Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda
Wednesday, September 2, 2015
7:00 PM
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes August 5, 2015
- Subdivision and Land Development Applications 942 Cornwallis Drive (SKETCH PLAN)
- Conditional Uses and Variances Goshen Village Shopping Center / Conditional Use for Beverage Café (Dunkin Donuts); Goshen Village Shopping Center / ZHB Application to Amend current ZHB Decision
- Ordinance Amendments
- Comprehensive Plan Update
- Old Business
- New Business
- 2015 Goals
- Any Other Matter
- Liaison Reports
- Correspondence
- Dates of Importance Aug 29, 2015 Community Day 5 PM / Fireworks at Dusk Sept 07, 2015 Labor Day / Township Office Closed Sept 09, 2015 Conservancy Board 7:00 pm Sept 10, 2015 Historical Commission 7:00 pm Sept 14, 2015 Municipal Authority 7:00 pm Sept 15, 2015 Trail Open House 6:30 pm Sept 15, 2015 Board of Supervisors Trail Plan Update 7:00 pm Sept 16, 2015 Futurist Committee 7:00 pm Sept 17, 2015 Commerce Commission 7:00 pm Sept 29, 2015 Zoning Hearing Board 7:30 pm
Newsletter Deadlines for 2015:
Winter: October 30
Bold Items indicate new information to review.
F:\Data\Shared Data\Agendas\Planning Commission5\PC AGENDA 09022015.doc
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
August 5, 2015
The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, August 5, 2015 at 7:00 p.m. at the East Goshen Township building. Members present were: Vice Chairman Adam Knox, Dan Landis, Jim McRee, Monica Close, Lori Kier and new member Brad Giresi. Also present was Mark Gordon, Zoning Officer.
COMMON ACRONYMS:
| Acronym | Acronym |
|---|---|
| BOS – Board of Supervisors | CPTF – Comprehensive Plan Task Force |
| BC – Brandywine Conservancy | CVS – Community Visioning Session |
| CB – Conservancy Board | SWM – Storm Water Management |
| CCPC – Chester Co Planning Commission |
A. FORMAL MEETING – 7:00
- Adam called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our troops.
- Adam asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response.
- Adam reviewed the Tracking Log and determined no need for a workshop
- Adam noted that the minutes of the July 1, 2015 meeting were approved.
B. ORDINANCE REVIEW
The Commission reviewed the outline of items in Article II thru IV of the Zoning Ordinance:
Article II
- PRD/PUD – no changes needed
- Animal Husbandry – Jim gave some background on what was discussed so far. The Commission will continue to review this section
- Temporary structure – This will be reviewed.
- Publically & privately owned recreation – Definitions need to be consistent. This will be reviewed.
- Solar – This is done.
- Wind – This will be reviewed.
- Single Family Cluster – This will be reviewed.
- Single Family Open space – This will be reviewed.
Article III - C1 and C2 will be reviewed and updated.
Article IV - Max Building Height and Rooftop structures are done. All other items will be reviewed.
C. COMPREHENSIVE PLAN
Mark reported that the final draft will be on the website soon. He reviewed the process to adoption planned for October 20th. The next meeting is Monday, August 17, 2015 at 7:00 pm.
D. ANY OTHER MATTER
- Ordinance Amendment – Dogs – The proposed ordinance was reviewed. The reasons for this ordinance are listed at the beginning. No more than 4 adult dogs. Adam found that this is the standard number in ordinances across the country. It was noted that on page 2 it should read “against property damage”. Jim moved to recommend that the Board of Supervisors adopt the amendment to the accessory use section of the Zoning Ordinance as it relates to dogs. Dan seconded the motion. The motion passed 5 to 1 – Lori voted no.
F:\Data\Shared Data\Minutes\Planning Commission5\PC 8-5-15 draft.docx 1
- Drone Ordinance – After some discussion, the Commission members will read this ordinance for discussion at a future meeting.
E. ADJOURNMENT
There being no further business, Monica moved to adjourn the meeting. Lori seconded the motion. The meeting adjourned at 9:20 pm. The next regular meeting will be held on September 2, 2015 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
F:\Data\Shared Data\Minutes\Planning Commission5\PC 8-5-15 draft.docx 2
8/28/2015
East Goshen Township Planning Commission
Application Tracking Log
| Application Name | Application (CU,LD,O, SD,V, SE, CA | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 942 Cornwallis Drive | SD | Sk | 8/26/15 | NA | NA | NA | NA | NA | NA | NA | NA | NA | |
| GVSC CU APP Beverage Café (Abjibapa / DUNKIN) | CU | Sk | 8/6/15 | 8/6/15 | NA | NA | 8/12/15 | 9/2/15 | 10/5/15 | 9/15/15 | 10/9/15 | ||
| GVSC ZHB APP Freestanding Signs | ZHB | SK | 8/6/15 | 8/6/15 | NA | NA | 1/10/00 | 9/2/15 | 10/5/15 | 9/29/15 | 10/5/15 | ||
| Bold = New Application or PC action required | |||||||||||||
| Completed in 2015 | |||||||||||||
| New Kent Final Plan Revision | LD | P/F | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Approved |
| 19 Hill St. / Smith | V | 5/27/15 | 5/27/15 | NA | NA | 5/29/15 | 7/1/15 | 7/7/15 | 7/9/15 | 7/24/15 | Approved | ||
| 1596 Paoli Pike (Swiss Farms) | ZHB | Sk | 2/23/15 | 2/23/15 | NA | NA | 2/242015 | 4/1/15 | 4/7/15 | 4/14/15 | 4/24/15 | Approved | |
| 10A Reservoir Rd. | SK | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Sketch | |
| 1131 N. Chester Rd. | SD | P/F | 10/15/14 | 11/5/14 | 10/16/14 | 10/16/14 | 10/16/14 | 1/7/15 | 1/20/15 | NA | 1/24/15 | Approved | |
| 1331 E. Strasburg Ln. | ZHB | Sk | 12/5/14 | 12/5/14 | NA | NA | 12/18/14 | 1/7/15 | 1/20/15 | 1/21/15 | 1/26/15 | Denied | |
| 612 Meadow Drive (Christenson) | V | Sk | 2/23/15 | 2/23/15 | NA | NA | 2/242015 | 4/1/15 | 4/7/15 | 4/14/15 | 4/24/15 | Approved |
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2015\PC Tracking Log for 09022015.xls
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 8/26/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [Signature: MG]
Re: 942 Cornwallis Dr. Sketch Plan
Commission Members,
The Township has received a SD Sketch Plan Submission for 942 Cornwallis Dr. The sketch plan shows a subdivision of the 3.5+ acre parcel creating on additional residential building lot.
The applicant is seeking the PC’s review and comments prior to submitting a complete SD/LD Application.
F:\Data\Shared Data\Property Management+-4+-4-37.1 (942 Cornwallis Drive)\SD Sketch Plan\Memo to PC re. 942 CormWal Dr 08262015.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 26, 2015
Dear Property Owner:
The purpose of this letter is to inform you that Robert and Amanda Gionfriddo, the owners of 942 Cornwallis Dr., West Chester, PA 19380, have submitted a Sketch Plan to the Township for review. The sketch plan proposes a subdivision of the 3.5+ acre lot into two residential building lots.
Pursuant to Township policy, property owners and residents within 1000 feet of the subject property are notified of sketch plan submissions. The applicant will present the plan to the Planning Commission in order to hear the Commissions’ initial comments prior to submitting an official subdivision and Land Development application.
The plan will be reviewed and discussed at the date and time outlined below and is subject to change without further written notice.
September 2, 2015 - Planning Commission Meeting (7:00 pm)
All meetings are held at the Township Building and are open to the public. The plan is available for review at the Township building during normal business hours. Please give me a call if you have any questions or need additional information.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
Cc: All Township Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management+-4+-4-37.1 (942 Cornwallis Drive)\SD Sketch Plan@0 foot letter for Sketch Plan 08262015.doc
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 8/27/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [Signature: MG]
Re: Beverage Café Conditional Use / Dunkin Donuts/ Goshen Village Shopping Center
Commission Members,
As you know and can see in your meeting packet, the Conditional Use application has been submitted for the proposed Dunkin Donuts Store in the former Citadel Bank building in the Goshen Village Shopping Center (GVSC).
All of the Conditional use issues were contemplated during the Zoning Ordinance amendment that was approved early this year. The ordinance is not yet codified however I have enclosed a copy for your use here.
Staff has reviewed the application and plans for the use and has determined that it meets the ordinance requirements.
The hearing is scheduled for 9/15. I have provided a draft motion for your review and consideration.
Draft Motion:
Mr. Chairman, I move that the Planning Commission recommend approval of the Conditional Use application of Abjibapa Enterprises, LLC. To operate a Beverage Café at 1500 Paoli Pike as outlined in the Zoning Ordinance with the following conditions:
- The applicant shall provide the Township with a draft parking agreement which addresses the 5 parking spaces eliminated for the drive thru in the event the Township determines in the future that they are needed.
- The Drive Thru menu board shall automatically turn off when the store is closed.
- The trash enclosure shall be closed at all times except when being serviced.
- The use shall include a serviceable grease trap for food waste sewage if determined by the Township upon building plan review.
- The drive thru landscape screening shall be installed as described in the Conservancy Board Review letter dated August 13, 2015.
- All new rooftop structures shall be painted to be aesthetically compatible with the roof façade.
- There shall be no outside storage of any kind, not including the arrangement of outdoor seating.
F:\Data\Shared Data\Property Management+-4+-4-77 (Goshen Village)\Beverage Cafe Conditional Use (Dunkin) 2015\Memo to PC 08272015.doc
[Illustration: Tree branches and leaves along the top and right margins]
EAST GOSHEN CONSERVANCY
August 13, 2015
East Goshen Township
Planning Commission
1580 Paoli Pike
West Chester, Pa. 19380
Re: Beverage Café / Conditional Use Plan for Dunkin Donuts
Landscape Screening Recommendation
Dear Commission Members:
At their meeting on August 12, 2014 the Conservancy Board unanimously approved the following motion:
Mr. Chairman, I move that we recommend that the Planning Commission accept the Landscape screening proposed on the Goshen Village plans for the new Dunkin Donuts location proposed with the following conditions:
- Eastern white pines shall not be used as a landscape screening species for this project.
- Arborvitae is acceptable for the drive thru screening so long as a deer resistant variety such as the Green Giant is used.
- The evergreen screening for the garbage dumpster enclosure shall be consistent with the Township Tree Resolution and not include species identified as invasive plants in the east Goshen Township code. These evergreen plantings shall be diversified.
Sincerely,
[Signature: Mark A. Gordon]
Mark A. Gordon
Zoning Officer
F:\Data\Shared Data\Property Management+-4+-4-77 (Goshen Village)\Beverage Cafe Conditional Use (Dunkin) 2015\CB Rec to PC 08122015.doc
1 5 8 0 P A O L I P I K E , W E S T C H E S T E R , P A . 1 9 3 8 0
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
FYI
August 12, 2015
Dear Property Owner:
The purpose of this letter is to inform you that Abjibapa Enterprises LLC (The Applicant) has submitted a Conditional Use application for a Beverage Café use within the Goshen Village Shopping Center. The Applicant proposes to locate the Beverage Café Use within the former Citadel Bank Branch Building within the Goshen Village Shopping Center at 1504 Paoli Pike, West Chester, PA 19380 which is located in the C-2 zoning district, Local Convenience Commercial. The Applicant proposes no changes to the exterior of the existing building other than signage. The applicant proposes a drive thru service lane to service their customers and an enclosed garbage dumpster area adjacent to the building location. A Beverage Café use is permitted use in the C-2 zoning district. The full application is available for review at the Township building.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Conditional Use applications. The meeting dates for this matter are listed below and subject to change without further written notice:
September 2, 2015 – Planning Commission (7:00 PM)
September 15, 2015 – Board of Supervisors (7:00 PM – Conditional Use Hearing)
All meetings are held at the Township Building and are open to the public. The Zoning Hearing Board Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610-692-7171 to discuss how those needs may be accommodated.
Please give me a call if you have any questions or need additional information.
Sincerely,
[Signature of Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-77 (Goshen Village)\Beverage Cafe Conditional Use (Dunkin) 2015\1000 foot letter CU 08122015.doc
OR&A Orth-Rodgers & Associates, Inc.
TRANSPORTATION ENGINEERS AND PLANNERS
August 29, 2014
Mr. Louis F. Smith, Jr., Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
RE: Dunkin Donuts Review
Dear Rick:
I am in receipt of McMahon Associates Transportation Impact Study dated August 2014 regarding the 3,000 square-foot eatery with a drive-through lane's impact to local traffic in the vicinity of the above referenced site located in the Goshen Village Shopping Center at Paoli Pike and Boot Road in the Township. The site entails the redevelopment of the existing vacant bank facility with access to both Paoli Pike and Boot Road via existing driveways to each via signalized access at Paoli Pike and stop control at Boot Road.
The following constitutes my review of the impact study:
1. ORA concurs in general with the introduction and the existing conditions reported for both Paoli Pike and Boot Road in the vicinity of the site. It should be noted that the intersection of Paoli and Boot has channelized right turn lanes in the eastbound and southbound that typically only effect the southbound and westbound directions of Boot and Paoli, respectively (noted in Appendix A photographs).
2. ORA concurs with the existing traffic count periods and the various peak hours found (7:30 AM, 4:45 PM and 11:45 AM Saturday) for Paoli & Boot, (8:00 AM, 5:00 PM and 11:30 AM Saturday) for Paoli & Site Access, and (7:30 AM, 4:45 PM and 11:45 AM Saturday) for Boot & Site Access. The peak hours are within the general timeframe that may only see minor differential volumes between the adjacent intersections.
It was specifically noted that due to school not being in session, an additional count would need to be done after school has been in session for at least one week. The applicant has agreed to have the count performed to determine if the data presented with a 'growth' of 2% indicated in the report to account for the reduced summertime traffic.
An additional note, the study does not include the channelized right turn volumes at either terminus of Paoli Pike or Boot Road channelized right turns. Through discussions with the applicant's traffic consultant, it was determined that the new count conducted in September will at least get the eastbound to southbound channelized right, since this node is near the Boot Road Site Access point.
3. A review of the existing traffic conditions at the intersection of Paoli Pike & Boot Road indicates that current levels of service are between 'A's and 'D's for all three peak periods with a level of service 'E' for the westbound Boot Road through movement during the AM peak. The signalized access on Paoli Pike operates with driveway levels of service 'D's during all peaks while the Boot Road access only shows a 'D' for the drive during the PM peak. ORA concurs with these as reported.
301 Lindenwood Drive | Suite 130 | Malvern, PA 19355 | www.orth-rodgers.com | Phone 610.407.9700 | Fax 610.407.9600
Mr. Rick Smith, East Goshen Twp.
Dunkin Donuts Review
Page 2 of 3 – August 29, 2014
4. Site traffic was investigated for the proposed 3,000 square-foot facility. Based on the ITE Trip Generation Manual, the calculated trips are acceptable. Two comments we have regarding this investigation:
a. The comparison generations between the previous bank use and the new Dunkin Donuts makes sense as part of the overall usage of the facility and its general comparison of generated trips. After discussions with McMahon regarding this, it was determined that the 'bank' trips are being reincorporated as background growth traffic. Though this should be clearly identified within the text, additional description should be provided as to where the bank traffic is being incorporated.
