Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, January 6, 2021 VIA Telephone/ Video Conference

7:00 PM

During this tele-conference Planning Commission meeting, public comment will be handled as follows:

• Participants must call in by 6:55 pm. • The public will be muted during the meeting when the Commission is conducting business. • The Chairman will ask for any public comment on agenda items. Audience members who wish to make comments must unmute, identify themselves with name and address, to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time.

A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. December 2, 2020 F. Subdivision and Land Development Applications G. Conditional Uses and Variances H. Ordinance Amendments

1. Pipeline Hazard Mitigation/ Pipeline Consultation Zone (DRAFT} I. Old Business J. New Business K. Any Other Matter L. Liaison Reports M. Correspondence N. Announcements

1. Annual Township Planning Session: January 26, 2021 / 6:30 PM Via Zoom. Meeting link will be posted on the Township Website. 2. Business Park Task Force Meeting January 5, 2021 7:00 PM Via Zoom. Meeting link will be posted on the Township Website.

Bold Items indicate new information to review or discuss.

F:\Data\Shared Data\Agendas\Planning Commission\2021\PC AGENDA 01062021.doc

January 6, 2021 PC Meeting

(.)

(/) >

(/) 0 "!, C -!. ::::> ii:' a:- C 0 ., .!:! ., CL Application Name ;;- ?:: Pipeline HMS / Consultation Zone Ord. ZO/SALDO DRAFT Bold = New Application or PC action required

Completed in 2020

1631 E. Strasburg Rd V Sk Solar Ordinance Amendment zo Sk Synthes USA/ 1303 Goshen Parkway LD P/F Boyle, 1137 N. Chester Rd. V Sk

East Goshen Township Planning Commission

Application Tracking Log

-'" Ill .,., < ·= - "' ci. C 0 w CL a. :E "' C "' C (.) = ;: a. :::, (.) .c "Cl ., ., - (.) < ., Li: C 0 0 0 - - - ., t: ., ., ., - ., - - - ., - ., ., ., C (/) C C C NA NA NA NA NA

9/29/2020 9/29/2020 NA NA 10/2/2020 10/30/2020 NA NA NA NA 4/27/2020 5/6/2020 4/28/2020 4/30/2020 4/30/2020 7/29/2020 7/29/2020 NA NA 7/31/2020

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2021\PC Tracking Log for 01062021.xlsx

.s .s ., ., C C C C 0 ., - 0 :;:: ., ., :;:: " - "Cl " < ., "Cl "' C < C - 0 I- ., C ·;;; I- ..J "' ., ., ..J z C C E C ., z (/) ·;:: CL E .l 0 ., 0 (.) ., 0 w a. Ill :I: C (.) NA NA NA NA NA NA

1017/2020 10/20/2020 10/27/2020 11/28/2020 NA NA 12/1/2020 NA NA 1 9/15/2020 9/2/2020 NA 10/2/2020 9/2/2020 9/15/2020 8/26/2020 9/25/2020

12/31/2020

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

December 2, 2020

The East Goshen Township Planning Commission held their regular monthly meeting on Wednesday December 2, 2020. Because of the COVID-19 restrictions the meeting was held via teleconference using Zoom. Members present are highlighted: Chair -Ernest Harkness Vice Chair -John Stipe Dan Daley Edward Decker Michael Koza Mark Levy

Michael Pagnanelli Also present were:

Mark Gordon, Zoning Officer Kristin Camp, Esq, Township Solicitor Christina Morley, Pipeline Taskforce member

COMMON ACRONYMS:

BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission

A. FORMAL MEETING - 7 p.m.

CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management

ZHB -Zoning Hearing Board

1. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders, military and healthcare providers.

2.

Ernest asked if anyone would be recording the meeting and if there were any public

comments about non-agenda items. There was no response. 3. Ernest checked the log. 4. The minutes of the November 4, 2020 meeting were approved as amended.

B. OLD BUSINESS

1. High Intensity Uses/Pipeline Considerations - Review of first draft - Mark Gordon reviewed the draft. The Pipeline Hazard Mitigation Study would be required for anything within 1,000 ft. of any existing pipeline. Kristin feels this will get the most information from an applicant at the outset. This would be part of the Subdivision and Land Development applications. The study would have to be done by a professional. Dan feels that it should be done by a professional specializing in pipelines. He feels this would probably be someone who works for the pipeline company. The type of materials in the pipeline are very impmtant in planning. Pipelines can change the content of an existing pipeline without permits. Kristin doesn't feel that this study should be required for all conditional use applications. We need to look at all of the conditional uses to see which would need the pipeline study. Dan gave an example: the IBM building across from the township building was changed to a school. So that change in use would not include Land Development and would not need a pipeline study. Pipeline design and hazard mitigation are two different things. Mark Gordon suggested adding wording about the engineer "with

appropriate experience." Kristin feels the applicant should meet with the local emergency management team. Mark Gordon will add emergency vehicle access at 4(d). Mike Koza feels it may be too restrictive for property owners seeking to do a small project. He thought this was going to be an Awareness Ordinance for use by developers. Is 1,000 ft. standard. Mark Gordon mentioned that he has seen 660 ft. as a distance from the pipeline. Mike K. asked ifthere is a definition for a pipeline. Mark Gordon will

PC 12-2-20 draft 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

add this. Also, Mark mentioned that the first pipelines were carrying liquids. Now they are converting to high pressure gases. Kristin commented that the applicant would be giving content information as of that point in time. They could not predict what the contents will be in the future. Mike P. mentioned demolition. If a building is going to be taken down and new building constructed, do they need two applications? Mark Gordon commented that they may have to put something in the building ordinance. Mike P. asked if the applicant is going to be able to get all the information about the pipeline that they need from the utility. Mark Gordon commented that this information is available to the public. John asked if the term transcounty should be included. Mark Gordon commented that inter or intra are used. Dan mentioned that these are transmission pipelines. The small pipelines in developments are service lines. Christina Morley is encouraged by all of the work that's being done with this project. She feels we

should include that the engineer must be PA licensed. In all of the DEP and Sunoco studies the State required them to be signed by a PA licensed engineer. She asked that a copy of the proposed document be provided to the Pipeline Taskforce for review. She asked that the Planning Commission and the Taskforce continue to work together.

C. NEW BUSINESS

I. 2021 Goals - Mark mentioned that the Annual ABC meeting will be held on Tuesday January 26, 2021 at 6:30 pm. Ernest reviewed the status of the 2020 goals. The 2021 goals can be finalized at the January 6, 2021 meeting.

