Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, May 4, 2022

7:00 PM

A Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. April 6, 2022 F. Subdivision and Land Development Applications

1. Malvern Institute G. Conditional Uses and Variances H. Ordinance Amendments

Bold Items indicate new information to review or discuss.

F:\Data\Shared Data\Agendas\Planning Commission\2022\PC AGENDA 05042022.doc

I. Old Business J. New Business

1. East Whiteland Township 537 Special Study/ Transfer of Sanitary Sewerage Facilities K. Liaison Reports L. Correspondence M. Announcements

:i May 4, 2022 PC Meeting

(.) ui Cl) ci Cl) 6 ci ...J ::> u:- 0.:- C 0 :.:; Ill .2 C.

Cl) Q. Application Name

>, I- The Malvern Institute LD p EWT 537 Special Study NA NA

Bold = New Application or PC action required

Completed in 2022

14 Broad St.

Completed in 2021 ------------ Small Wireless Facilities Imperial Marble, 1311 WCP

14 Reservoir Rd. I Glossen ESKE Development LLC

Albert and Lynn Greto

1365 Enterprise Drive 198 Oneida Ln Pipeline HMS / Consultation Zone 01

KEY A-Approved AD -Adopted D-Denied

V p

zo F V Sk V Sk V s V s V Sk V Sk ZOIS DRAFT

"O

Cl) u::: $

Ill C 6/28/2021 NA

East Goshen Township Planning Commission

Application Tracking Log

... m Cl) Cl) <( C ·s, ci. C 0 w ... a. Q. :c Cl C r/) C (.) E ;: a. ::, (.) .c $ 0 C I- (.) <( 0 Ill "ii, C 0 0 0 - - - C t: $ Cl) $ $ Ill - - Ill Ill Ill )( Cl) C C C w 7/1/2021 6/30/2021 6/29/2021 8/13/2021 (4) 6/30/2022 NA NA NA NA NA

312812022 I 3/2812022 NA NA 3/30/2022

NA NA NA NA NA NA 10/25/2021 10/25/2021 NA NA 10/28/2021 5/25/2021 5/25/2021 NA NA 5/27/2021 4/20/2021 4/20/2021 4/27/2021 NA 4/27/2021 4/26/2021 4/26/2021 NA NA 4/29/2021 4/1/2021 4/1/2021 NA NA 4/1/2021 1/26/2021 1/27/2021 NA NA 1/28/2021 NA NA NA NA NA NA

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2022\PC Tracking Log for 05042022.xlsx

Cl) - Cl) Ill - C Ill C C C 0 Cl) - 0 :.:; $

Ill :.:; (.) "O

(.) <( Ill "O <( C I- Ill I- ...J Cl Cl) ...J z C C z Cl) ·;: Q. 0 Ill 0 (.) Cl) ... a. m ]: C 2/2/2022 2/15/2022 NA 2/28/2022 NA NA NA NA

51412022 I 5/6/2022 I 511912022 I 512112021

NA NA 121712021 NA 11/3/2021 11/16/2021 12/14/2021 12/24/2021 6/2/2021 7/6/2021 7/15/2021 7/23/2021 5/5/2021 5/11/2021 5/26/2021 6/18/2021 5/5/2021 6/1/2021 6/8/2021 6/25/2021 5/5/2021 5/18/2021 TBD 5/31/2021 2/3/2021 1/162021 2/25/2021 3/26/2021 NA NA NA NA

r/) -C Cl) E E 0 (.)

AD

A A A D A A AD

4/28/2022

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

April 6, 2022

The East Goshen Township Planning Commission held their regular monthly meeting on Wednesday April 6, 2022 in the Township Building.

Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker

Michael Koza Mark Levy Michael Pagnanelli

Also present was: Mark Gordon, Zoning Officer John Hertzog, Township Supervisor

COMMON ACRONYMS:

BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission

FORMAL MEETING - 7 p.m.

CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management

ZHB - Zoning Hearing Board

I. John Stipe called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a moment of silence to remember our troops and first responders. 2. John asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. The tracking log was checked and no need for a workshop meeting. Mark mentioned that Malvern Institute has given another extension until June 30. He sent them a letter offering to meet with them. 4. The minutes of the March 2, 2022 meeting were approved as amended.

OLD BUSINESS None

NEW BUSINESS None

CONDITIONAL USES AND VARIANCES

I. 14 Broad Street (Zoning appeal and Zoning Variance) - Phillip Winicov and Margaux Arar, owners and husband and wife were present with their attorney. Mr. Winicov purchased 14 Broad Street earlier this year. He requested to use the accessory structure on the property as a second dwelling unit. There are two lots mentioned in all deeds since 1928. The main dwelling is on lot #38 and the accessory building is on lot #44 (16 Broad St.). Mr. Winicov described the accessory building as having a kitchen, bathroom, bedroom, electric, water and public sewer. He mentioned that he receives a separate bill from

PECO for the electric. He has also made several improvements including new roofs, expansion of the driveway. There are two mailboxes, one for 14 and one for 16.

PC 4-6-22 draft 1

1 Mark Gordon explained that the property is in Milltown and was probably built before 1952 and before 2 zoning. The Township denied Mr. Winicov's request to lease the second dwelling unit. He has submitted 3 a Zoning Hearing Board application. 4 Mark Levy asked if the accessory dwelling was always leased. Mr. Winicov answered that the previous 5 owner did not lease it but the owner before that did lease it. 6 Ed asked about the garage between both lots. Mark Gordon thinks it is very old and looks like it was 7 probably a barn. 8 9 PUBLIC COMMENT 10 Pam Coleman, 18 Broad Street- She owns the property south of Mr. Winicov at the intersection of Broad 11 and Center Sts. Her property is also shown as 2 lots. She agrees with the Zoning Officer's denial. There 12 would be significant impact to her because the second dwelling structure is so close to the prope1ty line. 13 Mark Gordon asked if her deed lists 2 lots. She answered yes. 14 15 John Stipe made a motion that the Planning Commission take no position on the Zoning Hearing Board 16 application. Mark Levy seconded the motion. The motion passed unanimously. 17 18 19 LIAISON REPORT 20 I. Board of Supervisors 21 I. TND - John He1tzog mentioned that Ernest Harkness was at the Board of Supervisors meeting last 22 night to discuss the proposed TND zoning for the section of Paoli Pike between Boot Rd. and Rte. 352. 23 In 2019 the BOS planned to hold a meeting about the TND but so many people showed up that they had 24 to postpone it. There was opposition to allowing apartments in this area. 25 Mark Gordon mentioned that this area permits single family residential, no apa1tments. A feasibility 26 study was done to see what other uses could be included along this corridor. The shopping center is fully 27 occupied for the first time. Mark agrees that the plan sent to the BOS may not have been explained well 28 enough. He will review it and prepare it for a BOS meeting. 29 2. Paoli Pike Trail - John Hertzog mentioned that the original plan for the Trail was compromised, so the 30 BOS is considering going through the Corporate Park to Ward Ave. instead of along Paoli Pike in front of 31 the Hicks Farm. It will be less expensive than the original plan along Paoli Pike. Neighborhood 32 connections were discussed. 33 34 35 ADJOURNMENT 36 There being no further business, Ed made a motion to adjourn the meeting. Mark Levy seconded the 37 motion. The meeting was adjourned at 8: 15 pm. The next regular meeting will be held on Wednesday, 38 May 4, 2022 at 7:00 pm. 39 40 41 Respectfully submitted, 42 43 44 45 46 Ruth Kiefer, Recording Secretary

PC 4-6-22 draft 2

MEMO to The EGT Planning Commission/ East Whiteland Township/ Act 537 Special Study, Transfer of Sanitary Sewerage Faclllties

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 4/28/2022 To: Planning Commission .,,, . ./G­ From: Mark Gordon, Township Zoning Officer H Re: East Whiteland Township/ Act 537 Special Study, Transfer of Sanitary Sewerage Facilities

Planning Commission Members,

The Township has received a request from East Whiteland Township (EWT) to review their Act 537 Special Study. The 537 special study is required because East Whiteland Township is selling their Municipal Sanitary Sewer System to Aqua PA.

