Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION

Meeting Agenda

Wednesday, October 7, 2015
7:00 PM

  1. Call to Order / Pledge of Allegiance and Moment of Silence
  2. Chairman will ask if anyone is going to record the meeting
  3. Review of Tracking Log / Determine need for Workshop Meeting
  4. Public Comment on Non-Agenda Items
  5. Approval of Minutes September 2, 2015
  6. Subdivision and Land Development Applications
  7. Conditional Uses and Variances
  8. Ordinance Amendments
  9. Comprehensive Plan Update Draft Resolution & Recommendation for Approval
  10. Old Business Parks, Recreation and Open Space Plan Update, Resolution & Recommendation for approval; Zoning Ordinance Review
  11. New Business
  12. 2015 Goals
  13. Any Other Matter Tree Ordinance Memo; Act 14 NPDES; Goshen Village Shopping Center / Replacement Landscape Plantings
  14. Liaison Reports
  15. Correspondence
  16. Dates of Importance Date Meeting / Event Time Oct 06, 2015 Board of Supervisors 7:00 pm Oct 07, 2015 Planning Commission 7:00 pm Oct 08, 2015 Historical Commission 7:00 pm Oct 08, 2015 Local Traffic Advisory Committee Special Meeting / Hershey Mill Estates 7:00 pm Oct 12, 2015 Municipal Authority 7:00 pm Oct 13, 2015 Paoli Pike Trail Meeting #3 Work on Final Draft 7:00 pm Oct 13, 2015 Special 2016 Budget Meeting 7:00 pm Oct 14, 2015 Pension Committee 10:30 am Oct 14, 2015 Conservancy Board 7:00 pm Oct 15, 2015 Commerce Commission 7:00 pm Oct 17, 2015 Pumpkin Festival 10:00 am

Newsletter Deadlines for 2015:
Winter: October 30

Bold Items indicate new information to review.

F:\Data\Shared Data\Agendas\Planning Commission\2015\PC AGENDA 10072015.doc

East Goshen Township Planning Commission
Application Tracking Log

Application Name Application (CU,LD,O, SD,V, SE, CA) Type (Sk, P, F) Date Filed Start Date Date to Township Engineer Date to CCPC Date to Abutting Prop. / ABC's Extension PC NLT Action Date BOS NLT Action Date Hearing Date Drop Dead date Status
No Applications in October
Bold = New Application or PC action required
Completed in 2015
New Kent Final Plan Revision LD P/F NA NA NA NA NA NA NA NA NA NA Approved
942 Cornwallis Drive SD Sk 8/26/15 NA NA NA NA NA NA NA NA NA Sketch
GVSC CU APP Beverage Café (Abijibaba / DUNKIN) CU Sk 8/6/15 8/6/15 NA NA 8/12/15 9/2/15 10/5/15 9/15/15 10/9/15 Approved
GVSC ZHB APP Freestanding Signs ZHB SK 8/6/15 8/6/15 NA NA 1/10/00 9/2/15 10/5/15 9/29/15 10/5/15 Approved
19 Hill St. / Smith V 5/27/15 5/27/15 NA NA 5/29/15 7/1/15 7/7/15 7/9/15 7/24/15 Approved
1596 Paoli Pike (Swiss Farms) ZHB Sk 2/23/15 2/23/15 NA NA 2/242015 4/1/15 4/7/15 4/14/15 4/24/15 Approved
10A Reservoir Rd. SK NA NA NA NA NA NA NA NA NA NA Sketch
1131 N. Chester Rd. SD P/F 10/15/14 11/5/14 10/16/14 10/16/14 10/16/14 1/7/15 1/20/15 NA 1/24/15 Approved
1331 E. Strasburg Rd. ZHB Sk 12/5/14 12/5/14 NA NA 12/18/14 1/7/15 1/20/15 1/21/15 1/26/15 Denied
612 Meadow Drive (Christenson) V Sk 2/23/15 2/23/15 NA NA 2/242015 4/1/15 4/7/15 4/14/15 4/24/15 Approved

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2015\PC Tracking Log for 10072015.xls

9/30/2015

Draft

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING

September 2, 2015

The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, September 2, 2015 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Dan Daley, Adam Knox, Dan Landis, Jim McRee, Monica Close, Lori Kier and Brad Giresi. Also present was Mark Gordon, Zoning Officer and Janet Emanuel, Supervisor.

COMMON ACRONYMS:

Acronym Meaning
BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force
BC – Brandywine Conservancy CVS – Community Visioning Session
CB – Conservancy Board SWM – Storm Water Management
CCPC – Chester Co Planning Commission

A. FORMAL MEETING – 7:00

  1. Dan called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our troops.
  2. Dan asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response.
  3. Dan reviewed the Tracking Log and determined no need for a workshop
  4. Dan noted that the minutes of the August 5, 2015 meeting were approved.

B. SUBDIVISION & LAND DEVELOPMENT APPLICATIONS

  1. 942 Cornwallis Drive (Sketch Plan) – Jack Robinson, Engineer, and Robert Gionfriddo, owner, were present. Jack reviewed the 3.5 acre property and existing buildings and stream. The proposal is to subdivide into 2 lots. Mr. Gionfriddo is planning to build 2 homes and sell them. They plan to have a shared driveway, which, Mark pointed out, will require a maintenance agreement recorded with the deeds. Public Comment: John Hertzog, 940A Cornwallis Dr – He raised the question about a safety exit. Mark explained that a new developer owns the properties that Mr. Angelinni had so that is off the table.; Jim Faunce, 1544 King George Ct. – Asked about grading and trees. Jack answered that there will be no major grading and the building area is clear. Mark explained that there may be removal of some bamboo and/or trees on the Township easement to uncover manholes so they will be more accessible.

C. CONDITIONAL USES & VARIANCES

  1. Goshen Village Shopping Center – CU for Beverage Café (Dunkin Donuts). Patrick McKenna, Attorney and Ryan Turner, Property Manager, were present. Patrick reviewed the history of the proposed use of the existing bank building at GVSC. The Ordinance dated 7/7/15 defines it as a Beverage Café with drive thru. A hearing is scheduled for 9/15/15. There is no net loss in parking spaces. Two spaces will be held in reserve. The parking lot is being paved and striped now. A proposed exit from the drive thru with right turn only to go onto Boot Road is being added. Five parking spaces along the Paoli Pike side will be held in reserve and used for the drive thru. The revised screening plan was approved by the Conservancy Board. They have complied with all of the Township’s requests. The dumpster will be fully enclosed with a cedar shake wood roof to match the building. The gate will be metal with privacy slats. Discussed size and type of dumpster. They may wait to install the proposed plantings until the trail plan is final. Janet reported that the trail plan is moving along. Jim suggested using wheel stops for the 10 parking spaces across from the drive thru entrance.

F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 9-2-15 draft.docx 1

Lori asked about the number of cars Hertz will have parked. Ryan reported that he spoke with Hertz recently and they will be parking their cars in the rear of the stores. Lines are being striped for that purpose.

Adam made a motion that the Planning Commission recommend approval of the Conditional Use application of Abjibapa Enterprises, LLC to operate a Beverage Cafe at 1500 Paoli Pike as outlined in the Zoning Ordinance with the following conditions:

  1. The applicant shall provide the Township with a draft parking agreement which addresses the 5 parking spaces eliminated for the drive thru in the event the Township determines in the future that they are needed.
  2. The Drive Thru menu board shall automatically turn off when the store is closed.
  3. The trash enclosure shall be closed at all times except when being serviced.
  4. The use shall include a serviceable grease trap for food waste sewage if determined by the Township upon building plan review.
  5. The drive thru landscape screening shall be installed as described in the Conservancy Board review letter dated August 13, 2015.
  6. All new rooftop structures shall be painted to be aesthetically compatible with the roof façade.
  7. There shall be no outside storage of any kind, not including the arrangement of outdoor seating.
  8. Stop signs and stop bars shall be installed at the exits
  9. If needed traffic calming procedures will be used to control traffic
  10. Install wheel stops at the 10 parking spaces near the drive thru entrance.

Patrick commented that they will comply with all conditions to the motion.
Jim seconded the motion. The motion passed unanimously.

  1. Goshen Village Shopping Center – ZHB application to Amend current ZHB Decision – Patrick McKenna, Attorney, gave a history of the signs in this shopping center. They are asking for 2 freestanding pylon signs, one at each entrance, 120 sq. feet and internally lit. Mark explained that originally every store sign had to be approved by the Planning Commission, a single color, and channel letters. Now he approves them. Ryan will supply Mark with a copy of the sign conditions in their lease. Placement of the signs, especially on Paoli Pike, was discussed. There are 22 stores including DD and 4 are vacant, so there will be white boxes on the sign when there is a vacancy.

Jim made a motion that the Planning Commission recommend approval of the Zoning Hearing Board Application to amend the ZHB Decision from 1988 and permit freestanding signs on the Goshen Village Shopping Center property as permitted in the ordinance, with the following conditions:

  1. The property owner agrees to meet with the Township and it’s consultants in order to orient the sign location so as to best accommodate the alignment of the proposed Paoli Pike Trail.
  2. Remove condition of staff review, Sec. F.

Monica seconded the motion. The motion passed unanimously.

D. COMPREHENSIVE PLAN

Mark mentioned that everyone was given a copy of Draft #6. The PC will review it at their 10/7/15 meeting. There will be a public hearing on 10/20/15.

E. ANY OTHER MATTER

  1. Goals for 2016 will be discussed at the next meeting.
  2. The Paoli Pike Trail will have a public open house at 6:30 pm on 9/15/15.

F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 9-2-15 draft.docx 2

E. ADJOURNMENT

There being no further business, Adam moved to adjourn the meeting. Lori seconded the motion. The meeting adjourned at 10:00 pm. The next regular meeting will be held on October 7, 2015 at 7:00 pm.

