Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda
Wednesday, January 17, 2018
7:00 PM
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting
- Review of Tracking Log / Determine need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes January 3, 2018
- Subdivision and Land Development Applications
- Conditional Uses and Variances Malvern Institute (SE and Variances) Meeting on Jan. 17, 2019 @ 7PM
- Ordinance Amendments Discussion on residential development changes to the Zoning Ordinance.
- 2018 Goals
- Any Other Matter
- Liaison Reports
- Correspondence
Bold Items indicate new information to review.
F:\Data\Shared Data\Agendas\Planning Commission\2018\PC AGENDA 01172018.doc
East Goshen Township
Planning Commission Tracking Log
| Application Name | Application (CU,LD,O, SD,V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Malvern Institute, 940 King Rd. | V, SE | P | 3/27/17 | 3/27/17 | NA | NA | 3/30/17 | 4 | 1/17/18 | 2/6/18 | 2/13/18 | 2/28/18 |
Bold = New Application or PC action required
Completed in 2018
| Application Name | Application (CU,LD,O, SD,V, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC NLT Action Date | BOS NLT Action Date | Hearing Date | Drop Dead date | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WCASD / EG Elem. | LD | P | 11/28/17 | 12/6/17 | 11/30/17 | 11/30/17 | 11/30/17 | 2/7/18 | 3/6/18 | NA | 3/6/18 | ||
| 1665 E. Boot Rd | V | P | 12/1/17 | 12/1/17 | NA | NA | 12/7/18 | 1/3/17 | 1/16/18 | 1/25/18 | 1/30/18 |
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2018\PC Tracking Log for 01172018.xlsx
Draft
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
January 3, 2018
The East Goshen Township Planning Commission held a regularly scheduled meeting on Wednesday, January 3, 2018 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Brad Giresi, Dan Daley, Jim McRee, Adam Knox, Ernest Harkness, Monica Close and Silvia Shin. Also present was Mark Gordon, (Township Zoning Officer), and Township Supervisors Janet Emanuel, Mike Lynch and Dave Shuey.
COMMON ACRONYMS:
| BOS – Board of Supervisors | CPTF – Comprehensive Plan Task Force |
|---|---|
| BC – Brandywine Conservancy | CVS – Community Visioning Session |
| CB – Conservancy Board | SWM – Storm Water Management |
| CCPC – Chester Co Planning Commission | ZHB – Zoning Hearing Board |
A. FORMAL MEETING – 7:00 pm
- Brad called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military.
- Brad asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response.
- Brad reviewed the Tracking Log and commented that Malvern Institute gave an extension. A workshop is scheduled for Wednesday January 17, 2018.
- Brad noted that the minutes of the December 6, 2017 meeting were approved.
B. SUBDIVISION AND LAND DEVELOPMENT
1. WCASD – East Goshen Elementary School –Mark Groves, WCASD Capital Program Manager, reviewed the application and issues that were discussed at the last meeting.
Warning Flashers – Mark Gordon found out that the Township owns these warning lights. He contacted PennDOT and got approval to move the light at the intersection of E. Boot Road further down Rt. 352 to before the Blacksmith Shop. He also got approval to install a new warning light on E. Boot Road before the intersection with Rt. 352.
Parking for events – Mark Groves commented that the school principal and a representative from the school district will contact the Township to work on a plan for the school to use Township parking areas during events held at the school.
Fire Hydrant – Mark Groves mentioned that they determined a location for a fire hydrant at the rear of the school. He explained how water will be fed into the sprinkler system in the school.
Parking Spaces – Mark Groves explained the calculation for parking spaces based on the number of staff and class rooms.
The Chester Co. Planning Commission response letter had 2 recommendations in it:
1. Give a 100 foot right of way off Rt. 352. Mark Groves pointed out the areas that would be impacted by this; i.e. lost parking spaces, fire hydrant, storm water management. Mark Gordon explained that the Township doesn’t have a need for this at this time.
2. Install sidewalks around the property. Mark Groves pointed out that there is not enough space to do this. Also, the School District does not allow any students to walk to this school. Also, they don’t allow students to walk along any major roads, such as Rt. 352 and Paoli Pike.
Buffer zone with Historic building- Mark Groves mentioned that they attended the Conservancy Board meeting and reviewed the landscaping plan, which includes a buffer along the property line with the historic building. The Conservancy Board approved the plan.
Ernest moved that the Planning Commission support the waiver requests and recommend approval of the Land Development Plan for the East Goshen Elementary School dated 4/28/2017 and revised 11/28/2017 with the following conditions:
PC 1-3-18 draft
1
- The applicant shall address all comments in the Township Engineers’ review letter dated December 19, 2017 and submit revised plans to the Township.
- The applicant shall follow all applicable Federal, State and Local laws and ordinances.
Jim seconded the motion. After discussion, Ernest revised the motion to add two more conditions:
3. In an effort to address the parking concerns for special events at the school, the Applicant shall begin conversations with the Township to use the Township Building parking lot for overflow parking during special school events.
4. The applicant shall petition PennDOT to relocate and supplement the “School Zone” flashing lights on N. Chester Rd. and E. Boot Rd. to improve safety at the school entrance on North Chester Road.
Jim seconded the revised motion. The motion passed unanimously.
