Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP PLANNING

COMMISSION Meeting Agenda

Wednesday, June 17, 2020 Rescheduled from June 3, 2020 VIA Telephone / Video Conference

7:00 PM

During this tele-conference Planning Commission meeting, public comment will be handled as follows:

• Participants are asked to call in by 6:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting • The public will be muted during the meeting when the Commission is talking. • The Chairman will ask for public comment on agenda items and participants will be unmuted and given an opportunity to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time. • Participants are asked to turn down the volume if they are livestreaming the meeting on YouTube.

A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. May 6, 2020 F. Subdivision and Land Development Applications

1. Synthes USA/ 1303 Goshen Parkway (Land Development} G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business

1. Zoning Ordinance Review 2. Review Model ordinances for Pipelines J. New Business K. Any Other Matter L. Liaison Reports M. Correspondence N. Announcements

Bold Items indicate new information to review or discuss.

F:\Data\Shared Data\Agendas\Planning Commission\2020\PC AGENDA 06032020.doc

June 17, 2020 PC Meeting

0 u.i > ci (/) 6 N ci ...J :::::> 0 u:- -

C: a.. 0 ., :;::; 23 Cl) cu (/) - - LL 0. Cl) Cl) C. - Application Name C. >, cu <( I- C

Synthes USA / 1303 Goshen Parkway LD P/F 4/27/2020

Bold = New Application or PC action required

Completed in 2019

Paoli Pike TND Overlay District Ord. zo N/A N/A ZEKS, 1302 Goshen Parkway cu Sk 8/27/2019 ESKE Development I Ducklings LO P/F 1/18/2019 PECO Gas Gate cu Sk 2/26/2019

CZ Woodworking / 1422 Ardleigh Cir. cu Sk 3/29/2019

1351 Paoli Pike / The Hankin Group zo SK 5/31/2019 1339 Enterprise Drive cu Sk 5/30/2019

East Goshen Township Planning Commission

Application Tracking Log

1/) (.) '- al Cl) Cl) <( C: ·s, ci. C: 0 w '- C. a..

.c: Cl 1/) C: 0 ; C: - 3: a.. :::s 0 0 .0 Cl) C: - I- 0 <( 0 cu C 0 0 0 1/) - - - C: t:: Cl) Cl) Cl) Cl) Cl$ - - - - - cu cu cu >< (/) C C C w

5/6/2020 4/28/2020 4302020 4/30/2020 1

N/A N/A NIA N/A N/A 8/27/2019 NA NA 8/29/2019 2/6/2019 2/23/2019 2/23/2019 2/29/2019 2/26/2019 2/28/2019 NA 2/28/2019 1

3/29/2019 NA NA 4/22/2019 1 NA NA NA 5/31/2019 NA 5/30/2019 NA NA 6/11/2019

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2020\PC Tracking Log for 06032020.xlsx

Cl) - Cl) - C cu C C: Cl) C: 0 - 0 ; Cl$ (,) Cl) ., :;::; - <( cu (,) ., 1/) <( C - I- cu C: I- ...J Cl Cl) Cl) ...J z C: C E 'i: z (/) C. E 0 cu 0 0 Cl) '- 0 a.. al :I: C 0 extension

not 7/15/2020 8/4/2020 NA 8/4/2020 included in these dates

N/A N/A 12/17/2019 NA Continued 10/2/2019 10/29/2019 10/15/2019 10/25/2019 APPVD. 4/3/2019 4/9/2019 NA 5/6/2018 APPVD. 4/3/2019 6/5/2019 5/14/2019 6/25/2019 APPVD. APPVD. W 6/5/2019 6/18/2019 6/18/2019 6/27/2019 Conds. NA NA NA NA DENIED 7/10/2019 7/16/2019 7/16/2019 7/29/2019 APPVD.

5/29/2020

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

May6,2020

The East Goshen Township Planning Commission held a regular meeting on Wednesday, May 6, 2020 at 7 :00 p.m. Because of the COVID-19 restrictions the meeting was held via teleconference. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli Also present were:

Mark Gordon, Zoning Officer Mattin Shane, Township Supervisor Mike Lynch, Township Supervisor Michele Truitt, Township Supervisor

COMMON ACRONYMS:

BOS -Board of Supervisors BC -Brandywine Conservancy

CB - Conservancy Board CCPC - Chester Co Planning Commission

A. FORMAL MEETING - 7 p.m.

CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management

ZHB - Zoning Hearing Board

1. Ernie called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military. 2. Ernie asked if anyone would be recording the meeting and if there were any public comments

about non-agenda items. There was no response. 3. Ernie checked the log. 4. The minutes of the March 4, 2020 meeting were approved as amended. There was no meeting in April.

B. SUBDIVISION AND LAND DEVELOPMENT APPLICATIONS

1. Synthes USA, 1303 Goshen Parkway (Land Development). Representatives that were present: Brendan Burke, Esq.; Todd McVoy; David Citro; Joshua Vanderveen; John Neilson; Bill Reichard; and Mr. Freese. Synthes received Conditional Use Approval in 2017 to add an addition to the existing

facility. Now they are requesting Land Development approval for the proposed improvements. Mr. Burke reviewed the plan to expand the existing facility. There will be no additional employees so there will be no additional traffic. Todd Mc Voy presented the slide presentation and explained that this will expand the metal processing area. David Citro, Project Engineer, highlighted current conditions and the proposed changes. He spoke about ordinance requirements and mentioned they are requesting 3 waivers.

They are the water study, traffic impact study and minimum diameter of pipe sizes. There will be no additional loading and no increase in noise. The only lights will shine on the walkway. He showed a rendering of the facility with the new addition. Water from the roof will go to the SW basin.

Construction will take 8-9 months. Commission members, Michele Truitt and Mark Gordon asked a few questions. Ernie thanked them for the presentation and explained the process after the necessary review letters are received.

PC 5-6-20 draft 1

1 C. OLD BUSINESS 2 1. Zoning Ordinance Review -This was defeJTed until the June meeting. 3 2. Review Model Ordinances for Pipelines - Mark met with the Solicitor after the March meeting. He 4 spoke to her today. She is organizing her comments. 5 6 D. NEW BUSINESS 7 None 8 9 E. LIASION REPORTS 10 Board of Supervisors -Michele reported that the parks and the rest rooms are open. 11 Yard waste pickup will start again on May 13 and May 20 then to the regular schedule. 12 The pipeline has started construction again. Community Day has been moved from June to combine with 13 the Food Truck and Music Festival in August. 14 Mark Gordon added that the township staff did a soft opening today in the township building. The 15 building will be closed to the public until restrictions are eased. Work has started on Paoli Pike Trail. 16 Also, the playground and active areas such as tennis courts, are still closed in the park. The Park and 17 Recreation Commission will make a final decision about the Festival in August at their June meeting. 18 19 F. ANYOTHERMATTER 20 None 21 22 23 G .. ADJOURNMENT 24 There being no further business, Mike Koza made a motion to adjourn the meeting. John Stipe 25 seconded the motion. The meeting was adjourned at 8:00 pm. The next regular meeting will be held on 26 Wednesday, June 3, 2020 at 7:00 p.m. 27 28 29 Respectfully submitted÷--------------------- 3 0 Ruth Kiefer, Recording Secretary

PC 5-6-20 draft 2

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 5/28/2020 To: Planning Commission I/ . From: Mark Gordon, Township Zoning Officer /4vi\.C.C::, Re: Synthes USA/ JABIL/ Land Development Application

Dear Commissioners,

As you know, the Township has received a Land Development Application from Synthes USA for their facility at 1303 Goshen Parkway. Synthes received Conditional

Use Approval in 2017, to add an addition to the existing facility as well as associated parking lot and pedestrian walkway modifications.