Our concern with this approach stems from the fact that the reduction of bank traffic from the Dunkin Donuts traffic provides the developer with traffic 'credits' for his proposed site. The "with-out development" traffic is artificially higher with the added bank traffic which did not exist at all during the traffic counts conducted at the beginning of August 2014.
b. Regarding the AM vs. PM vs. Saturday trip generation rates for the Dunkin Donuts facility, we are in concurrence with the use of the ITE rates by square-footage which are conservatively higher than the number of seats rate.
5. Trip distribution of the site traffic was based on current traffic patterns of Paoli Pike, Boot Road and the shopping center access patterns. ORA concurs with this distribution.
6. Future assessments of the three key intersections indicate that levels of service will still be acceptable during the peak hours with a growth factor of 1.91%. Proposed site traffic attributes approximately 10.2% of the AM peak hour Paoli & Access volumes, 13.5% of the AM peak hour Boot & Access volumes and 3.1% of the AM peak hour Paoli & Boot intersection volumes in the future and does not look to impact the two signalized intersection operations after minor timing adjustments. The afternoon peak hour at the Boot & Access drive is identified with a 13 second degradation (D to E for exiting movements, existing compared to with-out development volumes), but only an additional 4 second delay with the additional site traffic. (Again, would 'with-out' development traffic be that significant and 'with' development traffic be that small based on our comments made in #4a above?)
7. In general, ORA also concurs that the queue analysis performed at the intersections indicates insufficient eastbound left turn storage for the Boot Road left turn lane at Paoli Pike occurring today. All other turn movement lanes are currently sufficient and even with the growth and build out of the site, lane storage will should suffice. This is encouraging to note that the Boot & Access left turn in and exits appear to not be significantly impacted by the increased volumes associated with the redeveloped site.
8. Regarding internal site circulation, the site plan provided indicates a potential operation for the drive-thru lane that removes existing parking spaces while increasing the stacking available for drive-thru customers in the adjacent drive aisle. Our only concern is the potential for numerous customers to want to visit the facility in the AM period making the stacking longer than the available eight vehicles represented. We assume the developer hasn't provided any significant input to this concept to date so we will only comment to the concept's suspect layout at this time. As with many small restaurants/eateries with drive
Mr. Rick Smith, East Goshen Twp.
Dunkin Donuts Review
Page 3 of 3 – August 29, 2014
throughs, the typical layout 'wraps' around the building to limit the footprint that stacking vehicles use away from the building. This site lends itself to just that operation as well.
So overall, ORA concurs with the bulk of study as presented. As requested, new AM and PM peak hour traffic counts are required to determine if the West Chester Area School District traffic effects the current study intersections significantly. Additional explanation of bank vs. new facility trip generation should address the concern about reduced new site traffic from the 'with development' scenario.
I can be reached at (610) 407-9700 or dkaiser@orth-rodgers.com if you have any questions or comments regarding this review.
Sincerely,
ORTH-RODGERS & ASSOCIATES, INC.
[Signature of Dean J. Kaiser]
DEAN J. KAISER, P.E., PTOE
Director of Traffic Signal Operations
F:\2014_059_EGT_Dunkin\Documents\Correspondence\Letters\2014_08-29_DunkinDonuts Review.doc
FYI: ORTH-RODGERS (TWP TRAFFIC ENG.) WAS ACQUIRED BY THE BURNS GROUP.
THE Burns GROUP
ENGINEERING AND CONSTRUCTION
August 27, 2015
Mr. Mark Gordon, Township Zoning Officer
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199
RE: Dunkin Donuts Review 2
Dear Mark:
I am in receipt of McMahon Associates August 6, 2015 Response Letter regarding the Transportation Impact Study dated August 2014 for the 3,000 square-foot eatery with a drive-through lane. Additionally, an August 4, 2015 Transportation Impact Study Supplement was issued for the above referenced site located in the Goshen Village Shopping Center at Paoli Pike and Boot Road in the Township. The site entails the redevelopment of the existing vacant bank facility with access to both Paoli Pike and Boot Road via existing driveways to each via signalized access at Paoli Pike and stop control at Boot Road.
The following constitutes my review of the provided material:
1. An additional AM peak period turning movement count was performed as requested due to the 2014 summer count taken. Upon review, it is noted that AM peak volume is higher while school is in session. All but Paoli's northbound left, southbound left and Boot's westbound left and thru movements were higher in September versus the August volumes. Overall, traffic was approximately 11% higher when school is in session.
2. McMahon also complied with our request to provide turning movement count data for the channelized northbound Paoli Pike right turn lane understanding that this volume will impact the shopping center's Boot Road driveway. One concern we have with the provided supplemental information is that the provided count data sheet for Paoli and Boot identifies the direction of travel opposite of the Figure 1 graphic. Please ensure that the data is correctly represented.
3. Upon review of the site generated vehicular trips, their turning movement assignments and the background growth of existing traffic, we concur with the new AM peak hour volumes and operational analyses. Note that the supplement Figure 2 legend should identify '[A] 2015 WITH DEVELOPMENT PM PEAK HOUR' to 'AM'.
4. The critical center driveway on Boot Road shows acceptable levels of service, specifically during the critical AM peak. McMahon provided a gap analysis of the current conditions at the driveway and have identified that for outbound left turn traffic, 90 true (nonfactored) gaps over 8 seconds in duration exist on Boot Road near the access. The left turn critical gap time of 7.1 seconds needs to be exceeded, and the number of gaps greater than 7.1 seconds exceeds the number of AM and PM peak left turn motorists.
Burns Engineering, Inc. 301 Lindenwood Drive, Suite 130, Malvern, PA 10320 phone: (610) 407-9700 fax: (215) 405-2450
Mr. Mark Gordon, East Goshen Twp.
Dunkin Donuts Review
Page 2 of 2 – August 27, 2015
Additionally, McMahon factored out the longer duration gaps to help identify the 'additional' gaps that would be used by additional motorists in the left turn queue. They identified 188 gaps that the left turn motorists from the driveway would have to make their maneuver onto Boot Road which well exceeds the amount of left turn motorists during those peak periods.
Right turning motorists have minimally 120 gaps to over 400 gaps to work with, and we feel that the minimal delay associated with the new site traffic will not impede this access.
5. The revised site plan provided within the supplement as well as independently illustrates a new drive thru alignment approaching the facility. All eight existing parking spaces to the west side of the parking stalls are to be removed to potentially allow for extended queuing for the drive thru. Upwards of 10 vehicles could be queued in the approach while not impacting any potential thru vehicles in the adjacent drive aisle. This is better that the previously proposed scheme.
As a result of the intended use of the building, it is also identified that a right exit only access be incorporated near the Boot Road access as well. We feel this is prudent to get those drive thru customers out efficiently. It's location at the corner of the two existing aisles works well. There will be a net loss of 10 parking spaces that the Township will have to agree to if not accommodated for elsewhere.
Based on the provided response letter, supplemental report and revised site plan, we concur with the updated traffic assessment for the revitalized site .
I can be reached at (610) 407-9700 or dkaiser@burns-group.com if you have any questions or comments regarding this review.
Sincerely,
THE BURNS GROUP
[Signature of Dean J. Kaiser]
DEAN J. KAISER, P.E., PTOE
Principal Traffic Engineer
cc: Rick Smith – East Goshen
F:\2014_059_EGT_Dunkin\Documents\Correspondence\Letters\2015_08-27_DunkinDonutsReview2.doc
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. 129-F-2015
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE OF 1997, AS AMENDED, SECTION 240-6 TO ADD A DEFINITION FOR BEVERAGE CAFÉ AND SHOPPING CENTER; SECTION 240-15.C TO ADD A NEW SUBPARAGRAPH (9) TO ALLOW A BEVERAGE CAFÉ IN A SHOPPING CENTER BY CONDITIONAL USE; SECTION 240-22.H TO ESTABLISH REGULATIONS FOR MENU BOARDS, BILLS OF FARE AND PRICE LISTS; SECTION 240-22.P TO AMEND THE SIGN REGULATIONS FOR SIGNS ERECTED IN THE COMMERCIAL DISTRICT; SECTION 240-31.C(3)(cc) TO ADD CONDITIONAL USE REGULATIONS FOR A BEVERAGE CAFÉ; AND TO DELETE SECTION 240-20.G(3).
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that the East Goshen Township Zoning Ordinance of 1997, as amended, which is codified in Chapter 240 of the East Goshen Township Code, titled, "Zoning", shall be amended as follows:
SECTION 1. Section 240-6, titled, "Definitions", shall be amended to include the following definitions:
Beverage Café – a building measuring not more than 3,500 square feet of gross floor area where beverages and light fare normally and customarily associated with coffee shops or tea rooms are served for on-site or off-site consumption. Beverage café may also offer for sale coffee beans, tea, containers, mugs, coffee or tea brewing equipment and other related products. A beverage café shall not be considered a fast food restaurant and may have a drive-through lane.
Shopping Center– The multiple use of a single property for a group of nonresidential uses, such as, but not limited to, retail stores, restaurants and personal services, that are owned and maintained by a common entity. The shopping center shall be planned and designed as an integrated unit with common vehicular and pedestrian access, parking, utilities and stormwater management facilities.
SECTION 2. Section 240-15.C shall be amended to add a new subparagraph (9) as follows:
"(9) Beverage café with or without drive-through service in a shopping center."
SECTION 3. Section 240-22.H shall be amended as follows:
"§240-22.H. Menu Boards, bills of fare or price lists.
(1) Notwithstanding anything in this Ordinance to the contrary, menu boards for restaurants shall be permitted provided that all of the following conditions are met:
(a) the menu board is 3 square feet or less in area;
(b) the letters and numbers on the menu board are a maximum of 3 inches in height; and
(c) the sign is located on the building next to the entrance of the establishment or in the window next to the entrance to the establishment.
(2) Notwithstanding anything to the contrary in this Ordinance, menu boards associated with a beverage cafe with drive-through service in a shopping center permitted pursuant to Section 240-15.C(9) shall be permitted provided that all of the following conditions are met:
(a) the menu board shall not exceed eight feet in height, including the base, as measured from the elevation of the vehicle drive-through;
(b) the menu board shall not exceed fifty square feet in area;
(c) if the menu board is illuminated it shall only be internally illuminated and may only be illuminated during normal business hours;
(d) the menu board shall be located so as not to obstruct traffic or sight lines of vehicles in a shopping center; and
(e) landscaping shall be planted to minimize the visibility of the menu board from any public street."
SECTION 4. Section 240-22.P shall be amended as follows:
"P. Signs permitted in commercial districts. Only the following types of signs are permitted in a commercial district:
(1) Exempt signs as provided in Subsection J.
(2) Temporary signs as provided in Subsection I.
2
(3) Signs relating to the principal use on a lot, with a maximum of one commercial establishment in accordance with the following regulations:
(a) Wall sign. One wall sign shall be permitted for the commercial establishment. Such sign shall not exceed two square feet in area for each linear foot of wall-signable area, but not exceed 60 square feet.
(b) A freestanding sign not to exceed 10 square feet in area. No more than one freestanding sign shall be permitted on each street frontage.
(c) A window sign not to exceed 20% of window area to which it is attached.
(4) Signs relating to the principal use on a lot, including more than one commercial establishment are permitted in accordance with the following regulations:
(a) Wall sign. One wall sign shall be permitted for each commercial establishment. Such sign shall not exceed two feet in height or be longer than 75% of the linear length of the individual commercial establishment, with a maximum size of 32 square feet. Two wall signs shall be permitted if the commercial establishment is in a stand-alone building in a shopping center.
[1] All newly placed wall signs attached to the same building:
[a] Shall be generally consistent in proportion with existing signs.
[b] Shall not be box-type signs if at least 75% of the existing signs are not box-type signs.
[c] Shall maintain common vertical and horizontal lines with other signs in a manner consistent with the architecture of the building.
[d] Should be generally consistent in materials, font style and type size with other signs attached to the same building.
[2] An applicant for construction of a new principal building intended to include more than one establishment is strongly encouraged to submit a proposed set of standards that the
3
building owner intends to use to control the types and colors of signs to ensure compatibility among the signs.
[3] See Subsection K which prohibits certain types of signs, such as flashing and above-the-roofline signs.
[4] Wall sign alternative. In lieu of the wall sign referred to in Subsection P(4)(a), each commercial establishment in the structure shall be permitted to erect one freestanding sign in accordance with the following requirements:
[a] Each freestanding sign shall have a maximum size of 10 square feet and a maximum height of 10 feet.
[b] Each freestanding sign shall be located immediately in front of its respective establishment.
[c] All portions of the freestanding sign shall be located no more than 10 feet from the respective establishment.
[d] The freestanding signs shall comply with all front, rear and side yard requirements and they shall comply with the setback requirements for the zoning district.
(b) Freestanding signs.
[1] A shopping center use in the C-2 District or within a PRD may have a freestanding sign with a maximum area of 120 square feet and a maximum height of 14 feet on each street frontage. No more than one freestanding sign shall be permitted on each street frontage.
[2] All other freestanding signs shall not exceed 10 square feet in area nor five feet in height. No more than one freestanding sign shall be permitted on each street frontage.
(c) Window signs. The cumulative size of window signs is not to exceed 20% of the window area to which it or they are attached. Such signs may contain the names or businesses of the occupants of the facilities.
(d) All signs on the structure shall be of the same design and lit in a similar manner and shall be architecturally compatible with the structure.
4
(5) Sign bonus. Each permitted 10 square feet maximum freestanding sign in a commercial district may be increased in size to a maximum of 20 square feet if the sign is not internally illuminated and is constructed of relief-cut wood (other than plywood).
(6) Any sign (as defined in § 240-6, which includes but is not limited to graphics and logos) attached to or incorporated into functional elements of a building or development (including but not limited to awnings, canopies or murals) that serve an advertising or use identification purpose shall be considered to be a sign, and specifically shall be regulated by all provisions of this section for the applicable zoning district."
SECTION 5. Section 240-31.C(3)(cc) shall be amended as follows:
"(cc) Restaurant and beverage café.
[1] Any restaurant or beverage café with a drive-through shall be designed to allow safe pedestrian movement on the property and with sufficient stacking capacity to prevent backups of traffic onto a street.
[2] All outdoor trash dumpsters shall be totally screened as required by § 240-27C(4)."
SECTION 6. Section 240-20.G(3) shall be deleted.
SECTION 7. Severability. If any sentence, clause, section or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 8. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 9. Effective Date. This Ordinance shall become effective in five (5) days from the date of adoption.
5
ENACTED AND ORDAINED this 7th day of July, 2015.
| ATTEST: | EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS |
|---|---|
| [signature] Louis F. Smith, Secretary |
[signature] E. Martin Shane, Chairman |
| [signature] Senya D. Isayeff, Vice-Chairman |
|
| [signature] Carmen Battavio, Member |
|
| [signature] Charles W. Proctor, III, Esquire, Member |
|
| [signature] Janet L. Emanuel, Member |
6
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 8/27/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [Initials: MG]
Re: ZHB Application / 1988 ZHB Decision Amendment/ Goshen Village freestanding signs
Commission Members,
As you may know the GVSC is prohibited from having freestanding "Monument Signs" on the property due to a Zoning Hearing Board Decision from 1988 when the owner at the time agreed to that condition in return for zoning relief for two signs on the supermarket and a second the wall sign on the corner stores in the shopping center.