Respectfully submitted,

___________________________________________
Ruth Kiefer, Recording Secretary

F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 9-2-15 draft.docx 3

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 9/30/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer
Re: Comprehensive Plan / Final Draft / Motion to recommend Adoption

Dear Commission Members:

As you know the Township has been working on the Comprehensive Plan since 2012. You have the final Draft in hand and the Board of Supervisors has advertised a hearing date of October 20, 2015 to consider adoption of the Plan.

The CCPC has reviewed the plan and found it to be consistent with the Landscapes2 and the PA MPC.

As required by the MPC the Planning Commission must hold a public meeting pursuant to notice to consider the 2015 Comprehensive Plan.

I have prepared a draft motion for your consideration.

Draft Motion: Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors adopt the 2015 Comprehensive Plan.

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Memo and Draft Motion for Comp Plan to PC 09302015.doc

EAST GOSHEN TOWNSHIP

CHESTER COUNTY, PENNSYLVANIA

RESOLUTION NO.

A RESOLUTION OF THE TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, TO APPROVE AND ADOPT THE EAST GOSHEN TOWNSHIP COMPREHENSIVE PLAN 2015.

WHEREAS, Article III of the Pennsylvania Municipalities Planning Code (the “MPC”) requires municipalities to review and update their comprehensive plan every ten (10) years; and

WHEREAS, the Board of Supervisors of East Goshen Township (the “Board ”) created a Comprehensive Plan Task Force which included elected and appointed members from the Township’s Authorities, Boards and Commissions; and

WHEREAS, the Task Force was supported by staff from the Township and the Chester County Planning Commission and the planning consultants, The Brandywine Conservancy and Thomas Comitta Associates, Inc.; and

WHEREAS, the Task Force was assisted with funding provided, in part, through a grant from the Vision Partnership Program sponsored by the Chester County Board of Commissioners; and

WHEREAS, the Task Force incorporated its findings and recommendations in a document titled, “East Goshen Township Comprehensive Plan 2015”, last draft dated August 31, 2015 (the “2015 Plan”); and

WHEREAS, pursuant to Section 302(a) of the MPC, the Planning Commission conducted a public meeting pursuant to notice on October 7, 2015 to consider the 2015 Plan; and

WHEREAS, the Planning Commission voted to recommend that the Board adopt the 2015 Plan; and

WHEREAS, pursuant to Section 301(c) and Section 301.3 of the MPC, the Township sent a copy of the 2015 Plan to the Chester County Planning Commission (“CCPC”) and the CCPC issued its recommendations to the Board in a review letter dated September 25, 2015; and

WHEREAS, pursuant to Section 301(c) and Section 301.3 of the MPC, the Township sent copies of the 2015 Plan to the governing bodies of contiguous

municipalities and to the West Chester Area School District for review and comment; and

WHEREAS, pursuant to Section 302(b) of the MPC, the Board conducted a public hearing on the 2015 Plan on October 20, 2015, pursuant to public notice, at which time it considered and voted to approve the 2015 Plan; and

WHEREAS, the Board desires to adopt this Resolution approving and adopting the 2015 Plan.

NOW THEREFORE, BE IT AND IT IS HEREBY RESOLVED, as follows:

  1. The Background to this Resolution is incorporated in and fully made part hereof.
  2. After considering the recommendations and comments from the Task Force, Township Consultants, Township Planning Commission, and the Chester County Planning Commission, and following notice to the School District, adjacent municipalities, and the public, the Board hereby resolves to adopt the 2015 Plan, which is comprised of the maps, charts, textual matter and all other materials constituting a part thereof as more particularly specified in the Table of Contents and Appendices, attached hereto as Exhibit “A”, incorporated herein by reference and made a part hereof.

RESOLVED AND ADOPTED this _____day of _______________, 2015.

ATTEST:
_________________________________
Louis F. Smith, Secretary

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS

_________________________________
E. Martin Shane, Chairman

_________________________________
Senya D. Isayeff, Vice-Chairman

_________________________________
Carmen Battavio, Member

_________________________________
Charles W. Proctor, III, Esquire, Member

_________________________________
Janet L. Emanuel, Member

2

[Seal: SEAL OF CHESTER COUNTY PENNSYLVANIA]

[Seal: CHESTER WILLIAM PENN PROPRIATOR AND GOVENOR]

THE COUNTY OF CHESTER

COMMISSIONERS

Terence Farrell
Kathi Cozzone
Michelle Kichline

DAVID D. WARD, AICP
Acting Director

PLANNING COMMISSION

Government Services Center, Suite 270
601 Westtown Road
P. O. Box 2747
West Chester, PA 19380-0990
(610) 344-6285 Fax (610) 344-6515

September 25, 2015

Louis F. Smith Jr., Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Comprehensive Plan – East Goshen Township
Act 247 and Vision Partnership Planning Grant - Combined Review
VPP Contract #: 14676 – Extension #1
Act 247 Review #CP-9-15-12505

Dear Mr. Smith:

The referral for review was received by this office on September 1, 2015.

This letter serves as both the official Act 247 review pursuant to the provisions of Section 301.3 of the Pennsylvania Municipalities Planning Code, and the Vision Partnership Review required by Section 7.3 of the Vision Partnership Program Grant Manual 2013.

This review notes the project’s consistency with Landscapes2 and with the Vision Partnership Program (VPP) Grant Contract and Scope of Work, as well as providing additional comments for consideration by the municipality prior to adoption. Jeannine Speirs served as the VPP Grant Monitor for this project. Consistency with Landscapes2 and the VPP Grant Contract are required prior to VPP grant reimbursement.

DESCRIPTION:

The Township has developed a fully updated Comprehensive Plan that provides goals, objectives, and recommendations to address the following topics:

Topic Topic
• Land Use • Natural and Historic Resources
• Housing • Community Facilities and Services
• Economic Development • Utilities
• Transportation and Circulation • Energy Conservation

Background information for these topics, as well as demographics, are also provided. Overall the plan is user-friendly, reflects the results of a public process, and meets the scope of work.

CONSISTENCY WITH LANDSCAPES2:

Landsapes2, the Chester County Comprehensive Policy Plan, was adopted in 2009. According to the Landscapes2 map and plan, East Goshen Township is largely a suburban landscape with a small area in of rural landscape that coincides with Township protected open lands. Natural landscapes overlay the Township along streams. The following landscape types are most relevant to the proposed Township Comprehensive Plan:

E-mail: ccplanning@chesco.org • www.landscapes2.org • Web site: www.chesco.org/planning

Page: 2
Comprehensive Plan – East Goshen Township
VPP Contract #14676 – Extension #1
Act 247 Review #CP-9-15-12505

  1. Suburban Landscape: Objective LU 3 of Landscapes2 states: “Promote new development in suburban landscapes to accommodate anticipated population and employment growth, using appropriate density, sustainable design, and smart transportation principles.”
  2. Natural Landscape: Objective LU 6 of Landscapes2 states: “As an overlay on the four basic landscapes [one of which is suburban], encourage the preservation and restoration of sensitive natural resources.”

The proposed Comprehensive Plan is consistent with Landscapes2. Lower intensity uses are promoted in natural and rural landscapes, while more intense uses and higher densities are promoted in suburban landscapes. Projected population growth can be accommodated within the Township Future Land Use Plan. Enhanced economic development and mixed use is focused in the Town Center and in existing commercial areas. Opportunities to increase pedestrian links and walkability connecting residential areas and key community features are a focal point of the Plan. Balancing growth with consideration of maintaining cultural, historic, and natural features is a plan vision. The Plan begins implementation of the recent multi-municipal Central Chester County Bicycle and Pedestrian Circulation Plan through prioritizing a “Paoli Pike Promenade” as a Plan action. The Plan was coordinated with the simultaneous Open Space and Recreation Plan Update, which was reviewed by the Commission on September 4, 2015 (CCPC# CP-8-15-12373).

CONSISTENCY WITH VPP GRANT CONTRACT AND SCOPE OF WORK:

The plan is consistent with the VPP Grant Contract and has addressed the tasks listed in the Scope of Work (Appendix B, dated November 14, 2014).

In addition, the plan appears to be in conformance with the Municipalities Planning Code.

RECOMMENDATION:

Based on our review, the proposed plan is consistent with Landscapes2 and the VPP Scope of Work. East Goshen Township should adopt the Comprehensive Plan. Upon adoption, the Township may apply for reimbursement under Section 9.0 of the Vision Partnership Grant Manual 2013.

We request an official copy of the decision made by the Board of Supervisors, as required by Section 306(b) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current municipal file.

Sincerely,

Susan S. Elks, AICP
Planning Services Director

SE/JS/PF
cc: E. Martin Shane, Chair – Board of Supervisors
    Daniel Daley - Planning Commission
    Thomas Comitta Associates, Inc.

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 9/30/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature: Mark Gordon]
Re: Parks, Recreation and Open Space Plan Update / Final Draft / Motion to recommend Adoption

Dear Commission Members:

As you know the Township has been working on the Open Space, Parks and Recreation Plan Update since early 2013. You have the final Draft in hand and the Board of Supervisors has advertised a hearing date of October 20, 2015 to consider adoption of the Plan.

Countless hours have been dedicated to this effort by all involved and many of the tasks identified in the plan are already active projects.

I have prepared a draft motion for your consideration.

Draft Motion: Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors adopt the Parks, Recreation and Open Space Plan Update with the following condition:
The review comments from the Chester County Planning Commission should be incorporated.

F:\Data\Shared Data\Admin Dept\Open Space Plan 2013\Memo and Draft Motion for OPRP to PC 09302015.doc

EAST GOSHEN TOWNSHIP

CHESTER COUNTY, PENNSYLVANIA

RESOLUTION NO.

A RESOLUTION OF THE TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, ADOPTING THE PARKS, RECREATION, AND OPEN SPACE PLAN UPDATE 2015.

