Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday, October 2, 2019
7:00 PM
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. September 4, 2019 F. Subdivision and Land Development Applications G. Conditional Uses and Variances
1. ZEKS, 1302 Goshen Parkway (CU - Request to modify conditions of approval) H. Ordinance Amendments
1. TND Ordinance Overlay/ CCPC Review 2. Zoning Ord. Amendment/ Apartments in the Business Park District (BP)/ CCPC Review I. Old Business J. 2019 Goals K. Any Other Matter L. Liaison Reports M. Correspondence N. Announcements
1.
BOS Meeting on BP Apartments Ordinance, October 15 @ 7 pm 2. BOS Meeting on TND Ordinance, October 22 @ 7pm
Bold Items indicate new information to review or discuss.
F:\Data\Shared Oata\Agendas\Planning Commission\2019\PC AGENDA 10022019.doc
Click here to view TND Report on our website
October 2, 2019 PC Meeting
(.) "' > ci 6 ci -!. ::, ii:'
C: a. 0 ,:,l ,, .. Cl) CV "' - - u: 0.. Cl) Cl) C. .... Application Name ;;-
CV C ZEKS, 1302 Goshen Parkway cu Sk 8/27/2019
Bold = New Application or PC action required
Completed in 2019
ESKE Development I Ducklings LD P/F 1/18/2019 PECO Gas Gate cu Sk 2/26/2019 CZ Woodworking / 1422 Ardleigh Cir. cu Sk 3/29/2019
1351 Paoli Pike / The Hankin Group SK 5/31/2019 1339 Enterorise Drive cu Sk 5/30/2019
East Goshen Township Planning Commission
Application Tracking Log
1/) ... m Cl) <C Cl) C: -
0, ci. C: 0 w ... a. C.
0, .c: C 1/) C (.) .. == a. ....
:::I (.) .c Cl) 0 (.) <C C: .... 0 CV 0 'iii C 0 0 .... .... .... C: t:: Cl) Cl) Cl) Cl) CV .... .... .... .... .... CV CV CV >< "' C C C w 8/27/2019 NA NA 8/29/2019
2/6/2019 2/23/2019 2/23/2019 2/29/2019 2/26/2019 2/28/2019 NA 2/28/2019 1 3/29/2019 NA NA 4/22/2019 1 NA NA NA 5/31/2019 NA 5/30/2019 NA NA 6/11/2019
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2019\PC Tracking Log for 10022019.xlsx
Cl) .... Cl) CV .... C CV C C C 0 Cl) .... 0 .. Cl) CV .. (,) ,, .... (,) <C CV ,, 1/) <C C CV .... ..J 0, Cl) Cl) ..J z C C E z "' ·;: C. E 0 CV 0 (.) Cl) ... 0 a. m C (.) 10/2/2019 10/29/2019 10/15/2019 10/25/2019
4/3/2019 4/9/2019 NA 5/6/2018 APPVD. 4/3/2019 6/5/2019 5/14/2019 6/25/2019 APPVD. 6/5/2019 6/18/2019 6/18/2019 6/27/2019 CONT. NA NA NA NA NA 7/10/2019 7/16/2019 7/16/2019 7/29/2019 APPVD.
9/27/2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
September 4, 2019
The East Goshen Township Planning Commission held a regular meeting on Wednesday, September 4, 2019 at 7:00 p.m. at the East Goshen Township building. Members present are highlighted: Chair - Brad Giresi Vice Chair - Ernest Hukness Dan Daley Edward Decker Michael Koza Mark Levy John Stipe Also present were: Mark Gordon, Zoning Officer Janet Emanuel, Township Supervisor Marty Shane, Township Supervisor
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission
A. FORMAL MEETING - 7 p.m.
CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM- Storm Water Management
ZHB - Zoning Hearing Board
1. Brad called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military.
2.
Brad asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. Brad checked the log. 4. The minutes of the August 7, 2019 meeting were approved as amended.
B. CONDITIONAL USES AND VARIANCES
1. ZEKS, 1302 Goshen Parkway (CU-Request to modify conditions of approval) Henry Mark, Engineering Manager for ZEKS Compressed Air Solutions represented the applicant. Mark Gordon explained that they are requesting a modification to the approval granted for their use in 1998. Condition six of the original approval prohibits outdoor storage. The business has experienced significant growth over the years and is now owned by Ingersoll Rand. They have outlined their need for outdoor storage. Mr. Mark commented that the business is growing. They want to mitigate the impact of outdoor storage. They want to install a fence around the rear shipping area with 6 or 7 storage containers. The containers are about 9 feet tall and are used for commodity items. The fence will have an automated gate. Mark Gordon discussed the height of the fence in different areas. The fence will be 8 feet tall but when put on the berms, it will be higher. They will have to present the plan to the Conservancy Board. Mr. Mark mentioned that they will reconfigure the assembly area in the building which should give them more space. The chain link fence will include privacy slats. So far, they will be gray. Jim Douglas, 1405 Grand Oak Ln. - He asked about impervious coverage and water run off. Mark Gordon explained that the corporate park is controlled by infiltration basins. All lots have been built with the maximum required for storm water management. Linda Polishuk, 1424 Grand Oak La - She suggested that they consider using green slats to go with the trees in front of the fence.
PC 9-4-19 draft 1
1 Bard reviewed items for the next meeting. Storage units 9 - IO feet high; 2 I. Any fencing or fencing and berm have to be high enough to cover the containers 3 2. berm on the East side 4 3. color of slats 5 4. photos of installed fence with slats 6 5. define on the plan where the storage units will go 7 The next meeting is October 2, 2019. 8 9 C. ORDINANCE AMENDMENTS 10 I. Zoning Ordinance Amendment/Apartments in the Business Park District (BP) -1351 Paoli Pike 11 Neil Fisher represented the applicant the Hankin Group. He explained the changes they made since the 12 first PC meeting. The height of the building changed from 4 stories at 45 feet to 3 stories at 35 feet. The 13 front setback on Paoli Pike changed from 50 feet to 75 feet. The side yard setback changed from 15 feet 14 to 25 feet. Mark Gordon mentioned that letters were received from Pennoni and McMahon today. He, 15 Rick Smith and the Township Solicitor spoke with Mr. Cline of Pennoni today. 16 17 PC Comments 18 Ed- The total of parking was about half of what zoning requires. Brad commented that the proposed TND 19 is reducing the number of spaces required. East Goshen is high. 20 John - feels the setback should be I 00 feet as required in the ordinance. 21 Mike - asked for the height in the BP. Mark Gordon answered the maximum is 3 5 feet with a flat roof. 22 Brad mentioned that he likes the slope roof at New Kent. Mark Gordon mentioned that the peak mean of 23 the roof has to be 35 feet. 24 Mike -Pennoni referred to the Chester County Trail and right of way. 25 Neil- Hankin is 100% in support of the trail. They will construct the part that is on their property. 26 Ernie - He got comments from residents. Concerns are school impact and access to Paoli Pike. He 27 explained to them that under the current ordinance they can build a large commercial building. When you 28 look at the East Goshen Master Plan and Paoli Pike Trail Plan, he feels that the Hankin plan goes more 29 with future plans than a large commercial building. 30 Mark Gordon mentioned that there was a covenant, which restricted access to the corporate park via Paoli 31 Pike. They could only use Enterprise Drive, That expired in 2010. 32 Mark Levy -feels that the revised plan contains significant changes that covered concerns from the 33 residents. The McMahon letter refers to 60 foot left turn lanes on Paoli Pike. 34 Neil-They will have to do a full traffic study. PennDOT will dete1mine the length of the turning lanes. 3 5 Brad - Signs - free standing or wall. 36 Neil-feels signs for apartments can't be more than 10 feet so it would be free standing. 37 38 PUBLIC comments: 39 I. Jim Douglas, 1405 Grand Oak Ln - He and most of the residents are very concerned about the flood
40 plain, which might be increased and he would have to buy flood insurance. He mentioned how many 41 times this year they have had water problems. Something has changed and they are concerned that this 42 will cause more water problems. He spoke about the early rush hour traffic, which is already bad. 43 Brad explained that the storm water is infiltrated on this lot and will not run off. 44 2. Colleen Golden, 1411 Linden La- When they added a deck to their house, they had to maintain the 45 water, which goes into their back yard. This year they have had flooding into their basement. With the 46 proposed underground garage, where will the water go? She hopes the Township is thinking about the 4 7 residents. 48 Mark Gordon assured them that the developer will have a required plan to infiltrate the storm water. He 49 spoke about the huge increase in the water table this year. Four inches in 20 minutes is a 1000 year flood. 50 3. Linda Polishuk, 1424 Grand Oak La- Because of the more severe events she asked if the maps are 51 updated. Maybe it is time for the township to look at this area because of the flooding. She spoke about
52 screening along Paoli Pike. She feels that access should only be allowed through Enterprise Drive. She
PC 9-4- I 9 draft 2
1 mentioned the adaptive reuse of the house. She feels it is curious that the PC would have passed this to 2 the BOS considering the comments of the residents. 3 Mark Gordon answered that the maps were updated as of 2017. A restaurant is allowed in the BP. 4 4. Christina Vagnozzi, 1408 Linden La- She has pictures of Linden Lane when it rains. 5 5. Suzanne Coggins, 1442 Grand Oak La -She has lived here 25 years. She has trouble getting onto 6 Boot Road because of the traffic. When her kids went to East High School, they told her about the 7 accidents. This development will bring more traffic and impact schools. We don't need more people. 8 6. Thomas Arvanites, 1433 Cherry La- Will a traffic study be done before or after approvals? Brad 9 mentioned that they have preliminary studies, which show that there will be less traffic with the 10 apartments than with a large commercial building. Hankin will provide a full study during the process. 11 7. Christopher Smyth, 1426 Linden La - He just found out about this. How large is large commercial? 12 Please compare it to QVC. He lives behind QVC. 13 Ernie explained the types of uses that could go there up to 90,000 sq.ft. Mark Gordon commented that 14 QVC is 150,000 sq.ft. Techniplast is closer to 90,000 sq.ft. 15 8. Michele Truitt, 1430 Grand Oak La- She disagrees that commercial is worse than apartments. She 16 feels that once the change is made to allow apartments, other properties will put in apaitments. She wants 17 a study done to show how that would look. She feels it should be only BP as it is today. She asked if any 18 PC members work for Hankin. 19 Dan commented that the company he works for does business with Hankin so he has recused himself 20 from this request. 21 9. Jim Douglas - Asked how many Business Parks are in East Goshen. 22 Mark Gordon replied this is the only one. It also includes the Hicks prope1ties and 1450 Boot Road, 23 which is individually owned business office condos.
