Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday, September 2, 2020 VIA Telephone/ Video Conference
7:00 PM
During this tele-conference Planning Commission meeting, public comment will be handled as follows:
• Participants are asked to call in by 6:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting • The public will be muted during the meeting when the Commission is talking. • The Chairman will ask for public comment on agenda items and participants will be unmuted and given an opportunity to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time.
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. August 12, 2020 F. Subdivision and Land Development Applications G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business
1. Zoning Ordinance Review 2. Discuss Pipeline Ordinance Guidance from Board of Supervisors J. New Business K. Any Other Matter
1. Letter of Support for DCED Grant Application for Segment B of the Paoli Pike Trail L. Liaison Reports
M. Correspondence N. Announcements
Bold Items indicate new information to review or discuss.
F:\Data\Shared Data\Agendas\Planning Commission\2020\PC AGENDA 09022020.doc
August 5, 2020 PC Meeting
u
> ci (/) 0 "l. C .J ::, u:- u-
C a:- 0 :.:, d "' " 'ii .,
Q. Application Name
NONE
Bold = New Application or PC action required
Completed in 2020
,, .!!! ii: ., -"' C
East Goshen Township Planning Commission
Application Tracking Log
·"'u .. al ., < ., ·= -
Cl) ci. C 2 w C. .e- Cl) .c C II> C u :.:, ;: C. - ::, u J:I ., 0 C - I- u < 0 "' C 0 0 0 'iii - - - C t: ., ., ., ., "' - - - - "' "' "' >< -
C C C w (/)
., ., -"' - C "' C C 0 ., C - 0 :.:, ., "' :.:, " - ,, < "' " ,, < C "' I- ., I- .J Cl) z C C .J ·;: z (/) Q. "' 2 u 0 ., C. al :I: C
Synthes USA / 1303 Goshen Parkway LD P/F 4/27/2020 5/6/2020 4/28/2020 4/30/2020 4/30/2020 1 9/15/2020 9/2/2020 NA 10/2/2020 Boyle, 1137 N. Chester Rd. V Sk 7/29/2020 7/29/2020 NA NA 7/31/2020 9/2/2020 9/15/2020 8/26/2020 9/25/2020
Completed in 2019
Paoli Pike TND Overlay District Ord. zo NIA NIA NIA NIA NIA NIA NII NIA NIA 12/17/2019 NA ZEKS, 1302 Goshen Parkway cu Sk 8/27/2019 8/27/2019 NA NA 8/29/2019 10/2/2019 10/29/2019 10/15/2019 10/25/2019 ESKE Development I Ducklings LD P/F 1/18/2019 2/6/2019 2/23/2019 2/23/2019 2/29/2019 4/3/2019 4/9/2019 NA 5/6/2018 PECO Gas Gate cu Sk 2/26/2019 2/26/2019 2/28/2019 NA 2/28/2019 1 4/3/2019 6/5/2019 5/14/2019 6/25/2019
CZ Woodworking / 1422 Ardleigh Cir. cu Sk 3/29/2019 3/29/2019 NA NA 4/22/2019 1 6/5/2019 6/18/2019 6/18/2019 6/27/2019 1351 Paoli Pike / The Hankin Group zo SK 5/31/2019 NA NA NA 5/31/2019 NA NA NA NA NA 1339 Enterorise Drive cu Sk 5/30/2019 5/30/2019 NA NA 6/11/2019 7/10/2019 7/16/2019 7/16/2019 7/29/2019
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2020\PC Tracking Log for 09022020.xlsx
II> - C ., E E 0 u
Continued
APPVD. APPVD. APPVD. APPVD.
w Conds. DENIED APPVD.
8/28/2020
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
August 12, 2020
The East Goshen Township Planning Commission had to reschedule their meeting from Wednesday August 5, 2020 to Wednesday, August 12, 2020 because of the hurricane. Also, because of the COVID- 19 restrictions the meeting was held via teleconference using Zoom. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli Also present were: Mark Gordon, Zoning Officer Mattin Shane, Township Supervisor Susan D' Amore, Township Staff
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC- Chester Co Planning Commission
A. FORMAL MEETING - 7 p.m.
CPTF - Comprehensive Plan Task Force CVS- Community Visioning Session SWM - Storm Water Management
ZHB - Zoning Hearing Board
1. John called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders, militaty and healthcare providers. 2. John asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. John checked the log. 4. The minutes of the July 1, 2020 meeting were approved.
B. SUBDIVISION AND LAND DEVELOPMENT APPLICATIONS
1. Synthes USA, 1303 Goshen Parkway (Land Development). Synthes representatives: Brendan Burke, Esq., David Citro, Joshua Vanderveen, Todd McVoy and Ryan Freese. Mark Gordon mentioned that Synthes submitted revised plans. They met with Township Staff on site to review the fire protection concerns. Brendon was able to locate the 2013 plan which shows a blanket easement between the two propetties which was approved by the recorder of deeds in 2013. The easements will be on their Land Development plan. John moved that the Planning Commission recommend approval of the Land Development application for the Synthes/Jabil Finishing Plant Expansion project dated March 31, 2020 last revised July 27, 2020 and grant the waivers requested with the following conditions:
I. The Applicant agrees to design the rooftop structures in accordance with the Township Zoning Ordinance requirement, §240-l 9.F(2).
2. The Applicant agrees to address any final comments from Staff and the Township Engineer prior to submission of the Plan to the Township Board of Supervisors. Ed seconded the motion. The motion passed unanimously.
