Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda
Wednesday, July 1, 2015
7:00 PM
Workshop Session: 7:00 PM to 7:30PM (Conference Room – Open to the Public)
Formal Meeting: 7:30PM (Board Room – Open to the Public)
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes June 3, 2015
- Subdivision and Land Development Applications New Kent, Final Plan Revision
- Conditional Uses and Variances
- Ordinance Amendments
- Comprehensive Plan Update
- Old Business
- New Business PC Meeting Structure
- 2015 Goals
- Any Other Matter
- Liaison Reports
- Correspondence
- Dates of Importance July 01, 2015 Planning Commission 7:00 pm July 02, 2015 Park Commission (Cancelled) July 03, 2015 Office Closed for Independence Day July 07, 2015 Board of Supervisors 7:00 pm July 08, 2015 Conservancy Board 7:00 pm July 09, 2015 Historical Commission 7:00 pm July 09, 2015 Zoning Hearing Board 19 Hill St D. Variance 7:30 pm July 13, 2015 Municipal Authority 7:00 pm July 15, 2015 Futurist Committee 7:00 pm July 16, 2015 Open Space Park & Rec Comm. Review Final Draft 7:00 pm July 16, 2015 Commerce Commission (Cancelled) July 21, 2015 Board of Supervisors 7:00 pm
Newsletter Deadlines for 2015:
Fall: August 31
Winter: October 30
Bold Items indicate new information to review.
F:\Data\Shared Data\Agendas\Planning Commission\2015\PC AGENDA 07012015.doc
East Goshen Township Planning Commission
Application Tracking Log
| Application Name | Application (CU,LD,O, SD,V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| New Kent Final Plan Revision | LD | P/F | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |
| Bold = New Application or PC action required | |||||||||||||
| Completed in 2015 | |||||||||||||
| 19 Hill St. / Smith | V | 5/27/2015 | 5/27/2015 | NA | NA | 5/29/2015 | 7/1/2015 | 7/7/2015 | 7/9/2015 | 7/24/2015 | Approved | ||
| 1596 Paoli Pike (Swiss Farms) | ZHB | Sk | 2/23/2015 | 2/23/2015 | NA | NA | 2/242015 | 4/1/2015 | 4/7/2015 | 4/14/2015 | 4/24/2015 | ||
| 10A Reservoir Rd. | SK | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
| 1131 N. Chester Rd. | SD | P/F | 10/15/2014 | 11/5/2014 | 10/16/2014 | 10/16/2014 | 10/16/2014 | 1/7/2015 | 1/20/2015 | NA | 1/24/2015 | Approved | |
| 1331 E. Strasburg Ln. | ZHB | Sk | 12/5/2014 | 12/5/2014 | NA | NA | 12/18/2014 | 1/7/2015 | 1/20/2015 | 1/21/2015 | 1/26/2015 | Denied | |
| 612 Meadow Drive (Christenson) | V | Sk | 2/23/2015 | 2/23/2015 | NA | NA | 2/242015 | 4/1/2015 | 4/7/2015 | 4/14/2015 | 4/24/2015 | Approved | |
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2015\PC Tracking Log for 07012015.xls
6/26/2015
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
June 3, 2015
The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, June 3, 2015 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Dan Daley, Adam Knox, Al Zuccarello, Dan Landis, Jim McRee, Monica Close and Lori Keir. Also present was Mark Gordon, Zoning Officer; and Janet Emanuel, Supervisor.
COMMON ACRONYMS:
| BOS – Board of Supervisors | CPTF – Comprehensive Plan Task Force |
|---|---|
| BC – Brandywine Conservancy | CVS – Community Visioning Session |
| CB – Conservancy Board | SWM – Storm Water Management |
| CCPC – Chester Co Planning Commission |
A. INFORMAL MEETING – 7:00
- The tracking log was reviewed.
- Minutes from May 6 were reviewed. One correction.
- Al reviewed the Draft 4 of the Comprehensive Plan and thinks the economic plan is good. He pointed out that there are references to the West Chester Planning Commission, which is okay when there is reference to something in the past. However, this was a chartered commission which, since 2010 is no longer viable. So, any references to the future need to be changed.
