Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda
Wednesday, March 1, 2017
7:00 PM
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine need for Workshop Meeting DVRPC Presentation on the aging demographics of the region (3/28/2017)
- Public Comment on Non-Agenda Items
- Approval of Minutes February 1, 2017
- Subdivision and Land Development Applications 1420 E. Strasburg Rd. (Brakman Property, SD/LD) Revised Plans dated 2/20/2017 Applicant Response Letter dated 2/20/2017 Conservancy Board Letter dated 2/9/2017 Applicant LS Plan; Revised Plans dated 2/20/2017; Applicant Response Letter dated 2/20/2017; Conservancy Board Letter dated 2/9/2017; Applicant LS Plan
- Conditional Uses and Variances
- Ordinance Amendments Medical Marijuana Ordinance Discussion
- Old Business
- New Business
- 2017 Goals Memo from Rick Smith re: 2017 Goals
- Any Other Matter
- Liaison Reports
- Correspondence
Bold Items indicate new information to review.
F:\Data\Shared Data\Agendas\Planning Commission\2017\PC AGENDA 03012017.doc
East Goshen Township
Planning Commission Tracking Log
| Application Name | Application (CU, LD, O, SD, V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1420 E. Strasburg Rd. / Brakman-Gunnison | SD/LD | P/F | 5/18/16 | 6/1/16 | 5/19/16 | 5/19/16 | 5/20/16 | 3 | 3/1/17 | 3/21/17 | NA | 3/29/17 | |
| Bold = New Application or PC action required | |||||||||||||
| Completed in 2017 | |||||||||||||
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2017\PC Tracking Log for 03012017.xlsx
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
February 1, 2017
The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, February 1, 2017 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Adam Knox, Jim McRee, Dan Daley, Monica Close and Brad Giresi. Also present was Mark Gordon, Township Zoning Officer and Janet Emanuel, Township Supervisor.
COMMON ACRONYMS:
| BOS – Board of Supervisors | CPTF – Comprehensive Plan Task Force |
|---|---|
| BC – Brandywine Conservancy | CVS – Community Visioning Session |
| CB – Conservancy Board | SWM – Storm Water Management |
| CCPC – Chester Co Planning Commission |
A. FORMAL MEETING – 7:00 pm
- Adam called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our troops.
- Adam asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response.
- Adam reviewed the Tracking Log and determined no need for a workshop
- The Commission reviewed the meeting minutes from January 4, 2017, made two minor corrections and the Chairman accepted the January 4, 2017 meeting minutes.
- Mark mentioned that there is going to be a joint meeting / presentation on the aging demographics of the region soon, presented by the DVRPC. Date to be determined.
B. SUBDIVISION & LAND DEVELOPMENT APPLICATIONS
- 1420 E. Strasburg Road (Brakman Property) - Jim Brandolini, equitable owner of the property was present to update the commission on the status of the SD&LD plan. Jim reviewed the revised plan for 1 existing home and 2 new homes. The layout for new home #2 has been changed so the storm water will flow down the hill to E. Strasburg Road. They received a letter from the County with changes, which have been made. The neighbor on the other side of E. Strasburg has granted an easement to allow for better public sewer/water installation. Jim will submit the final revised plans to the Township for review. There are just some loose details to clarify on the plans.
C. LIAISON REPORT
- Board of Supervisors – Janet reported that the Board is interviewing candidates for vacant ABC positions and the PC should have a full complement in March.
D. OLD BUSINESS
- Goals for 2017 –Goals for 2017 will be Paoli Pike Trail, Zoning Ordinance review and discuss emerging trends
ADJOURNMENT
There being no further business, Dan moved to adjourn the meeting. Brad seconded the motion. The meeting adjourned at 8:40 pm. The next regular meeting will be held on Wednesday, March 1, 2017 at 7:00 pm.
Respectfully submitted,_________________________________________________
Mark Gordon, Township Zoning Officer
PC 2-1-17 draft 1
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
TITLE PLAN: SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC., 114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CE-I.COM
DATE: MAY 17, 2016 | SCALE: 1" = 40' | SURVEY: MPS | DRAWN: T.F. | CHECKED: V.K. | DRAWING NO. 201541-1(C) | SHEET: 1 OF 11
IMPERVIOUS COVERAGE SUMMARY
EXISTING IMPERVIOUS COVERAGE
LOT AREA = 221,252.8 SF / 5.079 AC (EXCLUSIVE OF ROW)
| Category | Item | Area / Percentage |
|---|---|---|
| EXISTING BUILDING COVERAGE | EXISTING BUILDINGS | 3,132 SF |
| EXISTING BUILDING COVERAGE | TOTAL BUILDING COVERAGE | 3,132 SF |
| EXISTING BUILDING COVERAGE | PERCENT EXISTING BUILDING COVERAGE | 1.42% |
| TOTAL EXISTING IMPERVIOUS COVERAGE | EXISTING BUILDING COVERAGE | 3,132 SF |
| TOTAL EXISTING IMPERVIOUS COVERAGE | EXISTING DRIVEWAY | 8,673 SF |
| TOTAL EXISTING IMPERVIOUS COVERAGE | TOTAL IMPERVIOUS COVERAGE | 11,805 SF |
| TOTAL EXISTING IMPERVIOUS COVERAGE | PERCENT IMPERVIOUS COVERAGE | 5.33% |
PROPOSED IMPERVIOUS COVERAGE (LOT 1)
LOT AREA = 59,060.162 SF / 1.356 AC (EXCLUSIVE OF ROW)
| Category | Item | Area / Percentage |
|---|---|---|
| PROPOSED BUILDING COVERAGE | PROPOSED BUILDING | 2,657 SF |
| PROPOSED BUILDING COVERAGE | TOTAL BUILDING COVERAGE | 2,657 SF |
| PROPOSED BUILDING COVERAGE | PERCENT PROPOSED BUILDING COVERAGE | 4.50% |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED BUILDING | 2,657 SF |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED DRIVEWAY | 8,759 SF |
| TOTAL IMPERVIOUS COVERAGE | TOTAL IMPERVIOUS COVERAGE | 11,416 SF |
| TOTAL IMPERVIOUS COVERAGE | PERCENT IMPERVIOUS COVERAGE | 19.33% |
PROPOSED IMPERVIOUS COVERAGE (LOT 2)
LOT AREA = 54,162.765 SF / 1.243 AC (EXCLUSIVE OF ROW)
| Category | Item | Area / Percentage |
|---|---|---|
| PROPOSED BUILDING COVERAGE | PROPOSED BUILDING | 2,341 SF |
| PROPOSED BUILDING COVERAGE | TOTAL BUILDING COVERAGE | 2,341 SF |
| PROPOSED BUILDING COVERAGE | PERCENT PROPOSED BUILDING COVERAGE | 4.32% |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED BUILDING | 2,341 SF |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED DRIVEWAY | 5,924 SF |
| TOTAL IMPERVIOUS COVERAGE | FUTURE IMPERVIOUS | 520 SF |
| TOTAL IMPERVIOUS COVERAGE | TOTAL IMPERVIOUS COVERAGE | 8,785 SF |
| TOTAL IMPERVIOUS COVERAGE | PERCENT IMPERVIOUS COVERAGE | 16.22% |
PROPOSED IMPERVIOUS COVERAGE (LOT 3)
LOT AREA = 90,877.001 SF / 2.086 AC (EXCLUSIVE OF ROW)
| Category | Item | Area / Percentage |
|---|---|---|
| PROPOSED BUILDING COVERAGE | PROPOSED BUILDING | 2,734 SF |
| PROPOSED BUILDING COVERAGE | TOTAL BUILDING COVERAGE | 2,734 SF |
| PROPOSED BUILDING COVERAGE | PERCENT PROPOSED BUILDING COVERAGE | 3.01% |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED BUILDING | 2,734 SF |
| TOTAL IMPERVIOUS COVERAGE | PROPOSED DRIVEWAY | 2,085 SF |
| TOTAL IMPERVIOUS COVERAGE | FUTURE IMPERVIOUS | 500 SF |
| TOTAL IMPERVIOUS COVERAGE | TOTAL IMPERVIOUS COVERAGE | 5,319 SF |
| TOTAL IMPERVIOUS COVERAGE | PERCENT IMPERVIOUS COVERAGE | 5.85% |
LEGEND
- STEEP SLOPES (15% TO 25%)
- STEEP SLOPES (OVER 25%)
- CONCRETE SURFACE
- EXISTING WETLANDS LINE
- STREAM LINE
- FLOOD HAZARD DISTRICT LINE
- EXISTING INTERMEDIATE CONTOUR
- EXISTING INDEX CONTOUR
- EXISTING WOODS / TREE LINE
- ADJOINER LINE
- EXISTING STORM SEWER LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING PAVING
- EXISTING SOILS LINE
- PROPOSED INTERMEDIATE CONTOUR
- PROPOSED INDEX CONTOUR
- PROPOSED SPOT ELEVATION
- PROPOSED STORM SEWER LINE
- PROPOSED SANITARY SEWER LINE
- PROPOSED WATER LINE
- PROPOSED WOODS / TREE LINE
- SUPER SILT FENCE
- LIMIT OF DISTURBANCE
- NORTH AMERICAN GREEN S150 TEMPORARY GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- NORTH AMERICAN GREEN SC250 PERMANENT GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- STABILIZED RIP-RAP CONSTRUCTION ENTRANCE
PENNSYLVANIA ONE CALL: PURSUANT TO ACT 287, 172, 38 AND ALL OTHER APPLICABLE AMENDMENTS, COMMONWEALTH ENGINEERS, INC. HAS CONTACTED THE PENNSYLVANIA ONE CALL SYSTEM FOR EXISTING UNDERGROUND UTILITY INFORMATION. THIS INFORMATION IS INDICATED HEREON. COMMONWEALTH ENGINEERS, INC. DOES NOT GUARANTEE THAT ALL SUBSURFACE UTILITY LINES, STRUCTURES, ETC. ARE SHOWN. EXCAVATORS ARE STILL OBLIGATED TO CALL 1-800-242-1776 TO HAVE UNDERGROUND UTILITY LINES MARKED THREE WORKING DAYS PRIOR TO EARTHMOVING OPERATIONS. (S.N. 20160320567)
UPI No. 5306-0089-0000
SHEET INDEX
| Sheet Title | Sheet Number |
|---|---|
| TITLE PLAN | SHEET 1 OF 11 |
| CONSTRUCTION IMPROVEMENTS PLAN | SHEET 2 OF 11 |
| EXISTING CONDITIONS PLAN | SHEET 3 OF 11 |
| PCSM & GRADING PLAN | SHEET 4 OF 11 |
| PCSM NON-STRUCTURAL BMP PLAN | SHEET 5 OF 11 |
| PCSM NOTES & DETAILS SHEET | SHEET 6 OF 11 |
| EROSION & SEDIMENT CONTROL PLAN | SHEET 7 OF 11 |
| E&SC NOTES & DETAILS SHEET | SHEET 8 OF 11 |
| ENTRANCE ROAD PLAN AND PROFILE | SHEET 9 OF 11 |
| SANITARY SEWER PROFILE AND DETAILS | SHEET 10 OF 11 |
| LANDSCAPE PLAN | SHEET 11 OF 11 |
PLAN LABELS & LOT SUMMARY
- EAST STRASBURG ROAD (S.R. 2010, 50 FOOT WIDE LEGAL RIGHT OF WAY) (POSTED SPEED LIMIT - 40 MPH)
- BROOK DRIVE
- TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK | 50' RIPARIAN BUFFER | FEMA 100-YR FLOODPLAIN ZONE A
- GROSS AREA: 221,252.80 SQ FT (5.079 ACRES) | NET AREA: 210,253.4 SF (4.827 ACRES)
- LOT 1: GROSS LOT AREA (64,665.682 SF) (1.484 ACRES) | NET LOT AREA (59,060.162 SF) (1.356 ACRES)
- LOT 2: GROSS LOT AREA (54,624.745 SF) (1.254 ACRES) | NET LOT AREA (54,162.765 SF) (1.243 ACRES)
- LOT 3: GROSS LOT AREA (100,219.753 SF) (2.301 ACRES) | NET LOT AREA (90,877.001 SF) (2.086 ACRES)
- ADJOINERS: UPI 5306B 0054 0000 N/F DANIEL E. CHERRY, DB 8962, PG 505; UPI 5306B 0052 0000 N/F WILLIAM E. LEIGH, DB 484, PG 105; UPI 5306B 0051 0000 N/F CHRISTOPHE V. KAPLAN, DB 4941, PG 1427; UPI 5306B 0046 0000 N/F JOSEPH P. LYONS, DB Y-48, PG 83; UPI 5306B 0047 0000 N/F JOHN M. DONOHUE, DB 2670, PG 502; UPI 5306 0089 0100 N/F RICHARD E. MATTHEWS, DB 3529, PG 1957; UPI 5306 0090 0100 N/F CHRISTOPHER N. & DEBORAH FALCONE, DB 8774, PG 511; UPI 5306B 0004 0000 N/F ROBERT & DOROTHY SULLIVAN, DB U-61, PG 290; UPI 5306B 0003 0000 N/F DENISE DANIELLE JORDAN, DB 9077, PG 2274; UPI 5306B 0002 0000 N/F JOSEPH E. PODELJAC JR, DB 2574, PG 272; UPI 5306B 0019 0000 N/F DIRK & JOAN L. VANDERLAAN, DB 4878, PG 1433; UPI 5306B 0031 0000 N/F CHARLES R. & ELLEN HENDRICKSON, DB V-49, PG 531
UNDERGROUND UTILITY USERS
PENNSYLVANIA ONE-CALL SYSTEM SERIAL NUMBER: 20160320567 (1-800-242-1776)
- PHILADELPHIA ELECTRIC COMPANY, 1050 SWEDESFORD ROAD, BERWYN, PA 19312, (610) 648-7702
- AQUA PA, 762 W. LANCASTER AVE, BRYN MAWR, PA 19010, (877) 987-2782
- EAST GOSHEN TOWNSHIP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380, (610) 692-7171
- VERIZON PENNSYLVANIA INC, 900 RACE STREET, 6TH FLOOR, PHILADELPHIA, PA 19107, (215) 560-4151
- COMCAST, 400 A B MCNALLY RD, P.O. BOX 351, COATESVILLE, PA 19320, (800) 934-6489
- WILLIAMS (TRANSCO GAS), 2800 POST OAK BOULEVARD, P.O. BOX 1396, HOUSTON, TX 77251, (800) 440-8475
GENERAL NOTES
- RECORD OWNER: ANTOINETTE BRAKMAN, 1420 E. STRASBURG ROAD, WEST CHESTER, PA 19380, UPI 5306-0089-0000 (TAX #53-6-89), PHONE: (610) 436-0152, DEED REFERENCES: DB. 3529, PG. 1960. EQUITABLE OWNER: JIM BRANDOLINI, GUNNISON DEVELOPMENT CO., LLC, 1138 MELISSA BUSH LANE, WEST CHESTER, PA 19380, PHONE: (610) 640-9974.
- SITE ADDRESS: 1420 E. STRASBURG ROAD, WEST CHESTER, PA 19380.
- TRACT AREA: 221,252.8 SQ. FT. / 5.079 ACRES (GROSS) LESS 50' ROAD RIGHT-OF-WAY: 17,152.849 SQ. FT. / 0.394 ACRES NET TRACT AREA: 4.685 ACRES (NET)
- BOUNDARY AND PARTIAL TOPOGRAPHY FROM FIELD SURVEY PERFORMED BY COMMONWEALTH ENGINEERS, INC., APRIL 2016. BENCHMARK: NO. 4 REBAR FOUND, NORTHEAST CORNER OF SITE, ASSUMED DATUM = 414.47.
- WETLANDS DELINEATION BY VORTEX ENVIRONMENTAL, INC. AND SURVEYED BY COMMONWEALTH ENGINEERS, INC. IN MAY 2016.
- SOILS CLASSIFICATIONS FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA) NATURAL RESOURCE CONSERVATION DISTRICT WEB SOIL SURVEY, IN AUGUST, 2014.
- UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM OBSERVABLE EVIDENCE AT THE TIME OF SURVEY AND FROM RECORD MAPPING PROVIDED BY THE UTILITY COMPANIES WHICH SERVICE/OCCUPY THE SITE. NO GUARANTEE IS MADE THAT UNDERGROUND UTILITIES ARE ACCURATELY OR COMPLETELY SHOWN HEREON. THE SITE CONTRACTOR MUST VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES AND FACILITIES PRIOR TO BEGINNING CONSTRUCTION.
- THE SITE IS SERVED BY PUBLIC WATER (AQUA PA).
- EXISTING SEPTIC SYSTEM PRESENT ON SITE BUT NOT LOCATED.
- EXISTING IRON PINS ARE SHOWN AS THUS "O".
- THE DEVELOPER SHALL CONFORM TO OR CAUSE CONFORMANCE WITH ALL OF THE APPLICABLE REQUIREMENTS OF THIS PLAN AND THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE AND SUBDIVISION AND LAND DEVELOPMENT ORDINANCE AS WELL AS OTHER APPLICABLE LOCAL, STATE AND FEDERAL LAWS, STATUTES, REGULATIONS AND ORDINANCES.
- THE DEVELOPER SHALL NOTIFY UNDERGROUND UTILITY USERS AT LEAST THREE DAYS PRIOR TO ANY CONSTRUCTION AT THIS SITE OUT IN ACCORDANCE WITH PA ACT 287 OF 1974, AS AMENDED BY ACT 187 OF 1996 & ALL OTHER APPLICABLE AMENDMENTS, AS WELL AS CONFORM TO ANY OTHER OBLIGATIONS OF SAID ACTS. UNDERGROUND UTILITIES SHOWN ARE FROM SURFACE EVIDENCE OBSERVABLE IN THE FIELD AND AS MARKED BY THE UTILITY COMPANIES.