WHEREAS, the Board is authorized by Section 503 of the Pennsylvania Municipalities Planning Code, 53 P.S. § 10503, (the “MPC”) to adopt regulations in the Township’s Subdivision and Land Development Ordinance requiring the public dedication of land suitable for parks and the construction of recreational facilities, and the payment of fees in lieu thereof, the private reservation of land, or a combination thereof, for park and recreation purposes, provided that the Township has a formally adopted park and recreation plan; and

WHEREAS, in Resolution No. 93-32, the Board of Supervisors of East Goshen Township adopted the East Goshen Township Recreation, Parks and Open Place Plan dated July 20, 1993 (the “1993 Plan”); and

WHEREAS, in 2013, the Township retained the services of Toole Recreation Planning, the Brandywine Conservancy and Natural Lands Trust as planning consultants (the “Consultants”) to assist in updating the 1993 Plan (the “Plan Update”); and

WHEREAS, the Consultants worked in collaboration with the Township and public to determine recreation needs, evaluate the current parks, recreation and open space system and to develop practical and achievable recommendations to improve the community through parks, recreation and open space; and

WHEREAS, based upon the public outreach and needs assessment, the Consultants identified the primary goal of the Plan Update as the desire to continue to provide premier parks and recreation facilities and services while protecting the Township’s scenic beauty, natural resources and open space; and

WHEREAS, at a public meeting on October 7, 2015, the Planning Commission reviewed the Plan Update and voted to recommend that the Board approve the Plan Update; and

WHEREAS, the Board desires to adopt this Resolution approving and adopting the Plan Update.

NOW THEREFORE, BE IT AND IT IS HEREBY RESOLVED, as follows:

  1. The Background to this Resolution is incorporated in and fully made part hereof.
  2. After considering the recommendations and comments from the Consultants and the Planning Commission, the Board hereby resolves to adopt the attached Plan Update, incorporated herein by reference and made a part hereof, as the Township’s formally adopted Park and Recreation Plan.

RESOLVED AND ADOPTED this _____day of _________________, 2015.

ATTEST: EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
_________________________________
Louis F. Smith, Secretary
_________________________________
E. Martin Shane, Chairman
_________________________________
Senya D. Isayeff, Vice-Chairman
_________________________________
Carmen Battavio, Member
_________________________________
Charles W. Proctor, III, Esquire, Member
_________________________________
Janet L. Emanuel, Member

THE COUNTY OF CHESTER

COMMISSIONERS: Terence Farrell, Kathi Cozzone, Michelle Kichline

DAVID D. WARD, AICP, Acting Director

PLANNING COMMISSION, Government Services Center, Suite 270, 601 Westtown Road, P. O. Box 2747, West Chester, PA 19380-0990, (610) 344-6285, Fax (610) 344-6515

September 4, 2015

Louis F. Smith, Jr., Manager, East Goshen Township, 1580 Paoli Pike, West Chester, PA 19380

Re: Proposed Parks, Recreation, and Open Space Plan Update (#CP-8-15-12373 - East Goshen Township)

Dear Mr. Smith:

The Chester County Planning Commission has reviewed the proposed Parks, Recreation, and Open Space Plan Update as submitted pursuant to the provisions of the Pennsylvania Municipalities Planning Code, Section 301.3. The referral for review was received by this office on August 10, 2015. We offer the following comments to assist in your review of the proposed Plan Update:

DESCRIPTION:

1. East Goshen Township proposes to adopt a Parks, Recreation, and Open Space Plan Update, to replace its 1993 Open Space, Recreation, and Environmental Resources Plan. The purpose of the Plan, as specified on Page 1, is to serve as the Parks, Recreation, and Open Space element of the Township's Comprehensive Plan, advance the 2013 Central Chester County Bicycle and Pedestrian Circulation Plan with respect to safe walking and cycling in the Township, and position the Township to be competitive for grant funding.

LANDSCAPES:

2. East Goshen Township is situated within the Suburban, Rural and Natural Landscape designations of Landscapes2, the 2009 County Comprehensive Plan. The majority of the Township is situated in the Suburban Landscape, where the objective is to promote new development to accommodate anticipated population and employment growth, using appropriate density, sustainable design, and smart transportation principles. The easternmost/southeastern portion of the Township along the Willistown Township border is situated in the Rural Landscape, where the objectives is to preserve the open, rural character of Chester County, enhance villages within their historic settings, and accommodate appropriate developments in rural centers. As an overlay of the basic landscapes, the objective of the Natural Landscape is to encourage the preservation and restoration of sensitive natural resources.

The proposed Plan Update is consistent with the goals and objectives of Landscapes2. The Open Space and Greenways component of Landscapes2 recommends that municipalities regularly update the parks and recreation sections of local comprehensive plans, establish and implement sustainable maintenance plans for municipally owned parks, preserves, and open spaces, and coordinate with public schools to integrate municipal and school recreation facilities where feasible.

E-mail: ccplanning@chesco.org • www.landscapes2.org • Web site: www.chesco.org/planning

Page: 2 — Re: Proposed Parks, Recreation, and Open Space Plan Update (#CP-8-15-12373 - East Goshen Township)

COMMENTS:

3. We note that East Goshen Township is also currently pursuing an update of its 2005 Comprehensive Plan, which is being prepared under the Chester County Vision Partnership Program (VPP), funded in part through a grant from the Chester County Board of Commissioners. We acknowledge Action Item 2.3A (page 16) states the Township shall coordinate the implementation of recommendations for natural resource conservation identified in the Comprehensive Plan as they apply to parks and public owned open space.

4. The County Planning Commission endorses Action Item 1.7.C (page 13), which states the Township shall undertake the development of a Township bicycle and pedestrian plan that builds upon the Central Chester County Bicycle and Pedestrian Plan.

5. The reference to the Central Chester County Bicycle and Pedestrian Plan on page 2 incorrectly identifies that the Plan was completed in 2012, rather than 2013. This should be corrected by the Township.

6. The preserved open space figures presented on Page 4 differ from the figures presented in the second paragraph on Page 15. Additionally, the total number of parks and open spaces used for active and passive recreation identified on Page 5 differs from the number provided Page 37. These issues should be corrected by the Township.

7. For clarity purposes, the Township should identify the general timeframes for the high, medium and low priority categories identified in Chapter 6 - Implementation Matrix.

8. We recommend that the Township consider reprinting the Implementation Matrix as a separate document, in addition to its inclusion in the Plan Update, and posting it on the Township's website. This will allow the Township's goals and objectives and implementation strategy, as well as the work program necessary for their implementation, to be read and distributed more widely.

9. We recommend the Township Owned Properties category on the Township Parks & Open Space Map (Page 31) be divided into active park and passive park categories, as specified in Table 1 on Pages 33-34. We also recommend that the names of the major active parks in the Township be added to this map, and that the font size of the UPI numbers shown on the map be increased in order to enhance the usability of the map with its corresponding Table.

10. UPI# 53-3M-29-E, which is identified in Table 1 as Township-owned passive open space ("Grand Oak Open Space, 9.9 acres), should be added to the Township Parks & Open Space Map.

11. In order to be consistent with the Combined Parks and Open Spaces Acreage figure presented in Appendix A, Table 1 on Page 38, we recommend that the last sentence on Page 38 be revised to identify that the Township owns an overall total of 508.81 acres of land for active and passive recreation.

12. The text note on page 77 (Appendix F) should be replaced with the summary from final public meeting in the adopted document.

Page: 3 — Re: Proposed Parks, Recreation, and Open Space Plan Update (#CP-8-15-12373 - East Goshen Township)

13. To assist in the Plan's implementation, we recommend that all members of the Board of Supervisors, the Township Planning Commission, and the Zoning Hearing Board be provided with official copies after adoption.

RECOMMENDATION:

The Commission commends the Township on preparing the Parks, Recreation, and Open Space Plan Update. The Township should adopt the Plan Update after consideration of the comments contained in this review.

We request an official copy of the decision made by the Board of Supervisors, as required by Section 306(b) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current file copy of your plan.

Sincerely,

Paul Farkas, Senior Planner

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 10/02/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature: Mark Gordon]
Re: Zoning Ordinance Review Recommendations

Commissioners,

Here are the items identified in Articles I-IV in the Review of the Zoning Ordinance that either pose some inconsistencies or require some clarifications in the code. I have drafted a matrix with the items we discussed last month. I will update the matrix with issues identified in articles V-IX prior to the meeting.

F:\Data\Shared Data\Admin Dept\Township Code\2012 Zoning Ordinance review\Memo to PC ZO recomendations 10022015.doc

East Goshen Township

Planning Commission Review of the Zoning Ordiance CH 240

Zoning Ordinace Reccomendations

Article Title Section Issue Recommendation Priority
Article II 2.1 Animal Husbandry 9.B(2) Animal Husbandry is listed as accessory use however referred to as requiring conditional use approval in the R-2 [240-9.B.(2)]. As I read the ordinance closely I believe that there are substantial inconsistencies and find the code nearly impossible to interpret. All aspects so of this ordinance be amended to be more readable and enforceable. The PC should develop a clear and simple objective to communicate to the Board that would encompass the use across the Zoning Ordinance. Once a clear objective is established
There are two definitions of Animal Husbandry in 240-6 that need consistency. This needs to be included in the review of Animal Husbandry. Look at the applicability of this use in the R-2 and R-4. The use could be permitted for all Residential districts as long as a clear definition and standard is outlined
a. Look at the applicability of this use in
The use could be permitted for all Residential districts as long as a clear definition and standard is outlined
2.2 Temporary Structure 6 There is no Definition in the ordiance for "Temporary Structure" Recommendation: We could add a definition for temporary structure which includes a finite period of time. We could specify that a permit is required for the temporary structure and a permit shall only be

Zoning Ordinance Reccomendations 10072015.xlsx

Zoning Ordinace Reccomendations

Article Title Section Issue Recommendation Priority
Webster’s online Definition of Temporary: lasting for a limited time
Temporary Use 6 “Temporary Use” is identified in the ordinance and it is also not defined. Recommendation: Define Temporary Use and develop a standard that specifies that a permit is required for the temporary use and a permit shall only be valid
Public and Private Recreation These terms should be consistent identify inconsistencies and correct
Windmill 32.T This use is permitted in all residential districts except the R-2 and R-5 a standard is outlined in §240-32.T Accessory Uses / Windmill. Amend the R-2 to permit this use, I believe it was an oversight since it’s allowed in Milltown with ~10K s.f. lots (R-3) and not in the R-2 with 25K s.f. lots. The terminology could be looked at too, for consistency: i.e. Windmill and Wind-generated Energy
2.3 Single Family Cluster Development 9.G This section of the ordinance somewhat hidden Single Family Cluster should be highlighted in the NOTES of 240-9.G directing readers to 240-28 for specific area and
2.4 Single Family Openspace Development 9.G This section of the ordinance somewhat hidden Single Family Openspace should be highlighted in the NOTES of 240-9.G refereeing readers to 240-36 for specific area
Article Title Section Issue Recommendation Priority
Article III 3.1 C-1 Uses 14.B/C/E B(6): C-1 Post Office Sale of goods on site? Sale of goods on site?
B(13): Outdoor retail sales of Christmas trees By Right?

