Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, November 4, 2015

7:00 PM

F:\Data\Shared Data\Agendas\Planning Commission\2015\PC AGENDA 11042015 highlighted.doc

A. Call to Order / Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log / Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. October 7, 2015 F. Subdivision and Land Development Applications

1. 930 N. Chester Rd G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business

1. Zoning Ordinance Review 2. Tree Ordinance J. New Business K. 2015 Goals L. Any Other Matter M. Liaison Reports N. Correspondence O. Dates of Importance Nov 03, 2015 Board of Supervisors 7:00 pm Cancelled (Election Day) Nov 8, 2015 Municipal Authority 7:00 pm Nov 11, 2015 Twp. Closed (Veterans Day) Nov 12, 2015 Historical Commission 7:00 pm Nov 11, 2015 Conservancy Board 7:00 pm Newsletter Deadlines for 2015: Winter: October 30 Bold Items indicate new information to review.

(; w (/)

~ c (/) 0 ci' ..J :::> ~

s:: 0 :;:::;

cu

.~ Q.. Application Name : 930 N. Chester Rd. I Gary and Paula Moore SD

Bold = New Application or PC action required

Completed in 2015 New Kent Final Plan Revision LD 942 Cornwallis Drive SD GVSC CU APP Beverage Cafe (Abijibapa I DUNKIN) cu GVSC ZHB APP Freestanding Signs ZHB 19 Hill St. I Smith v 1596 Paoli Pike (Swiss Farms) ZHB 10A Reservoir Rd. SK 1131 N. Chester Rd. SD 1331 E. Strasburg Rd. ZHB 612 Meadow Drive (Christenson) v

East Goshen Township Planning Commission

Application Tracking Log

Ill 0 ... al Cl> Cl> <C .5 - 0) ci. s:: e w 0.. Q. .s:: C'l u:::- Ill s:: s:: 0 :;:::; - ==

0.. :::J 0.. 0 0 .Cl "C Cl> ,:,I Cl> - I- 0 <C ~

cu u: c 0 0 0 - - - Cl> Cl> t:: Cl> Cl> Cl> Q. - cu - - - ~

cu -

cu cu cu c (/) c c c P/F 10/23/15 11/4/15 10/26/15 10/26/15 10/28/15

P/F NA NA NA NA NA Sk 8/26/15 NA NA NA NA Sk 8/6/15 8/6/15 NA NA 8/12/15 SK 8/6/15 8/6/15 NA NA 1/10/00 5/27/15 5/27/15 NA NA 5/29/15 Sk 2/23/15 2/23/15 NA NA 2/242015 NA NA NA NA NA P/F 10/15/14 11/5/14 10/16/14 10/16/14 10/16/14 Sk 12/5/14 12/5/14 NA NA 12/18/14 Sk 2/23/15 2/23/15 NA NA 2/242015

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2015\PC Tracking Log for 11042015.xls

Cl> - Cl> cu - c cu c s:: s:: 0 0 :;:::;

(.) :;:::;

<C (.) s:: <C 0 I- 'iii I- ..J ..J z s:: Cl> z (/) >< 0 0 w 0.. al 1/13/16 2/2/16

NA NA NA NA NA NA 9/2/15 10/5/15 9/2/15 10/5/15 7/1/15 7/7/15 4/1/15 4/7/15 NA NA NA 1/7/15 1/20/15 1/7/15 1/20/15 4/1/15 417/15

Cl> - cu c C'l s:: ·;:: cu Cl> :::c NA

NA

NA 9/15/15 9/29/15 7/9/15 4/14/15 NA NA 1/21/15 4/14/15

Cl> - cu "C "C cu Cl> c Q. 0 ... c 2/2/16

NA

NA 10/9/15 10/5/15 7/24/15 4/24/15 NA 1/24/15 1/26/15 4/24/15

Approved

Sketch Approved Approved Approved Approved

Sketch Approved

Denied Approved

10/29/2015

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

October 7, 2015

The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, October 7, 2015 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Dan Daley, Dan Landis, Monica Close, Lori Kier and Brad Giresi. Also present was Mark Gordon, Zoning Officer and Janet Emanuel, Supervisor.

COMMON ACRONYMS:

BOS Board of Supervisors BC - Brandywine Conservancy CB Conservancy Board CCPC - Chester Co Planning Commission

A. FORMALMEETING-7:00

CPTF - Comprehensive Plan Task Force CVS Community Visioning Session SWM - Storm Water Management

1. Dan called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our troops. 2. Dan asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. Dan reviewed the Tracking Log and determined no need for a workshop 4. Dan noted that the minutes of the September 2, 2015 meeting were approved.