24 Brad reviewed the process and the next steps that are needed. Maity Shane also commented about the 25 process. Mark Gordon spoke about the changes in Corporate Parks today. He explained what the 26 Planning Commission does and how involved their work is. Everyone on the Commission is a volunteer 27 and works in some phase of the planning process. 28 Brad thanked everyone for coming. 29 30 D. ANNOUNCEMENTS 31 1. Mark Gordon reminded everyone that the meeting for the TND is scheduled for Tuesday, October 22, 32 2019. He discussed what needs to be done to prepare for this meeting. 33 2. The Food Truck and Music Festival had about 4,000 people attend. There was lots of good food and 34 music. There is a survey to get ideas for the stage improvement. 35 36 E. ADJOURNMENT 3 7 There being no further business, Ernie made a motion to adjourn the meeting. Mark Levy 38 seconded the motion. The meeting was adjourned at 10:00 pm. The next regular meeting will be 39 held on Wednesday, October 2, 2019 at 7:00 p.m. 40 41 42 Respectfully submitted,, ____________________ _ 43 Ruth Kiefer, Recording Secretary
PC 9.4. I 9 draft 3
MEMO to Planning Commission/ Conditional Use Application (ZEKS)
Memorandum
East Goshen Township
1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 9/23/2019 To:
From: Re:
Planning Commission Mark Gordon, Township Zoning Officer Conditional Use Application ZEKS Compressed Air Solutions
Planning Commission Members,
As you know, the Township received a Conditional Use (CU) Application from ZEKS Compressed Air Solutions requesting a modification to the approval granted for their use in 1998. Condition six of the approval specifically prohibits outdoor storage other than metal scrap bins.
As you can read in the application, ZEKS has experienced significant growth over the years and is now owned by Ingersoll Rand. The applicant has outlined their need for outdoor storage due to the success of the business and how they will mitigate impacts of this outdoor storage use.
Outdoor storage is permitted as an accessory use in the 1-1 Zoning District and standards for that use are listed in §240-32M:
M..._Outdoor storage and display, commercial or industrial (not including routine display of vehicles or plants for sale or lease).
{!}_Location. Outside storage or display shall not occupy any part of the street right-of-way, any area intended or
designed for pedestrian use, any required parking areas or any part of the required front yard.
filSize. Outside storage and display areas shall occupy an area of less than 1/2 the existing building coverage. Uses
requiring more land area for storage or display may apply for a special exception by the Zoning Hearing Board. In
no case shall more than 25% of the lot area be used in outdoor storage or display.
filShielded from view. Outside storage areas shall be shielded from view from the public streets and abutting
residential property.
STAFF COMMENTS
Staff has reviewed the revised information provided by the applicant and has no objection to the request to amend condition six of the conditional use approval however the PC may want to get clarity form the applicant on the following items:
1. Height of Fence: The fence can be 8' tall on this property within the yard setback areas. The fence is shown to be taller than the storage containers that are being screened. 2. Type of Fence: The proposed fence is described as chain link fencing with privacy slats.
F:\Data\Shared Data\Property Management\53-3\53-3-1.22 (1302 Goshen Parkway)\CU Application 08272019\Memo to PC 09232019.doc
MEMO to Planning Commission/ Conditional Use Application (ZEKS)
The privacy slats are proposed to be grey in color. 3. The "Shielded from view" standard will be met once the applicant has the fence and screening in place.
The Conservancy Board reviewed the application and approved the applicants landscape screening plan which supplements the existing landscaping along the proposed fencing adjacent to the parking lot.
Staff has no objection to the PC taking action at this time and believes the applicant has presented a plan that will mitigate any impacts of the outdoor storage use, 240-32M., and we also believe the applicants proposal and the mitigation proposed meets the CU standards, 240-31C.
DRAFT MOTION
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors approve an amendment to the Conditional Use approval for the property located at 1302 Goshen Parkway (UPI 53-3-1.22) owned by Thomson Logistics Assets LLC, amending, in its entirety, condition number six of the Conditional Use approval dated March 18, 1998 to read:
6. Outdoor Storage shall be permitted so long as all storage areas identified in the applicant's testimony and exhibits are screened from view with a solid fence, and all standards for outdoor storage outlined in 240-32 M. The original CU approval shall remain in effect with only this amendment of condition #6.
F:\Data\Shared Data\Property Management\53-3\53-3-1.22 (1302 Goshen Parkway)\CU Application 08272019\Memo to PC 09232019.doc
, ..
I
N m en en 0 -· 0 ,+ (D 3 - "C 3 -, "C
(D -, en 0 en < (D
(D C.
- -a --)> (D -·-, :l ,+ en en 0 -
,+ -· 0 :l en
Outdoor Shipping & Receiving Area
ZEKS Compressed Air Solutions
Security & Outdoor Storage Upgrade •
• •
•
nstall security ferrcing along '"ear shioping area ...vith automated gate.
!= stin1ated Cost: S65K {Initial Quote)
Capital ?roject - Target,
mp1ernentation by '--\Dril 2020. Submit for capital approval 9'1 9.
Work tc be performec by Licensed &
Insured Contractors: 1
- ;:e'lc1ng Contractor - Install fence and automated gate
E,ectnca Contractor - 1 Install electrical :'.)ower to gate from ins1ae of facility.
- Rf=Q to be submittec for addit:ona, venaors.
Project Objectives • =>rovide additional shielding of --ear area from street vie ordinances regardit')g outdoo, storage requirernents.
2 l West Chester
in o:der to meet loca zonina
'V
(1"i!i) Ingersoll Rand
• J',' • r-'l 'I 1, • I -
Septe
3 I West Chester
er L, $019 Initial Review Meeting ZEKS Compressed Air Solutions
Follow Up Questions •
• •
•
•
Confirm heigh· o-i: +encing a'7d placement of containe,.s.
Detail berm locations
Slat color options
:Jeflne oermanent location of storage containers
[ook At ,-6,lternative Fencing Options
Other than chain link). I
<,-,:/) Ingersoll Rand
Alternate Fence Options ZEKS Compressed Air Solutions
Alternate l=ence Options (Other Than Chain Link
Alternative
Options
Cedar (Wood)
Est. Longevity
15 Years
PVC 25 Years
Composite 25 Years
Cost Increase Over Chain Link
15%
20%-25%
>30%
Alter11ative options found to be much higher in pnce
• Cedar & PVC does .,ot offer sarie durabiliK'Y as '.)"'a•r 11'7 • Ornamenla, Leric1ng does not prov·de vis--1a: s:-i1e1dt'lg a,...,d reau1res 1-i gr-ier cos: - Galvanized cna n link fencinc can last awards of 40_:_ ._, . years as corripared to wood and 1s stronger thar: PVC
Automated access gate woula still need to be, cna:r- ir:K style
41 West Cr")ester
Higher Cost/ Shorter Longevity
Higher ,.__ Cost I
Less strength
(ij:j) Ingersoll Rand
5 I West Chester
rial View - ·1302 Goshen Parkway
ZEKS Compressed Air Solutions
Current State ZEKS Compressed Air Solutions Current Outdoor Storage Layout - Obtained Temporary Permit for Outdoor Storage
· - PINE TRE£5 _ ·Hk __ jr: -:y;--,y,-- "-,(--y,- -,y __ - '( - --·y ,- ___ { _ ,_ ':(-----x -__ ':( __ -,)
-(2) 20·1 X e -.....;..« •• I ,•1 t • • • ,• ·• 1' \, ,• ', •' •• / •• .' \,_ / \ /
/1 - -:;EF-"',,__ ./. '·•., www / •·•., rm ,; · ... , w / " rm ·' · www ·• ' - ·' •• www • ' w · ' w · • w •
.. / ,
I .. l •' 39"'-')·
-,:-. .l
_./ s' '
\-{2) 20' X a• CONTAINERS -., f /
- '-- ,:··
// PARTS DROP OFT AREA -., _ _ _ FROM S OP ',.------- -v'.'"-...,.-
"" ... ._ .. l
--r:-.. /-
_,.., . .,/ 1) 40' X B' CON.T AINER j
(1) TRAILER rRETURNABLE SHIPPING CR.TES
'1 TRASH AP.EA-., I .-...... - .. -'::...-.. -. l -· . y "" .._ , I r ·.
I • -, > \. I I I I
l..tJ • 1 1 1--.,; n •
6 West Chester
_1:·,-;: ;•·;.:.,- i:a·!.lt ·!-"# ,::·.%·-.. -t::···-·· -..::,r- ....... ;,'.,..;, -:::. V;-J .,-._ . • ,· •Y-1"----,, ... ., ..... , ....... r:::::::=
. ) I ' I ( ) J • ✓ I I '-.__ .... ··-....v"-_/ ... _✓
,,
(Z) 20· :X a• CONTAINER
. ,- { 1 ) TRAIL.ER f7 N !TROGE" TU 8[
I I
[
..,
i::::, ,;.•□ □ □□
<,1fi) Ingersoll Rand
- -
, .. - .
0 -:J" (l) (/) ,-+ (I) -,
:' 'i
O C ., i :, ,... , A) :, 0. "' (") A) "0 -·
:, (Q
I z 0 :r C') 0 3 (I) ., 'TJ · 0 :,,... CA-· 0. ' (I)
I ,, A) * -· :, (Q ,-
0 ,... )=. i A)
co -
0 ::J"' (D (/) ,-+ (D '
-· ::, (C
I z 0 ::1. :::r
CJ)-· C. (I)
I - ::, en -· C. (I) 0
CJ) :::r -a·
"C -·
::, (C
(I) 0,)
z (D
r m ::, - c.. ti) 0 (t) m CJ) "C ,-+- -· 0 ::, :3" (Q (t)
I CJ) ,-+- z (t)
0 ::s. ::T (") 0 -, ::, (D -,
I '"tJ m -, -·
r
, '\
-
n . C: -, -, (D ::, ....li,. .... 0 - r I» ::, (D C. (./) "' ,-+ 0 () I» :::y "'C (D -· (./) ::, ,-+
(C (t) """I
I z 0 ::i. ::r
◄ n 0 -, ::, (D -,
I -c I» -, "" -· ::, (C
r- 0 .... )> -, (D I»
I a, C: -·- C. -· 5" ::, (C m . rt) C. 0 (C ::::
(D
New Landscaping - North Corner - Parking Lot Area
• Total Height of Fence (8') & Berm (2') = 10 ft; Storage Trailer Height: 8 Ft • Chain Link Fence with Gray Slats
"'r-- ., I l I ! Fl! 1 i l I '1 i l I 1.1 · ·•!Id) 1 1, ! ,: l I , . . I! II I I I I I ' 1' I *j !j i I I l I . 1 I I,, . 'I I II ' I I I 11,:. I! ii I I. I I l t' i;l •1 I I I ! 1 · I t : 11 I I 1 I 111111 1
' I d ii I! 11 I !1 . 1 1 1 ,I jl':!IT.·'11·11: 111 '' ll' ii !!11ll!, :!I I,, I I! ! l' ' I I: 1'
i I. I I,, I
i I I I I , , , · I " ,. '11 I I I . I I I, ,II! I' i '.. I] I I' Ii! ':i ! 11.11: I I I, I I
New Landscaping - North Corner - Parking Lot Area
Total Height of Fence (8') &
Berm (2') = 10 ft; Storage Trailer Height: 8'
,:, 4 North Side With Fence and Berm 1 =4,:f.....-- -i-. ;_,. r ., -; ., . -,·. 'Q!'. .. ..:"1 • :';:-.-- ·'"'' ....... . 'c4r,.• •'';\'! I !.--·- .._.,,.. .
