total area of all pads for all carriers located on the structure shall not exceed 500 square feet, unless otherwise approved by the Board.
If the commercial communications antenna is installed on an existing utility pole, the Board may authorize the installation of one or more cabinets on the utility pole upon which the antenna(s) is located. The cabinets shall be located at the maximum height allowed by the owner of the utility pole, however, in no case shall the bottom of any cabinet be less than eight feet above ground level. The Board shall approve the color, size and orientation of the cabinet(s) on the pole.
[e] Other facilities. With the exception of the wireless communications equipment pad housing the equipment necessary to the proper functioning of the commercial communications antenna(s), all other uses ancillary to commercial communications antenna(s), including but not limited to a business office, mobile telephone switching office, maintenance depot and vehicular storage area shall not be located on any land site, unless otherwise permitted by the applicable district regulations in which the site is located.
[f] Utilities. All utilities required for the antenna and associated ground equipment shall be located underground.
[g] Required parking. If the wireless communication antenna is fully automated, a minimum of two spaces shall be provided unless the applicant demonstrates to the satisfaction of the Board of Supervisors that adequate parking is available. If the wireless communication antenna is not fully automated, the number of required parking spaces shall equal the number of employees present at the wireless communication antenna during the largest shift.
[h] Safety of Antenna. The applicant shall demonstrate that the proposed commercial communications antenna(e) are designed and constructed in accordance with all applicable building standards for such facilities and structures, including but not limited to the standards developed by the Electronics Industry Association, the Institute of Electrical and Electronics Engineer, the Telecommunications Industry Association, the American National Standards Institute, the Electrical Industry Association and the Township's applicable Building Code. The applicant shall demonstrate that the proposed wireless communications facility is
12
designed in such a manner so that no part of the facility will attract/deflect lightning onto adjacent properties.
[i] Fencing. A security fence having a minimum height of six (6) feet shall be required around the equipment buildings or pads.
[j] Landscaping. Unless prohibited by federal or state law, the following landscaping shall be required to screen the equipment building or pads. The Board of Supervisors may permit any combination of existing vegetation, topography, walls, decorative fences or other features instead of landscaping, if, in the discretion of the Board of Supervisors, they achieve the same degree of screening as the required landscaping.
[i] An evergreen screen shall be required to surround the equipment building or pad. The screen can be either a hedge planted three feet on center maximum or a row of evergreen trees planted 10 feet on center maximum. The evergreen screen shall be a minimum planted height of six feet at planting and shall be capable of growing to a minimum of 15 feet at maturity.
[ii] Existing vegetation on and around the land site shall be preserved to the greatest extent possible.
[iii] The landscaping shall be maintained by the applicant for as long as the facility is in operation.
[h] Proof of annual inspection.
[i] Annually, the owner of a commercial communications antenna shall submit to the Township proof of the annual inspection of the commercial communications antenna by an independent professional engineer as required by the ANSI/EIA/TIA-222-E Code. Based upon the results of such inspection, the Board of Supervisors may require removal or repair of the wireless communications facility.
[ii] In the event that the annual inspection referred to above is not performed in a timely manner or if the owner of the antenna fails to make the necessary repairs or to remove the antenna when directed by the Board, the owner shall be subject to civil enforcement proceedings in accordance with § 240-54.
13
[i] Lighting. Commercial communications antenna shall meet all Federal Aviation Administration (FAA) regulations. No commercial communications antenna may be artificially lighted except when required by the FAA or other governmental authority. When lighting is required by the FAA or other governmental authority, it shall be limited to the minimum lumens and number of lights so required and it shall be oriented inward so as not to project onto surrounding properties. The applicant shall promptly report any outage or malfunction of FAA mandated lighting to the appropriate governmental authorities and to the Township.
[j] Abandonment. If use of the wireless communications antenna is abandoned, or if the wireless communications antenna is not in use for a period of six months or longer, the owner shall remove the wireless communications antenna from the existing structure within six months of such abandonment and/or nonuse. All costs of demolition and/or removal shall be borne by the owner of the wireless communications antenna. In the event that the demolition and/or removal referred to above is not performed in a timely manner, the owner shall be subject to civil enforcement proceedings in accordance with § 240-54C.
[k] Interference. In the event that the wireless communications antenna causes interference with the radio or television reception of any Township resident for a period of three continuous days, the resident shall notify the applicant of such interference and the applicant, at the applicant's sole expense, shall thereafter ensure that any interference problems are promptly corrected. In the event that the interference is not corrected in a timely manner, the applicant shall be subject to the civil enforcement proceedings in accordance with § 240-54C.