D. ANY OTHER MATTER

1. Mark Gordon reported that traffic signal inspections and DEP inspection are all that are needed to be done on the Paoli Pike Trail. 2. Mark Gordon repmted that Hankin has a buyer for their propeity in the business park along Paoli Pike.

E. LIASION REPORT

1. Mark Gordon repotted that the draft of the 2021 township budget is posted on the website. They will have a final vote on December 15t1,. They deferred some spending to 2022.

F. ADJOURNMENT Ernest thanked everyone for all of the work they did this year and wished them a safe and happy holiday. There being no further business, Mike K. made a motion to adjourn the meeting. John seconded the motion. The meeting was adjourned at 8:30 pm. The next regular meeting will be held on Wednesday, January 6, 2021 at 7:00 pm.

Respectfully submitted, ____________________ _

Ruth Kiefer, Recording Secreta,y

PC 12-2-20 draft 2

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 12/31/2020 To: Planning Commission From: Mark Gordon, Zoning Officer Re: Pipeline Hazard Mitigation Ordinances

Dear Commissioners,

Staff and the Solicitor have drafted an amendment to the SD&LD and Zoning Ordinances to address Pipeline safety and future development in the Township. The proposed ordinances will require new development within 660 feet of the centerline of the pipeline, to prepare a Pipeline Hazard Mitigation Study (PHMS). It will also require certain new uses to prepare the Pipeline Hazard Mitigation Plan should the new use require Conditional Use Approval.

The 660 foot requirement is outlined in both the Pipeline Hazard Materials Safety Administration (PHMSA) and the Pipelines and Informed Planning Alliance (PIPA) as the appropriate consultation zone distance for both Natural Gas and Hazardous Liquids Pipelines.

As luck would have it, as we were doing some final research this morning, we came across a model 11Consultation Zone" ordinance that we like and covers down on the 11Awareness

Ordinance" aspect that David Shuey had discussed with the PC.

I have included for your review the PHMS ordinance that we developed in house, and the model 11Consultation Zone" ordinance from PHMSA, along with some supporting information.

Please review these ordinances and we can discuss on Wednesday evening.

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline HM Ord (SALDO)\Memo to PC re. PHMS ords 12312020.doc

EAST GOSHEN TOWNSHIP

CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO. 2021-__

AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP CODE, CHAPTER 205 TITLED "SUBDIVISION AND LAND DEVELOPMENT" SECTION 205-7 TITLED "DEFINITIONS" TO ADD A DEFINITION FOR HAZARDOUS LIQUID PIPELINE AND NATURAL GAS TRANSMISSION PIPELINE AND TO ADD A NEW SECTION 205-40.1 TITLED "PIPELINE HAZARD MITIGATION STUDY."

BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township pursuant to the Board's power to adopt ordinances necessary to secure the health, safety and welfare of the citizens of the Township pursuant to Section 1506 of the Second­ Class Township Code, 53 P.S. §66506, and pursuant to the authority in the Pennsylvania Municipalities Planning Code, 53 P.S. § 10101 et seq., the Board enacts and ordains as follows:

SECTION 1. Chapter 205 of the East Goshen Township Code, titled, "Subdivision and Land Development", Section 205-7 titled "Definitions" shall be amended by adding the following new definitions:

Hazardous Liquid Pipeline - any pipeline designed for transmission of a hazardous liquid as regulated by CFR Title 49, Section 195.2.

Natural Gas Transmission Pipeline - any transmission pipeline regulated by CFR Title 49, Section 192.3.

SECTION 2. Chapter 205 of the East Goshen Township Code, titled, "Subdivision and Land

Development" shall be amended to add a new Section 205-40.1 titled "Pipeline Hazard Mitigation Study" which shall provide as follows:

"§ 205-40.1 Pipeline Hazard Mitigation Study.

A. Applicability. A pipeline hazard mitigation study ("PHMS"), prepared by and sealed by a professional engineer licensed in the Commonwealth of Pennsylvania shall be submitted to the Township, with the following submissions:

(1) As part of a preliminary plan submission for any land development application where the property proposed to be developed is located within 660 feet of the centerline of any Hazardous Liquid Pipeline or Natural Gas Transmission Pipeline.

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline HM Ord (SALDO)\PHMS Ord DRAFT dean 12312020.docx

(2) As part of a tentative plan submission for any application for a planned residential development (PRO where the property proposed to be developed is located within 660 feet of the centerline of any Hazardous Liquid Pipeline or Natural Gas Transmission Pipeline.

(3) As part of a conditional use application for the following uses when the property where the use is proposed is located within 660 feet of the centerline of any Hazardous

Liquid Pipeline or Natural Gas Transmission Pipeline:

(a) Any residential development.

(b) Township park.

(c) Place of worship or religious institution, excluding hospitals, sanitariums, penal or corrective institutions.

(d) Public or private primary or secondary school.

(e) Publicly owned recreation.

(f) Public utility facility.

(g) Private recreation facility.

(h) Church or place of worship.

(i) Nursing home or personal-care center.

G) Life-care center.

(k) Business and professional offices.

(I) Gasoline service station, which may include the sale of gasoline as an accessory use.

(m) Shopping center.

(n) Day care, child or adult.

(o) Hotel or motel.

(p) Mobile/manufactured home park in accordance with§ 205-64B of this Chapter 205.

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline HM Ord (SALDO)\PHMS Ord DRAFT clean 12312020.docx

(q) Medical facility for patient care that is supplementary to normal hospital services, but not including a hospital.

(r) Hospital.

(s) Cyber charter school campus

(t) Conference center.

(u)Treatment center.

(v) Exercise/health/tennis clubs.

(x) Fire or ambulance station.

B. Contents. The PHMS shall contain the following information:

(1) Background information.

(a) A general description of the property subject to the application, including lot area, topography, watercourses, vegetation, landscaping, existing improvements including buildings, structures, driveways, parking, loading areas, fire hydrants, surrounding uses, etc. (b) A specific description of the Hazardous Liquid Pipelines and Natural Gas Transmission Pipelines located within 660 feet of the proposed land development, PRO or conditional use which shall include:

[1] Size of pipeline. [2] Number of pipelines. [3] Width of easement. [4] Materials transported through the pipeline.

(2) An assessment of the potential negative impacts and hazards to health, safety and welfare of the occupants and buildings associated with the proposed land development, PRO or conditional use due to the proximity of the Hazardous Liquid Pipeline or Natural Gas Transmission Pipeline.