- FEMA FLOODPLAIN BOUNDARY TAKEN FROM FLOOD INSURANCE RATE MAP, PANEL 215F, MAP NUMBER 42029C0334F, EFFECTIVE SEPTEMBER 29, 2006.
- THIS PROJECT IS LOCATED IN THE WATERSHED OF TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK WHICH HAS THE DESIGNATION OF TROUT STOCK FISHES (TSF, MF) BY THE COMMONWEALTH OF PENNSYLVANIA.
- THIS PROJECT PROPOSES THE SUBDIVISION OF THE EXISTING LOT INTO 3 SEPARATE LOTS WITH EACH LOT TO BE SERVED BY PUBLIC WATER AND PUBLIC SEWER. PUBLIC SEWER TO BE THROUGH LOW PRESSURE FORCE MAIN TIED INTO AN EXISTING MANHOLE AS SHOWN.
SURVEY REFERENCE NOTES
- PLAN ENTITLED "BOUNDARY SURVEY PLAN FOR MS. ANTOINETTE BRAKMAN", PREPARED BY F. X. SMITH SURVEYORS, DATED MARCH 21, 2007.
- PLAN ENTITLED "REVERSE SUBDIVISION/SUBDIVISION PLAN FOR MICHAEL RIZZO", PREPARED BY HENRY S. CONREY, INC., A DIVISION OF CHESTER VALLEY ENGINEERS, CONSULTING ENGINEERS AND LAND SURVEYORS, DATED NOVEMBER 30, 2001.
- PECO GAS MAIN INFORMATION CONTAINED IN MAPPING FURNISHED BY PA 101.
- PLAN ENTITLED "THE GAMBONE BROTHERS INC.", PREPARED BY HENRY S. CONREY INC., DIVISION OF CHESTER VALLEY ENGINEERS, DATED JUNE 8, 1973 (LAST REVISED SEPTEMBER 9, 1973).
SIGHT DISTANCE NOTE
- SIGHT DISTANCE TO BE FIELD VERIFIED POST-CONSTRUCTION TO CONFIRM PROPER SIGHT DISTANCES ARE MET.
ZONING: R-2 LOW DENSITY RESIDENTIAL DISTRICT
| Requirement | REQUIRED | EXISTING | PROVIDED LOT 1 | PROVIDED LOT 2 | PROVIDED LOT 3 |
|---|---|---|---|---|---|
| MINIMUM LOT AREA (NET) | 1 ACRE | 4.685 AC | 1.356 AC | 1.243 AC | 2.086 AC |
| MINIMUM LOT WIDTH AT BUILDING SETBACK LINE | 150' | 409' | 170' | 150' | 180' |
| MINIMUM LOT WIDTH AT STREET LINE | 60' | 418' | -- | 310' | -- |
| MAXIMUM BUILDING COVERAGE | 25% | 1.42% | 4.50% | 4.32% | 3.01% |
| MAXIMUM TOTAL IMPERVIOUS COVERAGE | 35% | 5.33% | 19.33% | 16.22% | 5.85% |
| MAXIMUM BUILDING HEIGHT (STORIES) | 3 | 1 | 2 | 2 | 2 |
| MAXIMUM BUILDING HEIGHT (FEET) | 35' | 30' | 30' | 30' | 30' |
| MINIMUM FRONT YARD | 45' | 45' | 45' MIN. | 45' MIN. | 45' MIN. |
| AVERAGE FRONT YARD | 60' | 60' | 60' | 60' | 60' |
| MINIMUM SIDE YARD | 25' | 25' | 25' MIN. | 25' MIN. | 25' MIN. |
| MINIMUM REAR YARD | 50' | 50' | 50' MIN. | 50' MIN. | 50' MIN. |
WAIVER REQUESTS
- S.A.L.D.O. SECTION 205-31 FINAL PLAN TO BE SUBMITTED AFTER APPROVAL OF A PRELIMINARY PLAN. THE APPLICANT REQUESTS THAT THE PLAN BE SUBMITTED AS A PRELIMINARY/FINAL PLAN.
CERTIFICATIONS AND APPROVALS
COMMONWEALTH OF PENNSYLVANIA, COUNTY OF CHESTER
ON THIS, THE _____ DAY OF _____________, 20___, BEFORE ME, THE UNDERSIGNED OFFICER, PERSONALLY APPEARED JIM BRANDOLINI, EQUITABLE LAND OWNER, KNOWN TO ME, BEING DULY SWORN ACCORDING TO LAW, DEPOSES AND SAYS THAT HE IS THE EQUITABLE OWNER OF THE PROPERTY SHOWN ON THIS PLAN, THAT THE PLAN THEREOF WAS MADE AT HIS DIRECTION, THAT HE ACKNOWLEDGES THE SAME TO BE RECORDED, AND THAT ALL STREETS AND OTHER PROPERTY IDENTIFIED AS PROPOSED PUBLIC PROPERTY (EXCEPTING THOSE AREAS LABELED "NOT FOR DEDICATION") WILL BE OFFERED FOR DEDICATION. (JIM BRANDOLINI)
SWORN TO AND SUBSCRIBED BEFORE ME THIS _____ DAY OF _____________, 20___. (NOTARY PUBLIC) | MY COMMISSION EXPIRES _____________, 20___.
APPROVED BY THE BOARD OF SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, THIS _____ DAY OF _____________, 20___. (CHAIRMAN / VICE CHAIRMAN / MEMBER)
APPROVED BY PLANNING COMMISSION OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, THIS _____ DAY OF _____________, 20___. (CHAIRMAN)
APPROVED BY TOWNSHIP ENGINEER OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, THIS _____ DAY OF _____________, 20___. (TOWNSHIP ENGINEER)
THIS PLAN WAS REVIEWED BY THE CHESTER COUNTY PLANNING COMMISSION ON _____________, 20___. CCPC FILE NUMBER: _____________ (PLANNING COMMISSION SECRETARY)
RECORDED IN THE OFFICE OF THE RECORDER OF DEEDS OF CHESTER COUNTY AT WEST CHESTER, PENNSYLVANIA, IN PLAN OF BOOK _____ PAGE _____ ON THIS _____ DAY OF _____________, 20___. (DEPUTY RECORDER OF DEEDS)
STATEMENT OF COMPLIANCE: I HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THE PLAN SHOWN AND DESCRIBED HEREON IS TRUE AND CORRECT TO THE ACCURACY REQUIRED BY EAST GOSHEN TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE. (VICTOR KELLY, JR., PE / DATE)
REVISIONS
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/15/17 | PER CCPC REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCPC REVIEW LETTER DATED 12/8/16 |
| 2 | 10/11/16 | PER TWP. REVIEW LETTER DATED 8/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
CONSTRUCTION IMPROVEMENTS PLAN: SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC., 114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CE-I.COM
DATE: MAY 17, 2016 | SCALE: 1" = 40' | SURVEY: MPS | DRAWN: T.F. | CHECKED: V.K. | DRAWING NO. 201541-1(C) | SHEET: 2 OF 11
REQUIRED REGULATORY APPROVALS
- NPDES PERMIT (PADEP/CCCD) - APPROVAL STATUS: PENDING
- PLANNING MODULE (PADEP) - STATUS: EXEMPTION APPROVAL LETTER OBTAINED 12/17/16
- SANITARY SEWER (MUNICIPAL AUTHORITY) - STATUS: SEWER AVAILABILITY LETTER DATED 6/9/16 AND 6/13/16
- WATER (AQUA) - STATUS: WATER AVAILABILITY LETTER OBTAINED 5/2/16
- HIGHWAY OCCUPANCY PERMIT (PENNDOT) - APPROVAL STATUS: PENDING
- FIRE PLANNING (FIRE MARSHALL) - NOT APPLICABLE
- HISTORIC RESOURCE (HISTORIC COMMITTEE) - NOT APPLICABLE
- LANDSCAPING (CONSERVANCY BOARD) - STATUS: APPROVAL OBTAINED AT 2/8/17 MEETING
CONSTRUCTION & UTILITY CALLOUTS
- TIE 6" FUSED HDPE DR11 TO EXISTING MH
- 6" FUSED HDPE DR11 (TO BE DIRECTIONALLY DRILLED)
- BORING PIT
- 1" PROPOSED WATER LINE TO EXISTING WATER MAIN ALONG EAST STRASBURG RD.
- PROPOSED MH 1: TOP=394.2, INV.=385.2
- 3 METER PITS TO BE PROVIDED FOR EACH SEPARATE WATER LINE
- PROPOSED WATER LINE (3 SEPARATE LINES FROM EACH HOUSE TO TIE INTO EXISTING WATER MAIN AS SHOWN)
- PROPOSED 4" PVC | FLEXIBLE COUPLING (SEE DETAIL)
- PULL-OFF AREA
- SEWER CONNECTION TO EXISTING SEPTIC SYSTEM TO BE DISCONNECTED. EXISTING SEPTIC SYSTEM TO BE PUMPED OUT, FILLED, AND ABANDONED SUBJECT TO CHESTER COUNTY HEALTH DEPARTMENT APPROVAL.
- 25' DRIVEWAY & UTILITY EASEMENT
- 3 SEPARATE SEWER LATERALS (1 1/4" FOR EACH LOW PRESSURE SEWERS) | PROPOSED 1 1/4" LPSS
- CLEANOUTS (C.O.): C.O. TOP=414.5, INV.=410.5; C.O. TOP=417.1, INV.=413.1; C.O. TOP=423.8, INV.=419.8; C.O. TOP=424.5, INV.=419.8; C.O. TOP=426.3, INV.=422.3; C.O. TOP=428.6, INV.=424.6; C.O. TOP=429.6, INV.=425.6; C.O. TOP=431.7, INV.=427.2
- LOT 1: EXISTING DWELLING, PROPOSED 4" PVC
- LOT 2: FF=434.0, GF=433.5, BF=424.0, WALKOUT | LOT 2 RAIN GARDEN BOTTOM ELEV.=422.0 | 2' WIDE BERM ELEV.=423.5 | 15' LONG EMERGENCY SPILLWAY ELEV.=423.0 | PROPOSED ELECTRIC LINE
- LOT 3: FF=421.0, GF=420.5, BF=412.0, WALKOUT | GRINDER PUMP INV.=414.3 | LOT 3 RAIN GARDEN BOTTOM ELEV.=407.0 | 2' WIDE BERM ELEV.=409.0 | 15' LONG EMERGENCY SPILLWAY ELEV.=408.5 | PROPOSED ELECTRIC LINE
LEGEND
- STEEP SLOPES (15% TO 25%)
- STEEP SLOPES (OVER 25%)
- CONCRETE SURFACE
- EXISTING WETLANDS LINE
- STREAM LINE
- FLOOD HAZARD DISTRICT LINE
- EXISTING INTERMEDIATE CONTOUR
- EXISTING INDEX CONTOUR
- EXISTING WOODS / TREE LINE
- ADJOINER LINE
- EXISTING STORM SEWER LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING PAVING
- EXISTING SOILS LINE
- PROPOSED INTERMEDIATE CONTOUR
- PROPOSED INDEX CONTOUR
- PROPOSED SPOT ELEVATION
- PROPOSED STORM SEWER LINE
- PROPOSED SANITARY SEWER LINE
- PROPOSED WATER LINE
- PROPOSED WOODS / TREE LINE
- SUPER SILT FENCE
- LIMIT OF DISTURBANCE
- NORTH AMERICAN GREEN S150 TEMPORARY GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- NORTH AMERICAN GREEN SC250 PERMANENT GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- STABILIZED RIP-RAP CONSTRUCTION ENTRANCE
PENNSYLVANIA ONE CALL: S.N. 20160320567 (1-800-242-1776)
UPI No. 5306-0089-0000
UNDERGROUND UTILITY USERS
- PHILADELPHIA ELECTRIC COMPANY, 1050 SWEDESFORD ROAD, BERWYN, PA 19312, (610) 648-7702
- AQUA PA, 762 W. LANCASTER AVE, BRYN MAWR, PA 19010, (877) 987-2782
- EAST GOSHEN TOWNSHIP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380, (610) 692-7171
- VERIZON PENNSYLVANIA INC, 900 RACE STREET, 6TH FLOOR, PHILADELPHIA, PA 19107, (215) 560-4151
- COMCAST, 400 A B MCNALLY RD, P.O. BOX 351, COATESVILLE, PA 19320, (800) 934-6489
- WILLIAMS (TRANSCO GAS), 2800 POST OAK BOULEVARD, P.O. BOX 1396, HOUSTON, TX 77251, (800) 440-8475
GENERAL NOTES
- RECORD OWNER: ANTOINETTE BRAKMAN, 1420 E. STRASBURG ROAD, WEST CHESTER, PA 19380, UPI 5306-0089-0000 (TAX #53-6-89), PHONE: (610) 436-0152, DEED REFERENCES: DB. 3529, PG. 1960. EQUITABLE OWNER: JIM BRANDOLINI, GUNNISON DEVELOPMENT CO., LLC, 1200 BURNING BUSH LANE, WEST CHESTER, PA 19380, PHONE: (610) 640-9974.
- SITE ADDRESS: 1420 E. STRASBURG ROAD, WEST CHESTER, PA 19380.
- TRACT AREA: 221,252.8 SQ. FT. / 5.079 ACRES (GROSS) LESS 40' ROAD RIGHT-OF-WAY: 17,152.849 SQ. FT. / 0.394 ACRES NET TRACT AREA: 4.685 ACRES (NET)
- BOUNDARY AND PARTIAL TOPOGRAPHY FROM FIELD SURVEY PERFORMED BY COMMONWEALTH ENGINEERS, INC., APRIL 2016. BENCHMARK: NO. 4 REBAR FOUND, NORTHEAST CORNER OF SITE, DATUM: ASSUMED USGS.
- WETLANDS DELINEATION BY VORTEX ENVIRONMENTAL, INC. AND SURVEYED BY COMMONWEALTH ENGINEERS, INC. IN MAY 2016.
- SOILS CLASSIFICATIONS FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA) NATURAL RESOURCE CONSERVATION DISTRICT WEB SOIL SURVEY, IN AUGUST, 2014.
- UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM OBSERVABLE EVIDENCE AT THE TIME OF SURVEY AND FROM RECORD MAPPING PROVIDED BY THE UTILITY COMPANIES WHICH SERVICE/OCCUPY THE SITE. NO GUARANTEE IS MADE THAT UNDERGROUND UTILITIES ARE ACCURATELY OR COMPLETELY SHOWN HEREON. THE SITE CONTRACTOR MUST VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES AND FACILITIES PRIOR TO BEGINNING CONSTRUCTION.
- THE SITE IS SERVED BY PUBLIC WATER (AQUA PA).
- EXISTING SEPTIC SYSTEM PRESENT ON SITE BUT NOT LOCATED.
- EXISTING IRON PINS ARE SHOWN AS THUS "O".
- THE DEVELOPER SHALL CONFORM TO OR CAUSE CONFORMANCE WITH ALL OF THE APPLICABLE REQUIREMENTS OF THIS PLAN AND THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE AND SUBDIVISION AND LAND DEVELOPMENT ORDINANCE AS WELL AS OTHER APPLICABLE LOCAL, STATE AND FEDERAL LAWS, STATUTES, REGULATIONS AND ORDINANCES.
- THE DEVELOPER SHALL NOTIFY UNDERGROUND UTILITY USERS AT LEAST THREE DAYS PRIOR TO ANY CONSTRUCTION AT THIS SITE OUT IN ACCORDANCE WITH PA ACT 287 OF 1974, AS AMENDED BY ACT 187 OF 1996 & ALL OTHER APPLICABLE AMENDMENTS, AS WELL AS CONFORM TO ANY OTHER OBLIGATIONS OF SAID ACTS. UNDERGROUND UTILITIES SHOWN ARE FROM SURFACE EVIDENCE OBSERVABLE IN THE FIELD AND AS MARKED BY THE UTILITY COMPANIES.
- FEMA FLOODPLAIN BOUNDARY TAKEN FROM FLOOD INSURANCE RATE MAP, PANEL 215F, MAP NUMBER 42029C0215F, DATED SEPTEMBER 29, 2006.
- THIS PROJECT IS LOCATED IN THE WATERSHED OF TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK WHICH HAS THE DESIGNATION OF TROUT STOCK FISHES (TSF, MF) BY THE COMMONWEALTH OF PENNSYLVANIA.
- THIS PROJECT PROPOSES THE SUBDIVISION OF THE EXISTING LOT INTO 3 SEPARATE LOTS WITH EACH LOT TO BE SERVED BY PUBLIC WATER AND PUBLIC SEWER. PUBLIC SEWER TO BE THROUGH LOW PRESSURE FORCE MAIN TIED INTO AN EXISTING MANHOLE AS SHOWN.
SURVEY REFERENCE NOTES
- PLAN ENTITLED "BOUNDARY SURVEY PLAN FOR MS. ANTOINETTE BRAKMAN", PREPARED BY R.H. SMITH SURVEYORS, DATED MARCH 27, 2007.
- PLAN ENTITLED "REVERSE SUBDIVISION/SUBDIVISION PLAN FOR MICHAEL RIZZO", PREPARED BY HENRY S. CONREY, INC., A DIVISION OF CHESTER VALLEY ENGINEERS, CONSULTING ENGINEERS AND LAND SURVEYORS, DATED NOVEMBER 30, 2001.
- PECO BLANKET RIGHT-OF-WAY CONTAINED IN MISCELLANEOUS DB. 81, PG 452.
- PLAN ENTITLED "THE GAMBONE BROTHERS INC.", PREPARED BY HENRY S. CONREY INC., DIVISION OF CHESTER VALLEY ENGINEERS, DATED JUNE 8, 1973 (LAST REVISED SEPTEMBER 9, 1973).