- 19 Hill Street – Located in Milltown at the dead end of the street, house built in 1960s. Mrs. Smith wants to put a carport on the current driveway which is only 6” from the property line, so she needs a variance. Jim voiced concern about setbacks and how they impact a neighborhood. Mark mentioned that it doesn’t have to be 18’ wide, so it could be made smaller and require screening.
- Beverage café ordinance was sent to CCPC. The CCPC suggested removing “Beverage”.
- Dog and animal Ordinances need to be reviewed.
- Trail Alignment Maps are on the website. Next Tuesday June 9 will be a meeting with property owners.
B. FORMAL MEETING – 7:30 PM
- Dan called the meeting to order. He led the Pledge of Allegiance and a moment of silence to remember our troops.
- Dan asked if anyone would be recording the meeting. There was no response.
- Dan reviewed the tracking log.
- Dan noted that the minutes of the May 6, 2015 meeting were approved as corrected.
C. CONDITIONAL USES & VARIANCES
1. 19 Hill Street, Dimensional Variance - Mrs. Nancy Smith, property owner, was present. She explained that she needs a car port for protection from the weather. It would be built on the current driveway and two sides will be enclosed. Her son, Roger Smith, lives with her. He explained that they put up a temporary car port many years ago and took it down 3 years ago. A friend advised that they might need a variance for this car port.
Public Comment:
Donald Howe, 18 Edgewood – He is a neighbor behind 19 Hill Street, has lived here 24 years and supports Mrs. Smith’s request. He understands impervious coverage and feels it is best to build the car port on the existing driveway.
Jennifer Conway, 17 Hill Street – She is a neighbor and supports this request.
Robert Smith, Surveyor – He recently checked the property line and showed how the car port will be placed on the existing driveway.
F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docxF:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docx 1
Damon Magosian, contractor – He presented a photo of the original car port built in the 1980s. He explained how he built it and got approval from the Township but did not need a permit. He mentioned that Mrs. Smith has a PD (Physically Disabled) license plate.
Mrs. Smith explained that she has a breathing condition and feels better in cool conditions. The car port will provide shade from the sun. She also has a skin condition.
Lori feels there may be an ADA case which is a legal case and would require an attorney.
Dan explained the process and that the ZHB will make the final decision. This will be a permanent structure within the 20’ setback. Jim feels the width should be shortened from 18’ to 17’ and require screening.
Monica made a motion to recommend a no position to the Board of Supervisors on the variance request as outlined in the application. Adam seconded the motion. The motion passed unanimously. Mark pointed out that the BOS meeting shown on the letter to the residents has been changed to July 7, 2015.
D. ORDINANCE AMENDMENTS
1. Beverage Café in the C-2 Zoning District – Mark reported that the changes the PC suggested were made and the document was sent to the CCPC for review. Their response was received and they suggested not using the word “Beverage”. After discussion, the PC members decided to leave the wording as it is since it is a more specific definition. Monica moved to recommend that the Board of Supervisors approve the Zoning Ordinance amendment permitting a Beverage Café use in the C-2 district within a shopping center, as drafted. Jim seconded the motion. The motion passed unanimously.
E. COMPREHENSIVE PLAN UPDATE
1. Draft 4 was sent to the PC members. Next Wednesday June 10 at 7:00 pm is the meeting for ABC members to give input to the plan. Janet had 2 comments for the PC:
- At the last CPTF meeting on Chapter 4, they wanted a different way of estimating future population to be used. This wasn’t done.
- Chapter 16, the grid for responsibility, instead of having 1 ABC responsible, he listed all the ABCs that might have input.
2. SEPTA Technical Comments – Everyone was asked to review this for input at the June 10 meeting. Monica mentioned that there is reference to a chart on page 5, but she couldn’t find it.
F. ANY OTHER MATTER
1. Sunoco Pipeline - Mark distributed copies of the presentation that was given at the BOS meeting last night. The public meeting will be June 18, 2015. Janet explained that Sunoco wants 50 foot easements along the current Mariner 1 pipeline to put in 2nd and 3rd pipelines. At this point, this is the primary route but they are considering other routes. Negotiation with property owners will start in the next 2 weeks.