East Goshen Township receives sanitary sewer flows from EWT, therefore the East Goshen Township Planning Commission needs to review the Act 537 Special study and complete the required form for the PA Department of Environmental Protection. EGT receives a very low volume of flow from the+/- 30 EWT properties; approx. 7,700 gpd (gal. per. day). The entire EWT Sewer system conveys and treats over 1 MM gpd.

The agreement of sale does propose a rate freeze for 3 years for all customers of the EWT Sanitary Sewer System. The study is very long, 412 pgs., and is available for review and or download on the Township website.

What is the 537 Special Study?

The study is required by the PA DEP due to the change of ownership of the system.

• The Study is intended to address the following criteria including:

o Identify all assets of the system o Identify arrangements/agreements with the surrounding municipalities/ entities o Identify previous wastewater facilities planning o Identify future growth / and development that will impact the system o Identify all responsibilities for Sewage Facilities planning as well as the enforcement of sewer related ordinances

No improvements or modifications to any components of the EWT Sanitary sewer system are proposed with this study, this is strictly a study of the existing system to facilitate the transfer of ownership.

F:\Data\Shared Data\Public Works Dept\Sewer\EWT Act 537 Special Study 2022\Memo to PC 04282022.doc

MEMO to The EGT Planning Commission/ East Whiteland Township/ Act 537 Special Study, Transfer of Sanitary Sewerage Facilities

STAFF RECOMENDATION:

The Township Planning Commission is required to review and confirm that the Special Study is consistent with the Township's existing plans and ordinances that govern land use and planning related topics, by completing Component 4A of the Sewerage Facilities Planning Module (enclosed).

Staff and the Municipal Authority Engineer have reviewed the Special Study and have completed component 4A of the sewerage facilities planning module (enclosed) for submission to DEP. The Study outlines, in detail, the existing EWT Sanitary Sewerage System as required by PA DEP. The Study proposes no changes to the existing system. Staff has concluded from the study that the transfer of ownership of the EWT Sewerage System is consistent with the Township's existing plans and ordinances. Staff recommends that the Planning Commission authorize staff to sign component 4A of the EWT 537 Special Study and forward the study along to the Board of Supervisors for their review and approval.

DRAFT MOTION:

Mr. Chairman, after review of the East Whiteland Township Act 537 Plan Special Study, and finding it consistent with the East Goshen Township comprehensive plan and Township ordinances, I move that we direct staff to complete and sign the PA DEP Sewage Facility Planning Module component 4A form for the East Whiteland Township, Act 537 Special Study and forward it to East Whiteland Township, and that the East Goshen Township Board of Supervisors adopt the Special Plan by resolution as required by the Pa DEP.

F:\Data\Shared Data\Public Works Dept\Sewer\EWT Act 537 Special Study 2022\Memo to PC 04282022.doc

April 25, 2022

EWTPX 17000

Mr. Mark Gordon, Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380

Re: East Whiteland Township Act 537 Special Study

VIA EMAIL

Sale of Township Sanitary Sewer System

Dear Mr. Gordon:

3100 Horizon Drive Suite 200 King of Prussia, PA 19406

T: 610-277-2402

F: 610-277-7449

www.pennonl.com

As you may be aware, East Whiteland Township is in the process of selling their sanitary sewerage system to Aqua Pennsylvania Wastewater Inc. Being that portions of the East Whiteland's system flows into East Goshen Township, and inter-municipal sewage agreements exist between the Township's, the Department of Environmental Protection (PaDEP) requires East Goshen Township review and adopt the East Whiteland Township's Act 537 Special Study prepared for the sale of the system. Enclosed is a link to this study.

Adoption of the Special Study requires the Township's Planning Commission to review the study and complete the enclosed Component 4A - Municipal Planning Agency Review. We respectfully request this matter be placed on the Commissions May 4th agenda.

In addition, PaDEP requires the Township adopt a Resolution approving the Special Study. For your use, enclosed is a draft Resolution which includes PaDEP's requisite language.

Thank you in advance for your attention to this matter. Should you have any questions, please feel free to contact me.

Sincerely,

PENNONI ASSOCIATES INC.

clck-F Charles Faulkner, PE Township Wastewater Engineer

CF/rmc

cc: John Nagel, Manager, East Whiteland Township, via email John Neild, Director of Public Works, East Whiteland Township, via email Joseph J. McGrory Jr., Esquire, Hamburg, Rubin, Mullin, Maxwell & Lupin, PC, via email Aqua Pennsylvania Wastewater, Inc., via email

Derek Davis, East Goshen Township Manager, via email

U:\Accounts\EWTPX\EWTPX17000 - Sale of System\PROJ RESOURCES\Special Study for DEP Act 537 planning\Letters to review agencies \East Goshen TwpPlanning Commission Cover Letter.docx

CLICK here to view Materials

3850-FM-BCW0362A 6/2016 g pennsylvania

DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

IDEP Code#:

SEWAGE FACILITIES PLANNING MODULE COMPONENT 4A - MUNICIPAL PLANNING AGENCY REVIEW

Note to Project Sponsor: To expedite the review of your proposal, one copy of your completed planning module package and one copy of this Planning Agency Review Component should be sent to the local municipal planning agency for their comments.

SECTION A. PROJECT NAME (See Section A of instructions)

Project Name East Whiteland Townshii, Act 537 Si,ecial StudÇ Transfer of SanitarÈ Sewerage Facilities

SECTION B. REVIEW SCHEDULE (See Section B of instructions)

1. Date plan received by municipal planning agency 4/25/2022

2. Date review completed by agency

SECTIONC. AGENCY REVIEW (See Section C of instructions)

Yes No

[gJ □ 1. Is there a municipal comprehensive plan adopted under the Municipalities Planning Code (53 P.S. 10101, et seq.)?

[gJ □ 2. Is this proposal consistent with the comprehensive plan for land use?

If no, describe the inconsistencies

[gJ □ 3. Is this proposal consistent with the use, development, and protection of water resources?

If no, describe the inconsistencies

[gJ □ 4. Is this proposal consistent with municipal land use planning relative to Prime Agricultural Land Preservation? □ [gJ 5. Does this project propose encroachments, obstructions, or dams that will affect wetlands?

If yes, describe impacts □ [gJ 6. Will any known historical or archaeological resources be impacted by this project?

If yes, describe impacts □ [gJ 7. Will any known endangered or threatened species of plant or animal be impacted by this project?

If yes, describe impacts

[gJ □ 8. Is there a municipal zoning ordinance?

[gJ □ 9. Is this proposal consistent with the ordinance?

If no, describe the inconsistencies □ [gJ 10. Does the proposal require a change or variance to an existing comprehensive plan or zoning ordinance?

[gJ □ 11. Have all applicable zoning approvals been obtained?

[gJ □ 12. Is there a municipal subdivision and land development ordinance?

- 1 -

3850-FM-BCW0362A 6/2016

SECTIONC. AGENCY REVIEW (continued)

Yes No

□ 13. Is this proposal consistent with the ordinance?

If no, describe the inconsistencies

□ 14. Is this plan consistent with the municipal Official Sewage Facilities Plan?

If no, describe the inconsistencies □ 15. Are there any wastewater disposal needs in the area adjacent to this proposal that should be considered by the municipality?