The ordinance permits freestanding "monument" signs on all road frontages for shopping centers within the C-2 Zoning District. Staff is of the opinion that the freestanding signs would pose little impact to the surrounding residential neighborhoods do to the heavy landscape screening that exists today which buffers these neighborhoods.
I have drafted a motion for your review and consideration.
Draft Motion:
Mr. Chairman, I move that the Planning Commission recommend approval of the Zoning Hearing Board Application to amend the ZHB Decision from 1988 and permit freestanding signs on the Goshen Village Shopping Center property as permitted in the ordinance, with the following condition:
1. The property owner agrees to meet with the Township and it’s consultants in order to orient the sign locations so as to best accommodate the alignment of the proposed Paoli Pike Trail.
F:\Data\Shared Data\Property Management\53-4\53-4-77 (Goshen Village)\Sign Variance 2015\Memo to PC 08272015.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 18, 2015
Dear Property Owner:
The purpose of this letter is to inform you that Goshen Equities, LLC, (The Applicant and owner of the Goshen Village Shopping Center at the corner of Boot Rd. and Paoli Pike) has submitted a Zoning Hearing Board application. The applicant is requesting to amend this Board’s March 30, 1988 Decision for the shopping center, which in granting three variances, also attached the following condition: “There shall never be erected, on the site, a freestanding sign other than at the location of the intersection of Paoli Pike and Boot Road, as shown and described generally, on Exhibit A-10.”
The property subject to the application is a 11.03 acre parcel known as Goshen Village Shopping Center at the northeast corner of Paoli Pike and Boot Road, East Goshen Township, Chester County, Pennsylvania (Tax Parcel No. 53-4-77). Applicant proposes to erect two freestanding pylon signs, one along the street frontage of Paoli Pike, and the other along the street frontage of Boot Road, each totaling 120 square feet in area and being no more than 14 feet in height, which signs are currently permitted by the Zoning Chapter of the East Goshen Code.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Conditional Use applications. The meeting dates for this matter are listed below and subject to change without further written notice:
September 2, 2015 – Planning Commission (7:00 PM)
September 15, 2015 – Board of Supervisors (7:00 PM)
September 29, 2015 – Zoning Hearing Board (7:30 PM / Zoning Hearing)
All meetings will be held at the Township Building and are open to the public. The Zoning Hearing Board Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact the Township Building at 610-692-7171, to discuss how those needs may be accommodated.
Please give me a call if you have any questions or need additional information.
Sincerely,
[Signature of Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-77 (Goshen Village)\Sign Variance 2015\1000 foot letter ZHB app 08182015.doc
McMAHON
TRANSPORTATION ENGINEERS & PLANNERS
McMAHON ASSOCIATES, INC
840 Springdale Drive | Exton, PA 19341
p 610-594-9995 | f 610-594-9560
mcmahonassociates.com
PRINCIPAL
Joseph W. McMahon, P.E.
Joseph J. DeSantis, P.E., PTOE
John S. DePalma
William T. Steffer
Casey A. Moore, P.E.
Gary R. McNaughton, P.E., PTOE
ASSOCIATE
John J. Mitchell, P.E.
Christopher J. Williams, P.E.
R. Trent Ebersole, P.E.
Matthew M. Kozsuch, P.E.
Maureen Chlebek, P.E., PTOE
August 6, 2015
Mr. Louis F. Smith, Jr.
Township Manager
1580 Paoli Pike
West Chester, PA 19380-6199
RE: Response to Traffic Engineering Comments
East Goshen Dunkin Donuts
East Goshen Township, Chester County, PA
McMahon Project No. 814440.12
Dear Mr. Smith:
Our office has received the Traffic Engineering Review letter prepared by the Burns Group (formerly Orth-Rodgers & Associates, Inc.) dated August 29, 2014. On behalf of our client, we respectfully offer the following responses to each of the review comments repeated below:
1. ORA concurs in general with the introduction and the existing conditions reported for both Paoli Pike and Boot Road in the vicinity of the site. It should be noted that the intersection of Paoli and Boot has channelized right turn lanes in the eastbound and southbound that typically only effect the southbound and westbound directions of Boot and Paoli, respectively (noted in Appendix A photographs).
Response | No response required.
2. ORA concurs with the existing traffic count periods and the various peak hours found (7:30 AM, 4:45 PM and 11:45 AM Saturday) for Paoli & Boot, (8:00 AM, 5:00 PM and 11:30 AM Saturday) for Paoli & Site Access, and (7:30 AM, 4:45 PM and 11:45 AM Saturday) for Boot & Site Access. The peak hours are within the general timeframe that may only see minor differential volumes between the adjacent intersections.
It was specifically noted that due to school not being in session, an additional count would need to be done after school has been in session for at least one week. The applicant has agreed to have the count performed to determine if the data presented with a ‘growth’ of 2% indicated in the report to account for the reduced summertime traffic.
An additional note, the study does not include the channelized right turn volumes at either terminus of Paoli Pike or Boot Road channelized right turns. Through discussions with the applicant’s traffic consultant, it was determined that the new count conducted in September will at least get the eastbound to southbound channelized right, since this node is near the
Corporate Headquarters: Fort Washington, Pennsylvania
Serving the East Coast from 13 offices throughout the Mid-Atlantic, New England, and Florida
Mr. Louis F. Smith, Jr.
August 6, 2015
Page 2
Boot Road Site Access point.
Response | An additional traffic count was conducted in September 2014 when school was back in session. It was discussed with the Township Traffic Engineer that the weekday morning peak period would be recounted, as this was the only studied period that would be significantly influenced by school traffic. Please see the enclosed Transportation Study Supplement.
3. A review of the existing traffic conditions at the intersection of Paoli Pike & Boot Road indicates that current levels of service are between ‘A’s and ‘D’s for all three peak periods with a level of service ‘E’ for the westbound Boot Road through movement during the AM peak. The signalized access on Paoli Pike operates with driveway levels of service ‘D’s during all peaks while the Boot Road access only shows a ‘D’ for the drive during the PM peak. ORA concurs with these as reported.
Response | No response required.
4. Site traffic was investigated for the proposed 3,000 square-foot facility. Based on the ITE Trip Generation Manual, the calculated trips are acceptable. Two comments we have regarding this investigation:
a. The comparison generations between the previous bank use and the new Dunkin Donuts makes sense as part of the overall usage of the facility and its general comparison of generated trips. After discussions with McMahon regarding this, it was determined that the ‘bank’ trips are being reincorporated as background growth traffic. Though this should be clearly identified within the text, additional description should be provided as to where the bank traffic is being incorporated.
Our concern with this approach stems from the fact that the reduction of bank traffic from the Dunkin Donuts traffic provides the developer with traffic ‘credits’ for his proposed site. The “with-out development” traffic is artificially higher with the added bank traffic which did not exist at all during the traffic counts conducted at the beginning of August 2014.
b. Regarding the AM vs. PM vs. Saturday trip generation rates for the Dunkin Donuts facility, we are in concurrence with the use of the ITE rates by square-footage which are conservatively higher than the number of seats rate.
Response | The traffic impact study conservatively and appropriately evaluates the traffic conditions of the study area and intersections with full occupancy conditions of the approved shopping center under future without-development conditions. In the future with-development conditions, the study evaluates the incremental traffic impacts of the Dunkin Donuts project/application (beyond what is permitted with current shopping center approvals). Occupancy of the existing buildings and vacant space does not require Township approval, and therefore, should not be utilized in determining the impacts of the application, nor should it be considered a “credit”.
Mr. Louis F. Smith, Jr.
August 6, 2015
Page 3
5. Trip distribution of the site traffic was based on current traffic patterns of Paoli Pike, Boot Road and the shopping center access patterns. ORA concurs with this distribution.
Response | No response required.
6. Future assessments of the three key intersections indicate that levels of service will still be acceptable during the peak hours with a growth factor of 1.91%. Proposed site traffic attributes approximately 10.2% of the AM peak hour Paoli & Access volumes, 13.5% of the AM peak hour Boot & Access volumes and 3.1% of the AM peak hour Paoli & Boot intersection volumes in the future and does not look to impact the two signalized intersection operations after minor timing adjustments. The afternoon peak hour at the Boot & Access drive is identified with a 13 second degradation (D to E for exiting movements, existing compared to with-out development volumes), but only an additional 4 second delay with the additional site traffic. (Again, would ‘with-out’ development traffic be that significant and ‘with’ development traffic be that small based on our comments made in #4a above?)
Response | Occupancy of the vacant, approved retail space within the shopping center, including the existing bank building, will add traffic to the adjacent roadway network and have minor impacts to the traffic operations. Again, the incremental traffic associated with the proposed Dunkin Donuts will only add a negligible amount of delay to the adjacent roadway network, compared to full occupancy conditions of the approved shopping center. Regardless, the signalized study intersections will continue to function at acceptable levels of service and there are sufficient gaps for traffic exiting the unsignalized driveway (see enclosed TIA Supplement).
7. In general, ORA also concurs that the queue analysis performed at the intersections indicates insufficient eastbound left turn storage for the Boot Road left turn lane at Paoli Pike occurring today. All other turn movement lanes are currently sufficient and even with the growth and build out of the site, lane storage will should suffice. This is encouraging to note that the Boot & Access left turn in and exits appear to not be significantly impacted by the increased volumes associated with the redeveloped site.
Response | We concur with this assessment and further note that the additional site-traffic will only increase the queue length for the eastbound left turn storage for the Boot Road left turn lane at the Paoli Pike intersection by a few feet (less than one vehicle length).
8. Regarding internal site circulation, the site plan provided indicates a potential operation for the drive-thru lane that removes existing parking spaces while increasing the stacking available for drive-thru customers in the adjacent drive aisle. Our only concern is the potential for numerous customers to want to visit the facility in the AM period making the stacking longer than the available eight vehicles represented. We assume the developer hasn’t provided any significant input to this concept to date so we will only comment to the concept’s suspect layout at this
Mr. Louis F. Smith, Jr.
August 6, 2015
Page 4
time. As with many small restaurants/eateries with drive throughs, the typical layout ‘wraps’ around the building to limit the footprint that stacking vehicles use away from the building. This site lends itself to just that operation as well.
Response | The site plan has been updated and includes improvements to the configuration of the drive-thru facility that will better accommodate the drive-thru queuing by reducing both drive-thru/parking conflicts and drive-thru/pedestrian conflicts. Please refer to the TIS Supplement (dated 8/4/2015) for addition information.
We trust the preceding responses, as well as the enclosed Transportation Impact Study Supplement, satisfactorily addresses the traffic engineering review. If you have any questions or wish to discuss any of the responses in further detail, please do not hesitate to contact Christopher J. Williams, P.E., or me at your convenience.
Sincerely,
[Signature of John J. Yurick]
John J. Yurick, P.E., PTOE, PTP
Senior Project Manager
Enclosure
cc: Diptesh Patel, Abjibapa Enterprises, LLC
Patrick McKenna, Esquire, Gawthrop Greenwood, PC
I:\eng\814440\Correspondence\Municipality\Traffic Response Letter 08-06-2015.docx
McMAHON
TRANSPORTATION ENGINEERS & PLANNERS
McMAHON ASSOCIATES, INC
840 Springdale Drive | Exton, PA 1934
p 610-594-9995 | f 610-594-956
mcmahonassociates.com
PRINCIPAL
Joseph W. McMahon, P.E.
Joseph J. DeSantis, P.E., PTOE
John S. DePalma
William T. Steffer
Casey A. Moore, P.E.
Gary R. McNaughton, P.E., PTOE
ASSOCIATE
John J. Mitchell, P.E.
Christopher J. Williams, P.E.
R. Trent Ebersole, P.E.
Matthew M. Kozsuch, P.E.
Maureen Chlebek, P.E., PTOE
September 16, 2014
Updated August 4, 2015
Mr. Diptesh Patel
Abjibapa Enterprises, LLC
5101 Pennell Road
Media, PA 19063
RE: Transportation Impact Study Supplement
Dunkin’ Donuts – Goshen Village Shopping Center
East Goshen Township, Chester County, PA
McMahon Project No. 814440.11
Dear Mr. Patel:
McMahon Associates, Inc. has completed a transportation impact study supplement for the proposed Dunkin’ Donuts located within the Goshen Village Shopping Center in East Goshen Township, Chester County, PA. As you are aware, our office completed a transportation impact study entitled Transportation Impact Study for the Proposed Dunkin’ Donuts dated August 2014, which evaluates the transportation impact of the proposed Dunkin’ Donuts store with a drive-thru window. The purpose of this supplement is to 1) provide updated weekday morning peak hour traffic count data, 2) summarize a gap study completed to evaluate the Boot Road access during the weekday afternoon peak hour, and 3) summarize the traffic implications of the revised site plan.
Updated Weekday Morning Peak Hour Analysis
The traffic counts contained in the original transportation impact study were conducted in August 2014 prior to the opening of area schools. As such, in order to evaluate traffic conditions when all of the area schools are open, our office completed updated manual turning movement traffic counts in September 2014 at the intersection of Boot Road and Paoli Pike during the weekday morning commuter peak period (7:00 AM to 9:00 AM). In addition, the updated weekday morning peak hour count also included the traffic volumes at the northbound Paoli Pike channelized right-turn lane. In addition, the through traffic volumes at the Paoli Pike and Boot Road access intersections were also updated/increased by balancing the approach volumes from the Paoli Pike/Boot Road intersection. The traffic count data is tabulated in 15-minute increments in Attachment 1.
In order to complete the revised weekday morning peak hour analysis, our office used the same future traffic projection assumptions used in the original transportation impact study. The existing, 2015 future without-development, and 2015 future with-development traffic volumes are shown in Figure 1. The traffic volumes in Figure 1 were subjected to detailed capacity/level-of-service analysis, the results of which are shown in Figure 2, and summarized in Table 1. In addition, the existing and future queues based on this updated analysis are shown in Table 2. The detailed
Corporate Headquarters: Fort Washington, Pennsylvania
Serving the East Coast from 13 offices throughout the Mid-Atlantic, New England, and Florida
Mr. Louis F. Smith, Jr.
August 6, 2015
Page 2
capacity/level-of-service analysis worksheets are provided in Attachment 2 for existing conditions, Attachment 3 for 2015 future without-development conditions, and Attachment 4 for 2015 future with-development conditions.
Based on the results of the analysis, the study intersections generally operate with similar conditions under existing, 2015 future without-development, and 2015 future with-development conditions as compared to the analysis results shown in the original transportation impact study. Futhermore, the impact of the development is mitigated at the Paoli Pike/Boot Road intersection, and both site access intersections operate at acceptable LOS D or better overall and for all movements with the traffic generated by the proposed Dunkin Donuts.