[l] Visual appearance. All wireless communications equipment buildings and other accessory facilities shall be aesthetically and architecturally compatible with the surrounding environment and shall maximize the use of a like facade to blend with the existing surroundings and neighboring buildings to the greatest extent possible.
[m] Annual report. In January of each year, the owner of any wireless communications antenna shall pay the registration fee as established from time to time by resolution of the Board of Supervisors and shall provide the Township with the information specified in Section 240-31(h)[2][s]. Failure to supply the annual report by the close of the following January shall result in the issuance of an enforcement notice in accordance with Section 240-54.
[n] Signs. No sign or other structure shall be mounted on the wireless communications antenna, except as may be required by the FCC, FAA or other governmental agency.
14
Mark Gordon
[Stamp: FYI]
From: Manbeck, Natasha [nmanbeck@chesco.org]
Sent: Tuesday, January 18, 2011 3:01 PM
To: mgordon@eastgoshen.org
Cc: East Goshen Twp - Louis F. Smith, Jr. - Manager
Subject: RE: Upcoming Planning Events and PCTI Announcement
Attachments: FINAL_CentralChesCoBikePed_Application_wAttachments.pdf
Hi Mark-
I am sorry that it has taken a little while for me to respond. Thank you very much for following up and for inquiring about the Central Chester County Bicycle and Pedestrian Plan. I believe it is a great fit and opportunity to include East Goshen in the plan. Your neighbors (West Goshen and West Whiteland) are part of the study area. So, it is a logical connection to include East Goshen. Additionally, I believe we can incorporate and address some of the goals from your Paoli Pike PCTI project application in our planning process. I have attached a copy of our PCTI application for your review. The planning process will include a study advisory committee and it would be great if you or another representative from East Goshen could be a part of the committee.
I anticipate it will take ~3 months until the appropriate paperwork is complete for us to officially initiate the planning process. Please let me know if you have questions. Otherwise, we will be in touch once we officially begin the plan.
Thank you-
Natasha
From: Mark Gordon [mailto:mgordon@eastgoshen.org]
Sent: Tuesday, January 11, 2011 3:03 PM
To: Manbeck, Natasha
Cc: Al Zuccarello; Dan Daley; Don McConathy; Don McConathy; George Martynick; James McRee; James McRee; Martin Shane; Megann Hedgecock; Peter Mylonas; Rick Smith; Sue Carty; Carmen Battavio; Senya; Thom Clapper
Subject: RE: Upcoming Planning Events and PCTI Announcement
Thanks Natasha, I'll pass this info along to our Planning Commission Members and I'm sure there will be some attendance.
Unfortunately, yesterday I was informed that our application for PCTI funding to conduct a Trail Feasibility study along Paoli Pike was not selected. I am happy to learn that the County did receive funding for a multi-municipal master plan for bicycle and pedestrian linkages for Central Chester County. These linkages are really needed and will be utilized by county residents. Any chance East Goshen could be a part of that plan? We're not in the Center of the county, however East Goshen Residents would really benefit from a well designed multi municipal plan for bicycle and pedestrian linkages.
I'd love to be a part of the planning process if you need help.
-Mark
From: Manbeck, Natasha [mailto:nmanbeck@chesco.org]
Sent: Tuesday, January 11, 2011 2:15 PM
To: Manbeck, Natasha
Subject: Upcoming Planning Events and PCTI Announcement
Dear Chester County Planning Partners:
The following upcoming planning-related events might be of interest to you, municipal staff, and/or municipal elected officials. There is no registration fee for either event, but you must RSVP. We invite you to regularly check the Chester County Planning Commission's website for other upcoming Events, Meetings, and Training Opportunities.
1
Understanding Transportation Impact Studies
January 18, 2011 from 9:30am – 12:30pm
Montgomery County Community College, Science Center Auditorium, 340 DeKalb Pike, Blue Bell, PA 19422
PennDOT will present an overview of new Transportation Impact Study Guidelines and new stormwater and ADA provisions for Highway Occupancy Permits. RSVP by 1/14 to Angela Gavin with TMACC at angela@tmacc.org or (610) 993-0911.
2010 U.S. Census Data Workshop
February 1, 2011 at 2:00pm
Chester County Government Services Center, Room 171, 601 Westtown Rd., West Chester, PA 19380
Learn how to navigate the 2010 Census data for grant writing, needs assessments, demographic reports, and more. RSVP by calling (484) 444-0412.
