Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, November 15, 2017

7:00 PM A Call to Order I Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. November 1, 2017 F. Subdivision and Land Development Applications G. Conditional Uses and Variances

1. Malvern Institute - (Variances and Special Exception) H. Ordinance Amendments I. 2017 Goals J. Any Other Matter K. Liaison Reports L. Correspondence

Bold Items indicate new information to review.

F:\Data\Shared Data\Agendas\Planning Commission\2017\PC AGENDA 11152017.doc

~ (.) w . en

> c en 6 c ...J =i' ~ i'.L

ll.~ c: 0 'O ; ~ Q) cu en .!: - LL Q.

Q) Q) c.. ... Application Name c.. ~

cu <C c Malvern Institute, 940 King Rd. V,SE p 3/27/17

Bold = New Application or PC action required

Completed in 2017

Applebrook Golf Club LD P/F 8/28/2017 Taylor Partners, 1007 Taylor Ave SD P/F 9/25/2017 Synthes USA cu p 8/28/2017 1506 Meadowbrook Dr. v p 7/10/17 1380 Enterprise Drive v p 7/17/17 1007 Taylor Ave. v p 7/11/17 Crown Castle, DAS Nodes cu P/F 7/3/17 14 Reservoir Rd. SK NA NA 1420 E. Strasburg Rd. I Brakman SD/LD P/F 5/18/16 1506 Meadowbrook Dr. SD/V Sk 4/24/17 1007 Taylor Ave. SD/V Sk 5/30/17

East Goshen Township Planning Commission Tracking Log

I/) 0 ... al Q)

<C Q) c: - C> ci. c: 0 w ... c.. ll. .c: C> c: I/) c: (.) ; ... 3: ll. ::::s (.) .c Q) 0 ... I- (.) <C cu c 0 0 0 ... ... ... 1:: Q) Q) Q) cu ... ... ... ... cu cu cu en c c c 3/27/17 NA NA 3/30/17

8/28/2017 8/30/2017 8/30/2017 8/31/2017 10/4/2017 9/27/2017 9/27/2017 9/29/2017 8/28/2017 8/30/2017 8/30/2017 8/31/2017 7/10/17 NA NA 7/13/17 7/17/17 NA NA 7/27/17 7/11/17 NA NA 7/13/17 7/4/17 NA NA 7/5/17 NA NA NA NA 6/1/16 5/19/16 5/19/16 5/20/16 NA NA NA NA NA NA NA NA

Q) ... Q) cu ... c cu c c: c: 0 0 ; Q) CJ ; ... CJ <C cu c: <C c 0 I- I- ...J C> I/) ...J z c: c: Q) z en ·;:: ... 0 cu >< (.) Q) w ll. al :I: 3 11/15/17 12/5/17 12/12/17

11/1/2017 12/5/2017 NA 12/6/2017 1/2/2018 NA 10/4/2017 10/17/2017 10/17/2017 8/2/17 8/15/17 9/7/17 8/2/17 9/5/17 9/11/17 8/2/17 8/15/17 8/29/17 8/2/17 8/15/17 8/15/17 NA NA NA NA 3 3/1 /17 3/21/17 NA NA NA NA NA NA NA

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2017\PC Tracking Log for 11152017.xlsx

Q) ... cu 'O 'O I/) ... cu c: Q) Q) c E c.. E 0 ... 0 c (.) 12/19/17

12/5/2017 1/2/2017 10/27/2017 APPVD 9/8/17 APPVD 9/15/17 APPVD 9/9/17 APPVD 8/31/17 APPVD NA NA 3/29/17 APPVD NA NA NA NA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

November 1, 2017

The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, November 1, 2017 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Adam Knox, Brad Giresi, Dan Daley, Monica Close, Jim McRee, Ernest Harkness and Silvia Shin. Also present was Mark Gordon, (Township Zoning Officer), and Janet Emanuel (Township Supervisor).