Gap Study
As shown in the original transportation impact study, the capacity analysis indicates that the Boot Road site access will operate at LOS E during the weekday afternoon peak hour only. Since this access is located approximately 515 feet east of the signalized Paoli Pike/Boot Road intersection, it is likely that there are more gaps in the Boot Road traffic stream for use by side street traffic at the Boot Road site access intersection than are assumed in the capacity analysis, which does not account for the extra gaps created by the traffic signal. In order to determine the actual gaps in the Boot Road traffic stream at the Goshen Village Shopping Center access, our office completed a gap study in September 2014 during the weekday afternoon intersection peak hour (from 4:45 PM to 5:45 PM) at the Paoli Pike/Boot Road intersection. The results of the gap study are summarized in Table 3, and the gaps study counts and detailed calculations are provided in Attachment 5.
| Movement | Number of Effective Gaps | Turning Movement Volume | Adequate Available Gaps? |
|---|---|---|---|
| Southbound Goshen Village Shopping Center Access Left-Turn | 1881 | 66 | Yes |
| Southbound Goshen Village Shopping Center Access Right-Turn | 4442 | 68 | Yes |
1. Based on the number of combined gaps in the Boot Road traffic stream.
2. Based in the number of westbound gaps in the Boot Road traffic stream.
As shown in Table 3, there are more than adequate gaps in the Boot Road traffic stream for use by side street Goshen Village Shopping Center Access traffic. Based on this evaluation, it is likely that traffic exiting this access in the future will experience less delay than reported by the analysis, and the access will operate acceptably during the weekday afternoon peak hour with the traffic generated by the proposed Dunkin Donuts.
Mr. Louis F. Smith, Jr.
August 6, 2015
Page 3
Revised Site Plan Review
The revised site plan (see Figure 3) provides modifications to the drive-thru facility as well as provides a right-turn only exit lane from the main parking field to the Boot Road driveway. The drive-thru modifications separate the queuing from the general parking field which will reduce conflicts. Further, the drive-thru lane will accommodate approximately 12 vehicles so as to reduce the potential of drive-thru spillover into the parking lot or drive aisles. Based on observations by McMahon at other Dunkin Donut stores, we do not anticipate a queue to exceed the available proposed queue storage for this facility. Also, this drive-thru configuration will also reduce the number of pedestrian-vehicle conflicts compared to wrap-around drive-thru facilities seen at many other fast food restaurants that require customers to walk through the drive-thru queue at least one if not all of the building entrances.
In addition, the right-turn only turn lane to the Boot Road driveway will improve the traffic circulation within the shopping center by allowing some exiting traffic to avoid utilizing the main drive aisle along the store frontages. This modification will be more convenient for all customers leaving the shopping center (and destined to the Boot Road access) and will reduce vehicle-pedestrian conflicts along the store frontages.
If you have any questions, or require further information regarding the above analysis, please do not hesitate to contact our office.
Sincerely,
John J. Yurick, P.E., PTOE, PTP
Senior Project Manager
JJY/JDG/ab
Attachments
P:\814440\Correspondence\Client\Patel TIA Supplement 25-08-04.doc
Table 1. Level-of-Service Matrix
Paoli Pike and Boot Road
| Time Period | Design Year | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|
| Boot Road | EB | Left | D 36.7 | D 39.8 | D 45.1 |
| Thru | D 35.3 | D 35.7 | D 36.5 | ||
| WB | Left | C 26.6 | C 27.0 | C 28.5 | |
| Thru | E 58.9 | E 61.4 | E 67.0 | ||
| Right | A 0.0 | A 0.0 | A 0.0 | ||
| Paoli Pike | NB | Left | C 20.3 | C 20.8 | C 20.8 |
| Thru | D 43.6 | D 46.2 | D 46.8 | ||
| SB | Left | C 25.3 | C 26.0 | C 26.1 | |
| Thru | B 13.8 | B 14.8 | B 14.9 | ||
| Right | A 9.5 | A 9.8 | A 9.9 | ||
| Overall | D 36.6 | D 38.1 | D 40.0 |
Paoli Pike and Shopping Center Access
| Time Period | Design Year | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|
| Shopping Center Access | WB | Left | D 54.4 | D 52.3 | D 47.8 |
| Right | D 48.3 | D 50.5 | D 51.4 | ||
| Paoli Pike | NB | Thru | A 0.9 | A 0.9 | A 1.0 |
| Right | A 0.0 | A 0.0 | A 0.0 | ||
| SB | Left | A 1.5 | A 1.6 | A 2.5 | |
| Thru | A 2.0 | A 2.1 | A 3.1 | ||
| Overall | A 2.0 | A 2.3 | A 4.7 |
Boot Road and Shopping Center Access
| Time Period | Design Year | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|
| Boot Road | EB | Left | B 10.3 | B 10.6 | B 10.9 |
| Thru | (1) | (1) | (1) | ||
| WB | Thru | (1) | (1) | (1) | |
| Right | (1) | (1) | (1) | ||
| Shopping Center Access | SB | Left/Right | C 17.6 | C 18.7 | D 28.0 |
| Overall | A 0.2 | A 0.5 | A 2.6 |
(1) Movement operates at free flow
Table 2. 95th Percentile Queue Matrix
Paoli Pike and Boot Road
| Time Period | Design Year | Existing Storage (feet) | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|---|
| Boot Road | EB | Left | 350 | 160 | 173 | 188 |
| Thru | >1000 | 335 | 345 | 363 | ||
| WB | Left | 125 | 160 | 168 | 185 | |
| Thru | >1000 | 615 | 645 | 685 | ||
| Right | 300 | 0 | 0 | 0 | ||
| Paoli Pike | NB | Left | 100 | 45 | 48 | 48 |
| Thru | >1000 | 670 | 700 | 713 | ||
| SB | Left | 100 | 13 | 13 | 13 | |
| Thru | 800 | 243 | 265 | 275 | ||
| Right | 350 | 50 | 55 | 58 |
Paoli Pike and Shopping Center Access
| Time Period | Design Year | Existing Storage (feet) | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|---|
| Shopping Center Access | WB | Left | 100 | 18 | 20 | 53 |
| Right | 100 | 5 | 13 | 68 | ||
| Paoli Pike | NB | Thru | 800 | 23 | 15 | 15 |
| Right | 150 | 0 | 0 | 0 | ||
| SB | Left | 90 | 5 | 5 | 18 | |
| Thru | >1000 | 130 | 140 | 175 |
Boot Road and Shopping Center Access
| Time Period | Design Year | Existing Storage (feet) | Weekday Morning Peak Hour 2014 Existing | 2015 Without Dev. | With Dev. | |
|---|---|---|---|---|---|---|
| Boot Road | EB | Left | 150 | 0 | 3 | 8 |
| Thru | (1) | (1) | (1) | (1) | ||
| WB | Thru | (1) | (1) | (1) | (1) | |
| Right | (1) | (1) | (1) | (1) | ||
| Shopping Center Access | SB | Left/Right | - | 3 | 5 | 45 |
(1) Movement operates at free flow
FIGURE 1
Weekday Morning Peak Hour Traffic Volumes
DUNKIN' DONUTS - GOSHEN VILLAGE SHOPPING CENTER
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
Schematic traffic volume diagram (Not To Scale).
N W E Schematic- Not To Scale
MCMAHON TRANSPORTATION ENGINEERS & PLANNERS
I:\eng\814440\dwg\Figures\TIA Supplement 2014-09\Figure 1.dwg
LEGEND:
- 5 EXISTING AM PEAK HOUR
- (5) 2015 WITHOUT DEVELOPMENT AM PEAK HOUR
- [5] 2015 WITH DEVELOPMENT AM PEAK HOUR
- * MOVEMENT OCCURS AT CHANNELIZED RIGHT
GOSHEN VILLAGE SHOPPING CENTER & PAOLI PIKE (S.R. 2014):
- 708(724)[741]
- [540](523)508
- [59](26)19
- [481](497)489
- 8(14)[51]
- 12(14)[37]
- 20(28)[88]
- [119](59)46
- 27(33)[60]
- 700(710)[690]
PAOLI PIKE (S.R. 2014) & BOOT ROAD (S.R. 2020):
- 46(47)[47]
- 444(455)[468]
- 149(155)[167]
- 639(657)[682]
- [13](13)13
- [377](374)356
- [143](139)132
- 625(644)[661]
- [447](430)417
- [141](137)133
- [306](293)284
- *
- *
- 548(559)[562]
- 49(50)[50]
- 597(609)[612]
- [401](635)465
- [309](306)295
- 91(97)[109]
- CHANNELIZED RIGHT-TURN
GOSHEN VILLAGE SHOPPING CENTER & BOOT ROAD (S.R. 2020):
- 9(28)[101]
- [93](20)7
- [33](7)3
- [60](13)4
- 4(13)[51]
- 635(660)[638]
- [50](15)5
- [397](407)381
- 639(673)[689]
- [414](414)386
FIGURE 2
Weekday Morning Peak Hour Levels of Service
DUNKIN' DONUTS - GOSHEN VILLAGE SHOPPING CENTER
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
Schematic levels of service diagram (Not To Scale).
N W E Schematic- Not To Scale
MCMAHON TRANSPORTATION ENGINEERS & PLANNERS
I:\eng\814440\dwg\Figures\TIA Supplement 2014-09\Figure 2.dwg
LEGEND:
- A EXISTING AM PEAK HOUR
- (A) 2015 WITHOUT DEVELOPMENT AM PEAK HOUR
- [A] 2015 WITH DEVELOPMENT PM PEAK HOUR
- EXISTING LANE/MOVEMENT
- EXISTING TRAFFIC SIGNAL
- EXISTING STOP SIGN
GOSHEN VILLAGE SHOPPING CENTER & PAOLI PIKE (S.R. 2014):
- D(D)[D]
- D(D)[D]
- [A](A)A
- [A](A)A
- A(A)[A]
- A(A)[A]
- OVERALL A(A)[A]
PAOLI PIKE (S.R. 2014) & BOOT ROAD (S.R. 2020):
- A(A)[A]
- E(E)[E]
- C(C)[C]
- [B](C)C
- [A](C)B
- [A](A)A
- OVERALL D(D)[D]
- [D](D)D
- [D](D)D
- D(C)[B]
- C(C)[B]
- B(B)[B]
- CHANNELIZED RIGHT-TURN
GOSHEN VILLAGE SHOPPING CENTER & BOOT ROAD (S.R. 2020):
- [D](C)C
- OVERALL A(A)[A]
- [B](B)B
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
FIGURE 3
Site Plan
DUNKIN' DONUTS - GOSHEN VILLAGE SHOPPING CENTER
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
Site plan showing proposed redevelopment of existing bank building into a Dunkin' Donuts with drive-thru window.
MCMAHON TRANSPORTATION ENGINEERS & PLANNERS
I:\eng\814440\dwg\Figures\TIA Supplement 2014-09\Figure 3.dwg
INSERT PLAN
PREPARED FOR GOSHEN VILLAGE
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
G.D. HOUTMAN & SON, INC., CIVIL ENGINEERS AND SURVEYORS, MEDIA, PA
Sheet 2 of 3 | Scale: 1"=20' | Date: March 9, 2015 | File: 17562
Revision 1: 7/20/2015 Township Comments / Traffic Modifications
Purpose of Plan:
The purpose of this Plan is to show the proposed conversion of the existing building, located at the southwest corner of the site and formerly a bank, into a Dunkin' Donuts with a drive-thru window. This will involve a minor modification of the existing parking layout adjacent to the building.
LEGEND:
- PROPOSED BUFFER TREES ARBORVITAE - 6' AT TIME OF PLANTING
- PROPOSED PEDESTRIAN CROSSWALK SIGN
PARKING SPACE TABULATION:
- NUMBER OF SPACES REMOVED: 1. New Access Drive from West: 7; 2. Northern Side of Building: 2; 3. Six Car Queue at Drive Thru: 1; 4. Lengthened drive lane: 4; Total: 14
- NUMBER OF SPACES ADDED: 1. Employee Parking at Exitway: 2; 2. As Part of Drive-thru: 6; 3. Reserve Spaces: 9; Total: 17
- NET REDUCTION OF PARKING SPACES: 1. With the 6th car: 14-14 = 0 (no reduction)
GENERAL NOTES:
- 1. Tax Parcel # 53-4-77, UPI #53-04-0077.0000
- 2. Owner: Goshen Equities, LLC, 12000 Horizon Way, Suite 100, Mount Laurel, NJ 08054
- 3. Site Area: 11.33 Ac.
- 4. Reference Plan: Plan of Subdivision for Midway, Inc., dated Oct. 23, 2000 Last Revised Jan. 21, 2002, by Momenee and Associates, Inc.
- 5. Zoning District: C-2 Local Convenience Commercial District
- 6. Property currently serviced by Public Sewer and Public Water.
- 7. This Plan was prepared using a selective composite of the referenced Plans noted in Note #4 and does not represent a physical survey performed by this Office. The property contains several easements which are not shown hereon. See the referenced plan for a full listing.
- 8. The total number of existing parking spaces = 347.
Plan Labels:
- DETAIL AREA OF PROPOSED REDEVELOPMENT Scale :1"=20'
- 5 DENOTES 9 RESERVE PARKING SPACES. RESERVE PARKING SPACES PURSUANT TO SECTION 240-33.C.(4) OF THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE
- PROPOSED TRASH ENCLOSURE
- BOLLARD
- "DUNKIN DONUTS" WALL SIGN
- Arborvitae @ 5' O.C.
- MENU BOARD
- 2 Employee Parking
- Existing Bank Building (vacant)
- To Be Converted to a Dunkin Donuts w/ Drive thru Window
- 5 P.S. TO BE REMOVED
- ORDER BOX
- ISLAND TO BE REMOVED
- 2 NEW P.S.
- 1 P.S. TO BE REMOVED
- NOTE: PORTION OF ISLAND TO BE REMOVED UPON ANY FUTURE INSTALLATION OF THE RESERVE PARKING SPACES
- DIRECTION SIGN
- PROPOSED PYLON SIGN
- Existing Macadam
- Existing Shopping Center
- PROPOSED CROSSWALK
- PROPOSED PEDESTRIAN CROSSWALK SIGN (TYP)
- PROPOSED EXIT
- "Right Turn Only" Sign R3-5R 30" x 36"
- "Do Not Enter" Sign R5-1 30" x 30"
- INSTALL LANDSCAPE ISLAND WITH CURB
ATTACHMENT 1
McMahon Associates Inc.