If yes, describe □ 16. Has a waiver of the sewage facilities planning requirements been requested for the residual tract of this subdivision? □ □ If yes, is the proposed waiver consistent with applicable ordinances?

If no, describe the inconsistencies

17. Name, title and signature of planning agency staff member completing this section: Name: Mark A. Gordon Title: Townshig Zoning Officer

Signature: Date: 4/28/2022 Name of Municipal Planning Agency: East Goshen Townshig Planning Commission Address 1580 Paoli Pike Telephone Number: 610-692-7171

SECTION D. ADDITIONAL COMMENTS (See Section D of instructions)

This component does not limit municipal planning agencies from making additional comments concerning the relevancy of the proposed plan to other plans or ordinances. If additional comments are needed, attach additional sheets.

The planning agency must complete this component within 60 days.

This component and any additional comments are to be returned to the applicant.

- 2 -

MEMO to The EGT Planning Commission/ Malvern Institute Land Development Application

Memorandum

East Goshen Township

1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 4/28/2022 To: Planning Commission From: Mark Gordon, Township Zoning Officer Re: Malvern Institute/ Land Development Application

Planning Commission Members,

The Township has received a Land Development Application and Plan for the Malvern Institute proposing several development improvements on the property and which also addresses the requirements outlined in the November 25, 2020 Zoning Hearing Board Decision and Order (D&O), issued on Dec 1, 2020. The ZHB D&O outlines the ZHB approval for the following:

1. A special exception to expand the floor area serving the legal non-conforming use 2. A variance from the maximum 25% increase in total floor area, permitting an expansion of 34.04% {Second story addition) 3. A variance from the four foot maximum height limitation for fences in the front yard 4. A variance for the 24 foot driveway width requirement, to permit a 22 foot driveway width 5. A variance for the or the 18 month time limit for the applicant to implement the relief granted. The application and plans were originally submitted in June of 2021, however the Malvern Institute (Ml} was not prepared to answer the Township Engineers comments and present the application and plan to the Planning Commission until now. The plan set under consideration at this time is dated June 28, 2021, last revised April 20, 2022

STAFF COMMENTS

The applicant has provided a plan that proposes a second story addition to the Malvern Institute treatment facility in accordance with the ZHB D&O. The D&O outlines 28 conditions of approval, which in large part, are addressed within the LD plan set. There are however, a number of conditions that can't be reflected on the plans and have not been satisfied at this time.

Township has received plan reviews from the Township Engineer, the CCPC, the Conservancy Board, and the Historical Commission. At your meeting the applicant will present the revised Land Development plan and outline for the commission how the plan addresses the ZHB D&O.

At this time, Staff does not recommend action by the PC on this plan. Staff and the Township consultants just received the revised materials on 4/25.

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd}\2021 Land Dev. App\Memo to PC 04282022.doc

ChesterValley FNC' INF[RS, INC.

April 25, 2022

Mr. Mark Gordon Director of Code Enforcement East Goshen Township 1580 Paoli Pike West Chester, PA 19380

RECEt,TED

APR 2 5 2022

BY: ... } ........ .

Re: Preliminary Land Development Plan Malvern Institute - 940 King Road CVE Project No. 21465-0000

Dear Mr. Gordon:

83 Chestnut Road P.O. Box 447 Paoli, PA 19301

610-644-4623 610-889-3143 Fax

www.chesterv.com

On behalf of our client, Malvern Institute for Psychiatric & Alcoholics Studies, we are submitting the following response in support of an application for a Preliminary Land Development. The

following documents have been enclosed in support of the application:

• Eleven (11) copies of a Preliminary Land Development Plan for Malvern Institute, dated June 28, 2021, last revised on April 20, 2022; • Eleven (11) copies of a Stormwater Calculations Worksheet, dated June 28, 2021, last revised April 20, 2022. • Eleven (11) copies of a WB-40 Delivery Vehicle Exhibit, dated April 21, 2022.

We offer the following responses to the review comments from the Pennoni review letter dated August 16, 2021. Comments are repealed below and responses to each follow in bold, italicized text:

The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December 1, 2020 for the following: l. A special exception from §240-40.C(2)(e) to expand the floor area of the main building on

the properly serving the Applicant's legal nonconforming use;

2. A variance from the maximum 25% increase in total floor area of structures devoted to a nonconforming use per §240-40.C(2)(c) in order to permit a 34.04% floor area expansion pursuant to the initial ( original) proposal or a 52. 92% floor area expansion pursuant to the alternate (revised) proposal;

3. A variance from the four foot (4') maximum height limitations of §240-32.E(2) in order to construct a six foot (6') tall estate fence in the front yard of the property;

E"t. 1955 PAOLI EAGLE

CLICK HERE TO VIEW PLANS

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 2

Est. 1955 P A O L I E A G L E

4. A variance from the 24-foot driveway minimum width regulation of §240-33.C(10) in order to permit a 22-foot wide driveway for two-way traffic at night;

5. A variance from the 250-foot minimum setback requirement of §240-31.C(2)(mm) in order to permit the first floor of the new building made the subject of the revised proposals to be setback 45.1 feet from the neighboring residential properties;

6. A variance from the 18-month time limit in §240-58.D so that any relief here granted will not lapse or become null and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and

7. Such other relief necessary and appropriate to permit the Applicant’s proposed expansion of its nonconforming use.

Decision and Order

1. The Applicant shall restrict and limit the treatment program at the King Road facility (the “Facility”) to in-patient treatment only.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). It should be noted that Malvern Institute is licensed only for in-patient treatment. To the extent that a narrative response is requested, the responses in this letter shall constitute the narrative response.

2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and correct copy of the submission shall be provided to the parties hereto.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans).

3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of incoming and outgoing persons and vehicles. The location of all video cameras shall be

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 3

Est. 1955 P A O L I E A G L E

depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that any vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times in addition, the Applicant shall implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the locations of the required cameras are not indicated on the plans, as required.

The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). During the overnight hours, 9pm to 1am, security services are provided by Stonegate Services Group. During all other times, Malvern Institute has an on-staff security guard on site. Proposed video camera locations are shown on the plan. The video monitoring station is staffed at all times.

4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than 180 days from final, unappealable and unappealed zoning approval.

This condition has been met.

5. The Township confirmed the application was accepted in a timely fashion on June 28, 2021. King Road is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development plan review, along the entire western and southern boundaries of the Property except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color(s) shall be fully revealed during the land development plan review.

The required fence is indicated per the above; the detail for the fence is indicated on Sheet 12A. Board of Supervisors approval is required.

Acknowledged.

6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling of any and all land development plan review proceedings conducted by the Township Planning Commission and Board of Supervisors pursuant to this Order.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 4

Est. 1955 P A O L I E A G L E

The Township confirmed a letter was sent to all property owners within 1000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.

Acknowledged.

7. The Applicant shall submit and implement a landscape plan in accordance with §240- 27.C(2) for the western and southern portions of the property except for any areas within the floodplain.

A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.

Acknowledged.

8. The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C(3), for so long as the Property is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet in height. These plantings are intended to mitigate the view of the 8-foot fence from the neighboring properties. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant’s landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence.

A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as 10-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.

Acknowledged.

9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 5

Est. 1955 P A O L I E A G L E

submitted with the land development application for the review of the Board of Supervisors as part of the land development approval. Note:

a. The fence and landscaping are indicated as required.

Acknowledged.

b. It may be appropriate to substitute a more deer resistant species for the proposed

mountain laurel; please review with the Conservancy Board.

The native species of Mountain laurel (Kalmia latifolia) is noted to be deer resistant / tolerant. Deer will eat almost anything when they are hungry enough. Kalmia is able to withstand the deer browse should the deer chose to eat the plant. We would recommend retaining the Mountain laurel as an evergreen component to the property buffer.

c. We will defer to the Conservancy Board of additional comments.