C. CONDITIONAL USES AND VARIANCES
1. 1665 E. Boot Road (Dim. Variance) - Applicant and owner Eric Elliott was present along with Eric Freeman of Gasper Landscaping. Eric Freeman explained the application seeking relief from the side yard setback in order to enlarge the existing nonconforming pool house. The pool house was permitted by the Township and inspected, however, a recent survey shows that the pool house was constructed within the side yard setback area. They want to expand a non-conforming structure and have a letter of support from a neighbor.
Monica moved that the Planning Commission recommend that the Board of Supervisors take “No Position” with respect to the requested side yard variance relief. However, should the Zoning Hearing Board grant the requested relief, the following conditions should be imposed to mitigate any impacts caused by the granted relief:
- The applicant shall make every effort to protect the existing trees that currently screen the area of the proposed building addition from the neighboring property to the east.
- The applicant shall enhance the existing landscape screening, to the satisfaction of the Township, in order to provide a complete landscape screen for the neighboring property to the east.
- The applicant shall follow all applicable Federal, State and Local laws and ordinances.
Jim seconded the motion. The motion passed unanimously.
D. ORDINANCE AMENDMENTS
1. Residential Changes – Mark Gordon explained that the current Single Family Openspace Development (SFOD) regulation provides an openspace preservation development option for properties in zones R-2 and R-4, for clustering of single family homes. However, it does not consider semi-detached (carriage homes or twins) or a multi-family (townhouses) option. Brad pointed out that East Goshen is not competitive in these areas. Mike Lynch mentioned a Toll Brothers carriage home project on existing farmland in East Bradford. Janet pointed out that the remaining lots available for development are “in fill” meaning they are surrounded by other residential properties. You must consider these neighbors and have adequate setbacks. Ernie feels we need to find areas where this type of change went well and what was in the ordinance. More data is needed.
E. LIAISON REPORT
Board of Supervisors – Janet reported that they had their reorganization. Marty is Chairman, Carmen is Vice Chairman and Janet is Police Commissioner. She mentioned that Mike Lynch and Dave Shuey were sworn is as new supervisors. She reminded everyone that the annual ABC Meeting is this Saturday, January 6, 2018 from 8:00 am to 10:00 am.
F. ANY OTHER MATTER
1. Adopt-a-Highway – Mark Gordon contacted PennDot and renewed Strasburg Road for the Planning Commission. The Commission will divide into several groups to cover the different sections of the road and do a Spring and Fall cleanup.
2. Barkway Lane Pump Station – Mark Gordon explained the current maintenance that is needed for this pump station. The Municipal Authority wants to upgrade to a Muffin Monster, which will eliminate the
PC 1-3-18 draft
2
manual maintenance currently needed. They need to apply for a grant and need a letter of support from the Planning Commission. Adam moved to supply the requested letter of support. Ernest seconded the motion. The motion passed unanimously.
G. ADJOURNMENT
There being no further business, Sylvia moved to adjourn the meeting. Monica seconded the motion. The meeting adjourned at 9:00 pm. The next regular meeting will be held on Wednesday, February 7, 2018 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
PC 1-3-18 draft
3
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 1/9/2017
To: Planning Commission
From: Mark Gordon, Township Zoning Officer
Re: Malvern Institute ZHB Application for Special Exception and Variances
Staff Recommendation: After consultation with the solicitor, staff is recommending that the PC take no position with respect to the Special Exception and Variance requests or the legal argument that the Applicant makes concerning the right to expand the nonconforming use based on the doctrine of natural expansion of a nonconforming use.
Draft Motion:
Mr. Chairman, I move that the PC take no position on the special exception and variances requested by the Malvern Institute or the legal argument advanced by the Applicant with respect to the right to expand the legal non-conforming treatment center use based on the doctrine of natural expansion. Should the ZHB determine that the applicant has met its legal burden and is entitled to expand the non-conforming use; the Planning Commission recommends that the ZHB impose the following conditions on the Applicant in order to mitigate the impacts that the non-conforming use has on the surrounding community. The PC also recommends that the Board of Supervisors authorize the Township Solicitor and the Township Engineer to enter an appearance at the Zoning Hearing to advocate the Board of Supervisors’ position on the recommended conditions.
- Applicant shall restrict the drug and alcohol treatment programming at the King Road facility (the “Facility”) to in-patient treatment only.
- Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. Applicant shall forward a letter to the Commonwealth of PA Department of Health agreeing to permanently cap the licensing of the facility to 80 in-patients in perpetuity.
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. MI 01032018.doc
2705752v2
141117.60426
- Applicant shall add a camera at the front entrance as an addition to its existing camera system. The eastern parking lot gate shall be locked by 11 p.m. to ensure that any vehicle entering the site must approach the main building. Applicant shall have no less than one security guard on site during the nighttime shift when the clinical staff is reduced in number. In addition, Applicant will implement and maintain its new policy for any, however rare, nighttime patient departures against medical advice, including the use of at least one masters level clinical supervisor during the overnight shift and consistent with the Applicant’s testimony.
- Applicant commits to building a one story addition as identified in the site plan to facilitate the expansion of the use.
- Applicant agrees to submit a land development application that includes the proposed improvements to the Property which are approved in the Decision and which are consistent with the testimony and exhibits presented at the zoning hearing and with the conditions of approval within 180 days of final unappealable, and unappealed zoning approval.