425 Commerce Drive, Suite 200
Fort Washington, PA 19034
Municipality: East Goshen Township
Location: Paoli Pike & Boot Road
Counter/Board #: HR
File Name : egoshenboot01whr
Site Code : 81444401
Start Date : 9/3/2014
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles
| Start Time | Paoli Pk Southbound | Boot Rd Westbound | Paoli Pk Northbound | Boot Rd Eastbound | Int. Total | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Left | Thru | ROR | Right | Left | Thru | ROR | Right | Left | Thru | ROR | Right | Left | Thru | ROR | Right | ||
| 07:00 | 8 | 107 | 0 | 1 | 29 | 71 | 0 | 0 | 4 | 102 | 2 | 13 | 53 | 94 | 0 | 10 | 494 |
| 07:15 | 15 | 149 | 0 | 1 | 23 | 80 | 0 | 0 | 0 | 89 | 15 | 6 | 53 | 96 | 0 | 9 | 536 |
| 07:30 | 12 | 131 | 0 | 0 | 37 | 77 | 0 | 0 | 5 | 70 | 3 | 21 | 31 | 116 | 0 | 11 | 514 |
| 07:45 | 18 | 127 | 0 | 0 | 31 | 60 | 0 | 1 | 1 | 88 | 13 | 15 | 39 | 98 | 0 | 10 | 501 |
| Total | 53 | 514 | 0 | 2 | 120 | 288 | 0 | 1 | 10 | 349 | 33 | 55 | 176 | 404 | 0 | 40 | 2045 |
| 08:00 | 6 | 132 | 0 | 0 | 35 | 71 | 0 | 0 | 3 | 85 | 9 | 22 | 44 | 120 | 0 | 16 | 543 |
| 08:15 | 13 | 158 | 0 | 0 | 30 | 74 | 1 | 0 | 4 | 113 | 7 | 42 | 35 | 110 | 0 | 9 | 596 |
| 08:30 | 14 | 114 | 0 | 2 | 25 | 58 | 0 | 0 | 3 | 91 | 9 | 28 | 37 | 119 | 0 | 9 | 509 |
| 08:45 | 9 | 87 | 0 | 1 | 34 | 51 | 0 | 1 | 0 | 79 | 10 | 23 | 41 | 108 | 0 | 12 | 456 |
| Total | 42 | 491 | 0 | 3 | 124 | 254 | 1 | 1 | 10 | 368 | 35 | 115 | 157 | 457 | 0 | 46 | 2104 |
| Grand Total | 95 | 1005 | 0 | 5 | 244 | 542 | 1 | 2 | 20 | 717 | 68 | 170 | 333 | 861 | 0 | 86 | 4149 |
| Apprch % | 8.6 | 91 | 0 | 0.5 | 30.9 | 68.7 | 0.1 | 0.3 | 2.1 | 73.5 | 7 | 17.4 | 26 | 67.3 | 0 | 6.7 | |
| Total % | 2.3 | 24.2 | 0 | 0.1 | 5.9 | 13.1 | 0 | 0 | 0.5 | 17.3 | 1.6 | 4.1 | 8 | 20.8 | 0 | 2.1 | |
| Passenger Vehicles | 92 | 963 | 0 | 5 | 224 | 514 | 1 | 2 | 20 | 692 | 68 | 152 | 320 | 833 | 0 | 81 | 3967 |
| % Passenger Vehicles | 96.8 | 95.8 | 0 | 100 | 91.8 | 94.8 | 100 | 100 | 100 | 96.5 | 100 | 89.4 | 96.1 | 96.7 | 0 | 94.2 | 95.6 |
| Heavy Vehicles | 3 | 42 | 0 | 0 | 20 | 28 | 0 | 0 | 0 | 25 | 0 | 18 | 13 | 28 | 0 | 5 | 182 |
| % Heavy Vehicles | 3.2 | 4.2 | 0 | 0 | 8.2 | 5.2 | 0 | 0 | 0 | 3.5 | 0 | 10.6 | 3.9 | 3.3 | 0 | 5.8 | 4.4 |
McMahon Associates Inc.
425 Commerce Drive, Suite 200
Fort Washington, PA 19034
Municipality: East Goshen
Location: Boot Road &
Paoli Pk Northbound Right Channelization
Counter/Board #: RR
File Name : egoshenboot02aRR
Site Code : 81444402
Start Date : 9/3/2014
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles
| Start Time | Boot Road Westbound | Paoli Pk Right Northbound | Boot Road Eastbound | Int. Total | |||
|---|---|---|---|---|---|---|---|
| Left | Thru | Left | Right | Thru | Right | ||
| 07:00 | 0 | 0 | 0 | 21 | 0 | 0 | 21 |
| 07:15 | 0 | 0 | 0 | 29 | 0 | 0 | 29 |
| 07:30 | 0 | 0 | 0 | 18 | 0 | 0 | 18 |
| 07:45 | 0 | 0 | 0 | 23 | 0 | 0 | 23 |
| Total | 0 | 0 | 0 | 91 | 0 | 0 | 91 |
| 08:00 | 0 | 0 | 0 | 20 | 0 | 0 | 20 |
| 08:15 | 0 | 0 | 0 | 28 | 0 | 0 | 28 |
| 08:30 | 0 | 0 | 0 | 19 | 0 | 0 | 19 |
| 08:45 | 0 | 0 | 0 | 22 | 0 | 0 | 22 |
| Total | 0 | 0 | 0 | 89 | 0 | 0 | 89 |
| Grand Total | 0 | 0 | 0 | 180 | 0 | 0 | 180 |
| Apprch % | 0 | 0 | 0 | 100 | 0 | 0 | |
| Total % | 0 | 0 | 0 | 100 | 0 | 0 | |
| Passenger Vehicles | 0 | 0 | 0 | 162 | 0 | 0 | 162 |
| % Passenger Vehicles | 0 | 0 | 0 | 90 | 0 | 0 | 90 |
| Heavy Vehicles | 0 | 0 | 0 | 18 | 0 | 0 | 18 |
| % Heavy Vehicles | 0 | 0 | 0 | 10 | 0 | 0 | 10 |
ATTACHMENT 2
Dunkin Donuts - East Goshen
1: Paoli Pike & Boot Road | 2014 Existing AM Peak
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | ||||||||||||
| Volume (vph) | 133 | 284 | 0 | 149 | 444 | 46 | 49 | 548 | 0 | 13 | 356 | 132 |
| Ideal Flow (vphpl) | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 |
| Lane Width (ft) | 11 | 11 | 11 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 |
| Grade (%) | 0% | 0% | 1% | 3% | ||||||||
| Storage Length (ft) | 350 | 0 | 125 | 0 | 100 | 0 | 100 | 350 | ||||
| Storage Lanes | 1 | 0 | 1 | 1 | 1 | 0 | 1 | 1 | ||||
| Taper Length (ft) | 45 | 45 | 45 | 45 | ||||||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.850 | 0.850 | ||||||||||
| Flt Protected | 0.950 | 0.950 | 0.950 | 0.950 | ||||||||
| Satd. Flow (prot) | 1517 | 1667 | 0 | 1629 | 1748 | 1530 | 1701 | 1739 | 0 | 1620 | 1705 | 1507 |
| Flt Permitted | 0.130 | 0.371 | 0.371 | 0.151 | ||||||||
| Satd. Flow (perm) | 208 | 1667 | 0 | 636 | 1748 | 1530 | 664 | 1739 | 0 | 257 | 1705 | 1507 |
| Right Turn on Red | Yes | Yes | Yes | Yes | ||||||||
| Satd. Flow (RTOR) | 95 | 152 | ||||||||||
| Link Speed (mph) | 45 | 45 | 45 | 45 | ||||||||
| Link Distance (ft) | 767 | 160 | 717 | 900 | ||||||||
| Travel Time (s) | 11.6 | 2.4 | 10.9 | 13.6 | ||||||||
| Peak Hour Factor | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 |
| Heavy Vehicles (%) | 9% | 5% | 0% | 5% | 3% | 0% | 0% | 3% | 0% | 4% | 4% | 0% |
| Adj. Flow (vph) | 146 | 312 | 0 | 164 | 488 | 51 | 54 | 602 | 0 | 14 | 391 | 145 |
| Shared Lane Traffic (%) | ||||||||||||
| Lane Group Flow (vph) | 146 | 312 | 0 | 164 | 488 | 51 | 54 | 602 | 0 | 14 | 391 | 145 |
| Enter Blocked Intersection | No | No | No | No | No | No | No | No | No | No | No | No |
| Lane Alignment | Left | Left | Right | Left | Left | Right | Left | Left | Right | Left | Left | Right |
| Median Width(ft) | 12 | 12 | 12 | 12 | ||||||||
| Link Offset(ft) | 0 | 0 | 0 | 0 | ||||||||
| Crosswalk Width(ft) | 16 | 16 | 16 | 16 | ||||||||
| Two way Left Turn Lane | ||||||||||||
| Headway Factor | 1.12 | 1.12 | 1.12 | 1.07 | 1.07 | 1.07 | 1.08 | 1.08 | 1.08 | 1.09 | 1.09 | 1.09 |
| Turning Speed (mph) | 15 | 9 | 15 | 9 | 15 | 9 | 15 | 9 | ||||
| Number of Detectors | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||
| Detector Template | Left | Thru | Left | Thru | Right | Left | Thru | Left | Thru | Right | ||
| Leading Detector (ft) | 35 | 35 | 35 | 35 | 5 | 35 | 5 | 35 | 5 | 5 | ||
| Trailing Detector (ft) | -5 | -5 | -5 | -5 | 0 | -5 | 0 | -5 | 0 | 0 | ||
| Detector 1 Position(ft) | -5 | -5 | -5 | -5 | 0 | -5 | 0 | -5 | 0 | 0 | ||
| Detector 1 Size(ft) | 40 | 40 | 40 | 40 | 5 | 40 | 5 | 40 | 5 | 5 | ||
| Detector 1 Type | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | ||
| Detector 1 Channel | ||||||||||||
| Detector 1 Extend (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Detector 1 Queue (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Detector 1 Delay (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Turn Type | pm+pt | NA | pm+pt | NA | pm+ov | pm+pt | NA | pm+pt | NA | Perm | ||
| Protected Phases | 7 | 4 | 3 | 8 | 1 | 5 | 2 | 1 | 6 | |||
| Permitted Phases | 4 | 8 | 8 | 2 | 6 | 6 | ||||||
| Detector Phase | 7 | 4 | 3 | 8 | 1 | 5 | 2 | 1 | 6 | 6 | ||
| Switch Phase | ||||||||||||
| Minimum Initial (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 39.0 | 3.0 | 39.0 | 39.0 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
1: Paoli Pike & Boot Road | 2014 Existing AM Peak
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | ||||||||||||
| Minimum Split (s) | 9.0 | 9.0 | 9.0 | 9.0 | 10.0 | 10.0 | 46.0 | 10.0 | 46.0 | 46.0 | ||
| Total Split (s) | 14.0 | 40.0 | 14.0 | 40.0 | 12.0 | 12.0 | 49.0 | 12.0 | 49.0 | 49.0 | ||
| Total Split (%) | 12.2% | 34.8% | 12.2% | 34.8% | 10.4% | 10.4% | 42.6% | 10.4% | 42.6% | 42.6% | ||
| Maximum Green (s) | 8.0 | 34.0 | 8.0 | 34.0 | 5.0 | 5.0 | 42.0 | 5.0 | 42.0 | 42.0 | ||
| Yellow Time (s) | 4.0 | 4.0 | 4.0 | 4.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | ||
| All-Red Time (s) | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | ||
| Lost Time Adjust (s) | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | ||
| Total Lost Time (s) | 5.0 | 5.0 | 5.0 | 5.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | ||
| Lead/Lag | Lead | Lag | Lead | Lag | Lead | Lead | Lag | Lead | Lag | Lag | ||
| Lead-Lag Optimize? | ||||||||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | ||
| Recall Mode | None | None | None | None | None | None | C-Max | None | C-Max | C-Max |
Intersection Summary
Area Type: Other
Cycle Length: 115
Actuated Cycle Length: 115
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Splits and Phases: 1: Paoli Pike & Boot Road
- ø1: 12 s
- ø2 (R): 49 s
- ø3: 14 s
- ø4: 40 s
- ø5: 12 s
- ø6 (R): 49 s
- ø7: 14 s
- ø8: 40 s
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
2: Paoli Pike & Goshen Village Access | 2014 Existing AM Peak
| Lane Group | WBL | WBR | NBT | NBR | SBL | SBT |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 12 | 8 | 700 | 27 | 19 | 489 |
| Ideal Flow (vphpl) | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 |
| Lane Width (ft) | 12 | 12 | 11 | 14 | 12 | 12 |
| Storage Length (ft) | 0 | 0 | 150 | 90 | ||
| Storage Lanes | 1 | 1 | 1 | 1 | ||
| Taper Length (ft) | 45 | 45 | ||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.850 | 0.850 | ||||
| Flt Protected | 0.950 | 0.950 | ||||
| Satd. Flow (prot) | 1368 | 1224 | 1626 | 1569 | 1710 | 1731 |
| Flt Permitted | 0.950 | 0.310 | ||||
| Satd. Flow (perm) | 1368 | 1224 | 1626 | 1569 | 558 | 1731 |
| Right Turn on Red | Yes | Yes | ||||
| Satd. Flow (RTOR) | 9 | 21 | ||||
| Link Speed (mph) | 25 | 45 | 45 | |||
| Link Distance (ft) | 501 | 900 | 981 | |||
| Travel Time (s) | 13.7 | 13.6 | 14.9 | |||
| Peak Hour Factor | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 |
| Heavy Vehicles (%) | 25% | 25% | 7% | 4% | 0% | 4% |
| Adj. Flow (vph) | 13 | 9 | 753 | 29 | 20 | 526 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 13 | 9 | 753 | 29 | 20 | 526 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Right | Left | Right | Left | Left |
| Median Width(ft) | 12 | 12 | 12 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.07 | 1.07 | 1.12 | 0.99 | 1.07 | 1.07 |
| Turning Speed (mph) | 15 | 9 | 9 | 15 | ||
| Number of Detectors | 1 | 1 | 1 | 1 | 1 | 1 |
| Detector Template | Left | Right | Thru | Right | Left | Thru |
| Leading Detector (ft) | 35 | 35 | 5 | 5 | 35 | 5 |
| Trailing Detector (ft) | -5 | -5 | 0 | 0 | -5 | 0 |
| Detector 1 Position(ft) | -5 | -5 | 0 | 0 | -5 | 0 |
| Detector 1 Size(ft) | 40 | 40 | 5 | 5 | 40 | 5 |
| Detector 1 Type | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex |
| Detector 1 Channel | ||||||
| Detector 1 Extend (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Detector 1 Queue (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Detector 1 Delay (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Turn Type | Prot | Prot | NA | Perm | pm+pt | NA |
| Protected Phases | 3 | 3 | 2 | 1 | 6 | |
| Permitted Phases | 2 | 6 | ||||
| Detector Phase | 3 | 3 | 2 | 2 | 1 | 6 |
| Switch Phase | ||||||
| Minimum Initial (s) | 3.0 | 3.0 | 40.0 | 40.0 | 3.0 | 40.0 |
| Minimum Split (s) | 9.0 | 9.0 | 47.0 | 47.0 | 11.0 | 47.0 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
2: Paoli Pike & Goshen Village Access | 2014 Existing AM Peak
| Lane Group | WBL | WBR | NBT | NBR | SBL | SBT |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Total Split (s) | 26.0 | 26.0 | 75.0 | 75.0 | 14.0 | 89.0 |
| Total Split (%) | 22.6% | 22.6% | 65.2% | 65.2% | 12.2% | 77.4% |
| Maximum Green (s) | 20.0 | 20.0 | 68.0 | 68.0 | 7.0 | 82.0 |
| Yellow Time (s) | 3.0 | 3.0 | 5.0 | 5.0 | 5.0 | 5.0 |