Acknowledged.

d. The applicant shall submit the fencing plan to Willistown Township for review and

comment and a determination if any permits are required.

The fence details will be coordinated with Willistown Township upon receipt of Preliminary Approval from East Goshen Township.

10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the 8-foot fence and the estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility.

The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.

Acknowledged.

11. All proposed fencing shall be shown in detail in the land development plan and shall be continually maintained by the owner.

Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 6

Est. 1955 P A O L I E A G L E

Acknowledged. Maintenance requirements will be provided with the Final Plan.

12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style. The location of all proposed fencing shall be shown in plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, if available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the improvements for which financial security must be posted by the Applicant.

Note:

• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted. • Fence manufacture for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier

Acknowledged.

13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western property lines other than the garden, the greenhouse, and the pedestrian walking paths.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

Patient activities in these areas is limited to the greenhouse, the garden, and the walking path.

14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as are necessary to mitigate potential noise form these facilities.

To be discussed further with all parties.

Acknowledged.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 7

Est. 1955 P A O L I E A G L E

15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion. Staff and visitors shall be restricted to smoking in the front of the building.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.

The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). Upon installation of the smoking pavilion, patients will be informed of the rule that all smoking shall occur within the designated area. Staff will be employed to enforce the rule.

16. The smoking pavilion shall be equipped with a “Smoke Eater” type of ventilation and filtration system to minimize the effects of smoke on the surrounding property.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

The smoke-eater is indicated on the plans. Details for the smoke-eater, which was shown and explained during the proceedings, will also be included in the architectural package.

17. The Applicant shall screen the new smoking pavilion from the neighboring properties to the west and north with the 8-foot fence described above.

The required fence is indicated.

Acknowledged.

18. The Applicant shall demonstrate during the land development application review that the “Smoke Eater” can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

Details for the smoke-eater, which was shown and explained during the proceedings, will also be included in the architectural package. Additional information from the smoke-eater manufacturer will be provided to the Township. The project architect is seeking confirmation from a proper installation contractor that the unit will function as

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 8

Est. 1955 P A O L I E A G L E

intended upon installation. This will be provided prior to final land development approval.

19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

Details for the sound attenuation for the new generator will be provided to the Township.

20. The following site improvements shall be completed prior to issuance of a building permit for the vertical building addition or barn renovations:

a. Parking lot renovations; b. Installation of estate fence and the 8-foot fence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures; d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.

We recommend the applicant address these conditions as a narrative response, to be included on the plan and recorded with the final plan.

Acknowledged. It is recommended that the Township inspect the improvements listed above as they are implemented on site.

21. The Applicant shall construct and maintain all walking paths with pervious wood chips.

No modifications to the trail are proposed. However, we recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

The walking path is shown on the plans. The path will be maintained in good order by the Malvern Institute staff and landscaping contractor which is on site on a weekly basis during the spring, summer and fall seasons.

22. The Applicant shall comply with the parking allocation presented on the Plan.

The parking appears to meet Code requirements (see Sheet 4)

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 9

Est. 1955 P A O L I E A G L E

Acknowledged.

23. The Applicant shall agree to permit the outdoor patient activities on the property only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between 10 p.m. and 11:30 p.m. A maximum of 4 patients at any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between 11:30 p.m. and 7 a.m.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

Acknowledged outdoor patient activity will be limited between the hours of 10PM and 7AM and will be conducted under staff supervision during these hours.

24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any further expansion of the treatment center for a period of 30 years. The deed restriction shall be enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.

Nothing appears to have been provided to address this condition. We recommend that a draft document be submitted to the Township for the Township Solicitor’s review prior to recording.

A draft deed restriction will be submitted under separate cover.

25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors’ calls.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

During business hours M-F 8A-4:30P a contact hierarchy has been established to communicate to leadership on site consisting of Executive Director, Clinical Director, and the shift supervisor. Outside of these hours the shift supervisor/clinical lead designee will be properly trained to respond appropriately to neighbors’ calls.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 10

Est. 1955 P A O L I E A G L E

26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status of the expansion project, identify any issues that the Facility has encountered in the last year with neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by mail of the scheduling of this annual presentation.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

Acknowledged. The executive director or other assigned staff will present the report on an annual basis.

27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient’s identity or to require the police to respond but simply to advice the police that someone has left the Facility.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

Acknowledged. Malvern Treatment Center will alert Westtown East Goshen Regional Police Department of AWOL discharges by calling the radio room at 610-692-5100 and requesting to make notification that there was a volunteer walk-off. This is the requested method of communication as directed by the Westtown East Goshen Regional Police Department.

28. Applicant shall obtain a building permit for the vertical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.

The Township confirmed that the applicant shall secure a building permit for the vertical building addition no later than December 31, 2023 and the barn renovations no later then December 31, 2024. We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

Acknowledged.

Zoning

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 11

Est. 1955 P A O L I E A G L E

1. The applicant is reminded of the general performance standards of §240-24.

The applicant acknowledges the general performance standards of §240-24.

2. A permit is required from the Township for any construction within the identified floodplain. (§240-26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as ‘future’.

Improvements formerly indicated as “future” are not planned to be implemented at this time. In the event that the Applicant chooses to install them in the future, all necessary permits will be obtained by the Township and other applicable agencies.

3. Please clarify specific ADA ramp details to be utilized in accordance with PENNDOT standard details. (§240-33.B(7)(b))

The specific ADA ramp detail proposed for the site has been added to revised plans on sheet 12A.

4. Per §240-33.C(10), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.

The geometry of the island and one-way drive has been revised to provide a minimum 22 foot wide drive lane near the front door of the building.

5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a loading and unloading space for the vehicle. (§240-33.D(2))

The largest vehicle that delivers to the Malvern Institute is a WB-40 trailer. The loading area for this vehicle is on the east side of the building. An exhibit demonstrating the maneuvering of a WB-40 trailer is enclosed with this submission.

Subdivision And Land Development

6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(8))

Language in note #2 on sheet 2 has been revised to provide information about the site benchmark.

7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 12

Est. 1955 P A O L I E A G L E

There are no sidewalks or paths proposed along the public ROW by this plan.

Stormwater Management

8. Please indicate the Line of Interest/Point on Analysis on the drainage area plan.

The basis for analyses of project stormwater is that the outflow from SWM #1, when combined with runoff from buildout site disturbance that bypasses the basin, meets or exceeds ordinance criteria. Since the project is a proposed re-development, it is not necessary to control rate or volume of runoff from existing site areas that will not be made impervious in connection with the project. See Note 4 on page 1 of the Stormwater Report for a more detailed discussion of the calculational basis for the analysis and design of the proposed stormwater control system.

Given the above, the designated POI could be at any point on the creek downstream of all proposed disturbance (for the purposes of stormwater analyses and erosion control, areas of proposed landscape enhancement only are not considered “disturbance”). Therefore, we could designate the creek just downstream of the outlet for SW 108 (see Stormwater Calculation Worksheet) as the POI if necessary to designate such.

9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)

Soils testing will be provided with the final stormwater design prior to Final Land Development Approval.

10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.