PC 8-12-20 draft 1
1 2 C. CONDITIONAL USES AND VARIANCES 3 I. Boyle, 1137 N. Chester Rd./ Dimensional Variance. William and Jessica Boyle were present. Mark 4 Gordon reviewed the request and described the history of the prope1ty. The house is a non-conforming 5 structure and sits approximately 14 feet from the prope1ty line. The new owners are proposing to 6 construct a two-story addition in the same location as an existing deck. The owner will use the deck as a 7 template and build up. They will not go closer to the prope1ty line. They will have a master bedroom on 8 the second floor and more living space on the first floor. 9 John moved that the Planning Commission support this dimensional variance request to permit a side yard 10 setback of 14 feet for the new addition as depicted in the application for the following reasons: 11 1. The dimensional variance relief sought by the applicant will have no adverse effect on the 12 essential character of the neighborhood. 13 2. The existing home is a nonconforming structure, which was not created by the applicant. 14 3. An addition cannot be logically accommodated anywhere else on the pro petty. 15 4. The relief sought is the minimal relief needed to construct the new addition. 16 Ed seconded the motion. The motion passed unanimously. 17 18 C. OLD BUSINESS 19 I. Zoning Ordinance Review - John mentioned that Ernie attended the Futurist Committee meeting. 20 They are sending a survey to the businesses in the Corporate Park asking what they will need in the 21 future. 22 23 2. Review Model Ordinances for Pipelines - Mark's memo was reviewed. He shared a presentation of 24 the pipeline analysis, which Gabrielle Long assisted with, using GIS maps. It shows how many parcels in 25 the township would be affected by different buffers and easements from pipelines. He will put his memo 26 into a letter format and use the presentation at the BOS meeting. John moved that the Planning 27 Commission recommend that the Board of Supervisors review the findings of the Planning Commission, 28 take the matter under advisement, and provide the Commission with guidance and direction, as they deem 29 appropriate. Ed seconded the motion. The motion passed unanimously. 30 31 32 D. NEW BUSINESS 33 None 34 35 E. LIASION REPORTS 36 None 37 38 F. ANY OTHER MATTER 39 Flooding from the hurricane was discussed. Mark mentioned that there was significant flooding on Paoli 40 Pike at the entrance to the shopping center. The Hicks farm lost a bridge last year and replaced it with a 41 larger one. This helped to alleviate some of the flooding. Everything was cleaned up by the Public 42 Works Depaitment. 43 44 G .. ADJOURNMENT 45 There being no further business, John made a motion to adjourn the meeting. Ed seconded the 46 motion. The meeting was adjourned at 7:45 pm. The next regular meeting will be held on Wednesday, 47 September 2, 2020 at 7:00 p.m. 48 49
50
Respectfully submitted,, ____________________ _ 51 Ruth Kiefer, Recording Secreta,y
PC 8-12-20 draft 2
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 8/28/2020 PC: Planning Commission From: Mark Gordon, Township Zoning Officer Re: Zoning Ordinance Review
Dear Planning Commission Members,
Before the Pandemic hit the PC had reviewed Article IV of the zoning ordinance which covers the I and BP districts. Due to the light agenda this month I decided to resurrect this topic for discussion. I have included a copy of article IV for you again or if you prefer to view it online you can use this link. https://ecode360.com/7253521
F:\Data\Shared Data\Admin Dept\Township Code\2020 Zoning Ordinance Review\Memo to PC re. ZO Review 09022020.doc
1 Chapter 240. Zoning
2 Article IV. Industrial and Business Park Districts
3 § 240-18. Intent of industrial and business park districts.
4 In addition to the objectives stated in § 240-3, the industrial zoning districts are intended to serve 5 the following purposes:
6 A. 7 To meet the anticipated future needs for industrial and business activity by providing sufficient
8 space and a range of choice sites.
9 !L 10 To provide that the land most suitable for industrial and related activities is available for 11 development while preserving opportunities for new residential development. 12 h 13 To protect industry against congestion by limiting the bulk of buildings to one another and to the 14 land around them, and by providing sufficient off-street parking and loading facilities for such 15 development. 16 17 To promote the most desirable use ofland and direction of building development in accord with 18 a well-considered site development plan, to promote stable industry, to strengthen the economic 19 base of the Township, to protect the character of particular industrial and business areas and their 20 peculiar suitability to particular uses, to conserve the value of land and buildings and to protect 21 local tax revenues. 22 &.. 23 To promote high environmental protection standards to help ensure the preservation and 24 protection of natural features and other elements of the environment.
25 § 240-19. 1-1 Light Industrial District.
26 &_ 27 Specific intent. In addition to the objectives stated in §§ 240-3 and 240-18, the I-1 District is 28 intended to encourage the development of light industrial uses which adhere to performance 29 standards (see§ 240-24). Other uses which adhere to the performance standards and are 30 compatible to the adjoining BP Districts and residential districts are also encouraged. This 31 section also encourages excellence in site planning and building design, stringent traffic control, 32 attractive landscaping and screening. 33 !L 34 Uses permitted by right. The following principal uses are permitted by right in the I-1 District if 35 the area and bulk regulations and other applicable requirements of this chapter are satisfied: 36 ill 37 Agricultural uses in accordance with§ 240-34. 38 fil 39 Crop storage. 40 ffi
1
1 Agricultural/business in accordance with§ 240-34. 2 fil 3 Bank or savings and loan association. 4 ill_ 5 Forestry in accordance with the standards of§ 240-34.1.
6 [Added 10-29-2002 by Ord. No. 129-Q-02]
7 Q_,_ 8 Permitted conditional uses. The following principal uses may be permitted in the I-1 District in 9 accordance with § 240-31: 10 ill... 11 Multiple uses in a multiple use building with uses that are permitted in this section by right or by 12 conditional use and when specifically approved pursuant to § 240-31 C(3)(v). 13 [Amended 6-7-2011 by Ord. No. 129-F-11] 14 ill._ 15 Wholesaling, warehousing and distribution, including self-storage and mini-warehouse 16 developments, but not including the following: 17 @l_ 18 Truck terminal and/or the outdoor storage of trucks and trailers and/or material. 19 fil 20 Testing and repair of manufactured products, not including the storage or repair of such products 21 outside of the building or automotive repair. 22 fil 23 Manufacture of products requiring light metal processing, including finishing, grading, polishing, 24 heat treating and stamping. 25 ill_ 26 Packaging and bottling operations with no retail activity on the lot. 27 _(fil_ 28 Standard restaurant (which may include occasional take-out service), but not including drive- 29 through service, fast-food restaurant or food stand.
