Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, March 7, 2018 Rescheduled for Wednesday, March 21, 2018

7:00 PM

F:\Data\Shared Data\Agendas\Planning Commission\2018\PC AGENDA 03072018 rev 3.doc

A. Call to Order / Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log / Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. February 7, 2018 F. Subdivision and Land Development Applications

1. 1506 Meadowbrook Dr. (SD/LD) G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business

1. Discussion on RFP for residential development changes to the Zoning Ordinance. 2. Discussion with Mr. Tom Comitta on Paoli Pike Corridor Zoning Overlay District J. 2018 Goals K. Any Other Matter

1. 1405 Wexford Circle – On Lot Sewage application - Sewage Facility Module L. Liaison Reports M. Correspondence Bold Items indicate new information to review.

'

<C 0 u.i "' > c "' 6 ci -!. :::> 0 - LL - c 0.:- 0 "O :;:; ~ ~ ca "' .~ - u:: Q..

Q) Q) c. - Application Name : ?:

ca c 1506 Meadowbrook Drive SD/LO P/F 2/26/2018

Bold = New Application or PC action required

Completed in 2018

Malvern Institute, 940 King Rd. V,SE p 3/27/17 WCASD I EG Elem. LD p 11/28/17 1665 E. Boot Rd v p 12/1/17

East Goshen Township Planning Commission Tracking Log

_in ... 0

Q) m Q) <C .5 - C) si c e w a. c. :c C) 0 c 0 :;:::; c - == a. ::I 0 .Q Q) 0 - I- 0 <C ca c 0 0 0 - - - ~ Q) Q) Q) ca - - - -

ca ca ca "'

c c c 3/7/2018 3/27/2018 3/1/2018 3/1/2018

3/27/17 NA NA 3/30/17 12/6/17 11/30/17 11/30/17 11/30/17 12/1/17 NA NA 12/7/18

Q) - Q) ca - c ca c c c 0 0 :;:::; u Q) :;:::; - u <C ca c <C c 0 I- ·u; I- ...J C) ...J z c c Q) z "'

·;:

>< 0 ca 0 Q) w a. m :c 5/16/2018 6/5/2018 NA

4 1/17/18 2/6/18 2/13/18 2/7/18 3/6/18 NA 1/3/17 1/16/18 1/25/18

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2018\PC Tracking Log for 03072018.xlsx

Q) - ca "O "O 0 - ca c Q) Q) c E c. E 0 ... 0 c 0 6/5/2018

2/28/18 3/6/18 APPD 1/30/18 APPD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Draft EAST GOSHEN TOWNSIDP PLANNING COMMISSION MEETING

February 7, 2018

The East Goshen Township Planning Commission held a workshop meeting on Wednesday, February 7, 2018 at 7:00 p.m. at the East Goshen Township building. Members present were: Chairman Brad Giresi, Adam Knox, Dan Daley, Jim McRee, Ernest Harkness, Monica Close and Silvia Shin. Also present was Mark Gordon, (Township Zoning Officer) and Janet Emanuel, (Township Supervisor).

COMMON ACRONYMS:

BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission

A. FORMAL MEETING- 7:00 pm

CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management

ZHB - Zoning Hearing Board

1. Brad called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military. 2. Brad asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. Brad reviewed the Tracking Log 4. Brad noted that the minutes of the January 17, 2018 meeting were approved as amended.

B. LIAISON REPORTS

1. Board of Supervisors - Janet reported that the BOS met with Malvern Institute twice. The Township Solicitor is not sure what the Zoning Hearing Board will do. A few alterations were made to the Planning Commission's conditions. Two main issues were: 1. The sound fence - all agreed they don't like the noise but neighbors at higher elevations feel the sound will go over the fence anyway and they don't like the look of the fence. It is too industrial. The wording in the conditions was changed to "an 8 foot fence to be approved in Land Development by the BOS". 2. MI residents leaving without permission and getting into the neighborhood. The ZHB will meet next Tuesday to start the process and schedule a site walk.

The Historic Commission is reorganizing and having their first meeting tomorrow night.

B. ORDINANCE AMENDMENTS

1. Residential Development - Multi-family Open Space Development. Mark commented that the Township Comprehensive Plan and the Paoli Pike Trail Plan mention different types of housing. He presented a map of an area in East Bradford near West Chester University football field on Tigue Rd. This was about 80 acres. There is nothing that big available in East Goshen. The compromise was that all multi-family housing would be built in the larger property. The small piece on the other side of the road would remain open space. He recommended that the Planning Commission visit the sites that are available in East Goshen. Brad suggested meeting with developers. Monica moved that the Planning Commission recommend that the Board of Supervisors authorize the Staff and Planning Commission to begin the process of drafting a zoning ordinance to permit semidetached dwellings and/or townhouse dwellings as an option for a residential open space development option. Jim seconded the motion. The motion passed unanimously.

2. Paoli Pike Corridor Zoning Overlay - Mark gave each of the Commission members a copy of the final Paoli Pike Trail Plan. Brad commented that they should look at the land use and the vision of future development along the trail. They need to get approval from the BOS to hire Tom Comitta, consultant, to help with this overlay district. High priorities are Goshenville streetscape and way finding and signage. Mark reviewed the funding grants the Township has received so far. He went to a Futurist Committee meeting and discussed the Trail and Corridor plans. Engineering has started on one section of

PC 2-7-18 draft 1

1 the trail. Ernest moved that the Planning Commission recommend that the BOS authorize the Staff to 2 solicit a proposal from Thomas Comitta Associates to develop the following ordinance amendments in 3 order to implement the Paoli Pike Corridor Master Plan recommendations: 4 1. Zoning Ordinance Text Amendment 5 2. Zoning Map Amendment 6 3. SALDO Amendments 7 Jim seconded the motion. The motion passed unanimously. 8 9 ADJOURNMENT 10 There being no further business, Adam moved to adjourn the meeting. Ernest seconded the 11 motion. The meeting adjourned at 8:30 pm. The next meeting will be held on Wednesday, March 7, 12 2018 at 7:00 pm. 13 14 Respectfully submitted,. ___________________ _ 15 Ruth Kiefer, Recording Secretary

PC 2-7-18 draft 2

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 3/1/2018 To: Planning Commission / From: Mark Gordon, Township Zoning Officer ~ \() Re: 1506 Meadowbrook Dr. I SD-LD Application

Dear Commissioners,

As you may recall, the applicant received zoning variances for the following last summer in order to facilitate the proposed SD&LD application

The Variances requested are:

1. Min. lot width at street line, §240-9{G} (Required 60' minimum} a. Lot 2 - Proposed 0 (zero) linear feet of street frontage 2. Street Frontage, §240-23(B)(2)(a} (Street frontage required} a. Lot 2 - Proposed 0 (zero) linear feet of street frontage 3. Flag pole portion of the flag lot, §240-23(B}(2}(b}[2][e] (Required - 40' wide minimum}

a. Lot 1 - Proposed 25' width for the flag pole portion of the lot.

Staff Recommendation:

The Township Engineer is reviewing the application and will have a review for the April 4th meeting.

F:\Data\Shared Data\Property Management\53-4\53-4-23 {1506 Meadowbrook Ln.)\2017 ZHB App\Memo to PC 2016 07272017.doc

610-692-7171

www.eastgoshen.org

March 1, 2018

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380- 6199

Dear Property Owner:

FYI

The purpose of this letter is to inform you that the owner of 1506 Meadowbrook Dr., West Chester, PA 19380, has submitted a Subdivision and Land Development Application for their property. The owners, Stephen and Denise Legenstein, propose to subdivide their property to create one new residential lot for one new single family home. The existing parcel has an area of approximately 1.999 acres and has an existing single family home. The owners have an agreement with the neighboring property owner to purchase a 400 square foot strip of land in order to increase the area of their property to 2 acres to facilitate the subdivision of the parcel.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of subdivision and land development application submissions and the meeting dates when the application will be discussed.

The Subdivision and Land Development Application will be reviewed at the following meetings:

• March 7, 2018 - Planning Commission meeting (7:00 PM)

• April 4, 2018 - Planning Commission meeting (7:00 PM)

• May 1, 2018 - Board of Supervisors (7:00 PM)

All meetings are held at the Township Building and are open to the public and subject to change without further written notice by the Township. The application is available for review at the Township building during normal business hours. Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

~2l Mark A. Gordon Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-4\53-4-23 (1506 Meadowbrook Ln.)\2018 SD & LD\1000 foot letter for SO- LD apl? 03012018.doc

EAST GOSHEN TOWNSHIP

CHESTER COUNTY, PA

SUBDIVISION AND I OR LAND DEVELOPMENT APPLICATION

Date Filed:

Application for (Circle one): / 0 Subdivision 0 Land Development efsubdivision & Land Development

A. Application is hereby made by the undersigned for approval of a Subdivision and or Land

Development Plan, more particularly described below.

1. Applicant's name: S

Address: (S{J G

}~/\ f- C'<otdo w

2. Name and address of present owner (if other than 1. above)

c· ro- 3 A:S ----

~f ~

Name: ---=~-~_,____'t" __ A;>.:.s::;____;~~---"""-· '---~------- Address:----------------- Phone: _____ _

3. Location of plan:

4. Proposed name of plan:-----------------

5. County Tax Parcel No.: J J' t{ .,,-- J 3 Zoning District: ·{Q_ - ?-

6. Area of proposed plan (ac.): d • ~ 0 g1f tft- Number of lots: (). ~ /-4--/

7. Area of open space (ac.): /V/ 1.:- 2 {,.,, JJ? ,4 ..... ; 6" 4 <!l ,._.,. ..::. • /y' j

8. Type of structures to be constructed:/ j. {}II /J f tJ ( '/ ) t{ (J" ,,/ i (/; (a f

9. w~ provisions are to be made tor water supply and sritary sewer? Wt!! tf f ru Uc St?W~ k/r'f'+df= ~Y:IJ6

10. Linear feet of road to be const~ucted: A/ tJ I{ ~ /?

11. Name of Engineer: 5 ~I v-< -i><>"l C:, lA Y (c, l.<. V b(<!J ,- ) »;:.- I I Phone Number: OE~ ·'J_ Fax: --------

Email address:-------------------

f:\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc

EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION

1( J (' , ;J ~ - I ;1 S.H r ~ t< !«_rK-f'YJ/) 12. Name of Land Planner: -- ·~-o~lr ___ )_11~ __ ,~·T'L ___ --___ 1' __ fl__ { ·

Email address:---------------------

B. I/We agree to reimburse the Township of East Goshen for such fees and expenses the

Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan. C. I/We agree to post financial security for the improvements depicted on the Subdivision and or

land Development Plan pursuant to the Subdivision and Land Development Ordinance. D. I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost

to Township.

NOTICE

The Township requires an Occupancy Permit before any building can be occupied; no Occupancy Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.

plicant Signature

6' (fJ -- gSJ;; ~ ~() !'}

(/,' d f/ /It~ v.+- 0:+ ~ ~

I tf Jr 8~ct f {L-P

Fees received from applicant $ _____ basic fee, plus $ _____ per lot

For ____ lots=$ ______ _

Application and plan received by: ---------- Date: -------

(Signature)

Application accepted as complete on: _______ _

(Date)

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 2

EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION

SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process.

* Review the formal Planning Commission review procedure on page five.