Zoning Ordinance Reccomendations 10072015.xlsx

Zoning Ordinace Reccomendations

Article Title Section Issue Recommendation Priority
C(2): Outdoor retail sales of Christmas trees CU, WHY?
E(2): Outdoor Storage (Define!)
E(6): Temporary Use Define ?
3.2 C-2 Uses Restaurants? Its not very clear. Restaurant uses should be clear and concise
Article IV 4.1 I / BP Uses 19.C.(23) Research – This is allowed in I2 but not BP. Permit in BP
4.2 19.G. Max Building Height Since the height for apartments has been raised should this be raised. Dan pointed out that West Goshen allows up to 40 feet high.
4.3 20 Review I-2 district. There appears to be a lot of redundancy in I-1 & I-2. Review purpose of the I districts and determine if there are any uses that can be allowed in both I-
4.4 20.D.(6) and (24) Treatment center is listed twice. Remove (24)
4.5 20.F.(2) Typo: change 1-2 to I-2.
4.6 20.F.(2) (b) Just say Permitted Uses because the uses are shown in (a). ( c ) and (d) have references to Article V. This may need some additional thought because permitted uses
4.7 20.F.(3) (a) 330/150 feet from what?? Minimum perimeter building setback? Can the editor’s notes be incorporated into the zones for clarification. The notes are attached to the definitions.

Zoning Ordinance Reccomendations 10072015.xlsx

Zoning Ordinace Reccomendations

Article Title Section Issue Recommendation Priority
20.F.(3)(g) Two buildings on one lot Do we want to keep this? Yes, I believe this adds some flexibility to
20.F.(4) National Register of Historic Places Ask the Historical Commission to review and make any comments on this section? This section was written to preserve the Chamber building and allow it to be subdivided and

Zoning Ordinance Reccomendations 10072015.xlsx

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 9/30/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature: Mark Gordon]
Re: Tree Ordinance

Dear Commissioners,

The Board of Supervisors would like the PC to review the Tree Ordinance and prepare an amendment for their consideration. One of the concerns of the Board is that the tree replacement requirement is too restrictive for small lot owners with wooded lots.

The PC has discussed this matter in length in the past. I have enclosed a copy of the tree ordinance for your review. I suggest we discuss it this month, time permitted.

F:\Data\Shared Data\Admin Dept\Township Code\Trees 2015\Memo to PC re. Trees 09302015.doc

Township of East Goshen, PA
http://ecode360.com/print/EA1698?guid=7252392&children=true

Township of East Goshen, PA
Wednesday, September 30, 2015

Chapter 218. Trees

[HISTORY: Adopted by the Board of Supervisors of the Township of East Goshen 9-17-1996 by Ord. No. 114. Amendments noted where applicable.]

§ 218-1. Definitions and word usage.

A. Word usage. The singular number includes the plural, and the masculine gender includes the feminine.

B. Terms defined. Unless expressly stated otherwise, the following words and phrases shall be construed throughout this chapter to have the meanings indicated in this section:

APPLICANT
The person who makes the application for the permit and who is responsible for the work.

BASAL TRUNK ELEVATION
Grade elevation in the area around a tree which is in close proximity to the tree’s base.

BOARD
The Board of Supervisors of the Township of East Goshen.

CALIPER
For trees which are a minimum of 12 feet in height, the diameter of a tree trunk measured at a point 4 1/2 feet from the ground surface. For trees that are less than 12 feet in height, the diameter of a tree trunk measured at a point one foot from the ground surface.
[Amended 3-18-2003 by Ord. No. 129-D-03; 7-12-2011 by Ord. No. 129-G-11]

DRIPLINE
The line marking where the outer edges of a tree’s branches overhang the ground.

EMERGENCY WORK
Any work performed for the purpose of preventing or mitigating physical or property damage threatened or caused by an emergency.

HISTORIC TREE
Any tree over 100 years old identified by a licensed arborist.
[Amended 7-12-2011 by Ord. No. 129-G-11]

PERSON
Any individual, firm, association, partnership or corporation.

SPECIMEN TREE
A tree that is unique in either size, beauty, location, species or condition as determined by a licensed arborist.

TREE
Any woody perennial plant usually having one or more main stems or trunks and more or less definitely formed crowns and growing to a height of 15 feet or more at maturity.

TREE PROTECTION ZONE (TPZ)
An area that is radial to the trunk of a tree in which no construction activity, movement of vehicles, placement of fill or other land disturbance activities shall occur. The tree protection zone shall be 25 feet from the trunk of the tree to be retained or the distance from the trunk to the dripline, whichever is greater. Where there is a group of trees or woodlands, the tree protection zone shall be the aggregate of the protection zones for the

1 of 3

9/30/2015 10:13 PM

Township of East Goshen, PA
http://ecode360.com/print/EA1698?guid=7252392&children=true

individual trees.
[Amended 7-12-2011 by Ord. No. 129-G-11]

TREE REMOVAL
The cutting down of a tree, the transplanting of a tree to a property other than that under development or the infliction of damage to a tree which is of such severity as to show evidence within a period of two years of irreparable harm leading to the premature death of the tree.

§ 218-2. Trees on Township streets and property.

The Township shall have exclusive custody and control of those trees that are located within the area where the Township owns the right-of-way in fee of any Township street and/or Township-owned property and is authorized to plant, remove and protect such trees.

A. Except in cases of emergency work necessary for protection of life or property, it shall be a violation of this chapter for any person, without first obtaining Township approval, to do any of the following:
[Amended 7-12-2011 by Ord. No. 129-G-11]

  1. Cut, break, climb with spurs, injure in any manner or remove any tree.
  2. Cut down any tree or interfere in any manner with the main roots of any tree.
  3. Place any rope, guy wire, cable, sign, poster or other fixture on a tree.
  4. Injure, misuse or remove any device placed to protect trees.
  5. Place or install any stone, cement or other substance which shall impede the passage of water and air to the roots of any tree.

B. Emergency work. Notwithstanding any other provisions of this chapter, the Township shall have the right, without prior notice to any property owner, to perform any act/acts necessary to abate clear, present and immediate threats to the public health, safety or welfare caused by the condition of trees or parts thereof of those trees that are located within the area where the Township owns in fee the right-of-way of any Township street. The Township shall have the right to assess the cost of such summary abatement against the person whose action or inaction caused such threat to the public health, safety or welfare.

§ 218-3. Removal of diseased trees.

A. The Township can, upon four weeks’ prior written notice to the owners of any property, require owners of property to cut and remove trees or parts thereof afflicted with contagious diseases such as Dutch Elm disease.

B. Upon the failure of any such owner to comply with such notice, the Township can cause the work to be done by the Township and levy and collect the cost thereof from the owner of the property. The cost of such work shall be a lien upon the premises from the time of commencement of the work, which date shall be fixed by the Township Engineer and shall be filed with the Township Secretary. Any such lien may be collected by action in assumpsit or by lien filed in the manner provided by law for the filing and collection of municipal claims.

C. The Township shall give said four-week notice by mailing it, by certified mail, to the last known address of the owner of the property and by posting the notice at a conspicuous location on the property.

§ 218-4. Violations and penalties.

[Amended 7-12-2011 by Ord. No. 129-G-11]

Any person who violates or permits the violation of any provision of this chapter shall, upon being found liable therefor in a civil enforcement proceeding commenced by the Township before a District Justice, pay a fine for each such violation in an amount not less than $100 and not more than $600, plus all court costs, including reasonable attorney’s fees, incurred by the Township. No judgment shall be imposed until the date of the determination of a violation by the District Justice. If the defendant neither pays nor timely appeals the judgment, the Township may enforce the judgment pursuant to the applicable rules of civil procedure.

[1] Editor's Note: Former §§ 218-4, Protection of existing trees during construction, and 218-5, Permit procedure, were

2 of 3

9/30/2015 10:13 PM

Township of East Goshen, PA
http://ecode360.com/print/EA1698?guid=7252392&children=true

repealed 7-12-2011 by Ord. No. 129-G-11. This ordinance also provided for the redesignation of former § 218-6, Violations and penalties, as § 218-4. Concerning protection of existing trees during construction, see now § 205-63.