30 ffi 31 Conference center. 32 {fil_ 33 Fire or ambulance station, excluding an outdoor training center involving the actual setting of 34 fires. 35 fil 36 Public utility facility and public utility building. 37 [Amended 3-17-2015 by Ord. No. 129-C-2015] 38 .(lQl_ 39 Manufacturing when limited to pilot studies and prototype development for the production and 40 testing of precision instruments, optical goods, phaimaceuticals, health and personal care 41 products and similar products. 42 .Q1l 43 Facility for scientific, industrial, agricultural or engineering testing purposes or for product 44 development. 45 (11}_ 46 Parking garage or deck.
2
1 .UJ.l 2 Storage shed as an accessory use. 3 .Ll.ft 4 Facility for providing services, repairs and maintenance to office equipment. 5 .illl 6 Indoor recreation, such as bowling alleys, indoor baseball practice or miniature golf.
7 .(lfil_ 8 Publicly owned recreation.
9 Q.11_ 10 Golf course or private riding academy. 11 illl 12 Health/tennis/exercise club. 13 .(ill 14 Place of worship. 15 .(2.Q)_ 16 Wireless communications facility and commercial radio or television tower/antennas, subject to 17 § 240-31C(3)(h). 18 [Amended 4-7-1998 by Ord. No. 119-A-98] 19 .GU_ 20 Business, professional and governmental offices. 21 ill}_ 22 Printing and publishing establishments. 23 G1)_ 24 Research, engineering or testing laboratories, excluding all projects with the potential of creating 25 an environmental or genetic hazard. 26 a1)_ 27 Manufacture of jewelry, precision instruments, optical goods and similar products. 28 Qll 29 Manufacture and assembly of any of the following: 30 hl 31 Small electrical and electronic appliances, supplies and equipment. 32 .(hl_ 33 Products from previously prepared nontoxic materials such as plastic, leather, glass, cellophane 34 or textiles. 35 .Gfil_ 36 Day-care center, child or adult, in accordance with § 240-31. 37 .G])_ 38 Assembly of electronic equipment, such as computer hardware. 39 .Gfil_ 40 United States Postal Service. 41 G2)_ 42 Telephone central office. 43 .Q_Q}_ 44 Parking in the front yard and impervious coverage expansion, subject to § 240-31 C(3)(gg). 45 [Added 4-7-1998 by Ord. No. 119-A-98] 46 an
3
1 Mineral extraction in accordance with the standards in § 240-31 C(3)(uu). 2 [Added 10-29-2002 by Ord. No. 129-Q-02] 3 ill}_ 4 Medical marijuana grower/processor. 5 [Added 7-11-2017 by Ord. No. 129-B-2017]
6 IL 7 Uses permitted by special exception: none. 8 .E.,_ 9 Accessory uses. The following accessory uses shall be permitted in the I-1 District in accordance 10 with the provisions of§ 240-32 or such other section listed after each use: 11 ill 12 Solar or wind-generated energy systems.
13 m 14 Cafeteria or recreational facilities for employees only. 15 ffi 16 Signs. (See§ 240-22.) 17 fil 18 Off-street parking and loading. (See§ 240-33.) 19 ill 20 Outdoor storage. 21 .(fil_ 22 Home occupation.
23 ffi 24 Fence and wall. 25 .@_ 26 Garage. 27 fil 28 Storage of a recreational vehicle as an accessory to a dwelling. 29 .(lfil._ 30 Private greenhouse. 31 Qll 32 Tennis court. 33 ill)_ 34 Swimming pool.
35 Qll 36 (Reserved)ill 37 ill 38 Editor's Note: Former Subsection E(13), which listed keeping of animals or fowl as a permitted 39 accessory use, was repealed 2-19-2019 by Ord. No. 129-A-2019. 40 .Q1)_ 41 Temporary use. 42 .Ll2)_ 43 Day-care center as an accessory use. 44 {.lfil_ 45 No-impact home-based business as accessory to a residential dwelling. 46 [Added 10-21-2003 by Ord. No. 129-1-03]
4
1 L 2 Design and landscaping controls. The following shall apply within the 1-1 District: 3 [Amended 4-7-2015 by Ord. No. 129-E-2015]
4 ill 5 All applicable controls in § 240-27C and _B. 6 ill_ 7 New structures built after April 7, 2015, shall incorporate a complete visual screen for all rooftop 8 structures (except roof-mounted solar panels), including but not limited to heat pumps, cooling 9 towers and other mechanical equipment. All rooftop structures ( except roof-mounted solar 10 panels) shall be screened from view by a single piece of the building structure which is 11 aesthetically compatible in design, materials and color with the building facade and which is at 12 least equal in height to the highest rooftop structure. (See examples in Sketch Dill in the 13 Appendix.) 14 ill 15 Editor's Note: Sketch D is included as an attachment to this chapter. 16 fil 17 For structures built prior to April 7, 2015, an existing rooftop structure may be replaced with a 18 new rooftop structure of the same ( or smaller) size in the same location. If the replacement 19 rooftop structure is larger than the existing rooftop structure or is placed in a new location on the 20 roof, or if a new rooftop structure ( except rooftop solar panels) is proposed to be installed, the 21 rooftop structure shall be painted to be aesthetically compatible in color with the majority of the 22 other rooftop structures and the building facade. If the rooftop structure cannot be painted for any 23 reason, it shall be screened as required by Subsection F(2) of this section. 24 Q_ 25 Lot area, width, building coverage, height and yard regulations. The following requirements 26 apply to each use in the 1-1 District, unless a more restrictive provision in another section of this 27 chapter applies. All uses in this district shall be serviced by centralized sewage disposal and 28 centralized water supply systems. 29 [Amended 6-1-1999 by Ord. No. 129-D-99]
1-1 Principal Uses
Requirements Restaurant Minimum lot area 2 acres Minimum lot width
At building setback line 200 feet At street line 150 feet Maximum land coverage
By buildings 30% By total impervious cover 50% Maximum building height
Stories 3
5
Bank, Savings and Loan, Post Office, All Other Fire Station Uses 2 acres 4 acres
200 feet 200 feet 150 feet 150 feet
30% 30% 50% 50%
3 3
Requirements
Feet Minimum front yard
1-1 Principal Uses
Restaurant 35 feet 50 feet*
Bank, Savings and Loan, Post Office, All Other Fire Station Uses 35 feet 35 feet 50 feet* 50 feet* Minimum side yard 50 feet each 50 feet each 50 feet each Minimum rear yard 100 feet 100 feet 100 feet *No truck loading docks and no outdoor industrial storage shall occur within the required minimum front yard. A maximum of 10% of the required minimum front yard may be covered with impervious surfaces, with the remainder of such yard being landscaped.