ZONING: R-2 LOW DENSITY RESIDENTIAL DISTRICT
| Requirement | REQUIRED | EXISTING | PROVIDED LOT 1 | PROVIDED LOT 2 | PROVIDED LOT 3 |
|---|---|---|---|---|---|
| MINIMUM LOT AREA (NET) | 1 ACRE | 4.685 AC | 1.356 AC | 1.243 AC | 2.086 AC |
| MINIMUM LOT WIDTH AT BUILDING SETBACK LINE | 150' | 409' | 170' | 150' | 180' |
| MINIMUM LOT WIDTH AT STREET LINE | 60' | 409' | -- | 170' | -- |
| MINIMUM LOT WIDTH (FLAG LOT) | -- | -- | 60' | -- | 60' |
| MAXIMUM BUILDING COVERAGE | 25% | 1.42% | 4.50% | 4.32% | 3.01% |
| MAXIMUM TOTAL IMPERVIOUS COVERAGE | 35% | 5.33% | 19.33% | 16.22% | 5.85% |
| MAXIMUM BUILDING HEIGHT (STORIES) | 3 | 1 | 2 | 2 | 2 |
| MAXIMUM BUILDING HEIGHT (FEET) | 35' | 30' | 30' | 30' | 30' |
| MINIMUM FRONT YARD | 45' | 45' | 45' | 45' | 45' |
| AVERAGE FRONT YARD | 60' | 60' | 60' | 60' | 60' |
| MINIMUM SIDE YARD | 25' | 25' | 25' | 25' | 25' |
| MINIMUM REAR YARD | 50' | 50' | 50' | 50' | 50' |
REVISIONS
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP REVIEW LETTER DATED 1/26/17 |
| 5 | 1/03/17 | PER CCPC LETTER DATED 12/09/16 |
| 4 | 11/10/16 | REVISED TO A 3 LOT SUBDIVISION |
| 3 | 9/26/16 | PER EGT REVIEW LETTER DATED 8/31/16 |
| 2 | 7/26/16 | PER EGT REVIEW LETTER DATED 7/05/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PA101 REVIEW LETTER DATED 5/18/16 |
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
EXISTING CONDITIONS PLAN
SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CEI-1.COM
DATE: MAY 17, 2016 | SCALE: 1"=40' | SURVEY: MPS | DRAWN: TF | CHECKED: VK | DRAWING NO. 201541-1(C) | SHEET: 3 OF 11
[Signature] [Seal]
LOCATION MAP
SCALE 1"= 2000' (SITE marked)
- IMPERVIOUS AREA TO BE PERMANENTLY REMOVED AND REPLACED WITH NEW IMPERVIOUS AREA (TOTAL AREA=726 SQ. FT)
- IMPERVIOUS AREA TO BE PERMANENTLY REMOVED AND REPLACED WITH LAWN COVER (TOTAL AREA=2050 SQ. FT)
Plan labels
- UPI 5306 0089 0000 N/F ANTOINETTE S. BRAKMAN DB 3529 PG 1960
- GROSS AREA= 221,252.80 SQ FT (5.079 ACRES); NET AREA=210,253.0 SF (4.827 ACRES)
- EAST STRASBURG ROAD (S.R. 2010, 50 FOOT WIDE LEGAL RIGHT OF WAY) (POSTED SPEED LIMIT - 40 MPH); BROOK DRIVE
- Boundary: N71°27'39"E 410.78'; S24°28'52"E 524.73'; S65°43'30"W 403.18'; N25°01'38"W 565.83'
- TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK; 50' RIPARIAN BUFFER; FEMA 100-YR FLOODPLAIN ZONE A
- EXISTING DWELLING; EXISTING SHED; EXISTING SHED (TBR); APPROXIMATE LOCATION OF EXISTING SEPTIC SYSTEM
- 15' WIDE SANITARY SEWER EASEMENT PER "THE GAMBONE BROTHERS INC. PLAN" (SEE SURVEY REFERENCE #4)
- APPROX. LOCATION OF UNDERGROUND ELECTRIC LINE PER PECO PLANS; APPROX. LOCATION OF 8" WATER LINE PER AQUA PA PLANS
- PECO EASEMENT DB 81 PG 452 (SEE SURVEY REFERENCE NOTE 3)
- LIMIT OF CEI TOPOGRAPHY; PASDA TOPOGRAPHY
- Adjoiners: UPI 5306B 0054 0000 N/F DANIEL E. CHERRY DB 8962, PG 505; UPI 5306B 0052 0000 N/F WILLIAM E. LEIGH DB 484, PG 105; UPI 5306B 0051 0000 N/F CHRISTINE V. KAPLAN DB 4941, PG 1427; UPI 5306B 0046 0000 N/F JOSEPH P. LYONS DB X-49, PG 85; UPI 5306B 0047 0000 N/F JOHN M. DONOHUE DB 2670, PG 502; UPI 5306 0090 0000 N/F JOSEPH M. & CAROLE A. MATTHEWS DB 6136, PG 953; UPI 5306 0090 0100 N/F CHRISTOPHER N. & DEBORAH FALCONE DB 8774, PG 511; UPI 5306B 0004 0000 N/F ROBERT & SHIRLEY SULLIVAN DB U-61, PG 290; UPI 5306B 0003 0000 N/F DENISE DANIELLE JORDAN DB 9077, PG 2274; UPI 5306B 0002 0000 N/F JOSEPH E. ERDELJAC JR DB 2574, PG 272; UPI 5306B 0039 0000 N/F DIRK & JAN L. TROLTENER DB 6476, PG 1417; UPI 5306B 0038 0000 N/F CHARLES W. & SUE ELLEN HENDRICKSON DB 3067, PG 531
LEGEND
- STEEP SLOPES (15% TO 25%)
- STEEP SLOPES (OVER 25%)
- CONCRETE SURFACE
- EXISTING WETLANDS LINE
- STREAM LINE
- FLOOD HAZARD DISTRICT LINE
- EXISTING INTERMEDIATE CONTOUR
- EXISTING INDEX CONTOUR
- EXISTING WOODS / TREE LINE
- ADJOINER LINE
- EXISTING STORM SEWER LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING PAVING
- EXISTING SOILS LINE
- PROPOSED INTERMEDIATE CONTOUR
- PROPOSED INDEX CONTOUR
- PROPOSED SPOT ELEVATION
- PROPOSED STORM SEWER LINE
- PROPOSED SANITARY SEWER LINE
- PROPOSED WATER LINE
- PROPOSED WOODS / TREE LINE
- SUPER SILT FENCE
- LIMIT OF DISTURBANCE
- NORTH AMERICAN GREEN S150 TEMPORARY GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- NORTH AMERICAN GREEN SC250 PERMANENT GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- STABILIZED RIP-RAP CONSTRUCTION ENTRANCE
PENNSYLVANIA ONE CALL SYSTEM SERIAL NUMBER: 20160320567
UPI No.5306-0089-0000
UNDERGROUND UTILITY USERS
- PHILADELPHIA ELECTRIC COMPANY, 1050 SWEDESFORD ROAD, BERWYN, PA 19312, (610) 648-7702
- AQUA PA, 762 W. LANCASTER AVE, BRYN MAWR, PA 19010, (877) 987-2782
- EAST GOSHEN TOWNSHIP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380, (610) 692-7171
- VERIZON PENNSYLVANIA INC., 900 RACE STREET, 6TH FLOOR, PHILADELPHIA, PA 19107, (215) 560-4151
- COMCAST, [illegible], P.O. BOX 351, COATESVILLE, PA 19320, (800) 934-6489
- WILLIAMS (TRANSCO GAS), 2800 POST OAK BOULEVARD, HOUSTON, TX [illegible], (800) 440-8475
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER COCO REVIEW LETTER DATED 1/4/17 |
| 4 | 12/15/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER COCO REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
PCSM & GRADING PLAN
SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 COMENG@CEI-1.COM
DATE: MAY 17, 2016
SCALE: 1"=40'
SURVEY: MBS
DRAWN: TT
CHECKED: VK
DRAWING NO. 201541-1(C)
SHEET: 4 OF: 11
[Seal] [Signature]
SOIL IDENTIFICATION
| SYMBOL | DESCRIPTION | HYDROLOGIC GROUP | DEPTH TO WATER | DEPTH TO BEDROCK |
|---|---|---|---|---|
| UvB | URBAN LAND-GLADSTONE COMPLEX, 0 TO 8 PERCENT SLOPES | A | >80" | 60"-100" |
| UvD | URBAN LAND-GLADSTONE COMPLEX, 0 TO 8 PERCENT SLOPES | A | >80" | 60"-100" |
SOIL USE LIMITATIONS & RESOLUTIONS
ONLY THOSE LIMITATIONS TO ON-SITE SOILS AS DESCRIBED BY APPENDIX E OF THE 2012 EROSION CONTROL MANUAL ARE ADDRESSED BELOW.
| USE LIMITATION | PROPOSED RESOLUTION(S) |
|---|---|
| 1. CUTBANKS CAVE (UvB,UvD) | ALL APPLICABLE OSHA STANDARDS AND REGULATIONS WILL BE IMPLEMENTED. |
| 2. CORROSIVENESS TO CONCRETE AND/OR STEEL (UvB,UvD) | CHEMICAL PRE-TREATMENT OF ANY CONCRETE ENDWALLS TO PROVIDE ANTI-CORROSIVE PROPERTIES. |
| 3. EASILY ERODIBLE (UvB,UvD) | EROSION CONTROL MATTING IS PROPOSED AS APPROPRIATE. |
| 4. HYDRIC SOILS/INCLUSIONS (UvB,UvD) | LIMITED DISTURBANCE IN ANY POTENTIAL HYDRIC AREAS. |
| 5. SLOW PERCOLATION (UvB,UvD) | ON-SITE TESTING WAS PERFORMED TO ENSURE ADEQUATE PERCOLATION FOR BMP FACILITIES. |
| 6. FROST ACTION (UvB,UvD) | FROST ACTION IS NOT EXPECTED TO AFFECT PROPOSED FACILITIES. |
| 7. SHRINK/SWELL (UvB,UvD) | SHRINK/SWELL IS NOT EXPECTED TO AFFECT PROPOSED FACILITIES. |
FINAL CERTIFICATION REQUIREMENTS
THE PERMITTEE SHALL INCLUDE WITH THE NOTICE OF TERMINATION "RECORD DRAWINGS" A FINAL CERTIFICATION STATEMENT FROM A LICENSED PROFESSIONAL, WHICH READS AS FOLLOWS:
"I (NAME) DO HEREBY CERTIFY PURSUANT TO THE PENALTIES OF 18 Pa. C.S.A. SECTION 4904, TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, THAT THE ACCOMPANYING RECORD DRAWINGS ACCURATELY REFLECT THE AS-BUILT CONDITIONS, ARE TRUE AND CORRECT, AND ARE IN CONFORMANCE WITH CHAPTER 102 OF THE RULES AND REGULATIONS OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE PROJECT SITE WAS CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PCSM PLAN, ALL APPROVED PLAN CHANGES AND ACCEPTED CONSTRUCTION PRACTICES."
- (1) THE PERMITTEE SHALL RETAIN A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN.
- (2) THE PERMITTEE SHALL PROVIDE A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN TO THE PERSON IDENTIFIED IN THIS SECTION AS BEING RESPONSIBLE FOR THE LONG-TERM OPERATION & MAINTENANCE OF THE PCSM PLAN.
NOTICE OF TERMINATION REQUIREMENTS
UPON PERMANENT STABILIZATION OF THE EARTH DISTURBANCE ACTIVITIES UNDER 102.22(a)(2) (RELATING TO PERMANENT STABILIZATION) AND INSTALLATION OF BMPS IN ACCORDANCE WITH AN APPROVED PLAN PREPARED AND IMPLEMENTED IN ACCORDANCE WITH 102.4 AND 102.8 (RELATING TO EROSION AND SEDIMENT CONTROL REQUIREMENTS; AND PCSM REQUIREMENTS), THE PERMITTEE OR CO-PERMITTEE SHALL SUBMIT A NOTICE OF TERMINATION TO THE CONSERVATION DISTRICT.
SITE GEOLOGY
THE ENTIRE SITE IS UNDERLAIN BY FELSIC GNEISS PER THE PADEP EMAPPA WEBSITE.
CONSTRUCTION WASTE DISPOSAL NOTE
THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTE PRODUCTS IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ. AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIALS OR WASTE PRODUCTS AT THE SITE.
LEGEND
STEEP SLOPES (15% TO 25%); STEEP SLOPES (OVER 25%); CONCRETE SURFACE; EXISTING WETLANDS LINE; STREAM LINE; FLOOD HAZARD DISTRICT LINE; EXISTING INTERMEDIATE CONTOUR; EXISTING INDEX CONTOUR; EXISTING WOODS / TREE LINE; AQUIFER LINE; EXISTING STORM SEWER LINE; EXISTING RIGHT-OF-WAY LINE; EXISTING PAVING; EXISTING SOILS LINE; PROPOSED INTERMEDIATE CONTOUR; PROPOSED INDEX CONTOUR; PROPOSED SPOT ELEVATION; PROPOSED STORM SEWER LINE; PROPOSED SANITARY SEWER LINE; PROPOSED WATER LINE; PROPOSED WOODS / TREE LINE; SUPER SILT FENCE; LIMIT OF DISTURBANCE; NORTH AMERICAN GREEN S150 TEMPORARY EROSION CONTROL BLANKET (OR APPROVED EQUAL); NORTH AMERICAN GREEN SC250 PERMANENT GEOTEXTILE BLANKET (OR APPROVED EQUAL); STABILIZED RIP-RAP CONSTRUCTION ENTRANCE.
PLAN CALLOUTS
- NPDES BOUNDARY
- LIMIT OF DISTURBANCE =66,038 SQ. FT. =1.52 ACRES
- LINE OF INTEREST #1
- LINE OF INTEREST #2
- FEMA 100-YR FLOODPLAIN ZONE A
- TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK
- EAST STRASBURG ROAD
- BROOK DRIVE
- PROPOSED WATER LINE (3 SEPARATE LINES FROM EACH HOUSE TO TIE INTO EXISTING WATER MAIN AS SHOWN)
- CONSTRUCT RAILROAD TIE RETAINING WALL AROUND EXISTING UTILITY POLE
- SEWER CONNECTION TO EXISTING SEPTIC SYSTEM TO BE DISCONNECTED. EXISTING SEPTIC SYSTEM TO BE PUMPED OUT, FILLED, AND ABANDONED SUBJECT TO CHESTER COUNTY HEALTH DEPARTMENT APPROVAL
- PROPOSED GRASS SWALE (TRAPEZOIDAL), 2:1 SIDE SLOPES, 1' BOTTOM WIDTH, DEPTH=1.5', SLOPE=10.3% (LINED WITH NAG S150 OR EQUAL)
- LOT 2 RAIN GARDEN DRAINAGE AREA
- LOT 3 RAIN GARDEN DRAINAGE AREA
- 2:1 SIDE SLOPES; 3:1 SIDE SLOPES
- ROOF DRAIN COLLECTION PIPING SYSTEM (FOR ROOF DRAINS ON SOUTH SIDE OF HOUSES TO TIE INTO RAIN GARDEN AS SHOWN (GUTTER GUARDS REQUIRED ON ROOF DRAINS TIED TO THIS SYSTEM))
- [illegible] rain garden outlet details (8" PVC elbow/riser w/ drainage grate, level spreaders, 2' wide berm, emergency spillways) with elevations too small to read reliably
OFFER OF BLANKET EASEMENT
A BLANKET STORMWATER MANAGEMENT EASEMENT IS PROVIDED OVER AND ACROSS THE PROPERTY IN FAVOR OF EAST GOSHEN TOWNSHIP TO ALLOW THE TOWNSHIP AND ITS AGENT AND DESIGNEES ACCESS TO THE PROPERTY TO OBSERVE AND INSPECT ALL BMP'S AND SWM FACILITIES WITH THE RIGHT, BUT NOT THE DUTY, TO ACCESS AND CONDUCT PERIODIC INSPECTIONS AND TO UNDERTAKE OTHER ACTIONS THAT MAY BE NECESSARY TO ENFORCE THE REQUIREMENTS OF THE TOWNSHIP'S STORMWATER MANAGEMENT ORDINANCE OF ANY APPLICABLE O&M PLAN OR O&M AGREEMENT.
PCSM PLAN REVISIONS
I HEREBY ACKNOWLEDGE THAT ANY REVISIONS TO THE APPROVED SWM SITE PLANS SHALL BE SUBMITTED TO AND APPROVED BY THE TOWNSHIP AND ANY REVISED EROSION AND SEDIMENT CONTROL PLAN SHALL BE SUBMITTED TO AND APPROVED BY THE CONSERVATION DISTRICT OR TOWNSHIP AS APPLICABLE FOR A DETERMINATION OF ADEQUACY PRIOR TO THE CONSTRUCTION OF THE REVISED FEATURES.
(JIM BRANDOLINI) (DATE)
PCSM PLAN CERTIFICATION
I, VICTOR KELLY, JR., PE, ON THIS DATE ____ HEREBY CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE SWM SITE PLAN MEETS ALL DESIGN STANDARDS AND CRITERIA OF THE EAST GOSHEN TOWNSHIP STORMWATER MANAGEMENT ORDINANCE (CHAPTER 195).
(VICTOR KELLY, JR., PE) (DATE)
GENERAL NOTES
[illegible] Notes 1-15 (record owner Antoinette Brakman, 1420 E. Strasburg Road, West Chester, PA 19380; equitable owner Gunnison Development Co., Inc.; site address 1420 E. Strasburg Road; tract area 221,252.8 SQ. FT. / 5.079 ACRES (GROSS); net tract area 4.685 acres; deed references DB 3529, PG 1980; boundary and topography by Commonwealth Engineers, Inc., April 2016; wetlands by Vortex Environmental, Inc.; public water (Aqua PA); FEMA floodplain; project in watershed of Tributary 7 of East Branch Chester Creek, 3 lot subdivision) are too small to transcribe verbatim.
SURVEY REFERENCE NOTES
[illegible] four plan references (boundary survey plan for Ms. Antoinette Brakman by R.H. Smith Surveyors; reverse subdivision plan for Michael Rizzo; PECO blanket right-of-way; plan for the Gambone Brothers Inc.).