B. COMPREHENSIVE PLAN UPDATE

1. Mark introduced Erin Gross from Tom Comitta's office. He reported that the CCPC reviewed the plan and found it to be consistent with the Landscapes2 and the PA MPC. There were no comments from surrounding municipalities or West Chester Area School District. This is draft #6 dated 8/31/15 and the BOS has advertised a hearing date of October 20, 2015 to consider adoption of the Plan. Monica moved that the Planning Commission recommend that the Board of Supervisors adopt the 2015 Comprehensive Plan. Lori seconded the motion. The motion passed unanimously.

C. OLD BUSINESS

1. Parks, Recreation and Open Space Plan Update - Consultant Ann Toole was present. She reviewed what was involved in the collaboration with Township Staff and ABC Members. There were many outreach programs including a public meeting. She is very pleased that some recommendations are being implemented already; i.e. 1) a feasibility study for the Paoli Pike Trail, 2) Master Plan for the Park, and 3) East Goshen Park playground update. She mentioned that responses to an online survey showed that 9 out 10 people in Chester County feel Parks and Recreation is important. She pointed out that in the East Goshen Township 2014 Budget 6% of the budget went to parks and recreation - $32.04/capita. PA averaged 3% - $36/capita. East Goshen is also recovering 49% of those costs thru program fees. This is the final draft and the BOS has advertised a hearing date of October 20, 2015 to consider adoption of the plan. Brad asked about naturalizing vs mowing. Ann commented that education must be done so people understand the process of naturalizing. Mark reported that the CCPC letter had some comments. The public can make comments until 10/20/15. Dan Landis moved that the Planning Commission recommend that the BOS adopt the Parks, Recreation and Open Space Plan with the following condition:

a. The review comments from the CCPC should be incorporated. Brad seconded the motion. The motion passed unanimously.

2. Zoning Ordinance Review - Mark reported on what has been done so far for the new Commission members. He reviewed his spreadsheet that identifies in Articles I - IV of the Zoning Ordinance, items that either pose some inconsistencies or require some clarifications. Monica mentioned

F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 10-7-15 draft.docx 1

1 that she found a definition for a temporary structure. Lori proposed discussing the issues in the order that 2 they appear in the Ordinance. Mark will send a summary to the BOS for their guidance. 3 4 D. ANYOTHERMATTER 5 1. Tree Ordinance - Mark explained that the BOS would like the PC to review the Tree 6 Ordinance and prepare an amendment for their consideration. One of the concerns of the BOS is that the 7 tree replacement requirement is too restrictive for small lot owners with wooded lots. If over 20% of the 8 trees on a wooded lot are removed, then the replacement requirement kicks in. Dan Daley explained the 9 measurement calculations for replacing trees. Dan will do a comparison with other municipalities for the 10 next meeting. 11 2. Act 14 NPDES - Mark explained that this is pennit application notice of the Reservoir Road 12 Pump station which will pump excess from West Goshen to East Goshen treatment plants. Also, Mark 13 reported that AQUA PA is submitting DEP permit from 2 well stations to update disinfection systems. 14 3. Goshen Village Shopping Center- Replacement Landscape Plantings -Mark explained the 15 proposal from GVSC to replace the original buffer plantings with some low landscape beds along Boot 16 Rd and Paoli Pike. The Conservancy Board has approved the plan with 2 conditions. These plantings 17 will not impact their signs or the Paoli Pike Trail. Monica moved that the Planning Commission 18 recommend that the BOS accept the landscape plan to replace the buffer plantings along Boot Rd and 19 Paoli Pike with the following conditions: 20 a. The Boot Road plantings shown be installed prior to June 1, 2016 and that the Paoli Pike 21 plantings be deferred until there is a clear indication of where the proposed Paoli Pike Trail will be 22 situated, so as to minimize any disturbance to the plantings when the trail is constructed. 23 b. GVSC acknowledge and agree to maintain plantings as necessary. 24 Dan Landis seconded the motion. The motion passed unanimously. 25 26 E. ADJOURNMENT 27 There being no further business, Dan Daley moved to adjourn the meeting. Monica seconded the 28 motion. The meeting adjourned at 9:30 pm. The next regular meeting will be held on November 4, 29 2015 at 7:00 pm. 30 31 32 Respectfully submitted,, ____________________ _ 33 Ruth Kiefer, Recording Secretary

F:\Data\Shared Data\Minutes\Planning Commission\2015\PC 10-7-15 draft.docx 2

610-692-7171

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHE N TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 27, 2015

Dear Property Owner:

The purpose of this letter is to inform you that the Township has received a Subdivision application for 930 N. Chester Rd., West Chester, PA 19380. The applicants, Gary and Paula Moore, are proposing to subdivide the existing 4 acre parcel into two lots.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when subdivision applications are received.