COMMON ACRONYMS:

BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission

A. FORMAL MEETING - 7:00 pm

CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM-Storm Water Management

ZHB - Zoning Hearing Board

1. Adam called the meeting to order at 7 :00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military. 2. Adam asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. 3. Adam reviewed the Tracking Log and commented that Malvern Institute gave no extension. Although they are not here for this meeting, they are scheduled for the November 15, 2017 workshop. 4. Adam noted that the minutes of the October 4, 2017 meeting and the minutes of the October 18, 2017 workshop meeting were approved as amended.

B. SUBDIVISION AND LAND DEVELOPMENT

1. Applebrook Golf Club - Land Development Bob Plucienik, Chester Valley Engineers, repmied that he met with the Conservancy Board and believes that they approved the plan. He explained changes in the construction entrance off Boot Road and how they will return the area to its existing state. They addressed all of the comments in the two Pennoni letters. He reviewed the five waivers they are seeking. Adam asked if they considered any other access points. Bob mentioned that they did consider coming from the Golf Club's parking lot, but they would be forced to go over the Mobil pipeline and want to avoid that. He verified the size of the building at 1805 sq. ft. and 1200 sq. ft. of walkway. Monica made a motion that the Planning Commission recommend approval of the land development plan for Applebrook Golf Club, Golf Learning Center, and suppmi the requested waivers noted on the plans dated 8/29/2017 and last revised 10/31/2017 with the following conditions:

1. All remaining comments from the 10/25/2017 Pennoni letter are addressed to the satisfaction of the Township Engineer prior to releasing the plans for recording. 2. The applicant shall agree to restore the proposed temporary construction entrance to the preconstruction grade conditions. 3. The applicant shall agree to add additional replacement landscape material to the proposed area of the construction entrance in order to return the area to its pre-development condition, if determined necessary by the Township Zoning Officer, prior to the issuance of the final certificate of occupancy for the Golf Leaming Center. 4. The Conservancy Board is notified when the project is complete in order to inspect the plantings. 5. The final plans are not released for recording until the following agreements are approved by the Board of Supervisors:

a. Land Development Agreement b. Financial Security Agreement

PC 11-1-17 draft 1

1 c. Stormwater Management Operation and Maintenance Agreement 2 6. The applicant follows all Federal, State and local regulations and ordinances. 3 Regarding condition #4, Mark commented that the Township Landscape Architect will inspect the area 4 before the Conservancy Board. 5 Adam seconded the motion. The motion passed unanimously. The applicant accepts the conditions. 6 7 2. 1003-1007 Taylor Ave. - Subdivision - Noah Kahn, developer, reviewed the plan and 8 commented that nothing has changed except the township engineer's comments. They would like to start 9 the project in 1 - 2 months. 10 Ernest moved that the Planning Commission recommend approval of the Subdivision application, plan 11 and waivers requested by Taylor Avenue Pattners for the Subdivision of 1007 Taylor Ave. with the 12 following conditions: 13 1. Prior to releasing the subdivision plan for recording, the applicant shall revise the 14 plan by adding the entire final Zoning Hearing Board Order to the plan, including all 15 conditions. 16 2. The applicant shall apply for a building permit to modify the existing garage on Lot 1 17 as proposed to the Planning Commission. 18 3. The modifications to the garage on Lot 1 shall be completed prior to issuance of a 19 Use and Occupancy Ce1tificate for the single-family home on Lot 1. 20 4. The applicant shall follow all Federal, State and local regulations and ordinances. 21 Brad seconded the motion. The motion passed unanimously. 22 23 C. CONDITIONAL USES AND VARIANCES 24 1. Malvern Institute - Variances & Special Exception- Mark reviewed some of the Township 25 Solicitor's comments, especially no matter what position the Planning Commission takes (yes, no or no 26 position) conditions should be added for the Zoning Hearing Board to see. Mark provided a draft of a 27 recommended motion and conditions. The conditions were discussed as follows: 28 # 1 &# 2 described the number of patients 29 #3 & #4 Landscaping will be reviewed by a Landscape Architect. #4 includes 30 replacement of trees if they die. The type and number of trees need to be listed. 31 #5 The creek crossing will be permitted by PA Dept of Environmental Protection(DEP). 32 #6 Consider a single story addition instead of a second floor addition. Need to address 33 sound fencing. Mark explained that this suggestion is what they are considering now. 34 This doesn't change the variances that they need. Mark discussed the good aspects of the 35 single story vs second floor additions. Sound fencing was discussed. 36 #7 50 foot setback for the single story addition will allow for buffering 37 #8 Limiting recreational activity at the rear of the building. Mark explained no active 3 8 recreation in the rear because the sound bounces off the building to the residential homes. 39 Everyone agreed this is the biggest issue. 40 #9 Smoking areas were discussed. 41 # 10 If they don't do the addition, this discusses where the smoking areas will be. 42 #11 Smoking areas shall have a pavilion for shelter from the weather. 43 #12 Smoking areas shall have a Smoke Eator unit to help control the smoke. 44 #13 Mitigation of noise from the existing generator. 45 #14 Plantings and fencing in the wooded area on the eastern side of the prope1ty 46 # 15 Breakdown of their schedule 47 48 Other items discussed: 49 1. A gate in the parking area 50 2. Security/monitoring 51 3. Wood chip paths 52 4. Additional outside lighting 53 5. Staff increases in the future & parking