Application for (Circle all appropriate): ~divisionOLand Development

Applicant Information: ii--(> /J f,, .A {- a A/ { -f' !~("' ~ f /-e_ ',/ . N; ~ w bl"<' u I< ?--1:11-e:-- .,

Name of Applicant:

Address: /S?J {;

Telephone Number: 0/CJ /g J-} -"fJ tf"J- Fax: ' -----------

Email Address:

Property Addres-s:~~-/~flJ ~- --~~~-l-{ -~-- t7-_4--i -_-C4~~~tA./ ===f=/\=d=o=-~ - - ====ht ===r1=-c:.-=

Property Information:

Owner's Name:

Address: ( ~-~

5f-t>t ~

1 -tP~ r J2~~ 5f fl( 'C4 ~ t,J bid /( l /lvr <

Tax Parcel Number: }i . ..-- ~ 1--} Zoning District: 7Z.. J-- Acreage: ~RJ 'fO/}

Description of proposed subdivision and or land Development:

o?' I lo£

!IP /f <J~ S& I t/$( l>oof

14/t

F:\Data\Shared Dala\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 3

I I

5.05'

SEIERAL NOTES:

1. Both proposed lots will be served bY public sewer and on-lot water. 2. Lot f 2 is currently connected to public sewer end hes en an-lat water well. Lot I 1 will be connected to the existing public sewer vie en easement in Lot f 2. 3. A well permit from the Chester county Health Department is required before an occupancy

~- Iron pine shell be set et property corners. permit is iauued.

[i'l.i]~[Q)@\'l,i'll[IDIJ\l@@~ 11L!.\OO~

"' • Ii!. -~ ruO

33' WlDE -----

151.94'

N 49'31'00• E 226.60'

110.31'

N 49'31'00• E 110.31' -I~ ----=·~·o~·~'·_·_

N 49'31'00- E 110.32'

PROPERTY Ol'll£R'S CERTIFICATION: l J J The land owner acknowledges the per the provisions of the East Gosha Township Stormwater Manage ent Ordinance, it is unlawful to modify, remov • fill, landscape, alter or i11Pair th effectiveness of, or plac any structure. other vegetation, yard waste, brush cuttings, or other waste or debris into any permanent stor11Water managemant BNP or conveyance described in this O&M plan or to allow tha BMP conveianca to exist in a condition, whicn doas not conform to this O&M plan. without written approval from the Towneh p. The individual lot owner. hie/her heirs. assigns or successors shall be responsible for the perpetual llBintenance of the said facilities. A blanket stor11Weter manage11ent ease11ent is provided over and across the property in favor of East Goshen Township to allow the Township and its agents and designeee access to the proposed etor11Water facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requireinents of the Township's Stormwater Management Ordinance or of anI applicable OGM plan or OGM agreement. If the property owner. his/her heirs. assigns or successors. fails in anI way to 118 ntain the said facilities, or ceusee these facilities to be altered or removed, upon written notificat on by the Township, the defects ehall promptly be corrected by the property owner. Upon the owner's failure to correct the defects within time specified by the Township, the owner, hislhar hairs, assigns or successors, do hereby authorize the Township and/or its contractor to enter upon the said property and cause the repair, llBintenance, and/or correction to be 11Bde. A lien llBY be filed against the property for the cost of all corrections, including applicable engineering and/or attorney's fees. The Township is under no obligation to take any action. All subsequent real estate transactions. the existence of these stormwater facilities and their maintenance rasponsibilitias shall be disclosed to the new owners. Any revision to the approved SWM site plan shall be submitted to the Township along with an Erosion G Bedi11entation control Plan for review and approval.

Signature Dllte ....

N 49'31'00• E 250.00'

,~ I

EP

~ 49'31'00"' w 110.32' EP N 49"31'00"' E 110.32'

N49.31 '00"E-~ 25.05'

FLAG

OVERLAP

16.50'

POLE WIDTH

2s.oo·

8.50'

N/L HAMM DANIEL G

& SHEILA A 1510 MEADOWBROOK LN . DBt9103, PGf106

0· ru~ . ru ru . "°' ..... C0"1

I I

~o /·o"' coN !ii

N55 '02 '40 "E 193.29· N/L MATCHICA STRATTON N '

& ANGELA N I

EX.DRIVEWAY TO BE WIDENED TO 12'

N/L DORN ARTHUR

1508 MEADOWBROOK LN. 08#8113, PGf1271 I

!ii .. !; S55 "02, 40"W ~ 194.62'

~ ~~~~~~~~~~~~~~~~~~~~~~~~~~"

10' ill z

AREA• 3,879.11 SF

NIL LIM LUVIMINO 0 & LUZ S

1500 llEADOWBROOK LN. UPI 53-4-8

N49'31'00"E 401.94'

(EX.)

N49°31'00"E 399.94'

I

I

N/L DOHERTY NOEL G SHEILA I 1502 MEADOWBROOK LN. DBf6236, PGf1192

UPI 53-4-8.1

S49 '31 '00"W 2.00' 100.00' PROP.IP

I I

1504 MEADOWBROOK LN. 08#8465, PG#605

53-4-23. 31

PRDP.20' WIDE SAN.LATERAL EASEMENT

UPI

I I 549 "31 '00"W 192.35'

110.31'

UPI 53-4-23.2

PROP. IP N49'31'00"E 330.95"

110.

1UPI 53-4- .1

1

llJ'ii1i liUllL.

TOP OF

IRON PIN ELEV.438.05 I I

N49"31'00"E 138.60' 110.32'

AREA • 400.00 SF

25.05'- l ___ _ ---- _, "" EP ' ' I ~Q~i

0~§~~~~~.1~

r--f-f-r.-;;.HE~M~L~O".°'CK HILL ROW ' 33.oo· ,

EP

"" ' ' I

I N/L GROSSMAN EDWARD R G ROCHELLE B I 707 1-EMPLOCK HILL LN. 0815341. PGf1040 I

UPI 53-4-25. 1

,....__EX. HEMLOCK HILL LANE I I I

UPI 53-4-24

I I

I

O· ruo . 0 ru • ~g

IU • O· ruo . 0 ru . "O • 0 ~cu mcu

S49"31'00" 2.00'

AREA • 6, 271.00 SF

IU • o. Oo ·o 01 • !"., oN ;)!j

400

WEST CHESTER, PA

SCALE: 1.. • 600"

QUAD

S51"55'45"W 25.00'

S49 "31 'OO"W 138.60'

N49'31'00"E 162.00'

"' • Ii!· . co ru"' .., . ..... co"' !ii

1 .

1;l--.l.:\.....pROP. 25 ' WIDE ACCESS EASEMENT TOLOTf2

I I REVIEWED BY THE PLAMllING COlitlISSION CF EAST GOStEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA

IU • O· ruo ·o ru . "O • 0 CON "' "'

FY 60. I I

BAKER PROPERTY

UPI 53-4-7

N/L GABLE MARY VIRGINIA

1431 BOOT RD 0Bf58, PGf553

'----

S49"31'00"W 399.94'

~ PROP.BOUNDARY LINE~ -

PROP.REAR YARD LINE

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

----......,

I

IU • li!c. . 0 ~· .g 111ru UI

RY 50.

0 ru ru :r co !ii

SY 20·

N/L ABRAHAM JENSEN & CitlJY 919 CONTINENTAL DR. S49'31'00"W 401.94' (EX.) UPI

PROP.IP

53-4-211 IMPERVIOUS SURFACE:

LOTfi - PROPOSED BUILDING• 2,6667.37 SF IMPERVIOUS AREA IN LOTf1 • 4,47.38 SF

UPI 53-4-210

PLUS 501 CF JOINT DRIVEWAY WITHIN L0Tf1 • 1,255.08 SF TOTAL IMPERVIOUS AREA IN LOTt1 • ~ 402.46 SF

LOTt2 - EXISTING BUILDINB • 2.662.45 SF IMPERVIOUS AREA IN LOTf2 • 6, 726.28 SF PLUS 501 CF JOINT DRIVEWAY WITHIN LOTt1 • 1,255.0B SF TOTAL IMPERVIOUS AREA IN LOTt2 • 7.981.33 SF

I

I I

N/L SOLLECITOTHOMAS P G CAROLYN 8 920 CONTINENTAL DR. DBf4679, PG#1B97

PROP.LOT#

_J

UPI

N49"31'00"E 208.75' 53-4-217 N/L LU HUE SHIANG 917 NATHANIEL DR. DBt2075, PGt3BB

\

REl&ESTED WAIVERS FROM TIE SUIJIYISION NIJ LAN> DEYELIFMENT CRJINANCE: LOT

SY 20·

\

•

20

s49•31·oo·w

149.26'

s 49'31'00" w

(EX.)

356.00'

SY 20·

I I I I I

EX.PAVEMENT TO BE REMOVED

N/L TUBMAN EDWARD P & JOAN E 705 HEMPLOCK HILL LN. 08#3725, PG#1435

EX.DRIVEWAY TD BE WIDENED TO 12'

I I

I I I

I

~~.~::~~~A~~-!---

I 7 ----

PROP.IP PROP.SUBDIVISION LINE UPI 53-4-218

/ / N/L KASHEHAGEN LEO

19 NATHANIEL DR. Bt7919, PGt207B

\

G CHRISTIANE M SURVEYOR'S CERTIFICATION:

I hereby certifies that the boundary shown hereon was calculated by me end that the plan and survey accuracy ie in conformance with all East Goshen Township Ordinances.

Signature bate

COl"40NlllEALTH OF PEMllSYLVANIA COi.MTV OF CHESTER

On this the day of , before 11e,

THIS --- DAY OF ---

CHAIRPERSON MEMBER MEMBER llEMBER

VICE CHAIR MEtiEER MEteER

APPROVED BY THE SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA

THIS ---- DAY OF ----

CHAIRPERSON SUPERVISOR SUPERVISOR

VICE CHAIR SUPERVISOR

REVIEWED BY THE CHESTER COUNTY Pl.ANNIN& COMMISSION

THIS --- DAY OF ---

SECRETARY

REVIE~ED BY THE EAST GOSHEN TO~NSHIP ENGINEER

THIS ---- DAY OF ----

TOWNSHIP ENGINEER

RECOROED IN THE OFFICE OF TtE RECORDER OF DEEDS OF CHESTER COUNTY AT NEST CHESTER, PENNSYLVANIA.

IN PLAN BOOK ---- PAGE --- THIS ----DAY OF ----

EAST GOSHEN TOWNSHIP ZONING HEARING BOARD DECISION OF 10/3/2017 GRANTING THE FOLLOWING VARIANCES: 1. A variance from the minimum lot width at the street line requirements of Section 240-9G for Proposed Lotet1 and t2; 2. A variance in the street frontage requirement of Section 240-23.BC2l lal for Proposed Lotsfi and t2; and 3. A variance from the minimum pole width requirement of Section 240-23.B(2) lb) [2] [e] for Proposed Lott2.