.... ,.,. <""'?,!/!'•·' .<;;-'
••lll-f-o .,,.,,.. ..
tlf
. 1 •! :::---,, Automated Gate: 6 ft Tall=---,&
12 I West Cnester- (_IIJ) Ingersoll Rand
New Landscaping - North Corner - Parking Lot Area
Total Height of Fence (8') &
Berm (2') = 10 ft; Storage Trailer Height: 8'
\. \
//
13 t West Criester
r-, J
REMOVE CURB .l.LONC THE COMAINERS WHICH SIT ON CRUSHED STONE BED
Pt-VED AREA TO FACILITt.TE FORK TRUCK
...
·□·
I I
.. ,A'. I :.,r, --ir-Af "-"
-
I I
" - .,
- --=------------
.-s• DEEP CRUSHED STONE
,......, ....__ I
I '-' /'ff\ '.i'
/n ---------" I " I • ·......_ ..,, I
<iii> Ingersoll Rand
Proposed Landscaping Plan - North Corner - Parking Lot Area
INSTALL 8' TALL CHAIN Ut"( rENCE WITH GRAY/WJ-ilTE PRIV.O.CY SL.O.TS ON TOP OF' 2' TAU. B[RM TO ļCHIEVE
10· HEIGHT FOR PRIVACY SHIELDING
.r.{6) 20' X 8' CONTAINER / '-.(2' BELOW FENCE LINE) _,,,/,/
- INSTAU. 8' TALL CHAIN LINK FENCE \ ALONG EAST SIDE OF SHIPPING ARE.A
r'-
:71--T ,-.--->.;.:-,/ ......... :._: ... -: ...... I •• _.,:·:· f:•. -,:. ..... ... -· ... -: . I. ·-
'?\ -.... .....
I,Ľ / ( ...
' ,,,-. ./\ \
\\..SHIPPl"G & RECEIVING EN1RY SECURITY GATE
6' TALL AUTOMATED CHAIN LINK GATE \I/ITH GALVANIZED POSTS AND PRIVACY SLATS
-F'EI\CE POSTS TO BE SET IN
CONCRETE It-TO GROUI\D BEFORE B[RM IS lt-.STt-LL.£D -2• T.ALL BERM ---NEW EMERALD SENTI
Design Notes: • (3) Existing Norway Spruce Trees • Plant new Emerald Green Sentinai Cedar Trees in front of new fence
14 i West Chester (!---.J)1ngersol/ Rand
New Proposed Tree Planting - North Corner • Trees to be planted in front of existing Norway Spruce Trees.
r
-• X··"t· .
.. -.. , ·· .• : .. : .,_,i:r,:-.· .... -;,'. i'•. ·-!, t-,..,,,, .. i•-:; :;.-:. -.- ; ;-: .. > .,,_. ' -. • . <_., . - -.I. ' . - ., " ..... i·· .. ,. . .. -._. ·•-'-. ':· .... -:", .. 1 '
'ir• ·• . •-· L :;,. -'··' -- :, ... ,· .. ;rfY .
• -· • a . . . •. . r . ,\.,
• • J:11 ···- .. -.. , • .. . ---- -). ".• ,.• • --i.;,;, ,, .' • • r. ;.--'._ :b- • ."-,; "f .\ ':' -·-;.•.·-c .... d··. •: •• •·r.ef :-. -·':-"s,- . •.,.. ,..;.r . ::-r'r ... 1'. !: . •·. -· '. Z [..,. _.,_·L ..;._. ·>
• ' •. , ,, • • • • • •·I S° -i i
•; .,:-F. ···"''.:-'-_--G , .. - .l . ..,;.-.H-·t .. - .·I:,;a-, . . . . . . ... ,,. .... . '· --.... - '\., . '\ -] .... -;• .-- •. -. .-, 1,, , . ..,._, .. --::.. -^ . _
,,... ---:· ... ·J•
--K- -L.--.-.-i" ... "· 1._.J'M·";:-.,. •. N '-· --C: ·.D- - . :r..---E.·--.:.:.>;srF. -.. -·.-.... ..:-G ....... .-. H-.::.c-... -._
.. I • . - _. -', • • • • . • -,,.- ·• ' ' ,.._ • •lo. . .. . ' . . .... ,, l *--'J.•-. , . .;, --...• ·•.-. *·'". •
I::]
15 I West Chester
Description. Norway spruce is a large, fast growing evergreen coniferous tree that grows to mature heights of 115 to 180 feet (35 - 55 m) tall with a trunk up to 3 to 5 feet (1 - 1.5 m) in diameter, measured at breast height. It is fast growing when young, up to 3 feet (1 m) per year for the first 25 years under good conditions, but becomes slower once over 60 feet (20 m) tall.
Shoots are orange-brown and glabroli.Js (hairless) in texture. Leaves are needle-like, 0.5 to 1 inch (12-24 mm) long, quadrangular in cross-section (not flattened), and dark green on all four sides with inconspicuous stomata! lines.
Pollen cones measure (12 - 25 mm) long and are purplish red in color. Seed cones measure 4 to 7.5 inches (9 - 17 cm) long (the longest of any spruce), and have bluntly to sharply triangular-pointed scale tips. They are green or reddish when young, maturing brown 5 to 7 months after pollination. Seeds are black, 0.16 to 0.2 inch (4 - 5 mm) long, with a pale brown, 0.6 inch (15 mm) wing.
New Proposed Tree Planting - North Corner • Trees to be planted in front of existing Norway Spruce Trees.
Juniper Emerald Sentinel
16 I West Chester
Juniperus virginiana 'Corcorcor' I Emerald Sentinel TM Red-cedar
I
It is an upright, rather narrow selection of Eastern Red-cedar with bright green foliage. This is a female, fruiting cultivar that is deemed to have superior tJisease resistance and is considered one of the toughest plants in the nursery trade. After
10 years in the landscape, a mature specimen can measure up to 20 feet (6 m) tall and 8 feet (2.6 m) wide, a rate of growth approaching 2 feet (60 cm) annually. It is quite suitable for hedgerows where arborvitae may be inappropriate.
<fjp Ingersoll R nd
L Proposed Landscaping Plan - Plan View - Shipping & Receiving Area
North / !8 '--.::/
TRIM EXISTlll.:G t-.ORWAY SPRUCE EVERŅEEH TREES 2' IN AND 10· HICH___...--
1.AMP P::>ST
CUT DOWN [XIS!ING NO.WAY SPRUC
I
E[ /
-- - East Side
"' \:J··-..., NOPWAY SPRUCE: iR[E'.S INSTALL 8' TALL PRIVACY F£NC ". . c y-;-,f --,_.,- ·-...r .,._ r - _r ....__,,,..--._,
/ ./ ..__,,,. j ,. 1 ,. ,., ,.. , ,- f , SPEED BUIJP-:-----.:: -- .,; \. C } -· I, - ( - ) - / C I -· ) C
I ----- - - --
, •. ----SHIPPING h P•rrivu,.r: n .. TPY ņrr1•RITY GATE
6' TALL AUTOMATED GATE
r-COI\ TAINERS SIT 01\ CRUSHED STONE BED
WHICH EXTENDS TO GIVE A 2' BORDER
PARTS DROP or SE
ffiOl,I Sliotr-----:--
M I I ----(6) 20' X 8' CONTAINER (SEE DETAIL B)
/ NEW PAVED ARE
Ň ) TflAILER rRITURNABLE SňIPPING CRAiLS
RCFUS[ ARE (5) 20' X 8' CONTAINE:i
(1) TRAILER NITROGEN TUBE
PL.Aʼn Nl:W EMERALD SENTINEL CEDAR TRE9-----
0N A. 2· HIGH BERM AT 4'-5' CENTERS - Ŋ
Design Notes: • North Side
• (3) Existing Norway Spruce Trees - Prune to accommodate fence & container placement • Remove (1) Norway Spruce Tree • Plant new Emerald Green Sentinal Cedar Trees Jn front of new fenae • East Side
• Prune trees along East side (property border). Install fence 3' from Curb to allow for mowing lawn area.
17 I West Chester <,Wtngerso// Rand
•
Current Landscaping - Southeast View - Parking Lot Area
__.., . ..-
18 ! West Cnester (;IJ) Ingersoll Rand
. '
Future State - East Boundary Line View - Receiving Lot Area
Total Height of Fence (8') Chain Link Only w/o Slats
19 I West Chester •I c-':,.
Current Landscaping - South Side (Facing Wrights Lane)
Trees along South border obscure
20 f West Chester
Current Landscaping - South Side (Facing Airport Road)
21 f West Chester
Current Landscaping - South Side (Facing Wrights Lane)
22 I West Chester
Current Landscaping - South Side with Fence & Partial Berm
• Chain Link Fence With Gray Privacy Slats • 50 ft of Fence To Be Installed On Berm To Shield Container Height.
23 I West Chester
'4(, :3k 1\:-.,u'rV, l)lt URBAN FOREST I()*!',,;, r I' Jr
1269 Estate Drive, West Chester PA 19380 610 350 7000/mdunn@brandywineforest.corn www.brandywineforest.com
Re: Tree Line of Site Issues at Zeks Compressed Air.
Dear Mr. Mark,
September 10th, 2019
:
This letter is in response to your request that I examine the trees at the ZEKS Compressed air facility at 1302 Goshen Parkway in West Chester Pennsylvania. As new development plans were to take place at the rear of facility it became clear from East Goshen township officials that there was an issue with line of site. From our discussion it was divulged that ZEKS Condensed Air Solutions is planning to revise their conditional use to comply with the Outdoor Storage Zoning Ordinance. To shield these issues ZEKS has proposed installing a fence around the yard space at the rear of the property to protect the yard space from view. Also proposed was a landscape installation at the Northeastern corner of the property near the drive entrance to the yard space. This construction will have some impact on the existing trees.
I was contracted to do an initial site assessment with Mr. Mark and craft a basic letter report with recommendations to remediate any issues with the proposed plans put forth by ZEKS. These recommendations would include the feasibility of the ZEKS plan as it relates to any potential infringement on the critical root zone(CRZ) of the existing landscape trees. Also, I will make planting suggestions to cover any holes in line of site from the Northeastern corner.
Finally, I will make pruning recommendations to allow the fencing project the necessary clearance. The site was evaluated using a Level 1 Limited Visual Assessment as outlined in the International Society of Arboriculture's (!SA) Best Management Practices for Tree Risk Assessment and ANSI A300 Tree Risk Assessment Standard.
-41, t!rli\f,u (VI "I[ URBAI\I FOREST ( cm Ul rn,1._,
1269 Estate Drive, West Chester PA 19380 610 350 7000/mdunn@brandywineforest.corn www.brandywineforest,com
making appropriate cuts to a lateral 1/3 the diameter of the main stem. Pruning cuts should be directed by a company that employs ISA Certified Arborists. 2. Remove one forward facing Norway Spruce in Northeastern corner. 3. Grind stump to below grade. 4. Install 5-8 small evergreens along Northeastern corner on North Side of fence. All installations shall follow ANSI A300 Standards Part 6-Planting and Transplanting. Two recommended replacement specimens that are of small stature that should prosper in the intended space are Nelly Stevens Holly, /lex x 'Nellie Stevens' and Emerald Sentinel Cedar, Juniperus virginiana x 'emerald sentinel'. Exact number-of plants, spacing and placement will need to be determined at a future time. Planting size should be 6-8' or 8-10' in height.