The Conservancy Board reviewed this application at their meeting May 13th, I have included their recommendation for your consideration. The Township Engineer has reviewed the plans and has issued a review letter. Most comments are minor however; these comments must be addressed in the next plan revision, the review letter is included for your consideration.

The CCPC has forwarded their review comments, they are attached for your consideration; all their comments are administrative in nature.

Staff Recommendation:

We are awaiting revised plans addressing the Twp. Engineers comments. At this time staff does not believe it's appropriate for the Planning Commission to make a recommendation.

F:\Data\Shared Data\Property Management\53-3\53-3-1.12 {1303 Goshen Parkway)\LD 2020\Memo to PC 05282020.doc

EGOST 00131

Mark Gordon, Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380

May 21, 2020

RE: Jabil Finishing Plant Expansion, 1303 Goshen Parkway

Preliminary/Final Land Development Plan

Dear Mark:

One South Church Street

Second Floor West Chester, PA 19382

T: 610-429-8907

F: 610-429-8918

www.pennonl.com

As requested, we have reviewed the following information, prepared by Mainstay Engineering Group, Inc. in connection with the referenced project:

• "Finishing Plant Expansion Plans" (seventeen sheets), last revised April 23, 2020.

• "Jabil Finishing Plant Expansion - Land Development Storm water Narrative" dated April 23, 2020; and

• Cover letter dated April 23, 2020 and application package.

The applicant, Synthes USA HQ, Inc., proposes to construct a ±1,926 square foot addition with sidewalk and new utilities at an existing manufacturing facility on UPI #53-003-001.1200 (±8.6 acres) at 1303 Goshen Parkway (T-646). The property is located approximately 460 feet west of the intersection of Airport Road and Goshen Parkway, within the 1-1 Light Industrial District. The lot is currently served by public water and public sanitary sewer.

In 2017, the applicant received Conditional Use approval to increase the total impervious coverage to 60%. The proposed expansion was included on the Conditional Use Plan associated with that approval.

The applicant has requested the following three (3) waivers:

1. From §205-40 - requiring a water study; 2. From §205-39 - requiring a traffic impact study; and 3. From §205-37.((7) - requiring a minimum inside pipe diameter of 15 inches.

We offer the following comments:

ZONING

1. All new structures shall incorporate a complete visual screen for all rooftop structures. (§240-19.F(2))

2. It is unclear why the required building coverage area in the Zoning Summary table is blacked out. Please indicate the required 30% in the table. (§240-19.G)

3. The rear yard shall be measured from the property line to the proposed addition and the Zoning Summary table updated. (§240-19.G)

EGOST00131 Mark Gordon. Zoning Officer

May 21, 2020 Page 2 Jabil Finishing Plant Expansion 1303 Goshen Parkway

4. A detail for the proposed lighting shall be provided to confirm the light is completely shielded and/or covered by an appropriate translucent cover. (§240-27.C(7)(b))

SUBDIVISION AND LAND DEVELOPMENT

5. The applicant is proposing preliminary/final plan approval, therefore a waiver from §205.1 should additionally be requested.

6. Regarding preliminary and final plan requirements (§205-30 and §205-33), the following should be provided:

a. The name of all abutting or adjacent property owners in the vicinity of the project including those across Goshen Parkway. (§205-30.B(5)) b. Location and elevation of the benchmark to which contour elevations refer. (§205-30.B(S)) c. Such private deed restrictions and/or a statement of any restrictions previously imposed in accordance with §205-33.C(2). If no such deed restrictions exist or will be imposed, it is recommended a note stating the same be indicated on the plan.

STORMWATER MANAGEMENT

7. Regarding the Erosion and Sediment Control Plans, please provide the following, including details, if applicable:

a. Indicate construction fence around the proposed infiltration area. b. Provide a means to prevent sediment from being deposited on public roads, such as a rock construction entrance and/or wash station. c. Indicate a concrete washout area. d. Indicate a soil stockpile area. e. It is unclear how the outlet modifications will be completed without possible additional earth disturbance. Please revise the limit of disturbance accordingly.

8. Wherever possible, infiltration should be designed to accommodate the entire water quality and runoff volume required in §195-19. (§195-20.A)

9. The applicant should clearly identify the predeveloped and post-developed areas and specifically BMP drainage area in the report.

10. Please provide the location of the test pit used for the design of the proposed infiltration facility on the plan. (§195-20.1)

11. The applicant should provide Worksheet 4 calculations for the area tributary to the proposed infiltration BMP to demonstrate compliance with §195-19 and §195-20.

12. The proposed BMP does not appear to be included in the HydroCAD model. Please provide routing calculations for the proposed infiltration BMP. (§195-19 and §195-20)

13. The closest infiltration test to the proposed BMP appears to be more than 75 feet away from the proposed location. The applicant should provide a test pit and infiltration test at the proposed infiltration elevation in the area of the proposed BMP. (§195-201(1)

14. Please provide calculations to ensure the system will dewater in 72 hours. (§195-20-J(3))

EGOST00131 Mark Gordon, Zoning Officer

May 21, 2020 Page 3 Jabil Finishing Plant Expansion -1303 Goshen Parkway

15. The plans shall note that during site construction, all infiltration practice components shall be protected from compaction due to heavy equipment operation or storage of fill or construction material. Infiltration areas shall also be protected from sedimentation. Areas that are accidentally compacted or graded shall be re mediated to restore soil composition and porosity. (§195-20-M)

16. Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris (for example, silt, leaves and vegetation). Such measures shall include but are not limited to leaf traps, gutter guards and cleanouts. (§195-20-0)

17. All infiltration practices shall have appropriate positive overflow controls. Please provide a detail and routing calculations for the proposed BMP.

18. Please provide complete delineation of the flow paths used for calculating the time of concentration (Tc) for the predevelopment and postconstruction conditions. (§195-27.B(14))

19. Please provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by East Goshen Township for a determination of adequacy prior to construction of the revised features on the PCSM Plan. (§195- 27.A(3))

20. Please provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))

21. A detail for the proposed infiltration BMP shall be provided. (§195-27.B(B))

22. The PCSM Plan includes notes regarding a Notice of Termination. Since an NPDES permit is not required the notes should be removed.

23. The applicant is reminded that a Stormwater Management Operation and Maintenance Agreement shall be completed. (§195-36) This document is available on the Township website. Please sign two copies and return to the Township for authorization by the Board of Supervisors. The Township will then return to the applicant for recording with the plan, at the County. A copy of the time stamped document and proof of recording should then be returned to the Township.

24. It appears the proposed outlet structure modification may be on the adjacent property, which is noted as under different ownership; please confirm authorization has been provided from the property owner.