Pennsylvania Community Transportation Initiative (PCTI) grant program
On January 6th, PennDOT announced the projects selected for the Pennsylvania Community Transportation Initiative (PCTI) grant program of $24.7 million statewide. The following four projects in Chester County were selected to receive funding through this program:
- Borough of Phoenixville will receive $598,000 to implement streetscape amenities on Bridge Street initiated by the borough's residents, merchants, and building owners.
- County of Chester will receive $85,000 to complete a bicycle and pedestrian multi-municipal master plan emphasizing linkages to regional trails and access to transportation centers in central Chester County.
- Pennsbury Township will receive $80,000 to conduct a multi-municipal study to link recreational, institutional, cultural, and commercial destinations in the Battle Path area.
- Transportation Management Association of Chester County will receive $128,000 to plan improvements to infrastructure and multi-modal access along the Route 29 corridor in the Great Valley area.
The full list of the 41 projects selected from across is available online at: http://www.smart-transportation.com/pcti.html
Congratulations to the recipients and we look forward to working with the project sponsors! We will continue to make our planning partners aware of future potential funding opportunities.
Thank you-
Natasha
Natasha G. Manbeck, AICP, EIT
Director of Transportation Services
Chester County Planning Commission
601 Westtown Road, Suite 270
PO Box 2747
West Chester, PA 19380
Tel: 610-344-6285
Fax: 610-344-6515
Email: nmanbeck@chesco.org
Please visit www.Landscapes2.org to see Chester County's interactive plan that brings growth and preservation together.
2
[Coat of Arms of Pennsylvania]
[Logo: pennsylvania]
Pennsylvania Community Transportation Initiative (PCTI)
Project Application (V2010.1)
Note : The field titles that have a red double asterisk (**) are required information.
Section I: Project Summary
| **Project Title | **Project Type | **Total Project Cost | **Amount Requested |
|---|---|---|---|
| Central Chester County Bike & Ped Circulation Plan | Planning | $100,000 | $85,000 |
| **County | **Municipality | Planning Partner | District |
| Chester | Multiple | DVRPC MPO | 06 |
| Project Summary | Complete a bicycle and pedestrian circulation plan for 6 municipalities in central Chester County to promote walking and biking, improve safety, connect regional trails, and provide access to 3 Amtrak/SEPTA rail stations and 2 bus transportation centers | ||
Section II: Project Sponsor
| **Project Sponsor | **Sponsor Type | SAP ID Number | Federal ID Number | |
|---|---|---|---|---|
| Chester County Planning Commission | County | 23-6003040 | ||
| **Street Address | **City | **State | **Zip Code | |
| 601 Westtown Road (Suite 270) | West Chester | PA | 19380 | |
| **Prefix | **First Name | **Last Name | **Job Title | **Phone Number |
| Mr. | Ronald | Bailey | Executive Director | 610-344-6285 |
| **Email Address | Web Site | |||
| rbailey@chesco.org | www.chesco.org/planning | |||
Section III: Project Overview
| Primary Project Intent | Bicycle/Pedestrian | ||
|---|---|---|---|
| Is this proposal identified on or consistent with an existing plan(s)? | Yes | ||
| Identify all appropriate sources | Connection 2035 (MPO), Landscapes2 & Linking Landscapes (County), Municipal Comp. & Open Space Plans | ||
| Project Location Limits |
The study area includes six municipalities in Central Chester County: Downingtown Borough, East Bradford Township, East Caln Township, West Chester Borough, West Goshen Township, and West Whiteland Township. Over 80,000 people live within the study area. The Central Chester County region features the traditional Boroughs of Downingtown and West Chester, the suburban center of Exton, and a surrounding array of diverse communities, employment centers, parks, and protected open space. Additional major regional destinations/generators include the Exton Square Mall, Main Street at Exton, West Chester University, Chester County Courthouse, QVC Studio, and Marsh Creek State Park. The region includes segments of three regional multi-use trails: the Struble Trail in Downingtown, Chester Valley Trail in Exton (opening 9/21/10), Brandywine Trail in East Bradford, and the PA Bicycle Route L. In total, there are over 21 miles of existing surfaced trails within the study area. The area is well-served by public transportation including three stations on the Amtrak Keystone Corridor/SEPTA's Paoli/Thorndale Regional Rail Line (Exton, Downingtown, Whitford), two bus transportation centers (Exton, West Chester), and seven local bus routes. See the attached study area maps and documents that show the project location and context: |
||
| Is this proposal eligible for federal funding? | Yes | Is this proposal on the Federal Aid Highway System? | N/A |
| Statement of Problem |
Walking and biking are ideal transportation modes in Central Chester County due to the density, diversity, and design of land use. However, current conditions for walking and biking are limited and unsafe with these key challenges: |
||
|