Conditions: A. Applicants shall create the greatest possible sight triangle at the top of the driveway near the existing home, which ie at the northeast corner of Proposed Lotfi where the driveway takes a 45-degrse turn toward Hemlock Hill Lane: B. Applicants shall provide a complete evergreen landscape buffer for properties adjacent to the property that are located along Nathaniel Drive:

AREA [SF] AREA [AC] 1. SECTIONS 205.2B G 205.31: COMBINE THE PRELIMINARY AND FINAL REVIEW AND APPROVAL PROCESS. the subscriber. a notary public of the commonwealth of Pennsylvania, personally appeared who acknowledges RECORDER OF DEEDS

C. Applicants shall provide a large pull-off area along Hemlock Hill Lane to ensure safety for pedestrians and motorists using the lane: such pull-off area shall equal or exceed the area shown on Exhibit A-5; PEtff3YL VANIA LAW AEQUIFES

3 wa:!Klrf3 DAYS NlTICE Fm CONSTFLICTIDN PHASE MD 10 wa:!Klrf3 DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-inB SERIAL No.20170472360 DATE: 02/16/2017

EXISTING B7, 491.21 UPI 53-4-23 B7,077.89 PROP.LOT.1 43,995.00 43, 5B1.67 PROP.LOT.2 43,896.21 B5, 213. 70 BO. 213. 70 B4. 813. 70 7B, 813. 70

EXISTING UPI 53-4-7 PROPOSED UPI 53-4-7

2.00B5 1. 9990 1.0100 1.0005 1.0077 1. 9562 1.8415 1. 9471 1.8323

UPI ADDRESS OWNERS DEED BK PAGE 53-4-23 53-4-7 i506 MEADOWBROOK LA LEGENSTEIN STEPEH G DENISE i431 BOOT RD GABLE MARY VIRGINIA

5051 P5B

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY G TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER. PA. DATED 7/29/2017: EAST GOSHEN TOWNSHIP ZONING MAP: A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC., DATED B/i40/1977:

2296 553

A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HOWELL G ASSOSCIATES. INC., DATED i0/30/200i, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FOR BRUCE G AUDREY A.ATKINS" PREPARED BY JOHN O.STAPLETON Ill, DATED ii/3/i992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS ANO OWNERSHIP ltf'"ORMATION; CHESTER COUNTY RECORDER OF DEEDS: GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIB..D SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FDR ANY ERRORS, INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

(GROSS) (NET) (GROSS) (NET)

(GROSS) (NET) (GROSS) (NET)

AREA ISFl

{PEA OEEOl

87, 120 82, 764

R-2: LOW-DENSITY RESIDENTIAL DISTRICT

EX.PROPERTY AREA= B7.491.21 SF (GROSS). B7.077.B9 SF (NET) SECTION 240-9.B Cil 240-9.G

240-23.8(2) la] 240-23.8(2) (bl [2] [b] 240-23.8(2) lbl [2] [e]

DESCRIPTION PERMITTED USES: MIN. LOT AREA

MIN. LOT WIDTH

MAX.LOT COVERAGE

MAX.BUILDING HEIGHT

MIN.FRONT YARD

AVE . FRONT YARD MIN.SIDE YARD MIN.REAR YARD STREET FRONTAGE MAX.POLE LENGTH MIN. POLE WIDTH

REQUIRED PROVIDED SINGLE FAMILY DETACHED DWELLING 43, 560 SF

150 FT

60 FT

25•

35•

3 30 FT 45 FT

60 FT 20 FT 50 FT EACH LOT 400 FT 40 FT

LOTf1: LOTf2: LOTf1: LOTf2: LOTf1: LOTt2:

43, 581.67 SF 43, B96.21 SF 159.69 FT 198.32 FT 25.05 FT 0 FT

(NET)

LOTf1: LOTf2: LOTf1: LOTf2: 3

6. 11 PROPOSED 6. 11 EXISTING 12.41 PROPOSED 1B.21 EXISTING

30 FT LOTf1: 60 FT LOTf2: 60 FT 60 FT 20 FT 50 FT LOTf1 YES. LOT#2 NO 379. 21 FT 25 FT

VARIANCE

NO

NO NO NO NO llAANTEll

NO

NO

NO NO NO NO NO NO NO llAANTEll

NO llAANTEll

COMMENTS

AT BLDG.LINE AT BLDG.LINE AT STREET LINE AT STREET LINE BUILDINGS

TOTAL IMPERVIOUS COVER STORIES FEET

TO LOTt1 CORNER EX. CONDITIONS PROP.LOTf1

NOTES

'

2 3

3

himeelf/herself to be owner and/or equitable owner of the progerty shown on this plan. and that he/she acknowledge& the se11e to e his/her act end plan and desires the same to be recorded as such according to Jew.

(Yg@J~[QJ

EX.PROPERTY LINE Notary Pub] ic

My co11111ieeion Expires:

UTILITY NOTES: 1. PROPOSED LOTS TO BE SERVED BY PUBLIC SEWER. 2. EACH LOT WILL HAVE AN ON-LOT WATER SUPPLY WELL. 3. LOTf1 WILL ACCESS PUBLIC SEWER THROUGH AN EASEMENT IN LOT#2.

ZONING NOTES: 1. THE TOTAL AFEA OF THE LOT TO BE SUBDIVIDED WILL INCREASE Tl-flOUGH THE PURCHASE OF A STRIP OF LAND FROM THE ADJACENT PROPERTY UPI 53-4-7 AND ADDED TO THE SUBJECT PROPERTY. Tl-E AFEA OF THE LAND TD BE PURCHASED IS 400.00 SF. 2. THE EXISTING UPI 53-4-23 PROPERTY HAS A FRONTAGE OF 25.05 FT AT THE STREET LINE. THE DRIVEWAY TO THE PROPERTY IS KNOWN ALSO AS HEMLOCK HILL LANE. A PRIVATE ROAD THAT PROVIDES ACCESS TO THIS PROPERTY, AS WELL AS 4 ADDITIONAL PROPERTIES. 3. THE DRIVEWAY OF PROPOSED LOT # 2 WILL ACCESS FROM THE EXISTING HEMLOCK HILL LANE AND AN ACCESS EASEtiENT THROUGH PROPOSED LOT f 1 AND WILL NOT HAYE A SEPARATE FRONTAGE ON A PUBLIC ROAD.

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE

EX.BUILDING

EX.PAVEMENT

PROP.LOT LINE

PROP.DRIVEWAY EASEMENT PROP.SANITARY LATERAL EASEMENT

PROP.BUILDING

PROP.DRIVEWAY

N90"00'00"W 61.87'

N90 'OQ.' 00 "W -~~ITT .87°"' ~-

D

N90 ·oo • o::? 61.87' ~ ~

I I

D. Applicants shall pave the pull-off area with porous pavers an widen the shared driveway serving Lotsti and t2 to be i2 feet. and add Proposed Lotti into the existing Shared Driveway Easement Maintenance Agreement; E. Applicants shell finalize the subdivision with Mrs. Baker, so that both Proposed Lotti and Lott2 will comply with the one-acre lot area requirement. F. Applicants shall comply with all representations

made during the hearing and as set forth in the exhibits.

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES. INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPFESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... ll. .... a: u UI l!l

IU .... £!!

>-m

~

0 a: ll. .... m - - I "" Ol IL > .......

u " m <D ·- ::> 0 "' L ll.

z "' .... "' UJ " "' z UJ ll. 0 a: ll.

"' ~ ' "' ru ' ~ 0

"' "'

~

" "' u ll. ll. 0 a: ll.

"' ~ ' 0 ru ' ru 0

"' "'

ru

0 on I •

m - m u "'

J

"' "'

n m " u m .o= u

"' "'

i m L "

.... ~ 0 ru ' - 0 ' <D

m ... m "

LL 0

I I

N 49'31'00• E 226.60'

N 49'31'00• E 250.00'

\

\

______ 33'_Wl_DE_

\-~ \,.

125.0 •

I "' I

UJ •

z

UPI 53-4-8

BAKER PROPERTY

UPI 53-4-7

I I

I

O· CIJO ·o "' . "'O • 0 IDCIJ EX. PLANTING I I I I I

"' "'

- - s49·3i:oo·w 401.94-:-1- cEx. J UPI 53-4-210

SURVEY DATUM: NAVO 1988

UPI ADDRESS OWNERS 53-4-23 1506 MEADOWBROOK LA LEGENSTEIN STEPEH & DENISE 53-4-7 1431 BOOT RD GABLE MARY VIRGINIA 53-4-25.1 707 HEMLOCK HILL LA GROSSMAN EDWARD R & RDCHELLE B 53-4-23.1 1510 MEADOWBROOK LA HAMM DANIEL G & SHEILA A 53-4-23.2 150B MEADOWBROOK LA DORN ARTHUR 53-4-23.3 1504 MEADOWBROOK LA MATCHICA STRATTON N & ANGELA N 53-4-B.1 1502 MEADOWBROOK LA DDHERTY NOEL & SHEILA 53-4-B 1500 MEADOWBROOK LA LIM LUVIMIND D & LUZ S 53-4-210 919 CDNTINENTAL DR ABRAHAM JENSEN & CINDY

I

I I

DEED BK

5051 P5B 5341 9103 8113 8465 6236

PAGE 2296 553 1040 106 1271 605 1192

53-4-211 920 CONTINENTAL DR SDLLECITO THOMAS P & CAROLYN B 4679 1B97 53-4-217 917 NATHANIEL DR LU HUE SHIANG 2075 3BB 53-4-218 919 NATHANIEL DR KASHEHAGEN LEO & CHRISTIANE M 7919 2078 53-4-24 705 HEMLOCK HILL LA TUBMAN EDWARD P & JOAN E 3725 1435 THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BDUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYDRS, WEST CHESTER, PA, DATED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED '"PLAN OF SUBDIVISION FOR ANTHONY D'AMBRDSIO'" PREPARED BY HENRY S.CONREY INC .. DATED B/140/1977; A PLAN ENTITLED '"FINAL TITLE PLAN"" PREPARED BY D. L. HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED ""FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D.STAPLETDN III, DATED 11/3/1992; CHESTER COUNTY CHESCD VIEWS WEBSITE FOR DEEDS AND OWNERSHIP INFORMATION; CHESTER COUNTY RECORDER OF DEEDS; GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES DR OMMISSIDNS OF INFORMATION SHOWN ON THIS PLAN.

UPI

AREA [SF) (PER DEED)

B7, 120 B2, 764 49,614 43.560 43,560 43,560 56,628 60.984 30,866 26,556 34,542 28.248 69,696

-...._

'

FLOOD HAZARD NOTE:

' \

\

I

I

UPI 53-4-217

\

\ UPI 53-4-218 \

\

THE SITE IS LOCATED IN ZONE X - AREA OF MINIMAL FLOOD HAZARD. PER FEMA FIRM NUMBER 42029C0215G EFFECTIVE 09/29/2017, FOR EAST GOSHEN, PA, PANEL NUMBER 420277.

EXISTING SOILS ON SITE;

GdB: GdC: UrcB: UrlB:

Gladstone Gravely Loam, 3 - Bl slopes, HSG "BM Gladstone Grave1v Loam. B - 15% slopes. HSG "B" Urban Land - Califon Complex. O - 8% slopes. HSG "B" (assumed) Urban Land - Gladstone Complex, a - 8% slopes, HSG "B" (assumed)

/ /

UPI 53-4-24

..

-----

' ' I

I I I

I I

I I I

I I I

I

- -

~~[ii)

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT EX.BUILDING

EX.TREE

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR SOILS BOUNDARY EX.DRAINAGE AREA BOUNDARY

N90 "OQ..' 00. W _ ___,,. in .87'

Nso_:.oo_: oo • w ----'"" 61. 87.

D 0 --s ---<0-----{l -----11------ - - -··-··-··

400

~™'lnlmMM

WEST CHESTER, PA QUAD

SCALE: 1.. • 600"

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-1776 SERIAL No. 20170472360 DATE: 02/16/2017

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: 08.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... a. .... a: u ., l!l

w .... £!!

> m

~

0 a: "-... m - ~ I "" m IL > .......

u " m m ·- ::> 0 "' L a.

z "' .... "' UJ " "' z UJ "- 0 a: "- m - ' co "' ' - 0

"' "' -

" "' u a. "- 0 a: "- m - ' 0 "' ' "' 0

"' "'

"'

0 on I '

m - m u "'

J

"' "'

n m " u m .i= u

"' "'

i m L "

... - 0 "' ' - 0 ' m

m ... m "

LL 0

I

I I

5.0 •

z

UJ • O· rue ·a C\J • "" • a coru "' "'

EX.UTIL.POLE ~ BT090FPA

[i'l.i]~[Q)@\'l,i'll[ID[j\l@@~ 11L!.\OO~ & MH fo~.\ii."' 2 33' WlDE -----

~.INLET ~

:----:~~~E~P~~~~~~~,~~{~~~E~X··~IN~'".1. .... s 49'31'00"' w J ...... ~~407.91

· · - · · - · · .-49'31'00-. -E ~s.-.o-· · · - · · - I; _· ___ ·_·_,-._.-._ 94 ~ - - · · - 1r ... " .. :~·:-:o.31· -1~·-.-.-.. -,,-.::;:·:-"-,-,0-.• -2· - - 10i -N- 49-'.3-,.~::~:-~p-,,o. ~~ 0 =__,='::s:. :;;;::~-~-- 1 -·

I I I I ,, '\_ -----

I

N 49'31'00" E 250.00'

UPI 53-4-8

N49'31'00"E 401.94"

(EX.)