PC 11-1-17 draft 2

1 6. Time limitation on outdoor activities 2 7. Expansion limit met by this application 3 4 PUBLIC COMMENT: 5 1. Curt Quaintance, 20 Line Road - He has a business related to noise control. He is concemed about 6 noise coming into the neighboring properties. Most ordinances are about the noise that comes across the 7 prope11y line. Malvem Institute should provide a noise study and plan for how they will mitigate the 8 noise. He suggested they provide a comprehensive plan showing the property, building, where people are 9 going to be and what is the expected noise level. Just having a brochure to show sound fencing isn't 10 enough. Mark explained that the township noise ordinance can regulate noise from machines but not the 11 human voice. To soften that, the applicant is proposing buffering and sound fencing. They will have a 12 sound study to present on November 15°

1 • 13 2. Teni Relick, 12 Treemont Dr, Malvem -Are they going to use sound fencing similar to what's along 14 the tumpike? 15 Mark is not sure what type they are proposing. He is hoping for a softer product. 16 Terri commented that the neighbors would not want this. Security is her# 1 concem. She sees them 17 walking off the prope11y at night. They don't enforce a curfew. Fencing around the pond should be 18 considered. The police refused to come out the last time they called because of the noise. 19 3. Paige Fenimore, 3 Treemont Dr, Malvem- She spoke about security. In 2012 an application was 20 made to open a facility in Bethlehem and they promised everything but still hasn't received approval 21 because of the possible problems. She read a list of security items other townships have put on this type 22 of facility. The Township Code has a special exception that covers security measures. The original size 23 of the building was 6200 sq. ft. It is now 12,000 sq.ft. so they have expanded. The number of beds is 24 controlled by the state but they are in violation of township code because of parking issues. Adam 25 commented that the Planning Commission is familiar with past requests of MI but natural expansion is 26 handled by the ZHB. 27 4. Lisa O'Neil, 10 Brookmont Dr, Malvem - She asked if they have done a 15 year plan before. She 28 feels they have already gone through this with MI. There are about 100 cars parking there, which is not 29 what they were approved for. She feels they have built out as much as possible, so she doesn't want this 30 expansion approved. Also there was a sewer problem years ago because there was no run off plan. They 31 were told they had to do this but they never did. Mark explained what the township is trying to do to 32 mitigate problems. 33 5. Diane Weitman, 5 Line Rd. -They haven't seen anything about the one story option. Can this be done 34 in the next meeting? Mark explained that, if what they present isn't okay, we can ask them for an 35 extension. 36 Adam reminded everyone that there will be a workshop meeting on November 15, 2017. 37 38 D. ORDINANCE AMENDMENTS 39 1. Wall Signs in the BP - Ryan Jennings, Township Solicitor, reviewed the proposed ordinance 40 amendment. Ernest made a motion to recommend to the Board of Supervisors adoption of the ordinance 41 amendment. Jim seconded the motion. The motion passed unanimously. 42 43 E. 2017 GOALS 44 t There was discussion about drones and emerging housing trends. Mark will send an update to 45 the BOS. 46 47 ADJOURNMENT 48 There being no further business, Emest moved to adjourn the meeting. Monica seconded the 49 motion. The meeting adjoumed at 10:30 pm. The next workshop meeting will be held on 50 Wednesday, November 15, 2017 at 7:00 pm. 51 52 Respectfully submitted, ____________________ _ 53 Ruth Kiefer, Recording Secretary