(3) Mitigation measures that Applicant may implement to address the potential negative impacts and hazards to the health, safety and welfare of the occupants and buildings associated with the proposed land development, PRO or conditional use and suggested measures to mitigate the potential negative impacts and hazards to the proposed

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline HM Ord (SALDO)\PHMS Ord DRAFT clean 12312020.docx

occupants and buildings proposed in the development, PRO or conditional use, including but not limited to: design alternatives, reconfiguration of buildings, access driveways, interior driveways and parking lots, additional means of access, additional and/or enhanced fire protection measures and devices, enhanced emergency communication systems, use of specific building materials, increased setbacks, buffering, landscaping, conservation of existing vegetation, and any other appropriate measurer permitted under the terms of this chapter and other Township ordinances.

C. As part of the review of the preliminary plan submission, tentative PRO plan submission or conditional use submission for the uses specified in §205-40.1.A(3) above, the Planning

Commission and Board shall consider the contents of the PHMS and evaluate if the respective plans appropriately address the potential negative impacts and hazards to the health, safety and welfare of the occupants and buildings associated with the Hazardous Liquid Pipelines and Natural Gas Pipelines located within 660 feet of the proposed development, PRO or conditional use. The Planning Commission and Board may seek input from the Emergency Management Coordinator, Fire Marshall, Fire Chief, utility providers, Pipeline Task Force or any other person or entity with experience or knowledge of hazards associated with Hazardous

Liquid Pipelines and Natural Gas Pipelines. As a result of such review, the Planning Commission and Board may require the Applicant to revise its plans to mitigate potential negative impacts and hazards to the health, safety and welfare of the occupants and buildings caused by the proximity of the Hazardous Liquid Pipeline or Natural Gas Pipeline to the proposed development, PRO or use."

SECTION 3. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal, or invalid sentence, clause, section, or part thereof not been included herein.

SECTION 4. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.

SECTION 5. Effective Date. This Ordinance shall become effective five days from the date of adoption.

ENACTED AND ORDAINED this __ .day of ______ , 2020.

ATTEST:

Louis F. Smith, Secretary

EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS

E. Martin Shane, Chair

F:\Data\Shared Data\Admin Dept\Township Code\Pipetine HM Ord (SALDO)\PHMS Ord DRAFT clean 12312020.docx

David E. Shuey, Vice-Chair

John Hertzog, Member

Michael P. Lynch, Member

Michele Truitt, Member

F:\Data\Shared Data\Admin Dept\Township Code\Pipeline HM Ord {SALDO)\PHMS Ord DRAFT clean 12312020.docx

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report "Partnering to Further Enhance Pipeline Safety In Communities Through Risk­

Informed Land Use Planning"

November 17, 2010

Appendix B: Model Ordinance

The following model ordinance may be used by cities or other jurisdictions with planning authority (e.g., counties, townships, villages) as a starting point for development of an ordinance to incorporate or promote recommended practices for protecting communities and underground utility infrastructure. Although the model ordinance as written refers directly to transmission pipelines located in a city, it may be used by other jurisdictions (with appropriate changes). It is expected that each specific jurisdiction would change the text of the ordinance to fit the circumstances of that jurisdiction.

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report, November 2010

Bill No. _________ _

ORDINANCE NO.

AN ORDINANCE PROVIDING FOR MINIMUM REQUIREMENTS PERTAINING TO LAND USE,

CONSTRUCTION, AND PUBLIC SAFETY NEAR GAS TRAN MISSION AND/OR HAZARDOUS

LIQUID TRANSMISSION PIPELINES WITHIN THE CITY

WHEREAS, the United States economy is heavily dependent on gas transmission and hazardous liquids pipelines to transport and distribute energy and raw materials; and

WHEREAS, gas transmission and/or hazardous liquid transmission pipelines extend through portions of the City of; and

WHEREAS, these pipelines, if ruptured or damaged, may pose a risk to public safety and/orthe environment; and

WHEREAS, new development in proximity to pipelines should incorporate design features to minimize possible public safety and/or environmental risks; and

WHEREAS, the [Board of Aldermen] [City Council] wishes to minimize risk of rupturing or damaging these pipelines; and

WHEREAS, the National Transportation Safety Board has recognized that third-party damage and pipeline right-of-way encroachment are significant threats to pipeline safety; and

WHEREAS Title 49, Code of Federal Regulations, Parts 192 & 195 provide regulations for transmission pipelines; and

WHEREAS, the City has been encouraged by the U.S. Department of Transportation to adopt policies and regulations intended to reduce the likelihood of accidental damage to gas and hazardous liquid pipelines and to reduce adverse impacts of pipeline failures located within its jurisdiction; and

WHEREAS, the City desires to amend the City Code by adopting policies and regulations intended to reduce the likelihood of accidental damage to the gas and hazardous liquid pipelines and to help reduce adverse impacts in the event of a pipeline failure; and

[WHEREAS, the City held a Public Hearing on these proposed City Code amendments; and]

[WHEREAS, at the Public Hearing, all interested persons and citizens were given an opportunity to be heard on these proposed amendments to the City Code; and]

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report, November 2010

NOW THEREFORE, BE IT ORDAINED BY THE [BOARD OF ALDERMEN] [CITY COUNCIL] OF THE CITY OF-1------------ , AS FOLLOWS:

SECTION 1. That Section of the City Code shall be and is hereby amended by adding the following definitions:

CONSULTATION ZONE means an area within ___ feet of a transmission pipeline. See Section 2 below. [Refer to PIPA Recommended Practice BL05.]

DEVELOPMENT PERMIT means, for the purposes of the consultation zone requirements, any permit for activity that involves construction, grade modification, excavation, blasting, land clearing, or the deposit of earth, rocks or other materials that places an additional load upon the soil. Construction that involves work totally within an existing building footprint, such as residential remodeling projects, is specifically exempted from these consultation zone requirements.

GAS TRANSMISSION PIPELINE means a "transmission line" as defined by Title 49, Code of Federal Regulations, Section 192.3.

HAZARDOUS LIQUID PIPELINE means a pipeline designed for the transmission of a "hazardous liquid", as defined by Title 49, Code of Federal Regulations, Section 195.2.

PERSON means any individual, firm, joint venture, entity, partnership, corporation, association or cooperative.

PIPA REPORT means a report prepared by the U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA) through the Pipelines and Informed Planning Alliance (PIPA) initiative with support from many participating stakeholders. The report was initially released in 2010 and will be updated as needed. It is available on the PHMSA Pipeline Safety Stakeholder Communications web site at http://primis.phmsa.dot.gov/comm/.

PIPELINE means the same as is defined by Title 49, Code of Federal Regulations, Sections 195.2 and 192.3.

PIPELINE FACILITY means the same as is defined by Title 49, Code of Federal Regulations, Sections 195.2 and 192.3.