N49°31'00"E 399.94'

BAKER PROPERTY

UPI 53-4-7

I / / N49"31"00"E '\_ I

25 05. .... ' 1-~·- \ \,,.- ' I I I . ,, ":: ' .... :'.' '

;,. OVERLAP ' ~ ~ 16 ~EX.DRIVEWAY TO /:;j .so· .. , ' - UPI 53-4-25. 1 J... / I / FLAG POLE WIDTH "'rt "'- HEMLOCK HILL ROW '

=-- I I I 25.oo· 33.oo· '

I

~ I I I a.so· '' ', --- '\_ ~ ' ~j~ '\_ ........ ' ":.Cl 1z (T) {\J ...., '-..' -~ '' ' Cf ' ~ ' ~ ' ~ ', <++"" ,.--..,,,~~~~. ~~~~2 ~p~~~~c~~~ /

\

\

\-~ \,.

EX.MH.

~ J; ; J; ; J; ; ~~ ~~ i~= (PERMEABLE PAVERS)

0 0 0 "" " --->@ ~ I~ H I~ H I~ H ~ '- ' t' fi:;;j ~ ~ ,~ Q_ ,~ Q_ '':f" a_ 0· ...... ,., => ,., => ~ => ?J ru '' ' l

z lz f z ~oi "" ' ', -·iii~

I I

• " ' [!!YJ EX.DRIVEWA TO BE lfl"' ..,, ' °"" WIDENED TO 12' z " ' °"" .... , ' I JCJo--EP ... ' E/k<.if I

111111! llUlll. TOP OF

IRON PIN ELEV.43B.05

' ' .... "' 1-j~'i'f~J':,,-- ' ,,

UPI 53-4-25.1

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

I I

PROP.20' WIDE SAN.LATERAL EASEMENT I I

PROP.1.25"" PE SAN.FORCE LINE

PROP. IP

/EX.TREES TO '"--EX. HEMLOCK HILL LANE

I BE TRIMMED

TO IMPROVE VISIBILITY ~,, 'i>::"'""

,,. fl UPI 53-4-24

RIM 454.88 <>-- ~ .... ~~•

PROP.BOUNDARY

EX. BOUNDARY LINE-f'::". ;t"'->:_:.;;i

"""-+'-"-PROP. 25 ' WIDE

\ \ ~

\ I \ I .. ,

~ I

ACCESS EASEMENT TOLOTf2 EX.PAVEMENT TO BE REMOVED

PROP. 6 "' PVC CLEANOUT W/LIO

I I I

I I

I I I

I I I g EX. PLANTING~-

~n;H-PROP. TRM

"

EX.DRIVEWAY TO BE WIDENED TO 12'

I

- -

FLOOD HAZARD NOTE:

400

'ft • ~'"50 ::__, ~

~™'lnlmMM

WEST CHESTER, PA QUAD

SCALE: 1" • 600"

UTILITY NOTES:

1. PROPOSED LOTS TO BE SERVED BY PUBLIC SEWER . 2. EACH LOT WILL HAVE AN ON-LOT WATER SUPPLY WELL. 3. LOT#1 WILL ACCESS PUBLIC SEWER THROUGH AN EASEMENT IN LOT#2. 4. THE END OF THE PUBLIC SANITARY SEWER AT THE WEST CORNER OF LOT # 2 SHALL BE EXCAVATED AND THE EXISTING CLEANOUT SHALL BE REPLACED WITH A SANITARY MANHOLE. THE INVERT ELEVATION OF THE MANHOLE WILL BE DETERMINED AT THE TIME OF CONSTRUCTION TO MATCH THE INVERT ELEVATION OF THE EXISTING PIPE. THE EXISTING LATERAL SERVING LOT f 2 WILL BE CONNECTED TO THE MANHOLE. THE NEW FORCE LINE FROM LOT # 1 WILL BE CONNECTED TO THE MANHOLE AS WELL. ALL WORK SHALL BE PERFORMED WITHIN THE EXISTING PUBLIC SANITARY SEWER EASEMENT.

ZONING NOTES: 1. THE TOTAL AREA OF THE LOT TO BE SUBDIVIDED WILL INCREASE THROUGH THE PURCHASE OF A STRIP OF LAND FROM THE ADJACENT PROPERTY UPI 53-4-7 AND ADDED TO THE SUBJECT PROPERTY. THE AREA OF THE LAND TO BE PURCHASED IS 400.00 SF. 2. THE EXISTING UPI 53-4-23 PROPERTY HAS A FRONTAGE OF 25.05 FT AT THE STREET LINE. THE DRIVEWAY TO THE PROPERTY IS KNOWN ALSO AS HEMLOCK HILL LANE, A PRIVATE ROAD THAT PROVIDES ACCESS TO THIS PROPERTY. AS WELL AS 4 ADDITIONAL PROPERTIES. 3. THE DRIVEWAY OF PROPOSED LOT # 2 WILL ACCESS FROM THE EXISTING HEMLOCK HILL LANE AND AN ACCESS EASEMENT THROUGH PROPOSED LOT # 1 AND WILL NOT HAVE A SEPARATE FRONTAGE ON A PUBLIC ROAD. 4. THE SUBJECT PROPERTY AND ALL ADJACENT PROPERTIES ARE ZONED R-2, LOW DENSITY RESIDENTIAL DISTRICT.

I

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

'l' I x PROP.STORMWATER MANAGEMENT BMP I :-Je--,.__PROP. 12 "' WIDE CONC. I

THE SITE IS LOCATED IN ZONE X - AREA OF MINIMAL FLOOD HAZARD. PER FEMA FIRM NUMBER 42029C0215G EFFECTIVE 09/29/2017. FOR EAST GOSHEN, PA, PANEL NUMBER 420277. , .. ,

' I '---- _J ... \ ----- ' \ \ \

\

) ) ( \ S49"31'00"W 399 .. 94'

S49'31'00"W 401.94" (EX.) UPI 53-4-210

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-1776 SERIAL No. 20170472360 DATE: 02/16/2017

SURVEY DATUM: NAVO 19BB

W'ii'~

I

I I

LOT AREA [SF] AREA [AC] EXISTING B7. 491.21 2.00B5 (GROSS)

B7, 077. B9 1. 9990 PROP. 1 43. 995. 00 1. 0100 (GROSS) 43, 5B 1. 67 1. 0005 (NET) PROP.2 43. B96.21 1.0077

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DATED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED ""PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC .. DATED B/140/1977; A PLAN ENTITLED ""FINAL TITLE PLAN"" PREPARED BY D. L. HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED ""FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN O.STAPLETON III, DATED 11/3/1992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS ANO OWNERSHIP INFORMATION; CHESTER COUNTY RECORDER OF DEEDS; GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

' I \ PROP. P UPI 53- -~11 I

N49"31'00"E 208.75' UPI 53-4-217

\

I

I \

\

~m ©IRlMIMlli!OO'ii'a l!.ii\OO~OO®i (PER TOWNSHIP REQUIREMENTS)

I

\

\

TYPE KEY BOTANICAL NAME COMMON NAME SIZE ROOT QTY ORNAMENTAL MV TREE DECIDUOUS hq SHRUB DECIDUOUS cs SHRUB EVERGREEN im SHRUB EVERGREEN tm SHRUB

NOTE:

MAGNOLIA SWEET BAY 1.5"" CAL. B&B VIRGINIANA MAGNOLIA HYDRANGEA OAKLEAF 24 "" HT B&B QUERCIFOLIA HYDRANGEA CORNUS SERICEA YELLOW TWIG 24 .. HT B&B "FLAVIRAMEA" DOGWOOD ILEX X CHINA GIRL 24 .. HT B&B MESERVEAEA HOLLY TAXUS X 24"" HT B&B MEDIA HICKSII HICKS YEW

2

5

5

5

5

ORNAMENTAL LANDSCAPING TO BE PLANTED BY THE HOMEOWNERS AROUND SITE PER THEIR PREFERENCE.

~ rnllYJll'lffillm Wllb/A\00ii1IOO®l

TYPE KEY BOTANICAL NAME COMMON NAME SIZE ROOT QTY EVERGREEN CL CUPRESSUS LEYLAND 4' -5" HT B&B B TREE LEYLANDII CYPRESS EVERGREEN td TAXUS DENSE 24"-30" HT B&B 10 SHRUB OENSIFORMIS SPREADING YEW

LEVEL SPREADER I ~~.~::~~~A~~ ----

- -PROP/C-CLEANOUI li/LI·~o---'- - --

NOTE:

/ /

PROP.EVERGREEN BUFFER PLANTING

TAM, SUCH AS NORTH AMERICAN GREEN P300 OR EQUAL SHALL BE PLACED ON THE GROUND DOWNSLOPE FROM THE LEVEL SPREADER TO THE EAST PROPERT LINE.

~IID'llID

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT

EX.BUILDING

EX.TREE

N90_:.QQ_.'. 00" W -~~ 61.87"

N90'00"00"W -~~ 61.B7'

D 0

EX.DEAD TREE TO BE REMOVED ~

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR

--s----s-- --<G G-- ____ .....,._ ___ _

PROP.LOT LINE PROP.DRIVEWAY

PROP.DRIVEWAY EASEMENT PROP.PULL-OFF AREA PERMEABLE PAVERS PROP.SANITARY LATERAL EASEMENT

PROP.TRIMMED VEGETATION

PROP.BUILDING

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

~

1~'~'~'~'~'~1 ~

~ I I

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... a. .... a: u ., l!l

w .... £!!

>-m

~

0 a: a. .... m - ~ I "" m IL > .......

u " m m ·- ::> 0 "' L a.

z "' .... "' w " "' z w a. 0 a: a.

m - ' "' C\J ' - 0

"' "' -

" "' u a. a. 0 a: a.

m - ' 0 C\J ' C\J 0

"' "'

C\J

a on

I '

m - m u "'

J

"' "'

n m " u m " u

"' "'

i m L "

.... - 0 C\J ' - a ' m

m ... m "

LL 0

R

151.94' 110.31'

EX. UTIL. POLE BT090FPA

[MJ~[Q)@~rn1@@~ 11&~1:§

& MH

33' WIDE EP ------ ------

~

! {

- - --- - -

CONSTRUCTION SEQUENCE:

1. INSTALL ORANGE CONSTRUCTION FENCE AND COMPOST TUBES WHERE INDICATED ON THE PLAN. 2. DELINEATE AND MARK THE LIMIT OF DISTURBANCE IN THE FIELD. 3. INSTALL CRUSHED STONE CONSTRUCTION ENTRANCE. 4. STRIP TOSOIL AND STOCKPILE WHERE INDICATED ON THE PLAN. SURROUND STOCKPILE WITH COMPOST TUBES. 5. CONSTRUCT HOUSE AND DRIVEWAY BASE COURSE. 6. EXCAVATE AND INSTALL STORMWATER MANAGEMENT BMP. INSTALL ROOF DRAIN PIPES AND CONNECT TO BMP. 7. INSTALL SANITARY MANHOLE AT THE END OF THE EXISTING SANITARY SEWER AT CORNER OF UPI 53-4-7 AND UPI 53-4-B.1. ANY AND ALL DISTURBANCE IN ADJACENT PROPERTIES SHALL BE RESTRICTED TO WITHIN THE SANITARY SEWER EASEMENT OF EAST GOSHEN TOWNSHIP. CONNECT LOT # 2'S LATERAL TO THE NEW MANHOLE. N 49"31'00" E 226.60" I ----- N 49"31'00" E 110.31'

-/~ ____ 1_10_.3_2_· _

N 49"31'00" E 110.32' B. INSTALL SANITARY SEWER FORCE LINE AND CONNECT TO MANHOLE.