2. Dog and Pet Ordinance – Janet explained that this is required by the State as a result of the recent incident in the Township, although the Township is not allowed to control dangerous dogs. Lori is an SPCA volunteer and asked if the number of dogs allowed includes foster dogs. Janet commented that only 4 dogs (full time or foster) are allowed at anytime.
3. Stand Alone Ordinance for Dogs – Comments:
- Look into electronic fence/collar
- Registration – add must comply with state laws
- Running at large – definition doesn’t include private property
- Change police dept name to “local police”
- Fines seem low.
Mark will write a letter with comments.
F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docxF:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docx 2
G. ADJOURNMENT
There being no further business, Adam moved to adjourn the meeting. Lori seconded the motion. The meeting adjourned at 9:30 pm. The next regular meeting will be held on July 1, 2015 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docxF:\Data\Shared Data\Minutes\Planning Commission\2015\PC 6-3-15 draft.docx 3
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 9, 2013
The Hankin Group
Attn: Neal Fisher, P.E.
707 Eagleview Blvd.
PO BOX 562
Exton, PA 19341
Re: New Kent II Land Development Approval
Dear Mr. Fisher:
At their meeting on August 6, 2013 the Board of Supervisors authorized the execution of the escrow agreements and signed the final plans for the New Kent II Land Development. I will send a copy of the executed Financial Security Agreement to Summit Financial with a copy of this letter.
Please record the signed land development plans with Chester County and provide the Township with proof of recording and a copy of the recorded set for our records.
Please give me a call at 610-692-7171 or e-mail me at mgordon@eastgoshen.org if you have any questions or need additional information.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
Cc: R. Robert McElwee, Summit Financial Services, Inc.
F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\2012 Land Development (1 Building)\New Kent LD Ltr 08092013.doc
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 6/22/2015
To: Planning Commission [Initialed: MAG]
From: Mark Gordon, Township Zoning Officer
Re: Final Plan Revisions: New Kent Apartments / LD (1 New 12 Unit Apartment Building)
PC Members,
As most of you know, New Kent Apartments has an approved Land Development Plan to build a new two story, twelve unit apartment building near the tennis courts. The plan is recorded and the development agreements are in place. The applicant, Hankin Group, has a couple of revisions that they propose to the final recorded plan. The footprint of the building is smaller than the approved building and the height is proposed to be 3 stories and 35 feet tall. The building design has been changed due to market conditions in which Hankin has found that larger 2 bedroom units are very desirable. The approved plan proposes 8 one bedroom apartments and 4 two bedroom units. The revised building design has 6 one bedroom units and 6 two bedroom units. The one bedroom units will all be on the first floor and the two bedroom units will occupy the second and third floors similar to a town house. Each apartment still has a private exterior ground floor entrance.
This change will affect the bedroom mix of the complex therefore Hankin proposes to convert 2 of their existing two bedroom units within the existing community to one bedroom units with a den. This will satisfy the bedroom mix requirement. Hankin also proposes to reorient the tennis court and convert it to a “Sport Court” for Basketball, Tennis, Pickle ball, volleyball, etc.
There is no change to the storm water conditions, basin, or the storm water design. There are no changes proposed to the parking areas except that the Handicap parking will be relocated to the new parking lot in order to avoid significant grade changes that make the construction of the HC parking in the in the existing parking area problematic. There are also no changes proposed to the Landscape Plan.
Since this is an approved and recorded plan the SALDO allows for minor changes to a plan without requiring the applicant to comply with all SALDO procedures, so long as the plan is reviewed by the Township Engineer, PC and the Board of Supervisors approves the plan. Also, The applicant shall prepare a record plan and record it as an amendment to the current recorded plan.
The changes proposed meet the Zoning Ordinance Requirements and Hankin has submitted revised plans for your review on July 1.