Since infiltration testing at the site hadn’t yet been undertaken at the time the stormwater system was designed, the outlet works was designed to retain, at the lowest opening (IE 527.37 ft. msl, see Sheet 8A, Detail: Outlet Control @ SW 103) a volume (3,010 CF, see Stormwater Report, page A19) exceeding the required infiltration volume (2,991 CF, Stormwater Report, page 2) to ensure compliance without reliance on infiltration occurring during the 2-yr. design rainfall event. The indicated Proposed Infiltration Volume 3,010 CF on page 2 can be considered conservative. The volume calculated within HydroCAD on page A3 (3,326 CF) is the infiltration volume that would be realized if the measured field infiltration rate yields a design infiltration rate of 0.11 in/hr. The actual 2 -yr. infiltration will be at least 3,010 CF, but could be theoretically as high as 5,340 CF (entire 2-yr. SWM #1 inflow volume) if the design infiltration rate is high enough.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 13

Est. 1955 P A O L I E A G L E

11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and subgrade stability. The applicant should provide soils tests for the infiltration BMP. (§195-20.I)

Soils testing will be provided with the final stormwater design prior to Final Land Development Approval.

12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system. (§195-20.N)

Permanent inlet filters are proposed for the new drainage inlets upstream of the infiltration basin. A detail for the inlet filters has been added to sheet 8B.

13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.

As indicated on page A17 of Stormwater Report, the top of aggregate of SWM #1 is IE 525.75’ + 3.42’= 529.17’. This is consistent with the elevations indicated for SWM #1 on Sheet 5 of 15, Grading & Utilities Plan; Sheet 8A of 15, Post Construction Stormwater Management Details, Detail: SWM#1, and on the Stormwater Calculation Worksheet. The 2-yr. peak elevation (527.48) within SWM #1, as indicated on Page A3, while (slightly) above the invert (527.37) of the lowest opening in the outlet control at SW 103, is below the top of wall within SW 103, and is well below the top of aggregate of SWM #1.

Furthermore, given the basin’s footprint of 3,922 SF [(58’ x 55’) + (24’ x 30.5’)] and a storage volume (3010 CF) below the lowest opening (527.37) in the outlet control, the hydraulic head (of infiltration) is 9.2”, and for total storage (6109 CF) at top of bed (529.17), the hydraulic head is 18.7”, both well below the DEP recommended maximum depth of 24” on page 16 of 21, Appendix C of the PENNSYLVANIA Stormwater BMP Manual December 30, 2006.

14. The Peak Rate calculations appear to consider only SWM #1 outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§195-22)

The basis of analyses for project stormwater is explained in the response to comment 8. The Table, Peak Rate Control, on page 2 of the Stormwater Report lists proposed and existing peak flows from project (ie, new impervious surfaces) area, as well as allowable flow from project area given ordinance criteria. The enclosed revised Stormwater Calculation Worksheet has been revised to identify the areas of new impervious and the areas where existing impervious cover is being redeveloped with impervious cover. The

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 14

Est. 1955 P A O L I E A G L E

difference between proposed and allowable project peak flows is the required attenuation of peak flow to SWM #1 to ensure that the peak sum of bypass flow and SWM #1 discharge will meet ordinance requirements at the POI. It can be seen that the actual peak outflow from SWM #1 is less than allowable peak SWM #1, particularly for frequent storms (1-10-years). See pages A2-A8 of the Stormwater Report for the data presented in the referenced table.

15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by, the Conservation District or municipality (as applicable) for a determination of adequacy prior to construction of the revised features. (§195-27.A(3))

A statement by the applicant certifying compliance with this requirement has been added to the cover sheet of the revised plans.

16. The applicant should provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195- 27.A(4))

The required signature block has been added to the cover sheet.

17. The applicant should provide an easement around the stormwater management BMP’s; alternately a blanket easement can be provided. (§195-27.B(18)(c)

A note has been added to the cover sheet providing a blanket easement to East Goshen Township to inspect the stormwater management facilities.

18. The applicant should provide the documents required per§195-27.F and §195-37 regarding a Stormwater Operations & Management Plan and Agreement, to be recorded.

The Stormwater Operations & Management and Agreement will be provided for review and approval by the Township prior to plan recordation.

19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP’s. (§195-37)

Operations and Maintenance notes are provided within the plan set. This will serve as the Operations and Maintenance Plan upon recordation of the Final Land Development Plan.

20. Please provide a sediment barrier downslope of SW108.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 15

Est. 1955 P A O L I E A G L E

Compost filter sock has been added downslope of SW108.

21. The limit of disturbance does not include any fencing, landscaping improvements nor ‘future’ improvements.

Installation of the fencing and landscaping will not alter the grading and is therefore not included in the LOD. Improvements identified on the plan as “future” are not planned to be implemented at this time. In the event that the Applicant chooses to install them in the future, necessary permits will be obtained from the Township and other applicable agencies.

General

22. Multiple improvements are indicated as ‘future’. It is unclear if they are intended to be included as part of the overall approval.

Improvements identified on the plan as “future” are not planned to be implemented at this time. In the event that the Applicant chooses to install them in the future, necessary permits will be obtained from the Township and other applicable agencies.

23. We recommend adding an additional arrow at the circle in addition to ONE WAY signage.

A directional arrow and sign have been added to the circle and a one-way sign detail has been added to sheet 12A on the revised plan.

24. The applicant shall confirm the height of the proposed walls, if more than four (4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.

Final wall designs will be provided prior to Final Land Development Approval.

25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.

Acknowledged.

26. We recommend a detail for the dumpster enclosure be provided.

A trash enclosure detail has been added to sheet 12A of the revised plans.

27. An additional ‘decorative fence’ is indicated within the interior of the site; please provide a detail for this fence.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 16

Est. 1955 P A O L I E A G L E

Final fence and wall details will be provided prior to Final Land Development Approval.

28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.

Proposed fence along the western property boundary and behind the southwestern portion of the main building are intended to be sound attenuation fencing. The limits of sound attenuation fencing will be established prior to final Land Development Approval.

29. Fencing sound attenuation details should be provided.

A detail for sound attenuation fencing is provided on the plans. Specifications for the sound attenuation fencing will be provided prior to final Land Development Approval.

30. Please additionally note the status of the following reviews/permits: a. NPDES Permit (PADEP/CCCD) (§195-15.C(2), -16.A, -17.A) – Not applicable (limit of disturbance is indicated as 0.88 acres) Not applicable. b. Planning Module (PADEP) (§240-24.F, §205-33.B(22)(a)) – Correspondence has

not yet been received. There are no additional EDU’s required for the improvements proposed by this plan. c. Sanitary Sewer (Municipal Authority) – Correspondence has not yet been received

Not applicable. d. On-lot Wells (CCHD) – Not applicable.

Not applicable. e. Highway Occupancy Permit (PennDOT) – Not applicable Not applicable. f. Fire/Emergency – Correspondence has not yet been received Acknowledged. g. Historic Resource (Historical Comm.) – Correspondence has not yet been received

Acknowledged. h. Landscaping (Conservancy Board) – Correspondence has not yet been received.

Acknowledged. i. County Planning – See July 28, 2021 correspondence Acknowledged. The County comments will be taken under advisement. j. Willistown Township - Correspondence has not yet been received Acknowledged.

Chester Valley Engineers

Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 17

Est. 1955 P A O L I E A G L E

We trust the above items constitute a complete submission adequate for your review. Should you have any questions or require additional information, I can be reached at 610-644-4623 x103 or by email at rstratton@chesterv.com.

Very truly yours, Chester Valley Engineers, Inc.

Richard F. Stratton, P.E. Senior Project Manager

Enclosures: as noted

cc: Kevin Williams, Malvern Institute Brian L. Nagle, MacElree Harvey, Ltd.

WB-40 - Intermediate Semi-Trailer

WB-40 DELIVERY VEHICLE EXHIBIT SCALE:1"=40' DATE:04/21/2022

J:\CVE-21000\21465\dwg\21465 VT.dwg, 4/21/2022 12:58:22 PM, . .

STORMWATER CALCULATION WORKSHEET

E

U

M

PENNSYLVANIA ONE CALL SYSTEM, INC.

CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776

SEE SHEET FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C .

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C .

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C .