- Applicant shall submit and implement a landscape plan in accordance with §240-27.C.(2) of the East Goshen Code for the western and southern portions of the property together with the planned understory restoration at the eastern property boundaries as part of its land development application.
- Applicant agrees to plant and maintain the aforesaid buffer yard landscaping in accordance with §240-27.C.(3), as long as the Property is used as a Treatment Center, subject to accommodation of the sound fence within said buffer yard landscaping.
- Applicant shall obtain all necessary governmental permits and approvals to construct a creek crossing, including but not limited to permits from the PA Department of Environmental Protection.
- Applicant shall install and maintain 8 foot high sound fencing, as described, along the entire western, southern and eastern boundaries of the Property. The 8 foot sound fencing shall extend to the King Rd. right of way line, so long as the fencing does not impede sight distance for motorists exiting the Facility’s driveway or the driveway for 950 King Rd. Any new recreation facilities shall be subject to review and approval of the Township Engineer for determining appropriate sound attenuation measures.
- Applicant shall install a fence along the right of way line for King Rd. up to and around the pump station to meet the street line on the eastern side of the property. The entrance shall include a monitored camera. This fencing and the
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. MI 01032018.doc
2705752v2
141117.60426
aforesaid sound fencing shall be connected and is intended to facilitate ingress and egress via the main entrance.
- Applicant shall identify the fencing types and styles as well as provide details of each style of fencing in the land development plan which fencing shall be approved by the Board of Supervisors at land development.
- If Applicant chooses to build a new one story building addition, the new addition shall be set back a minimum of 45 feet from any property line.
- Applicant shall agree to permit no recreational activity (excluding the garden and the greenhouse) in the area between the existing and/or proposed building and the southern and western property lines except for pedestrian walking paths.
- Applicant shall identify the active recreation areas on the land development plan.
- The Facility shall be restricted to one outdoor smoking area for patients. (smoking pavilion) The applicant shall agree to require all patients to smoke within the limit of the smoking pavilion.
- The smoking pavilion shall be equipped with a “Smoke Eater” type of ventilation and filtration system to minimize the effects of smoke for the surrounding property owners.
- Applicant shall screen the smoking pavilion from the neighboring properties to the west and north with an 8 foot sound fence. This sound fence shall remain in place until the one story addition project is complete.
- The Applicant shall demonstrate during the land development application review; that the “Smoke Eater” system can effectively ventilate and filter cigarette smoke in an open pavilion.
- The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.
- The Applicant shall install the 8 foot sound fencing and deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any walking paths and/or meditation areas on the east side of the Ridley Creek . The fencing and landscaping shall be shown on the landscape plans submitted with the land development application and shall be approved by the Board of Supervisors as part of land development.
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. MI 01032018.doc
2705752v2
141117.60426
- The Applicant shall implement the Malvern Institute 15 year renovation plan as presented to the Zoning Hearing Board in the order as outlined in Applicant’s testimony and shall implement all of the 1-2 year site improvements prior to the issuance of any building permits.
- All conditions shall be implemented as per the plans and presentations given to the Planning Commission.
- Applicant shall agree to construct all walking paths with pervious wood chips. If path surfaces are changed, permits shall be obtained prior to any changes.
- The parking lot lighting shall comply with the Township Zoning Ordinance.
- The Applicant shall comply with the parking allocation presented on the plans and presentations made to the Township Planning Commission and Board of Supervisors.
- Applicant shall agree to only permit outdoor activities on the property between the hours of 7 AM and 10 PM, provided that no more than 8 patients at any one time shall be permitted to use the smoking pavilion until 11:30 p.m., with active supervision from staff, and no more than 4, also supervised, during the overnight hours.
- The following site improvements shall be completed prior to the commencement of any other improvements listed in the 15 Year Renovation Timeline: Completion of all parking lot renovations; Completion of all sound fence installation; Installation of the smoking pavilion to include the installation of screening and smoke mitigation measures; Installation of sound blankets inside the generator fencing; Installation of understory restoration planting as determined on the land development landscape plan.
- In the event that the Applicant’s requested relief is granted, the Applicant shall agree to record a copy of the Zoning Hearing Board Decision with the Chester County Recorder of Deeds.
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\Special Exception 2017\Memo to PC Re. MI 01032018.doc
2705752v2
141117.60426
[Plan: 15-Year Master Plan / Proposed Site Plan for Malvern Institute, 940 West King Road, East Goshen Township, Chester County, Pennsylvania, prepared by Chester Valley Engineers, Inc. (Drawing No. 20170, Sheet 01 of 01, dated 02/24/17, scale 1″ = 50′). The plan shows existing campus layout, property lines, proposed 1-story basement addition, parking spaces, smoking pavilion, sound fencing, walkways, landscaping buffers, and environmental features.]