PC 11-1-17 draft 3

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 11/7 /2017 To: Planning Commission I From: Mark Gordon, Township Zoning Officer ·f4 /1. {v Re: Malvern Institute ZHB Application for Special Exception and Variances

Staff Recommendation: After consultation with the solicitor, staff is recommending that the PC take no position with respect to the Special Exception and Variance requests or the legal argument that Applicant makes concerning the right to expand the nonconforming use based on the doctrine of natural expansion of a nonconforming use.

Draft Motion: Mr. Chairman, I move that the PC take no position on the special exception and variances requested by the Malvern Institute or the legal argument advanced by Applicant with respect to the right to expand the legal non-conforming treatment center use based on the doctrine of natural expansion. Should the ZHB determine that the applicant has met its legal burden and is entitled to expand the non-conforming use; the Planning Commission recommends that the ZHB impose the following conditions on the Applicant in order to mitigate the impacts that the non-conforming use has on the surrounding community. The PC also recommends that the Board of Supervisors authorize the Township Solicitor and the Township Engineer to enter an appearance at the Zoning Hearing to advocate the Board of Supervisors' position on the recommended conditions.

1. Applicant shall restrict the drug and alcohol treatment programming at the King Road facility (the "Facility") to in-patient treatment only.

2. Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. Applicant shall forward a letter to the Commonwealth of PA Department of Health agreeing to permanently cap the licensing of the facility to 80 in-patients in perpetuity.

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. Ml 11072017.doc

3. Applicant agrees to have at least one security guard on duty at the Facility 24 hours a day, 7 days a week.

4. Applicant agrees to submit a land development application that includes the proposed improvements to the Property which are approved in the Decision and which are consistent with the testimony and exhibits presented at the zoning hearing and with the conditions of approval within 90 days of final unappealable, and unappealed zoning approval.

5. Applicant shall submit and implement a landscape plan in accordance with §240- 27.C.(2) of the East Goshen Code for the western, southern and eastern property boundaries as part of its land development application.

6. Applicant agrees to plant and maintain the aforesaid buffer yard landscaping in accordance with §240-27.C.(3), as long as the Property is used as a Treatment Center.

7. Applicant shall obtain all necessary governmental permits and approvals to construct a creek crossing, including but not limited to permits from the PA Department of Environmental Protection.

8. Applicant shall install and maintain 8 foot high sound fencing, as described, along the entire western, southern and eastern boundaries of the Property. The 8 foot sound fencing shall extend to the King Rd. right of way line, so long as the fencing does not impede sight distance for motorists exiting the Facility's driveway or the driveway for 950 King Rd. The 8 foot sound fencing shall be installed adjacent to pathways and recreational areas to maximize the sound attenuation properties of the fencing.

9. Applicant shall install a fence along the right of way line for King Rd. This shall include a monitored security gate for pedestrian and vehicular access. This fencing and the aforesaid sound fencing shall be connected and is intended to limit ingress and egress to a single monitored security gate.

10. Applicant shall identify the fencing types and styles as well as provide details of each style of fencing in the land development plan which fencing shall be approved by the Board of Supervisors at land development .

. 11. If Applicant chooses to build a new one story building addition, the new addition

shall be set back a minimum of 50 feet from any property line. In addition, if an active recreation area is or will be located north of the new one story addition, a second 8 foot sound fence shall be installed from the west wall of the one story addition to the King Rd. right of way line, to further screen the active recreation area from the homes to the west.

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. Ml 11072017.doc

12. Applicant shall agree to permit no recreational activity in the area between the existing and/or proposed building and the southern and western property lines except for pedestrian walking paths.

13. Applicant shall identify the active recreation areas on the land development plan and only permit active recreation within the designated active recreation areas.