3 of 3

9/30/2015 10:13 PM

[Pennoni logo]
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

[Handwritten / Stamp: FYI]

September 14, 2015

[Stamp: SEP 15 2015]

EGMA1504

Chairman Daniel Daley
East Goshen Township Planning Commission
1580 Paoli Pike
West Chester, PA 19380

RE: Act 14 Notification – NPDES, General Permit and Water Quality Management Part II Permit Applications - Reservoir Road Pump Station and Force Main
East Goshen Township

Dear Chairman Daley:

In accordance with Pennsylvania Act 14 we are hereby providing notification that Applications for NPDES, General Permits, and Water Quality Management Permit (Part II) will be submitted to the Pennsylvania Department of Environmental Protection (PADEP) by Pennoni on behalf of East Goshen Municipal Authority. The Applications seek approval for construction of a new wastewater pump station and force main extension.

Acts 67, 68 and 127, which amended the Municipalities Planning Code, direct state agencies to consider comprehensive plans and zoning ordinances when reviewing applications for permitting of facilities and infrastructure, and specify that state agencies may rely upon comprehensive plans and zoning ordinances under certain conditions as described in Sections 619.2 and 1105 of the Municipalities Planning Code. The Pennsylvania Department of Environmental Protection’s Policy for Consideration of Local Comprehensive Plans and Zoning Ordinances in DEP Review of Permits for Facilities and Infrastructure (DEP’s Land Use Policy) provides direction and guidance to DEP staff, permit applicants, and local and county governments for the implementation of Acts 67, 68 and 127 of 2000. This policy can be found at www.depweb.state.pa.us; Keyword: Land Use. In accordance with DEP’s Land Use Policy, enclosed please find a General Information Form (GIF) completed for this project, USGS location maps for reference, and a Municipal Land Use Letter that is to be submitted with our permit application to DEP. Please complete the attached form and return within 30 days to:

Michael J. Ellis, PE
Pennoni
121 Continental Drive, Suite 207
Newark, DE 19713

Please do not send this form to DEP, as we must include the Municipal Land Use Letter with our permit application. If we do not receive a response from you within 30 days, we shall proceed to submit our permit application to DEP without the Municipal Land Use Letter. If the Municipal Land Use Letter is not submitted with our permit application, and we provide proof to DEP that we attempted to obtain it, DEP will assume there are no substantive land use conflicts and proceed with the normal application review process. If you have any questions, please do not hesitate to contact me at 302-351-5236 or mellis@pennoni.com.

Christiana Executive Campus • 121 Continental Drive, Suite 207 • Newark, DE 19713 • Tel: 302-655-4451 • Fax: 302-654-2895
www.pennoni.com

Project / Addressee Date Page / Subject
EGMA1504
Daniel Daley, Chairman
September 14, 2015 Page 2
Act 14 Notification

Sincerely,

PENNONI

[Signature: Michael J. Ellis]
Michael J. Ellis, PE
East Goshen Municipal Authority Engineer

MJE/BWM

Enclosure

cc: Rick Smith, East Goshen Township Manager

w:\projects\egma\egma1504-reservoir rd ps design permitting\permits\padep\general background information form\act14notice_mailmerge.docx

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Date: September 29, 2015

Michael J. Ellis, PE
Pennoni
121 Continental Drive, Suite 207
Newark, DE 19713

RE: Land Use Letter
Reservoir Road Pump Station and Force Main

The Municipality of East Goshen Township states that it:
X has adopted a municipal or multi-municipal comprehensive plan. If yes, please provide date of adoption: June 21, 2005
___ has not adopted a municipal or multi-municipal comprehensive plan.

The Municipality of East Goshen Township states that it:
X has adopted a county zoning ordinance, or a municipal or joint-municipal zoning ordinance.
___ has not adopted a county zoning ordinance, or a municipal or joint-municipal zoning ordinance.

If applicable:
The Municipality of East Goshen Township states that is zoning ordinance is generally consistent with its municipal comprehensive plan and the county comprehensive plan.
The above referenced proposed project
X meets the provisions of the local zoning ordinance.

If zoning approval is required for the project to proceed, the above referenced project:
X has received zoning approval.
___ has not received zoning approval.

If the proposed project has not received zoning approval:
What is the status of the zoning request for the proposed project? (e.g., Special Exception Approval from the Zoning Hearing Board required, Conditional Use approval from the Governing Body required)
____________________________________________________________________________________
____________________________________________________________________________________

Is there a legal challenge by the applicant with regard to zoning for the proposed project?
No.
____________________________________________________________________________________

Name and Contact Information for Municipal Zoning Officer:
Mark A. Gordon, 1580 Paoli Pike West Chester PA 19380
610-692-7171

F:\Data\Shared Data\Code Dept\Sanitary Sewer\Reservoir Rd Pump station and force main LandUseLtr 09292015.docx

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

Page 2

Additional Comments (attach additional sheets if necessary):
____________________________________________________________________________________
____________________________________________________________________________________

Submitted by:

Name: Mark A. Gordon

Title: Township Zoning Officer

Address: 1580 Paoli Pike, West Chester, PA 19380

Phone: 610-692-7171

Signature: [Signature: Mark A. Gordon]
____________________________________________________________________________________

Date: 9/29/2015
____________________________________________________________________________________

F:\Data\Shared Data\Code Dept\Sanitary Sewer\Reservoir Rd Pump station and force main LandUseLtr 09292015.docx

1300-PM-BIT0001 5/2012
Form

[Pennsylvania Department of Environmental Protection logo]
pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION

GENERAL INFORMATION FORM – AUTHORIZATION APPLICATION

Before completing this General Information Form (GIF), read the step-by-step instructions provided in this application package. This version of the General Information Form (GIF) must be completed and returned with any program-specific application being submitted to the Department.

Related ID#s (If Known) DEP USE ONLY
Client ID# 62683
Site ID# ___________________
Facility ID# ___________________
APS ID# ___________________
Auth ID# ___________________
Date Received & General Notes

CLIENT INFORMATION

Client Details
DEP Client ID#
62683
Client Type / Code
AUTH
Organization Name or Registered Fictitious Name
East Goshen Municipal Authority
Employer ID# (EIN)
23-6005479
Dun & Bradstreet ID#
Individual Last Name First Name      MI      Suffix      SSN
Additional Individual Last Name First Name      MI      Suffix      SSN
Mailing Address Line 1
1580 Paoli Pike
Mailing Address Line 2
Address Last Line – City
West Chester
State: PA      ZIP+4: 19380      Country: USA
Client Contact Last Name
Smith
First Name: Louis "Rick"      MI: F      Suffix:
Client Contact Title
Township Manager
Phone: 610-692-7171      Ext:
Email Address
rsmith@eastgoshen.org
FAX: 610-692-8950

SITE INFORMATION

Site Details
DEP Site ID# Site Name
Reservoir Road Pump Station
EPA ID# Estimated Number of Employees to be Present at Site: 0-1
Description of Site
Wastewater Pump Station
County Name: Chester
Municipality: East Goshen
[ ] City      [ ] Boro      [X] Twp      State: PA
County Name:
Municipality:
[ ] City      [ ] Boro      [ ] Twp      State:
Site Location Line 1
Intersection of East Strasburg Road and Reservoir Road
Site Location Line 2
Site Location Last Line – City
West Chester
State: PA      ZIP+4: 19380
Detailed Written Directions to Site
From 202, travel east on West Chester Pike (S.R. 3), turn left onto East Strasburg Road, continue approximately 0.8 miles to intersection with Reservoir Road
Site Contact Last Name
Miller
First Name: Mark      MI:      Suffix:
Site Contact Title
Director of Public Works
Site Contact Firm
East Goshen Township
Mailing Address Line 1
1580 Paoli Pike
Mailing Address Line 2

Page 1 of 7

1300-PM-BIT0001 5/2012

Mailing Address Last Line – City
West Chester
State
PA
ZIP+4
19380
Phone
610-692-7171
Ext FAX
610-692-8950
Email Address
mmiller@eastgoshen.org
NAICS Codes (Two- & Three-Digit Codes – List All That Apply)
221
6-Digit Code (Optional)
Client to Site Relationship
OWNOP

FACILITY INFORMATION

Modification of Existing Facility Yes No
1. Will this project modify an existing facility, system, or activity? [ ] [X]
2. Will this project involve an addition to an existing facility, system, or activity?
If "Yes", check all relevant facility types and provide DEP facility identification numbers below.
[X] [ ]
Facility Type DEP Fac ID# Facility Type DEP Fac ID#
[ ] Air Emission Plant [ ] Industrial Minerals Mining Operation
[ ] Beneficial Use (water) [ ] Laboratory Location
[ ] Blasting Operation [ ] Land Recycling Cleanup Location
[ ] Captive Hazardous Waste Operation [ ] MineDrainageTrmt/LandRecyProjLocation
[ ] Coal Ash Beneficial Use Operation [ ] Municipal Waste Operation
[ ] Coal Mining Operation [ ] Oil & Gas Encroachment Location
[ ] Coal Pillar Location [ ] Oil & Gas Location
[ ] Commercial Hazardous Waste Operation [ ] Oil & Gas Water Poll Control Facility
[ ] Dam Location [ ] Public Water Supply System
[ ] Deep Mine Safety Operation -Anthracite [ ] Radiation Facility
[ ] Deep Mine Safety Operation -Bituminous [ ] Residual Waste Operation
[ ] Deep Mine Safety Operation -Ind Minerals [ ] Storage Tank Location
[ ] Encroachment Location (water, wetland) [ ] Water Pollution Control Facility
[ ] Erosion & Sediment Control Facility [ ] Water Resource
[ ] Explosive Storage Location [X] Other: Public Sewer System
Latitude/Longitude
Point of Origin
Latitude Longitude
Degrees Minutes Seconds Degrees Minutes Seconds
Pump Station 39 58 20 -75 32 54
Horizontal Accuracy Measure Feet 1 –or– Meters
Horizontal Reference Datum Code [ ] North American Datum of 1927
[X] North American Datum of 1983
[ ] World Geodetic System of 1984
Horizontal Collection Method Code GPS
Reference Point Code CNTAR
Altitude Feet 345 –or– Meters
Altitude Datum Name [ ] The National Geodetic Vertical Datum of 1929
[X] The North American Vertical Datum of 1988 (NAVD88)
Altitude (Vertical) Location Datum Collection Method Code GPS
Geometric Type Code POINT
Data Collection Date 12/2013
Source Map Scale Number 1 Inch(es) = 800 Feet
–or– Centimeter(s) = Meters