In conclusion the ZEKS plan to install the fence and these above recommendations will ensure that the existing landscape offers the correct line of site protection. As the majority of the fencing installation will be outside of the critical root zone there is a low probability of substantial root damage. With proper pruning following ISA standards the trees will not be harmed when clearance cuts are made. The additional landscape feature plants will block line of site issues from the Northeastern corner. Please remember to involve a consulting arborist if the plan or scope of work changes.
Sincerely,
Michael B. Dunn
Board Certified Master Arborist PD 1829 BM
/4/_ftvtz__
Slat Pictures
- _11
24 L West Criester
Slat Notes: • Color Selection: Gray
@tngerso/1 Rand
White 0
Top-Locking Slats
11,Hln
• Design: Top-Locking Slats are flat and tubular in shape. with circular. notched out holes locnrecl near the top of the slat.
• Fast & Easy Installation: There is no need to kneel clown' Simply insert the slats vertically from top to bottom. keeping the locking holes on top. Then thread the flexible locking channel horizontally through the notched holes in the slats. These holes are elliptical to ensure they always stay open for fast nncl easy t_!!reading.
• Standard Heights: 4 ft.. 5 ft.. 6 ft .. 7 IL 8 ft.. IO ft.. 12 ft. Si.1ecilrl heighrs m·ailable upon req11e.1·1.
• Slat Length: T shorter than the overall height of the fence.
• Flexible, Top-Locking Channel: Also a\'ailable on a continuous 200 rt. reel for larger jobs.
• Wind Load and Privacy Factor: Approximately 75<Jr.
Slat Name
I,. 1.c ·I l ,p i ,,._k È
\ I 1: / , ,,-
Slat Widrh i'vlcsh Size
\I ,,,
\k-.,1 \k,.lt \ Jc,.
Wire Gauge
\I \1r I! Cau/•.' 11 '· ,\I' 1 ! ( 1:'l•.:-·"· 11 I id11;,t
(, ( j I.) ,
Slats per bag Coverage per bag
.ÉÊ !II Lll\t..',1! f\· 'I Ii! 1_:illt.',11' h .._ ! JIiii i'ltl
!O I Jll•";I; !·.;,;'( //) /..lfk'" l .,
'" Ex:ic1 rcprc,c111mio11 of slal n.1/or, in printing is clif
firnlt. Plc:isc rd"cr 10 actual rnlor ,a111plcs i(>r finnl 1m11chinf . • •
re
Redwood •
I.
D
C
B
A
L
7
◄N s►
OUTDOOR STORAGE LAYOUT PROPOSAL
7
6
6
5 4 3 DWG HO.
Rtv.SIONS
ZONE R£V OESCRlPTIOH Oi\lE APPRO'IED
CONTAINERS SIT ON CRUSHED STONE BED . WHICH EXTENDS TO GIVE A 2' BORDER
(6) 20' X 8' CONTAINER (SEE DETAIL B)
A ORIQNAL RaEASE
8'
0
PARTS DROP OFF AREA
FROM SHOP
7/26/2019 Hlol
TRIM EXISTING NORWAY SPRUCE EVERGREEN TREES 2' IN AND 1 O' HIGH V
NEW PAVED AREA 8' TALL PRIVACY
CUT DOWN EXISTING NORWAY
CONTAINER
LAMP POST (I) TRAILER • RETURNABLE SHIPPING
(5) 20' X 8' CONTAINER]
(1) TRAILER
5
. '-l ;.":;.:
NOTICE: n-us DRAWING EMBODIES A CONFIDENTIAL PROPRIETARY DESIGN 01'/111£0 BY ZEKS AND All PATENT RIGHTS AND DESIGN. MANUFACTURING THE SAME ARE EXPRESSl Y RESERVED TO ZEKS. TI-HS DRAWING IS SUBMITTED UNDER A CONFIDENTIAL RELATIONSHIP FOR A SPEOFIEO PURPOSE ANO THE RECIPIENT HEREOF BY ACCEPTING THE DRAWING ASSUMES CUSTODY THEREOF ANO AGREES NOT TO O!Sct.OSE ANY INFOfU,IATION REGARDING IT TO ANY UNAUTHORIZED PERSON, TO ALTER THIS DRAWING IN ANY WAY, OR TO INCORPORATE THIS PROPRIETARY DESIGN OR THE SUBSTANCE OF IT EITHER IN WHOLE OR IN PART IN ANY EQUIPMENT, NOR USE IT FOR THE MANUFACTURE OF ANY PARTS,
4
NITROGEN TUBE
'"' ""
PART OR IOENT1F'l1NC NO.
NONENQ.A TUR[ OR otSCRIPTION
PARTS UST
IJNL£SS OtHER\\ISE SPECIFIED ZEKS DlUENSIOHS AAE IN INCHES tol.ERAHCES AAE:
FRACTIONS DECIMALS ANGLES COMPRES5EO AIR SOLUTIOOS" ¼ JO( ¼ - ¼ANGl.E .XKX::I: -
MATERIAt
FINISH
DO NOT SCALE DRAWING
3
"""' "' CHECK£D "" ""'' ' ... "'"
NOT TO SCALE
"" 7/26/2019
7/28/2019 SIZE
8
2
OWO NO.
m
MATERIAi. SPEaf1CATION
1302 Goshen Parkway West Chester, PA. 19360
ZEKS_FACILITY FUTURE_STATE
#6
'"" "·
""
E
7
D
C
B
A
D
8'
C
B
A
L
7 6 5 4 3 O'NG ND.
RE'v'ISIONS ZONE REV DATE APPRO'oED
'
8' f
12'
BERM 2'
J
8 '
8'
A ORIGINAL REl..£ASE
8'
2' BERM
7/26/2019 HW
5' '-----20'----...J
C EAST ELEVATION D EAST ELEVATION C BUILDING SIDE FRONT VIEW D BUILDING SIDE BACK VIEW
--,-
1 I
--T
l I
INSTALL 8' TALL CHAIN LINK FENCE WITH PRIVACY SLATS WITH A 2' BERM
TO ACHIEVE 1 O' HEIGHT FOR PRIVACY SHIELDING
-T
l I
5) 20' X 8' CONTAINERS
2' TALL BERM
'------------------67'------------------j
INSTALL 8' TALL CHAIN LINK FENCE ALONG EAST SIDE OF SHIPPING AREA
B SOUTH ELEVATION B BUILDING BACK VIEW
INSTALL 8' TALL CHAIN LINK FENCE WITH GRAY/WHITE PRIVACY SLATS ON TOP OF 2' TALL BERM TO ACHIEVE 1 O' HEIGHT FOR PRIVACY SHIELDING
SHIPPING & RECEIVING ENTRY SECURITY GATE 6' TALL AUTOMATED CHAIN LINK GATE WITH GALVANIZED POSTS AND PRIVACY SLATS
FENCE POSTS TO BE SET IN CONCRETE INTO GROUND BEFORE
BERM IS INSTALLED OUTDOOR STORAGE LAYOUT PROPOSAL
CONTAINER
A NORTH ELEVATION A BUILDING FRONT VIEW
NOTICE:: THIS DRAYilNG EMBODIES A CONFIDENTIAL PROPRIETARY DESIGN OWNED BY ZEKS ANO All PATENT RIGHTS AND DESIGN. MANUFACTURING THE SAME ARE EXPRESSLY RESERVED TO ZEKS. ll-11S DRAWING JS SUBMITTED UNDER
INSTALL 8' TALL CHAIN LINK FENCE
WITH PRIVACY SLATS ALONG BACK
OF SHIPPING AREA
INSTALL 8' TALL CHAIN LINK FENCE WITH PRIVACY SLATS
(6/ 20' X 8' CONTAINER (2 BELOW FENCE LINE)
EXISTING NORWAY SPRUCE
2' TALL BERM NEW EMERALD SENTINEL CEDAR "' """
PAAT OR IOENTIF'rlNG HO.
HOMENa..Al\JRE OR OESCRIPTIOff
PAATS UST
UHL£S5 OlHER'MSE SPEOFlED ZiEKS DlWENSIONS AA£. IN INCHES TOl.£RANCES ARE:
FRACTIONS OEOW"1.S ANGLES COMPR£SSEO AIR SOLUTIONS• ± .XX ± - ±ANa.E .xxx ± -
FlHlSH
""'"'
CHECKED .. ,,.,
'"' "' 7/2.6/2019 '" 7/26/2019 SIZE
t.lATERJAL SPEOF1CATION
1302 Goshen Pari<way West Chester, PA. 19380
ZEKS_FACILITY FUTURE_STATE
'"" ,.
A CONFIDENTIAL RELATIONSHIP FOR A SPECIFIED PURPOSE AND TI-IE RECIPIENT HEREOF BY ACCEPTING THE ORA\'o1NG ASSUMES CUSTODY THEREOF AND AGREES
NOT TO DISCLOSE ANY INFORMATION REGARDING IT TO ANY UNAUTHORIZED PERSON, TO ALTER THIS DRAWING IN ANY WAY, OR TO INCORPORATE THIS PROPRIETARY DESIGN OR THE SUBSTANCE OF IT EITHER IN WHOLE OR IN PART !N ANY EQUIPMENT, NOR USE IT FOR THE MANUFACTURE OF ANY PARTS. ""
B
OW:. NO. #6 '" 00 NOT SCALE DRAWING """ E NOT TO SCAl£
7 6 5 4 3 2
7
D
C
B
A
7
D
23'
C
B
A
L 7
6
55'
6
2' BORDER AROUND CONTAINERS
0
5
0
5
4 3 DWG NO. .. "''
R'SIOHS
ZONE REV OESCfilPTION DATE APPROVED
A ORIGINAL REl..£AS£ 7/26/2019 HU
REMOVE CURB ALONG THE CONTAINERS WHICH SIT ON CRUSHED STONE BED
.. •
• . .
· . '9·
·• 'l. ,q: •
PAVED AREA TO FACILITATE FORK TRUCK
•
6" DEEP CRUSHED STONE ..
0 □ 0
12'
8' 5'
1-------------56'----------------l ® ISLAND DETAIL
NOTIC£: 11-11S ORAVr1NG EMBODIES A CONFIDENTIAL PROPRIETARY DESIGN OWNED BY ZEKS ANO ALL PATENT RIGHTS ANO DESIGN. MANUFACTURING THE SAME ARE EXPRESSLY RESERVED TO ZEKS. THIS DRAWING IS SUBMITTED UNDER A CONflOENTIAL RELATIONSHIP FOR A SPEC!FIEO PURPOSE AND THE RECIPIENT HEREOF BY ACCEPTING THE DRAWING ASSt.JMES CUSTODY THEREOF ANO AGREES NOT TO DISCLOSE ANY INFORMATION REGARDING IT TO ANY UNAUTHORIZED PERSON, TO ALTER TI-US DRAWING IN ANY WAY, OR TO INCORPORATE: THIS PROPRIETARY DESIGN OR lliE SUBSTANCE OF IT EITHER IN WHOLE OR IN PART IN ANY EQUIPMENT, NOR USE IT FOR THE MANUFACTURE OF ANY PARTS.