The meeting dates and times scheduled for the review, discussion and possible approval of this application are outlined below. These meeting dates and times are subject to change without further written notice.

November 4, 2015: Planning Commission meeting (7:00 PM

December 2, 2015: Planning Commission meeting (7:00 PM)

December 15, 2015: Board of Supervisors meeting {7:00 PM)

All meetings are held at the Township Building and are open to the public. The subdivision application and plan are available for review during normal business hours. Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Mark A. Gordon Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-4\53-4-55 (930 N. Chester Rd.)\2015 Subdivision\1000 foot letter 53-4-55 10262015.doc

I

EAST GOSHEN TOWNSHIP

CHESTIER C-OUNTY, PA

SUBDIVISION AND I OR LAND DEVELOPMENT APPLICATION

Date Filed:

Application for (Circle one):

@)Subdivision 0 Land Development 0Subdivision & Land Development

A. Application is hereby made by the undersigned for approval of a Subdivision and or Land

Development Plan, more particularly described below.

1. Applicant's name: Gary B. & Paul~ M. Moore

Address: 930 N. Chester Road, West Chester, PA 19380 Phone: 610-405-7093

Fax: Email: paugar82@comcast.net ~---------

2. Name and address of present owner (if other than 1. above)

Name: Same as Applicant above

3. Location of plan: 930 N. Chester Road

4. Proposed name of plan; _2_L_o_t s_u~b_d_iv_is_io_n ____________ _

5. County Tax Parcel No.: _5_3_-4_-5_5 _______ Zoning District: _R_-_2 _____ _

6. Area of proposed plan (ac.): 4.05 Number of lots: _2 _____ _

7. Area of open space (ac.): _n_la ____________________ _

8. Type of structures to be constructed: _s_in_g_le_F_a_m_i_ly_R_e_s_id_en_t_ia_I ----------

9. What provisions are to·be made for water supply and sanitary sewer? Private Water &

Public Sewer via a grinder pump

10. Linear feet ~f. road to be constructed: _n_la--~---

11. Name of Engineer: Dave Gibbons, PE; DL Howell & Associates, Inc.

Phone Number: 610-918-9002 Fax: 610-918-9003

Email address: dgibbons@dlhowell.com

f:\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc

EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION

12. Name of Land Planner: n/a -~-----------------

Phone Number:---------Fax:----------

Email address:---------------------

B. I/We agree to reimburse the Township of East Goshen for such fees and expenses the

Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan. C. I/We agree to post financial security for the improvements depicted on the Subdivision and or

land Development Plan pursuant to the Subdivision and Land Development Ordinance. D. I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost

to Township.

NO'f~CE

The Township requires an Occupancy Permit before any building can be occupied; no Occupancy

Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.

~Bf') (Jye f6. 1 1ei \tl\V1Au>- o er Signature

Administrative Use

~ - Fees received from applicant $ Zo-o basic fee, plus $ __ -__ ~per lot ,,.,._ ~ For - lots = $ w;o -------

Application and plan received by: ~ ~ (Signature)~

Application accepted as complete on: 1o{z.tt,{z,oc(:' . . (Date)

Date:

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc

{.· <f • ' !

'{~ - , , . :

! ...

2

EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION

SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST

This checklist outlines the steps and items needed to insure completeness of the application and-. to· insure the application follows the process and conforms to the timeframe outlined by the, State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process .

. . * Review the formaft Planning Commission review proced1U1re on page five.

Applllcation for (Circle all apprropriate): 0Subdivision0Land Development

Applicarnt Information:

Name of Applicant: Gary B. & Paula M. Moore

Address: 930 N. Chester Road, West Chester, PA 19380

Telephone Number: _6_1_0-_4_05_-7_0_9_3_~---- Fax: -----------

. ' Email Address: paugar82@comcast.net

Property Address: 930 N. Chester Road, West Chester, PA 19380

Property Information:

Owner's Name:. Gary B. & Paula M. Moore

Address: 930.N. -Chester Road, West Chester, PA 19380

... ·· .'(;, Tax Parcel Number:~· 5_3_-4_-5_5 ______ Zoning District: _R_-2 ___ Acreage: 4.05

Description of ~r~hosed subdivision and or land Development:

The purpose of this· subdivision is to subdivide an existing 4 acre parcel into two (2) -2 acre parcels for

single family residences. The existing dwelling will remain on one lot, and a new dwelling is proposed for

the second lot.