PROJECT INFORMATION

Project Name
Reservoir Road Pump Station
Project Description
New Wastewater Pump Station and Force Main
Project Consultant Last Name
Ellis
First Name
Michael
MI
J
Suffix
Project Consultant Title
Senior Engineer
Consulting Firm
Pennoni Associates Inc.
Mailing Address Line 1
121 Continental Drive
Mailing Address Line 2
Suite 207

Page 2 of 7

1300-PM-BIT0001 5/2012

Address Last Line – CityStateZIP+4
NewarkDE19713
PhoneExtFAXEmail Address
302-351-5236mellis@pennoni.com
Time SchedulesProject Milestone (Optional)
October 2015Submit WQM Part II Permit Application to PADEP
February 2016PADEP Approval of WQM Part II Permit
TBD (within 5 yrs.)Construct Project

1. Have you informed the surrounding community and addressed any concerns prior to submitting the application to the Department? [X] Yes [ ] No

2. Is your project funded by state or federal grants? [ ] Yes [X] No

Note: If "Yes", specify what aspect of the project is related to the grant and provide the grant source, contact person and grant expiration date. Aspect of Project Related to Grant; Grant Source; Grant Contact Person; Grant Expiration Date.

3. Is this application for an authorization on Appendix A of the Land Use Policy? (For referenced list, see Appendix A of the Land Use Policy attached to GIF instructions) [X] Yes [ ] No

Note: If "No" to Question 3, the application is not subject to the Land Use Policy. If "Yes" to Question 3, the application is subject to this policy and the Applicant should answer the additional questions in the Land Use Information section.

LAND USE INFORMATION

Note: Applicants are encouraged to submit copies of local land use approvals or other evidence of compliance with local comprehensive plans and zoning ordinances.

1. Is there an adopted county or multi-county comprehensive plan? [X] Yes [ ] No

2. Is there an adopted municipal or multi-municipal comprehensive plan? [X] Yes [ ] No

3. Is there an adopted county-wide zoning ordinance, municipal zoning ordinance or joint municipal zoning ordinance? [X] Yes [ ] No

Note: If the Applicant answers "No" to either Questions 1, 2 or 3, the provisions of the PA MPC are not applicable and the Applicant does not need to respond to questions 4 and 5 below. If the Applicant answers "Yes" to questions 1, 2 and 3, the Applicant should respond to questions 4 and 5 below.

4. Does the proposed project meet the provisions of the zoning ordinance or does the proposed project have zoning approval? If zoning approval has been received, attach documentation. [X] Yes [ ] No

5. Have you attached Municipal and County Land Use Letters for the project? [X] Yes [ ] No

Page 3 of 7

1300-PM-BIT0001 5/2012

COORDINATION INFORMATION

Note: The PA Historical and Museum Commission must be notified of proposed projects in accordance with DEP Technical Guidance Document 012-0700-001 and the accompanying Cultural Resource Notice Form.

If the activity will be a mining project (i.e., mining of coal or industrial minerals, coal refuse disposal and/or the operation of a coal or industrial minerals preparation/processing facility), respond to questions 1.0 through 2.5 below.

If the activity will not be a mining project, skip questions 1.0 through 2.5 and begin with question 3.0.

1.0 Is this a coal mining project? If "Yes", respond to 1.1-1.6. If "No", skip to Question 2.0. [ ] Yes [X] No
1.1 Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be equal to or greater than 200 tons/day? [ ] Yes [ ] No
1.2 Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be greater than 50,000 tons/year? [ ] Yes [ ] No
1.3 Will this coal mining project involve coal preparation/ processing activities in which thermal coal dryers or pneumatic coal cleaners will be used? [ ] Yes [ ] No
1.4 For this coal mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? [ ] Yes [ ] No
1.5 Will this coal mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? [ ] Yes [ ] No
1.6 Will this coal mining project involve underground coal mining to be conducted within 500 feet of an oil or gas well? [ ] Yes [ ] No
2.0 Is this a non-coal (industrial minerals) mining project? If "Yes", respond to 2.1-2.6. If "No", skip to Question 3.0. [ ] Yes [X] No
2.1 Will this non-coal (industrial minerals) mining project involve the crushing and screening of non-coal minerals other than sand and gravel? [ ] Yes [ ] No
2.2 Will this non-coal (industrial minerals) mining project involve the crushing and/or screening of sand and gravel with the exception of wet sand and gravel operations (screening only) and dry sand and gravel operations with a capacity of less than 150 tons/hour of unconsolidated materials? [ ] Yes [ ] No
2.3 Will this non-coal (industrial minerals) mining project involve the construction, operation and/or modification of a portable non-metallic (i.e., non-coal) minerals processing plant under the authority of the General Permit for Portable Non-metallic Mineral Processing Plants (i.e., BAQ-PGPA/GP-3)? [ ] Yes [ ] No
2.4 For this non-coal (industrial minerals) mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? [ ] Yes [ ] No
2.5 Will this non-coal (industrial minerals) mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? [ ] Yes [ ] No
3.0 Will your project, activity, or authorization have anything to do with a well related to oil or gas production, have construction within 200 feet of, affect an oil or gas well, involve the waste from such a well, or string power lines above an oil or gas well? If "Yes", respond to 3.1-3.3. If "No", skip to Question 4.0. [ ] Yes [X] No

Page 4 of 7

1300-PM-BIT0001 5/2012

3.1 Does the oil- or gas-related project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water (including wetlands)? [ ] Yes [ ] No
3.2 Will the oil- or gas-related project involve discharge of industrial wastewater or stormwater to a dry swale, surface water, ground water or an existing sanitary sewer system or storm water system? If "Yes", discuss in Project Description. [ ] Yes [ ] No
3.3 Will the oil- or gas-related project involve the construction and operation of industrial waste treatment facilities? [ ] Yes [ ] No
4.0 Will the project involve a construction activity that results in earth disturbance? If "Yes", specify the total disturbed acreage.
4.0.1 Total Disturbed Acreage      approx. 1.3 acres
[X] Yes [ ] No
5.0 Does the project involve any of the following? If "Yes", respond to 5.1-5.3. If "No", skip to Question 6.0. [X] Yes [ ] No
5.1 Water Obstruction and Encroachment Projects – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water? [X] Yes [ ] No
5.2 Wetland Impacts – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a wetland? [ ] Yes [X] No
5.3 Floodplain Projects by the commonwealth, a Political Subdivision of the commonwealth or a Public Utility – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a floodplain? [X] Yes [ ] No
6.0 Will the project involve discharge of stormwater or wastewater from an industrial activity to a dry swale, surface water, ground water or an existing sanitary sewer system or separate storm water system? [ ] Yes [X] No
7.0 Will the project involve the construction and operation of industrial waste treatment facilities? [ ] Yes [X] No
8.0 Will the project involve construction of sewage treatment facilities, sanitary sewers, or sewage pumping stations? If "Yes", indicate estimated proposed flow (gal/day). Also, discuss the sanitary sewer pipe sizes and the number of pumping stations/treatment facilities/name of downstream sewage facilities in the Project Description, where applicable.
8.0.1 Estimated Proposed Flow (gal/day)      300,000
[X] Yes [ ] No
9.0 Will the project involve the subdivision of land, or the generation of 800 gpd or more of sewage on an existing parcel of land or the generation of an additional 400 gpd of sewage on an already-developed parcel, or the generation of 800 gpd or more of industrial wastewater that would be discharged to an existing sanitary sewer system? [ ] Yes [X] No
9.0.1 Was Act 537 sewage facilities planning submitted and approved by DEP? If "Yes" attach the approval letter. Approval required prior to 105/NPDES approval. [X] Yes [ ] No
10.0 Is this project for the beneficial use of biosolids for land application within Pennsylvania? If "Yes" indicate how much (i.e. gallons or dry tons per year).
10.0.1 Gallons Per Year (residential septage) ___________________
10.0.2 Dry Tons Per Year (biosolids) ___________________
[ ] Yes [X] No
11.0 Does the project involve construction, modification or removal of a dam? If "Yes", identify the dam.
11.0.1 Dam Name ___________________
[ ] Yes [X] No
12.0 Will the project interfere with the flow from, or otherwise impact, a dam? If "Yes", identify the dam.
12.0.1 Dam Name ___________________
[ ] Yes [X] No