1 § 240-20. 1-2 Planned Business, Research and Limited Industrial District.
2 &_ 3 Specific intent.
4 ill 5 In addition to the objectives stated in§§ 240-3 and 240-18, the I-2 District is intended to provide 6 the opportunity for carefully selected businesses, including office and research facilities and 7 certain manufacturing uses in an attractive, well-planned and well-designed setting, meeting 8 specific performance criteria, and to provide opp01iunities for residential use. 9 ill_ 10 By achieving the land use performance standards and site characteristics established in this 11 district and by preserving opportunities for the appropriate residential development, this district, 12 when developed, will benefit the local economy, preserve and enhance open space and retain an 13 atmosphere that will be compatible with the existing character of the Township. 14 IL
15
Special definitions. The following definitions shall have the following meanings for the purposes 16 of this section,§ 240-270 or any other sections which specifically incorporate these definitions 17 by reference: 18 SITE ENTRANCE(S) 19 A point(s) of ingress or egress providing access to the district from East Boot Road, Line 20 Road and/or Paoli Pike, excluding, however, public recreation, planned golf course 21 development, existing residential use, existing land.developments devoted to life-care, 22 public recreation or agricultural uses. 23 [Amended 11-1-1999 by Ord. No. 129-G-99] 24 PERIMETER BUILDING SETBACK 25 The distance that buildings (excluding guardhouses at site entrances) and outside storage 26 (other than temporary crop storage) must be set back from the respective center lines of 27 East Boot Road, Line Road and/or Paoli Pike. 28 [Amended 1-25-2000 by Ord. No. 129-B-00] 29 ill
6
1 The minimum perimeter building setback shall be 330 feet (as measured from the road center 2 line) in all areas along Paoli Pike, Line Road and East Boot Road, except it shall be 150 feet (as 3 measured from the road center line) along East Boot Road and Line Road for a distance of 2,400 4 feet west of the center line of Line Road and 2,500 feet north of the center line of East Boot 5 Road respectively.ill
6 ill 7 Editor's Note: For the purposes of this chapter, provision of said perimeter building setback shall 8 be deemed to have satisfied the buffer requirements of§ 240-27C(2) of and (3) of this chapter
9 and § 205-60 of Chapter 205, Subdivision and Land Development. 10 fil 11 Individual access(es) to a lot(s) from a site entrance shall only be permitted within the perimeter 12 building setback if such access( es) results in less environmental disturbance and/or may preclude 13 the need for a separate driveway access to a lot from East Boot Road, Line Road and/or Paoli 14 Pike.ill 15 ill 16 Editor's Note: For the purpose of this chapter, limitations for site entrances shall be interpreted in 17 conjunction with the requirements of§ 240-27B(2) and G(l)(c). rn h 19 Uses permitted by right. The following principal uses are permitted by right in the I-2 District, 20 subject to §§ 240-25 and 240-26:Ll] 21 ffi 22 Agricultural uses in accordance with § 240-34, including crop storage, agricultural/business and 23 dairy and livestock. 24 fil 25 Single-family detached dwellings pursuant to the R-2 District regulations of§ 240-9 (other than 26 single-family cluster developments, which are addressed in Subsection D). 27 fil 28 A research, testing or experimental laboratory or facility for research or product development, or 29 a research laboratory for scientific, industrial, agricultural or engineering purposes, but not
30 including any project with the potential of creating an environmental or genetic hazard. 31 fil 32 Manufacturing when limited to pilot studies and prototype development for the production and 33 testing of precision instruments, optical goods, pharmaceutical, health and personal care and 34 similar products. 35 .G.l_ 36 Business, professional and/or governmental offices. 37 @_ 38 Planned golf course development, subject to § 240-30.1. 39 [Added 11-1-1999 by Ord. No. 129-G-99] 40 ffi 41 Forestry in accordance with the standards of§ 240-34.1. 42 [Added 10-29-2002 by Ord. No. 129-Q-02] 43 .@_ 44 Single-family detached dwellings in accordance with§ 240-30.1 C(2)(a), provided the dwelling 45 units are served by a centralized public water supply system and a centralized sewage disposal 46 system.
7
1 [Added 5-4-2004 by Ord. No. 129-D-04] 2 ill 3 Editor's Note: For the purposes of Subsections C and D, multiple principal uses shall be 4 pe1mitted on a lot and/or in a building.
5 IL 6 Permitted conditional uses. The following principal uses are permitted in the I-2 District when 7 authorized by the Board of Supervisors in accordance with § 240-31 of this chapter, including 8 but not limited to the traffic standards in § 240-31 C(2):
9 ffi 10 Production, testing, storing, manufacturing, assembly, packaging and/or distributing facilities for 11 precision instruments, pharmaceutical goods, optical goods, jewelry, electronic, computer and 12 similar products not involving any retail activity on the lot and other than uses that are permitted 13 by right under Subsection C. 14 {l)_ 15 Life care development pursuant to § 240-31. 16 fil 17 Publicly owned recreation, golf course or private riding academy. 18 fil 19 Medical facility for patient care supplementary to normal hospital services, but excluding 20 hospitals. 21 fil 22 Single-family cluster developments within the regulations of the R-2 District and§ 240-28. 23 ®._ 24 Treatment center, within the requirements for such use in § 240-31. 25 ffi 26 Wireless communications facility and commercial radio or television tower/antennas, subject to
27 § 240-31 C(3)(h). 28 [Amended 4-7-1998 by Ord. No. 119-A-98] 29 .{fil_ 30 Parking garage or deck. 31 fil 32 Storage shed. 33 .QQl_ 34 Manufacturing facility of jewelry, precision instruments, optical goods and similar products. 35 .Llll. 36 Indoor recreation facility, such as bowling alleys, indoor baseball practice or miniature golf.
37 .{J1l_ 38 Standard restaurant, not including fast-food restaurant, food stand or drive-through service. 39 .{Ll.l 40 Helipad as an accessory use. 41 .cH}_ 42 Nursing home or personal care home. 43 fLll. 44 Place of worship. 45 .Ll.fil_ 46 Adult use.