STORMWATER TEST PIT INFORMATION
INFILTRATION TESTING PERFORMED WITH A DOUBLE-RING INFILTROMETER
| TEST PIT ID | INFILTRATION RATE | TESTING DEPTH | TESTING ELEVATION | LIMITING ZONE DEPTH | LIMITING ZONE DESCRIPTION |
|---|---|---|---|---|---|
| LOT 2 | 2.50 IN/HR | 36" | 420.3 | 51" | ROCK ENCOUNTERED |
| LOT 3 | 2.25 IN/HR | 24" | 406.6 | 48" | ROCK ENCOUNTERED |
RECEIVING WATERSHED NOTICE
THIS PROJECT IS WHOLLY LOCATED WITHIN THE WATERSHED OF TRIBUTARY 7 OF EAST CHESTER CREEK, A WATERSHED DESIGNATED TROUT STOCK FISHERY; MIGRATORY FISHERY (TSF; MF) BY THE COMMONWEALTH OF PENNSYLVANIA.
LOCATION MAP
SCALE 1"= 2000' (site marked on map)
UNDERGROUND UTILITY USERS
PHILADELPHIA ELECTRIC COMPANY; VERIZON PENNSYLVANIA INC.; AQUA PA; COMCAST; EAST GOSHEN TOWNSHIP; WILLIAMS (TRANSCO GAS); Pennsylvania One Call System, Serial Number 20160320567. (Addresses and phone numbers too small to read reliably.)
REVISIONS
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCCO REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCCO REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
PCSM NON-STRUCTURAL BMP PLAN
SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CEI-1.COM
DATE: MAY 17, 2016 | SCALE: 1"=40' | SURVEY: MBS | DRAWN: TT | CHECKED: VK | DRAWING NO. 201541-1(C) | SHEET: 5 OF: 11
SITE STABILIZATION STANDARDS:
UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY THAT WILL EXCEED 4 DAYS, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
DURING NON-GERMINATING PERIODS HAY OR STRAW MULCH MUST BE APPLIED AT THE RATE OF THREE (3) TONS PER ACRE. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN ONE (1) YEAR MUST BE STABILIZED IN ACCORDANCE WITH TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINISHED GRADE OR WHICH WILL NOT BE REDISTURBED WITHIN ONE YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER AND/OR ANY OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER SUBSURFACE MOVEMENTS.
FINAL SITE STABILIZATION REQUIREMENTS:
AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER AND/OR ANY OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER SUBSURFACE MOVEMENTS.
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL STABILIZE ANY AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING PERIODS, MULCH SHALL BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN ONE (1) YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINISHED GRADE OR WHICH WILL NOT BE REDISTURBED WITHIN ONE YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
GEOLOGIC OR SOIL CONDITIONS POLLUTION:
THERE ARE NO KNOWN NATURALLY OCCURRING GEOLOGIC OR SOILS CONDITIONS ON THIS SITE THAT MAY HAVE THE POTENTIAL TO CAUSE POLLUTION DURING CONSTRUCTION OR AFTER EARTH DISTURBANCE ACTIVITIES ARE COMPLETED AND PCSM BMPS ARE OPERATIONAL. SHOULD SUCH CONDITIONS BE DETECTED, THE OWNER SHALL CONTACT THE PLAN ENGINEER AND THE CHESTER COUNTY CONSERVATION DISTRICT TO DISCUSS REMEDIAL ACTIONS.
GEOTEXTILE STABILIZATION REQUIREMENTS:
ALL DISTURBED SLOPES STEEPER THAN 3:1 (33%) SHALL BE IMMEDIATELY STABILIZED WITH AN APPROPRIATE EROSION CONTROL GEOTEXTILE FABRIC (NORTH AMERICAN GREEN C125 OR AN APPROVED EQUIVALENT), PERMANENT SEEDING, AND LIME AS PRESCRIBED.
TEMPORARY SITE STABILIZATION REQUIREMENTS:
UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY THAT WILL EXCEED FOUR (4) DAYS, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WIT THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION. PLAN NOTES AND THE CONSTRUCTION SEQUENCE SHOULD REFLECT THIS REQUIREMENT. THE CONSTRUCTION SEQUENCE SHOULD INCORPORATE THE IMMEDIATE STABILIZATION REQUIREMENT INTO ANY APPLICABLE AREAS. (PLEASE NOTE THAT HYDROSEED IS NOT CONSIDERED STABILIZATION UNTIL IT GERMINATES). HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE.
UNFORESEEN EROSIVE CONDITIONS:
- SHOULD ANY UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE THE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT. STOCKPILES OF WOOD CHIPS, HAY BALES, CRUSHED STONE, AND OTHER ACCEPTABLE MULCHES SHALL BE HELD IN READINESS TO IMMEDIATELY ADDRESS EMERGENCY EROSION AND SEDIMENTATION PROBLEMS.
- THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH ALL OF THE PROVISIONS OF APPENDIX 64, "EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUB-PART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION CONTROL."
- CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT ALL EROSION & AIR POLLUTION IS MINIMIZED. STATE AND LOCAL LAW CONCERNING POLLUTION ABATEMENT SHALL BE OBSERVED.
- MEASURES FOR THE PROTECTION OF EXISTING TREES AND SHRUBS SHALL BE TAKEN BY THE CONTRACTOR TO ELIMINATE UNNECESSARY DAMAGE.
* A COPY OF THESE EROSION AND SEDIMENTATION POLLUTION CONTROL PLANS MUST BE POSTED AND AVAILABLE AT THE CONSTRUCTION SITE IN ACCORDANCE WITH STATE AND FEDERAL LAW.
POST CONSTRUCTION STORMWATER BMPS:
POST CONSTRUCTION STORMWATER BMPS ARE PERMANENT FACILITIES THAT CANNOT BE REMOVED OR ALTERED WITHOUT APPROVAL OF THE TOWNSHIP.
POST-CONSTRUCTION STORMWATER MANAGEMENT DESIGN:
THIS SITE WILL UTILIZE TWO (2) PRIMARY STORMWATER MANAGEMENT FACILITIES TO CONTROL THE POST-DEVELOPMENT PEAK RATES OF STORMWATER RUNOFF AND STORMWATER VOLUME FOR THE SITE IN ACCORDANCE WITH PADEP BMP GUIDELINES. THE STORMWATER MANAGEMENT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED TO THE SPECIFICATIONS DESCRIBED IN THESE PLANS AND WILL ACCOMPLISH THE FOLLOWING:
- PRESERVE THE INTEGRITY OF STREAM CHANNELS AND PROTECT THE PHYSICAL, BIOLOGICAL, AND CHEMICAL QUALITIES OF THE RECEIVING STREAM THROUGH REDUCTION OF POST-DEVELOPMENT PEAK RATES AND VOLUMES OF STORMWATER RUNOFF AND THE MITIGATION OF THERMAL IMPACTS.
- PREVENT THE INCREASE IN STORMWATER RUNOFF THROUGH RETENTION OF INTERCEPTED OVERLAND RUNOFF.
- CAPTURE AND REMOVE THE INCREASE IN STORMWATER RUNOFF VOLUME THROUGH THE PROPOSED RAIN GARDEN FACILITIES THAT WILL PROVIDE INFILTRATION AND EVAPOTRANSPIRATION OF THE INCREASE IN STORMWATER RUNOFF VOLUME FROM PRE-DEVELOPMENT TO POST-DEVELOPMENT CONDITIONS FOR THE 2-YEAR STORM EVENT.
IN ADDITION, THE FOLLOWING NON-STRUCTURAL PRACTICES ARE PROMOTED TO REDUCE THE STRUCTURAL POST-CONSTRUCTION STORMWATER MANAGEMENT REQUIREMENTS:
- MINIMIZE IMPERVIOUS AREAS BY PROPOSING ONLY THE MINIMUM IMPERVIOUS COVER NECESSARY FOR THE VIABILITY OF THE PROPOSED USE.
- MAXIMIZE THE PROTECTION OF EXISTING DRAINAGE FEATURES AND VEGETATION BY DISCHARGING EACH RAIN GARDEN THROUGH AN ENERGY DISSIPATING DEVICE.
- MINIMIZE LAND CLEARING AND GRADING BY STRICTLY DELINEATING LIMITS OF PROPOSED EARTH DISTURBANCE AND BY PROVIDING A SEQUENCE OF CONSTRUCTION THAT REQUIRES SENSIBLE AND EFFICIENT PROJECT STAGING AND IMMEDIATE STABILIZATION OF DISTURBANCE.
- MINIMIZE SOIL COMPACTION BY STRICTLY DELINEATING LIMITS OF PROPOSED EARTH DISTURBANCE AND BY PROVIDING A SEQUENCE OF CONSTRUCTION THAT REQUIRES SENSIBLE AND EFFICIENT PROJECT STAGING AND IMMEDIATE STABILIZATION OF DISTURBANCE.
- UTILIZE OTHER STRUCTURAL AND NON-STRUCTURAL BMP'S THAT WILL PREVENT AND/OR MINIMIZE CHANGES IN STORMWATER RUNOFF VIA INFILTRATION, VEGETATIVE FILTRATION, DETENTION AND RESTRICTED RELEASE OF OVERLAND RUNOFF, AND PROTECTION OF EXISTING DRAINAGE FEATURES AND VEGETATION.
RECEIVING WATERSHED NOTICE:
THIS PROJECT IS WHOLLY LOCATED WITHIN THE WATERSHED OF TRIBUTARY 7 OF EAST CHESTER CREEK, A WATERSHED DESIGNATED TROUT STOCK FISHERY, MIGRATORY FISHERY (TSF, MF) BY THE COMMONWEALTH OF PENNSYLVANIA.
INFILTRATION FACILITY PROTECTION NOTICE:
ALL PROPOSED UNDERGROUND STORMWATER INFILTRATION FACILITIES PROPOSED WITH THESE PLANS MUST BE PROTECTED DURING CONSTRUCTION FROM SOIL COMPACTION AND SEDIMENT CONTAMINATION AT ALL TIMES. CONSTRUCTION OF ALL INFILTRATION FACILITIES SHALL BE STAGED IN SUCH A MANNER AS TO AFFORD THE FACILITY MAXIMUM PROTECTION FROM CONTAMINATION AND SOIL COMPACTION DURING CONSTRUCTION.
INFILTRATION FACILITY FAILURE NOTICE:
STORMWATER INFILTRATION BMP FAILURE IS DEFINED AS THE BMP NO LONGER PROVIDING THE BENEFIT OR PERFORMANCE THE BMP WAS INTENDED TO PROVIDE. STORMWATER INFILTRATION BMPS FAILURE MAY BE EVIDENT IF STORMWATER DISCHARGE HAS EXCESSIVE LEVELS OF POLLUTANTS. FAILURE MAY BE THE LOSS OF STRUCTURAL INTEGRITY OF THE WEARING COURSE FOR POROUS PAVING. FAILURE MAY BE THE INABILITY TO SUPPORT SURFACE VEGETATION IN RAIN GARDEN. FAILURE MAY BE STANDING WATER FOR LONGER THAN 3 DAYS WITHIN AN INFILTRATION BASIN OR INFILTRATION BED. THE PROPERTY OWNER OR RESPONSIBLE PARTY SHOULD CONTACT THE TOWNSHIP TO DETERMINE THE CORRECTIVE MEASURE(S) TO BE TAKEN SHOULD FAILURE OF A STORMWATER INFILTRATION BMP OCCUR.
GEOLOGIC OR SOIL CONDITIONS POLLUTION:
THERE ARE NO KNOWN NATURALLY OCCURRING GEOLOGIC OR SOILS CONDITIONS ON THIS SITE THAT MAY HAVE THE POTENTIAL TO CAUSE POLLUTION DURING CONSTRUCTION OR AFTER EARTH DISTURBANCE ACTIVITIES ARE COMPLETED AND PCSM BMPS ARE OPERATIONAL. SHOULD SUCH CONDITIONS BE DETECTED, THE OWNER SHALL CONTACT THE PLAN ENGINEER AND THE CHESTER COUNTY CONSERVATION DISTRICT TO DISCUSS REMEDIAL ACTIONS.
PLAN CALLOUTS
- NPDES BOUNDARY
- AREA OF PROTECTED SENSITIVE/SPECIAL VALUE FEATURES = 117,634 SQ. FT. = 2.70 ACRES
- AREA OF MINIMIZED TOTAL DISTURBED AREA = 38,507 SQ. FT. = 0.88 ACRES
- LIMIT OF DISTURBANCE = 66,038 SQ. FT. = 1.52 ACRES
- AREA OF DISCONNECTION FROM STORM SEWERS = 2,971 SQ. FT.
- LINE OF INTEREST #1; LINE OF INTEREST #2
- TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK; FEMA 100-YR FLOODPLAIN ZONE A; PULL-OFF AREA
- LOT 2: FF=434.0, GF=432.0, BF=424.0, WALKOUT
- LOT 3: FF=422.0, GF=420.0, BF=412.0, WALKOUT
- EAST STRASBURG ROAD; BROOK DRIVE
LOCATION MAP
SCALE 1"= 2000'
LEGEND:
- STEEP SLOPES (15% TO 25%)
- STEEP SLOPES (OVER 25%)
- CONCRETE SURFACE
- EXISTING WETLANDS LINE
- STREAM LINE
- FLOOD HAZARD DISTRICT LINE
- EXISTING INTERMEDIATE CONTOUR
- EXISTING INDEX CONTOUR
- EXISTING WOODS / TREE LINE
- ADJOINER LINE
- EXISTING STORM SEWER LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING PAVING
- EXISTING SOILS LINE
- PROPOSED INTERMEDIATE CONTOUR
- PROPOSED INDEX CONTOUR
- PROPOSED SPOT ELEVATION
- PROPOSED STORM SEWER LINE
- PROPOSED SANITARY SEWER LINE
- PROPOSED WATER LINE
- PROPOSED WOODS / TREE LINE
- SUPER SILT FENCE
- LIMIT OF DISTURBANCE
- NORTH AMERICAN GREEN S150 TEMPORARY GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- NORTH AMERICAN GREEN SC250 PERMANENT GEOTEXTILE BLANKET (OR APPROVED EQUAL)
- STABILIZED RIP-RAP CONSTRUCTION ENTRANCE
UNDERGROUND UTILITY USERS
PHILADELPHIA ELECTRIC COMPANY, 1050 SWEDESFORD ROAD, BERWYN, PA 19312, (610) 648-7702
AQUA PA, 762 W. LANCASTER AVE, BRYN MAWR, PA 19010, (877) 987-2782
EAST GOSHEN TOWNSHIP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380, (610) 692-7171
VERIZON PENNSYLVANIA INC., 900 RACE STREET, 6TH FLOOR, PHILADELPHIA, PA 19107, (215) 592-4151
COMCAST, RT. 82 & MONACY RD., P.O. BOX 351, COATESVILLE, PA 19320, (800) 934-6489
WILLIAMS (TRANSCO GAS), 2800 POST OAK BOULEVARD, HOUSTON, TX 77056, (800) 440-8475
PENNSYLVANIA ONE CALL
UPI No.5306-0089-0000
REVISIONS
| REV No. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCCD REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCCD REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
[Seal]
6 COMMONWEALTH ENGINEERS, INC.
1) The project site is currently a combination of woods, meadow, and lawn with one existing dwelling and two existing sheds. There is also an existing septic system on the site. Stormwater runoff drains off the site from east to west into Tributary 7 of East Branch Chester Creek (TSF, MF). 2) This site achieves the requirements of East Goshen Township Stormwater Management Ordinance Section 195-18 by controlling stormwater runoff to pre-development conditions. These requirements are displayed throughout the PCSM Plans, E&SPC Plans, and the corresponding reports. 3) This site achieves the requirements of East Goshen Township Stormwater Management Ordinance Sections 195-15 through 195-25 through the use of a variety of stormwater BMP's (rain gardens) and conveyance systems (swales) to control stormwater runoff to pre-development conditions while complying with the design standards stated in the above stormwater management ordinance sections. 4) This project proposes the construction of 2 new dwellings and new paved driveway areas. Stormwater runoff from the new buildings will be directed to individual on-lot rain gardens through overland flow or roof drain collection piping systems. These rain gardens will retain and infiltrate runoff for the various design storms. Erosion and sediment control will be achieved primarily through the use of silt fences. 5) The project proposes no adverse effects on adjacent or downstream properties or conveyance systems since the project proposed the use of stormwater BMP's that will control stormwater runoff to pre-development conditions for various design storm events and that will retain runoff volume onsite for the 2-year storm. 6) The project implements water quality BMP's in the form of conserving of riparian buffers and minimizing of total disturbed areas. 7) Construction of this project is anticipated to begin the winter of 2017 and end the summer of 2017. 8) This project will be constructed as a single phase.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
EROSION & SEDIMENT CONTROL PLAN
SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CEI-1.COM
DATE: MAY 17, 2016 | SCALE: 1"=40' | SURVEY: MPS | DRAWN: TT | CHECKED: VK | DRAWING NO. 201541-1(C) | SHEET: 7 OF: 11
CONSTRUCTION OVERSIGHT REQUIREMENTS
THE PERMITTEE SHALL PROVIDE ENGINEERING CONSTRUCTION OVERSIGHT FOR THE PROPOSED STORMWATER BMPS. ADDITIONAL SOIL TESTING MAY BE REQUIRED PRIOR TO THE INSTALLATION OF INFILTRATION BMPS TO ENSURE PROPER LOCATION & FUNCTION. A LICENSED PROFESSIONAL ENGINEER KNOWLEDGEABLE IN THE DESIGN AND CONSTRUCTION OF STORMWATER BMPS, PREFERABLY THE DESIGN ENGINEER, SHALL CONDUCT THE OVERSIGHT.
CONSTRUCTION WASTE DISPOSAL NOTE
THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTE PRODUCTS IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1 ET SEQ. AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIALS OR WASTE PRODUCTS AT THE SITE.