25. The applicant should provide an easement granting the Township ingress and egress to the stormwater BM P's. Note: a blanket easement is acceptable; see below. (§195-27.B(18)(c))

26. Per §195-39, the Township requests that the following be added to the plans regarding stormwater management easement:

"A blanket stormwater management easement is provided over and across the property in favor of East Goshen Township to allow the Township and its agent and designees access to the proposed stormwater management facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requirements of the Township's Stormwater Management Ordinance or of any opplicoble O&M plan or O&M agreement."

EGOST00131 May 21, 2020 Page 4 Mark Gordon, Zoning Officer Jabil Finishing Plant Expansion - 1303 Goshen Parkway

GENERAL

27. We recommend the Conditional Use approval be noted on the plans and referenced below the Zoning Summary table (Sheet C0.12) regarding the impervious coverage.

28. The plans should indicate any additional signage proposed.

Should you have any further questions or comments, please contact the undersigned.

Sincerely,

PENNONI

Nathan M. Cline, PE Township Engineer

cc: Rick Smith, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail)

EAST GOSHEN

CONSERVANCY

May 14, 2020

East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380

Re: Synthes USA LD Application

Dear Commission Members: ,..,. At their meeting on May 13, 2020, the Conservancy Board votem the following motion:

Mr. Chairman, I mave that we recommend the Planning Commission approve the Synthes USA Land Development application with the following conditions:

1. The applicant agrees to add five (5) additional evergreen trees on the north side of the northern parking area. 2. The applicant agrees to amend the plans specifying tree species that are identified in the Township Tree Species list; Resolution 2015-20.

Sincerely,

di)___ Mark A. Gordon Zoning Officer

F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\CB Rec to PC 1 5 Olri tf020tJo'i\ O L I P I K E , W E S T C H E S T E R , P A . 1 9 3 8 0 J ffl

' .,

Marian D. Moskowitz Josh Maxwell Michelle Kichline

Brian N. O'Leary, AICP Executive Director

Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380

Government Services Center, Suite 270 601 WesttownRoad P. 0. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515

May 27, 2020

Re: Preliminary/Final Land Development - 1303 Goshen Parkway # East Goshen Township - LD-05-20-16336

Dear Mr. Smith:

A Preliminary/Final Land Development Plan entitled "1303 Goshen Parkway", prepared by Mainstay Engineering Group, and dated March 31, 2020, and last revised on April 23, 2020, was received by this

office on April 28, 2020. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.

PROJECT SUMMARY:

Location: Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use: New Parking Spaces: Municipal Land Use Plan Designation: UPI#:

PROPOSAL:

the north side of Goshen Parkway, east of Airport Road 8.63 1 Lot 1,921 Addition to Existing Building (Jabil Brandywine Plant) 0 Business Park Industrial 53-3-1.12

The applicant proposes the construction of a 1,921 square foot building addition. No new sewage disposal or water supply is proposed as part of this plan submission. The project site is located in the 1-1 Light Industrial zoning district.

RECOMMENDATION: The County Planning Commission recommends that the administrative issues raised in this letter should be addressed, and all Township issues should be resolved before action is taken on this land development plan.

email: ccplanning@chesco.org • website: www.chescoplanning.org

Page: 2 Re: #

Preliminary/Final Land Development - 1303 Goshen Parkway East Goshen Township-LD-05-20-16336

0•==20•0 -==o.,o---•aoco==== 1,2iii oo•--• 1.s.,

Parcel Info: Parcel(s): 53-3-1.12

(Main) Address: 1303 Goshen Pw. Municipality: Ea5t Goshen Tv-.,,.

COUNTY POLICY:

LANDSCAPES:

kn ago Info: Onte T11ken: 2017

Source: CCPC, 2020

Map Feturtt:

QParc•I

Other Percels +

Uate:The CCPC makes every ellort to ensure tiis I'll.lip is r^ or e,ron. but doe& not U')atanlee fie map otl_ rub.nu to b.e. sp1!1al)' « t«npoBll1 aicc.unite.

1. The project site is located within the Suburban Center Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Center Landscape is regional economic, population and transp01tation centers with varying land uses, accommodating substantial future growth of medium to high intensity. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. The proposed land development is consistent with the objectives of the Suburban Center Landscape.

WATERSHEDS:

2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the Chester Creek watershed. Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, restore water quality of"impaired" streams, and protect vegetated riparian corridors. Watersheds can be accessed at www.chesco.org/water.

Page: Re: #

ISJC. J.

3 Preliminary/Final Land Development - 1303 Goshen Parkway East Goshen Township -LD-05-20-16336

f'",/)!,."./JJ<}(JJIJU

l"iPl"F/1' !i'. 'Rl'ffl I'.&

S.,r,JlfS'•,,f;';

I --j I1 i I

I

-.

-.

Site Plan Detail, Sheet CO. I 2: Prelimina,y/Final Land Development -1303 Goshen Parkway

Page: 4 Re: Preliminary/Final Land Development - 1303 Goshen Parkway East Goshen Township -LD-05-20-16336 #

ADMINISTRATIVE ISSUES:

3. While not identified on Sheet C0.11 (Conditional Use Plan), the October 17, 2017 Township Board of Supervisors meeting minutes indicate that conditional use approval was granted to increase the impervious coverage on the property to sixty percent (60%), with six conditions ofapproval (we note that the Zoning Summary table Sheet C0.12-Land Development Plan indicates that the maximum impervious coverage is proposed to increase from 55 percent to approximately 56 percent). Prior to granting final plan approval, the Township should verify that all applicable conditions of approval are incorporated into the final plan, the details of which should be identified on the plan.

4. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 storm water management ordinance standards adopted by each municipality.

5. The applicant is requesting three waivers from Article VIII-Supplementary Studies and Plans of the Township Subdivision and Land Development Ordinance, Waiver requests should only be granted following the dete1mination that the proposed project either meets the purpose of these requirements or does not create the impacts that these provisions are intended to manage.

6. A minimum of four (4) copies of the plan should be presented at the Chester County Planning

Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the reqnirements of the Recorder of Deeds and the Assessment Office.

This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.

cc: Synthes USA HQ, Inc. Johnson & Johnson Mainstay Engineering Group

Sincerely,

Paul Farkas Senior Review Planner

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 5/27/2020 To: Planning Commission fJ I From: Mark Gordon, Township Zoning Officer D\,, Re: Model Ordinance Review Land Development Ordinance Standards for Transmission Pipelines Zoning Ordinance Standards for Transmission Pipelines

Dear Commissioners,

As you may recall the Commission discussed these two model pipeline ordinances back in February. As requested the Township Solicitor, Ms. Kristin Camp

Esq., has reviewed these to model ordinances and provided comments in the margins for your consideration. Ms. Camp will be available to discuss these ordinances on at your meeting on June 3.

Remember, there are two separate ordinances, one that would be included in the Zoning Ordinance and the other would be included in the Subdivision and Land Development Ordinance. These model ordinances propose use, buffering, and setback standards for new construction from existing and proposed transmission pipelines, along with other suggested regulations.

The PC has identified a 2020 goal to review the Township ordinances for appropriate legislation changes concerning transmission pipelines.

I would suggest that you review the ordinances again, along with Ms. Camp's comments, and ask yourself what we are trying to accomplish with these ordinances. Once we know what our objective is, the easier it will be to craft appropriate ordinance language.