4
PART OR IOENTIFWIG NO.
NOMENCU.WRE OR OESCIIIPTIDN
PARTS UST ZEKS f'RACTIONS OEOMALS ANl;LES :I: .xx :I: - :l:Altl;LE .XKX:I: -
MA1£R!"1.
FINISH
DO NOT SCALE DRAWING
3
COMPRESSEO AIR SOLUTIONS• """"' "" .. , 7/26/20!9
CHEa<ED "" 7/28/2019
HIT "". SIZE
B
OWG NO. "'"'
NOT TO SCALE
2
t.lATERIAL SPECIFICATION
13D2 Goshen Parkway West Chester, PA. 1938D
ZEKS_FACILITY FUTURE_STATE
#6
'""' ••
E
7
D
C
B
A
7 6 5 4 3 OW(l NO.
ZONE: REY
A ORHllHAL REI.EASE
RF:VISIONS
OESCRIPT10ff DA 'IE APPRO'<m
7/26/20111 HM
D
D
'
_QJ n
J n
8'
7 ! 13 ! ii ! " n - -
] n n D
ID ■ 7il 7 C
C
8'
A
L 7 6 5
20' ® CONTA!NER DETAIL
NOTIC£: THIS DRAWING EMBODIES A CONRDENTIAL PROPRIETARY DESIGN OWNED BY ZEKS ANO All PATENT RIGHTS AND DESIGN. MANUFACTURING 11-IE SAME ARE EXPRESSLY RESERVED TO ZEKS. THIS DRAWING IS SUBMITTED UNDER
A C0NR0ENTIAL RELATIONSHIP FOR A SPEaFIE0 PURPOSE ANO THE REOPIENT HEREOF BY ACCEPTING THE DRAWING ASSUMES CUSTODY THEREOF AND AGREES
NOT TO DISCLOSE ANY !NFORMAllON REGARDING IT TO ANY UNAUTHORIZED PERSON, TO ALTER 11-11S DRAWING IN ANY WAY, OR TO INCORPORATE THIS PROPRIETARY DESIGN OR THE SUBSTANCE OF lT EITHER lN WHOLE OR IN PART IN ANY EQUIPMENT, NOR USE lT FOR TI-IE MANUFACTURE OF ANY PARTS.
4
or, """
PART OR KlDHlrYING NO.
NOMENClA TUR£ OR OE.'SCRIPT10ff
PARTS UST
UNLESS OTHERYIISE SP£CIFIID 011,U'.NSIONS ARE IN INCHES TOl..£RAffC£S AR£:
F'RACTIONS DECIMALS ANGLES ZEICS
:I, .XX :t, - :1:ANCl..£ .xxx :I, -
MAtrR!AL
FINISH
DO NOT SCALE DRAWING
3
COMPRESS[{) AIR SOI.UTIONs• "'"" "" ,.., 7/26/2019 """""' '" 7/28/20!9 '"'" . ". SIZE
O'IIG NO.
NOT TO SCALE:
2
MAlERIAL SPEOf'ICATlON
1302 Goshen Porkway West Chester, PA. 19380
ZEKS_F ACI LITY FUTURE_STATE
#6
"'" "'·
"" E
A
7
EAST GOSHEN
CONSERVANCY
September 27, 2019
East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380
Re: 1201 Goshen Parkway/ ZEKS Air Dryers/ Conditional Use Landscape screening
Dear Commission Members:
I
At their meeting on September 11, 2019 the Conservancy Board vote the following motion:
/4' ,,
Mr. Chairman, I fnave that the Conservancy Board support the landscape screening plan as presented by the applicant.
Sinc;:;Lj)_
Mark A. Gordon Zoning Officer
F:\Data\Shared Data\Property Management\53-3153-3-1.22 (1302 Goshen Parkway)\CU Application 08272019\CB Rec to 1 5 c i9212i19i(' 0'b L I P I K E , W E S T C H E S T E R , P A - 1 9 3 8 0
i ii ' ,
AREA CODE 610
692-7171 ( BOARD OF SUPER VISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WESTCHESTER, PA 19380-6199
March 18, 1998
Mr. Tim Townes J. Loew & Associates 55 Country Club Lane, Suite 200 Downingtown, PA 19335
Re: Conditional Use Application of J. Loew & Associates Inc./Zeks Air Dryer Corporation 1302 Goshen Parkway in the Goshen Corporate Park- West (Tax Parcel #53-3-1.22)
At their meeting on March 17, 1998 the Board of Supervisors approved the Conditional Use Application of the Zeks Air Drier Corporation to construct a 120,000 sq./ft. facility in two phases (+-75,000 sq./ft. in phase one and +-45,000 sq./ft. in phase two) with the following conditions:
1. Pursuant to Section 510.2m of the Zoning Ordinance, the Use shall not be transferred to another party without the authorization of the Board of Supervisors.
2. That a minimum of one parking space for each employee on the largest shift shall be
provided. The number of employees on any shift shall not, in any case, exceed the allotted number of spaces for employee parking as shown and designated on the approved Final Subdivision and Land Development Plan(s).
3. That all landscaping will be maintained, including replacement, if necessary, by Zeks.
4. That the applicant shall report any reportable spill of hazardous material, at the same time it is reported to any other governmental agency or regulating body, to East Goshen Township.
5. That, as agreed to by the applicant, the building will be faced on all four sides, including the expansion wall, with brick.
6. That no materials and/or products shall be stored outside except for the bins containing the scrap materials and the trash dumpster. The bins and the trash dumpster shall be screened in accordance with Section 506.3d. of the Zoning Ordinance and furthermore, between the hours of9:00 P.M. and 7:00 A.M. scrap materials shall not be placed into the bins nor shall the bins or the trash dumpster be removed for emptying.
7. That all government permits and approvals, including, but not limited to OSHA and DEP,
shall be obtained by the Applicant.
BOARD OF SUPERVISOR{ EAST GOSHEN TOWNSHIP
{
8. That the applicant shall obtain Final Land Development Plan Approval by the Board of Supervisors in accordance with the Ordinances of East Goshen Township.
9. All ordinances and regulations of East Goshen Township shall be adhered to and complied with.
10. That the use be in conformance with the testimony and exhibits that have been entered at the hearing.
11. That these conditions shall apply to Zeks, its successors and assigns.
At the meeting you indicated that these conditions were acceptable to Zeks Air Dryer
Corporation.
Sincerely,
f?(C
c
lc Louis F. Smith, Jr. Township Manager
cc: Ron Nagle, Esquire Planning Commission
Sharon Lynn, West Goshen Township Manger Andrew Kowalski, Zeks
\R1CK\COND-USEV-LOEW.WPD
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 9/27/2019 To: Planning Commission From: Mark Gordon, Township Zoning Officer Re: Paoli Pike/ Goshenville TND Planning
Planning Commission Members,
tA-l
The Township BOS has forwarded the Paoli Pike TND ordinance to the CCPC for review and we have received their review comments. With the CCPC review comments in mind the BOS requests the Planning Commission provide comments on the CCPC review for their consideration.
Staff Recommendation:
The CCPC review identifies numerous housekeeping and several ordinance structure comments that can and should be considered prior to moving forward.
Staff has reviewed these comments and concurs that they need to be considered and addressed. The CCPC review supports the concept and approach of the PP TND Ordinance. At this time staff believes that the PC should wait to make amendments to the draft ordinance until the Board of Supervisors has had an opportunity to present the Draft Ordinance to the public and receive their feedback.
Draft Motion:
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors present the Paoli Pike TND Overlay Draft Zoning Ordinance to the public, receive feedback and provide the Planning Commission with clear direction on how to proceed.
F:\Data\Shared Data\Admin Dept\Township Code\Paoli Pike Overlay TND Ord\Memo to PC Re. TND 09272019.doc
THE COUNTY OF CHESTER
COMMISSIONERS Michelle Kichline Kathi Cozzone Terence Fan-ell
Brian N. O'Leary, AICP Executive Director
Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
PLANNING COMMISSION
Govemment Services Center, Suite 270 601 Westtown Road P. 0. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515
September 18, 2019
Re: Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment - Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts # East Goshen Township - ZA-08-19-16030 and SA-08-19-16031
Dear Mr. Smith:
The Chester County Planning Commission has reviewed the proposed Zoning Ordinance Amendment and Subdivision and Land Development Ordinance (SLDO) Amendment submitted pursuant to the provisions of the Pennsylvania Municipalities Planning Code, Sections 609(e) and 505(a), respectively. The referral for review was received by this office on August 19, 2019. We offer the following comments to assist in your review of the proposed amendments.
DESCRIPTION:
1. The Township proposes the addition of the Traditional Neighborhood Development: TND-1 Goshenville Overlay District (proposed Section 240-61), and the Traditional Neighborhood Development: TND-2 Goshenville Overlay District (proposed Section 240-62) to the Township Zoning Ordinance. Applicability and conditions of eligibility, intent, use regulations, area and bulk requirements, and special design and development standards are provided for each overlay district. We also note that, while the TND-1 Overlay District will promote a mix of non residential and residential uses, the TND-2 Overlay District will generally be limited to residential uses.
Additionally, a General Manual of Written and Graphic Design Standards is provided for the TND-1 and TND-2 Overlay Districts (Appendix A and Appendix B, respectively). Furthermore, definitions for the following terms are proposed to be added to Section 240-6: Attisan Shop, Build-To Line, Outdoor Dining, Pedestrian Gathering Area, Pop-Use Use, Revitalization, Streetscape, and TND Open Space.
2. The amendment submission from the Township included a draft Township Zoning Map (last revised April 5, 2019) depicting the location of the TND-1 and TND-2 Overlay Districts. The map inset from the draft Zoning Map is provided on page 2.
3. The Township also proposes the following amendments to its SLDO: add Section 205-75, pe1taining to design and development standards for the TND-1 and TND-2 Overlay Districts; and add Appendix A - General Manual of Written and Graphic Design Standards for the TND-1 and TND-2 Overlay Districts.
Email: ccplanning@chesco.org • website: www.chescoplanning.org
Page: 2 Re: Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment - Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts # East Goshen Township - ZA-08-19-16030 and SA-08-19-16031
Map Inset, Draft Township Zoning Map: Proposed TND-1 Overlay District (red outlined area),
and Proposed TND-2 Overlay Districts (green outlined areas)
lf';';W 2\2·h It P.WW<·,
······-- ---- ZA-08-19-16030 l
Parcol Info: Paree•>: 53-4-255.1, 53..i.11e, 53-4-117, 53-4-67, 5:i.,.ee. o '"° ooo 1.soo 2,700 3,600 53+8 I, 53,4-80.1, 53..i-eo. 53-4-79. 53•4•78. 2. 5;1, 4-76.1, Ftel 53·◄•77.1A. 5:l-4-77.1, 53"'-77, 53-4-75, 534-67 534-49 53•4"'6.2, 53-4,48. t. 5:l-4-48, 53,4-47. 53-4,43, 5:l-4-6.3.' I.lap Peatures:
:,-.!•A
5!!: 1501 P.aofi Pk. Image Info: Date Taken: 2014 D Parcels.