PLANNING AREA means an area around a transmission pipeline that is defined, based on characteristics of the pipeline and the surrounding area, to determine where the requirements of Section 6 below apply. [Refer to PIPA Recommended Practice BL06.]

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report, November 2010

TRANSMISSION PIPELINE means gas transmission pipeline or hazardous liquid pipeline as defined above.

SECTION 2. That Section _________ of the City Code shall be and is hereby amended by adding Subsection thereto, which Subsection shall read as follows:

CONSULTATION ZONE

a. Consultation Zone Distance

A consultation zone is hereby established for any parcels within __ feet of the centerline of a transmission pipeline. [Refer to PIPA Recommended Practice BL0S.]

b. Consultation Zone Notification

At application for a development permit, staff at the permit counter shall notify the individual they are within the consultation zone, explain the relevant application procedures, and provide contact information for the applicable pipeline operator(s). This same procedure shall be followed whenever an individual inquires about development regulations or zoning restrictions for property within the consultation zone.

c. Application Process within Consultation Zone

Complete application for development permit within a designated consultation zone must include written verification from applicant that:

1. Applicant has contacted the pipeline operator(s) and has provided them with documentation detailing the proposed development type and place of the activity; and

2. The pipeline operator(s) has reviewed the documents.

3. The written verification required by this section can be in any form acceptable to the City, including electronic communications, so long as it is clear that the pipeline operator(s) has received and reviewed documentation showing the proposed information concerning any impact the activity will have upon the integrity of the transmission pipeline(s). The verification should include all comments received from the operator or a notice from the operator indicating that the operator has no comments.

4. If the operator does not respond within 30 days after being contacted and provided information by the developer pursuant to c.1 above, then the City may waive the requirement for written verification given under c.3 above.

SECTION 3. That Section _________ of the City Code shall be and is hereby amended by adding Subsection thereto, which Subsection shall read as follows:

PLANNING AREA

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report, November 2010

a. Planning Area Distance

Planning areas are hereby established within the following distances of the pipeline centerlines,

for the following transmission pipeline(s).

Pipeline A - YYY feet

Pipeline B - ZZZ feet

Pipeline C-Etc. [See PIPA Report Recommended Practice BL06]

b. Applicability of Planning Area

At application for a development permit, staff at the permit counter shall notify the individual

they are within the planning area and explain the relevant requirements.

Development within the planning area shall meet the requirements under Section 6 below.

SECTION 4. That Section _________ of the City Code shall be and is hereby

amended by adding Subsection thereto, which Subsection shall read as follows:

The plat must provide a note that all existing gas transmission and/or hazardous liquid pipelines

or pipeline facilities through the subdivision have been shown, or that there are no known

existing gas transmission and/or hazardous liquid pipelines or pipeline facilities within the limits

of the subdivision.

The location of all transmission pipelines and related easements shall be shown on all

preliminary plat, zoning, building, and record plat maps when proposed development is within

the planning area.

For proposed development within the consultation zone around pipeline(s), developer shall

forward all site or subdivision plans for review comments to the Pipeline Operators by certified

mail, return receipt requested, to be supplied to the City as proof of notification prior to plan

approval.

SECTION 5. That Section _________ of the City Code shall be and is hereby'

amended by adding Subsection thereto, which Subsection shall read as follows:

{Insert selected PIPA Recommended Practices for protecting transmission pipelines]

SECTION 6, That Section of the _____ Code shall be and is hereby amended by adding

Subsection thereto, which Subsection shall read as follows:

Model Ordinance for Land Use and Construction Near Transmission Pipelines

Appendix B from PIPA Report, November 2010

[Insert selected PIPA Recommended Practices NDll through ND23, os appropriate, indicating requirements within the planning area]

SECTION 7. Severability. If any term, condition, or provision of this Ordinance shall, to any extent, be held to be invalid or unenforceable, the remainder hereof shall be valid in all other respects and continue to be effective and each and every remaining provision hereof shall be valid and shall be enforced to the fullest extent permitted by law, it being the intent of the Board of Aldermen (or City Council) that it would have enacted this Ordinance without the invalid or unenforceable provisions. In the event of a subsequent change in applicable law so that the provision that had been held invalid is no longer invalid, said provision shall thereupon return to full force and effect without further action by the City and shall thereafter be binding.

SECTION 8. Effective Date. This Ordinance shall be in full force and take effect from and after the date of its final passage and approval.

SECTION 9. Savings. Nothing contained herein shall in any manner be deemed or construed to alter, modify, supersede, supplant or otherwise nullify any other Ordinance of the City or the requirements thereof whether or not relating to or in any manner connected with the subject matter

hereof, unless expressly set forth herein.

Read two times and passed this __ day of _______ __, 2_.

As Presiding Officer and as Mayor

Attest: _______________ _

City Clerk

Approved this ___ day of _____ _, 2008.

Mayor

Attest: _______________ _

12/31/2020 PHMSA: S1akeholder Communications - PIPA Consul1ation Planning

U.S. Department Pipeline & Hazardous Materials of Transportation Safety A dminist,·ation

Pipeline Safety Stakeholder Communications Pipeline Safety Connects Us All

Consultation Zones and Planning Areas

Communication Helps Ensure Safety

Land use changes and development near transnission pipelines can create risks to comm.mities and to the pipeline infrastructure. Safety is a primary and common goal for all stakeholders and should be considered when decisions are made that impact life, property or the environment. Early communication among stakeholders can help. Doing so will ensure that development plans nininize risks to the people living or working nearby, and are consistent with the needs and legal rights of developers and pipeline operators.

Consultation Zone - Local governments should define "consultation zones" to provide mechanisms for communication between property developers/owners and operators of nearby transnission pipelines when new land uses and property developments are being planned. (PIPA Recommended Practice BL0S)

Planning Area - Local governments should consider implementing "planning areas" to enhance safety when new land use and

property developments are planned near transnission pipelines. (PIPA Recommended Practice BL06)

A planning area should not be construed as an unsafe area and the planning area distance is not intended to be used as a fixed setback distance. Rather, these are areas where additional development regulations, standards or guidelines to ensure safety should be considered. PIPA Recorrrrended Practices NDll through ND23

1describe additional considerations for use

I I I I I EJk

Oistance defined by

local ordinance

Oistance

defined by local ordinance

Consu It at ion Zone

l

within a planning area.