8
1 .Ll1l 2 Fire or ambulance station. 3 .Qfil_ 4 Conference center. 5 Q.2l_ 6 Exercise/health/tennis clubs. 7 .@}_ 8 A lawfully permitted dwelling unit used as a group home, provided that the requirements for 9 such use in § 240-3 8 are met. 10 Q.ll 11 Day-care center, child or adult, in accordance with§ 240-31. 12 Q2}_ 13 Assembly of electronic equipment, such as computer hardware. 14 illl_ 15 Public utility facility and public utility building. 16 [Amended 3-17-2015 by Ord. No. 129-C-2015] 17 .(l4}_ 18 Treatment center. 19 Q2l_ 20 Single-family open space development in accordance with§ 240-36. 21 Q§l_ 22 Mineral extraction in accordance with the standards in§ 240-31C(3)(uu). 23 [Added 10-29-2002 by Ord. No. 129-Q-02] 24 {11)_ 25 Caniage homes in accordance with the standards set fo1ih in § 240-31 C(3)(vv). 26 [Added 2-22-2005 by Ord. No. 129-A-05] 27 Q.fil_ 28 Medical marijuana grower/processor. 29 [Added 7-11-2017 by Ord. No. 129-B-2017] 30 .E.,_ 31 Accessory uses. In addition to the accessory uses already permitted in all districts pursuant to 32 § 240-32, the following accessory uses shall be permitted in the I-2 District: 33 ffi 34 Cafeteria for employees only. 35 fil 36 Off-street parking and loading for the purpose of serving a use(s) permitted in the district 37 pursuant to § 240-33 of this chapter. 38 fil 39 Signs pursuant to § 240-22. 40 fil 41 Other uses customarily accessory and incidental to the principal uses permitted in the I-2 42 District. 43 fil 44 Outdoor recreational facilities for employees as provided by employers in the district. Said 45 facilities may be utilized by others at the discretion of the owner of said facilities. 46 fil
9
1 Day-care center. 2 ffi 3 Storage of a recreational vehicle as accessory to a dwelling. 4 .(fil_ 5 Home occupation as accessory to a dwelling.
6 fil 7 Solar energy systems. 8 ilQl_ 9 Fences and walls. 10 ill)_ 11 Antique shop as an accessory use operated from a building eligible for inclusion on the National 12 Register of Historic Places. 13 [Added 5-7-2002 by Ord. No. 129-1-02] 14 .(ill 15 No-impact home-based business as accessory to a residential dwelling. 16 [Added 10-21-2003 by Ord. No. 129-1-03] 17 L 18 Development regulations. Uses pe1mitted in the I-2 District shall be subject to the following 19 regulations: 20 ill_ 21 All uses shall be subject to the minimum perimeter building setback requirements specified in 22 Subsection F(3), except those lots within the 1-2 District devoted to: 23 [Amended 11-1-1999 by Ord. No. 129-G-99]
24 f& 25 Either life-care development or single-family residential dwellings prior to November 9, 1993; 26 fhl_ 27 Planned golf course development; or 28 fil
29 Public recreation.
30 .@_ 31 Buildings which would be eligible for inclusion on the National Register of Historic Places. 32 [Added 4-18-2000 by Ord. No. 129-F-00] 33 hl 34 Carriage homes in accordance with the standards set forth in § 240-31 C(3)(vv). 35 [Added 2-22-2005 by Ord. No. 129-A-05] 36 ill_ 37 Minimum requirements for specific uses within the 1-2 District: 38 [Amended 11-1-1999 by Ord. No. 129-G-99; 4-18-2000 by Ord. No. 129-F-00] 39 f& 40 All uses, except permitted agriculture, recreation, life-care development, single-family detached 41 dwellings, single-family cluster development, buildings which would be eligible for inclusion on 42 the National Register of Historic Places and planned golf course development, shall be subject to 43 the lot width, height and yard regulations established in Subsection F(3). 44 fhl_ 45 Permitted agriculture, recreation, life-care development, single-family detached dwellings, 46 single-family cluster development, buildings which would be eligible for inclusion on the
10
1 National Register of Historic Places and planned golf course development shall be subject to the 2 lot area, lot width, height limit, yard requirements and design standards as provided for in 3 Subsections C and D of this§ 240-20 and all other applicable provisions of this chapter.
4 fil 5 A planned golf course development shall not be subject to the perimeter building setback 6 requirements specified in Subsection F(3), but rather shall be governed by the design standards 7 set forth in§ 240-30.1 of this chapter. Buildings which would be eligible for inclusion on the 8 National Register of Historic Places shall not be subject to the requirements specified in 9 Subsection F(3), but rather shall be subject to the requirements specified in Subsection F(4). 10 .@_ 11 Caniage homes in accordance with the standards set forth in§ 240-31 C(vv) shall not be subject 12 to the perimeter building setback requirements specified in Subsection .EQ) but rather shall be 13 governed by the requirements set forth in§ 240-31 C(3)(vv). 14 [Added 2-22-2005 by Ord. No. 129-A-05] 15 fil 16 Minimum requirements for uses within the I-2 District: 11 hl 18 Minimum perimeter building setback: 330/150 feet. [See Subsection B(2).] 19 ilil. 20 Minimum lot width: 21 ill 22 At building setback line: 200 feet. 23 fil 24 At street line: 50 feet.ill 25 ill 26 Editor's Note: All lots not having street frontage as required by§ 240-23B(2) of this chapter and 27 § 205-55K of Chapter 205, Subdivision and Land Development, must demonstrate a permanent 28 means of access to a street and, upon so doing, shall be deemed to have satisfied these 29 requirements. 30 fil 31 Minimum front yard: 50 feet.