EROSION CONTROL PLAN REVISION NOTICE
[illegible]
SEDIMENT TRACKING NOTICE
[illegible]
NOTICE OF TERMINATION REQUIREMENTS
[illegible]
FINAL CERTIFICATION REQUIREMENTS
[illegible]
OVERALL SEQUENCE OF CONSTRUCTION
[illegible]
* CRITICAL STAGES OF THE SEQUENCE OF CONSTRUCTION ARE CIRCLED. THESE STAGES WITHIN THE SEQUENCE REQUIRE INSPECTION BY THE SITE ENGINEER.
STANDARD E&S CONTROL PLAN NOTES
[illegible]
PLAN REFERENCE NOTE
THIS EROSION & SEDIMENT CONTROL PLAN IS ASSOCIATED WITH THE "PCSM & GRADING PLAN" (SHEET 4) OF THE FULL SITE PLAN SET TITLED "BRAKMAN PROPERTY" AND DATED 5/17/16.
RECEIVING WATERSHED NOTICE
[illegible]
PLAN LABELS
LOCATION MAP, SCALE 1" = 2000'. LIMIT OF DISTURBANCE =66,038 SQ. FT. =1.52 ACRES. EAST STRASBURG ROAD. BROOK DRIVE. TRIBUTARY 7 OF EAST BRANCH CHESTER CREEK. FEMA 100-YR FLOODPLAIN ZONE A. SUPER SILT FENCE (SSF #01) through (SSF #08). ROCK CONSTRUCTION ENTRANCE. ROCK FILTER. NAG S150 LINING (OR APPROVED EQUAL). PULL-OFF AREA. COMPOST SOCK CONCRETE WASHOUT STATION. 2A STONE PER PAVEMENT DETAIL. ORANGE CONSTRUCTION FENCE. LOT 2. LOT 3. PROPOSED GRASS SWALE.
LEGEND
[illegible]
UNDERGROUND UTILITY USERS / PENNSYLVANIA ONE CALL
PENNSYLVANIA ONE CALL SYSTEM SERIAL NUMBER: 20160320567. UPI No.5306-0089-0000
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCCD REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCCD REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
[Seal]
8 COMMONWEALTH ENGINEERS, INC.
STANDARD CONSTRUCTION DETAIL #3-16 PUMPED WATER FILTER BAG
STANDARD CONSTRUCTION DETAIL #11-1 EROSION CONTROL BLANKET INSTALLATION
STANDARD CONSTRUCTION DETAIL #3-1 ROCK CONSTRUCTION ENTRANCE
STANDARD CONSTRUCTION DETAIL #4-14 ROCK FILTER STANDARD CONSTRUCTION DETAIL #4-10 SUPER SILT FENCE
ENTRANCE DRIVEWAY PLAN & PROFILE: SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC., 114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CE-I.COM
DATE: MAY 17, 2016 | SCALE: AS SHOWN | SURVEY: MPS | DRAWN: TT | CHECKED: VK | DRAWING NO. 201541-1(C) | SHEET: 9 OF 11
PLAN VIEW (SCALE: 1" = 40')
- ROADWAY: EAST STRASBURG ROAD (S.R. 2010, 50 FOOT WIDE LEGAL RIGHT OF WAY) (POSTED SPEED LIMIT - 40 MPH)
- LEFT SIGHT DISTANCE: MINIMUM SAFE STOPPING DISTANCE = 305' | AVAILABLE SIGHT DISTANCE = 455'
- RIGHT SIGHT DISTANCE: MINIMUM SAFE STOPPING DISTANCE = 325' | AVAILABLE SIGHT DISTANCE = 385' (STATION 0+00 TO EP: 3+95.00)
- DRIVEWAY ALIGNMENT STATIONS: BP: 0+00.00; PC: 0+23.88; PT: 0+99.82; PC: 1+22.50; PT: 1+46.76; PC: 1+80.33; PT: 2+35.66; EP: 2+41.38
- FEATURES: CONSTRUCT RAILROAD TIE RETAINING WALL AROUND EXISTING UTILITY POLE | 2:1 SIDE SLOPES | PULL-OFF AREA
PROFILE VIEW (DRIVEWAY ENTRANCE) (SCALE: 1" = 4' VERTICAL, 1" = 40' HORIZONTAL)
Showing Existing Grade and Proposed Grade from Station -0+50 to 3+00 (Elevations 380 to 420):
| Station | Elevation / Grade Callout | Existing / Proposed Axis Elevations |
|---|---|---|
| 0+00 | Start of Profile (-2.00% slope) | 388.94 / 388.93 |
| 0+11.62 | GRADE BREAK STA = 0+11.62, ELEV = 388.82 | -- |
| 0+15.62 | STA 0+15.62, ELEV: 388.74 (Transition to 4.00% slope) | -- |
| 0+41.00 | STA 0+41.00, ELEV: 389.76 (Transition to 10.00% slope) | -- |
| 0+66.00 | STA 0+66.00, ELEV: 392.26 (Transition to 13.54% slope) | -- |
| 1+00 | 13.54% slope | 399.28 / 399.27 |
| 2+00 | 13.54% slope | 411.88 / 411.88 |
| 2+41.38 | GRADE BREAK STA = 2+41.38, ELEV = 416.00 | -- |
PROFILE VIEW (RIGHT SIGHT DISTANCE LINE) (SCALE: 1" = 4' VERTICAL, 1" = 40' HORIZONTAL)
Showing Existing Grade, Proposed Grade, and Sight Distance Line from Station -0+50 to 4+50 (Elevations 385 to 420):
| Station | Existing Elevation | Proposed Elevation |
|---|---|---|
| 0+00 | 389.39 | 389.39 |
| 1+00 | 403.20 | 403.20 |
| 2+00 | 409.87 | 409.86 |
| 3+00 | 413.84 | 413.83 |
SIGHT DISTANCE NOTE
SIGHT DISTANCES TO BE FIELD VERIFIED POST-CONSTRUCTION TO CONFIRM PROPER SIGHT DISTANCES ARE MET.
LEGEND & UNDERGROUND UTILITY USERS
SEE STANDARD LEGEND AND UNDERGROUND UTILITY USERS (PA ONE-CALL SYSTEM SERIAL NUMBER: 20160320567, 1-800-242-1776; UPI No. 5306-0089-0000).
REVISIONS
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCCO REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCCO REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
[Seal] [Signature]
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
SANITARY SEWER PROFILE AND DETAILS
SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC.
114 EAST LANCASTER AVENUE ~ SECOND FLOOR
DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004
COMENG@CEI-1.COM
[Seal] [Signature]
DATE: MAY 17, 2016
SCALE: AS SHOWN
SURVEY: MBS
DRAWN: TT
CHECKED: VK
DRAWING NO. 201541-1(C)
SHEET: 10 OF 11
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCPC REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/16/16 | PER CCCD REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
TYPE "A" STANDARD MANHOLE DETAIL (FOR PROPOSED MH 1)
NOT TO SCALE
[illegible] (detail labels and notes 1-14 are too small to read reliably; legible labels include: PRECAST REINFORCED CONCRETE ECCENTRIC CONE TOP SECTION, WATERTIGHT TONGUE AND GROOVE JOINT (TYPICAL), PRECAST REINFORCED CONCRETE BASE, 6" FUSED HDPE DR11 PIPE, 6" MIN 2B STONE, SECTION A-A, PLAN BELOW LINE B - B)
SANITARY SEWER TRENCH
NOT TO SCALE [illegible]
CONNECTION TO EXISTING MANHOLE DETAIL
NOT TO SCALE
- EXISTING SANITARY MH ON KAPLAN PROPERTY
- PROPOSED CONCRETE FILL
- EXISTING SANITARY SEWER PIPE
- EXISTING BENCH
- MANHOLE INVERT
- EXISTING CONCRETE FILL
- PROPOSED CAST-IN-PLACE CONCRETE CHANNEL
GRINDER PUMP DETAIL
NOT TO SCALE
NOTES:
1) GRINDER PUMP SHOWN ABOVE (OR APPROVED EQUAL) TO BE USED AS SHOWN ON LOT 3.
2) A SEWER AGREEMENT TO BE CREATED THAT WILL REQUIRE THE OWNER TO HAVE A LONG TERM MAINTENANCE AGREEMENT THAT IS SATISFACTORY TO THE TOWNSHIP.
PLAN VIEW
(SCALE: 1"=40')
INSTALLATION NOTES:
1) SANITARY PIPE TO BE INSTALLED AS SHOWN USING FITTINGS (45 DEGREES OR LESS) AS APPROPRIATE.
2) GRINDER PUMP DISCHARGE PIPING SHALL BE BEDDED IN EITHER SAND OR SCREENINGS. THE BEDDING SHALL BE AT LEAST 4 INCHES THICK. AFTER THE DISCHARGE PIPING HAS BEEN TESTED AND INSPECTED, AN ADDITIONAL 12 INCHES OF SAND OR SCREENINGS SHALL BE PLACED OVER THE PIPE.
3) ALL GRAVITY SEWER PIPES FROM THE HOUSES TO INCLUDE A FRESH AIR VENT, A BUILDING TRAP, AND CLEANOUTS (AS SHOWN ON THE PLAN) TO BE INSTALLED PER EAST GOSHEN TOWNSHIP ORDINANCE SECTION 188-31.C AND PER THE EAST GOSHEN TOWNSHIP SEWER (LATERAL/BUILDING SEWER DETAIL). [illegible]
4) THE PROPOSED 6" SEWER MAIN AND PROPOSED MH 1 TO BE DEDICATED TO EAST GOSHEN TOWNSHIP.
HORIZONTAL DIRECTIONAL DRILLING NOTES:
1) PIPE SHALL PASS A MANDREL TEST FOR THE INSTALLED PIPE SIZE.
2) PIPE SHALL PASS A CCTV INSPECTION TO THE SATISFACTION OF THE TOWNSHIP.
3) PIPE SHALL PASS A LAMP TEST TO THE SATISFACTION OF THE TOWNSHIP.
4) PIPE SHALL PASS A PRESSURE TEST.
IF THE ABOVE CONDITIONS ARE NOT MET, THE APPLICANT WOULD NEED TO REMOVE AND REPLACE THE SEWER, LIKELY VIA OPEN CUT, WITH AN ACCEPTABLE SEWER LINE AT THE COST OF THE APPLICANT. SILT FENCE WOULD ALSO NEED TO BE INSTALLED DOWNSLOPE OF THE SEWER LINE INSTALLATION WITHIN THE LIMIT OF DISTURBANCE.
FLEXIBLE COUPLING DETAIL
NOT TO SCALE. Labels: FLEXIBLE COUPLING (FERNCO OR APPROVED EQUAL); 1-1/4" LPSS PIPE; 4" PVC PIPE.
CONCRETE STEEP SLOPE PIPE ANCHOR
(NOT TO SCALE)
MAXIMUM SPACING: 24' C.C. FOR 35% TO 50% SLOPES
GRAVITY SEWER PROFILE VIEW (EXISTING MH TO C.O.)
(SCALE: 1"=4' VERTICAL, 1"=40' HORIZONTAL)
- EXISTING MH: TOP=389.01, INV. IN (EX.)=380.79, INV. OUT (EX.)=380.63, INV. IN (PROP.)=381.40
- TIE PROPOSED PIPE TO TOP OF EXISTING BENCH
- 113 L.F. PROPOSED 6" FUSED HDPE DR11 PIPE, SLOPE=3.5%
- EXISTING 8" WATER LINE INV.=387.3 (APPROX.)
- PROPOSED MH 1: TOP=394.2, INV.=385.2
- INV.=392.0
- ADD CONCRETE STEEP SLOPE PIPE ANCHORS BETWEEN STA 1+67 AND STA 1+93
- PROPOSED CLEANOUT: TOP=407.1, INV.=403.1
- PROPOSED CLEANOUT: TOP=423.8, INV.=419.9
- PROPOSED CLEANOUT: TOP=428.6, INV.=423.1
- PROPOSED CLEANOUT: TOP=429.6, INV.=424.4
- PROPOSED 4" PVC
- PROPOSED GRADE; EXISTING GRADE
NOTE: SANITARY PIPE TO BE INSTALLED AS SHOWN USING FITTINGS AS APPROPRIATE
PENNSYLVANIA ONE CALL; UNDERGROUND UTILITY USERS; LEGEND [illegible]
UPI No.5306-0089-0000
LANDSCAPE PLAN: SUBDIVISION AND LAND DEVELOPMENT PLAN (PRELIMINARY/FINAL) FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC., 114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CE-I.COM
DATE: MAY 17, 2016 | SCALE: 1" = 40' | SURVEY: MPS | DRAWN: T.F. | CHECKED: V.K. | DRAWING NO. 201541-1(C) | SHEET: 11 OF 11
DECIDUOUS STREET TREE PLANTING DETAIL (NOT TO SCALE)
- CAMB GUARD, LEONARD TREE TIE WEBBING (OR APPROVED EQUAL) WHERE CONTACT IS MADE WITH TREE
- 2"x2"x96" STAKES: IF LESS THAN 8 FT - USE 2 STAKES PER TREE; IF GREATER THAN 8 FT - USE 3 STAKES PER TREE
- 3" OF MULCH TAPERED TO PLANT BASE
- 3" LIP OF TOPSOIL TO FORM SAUCER
- CUT & REMOVE BURLAP FROM UPPER 1/3 OF BALL
- BACKFILL WITH EXCAVATED SOIL (12" CLEARANCE EACH SIDE OF ROOT BALL)
- UNDISTURBED SOIL OR THOROUGHLY COMPACTED BACKFILL
SHRUB PLANTING IN PLANTING BED (NOT TO SCALE)
- SET ROOT COLLAR AT FINISHED GRADE
- REMOVE BURLAP FROM TOP 1/3 OF BALL OR WITH CONTAINER PLANTS REMOVE POTS AND SPLIT BALLS AS SPECIFIED
- 3" OF SHREDDED MULCH COVERING ENTIRE PLANT BED
- PLANT MIXTURE AS SPECIFIED | SCARIFY MIXTURE AS SPECIFIED (6" DEPTH) | SUBGRADE
NOTES (BALLED AND BURLAPPED SHRUBS / BARE ROOT OR CONTAINER SHRUBS):
- REMOVE BURLAP FROM TOP 1/3 OF BALL, OR WITH CONTAINER PLANTS REMOVE POTS AND SLICE BALLS 1" DEEP PER COMMON NURSERY PRACTICE.
- DO NOT PRUNE EVERGREENS EXCEPT TO REMOVE DEAD AND BROKEN BRANCHES.
- THIN BRANCHES AND FOLIAGE (NOT ALL BRANCH TIPS) BY 1/3, RETAINING NORMAL PLANT SHAPE ON BARE ROOT SHRUBS.
- SHRUB SHALL BEAR SAME RELATIONSHIP TO FINISHED GRADE AS IT BORE TO PREVIOUS GRADE IN THE NURSERY. MULCH OR SOIL SHALL NOT BE PLACED ABOVE ROOT COLLAR.
LANDSCAPE PLANTING NOTES
- ALL PLANTS SHALL CONFORM TO THE STANDARDS OF THE MOST CURRENT VERSION OF THE "AMERICAN STANDARD FOR NURSERY STOCK" OF THE AMERICAN ASSOCIATION OF NURSERYMEN.
- TREES AND SHRUBS SHALL BE TYPICAL OF THEIR SPECIES AND VARIETY; HAVE A NORMAL GROWTH HABIT; WELL-DEVELOPED, DENSELY FOLIATED BRANCHES; AND VIGOROUS FIBROUS ROOT SYSTEMS.
- TREES AND SHRUBS SHALL BE FREE FROM DEFECTS AND INJURIES AND CERTIFIED BY APPROPRIATE FEDERAL AND STATE AUTHORITIES TO BE FREE FROM DISEASES AND INSECT INFESTATIONS.
- TREES AND SHRUBS SHALL BE FRESHLY DUG AND/OR CONTAINERIZED NURSERY-GROWN STOCK. THEY SHALL HAVE BEEN GROWN UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT.
- ALL TREE PITS AND PLANTING BEDS ARE TO BE MULCHED WITH AGED DOUBLE SHREDDED HARDWOOD MULCH. PRIOR TO INSTALLATION OF MULCH, ALL PLANT PITS & BED AREAS ARE TO RECEIVE AN APPLICATION OF PRE-EMERGENT HERBICIDE SUCH AS "PREEN" OR EQUAL.
- ALL PLANT MATERIALS ARE TO BE GUARANTEED BY THE APPLICANT FOR A PERIOD OF EIGHTEEN MONTHS FROM THE DATE OF INSTALLATION AGAINST DEATH & UNHEALTHY CONDITION. INSPECTION OF THE INSTALLED PLANT MATERIAL TO DETERMINE THE BEGINNING OF THE GUARANTEE PERIOD SHALL BE MADE BY THE TOWNSHIP, WITH APPROVAL FROM THE TOWNSHIP ISSUED IN WRITING. THE APPLICANT SHALL REPLACE ANY TREE THAT IS DEAD OR IN THE OPINION OF THE TOWNSHIP IS IN UNHEALTHY CONDITION OR HAS LOST ITS NATURAL SHAPE DUE TO DEAD BRANCHES. ALL REPLACEMENT PLANTINGS SHALL BE OF THE SAME KIND AND SIZE AS THOSE SPECIFIED ON THIS LANDSCAPE PLAN, AND SHALL BE SUBJECT TO THE SAME GUARANTEE.
- ALL SHRUBS SHOWN MASSED TOGETHER ON THE PLAN SHALL BE PLANTED IN A CONTINUOUS MULCH BED.
- THE TOP OF ALL ROOT BALLS SHALL BEAR SAME RELATIONSHIP TO FINISHED GRADE AS IT BORE TO PREVIOUS GRADE IN THE NURSERY. MULCH OR SOIL SHALL NOT BE PLACED ABOVE ROOT COLLAR.
- ALWAYS PRUNE TO BRANCH COLLAR. NEVER CUT A LEADER OR FLUSH CUT. ALWAYS ATTEMPT TO RETAIN THE FULL CHARACTER OF THE TREE OR SHRUB.