Page 5 of 7

1300-PM-BIT0001 5/2012

13.0 Will the project involve operations (excluding during the construction period) that produce air emissions (i.e., NOX, VOC, etc.)? If "Yes", identify each type of emission followed by the amount of that emission.
13.0.1 Enter all types & amounts of emissions; separate each set with semicolons.
[ ] Yes [X] No
14.0 Does the project include the construction or modification of a drinking water supply to serve 15 or more connections or 25 or more people, at least 60 days out of the year? If "Yes", check all proposed sub-facilities.
14.0.1 Number of Persons Served ___________________
14.0.2 Number of Employee/Guests ___________________
14.0.3 Number of Connections ___________________
14.0.4 Sub-Fac: Distribution System      [ ] Yes      [ ] No
14.0.5 Sub-Fac: Water Treatment Plant      [ ] Yes      [ ] No
14.0.6 Sub-Fac: Source      [ ] Yes      [ ] No
14.0.7 Sub-Fac: Pump Station      [ ] Yes      [ ] No
14.0.8 Sub-Fac: Transmission Main      [ ] Yes      [ ] No
14.0.9 Sub-Fac: Storage Facility      [ ] Yes      [X] No
[ ] Yes [X] No
15.0 Will your project include infiltration of storm water or waste water to ground water within one-half mile of a public water supply well, spring or infiltration gallery? [ ] Yes [X] No
16.0 Is your project to be served by an existing public water supply? If "Yes", indicate name of supplier and attach letter from supplier stating that it will serve the project.
16.0.1 Supplier's Name      Aqua Pennsylvania
16.0.2 Letter of Approval from Supplier is Attached      [ ] Yes      [X] No
[X] Yes [ ] No
17.0 Will this project involve a new or increased drinking water withdrawal from a stream or other water body? If "Yes", should reference both Water Supply and Watershed Management.
17.0.1 Stream Name ___________________
[ ] Yes [X] No
18.0 Will the construction or operation of this project involve treatment, storage, reuse, or disposal of waste? If "Yes", indicate what type (i.e., hazardous, municipal (including infectious & chemotherapeutic), residual) and the amount to be treated, stored, re-used or disposed.
18.0.1 Type & Amount ___________________
[ ] Yes [X] No
19.0 Will your project involve the removal of coal, minerals, etc. as part of any earth disturbance activities? [ ] Yes [X] No
20.0 Does your project involve installation of a field constructed underground storage tank? If "Yes", list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit.
20.0.1 Enter all substances & capacity of each; separate each set with semicolons. ___________________
[ ] Yes [X] No
21.0 Does your project involve installation of an aboveground storage tank greater than 21,000 gallons capacity at an existing facility? If "Yes", list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit.
21.0.1 Enter all substances & capacity of each; separate each set with semicolons. ___________________
[ ] Yes [X] No
22.0 Does your project involve installation of a tank greater than 1,100 gallons which will contain a highly hazardous substance as defined in DEP's Regulated Substances List, 2570-BK-DEP2724? If "Yes", list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit.
22.0.1 Enter all substances & capacity of each; separate each set with semicolons. ___________________
[ ] Yes [X] No

Page 6 of 7

1300-PM-BIT0001 5/2012

23.0 Does your project involve installation of a storage tank at a new facility with a total AST capacity greater than 21,000 gallons? If "Yes", list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit.
23.0.1 Enter all substances & capacity of each; separate each set with semicolons. ___________________
[ ] Yes [X] No
24.0 Will the intended activity involve the use of a radiation source? [ ] Yes [X] No

CERTIFICATION

I certify that I have the authority to submit this application on behalf of the applicant named herein and that the information provided in this application is true and correct to the best of my knowledge and information.

Type or Print Name
Michael J. Ellis
Title
Authority Engineer
Signature
[Signature: Michael J. Ellis]
Date
9/14/15

Page 7 of 7

Topographic location map showing the Reservoir Road Pump Station and Force Main stream crossing at Reservoir Road and East Strasburg Road in East Goshen Township, Chester County, PA.

CHESTER CREEK LOCATION MAP

RESERVOIR ROAD PUMP STATION AND FORCE MAIN

RESERVOIR ROAD AT EAST STRASBURG ROAD, WEST CHESTER, PA

EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380

Title Block and Project Metadata

  • PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
  • PROJECT: EGMA1504
  • DATE: 2015-07-22
  • DRAWING SCALE: 1" = 2000' (Scale bar: 0, 2000', 4000')
  • DRAWN BY: MWF
  • APPROVED BY: MJE
  • DRAWING NO.: LM0001
  • SHEET 1 OF 1
  • FILE: PROJECTS\EGMA\EGMA1504-RESERVOIR RD PS\DESIGN PERMITTING\DESIGN\_PUBLISH\LM0001.DWG
  • PLOTTED: 8/17/2015 2:43:04 PM, BY: BRIAN MILLER, PLOTSTYLE: PENNONI NCS.STB, PROJECT STATUS: PRELIMINARY DESIGN PLANS

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

Map Callouts and Labels

  • Callout: STREAM CROSSING
  • Waterways and Reservoirs: E Br Chester Cr, Milltown Reservoir, Westtown Lake
  • Communities and Places: Grand Oak Run, Clock Tower Woods, Hunt Country, Bible Baptist Cem, Marydell Farms, Bow Tree, Pin Oak Farms, Meriweather Farms, Rockland Village I and II, Rocky Hill, Ashbridge Farms, Goshen Terrace, Goshen West, Strasburg Court, White Chimneys, West Goshen, Milltown, Rollinwood, West Wynn, Cider Knoll, Dutts Mill, Westtown Acres, Twin Bridge Farm, Westtown Knoll, Tiberton, Hyllwynd, Hummingbird Farm
  • Roads: GRAND OAK LN, CHERRY LN, LINDEN LN, GENERALS WAY, SARATOGA DR, CLOCK TOWER DR, PEACH TREE DR, BANCROFT DR, GOSHEN PKWY, AIRPORT RD, ENTERPRISE DR, PAOLI PIKE, BOOT RD, MARYDELL DR, BARKER DR, ELDRIDGE DR, BOW TREE DR, LARCH LN, GATESWOOD DR, HERRON LN, ELLIS LN, RESERVOIR RD, RICHARD DR, SCOFIELD LN, GATEWAY LN, RICHMOND RD, POWELL LN, FARMINGTON LN, ISABEL LN, SPRING LN, KINGSWAY RD, BOX ELDER DR, JOY LN, HAWTHORNE LN, MARK DR, BALDWIN DR, COOPER CIR, BRIAN DR, ALISON DR, ANNE DR, MISAK DR, 352, BEAUMONT CIR, CHRISTINE LN, MARGO LN, E STRASBURG RD, PARK AVE, LOCHWOOD LN, GLENBROOK LN, WATERVIEW RD, WARREN RD, DAVID LN, S 5 POINTS RD, WILNOR DR, BASIN RD, WESTBROOK DR, PENN LN, GLEN AVE, ROBERTS LN, 3, BOULDER LN, SYLVAN RD, MALLARD RD, RAVENS LN, EAGLE RD, DAISY LN, FALCON LN, VALLEY DR, WESTTOWN WAY, SCHOOL LN, HILL ST, MANLEY RD, CIDER KNOLL WAY, DIANE DR, LESLIE LN, GRANT RD, CARLSON AVE, FLAGG LN, RIDGEWOOD LN, MAULE LN, STEWARD LN, EDWARD LN, BERWICK DR, WEATHERHILL DR, HILLARY ST, WALNUT HILL RD, PONDS EDGE RD, CARROLL BROWN WAY, CARTER PL, FRANKLIN DR, APPLEGATE DR, TOPAZ DR, EMPRESS RD, HALVORSEN DR, LITTLE SHILOH RD, EVIE LN

RIDLEY CREEK LOCATION MAP

Topographic location map showing the Ridley Creek stream crossing area in East Goshen Township and surrounding areas, with a callout box pointing to "STREAM CROSSING" near Sinkler Lake, Towne Dr, Line Rd, and E Strasburg Rd, a North arrow ("NORTH"), and a graphic scale bar from 0 to 4000' (with a 2000' interval).

Map Labels and Features

  • Callout: STREAM CROSSING
  • Waterways and Lakes: Ridley Cr, Benoni Run, Shugart Run, Ashbridge Run, George Smedley Run, Sinkler Lake, Milltown Reservoir
  • Neighborhoods, Places, and Landmarks: Goshenville, E Goshen Bible Cem, Applebrook Golf Course, Sugartown, Clock Tower Woods, Hunt Country, Marydell Farms, Bow Tree, Dutton Mill, Pin Oak Farms, Rocky Hill, Wyllpen Farms, Rockland Village I and II, Ashbridge Farms, Hunters Run, White Chimneys, Windmere Place, Hilloch Manor, Milltown, Green Lane Village, Worington Commons, Westtown Knoll, Dutts Mill, Cider Knoll, Rollinwood, West Wynn, Tiberton
  • Highways and Roads: Route 3, Route 352, Cornwallis Dr, Vista Dr, Hibberd Ln, E Boot Rd, Boot Rd, Providence Rd, Roselawn Ln, Dutton Mill Rd, Sugartown Rd, Rals Way, Saratoga Dr, Clock Tower Dr, Peach Tree Dr, Thorncroft Dr, Chowning Dr, Green Ln, Marydell Dr, Eldridge Dr, Towne Dr, Line Rd, Barker Dr, Bow Tree Dr, Larch Ln, Gateswood Dr, Scofield Ln, Herron Ln, Richard Dr, Goshen Rd, Reservoir Rd, E Strasburg Rd, Farm Ln, Brian Dr, Anne Dr, Cooper Cir, Beaumont Cir, Hunter Cir, Baldwin Dr, Alison Dr, Misak Dr, Christine Ln, Margo Ln, Fox Xing, Manley Rd, Still Rd, Edith Rd, Park Ave, Lochwood Ln, Glenbrook Ln, Waterview Rd, Woodcrest Rd, E Hilltop Rd, Falcon Ln, Valley Dr, Westtown Way, School Ln, Hill St, Diane Dr, Leslie Ln, Wickerton Dr, Daisy Ln, Cider Knoll Way, Grant Rd, Edgewood Chase, Hillary St, Ponds Edge Rd, Carter Pl, Pennsbury Dr, Powderhorn Dr, Walnut Hill Rd, Carroll Brown Way, Franklin Dr, Johnnys Way, Carmac Rd, W Lynn Dr
  • Scale Bar: 0, 2000', 4000'

Title Block

Pennoni — PENNONI ASSOCIATES INC.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
T 302.655.4451 F 302.654.2895

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

RESERVOIR ROAD PUMP STATION AND FORCE MAIN
RESERVOIR ROAD AT EAST STRASBURG ROAD
WEST CHESTER, PA

RIDLEY CREEK LOCATION MAP

EAST GOSHEN MUNICIPAL AUTHORITY
1580 PAOLI PIKE
WEST CHESTER, PA 19380

Field Value
PROJECT EGMA1504
DATE 2015-07-22
DRAWING SCALE 1" = 2000'
DRAWN BY MWF
APPROVED BY MJE
DRAWING NUMBER LM0002
SHEET 1 OF 1

PROJECTS\EGMA\EGMA1504-RESERVOIR RD PS DESIGN PERMITTING\DESIGN\_PUBLISH\LM0002.DWG
PLOTTED: 8/17/2015 2:59:51 PM, BY: BRIAN MILLER PLOTSTYLE: PENNONI NCS.STB, PROJECT STATUS: PRELIMINARY DESIGN PLANS

RESERVOIR ROAD PUMP STATION

Topographic location map showing the Reservoir Road Pump Station and Force Main Connection to Interceptor in East Goshen Township and surrounding areas, with callout boxes pointing to "FORCE MAIN CONNECTION TO INTERCEPTOR" and "RESERVOIR ROAD PUMP STATION", a North arrow ("NORTH"), and a graphic scale bar from 0 to 4000' (with a 2000' interval).