1consultation Zone and Planning Area Distance - Absent any site specific information, the recommended

r

ize for consultation zones and planning areas is:

• 660 feet on either side of the centerline of natural gas pipelines I. 660 - 1000 feet on either side of the centerline of hazardous liquid pipelines

However, in either case it is recommended that colTITlunities develop and utilize site-specific distances for planning areas, based on the unique characteristics for the pipeline and the area surrounding the pipeline. Generally, consultation zones and planning areas larger or smaller than the recommended default distances may be warranted.

Incorporate Consultation Zones and Planning Areas by Ordinance

he most effective way for a local government to ensure early communication among stakeholders to help them make risk-informed decisions about land use and development near transmission pipelines is to require by ordinance that such communication be conducted. PIPA developed a model ordinance which is included as Appendix B in the PIPA Report (a link to the model ordinance is provided below). Additionally, several communities have already taken steps to require by ordinance that such communications occur.

Examples of land planning ordinances and codes

• PIPA Model Ordinance .,J !!!I • Brookings, South Dakota • Whatcom County, Washington • Austin, Texas

........................................................................................................................ ___ ,.,, ......................................... . Land Planning Ordinance: Brookings County, SD - Transmission Pipeline Risk Reduction Overlay District An overlay is an additional "layer" of zoning targeted to a specific area with special needs.

https://primis.phmsa.dot.g ov/comm/pipa/pipa _ consultation _planning .htm/lbrooki ngs 1/3

12/31/2020 PHMSA: Stakeholder Communications - PIPA Consultation Planning

Brookings County adopted a consultation zone and a planning zone ordinance which uses an overlay

!

district to identify when

300' ConlinttnMI Buldirg ---- Flpeline

--Roads CJF111cels

Landowner's final plan after consulting with pipeline operator

th ·• ,u •. -·- ,:,· •• •I•' •• ":••. - ! ,1 •,,, • .f.

I

development is planned near a transmission pipeline. The Transmission Pipeline Risk Reduction Overlay

District was incorporated into the County's GIS and is used primarily when issuing zoning and building permits, to facilitate discussions among developers, landowners, and pipeline operators.

The consultation zone is an area within 660 feet of existing pipelines. When a building permit is requested within the consultation zone, the person requesting the permit is verbally informed that the building is being constructed near a transmission pipeline. A pipeline safety brochure is provided along with the building permit. The permit office notifies the pipeline operator of the building permit request, and the type and size of the building. The property developer/owner must initiate a consultation with the transmission pipeline operator as early as possible in the development planning process.

The planning zone distance is determined based on the site-specific and pipeline-specific characteristics. The planning zone is a tool to identify where new development requires a physical response. When an

individual or organization requests a building permit and the location is within the planning zone then the permit office staff will request a detailed site plan - a hand rendered drawing will suffice. The building permit requestor will be given a brochure with information on the point-of-contact for the pipeline company, and the recommended land management practices for new development near existing transmission pipelines. The requestor will also be notified to contact the South Dakota One Call to have the pipeline located and marked prior to the issuance of a building permit. The individual or organization

requesting the building permit must then confirm or correct the actual location of the pipeline on the site drawing.

If excavation will occur completely outside of the pipeline right-of-way, a building permit will be issued. The pipeline operator will be notified that a building permit has been issued and will be provided with the location of the construction by the permit office.

If excavation will occur inside the pipeline right-of-way, the developer must obtain a written, signed encroachment agreement from the pipeline operator. The encroachment agreement must be submitted to the building permit issuing office before a building permit will be issued. The pipeline operator will be notified that a building permit has been issued and will be provided with the location of the construction by the permit office.

Land Planning Ordinance: Whatcom County, WA - Consultation Zone Ordinance

Whatcom County's consultation zone ordinance specifies:

• No high-occupancy, hard-to-evacuate buildings such as schools, hospitals, nursing homes, etc. within 500 feet of transmission pipelines • Consultation zone of 500 feet • Protect easements during construction • Verify use of one-call

https://primis.phmsa.dot.gov/comm/pi pa/pi pa_ consultation _planning .htm#broo!Q ng s 2/3

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

PIPA Recommended Practice BLOS

BLOS "Define Transmission Pipeline Consultation Zone" Practice Statement Local governments should define a "consultation zone" to provide a mechanism for communication between property developers/owners and operators of nearby transmission pipelines when new land uses and property developments are being planned. Audience{s): Local Government

Practice Description Local governments should define a consultation zone to provide a mechanism to initiate communication between property developers/owners and operators of nearby transmission pipelines when new land uses and property developments are being planned. Optimally, the consultation zone distance should be measured from the transmission pipeline centerline and should be based on specific pipeline

characteristics and local conditions. The intent of this recommended practice is to initiate a dialogue between the property developer/owner and the transmission pipeline operator when new land use or property development is planned near a transmission pipeline. This dialogue will serve to: (1) protect the transmission pipeline by promoting adequate consideration of the potential safety impacts of the proposed land use or property development on the pipeline; and (2) raise awareness of the potential safety impacts of the transmission pipeline on the proposed land use or development so they can be taken into account during planning and design. For proposed new land uses and developments within the consultation zone, the property developer/owner should be required to initiate consultation with the transmission pipeline operator as early as possible in the development planning process. The local government and the property developer/owner should consult local land records to determine if transmission pipelines are located in the proposed development area. In addition, the National Pipeline Mapping System (NPMS), https://www.npms.phmsa.dot.gov/, may be utilized, with the caution that the accuracy of pipeline locations in the NPMS vary from pipeline to pipeline and may be as much as +/- 500 feet. Also, neither local land records nor the NPMS should ever be used in lieu of calling the one­ call center to have the actual position of transmission pipelines and other underground facilities located and marked prior to excavation. In most cases an excavator can generally dial 811 to contact the one-call center. Once consultation has begun, specific considerations to further enhance safety and protect communities where new development is planned near transmission pipelines may be taken into account. Several additional considerations are discussed in PIPA recommended practices BLOG and ND11