LOCATION MAP (SCALE: 1″ = 800′)
[Map showing King Road, North Chester Road, Treemont Dr., Kings Cir., Brookmont Dr., Woodcrest, and location of Malvern Institute]
EXISTING FEATURES LEGEND
- EXISTING 2' CONTOURS
- EXISTING 10' CONTOURS
- EXISTING BUILDING
- EXISTING SPOT ELEVATION
- EXISTING FENCE LINE
- EXISTING EDGE OF PAVING
- EXISTING ADJACENT PROPERTY LINE
- EXISTING EASEMENT LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING TRACT BOUNDARY LINE
- EXISTING LOT LINE
- EXISTING GUIDE RAIL
- EXISTING CURB
- SOILS LINE AND DESCRIPTION (EcB2, BdA)
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING STORM ENDWALL AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING POST
- EXISTING UNDERGROUND WATER MAIN
- EXISTING UNDERGROUND ELECTRIC
- EXISTING UNDERGROUND TELEPHONE
- EXISTING UNDERGROUND GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING FIRE LINE
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING TREE & SHRUB LINE
- EXISTING MANHOLE (SAN, STORM, GAS, WATER, ELECTRIC, TELEPHONE, ETC.)
- BUILDING SETBACK LINE
- WETLANDS POINTS
- FEMA ZONE “A” FLOODPLAIN BOUNDARY
- CALCULATED 100-YEAR FLOODPLAIN BOUNDARY
- MUNICIPAL BOUNDARY LINE
- EXISTING NUMBER PARKING SPACES
PROPOSED FEATURES LEGEND
- PROPOSED BUILDING
- PROPOSED CURB
- PROPOSED FENCE
- PROPOSED RETAINING WALL
- PROPOSED NUMBER PARKING SPACES
- PROPOSED WOODCHIP PATH
- PROPOSED TRASH/RECYCLING
NOTES:
- BEING: CHESTER COUNTY UNIFORM PARCEL IDENTIFIERS: 53-2-18 & 53-2B-13. ADDRESS FOR PARCEL 53-2-18 & 53-2B-13: 940 WEST KING ROAD, MALVERN PA 19355.
- BOUNDARY AND IMPROVEMENTS SHOWN FROM BOUNDARY AND TOPOGRAPHY SURVEY PLAN DATED JULY 31, 2006 BY SITE ENGINEERING CONCEPTS.
- TOPOGRAPHY SHOWN IN AREA FROM PHYSICAL FIELD SURVEY PERFORMED MARCH 25, 2015 BY CHESTER VALLEY ENGINEERS, INC.
- ELEVATIONS BASED ON NAVD 1988 DATUM.
- CONTOURS SHOWN BEYOND AREA OF PHYSICAL FIELD SURVEY FROM P.A.S.D.A. LIDAR CONTOURS.
- THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT.
- THE BEARINGS SHOWN ON THE TITLE LINES STILL REFLECT THE DEED BEARINGS BUT THE SITE HAS BEEN MODIFIED TO STATE PLANE COORDINATES.
- WETLANDS DELINEATION BY KEN MCKREE, PHD AND FIELD LOCATED BY SITE ENGINEERING CONCEPTS AS SHOWN ON A BOUNDARY AND TOPOGRAPHY SURVEY PLAN DATED JULY 31, 2006. ADDITIONAL WETLANDS FIELD INVESTIGATION AND DETERMINATION BY GHD SERVICES, INC ON MAY 17, 2017.
15-YEAR MASTER PLAN FOR THE MALVERN INSTITUTE
ZONING DATA – EAST GOSHEN TOWNSHIP
R-2 – RESIDENTIAL DISTRICT
| ITEM | REQUIRED | EXISTING | PROPOSED |
|---|---|---|---|
| LOT AREA (MIN.) | 1 ACRE | 9.60 ACRES | 9.60 ACRES |
| LOT WIDTH AT BUILDING LINE (MIN.) | 150 FT. | 862 FT. | 862 FT. |
| LOT WIDTH AT STREET LINE (MIN.) | 60 FT. | 877 FT. | 877 FT. |
| BUILDING COVERAGE (MAX.) | 25% | 4.72% | 7.02% |
| TOTAL IMPERVIOUS COVERAGE (MAX.) | 35% | 14.24% | 19.17% |
| BUILDING HEIGHT (MAX.) | 30 FT./3-STORIES | <30 FT. | <30 FT. |
| FRONT YARD SETBACK (MIN.) | 45 FT. | 332.8 FT. | 174.5 FT. |
| AVERAGE FRONT YARD (MIN.) | 60 FT. | N/A | N/A |
| SIDE YARD SETBACK (MIN.) | 20 FT. EACH | 111.4 FT/ 335.4 FT | 45.1 FT/ 335.4 FT |
| REAR YARD SETBACK (MIN.) | 50 FT. | 54.7 FT. | 54.7 FT. |
LOT AREA CALCULATIONS
(AREAS IN SQ. FT.)
| UPI# 53-2-18 | UPI# 53-2B-13 | |
|---|---|---|
| GROSS AREA = | 418,080 (9.60 Ac) | 43,565 (1.00 Ac) |
| LESS: | ||
| STREET R/W = | 58,916 (1.35 Ac) | 4,040 (0.09 Ac) |
| LOT AREA = | 359,164 (8.25 Ac) | 39,525 (0.91 Ac) |
PARCEL 53-2B-13 HAS NOT BEEN INCLUDED IN ANY CALCULATIONS
IMPERVIOUS COVERAGE
(AREAS IN SQ. FT.)