I also have a short presentation of the Pipeline Mapping tool that we've been working on.

Ms. Camp is Available from 7 pm to 7:30 so this item needs to be your first order of Business for the evening.

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline Zoning\Memo to PC 05272020.doc

Draft: December, 2014

ORDINANCE GUIDELINES

SURFACE LAND USES AFFILIATED WITH TRANSMISSION PIPELINES

Note: The purpose of these guidelines is to provide a framework for an ordinance to

be enacted as part ofa Municipality's Zoning Ordinance, preferably within a "Supplementary Regulations" section. All contents of these ordinance guidelines, as well as any modifications made by local municipalities consistent with local planning objectives, are subject to review by a municipal solicitor consistent with the Pe1msylvania Municipalities Planning Code, Act 247 of

1968, as amended, and the Pennsylvania Oil and Gas Act (including amendments contained in Act 13 of2012 and subsequent findings of the PA Commonwealth Court and PA Supreme Court of challenges to Act

13).

AN ORDINANCE PURSUANT TO ARTICLE VI OF THE PENNSYLVANIA MUNICIPALITIES PLANNING CODE, AMENDING CHAPTER _OF THE CODE OF ORDINANCES OF

t)(l.'t)

,w ? . $,OLl (__ t TOR_,

s-/1.1 /202.0

TOWNSlilP, BEING THE ZONING ORDINANCE BY PROVIDING FOR THE REGULATION OF SURFACE LAND USES AFFILIATED WITH TRA_NSMISSION PIPELINES. EFFECTIVE FIVE DAYS FROM jENACTMEN'ij. ··-· ···-______ ·--··-.. _____________ . ___ ·-· .. __ . ___________ . _______________ . _____ . _______ . ____ --··

Section 1, The Code of the Township of. ____ , Chapter __ thereof, being the __ _ Township Zoning Ordinance, as amended (the "Zoning Chapter"), Atticle_, Supplementary Regulations, Section_, is amended by adding a new section_, to read as follows:

A. Surface Land Uses Affiliated with Transmission Pipelines. The purpose of this section shall be to:

(1) Accommodate the need for surface land uses affiliated with transmission pipelines consistent with the desire to protect the health, safety and welfare of the citizens of the Township.

(2) Minimize aesthetic, nuisance and visual impacts of surface land uses affiliated

with transmission pipelines through design, siting and vegetative screening.

(3) Ensure the location of surface land uses affiliated with transmission pipelines k. in compliance with applicable industry standards and requirements, Federal law, and Pennsylvania State law, including the Federal Energy Regulatory Commission (FERC), the Pennsylvania Oil and Gas Act (as amended), and Pennsylvania case law.

(4) Preserve the rnral, sĐIJHlđcharacter of neighborhoods adjacent to surface land uses affiliated with transmission pipelines.

B. Use provisions.

Draft: December, 2014

(!) Surface land uses affiliated with transmission pipelines shall be pem1itted as a principal use by right in the I-2Jndus!rlallz)isf1•icwhere_under_ground.Pjpelines _______________ _ exist or are proposed. Such uses shall meet the dimensional requirements,

including but not limited to area and bulk standards, of the I-2 lnduS:Pio.1 DisMct, Applicants are required to demonstrate to the satisfaction of the Township that the requirements of Section C, Standards for surface land uses affiliated with transmission pipelines, can be met.

Note: Municipalities may wish to permit swface land uses as conditional uses within

their Industrial District (rather than as by right uses); if so, the standards contained in Subsection C, below, would become the "condWonal use standards" by wMch the land use would be permitted.

Note: MunicipalWes may wish to designate other areas where swface uses are permitted

as conditional uses, such as zoning districts wNhin which existing pipeline corridors already eYdst, or other special use districts (such as a defined "pipeline corridor disMct'} appropriate/or such uses. Each municipaUty wnl need to carefully consider whether additional or special use districts are appropriate for surface land uses affiliated with transmission pipelines in their community. Sample

language for permhting swface land uses affiliated with existing transmission pipelinesfollows and could be inserted here as Subsection B.2,·

(2) Except as otherwise designated in Subsection (3) below, surface land uses affiliated with transmission pipelines shall be pem1itted as a principal use in ___ zoning districts where underground pipelines exist as of the date of adoption of this Section when authorized as a conditional use pursuant to Section C, Standards for surface

land uses affiliated with transmission pipelines and (insert reference to municipal Conditional Use Approval Standards). In addition, such uses shall meet the dimensional requirements, including but not limited to area and bulk standards, of the underlying district.

@}--Surface land uses affiliated with transmission pipelines shall be prohibited on a lot

containing a Class I or II Historic Resource as defined in Section 240-6. ifr-the Histarie Presenw#en-f)ve,4ey-Di&ffief:

Note: The example in Subsection B,3 above prohibits swface land uses in historic

districts. lifunicipalities may also wish to prohibit or othe1111ise regulate such uses in other special districts or resource protection areas such as scenic corridor overlay districts, water resource protection areas (critical aquifer recharge areas, source water protection areas, wellhead protection areas, etc,),natural resource protection areas (wetlands, riparian biiffer areas, rare habitat areas), etc.

2

-+------ Formatted: List Paragraph, Indent Hanging: 0.5'',

Numbered + Level: 1 + Numbering Style: 1, 2, 3, ... + Start at 3 + Alignment: Left + Alfgned at 0.57" + Indent at 1.07", Tab stops: 1.07", left+· 1.07", left

Draft: December, 2014

fiB_Ll_LAll other uses ancillary to surface land uses affiliated with transmission pipelines

arJ?f?hibited unless otherwise pennitted in the zoning district in which the use is

[locate; ... _________________________________________________________________________________________________ ,. Coiµrii"e-·hcq1; '1 -voHI.<!-,t iO.'Jin"deX)Y.itatfype:

_ofancill..}!dings .thl.is try.ing t9_:(lie){ot.J_,Vou!-.d uot-\ l .t!i.\Yould.b_t;_sign_l\ge ss9.ia\t;d.wilh %11: cW* ·: unli;Hi:quJ!"4 for Sefety pUtpQSClf .Wµi case you)_ould _i ngl Want to_p(ol.Jjbit. ,Existing .sigu regs m· 240-22,Q :woiild :: iiuo,V'Signs, [,·,:.,,·.=; ,:- -:: >;:,.;·. ·.-.·,.:,,: ;_,,;=;_::/,;:_:/:'.'!.\'.:::-:,:•:,::;·\\1 Note: Ancillary uses could include signage or others types of outbuildings,

C. Standards for surface land uses affiliated with transmission pipelines, The fo!Iowing standards will be considered by the Township prior to permitting surface land uses affiliated with transmission pipelines:

(!) ! ill ii¥::i{6o

p .. ;g··]o::1

pt:

i

:ptan

oshalf_-_-_-_-_-_-_-_

-

_ -

_ -

_-_

-

_ -

_-_-_-_·:•;,;".;.'m;;,;;;•t;,;t•,cd,;';.H;,lg:;;hc,llgech;;,t=----==-..-I ..... ) _cq:,tfoi*J+-,-.iK-i;.i"do.(!/0e:i1g234:;µ:.5-z67g-\\'. demonstrate that the setbacks for surface land uses affiliated with transmission 0;4!nAA..1flat.iiJJ!'.!ws the Board ofSupei:$!'.!ts t51_ Y.!JIY th?.-'·.·. pipelines and all suppo1ting equipment and structures to any property line or standards. ·,'fhatistherole oftheZHB_··, ··= ·-,·· ·· · ·· •· · ·· · · right-of-way shall be consistent with the minimum setback in the underlying zoning district. In addition, surface land uses affiliated with transmission pipelines

and all supporting equipment and structures shall be setback a minimum of seven hundred and fifty (750) feet from residential buildings and all commercial, industrial and institutional uses or a minimum of five hundred (500) feet from the nearest lot line, whichever is !gre"ate._ -----------------------·····--···----------------------------····

Setbacks may be increased by the Township pursuant to the type of material being managed at the surface land use affiliated with transmission pipelines and whether the use is adjacent to areas of high on-site population. Land uses with high on-site populations include schools (through grade 12, trade schools, advanced education institutions, etc.), hospitals, clinics, multi-family housing, retirement and/or life care facilities, stadiums or arenas, day care centers, or large scale commercial, industrial or institutional uses of fifty (50) or morePersO------··----------------------.. --------

The Township shall, on a case-by-caseasi{l_t:!!l_lj -'?".'. th!.½2.t:.------------------. setbacks are warranted consistent with the "Potential Impact Radius" (PIR), •,,_ defined by the relationship between the diameter of the adjacent pipeline (and ',, appurtenances) and its maximum operating pressure (see Exhibit 1), whether high on-site populations are located in close proximity, and whether more than one transmission pipeline (such as coupled lines) wil1 be managed at the surface land use affiliated thereto. The PIR approach is applicable only to surface land uses affiliated with "gas" or 11petroleum gas" transmission pipelines as defined by Title 49, Code of Federal Regulations, Section 192.3. Surface land uses affiliated with transmission pipelines canying 11hazardous liquids", as defined by Title 49, Code of Federal Regulations, Section 195.2, shall adhere to the setback standards contained in this subsection.

3

·cQ··enii:t [KCSJ: 750 feet and 500 f'eei -\ty·Jarg /:··. /Ind may b.e".difficuit tO ply \Vit4.-24!J-19 eSiQblisheii a;:_::·: seih!l-Clc bii°sed 0 11 imdrequkes 4 f/.reS·ro. It4lJ1 4 \: 9?-0.esta9,h sef'-!acks foruses in..12 \\!Itjcl?,.are qSt_. Cli5"es 50 feetformln.imum front, side and rear yard. ;i: '- ·. · ·

_Com:ntd [K<;:6]: I do not like .PIPviio:i.ill.Q..;;S _·: tl1!l.regaji:itio tQ e :v¥ieii wilhot.M,Y spep,ifio .. t.4.¥. 1):!, ':. apply and limiting range 9fhow mµcl1 th_se_lhJ!.WCmay J?.!': ;:; iucreascd, Thls could bo challenged as yoidforvll8ueness •. '·. How.inti.ch ;;·itbcaricd?, :-:·,' ·,::,;:,;:i.'.'.:\':!,'.\'i.'•::.\} ',\·\ ··

9. n!d [KC7]: Same cou·(· -bYe) d.9i.\e 1;gulation to be. set on a cRSe by cas.as wi.lft. ill!-Y. ( ·\ · Standards to be applied or maximum vruiation. :-:· ''· -:.•

Draft: December, 2014

Note: Although Act 13 's setbacks were 750 feetfiwn compressor stations, the Act also

provided PADEP latitude to reduce such setbacks if waived by the owner of

adjacent buildings or aqjofning lots. Municipalities wishing to consider larger setbacks/or su,face land uses affiliated with petroleum 01· other hazardous liquid pipelines should only do so if they believe they can justify the need for large,•

setbacks to pl'otect High Consequence Areas (areas with high onRsite populations) or Unusually Sensitive Areas (areas with unique natural resource constraints). Any increase or decrease in setbacks should be reviewed by the municipal solicitor.

(2)

(3)

(4)

(5)

The municipality should consider retaining special counsel to present the case for larger setbacks when/if the conditional use process is utilized

Landscaping. The applicant shall provide a plan prepared by a landscape architect licensed in Pennsylvania showing landscaping proposed to be installed to screen and buffer surface land uses affiliated with transmission pipelines. The landscape plan shall incorporate the use of an eightRfoot decorative fence surrounded by a mix of native vegetation, including evergreens, shrubbery and trees, which shall not he less than the height of the fence and shall be of sufficient density to screen the facility. Existing vegetation in proximity to surface land uses affiliated with transmission pipelines shall be preserved to the greatest extent possible. All proposed landscaping shall comply with the requirements of Section 24027.C of

the Zoning Ordinanccthe Te•.,,'tlship1s Suhdivisien 006 Laad-D&Yel&}ml8Ht­ Gf4tnanee (el' aubstltu:-e the leea#on e:fffl1J' landsespingpro1•lsiona of:Ire r;i:, !"#j.$%&''.f()*+,-./}0123¾4Z567?J!Y&8i9:&;i<:. ________ .. -·--iF_o_,m•·••_d_:_Hlghlgh_t _________

mitig"lltlo·n"i.->f'VisUal[impact.(don't understand what a visual sur_vey is,) -·--•--w---··-·-1,----- ommeOte:d.l!}l;81!)'1aYt·tp·:ddJf!11dscaPingi i4\k.

_'1,7 .• C wl;tlch argua_b.1.Y.Yl.':l}M applyq .this use ifit!ll>uti:. .'( ·:

Note: Municipalities could consider whether they wish to ask that the fence provide

screening (less than fifty percent open) for surface land uses. In addition, the word "decorative"could be deleted ifit is viewed as too subjective.

'\,,, ·:residential district an. d.wouldrequire a bufferplantiag sh-m. ,. \:•,:,.;,;;=;;;.. .... ==""""====-==· ~·

\ Formatted: H!ghlight

Formatted: Highlight

Noise. Sound produced by the surface land use affiliated with transmission pipelines shall not result in noise or vibration exceeding the average intensity of noise or vibration occurring from other causes as measured at the property line at any time in a 24 hour period; in no case shall the sound pressure level exceed 60 dB(A) (according to the American National Standards Institute (ANSI) "aH

weighted scale) at the property line closest to the landseL _____________________________________ .- .ommeflted. [l<_(;J:.·gg;;;f 9 1)JStre( rt C! p . · · withChapte_r._1 6oftheCo4.e.'.'Noise", ·,, .. ·· · '· · Odors. Odor, vapors or pruticulate matter produced by the surface land use , Commente iKC.lOJ: Od }1l .. re&u1ated._in 2_40,24.G as , affiliated with transmission pipelines shall not exceed the pennissible emission of / follows":>:·:·.:·-::-:\\::\-::;:,.?;.,;:;\\':· \\'.,.-:·:,_:·,;:_-,:,;,_'.:: such substances occmting from other causes as measured at the property line, / All uses shall comJ)_1y:W1th an. /lf)Ucable state.and ' · · .' (what is that permissible level?)Specific contaminants shall be regulated by PA / federal laws O!i f?QU!\1.ons .COnl;rolllng !r pg_ll_u!,ln:i, ·. ·:: Code. Title 25, Environmental Protection, Part 1, Subpart C, Article ill, Air / t&11 .!> f;J ff0ft .-;,,----/.;·.< '.>: ·, :: .:· =" esource. ·-----------------------·--·--···--·--------·--·------·--------------------·------•- _____ / 1:v:;m-!1;9J:;gorr- Signage. All signs, other than utility identification signs, appropriate warning

4

nulsances tha\ y.,ould.!:>i!=.Sfgn!fic;an!ly offensive q , · reasonable Pf':t;f, -- .. _nslllvitres.