through ND23. Recommended Practice BLOG addresses the development and implementation of a "planning area". A consultation zone distance should be measured from the transmission pipeline centerline. So that consultation zone requirements are appropriately applied to proposed land uses and developments, a site-specific distance based on the characteristics of the pipeline (e.g., pipeline diameter, operating pressure, potential spill volumes, transported commodities, unrestrained flow characteristics of transported commodities) and the area surrounding the pipeline (e.g., topography, population density, vegetation, structures, etc.) should be determined. Local governments should work with the pipeline operators to determine site-specific pipeline characteristics when developing their consultation zone distances. Absent site-specific information, it is suggested that a standard consultation zone distance, on either side of the pipeline centerline, of 660 feet be used for natural gas transmission pipelines. For hazardous liquid pipelines, also absent site-specific information, it is suggested that a standard consultation zone distance in a range from 660 to 1,000 feet be considered. However, in either case it is recommended that communities develop and utilize site­ specific distances for consultation zones, based on the unique characteristics for the pipeline and the area surrounding the pipeline. As noted, the transmission pipeline operator can be helpful and should be consulted in assisting local governments to better understand the pipeline characteristics when they develop site-specific consultation zone distances. Generally, consultation zone distances larger or smaller than the standard distances may be warranted. High/low operating pressure, large/small pipe diameters, type of product carried and local topography can influence the potential impact on nearby development. Related information on refining planning area distances (see PIPA Recommended Practice BLOG) is provided in Appendix I. Additionally, American Petroleum Institute Recommended Practice (API RP) 1162, Public Awareness Programs for Pipeline Operators, First Edition, December 2003, includes recommendations for collaboration among pipeline operators, property owners/developers and emergency response officials that may be helpful in developing criteria for a planning area. API RP 1162 applies within 660' of a hazardous liquid pipeline.

2

Pipeline

Distance

defined by

local

ordinance

Distance

defined

by local

ordinance

Local requirements should be clear that the consultation zone is only intended to: Alert the transmission pipeline operator that a development near its pipeline is being planned;

• Help protect transmission pipelines by promoting adequate consideration of the potential safety impacts of the development on the transmission pipeline; and • Raise awareness of the potential safety impacts of the transmission pipeline on the development.

Satisfying these objectives may help to avoid costly changes in land use and development plans at a later date and potential damage to the pipeline. Relationship to Practice BL04 PIPA Recommended Practice BL04 encourages local governments to enact ordinances, regulations, or procedural recommendations that require property developers/owners to consult with transmission pipeline operators as part of the land use planning and permitting process, when development is planned within a consultation zone. The definition of a consultation zone, as provided here in Recommended Practice

BLOS, helps to simplify the determination of when such

Consultatior

Zone

3

consultations should be initiated. Verification that the requirements for consultation are met should not impose an

undue burden on the landowner, developer, or pipeline operator.

Relationship to Pipeline Operator Public Awareness Programs The purpose for and size of a consultation zone does not affect the requirements for transmission pipeline operators to

develop and implement pipeline public awareness programs as defined by PHMSA pipeline safety regulations.

Information the Transmission Pipeline Operator may need from the Property Developer/Owner

During consultation, a transmission pipeline operator may need information from the property developer/owner in order to discuss appropriate considerations for the proposed development.

1. What is the street address (or if not available, the general location) of the property. 2. Is the property encumbered by a pipeline easement? If so, please attach a copy of the easement or provide the

recording (volume and page) information. 3. Is there visual evidence of a pipeline on subject property (e.g., aerial markers, above-ground appurtenances, etc.)? 4. Will the proposed development of the property require/entail (and if so, please describe briefly):

a. Road crossings over the pipeline? b. Other utility lines crossing over or under the

pipeline? c. Permanent structures or paving within the easement area (e.g., paving, parking lots,

buildings, pedestrian paths, signage, poles, retaining walls, septic systems, basketball/tennis courts, etc.)?

d. Extensive landscaping (including irrigation systems) within the easement area? e. Changing the amount of cover (by adding or

removing dirt) within the easement area?

f. Construction equipment crossing the pipeline? g. Blasting, seismic vibration testing, pile driving, or similar event which produces significant shock and/or sound waves? h. Significant excavation (underground parking

structures or building foundations, core samples, rock/mineral quarries, dams, etc.)? i. Impounding water or building drainage ditches or other drainage facilities? j. Fencing running parallel to (within 100 feet) or crossing the pipeline? k. Storing materials, equipment, vehicles, or other items within the easement area (e.g., construction materials, junk or scrap heaps, cut timber, boats, military equipment, etc.)

5. What is the approximate distance of the proposed building closest to the pipeline? 6. Has the pipeline operator been previously contacted regarding this development? If so, by whom. 7. Provide a site plan if available.

Information Transmission Pipeline Operators may provide during Consultation Some examples of information that transmission pipeline operators may provide to local governments and/or property developers/owner to assist them in developing consultation zone distances or planning specific developments:

1. Pipeline diameter and wall thickness 2. Age of pipeline 3. Depth of cover 4. Typical operating pressure and maximum allowable operating pressure 5. Material transported and typical daily flow rate 6. Estimated worst case spill volume in the area of the development

References

• California Department of Education, Guidance Protocol for School Site Pipeline Risk Analysis, 2007 • American Petroleum Institute (API) Recommended Practice (RP) 1162. Public Awareness Programs for Pipeline

Operators. • References on Potential Gas Pipeline Impacts: o Gas Research Institute GRI-00/0189, A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines. 2000 o 49 CFR 192.5, 49 CFR 192.903 o ASME B31.8-2004, Managing System Integrity of Gas Pipelines

Navigate to Other Practices:

• Baseline {BL) Recommended

Practices: BL01 BL02 BL03 BL04 BL0S BL06 BL07 BL08 .12 L09 BL10 BL11 BL12 BL13 BL14 BL15 BL16 BL17 BL18 • New Development {ND) Recommended

Practices: ND01 ND02 ND03 ND04 ND05 ND06 ND07 ND 08 ND09 ND10 ND11 ND12 ND13 ND14 ND15 ND16 ND17 ND18 ND19 ND20 ND21 ND22 ND23 ND24 ND25 ND26 ND 27 ND28 • Table of Recommended Practices

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

U.S. Department Pipeline & Hazardous Materials of Transportation Safety Administration

Pipeline Safety Stakeholder Communications Pipeline Safety Connects Us All PIPA Recommended Practices

Recommended Practices - Expanded Version [condensed version]

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission Baseline (BL) Recommended Practices BLOl "Obtain Transmission Pipeline Mapping Data" Yes Local govemrrent agencies responsible for land use and developrrent planning or the issuance of developrrent permits should obtain mapping data for all transmission pipelines within their areas of jurisdiction from PHMSA's National Pipeline Mapping System or from the transmission pipeline operators and show these pipelines on maps used for developrrent planning. BL02 "n/a - Recommendation is incorporated into

other practices. " BL03 "Utilize Information Regarding Development Yes Yes around Transmission Pipelines" Transmission pipeline operators should

provide information about their pipelines to local govemrrents and property developers/owners who are planning developrrent around their pipelines. Local governrrent authorities regulating developrrent should use this information to establish requirerrents regarding land use and developrrent around transmission pipelines.