D

I

G

!

,

I

E

U

M

1-800-242-1776

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

L

V

A

N

I

A

ON

L

S

Y

S

A

C

L

N

C .

D

I

G

!

,

I

E

U

M

1-800-242-1776 POCS SERIAL NUMBER:

E

1-800-242-1776

*

P

P

S

T

O

O

Y

C

A

E

B

L

L

O

R

F

E

N

N

S

Y

E

T

20211743009

LOCATION MAP

NO. DATE REVISION

SCALE DRAWN BY DATE CHECKED BY

PROJECT NO.

DRAWING

F.B. 83 Chestnut Road, P.O . Box 447, P aoli, PA 19301

610-644-4623 | 610-889-3143 Fax www.chesterv.com

Chester Valley ENG INE ERS, INC. 21465

MALVERN INSTITUTE 2ND STORY BUILDING ADDITION

PRELIMINARY LAND DEVELOPMENT PLAN

FOR

EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA

UNIFORM PARCEL IDENTIFIER: 53-2-18, 53-2B-13

1 OF 1

1"=20' 06/28/2021 PT RFS

60

1" = 20'

Scale in Feet

0 20 40 80 15 10 5

J:\CVE-21000\21465\dwg\Sheets\DA Plans\01 SW CALCS.dwg, 4/22/2022 8:51:54 AM, . .

One South Church Street

Second Floor West Chester, PA 19382

T: 610-429-8907 F: 610-429-8918

www.pennoni.com August 16, 2021

EGOST 00124

Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380

RE: Malvern Institute, LLC, 940 West King Road Preliminary Land Development Review

Dear Mark:

As requested, we have reviewed the following information, regarding the referenced revised submission:

• “Preliminary Land Development Plans for Malvern Institute” (15 sheet) dated June 28, 2021, prepared by Chester Valley Engineers, Inc.;

• “Stormwater Management Report for Malvern Institute” dated June 28, 2021, prepared by Chester Valley Engineers, Inc.; and

• Application and supplemental documents.

The applicant/owner, Malvern Institute, is proposing various improvements to UPI 53-2-18 (9.6 acres) which includes a 2nd story building addition, greenhouse, smoking pavilion, additional parking spaces, fence with associated landscaping, lighting and stormwater management. The site is located on the south side of King Road (SR 2022) opposite Madeline Drive, within the R-2 Residential District. A small portion of the site UPI 53- 2B-13 (1.0 acre) is located within Willistown Township however no improvements are proposed on this parcel. The property is served by public water and public sanitary sewer.

The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December 1, 2020 for the following:

1. A special exception from §240-40.C(2)(e) to expand the floor area of the main building on the property serving the Applicant’s legal nonconforming use; 2. A variance from the maximum 25% increase in total floor area of structures devoted to a nonconforming use per §240-40.C(2)(c) in order to permit a 34.04% floor area expansion pursuant to the initial (original) proposal or a 52.92% floor area expansion pursuant to the alternate (revised) proposal; 3. A variance from the four foot (4’) maximum height limitations of §240-32.E(2) in order to construct a six foot (6’) tall estate fence in the front yard of the property; 4. A variance from the 24-foot driveway minimum width regulation of §240-33.C(10) in order to permit a 22-foot wide driveway for two-way traffic at night; 5. A variance from the 250-foot minimum setback requirement of §240-31.C(2)(mm) in order to permit the first floor of the new building made the subject of the revised proposals to be setback 45.1 feet from the neighboring residential properties;

EGOST 00124 August 16, 2021 Page 2 Mark A. Gordon, Zoning Officer Malvern Institute

6. A variance from the 18-month time limit in §240-58.D so that any relief here granted will not lapse or become null and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and 7. Such other relief necessary and appropriate to permit the Applicant’s proposed expansion of its nonconforming use.

We offer the following comments:

DECISION AND ORDER

1. The Applicant shall restrict and limit the treatment program at the King Road facility (the “Facility”) to in-patient treatment only.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and correct copy of the submission shall be provided to the parties hereto.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of incoming and outgoing persons and vehicles. The location of all video cameras shall be depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that any vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times in addition, the Applicant shall implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the locations of the required cameras are not indicated on the plans, as required.

4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than 180 days from final, unappealable and unappealed zoning approval.

The Township confirmed the application was accepted in a timely fashion on June 28, 2021.

EGOST 00124 August 16, 2021 Page 3 Mark A. Gordon, Zoning Officer Malvern Institute

5. King Road is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development plan review, along the entire western and southern boundaries of the Property except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color(s) shall be fully revealed during the land development plan review.

The required fence is indicated per the above; the detail for the fence is indicated on Sheet 12A. Board of Supervisors approval is required.

6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling of any and all land development plan review proceedings conducted by the Township Planning Commission and Board of Supervisors pursuant to this Order.

The Township confirmed a letter was sent to all property owners within 1000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.

7. The Applicant shall submit and implement a landscape plan in accordance with §240-27.C(2) for the western and southern portions of the property except for any areas within the floodplain.

A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.

8. The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C(3), for so long as the Property is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet in height. These plantings are intended to mitigate the view of the 8-foot fence from the neighboring properties. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant’s landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence.

A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as 10-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.

9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans submitted with the land development application for the review of the Board of Supervisors as part of the land development approval.

EGOST 00124 August 16, 2021 Page 4 Mark A. Gordon, Zoning Officer Malvern Institute

Note: a. The fence and landscaping are indicated as required. b. It may be appropriate to substitute a more deer resistant species for the proposed mountain laurel; please review with the Conservancy Board. c. We will defer to the Conservancy Board of additional comments. d. The applicant shall submit the fencing plan to Willistown Township for review and comment and a determination if any permits are required.

10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the 8-foot fence and the estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility.

The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.

11. All proposed fencing shall be shown in detail in the land development plan and shall be continually maintained by the owner.

Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.

12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style. The location of all proposed fencing shall be shown in plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, if available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the improvements for which financial security must be posted by the Applicant.

Note:

• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted. • Fence manufacture for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier

13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western property lines other than the garden, the greenhouse, and the pedestrian walking paths.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as are necessary to mitigate potential noise form these facilities.

To be discussed further with all parties.

EGOST 00124 August 16, 2021 Page 5 Mark A. Gordon, Zoning Officer Malvern Institute

15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion. Staff and visitors shall be restricted to smoking in the front of the building.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.

16. The smoking pavilion shall be equipped with a “Smoke Eater” type of ventilation and filtration system to minimize the effects of smoke on the surrounding property.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

17. The Applicant shall screen the new smoking pavilion from the neighboring properties to the west and north with the 8-foot fence described above.

The required fence is indicated.

18. The Applicant shall demonstrate during the land development application review that the “Smoke Eater” can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

20. The following site improvements shall be completed prior to issuance of a building permit for the vertical building addition or barn renovations:

a. Parking lot renovations; b. Installation of estate fence and the 8-foot fence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures; d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.

We recommend the applicant address these conditions as a narrative response, to be included on the plan and recorded with the final plan.

EGOST 00124 August 16, 2021 Page 6 Mark A. Gordon, Zoning Officer Malvern Institute

21. The Applicant shall construct and maintain all walking paths with pervious wood chips.

No modifications to the trail are proposed. However, we recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

22. The Applicant shall comply with the parking allocation presented on the Plan.

The parking appears to meet Code requirements (see Sheet 4)

23. The Applicant shall agree to permit the outdoor patient activities on the property only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between 10 p.m. and 11:30 p.m. A maximum of 4 patients at any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between 11:30 p.m. and 7 a.m.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any further expansion of the treatment center for a period of 30 years. The deed restriction shall be enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.