| EXISTING | PROPOSED | |
|---|---|---|
| 2 1/2 STORY MASONRY (PRIMARY BUILDING) = | 13,411 | 13,411 |
| PROPOSED (PRIMARY BUILDING) ADDITION = | -- | 6,980 |
| 1 STORY MASONRY = | 526 | 526 |
| 2 STORY BARN = | 2,240 | 2,322 |
| SHED = | 120 | 120 |
| SPRING HOUSE = | 296 | 296 |
| PUMP STATION BUILDING = | 301 | 301 |
| WALK-IN FREEZER (W.I.F.) = | 44 | 44 |
| PAVEMENT (INCLUDING CURB) = | 33,080 | 41,886 |
| SIDEWALKS = | 1,144 | 1,774 |
| SMOKING PAVILION = | -- | 800 |
| GREEN HOUSE = | -- | 400 |
| *TOTAL = | 51,162 (14.24%) (1.17 Ac) |
68,860 (19.17%) (1.58 Ac) |
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | SUITABILITY FOR: WINTER GRADING | SUITABILITY FOR: ROAD SUBGRADE | SUITABILITY FOR: ROAD FILL | CHARACTERISTICS THAT AFFECT: TOPSOIL | CHARACTERISTICS THAT AFFECT: FARM POND EMBANKMENTS |
|---|---|---|---|---|---|---|---|---|
| URBAN LAND – CHESTER COMPLEX | ||||||||
| UugB | 0% TO 8% SLOPES | > 200 CM | 20″ TO 70″ | 165 DAY | NOT RATED | NOT RATED | NOT RATED | NOT RATED |
| UugD | NOT SPECIFIED | |||||||
PARKING TABULATION
REQUIRED PARKING PER ORDINANCE SECTION 240-33.A.(2)(b)[2]C]D.2*
- 1 SPACE/4 BEDS * 80 BEDS = 20 SPACES
- 1 SPACE/EMPLOYEE DURING PEAK SHIFT * 35 EMPLOYEES = 35 SPACES
- 1 SPACE/ EXTRA EMPLOYEE DURING OVERLAPPING SHIFTS * 20 EMPLOYEES = 20 SPACES
- 4 SPACES FOR MALVERN INSTITUTE WORK VEHICLES = 4 SPACES
| TOTAL REQUIRED = | 79 SPACES |
|---|---|
| TOTAL EXISTING = | 48 SPACES |
| TOTAL PROPOSED = | 33 SPACES (INCLUDES 3 HANDICAP SPACES) |
| TOTAL PARKING PROVIDED = | 81 SPACES (INCLUDES 4 HANDICAP SPACES) |
* TREATMENT CENTER USE NOT LISTED IN OFF STREET PARKING ORDINANCE THEREFORE REQUIRED PARKING TABULATED FOR MOST SIMILAR USE LISTED IN ACCORDANCE WITH 240-33.A(1)(b).
PROPOSED SITE PLAN
FOR
MALVERN INSTITUTE
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc.
civil engineers & land surveyors
Main Office: 83 Chestnut Road, P.O. Box 447, Paoli, PA 19301
(610) 644-4623 • cve@chesterv.com • http://www.chesterv.com
REVISION TABLE:
| NO. | DATE | REVISION |
|---|---|---|
| 1 | 11/07/2017 | ONE STORY ADDITION OPTION |
| 2 | 12/11/2017 | ONE STORY ADDITION OPTION (AMMENDED) |
SCALE: SEE PLAN • DATE: 02/24/17 • DRAWN BY: BJM • CHECKED BY: RFS • PROJECT NO. 20170 • SHEET 01 OF 01
[Seal: Commonwealth of Pennsylvania Registered Professional Engineer Richard F. Stratton, PE078211]
UNIFORM PARCEL IDENTIFIER: 53-2-18
[Colored site plan: a main building, carriage house, barn and spring house on a green site with a parking lot, wooded areas, a stream and pond, surrounded by neighboring lots with houses. Roads labeled: King Road SR 2022, Madeline Drive, Kings Circle, Line Road, Treemont Dr, Brookmont Drive.]
EXISTING CONDITIONS
FOR
THE MALVERN INSTITUTE
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers
civil engineers & land surveyors
DATE: SEPTEMBER 26, 2017
Chester Valley Engineers, Inc.
Main Office: 83 Chestnut Road
P.O. Box 447, Paoli, PA 19301
(610) 644-4623
(610) 889-3143 Fax
cve@chesterv.com
http://www.chesterv.com
JOB #: 20170
SHEET 01 OF 04
Scale in Feet: 1" = 40'
LEGEND
- BUILDINGS
- PAVING
- PARKING
- PATH (WOOD CHIPS) PERVIOUS
- TREES
- FENCE
Other labels: EAST WHITELAND TOWNSHIP, EAST GOSHEN TOWNSHIP, WILLISTOWN TOWNSHIP, EXISTING BUILDING/MAIN HOUSE, EXISTING BARN, EXISTING CARRIAGE HOUSE, EXISTING SPRING HOUSE, GARDEN AREA, wood privacy fence notes, [illegible] fine print.
[Site plan drawing depicting the 15-Year Master Plan for The Malvern Institute in East Goshen Township, Chester County, Pennsylvania, prepared by Chester Valley Engineers, Inc. (Job #: 20170, Date: January 08, 2018, Sheet 02 of 04). The plan shows proposed building additions, reconfigured parking and driveways, meditation garden, sound fencing, landscaping, operations activity zones, and zoning/parking tabulations. Labelled roads include Madeline Drive, King Road SR 2022, Kings Circle, Treemont Dr, Brookmont Drive and Line Road.]