https://primis.phmsa.dot.g ov/comm/pipa/pipa _practice _table_ e:xpanded.htm 1/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Elq:)anded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission BL04 "Adopt Transmission Pipeline Consultation Yes Zone Ordinance"

Local governments should adopt land development procedures requiring property developers/owners to consult with transmission pipeline operators early in the development process, so that development designs minimize risks to the populace living or working nearby and are consistent with the needs and legal rights of the operators. BLOS "Define Transmission Pipeline Consultation Yes Zone"

Local governments should define a "consultation zone" to provide a mechanism for communication between property developers/owners and operators of nearby transmission pipelines when new land uses and property developments are being planned. BL06 "Implement New Development Planning Yes Areas around Transmission Pipelines"

Local governments should consider implementing "planning areas" to enhance safety when new land use and property development is planned near transmission pipelines. BL07 "Understand the Elements of a Yes Transmission Pipeline Easement" Property developers/owners should have an understanding of the elements of and rights conveyed in a transmission pipeline easement. BL08 "Manage Land Records" Yes Yes Land use agreements between pipeline operators and property owners should be documented and managed and, when necessary, recorded. BL09 "Document and Record Easement Yes Yes Amendments"

Easement amendments should be documented, managed and recorded.

https://primis.phmsa.dot.govtcomm/pipa/pipa_practice_table_expanded.htm 2/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission

BLlO "Implement Communications Plan" Yes Transmission pipeline operators should

develop and implement effective communications plans when communicating acceptable transmission pipeline right-of- way uses and activities to property developers/owners and other stakeholders.

Blll "Effectively Communicate Pipeline msk and Yes msk Management Information" Transmission pipeline operators should identify barriers to effectively communicating with stakeholders and use communication techniques designed to overcome those barriers and effectively engage stakeholders to communicate with them regarding pipeline risks and how the

operator manages such risks.

BL12 "Notify Stakeholders of mght-of-Way Yes Maintenance Activities" Transmission pipeline operators should notify

affected stakeholders of right-of-way maintenance activities, including vegetation management.

BL13 "Prevent and Manage 0ght-of-Way Yes Encroachment" Transmission pipeline operators should communicate in a documented and timely manner with property developers/owners to prevent or rectify unacceptable encroachments or inappropriate human activity within the transmission pipeline right-of-way.

BL14 "Participate to Improve State Excavation Yes Yes Yes Damage Prevention Programs" All pipeline safety stakeholders should participate in the work of organizations seeking to make improvements to state

excavation damage prevention programs, especially efforts to reduce exemptions frorr participation in one-call systems.

https://primis.phmsa.dot.gov/comm/pipa/pipa_practice_table_e:xpanded.htm 3/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/Owner Operator Commission BLlS "Enhance Damage Prevention Practices Yes near High-Priority Subsurface Facilities" Transmission pipeline operators should implement enhanced damage prevention practices within the transmission pipeline right-of-way to ensure that pipeline operators and excavators meet on-site prior to excavation activity near high-priority subsurface facilities. BL16 "Halt Dangerous Excavation Activities near Yes Yes Transmission Pipelines" Transmission pipeline operators should have procedures and established contacts with local enforcement personnel in order to act appropriately to halt dangerous excavation activities that may damage their pipelines and potentially cause an imrrediate threat to life or property. BL17 "Map Abandoned Pipelines" Yes When a transmission pipeline operator abandons a transmission pipeline, information regarding the abandoned pipeline should be maintained and included in the information provided to the one-call center. BL18 "Disclose Transmission Pipeline Easements Yes in Real Estate Transactions" As part of all real estate sales contracts, each state should require the disclosure of

known transmission pipeline easements on the property. New Development (ND) Recommended Practices NDOl "n/a - Recommendation is incorporated into

other practices."

https://primis.phmsa.dot.gow'comnv'pipa/pipa_practice_table_expanded.htm 4/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/Owner Operator Commission ND02 "Gather Information for Design of Property Yes Yes Development near Transmission Pipelines" In designing a proposed property development the property developer/owner should use all reasonable means to obtain information about transmission pipeline facilities in the area of the proposed development. ND03 "Review Acceptability of Proposed Land Use Yes of Transmission Pipeline Right-of-Way Prior to Design" The property developer/owner should review preliminary information about acceptable land uses on a transmission pipeline right-of-way prior to the design of a property development. ND04 "Coordinate Property Development Design Yes Yes and Construction with Transmission Pipeline

Operator" When property development is planned within the consultation zone (reference PIPA Recommended Practice BLOS), the property developer/owner and the transmission pipeline operator should communicate to ensure possible impacts of pipeline incidents and maintenance needs are considered during development design and construction. NDOS "n/a - Recommendation is incorporated into

other practices. " ND06 "Require Consideration of Transmission Yes Yes Pipeline Facilities in Land Development Design" Whenever development is proposed on property containing transmission pipeline facilities, local governments should require that the submitted land development plans address in detail the steps necessary to safely integrate the transmission pipeline into the design of the project.

https://primis.phmsa.dot.gov/comm/pipa/pipa_practice_table_expanded.htm 5/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Elq)anded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission ND07 "Define Blanket Easement Agreements Yes Yes Yes When Necessary" Upon request by the landowner, a transmission pipeline easerrent agreerrent

I may be defined to an acceptable, I I reasonable, and safe width and explicit I location. State statutes or local I governrrent regulations may require I easerrents to be defined prior to the

I approval of rezoning, subdivision plats and developrrent permits. NDOS "Collaborate on Alternate Use and Yes Yes Yes Development of Transmission Pipeline Right- of-Way"

Property developers/owners, local governrrents and transmission pipeline operators may collaborate on alternative use of the transmission pipeline right-of- way and related maintenance. ND09 "Provide Flexibility for Developing Open Yes Space along Transmission Pipeline Rights-of-

Way" Local governrrents should consider allowing site planning flexibility in the developrrent of comrrercial, industrial or residential property whenever a transmission pipeline is located in, or in close proximity to, the proposed developrrent. NDlO "Record Transmission Pipeline Easements Yes Yes on Development Plans and Final Plats"

Local govemrrents should require all recorded developrrent plans and final plats to clearly show the location of transmission pipeline easerrents and identify the pipeline operators.

https://primis.phmsa.dot.govfcomm'pipa/pipa_practice_table_expanded.htm 6/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission NDll "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Parking Lots and Parking Structures" Parking lots and parking structures should be preferentially located and designed to reduce the consequences that could result from a transmission pipeline incident and to

reduce potential interference with transmission pipeline maintenance and inspections. ND12 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Roads"