Nothing appears to have been provided to address this condition. We recommend that a draft document be submitted to the Township for the Township Solicitor’s review prior to recording.

25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors’ calls.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.

26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status of the expansion project, identify any issues that the Facility has encountered in the last year with neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by mail of the scheduling of this annual presentation.

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient’s identity or to require the police to respond but simply to advice the police that someone has left the Facility.

EGOST 00124 August 16, 2021 Page 7 Mark A. Gordon, Zoning Officer Malvern Institute

We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

28. Applicant shall obtain a building permit for the vertical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.

The Township confirmed that the applicant shall secure a building permit for the vertical building addition no later than December 31, 2023 and the barn renovations no later then December 31, 2024. We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.

ZONING

1. The applicant is reminded of the general performance standards of §240-24.

2. A permit is required from the Township for any construction within the identified floodplain. (§240- 26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as ‘future’.

3. Please clarify specific ADA ramp details to be utilized in accordance with PENNDOT standard details. (§240-33.B(7)(b))

4. Per §240-33.C(10), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.

5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a loading and unloading space for the vehicle. (§240-33.D(2))

SUBDIVISION AND LAND DEVELOPMENT

6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(8))

7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.

STORMWATER MANAGEMENT

8. Please indicate the Line of Interest/Point on Analysis on the drainage area plan.

9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)

10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.

11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and subgrade stability. The applicant should provide soils tests for the infiltration BMP. (§195-20.I)

EGOST 00124 August 16, 2021 Page 8 Mark A. Gordon, Zoning Officer Malvern Institute

12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system. (§195-20.N)

13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.

14. The Peak Rate calculations appear to consider only SWM #1 outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§195-22)

15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by, the Conservation District or municipality (as applicable) for a determination of adequacy prior to construction of the revised features. (§195-27.A(3))

16. The applicant should provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))

17. The applicant should provide an easement around the stormwater management BMP’s; alternately a blanket easement can be provided. (§195-27.B(18)(c)

18. The applicant should provide the documents required per§195-27.F and §195-37 regarding a Stormwater Operations & Management Plan and Agreement, to be recorded.

19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP’s. (§195-37)

20. Please provide a sediment barrier downslope of SW108.

21. The limit of disturbance does not include any fencing, landscaping improvements nor ‘future’ improvements.

GENERAL

22. Multiple improvements are indicated as ‘future’. It is unclear if they are intended to be included as part of the overall approval.

23. We recommend adding an additional arrow at the circle in addition to ONE WAY signage.

24. The applicant shall confirm the height of the proposed walls, if more than four (4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.

25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.

26. We recommend a detail for the dumpster enclosure be provided.

27. An additional ‘decorative fence’ is indicated within the interior of the site; please provide a detail for this fence.

EGOST 00124 August 16, 2021 Page 9 Mark A. Gordon, Zoning Officer Malvern Institute

28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.

29. Fencing sound attenuation details should be provided.

30. Please additionally note the status of the following reviews/permits: a. NPDES Permit (PADEP/CCCD) (§195-15.C(2), -16.A, -17.A) – Not applicable (limit of disturbance is indicated as 0.88 acres) b. Planning Module (PADEP) (§240-24.F, §205-33.B(22)(a)) – Correspondence has not yet been received c. Sanitary Sewer (Municipal Authority) – Correspondence has not yet been received d. On-lot Wells (CCHD) – Not applicable e. Highway Occupancy Permit (PennDOT) – Not applicable f. Fire/Emergency – Correspondence has not yet been received g. Historic Resource (Historical Comm.) – Correspondence has not yet been received h. Landscaping (Conservancy Board) – Correspondence has not yet been received i. County Planning – See July 28, 2021 correspondence j. Willistown Township - Correspondence has not yet been received

Should you have any further questions or comments, please contact the undersigned.

Sincerely,

PENNONI

Nathan M. Cline, PE Township Engineer

cc: Derek Davis, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) Brian Nagle, Esq., MacElree Harvey (via e-mail) Malvern Institute for Psychiatric & Alcoholic Studies (via e-mail) Brett MacKay, PE, Chester Valley Engineers, Inc. (via e-mail) Richard Stratton, PE, Chester Valley Engineers, Inc. (via e-mail) Kristin Camp, Esq., Buckley Brion (via e-mail)

THE COUNTY OF CHESTER

COMMISSIONERS Marian D. Moskowitz Josh Maxwell Michelle Kichline

Brian N. O’Leary, AICP Executive Director

PLANNING COMMISSION Government Services Center, Suite 270 601 Westtown Road P. O. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515

email: ccplanning@chesco.org • website: www.chescoplanning.org

July 28, 2021

Derek Davis, Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380

Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition (Revised) # East Goshen Township – LD-07-21-16804

Dear Mr. Davis:

A Preliminary Land Development Plan entitled "Malvern Institute 2nd Story Building Addition", prepared by Chester Valley Engineers Inc., and dated June 28, 2021, was received by this office on June 29, 2021. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.

PROJECT SUMMARY:

Location: south side of King Road, west of Line Road Site Acreage: 10.50 Lots/Units: 1 Lot Non-Res. Square Footage: 5,400 Proposed Land Use: Expansion of existing medical facility New Parking Spaces: 33 Municipal Land Use Plan Designation: Low Density Residential UPI#: 53-2B-13, 53-2-18, 54-2-127

PROPOSAL:

The applicant proposes the construction of a 5,400 square foot second floor addition to the existing facility, along with the construction of 33 additional parking spaces (81 parking spaces, including 4 handicapped-accessible spaces, will be provided). No new sewage disposal or water supply is proposed as part of this project. The project site is located in the R-2 Low Density Suburban Residential zoning district. The easternmost portion of the site is situated in Willistown Township, which is zoned R-1 Residence.

RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed, and all Township issues should be resolved before action is taken on this land development plan.

Page: 2 Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition # East Goshen Township – LD-07-21-16804

Site Plan Detail, Sheet 1: Preliminary Land Development- Malvern Institute 2nd Story Building Addition

Page: 3 Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition # East Goshen Township – LD-07-21-16804

COUNTY POLICY:

LANDSCAPES:

1. The project site is located within the Suburban Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and affordability. As an overlay of all other landscapes, the county’s Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. The proposed land development is consistent with the objectives of the Suburban Landscape.

WATERSHEDS:

2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the Ridley Creek watershed. Watersheds’ highest priority land use objectives within this watershed are: reduce stormwater runoff, protect vegetated riparian corridors, and protect/enhance water-based recreation, cultural, historic resources and public access. Watersheds can be accessed at www.chesco.org/water.

PRIMARY ISSUES:

3. The Township should verify that the design of the proposed outdoor lighting plan (Sheet 10) conforms to Township ordinance requirements. The illumination should be directed inward from the periphery of the site and be oriented to reduce glare and visual impact on the adjoining roadways and land uses.

4. While we acknowledge that Sheet 9-Landscape Plan depicts that extensive landscaping will be provided along the northern, western, and southern parcel boundaries (west of the existing floodplain area), we recommend that the applicant and Township consider planting additional trees, shrubs, and ground cover in areas currently covered by lawn within and adjacent to the parking areas. Landscapes3 recommends that developments in the Suburban Landscape include extensive landscaping in parking areas (page 39).

5. The site contains land within the 100 year flood plain. Although it does not appear that any development activity will encroach into the floodplain, we note that the County Planning Commission does not support development in the floodplain, and the Federal Emergency Management Agency and Pennsylvania Department of Environmental Protection regulate filling or development in the floodplain. Development within a floodplain can increase the magnitude and frequency of normally minor floods, and present health and safety problems.