14. The Facility shall be restricted to one outdoor smoking area and shall all smoking outdoors shall be conducted within the limits of the smoking pavilion.

15. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and filtration system to minimize the effects of smoke for the surrounding property owners.

16. Applicant shall screen the smoking pavilion from the neighboring properties to the west and north with an 8 foot sound fence. This sound fence shall remain in place until the expansion project is complete.

17. If the Applicant does not choose to build a new one story addition, which effectively screens the smoking pavilion from view of the neighboring properties the aforesaid sound fence shall be maintained as long as the Property is used as a Treatment Center.

18. The Applicant shall demonstrate that the "Smoke Eater" system can ventilate and filter cigarette smoke in an open pavilion.

19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.

20. The Applicant shall install the 8 foot sound fencing and deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any walking paths and/or meditation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans submitted with the land development application and shall be approved by the Board of Supervisors as part of land development.

21. The Applicant shall implement the Malvern Institute 15 year renovation plan as presented to the Zoning Hearing Board in the order as outlined in Applicant's testimony and shall implement all of the 1-2 year site improvements prior to the issuance of any building permits for year 2-4 barn renovations.

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. Ml 11072017.doc

22. All conditions shall be implemented as per the plans and presentations given to the Planning Commission.

23. Applicant shall agree to construct all walking paths with pervious wood chips. If path surfaces are changed, permits shall be obtained prior to any changes.

24. The parking lot lighting shall comply with the Township Zoning Ordinance.

25. The Applicant shall comply with the parking allocation presented on the plans and presentations made to the Township Planning Commission and Board of Supervisors.

26. Applicant shall agree to only permit outdoor activities on the property between the hours of 7 AM and 10 PM.

27. The Applicant shall file a deed restriction, to be approved by the Township Solicitor, agreeing that there shall be no further expansion of the non- conforming use beyond the expansion approved by the Zoning Hearing Board in this application.

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memoto PC Re. Ml 11072017.doc

MacElree Harvey
SINCE 1880
INITIATIVE IN PRACTICE®

MacElree Harvey, Ltd.
Attorneys at Law
17 West Miner Street
West Chester, PA 19382
610-436-0100 | main
macelree.com

Brian L. Nagle
bnagle@macelree.com
d | 610-840-0224
f | 610-430-8245

[Stamp: RECEIVED AFTER AGENDA WAS PRINTED]

November 8, 2017

Via Hand Delivery

Mark Gordon
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199

Re: Application for Zoning Relief of
Malvern Institute for Psychiatric and Alcoholic Studies, Inc.

Dear Mark:

Enclosed are fifteen (15) copies of the revised Narrative for Zoning Relief of Malvern Institute for consideration by Zoning Hearing Board. The Narrative has been revised to reflect the one story addition alternative plan that the Township Planning Commission and staff has asked my client to consider.

The revised Plans are part of the Application but have been submitted separately today by Chester County Engineers. I also attached the updated 15 Year Renovation Timeline (2nd Story Addition Plan) as well as the timeline for the One Story Addition Plan alternative. Thank you for your consideration.

Very truly yours,

[Signature: Brian L. Nagle]
Brian L. Nagle

/cfg
Enclosures

2650331v1
141117.60426

CENTREVILLE, DE | DOYLESTOWN, PA | KENNETT SQUARE, PA | WEST CHESTER, PA

Introduction

MALVERN INSTITUTE

15 Year Renovation Timeline One Story Addition Plan

The Township has requested that all renovations necessary for the Malvern Institute over the next 15 years, as explained in the Narrative in Support of the Application (Revised), be included in a 15 Year Plan. After developing the 15 Year Plan, the Malvern Institute provides the following best estimate outline and timeline of improvements. Notwithstanding that the timing

may alter to some degree, the Year 1-2 Site Improvements will be completed prior to the commencement of any other listed improvements, and the Applicant will accept same as a condition of the approval of the relief sought in the Application that is pending before the Zoning Hearing Board.