32 .@_ 33 Maximum building height:_[2}
34 ill 35 Zone A: 45 feet. 36 [Amended 11-1-1999 by Ord. No. 129-G-99] 37 fil 38 Zone B: 45 feet. 39 fil 40 Zone C: 60 feet. 41 ill 42 Editor's Note: Height zones, for the purpose of this section, shall be defined as follows: "Zone A" 43 shall be that portion of the district which extends inward from the center line of Paoli Pike for a 44 distance of 500 feet and from the center lines of Line Road and East Boot Road for a distance of 45 750 feet. "Zone B" shall be that portion of the district more than 500 feet from the center line of 46 Paoli Pike and more than 750 feet and less than 1,200 feet from the center lines of Line Road and
11
1 East Boot Road. "Zone C" shall be that portion of the district more than 500 feet from the center 2 line of Paoli Pike and more than 1,200 feet from the center lines of Line Road and East Boot 3 Road. 4 hl 5 Minimum rear yard: 50 feet. 6 ill_ 7 Minimum side yard:.(fil 50 feet. 8 .(fil 9 Editor's Note: To promote the integration of buildings and activities within this district, open or 10 enclosed driveways not to exceed 24 feet in width, sidewalks and/or paths between buildings 11 and/or lots are permitted within the required side and rear yards and may extend up to the side 12 and/or rear lot lines for purposes of facilitating said interconnections. In no event shall said 13 interconnections be permitted within the perimeter building setback. (See Sketch F in the 14 Appendix.) 15 .(g)_ 16 Two or more principal buildings may be constructed on a lot without conforming to the 17 requirements of§ 240-23B(l), provided that the final land development plan contains the 18 following statement: "The office buildings depicted on this plan shall not be sold separately 19 unless further subdivision approval from this Township is granted and the land upon which the
20 buildings are situated remains in single, undivided common ownership." A subdivision plan 21 which consists only of the building footprint as a separate lot shall be accompanied by restrictive 22 covenants, easements and/or deed restrictions which provide for shared access, parking and 23 utility usage, in form and content acceptable to the Township Solicitor and shall be recorded with 24 the final subdivision and land development plan. 25 [Added 11-1-1999 by Ord. No. 129-G-99] 26 .{h)_ 27 In order to allow for excellence in design and the preservation of existing trees, strict adherence 28 to the requirements of§ 240-33C(3) shall not be required in this district, provided that the 29 following criteria are met where applicable: 30 [Added 11-1-1999 by Ord. No. 129-G-99] 31 [ll 32 The applicant demonstrates, during the subdivision and land development process, that the 33 proposed parking layout is superior in form and function to the parking layout otherwise required 34 by§ 240-33C(3). 35 fil 36 The proposed layout will, wherever possible, result in the preservation of existing specimen 37 trees. 38 fil 39 National Register of Historic Places eligible buildings. 40 [Added 4-18-2000 by Ord. No. 129-F-00] 41 .ill)__ 42 The original footprint of any building, which for purposes of this section is defined to mean the 43 perimeter of the historic building coincident with the building's foundation, which would be 44 eligible for inclusion on the National Register of Historic Places, plus an area for expansion 45 which shall not exceed 50% of the original footprint, may be subdivided from a parent lot and
12
1 conveyed irrespective of the requirements of Subsections F(3)(a), ili), {0, ill and ill, provided 2 that the applicant demonstrates during the subdivision and land development process that: 3 ill 4 The proposed renovation and/or use of the building will result in preservation of the building;
5 ill 6 There is sufficient area on the parent lot, from which the building footprint is being subdivided, 7 to contain the required parking and stormwater management facilities necessary to support the
8 proposed use of the building;
9 fil 10 The area of the proposed expansion is based upon the original footprint of the historic building as 11 it existed on the date of the adoption of this section. 12 .(hl_ 13 The subdivision plan shall contain the following information, in addition to that required by 14 Chapter 205, Subdivision and Land Development: 15 ill 16 The original building footprint and a statement noting the proposed use of the building;
17 ill 18 An expansion area of not more than 50% of the original building footprint, provided that the 19 expansion shall not result in any encroachment into any required yard or building setback area 20 nor increase any existing nonconformity of the building by a greater encroachment into any such 21 required yard or building setback area; 22 fil 23 The location of any easements required for utilities, common areas, access, parking, stormwater 24 management facilities and building maintenance;
25 Bl 26 The location of any limited common area around the building that is intended for use by the 27 owner of the building. The written agreement of the owner of the common area allowing an
28 easement for same; and 29 fil 30 Renderings, architectural details and elevations which depict the facade treatment for the existing 31 building, such as to retain its historic character, as well as the proposed fifty-percent expansion,
32 which shall be architecturally consistent with the existing historic structure. 33 hl 34 The subdivision plan shall be accompanied by the following documents, which shall be, in the 35 form and content, acceptable to the Township Solicitor, and they shall be recorded 36 contemporaneously with the final subdivision plan. The Board of Supervisors shall be given the
37 right but not the obligation to enforce all of the following covenants, easements, restrictions, 38 none which shall be modified or extinguished without the prior written approval of the Board of 39 Supervisors. 40 ill 41 Restrictive covenants, easements and/or deed restrictions which provide for access, parking, 42 common areas, sto1mwater management and utilities; 43 ill 44 A covenant describing the maintenance responsibilities for the limited common area intended for 45 the use of the owner of the building; and 46 fil
13
1 A facade easement, which shall require that the existing facade of the historic building shall be 2 retained in its essential form, including any historic elements of the building which identify its 3 historic character, excepting only such betterments as are approved by the Board of Supervisors. 4 The facade easement shall also describe the facade treatment for the fifty-percent expansion area. S Q,_ 6 Site plan and phasing plan regulations. 7 ill 8 In addition to and in conjunction with the submission of any application for a land development, 9 a site plan for the land development at a scale of one inch equals 200 feet shall be submitted 10 depicting only the proposed development, perimeter building setback, floodplain, wetlands and 11 all existing/as-built development. 12 ffi. 13 A land development proposed to be constructed in phases shall contain a phasing plan at a scale 14 of at least one inch equals 200 feet.Ill 1s Ill 16 Editor's Note: Former Subsection 0(3), regarding rooftop structures, which immediately 17 followed this subsection, was repealed 7-7-2015 by Ord. No. 129-F-2015. 13 lL 19 Design and screening. 20 [Added 4-7-2015 by Ord. No. 129-E-2015] 21 ill 22 New structures built after April 7, 2015, shall incorporate a complete visual screen for all rooftop 23 structures (except roof-mounted solar panels), including but not limited to, heat pumps, cooling 24 towers and other mechanical equipment. All rooftop structures ( except roof-mounted solar 25 panels) shall be screened from view by a single piece of the building structure which is 26 aesthetically compatible in design, materials and color with the building facade and which is at 27 least equal in height to the highest rooftop structure. (See examples in Sketch Difil in the 28 Appendix.)