The Central Chester County Bicycle and Pedestrian Plan will address safety, accessibility, and mobility issues for bicyclists and pedestrians in the heart of Chester County through a comprehensive and collaborative planning approach. Key outcomes of the project include: |
|||
| Proposed Solutions or Actions |
between multi-use regional trails and key destinations The Chester County Planning Commission will lead an eighteen month comprehensive public planning process to develop the Central Chester County Bicycle and Pedestrian Circulation Plan following the scope of work detailed below. The schedule and budget associated with this scope is presented in Section V of the application. The Chester County Planning Commission assumes that PennDOT will notify successful applicants in December 2010 and necessary agreements will be executed by June 2011 to allow work to begin. The Chester County Planning Commission will manage the project and perform the services with in-house staff. Chester County has committed to providing a 15% local contribution towards the project through in-kind services. 1. Public Involvement and Partnerships 2. Needs, Opportunities, and Constraints: Evaluation of Existing Conditions 3. Goals and Objectives 4. Regional Connections 5. Local Connections within Growth Centers |
|---|
|
between West Chester University and the downtown business district. 6. Supportive Policies and Programs 7. Implementation and Action Plan 8. Draft and Final Circulation Plan 9. Project Management |
|
|---|---|
| Complete the following six statements. How does the proposal support... | |
| ...smart transportation? |
The Central Chester County Bicycle and Pedestrian Circulation Plan exemplifies the principles of Smart Transportation by focusing on safe connections for all users of the transportation system - bicyclists, pedestrians, and transit riders as well as motorists - to provide sustainable transportation options and build supportive land uses. While bicycle and pedestrian plans often strive for similar objectives, what makes this project unique is the Plan's approach to: An Affordable, Cost-Effective Solution Supportive Urban Centers and Suburban Context for Walking and Bicycling Providing Last-Mile Connections to Public Transportation: Strategic Multi-modal Opportunities |
|
Connecting to the Philadelphia Region's Trail System: Leveraging Existing Investments Additionally, the planned bicycle and pedestrian network will link together the Study Area's 36 parks and 5,100 acres of protected open space – more than 17% of the region – that have been protected through coordinated state, county, municipal and land trust efforts. |
|
| ...a stronger land use? |
Consistent with Regional, County, and Municipal Plans Strengthening Centers and Corridors through Improved Transportation Choices |
| ...more transportation choices? |
A primary goal of the Circulation Plan is to reduce the vehicular dependency of the region, and instead provide safe and efficient walking, bicycling, and transit alternatives for this growing area. The region has experienced significant population growth – 16,000 additional residents since 1990 – and expects to continue growing, with 12,000 additional residents projected over the next 20 years. Yet, there are no programmed improvements for increasing capacity on the major roadways (US 30, US 202, PA 100) within the study area. The region strongly supports enhancing walking, bicycling, and transit modes to establish a variety of sustainable transportation options. US Census data (2000) demonstrates that the region already has a significant number of commuters that regularly walk and bike to work. Over 1,800 commuters or 11% of commuters in the study area reported walking or biking to work, which makes these non-motorized modes the second-most utilized transportation mode behind driving alone. In comparison, only 3% of all Chester County commuters reported walking or biking to work, so the study area has a large concentration of bicyclist and pedestrian commuters. Additionally, rail boardings at the Downingtown, Whitford, and Exton train stations have increased 34% over the last 10 years to 1,479 in 2009. However, parking at the train stations are at or near capacity and providing access by alternative modes is critical to promoting continued rail ridership. A primary goal of the Circulation Plan is to ensure safety for bicyclists and pedestrians and promote these alternative modes for a variety of trip purposes. |
| ...social equity? |
The Central Chester County region has a significant number of households without access to vehicles that will benefit from the Circulation Plan's emphasis on improving transit, walking, and bicycling opportunities. Over 1,500 households in the study area (or 6%) reported not having access to a vehicle in 2000. In particular, West Chester Borough (13%) and Downingtown Borough (9%) reported significantly higher rates of vehicle-unavailability than the Chester County average of 5%. Circulation planning in West Chester and Downingtown will specifically target and identify improvements for transit-dependent riders, persons with disabilities, youth, and the elderly. |
| ...economic competiveness? |