Roads and associated appurtenances should be preferentially located and designed to reduce the consequences that could result from a transmission pipeline incident and reduce the potential of interference with pipeline operations and maintenance. ND13 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Utilities and

Related Infrastructure" Utilities (both above and below ground) and related infrastructure should be preferentially located and designed to reduce the consequences that could result from a transmission pipeline incident and to reduce the potential of interference with transmission pipeline maintenance and inspections.

https://primis.phmsa.dot.goldcomm/pipa/pipa_practice_table_expanded.htm 7/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Elq:)anded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission ND14 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of Aboveground Water Management Infrastructure" Storm water and irrigation water management facilities, retention ponds, and other above-ground water management infrastructure should be preferentially located and designed to reduce the consequences that could result from a transmission pipeline incident and to reduce the potential of interference with transmission pipeline operations and maintenance. NDlS "Plan and Locate Vegetation to Prevent Yes Yes Interference with Transmission Pipeline Activities"

Trees and other vegetation should be

planned and located to reduce the potential of interference with transmission pipeline operations, maintenance, and inspections. ND16 "Locate and Design Water Supply and Yes Yes Sanitary Systems to Prevent Contamination and Excavation Damage" Individual water supplies (water wells), small public/private water systems and sanitary disposal systems (septic tanks, leach or drain fields) should be designed and located to prevent excavation damage to transmission pipelines, interference with transmission pipeline maintenance and inspections, and environmental contamination in the event of a transmission pipeline incident.

https://primis.phmsa.dot.gov/commlpipa/pipa_practice_table_el<panded.htm 8/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/Owner Operator Commission ND17 "Reduce Transmission Pipeline Risk in New Yes Yes Development for Residential, Mixed-Use, and Commercial Land Use"

New developrrent within a transmission pipeline planning area (see PIPA Recomrrended Practice BL06) should be designed and buildings located to reduce the consequences that could result from a transmission pipeline incident and to provide adequate access to the pipeline for operations and maintenance.

ND18 "Consider Transmission Pipeline Operation Yes Yes Yes Noise and Odor in Design and Location of

Residential, Mixed-Use, and Commercial Land Use Development" Consider noise, odor and other issues when planning and locating developrrents near above-ground transmission pipeline facilities, such as compressor stations, pumping stations, odorant equiprrent, regulator stations and other pipeline appurtenances.

ND19 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Industrial Land Use Development" New industrial land use developrrent within a transmission pipeline planning area (see PIPA Recommended Practice BL06) should be designed and buildings located to reduce the consequences that could result from a transmission pipeline incident and reduce the potential of interference with transmission pipeline operations and maintenance.

https://primis.phmsa.dot.gov/commlpipa/pipa_practice_table_expanded.htm 9/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/ Owner Operator Commission

ND20 "Reduce Transmission Pipeline Risk through Yes Yes Location, Design, and Construction of New Institutional Land Use Developments"

New development of institutional facilities that may be difficult to evacuate within a transmission pipeline planning area (see PIPA Recommended Practice BL06) should be designed and the facilities located and constructed to reduce the consequences that could result from a transmission pipeline incident. Such facilities should also

be located to reduce the potential of interference with transmission pipeline operations and maintenance activities. Emergency plans for these facilities should consider potential transmission pipeline incidents.

ND21 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Public Safety and Enforcement Facilities" New development of emergency responder facilities within a transmission pipeline planning area (see PIPA Recommended Practice BL06) should be designed and the facilities located and constructed to reduce the consequences that could result from a transmission pipeline incident. Such facilities should also be designed and located to avoid the potential of interference with pipeline operations and maintenance. Planning for these facilities should include emergency plans that consider the effects of a transmission pipeline incident.

https://primis.phmsa.dot.gov/comm/pipa/pipa_practice_table_expanded.htm 10/12

12/31/2020 PHMSA: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/Owner Operator Commission

ND22 "Reduce Transmission Pipeline Risk through Yes Yes Design and Location of New Places of Mass Public /lssembly (Future Identified Sites)"

New developrrent of places of potential mass public assembly within a transmission pipeline planning area (see PIPA Recornrrended Practice BL06) should be designed and the facilities located and constructed to reduce the consequences of a potential transmission pipeline incident, the risk of excavation damage to the pipeline, and the potential of interference with transmission pipeline operations and maintenance. Planning for these facilities should include errergency plans that consider the effects of a potential pipeline incident. ND23 "Consider Site Emergency Response Plans in Yes Yes Land Use Development" Errergency response plan requirerrents should be considered in new land use

developrrent within a planning area (see PIPA Recornrrended Practice BL06) to reduce the risks of a transmission pipeline incident. ND24 "Install Temporary Markers on Edge of Yes Yes Transmission Pipeline Right-of-Way Prior to Construction Adjacent to Right-of-Way" The property developer/owner should install temporary right-of-way (ROW) survey markers or fencing on the edge of the transmission pipeline ROW or buffer zone, as determined by the transmission pipeline operator, prior to construction to provide a clearly defined boundary. The property developer/owner should ensure that the temporary markers or fencing are maintained throughout the course of construction.

https://primis.phmsa.dot.gov/comm'pipa/pipa_practice_table_eiq,anded.htm 11/12

12/31/2020 PHMS A: Stakeholder Communications - PIPA Practice Table Expanded

Transmission Local Property Pipeline Real Estate No Title and Practice Statement Government Developer/Owner Operator Commission ND25 "Contact Transmission Pipeline Operator Yes Yes Yes Prior to Excavating or Blasting" Anyone planning to conduct excavating, blasting and/or seismic activities should consult with affected transmission pipeline operators well in advance of commencing these activities. Excavating and blasting have the potential to affect soil stability or lead to movement or settling of the soil surrounding the transmission pipeline. ND26 "Use, Document, Record and Retain Yes Yes Yes Encroachment Agreements or Permits"

Encroachment agreements should be used, documented, recorded and retained when a transmission pipeline operator agrees to allow a property developer/owner or local government to encroach on the pipeline right-of-way for a long or perpetual duration in a manner that conflicts with the activities allowed on the easement. ND27 "Use, Document and Retain Letters of No Yes Yes Yes Objection and Conditional Approval Letters" Transmission pipeline operators may use,

document and retain "letters of no objection" in agreeing to land use activities on or near a transmission pipeline right-of- way. Such land uses may or may not be temporary. ND28 "Document, Record and Retain Partial Yes Yes Releases" Partial releases may be used to allow some part of the transmission pipeline right-of- way to be released from certain easement conditions, and should be documented, recorded and retained.

https://primis.phmsa.dot.golO'comm'pipa/pipa_practice_table_expanded.htm 12/12