YEAR 1-2

Site Improvements Parking lot renovations, sound fence installation, smoking pavilion installation, sound blankets added at generator, commence understory restoration at Eastern wooded portion of property

YEAR 2-4

First floor addition project

YEARS 3-5

Barn Renovation Loft level - patient activity space (group meeting and group fitness/activity space) Main level - (parking lot side) Admissions and related offices Lower level - (pond side) storage and laundry Relocate designated personnel to the barn

YEARS 5-7

Main Building Relocation Renovation, Part 1 Scope TBD but relocated areas would be renovated and/or relocated.

YEARS 7-12

Contingency Period- Complete any unfinished aspects of the project All proposed improvements are required to enable Applicant to maintain its facility in accordance with industry standards, to remain competitive in the marketplace, and to effectively serve and treat its patients.

2650075v1 141117.60426

Introduction

MALVERN INSTITUTE

15 Year Renovation Timeline 2"d Story Addition Plan

The Township has requested that all renovations necessary for the Malvern Institute over the next 15 years, as explained in the Narrative in Support of the Application (Revised), be included in a 15 Year Plan. After developing the 15 Year Plan, the Malvern Institute provides the following best estimate outline and timeline of improvements. Notwithstanding that the timing may alter to some degree, the Year 1-2 Site Improvements will be completed prior to the commencement of any other listed improvements, and the Applicant will accept same as a condition of the approval of the relief sought in the Application that is pending before the Zoning Hearing Board.

YEAR 1-2

Site Improvements Parking lot renovations, sound fence installation, smoking pavilion installation, sound blankets added at generator, commence understory restoration at Eastern wooded portion of property

YEAR 2-4

Barn Renovation Loft level - patient activity space (group meeting and group fitness/activity space) Main level - (parking lot side) Admissions and related offices Lower level - (pond side) storage and laundry

YEARS 3-5

Main Building Relocation Renovation, Part 1 Scope TBD but relocated areas would be renovated and/or relocated for upcoming phases. Relocate designated personnel to the barn.

YEARS 4-6

Second Floor Renovations Construction of second floor renovation/addition on the Main Building

YEARS 4-8

Main Building Renovations, Part 2 When the second floor renovation is complete, there will be areas open for renovation

YEARS 8-12 Contingency Period- Complete any unfinished aspects of the project

All proposed improvements are required to enable Applicant to maintain its facility in accordance with industry standards, to remain competitive in the marketplace, and to effectively serve and treat its patients.

2611555v2 141117.60426

BEFORE THE ZONING HEARING BOARD OF EAST GOSHEN TOWNSHIP

IN RE: APPLICATION FOR ZONING RELIEF OF MALVERN INSTITUTE FOR PSYCHIATRIC AND ALCOHOLIC STUDIES, INC.

NARRATIVE IN SUPPORT OF APPLICATION (Revised)

I. Introduction

Malvern Institute for Psychiatric and Alcoholic Studies, Inc. ("Malvern Institute" or

"Applicant"), is the legal owner of certain real estate located at 940 W. King Road, East

Goshen Township, Chester County, known as Chester County UPI No. 53-2-18 (the

"Property"). The Property is improved with, inter alia, a 2 % story masonry structure (the

"Main Building") and a 2 story barn (the "Barn"). The Property constitutes approximately

8 acres in the Township's R-2 Low Density Residential District. 1 Applicant uses the

Property as a treatment center, as that term is defined in the Township's Zoning

Ordinance (the "Ordinance"). The treatment center is a legal nonconforming use, as that

term is defined in the Township's Zoning Ordinance. The Existing Conditions Plan,

separately submitted, is made a part of this Application. Through the treatment center,

Malvern Institute provides critical services to residents in need in Chester County and

nearby, offering a continuum of care for those affected by addiction, including many

fellow Chester County residents. All services are inpatient services and Malvern

lnstitute's success is achieved through dedication to clinical care and innovative

treatment solutions.