Map Labels and Features

  • Callouts: FORCE MAIN CONNECTION TO INTERCEPTOR, RESERVOIR ROAD PUMP STATION
  • Waterways and Lakes: E Br Chester Cr, Sinkler Lake, Milltown Reservoir, Westtown Lake
  • Neighborhoods, Places, and Landmarks: Airport, Grand Oak Run, Clock Tower Woods, Hunt Country, Bible Bap Cem, Marydell Farms, Bow Tree, Pin Oak Farms, Meriwether Farms, Rocky Hill, Rockland Village I and II, Ashbridge Farms, Goshen Terrace, Strasburg Court, White Chimneys, Windmere Place, West Goshen, Milltown, Westtown Acres, Twin Bridge Farm, Westtown Knoll, Cider Knoll, Rollinwood, West Wynn, Dutts Mill, Hyllwynd, Tiberton, Pennwood South, Westover, Woodcock, Shiloh Woods, Hummingbird Farm, Westmount
  • Highways and Roads: Route 3, Route 352, Goshen Pkwy, Airport Rd, Enterprise Dr, Paoli Pike, Boot Rd, Marydell Dr, Eldridge Dr, Barker Dr, Bow Tree Dr, Larch Ln, Gateswood Dr, Herron Ln, Scofield Ln, Reservoir Rd, Richard Dr, E Strasburg Rd, Gateway Ln, Ellis Ln, Richmond Rd, Cooper Cir, Brian Dr, Alison Dr, Anne Dr, Beaumont Cir, Misak Dr, Christine Ln, Margo Ln, Fox Xing, Farmington Ln, Box Elder Dr, Baldwin Dr, Mark Dr, Still Rd, Edith Rd, Joy Ln, Hawthorne Ln, Spring Ln, Kingsway Rd, Park Ave, Lochwood Ln, Glenbrook Ln, Waterview Rd, Warren Rd, David Ln, S 5 Points Rd, Basin Rd, West Brook Dr, Penn Ln, Glen Ave, Robert Ln, Boulder Ln, Sylvan Rd, Valley Dr, Westtown Way, School Ln, Hill St, Manley Rd, Diane Dr, Leslie Ln, Wickerton Dr, Wilnor Dr, Mallard Rd, Ravens Ln, Eagle Rd, Daisy Ln, Falcon Ln, Cider Knoll Way, Grant Rd, Flagg Ln, Ridgewood Ln, Steward Ln, Edward Ln, Weatherhill Dr, Hillary St, Ponds Edge Rd, Carter Pl, Pennsbury Dr, Franklin Dr, Johnnys Way, Walnut Hill Rd, Carroll Brown Way, Applegate Dr, Berwick Dr, Halvorsen Dr, Topaz Dr, Empress Rd, Little Shiloh Rd, Tyson Dr, Evie Ln
  • Scale Bar: 0, 2000', 4000'

Title Block

Pennoni — PENNONI ASSOCIATES INC.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
T 302.655.4451 F 302.654.2895

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

RESERVOIR ROAD PUMP STATION AND FORCE MAIN
RESERVOIR ROAD AT EAST STRASBURG ROAD
WEST CHESTER, PA

RESERVOIR ROAD PUMP STATION

EAST GOSHEN MUNICIPAL AUTHORITY
1580 PAOLI PIKE

Field Value
PROJECT EGMA1504
DATE 2015-08-06
DRAWING SCALE AS NOTED
DRAWN BY MWF
APPROVED BY MJE
DRAWING NUMBER LM0003
SHEET 1 OF 1

PROJECTS\EGMA\EGMA1504-RESERVOIR RD PS DESIGN PERMITTING\DESIGN\_PUBLISH\LM0003.DWG
PLOTTED: 8/17/2015 2:57:38 PM, BY: BRIAN MILLER PLOTSTYLE: PENNONI NCS.STB, PROJECT STATUS: PRELIMINARY DESIGN PLANS

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 10/2/2015
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature]
Re: Goshen Village Shopping Center Buffer Planting Replacement

Dear Commissioners:

As you recall, the GVSC is proposing to replace the buffer plantings removed with some low landscape beds along Boot Rd and Paoli Pike. The Conservancy Board reviewed the landscape plan submitted, their recommendations are enclosed.

Draft Motion:
Mr. Chairman, I move that we recommend that the Board of Supervisors accept the landscape plan to replace the buffer plantings along Boot Rd and Paoli Pike with the following conditions:

  1. The Boot Road plantings shown be installed this fall and that the Paoli Pike Plantings be deferred until there is a clear indication of where the proposed Paoli Pike Trail will be situated; so as to minimize any disturbance to the plantings when the trail is constructed.

F:\Data\Shared Data\Property Management+-4+-4-77 (Goshen Village)\Landscape replacement\Memo to PC 10022015.doc

[Illustration of tree branches and foliage along the top and right margins]

EAST GOSHEN CONSERVANCY

September 9, 2015

East Goshen Township
Planning Commission
1580 Paoli Pike
West Chester, Pa. 19380

Re: Goshen Village Shopping Center
Replacement Buffer Landscaping

Dear Commission Members:

At their meeting on September 9, 2015 the Conservancy Board reviewed the Landscape Plan for the replacement buffer plantings at the Goshen Village Shopping Center. The Conservancy Board was pleased with the plantings shown on the plan and offers two recommendations for consideration:

  1. The Boot Road plantings shown be installed this fall and that the Paoli Pike Plantings be deferred until there is a clear indication of where the proposed Paoli Pike Trail will be situated, so as to minimize any disturbance to the plantings when the trail is constructed.
  2. The property owners choose a dogwood species that is low growing so as to minimize screening the shopping center from passing motorists.

Sincerely,

[Signature: Mark A. Gordon]
Mark A. Gordon
Zoning Officer

F:\Data\Shared Data\Property Management+-4+-4-77 (Goshen Village)\Landscape replacement\CB Rec to PC 09092015.doc

1580 PAOLI PIKE, WEST CHESTER, PA. 19380

Site Plan and Enlarged Bed View — Paoli Pike (SR 2014) and Boot Road (SR 2020)

Site and landscaping plan at the intersection of Paoli Pike (SR 2014) and Boot Road (SR 2020) showing an existing vacant bank building to be converted to a Dunkin Donuts with drive-thru service, an existing shopping center, parking layout, proposed signage, landscaped beds, and an inset Enlarged Bed View detail with plant photographs.

Site Plan Labels

  • PAOLI PIKE — SR 2014
  • BOOT ROAD — SR 2020
  • WEST BRANCH RIDLEY CREEK
  • Existing Bank Building (vacant) To be Converted to a Dunkin Donuts w/ Drive thru service
  • Existing Shopping Center
  • Existing Macadam
  • PHASE I / PHASE II
  • LIMIT OF PHASE I
  • PROPOSED PYLON SIGN
  • LINE OF SIGHT PROFILE
  • PROPOSED DIRECTIONAL SIGN
  • 2 Dumpsters
  • Contour elevations: 410, 400, 390

Enlarged Bed View Inset

Oval planting bed detail measuring 20' by 12' with color key symbols and photographs of the four plant species:

  • 20'
  • 12'
  • VAR. LIRIOPE
  • SPIREA
  • KNOCK OUT ROSES
  • CRAPEMYRTLE SEMI-DWARF TONTO

ENLARGED BED VIEW

Close-up planting diagram of a 20' oval landscape bed with four accompanying plant photographs and labels indicating the arrangement of plant species within the bed.

  • 20'
  • VAR. LIRIOPE
  • SPIREA
  • KNOCK OUT ROSES
  • CRAPEMYRTLE SEMI-DWARF TONTO

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

[Handwritten top right: FYI]

September 9, 2015

Dear Property or Business Owner:

As you may recall, the Township sent a letter to you in May regarding the Paoli Pike Trail Feasibility Study and Master Plan. Since that time, the Township’s consultant team has developed a Draft Trail Conceptual Plan for the bicycle and pedestrian trail along Paoli Pike in East Goshen Township.

The Draft Trail Conceptual Plan will be presented to the public in an open house format beginning at 6:30 PM on Tuesday September 15, 2015 at the Township Building. The Township’s consultant team, led by McMahon Associates, Inc., will present a summary of the work done to date and an overview of the Draft Trail Conceptual Plan to the Board of Supervisors at their regularly scheduled meeting beginning at 7 PM.

Information about the Paoli Pike Trail Feasibility Study and Master Plan is posted on the Township web page (www.eastgoshen.org) and the draft Trail Conceptual Plan will be posted no later than September 14, 2015. The Township will accept public comments on the draft Trail Conceptual Plan through September 30, 2015. Please contact me with any questions you have at 610-692-7171 or by e-mail at mgordon@eastgoshen.org.

Sincerely,

[Signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Paoli Pike Trail\PPT Open House and presentation letter 09092015 v2.doc