The six municipalities of the Central Chester County region are keenly aware that an optimized transportation system is a critical for economic competitiveness. The Bicycle and Pedestrian Plan will significantly enhance the region's economic competitiveness by:
Improve Access to Employment Opportunities |
|
Promoting Economic Opportunities for Growth Centers Establishing a Regional Recreation Asset |
|
| ...community values? |
The residents and businesses in the Central Chester County region have voiced a strong desire and support for a) expanded transportation alternatives; b) opportunities to reduce greenhouse gases; and c) further options for active recreation. The Bicycle and Pedestrian Circulation Plan will strategically advance each of these community values: Expanding Transportation Alternatives In follow-up focus groups to the survey, participants identified a “frustration with having to drive” as a primary dissatisfaction with the region's present land use and transportation system. A key objective of the plan is to mitigate the region's reliance on automobile transportation by providing safe bicycle, pedestrian, and transit alternatives. The Chester County Cycling Coalition recently initiated a volunteer based effort to identify strategies to make the Borough of West Chester more “bike friendly.” The initiative kicked-off with a coordinated bike ride from the Mayor of West Chester's home to Borough Hall in observance of Bike to Work Day in May 2010. Through volunteer efforts, the Cycling Coalition completed an inventory of bike parking within the Borough and met with representatives of West Chester University to discuss bike parking on campus. The Cycling Coalition's anticipated next step includes conducting a survey of cyclists and residents. The data collected by the Cycling Coalition will be incorporated into the planning process for the Central Chester County Bicycle and Pedestrian Plan. Additionally, a member of the Cycling Coalition will serve on the Plan Advisory Committee and help ensure that plan addresses needs identified by the Cycling Coalition. Pursuing Sustainable Transportation Choices Providing Opportunities for Active Recreation |
| List any pending or potential public or private development activities that are known at this time and how they will impact this proposal. | |
|
There are no pending or potential development activities that will negatively impact the completion of the Central Chester County Bicycle and Pedestrian Circulation Plan. Municipal representatives from the six municipalities within the study area will serve on the Plan Advisory Committee and information about planned developments will be incorporated into the plan. In particular, opportunities to implement and coordinate bicycle and pedestrian connections through the land development process will be identified. For example, River Station in Downingtown and East Caln is a planned mixed-use development and the developer has expressed interest in providing a multi-use trail connection. The Bicycle and Pedestrian Circulation Plan will help to identify similar opportunities. |
|
| Describe how any planned or scheduled projects (Federal, State, Local, Private) may impact this proposal. | |
|
There are no planned or scheduled transportation improvement projects that will negatively impact the completion of the Central Chester County Bicycle and Pedestrian Circulation Plan. There are several transportation improvement projects programmed on the TIP that demonstrate the need for continued and well coordinated planning for bicycle and pedestrian connections within the study area. • Chester Valley Trail: Chester Valley Trail – Phase 1 (MPMS 14663) between Valley Creek Boulevard in Exton and PA 29 in Great Valley will |
|
be officially opened for public use on 9/21/10. Chester Valley Trail – Phase 2 (MPMS 14675) between PA 29 in Great Valley and Warner Rd. in King of Prussia is programmed on DVRPC's TIP for $14.8 million and final design is underway. Chester County anticipates beginning construction of Phase 2 in Spring 2011. Chester County anticipates that the recent completion of Phase 1 and scheduled completion of Phase 2 will increase interest and demand for trail usage within the Central Chester County study area. The proposed Bicycle and Pedestrian Plan is closely coordinated with the construction of the trail and will identify an alternative for extending the Chester Valley Trail westward from Exton to Downingtown and identify a connection to the trail from West Chester.
- US 322/Brandywine Creek Ave. Bridge over Brandywine Creek (MPMS 69647): PennDOT is designing the bridge replacement to include a bicycle/pedestrian facility on at least one side of the bridge, which will provide a key connection for the Brandywine Trail.
- Boot Rd. Extension Bridge (MPMS 83710): Downingtown Borough and the developer of River Station are designing a new bridge to connect the proposed development with the Downingtown Train Station. The bridge will include bicycle and pedestrian facilities, which could provide a key connection for the PA Bicycle L Route and Brandywine Trail.
Describe any potential impact on environmental features, or public controversy on environmental grounds.
None.
Describe any needed or acquired temporary or permanent easements of Right-of-Way.