29 Ifil 30 Editor's Note: Sketch D is included as an attachment to this chapter. 31 ill. 32 For structures built prior to April 7, 2015, an existing rooftop structure may be replaced with a 33 new rooftop structure of the same ( or smaller) size in the same location. If the replacement 34 rooftop structure is larger than the existing rooftop structure or is placed in a new location on the 35 roof, or if a new rooftop structure ( except rooftop solar panels) is proposed to be installed, the
36 rooftop structure shall be painted to be aesthetically compatible in color with the majority of the 37 other rooftop structures and the building facade. If the rooftop structure cannot be painted for any 38 reason, it shall be screened as required by Subsection fill} of this section.
39 § 240-21. BP Business Park District.
40 41 Specific intent. In addition to the objectives stated in §§ 240-3 and 240-18, the BP District is 42 intended to encourage the development of a planned campus-like office, laboratory or production 43 research facilities and other uses which are compatible with sunounding residential uses and 44 which adhere to the performance standards (see§ 240-24). The BP District also encourages
14
1 excellence in site planning and building design, stringent traffic control and attractive 2 landscaping and screening.
3 IL 4 Uses permitted by right. The following principal uses are permitted by right in the BP District if 5 the area and bulk regulations and all other applicable requirements of this chapter are satisfied: 6 ffi 7 Agricultural uses in accordance with§ 240-34. 8 ill_ 9 Crop storage. 10 .Ql 11 Agricultural/business in accordance with § 240-34. 12 fil 13 Assembly of electronic equipment, including computer hardware. 14 ill_ 15 Development of computer software packages and related marketing and training facilities. 16 fil 17 Facility for providing services, repairs and maintenance to office equipment. 18 ffi 19 Computer training facilities. 20 _(fil_ 21 Forestry in accordance with the standards of§ 240-34.1. 22 [Added 10-29-2002 by Ord. No. 129-Q-02] 23 24 Permitted conditional uses. The following principal uses are permitted by condition in the BP 25 District in accordance with § 240-31: 26 ffi_ 27 Multiple uses in a multiple-use building with uses that are permitted in this section by right or by 28 conditional use and when specifically approved pursuant to § 240-31 C(3)(v). 29 [Amended 6-7-2011 by Ord. No. 129-F-1 l] 30 ill_ 31 Wholesaling facility, warehousing and distribution, but with the following uses specifically 32 being prohibited in the BP District:
33 fil 34 Truck terminal and/or outdoor overnight storage of trucks and trailers and/or material.
35 {hl_ 36 Self-storage developments and/or mini-warehousing. 37 .Ql 38 Fire or ambulance station.
39 fil 40 Standard restaurant (which may include occasional take-out service), but not including drive- 41 through service, food stand or fast-food restaurant. 42 fil 43 Manufacturing facility when limited to pilot studies and prototype development for the 44 production and testing of precision instruments, optical goods, pharmaceuticals, health and 45 personal care products and similar products.
46 fil
15
1 Conference center. 2 ffi 3 Wireless communications facility and commercial radio or television tower/antennas, subject to 4 § 240-31 C(3)(h). 5 [Amended 4-7-1998 by Ord. No. 119-A-98] 6 ffi. 7 Health/exercise/tennis clubs. 8 fil 9 Manufacturing facility of jewelry, precision instruments, optical goods and similar products. 10 ilQ)_ 11 Place of worship. 12 .Ll.ll. 13 Parking deck or garage. 14 Q1)_ 15 Public utility facility and public utility building. 16 [Amended 3-17-2015 by Ord. No. 129-C-2015] 17 Qll_ 18 Storage shed. 19 Q.1l. 20 Banks, savings and loan or other financial institutions. 21 .(Lll 22 Publicly owned recreational facilities. 23 (lfil_ 24 Golf course or private riding academy. 25 Q1l 26 Indoor recreation facility, such as bowling alleys, indoor baseball practice or miniature golf. 27 .Qfil_ 28 Facility for manufacture and assembly of any of the following products: 29 fil 30 Small electrical and electronic appliances, supplies and equipment. 31 (hl_ 32 Products from previously prepared nontoxic materials such as plastics, leather, glass, cellophane 33 or textiles.
34 il2l_ 35 Business, professional and governmental offices. 36 QQ)_ 37 Printing and publishing establishments. 38 Q.l)_ 39
Facility for scientific, industrial, agricultural or engineering testing purposes, excluding all 40 projects with the potential of creating an environmental or genetic hazard. 41 {2Z)_ 42 Testing or experimental laboratory for research or product development. 43 ill)_ 44 Parking in the front yard and impervious coverage expansion, subject to § 240-31 C(3)(gg). 45 [Added 4-7-1998 by Ord. No. 119-A-98] 46 Q1)_
16
1 Mineral extraction in accordance with the standards in§ 240-31C(3)(uu). 2 [Added 10-29-2002 by Ord. No. 129-Q-02] 3 .Ga 4 Cyber charter school. 5 [Added 4-18-2006 by Ord. No. 129-B-06] 6 .G.& 7 Medical marijuana grower/processor. 8 [Added 7-11-2017 by Ord. No. 129-B-2017]
9 I1._ 10 Uses permitted by special exception: none. 11 E_,_ 12 Accessory uses. The following accessory uses shall be permitted in the BP District in accordance 13 with§ 240-32 or such other section listed after each use and all other provisions of this chapter: 14 ill 15 Solar energy systems. 16 ill_ 17 Cafeteria or recreational facilities for employees only. 18 Ql 19 Signs. (See§ 240-22.) 20 fil 21 Off-street parking and loading. (See§ 240-33.) 22 ffi 23 Outdoor storage. 24 .(fil_ 25 Home occupation. 26 ffi 27 Fence and wall. 28 .(fil_ 29 Garage. 30 .(2)_ 31 Recreational vehicle. 32 .QQ)_ 33 Private greenhouse. 34 Qll 35 Tennis court. 36 Q1l 37 Swimming pool. 38 DJl 39 Animal husbandry. 40 .(ill 41 Temporary use. 42 .(Lll 43 Day-care center for the dependents of the employees of the principal use as well as the 44 dependents of employees of other principal uses in this district. 45 .Ll.fil_ 46 No-impact home-based business as accessory to a residential dwelling.