PARKING TABULATION
REQUIRED PARKING PER ORDINANCE SECTION 240-33.A(2)(b)[2][C]D.2*
- 1 SPACE/4 BEDS * 80 BEDS = 20 SPACES
- 1 SPACE/EMPLOYEE DURING PEAK SHIFT * 35 EMPLOYEES = 35 SPACES
- 1 SPACE/ EXTRA EMPLOYEE DURING OVERLAPPING SHIFTS * 20 EMPLOYEES = 20 SPACES
- 4 SPACES FOR MALVERN INSTITUTE WORK VEHICLES = 4 SPACES
TOTAL REQUIRED = 79 SPACES
TOTAL EXISTING = 48 SPACES
TOTAL PROPOSED = 33 SPACES (INCLUDES 3 HANDICAP SPACES)
TOTAL PARKING PROVIDED = 81 SPACES (INCLUDES 4 HANDICAP SPACES)
* TREATMENT CENTER USE NOT LISTED IN OFF STREET PARKING ORDINANCE THEREFORE REQUIRED PARKING TABULATED FOR MOST SIMILAR USE LISTED IN ACCORDANCE WITH 240-33.A(1)(b).
IMPERVIOUS COVERAGE
(AREAS IN SQ. FT.)
| Feature | EXISTING | PROPOSED |
|---|---|---|
| 2 1/2 STORY MASONRY (PRIMARY BUILDING) | 13,411 | 13,411 |
| PROPOSED (PRIMARY BUILDING) ADDITION | -- | 6,980 |
| 1 STORY MASONRY | 526 | 526 |
| 2 STORY BARN | 2,240 | 2,322 |
| SHED | 120 | 120 |
| SPRING HOUSE | 296 | 296 |
| PUMP STATION BUILDING | 301 | 301 |
| WALK-IN FREEZER (W.I.F.) | 44 | 44 |
| PAVEMENT (INCLUDING CURB) | 33,080 | 41,886 |
| SIDEWALKS | 1,144 | 1,774 |
| SMOKING PAVILION | -- | 800 |
| GREEN HOUSE | -- | 400 |
| *TOTAL | 51,162 (14.24%) (1.17 Ac) | 68,860 (19.17%) (1.58 Ac) |
LOT AREA CALCULATIONS
(AREAS IN SQ. FT.)
| Calculation | UPI# 53-2-18 | UPI# 53-2B-13 |
|---|---|---|
| GROSS AREA | 418,080 (9.60 Ac) | 43,565 (1.00 Ac) |
| LESS: STREET R/W | 58,916 (1.35 Ac) | 4,040 (0.09 Ac) |
| LOT AREA | 359,164 (8.25 Ac) | 39,525 (0.91 Ac) |
PARCEL 53-2B-13 HAS NOT BEEN INCLUDED IN ANY CALCULATIONS
ZONING DATA - EAST GOSHEN TOWNSHIP
R-2 - RESIDENTIAL DISTRICT
| ITEM | REQUIRED | EXISTING | PROPOSED |
|---|---|---|---|
| LOT AREA (MIN.) | 1 ACRE | 9.60 ACRES | 9.60 ACRES |
| LOT WIDTH AT BUILDING LINE (MIN.) | 150 FT. | 862 FT. | 862 FT. |
| LOT WIDTH AT STREET LINE (MIN.) | 60 FT. | 877 FT. | 877 FT. |
| BUILDING COVERAGE (MAX.) | 25% | 4.72% | 7.02% |
| TOTAL IMPERVIOUS COVERAGE (MAX.) | 35% | 14.24% | 19.17% |
| BUILDING HEIGHT (MAX.) | 30 FT./3-STORIES | <30 FT. | <30 FT. |
| FRONT YARD SETBACK (MIN.) | 45 FT. | 332.8 FT. | 174.5 FT. |
| AVERAGE FRONT YARD (MIN.) | 60 FT. | N/A | N/A |
| SIDE YARD SETBACK (MIN.) | 20 FT. EACH | 111.4 FT/ 335.4 FT | 45.1 FT/ 335.4 FT |
| REAR YARD SETBACK (MIN.) | 50 FT. | 54.7 FT. | 54.7 FT. |
OPERATIONS KEY MAP
SCALE: 1" = 200'
- FACILITY OPERATIONS ACTIVITY
- DAILY-SUPERVISED PATIENT ACTIVITY AREA
- SHORT-TERM SUPERVISED PATIENT ACTIVITY AREA
- NO ACTIVITY
Surrounding roads on the key map: KING ROAD SR 2022, MADELINE DRIVE, KINGS CIRCLE, BROOKMONT DRIVE
LEGEND
| Feature | Existing | Proposed |
|---|---|---|
| BUILDINGS | Tan block | Brown block |
| PAVING | Light gray | Dark gray |
| PARKING | Paved stalls | Paved stalls |
| PATH (WOOD CHIPS) PERVIOUS | Tan strip | Brown strip |
| TREES | Green tree canopy symbol | Green tree canopy symbol with center dot |
| FENCE | Line with crosses | Green band with dashed line |
15-YEAR MASTER PLAN
FOR
THE MALVERN INSTITUTE
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers
civil engineers & land surveyors
DATE: JANUARY 08, 2018
Chester Valley Engineers, Inc.