None.
Section IV: Project Support
| Name | Organization | Role |
|---|---|---|
| Steve Sullins | Borough of Downingtown | Plan Advisory Committee |
| Michael Lynch | East Bradford Township | Plan Advisory Committee |
| Barbara Kelly | East Caln Township | Plan Advisory Committee |
| Ernie McNeely | Borough of West Chester | Plan Advisory Committee |
| Casey LaLonde | West Goshen Township | Plan Advisory Committee |
| Michael Cotter | West Whiteland Township | Plan Advisory Committee |
| Mark Mixner | West Chester University | Plan Advisory Committee |
| Ellen Zadoff | Chester County Cycling Coalition | Plan Advisory Committee |
| Karen Babiak | Activate Chester County (YMCA) | Plan Advisory Committee |
| Katie Walker | Chamber of Commerce of Greater West Ch+ | Plan Advisory Committee |
| Alane Bulter | Downingtown Area Chamber of Commerce | Plan Advisory Committee |
| Diane Herrin | West Chester BLUER | Plan Advisory Committee |
| Byron Comati | SEPTA | Plan Advisory Committee |
Section V: Plan Proposal (Only) Information
| Milestone | Start Date | End Date | Funding Secured | Funding Source | Amt. Requested |
|---|---|---|---|---|---|
| Public Involvement and Partnerships | 06/01/2011 | 12/03/2012 | $2,250 | Chester County (in kind services) | $12,750 |
| Needs, Opportunities, Constraints | 06/01/2011 | 10/03/2011 | $1,500 | Chester County (in kind services) | $8,500 |
| Goals and Objectives | 08/01/2011 | 12/01/2011 | $600 | Chester County (in kind services) | $3,400 |
| Regional Connections | 11/01/2011 | 02/01/2012 | $2,400 | Chester County (in kind services) | $13,600 |
| Local Connections within Growth | 01/03/2012 | 04/02/2012 | $2,400 | Chester County (in kind services) | $13,600 |
| Supportive Policies and Programs | 11/01/2011 | 05/01/2012 | $1,500 | Chester County (in kind services) | $8,500 |
| Implementation and Action Plan | 04/02/2012 | 07/31/2012 | $1,800 | Chester County (in kind services) | $10,200 |
| Draft and Final Circulation Plan | 08/01/2012 | 12/03/2012 | $2,250 | Chester County (in kind services) | $12,750 |
| Project Management | 06/01/2011 | 12/03/2012 | $300 | Chester County (in kind services) | $1,700 |
| Plan Totals | $15,000 | $85,000 | |||
| Select current plan status. | Finalized plan seeking funding. | ||||
Section VII: Additional Funding Identified
| Funding Sources | Amount | Phase | Year | Status |
|---|
| Funding Sources | Amount | Phase | Status |
|---|---|---|---|
| Dept. of Community & Economic Development (DCED) | $0 | ||
| Dept. of Conservation & Natural Resources (DCNR) | $0 | ||
| Dept. of Health (DOH) | $0 | ||
| Dept. of Education (DOE) | $0 | ||
| Dept. of Environmental Protection (DEP) | $0 | Requested | |
| Local Funds | $15,000 | Planning | Secured |
| Other Funds | $0 | ||
| Total Other Applied/Secured Funds | $15,000 |
Section VIII: Terms and Conditions
By checking the boxes below, as project sponsor, I and my associates, understand and accept that:
- [x] **This is a reimbursement program, not a grant program, and that no money will be provided up front.
- [x] **We will comply with all Federal Aid Highway requirements. Failure to comply with any and all of these requirements may result in the disapproval or termination of a previously approved project; and, if the project is already underway, we will be obligated to refund all funding dispersed on the project to date.
- [x] **We are responsible for advancing the project, not PennDOT. However, PennDOT is available to assist with these processes.
- [x] **All of the individuals and entities listed on the application are aware that they are being included in the project listed on the application and agree to their assigned roles, as required.
- [x] **We agree to enter into an agreement prepared by PennDOT that, among other things, sets forth the terms and conditions governing the performance of the project, disbursement of funding, and our financial obligations as sponsor and provides for maintenance of the completed project improvements.
- [x] **We certify that the affirmations contained in this Application are true and correct to the best of Applicant's knowledge, information and belief; and that this verification is made subject to the penalties of 18 Pa. C.S. § 4904, relating to unsworn falsification to authorities.