F:\Data\Shared Data\Coda Dept\Application & Fonns\Current Forms and Applications\Subdivision and Land Dev Application.doc 3

EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVIStON AND/OR LAND DEVELOPMENT APPLICATION

Application Process Checklist (Administrative use only)!

Date Complete

1. Completed Township Application Form: . . . . . . . . . . . . . .. . .. . . . . . . .. . l.o·VJ"' 15 2. Township application and review fees paid:...................... to .. z. 3 3. County Act 247 Form complete: ...... : .............................. 10·-t~ 4. Appropriate County Fees included: . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . 10- t ~ 5. 11 Copies of sealed Sub I LO plans: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Qi. 'l 6. 11 copies of other required plans: a. Landscape: (sealed).............................................. -=- b. Conservancy:· (sealed) ...... :................................. -- c. Stormwater Management: (sealed)........................ 10· !. \> 7. Three copies of the stormwater report and calculations: ...... 10°2-'; 8. Copies of supplementary studies, if required: a. Traffic Impact Study: ............................................ __ _ b. Water Study: ...................................................... _-__

Review Process Checklist (Administrative use only}

Date Complete

1. Date of first formal Planning Commission Meeting following complete submission of application, (Day 1): ..................... l 1-~-- tS Date Abutting property letter sent: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 o • t..1.,, '~ 2. Date presented to Planning Commission: ......................... fl-it.J -tS" 3. Date submitted to CCPC: .............................................. to .. zt..-•S- 4. Date submitted to Township Engineer: ............................ 10 .. i.eo- tS 5. Date by which the PC must act, (Day 70): ......................... g ... J1 .. 'l~ I t, 6. Date by which Board of Supervisors must act, (Day 90): ...... z .. t .. liiJ• f.r. 7. Date sent to CB: .......................................................... to· z1-1 <i:, 8. Date sent To MA:......................................................... •c 9. Date sent to HC: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • 10. Date sent to PRB: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 1 11. Date sent to TAB: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 'a

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 4

Plan Available For Review At
Township Office

East Goshen Township

Planning Commission Review of the Zoning Ordiance CH 240

Zoning Ordinace Reccomendations

10/30/2015

Title Section Issue Recommendation

Article II 2.1 Animal Husbandry 9.B(2) Animal Husbandry is listed as All aspects so of this ordinance be amended to be more accessory use however referred readable and enforceable. The PC should develop a clear to as requiring conditional use and simple objective to communicate to the Board that approval in the R-2 [240-9.B.(2)]. would encompass the use across the Zoning Ordinance. As I read the ordinance closely I Once a clear objective is established the solicitor could believe that there are substantial draft an amendment for review. inconsistencies and find the code nearly impossible to interpret.

There are two definitions of This needs to be included in the review of Animal Animal Husbandry in 240-6 that Husbandry. Look at the applicability of this use in the R-2 need consistency. and R-4. The use could be permitted for all Residential districts as long as a clear definition and standard is outlined for setbacks, etc.

a. Look at the applicability of this use in the R-2 and R-4 The use could be permitted for all Residential districts as

long as a clear definition and standard is outlined for setbacks, etc.

2.2 Temporary 6 There is no Definition in the Recommendation: We could add a definition for Structure ordiance for "Temporary temporary structure which includes a finite period of time. Structure" We could specify that a permit is required for the temporary structure and a permit shall only be valid for a

defined period of time. Webster's on line Definition of Temporary: lasting for a limited time

Zoning Ordinance Reccomendations 10302015.xlsx

Priority Status

1

2

Zoning Ordinace Reccomendations 10/30/2015

Title Section Issue Recommendation

2.3 Temporary Use 6 "Temporary Use" is identified in Recommendation: Define Temporary Use and develop a the ordinance and it is also not standard that specifies that a permit is required for the defined. temporary use and a permit shall only be valid for a defined period of time.

2.4 Public and Private These terms should be consistent identify inconsistencies and correct Recreation

2.5 Windmill 32.T This use is permitted in all Amend the R-2 to permit this use, I believe it was an residential districts except the R-2 oversight since it's allowed in Milltown with ~loK s.f. lots and R-5 a standard is outlined in (R-3) and not in the R-2 with 25K s.f. lots. The terminology §240-32.T Accessory Uses I could be looked at too, for consistency: i.e. Windmill and Windmill. Wind-generated Energy systems but this isn't a huge concern, the meanings are synonymous.