17
1 [Added 10-21-2003 by Ord. No. 129-L-03] 2 E._ 3 Design and landscaping controls. The following shall be applicable for all uses in the BP 4 District: 5 [Amended 4-7-2015 by Ord. No. 129-E-2015]
6 ill 7 All applicable controls in § 240-27C and ,E. 8 ill_ 9 New structures built after April 7, 2015, shall incorporate a complete visual screen for all rooftop 10 structures (except roof-mounted solar panels), including but not limited to heat pumps, cooling 11 towers and other mechanical equipment. All rooftop structures ( except roof-mounted solar 12 panels) shall be screened from view by a single piece of the building structure which is 13 aesthetically compatible in design, materials and color with the building facade and which is at 14 least equal in height to the highest rooftop structure. (See examples in Sketch Dill in the 15 Appendix.) 16 ill 17 Editor's Note: Sketch D is included as an attachment to this chapter. 18 ffi 19 For structures built prior to April 7, 2015, an existing rooftop structure may be replaced with a 20 new rooftop structure of the same ( or smaller) size in the same location. If the replacement 21 rooftop structure is larger than the existing rooftop structure or is placed in a new location on the 22 roof, or if a new rooftop structure ( except rooftop solar panels) is proposed to be installed, the 23 rooftop structure shall be painted to be aesthetically compatible in color with the majority of the 24 other rooftop structures and the building facade. If the rooftop structure cannot be painted for any 25 reason, it shall be screened as required by Subsection F(2) of this section. 26 fil 27 Businesses are strongly encouraged to provide informal outdoor eating areas for employees, such 28 as picnic tables with landscaping and trash receptacles. 29 Q_,._ 30 Lot area, width, building coverage, height and yard regulations. The following requirements 31 apply to each use in the BP District, subject to fmther applicable provisions of this chapter. All 32 uses in this district shall be serviced by centralized sewage disposal and centralized water supply 33 systems. 34 [Amended 6-1-1999 by Ord. No. 129-D-99]
BP Principal Uses Requirements All Uses Minimum lot area 4 acres Minimum lot width
At building setback line 400 feet At street line 300 feet Maximum land coverage
By buildings 30% By total impervious cover 50% Maximum building height
18
1
BP Principal Uses Requirements All Uses Stories Feet Minimum front yard Minimum side yard Minimum rear yard
3 35 feet 100 feet 50 feet each 50 feet
19
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 8/28/2020 To: Planning Commission From: Mark Gordon, Zoning Officer Re: Pipeline Ordinances
Dear Commissioners,
The Board of Supervisors accepted the PC recommendation and would like the PC to continue working on this by doing the following:
1. Identify uses that should not be located near pipelines 2. Identify what zoning districts those uses are currently permitted 3. Identify parcels where these uses could be located safely
F:\Data\Shared Data\Admin Dept\Township Code\Pipeline Zoning\Memo to PC re. Pipeline ords 08282020.doc
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 8/27/2019 To: Planning Commission o/4 tO, From: Mark Gordon, Township Zoning Officer
Re: CFA-MTF Grant Application Letter of Support
Dear Commission Members,
We are working on a grant application for PA State Funding to assist with construction costs for Segment B of the Paoli Pike Trail (Ellis Ln. to Reservoir Rd.).
I have drafted a letter of support for your consideration.
Draft Motion:
Mr. Chairman, I move that the Planning Commission send a letter of support to the DCED for the Township's CFA-MTF Grant Application for segment B of the Paoli Pike Trail.
F:\Data\Shared Data\ABC'S\Planning Commission\2020 Letters of Reccomendation\Memo to PC Re. CFA MTF LOS 08272020.doc
September 3, 2020
PA Department of Community and Economic Development Center for Business Financing - Grants Division
Multimodal Transportation Fund Commonwealth Keystone Building 400 North Street, 4th Floor Harrisburg, PA 17120-0225
Re: East Goshen Township, Chester County
Commonwealth Finance Authority - Multimodal Transportation Fund
To whom it may concern:
This letter shall certify that the proposed Paoli Pike Trail construction project that East Goshen Township is has submitted for funding consideration through the CFA Multi Modal Transportation Fund is consistent with the East Goshen Township Comprehensive Plan 2015 and the land use goals outlined within the plan. The Paoli Pike Trail is also consistent with the Paoli Pike Trail Master Plan and Feasibility Study and the Paoli Pike Corridor Master Plan, adopted by the Board of Supervisors in 2016 and 2017 respectively. The trail will provide an additional transportation alternative, reduce traffic along Paoli Pike, and improve air quality.
The Paoli Pike Trail Project traverses the entire span of Paoli Pike throughout the Township. CFA -MTF Funds for this project will be utilized to construct Segment B of the trail, a .6 mile segment that crosses wetlands and the Chester Creek. Engineering and permitting for Segment B has been completely funded by East Goshen Township and is nearing completion . We look forward to moving forward with this project as it serves to benefit the community in the following ways:
• Create a safe and connected transportation network that offers people multiple options for travel. • Promote non-motorized travel to reduce congestion and improve air quality. • Support multimodal transportation and recreation, including trips to school, work, shops, and parks. • Expand access to recreational resources, including the Township's park facilities. • Link existing businesses and support future commercial opportunities, particularly in the Town Center. • Minimize negative impacts on sensitive environmental and cultural resources.
The East Goshen Township Planning Commission supports the Paoli Pike Trail Project and the CFA-MTF application for funding. Thank you for your consideration of this worthwhile project.
Sincerely,
Ernest Harkness, P.E. Chairman
F:\Data\Shared Data\ABC'S\Planning Commission\2020 letters of Reccomendation\EGT PC LOS 2020 CFA MTF.doc