- [x] **We agree that this project must be obligated prior to 6/30/2012. Projects Sponsors who are unable to meet this agreement will forfeit Pennsylvania Community Transportation Initiative funds and may be subject to reimbursing all federal funds utilized on the project.
- [x] **I AGREE TO THESE TERMS AND CONDITIONS.
| **Responsible Person | Ronald Bailey | Submit Date | 9/16/10 |
|---|
All applications must be received by the PennDOT Center for Program Development and Management prior to 5 p.m. on Wednesday, September 15, 2010.
If the Submit button does not display a message screen please attach this document to an email message and send to: RA-PDPennDOTPDFPCTI@state.pa.us
Central Chester County Bicycle and Pedestrian Circulation Plan
-- Regional Context and Regional Trails--
Map of Chester County and adjacent counties illustrating the regional trail network, Landscapes2 growth areas, and the Central Chester County study area encompassing Downingtown, Exton, and West Chester.
Map Labels
- Counties: Montgomery County, Delaware County, New Castle County, Chester County, Lancaster County
- Study Area: STUDY AREA, Downingtown, Exton, West Chester
- Trails: Schuylkill River Trail, French & Pickering Trail, Uwchlan Trail, Chester Valley Trail, Struble Trail, Brandywine Trail
- Highways: 76, 30, 100, 113, 202, 322, 1
Legend
- Regional Trails - Existing
- Regional Trails - Proposed
- Landscapes2 Growth Areas: Urban; Suburban Center
Central Chester County Bicycle and Pedestrian Circulation Plan
-- Local Context with Missing Regional Trail Connections--
Map of the Central Chester County study area and surrounding municipalities showing existing and proposed regional trails, bus routes, parks and protected open space, Landscapes2 growth areas, and large directional arrows indicating missing regional trail connections between Downingtown and Exton, between West Chester and Exton, and between West Chester and the Brandywine Trail near Route 322.
Map Labels
- Municipalities and Parks: Marsh Creek State Park, Upper Uwchlan, East Brandywine, Uwchlan, West Pikeland, Caln, East Caln, West Whiteland, Downingtown, Exton, Exton Park (Future Site), West Bradford, East Bradford, West Goshen, East Goshen, West Chester, Popcopson, Westtown
- Trails and Waterways: Struble Trail, Uwchlan Trail, Chester Valley Trail, Brandywine Trail, Brandywine Creek East Branch
- Transit Stations and Corridors: Downingtown (SEPTA/Amtrak), Amtrak Keystone Service, SEPTA Paoli-Thorndale, Whitford (SEPTA), Exton (SEPTA/Amtrak), Exton Square Mall/Transportation Center, West Chester Transportation Center
- Commercial and Institutional Destinations: Ashbridge Square, Brandywine Square, Main Street at Exton, QVC Studio, American Helicopter Museum, West Chester Business District, West Chester University
- Highways and Routes: 76, 113, 282, 100, 401, 322, BUS 30, 30, 202, 162, 3, 842, 52, 926
Legend
- Regional Trails - Existing
- Regional Trails - Proposed
- Bus Routes
- Parks and Protected Open Space
- Study Area
- Landscapes2 Growth Areas: Urban; Suburban Center
Scenes from Central Chester County
Collage of nine photographs labeled A through I showing trails, streets, bus stops, and train stations across Central Chester County. Visible signage includes "EXTON" at Exton Train Station (B), "ONE WAY" and no-right-turn street signs on Gay Street (H), and "West Chester Transportation Center" and "SEPTA Route 104" signage (I).
Legend:
- (A) Main Street at Exton
- (B) Exton Train Station
- (C) Exton Transportation Center
- (D) Struble Trail
- (E) Eastbound PA 3, West Goshen
- (F) Chester Valley Trail
- (G) East Branch Brandywine Trail
- (H) Gay Street, West Chester
- (I) West Chester Transportation Center
West Chester University
Office of the Vice President
for Administration and Finance
Philips Memorial Building - Room 202
West Chester University
West Chester, Pennsylvania 19383
610-436-2731
fax: 610-738-0314
www.wcupa.edu
September 14, 2010
Mr. Ronald T. Bailey
Executive Director
Chester County Planning Commission
601 Westtown Road, Suite 270
P. O. Box 2747
West Chester, PA 193 80-0990
Dear Mr. Bailey:
On behalf of West Chester University of Pennsylvania, I am submitting this letter of support of Chester County Planning Commission's development of Central Chester County Bicycle and Pedestrian Plan.