| All-Red Time (s) | 3.0 | 3.0 | 2.0 | 2.0 | 2.0 | 2.0 |
| Lost Time Adjust (s) | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 |
| Total Lost Time (s) | 5.0 | 5.0 | 6.0 | 6.0 | 6.0 | 6.0 |
| Lead/Lag | Lag | Lag | Lead | |||
| Lead-Lag Optimize? | ||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 |
| Recall Mode | None | None | C-Max | C-Max | None | C-Max |
Intersection Summary
Area Type: Other
Cycle Length: 115
Actuated Cycle Length: 115
Offset: 32 (28%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Splits and Phases: 2: Paoli Pike & Goshen Village Access
- ø1: 14 s
- ø2 (R): 75 s
- ø3: 26 s
- ø6 (R): 89 s
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
10: Channelized Right-turn Lane & Boot Road | 2014 Existing AM Peak
| Lane Group | EBT | EBR | WBL | WBT | NBL | NBR |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 295 | 0 | 0 | 639 | 0 | 91 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Grade (%) | 1% | 0% | 0% | |||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 0.95 | 1.00 | 1.00 |
| Frt | 0.865 | |||||
| Flt Protected | ||||||
| Satd. Flow (prot) | 1800 | 0 | 0 | 3539 | 0 | 1522 |
| Flt Permitted | ||||||
| Satd. Flow (perm) | 1800 | 0 | 0 | 3539 | 0 | 1522 |
| Link Speed (mph) | 45 | 45 | 30 | |||
| Link Distance (ft) | 160 | 340 | 256 | |||
| Travel Time (s) | 2.4 | 5.2 | 5.8 | |||
| Peak Hour Factor | 0.90 | 0.90 | 0.90 | 0.90 | 0.90 | 0.90 |
| Heavy Vehicles (%) | 5% | 2% | 4% | 2% | 2% | 8% |
| Adj. Flow (vph) | 328 | 0 | 0 | 710 | 0 | 101 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 328 | 0 | 0 | 710 | 0 | 101 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Right | Left | Left | Left | Right |
| Median Width(ft) | 12 | 12 | 0 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.01 | 1.01 | 1.00 | 1.00 | 1.00 | 1.00 |
| Turning Speed (mph) | 9 | 15 | 15 | 9 | ||
| Sign Control | Free | Free | Stop |
Intersection Summary
Area Type: Other
Control Type: Unsignalized
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
10: Channelized Right-turn Lane & Boot Road | 2014 Existing AM Peak
Intersection
Int Delay, s/veh 1
| Movement | EBT | EBR | WBL | WBT | NBL | NBR |
|---|---|---|---|---|---|---|
| Vol, veh/h | 295 | 0 | 0 | 639 | 0 | 91 |
| Conflicting Peds, #/hr | 0 | 0 | 0 | 0 | 0 | 0 |
| Sign Control | Free | Free | Free | Free | Stop | Stop |
| RT Channelized | - | None | - | None | - | None |
| Storage Length | - | - | - | - | 0 | - |
| Veh in Median Storage, # | 0 | - | - | 0 | 0 | - |
| Grade, % | 1 | - | - | 0 | 0 | - |
| Peak Hour Factor | 90 | 90 | 90 | 90 | 90 | 90 |
| Heavy Vehicles, % | 5 | 2 | 4 | 2 | 2 | 8 |
| Mvmt Flow | 328 | 0 | 0 | 710 | 0 | 101 |
| Major/Minor | Major1 | Major1 | Major2 | Major2 | Minor1 | Minor1 |
| Conflicting Flow All | 0 | 0 | 328 | 0 | 683 | 328 |
| Stage 1 | - | - | - | - | 328 | - |
| Stage 2 | - | - | - | - | 355 | - |
| Critical Hdwy | - | - | 4.14 | - | 6.83 | 6.32 |
| Critical Hdwy Stg 1 | - | - | - | - | 5.43 | - |
| Critical Hdwy Stg 2 | - | - | - | - | 5.83 | - |
| Follow-up Hdwy | - | - | 2.236 | - | 3.519 | 3.376 |
| Pot Cap-1 Maneuver | - | - | 1220 | - | 399 | 696 |
| Stage 1 | - | - | - | - | 729 | - |
| Stage 2 | - | - | - | - | 681 | - |
| Platoon blocked, % | - | - | - | |||
| Mov Cap-1 Maneuver | - | - | 1220 | - | 399 | 696 |
| Mov Cap-2 Maneuver | - | - | - | - | 399 | - |
| Stage 1 | - | - | - | - | 729 | - |
| Stage 2 | - | - | - | - | 681 | - |
| Approach | EB | WB | NB |
|---|---|---|---|
| HCM Control Delay, s | 0 | 0 | 11.1 |
| HCM LOS | B |
| Minor Lane/Major Mvmt | NBLn1 | EBT | EBR | WBL | WBT |
|---|---|---|---|---|---|
| Capacity (veh/h) | 696 | - | - | 1220 | - |
| HCM Lane V/C Ratio | 0.145 | - | - | 0 | - |
| HCM Control Delay (s) | 11.1 | - | - | 0 | - |
| HCM Lane LOS | B | - | - | A | - |
| HCM 95th %tile Q(veh) | 0.5 | - | - | 0 | - |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
ATTACHMENT 3
Dunkin Donuts - East Goshen
3: Boot Road & Goshen Village Acces | 2014 Existing AM Peak
| Lane Group | EBL | EBT | WBT | WBR | SBL | SBR |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 5 | 381 | 635 | 4 | 3 | 4 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Lane Width (ft) | 11 | 11 | 11 | 11 | 16 | 16 |
| Grade (%) | 1% | -1% | -1% | |||
| Storage Length (ft) | 150 | 0 | 0 | 0 | ||
| Storage Lanes | 1 | 0 | 1 | 0 | ||
| Taper Length (ft) | 45 | 45 | ||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.999 | 0.923 | ||||
| Flt Protected | 0.950 | 0.979 | ||||
| Satd. Flow (prot) | 1447 | 1757 | 1788 | 0 | 1713 | 0 |
| Flt Permitted | 0.950 | 0.979 | ||||
| Satd. Flow (perm) | 1447 | 1757 | 1788 | 0 | 1713 | 0 |
| Link Speed (mph) | 45 | 45 | 25 | |||
| Link Distance (ft) | 340 | 1418 | 335 | |||
| Travel Time (s) | 5.2 | 21.5 | 9.1 | |||
| Peak Hour Factor | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 |
| Heavy Vehicles (%) | 20% | 4% | 3% | 25% | 33% | 0% |
| Adj. Flow (vph) | 5 | 419 | 698 | 4 | 3 | 4 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 5 | 419 | 702 | 0 | 7 | 0 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Left | Left | Right | Left | Right |
| Median Width(ft) | 11 | 11 | 16 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.05 | 1.05 | 1.04 | 1.04 | 0.84 | 0.84 |
| Turning Speed (mph) | 15 | 9 | 15 | 9 | ||
| Sign Control | Free | Free | Stop |
Intersection Summary
Area Type: Other
Control Type: Unsignalized
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
3: Boot Road & Goshen Village Acces | 2014 Existing AM Peak
Intersection
Int Delay, s/veh 0.2
| Movement | EBL | EBT | WBT | WBR | SBL | SBR |
|---|---|---|---|---|---|---|
| Vol, veh/h | 5 | 381 | 635 | 4 | 3 | 4 |
| Conflicting Peds, #/hr | 0 | 0 | 0 | 0 | 0 | 0 |
| Sign Control | Free | Free | Free | Free | Stop | Stop |
| RT Channelized | - | None | - | None | - | None |
| Storage Length | 150 | - | - | - | 0 | - |
| Veh in Median Storage, # | - | 0 | 0 | - | 0 | - |
| Grade, % | - | 1 | -1 | - | -1 | - |
| Peak Hour Factor | 91 | 91 | 91 | 91 | 91 | 91 |
| Heavy Vehicles, % | 20 | 4 | 3 | 25 | 33 | 0 |
| Mvmt Flow | 5 | 419 | 698 | 4 | 3 | 4 |
| Major/Minor | Major1 | Major1 | Major2 | Major2 | Minor2 | Minor2 |
| Conflicting Flow All | 702 | 0 | - | 0 | 1130 | 700 |
| Stage 1 | - | - | - | - | 700 | - |
| Stage 2 | - | - | - | - | 430 | - |
| Critical Hdwy | 4.3 | - | - | - | 7.1 | 6.2 |
| Critical Hdwy Stg 1 | - | - | - | - | 5.53 | - |
| Critical Hdwy Stg 2 | - | - | - | - | 5.53 | - |
| Follow-up Hdwy | 3 | - | - | - | 3 | 3.1 |
| Pot Cap-1 Maneuver | 685 | - | - | - | 199 | 463 |
| Stage 1 | - | - | - | - | 540 | - |
| Stage 2 | - | - | - | - | 738 | - |
| Platoon blocked, % | - | - | - | |||
| Mov Cap-1 Maneuver | 685 | - | - | - | 198 | 463 |
| Mov Cap-2 Maneuver | - | - | - | - | 198 | - |
| Stage 1 | - | - | - | - | 540 | - |
| Stage 2 | - | - | - | - | 733 | - |
| Approach | EB | WB | SB |
|---|---|---|---|
| HCM Control Delay, s | 0.1 | 0 | 17.6 |
| HCM LOS | C |
| Minor Lane/Major Mvmt | EBL | EBT | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|
| Capacity (veh/h) | 685 | - | - | - | 294 |
| HCM Lane V/C Ratio | 0.008 | - | - | - | 0.026 |
| HCM Control Delay (s) | 10.3 | - | - | - | 17.6 |
| HCM Lane LOS | B | - | - | - | C |
| HCM 95th %tile Q(veh) | 0 | - | - | - | 0.1 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
1: Paoli Pike & Boot Road
2015 AM Peak without Development
| Movement | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ | ||
| Volume (veh/h) | 137 | 293 | 0 | 155 | 455 | 47 | 50 | 559 | 0 | 13 | 374 | 139 |
| Number | 7 | 4 | 14 | 3 | 8 | 18 | 5 | 2 | 12 | 1 | 6 | 16 |
| Initial Q (Qb), veh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Ped-Bike Adj(A_pbT) | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | ||||
| Parking Bus, Adj | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Adj Sat Flow, veh/h/ln | 1651 | 1714 | 0 | 1714 | 1748 | 1800 | 1791 | 1739 | 0 | 1705 | 1705 | 1773 |
| Adj Flow Rate, veh/h | 151 | 322 | 0 | 170 | 500 | 0 | 55 | 614 | 0 | 14 | 411 | 124 |
| Adj No. of Lanes | 1 | 1 | 0 | 1 | 1 | 1 | 1 | 1 | 0 | 1 | 1 | 1 |
| Peak Hour Factor | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 |
| Percent Heavy Veh, % | 9 | 5 | 0 | 5 | 3 | 0 | 0 | 3 | 0 | 4 | 4 | 0 |
| Cap, veh/h | 206 | 522 | 0 | 329 | 532 | 494 | 364 | 709 | 0 | 155 | 654 | 578 |
| Arrive On Green | 0.08 | 0.30 | 0.00 | 0.08 | 0.30 | 0.00 | 0.04 | 0.41 | 0.00 | 0.04 | 0.77 | 0.77 |
| Sat Flow, veh/h | 1573 | 1714 | 0 | 1633 | 1748 | 1530 | 1706 | 1739 | 0 | 1624 | 1705 | 1507 |
| Grp Volume(v), veh/h | 151 | 322 | 0 | 170 | 500 | 0 | 55 | 614 | 0 | 14 | 411 | 124 |
| Grp Sat Flow(s),veh/h/ln | 1573 | 1714 | 0 | 1633 | 1748 | 1530 | 1706 | 1739 | 0 | 1624 | 1705 | 1507 |
| Q Serve(g_s), s | 7.5 | 18.5 | 0.0 | 8.3 | 32.1 | 0.0 | 2.2 | 37.2 | 0.0 | 0.6 | 12.5 | 2.6 |
| Cycle Q Clear(g_c), s | 7.5 | 18.5 | 0.0 | 8.3 | 32.1 | 0.0 | 2.2 | 37.2 | 0.0 | 0.6 | 12.5 | 2.6 |
| Prop In Lane | 1.00 | 0.00 | 1.00 | 1.00 | 1.00 | 0.00 | 1.00 | 1.00 | ||||
| Lane Grp Cap(c), veh/h | 206 | 522 | 0 | 329 | 532 | 494 | 364 | 709 | 0 | 155 | 654 | 578 |
| V/C Ratio(X) | 0.73 | 0.62 | 0.00 | 0.52 | 0.94 | 0.00 | 0.15 | 0.87 | 0.00 | 0.09 | 0.63 | 0.21 |
| Avail Cap(c_a), veh/h | 206 | 522 | 0 | 329 | 532 | 494 | 381 | 709 | 0 | 209 | 654 | 578 |
| HCM Platoon Ratio | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 2.00 | 2.00 | 2.00 |
| Upstream Filter(l) | 1.00 | 1.00 | 0.00 | 1.00 | 1.00 | 0.00 | 1.00 | 1.00 | 0.00 | 0.95 | 0.95 | 0.95 |
| Uniform Delay (d), s/veh | 29.4 | 34.3 | 0.0 | 26.3 | 39.0 | 0.0 | 20.3 | 31.2 | 0.0 | 25.5 | 9.7 | 8.6 |
| Incr Delay (d2), s/veh | 12.6 | 2.2 | 0.0 | 1.4 | 25.0 | 0.0 | 0.2 | 13.4 | 0.0 | 0.2 | 4.3 | 0.8 |
| Initial Q Delay(d3),s/veh | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| %ile BackOfQ (-26165%),veh/ln | 4.0 | 9.1 | 0.0 | 3.8 | 19.1 | 0.0 | 1.0 | 20.4 | 0.0 | 0.3 | 6.4 | 1.2 |
| LnGrp Delay(d),s/veh | 42.0 | 36.5 | 0.0 | 27.7 | 64.0 | 0.0 | 20.5 | 44.6 | 0.0 | 25.7 | 14.0 | 9.4 |
| LnGrp LOS | D | D | C | E | C | D | C | B | A | |||
| Approach Vol, veh/h | 473 | 670 | 669 | 549 | ||||||||
| Approach Delay, s/veh | 38.2 | 54.7 | 42.6 | 13.3 | ||||||||
| Approach LOS | D | D | D | B |
| Timer | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Assigned Phs | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Phs Duration (G+Y+Rc), s | 8.1 | 52.9 | 14.0 | 40.0 | 10.9 | 50.1 | 14.0 | 40.0 |
| Change Period (Y+Rc), s | 7.0 | 7.0 | 6.0 | 6.0 | 7.0 | 7.0 | 6.0 | 6.0 |
| Max Green Setting (Gmax), s | 5.0 | 42.0 | 8.0 | 34.0 | 5.0 | 42.0 | 8.0 | 34.0 |
| Max Q Clear Time (g_c+l1), s | 3.1 | 39.7 | 10.8 | 21.0 | 4.7 | 15.0 | 10.0 | 34.6 |
| Green Ext Time (p_c), s | 0.0 | 0.9 | 0.0 | 2.4 | 0.0 | 3.1 | 0.0 | 0.0 |
Intersection Summary
HCM 2010 Ctrl Delay: 38.4
HCM 2010 LOS: D
I:\eng\814440\Traffic\Analysis\Submission 2 - September 2014\2015 without\AM Peak.syn
Synchro 8 Report
Dunkin Donuts - East Goshen | 2: Paoli Pike & Goshen Village Access | 2015 AM Peak without Development
| Movement | WBL | WBR | NBT | NBR | SBL | SBT |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (veh/h) | 14 | 14 | 710 | 33 | 26 | 497 |
| Number | 3 | 18 | 2 | 12 | 1 | 6 |
| Initial Q (Qb), veh | 0 | 0 | 0 | 0 | 0 | 0 |