Main Office: 83 Chestnut Road
P.O. Box 447, Paoli, PA 19301
(610) 644-4623
(610) 889-3143 Fax
cve@chesterv.com
http://www.chesterv.com
JOB #: 20170
SHEET 02 OF 04
Scale in Feet: 1" = 40'
[Engineering drawing showing sight line profiles for The Malvern Institute, East Goshen Township, Chester County, Pennsylvania, prepared by Chester Valley Engineers, Inc. (Job #: 20170, Date: January 08, 2018, Sheet 03 of 04). The sheet includes cross-sectional profiles A through H illustrating lines of sight from neighboring residential properties across proposed 8-foot sound fencing to the institute's buildings, along with a plan map showing sightline orientations.]
SECTION A – DOUGLAS W. JONES
Proposed line of sight to top of fence: 179'
Features: Top of 8' sound fence, Proposed 1 story addition, Exist. masonry bldg.
SECTION B – DOUGLAS W. JONES
Proposed line of sight to top of fence: 132'
Features: Existing wood fence, Top of 8' sound fence, Proposed 1 story addition.
SECTION C – JOSEPH H. FENIMORE
Proposed line of sight to top of fence: 301'
Features: Existing wood fence, Top of 8' sound fence, Proposed 1 story addition, Exist. masonry bldg.
SECTION D – JANICE DENKER
Proposed line of sight to top of fence: 255'
Features: Existing wood fence, Top of 8' sound fence, Exist. masonry bldg.
SECTION E – LISA O'NEILL
Proposed line of sight to top of fence: 243'
Features: Existing wood fence, Top of 8' sound fence, Exist. masonry bldg.
SECTION F – JOSEPH & DEBORAH MAROVICK
Proposed line of sight to top of fence: 195'
Features: Existing wood fence, Top of 8' sound fence, Exist. masonry bldg.
SECTION G – JOSEPH & MISETIC MEHL DB
Proposed line of sight to top of fence: 321'
Features: Existing wood fence, Top of 8' sound fence, Exist. masonry bldg.
SECTION H – MARY & LOUIS IRVINE
Proposed line of sight to top of fence: 370'
Features: Existing wood fence, Top of 8' sound fence, Proposed greenhouse, Exist. masonry bldg.
LEGEND
| Feature | Existing | Proposed |
|---|---|---|
| BUILDINGS | Tan block | Brown block |
| PAVING | Light gray | Dark gray |
| PARKING | Paved stalls | Paved stalls |
| PATH (WOOD CHIPS) PERVIOUS | Tan strip | Brown strip |
| TREES | Green tree canopy symbol | Green tree canopy symbol with center dot |
| FENCE | Line with crosses | Green band with dashed line |
SIGHT LINE PROFILES
FOR
THE MALVERN INSTITUTE
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers
civil engineers & land surveyors
DATE: JANUARY 08, 2018
Chester Valley Engineers, Inc.
Main Office: 83 Chestnut Road
P.O. Box 447, Paoli, PA 19301
(610) 644-4623
(610) 889-3143 Fax
cve@chesterv.com
http://www.chesterv.com
JOB #: 20170
SHEET 03 OF 04
Scale in Feet: 1" = 40'
[Site plan drawing with two panels, labelled EXISTING FEATURES PLAN (top) and PROPOSED PLAN (bottom), each showing the Malvern Institute property in East Goshen Township with buildings, a parking area, a pond and stream, and wooded areas, bordered by King Road SR 2022, Madeline Drive, Kings Circle, Line Road, Brookmont Drive and Treemont Dr. The proposed panel adds a building addition, expanded paving and parking, wood chip paths, trees and fencing.]
EXISTING FEATURES PLAN
Scale in Feet: 1" = 60'
PROPOSED PLAN
Scale in Feet: 1" = 60'
LEGEND (Existing / Proposed)
- BUILDINGS
- PAVING
- PARKING
- PATH (WOOD CHIPS) PERVIOUS
- TREES
- FENCE
15-YEAR MASTER PLAN
FOR
THE MALVERN INSTITUTE
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers
civil engineers & land surveyors
DATE: JANUARY 08, 2018
Chester Valley Engineers, Inc.
Main Office: 83 Chestnut Road
P.O. Box 447, Paoli, PA 19301
(610) 644-4623
(610) 889-3143 Fax
cve@chesterv.com
http://www.chesterv.com
JOB #: 20170
SHEET 04 OF 04
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 1/11/2018
To: Planning Commission
From: Mark Gordon, Township Zoning Officer
Re: New Residential Development Regulations
Dear Commissioners,
As a follow-up to our last conversation about new residential development regulations concerning our remaining larger underdeveloped parcels I found the following to support the concept.
The Township Comprehensive Plan:
Objective 6.7 – Continue to provide for a variety of housing options within the Township to accommodate a diverse population.
Recommendation 6.7.1 – Evaluate the Zoning Ordinance in Light of housing choices for changing demographics and income diversity.
Objective 6.8 – Preserve the Character of existing residential housing neighborhoods.
Recommendation 6.8.1 – Consider adopting provisions in the Zoning and Subdivision & Land Development Ordinance that encourage innovative design for new residential development while respecting the character of surrounding neighborhoods.