6. The site contains delineated wetlands. Although it does not appear that any development activity will encroach into the delineated wetland area, the applicant should be aware that placement of fill in wetlands is regulated by the Corps of Engineers in accordance with Section 404 of the Clean Water Act (1977) and the Department of Environmental Protection under Chapter 105 Rules and Regulations for the Bureau of Dams and Waterway Management.

Page: 4 Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition # East Goshen Township – LD-07-21-16804

ADMINISTRATIVE ISSUES:

7. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 stormwater management ordinance standards adopted by each municipality.

8. Sheet 13-Decision and Order Letter indicates that the Township Zoning Hearing Board granted approval for this project with 28 conditions of approval. We note that the conditions of approval include the following:

The applicant shall install and maintain an 8-foot high fence along the entire western and southern property boundaries except for any areas within the floodplain (condition #5); The applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations (condition #9); The applicant shall install 6-foot high estate fencing along the right of way line for King Road (condition #10); and The applicant shall record a deed restriction that prohibits any further expansion of the treatment center for a period of 30 years, which shall be enforceable by the Township (condition #24).

The Township should verify that all applicable conditions of approval have been incorporated into the final plan. The date of the Zoning Hearing Board’s decision should be identified on the approved plan. We note that the Township application form indicates that the Zoning Hearing Board order is dated November 25, 2020 and issued on December 1, 2020.

9. A site plan note incorrectly identifies the UPI-Uniform Parcel Identifier number of the portion of the project site in Willistown Township as 54-2B-127, rather than 54-2-127. This should be corrected by the applicant. The Chester County Recorder of Deeds Office requires that the correct UPI numbers be identified on all subdivision and land development plans submitted for recording.

10. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.

This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.

Sincerely,

Paul Farkas Senior Review Planner

cc: Malvern Institute For Psychiatric & Alcoholics Studies Chester Valley Engineers Inc. Sally A. Slook, Manager, Willistown Township

tstortcal <tCommtsston

ast osbtn otunsbip <ttbtsttr <ttountp tnnsp lbanta

1580 fe"8lkW r 28, 2021 •

East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380

wmtest C!tf)ester, lSS 19380 •

Re: 940 King Rd./ Malvern Institute Land Development Application Historic Resource Impact Study (HRIS) Waiver Request

Dear Commissioners:

610-692-7171

At their meeting on September 9, 2021, the Historical Commission discussed a waiver request that the Township has received from the Malvern Institute. The Malvern Institute has requested a waiver from the Historic Resource Impact Study (HRIS) requirement of the ordinance for their land development application. I have enclosed a copy of the waiver request and the applicable ordinance section for your use.

The Historical Commission discussed the request and does not believe that the applicant has a compelling reason or hardship to support their waiver request. The Historical Commission voted unanimously in favor of the following motion:

Madame Chairman, I move that the Historical Commission recommend denial of the waiver request for the submission of a Historic Resource Impact Study for the Malvern Institute Land Development Application.

Sia

Mark Gordon Township Zoning Officer

Enclosures

F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\2021 Land Dev. App\HC Rec to PC re. Ml Waiver Req. 09282021.doc

MacElree f fr

fkNscg Harvey

INITIATIVE IN PRACTICE'

September 2, 2021

Via Electronic Mail Only: mgordon@eastgoshen.org

Mark Gordon, Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380-619

Re: Malvern Institute for Psychiatric and Alcoholic Studies, Inc. Chester County CCP No: 2019-03106-ZB

Dear Mr. Gordon:

MacElree Harvey, Led. Attorneys ar Law

17 West Miner Street West Chester, PA 19382

61Q.436·0100 I main macelree.com

Brian L Nagle bnag1e@macelree.com d I 610-840-0224 t I 610-430-8245

Please accept this correspondence as formal request for a waiver from the requirement of the Township Code Free Historic Impact Assessment Report relative to the Malvern Institute land development project. Please note that the project is a second floor addition to an existing building and there is no new impact on any historic resource, especially considering the location of the improvements. The barn improvements are all interior renovations.

Thank you for your consideration.

/cfg cc: Malvern Institute [via Electronic Mail Only]

4139741v1 141117.60426

CENTREVILLE, DE KENNETT SQUARE, PA PHILADELPHIA, PA WEST CHESTER, PA

9/28/21, 11 :44 AM TO'M'lship of East Goshen, PA Ecode360

Chapter 240. Zoning

Article VI. Historic Preservation

§ 240-38.10. Historic resource impact study.

[Amended 10-17-2006 by Ord. No. 129-F-06]

Township of East Goshen, PA Tuesday, September 28, 2021

A. Applicability. An historic resource impact study (HRIS}, prepared by a registered architect specializing in historic preservation and adaptive reuse of historic buildings and structures, shall be submitted to the Township, unless waived or modified by the Board of Supervisors, in the following situations:

(1) As part of a preliminary plan submission for any subdivision or land development application

which proposes new construction of buildings, structures, roads, driveways, parking areas, or other land disturbance within 250 feet of the exterior walls of any Class I or II historic resource.

(2) As part of a tentative plan submission for any application for a planned residential

development (prd) which proposes new construction of buildings, structures, roads, driveways, parking areas, or other land disturbance within 250 feet of the exterior walls of any Class I or II historic resource.

(3) As part of a demolition permit application.

(4) As part of a conditional use application.

B. Contents. The HRIS shall contain the following information, unless waived or modified by the Board of Supervisors:

(1) Background information:

(a) If not otherwise provided by the applicant, a general description of the site subject to

the application, including topography, watercourses, vegetation, landscaping, existing drives, etc.

(b) A general description and classification of the historic resources located within 250 feet

of any proposed land development or land disturbance.

(c) A physical description of the interior and exterior of the historic resource(s), including

an interior floor plan.

(d} A narrative description of the historical significance of the historic resource, relative to

both the Township and to the region in general, including the names of past owners and their significance to the Township, region or nation.

(e) A sufficient number of four-inch-by-six-inch photographs to show the exterior of the

historic resource in its setting and, if the applicant is the owner, then photographs of the interior.

(2) An assessment of potential impacts to the historic resources.

https://ecode360.com'prinVEA 16987g uid=7255599 112

9128/21, 11:44AM Tov.nship of East Goshen, PA Ecode360 (a) A description of potential impact(s) to each historic resource with regard to architectural

integrity, historic setting, and future use.

(3) Mitigation measurers: suggested approaches to mitigate potentially negative impacts to

historic resources, including design alternatives, buffering, landscaping, conservation of existing vegetation, and any other appropriate measurers permitted under the terms of this chapter and other Township ordinances.

https://ecode360.c01TvprinVEA1698?guid=7255599 2/2

EAST GOSHEN

CONSERVANCY

September 28, 2021

East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380

Re: 940 King Rd./ Malvern Institute LD Recommendation Landscaping

Dear Commission Members:

At their meeting on September 8, 2021, the Conservancy Board voted unanimously in favor of the following motion:

Mr. Chairman, I move that the Conservancy Board recommend that the Planning Commission approve the landscaping plan proposed for the Malvern Institute Land Development application as submitted with the following conditions:

1. The applicant shall provide additional landscaping within the parking lot island and along the western and eastern side of the parking areas, similar to what they propose along the northern side of the parking area.

2.

The applicant shall increase the diversity of the proposed evergreen species in order to help improve the resiliency of the evergreen planting buffer. 3. The applicant agree to a condition that should the landscape buffer cease to provide a visual screen of the sound fence in the future the applicant will replace dead and thinning landscape material at the direction of the Township.

Si;:t_

Mark A. Gordon Zoning Officer

F:\Data\Shared Data\Property Managemenl\53-2\53-2-18 (940 King Rd)\2021 Land Dev. App\CB Rec to PC 1 5 012aijo21.ioc A O L I p I K E ' w E s T C H E s T E R ' p A . 1 9 3 8 0