- REMOVE GUYS AND STAKES AFTER EXPIRATION OF THE GUARANTEE PERIOD.
LANDSCAPE PLANTING SCHEDULE
| ID | PLANTING TYPE | BOTANICAL NAME | COMMON NAME | QUANTITY PROVIDED | SIZE REQUIREMENTS | COMMENTS |
|---|---|---|---|---|---|---|
| BN | DECIDUOUS TREE | Betula Nigra | River Birch | 4 | 2.5" CALIPER (MIN) | B & B |
| CS | SHRUB | Cornus sericea | Redtwig Dogwood | 6 | 24" HEIGHT (MIN) | CONTAINER |
| IG | SHRUB | Ilex glabra | Inkberry Holly | 6 | 24" HEIGHT (MIN) | CONTAINER |
TREE REMOVAL AND PROTECTION NOTES
- NEITHER PORTIONS OF TREE MASSES NOR SPECIMEN TREES SHALL BE CLEARED UNLESS ABSOLUTELY NECESSARY. ALL REASONABLE EFFORTS SHALL BE MADE TO PRESERVE THE EXISTING TREES.
- TREES TO BE RETAINED AFTER DEVELOPMENT MUST BE PROTECTED FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. THE FOLLOWING PROCEDURES MUST BE OBSERVED IN ORDER TO PROTECT THOSE TREES THAT ARE TO REMAIN: A. PROTECTION FROM MECHANICAL INJURY AND CONSTRUCTION. ALL TREES TO BE RETAINED SHALL BE PROTECTED FROM EQUIPMENT DAMAGE BY ENCLOSING THE TREE(S) AT THE EDGE OF THE TREE PROTECTION ZONE (TPZ) WITH SECTIONS OF SNOW FENCE OR OTHER FENCING ATTACHED TO POSTS. SNOW AND PLASTIC FENCING SHALL BE A MINIMUM OF FOUR FEET HIGH ABOVE THE GROUND AND SET NOT MORE THAN TEN FEET APART. THIS FENCING SHALL NOT BE REMOVED WITHOUT TOWNSHIP PERMISSION. CONSTRUCTION EQUIPMENT SHALL NOT OPERATE WITHIN THE TPZ NOR SHALL DIRT, ROCKS, DEBRIS OR OTHER MATERIALS BE PLACED THEREIN. THE AREA WITHIN THE TPZ SHALL NOT BE BUILT UPON OR PAVED, NOR SHALL IT BE USED FOR STORAGE, EITHER TEMPORARILY OR PERMANENTLY. VEHICLES AND EQUIPMENT SHALL NOT BE PARKED IN THE TPZ. TREES SHALL NOT BE USED FOR ROPING, CABLES, SIGNS OR FENCING. NAILS AND SPIKES SHALL NOT BE DRIVEN INTO TREES. HEAVY EQUIPMENT OPERATORS SHALL NOT OPERATE OR PARK ANY EQUIPMENT UNDER THE TPZ. EXPOSED ROOTS DAMAGED DURING CONSTRUCTION SHALL BE PROTECTED FROM FURTHER DAMAGE AND CLEANLY PRUNED. TREE LIMBS DAMAGED DURING CONSTRUCTION SHALL BE LATERALLY PRUNED IMMEDIATELY. CONSTRUCTION DEBRIS SHALL NOT BE DISPOSED OF WITHIN THE DRIPLINE. TRENCHING AND ROOT PRUNING SHALL NOT TAKE PLACE WITHIN THE TPZ. ROOT PRUNING SHOULD NOT BE DONE UNLESS ABSOLUTELY NECESSARY, AND IF NECESSARY, THEN NO MORE THAN ONE SIDE OF THE ROOT SYSTEM SHALL BE PRUNED IN A GIVEN YEAR. OPTIMUM TIMING IS AUTUMN. FEEDER ROOTS SHALL NOT BE CUT CLOSER THAN 25 FEET TO TREE TRUNKS.; ALL TREES TO BE RETAINED SHALL BE PROTECTED FROM EQUIPMENT DAMAGE BY ENCLOSING THE TREE(S) AT THE EDGE OF THE TREE PROTECTION ZONE (TPZ) WITH SECTIONS OF SNOW FENCE OR OTHER FENCING ATTACHED TO POSTS. SNOW AND PLASTIC FENCING SHALL BE A MINIMUM OF FOUR FEET HIGH ABOVE THE GROUND AND SET NOT MORE THAN TEN FEET APART. THIS FENCING SHALL NOT BE REMOVED WITHOUT TOWNSHIP PERMISSION.; CONSTRUCTION EQUIPMENT SHALL NOT OPERATE WITHIN THE TPZ NOR SHALL DIRT, ROCKS, DEBRIS OR OTHER MATERIALS BE PLACED THEREIN. THE AREA WITHIN THE TPZ SHALL NOT BE BUILT UPON OR PAVED, NOR SHALL IT BE USED FOR STORAGE, EITHER TEMPORARILY OR PERMANENTLY. VEHICLES AND EQUIPMENT SHALL NOT BE PARKED IN THE TPZ.; TREES SHALL NOT BE USED FOR ROPING, CABLES, SIGNS OR FENCING. NAILS AND SPIKES SHALL NOT BE DRIVEN INTO TREES.; HEAVY EQUIPMENT OPERATORS SHALL NOT OPERATE OR PARK ANY EQUIPMENT UNDER THE TPZ.; EXPOSED ROOTS DAMAGED DURING CONSTRUCTION SHALL BE PROTECTED FROM FURTHER DAMAGE AND CLEANLY PRUNED.; TREE LIMBS DAMAGED DURING CONSTRUCTION SHALL BE LATERALLY PRUNED IMMEDIATELY.; CONSTRUCTION DEBRIS SHALL NOT BE DISPOSED OF WITHIN THE DRIPLINE.; TRENCHING AND ROOT PRUNING SHALL NOT TAKE PLACE WITHIN THE TPZ.; ROOT PRUNING SHOULD NOT BE DONE UNLESS ABSOLUTELY NECESSARY, AND IF NECESSARY, THEN NO MORE THAN ONE SIDE OF THE ROOT SYSTEM SHALL BE PRUNED IN A GIVEN YEAR. OPTIMUM TIMING IS AUTUMN.; FEEDER ROOTS SHALL NOT BE CUT CLOSER THAN 25 FEET TO TREE TRUNKS.; B. PROTECTION FROM GRADE CHANGE. RAISING THE GRADE. IF AN INCREASE IN THE GRADE OF THE LAND IS PROPOSED, THE APPLICANT SHALL INSTALL EITHER: a) A SYSTEM OF GRAVEL AND DRAIN TILES AT THE OLD SOIL LEVEL OPENING INTO A DRY WELL BUILT AROUND THE TRUNK AND DESIGNED FOR EACH TREE, INDIVIDUALLY, FROM THE CONTOUR OF THE LAND SO THAT IT DRAINS WATER AWAY FROM THE TREE TRUNK. b) A RETAINING WALL BETWEEN THE EXISTING GRADE AND HIGHER GRADE. LOWERING THE GRADE. IF A LOWERING OF THE GRADE IS PROPOSED, THE APPLICANT SHALL USE ONE OF THE FOLLOWING METHODS, INDIVIDUALLY DESIGNED TO EACH TREE: a) TERRACING THE GRADE. b) PLACING A RETAINING WALL BETWEEN THE EXISTING GRADE AND THE LOWER GRADE.; RAISING THE GRADE. IF AN INCREASE IN THE GRADE OF THE LAND IS PROPOSED, THE APPLICANT SHALL INSTALL EITHER: a) A SYSTEM OF GRAVEL AND DRAIN TILES AT THE OLD SOIL LEVEL OPENING INTO A DRY WELL BUILT AROUND THE TRUNK AND DESIGNED FOR EACH TREE, INDIVIDUALLY, FROM THE CONTOUR OF THE LAND SO THAT IT DRAINS WATER AWAY FROM THE TREE TRUNK. b) A RETAINING WALL BETWEEN THE EXISTING GRADE AND HIGHER GRADE.; a) A SYSTEM OF GRAVEL AND DRAIN TILES AT THE OLD SOIL LEVEL OPENING INTO A DRY WELL BUILT AROUND THE TRUNK AND DESIGNED FOR EACH TREE, INDIVIDUALLY, FROM THE CONTOUR OF THE LAND SO THAT IT DRAINS WATER AWAY FROM THE TREE TRUNK.; b) A RETAINING WALL BETWEEN THE EXISTING GRADE AND HIGHER GRADE.; LOWERING THE GRADE. IF A LOWERING OF THE GRADE IS PROPOSED, THE APPLICANT SHALL USE ONE OF THE FOLLOWING METHODS, INDIVIDUALLY DESIGNED TO EACH TREE: a) TERRACING THE GRADE. b) PLACING A RETAINING WALL BETWEEN THE EXISTING GRADE AND THE LOWER GRADE.; a) TERRACING THE GRADE.; b) PLACING A RETAINING WALL BETWEEN THE EXISTING GRADE AND THE LOWER GRADE.
LANDSCAPE NOTE
FOUNDATION PLANTINGS TO BE PROVIDED BY BUILDER UNDER SEPARATE PLANS.
TREE REMOVAL QUANTITIES
| SUBDIVISION AND LAND DEVELOPMENT ORDINANCE SECTION | QUANTITY OF EXISTING TREES ON SITE | QUANTITY OF TREES ALLOWED TO BE REMOVED | QUANTITY OF TREES TO BE REMOVED | PERCENTAGE OF TREES TO BE REMOVED |
|---|---|---|---|---|
| 205-61C | 336 | 67 | 42 | 12.5 |
REVISIONS
| REV NO. | DATE | DESCRIPTION |
|---|---|---|
| 6 | 2/20/17 | PER TWP. REVIEW LETTER DATED 1/26/17 |
| 5 | 1/10/17 | PER CCPC REVIEW LETTER DATED 1/4/17 |
| 4 | 12/19/16 | CHANGES TO SANITARY SEWER DESIGN |
| 3 | 12/12/16 | PER CCCD REVIEW LETTER DATED 12/8/16 |
| 2 | 10/17/16 | PER TWP. REVIEW LETTER DATED 6/1/16 AND REVISED LAYOUT |
| 1 | 5/23/16 | PER PADOT REVIEW LETTER DATED 5/18/16 |
SURVEY REFERENCE NOTES
- PLAN ENTITLED "BOUNDARY SURVEY PLAN FOR MS. ANTOINETTE BRAKMAN," PREPARED BY R.H. SMITH SURVEYORS, DATED MARCH 27, 2007.
- PLAN ENTITLED "REVERSE SUBDIVISION/SUBDIVISION PLAN FOR MICHAEL RIZZO," PREPARED BY BRANDYWINE VALLEY ENGINEERS, A DIVISION OF VOLLMER ASSOCIATES, LLP., CONSULTING ENGINEERS AND LAND SURVEYORS, DATED NOVEMBER 30, 2001.
- PECO BLANKET RIGHT-OF-WAY CONTAINED IN MISCELLANEOUS DB. B1, PG 452.
- PLAN ENTITLED "THE DAMBONE BROTHERS INC.," PREPARED BY HENRY S. CONREY INC., DIVISION OF CHESTER VALLEY ENGINEERS, DATED JUNE 6, 1973 (LAST REVISED SEPTEMBER 9, 1973).
RAIN GARDEN LANDSCAPE PLAN FOR BRAKMAN PROPERTY
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
COMMONWEALTH ENGINEERS, INC., 114 EAST LANCASTER AVENUE ~ SECOND FLOOR, DOWNINGTOWN, PA 19335
TELEPHONE: (610) 518-9003 ~ FAX: (610) 518-9004 ~ COMENG@CEI-1.COM
DATE: MAY 17, 2016 | SCALE: 1"=40' (GRAPHIC SCALE 1" = 20') | SURVEY: MBS | DRAWN: TT | CHECKED: VK | DRAWING NO. 201541-(C) | SHEET: 1
LANDSCAPE PLANTING SCHEDULE
| ID | PLANTING TYPE | BOTANICAL NAME | COMMON NAME | QUANTITY PROVIDED | SIZE REQUIREMENTS | COMMENTS |
|---|---|---|---|---|---|---|
| BN | DECIDUOUS TREE | Betula Nigra | River Birch | 4 | 2.5" CALIPER (MIN) | B X B |
| CS | SHRUB | Cornus sericea | Redtwig Dogwood | 6 | 24" HEIGHT (MIN) | CONTAINER |
| IG | SHRUB | Ilex glabra | Inkberry Holly | 6 | 24" HEIGHT (MIN) | CONTAINER |
RAIN GARDEN SEED MIXTURE
| SPECIES NAME | COMMON NAME | PERCENT WEIGHT |
|---|---|---|
| Chasmanthium latifolium (Uniola latifolia) PA/VA Ecotype blend | RIVER OATS, PA/VA ECOTYPE BLEND | 46% |
| Carex vulpinoidea, PA Ecotype | FOX SEDGE, PA ECOTYPE | 25% |
| Elymus virginicus, PA, Ecotype | VIRGINIA WILDRYE, PA ECOTYPE | 20% |
| Agrostis perennans, PA Ecotype | AUTUMN BENTGRASS, PA ECOTYPE | 4% |
| Carex scoparia, PA Ecotype | BLUNT BROOM SEDGE, PA ECOTYPE | 3% |
| Juncus effusus | SOFT RUSH | 1% |
| Juncus tenuis, PA Ecotype | PATH RUSH, PA ECOTYPE | 1% |
SEED MIX APPLICATION RATE: 15 LBS/ACRE WITH A COVER CROP OF GRAIN RYE AT 30 LBS/ACRE
SEED MIX AVAILABILITY:
ERNST CONSERVATION SEEDS
8884 MERCER PIKE
MEADVILLE, PA 16335
PHONE: (800) 873-3321
FAX: (814) 336-2403
PRODUCT No.: ERNMX-180-1
PLAN CALLOUTS & ELEVATIONS
- LOT 3: FF=422.0, GF=420.0, BF=412.0, WALKOUT | RAIN GARDEN ELEVATIONS: 407, 410
- LOT 2: FF=434.0, GF=432.0, BF=424.0, WALKOUT | RAIN GARDEN ELEVATIONS: 420, 422
- STRUCTURES & UTILITIES: EXISTING SHED (TBR) | U.P. PECO 59090A | OVERHEAD ELECTRIC (OE)
NOTICE
The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part without express written permission of Commonwealth Engineers, Inc. It is the Contractors responsibility to verify all dimensions shown on the drawings. These drawings are NOT to be scaled. Any errors or omissions found on the drawings shall be reported immediately to Commonwealth Engineers, Inc.
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 2/24/2017
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature]
Re: 1420 E. Strasburg Rd. - SD/LD Application
Dear Commissioners,
The Township has received revised subdivision documents for the Brakman SD/LD application. As you know, this is a 5 acre wooded parcel in the R-2 District, is proposed to be subdivided into three lots. The property will use the existing driveway on E. Strasburg Rd. however alignment and sight distance modifications will be made to improve safety in accordance with the PennDOT approval. The existing home will be saved and two new Single Family homes will be constructed. All three new lots will be served by public water and public sanitary sewer. The applicant is seeking the Planning Commission recommendation for approval to include the following waiver from the Subdivision Ordinance:
- 205-31 - Combine Prelim and Final Plan Approval Staff has no objection to this request.
The applicant has addressed most of the main issues in the revised plan submission however at the time the packets were created the Township Engineer had not reviewed the final revised plans. I anticipate having a review letter from Nate early in the week and will forward it to everyone at that time with my recommended draft motion and conditions.
The Township has until March 29, 2017 to render a decision on this application, which would require a Planning Commission recommendation on or before March 15th.
F:\Data\Shared Data\Property Management\53-6\53-6-89 (1420 E. Strasburg Rd.)\2016 SD application\Memo to PC 02242017.doc
EAST GOSHEN CONSERVANCY
February 9, 2017
East Goshen Township
Planning Commission
1580 Paoli Pike
West Chester, Pa. 19380
Re: 1420 E. Strasburg Rd. / SD/LD Application
Landscaping
Dear Commission Members:
At their meeting on February 8, 2017 the Conservancy Board voted unanimously in favor of the following motion:
Madam Chairman, I move that we recommend that the Planning Commission recommend approval of the SD and LD Plan for 1420 E. Strasburg Rd.
Sincerely,
[Signature]
Mark A. Gordon
Zoning Officer
F:\Data\Shared Data\Property Management\53-6\53-6-89 (1420 E. Strasburg Rd.)\2016 SD application\CB Rec to PC 02092017.doc
1580 PAOLI PIKE, WEST CHESTER, PA. 19380
COMMONWEALTH ENGINEERS, INC.
114 East Lancaster Avenue ~ Second Floor ~ Downingtown, PA 19335
Telephone: (610) 518-9003 ~ Fax: (610) 518-9004 ~ comeng@cei-1.com
February 20, 2017
Mr. Mark A. Gordon
Director of Code Enforcement/Zoning Office
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Brakman Property, 1420 E. Strasburg Road
Preliminary/Final Subdivision and Land Development
Dear Mr. Gordon:
The following revisions are offered in response to Review Letter dated January 26, 2017 issued by Nathan M. Cline, P.E. of Pennoni, Township Engineer, for the above-referenced plan submission. Pennoni comments are shown in italics. Commonwealth Engineers, Inc., responses are shown in bold.
SANITARY SEWER
- The elevations of the existing manhole on the Kaplan property should be field surveyed to confirm the actual elevations. The manhole needs to be field surveyed now that a gravity sewer connection is proposed. 1. The existing manhole has been field surveyed and the plans have been updated accordingly.