Paoli Pike Corridor Master Plan:
The Land Use Overview of the Paoli Pike Corridor Master Plan identifies a demand for additional housing units in the Township. Based on the population projections and the build out analysis, more diverse housing options are needed.
Staff Recommendation:
Staff is of the opinion that there is support in both the PPCMP and the Comp Plan to warrant moving forward with a planning effort to develop an amendment to the existing
F:\Data\Shared Data\Code Dept\New Openspace Development Regulation 2018\Memo to PC 01112018 re. New Openspace Development Regs.doc
SFOD ordinance or a to develop a new residential openspace development that will meet these identified goals and objectives.
Draft Motion:
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors authorize the Staff and the Planning Commission to begin the process of drafting a zoning ordinance to permit semidetached dwellings and/or townhouse dwellings as an option for a residential openspace development option.
F:\Data\Shared Data\Code Dept\New Openspace Development Regulation 2018\Memo to PC 01112018 re. New Openspace Development Regs.doc
Appendix A-3 Land Use
Action Item 6.3.2.5. - Review landscaping regulations to enhance landscaping for new uses, while recognizing the practical limitations of nonconforming uses and combined sites.
Objective 6.4. – Continue to receive guidance from the Authorities, Boards, and Commissions (ABC’s).
The ABC’s offer valuable talent and insight on numerous land use issues. The roles of the ABC’s should be maintained and expanded.
Recommendation 6.4.1. – Continue to meet in January of each year to review past achievements and current goals.
Action Item 6.4.1.1. – Continue to seek input and new creative ideas from the ABC’s for improving and enhancing the Township.
Objective 6.5. – Continue effective governance by the East Goshen Township Board of Supervisors.
Recommendation 6.5.1. – Continue to focus on all aspects of land use, development, and redevelopment.
Action Item 6.5.1.1. – Continue to rely on the input of the ABC’s.
Objective 6.6. – Continue to accommodate a diverse mix of residential, commercial, institutional, light industrial, and recreational uses.
Recommendation 6.6.1. – Insure that the Ordinances are consistent with and used to implement the Future Land Use Plan.
Action Item 6.6.1.1. – Compare the text and map of the Zoning Ordinance with the Future Land Use Map and consider updates to the Ordinance as needed to provide for land use decisions that are consistent with this map.
Action Item 6.6.1.2. – Review the Subdivision & Land Development Ordinance, with the Future Land Use Plan and consider needed revisions.
Objective 6.7. – Continue to provide for a variety of housing options within the Township to accommodate a diverse population.
An extensive number of single-family detached dwellings on individual lots are located throughout the Township. In addition, the northern portion of the Township is home to Hershey’s Mill, a large, senior-oriented, and gated residential/golf course community that offers a mix of housing options. Higher-density housing in the form of townhomes and garden apartments is clustered along West Chester Pike at the southern end of the Township. Consistent with national housing trends, most of the Township residents are likely to prefer remaining in their current housing as they grow older, or move to other forms of housing in the Township that can address their changing needs. Also, an increasing number of children of
A-3-4
Appendix A-3 Land Use
Township families, upon graduation from college, are expected to return to their parents’ home while seeking suitable employment or while working to pay off student debt.
Recommendation 6.7.1. – Evaluate the Zoning Ordinance in light of housing choices for changing demographics and income diversity.
Action Item 6.7.1.1. – Consider updating residential zoning districts to allow smaller residential lots, multi-generational homes, and principal and accessory residential dwellings on the same lot.
Action Item 6.7.1.2. – Continue to accommodate higher-density residential housing through zoning, especially near existing or planned commercial areas and where infrastructure capacity exists or is planned.
Objective 6.8. – Preserve the character of existing residential neighborhoods.
Recommendation 6.8.1. – Consider adopting provisions in the Zoning and Subdivision & Land Development Ordinances that encourage innovative design for new residential development while respecting the character of surrounding neighborhoods.
Action Item 6.8.1.1. – Encourage innovative development in areas of the Township designated Low Density Residential (LDR) Medium Density Residential (MDR) or Planned Community (PC) on the Future Land Use Map in order to better protect existing neighborhoods, historic structures, and natural resources.
Action Item 6.8.1.2. – Review and amend, if necessary, the existing lot area, width, and yard regulations of the R-3, Medium Density Residential District to more closely reflect the existing lot sizes within this district.
Action Item 6.8.1.3. – Utilize the input of the Township’s Historic Commission and the Conservancy Board during review of sketch, preliminary, and final land development plan applications, as well as for Variance, Special Exception, and Conditional Use applications, to help address historic- or environmentally-related issues.
Action Item 6.8.1.4. – Review area and bulk regulations, and impervious coverage limitations in all residential zoning districts and update as necessary to provide for appropriately designed infill development.
Objective 6.9. – Retain and attract corporate investment on lands shown on the Future Land Use Plan as Business Park Industrial.
Recommendation 6.9.1. - Create opportunity for more compatible or co-dependent, uses, building expansion, and expanded amenities in existing corporate/business/industrial parks.
Action Item 6.9.1.1. – Allow for growth within the business and industrial parks by considering amendments to the B-P and I-1 zoning districts to increase the maximum building height beyond 3 stories or 35 feet, and to permit building coverage to exceed 30 percent.
A-3-5