Draft: December, 2014

signs, or owner identification signs, shall be prohibited. There shall be no

5

Draft: December, 2014

antennae, advertising, or other items or matetial affixed to or otherwise placed on surface land uses affiliated with transmission pipelines, except as pennitted by the Township, pursuant to its sign P1;$hiancrt_ -----------------------------------------------------------'ti'tif ji!f f \ ii; \;):f 19: tzj_.f:ii.:

(6) Parking. ff the surface land use affiliated with transmission pipelines is fully automated, adequate parking shall be required for maintenance workers. (the site ____________ is not automated, the number of parking spaces shall be equal to the number of people on the largest shift. Parking spaces shall be located within the decorative fence and landscape buffer area so they are substantially concealed when viewed from surrounding properties. why does parking space have to be concealed from view?

(?) Access. Sufficient access shall be provided to surface land uses affiliated with

transmission pipelines for routine maintenance and emergency operations. Such access shall be sufficient to accommodate emergency vehicles. shall be all weather accessible. and shall provide sufficient area to safely deploy emergency equipment.

(8) Lighting. No surface land use affiliated with pipeline utilities shall be artificially lighted except as required for emergency night time access. Any such lights shall be shielded so as to prevent intrusion upon neighboring properties and shall not be directed in such a way as to create a nuisance to users of adjoining streets and property or subject them to direct glare or hazardous interference of any kind.

(9)

(IO)

(11)

Engineered drawing submission. Applications for a land use affiliated with transmission pipelines shall be accompanied by engineering drawings prepared by an engineer licensed in Pennsylvania. The applicant shall show that all applicable Commonwealth of Pennsylvania and U.S. standards for the construction, operation, and maintenance of the proposed facility have been!me( _____________________________ _

Design. The applicant proposing a surface land use affiliated ·with transmission pipelines must demonstrate that the structure has been designed to blend in with or mimic existing structures in the landscape such as residential outbuildings, fann structures, or other uses permitted in the underlying/district---------------------

Visual impact. Any surface land use affiliated with transmission pipelines shall be designed and constructed so as to mitigate the visual impact from public roads and nearby uses. In addition, the color and other visual features of the land use affiliated with pipeline utilities shall be designed and installed in such a manner so as to create the least visual impact practicable. trh% a_QpJicant_shall demonstrate ____________ _ compliance with this section. by among other things, providing photographic perspectives of the proposed site from all sides of the property, adjacent road ways and neighboring properties (with penn.ission of the owners). Mitigation of visual impact shall be consistent with the landscaping requirements of Subsection

C (2), above.

6

,i;:omniū!i:iŬd .lŭ¢1 ?ii".$.µggefy9µ·:a,d Ů-ůPicifi!l. ŰűŲų(. { of spaces- 1 space ifautomated. ·,, · ., ,_-.::i '·

CommeŴi.ed. tl5P.ŵI:.iJ?ŶllAve_ŷŸirucŹg thlź us_e OD.. 11. i'. lot constitu\e!ll!l.11Ż dc;Y<;ioplJ!ent J,µd_th,us.would l"żquire :-;, :., submissionan,dappŽyž !)f I!µ pl!l!l.in.\yNi;:ta c_ll!!e ·*, i' section is not needed."':·'-..

i :_·. '• ··, :. ·' · :· '·· · · .. · ·· ·. · '· ;,,.

Comltleſiƀd [KC14J: This ffia":s-;_ƁƂt be realistic for this . .' type of USC."·· '.:·.:·:,·<· · · ' · ·· · : · .- · · • •. · • · ., ·· · · · ·

Commented. [KC15]: .This is vƃry vague and subjective and tlmswillbebaid to enforce ... ·· . .>'·.'!' --- . :-•" . . ·.

Draft: December, 2014

(12) Need. The applicant for a surface land use affiliated with transmission pipelines is required to demonstrate, using scientific and technological evidence, that the facility must be located where it is proposed in order to satisfy its function in the company's pipeline system and demonstrate that there is a need for this facility at

the location where it will be located.

(13) State and Federal Regulation. All applicants, whethel' commercj_al pipeline companies or otherwi.. must demonstrate the submission ofJji_i}JQii!_Ql_ing------------------ Formatted: Highl!ght and/or receive ufficieft_ approvals_., as require through the Federal Ene1:gy . ___________ --,----- ,.c;-

"'\n"' -m.:·"n"'td

'"· 1 '" c"' J6]

.,: p · tt"', ,-_r"'_th.- ": "

,-,q

"'r

7

,)l"n" .-c":."s;"_

"'·.,Qr

"'· . Regulatory Commission (FERC), the Pipeline and Hazardous Materials Safety ',,, applicable £i..lmgS.1U1d approvals:,'notsuf:ficient. ·.-::,.'.•': .. i'.-; Administration (PH1\.'1SA), and the Commonwealth of Pennsylvania [the ',, Formatted: Highlight Pennsylvania Department of Environmental Protection (PADEP) and/or the =======---------_J

(14)

Pennsylvania Public Utilities Commission (PA PUC)]. Such documentation is not required as prut of the initial application to the Township, but must be included prior to issuance of-with-the final as huilt pl!lfls slffli:aittedl.lf!ell approval by the Township.

Removal of surface land uses affiliated with transmission pipelines. Any surface land uses affiliated with transmission pipelines) including access roads and related infrastructure, that are no longer licensed and active shall be removed and the site restored to its original condition at the owner's expense within 60 days of the last date that the facility was licensed by the PADEP and[FERQ,_A bond or escrow·-·------------· account shall be posted with the Township in an amount sufficient to ensure such removal and site restoration prior to the construction of the facility, The applicant shall have prepared and submit to the Township to accompany the bond or escrow account, an estimate of the cost necessary to remove the surface land use facility associated with the pipeline and restore the site to its preconstruction condition.

Section 2- The Code of the Township of______, Chapter_thereof, being the-­ Township Zoning Ordinance, as amended (the "Zoning Ordinance"), Article_, Section __ , Definitions, is runended by adding the following terms and definitions therefore in the correct alphabetical sequence:

Pipeline-As defined by Title 49, Code ofFederal Regulations, Sections 195,2 and 192.3.

Surface land uses affiliated with transmission pipelines - AboveMground transmission pipeline facilities including, but not limited to, compressor stations, pumping stations, regulator stations, launcher/receiver stations, and other surface pipeline appurtenances.