- We recommend the inclusion of an additional detail showing the connection of the LPSS lines to the new manhole. Detail and notes should include, at minimum: LPSS discharge pipes to enter connecting manhole at bottom of manhole.; Details on discharge piping into flow channel within manhole.; That manhole wall opening should be precast with A-lok gaskets. The sewage system has been redesigned to no longer discharge the forcemain into this manhole. However, a detail should be included that shows the connection/orientation of the three 4-inch PVC gravity lines into the new manhole with flow channel(s). 2. The new MH is now labeled as Proposed MH 1. The Standard Manhole Detail on Sheet 10 has been changed to a detail that is specifically for Proposed MH 1 and has been modified accordingly.
PROFESSIONAL CIVIL ENGINEERING
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 2
- We recommend that interior of the new manhole be lined with a Duraplate-type liner, or equal, since the manhole will be subject to hydrogen sulfide deterioration from the pressure sewers. The interior of the existing manhole on the Kaplan property should also be lined with a Sprayroq polyurethane liner, or equal, to mitigate the same deterioration. An additional manhole has been proposed on the subject property with Standard Manhole Detail Note #14 on Sheet 10 stating that any manhole receiving forcemain discharge should be lined with a PVC liner. For clarity, this note should call out the referenced manhole specifically and state that it shall receive a Duraplate-type PVC liner or approved equal. 3. Note 14 of the Proposed MH 1 detail on Sheet 10 has been revised accordingly.
- We recommend the inclusion of additional details or notes regarding the gravity sewer lateral from the house to the grinder pump including, at minimum, pipe material, size, cleanout, trap, and vent cap. Installation Note #3 has been added to Sheet 10 that all gravity sewer pipes should be installed as per §188-31.C. This note should also reference the "East Goshen Township Sewer Lateral/Building Sewer Detail" if not including the detail on the plans. We recommend that the detail be added to the plans to ensure compliance. 4. The note has been revised to reference the "East Goshen Township Sewer Lateral/Building Sewer Detail".
- Plan views propose the Lot 3 grinder pump invert elevation as 411.0 feet. Proposed grade at this location is approximately 420 feet. The literature submitted for the E/ONE Model DH071-93/DR071-93 grinder pump shows that cover to grade above the 4-inch gravity invert is only 55-inches. This is not consistent with the elevations on the plan. 5. The plans have been revised accordingly.
- Plan notes should state that there shall be a spare pump on-site (§188-33.B (2) (a)). 6. A note has been added below the grinder pump detail on Sheet 10 regarding the requirement of the owner to have a long term maintenance agreement.
- The sewer system design has been revised to eliminate grinder pumps from Lots 1 and 2 in favor of gravity sewer systems. Lot 3 retains the grinder pump and now has a proposed pressure sewer for approximately 150 feet whereupon it transitions to a 4-inch PVC gravity sewer at a clean-out. An additional manhole has been proposed on the subject property, and directional drilling is proposed for the new main to connect to the existing manhole on the Kaplan property. Comments on the redesign follow:
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 3
- We typically do not recommend horizontal directional drilling (HDD) gravity sewers due to the rocky conditions in the area and potential of the drill and ultimately the sewer to fluctuate vertically and horizontally resulting in sags and blockages. We also question the feasibility to drill directly into the existing manhole and pull the pipe through. However, since the sewer is proposed with a steep approx. 9% slope, we would not object to HDD in this case under the following conditions and at the Applicant's own risk; if the conditions are not met, the Applicant would need to remove and replace the sewer, likely via open cut, with an acceptable sewer line at his cost. The pipe should be fused HDPE DR11 instead of PVC.; It shall pass a mandrel test for the installed pipe size.; It shall pass a CCTV inspection to the satisfaction of the Township.; It shall pass a lamp test to the satisfaction of the Township.; The pipe shall pass a pressure test. a. The pipe between Proposed MH 1 and the existing manhole has been relabeled on the plans and profile accordingly. A note section labeled as "Horizontal Directional Drilling Notes" has been added to Sheet 10 stating the rest of the above requirements.
- The proposed gravity sewer main shall be 8" diameter instead of 6" diameter. (§205-71.B (4) (d) [1]). b. The size of the proposed pipe has been kept to 6" per meetings between the applicant and the township.
- When sewer lines are designed with a grade in excess of 20%, steep slope anchors shall be installed (§205-71.B (4) (d) [3]). One section of the gravity sewer laterals, from approximately 1+65 to 1+90 on Sheet 10 profile, has a slope of approximately 40%. Steep slope anchors need to be included in the design for this stretch of piping with details added to the plans. c. A detail have been added to Sheet 10. A note has been added to the profile on Sheet 10.
- Cleanouts need to added to each lateral pipe at the right-of-way line. (§188-31.C (3) (a)). The Township will then be responsible for the laterals from clean-outs to manhole. d. Cleanouts have not been added to the plan because of the close proximity of the Proposed MH 1 to the Right of Way line (about 8 feet).
- A note should be added to the plans that the 8-inch sewer main and the proposed manhole will be dedicated to East Goshen Township.
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 4
- e. The requested note has been added to the plans as note #4 of the Installation Notes on Sheet 10.
- f. A transition coupling detail should be added to the Lot 3 pipe transition from pressure to gravity sewer. f. A detail labeled as "Flexible Coupling Detail" has been added to Sheet 10.
- g. A detail should be added for the connection of the proposed gravity sewer main to the existing manhole on the Kaplan property indicating that the manhole will be cored and the opening sealed with a Link-Seal modular seal or approved equal. Additionally, we recommend the new sewer enter the manhole at the top of the existing bench to avoid having to core cut the bench, and a cast-in-place concrete channel should be constructed above the existing bench to convey flow into the existing channel. g. A new detail labeled "Connection To Existing Manhole Detail" has been added to Sheet 10.
- h. The horizontal separation distance between all the proposed water lines and the sewer lines should be a minimum of 10 feet. h. All separation distances are now shown at a minimum of 10 feet.
- i. On Sheet 7, silt fence or filter sock should be added along the location of the existing manhole and proposed sewer on the Kaplan property if any earth disturbance will occur during sewer construction. i. Earth disturbance is not anticipated since the sewer line in that area will be installed through horizontal direct drilling. At the end of the "Horizontal Directional Drilling Notes" on Sheet 10, a note has been added requiring the installation of silt fence if an open cut installation of the sewer line is required.
- j. The profile view (Sheet 10) indicates that the existing water main has less than 3 feet of cover. We understand this is the depth at which Aqua believes the main MAY be located. The Applicant should consider installing the sewer main a little deeper at this location to minimize the risk of a conflict, specifically since the new manhole may not be deep enough to address such a conflict. j. The invert of Proposed MH 1 has been lowered and the profile has been revised accordingly so that there is now an approximate 2.5' of clearance between the water line and the proposed sewer line.
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 5
- The proposed sanitary sewer laterals are within 2 feet to the easement line, which provides a limited area for maintenance in the future (§188-31.B.(8)). We recommend the easement width be increased or lateral locations adjusted to provide at least 5 feet to the edge of the easement. 8. The easements have been revised accordingly.
- The following comments are in regard to the new Standard Manhole detail and notes on Sheet 10: The manhole cover adjustment note should only reference precast grade rings; the reference to bricks should be deleted. a. The detail has been revised accordingly.; In lieu of a separate cover detail, a note should be added that the manhole cover should read "East Goshen Municipal Authority Sanitary Sewer". Notes should also be added which state that the manhole shall be traffic rated, bolted down, and watertight. b. The detail has been revised accordingly.; We question why the base is stated to be cast-in-place. We suggest a precast base be used instead. c. The detail has been revised accordingly.; Note #11 – Manhole steps should be steel reinforced polypropylene. Reference to aluminum should be deleted. d. The detail has been revised accordingly.; Note #12 – A note should be added to clarify that this is to be a 4-foot diameter manhole, or the note be revised to require a four-foot diameter manhole for "up to 15-inch pipes." e. The detail has been revised accordingly.
GENERAL
- A Sight Distance Note was added to Sheet 9 as requested. This note should appear on a plan that is to be recorded. 10. The note has been added to Sheet 1 under the "Survey Reference Notes" section.
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 6
- 11. A Landscaping Note appears on Sheet 11 indicating foundation plantings are to be provided by the builder. A plan should be provided indicating proposed plantings. 11. A separate foundation plantings plan is to be submitted under a separate plan. The Landscape Note on Sheet 11 has been revised accordingly.
- 12. Per the PaDEP BMP Manual it is recommended that additional plantings, such as shrubs and trees, be included in the rain garden area, per PaDEP specifications. The Applicant should present a planting detail identifying plant species to be used and the number of plantings. 12. Sheet 11 has been revised accordingly.
- 13. Please additionally note the status of the following reviews/permits: NPDES Permit (PaDEP/CCCD) (§195-15.C (2), -16.A, -17.A) – Not applicable. Correspondence has not yet been received. a. The status chart located on Sheet 2 has revised accordingly.; Planning Module (PaDEP) (§240-24.F, §205-33.B (22) (a)) – Exemption approval letter dated 12/17/16. b. The status chart located on Sheet 2 has revised accordingly.; Sanitary Sewer (Municipal Authority) – Correspondence has not yet been received. c. The status chart located on Sheet 2 has revised accordingly.; Water (Aqua) – Will Serve Letter dated May 2, 2016. d. The status chart located on Sheet 2 has revised accordingly.; Highway Occupancy Permit (PaDOT) – Correspondence has not yet been received. e. The status chart located on Sheet 2 has revised accordingly.; Fire Planning (Fire Marshal) – Not applicable. f. The status chart located on Sheet 2 has revised accordingly.; Historic Resource (Historical Comm.) – Not applicable. g. The status chart located on Sheet 2 has revised accordingly.
COMMONWEALTH ENGINEERS, INC.
TO: East Goshen Township
RE: 1420 E. Strasburg Rd, Brakman Property
DATE: February 20, 2017
PAGE: 7
- Landscaping (Conservancy Board) – Comments via January 19, 2017 email. h. The status chart located on Sheet 2 has revised accordingly.
- The existing deed for the parcel, proposed draft legal descriptions for Lots 1, 2 and 3 and all other easements associated with the property (driveway, utility, sewer, etc.) should be provided to the Township. All legal descriptions, easements and agreements are subject to review and approval by the Township Solicitor. 22. The existing deed was provided with the previous submission. Documents for proposed items are pending.
- The Applicant is reminded that a Stormwater O&M Agreement as well as a Grinder Pump Station O&M Agreement shall be executed with the Township prior to plan recording. 23. Noted.
We hope that the above plan revisions satisfy your requirements. If you have any questions or need further clarification of the revisions we have made, please feel free to contact me.
Sincerely,
[Signature]
Thomas Tran, P.E.
Project Engineer
cc: Gunnison Development Co., LLC
G:\ACTIVE JOBS\2015\201541 Brakman Property\01 Administrative Files\02 Township\201541_Township Response Ltr_2017-2-20.docx
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 2/24/2017
To: Planning Commission
From: Mark Gordon, Township Zoning Officer [signature]
Re: Medical Marijuana Uses
Dear Board Members,
As I'm sure you are aware the PA State Legislature approved the Medical Marijuana Act on April 17, of 2016. Since enactment of the Act the PA Dept. of Health (PADH) has established a Medical Marijuana (MMJ) Department with a Director which is overseen by the Medical Marijuana Advisory Board comprised of 15 members. The PA Dept. of Health is in the process of promulgating regulations and procedures for the program now.
I have included with this Memo an extensive amount of information regarding the PA MMJ program for your review and I'm happy to provide you with a hard copy of the act if you'd like to read all 49 pages of it. Here's a link http://www.legis.state.pa.us/cfdocs/legis/li/uconsCheck.cfm?yr=2016&sessInd=0&act=16
BACKGROUND:
The Act breaks the PA MMJ industry into two categories:
- MMJ Grower/Processors –industrial growing and production use
- MMJ Dispensaries –retail distribution use
These are the two uses that municipalities in PA need to understand. In the 49 pages of the Act there are two sentences that address zoning for MMJ; and they are:
Section 2107. Zoning.
The following apply:
(1) A grower/processor shall meet the same municipal zoning and land use requirements as other manufacturing, processing and production facilities that are located in the same zoning district.
F:\Data\Shared Data\Admin Dept\Township Code\Medical Marijuana\Memo to PC 02242017.doc
(2) A dispensary shall meet the same municipal zoning and land use requirements as other commercial facilities that are located in the same zoning district.
Those two sentences tell me one thing; MMJ is not an agricultural use. Grower/processors are to be treated as a manufacturing use and dispensaries are to be treated as a commercial use.
The Act and PADH have established strict guidelines and regulations for both dispensaries and grower/processors. The PADH will regulate and enforce them through the rigorous permit process and strict operational regulations and oversight. The industry will be scrutinized similarly to pharmaceutical manufacturers and pharmacies; even as far as the potency of the products they produce. Since they are producing Medical Marijuana it appears that these uses should be treated similarly to pharmaceutical manufacturing and retail commercial pharmacies.
MMJ USES IN EAST GOSHEN:
After a close look at the Zoning Ordinance and speaking with many colleagues about these uses, I beleive the uses are most similar to a commercial retail use and an industrial manufacturing use. The East Goshen Township Zoning Ordinance currently provides for both of these uses.
Dispensaries – Currently, retail sales of legal drugs as outlined in the Zoning Ordinance, is a permitted "By Right" use in the C-2 and C-4 districts.
Grower/processors – Currently, production, manufacturing and storage of pharmaceuticals, as outlined in the Zoning Ordinance, is permitted "By Conditional Use" in the I-2 district.
STAFF COMMENTARY:
Staff has looked at this closely and believes that the existing ordinance and the PADH regulations will dictate where the uses can locate however it is a policy decision to specify the use and determine what zoning districts are appropriate for the use.
There a have been two inquires for MMJ Dispensaries in the last week or so. I told both that the current ordinance and the State requirements would most likely require a MMJ dispensary to be located in the C-4 district along West Chester Pike. All the properties in the C-2 are in close proximity to schools.
I presented this information to the Board and they would like the PC to make a recommendation to them on where the uses should be permitted and why.
F:\Data\Shared Data\Admin Dept\Township Code\Medical Marijuana\Memo to PC 02242017.doc
Medical Marijuana in Pennsylvania
- Regulated by the Pennsylvania Department of Health
- Commonwealth divided into six (6) regions for purposes of implementation & regulation Region 1 – Southeast Comprised of Schuylkill, Berks, Lancaster, Bucks, Montgomery, Philadelphia, Delaware and Chester Counties Program’s first phase: 10 dispensary permits – 2 grower/processor permits; Comprised of Schuylkill, Berks, Lancaster, Bucks, Montgomery, Philadelphia, Delaware and Chester Counties; Program’s first phase: 10 dispensary permits – 2 grower/processor permits
- Dispensary permits will be available beginning on January 17, 2017
- Applications will be accepted from February 20 until March 20, 2017
- Up to 27 dispensary permits will be issued throughout Pennsylvania, with specific counties targeted for the placement of specific numbers of dispensaries Conditional placement of initial dispensaries will ensure patient access, while also allowing a competitive market to develop throughout the Commonwealth; Berks (1), Bucks (1), Chester (1), Delaware (1), Lancaster (1), Montgomery (2), Philadelphia (3); Each dispensary permit entitles the permittee to maintain no more than three (3) separate dispensary locations
- Permit application fees/requirements: Initial, non-refundable fee of $5,000; Permit fee of $30,000 (refundable if permit is not granted); Proof of $150,000 in capital
- Limited Zoning Requirements/Criteria: (Section 2107 – title “Zoning”) “A dispensary shall meet the same municipal zoning and land use requirements as other commercial facilities that are located in the same zoning district.” This is the only insight the Act provides for zoning considerations; This is the only insight the Act provides for zoning considerations
- Facility Requirements/Restrictions: (Section 802(a)(1)-(3) and (b)) Indoor, enclosed, secure facility, as approved by the Department; May not operate on the same site as a facility used for growing/processing medical marijuana; May not be located in the same office space as a practitioner or other physician; May not be located within 1,000 feet of the property line of a public, private or parochial school or a day-care center; May sell medical devices and instruments
- Other considerations/highlights: A permit will not be issued to a medical marijuana organization for use in a personal residence or any other location where the Department or its authorized agents or law enforcement would have limited access.
- Initial permit applications require “evidence that the applicant is or will be in compliance with the municipality’s zoning requirements.
- The Department may conduct inspections to determine the appropriateness of a proposed site and facility, including the municipality’s zoning requirements relating to the applicant’s proposed site and facility and its use as outlined in the permit application.
- Reporting – A medical marijuana organization must submit reports to the Department at the end of the first 12-month period following issuance of the permit, and as of the end of each 3-month period thereafter. Such reporting will include the amount purchased, per-dose price, etc.
- The Department may suspend or revoke permits for violations, those violations include provisions of Pennsylvania or local laws regarding the operation of the facility
- In advertising and marketing medical marijuana, organizations must be consistent with the Federal regulations governing prescription drug advertising and marketing (as set forth in 21 CFR 202.1 – relating to prescription-drug advertisements)
- Dispensaries may not advertise medical marijuana: (i) as a promotional item; (ii) as part of a giveaway; or (iii) as part of a coupon program
- Dispensaries may not employ individuals under the age of 18
- No one under the age of 18 is permitted to enter a dispensary unless the individual is a patient or accompanied by a parent, guardian or caregiver
- Dispensaries may not dispense an amount of medical marijuana greater than a 30-day supply
- Dispensaries shall ensure that a physician or a pharmacist is present at the facility at all times during the hours the facility is open to dispense or offer to dispense medical marijuana to patients and caregivers
- Dispensaries must have an enclosed, secure area out of public sight for the loading and unloading of medical marijuana into and from a transport vehicle
- Dispensaries may not offer the delivery of or deliver medical marijuana to a patient or caregiver at the patient’s or caregiver’s home or any other location
Pennsylvania’s Medical Marijuana Act
William Roark, Esq.
HRMM&L
MEDICAL MARIJUANA (MMJ) IN THE U.S.
[Map: A map of the United States displaying state medical marijuana laws categorized by legality and policy effectiveness, produced by the Marijuana Policy Project (MPP).]