I

C!l

C!l

• 0 ·°' N :t" Ill z

lLJ O· C\Jo ·a (\J . -to •a <O (\J CT) rn I

I

l -

N 49"31'00" E 250.00'

UPI 53-4-8

N49"31'00"E 401.94' (EX.)

BAKER PROPERTY

UPI 53-4-7

I

I

I"

PROP.BOUNDARY

PROP.REAR YARD LINE

EX. PLANTING

ClJ

I ~

I (T) lD

H Q. :::i

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23 , .........

" __J"', \\

S49'31'00'W 399.94'

S49"31'00"W 401.94' (EX.) UPI 53-4-210

\ \ \ PROP. P UPI 53-i4-~11

I

I (T)

(T) (\j

I

""'" I (T) ID

H Q. :::i

I TEMP.B" DIA. I COMPOST TUBE

I

I E ,HE

I

I (\j

(T) (\j

I

""'" I (T) ID

I

I

I.

I

~ ~ ,.,

31:

'

~ H "' o._ I :t- :::i Ill

EX.ORIVEWAf zTO BE WIDENED TO 12' TEMP.ORANGE CONSTRUCTION! FENCE

I

JS.so·-,"

FLAG POLE WIDTH "" '-'-

25. oo ·

-........ "

(T) (\j

I

""'" I (T) ID

H 3: Q. :::i

' '

ld+~:=rrPROP. B ' x 22 ' PULL -OFF

~ AREA WITH APPROACHES ..,.g §!/ (PERMEABLE PAVERS)

~-' g i~~ --~@

I-~~ )> -~~

I!!!!] 2S UPI 53-4-25. 1 ~@tlt7/j]

WU'li lil.IML

TOP OF

' ~

1:-t;~~-.--- - - ---

PROP. 1. 25" PE SAN.FORCE LINE

IRON PIN ELEV.438.05 I EX.TREES TO I BE TRIMMED

TO IMPROVE

EX.HEMLOCK HILL LANE

'

UPI 53-4-24 . 1 ~~~-\~;--TEMP. 50' MIN.

CONSTRUCTION ENTRANCE EX.PAVEMENT TO BE REMOVED

PRDP.6"

~@@

®@@

:.-J"i~-PROP. TAM

PVC CLEANDUT W/LID

EX.DRIVEWAY TO BE ... WIDENED TO 12'

TEMP.12" DIA.COMPOST TUBE

' ' I

I

1"'-1-PROP. STORMWATER MANAGEMENT BMP I f:---,__PROP. 12" WIDE CONC. I

I I I I I

LEVEL SPREADER I ~~.~-~:~~~A~(§ ----

~ • ! ' i OCK! & PINE il<EE ROW

N49'31'00"E 208.75' \

\

- - PROP·~" C-CLEANOO I -w;o~o--- ' TEMP.ORANG CONSTRUCT N FENCE

/ /

9. DIG AND INSTALL WATER WELL. 10. FINE GRADE SITE. 11. PLANT BUFFER TREES AND SHRUBS. PLANT OTHER TREES AND SHRUBS PER PLAN. 12. INSTALL PERMEABLE PAVERS PULL-OFF AREA ALONG DRIVEWAY. 13. INSTALL TOPSOIL IN AREAS TD BE VEGETATED. PLANT, SEED AND MULCH WHERE NECESSARY. 14. REMOVE CRUSHED STONE ENTRANCE FROM EXISTING DRIVEWAY. 15. INSTALL NEW DRIVEWAY WITH POROUS ASPHALT. REPAIR EXISTING DRIVEWAY. REPAVE WHERE NECESSARY. 16. AFTER THE ENTIRE DISTURBED ARE HAS BEEN STABILIZED, REMOVE ALL TEMPORARY E~S MEASURES. ANY AREA THAT IS DISTURBED DURING SUCH OPERATIONS SHALL BE REPAIRED AND STABILIZED IMMEDIATELY.

EROSION G SEDIMENTATION CONTROL NOTES:

1.Erosion and sedimentation controls must be constructed, stabilized and functional before site disturbance within the tributary areas of these controls. 2.After the final site stabilization has been achieved. temporary erosion and sedimentation controls must be removed. Areas disturbed during removal of the controls must be stabilized immediately. 3.Sediment traps must be protected from unauthorized acts of third parties. 4.Filter compost tubes must be installed at level grade. Both ends of each tube section must extend at least ten feet upslope at 45 degrees to the main tube alignment. 5.Sediment must be removed when accumulations reach half the above ground height of the tube. 6.Any tube section which has been undermined or topped must be immediately replaced or strengthened with additional tubes. 7. Stockpile heights must not exceed 35 feet. Stockpile slopes must be 2: 1 or flatter. B.Any disturbed area, on which activity has ceased, and which will remain exposed must be stabilized immediately. During non-germinating periods, mulch must be applied at the recommended rates. Disturbed areas which are not at finished grade and which will be redisturbed within on year, may be stabilized in accordance with temporary seeding specifications. Disturbed areas which are either at finished grade or will not be disturbed in one year, must be stabilized in accordance with permanent seeding specifications. 9.0iversions. channels. sedimentation basins. sedimentation traps and stockpiles must be stabilized immediately. 10.Hay or straw mulch must be applied at rates of at least 3.0 tons per acre. 11.Until the site is stabilized, all erosion and sedimentation controls must be maintained properly. Maintenance must include inspections of all erosion and sedimentation controls after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching, and renetting, must be performed immediately.

I

I UPI 53-4-217 \

PROP.EVERGREEN BUFFER PLANTING LIMIT OF DISTURBANCE AREA = 2B, 796 SF = 0.661 AC \

COMPOST TUBE NOTE: COMPOST TUBES TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITIES ON SITE SHALL BE B" DIA., EXCEPT ALONG THE EAST PROPERTY LINE OF LDT 1. WHERE THE COMPOST TUBE SHALL BE 12" DIA.

EXISTING SOILS ON SITE:

Gd~ Gladstone Gravely Loam, 3 - B% slopes, HSG "B" GdC: Gladstone Gravely Loam, B - 15% slopes, HSG "B" UrcB: Urban Land - Califon Complex, o - B% slopes, HSG "B" (assumed) UrlB: Urban Land - Gladstone Complex, o - B% slopes, HSG "B" (assumed)

SURVEY DATUM: NAVO 19BB THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY ~ TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DA TED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBRDSIO" PREPARED BY HENRY S.CONREY INC .. DATED 8/140/1977: A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HDWELL & ASSDSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FDR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D. STAPLETON III. DATED 11/3/1992: CHESTER COUNTY CHESCO VIEWS WEBSITE FDR DEEDS AND OWNERSHIP INFORMATION: CHESTER COUNTY RECORDER OF DEEDS: GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES DR OMMISSIDNS OF INFORMATION SHOWN ON THIS PLAN.

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System. Inc

1-800-242-1776 SERIAL No.20170472360 DATE: 02/16/2017

\

~l§~[Q)

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT

N90_:0Q.: 00" W --~61.B7""' ---

N90"00'00"W --~ 61.87"'' ---

EX.BUILDING c::::::::J

EX.TREE 0

EX.DEAD TREE TO BE REMOVED ~

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR SOILS BOUNDARY

--s----:s-- --G G-- ----""""4011-------

PROP.LOT LINE PROP.DRIVEWAY PROP.PULL-OFF AREA PERMEABLE PAVERS

PROP.BUILDING

PROP.TRIMMED VEGETATION

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

--S----:S--

-~sr----·sr-- PROP.DRAINAGE PIPE

TEMP.CONSTRUCTION ENTRANCE ~

TEMP.TREE PROTECTION FENCE 0 TEMP.CONSTRUCTION ORANGE FENCE TEMP.COMPOST TUBE

TEMP.LIMIT OF DISTURBANCE

_,_,_,~_,_,_,_,_

--- ~

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE

0 50 100

1 "=50'

150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

z 0 .... I- D.. .... a: tJ en w c

w I- "' c

>- Cll

> w a:

a a: o._ " QJ ..... ...... I ..... <Il LL > .µ H u D QJ <Il ....... =i o rn '- 0..

z C!l H rn lLJ D

C!l z lLJ

o._ a a: a_

<Il ..... ' <O (\J ' ..... a

C!l rn

.....

:::E rn u o._

o._ a a: a_

<Il ..... ' a (\J ' (\J a

C!l rn

(\J

a ID

II -.....

OJ ......

"' u UJ

i -

a .I Ul ~

ai rn QJ "C ..... c m ru ·r-1 0-<C tO 1

c. a <

Cl> a: D.. <Il c 0 IJ.Jc:.I

OJ OJI!) - .c. C.... I.Cl ._.. m re (1') c 0 ::J ·r-1 t!) C" - +' enc ...... <Il ..... :::J 0 C:lO Ul ID :;i:- C CTl o .... ,.T, 0 3: ii-ii C.J QJ g. z

~

C!l rn

"C

OJ .>I. u OJ .i:: u

C!l rn

i:: 3: m '- 0

" ..... a (\J ' ..... a ' <Il

OJ ....

"' D

[)=

LL 0

EX. UTIL. POLE BT090FPA

EAST GOSHEN D&M NOTES

1. The person or entity responsible for the operation and maintenance of a BMP or conveyance shall make records of the installation and of all maintenance and repairs. and shall retain the records far at least 2 years. A copy of these records shall be submitted to the Township.

[MJ~[Q)@~rn1@@~ 11&~1:§

& MH

{

2. Upon final inspection. the Municipality shall inform the person responsible far the operation and maintenance whether the submission of periodic (annual or other frequency) inspections and maintenance reports will be required. 3. The owner of each BMP and conveyance shall keep on file with the Township the name. address and telephone number of the person responsible for maintenance activities and implementation of the O&M plan. In the event of a change, new information shall be submitted by the BMP or conveyance owner ta the Township within 10 days of the change.

N 49"31'00" E 226.60'

N 49"31'00" E 250.00'

I~ _____ 15_1_.9_4· I

ClJ

I ~

I (T) lD

I

I

110.31'

N 49"31'00" E 110.31'

(T)

(T) C\I

I "<:J"

I (T) ID

33' WIDE ------

~ -/~ ____ 1_10_.3_2_· _

N 49"31'00" E 110.32'

I

I C\I

(T) C\I

I "<:J"

I (T) ID

______ EP

I JS.so·-,"

FLAG POLE WIDTH "" '-'-

25. 00'

-..,,,,,,, " " I

(T) I. C\I

I

~ ~ /:; I

31: (T) ' ID . ...

!

i;x.INLET LG=407.91

' '

-----

' ' I

4. All stormwater management structures shall be inspected at least 2 times per year. The overlying vegetation should be maintained in goad condition. and care should be taken to avoid excessive compaction by mowers.

INFILTRATION BED CONSTRUCTION NOTES i. Excavation shall be performed with equipment that will not compact the bottom of the bed. Equipment shall not be allowed on excavated area of the infiltration bed at any time during its construction. 2. The bottom of the bed shall be scarified immediately prior to the placement of the geotextile fabric on the bottom of the bed. 3. The bed shall be protected during construction. Sediment shall not be allowed to be washed back into the bed. both during the time when the bottom of the bed is open. and once the stone is placed. 4. Only uniformly graded, clean aggregate, free of fines, slate, shale. clay, silt. and vegetative material shall be used. The supplier of the stone shall provide certification of the porosity of the stone delivered to the site.