Applicant hereby seeks relief, as set forth below, to expand the second floor of

the Main Building on the Property by 6,200 square feet and to construct a loft in the

Barn which would increase the floor area of that structure by 2,320 square feet (the

1 A small portion of the Property is located in Willistown Township, which portion is not improved with any structures.

2650681v1 141117.60426

1

"Proposal"). The Proposal will not increase the footprint of the Barn, with the exception

of an 80 square feet code-required elevator, and will only increase the footprint of the

Main Building by 200 square feet via a small cantilever. The Proposal also includes the

permanent relocation of the smoking area from the rear of the facility to the front of the

facility at a new smoking pavilion that will be farther away from residential neighbors as

compared to the prior location. The prior smoking area will be converted to a quiet

greenhouse space.

In the alternative, and at the request of the Township staff and Planning

Commission, Applicant proposes a one-story addition to the Main Building which would

increase the footprint of the Main Building by 5,492 square feet and a loft in the Barn

which would increase the floor area of that structure by 2,320 square feet (the

"Alternative Proposal"). The Alternative Proposal would include a basement area

beneath the one-story addition, and would be comprised of a total increase in floor area

of 10,200 square feet to the Main Building.

The proposed expansion in floor area of the Main Building and Barn are

necessary to accommodate the natural expansion of the Applicant's pre-existing legal

non-conforming use to enable Applicant to maintain its facility in accordance with

industry standards, to remain competitive in the marketplace, and to effectively serve

and treat its patients and the residents of Chester County. The proposed expansion of

the Main Building, will improve the accommodations available to Applicant's residents.

Applicant does not propose to increase the number of patients it serves, and, in the

event that the relief sought herein is granted, Applicant will agree to a condition of

2650681v1 141117.60426

2

approval that it will not increase the state-approved limit of patient beds for the subject

Property, which is currently approved at 80 beds.

II. Request for Relief and Project Background

Applicant seeks a special exception under Ordinance Chapter 240, Section

40.C(2)(e) in order to expand the floor area of the Main Building serving its legal

nonconforming use. Applicant also seeks a dimensional variance from Ordinance

Chapter 240, Section 40.C(2)(c) in order to permit an expansion of floor area serving a

nonconforming use by 36% pursuant to the Proposal, or by 49% pursuant to the

Alternative Proposal, if deemed required after consideration is given to the doctrine of

natural expansion. The maximum expansion of floor area serving a nonconforming use

permitted by the Township's Zoning Ordinance is 25%2. Chapter 240, Section 32.E(1)

I

requires that fences erected in the side or rear yards shall not exceed six feet in height

on a residential lot and eight feet in height on any other lot. The Applicant's position is

that the subject lot is a commercial lot. In the event that the Board determines that the

subject property is a residential lot by virtue of being located in a residential zoning

district, notwithstanding the pre-existing and legally non-conforming non-residential use

of the lot, than Applicant requests a variance to permit the eight foot sound fence as

shown on the plans. The sound fence is designed to improve existing conditions

relative the historical use of the outdoor portions of the Property for patient activities.

The Section 32.E(2) states that fences which are erected within the required front yard

shall not exceed four feet in height. The Applicant has proposed a six foot tall estate

2 Section 240-40.C(2)(c) includes the restriction that if prior to the effective date of the 25% expansion restriction in the zoning ordinance, the use has been expanded by a percentage greater than 25%, it shall not be entitled to any further expansion under this section. Malvern Institute underwent a prior expansion of 25% or greater in 1982. This retroactive restriction based upon a pre-ordinance expansion is of questionable legal impact.

2650681v1 141117.60426

3

fence in the front yard, and hereby requests a variance to allow same. Applicant is

proposing a 22 foot wide one-way section for a portion of the driveway to accommodate

additional parking adjacent to that section of the driveway and to avoid additional

parking in the front yard setback. This complies with the Township's zoning regulations.

However, at night, the driveway will operate as a two-way driveway so that vehicle

egress can be observed, and during that period of time, a variance of two feet in width is

required, and hereby requested, from Section 33.C(10). Finally, given the timeframe of

the proposed improvements, the Applicant requests a variance from Chapter 240,

Section 58.D. to allow the variances to remain in place to allow the improvements to

occur no later than 12 years from approval of the variances.

The Applicant also requests that the Board grant such other relief that is

necessary in the judgment of the Board to allow the proposed expansion.