Munl<ipahty. Eul Goslien Source: CCl'C, 2018 Olher Parcel,
N + Hot1:Th,CCPCmMtttrtrytlortto1n1v, fllt IMP 11 ,,., OttrrOn bill lkltt no1ov111nttt .. ,m1p o,lbfn\lrea tolle 1p,1hltyortffflpo,t1ty KCural,
Location Map: Parcels in proposed TND-1 and TND-2 Overlay Districts,
based upon the Map Inset in the draft Township Zoning Map
Page: Re:
#
3 Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment -
Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts
East Goshen Township -ZA-08-19-16030 and SA-08-19-16031
AREA EVALUATION:
4. Existing Zoning: The proposed TND-1 Overlay District would apply to parcels situated in the Township's C-2 Local Convenience Commercial; C-5 Government, Finance and Office; BP Business Park; and R-2 Low Density Residential zoning districts. The TND-2 Overlay District would apply to parcels situated in the R-2 Low Density Residential and R-3 Medium Density Residential zoning districts.
5. Water and Sewer Facilities: According to County mapping records, this area of the Township is served by public water and public sewer facilities.
6. Municipal Comprehensive Plan: The Future Land Use Plan (page 6-1) in the Township's 2015 Comprehensive Plan indicates that the TND-1 Overlay District is situated in the Commercial and Town Center designations. The eastern TND-2 Overlay District, generally located on the east side of North Chester Road and the north and south side of Paoli Pike, is situated located in the Low Density Residential and Medium Density Residential designations. The western TND-2 Overlay District, located on the south side of Paoli Pike west of Boot Road, is situated in a Low Density Residential designation. Additionally, the Overlay Districts are located within the Paoli Pike Corridor overlay area.
LANDSCAPES:
7. The proposed TND-1 and TND-2 Overlay Districts are located within the Suburban Landscape designation of Landscapes3, the 2018 County Comprehensive Plan. Additionally, a portion of the TND-1 Overlay District, situated along an unnamed tributary to Ridley Creek, is located in a Natural Landscape Overlay designation. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and affordability. Additionally, roads, sidewalks and paths with convenient access to parks and community facilities should be provided. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources.
The proposed zoning ordinance and SLDO amendments are consistent with the objectives of the Suburban Landscape. We acknowledge and endorse that the intent of the Overlay Districts, as specified in proposed Sections 240-61.B and 240-62.B of the Zoning Ordinance, includes the implementation the Township's 2015 Comprehensive Plan, the implementation of the Paoli Pike Corridor Master Plan (adopted December 19, 2017), and to promote walkability.
Additionally, we acknowledge the Township's ongoing efforts in the preservation of the historic resources in Goshenville. Landscapes3 recognizes these significant historical landscapes as an overlay area on the Landscapes Map. Overlay areas do not replace the underlying landscape
categories, but they identify areas where continued preservation of these resources is a high priority. Development within or adjacent to historic resources should apply context-sensitive design to integrate with distinctive cultural features.
Page: 4 Re: Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment - Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts # East Goshen Township - ZA-08-19-16030 and SA-08-19-16031
COMMENTS:
Zoning Amendment Comments:
8. For clarity purposes, the Township should provide the list of parcels to be located in the TND-1 and TND-2 Overlay Districts. We note that, while our location map at the bottom of page 2 is based upon the map inset in the draft Township Zoning Map, it may not accurately reflect the parcels to be included in the overlay districts due to the small size of the map inset.
9. In its review of the proposed design standards, the Township should avoid the use of language which may be difficult to enforce. For example, the Design Standards for temporary uses in Sections 240-6I.F.(l)(c)[4] through 240-6I.F.(l)(c)[6] state that such uses "shall minimize impacts on surrounding and nearby properties," "shall not cause vehicular traffic/parking problems, or put pedestrian safety at risk," and "shall be located in an area with sufficient open space available to conduct the proposed use." We suggest that some design standards be moved into the Legislative Intent Category, be provided with a measure of specificity to allow application or enforceability, or be removed to reduce the number of subjective design standards.
10. The Township should clearly identify how food trucks will be regulated. Design Standard 240- 61.F .(1 )( c )[3] states that temporary uses may include pop-up markets, pop-up festivals/events, pop-up art shows, food trucks/vendors, food stands, etc. However, the proposed definition of Pop-Up Use, which will be a by-right use in the TND-1 Overlay District, does not specifically reference food trucks.
11. The Township should provide their rationale for requiring conditional use approval for a lot or building containing more than one commercial or office establishment in the TND-1 Overlay District (Section 240-6I.C(2)(a)). We suggest that the Township, in order to encourage development in the TND-1 Overlay District, consider allowing a lot or building with two or more commercial or office establishments as a by-right use. Alternatively, the Township could provide a higher upper limit for the number of commercial or office establishments permitted by-right, above which conditional use approval would be required (for example, permitting up to three establishments by-right, while requiring conditional use approval for four or more establishments).
12. As an incentive for historic preservation, we recommend that the Township allow the development of semidetached dwellings and townhouse dwellings in accordance with the development standards in the TND-2 Overlay District, only when the historic resources on the project site are preserved. We note that the Historic Resources Map (page 13-1) in the Township's Comprehensive Plan indicates that all four parcels within the eastern TND-2 Overlay District contain Class 1 or Class 2 historic resources.
13. The draft Ordinance contains three text annotations (stricken text) depicting proposed revisions. These annotations are located at:
• Section 240-61.D.(l)-the first line underneath Minimum building height; • Section 240-61.D.(2) - Maximum Density; and • Section 240-62.E.(2)(g).
The Township should ensure that all such annotations are removed from the approved document.
Page: 5 Re: Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment - Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts # East Goshen Township - ZA-08-19-16030 and SA-08-19-16031
14. Prior to taking action on this amendment, the Township should ensure that they have met the posting and notification requirements for zoning map amendments as set forth in Section 609 of the PA Municipalities Planning Code (PA MPC).
SLDO Amendment Comments:
15. The Township should verify the accuracy of the Article and Section references provided on page 1 of the draft SLDO Ordinance and page 1 of Appendix A. Page 1 of the draft SLDO Ordinance indicates that proposed Section 205-75 will be added to the Township SLDO within "Article IX.
Special Development and Design Standards." However, our copy of the Township SLDO identifies Article IX as "Development and Design Standards," and it also indicates that existing Section 205-74 is part of Article X. Amendments, Penalties and Appeals.
16. There are two design standards on page 10.1 of Appendix A that are identified as Design Standard 205-75.A.(l 0)(g), and the text in the second design standard identified as 205- 75.A.(10)(g), pertaining to retaining walls, is identical to the text in Design Standard 205- 75.A.(l0)(h) on page 10.2 of Appendix A. This should be clarified by the Township.
17. As currently written, Design Standard 205-75.A.(l0)(h) on page 10.2 of Appendix A, which states that retaining walls utilized to enable the trail in narrow areas shall be pre-cast stone "that is referential to Historic Goshenville," seems more like a legislative intent statement than a design standard. We recommend that Township should provide specific design standard(s) for retaining walls that can objectively be enforced.
18. While we acknowledge that Design Standard 205-75.A.(12)(b) states that internal street networks shall be designed and built as an interconnected network, we recommend that the Township add design standard(s) pertaining to the interconnection of parking areas, driveways and adjacent residential uses.
19. While the protection of historic resources is identified within the legislative intent statements, we suggest that the Township include a specific set of historic preservation design guidelines that addresses issues such as massing, scale and materials that is not already addressed in these amendments or in Atticle VI-Historic Preservation of the Township Zoning Ordinance.
We note that the Historic Resources Map (page 13-1) in the Township's Comprehensive Plan indicates that all four parcels within the eastern TND-2 Overlay District contain Class 1 or Class 2 historic resources, and Action Item 13.2.1.1 on page A-9-1 of the Comprehensive Plan Appendix recommends that the Township create graphic design guidelines to illustrate appropriate techniques for building protection and rehabilitation of historic resources. "Appreciate" Objective A of Landscapes3, the 2018 County Comprehensive Plan, is to preserve historic resources in their context while supporting appropriate reuse as a vital patt of our community infrastructure and character. Additional information on this issue is available online at: www .chescoplanning.org/Landscapes3/l c-Appreciate.cfm.
RECOMMENDATION: The County Planning Commission commends East Goshen Township's efforts in preparing these amendments. The Township should consider the comments in this letter before acting on the proposed zoning ordinance and subdivision and land development ordinance amendments.
Page: 6 Re: Zoning Ordinance Amendment and Subdivision and Land Development Ordinance Amendment -
Traditional Neighborhood Development TND-1 and TND-2 Goshenville Overlay Districts # East Goshen Township -ZA-08-19-16030 and SA-08-19-16031
We request an official copy of the decision made by the Township Supervisors, as required by Section 609(g) and Section 505(b) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current file copy of your ordinances.
Sincerely, cu&P
Paul Farkas Senior Review Planner
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. __
AN ORDINANCE OF THE TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 240 OF THE EAST GOSHEN TOWNSHIP CODE, AS AMENDED, ENTITLED "ZONING", AMENDING SECTION 240-6 (TITLED "DEFINITIONS; WORD USAGE") SUBSECTION B THEREOF TO ADD A DEFINITION OF "BUSINESS PARK APARTMENTS"; AMENDING SECTION 240-21 (TITLED "BP BUSINESS PARK DISTRICT"), SUBSECTION A TO AMEND THE PURPOSE FOR THE BP DISTRICT; AMENDING SECTION 240-21.C TO ADD A NEW SUBSECTION 27 THERETO TO PERMIT BUSINESS PARK APARTMENTS BY CONDITIONAL USE IN THE BP BUSINESS PARK DISTRICT; AMENDING SECTION 240-22.Q TO ADD A NEW SUBSECTION 10 THERETO TO PROVIDE SIGNAGE STANDARDS FOR BUSINESS PARK APARTMENTS; AMENDING SECTION 240-29
(TITLED "PLANNED APARTMENT DEVELOPMENT") TO ADD AREA AND BULK REQUIREMENTS AND DESIGN STANDARDS FOR BUSINESS PARK APARTMENTS; AND AMENDING SECTION 240-33 (TITLED "OFF-STREET PARKING AND LOADING") SUBSECTION A THEREOF TO ESTABLISH MINIMUM OFF-STREET PARKING REQUIREMENTS FOR BUSINESS PARK APARTMENTS.