24 States, D.C. & Guam currently allow some form of MMJ
Alaska, Arizona, California, Colorado, Connecticut, Delaware, District of Columbia, Guam, Hawaii, Illinois, Maine, Maryland, Massachusetts, Michigan, Minnesota, Montana, Nevada, New Hampshire, New Jersey, New Mexico, New York, Oregon, Pennsylvania, Rhode Island, Vermont, Washington
17 Other States currently allow very limited MMJ
Alabama, Florida, Georgia, Iowa, Kentucky, Louisiana, Mississippi, Missouri, North Carolina, Oklahoma, South Carolina, Tennessee, Texas, Utah, Virginia, Wisconsin, Wyoming
Legend
- Effective Medical Marijuana Laws
- Flawed CBD Laws
- Workable CBD Laws
- Flawed Medical Marijuana
- No Medical Marijuana Laws
[Logo: MPP]
CHAPTER 3: WHO RUNS THE PA MMJ PROGRAM?
PA Department of Health
- Director of Medical Marijuana
- Advisory Board – 15 Members (7 from State Govt. & 8 At-Large Members)
POWERS OF THE PA DEPARTMENT OF HEALTH
- Issue Permits
- Register Practitioners
- Regulatory and Enforcement
- Establish and Maintain Database
- Maintain a Directory
WHAT MEDICAL CONDITIONS WILL QUALIFY?
Serious medical conditions, including:
- Cancer
- HIV / AIDS
- ALS
- Parkinson’s Disease
- Multiple Sclerosis
- Spinal Cord Nerve Injuries
- Epilepsy
- Inflammatory Bowel Disease
- Neuropathies
- Huntington’s Disease
- Crohn’s Disease
- Post Traumatic Stress Disorder (PTSD)
- Intractable Seizures
- Glaucoma
- Sickle Cell Anemia
- Severe Chronic or Intractable Neuropathic Pain
- Chronic or Intractable Pain (resistant to opioid or other therapeutic treatments)
- Autism
HOW WILL MEDICAL MARIJUANA BE DISPENSED/ ADMINISTERED?
- Pills
- Oils
- Topical Forms (i.e. gel, creams, ointments)
- Vaporization
- Tinctures
- Liquid
- NO Dry Leaf or Plant Forms.
- NO Sales of Edibles
CHAPTER 4: PRACTITIONERS
- Physicians must apply / credentials
- Physicians must complete a 4-hour course
- Subject to annual review
- Affirmative obligation to notify Dept. of Health regarding a patient’s status
RESTRICTIONS ON PARTICIPATING DOCTORS
- Examination fee only
- Can hold no ownership in an Medical Marijuana Organization (MMO)
- Cannot advertise Medical Marijuana services
- Subject to disciplinary action by State Board of Medicine or State Board of Osteopathic Medicine
- Cannot recommend for themselves or family members
WHAT HAPPENS WHEN A DOCTOR SEES A PATIENT?
- Issues certification
- Can only recommend for serious medical conditions
- Continuing care of practitioner
- Patient to receive therapeutic or palliative benefit for use of MMJ
- Any requirement or limitation as to the form of MMJ
- Must review Rx Drug monitoring program before issuing a certification
CHAPTER 5: HOW DOES THE MMJ LAW APPLY TO PATIENTS?
- Certification
- ID Card to patient or Caregiver
- $50 application fee
- Valid for only One Year
- ONLY a 30-day supply
Medical Marijuana Organizations
Overview
- Department to issue permits to two types of entities: Grower/Processors; Dispensaries
- Both addressed in Chapters 6 and 7.
- Chapter 8 provides further restrictions on dispensaries.
Chapter 6 - Medical Marijuana Organizations
- Applications for Permits must include items identified in § 602, including:
- Criminal history record check
- Description of business activities
- A statement that the applicant "possesses the ability to obtain in an expeditious manner the right to use sufficient land, buildings and other premises and equipment to properly carry on the activity described in the application and any proposed location for a facility."
Chapter 6 - Medical Marijuana Organizations
- 602 Application Requirements (cont’d): Maintenance of adequate security; Information from all financial backers and principals of the applicant, including identifying all involvement with the manufacturing or distribution of controlled substances in and outside of the Commonwealth.
Medical Marijuana Organizations
Zoning Information
- Section 2107 is the only insight the Act provides for zoning considerations
- A grower/processor shall meet the same municipal zoning and land use requirements as other manufacturing, processing and production facilities that are located in the same zoning district.
- A dispensary shall meet the same municipal zoning and land use requirements as other commercial facilities that are located in the same zoning district.
Medical Marijuana Organizations
Controls
- Both growers/processors and dispensaries must implement an electronic seed-to-sale tracking system. S. 701(a)
- Both entities must also submit quarterly accounting reports concerning sales and inventory. S. 701(d)
Medical Marijuana Organizations
Controls
- Department to promulgate regulations concerning the storage and transportation of medical marijuana. S. 703 Use of GPS systems for transportation. S. 703(4).
- All grower/processors must contract with a certified laboratory to test the medical marijuana at harvest and at final processing. S. 704
Chapter 6 - Medical Marijuana Organizations
Grower/Processors
- The Department may not initially permit more than 25 Growers/Processors. S. 616(1).
- Initial nonrefundable application fee of $10,000. S. 607(1)(i).
- Permit fee of $200,000. Must be included with application, returned if permit is denied. S. 607(1)(ii).
- $2,000,000 in capital; $500,000 on deposit with financial institution. S. 607(1)(vi).
Medical Marijuana Organizations:
Grower/Processor Cont’d
- Medical marijuana must be grown in an indoor, enclosed, secure facility. S. 702(b)(1).
- Regulations will be promulgated enabling growers/processors to obtain seed from outside the Commonwealth in order to initially grow medical marijuana. S. 702(a)(1).
- The Department may not issue more than one individual grower/processor permit to one person. S. 616(4).
Medical Marijuana Organizations:
Dispensary
- The Department may not initially permit more than 50 dispensaries. Each dispensary may operate no more than 3 locations. S. 616(2)
- Initial nonrefundable application fee of $5,000. S. 607(2)(i) .
- Permit fee of $30,000. Must be included with application, returned if permit is denied. S. 607(2)(ii)
- $150,000 in capital and on deposit with financial institution. S. 607(2)(vi)
Medical Marijuana Organizations:
Dispensary Cont’d
- Medical marijuana may only be dispensed in an indoor, enclosed, secure facility. S. 802(a)(1) .
- Dispensary may not operate on the same site as growing/processing facility. S. 802(a)(2) .
- May not operate within 1,000 feet of public, private or parochial school or a day-care center, unless waiver obtained from Department. S. 802(a)(3) and 802(b)
- No single person may hold more than five individual dispensary permits. S. 616(3) .
Medical Marijuana Organizations:
Dispensary Cont’d
- No more than five growers/processors may be permitted as dispensaries. S. 616(5)
- Dispensaries must have a physician or pharmacist onsite at all times. S. 801(b)
- Onsite physician may not certify patients to receive treatment at the dispensary. S. 801(b)
Chapter 11: Regulatory Promulgation
Temporary Regulations
- Mandatory Publication - DOH must being promulgating temporary regulations within six months of the Effective Date. §1107 (c).
- Mandatory Expiration - Temporary regulations shall expire not later than two years following the publication of the temporary regulation, which will not be subject to: (1) the Commonwealth documents law; (2) regulatory review act; or (3) the Commonwealth attorneys act. §1107 (a).
- Time Limit - the DOH's shall have the ability to promulgate temporary regulations for two years after the Effective Date. Regulations adopted after this period shall be promulgated as provided by law. §1107 (b).
- Practical Implications - DOH must begin promulgating temporary regulations on November 17, 2016, and may continue to do so until May 17, 2018, which temporary regs may not expire later than two years following the publication. Such timing essentially allows for temporary regulations to remain in effect as late as May 17, 2020.
Chapter 11: Regulatory Promulgation
Permanent Regulations
- The DOH will presumably need to begin to establish promulgate permanent regulations no later than two years from the effective date (May 17, 2018).
- There is uncertainty as to whether full regulatory review will unfold during the temporary promulgation process.
- There is uncertainty as to whether the temporary regulations will be intended for conversion to permanent regulations.
Chapter 12: Advisory Board
Medical Marijuana Advisory Board is Established
- The Board will consist of the following individuals, or their chosen designee: Secretary pf the Department of Health; State Police Commissioner; State Board of Pharmacy Chairman; Commissioner of Professional and Occupational Affairs; Physician General; President of PA Chiefs of Police; President of PA District Attorneys Association; A designee with knowledge and experience “in issues relating to care and treatment of individuals with a serious medical condition, geriatric or pediatric medicine or clinical research” appointed by each of the following: Governor President pro tempore of the Senate Majority Leader of the Senate Speaker of the House of Representatives Minority Leader of the House of Representatives Governor selected patient advocate §1201 (a).; Governor; President pro tempore of the Senate; Majority Leader of the Senate; Speaker of the House of Representatives; Minority Leader of the House of Representatives; Governor selected patient advocate §1201 (a).
Chapter 12: Advisory Board - Powers
The advisory board shall have the power to prescribe, amend and repeal bylaws, rules and regulations governing the advisory board. The advisory board may delegate supervision of the administration of advisory board activities to an administrative secretary and other employees of the department. §1201 (f).
(1-2) examine/analyze statutory/ regulatory law of Medical Marijuana in PA and in other jurisdictions;
(3) accept/ review written comments about Medical Marijuana;
(4) issue on May 17, 2018 a report ("Report") to the governor, senate, and house, which will be a public record;
(5) the Report shall be written and include recommendations and findings as to whether to change:
- (i) the types of medical professionals permitted to certify Patients;
- (ii) the list of Serious Medical Conditions;
- (iii) the form of permitted Medical Marijuana;
- (iv) the number of growers/processors or dispensaries;
- (v) Patient access to Medical Marijuana and affordability of access; and
- (vi) the regulations on dispensing dry leaf or plant. §1201 (j).
Chapter 19: Research Program and Health Care Medical Marijuana Organization “HCMMO”
- Section 1902 of the Act calls for the establishment of a Research Program to study Medical Marijuana “MMJ.”
- The Act indicates that the DOH will create a database of medical conditions cited by Practitioners with respect to each Serious Medical Condition.
- When the database reaches 25 Patients for a particular medical condition, the DOH shall petition the FDA for approval to study MMJ treatment of said condition.
- Upon application to the USDA, the FDA will publicly announce the proposed study, upon which notice a Vertically Integrated Health System (“VIHS”) and University within the Commonwealth may request to participate.
Research Program and Health Care Medical Marijuana Organization “HCMMO” - continued
- Upon approval from the FDA and DEA, the DOH will select a VIHS to conduct the study.
- Such approved VIHS is then considered a HCMMO, which is defined in the preamble of Section 1902 in part as a VIHS approved…to dispense or grow and process, or both, MMJ.
- The Act requires that HCMMOs only dispense MMJ received from an approved Grower or an HCMMO approved to Grow and Process. The statement that HCMMOs must only dispense MMJ obtained by “approved” parties, which may be an “approved” HCMMO, indicates that some HCMMOs may apply for growing licenses.
- The application process for such license is not outlined in the Act and will thus be subject to regulation.
GROWING AND
PROCESSING CANNABIS
Josh Genderson
President & CEO, Holistic Industries
PROPAGATION : WHERE IT ALL BEGINS
Three photographs of young plant cuttings and seedlings: a hand holding a cutting, rows of potted seedlings under lights, and a hand holding a rooted cutting (labels: Alchimia, 28/10/2005).
HYDROPONIC MEDIUM
- Coco Coir Made from coconut husk; Optimal water retention
- Rockwool Made from molten rock spun into a bundles; Lower labor costs
- Clay pellets Made from clay; Very little retention enables more complete control
STAGE 2 : VEGATATIVE GROWTH
[Photograph showing rows of multi-tiered industrial metal shelving with potted cannabis plants in vegetative growth under overhead grow lights in an indoor cultivation facility.]
VEGATATIVE LIGHTING
- Ceramic Metal Halide Efficient; Low heat output
- T5 Flourescent Low power output; Low heat output
- LED Optimal spectrum; Low heat output
FLOWERING
DOUBLE ENDED HPS
- Excellent production
- Red spectrum great for THC production
- Creates heat
- Excess heat must be counteracted with HVAC
FLOWER LIGHTING
LED LIGHTING
- Optimal spectrum
- Efficiency
- No heat Air cooled; Water cooled
- Not proven for cannabis
FLOOD AND DRAIN
[Photograph showing a commercial greenhouse hydroponic flood and drain irrigation system with water flowing into trays containing plants growing in rockwool cubes (labeled "grodan").]
TOP DRIP
[Photograph showing an indoor cultivation setup with potted cannabis plants fed by a top drip hydroponic irrigation system connected to PVC manifold piping.]
TRIM
[Photographs showing cannabis trimming operations: on the left, workers manually trimming harvested plants at a workstation; on the right, an automated mechanical trimming machine and conveyor system.]
SATIVA
- Longer flowering time
- More energetic
INDICA
- Shorter flowering time
- Larger, denser flower
OUTDOOR CULTIVATION
[Photograph showing outdoor cultivation of cannabis plants growing in a fenced yard or garden.]
GREENHOUSE CULTIVATION
[Photograph showing a large-scale commercial greenhouse cultivation facility filled with flowering cannabis plants under a glass roof with lighting and ventilation systems.]
INDOOR CULTIVATION
[Photograph showing an indoor commercial cannabis cultivation warehouse with rows of potted plants, support stakes, and overhead ventilation ductwork.]
CARBON FOOTPRINT
- Cogen Producing power locally using natural gas/propane; Reusing heat produced; Utilizing CO2 produced
- Renewable Energy Solar power; Wind power
- Recirculating irrigation systems
- Water catchment
- Cutting power use LED lighting; Water chilled HVAC
PROCESSING FLOWERS TO CONCENTRATE: EXTRACTION AND ENRICHMENT
Flower
15 - 25% Cannabinoids
- Plant matter
- Waxes
- Fats
- Chlorophyll
Concentrate
70 - 99% Cannabinoids
The processes of extraction and enrichment removes impurities and creates a more concentrated and versatile product.
CONCENTRATES
- Fastest growing segment of the market Outpacing flowers and edibles in 2016; 125% growth in Colorado; 60% growth in Washington state
- New York, Minnesota and Pennsylvania strictly concentrates
- Discreet
- Potent
- Versatile
CHEMISTRY
Cannabinoids- Over 70 found in Cannabis, biologically active
THC
Psychoactive, analgesic, sedative, anti-inflammatory, appetite stimulant
CBD
Non-psychoactive, anti-inflammatory, analgesic, anticonvulsant
Terpenes- Aromatic flavor compounds, desirable organoleptic properties
Myrcene
Earthy, Herbal, Citrus
Pinene
Pine, Medicinal
Limonene
Citrus, Floral
Caryophyllene
Peppery, spicy
EXTRACTION TECHNIQUES
- Supercritical Fluid Solvent-less, nonhazardous
- Butane Terpene rich, high purity
- Water Solvent-less, terpene rich
- Alcohol Efficient, low cost
- Distillation Efficient, high purity, possible to preserve terpenes
- Isolation very high purity (97-99%)
- Pressing Rosin high purity, maintains terpenes
Products
- Bubble Hash
- Butane Hash Oil
- CO2 Oil
- Rick Simpson Oil
- Rosin
- Sha7er
- Sugar
- Wax
- Tinctures
- Sublinguals
Memo
East Goshen Township
Date: February 2, 2016
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: ABC Goals
Below is a list of the 2017 Goal presented by the ABC’s at the January 7, 2017, Planning Session.
Where applicable I have noted the appropriate objective from the Comp Plan or action from the Park Rec and Open Space Plan.
Conservancy Board:
Wood chipping around planted trees
Continual spraying against invasive – Comp Plan Objective 11.6
Develop a plan for the Serpentine Rock - PR&O Plan Action 2.2C
Upkeep of Blue Bird houses to control insect population
April 22, 2017 is the date for “Keep E. Goshen Beautiful” Day - Comp Plan Objective 11.4
Clymer’s Woods, which is currently being maintained as a free form woodland area may need to become a more manicured area as it also occupies the area which is the Gateway Entrance to E. Goshen Township.
Futurist Committee:
The creation of a much needed “town center” to house specialty shops, restaurants, micro businesses, and a central gathering area - Comp Plan Objective 6.1
Clear signage and lighting to highlight the “town center” – Comp Plan Objective 6.1
Amend the Township “bylaws” to allow for liquor sales.
Establish a strategic long range planning objective with steps outlining how to achieve the objective and the stated benefits to all residents then adopt a resolution to make it official.
C:\Users\bmccool\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\5UUMSK0C\Memo 020317.doc
Need for a “branding” of the Township to include clear signage that would include renaming the Township to “Goshenville”.
Historic Commission: No goals presented.
Municipal Authority:
The West Goshen Sewer Plant, of which East Goshen Township has a 16.66% interest, is in the process of upgrading the Plant’s equipment Comp Plan Objective 10.1
West Goshen Township is currently undergoing an EPA review to determine its phosphorous limit. Comp Plan Objective 10.1
Park and Recreation Commission:
Increasing pedestrian circulation along Paoli Pike, especially in the form of a “Paoli Pike Promenade” with sidewalks and crosswalks, as well as increasing pedestrian circulation and pedestrian safety along Greenway, with trails, walkways, and crosswalks - Comp Plan Objective 8.6
Developing the Paoli Pike Trail through East Goshen, from West Goshen to Willistown - Comp Plan Objective 9.2
Maintaining and upgrading East Goshen Park Comp Plan Objective 9.3
Planning Commission:
Assist in the Paoli Pike Master Corridor Plan. Comp Plan Objectives 6.2 & 8.6 and PR&O Plan Action 1.7B
Review Zoning Ordinance as it relates to new technologies, drones, nodes replacing telecommunications towers and the best locations for them. Comp Plan Objective 6.6
C:\Users\bmccool\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\5UUMSK0C\Memo 020317.doc