The University's commitment to work towards a more environmentally-sustainable future will be enhanced with improved pedestrian and bicycling commuter opportunities. The University is particularly interested in ways to minimize the need for additional parking on and around campus, reduce traffic, which will benefit visitors who will find less congestion on the road, and to provide a more environmentally-friendly community.
To that end, we are monitoring the commuter population at the University, and are implementing various practices meant to reduce the amount of traffic and to raise the environmental consciousness of our students, faculty and staff. We believe the Central Chester County Bicycle and Pedestrian Plan augments our ongoing efforts.
If West Chester University of Pennsylvania can be of further assistance, please do not hesitate to contact me.
Sincerely,
Mark P. Mixner
Vice President for Administration & Finance
West Chester University of Pennsylvania
Philips Memorial Building - Room 203
West Chester, PA 19383
610-436-2731 (Business)
610-738-0314 (Fax)
MPM/cn
Copies: Greg Weisenstein, President
West Chester University of Pennsylvania is a member of the State System of Higher Education
FYI
RECEIVED
BY:
JAN 24 2011
WESTTOWN TOWNSHIP PLANNING COMMISSION MEETING
Stokes Assembly Hall
1039 Wilmington Pike, Westtown Township
January 5, 2011 - 7:30PM
Call to Order
Chairman Lees led those present in the Pledge of Allegiance to the Flag and called the meeting to order.
Present
Commissioners – Hatton, Whitig, Adler, Lees, Walter, Pomerantz, and Rohrbach. Also present were Township Manager Robert Layman and Walter Pavelchek.
Adoption of Agenda
The Agenda was adopted as presented (RP/BW).
Election of Officers for 2011
Chair – Jim Lees – nominated by Dave Walter, second Brent Whittig, unanimously elected.
Vice Chair – Dave Walter – nominated by Brent Whittig, second Jim Less, unanimously elected.
Secretary – Elaine Adler – nominated by Jim Lees, second Russ Hatton, unanimously elected.
Approval of Minutes
The minutes of the Planning Commission meeting of December 8, 2010, were approved as corrected (Dave Walter was not in attendance). (BW/RH).
Reports.
Brent Whittig reported on the December 20th Board of Supervisors meeting. The Board approved the plan for Tract 2010-4 Facciolli/Schmidt Lot Line Revision, adopted ordinances for a Yield Sign on Carolyn Drive and a reduced speed limit on Stanton Avenue. The 2011 Budget was adopted and the Real Estate Tax raised to 2.5 mills. The Board also discussed requesting PennDOT approval for a 3-way stop at South Concord and Westbourne Road. Dave Walter asked if the Board explained the 25% increase in the tax rate and if any plans were made for the Oakbourne Road and S. New Street bridges. Mr. Whittig said neither were discussed.
Eric Rohrbach reported on the January 3rd meeting. At the Re-organization meeting Tom Foster was elected Chair, Charles Barber Vice Chair, and Carol DeWolf Police Commissioner. Provision for repair of the Oakbourne Road bridge is in the 2011 budget. The Liberty Square project is still not complete. The Lain sewer issue is still pending. The Supervisors authorized accepting contracts for Oakbourne Mansion events through September 2011 as plans for possible renovation are proceeding slowly.
Announcements
The schedule for PC members' attendance at the Board meetings was distributed. PC members are asked to please notify the office if they change the schedule.
Mr. Layman responded to questions relating to the 2011 Budget and the tax increase. The police department is responsible for approximately 55% of the budget. He explained that the police benefits package is a major factor in this cost. Mr. Pomerantz noted that these issues had been the topic of a number of recent studies. He will provide further information to the Township.
Non-agenda Public Comment
Walt Pavelchek reported that he had asked about the funding for Township employees benefits and was told that this was not a problem.
Zoning Hearing Board Application – Chester County Outdoor LLC
Packages including the application to the Zoning Hearing Board, site plans, and plans for the proposed
Planning Commission Minutes – January 5, 2011 – page 1 of 2
digital billboard were distributed to the Planning Commission members. The Hearing is scheduled for Tuesday, January 25th. The Planning Commission discussed the implications of a large sign of this type at the West Chester Pike/Cavanaugh Court/352 intersection and requested that the plans be sent to the Traffic Consultant for review and comment. The PC will discuss further at the meeting on January 19th.
Public Comment.
None at this time.
Adjournment (ER/EA) 8:55pm.
Elaine L. Adler
Planning Commission Secretary
Planning Commission Minutes – January 5, 2011 – page 2 of 2