Transmission Pipelines - Transmission pipelines include, but are not limited to, pipelines

designed for the transmission of a Pgas'1 or 11petroleum gas'\ except a "service line0

, as those terms are defined by Title 49, Code of Federal Regulations, Section 192,3; also included are pipelines designed for the transmission of a 11hazardous liquid", as defmed by Title 49, Code of

Federal Regulations, Section 195,2.

7

·cq_iil -te!. IKC17): fu"#:$sp%&e:'ai"(-whc_)_;: /: :: liccrue expires? J;Iow does Twp lnow :ivhen !his license . ',. ·. i:xi;ir(S? Is 60 days enough time? ,;-:-:·.:;c:.<_.:;,-1 i_-.._\/'._'::.',"\i = _..

'i="orz...

(_o.,.___ k._,,

$OL.\ c__ \. ,<L....

Draft: December, 2014

PLAN SUDMISSION, BUFFERING AND SETBACK FROM

TRANSMISSION PIPELINES

Note: The sections of this ordinance are intended to be enacted as pait

ofa Township's Subdivision and Land Development Ordinance.

AN ORDINANCE PURSUANT TO ARTICLE V OF THE PENNSYLVANIA MUNICIPALITIES PLANNING CODE, AMENDING CHAPTER OF THE CODE OF ORDINANCES OF TOWNSIDP, BEING THE SUBDIVISION AND LAND DEVELOPMENT ORDINANCE BY PROVIDING FOR PLAN SUBMISSION, BUFFER, SETBACK, SIGNAGE AND LANDSCAPING PROVISIONS FOR NEW DEVELOPMENT ADJACENT TO TRANSMISSION PIPELINES. EFFECTIVE FIVE DAYS FROMjENACTMEN:q ____________________________________________________ _

Section 1. The Code of the Township of , Chapter __ thereof, being the __ _ Township Subdivision and Land Development Ordinance, as amended (the "Subdivision Chapter"), Article_, Plan Requirements and Procedures, Sections_, Plan Content for Preliminary and Final Plan Submissions, is amended by adding a new subsection_, to read as follows:

LJ The location, center line right-of-way, and limits of easements for all transmission pipelines on the tract or on any abutting property.

Section 2. The Code of the Township of Chapter __ thereof, being the __ _ Township Subdivision and Land Development Ordinance, as amended (the "Subdivision Chapter"), Article_, Design Standards, Section_, is amended by adding a new section_, to read as follows:

Section_. Buffer Standards and Setbacks from Transmission Pipelines

A. Purpose

The purpose of this section is to help prevent and minimize unnecessaiy risk to the public health, safety and welfare due to transmission pipelines and ensure consistency with the intent of the Township's ComprehensivejPlai{ Recognizin_g_it is impossible to eliminate _____________ risk entirely, this section is intended to:

(1) Minimize the likelihood of accidental damage to transmission pipelines due to external

forces, such as construction activity and equipment.

(2) Avoid exposing land uses with high on-site populations that are difficult to evacuate.

(3) Help reduce adverse impacts in the event of a pipeline failure.

-:r-/zei / 'lo 2 o

Ir}fr!l/;tlN:t t:;!y"t#f l$if %i&_;·

_un.4•r.s!;m_d/i_ll! 0J11_0.,r !l)csc regs ifenacteŰ_/v.ould űcct '. · :· po.teŲ\ial ų•Ŵ_e_lop1)lŵŶt.ofland,.:Iti;nay _havounin1endeŷ •... ._- ·ConseQuenCes:·:·.:*·:•:, .=.:\ ::: :·: '. · · .. : · •. + ,:•

CommŸŹi;;;j iKC2]: Are we sure the Township Coi',;p;ehensiźe Plan includes this as a goal?

Draft: December, 2014

( 4) Ensure compliance with and supplement existing federal and state regulations related to

transmission pipeline corridor management, among them the Federal Energy Regulatory Commission (FERC) and the Pennsylvania Oil and Gas Act.

B. Applicability

(1) Setbacks. New residential buildings and all new commercial, industrial and institutional

uses other than those surface uses affiliated with transmission pipelines shall be set back a minimum of three hundred (300) free{ from any existing or .QrO.QOSed transmission ________________ _ pipeline right-of-way; such uses shall be set back from natural gas compressor stations or other surface land uses affiliated with transmission pipelines a minimum of seven hundred and fifty (750) feet or five hundred (500) feet from the nearest lot line of natural gas compressor stations or other surface land uses affiliated with transmission pipelines, whichever is greater. Other unoccupied residential or non-residential accessory uses such as but not limited to detached garages, parking areas, storage facilities or garden sheds shall not be located within two hundred (200) feet of any pipeline right-of-way.

co·m.{m nieI!( 31:: --.Af-y·This cotdd_ be.°' ;dgnifi,;;ant 1'.taki;ng'_'J>_fJ<:J. ify<iul}_avi; t(! bi; i;\a.k :·; .: 300, 750 01.S00 feet.'··,, ·. '-:, ',:•.;;;i.\'.; ::\::::c.',:\ · ·:., · · · ·., ·

1:s¥T2l; 34:if :56::c:7:89:;1<=>k:?I@i:A:!iiBCD;lE:FG:EH1:::------------ sIJlrlKLM::;;!:NOlPQiti.R\S;:;i; warranted consistent with the '

1Potential Impact Radius" (PIR), defined by the relationship between the diameter of the adjacent pipeline and its maximum operating

pressure (see Exhibit 1), whether high on-site populations are proposed, and whether more than one transmission pipeline (such as coupled lines) exist (or are proposed). The PIR approach is applicable only to "gas" or "petroleum gas" transmission pipelines as defined by Title 49, Code of Federal Regulations, Section 192.3. Transmission pipelines carrying uhazardous liquids", as defined by Title 49, Code of Federal Regulations, Section 195.2 shall adhere to the setback standards contained in this subsection.

Note: Although Act 13 's setbacks were 750 feet from compressor stations, the Act also

provided DEP latitude to reduce such setbacks if waived by the owner of adjacent

buildings or adjoining lots. The setbacks offered here are graduated to apply to different types of uses and settings. Municipalities wishing to consMer larger setbacks for transmission pijJelines (including petroleum or other hazardous liquid pipelines not addressed by the P IR approach) should only do so if they believe they can justify the need for larger setbacks to protect High Consequence Areas (areas with high onHsite populations) or Unusually Sensitive Areas (areas with unique natural resource constraints). Any increase or decrease ;n setbacks should be reviewed by the municipal solicitor,

No activity or grading within the pipeline setback shaJl create depressions or areas in which flammable or explosive materials may collect or ccumulatel;_eXfilil_l?les in dude_ but ____ •• --1 corriented IKCS]: This Jan,8uag is; broad. are not limited to grading for structures1 storm water management facilities or landscape beds. Furthermore, pipeline rights-of way shall be identified and protected during construction by erecting suitable temporary barricades (non disturbance fencing or silt ,, fencing) and posting notices on-},itE{ _____________________________________________________________________ /,

2

Con,mented {KC6]: Iflhe pipelin is _not on the applicant's property. they do nqt havf! GH _righf _tq 1:-1:et. tbIe barricades on private land. · · · ·

Draft: December, 2014

Note: Given the regulat01y process undertaken to permit new pipelines, the economic

variables that influence pipeline location, and the changing market for materials tl'ansported through pipelines, it is often veiy difficult to determine whether a

"proposed" pipeline will be constructed The intent of requiring applicants to plan for proposed pipelines is to ensure applicants undertake due diligence in their land planning activities - communicating with pipeline companies/operators about intended development, informing and involving municipal officials in such communications, and making informed decisions regarding the likelihood of

proposed pipelines being constructed. Municipalities may wish to consider adding ordinance language such as the following:

"Applicants undertaking development in proximity to proposed transmission pipeline

rights-of-way shall determine the likelihood of the pipeline being installed through

proactive communications with the pipeline company/operator; such communications shall involve municipal officials and a detennination shall be made as to the likelihood of the pipeline being constructed. In the event the developer and municipality disagree regarding the likelihood of the pipeline being constructed, the applicant shall indicate

the extent of the disagreement on the plan. shall provide a minimum 100 foot buffer from the proposed right-of-way, and shall indicate on both the property and lot deeds the inherent risks of being in close proximity to a pipeline should it be constructed in the future."