| Ped-Bike Adj(A_pbT) | 1.00 | 1.00 | 1.00 | 1.00 | ||
| Parking Bus, Adj | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Adj Sat Flow, veh/h/ln | 1440 | 1440 | 1682 | 1800 | 1800 | 1731 |
| Adj Flow Rate, veh/h | 15 | 15 | 763 | 34 | 28 | 534 |
| Adj No. of Lanes | 1 | 1 | 1 | 1 | 1 | 1 |
| Peak Hour Factor | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 |
| Percent Heavy Veh, % | 25 | 25 | 7 | 4 | 0 | 4 |
| Cap, veh/h | 37 | 33 | 1348 | 1226 | 630 | 1519 |
| Arrive On Green | 0.03 | 0.03 | 1.00 | 1.00 | 0.02 | 0.88 |
| Sat Flow, veh/h | 1371 | 1224 | 1682 | 1530 | 1714 | 1731 |
| Grp Volume(v), veh/h | 15 | 15 | 763 | 34 | 28 | 534 |
| Grp Sat Flow(s),veh/h/ln | 1371 | 1224 | 1682 | 1530 | 1714 | 1731 |
| Q Serve(g_s), s | 1.2 | 0.9 | 0.0 | 0.0 | 0.3 | 6.3 |
| Cycle Q Clear(g_c), s | 1.2 | 0.9 | 0.0 | 0.0 | 0.3 | 6.3 |
| Prop In Lane | 1.00 | 1.00 | 1.00 | 1.00 | ||
| Lane Grp Cap(c), veh/h | 37 | 33 | 1348 | 1226 | 630 | 1519 |
| V/C Ratio(X) | 0.41 | 0.31 | 0.57 | 0.03 | 0.04 | 0.35 |
| Avail Cap(c_a), veh/h | 250 | 224 | 1348 | 1226 | 707 | 1519 |
| HCM Platoon Ratio | 1.00 | 1.00 | 2.00 | 2.00 | 1.00 | 1.00 |
| Upstream Filter(I) | 1.00 | 1.00 | 0.45 | 0.45 | 1.00 | 1.00 |
| Uniform Delay (d), s/veh | 55.1 | 54.9 | 0.0 | 0.0 | 1.4 | 1.2 |
| Incr Delay (d2), s/veh | 7.2 | 5.1 | 0.8 | 0.0 | 0.0 | 0.6 |
| Initial Q Delay(d3),s/veh | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| %ile BackOfQ(50%),veh/ln | 0.5 | 0.4 | 0.3 | 0.0 | 0.1 | 3.1 |
| LnGrp Delay(d),s/veh | 62.2 | 60.1 | 0.8 | 0.0 | 1.4 | 1.9 |
| LnGrp LOS | E | E | A | A | A | A |
| Approach Vol, veh/h | 25 | 797 | 562 | |||
| Approach Delay, s/veh | 61.4 | 0.7 | 1.9 | |||
| Approach LOS | E | A | A |
| Timer | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Assigned Phs | 1 | 2 | 6 | 8 | ||||
| Phs Duration (G+Y+Rc), s | 8.8 | 98.2 | 106.9 | 8.1 | ||||
| Change Period (Y+Rc), s | 7.0 | 7.0 | 7.0 | 6.0 | ||||
| Max Green Setting (Gmax), s | 7.0 | 68.0 | 82.0 | 20.0 | ||||
| Max Q Clear Time (g_c+I1), s | 2.8 | 2.5 | 8.8 | 3.7 | ||||
| Green Ext Time (p_c), s | 0.0 | 4.0 | 4.0 | 0.0 |
Intersection Summary
HCM 2010 Ctrl Delay: 2.3
HCM 2010 LOS: A
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\2015 without\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
3: Boot Road & Goshen Village Acces | 2015 AM Peak without Development
| Lane Group | EBL | EBT | WBT | WBR | SBL | SBR |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 15 | 407 | 660 | 13 | 7 | 13 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Lane Width (ft) | 11 | 11 | 11 | 11 | 16 | 16 |
| Grade (%) | 1% | -1% | -1% | |||
| Storage Length (ft) | 150 | 0 | 0 | 0 | ||
| Storage Lanes | 1 | 0 | 1 | 0 | ||
| Taper Length (ft) | 45 | 45 | ||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.997 | 0.914 | ||||
| Flt Protected | 0.950 | 0.982 | ||||
| Satd. Flow (prot) | 1447 | 1757 | 1780 | 0 | 1734 | 0 |
| Flt Permitted | 0.950 | 0.982 | ||||
| Satd. Flow (perm) | 1447 | 1757 | 1780 | 0 | 1734 | 0 |
| Link Speed (mph) | 45 | 45 | 25 | |||
| Link Distance (ft) | 340 | 1418 | 335 | |||
| Travel Time (s) | 5.2 | 21.5 | 9.1 | |||
| Peak Hour Factor | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 |
| Heavy Vehicles (%) | 20% | 4% | 3% | 25% | 33% | 0% |
| Adj. Flow (vph) | 16 | 447 | 725 | 14 | 8 | 14 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 16 | 447 | 739 | 0 | 22 | 0 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Left | Left | Right | Left | Right |
| Median Width(ft) | 11 | 11 | 16 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.05 | 1.05 | 1.04 | 1.04 | 0.84 | 0.84 |
| Turning Speed (mph) | 15 | 9 | 15 | 9 | ||
| Sign Control | Free | Free | Stop |
Intersection Summary
Area Type: Other
Control Type: Unsignalized
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\2015 without\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
3: Boot Road & Goshen Village Acces | 2015 AM Peak without Development
Intersection
Int Delay, s/veh 0.5
| Movement | EBL | EBT | WBT | WBR | SBL | SBR |
|---|---|---|---|---|---|---|
| Vol, veh/h | 15 | 407 | 660 | 13 | 7 | 13 |
| Conflicting Peds, #/hr | 0 | 0 | 0 | 0 | 0 | 0 |
| Sign Control | Free | Free | Free | Free | Stop | Stop |
| RT Channelized | - | None | - | None | - | None |
| Storage Length | 150 | - | - | - | 0 | - |
| Veh in Median Storage, # | - | 0 | 0 | - | 0 | - |
| Grade, % | - | 1 | -1 | - | -1 | - |
| Peak Hour Factor | 91 | 91 | 91 | 91 | 91 | 91 |
| Heavy Vehicles, % | 20 | 4 | 3 | 25 | 33 | 0 |
| Mvmt Flow | 16 | 447 | 725 | 14 | 8 | 14 |
| Major/Minor | Major1 | Major1 | Major2 | Major2 | Minor2 | Minor2 |
| Conflicting Flow All | 740 | 0 | - | 0 | 1212 | 732 |
| Stage 1 | - | - | - | - | 732 | - |
| Stage 2 | - | - | - | - | 480 | - |
| Critical Hdwy | 4.3 | - | - | - | 7.1 | 6.2 |
| Critical Hdwy Stg 1 | - | - | - | - | 5.53 | - |
| Critical Hdwy Stg 2 | - | - | - | - | 5.53 | - |
| Follow-up Hdwy | 3 | - | - | - | 3 | 3.1 |
| Pot Cap-1 Maneuver | 664 | - | - | - | 175 | 444 |
| Stage 1 | - | - | - | - | 521 | - |
| Stage 2 | - | - | - | - | 697 | - |
| Platoon blocked, % | - | - | - | |||
| Mov Cap-1 Maneuver | 664 | - | - | - | 171 | 444 |
| Mov Cap-2 Maneuver | - | - | - | - | 171 | - |
| Stage 1 | - | - | - | - | 521 | - |
| Stage 2 | - | - | - | - | 680 | - |
| Approach | EB | WB | SB |
|---|---|---|---|
| HCM Control Delay, s | 0.4 | 0 | 18.7 |
| HCM LOS | C |
| Minor Lane/Major Mvmt | EBL | EBT | WBT | WBR | SBLn1 |
|---|---|---|---|---|---|
| Capacity (veh/h) | 664 | - | - | - | 285 |
| HCM Lane V/C Ratio | 0.025 | - | - | - | 0.077 |
| HCM Control Delay (s) | 10.6 | - | - | - | 18.7 |
| HCM Lane LOS | B | - | - | - | C |
| HCM 95th %tile Q(veh) | 0.1 | - | - | - | 0.2 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\2015 without\AM Peak.syn | Synchro 8 Report
ATTACHMENT 4
Dunkin Donuts - East Goshen
1: Paoli Pike & Boot Road | 2014 Existing AM Peak
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | ||||||||||||
| Volume (vph) | 133 | 284 | 0 | 149 | 444 | 46 | 49 | 548 | 0 | 13 | 356 | 132 |
| Ideal Flow (vphpl) | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 |
| Lane Width (ft) | 11 | 11 | 11 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 |
| Grade (%) | 0% | 0% | 1% | 3% | ||||||||
| Storage Length (ft) | 350 | 0 | 125 | 0 | 100 | 0 | 100 | 350 | ||||
| Storage Lanes | 1 | 0 | 1 | 1 | 1 | 0 | 1 | 1 | ||||
| Taper Length (ft) | 45 | 45 | 45 | 45 | ||||||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.850 | 0.850 | ||||||||||
| Flt Protected | 0.950 | 0.950 | 0.950 | 0.950 | ||||||||
| Satd. Flow (prot) | 1517 | 1667 | 0 | 1629 | 1748 | 1530 | 1701 | 1739 | 0 | 1620 | 1705 | 1507 |
| Flt Permitted | 0.130 | 0.371 | 0.371 | 0.151 | ||||||||
| Satd. Flow (perm) | 208 | 1667 | 0 | 636 | 1748 | 1530 | 664 | 1739 | 0 | 257 | 1705 | 1507 |
| Right Turn on Red | Yes | Yes | Yes | Yes | ||||||||
| Satd. Flow (RTOR) | 95 | 152 | ||||||||||
| Link Speed (mph) | 45 | 45 | 45 | 45 | ||||||||
| Link Distance (ft) | 767 | 160 | 717 | 900 | ||||||||
| Travel Time (s) | 11.6 | 2.4 | 10.9 | 13.6 | ||||||||
| Peak Hour Factor | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 | 0.91 |
| Heavy Vehicles (%) | 9% | 5% | 0% | 5% | 3% | 0% | 0% | 3% | 0% | 4% | 4% | 0% |
| Adj. Flow (vph) | 146 | 312 | 0 | 164 | 488 | 51 | 54 | 602 | 0 | 14 | 391 | 145 |
| Shared Lane Traffic (%) | ||||||||||||
| Lane Group Flow (vph) | 146 | 312 | 0 | 164 | 488 | 51 | 54 | 602 | 0 | 14 | 391 | 145 |
| Enter Blocked Intersection | No | No | No | No | No | No | No | No | No | No | No | No |
| Lane Alignment | Left | Left | Right | Left | Left | Right | Left | Left | Right | Left | Left | Right |
| Median Width(ft) | 12 | 12 | 12 | 12 | ||||||||
| Link Offset(ft) | 0 | 0 | 0 | 0 | ||||||||
| Crosswalk Width(ft) | 16 | 16 | 16 | 16 | ||||||||
| Two way Left Turn Lane | ||||||||||||
| Headway Factor | 1.12 | 1.12 | 1.12 | 1.07 | 1.07 | 1.07 | 1.08 | 1.08 | 1.08 | 1.09 | 1.09 | 1.09 |
| Turning Speed (mph) | 15 | 9 | 15 | 9 | 15 | 9 | 15 | 9 | ||||
| Number of Detectors | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||
| Detector Template | Left | Thru | Left | Thru | Right | Left | Thru | Left | Thru | Right | ||
| Leading Detector (ft) | 35 | 35 | 35 | 35 | 5 | 35 | 5 | 35 | 5 | 5 | ||
| Trailing Detector (ft) | -5 | -5 | -5 | -5 | 0 | -5 | 0 | -5 | 0 | 0 | ||
| Detector 1 Position(ft) | -5 | -5 | -5 | -5 | 0 | -5 | 0 | -5 | 0 | 0 | ||
| Detector 1 Size(ft) | 40 | 40 | 40 | 40 | 5 | 40 | 5 | 40 | 5 | 5 | ||
| Detector 1 Type | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | ||
| Detector 1 Channel | ||||||||||||
| Detector 1 Extend (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Detector 1 Queue (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Detector 1 Delay (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Turn Type | pm+pt | NA | pm+pt | NA | pm+ov | pm+pt | NA | pm+pt | NA | Perm | ||
| Protected Phases | 7 | 4 | 3 | 8 | 1 | 5 | 2 | 1 | 6 | |||
| Permitted Phases | 4 | 8 | 8 | 2 | 6 | 6 | ||||||
| Detector Phase | 7 | 4 | 3 | 8 | 1 | 5 | 2 | 1 | 6 | 6 | ||
| Switch Phase | ||||||||||||
| Minimum Initial (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 39.0 | 3.0 | 39.0 | 39.0 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
1: Paoli Pike & Boot Road | 2014 Existing AM Peak
| Lane Group | EBL | EBT | EBR | WBL | WBT | WBR | NBL | NBT | NBR | SBL | SBT | SBR |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lane Configurations | ||||||||||||
| Minimum Split (s) | 9.0 | 9.0 | 9.0 | 9.0 | 10.0 | 10.0 | 46.0 | 10.0 | 46.0 | 46.0 | ||
| Total Split (s) | 14.0 | 40.0 | 14.0 | 40.0 | 12.0 | 12.0 | 49.0 | 12.0 | 49.0 | 49.0 | ||
| Total Split (%) | 12.2% | 34.8% | 12.2% | 34.8% | 10.4% | 10.4% | 42.6% | 10.4% | 42.6% | 42.6% | ||
| Maximum Green (s) | 8.0 | 34.0 | 8.0 | 34.0 | 5.0 | 5.0 | 42.0 | 5.0 | 42.0 | 42.0 | ||
| Yellow Time (s) | 4.0 | 4.0 | 4.0 | 4.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | ||
| All-Red Time (s) | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | ||
| Lost Time Adjust (s) | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | ||
| Total Lost Time (s) | 5.0 | 5.0 | 5.0 | 5.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | ||
| Lead/Lag | Lead | Lag | Lead | Lag | Lead | Lead | Lag | Lead | Lag | Lag | ||
| Lead-Lag Optimize? | ||||||||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | ||
| Recall Mode | None | None | None | None | None | None | C-Max | None | C-Max | C-Max |
Intersection Summary
Area Type: Other
Cycle Length: 115
Actuated Cycle Length: 115
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Splits and Phases: 1: Paoli Pike & Boot Road
- ø1: 12 s
- ø2 (R): 49 s
- ø3: 14 s
- ø4: 40 s
- ø5: 12 s
- ø6 (R): 49 s
- ø7: 14 s
- ø8: 40 s
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
2: Paoli Pike & Goshen Village Access | 2014 Existing AM Peak
| Lane Group | WBL | WBR | NBT | NBR | SBL | SBT |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 12 | 8 | 700 | 27 | 19 | 489 |
| Ideal Flow (vphpl) | 1800 | 1800 | 1800 | 1800 | 1800 | 1800 |
| Lane Width (ft) | 12 | 12 | 11 | 14 | 12 | 12 |
| Storage Length (ft) | 0 | 0 | 150 | 90 | ||
| Storage Lanes | 1 | 1 | 1 | 1 | ||