~. Compaction of the infiltration bed shall be avoided to the fullest extent possible. Heavy equipment and traffic shall be restricted from traveling over the proposed location of the infiltration bed to minimize compaction of the soil. Excavation of the bed shall be completed with relatively light tracked equipment or from outside the bed to avoid compaction of the bed floor. 6. Construction equipment shall only be allowed on the top of the stone after it has been placed to its full depth and to allow completion of the placement of the stone and backfill. 7. Drainage filter fabric shall be placed in accordance with manufacturer's directions, including pipe penetrations and should overlap a minimum of i6 inches. B. During site construction all facility components shall be protected from sedimentation using storm inlet protection in accordance with the PADEP Chapter i02 regulations, as amended, and the Erosion and Sediment Pollution Control Manual, as amended. Inlet protection shall remain until the contributary drainage area has achieved full stabilization.

I

I

H Q. :::i

H Q. :::i

,~ 3: • ~ I~ PROP.~~ jl.

::JEX. DRIVEWAI zT:A~I; ::J • :¥ ru WIDENED TD 12'

PROP.DA-II I

I

C!l

C!l

-

• 0 ·"' N :t' Ill z

O·

rue I -a ru . -to •a <eru CT) rn

UPI 53-4-8

BAKER PROPERTY

UPI 53-4-7

I"

PROP.REAR YARD LINE

EX. PLANTING

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

I I I

I

I , .........

" __J .... , \\

PRDP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

\

\

I .• '\

\~\~~~

l -

S49'31"00"W 399.94"

S49"31'00"W 401.94' (EX.) UPI 53-4-210

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System. Inc

1-800-242-1776 SERIAL No. 20170472350 DATE: 02/15/2017

SURVEY DATUM: NAVO 19BB

I

I

\

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DA TED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC., DATED B/140/1977: A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D. STAPLETON III, DATED 11/3/1992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS AND OWNERSHIP INFORMATION: CHESTER COUNTY RECORDER OF DEEDS:

\ \ \ PROP. P UPI 53-i4-~11

PROPOSED ROOF DRAIN PIPES:

\ \

\

I

I

N49'31'00"E 208.75' UPI 53-4-217

ALL ROOF DRAINS SHALL BE PIPED TO THE PROPOSED STORMWATER MANAEMENT BMP. DRAIN PIPES SHALL BE 4" DIA.PVC AT 0.02 FT/FT MIN.

DOUBLE-RING INFILTRATION TEST RESULTS:

INFILTRATION TESTING WAS PERFORMED BY KATHERINE HEED AND PROVIDED TO GUY ENGINEERING. TEST PIT TP-1:

SURFACE ELEVATION = 441.00 DEPTH = 48" TEST ELEVATION = 437.00

INFILTRATION RATE = 2.50 IN/HR TEST PIT TP-2:

SURFACE ELEVATION = 441.00 DEPTH = 48" TEST ELEVATION = 437.00

INFILTRATION RATE = 6.98 IN/HR MEASURED AVERAGE INFILTRATION RATE= 4.74 IN/HR DESIGN INFILTRATION RATE = 2.37 IN/HR

EXISTING SOILS ON SITE:

GdB: GdC:

Gladstone Gravely Loam. 3 - B% slopes, HSG "B" Gladstone Gravely Loam. B - 15% slopes. HSG "B"

\

~P.DA-I

\

GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS. INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

UrcB: UrlB: Urban Land - Califon Complex. a - B% slopes. HSG "B" (assumed) Urban Land - Gladstone Complex. 0 - B% slopes, HSG "B" (assumed)

LOW PATH EP

UPI 53-4-25. 1

EX.HEMLOCK HILL LANE

EX.DRIVEWAY TO BE WIDENED TO 12' I

I I I I I

lb<-....'--PROP.STORMWATER MANAGEMENT BMP I I PROP. 12" WIDE CONC. I LEVEL SPREADER I

I PT~[}Y,l)[J,,@©~ [}{]0[1,[1, ~(§ - - -

25' WIDE - PRIVATE LANE

:'1-l'ROl~.D.A-I I

~~"-'----- - PROP /C-CLEANOO I "W/00

/ /

PROP.EVERGREEN BUFFER PLANTING

~@ll§~IID

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT EX.BUILDING

N90"00'00"W __ _,,., 61. 87 "'· ---"---

N 90'00'00 "W ---"'" 61 . 87 "'· ----"---

D

PROP.LDT LINE PROP.DRIVEWAY

PROP.DRIVEWAY EASEMENT PROP.PULL-OFF AREA PERMEABLE PAYERS PROP.SANITARY LATERAL EASEMENT

PROP.TRIMMED VEGETATION

PROP.BUILDING

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

~ I : I : I : I : I : I : I ~

I

--S----!S--

EX.TREE 0 PROP. DRAINAGE PIPE --sr----:sr--

EX.DEAD TREE TO BE REMOVED ~

EX. SAN IT ARY SEWER --s----•s-- EX.GAS LINE EX.CONTOUR

G----IG-- --------45Q-----

INFIL TRATIDN TEST LOCATION TP1. TP2() PROP.CRUSHED STONE

INFILTRATION BED

PROP.STORMWATER DISTRIBUTION PIPE PROP.DRAINAGE AREA BOUNDARY -··-··-··

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE

0 50 100

1 "=50'

150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

QJ ...... ..... LL

z 0 .... I- D.. .... a: tJ en w c

w I- -c c

>- Cll

> w a:

a a: a_

r-- .....

I D:l > .µ H u D OJ ID -~ =i o rn '- a_

z C!l H rn w D

C!l z w a_ a a: D..

CD ..... .....

<O C\J ' ..... a

(.') rn

.....

:::E rn u a_

a_ 0 a: D..

CD ..... ..... a ru ' ru a

(.') rn

ru

0 ITT

II -.....

QJ ......

"' u UJ

i - 1 i Ul ~ c.. 0 ai rn QJ 'C"" c m ru ·r-1 0-<C tO <

Cl> a: D.. IXl

C!l rn

'C

QJ _,,_

u QJ _r;: u

c 0

lJ.J ~ mth

- .c. C.... I.Cl ...... m re (1') c 0 ::J ·r-1 t!) C" - +' enc .-... CD ..-. :::J 0 c:tO Ul I() :;i:- c CT) 0 0 .... C.J ~

C!l rn

i:: 3: m '- 0

z

r-- ..... a ru ' ..... a ' CD

QJ ....

"' D

[)=

LL 0

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

PRELIMINARY / FINAL CONSTRUCTION NOTES AND DETAILS PLAN - LOT # 1

Engineering plan sheet (Sheet 3 of 6) prepared by Guy Engineering Associates, Inc. for the Proposed Residential Subdivision at 1806 Meadowbrook Lane, West Chester, PA 19380, East Goshen Township, Chester County, PA (Applicants: Stephen & Denise Legenstein), containing construction details, cross-sections, seeding specifications, and stormwater management notes.

TYPICAL TREE PROTECTION DETAIL DURING CONSTRUCTION (N.T.S.)

Diagram showing tree protection fencing staked around a tree trunk and drip line.

  • SHAPE OF TREE IS NOT TYPICAL FOR ALL VARIETIES
  • 3-2"x4" HARDWOOD STAKES ABOVE GROUND TO LOWEST BRANCHES.
  • DOUBLE STRAND #12 GAUGE GALV. WIRE TWISTED IN RUBBER HOSE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
  • 1"x1"x57" HIGH #12 GAUGE WIRE STAPLED TO OUTSIDE OF STAKES OR WOOD SLAT SNOW FENCE.
  • WRAP TRUNK AND LARGE BRANCHES WITH WATERPROOF TREE WRAP SECURED WITH TWINE.
  • BOTTOM OF FENCE: 3"

TYPICAL DRIVEWAY SECTION DETAIL (N.T.S.)

  • 1.5" ID-2A WEARING COURSE
  • 6" BASE COURSE 3-A CRUSHED STONE
  • COMPACTED SUBGRADE

STANDARD CONSTRUCTION DETAIL #3-1: ROCK CONSTRUCTION ENTRANCE (NOT TO SCALE)

Profile and plan view diagrams of a rock construction entrance meeting an existing roadway (50' min. length, 20' min. width, 10' min. turning radii, mountable berm 6 in. min., min. 8" AASHTO #1 rock over geotextile, earth fill, and pipe as necessary).

* MOUNTABLE BERM USED TO PROVIDE PROPER COVER FOR PIPE

NOTES:

REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.

RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.

MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.

MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.

SEEDING AND EROSION CONTROL NOTES

TEMPORARY SEEDING

  • LIME: 190 lbs/1000 sf - Ground limestone incorporated 4 inches into soil.
  • FERTILIZER: 25 lbs/1000 sf - 10-20-20 incorporated 4 inches into soil.
  • SEED: 1.0 lbs/1000 sf - Annual ryegrass
  • MULCH: 140 lbs/1000 sf - Straw mulch

Minimum Standard for Limestone and Fertilizer:

  • Limestone shall be applied at a rate of 1 ton per acre.
  • Fertilizer shall be applied at a rate of: Nitrite nitrogen 30 lbs/acre average; Phosphorous 100 lbs/acre average; Potassium 120 lbs/acre average.

PERMANENT SEEDING

  • LIME: 190 lbs/1000 sf - Ground limestone incorporated 4 inches into soil.
  • FERTILIZER: 25 lbs/1000 sf - 10-20-20 incorporated 4 inches into soil.
  • SEEDING: Lawn and mowed areas - Kentucky Bluegrass - 30 lbs/ac, Redtop - 3 lbs/ac, Perennial Ryegrass - 20 lbs/ac (Total Seeding = 53 lbs/ac) - OR - Pennlawn Fine Fescue - 40 lbs/ac, Redtop - 3 lbs/ac, Perennial Ryegrass - 20 lbs/ac (Total Seeding = 63 lbs/ac).
  • Slopes or unmowed areas - Crown Vetch - 25 lbs/ac, Perennial Ryegrass - 25 lbs/ac (Total Seeding = 50 lbs/ac).
  • Planting date: March 1st to May 15th, and August 15th to October 1st.
  • Mulch: Straw at a rate of 140 lbs/1000 sf. Mulch shall be secured by approved methods.

NOTE: THE SILT FENCES ALONG SCHWAB AND INDUSTRY ROADS SHALL BE "SUPER" FILTER FABRIC SANDBAG TYPE, AS RECOMMENDED BY THE PADEP HANDBOOK OF BEST MANAGEMENT PRACTICES AND THE MONTGOMERY COUNTY CONSERVATION DISTRICT.

TEMPORARY RISER IN SEDIMENT TRAP SHALL BE 18" PERFORATED CMP WITH 15" CMP OUTLET.

ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF HATFIELD TOWNSHIP, PA DEPT. OF TRANSPORTATION, HATFIELD TOWNSHIP MUNICIPAL AUTHORITY, OR OTHER GOVERNMENT AGENCY HAVING JURISDICTION. SEE HATFIELD TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE.

PERMEABLE PAVERS AND STORMWATER BED DETAIL (N.T.S.)

  • TYP. NO. 8 AGGREGATE IN OPENINGS
  • PERMEABLE PAVERS
  • BEDDING COURSE 2" THICK NO. 8 AGGREGATE
  • 4" THICK NO. 57 STONE OPEN-GRADED BASE
  • MIN. 6" THICK NO. 2 STONE SUBBASE
  • NONWOVEN GEOTEXTILE ON BOTTOM, TOP AND SIDES OF OPEN-GRADED BASE (MIRAFI 140N OR EQUAL)
  • UNCOMPACTED SOIL SUBGRADE

NOTE: PERMEABLE PAVERS EP HENRY ECO-COBBLE OR EQUAL, 3-1/8" THICK

STANDARD CONSTRUCTION DETAIL #4-1: COMPOST FILTER SOCK (NOT TO SCALE)

Section and plan view diagrams of a compost filter sock (12 in. min., blown/placed filter media, 2 in. x 2 in. wooden stakes placed 10 ft on center between disturbed area and undisturbed area).