(2) Consultation zone. Any application. other than those surface uses affiliated with

transmission pipelines, for new residential structures and all new commercial, industrial and institutional uses (whether Class 1, 2, 3 or 4 locations pursuant to Exhibit 1)1 proposed within six hundred sixty (660) feet of any existing or proposed transmission pipeline right-of-way shall include written verification from the applicant that:

(a) The applicant has contacted the pipeline operator(s) and has provided the pipeline operator(s) with documentation detailing the proposed development activity and where the activity is to take place;

(b) The applicant has made sufficient access to the pipeline available to the pipeline

operator(s) for routine maintenance and emergency operations; and

(c) The pipeline operator(s) has reviewed the documents for compatibility with continued or proposed safe operation of the transmission pipeline(},{), ___________________________ _

It shall be clear in the written notification submitted with the application that the pipeline operator(s) has received and acknowledged documentation showing the proposed activity and its location.

Note: The 660 feet designation for consultation zones (above) and high on-sUe

populations (below) is based upon "best practices" developed by the Pipelines and Informed Planning Alliance (PIPA), a planning committee formed by Pipeline and Hazardous Materials Safety Administration (PHMSA) (see the

"Planning Near Pipelines" Introduction for more information).

3

Co0ul1ei,°t :[C7i

°::Th.e epplic't_:iuµ;·..ol over wh!h,Ci: th0.pip.l,½!' operetohas.ri,ivjewd-e d_cuments "j1oyidd JQ. t!J. :!Jl ti;t!l,t YOI!, cen dq is_ :f!lqulre. applicant to_ send nofo; ;m4.r_eql!!',_St Wat pipeline; opexafog!l.vie.w_ f!?d.. : ·

providecommeuts.' - ·· ·· .. · · '· .. · · · ·

c,

Draft: December, 2014

(3) L uss with high on-site populations. Applicants for land uses with high on-site

opulatiom{ within six hundred sixty(660) feet of a transmission }}iQeline shall develop ___________ _

appropriat.(? mitigation measures to help reduce adverse impacts in the event of a pipeline failure. ucijmeasures and/or correspondinz.pJans shall be submitted to_the Township for _________ review, Land uses with high on-site populations include schools (through grade 12, trade schools, advanced education institutions, etc.), hospitals, clinics, multi-family housing, retirement and/or life care facilities, stadiums or arenas, day care centers, or large scale

commercial, industrial or institutional uses of fifty (50) or more persons.

Mitigation measures intended to reduce risk and minimize impact in the event of a pipeline failure include but are not limited to: emergency procedures such as emergency plans and guides, employee training and drills, and education programs for occupants and employees concerning pipeline safety, such as what to be aware of and how to respond in the event of a problem. Applicants shall consult with the local Fire Marshal regarding the level of emergency planning and procedures appropriate for the proposed development; the Fire Marshall may also require submission of plans for review and approval where deemed appropriate.

Land Development Design, Buffering and Screening. Applicants shall consider existing or proposed pipelines in their design and placement of lots, structures and roads. Specifically, consideration shall be given to incorporating the linear appearance of the pipeline right-of-way into the overall development design or landscaping in a manner that works with or minimizes the linear appearance of the pipeline right-ofway, Attempts

shall be made to avoid creating a bisecting and unnatural linear space that does not relate to the land[developmenL _____________________________________________________________________________________ _

The applicant shall provide a plan prepared by a landscape architect licensed in Pennsylvania showing landscaping proposed to be installed to minimize the linear appearance of the pipeline right-of-way and screen and buffer new development from transmission pipelines in the event of an accident or failure, Landscaping can be used both to minimize the linear appearance of the pipeline right-or-way and buffer sh·uctures from those remedial activities associated with pipeline failure and clean-up.

The landscape plan shall incorporate a mix of native vegetation, including evergreens, shrubbery and trees, which shall be of sufficient density to meet the objectives outlined herein while pennitting suitable points of access for pipeline personnel providing routine maintenance, Existing vegetation in proximity to transmission pipelines shall be preserved to the greatest extent possible. All proposed landscaping shall comply with the requirements of this Ordinance.

D, Signage. Applicants shall consult with transmission pipeline operators to determine the need for, number of, and placement of utility identification signs, appropriate warning signs and owner identification signs. The number and placement of signs and their content shall be shown on plan submissions.

4

itpiit:1J2.&34i .5R678fi1t1fl9:.;<r:.=>:ift:;: . :. ;,: ?1f iet!rt/Jt@i,Af Bt!CD;:::::0 , .'.. ;!f;, ):Q!l.!l;Sllfllslplllfl, 1b!lY Ąe .. 4ependeą!}'!n tl.1.Ć. pipe,lin.c operać!K. ·.

providing risk ass&;Ssmentwhlch we know is not always eĈ to obniin. ·.;_,,,,::'X.•.\ ·,, :·•: \;:.'?\·-'::i ;,'::<'.'\'.; ·: ·-::\< '· '·: .' · ·, :::

Commented [ĉC'.'10]: Some piPeĊe ċČpanies want to b.o. able čo. clearly v:Ďďu.Đ .đ',I Ē.i:ri.dp; .1!<!ē air to do yisu.l½. i."'.· lllspecfions, Landsc11piog may interfere with this. · ·" ·

Draft: December, 2014

Section 3. The Code of the Township oL____,, Chapter_ thereof, being the __ _ Township Subdivision and Land Development Ordinance, as amended (the "Subdivision Chapter"), Article_, Section __ , Definitions, is amended by adding the following terms and definitions therefore in the correct alphabetical sequence:

Pipeline-As defined by Title 49, Code of Federal Regulations, Sections 195.2 and 192.3.

Surface land uses affiliated with transmission pipelines -Above-ground transmission pipeline facilities including, but not limited to, compressor stations, pumping stations, regulator stations, launcher/receiver stations, and other surface pipeline appmtenances.

Transmission Pipelines -Transmission pipelines include, but are not limited to, pipelines designed for the transmission of a 11gas" or 11petrolewn gas", except a uservice Iine11

, as those terms are defined by Title 49, Code of Federal Regulations, Section 192.3; also included are pipelines designed for the transmission of a 1

1hazardous liquid11, as defined by Title 49, Code of Federal Regulations, Section 195.2.

5