F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\2012 Land Development (1 Building)\Final Plan revisions\Memo to PC 06222015.doc
DRAFT MOTION:
Mr. Chairman, I move that we recommend that the Board of Supervisors approve the Final Plan revisions for the Approved New Kent II Land Development Plan dated 10/9/2012 approved on 8/6/2013 and last revised on 6/15/2015 with the following condition:
1. The applicant shall convert both 309 and 312 Hampton Court into one bedroom units with dens prior to the issuance of any use and occupancy for the new building.
F:\Data\Shared Data\Property Management\53-4\53-4-76 (New Kent Apts.)\2012 Land Development (1 Building)\Final Plan revisions\Memo to PC 06222015.doc
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: June 25, 2015 June 12, 2015 May 7, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Up Coming meetings
We have a lot going on this summer.
Long Range Planning Session
May 27, 2015 2 9:30 am
Open Space, Parks and Recreation Plan
June 4, 2015 – Final draft issued to Committee (I will provide a copy to the Board) Copy to Board on June 2, 2015
July 7, 2015 June 16, 2015 @ 7pm – Board of Supervisors meeting (Board reviews final draft of plan)
July 16, 2015 June 18, 2015 @ 7 pm- Committee meeting to review final draft of plan
July 31, 2015 June 19, 2015 – Any changes are made (if needed) and plan is sent to CCPC and adjacent municipalities for review and comment
October 7, 2015 August 5, 2015 @ 7 pm - Planning Commission public meeting and recommendation
October 20, 2015 September 15, 2015 @ 7 pm– Board of Supervisors adopts at regular meeting
Paoli Pike Trail
May 21, 2015 @ 7 pm – Trail Committee Meeting #1
June 9, 2015 @ 7 pm Property and Business owners meeting.
June 16, 2015 – Open House @ 6 pm, Presentation at Board meeting a@ 7 pm.
August 24, 2015 @ 7 pm TBD – Trail Committee Meeting #2
Comp Plan
June 8, 2015 @ 7 pm – Presentation to Board of Supervisors
June 10, 2015 @ 7 pm – Presentation to ABCs
June 11, 2015 @ 8 am – Presentation to Business and Commercial owners
June 11, 2015 @ 7 pm – Presentation to General Public
July 27, 2015 – Final Draft to Jeannine Spears @CCPC for final comments
July 31, 2015 – Send Final Draft to CPTF, PC, BOS
August 17, 2015 – CPTF Final Meeting (recommendation)
On or about August 18, 2015 – Send to adjoining municipalities, CCPC, WCASD etc. for 45 day public input period.
October 7, 2015 – Planning Commission public meeting and recommendation
October 20, 2015 – Board of Supervisors adopt Plan at regular meeting
We are meeting with Tom C and Jeannine on 6/24 to review the comments made at the public meetings. We will also discuss the possibility of moving up the time frame for adoption. Perhaps we can adopt the Comp Plan and the Open Space Plan at the same time.
The Comp Plan Exec. Committee met with Tom C. and it appears that we will have a final draft of the comp plan ready for distribution to adjoining municipalities and the CCPC by late July. This will put us in a good position to adopt both plans on October 20th.
F:\Data\Shared Data\ABC'S\Board of Supervisors\General\Up coming events & meetings 062515 v2.docxF:\Data\Shared Data\ABC'S\Board of Supervisors\General\Up coming events & meetings 061215.docxF:\Data\Shared Data\ABC'S\Board of Supervisors\General\Up coming events & meetings 050715.docx
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 6/26/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature: MG]
Re: Meeting Structure
Dear Commissioners,
I'd like to recommend a change to the meeting structure for your consideration. Currently the PC uses 30 minutes to review the agenda without public input. This seems unnecessary and possibly repetitive. It also delays the applicant for an additional 30 minutes and when they have consultants with them, that can be costly over the span of several meetings.
My recommendation is that the formal meeting begin directly at 7 PM and that each item be discussed as outlined in the agenda. Even the review of the meeting minutes. I can still give a brief, 30 second, background of each item, if needed, and then allow the applicant to present their plan, etc.
It just seems like a more efficient use of the Commissions' and the Applicants' time and it allows the applicant to present their plan and address the PC's questions themselves.
If the PC agrees I'd suggest trying the new format for three months to see how it goes.