NOTES:

SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.

COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.

TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.

ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.

COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.

BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.

CRUSHED STONE INFILTRATION BED DETAIL (1"=30') & SECTION (1"=30' H, 1"=3' V)

  • Dimensions: 20.10', 45.00', 33.82', 90.00', 90.00', 23.00'
  • ROOF DRAIN 6" PIPE CONNECTION INV. 437.90
  • 6" PERFORATED PVC PIPE @ 0.00 INV. 437.90 (CLOSED LOOP)
  • 1' WIDE, 1' DEEP CONC LEVEL SPREADER TOP ELEV. 442.00
  • 6" CLEANOUT LID ELEV. 440.50
  • P300 TRM OR EQUAL TO PROPERTY LINE
  • RAIN GARDEN VEGETATION (Elevations: 439.50, 438.50, 437.00)
  • 1/2"-2" clean washed crushed stone

NOTES:

  • 1. The crushed stone bed shall be wrapped on top, bottom and sides with non-woven drainage fabric, such as Mirafi 140N, or approved equal.
  • 2. Excavation for the infiltration BMP shall be performed with equipment that will not compact the bottom of the facility.
  • 3. The bottom of the BMP shall be scarified prior to placement of fabric and aggregate.
  • 4. Only clean aggregate with documented porosity, free of fines, shall be allowed.
  • 5. The contractor shall contact the Township to have the construction of the infiltration BMP inspected. Inspection of the BMP must start prior to placement of stone.

DECIDUOUS AND CONIFEROUS TREE PLANTING DETAILS

  • PRUNE DAMAGED TWIGS AFTER PLANTING
  • PLACE PLANT IN VERTICAL POSITION
  • 2"x2"x8' CEDAR STAKING (Deciduous) / 2"x2"x6' CEDAR STAKING (Coniferous)
  • RUBBER HOSE LOOP AND #12 WIRE
  • TREE WRAPPING PAPER: WRAP TO BOTTOM OF BRANCHES, LAP PAPER MIN. 1/3 WIDTH, WRAPPING TO REMAIN MIN. ONE YEAR
  • 2" MULCH
  • BURLAP TO REMAIN LOOSEN FROM TOP OF BALL
  • PREPARED BACKFILL: 1 PART PEAT TO 3 PARTS TOPSOIL
  • TAMP AND SOAK BACKFILL THOROUGHLY AFTER PLANTING
  • COMPACTED OR UNDISTURBED SOIL

E/ONE SEWER SYSTEMS MODEL DH152 / DR152 DETAIL SHEET (NA0052P02)

  • OPTIONS: DH152 (4x8' WIRE LEVEL CONTROLS) / DR152 (WIRELESS LEVEL CONTROLS)
  • FIELD JOINT REQUIRED FOR MODELS; GASKETED LID ROPE; ACCESS WAY VENT; STRAIN RELIEF CORD CONNECTOR; DUAL WALL CORRUGATED HDPE ACCESSWAY; POWER/ALARM CABLE 6 CONDUCTOR W/GND; INTERNAL WELL VENT 2.0" DIA.; E/ONE EQUALIZER; ELECTRICAL QUICK DISCONNECT NEMA 6P (EQD); DISCHARGE 1 1/4" FPT (304 S.S.); INLET, GROMMET TO ACCEPT 4.50" O.D. PVC PIPE (STANDARD); QUICK DISCONNECT ASSY. (304 S.S.); C.C. CAST BALL VALVE; 1 1/4" DISCHARGE LINE (304 S.S.); CHECK VALVE (NORYL); ANTI-SIPHON VALVE (NORYL); HDPE TANK 1/2" NOMINAL WALL THICKNESS 150 GALLON CAPACITY; SEMI-POSITIVE DISPLACEMENT TYPE PUMP EACH DIRECTLY DRIVEN BY A 1 HP MOTOR.
  • (CONCRETE BALLAST MAY BE REQUIRED) SEE INSTALLATION INSTRUCTIONS FOR DETAILS. NOTE: DIMENSIONS ARE FOR REF ONLY.

POROUS ASPHALT DETAIL (N.T.S.), TYPICAL DRIVEWAY SECTION / DRIVEWAY WIDENING DETAIL, AND ROOF DRAIN DETAIL

  • POROUS ASPHALT DETAIL: 4" POROUS ASPHALT COURSE (3/8"-3/4" AGGREGATE ASPHALT MIX), 2" FILTER COURSE (1/2" CLEAN CRUSHED STONE), 4" RESERVOIR COURSE (1/2"-2" CLEAN CRUSHED STONE), NON-WOVEN DRAINAGE FABRIC SUCH AS MIRAFI 140N OR EQUAL, UNCOMPACTED SUBGRADE.
  • TYPICAL DRIVEWAY SECTION (10' width): 1 1/2" ID-2 BITUMINOUS WEARING COURSE, 6" 3A STONE COMPACTED, COMPACTED SUBGRADE.
  • ROOF DRAIN DETAIL: BUILDING DOWNSPOUT, ADAPTER TO RECEIVE DOWNSPOUT, "Y" CONNECTION FOR OVERFLOW, SPLASH BLOCK, 24"x24"x36" DRYWELL, 6" PVC ROOF DRAIN, SELECTED BACKFILL MATERIAL.

TITLE BLOCK AND PROPERTY INFORMATION

PROPERTY OWNER / APPLICANT: STEPHEN & DENISE LEGENSTEIN, 1806 MEADOWBROOK LANE, WEST CHESTER, PA 19380. DEED RECORDED: DB.5051, PG.2296. TMP # 53-4-23.

Project: PROPOSED RESIDENTIAL SUBDIVISION, 1806 MEADOWBROOK LANE, WEST CHESTER, PA 19380, EAST GOSHEN TOWNSHIP, COUNTY OF CHESTER, PA. Project File: SUBDIV 8-17 PRO. Scale: 1"=50'. Checked: S.G. Drawn: S.G. Date: 8/01/2017. SHEET 3 OF 6. Professional Engineer Seal: Moin U. Guy, PE-033822-E. Revisions: Rev 1 (SG, 01/26/18, PROP ENG DESIGN); Rev 2 (SG, 02/20/18, PROP PCSM).

Introduction:

East Goshen Township

Request for Proposals

Residential Open Space Development Ordinance Amendment

DRAFT

The East Goshen Township Board of Supervisors is soliciting proposals from Professional Planning

Consultants to assist the Township Planning Commission in the development of a zoning ordinance

amendment to incorporate 1 and 2 family (carriage home} and multifamily (townhouse} residential

construction into the open space development option outlined in §240-36 of the township zoning

ordinance.

Background:

East Goshen Township completed a rewrite to the Township Comprehensive Plan in 2015. Since that

time the township has also completed the Paoli Pike Corridor Master Plan.

The Comprehensive Plan and the Paoli Pike Corridor Master Plan support a diverse range of housing options that preserve open space resources and historic resources as well as promote pedestrian and bicycle connections.

The following sections of the Township Comprehensive Plan and the Paoli Pike Corridor Master support this concept.

The Township Comprehensive Plan: Objective 6.7 - Continue to provide for a variety of housing options within the Township to accommodate a diverse population.

Recommendation 6.7.1- Evaluate the Zoning Ordinance in light of housing choices for changing demographics and income diversity.

Objective 6.8 - Preserve the Character of existing residential housing neighborhoods.

Recommendation 6.8.1- Consider adopting provisions in the Zoning and Subdivision & Land Development Ordinance that encourage innovative design for new residential development while respecting the character of surrounding neighborhoods.

Paoli Pike Corridor Master Plan: The Land Use Overview of the Paoli Pike Corridor Master Plan identifies a demand for additional

housing units in the Township. Based on the population projections and the build out analysis, more diverse housing options are needed.

The current Single Family Open Space Development (SFOD} regulation (§240-36} provides an open space

development option for properties zoned R-2 and R-4, for clustering of single family homes however it

does not consider semi-detached (Carriage Homes or Twins} or a multi-family (townhouses} options.

The SFOD requires a tract size of at least 8 acres, 55% of which must be set aside for open space.

East Goshen Township - RFP - Residential Open Space Development Ordinance Amendment

The primary motivation of this endeavor is to consider additional residential development options for

the larger parcels in the Township which have significant natural and cultural resources. A Carriage

Home or Townhouse Open space development could help facilitate the preservation of Historic

Resources and the natural areas that exist on these larger residential properties within the Township.

Determination of the appropriate density credits and allowances for this type of residential

development option is very important to the Township.

There are 26 properties greater than 8 acres in East Goshen. Subtracting those within the Business Park

(BP) and Industrial (I) districts and those which are deed restricted from further development leaves 16

properties with a lot size greater than 8 acres.

There could be other opportunities if lots are combined. The lot sizes range from 8.0 acres to 87.28

acres. Eight acres was look at as the starting point because that's the lot size requirement for the

current Single Family Open Space Development option in the ordinance. The tentative process is

outlined as follows

Selection process and next steps:

After the deadline for this RFP, the Township's Board of Supervisors will select a winning consultant,

with input from Township Staff and the Township Planning Commission. The winning consultant will

then be asked to begin the planning and ordinance development process. The Township envisions this

as a mini planning exercise that will result in a well thought out and implementable ordinance. which

shall include but is not limited to the following:

1) Meeting with Staff prior to Kick off Meeting and /or property owners

2) Kick off meeting with Township Planning Commission at a public meeting

3) Engagement with local developers

4) Engagement with township commissions

5) Engagement with Township Solicitor

6) Presentation of draft ordinance to Planning Commission

7) Preparation of final ordinance to the Township Board of Supervisors

Required Information: To be considered, your proposal must address the following required items:

1) At least 2 (and preferably more) examples of similar zoning ordinances developed by the firm.

2) Provide an example of where you have seen this type of development option work well and

support it.

3) Provide a brief description of how you will lead the Planning Commission through this process.

4) Brief biographies of planners who would be assigned to this project and either a full or partial

list of municipal projects each has worked on.

5) A proposed scope of work for the project.

6) A proposed timeline for completion of the project.

7) A best and final cost proposal.

Brevity of responses is encouraged.

F:\Data\Shared Data\Admin Dept\ Township Code\Residential Openspace Developement\DRAFT RFP for RODO 03012018.docx

East Goshen Township - RFP - Residential Open Space Development Ordinance Amendment

Additional information: Please contact Mark Gordon at mgordon@eastgoshen.org or 610-692-7171 for

additional information.

Deadline: An electronic copy of the proposal can be emailed to Mark Gordon at

mgordon@eastgoshen.org and must be received by not later than March 161h, 2018 at 10 am.

Additional disclosures: If a contract is entered into as a result of this RFP, the contents of the selected

vendor's proposal will become contractual obligations of the firm. Negotiations may be undertaken with

one or more vendors whose proposals as to price and other factors show them to be qualified,

responsible, and capable of performing the work. This request for proposals does not, under any

circumstances, commit the Township to any cost incurred by any vendor prior to the execution of the

agreement. Each prospective vendor is solely responsible for all costs associated with the preparation of

a response to this RFP. The Township reserves the right to reject any and all proposals received as a

result of this request and to negotiate separately with competing vendors.

F:\Data\Shared Data\Admin Dept\ Township Code\Residential Openspace Developement\DRAFT RFP for RODD 03012018.docx

610-692-7171

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

February 7, 2018

East Goshen Township ABC Members 1580 Paoli Pike West Chester, PA 19380

Dear ABC Members:

The East Goshen Township ABC Annual Planning Session was held on Saturday, January 6, 2018. This was on·e of the best planning sessions that we have had to date, and it was due in no small part to the efforts of the ABC members in attendance.