WHEREAS, the East Goshen Township Comprehensive Plan of 2015 (the "Comprehensive Plan") provides that the Paoli Pike corridor, and in particular, the Goshen Corporate Park along Paoli Pike and Boot Road, is an area that can be enhanced and/or improved and/or energized, and is within an area identified as a higher land use intensity area; and
WHEREAS, the Comprehensive Plan and the Chester County Planning Commission's Report titled, Commercial Landscape Series Reinventing Office Parks for
the 21st Century, both recognize that allowing for new uses and a mix of uses in the corporate parks is important to the long term economic viability of the corporate parks, including the Goshen Corporate Park; and
WHEREAS, the Comprehensive Plan and the Paoli Pike Corridor Master Plan also establish a goal of increasing pedestrian circulation along Paoli Pike through the development of the Paoli Pike Trail and pedestrian connections; and
WHEREAS, the Goshen Corporate Park is located in the BP Business Park District; and
WHEREAS, the Board finds it appropriate to allow for a mix of uses within the BP District, including apartments, in order to encourage the continued economic viability of the Paoli Pike corridor and business park area of the Township;
NOW THEREFORE BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, Chester County, Pennsylvania, that Chapter 240 of the East Goshen Zoning Code, entitled, "Zoning", as amended, shall be amended as follows:
SECTION 1. Section 240-6.B, titled "Definitions; word usage" shall be amended by adding the following definition:
"BUSINESS PARK APARTMENTS - An apartment dwelling permitted in the BP Business Park District which meets the standards in Section 240-29."
SECTION 2. Section 240-21.A shall be amended as follows:
"A. Specific intent. In addition to the objectives stated in§§ 240-3 and 240-18, the BP District is intended to encourage the development of a planned campus with office, laboratory or product research facilities and other uses which are compatible with surrounding residential uses and which adhere to the performance standards in § 240- 24. Recognizing the changing demands for office space, the BP District also allows Business Park Apartments to be developed to allow for a mix of uses within the District, in order to encourage the continued economic viability of the Paoli Pike corridor and business park area of the Township."
SECTION 3. Section 240-21.C shall be amended by adding a new subsection (27) which shall provide as follows:
"(27) Business Park Apartments in accordance with the standards in Section 240-29 and on a lot or lots that have frontage on an arterial road."
SECTION 4. Section 240-22.Q, titled "Signs", shall be amended by adding a new subsection (10) which shall provide as follows:
"(10) Signs for Business Park Apartments and convenience commercial facilities in a
Business Park Apartment development in accordance with the following regulations:
(a) Wall sign. One wall sign not to exceed 24 square feet in area shall be permitted for each convenience commercial establishment located in a Business Park Apartment development.
(b) Freestanding sign. One sign along each street frontage, each of which shall not exceed 32 square feet.
2
(c) A nonilluminated window sign not to exceed 20% of window area to which it is attached shall be permitted for a convenience commercial facility in a Business Park Apartment development."
SECTION 5. Section 240-29 shall be revised as follows:
"§ 240-29. Planned Apartment Development and Business Park Apartments.
A. Specific intent. The intent of this section is to provide regulations that encourage well-planned and well-designed apartment developments appropriate to the district and in harmony with adjacent existing development.
B. Applicability. This section shall apply lo all apartment developments, including Business Park Apartments permitted in the BP Business Park District.
C. Standards for apartment dwellings and Business Park Apartments. The following standards shall be observed:
(1) Central water and sewer. All apartments shall be serviced by centralized water and centralized sewage disposal systems.
(2) Underground utilities. All utilities shall be placed underground.
(3) Minimum lot area. Apartment developments shall provide a lot area of at least four acres and a minimum average of 3,000 square feet of lot area per dwelling unit on the lot; provided that Business Park Apartments shall provide a lot area of at least seven acres and a minimum average of 2,000 square feet of lot area per dwelling unit on the lot.
(4) Maximum building coverage. The maximum building coverage shall be 20% and the maximum impervious surface coverage shall be 40%; provided that Business Park Apartments shall have a maximum building coverage of 30% and a maximum impervious surface coverage of 50%.
(5) Setbacks. All principal buildings shall be at least 50 feet from all street right of-way lines and property lines; provided that Business Park Apartment buildings shall have the following minimum setbacks:
From an arterial street:
From a collector street:
Side yard:
Rear yard:
3
75 feet measured from street right-of-way line
50 feet measured from street right-of-way line
25 feet
50 feet
Garages shall be at least five feet from all side and rear property lines and at least 50 feet from all street right-of-way lines.
(6) Maximum height/stories. Maximum height of all buildings shall not exceed 45 feet and three stories; provided that the maximum building height of a Business Park Apartment shall not exceed 35 feet and three stories.
(7) Building separations. Each building with three or fewer stories shall:
(a) Have a maximum length of each wall of 100 feet in horizontal length.
(b) Be separated from each other building by at least 25 feet.
(c) Be separated from each other building by at least 1.5 times the height of the tallest building.
(8) Maximum dwelling unit size. No dwelling unit within an apartment development shall contain more than two bedrooms. No more than 40% of the total number of dwelling units shall contain two bedrooms, except that for Business Park Apartments no more than 50% of the total number of dwelling units shall contain two bedrooms.
(9) Building location, orientation and design. The location, orientation and design of all buildings should give consideration for site terrain and other natural features and conform with site design principles outlined in the Township Comprehensive Plan.
(10) Recreation/open spaces. One or more recreation/common open spaces (each with a minimum area of 2,500 square feet) shall be provided, whose total area equals at least 200 square feet per dwelling unit. All recreation/common open spaces shall be located in areas suitable for outdoor active or passive recreation (such as outdoor relaxation, walking and/or gardening). Only recreation spaces at least 20 feet from any building shall count towards the minimum required recreation/common open space. The types of recreation areas shall relate to the expected breakdown of ages of residents of the units.
(11) Driveways. The following minimum cartway widths shall be provided for any driveway within an apartment development:
Function
One-way traffic, no parking
Two-way traffic, no parking
One-way traffic, parallel parking on one side
4
Minimum Cartway Width (feet)
9 18 18
Function
Two-way traffic, parallel parking on one side
Two-way traffic, parallel parking on two sides
Minimum Cartway Width
(feet)
27
34
(12) Off-street parking. The off-street parking requirements of§ 240-33 shall be complied with.
D. Convenience commercial within an apartment development.
(1) The following uses, not including an adult use, may be permitted in an apartment development, when authorized by the Board of Supervisors in accordance with § 240-31, provided that all requirements of this section are met:
(a) Convenience stores, including the sale of groceries and food products, hardware, newspapers and magazines, drugs and variety items.
(b) Personal service establishment, including tailor, barber shop, beauty salon, dressmaker and shoe repair.
(c) Gift shops, including cameras, books, stationery, cosmetics, candy, cigarettes and tobacco, flowers, hobbies, jewelry and crafts.
(d) Standard restaurant without drive-through service.
(e) Professional office, including offices of attorneys, accountants, physicians, dentists, realtors, insurance or financial consultants, brokers, engineers, architects or other recognized profession.
(f) Financial institution, including bank, savings and loan and commercial loan office.
(2) No more than 2,400 square feet of floor area of convenience commercial uses shall be permitted for each 100 dwelling units or part thereof. No single convenience commercial use shall exceed 3,000 square feet.
(3) Convenience commercial uses shall be considered as a part of the total apartment development and shall comply with all of the requirements of Subsection C.
(4) Any commercial convenience uses permitted in a planned apartment
development shall be located within a building that does not contain
5
dwellings, except within a Business Park Apartment development. If more than one commercial establishment is to be provided, all such establishments shall be within a single building.
(5) Signs for a convenience commercial development shall be provided in accordance with § 240-22.P(4) of this chapter if located in the C-4 Zoning
District, § 240-22. 0(3), if located in the R-4 and R-5 Zoning Districts, and § 240-22.Q(10) if located in the BP District."
SECTION 6. The Chart of Minimum Off-Street Parking Requirements contained in Section 240-33.A, titled "Off-Street Parking and Loading" shall be revised to add the following parking regulation for Business Park Apartments.
"B. Residential Uses.
Use
7. Business Park
Minimum Off-Street Parking Spaces
1.3 spaces per 1 bedroom dwelling unit
1.6 spaces per 2 bedroom dwelling unit"
Plus the Following Minimum Off-Street Parking Spaces
SECTION 7. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 8. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 9. Effective Date. This Ordinance shall become effective in five days from the date of adoption.
6
ENACTED AND ORDAINED this __ day of ______ , 2019.
ATTEST:
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
Janet L. Emanuel, Chair
E. Martin Shane, Vice-Chair
Carmen R. Battavio, Member
Michael P. Lynch, Member
David E. Shuey, Member
7
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 9/27/2019 To:
From: Re:
Planning Commission 1 Mark Gordon, Township Zoning Officer <= BP Apartments Draft Zoning Ordinance
Planning Commission Members,
The Township BOS forwarded the Business Park Apartments ordinance to the CCPC for review and we have received their review comments. With the CCPC review comments in mind the BOS requests the Planning Commission provide comments on the CCPC review for their consideration.
Staff Recommendation:
The CCPC review identifies a number of comments that require review and consideration by the Planning Commission as well as some policy comments where additional input from the Board of Supervisors is warranted.
Staff has reviewed these comments and concurs that they need to be considered and addressed.
At this time staff believes that the PC should wait to make amendments to the draft ordinance until the Board of Supervisors has had an opportunity to present the
Draft Ordinance to the public and receive their feedback.
Draft Motion:
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors present the Business Park Apartments Draft Zoning Ordinance to the public, receive feedback and provide the Planning Commission with clear direction on how to proceed.
F:\Data\Shared Data\Admin Dept\Township Code\Apartments 2019\Memo to PC Re. BP Apartments Ord. 09272019.doc
Kathi Cozzone Terence Farrell
Brian N. O'Leary, AICP Executive Director
Louis F. Smith, Jr., Manager East Goshen Township
1580 Paoli Pike West Chester, PA 19380
September 24, 2019
Re: Zoning Ordinance Amendment - Business Park Apartments, BP Business Park Zoning District # East Goshen Township - ZA-08-19-16045
Dear Mr. Smith:
The Chester County Planning Commission has reviewed the proposed Zoning Ordinance Amendment as submitted pursuant to the provisions of the Pennsylvania Municipalities Planning Code, Section 609(e). The referral for review was initially received by this office on August 29, 2019, and a revised version of this amendment was received on September 10, 2019; this review addresses the revised version of the amendment received on September 10, 2019. We offer the following comments to assist in your review of the proposed amendment.
DESCRIPTION:
1. The Township proposes the following amendments to its Zoning Ordinance:
A. Add a definition for the term "Business Park Apartments" to Section 240-6.B; 8. Amend the Specific Intent Statement of the BP Business Park District in Section 240-21.A; C. Add "Business Park Apartments in accordance with the standards in Section 240-29 and on a
lot or lots that have frontage on an arterial road" to the list of uses permitted by conditional use in the BP Business Park District; D. Add Section 240-22.Q, pe1taining to signage for business park apa,tments and convenience
commercial facilities in a Business Park Apattment development; E. Amend Section 240-29, pertaining to design standards for all apaitment developments,
including Business Park Apartments in the BP Business Park District; and F. Add Minimum Off-Street Parking Space Requirements for Business Park Apartments to
Section 240-33.A. 1.3 parking spaces will be required for each one (1) bedroom dwelling unit, and 1.6 spaces will be required for each two (2) bedroom dwelling unit.