| Taper Length (ft) | 45 | 45 | ||||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| Frt | 0.850 | 0.850 | ||||
| Flt Protected | 0.950 | 0.950 | ||||
| Satd. Flow (prot) | 1368 | 1224 | 1626 | 1569 | 1710 | 1731 |
| Flt Permitted | 0.950 | 0.310 | ||||
| Satd. Flow (perm) | 1368 | 1224 | 1626 | 1569 | 558 | 1731 |
| Right Turn on Red | Yes | Yes | ||||
| Satd. Flow (RTOR) | 9 | 21 | ||||
| Link Speed (mph) | 25 | 45 | 45 | |||
| Link Distance (ft) | 501 | 900 | 981 | |||
| Travel Time (s) | 13.7 | 13.6 | 14.9 | |||
| Peak Hour Factor | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 | 0.93 |
| Heavy Vehicles (%) | 25% | 25% | 7% | 4% | 0% | 4% |
| Adj. Flow (vph) | 13 | 9 | 753 | 29 | 20 | 526 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 13 | 9 | 753 | 29 | 20 | 526 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Right | Left | Right | Left | Left |
| Median Width(ft) | 12 | 12 | 12 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.07 | 1.07 | 1.12 | 0.99 | 1.07 | 1.07 |
| Turning Speed (mph) | 15 | 9 | 9 | 15 | ||
| Number of Detectors | 1 | 1 | 1 | 1 | 1 | 1 |
| Detector Template | Left | Right | Thru | Right | Left | Thru |
| Leading Detector (ft) | 35 | 35 | 5 | 5 | 35 | 5 |
| Trailing Detector (ft) | -5 | -5 | 0 | 0 | -5 | 0 |
| Detector 1 Position(ft) | -5 | -5 | 0 | 0 | -5 | 0 |
| Detector 1 Size(ft) | 40 | 40 | 5 | 5 | 40 | 5 |
| Detector 1 Type | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex | Cl+Ex |
| Detector 1 Channel | ||||||
| Detector 1 Extend (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Detector 1 Queue (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Detector 1 Delay (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Turn Type | Prot | Prot | NA | Perm | pm+pt | NA |
| Protected Phases | 3 | 3 | 2 | 1 | 6 | |
| Permitted Phases | 2 | 6 | ||||
| Detector Phase | 3 | 3 | 2 | 2 | 1 | 6 |
| Switch Phase | ||||||
| Minimum Initial (s) | 3.0 | 3.0 | 40.0 | 40.0 | 3.0 | 40.0 |
| Minimum Split (s) | 9.0 | 9.0 | 47.0 | 47.0 | 11.0 | 47.0 |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
2: Paoli Pike & Goshen Village Access | 2014 Existing AM Peak
| Lane Group | WBL | WBR | NBT | NBR | SBL | SBT |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Total Split (s) | 26.0 | 26.0 | 75.0 | 75.0 | 14.0 | 89.0 |
| Total Split (%) | 22.6% | 22.6% | 65.2% | 65.2% | 12.2% | 77.4% |
| Maximum Green (s) | 20.0 | 20.0 | 68.0 | 68.0 | 7.0 | 82.0 |
| Yellow Time (s) | 3.0 | 3.0 | 5.0 | 5.0 | 5.0 | 5.0 |
| All-Red Time (s) | 3.0 | 3.0 | 2.0 | 2.0 | 2.0 | 2.0 |
| Lost Time Adjust (s) | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 | -1.0 |
| Total Lost Time (s) | 5.0 | 5.0 | 6.0 | 6.0 | 6.0 | 6.0 |
| Lead/Lag | Lag | Lag | Lead | |||
| Lead-Lag Optimize? | ||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 |
| Recall Mode | None | None | C-Max | C-Max | None | C-Max |
Intersection Summary
Area Type: Other
Cycle Length: 115
Actuated Cycle Length: 115
Offset: 32 (28%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Splits and Phases: 2: Paoli Pike & Goshen Village Access
- ø1: 14 s
- ø2 (R): 75 s
- ø3: 26 s
- ø6 (R): 89 s
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
10: Channelized Right-turn Lane & Boot Road | 2014 Existing AM Peak
| Lane Group | EBT | EBR | WBL | WBT | NBL | NBR |
|---|---|---|---|---|---|---|
| Lane Configurations | ||||||
| Volume (vph) | 295 | 0 | 0 | 639 | 0 | 91 |
| Ideal Flow (vphpl) | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
| Grade (%) | 1% | 0% | 0% | |||
| Lane Util. Factor | 1.00 | 1.00 | 1.00 | 0.95 | 1.00 | 1.00 |
| Frt | 0.865 | |||||
| Flt Protected | ||||||
| Satd. Flow (prot) | 1800 | 0 | 0 | 3539 | 0 | 1522 |
| Flt Permitted | ||||||
| Satd. Flow (perm) | 1800 | 0 | 0 | 3539 | 0 | 1522 |
| Link Speed (mph) | 45 | 45 | 30 | |||
| Link Distance (ft) | 160 | 340 | 256 | |||
| Travel Time (s) | 2.4 | 5.2 | 5.8 | |||
| Peak Hour Factor | 0.90 | 0.90 | 0.90 | 0.90 | 0.90 | 0.90 |
| Heavy Vehicles (%) | 5% | 2% | 4% | 2% | 2% | 8% |
| Adj. Flow (vph) | 328 | 0 | 0 | 710 | 0 | 101 |
| Shared Lane Traffic (%) | ||||||
| Lane Group Flow (vph) | 328 | 0 | 0 | 710 | 0 | 101 |
| Enter Blocked Intersection | No | No | No | No | No | No |
| Lane Alignment | Left | Right | Left | Left | Left | Right |
| Median Width(ft) | 12 | 12 | 0 | |||
| Link Offset(ft) | 0 | 0 | 0 | |||
| Crosswalk Width(ft) | 16 | 16 | 16 | |||
| Two way Left Turn Lane | ||||||
| Headway Factor | 1.01 | 1.01 | 1.00 | 1.00 | 1.00 | 1.00 |
| Turning Speed (mph) | 9 | 15 | 15 | 9 | ||
| Sign Control | Free | Free | Stop |
Intersection Summary
Area Type: Other
Control Type: Unsignalized
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
Dunkin Donuts - East Goshen
10: Channelized Right-turn Lane & Boot Road | 2014 Existing AM Peak
Intersection
Int Delay, s/veh 1
| Movement | EBT | EBR | WBL | WBT | NBL | NBR |
|---|---|---|---|---|---|---|
| Vol, veh/h | 295 | 0 | 0 | 639 | 0 | 91 |
| Conflicting Peds, #/hr | 0 | 0 | 0 | 0 | 0 | 0 |
| Sign Control | Free | Free | Free | Free | Stop | Stop |
| RT Channelized | - | None | - | None | - | None |
| Storage Length | - | - | - | - | 0 | - |
| Veh in Median Storage, # | 0 | - | - | 0 | 0 | - |
| Grade, % | 1 | - | - | 0 | 0 | - |
| Peak Hour Factor | 90 | 90 | 90 | 90 | 90 | 90 |
| Heavy Vehicles, % | 5 | 2 | 4 | 2 | 2 | 8 |
| Mvmt Flow | 328 | 0 | 0 | 710 | 0 | 101 |
| Major/Minor | Major1 | Major1 | Major2 | Major2 | Minor1 | Minor1 |
| Conflicting Flow All | 0 | 0 | 328 | 0 | 683 | 328 |
| Stage 1 | - | - | - | - | 328 | - |
| Stage 2 | - | - | - | - | 355 | - |
| Critical Hdwy | - | - | 4.14 | - | 6.83 | 6.32 |
| Critical Hdwy Stg 1 | - | - | - | - | 5.43 | - |
| Critical Hdwy Stg 2 | - | - | - | - | 5.83 | - |
| Follow-up Hdwy | - | - | 2.236 | - | 3.519 | 3.376 |
| Pot Cap-1 Maneuver | - | - | 1220 | - | 399 | 696 |
| Stage 1 | - | - | - | - | 729 | - |
| Stage 2 | - | - | - | - | 681 | - |
| Platoon blocked, % | - | - | - | |||
| Mov Cap-1 Maneuver | - | - | 1220 | - | 399 | 696 |
| Mov Cap-2 Maneuver | - | - | - | - | 399 | - |
| Stage 1 | - | - | - | - | 729 | - |
| Stage 2 | - | - | - | - | 681 | - |
| Approach | EB | WB | NB |
|---|---|---|---|
| HCM Control Delay, s | 0 | 0 | 11.1 |
| HCM LOS | B |
| Minor Lane/Major Mvmt | NBLn1 | EBT | EBR | WBL | WBT |
|---|---|---|---|---|---|
| Capacity (veh/h) | 696 | - | - | 1220 | - |
| HCM Lane V/C Ratio | 0.145 | - | - | 0 | - |
| HCM Control Delay (s) | 11.1 | - | - | 0 | - |
| HCM Lane LOS | B | - | - | A | - |
| HCM 95th %tile Q(veh) | 0.5 | - | - | 0 | - |
I:\eng\814440\TrafficAnalysis\Submission 2 - September 2014\existing\AM Peak.syn | Synchro 8 Report
ATTACHMENT 5
Gap Study Data Results
Intersection of Boot Road and Goshen Village Access
Combined Gaps - Boot Road
| 9/12/2014 End of Study (17:45) Start of Study (16:45) Total Survey Time (60) One Eastbound Through and one Westbound Through 24' Cartway |
|||
|---|---|---|---|
| Gap Size (Seconds) |
Number of Gaps |
Gap Size Factor |
Multiply Gap Size Factor by Number of Gaps |
| 0 to 7 | 207 | 0 | 0 |
| 8 to 11 | 44 | 1 | 44 |
| 12 to 15 | 24 | 2 | 48 |
| 16 to 17 | 3 | 3 | 9 |
| 18 to 21 | 11 | 4 | 44 |
| 22 to 25 | 5 | 5 | 25 |
| 26 to 29 | 3 | 6 | 18 |
| over 29 | 0 | 7 | 0 |
| Total | 188 | ||
Westbnound Gaps - Boot Road
| 9/12/2014 End of Study (17:45) Start of Study (16:45) Total Survey Time (60) One Eastbound Through and one Westbound Through 24' Cartway |
|||
|---|---|---|---|
| Gap Size (Seconds) |
Number of Gaps |
Gap Size Factor |
Multiply Gap Size Factor by Number of Gaps |
| 0 to 7 | 123 | 0 | 0 |
| 8 to 9 | 29 | 1 | 29 |
| 10 to 13 | 18 | 2 | 36 |
| 14 to 17 | 22 | 3 | 66 |
| 18 to 19 | 4 | 4 | 16 |
| 20 to 23 | 13 | 5 | 65 |
| 24 to 25 | 6 | 6 | 36 |
| over 25 | 28 | 7 | 196 |
| Total | 444 | ||
McMahon Associates Inc.
425 Commerce Drive, Suite 200
Fort Washington, PA 19034
Municipality: East Goshen Township
Location: Boot Road & Shopping Center Access
Counter/Board #: BW
File Name : paolibootGAP01p
Site Code : 11111111
Start Date : 9/12/2014
Page No : 1
Directions Printed: Westbound
| Start Time | Volume | 2 - 3 | 4 - 5 | 6 - 7 | 8 - 9 | 10 - 11 | 12 - 13 | 14 - 15 | 16 - 17 | 18 - 19 | 20 - 21 | 22 - 23 | 24 - 25 | 26 - 27 | 28 - 29 | >29 | Int. Total | Average |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 16:45 | 0 | 16 | 16 | 13 | 8 | 3 | 2 | 2 | 4 | 1 | 2 | 0 | 2 | 1 | 2 | 1 | 73 | 6 - 7 |
| Total | 0 | 16 | 16 | 13 | 8 | 3 | 2 | 2 | 4 | 1 | 2 | 0 | 2 | 1 | 2 | 1 | 73 | 6 - 7 |
| 17:00 | 0 | 7 | 10 | 9 | 7 | 1 | 2 | 4 | 3 | 0 | 1 | 1 | 1 | 1 | 0 | 7 | 54 | 8 - 9 |
| 17:15 | 0 | 10 | 12 | 5 | 7 | 4 | 3 | 2 | 1 | 1 | 1 | 4 | 1 | 1 | 0 | 6 | 58 | 8 - 9 |
| 17:30 | 0 | 10 | 9 | 6 | 7 | 1 | 2 | 4 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 6 | 58 | 8 - 9 |
| Grand Total | 0 | 43 | 47 | 33 | 29 | 9 | 9 | 12 | 10 | 4 | 6 | 7 | 6 | 5 | 3 | 20 | 243 | 6 - 7 |
| Total % | 17.7 | 19.3 | 13.6 | 11.9 | 3.7 | 3.7 | 4.9 | 4.1 | 1.6 | 2.5 | 2.9 | 2.5 | 2.1 | 1.2 | 8.2 |
Highway Capacity Manual 2010
Similar to the computation of critical headways, the analyst begins the computation of follow-up headways with the base follow-up headways given in Exhibit 19-11. The analyst then makes movement-specific adjustments to the base follow-up headways with information gathered on heavy vehicles and the geometrics of the major street per the adjustment factors given in Equation 19-31.
Equation 19-31
tf,x = tf,base + tf,HVPHV
where
tf,x = follow-up headway for movement x (s),
tf,base = base follow-up headway from Exhibit 19-11 (s),
tf,HV = adjustment factor for heavy vehicles (0.9 for major streets with one lane in each direction, 1.0 for major streets with two or three lanes in each direction); and
PHV = proportion of heavy vehicles for movement (expressed as a decimal; e.g., PHV = 0.02 for 2% heavy vehicles).
Exhibit 19-11
Base Follow-Up Headways for TWSC Intersections
| Vehicle Movement | Base Follow-Up Headway, tf,base (s) | ||
|---|---|---|---|
| Two Lanes | Four Lanes | Six Lanes | |
| Left turn from major | 2.2 | 2.2 | 3.1 |
| U-turn from major | N/A | 2.5 (wide) 3.1 (narrow) |
2.3 |
| Right turn from minor | 3.3 | 3.3 | 3.9 |
| Through traffic on minor | 4.0 | 4.0 | 4.0 |
| Left turn from minor | 3.5 | 3.5 | 3.8 |
Values from Exhibit 19-10 and Exhibit 19-11 are based on studies throughout the United States and are representative of a broad range of conditions. If smaller values for tc and tf are observed, capacity will be increased. If larger values for tc and tf are used, capacity will be decreased.
Step 5: Compute Potential Capacities
Step 5a: Potential Capacity If No Upstream Signal Effects Are Present
The potential capacity cp,x of a movement is computed according to the gap-acceptance model provided in Equation 19-32 (6). This model requires the analyst to input the conflicting flow rate vc,x, the critical headway tc,x, and the follow-up headway tf,x for movement x.
Equation 19-32
cp,x = vc,x (e−vc,xtc,x / 3,600) / (1 − e−vc,xtf,x / 3,600)
where
cp,x = potential capacity of movement x (veh/h),
vc,x = conflicting flow rate for movement x (veh/h),
tc,x = critical headway for minor movement x (s), and
tf,x = follow-up headway for minor movement x (s).
Methodology | Page 19-16 | Chapter 19/Two-Way STOP-Controlled Intersections
December 2010