2.6 Single Family 9.G This section of the ordinance is Single Family Cluster should be highlighted in the NOTES Cluster somewhat hidden of 240-9.G directing readers to 240-28 for specific area Development and bulk regulations.

2.7 Single Family 9.G This section of the ordinance Single Family Openspace should be highlighted in the Openspace somewhat hidden NOTES of 240-9.G refereeing readers to 240-36 for specific Development area and bulk regulations.

Article Ill 3.1 C-1 Uses 14.B/C/E B(6): C-1 Post Office Sale of Sale of goods on site? goods on site?

B(13): Outdoor retail sales of By Right? Christmas trees C(2): Outdoor retail sales of CU, WHY? Christmas trees E(2): Outdoor Storage (Define!)

Zoning Ordinance Reccomendations 10302015.xlsx

Priority Status

3

4

5

6

7

8

Zoning Ordinace Reccomendations 10/30/2015 Title Section Issue Recommendation

E(6): Temporary Use Define?

3.2 C-2 Uses Restaurants? Its not very clear. Restaurant uses should be clear and concise

Article IV 4.1 I/ BP Uses 19.C.(23) Research - This is allowed in 12 Permit in BP but not BP.

4.2 19.G. Max Building Height Since the height for apartments has been raised should this be raised. Dan pointed out that West Goshen allows

up to 40 feet high.

4.3 20 Review 1-2 district. There appears to be a lot of redundancy in 1-1 & 1-2.

Review purpose of the I districts and determine if there are any uses that can be allowed in both 1-1and1-2.

4.4 20.D.(6) Treatment center is listed twice. Remove (24) and (24)

4.5 20.F.(2) Typo: change 1-2 to 1-2.

4.6 20.F.(2) Just say Permitted Uses because ( c) and (d) have references to Article V. This may need (b) the uses are shown in (a). some additional thought because permitted uses include conditional uses.

4.7 20.F.(3) 330/150 feet from what?? Can the editor's notes be incorporated into the zones for

(a) Minimum perimeter building clarification. The notes are attached to the definitions. setback?

4.8 20.F.(3)(g Two buildings on one lot Do we want to keep this? Yes, I believe this adds some ) flexibility to property owners.

Zoning Ordinance Reccomendations 10302015.xlsx

Priority Status

9

10

11

12

13

14

15

16

17

Zoning Ordinace Reccomendations 10/30/2015 Title Section Issue Recommendation

4.9 20.F.{4) National Register of Historic Ask the Historical Commission to review and make any Places comments on this section? This section was written to preserve the Chamber building and allow it to be subdivided and conveyed separately.

Zoning Ordinance Reccomendations 10302015.xlsx

Priority Status

18

Memo East Goshen Township

E-mail rsmith@eastgoshen.org

Date: October 28, 2015 To:

From: Re:

Commerce Commission, Conservancy Board, Futurist Committee, Historical Commission Municipal Authority, Park and Rec.Commission and Planning Commission Rick Smith, Township Manager ABC Goals

At their meeting on Tuesday, October 27, 2015 the Board approved the following tentative ABC Goals for 2016. The Board intends to finalize the list of goals at the Annual Planning Session which will be held on Saturday January 9, 2016.

In addition the new Comprehensive Plan and the Parks, Recreation and Open Space Plan (Plans), both of which are posted on the Township web site; each have a number of action items with an "On-Going" priority. The Board's expectation is that each ABC will continue· to implement these action items going forward.

If you have any comments, questions or concerns about your respective ABC's Goal(s) please provide them to me by December 30, 2015. Additional information about these goals and their method of implementation can be found in the Plans which are posted on the Township web site.

Comprehensive Plan Board of Supervisors Goal 7.3 Allowing for new uses and smaller incubator businesses in the corporate parks and industrial park Goal 6.2 Transforming the Paoli Pike Corridor into a walkable, connected artery.

Commerce Commission Goal 7.3 Allowing for new uses and smaller incubator businesses in the corporate parks and industrial park. Goal 6.1 Transforming the Town Center into a viable, walkable, visitable Place. Senya agreed to act as the liaison from the BOS.

Conservancy Board Goal 11.5 Continuing riparian buffer plantings throughout the Township. Goal 11.8 Reviewing and updating tree replacement standards as needed.

Futurist Commission Goal 6.1 Transforming the Town Center into a viable, walkable, visitable Place. Senya agreed to act as the liaison from the BOS.