2. The zoning amendment submission from the Township included a sketch plan. This sketch plan, entitled "The Hicks Tract," prepared by DL Howell, and dated August 12, 219, depicts the construction of 170 apartment units in two three-story buildings, and 286 parking spaces, on an 8.1 acre site (UPI# 53-4-166 and 53-4-167) situated on the north side of Paoli Pike at its intersection with Meadow Drive, in accordance with the proposed ordinance standards. Our comments on this sketch plan begin on page 3 of this review letter.
Email: ccplanning@chesco.org • website: www.chescoplanning.org
Page: 2 Re: Zoning Ordinance Amendment - Business Park Apa,tments, BP Business Park Zoning District # East Goshen Township - ZA-08-19-16045
RECOMMENDATION: The Township should consider the comments in this letter before acting on the proposed zoning ordinance amendment.
Area Evaluation, BP Business Park District:
3.
4.
Township Comprehensive Plan: The BP Business Park zoning district is situated on the north side of Paoli Pike, between Boot Road to the east and the East Goshen/West Goshen border to the west. The Future Land Use Plan (page 6-1) in the Township's 2015 Comprehensive Plan indicates that the BP zoning district is located in the Business Park Industrial and Paoli Pike Corridor designations. We also note that the Township Comprehensive Plan (page 14-1) indicates that the list of Higher Land Use Intensity Areas that can be enhanced and/or improved and/or energized includes the Goshen Corporate Park, which is located within this zoning district. Additionally, the Comprehensive Plan (Goal 6 on page A-3-1 of the Appendix) states that the Township should provide for a diverse mix of residential, commercial and other land uses in a way that enhances the Township's suburban character, builds community, and respects natural and historic resources.
Water and Sewer Service: According to County mapping records, this area of the Township is served by public water and public sewer facilities.
LANDSCAPES:
5. The Township's BP Business Park district is generally located within the Suburban Center Landscape designation of Landscapes3, the 2018 County Comprehensive Plan. The easternmost
area of the district is located in the Suburban Landscape designation, and the po1tion of the district along the East Branch of the Chester Creek is also located in a Natural Landscape Overlay designation.
The vision for the Suburban Center Landscape is regional economic, population and transpmtation centers with varying land uses, accommodating substantial future growth of medium to high intensity. Repurposing obsolete structures and sites and encouraging sustainable development will be critical as suburban centers grow, and transpmtation infrastructure and amenities will need to expand to create an integrated multimodal network. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and affordability. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. Multifamily residential development is an appropriate use in the Suburban Center and Suburban Landscapes.
COMMENTS - ZONING ORDINANCE AMENDMENT:
6. We suggest that the Township consider only allowing Business Park Apa1tments as a bonus in the BP Business Park District if the following elements are provided: trail improvements, preservation of historic resources, underground parking, and the inclusion of affordable housing units. "Live" Objectives A and B of Landscapes3, the 2018 County Comprehensive Plan, support the provision of diverse and affordable housing to meet the needs of all residents. Additional information on this issue is available online at: http://www.chescoplanning.org/Landscapes3/3d2-LiveRec.cfm.
Page: Re: #
7.
8.
9.
10.
II.
12.
3 Zoning Ordinance Amendment - Business Park Apartments, BP Business Park Zoning District
East Goshen Township - ZA-08-19-16045
The Township may want its Solicitor to review Section 240-29.C.(8) of the proposed ordinance, which states that no dwelling unit within an apartment development shall contain more than two bedrooms. If it does not do so already, the Township may want to allow three bedroom aprutments in some locations to accommodate families.
For clarity purposes, we suggest that Section 240-20.C.(5) be revised to provide two separate columns for the setback standards ( one column for Business Park Apartments, and a second column for apartments permitted elsewhere in the Township). This section is difficult to interpret as currently formatted.
Proposed Section 240-33.B.7 provides the minimum off-street parking space requirements for one (I) and two (2) bedroom units for Business Park Apartments. For clarity purposes, the Township should also identify the minimum off-street parking space requirement for any efficiency or studio apartments proposed as part of a Business Park Apartment development.
The Township should exrunine the adequacy of the existing landscaping/buffer provisions in its zoning ordinance. No additional landscaping/buffer standards are provided as part of the current zoning amendment. There is a farm to the west of the site, so buffering should be provided on the more intensely proposed site.
We recommend that the proposed standards require building elevations to be submitted as part of the conditional use application.
We suggest that the Township consider limiting the number of aprutment units to be permitted in Goshen Corporate Park. This is because this is the only commercial business park area in the Township, while there are many residentially zoned areas in the Township.
COMMENTS - SKETCH PLAN:
We offer the following comments, primarily focused on design-related issues and concerns, to assist the applicant and the Township in its review of the sketch plan prior to an official submission.
13. Sketch Plan Summary:
Location:
Site Acreage: Proposed Land Use: Municipal Land Use Plan Designation: UPI#:
the north side of Paoli Pike at its intersection with Meadow Drive 8.1 170 apartment units Business Park Industrial 53-4-166, 53-4-167
14. Description: The applicant proposes the construction of 170 apartment units in two three-story buildings. A total of 286 parking spaces will be provided, including 175 parking spaces in a below ground pru·king garage underneath the western building. Vehicular access will be provided from two driveway entrances onto Enterprise Drive, and also from Paoli Pike at its intersection with Meadow Drive. The August 20, 2019 Township Board of Supervisors meeting minutes indicate that the applicant proposes that about ten percent (10%) of the units will be reserved for short-term rentals to serve the businesses in the Goshen Corporate Park.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Page: 5 Re: Zoning Ordinance Amendment - Business Park Apartments, BP Business Park Zoning District # East Goshen Township - ZA-08-19-16045
15. Landscapes: The project site is located within the Suburban Center Landscape and Natural
Landscape designations of Lantlscapes3, the 2018 County Comprehensive Plan. While multifamily residential development is an appropriate use in the Suburban Center Landscape, careful consideration of any future development activity on this site is required due to historic preservation issues and environmental constraints (particularly the I 00-year floodplain).
16. While 2014 aerial photography indicates that there are several existing buildings/structures on UPI# 53-4-167, the sketch plan indicates that only an existing dwelling will remain. The Historic Resources Map in the Township's 2015 Comprehensive Plan identifies that UPI# #53-4-167 contains a Class 2 Historic Resource. It is our understanding that the existing dwelling to remain is an historic structure, and that this historic structure will be retained and renovated for a possible restaurant space.
Any rehabilitation and change including additions to the farm house should be compatible with its historic and architectural character and should be reviewed by the Township Historical Commission. The barn should also be preserved and reused as part of the development. Reusing both of these structures will make the development more unique and locally oriented. The Township should reserve taking action on an official plan submission for this site until the proposal has been reviewed by the Township's Historical Commission.
We suggest that the applicant and Township investigate the feasibility of a revised site plan which preserves the viewshed from Paoli Pike for the existing dwelling. The existing mature trees on this site should be retained as part of this buffering. "Appreciate" Objective A of Lantlscapes3, the 2018 County Comprehensive Plan, is to preserve historic resources in their context while supporting appropriate reuse as a vital patt of our community infrastructure and character. Additional information on this issue is available online at: www.chescoplanning.org/Landscapes3/1 c-Appreciate.cfm.
17. We acknowledge, and endorse, that sidewalks will be provided within the development, which extend to Enterprise Drive and to the proposed 10 foot wide trail along the north side of Paoli Pike. Sidewalks are an essential design element in the Suburban Center Landscape. We recommend that a crosswalk area be provided on Enterprise Drive in order to provide direct pedestrian access to the existing walkway on the north side of Enterprise Drive. Additionally, the applicant and Township should consider providing direct access (sidewalk and crosswalk areas) to the existing dwelling from Enterprise Drive and the western apartment building. The sketch plan indicates that pedestrian access will only be provided on the south side of the existing dwelling.
18. The August 7, 2019 Traffic Evaluation, prepared by Traffic Planning and Design, Inc., indicates that the proposed access and roadway configurations on Paoli Pike (State Route 2014) will need to be further evaluated through the Highway Occupancy Permit (HOP) process, including sight distance evaluation, consideration for traffic signalization, etc. Additionally, the August 20, 2019 Township Board of Supervisors meeting minutes indicate that the applicant has proposed road improvements to Paoli Pike to mitigate traffic problems, including adding a center left turn lane, and applying to PennDOT for a new traffic signal at Meadow Drive. We recommend that the applicant and Township, in consultation with PennDOT, determine if any additional right-of-way is required for Paoli Pike, in order to accommodate the transp01tation improvements that will be required for this project. Consideration should be provided for eliminating the driveway entrance on Paoli Pike, to minimize potential traffic impacts on Paoli Pike.
Page: 6 Re: Zoning Ordinance Amendment - Business Park Apartments, BP Business Park Zoning District # East Goshen Township - ZA-08-19-16045
The County Planning Commission's Multimodal Circulation Handbook (2016 Update) classifies Paoli Pike as a minor arterial road. The Handbook (page 183) recommends a I 00 foot-wide right-of-way for minor arterial roads in suburban areas to accommodate future road and infrastructure improvements. The Circulation Handbook is available online at: www.chescoplanning.org/resources/PubsTransportation.cfin.
19. The applicant and Township should consider providing dedicated bicycle parking. Bicycle racks should be located in visible areas near building entrances and/or areas of pedestrian activity such as bus shelters, and they should be located under a shelter or building overhang to provide shelter from the elements. Additional inf01mation on this topic is provided in the County Planning Commission's Multimodal Circulation Handbook (2016 Update). which is available online at: www.chesco.org/documentcenter/view/27029.
20. The site contains land within the 100 year floodplain, and the proposed western building is in very close proximity to the floodplain limit shown on the sketch plan. We note that the County Planning Commission does not supp01t development in the floodplain, and the Federal Emergency Management Agency and Pennsylvania Department of Environmental Protection regulate filling or development in the floodplain. Development within a floodplain can increase the magnitude and frequency of normally minor floods, and present health and safety problems. The applicant should contact both of these agencies to determine if future development activity will require a permit. The Township should request documentation of these contacts or permit(s) before approving the plan. Additionally, utilities should be provided above the base flood elevation.
21. County mapping records indicate the site contains areas of hydric (wet) soils (CaB Califon, and Ha Hatboro) which have limitations to development. These limitations include drainage problems due to low permeability, low runoff rates and sub-surface saturation. When construction takes place on these soils, it interferes with the natural drainage of the land. If construction occurs on this site, on-site alterations to existing drainage patterns should be carefully inspected by the Township Engineer to insure that off-site drainage conditions are not negatively affected.
22. 2014 aerial photography indicates that a portion of the site contains mature trees. We suggest that the applicant and Township preserve as many of these trees as possible, along with using proper methods to protect them during construction.
We request an official copy of the decision made by the Township Supervisors, as required by Section 609(g) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current file copy of your ordinance.
Sincerely, 7cu&-P
Paul Farkas
Senior Review Planner
cc: 1351 Paoli Pike Associates, c/o Hankin Group