Under either the Proposal or the Alternative Proposal, the proposed expansion

and dimensional variances are modest. The Proposal would constitute a nominal

increase in building footprint and the Alternative Proposal would permit a reasonable

expansion with half of the proposed additional floor area in the form of a basement

which would pose virtually no negative impact on the surrounding properties. The

Alternative Proposal would create a "court yard" effect, which would enhance the buffer

between Malvern Institute and the neighboring property owners. Neither the Proposal

nor the Alternative Proposal include an increase in the number of residents whom

Applicant serves. Additionally, neither proposal would necessitate an increase in staff,

nor is one anticipated.

2650681v1 141117.60426

4

It is noteworthy that the Applicant has designed its "15 Year Plan" in conjunction

with the proposed improvements.3 The 15 Year Plan has been separately submitted as

part of this application, together with the following plans: Existing Conditions, Sightline

Profiles, 15 Year Master Plan with Existing Features. The 15 Year Plan was designed

specifically to minimize and improve any Malvern Institute impacts on residential

neighbors. The 15 Year Plan includes significant landscaping and buffering

improvements in an effort to achieve this goal. After completing the design, Malvern

Institute sent a letter to neighboring property owners inviting them to visit and tour the

facility and to review the 15 Year Plan. See Exhibit "B-1", the mailing list for the letter,

also attached. Numerous neighbors attended one of several meetings and provided

insight and feedback to the Applicant. Changes were made to the plan as a result of

those meetings, resulting in the Proposal, which, with the exception of a proposed

greenhouse at the former rear smoking area, the 200 square foot second floor

cantilever, the proposed new smoking pavilion, and the small elevator shaft area,

includes no increase of the footprint of the structures on the Property.

At the behest of the Township's Planning Commission, Applicant devised the

Alternative Proposal, which, while adding to the footprint of the Main Building, alleviates

certain concerns regarding privacy and screening for the Property's residential

neighbors. The Alternative Proposal would further enhance the quality of life both for

Applicant's patients and neighbors by providing space for recreation in the basement

area, which would naturally decrease the amount of outdoor recreation on the Property.

3 The Township had previously requested that if any improvements were being proposed, that all improvements contemplated over the next 15 years be shown.

2650681v1 141117.60426

5

Ill. Conclusion

The Applicant will present testimony and evidence in support of the Application

and establish compliance with all other applicable Ordinance standards during the

hearing before the Zoning Hearing Board in support of the instant Application.

Date: November~' 2017

2650681v1 141117.60426

By:

Respectfully submitted,

Brian L. Nagle, Esquire Lindsay A. Dunn, Esquire Attorneys for Applicant

6

15 -YEAR MASTER PLAN FOR THE MALVERN INSTITUTE

E

U

M

PENNSYLVANIA ONE CALL SYSTEM, INC.

CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776

SEE SHEET FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C

.

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C

.

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C

.

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C

.

D

I

G

!

,

I

E

U

M

1-800-242-1776 POCS SERIAL NUMBER:

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

T

LOCATION MAP

NO. DATE REVISION

SCALE DRAWN BY DATE CHECKED BY

PROJECT NO.

DRAWING

F.B. cve@chesterv.com

(610) 889-3143 Fax

(610) 644-4623

P.O. Box 447, Paoli, PA 19301

Main Office: 83 Chestnut Road

Chester Valley Engineers, Inc.

civil engineers & land surveyors http://www.chesterv.com

20170

MALVERN INSTITUTE

PROPOSED SITE PLAN

FOR

EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA

UNIFORM PARCEL IDENTIFIER: 53-2-18 SEE PLAN 02/24/17 BJM RFS

1" = 50'

Scale in Feet

50 40 30 0 10 20 100 150 200

SHEET 01 OF 01

· · ·

·

N

A

V

L

S

N

N

Y

No.. PE076211

RICHARD F. STRATTON

T

PROFESSIONAL

ENGINEER

E

P

N

REGISTERED

M

O

C

O

M

A

L

W

E

I

A

F

O

H

J:\CVE-20000\20170\dwg\Sheets\15 Year Master Site Plan.dwg, 11/8/2017 11:29:12 AM, . .