F:\Data\Shared Data\ABC'S\Planning Commission\Memo to PC re. Mtg Struct 07262015.doc
[Cover graphic featuring a blue architectural plan background above four inset photographs: a brick residential building, an outdoor sports court, a clubhouse and pool, and a living room interior.]
NEW KENT II PROJECT NARRATIVE
June 19, 2015
HANKIN SM
Hankin Group
707 Eagleview Blvd
Suite 400
Exton, PA 19341
610.458.1900
www.hankingroup.com
New Kent Apartments
Introduction
The Hankin Family Limited Partnership (Hankin) is the owner and developer of the New Kent Apartment complex, which contains approximately 30.8 acres and is located at the northwest corner of Route 352 and Boot Road, East Goshen Township, Chester County, PA.
Map 1 shows the project location on an aerial map, the development area is highlighted in yellow.
Map 1: Site location
[Map: Aerial view of New Kent Apartments and surrounding area at the northwest corner of Route 352 and E. Boot Road. Road labels include Paoli Pike, E. Boot Road, Barker Circle, New Kent Drive, and Route 352. A yellow arrow and label point to "PROPOSED BUILDING" highlighted in yellow.]
Background:
On February 19, 2013 the Board of Supervisors unanimously approved the Final Land Development plans for New Kent Apartments II. These plans illustrate the construction of a new 12 unit apartment building (8 one bedroom units and 4 two bedroom units), 30 parking spaces (10 spaces allocated for future parking), a picnic area and alterations to the existing tennis courts. Over the past year, Hankin has further studied the approved plans in conjunction with the market place and tenant requests, based on this information Hankin is proposing certain modifications to
the approved plans. These changes are intended to increase residential unit variety and improve recreational areas and connectivity. The following paragraphs highlight the plan modifications.
Apartment Building:
The proposed 12 unit building will accommodate an even mix of one and two bedroom units with the one bedroom units being located on the first floor and the two bedroom units spanning the second and third floors. The design of the 2 bedroom units attempts to provide a living arrangement similar to that of a townhouse. In order to accommodate the new building design we propose reducing the building footprint by approximately 800 sf and increasing the building height to 3-stories.
Density:
No change is proposed to the overall unit count or overall mix of units. The proposed new building will contain a mix of 6 one bedroom units and 6 two bedroom units. In order to maintain the same unit mix Hankin is proposing to convert 2 two bedroom units in an existing building into one bedroom units.
[Architectural rendering: Front elevation rendering of New Kent New Apartments showing a three-story brick and siding apartment building with pitched roofs and front porches, flanked by trees.]
NEW KENT NEW APARTMENTS
HANKIN GROUP
William D. Eckley LLC Architect
Active Recreation Area:
The approved plans proposed to retain one of the two existing tennis courts east of the clubhouse, Hankin is proposing to modify the tennis court for use as a Sport Court. Sport Courts provide a surface that can be utilized by various sports providing active recreation flexibility to the residents. The image below is an example of a Sport Court striped for basketball, volleyball and tennis.
[Photograph: An outdoor sport court with blue, green, and yellow playing surfaces, basketball hoop, and tennis/volleyball net, adjacent to residential townhomes.]
In addition to the sport court, Hankin proposes a 12' x 20' pavilion and additional pedestrian walkways. The walkways have been designed to interconnect the proposed recreational areas with the existing clubhouse and pool area.
Building and Overall Impervious Cover:
As shown in the table below, building coverage is reduced as a result of the smaller building footprint while the overall impervious coverage ratio remains constant as a result of increased pedestrian connectivity.
| Approved Plans | Plan Amendment | Allowable | |
|---|---|---|---|
| Building Coverage | 15.33% | 15.26% | 20% |
| Impervious Coverage | 39.94% | 39.94% | 40% |
Parking:
No change is proposed to the overall parking count. Hankin is proposing to relocate the two handicap stalls from Kent Drive to the proposed parking lot south of the new building. The revised location provides for more gently sloping ground and easier compliance with the Americans with Disabilities Act.
Stormwater Management:
No change has been made to the stormwater basin designs, stormwater piping or impervious coverage.