Historic Commission Goal 13.6 Considering simplified Historic Preservation standards Goal 13.5 Considering simplified Historic Preservation requirements

Park and Recreation Commission Goal 9.2 Developing the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen from West Goshen to Willistown. In addition the Board suggested the Commission also consider the potential for "feeder" trails from the various developments to the Paoli Pike trail.

Goal 8.6 Increasing pedestrian circulation along Paoli Pike, especially in the form of a "Paoli Pike Promenade" with Sidewalks and Crosswalks, as well as increasing pedestrian circulation and pedestrian safety along Greenway, with Trails, Walkways and Crosswalks.

Planning Commission Goal 6.2 Transforming the Paoli Pike Corridor into a walkable, connected artery.

Parks, Recreation and Open Space Plan

Board of Supervisors Goal 1.lA Adopt the parkland standard of 28.20 acres per 1,000 residents Goal 1.lB Adopt a Mandatory Dedication of Parkland Ordinance

Conservancy Board Goal 1.5 Develop a public education program to increase public awareness, appreciation and engagement in managing natural resources and park features.

F:\Data\Shared Data\ABC'S\Goals\Memo to ABCs 102815.doc

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

Our implementation strategies are consistent with our overarching view of: protecting the health, safety, and welfare of our residents; maintaining East Goshen's overall economic prosperity; enhancing the Township's built environment; protecting natural and historic environments; sustaining successful recreational programs; and protecting and improving the quality of life that we all enjoy.

Priority: Implementation steps include one of three levels of priority, as follows:

1 - Higher Priority Initiatives include those that the Task Force feels are the most urgent and achievable;

2 - Medium Priority Initiatives do not rise to the level of being a top priority, but are recognized as being important; and

3 - Lower Priority Initiatives include actions that are considered to be useful, but are not as critical as #1 and #2.

Completion Time Frame: is meant as an estimate of the time frame in which a specific Initiative can be completed.

Responsibility: identifies which of the East Goshen Township ABC's are most responsible for overseeing the Implementation of each Initiative.

Implementation Method: identifies whether the Initiative will require such actions as an ordinance amendment, physical improvement, special study, meetings, workshops, plan review, or development.

Potential Funding Source: addresses potential funding sources that could be used to supple- ment Township funds. These include state funding sources - the Department of Conservation and Natural Resources (DCNR), the Department of Community & Economic Development (DCED), the Department of Environmental Protection (DEP), grants from federal Community Development funds , and grants from the Chester County Board of Commissioners.

The Board of Supervisors should use this Implementation Matrix as a guide to monitor progress on the various Initiatives. Therefore, the Board of Supervisors should periodically review and update the Implementation Matrix to reflect current Township priorities.

Notes: 1. The Initiatives listed in this Section are supplemented by expanded lists in the Appendices. 2. Whenever there is an "On-Going" initiative, an asterisk ( *) is indicated as these items are constant.

f mp ementa ion M t . a nx

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

5. Housing Plan

Encouraging the 5.1. maintenance and * on-going PS Development, PS improvement of the Plan Review existina housing stock Continuing to provide * 5.2. opportunities for a variety on-going BOS PC zo PS of housina !voes. Encouraging infill opportunities by providing 5.3. for additional dwelling * on-going PC BOS, FC ZO, SLDO, PS units, without adversely Plan Review impacting the character of existina neiahborhoods. Redeveloping selected properties along West Development, 5.4. Chester Pike in order to 3 2to10 years PS Plan Review PS provide for new housing oooortunities. Encouraging mixed uses * 5.5. and mixed housing types on-going BOS PC zo PS where aoorooriate. Encouraging the Redevelopment of vacant Development, 5.6. and/or underperforming 3 5 to 10 years PC PS Plan Review PS lots to create new housing oooortunities.

5.7. Fostering opportunities for 2 2 to 10 years BOS PC zo PS, CCC aqinq in olace.

6. Land Use Plan

Transforming the Town Plan Review, 6.1. Center into a viable, 1 1to10 years PS BOS, PC Development PS,PT walkable, visitable Place. Transforming the Paoli 6.2. Pike Corridor into a 1 1 to 10 years BOS PC, PT, Special Study PT,DVRPC walkable, connected, CCC arterv. Transforming the West 6.3. Chester Pike Corridor into 2 2 to 20 years PS BOS, Special Study PT, PS, DVRPC a more functional and PC, PT attractive arterv. Continuing to receive 6.4. guidance from the * on-going BOS PC, Meetings, Workshops GF Authorities, Boards and ABC's Commissions !ABC's\. Continuing effective 6.5. governance by the East * on-going BOS Meetings, Hearings GF Goshen Township Board of Suoervisors. Continuing to accommodate a diverse 6.6. mix of residential, * on-going BOS PC, FC ZO, Plan Review PS commercial, institutional, light industrial, and recreational uses.