Enclosed is a list of the goals that were presented by the ABCs at the planning session.

At their meeting on February 6, 2018 the Board of Supervisors approved these goals.

It would be appreciated begin working on these goals ASAP.

Also please provide me with a status report on your goals by August 29th. The Board will review them at its meeting on September 5, 2017.

Sincerely,

(Zc!<-

Louis F. Smith, Jr. Township Manager

Enclosure

F:\Data\Shared Data\ABC'S\Goals\2018\Letter 020717.docx

Memo

East Goshen Township

Date: February 1 2018 To: Board of Supervisors From: Rick Smith1 Township Manager

Re: 2018 ABC Goals

The Board needs to set the 2018 ABC Goals. The goals listed below are a summation of what was presented at the Planning Session. Where applicable I have noted the appropriate objective from the Comp Plan or action from the Park Rec and Open Space Plan. I have also identified three goals for the Board.

If the Board approves the goals I will send a cover letter with the goals to each ABC and

ask them to submit a status report for the Board's review at their meeting on September 4.

Conservancy Board

1. Continue invasive species control - Comp Plan Objective 11.6

2. Continue maintenance of the blue bird houses in Applebrook

3. Develop a maintenance plan for the Serpentine Barren - PR&OS Plan Action 2.2C

4. Keep East Goshen Beautiful Day - Comp Plan Objective 11.4

5. Maintain the riparian buffer along the creeks

6. Maintain Clymer 1s Woods.

7. Review the pond study and make a recommendation to the Board of Supervisors.

Futurist Commission

1. The creation of a much needed "town center' to house specialty shops1 restaurants1 micro businesses1 and central gathering areas. Comp Plan Objective 7.1

2. Develop clear signage and lighting to highlight the "town center 11 • Comp Plan Objective 6.1 ·

3. Support a referendum to allow for liquor sales.

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.docx 1

4. Establish a strategic long-range planning objective with steps outlining how to achieve the objective and the stated benefits to all residents.

5. Rebranding the Town Center as "Goshenville".

Municipal Authority

1. Continue to monitor the upgrades at West Goshen Sewer Plant. Comp Plan Objective 10.1

2. Continue to implement the Inflow (surface water) & Infiltration (groundwater) (collectively "l&I") Plan. Comp Plan Objective 10.1

3. Submit articles for the newsletter.

Park & Recreation Commission

1. Increase pedestrian circulation along Paoli Pike, especially in the form of a "Paoli Pike Promenade" with sidewalks and crosswalks, as well as increasing pedestrian circulation and safety along Greenways, with trails, walkways and crosswalks. Comp Plan Objective 8.6

2. Develop the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown and consider the potential for feeder trails from the various developments to the Paoli Pike Trail. Comp Plan Objective 8.6

3. Complete the playground renovation. Comp Plan Objective 9.3

4. Renovate the basketball court area Comp Plan Objective 9.3

5. Improve the upper sports fields to include landscaping and a new access. Comp Plan Objective 9.3

6. Install security cameras in the park. Comp Plan Objective 9.3

7. Make the Veterans Pavilion more user friendly for seniors. Comp Plan Objective 9.3

8. Improve the pathway from the Pavilion to the Pickle Ball Court. Comp Plan Objective

9.3

9. Installed a picnic area to support the playground and the baseball fields. Comp Plan Objective 9.3

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.don: 2

Planning Commission

1. Review the PPMCP and look at the overlay district to determine what needs to be amended in the Zoning Ordinance. Comp Plan Objective 6.2 and 6.2

2. Look at single family development for the remaining parcels in the township. Comp Plan Objective 5.2 and 5.5

Board of Supervisors

Review and update as need the Comp Plan Implementation Matrix. Comp Plan Notes on page 16-1

Adopt a parkland standard of 28.20 acres per 1,000 residents PR&OS Plan Action 1.1A

Adopt a mandatory Dedication of Parkland Ordinance. PR&OS Plan Action 1.18

Adopt the Pond Study and a schedule for implementing the recommendations. PR&OS

Plan Action 2.28

F:\Data\Shared Data\ABC'S\Goals\2018\2018 ABC Goals.docx 3

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: To:

From: Re:

3/1/2017 Planning Commission . /1 Mark Gordon, Township Zoning Officer iM¥ Sewer Planning module, 1405 Wexford Circle, 53-lR-25

The Township has received a Sewer Facility Planning Module for the above referenced

property.

The On-Lot System at 1405 Wexford is failing and the resident has hired an outside firm to design a solution to meet the requirements of the DEP. The option to replace the system with another septic system is not viable due to a variety of issues so the proposed plan proposes to install a stream discharge system to treat the sanitary sewer and discharge the treated effluent to the stream. This is a mini sanitary sewer treatment facility equipped with all levels of treatment found in a large scale Waste Water Treatment Plant, to include Ultra Violet disinfection.

The Township Planning Commission, Chester County Health Department and the Chester County Planning Commission are all required to review and comment on these submissions.

Draft Motion: I move that the Planning Commission _authorize staff to complete Component 4A of the Sewage Planning Module, with the assistance of the Municipal Authority engineer, and return it to the applicant for submission to DEP.

F:\Data\Shared Data\Property Management\53-lr\53-lR-25 (1405 Wexford Cir)\Stream Discharge Sanitary Sewer\Memo to PC Re. SPM 03012018.doc

DATE:

TO:

CC:

FROM:

RE:

EVANS MILL

ENVIRONMENTAL, LLC

Enviromnental Engineers & Consultants

101 Fellowship Road P.O. Box735 Uwchland, PA 19480 (610) 458-8300; FAX (610) 458-7168

TRANSMITTAL SHEET

February 26, 2018

Rick Smith, Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199

EME File# 2875-00

Ann M. Lane

Matthew Delaney - Wexford Circle Sewage Facilities Planning Module DEP Code No. 1-15919-224-3s

Please find attached four (4) copies of the revised Sewage Facilities Planning Module for the Matthew Delaney property on Wexford Circle. We have revised the submittal in response to comments from Mike Ellis in his email dated October 4, 2017.

EME requests that East Goshen Township forward copies of the modules for distribution to the following agencies with your transmittal requesting their review:

2 copies 1 copy 1 copy

Matt Skiljo, Chester County Health Department Carrie Conwell, Chester County Planning Commission East Goshen Township Planning Commission

If you have any questions regarding this matter, or need additional information or copies, please feel free to give myself or Dan Hudson a call at our office. Thank you in advance in your prompt attention in this matter.

3850-FM-BCW0362A 6/2016 pennsylvania DEPARlMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

DEP Code#:

1-15919-240-3s

SEWAGE FACILITIES PLANNING MODULE COMPONENT 4A - MUNICIPAL PLANNING AGENCY REVIEW

Note to Project Sponsor: To expedite the review of your proposal, one copy of your completeCI planning module package and one copy of this Planning Agency Review Component should be sent to the local imunicipal planning agency for their comments.

SECTION A. PROJECT NAME (See Section A of instructions)

Project Name

MATTHEW DELANEY - WEXFORD ROAD

SECTION 8. REVIEW SCHEDULE (See Section B of instructions) '

1. Date plan received by municipal planning agency

2. Date review completed by agency

SECTION C. AGENCY REVIEW (See Section C of instructions)

J Yes No , D· D 1. Is there a municipal comprehensive plan adopted under the Municipalities Planning Code (53 P.S. 10101, et seq.)? D D 2. Is this proposal consistent with the comprehensive plan for land use?

If no, describe the inconsistencies ' D D 3. Is this proposal consistent with the use, development, and protection of water resources?

If no, describe the inconsistencies D D 4. Is this proposal consistent with municipal land use planning relative to Prime Agricultural Land Preservation? D D 5. Does this project propose encroachments, obstructions, or dams that will affect wetlands?

If yes, describe impacts D D 6. Will any known historical or archaeological resources be impacted by this project?

If yes, describe impacts

D D 7. Will any known endangered or threatened species of plant or animal be impacted by this project?

If yes, describe impacts D D 8. Is there a municipal zoning ordinance? D D 9. Is this proposal consistent with the ordinance?

If no, de~cribe the inconsistencies

D D 10. Does the proposal require a change or variance to an existing comprehensive plan or zoning ordinance?

D D 11. Have all applicable zoning approvals been obtained?

D D 12. Is there a municipal subdivision and land development ordinance?

- 1 -

3850-FM-BCW0362A 6/2016

SECTION C. AGENCY REVIEW (continued)

Yes No ' D D 13. Is this proposal consistent with the ordinance?

If no, describe the inconsistencies ' I

D D 14. Is this plan consistent with the municipal Official Sewage Facilities Plan? I

i If no, describe the inconsistencies D D 15. Are there any wastewater disposal needs in the area adjacent to this proposal that should be considered by the municipality?

If yes, describe D D 16. Has a waiver of the sewage facilities planning requirements been requested for the residual tract of this subdivision? D D If yes, is the proposed waiver consistent with applicable ordinances?

If no, describe the inconsistencies ,I ,

.•

17. Name, title and signature of planning agency staff member completing this section:

Name:

Title:

Signature:

Date:

Name of Municipal Planning Agency:

Address

Telephone Number:

SECTION D. ADDITIONAL COMMENTS (See Section D of instructions)

This component does not limit municipal planning agencies from making additional comments concerning the relevancy of the proposed plan to other plans or ordinances. If additional comments are needed, a~ch additional sheets.

The planning agency must complete this component within 60 days.

This component and any additional comments are to be returned to the applicant.

-2-

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

Site Plan for Sewage Facilities Planning Module

Site plan of a lot at 1405 Wexford Circle showing property lines with bearings and distances, an existing bi-level framed dwelling, existing septic and pump tanks to be replaced by proposed treatment units, a proposed 4" PVC lateral and discharge point to a perennial stream, an existing drainage field, flood zones X and A, and a north arrow. Stamped "Issued for Planning Module, Not for Construction".

Plan labels

  • N66°47'30"E 123.48'
  • S23°12'30"E 352.79'
  • N23°12'30"W 352.79'
  • S66°47'30"W 123.48'
  • Wexford Circle (50 feet wide)
  • P.O.B.
  • 1/2" rebar found; 5/8" rebar set; lath set
  • Approximate location existing drainage field
  • Approx. location intermittent stream
  • Discharge point initially proposed before stream was determined to be intermittent
  • Approx. location existing septic & pump tanks - to be replaced by proposed treatment units
  • Proposed 4" PVC lateral; septic tank; Ecoflow IV/pump; UV unit
  • Existing storm sewer inlet; existing 4" PVC storm sewer
  • Proposed discharge point to perennial stream (existing storm drainage pipe outfall)
  • Approx. location tributary to Boot Road Run
  • Bi-level framed dwelling; covered porch; wooden retaining wall; paved drive
  • Flood Zone X; Flood Zone A; approximate location flood zone boundary
  • Adjoining lands: T. Douglas Culbertson (Lot 101 Charter Chase), Linda Kane (Lot 100), Brad and Danielle Modzelewski (Lot 18 Regal Vistas), Lawrence L. and Terran J. Chertok (Lot 19 Regal Vistas)
  • Graphic scale 1 inch = 20 feet

Title block: Matthew Delaney, 1405 Wexford Circle, Site Plan for Sewage Facilities Planning Module. East Goshen Township, Chester County. Evans Mill Environmental, LLC, Environmental Engineers and Consultants, 101 Fellowship Road, Uwchland, PA 19480. Project # 2875-00. Date 08-30-2017. Sheet 1 of 1. Scale 1" = 20 ft. Drawn by DRH. UPI#: 53-1R-25. Revision 1, 2/23/2018, Issued for Planning Module. Base plan prepared by Howell Kline Land Surveying, West Chester, PA. Pennsylvania One Call 1-800-242-1776.