Notes: (1) The Township can use this Implementation Matrix as a guide to monitor progress on various Initiatives. Therefore, this Implementation Matrix should be periodically reviewed and updated to reflect current Township priorities.

(2) BOS = Board of Supervisors; PC= Planning Commission; PR = Parks & Recreation Commission; MA= Municipal Authority; CB = Conservancy Board; HC = Historic Commission; CC = Commerce Commission; FC = Futurist Committee; PS= Private Sector; PT= Penn DOT; DCNR: PA Department of Conservation and Natural Resources; DCED =PA Department of Community & Economic Development; DEP =Department of Environmental Protection; CCC = Chester County Commissioners; DVRPC = Delaware Valley Regional Planning Commission.

(3) ZO = Zoning Ordinance; SLDO =Subdivision and Land Development Ordinance; GF = General Fund

16-1

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

7. Economic Development Strategy

Promoting the 7.1. enhancement of * on-going BOS PC,CC, ZO, SLDO, PS,GF business opportunities in FC Plan Review

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

8. Transportation & Circulation Systems Plan (continued)

Increasing pedestrian circulation along Paoli Pike, especially in the form of a "Paoli Pike the Town Center. Promenade" with Promoting the enhancement of * PC,CC, ZO, SLDO, 7.2. business opportunities on-going BOS PS,GF along the West Chester FC Plan Review

Sidewalks and Special Study, GF, CCC, 8.6. Crosswalks, as well as 1 1 to 10 years BOS PC,PR ZO, SLDO DVRPC, increasing pedestrian DCNR circulation and Pike Corridor. pedestrian safety along Allowing for new uses Greenway, with Trails, and smaller incubator PC,CC, ZO, Plan Review, 7.3. businesses in the 1 1 to 10 years BOS PS corporate parks and the FC Development

industrial oark.

Walkways, and Crosswalks. Implementing the East * 8.7. Goshen Township Act on-going BOS PC Plan Review PS Continuing the use of 209 Transportation Plan East Goshen Park for 7.4. the Farmers Market and * on-going BOS PR Programs, GF other context-sensitive Development 9. Community Facilities and Services Plan

enterprises and activities. Utilizing the Commerce

Maintaining and 9.1. expanding the Open 2 2 to 20 years BOS PC, PR, Special Study GF, CCC, DCNR Space, Recreation, and CB Commission with the Trails Network. business community, in *

Workshops, 7.5. order to identify and on-going cc BOS Newsletter, PS

Developing the Paoli Pike Trail to create the address needs Website pertaining to business arowth and exoansion.

linkage between West PC, PR, GF, PT, CCC, 9.2. Chester and Malvern, 1 1 to 10 years BOS PT, CCC Special Study DCNR through East Goshen, Providing opportunities from West Goshen to for shared parking Willistown. 7.6. opportunities for smaller 2 2 years BOC PC ZO,SLDO PS commercial establishments.

Maintaining and * Maintenance, 9.3. upgrading East Goshen on-going BOS PR Rec Fee in Lieu GF, DCNR Park. Continuing No-Impact Home-Based * 7.7. Businesses, Home on-going BOS PC,PS ZO, SLDO PS

Continuing to provide * 9.4. high quality Recreation on-going BOS PR Programs GF, DCNR Services. Occupations, and Home- Related Businesses.

Continuing to provide * 9.5. high quality Police, Fire on-going BOS Maintenance GF, DCED and EMS services. 8. Transportation & Circulation Systems Plan

Continuing to provide 8.1. safe, well-maintained * on-going BOS PT Maintenance GF, PT roads throughout the Townshio. Identifying and implementing regional 8.2. highway improvement 1 1to10 years BOS PT, Special Study PT,DVRPC projects that enhance DVRPC mobility, safety, and

Continuing the provisions of effective * 9.6. administrative, public on-going BOS MA Maintenance GF works, and related services. Continuing to support * 9.7. important and viable on-going BOS PR Maintenance GF Communitv Facilities.

10. Utilities Plan

reduce conaestion. Minimizing speeding vehicular traffic on the 8.3. local roadways and * on-going BOS PT Maintenance, PT,PS minimizing cut-through Development vehicular traffic within

Continuing to provide effective sewage 10.1. disposal and wastewater * on-going BOS MA Development PS treatment with oversight of the Municipal Authoritv. neighborhoods. Implementing vehicular traffic flow and traffic Plan Review, 8.4. calming improvements 2 2 to 10 years BOS PT PT,GF for select roads and Maintenance

intersections.

Continuing to provide 10.2. effective solid waste * on-going BOS MA Maintenance GF disposal, and recycling services. Maintaining the role of the East Goshen Reducing vehicular traffic by supporting 8.5. public transportation * on-going BOS DVRPC Special Study DVRPC, PT opportunities and travel

10.3. Township Municipal * on-going BOS MA Special Study, PS Authority for evaluating Plan Review sewered and unsewered areas. demand management techniaues.

16-2

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2) (1) Primary Other (3) Sources (2)

1 O. Utilities Plan (continued) 12. Energy Conservation Strategy (continued)

10.4. Cooperating with Aqua * on-going PS Development PS on Public Water Supply

Designating areas for 12.5. compact car parking, in 2 2 to 5 years BOS PC ZO, SLDO, PS order to reduce the size Plan Review

Maintaining effective * 10.5. Stormwater on-going BOS DEP Plan Review PS Management Regulating pipelines to

* 10.6. protect land uses and on-going BOS DEP Plan Review CCC, PS the environment.

of off-street parkinq lots. Encouraging park and PT, 12.6. ride facilities, shared * on-going BOS CCC, BOS, DVRPC, PT, DVRPC, parking, and increased CCC, PT BOS public transoortation. DVRPC

Providing conservation 12.7. tips on the Township * on-going BOS CB Website GF website. 11. Natural Resource Protection Plan 13. Historic Resources Protection Plan Protecting the Riparian PC, 11.1. Areas along Ridley and * on-going BOS DEP, CB,DCNR,DEP PS, DCNR, DEP Chester Creeks and their tributaries. DCNR

Continuing the East Goshen Historical Commission (EGHC)

Considering opportunities for a * PC, PR, Special Study, 11.2. Greenway Network on-going BOS DCNR Plan Review DCNR, GF along Chester and Ridley Creeks.

programs at the * HC Programs, 13.1. Blacksmith Shop and on-going HC BOS Special Study GF Plank House, and refinement of the Township Historic Property Inventory. 11.3. Preserving and * on-going BOS PC,CB Plan Review PS enhancing Street Trees.

Continuing to have the EGHC comment on

Continuing the advocacy * Website, 11.4. role of the Conservancy on-going CB BOS GF Board. Plan Review

applications for * 13.2. subdivision and land on-going HC PC SLDO PS development involving

Continuing riparian 11.5. buffer plantings 1 1to20 years CB DCNR Planting GF,DCNR throughout the Township.

11.6. Continuing to control * on-going CB DCNR DEP, PS invasive species. Plan Review

and adjacent to Historic properties. Continuing to have the EGHC provide * Website, 13.3. educational information on-going HC Newsletter GF for the Township website and Newsletter.

11.7. Improving woodland

2 2 to5 years BOS PC,CB ZO,SLDO GF, CCC protection standards.

Utilizing the characteristics of

Reviewing and updating

ZO, SLDO, 11.8. tree replacement 2 2 to 5 years BOS PC,CB GF, CCC standards as needed. Plan Review

13.4. Goshenville and Rocky 3 5 years HC PC, BOS ZO, SLDO CCC, GF Hill to guide the character of nearby develooment. Reviewing and updating

ZO, SLDO, 11.9. criteria for non-buildable 2 2 to5 years BOS PC,CB GF, CCC areas. Plan Review

Reviewing Historic 13.5. Preservation 1 1 to 5 years HC PC ZO,SLDO CCC, GF requirements. Improving and * ZO,SLDO, 11.10. enhancing Green on-going BOS PC,PS GF, DCNR Infrastructure Plan Review

Considering simplified 13.6. Historic Preservation 2 2 to 5 years HC PC ZO,SLDO CCC, GF Standards.

12. Energy Conservation Strategy

Creating more compact, 12.1. mixed-use, walkable * on-going PS BOS, Plan Review, PS,DCED places. PC,FC Development

Advocating energy 12.2. conservation for * on-going BOS PC, CB, Website, GF,DEP residents, businesses, FC Newsletter and institutions. Advocating green 12.3. building and site * on-going BOS PC,CB, ZO, SLDO, GF, DEP, development practices. FC Special Study DVRPC

Promoting and 12.4. enhancing the protection * on-going BOS PC, CB, ZO, SLDO, PS,DCNR of Woodlands. DCNR Plan Review

16-3