Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday, June 1, 2022
7:00 PM
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. May 4, 2022 F. Subdivision and Land Development Applications
1. Malvern Institute G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business J. New Business
1. Paoli Pike Trail (Alternate Route Alignment) K. Liaison Reports L. Correspondence M. Announcements
Bold Items indicate new information to review or discuss.
F:\Data\Shared Data\Agendas\Planning Commission\2022\PC AGENDA 06012022.doc
June 1, 2022 PC Meeting
(.) ui en
en 6 N
=i (.) i:L -
0: r::: 0 ; 111 en - -
Cl) Q. Application Name The Malvern Institute LD p Paoli Pike Trail ALT Route N/A N/A Bold = New Application or PC action required
Completed in 2022
14 Broad St. EWT 537 Special Study
Completed in 2021
Small Wireless Facilities Imperial Marble, 1311 WCP 14 Reservoir Rd. I Glossen ESKE Development LLC
Albert and Lynn Greto 1365 Enterprise Drive 198 Oneida Ln Pipeline HMS/ Consultation Zone 0
KEY
A-Approved AD-Adopted D- Denied P- Pending
V p NA NA
zo F V Sk V Sk V s V s V Sk V Sk ZO/ S DRAFT
,,
Cl) ii: 2 111 C 6/28/2021 N/A
East Goshen Township Planning Commission
Application Tracking Log
U) ... m Cl) Cl) <( r::: - Cl) ci. r::: 0 w ...
Q. :E Cl)
U) r::: r::: (.) E :: a. :::, (.) .c Cl) 0 r::: .... I- (.) <( 0 111 0 0 0 ·;; C .... .... - r::: t:: 2 Cl) 2 Cl) 111 - .... .... 111 111 111 X en 0 C C w 7/1/2021 6/30/2021 6/29/2021 8/13/2021 (4) 6/30/2022 N/A N/A N/A N/A N/A
3/28/2022 I 3/28/2022 NA NA 3/30/2022 NA NA NA NA NA NA
NA NA NA NA NA NA 10/25/2021 10/25/2021 NA NA 10/28/2021 5/25/2021 5/25/2021 NA NA 5/27/2021 4/20/2021 4/20/2021 4/27/2021 NA 4/27/2021 4/26/2021 4/26/2021 NA NA 4/29/2021 4/1/2021 4/1/2021 NA NA 4/1/2021 1/26/2021 1/27/2021 NA NA 1/28/2021 NA NA NA NA NA NA
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2022\PC Tracking Log for 06012022.xlsx
2 Cl) 111 - C 111 C r::: r::: 0 2 0 ; Cl) 111 ; 0 - ,, 0 <( 111 ,, U) <( C - I- 111 r::: I- ...J Cl) Cl) Cl) ...J z r::: C E z en ·;:: Q. 0 111 0 (.) Cl) ... 0 a. IJl ::c: C (.) 2/2/2022 2/15/2022 NA 2/28/2022 N/A N/A N/A N/A N/A
5/4/2022 I 5/6/2022 I 5/19/2022 I 5/27/2021 I P NA NA NA NA A
NA NA 12/7/2021 NA AD 11/3/2021 11/16/2021 12/14/2021 12/24/2021 A 6/2/2021 7/6/2021 7/15/2021 7/23/2021 A 5/5/2021 5/11/2021 5/26/2021 6/18/2021 A 5/5/2021 6/1/2021 6/8/2021 6/25/2021 D 5/5/2021 5/18/2021 TBD 5/31/2021 A 2/3/2021 1/162021 2/25/2021 3/26/2021 A NA NA NA NA AD
5/27/2022
1 2 3 4 5 6 7 8 9 10 11 12
13
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
May 4, 2022
The East Goshen Township Planning Commission held their regular monthly meeting on Wednesday May 4, 2022 in the Township Building. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli
Also present was: Mark Gordon, Zoning Officer Michele Truitt, Township Supervisor
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC- Chester Co Planning Commission
FORMAL MEETING 7 p.m.
CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management
ZHB - Zoning Hearing Board
1. Emest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a moment of silence to remember our troops and first responders. 2. Ernest asked if anyone would be recording the meeting and ifthere were any public
comments about non-agenda items. There was no response. 3. The tracking log was checked and no need for a workshop meeting. 4. The minutes of the April 6, 2022 meeting were approved as amended.
SUBDIVISION AND LAND DEVELOPMENT APPLICATIONS Malvern Institute - Dave Lumpkin, Executive Director; Rick Stratton, Engineer for Applicant, and Brian Nagle, Esq. were present. Brian Nagle made a presentation to the Planning Commission as follows:
• Malvern Institute will address all Township Solicitor comments and Township Engineer comments. To date the Township has not received the Twp. Engineer's comments n the latest plan revision. Rick Stratton presented the Land Development Plan and discussed how the plan addresses the Zoning Hearing Board decision. The Planning Commission members asked the applicant and their consultants questions. Earnest asked for any public comment.
PUBLIC COMMENT The following made comments or asked questions:
I. I Can-ol Lane, East Whiteland Twp., Norman Phizenmayer 2. 12 Treemont, Terri Relick 3. 20 Brookmont Dr., Joanne Murphy
PC 5-4-22 draft 1
1 4. IO Brookmont Dr., Amanda Greenberg 2 5. 21 Treemont Dr., John McCullough 3 6. 3 Treemont Dr., Paige Fenimore 4 7. 8 Line Rd., Maureen Martino 5 6 NEW BUSINESS 7 East Whiteland Township 537 Special Study/Transfer of Sanitary Sewerage Facilities 8 Bernadette Curney and Chuck Faulkner made a quick presentation. Planning Commission members 9 asked Mr. Faulkner some questions. The Planning Commission passed a motion to forward this to the 10 Board of Supervisors. 11 12 13 LIAISON REPORT 14 I. Board of Supervisors 15 Michele Truitt gave an update to the PC. 16 17 ADJOURNMENT 18 There being no further business, the meeting was adjourned at 9: 15 pm. The next regular meeting will be 19 held on Wednesday, June I, 2022 at 7:00 pm. 20 21 22 Respectfully submitted, 23 24 25 26 27 Ruth Kiefer, Recording Secretary 28 Notes from Mark Gordon
PC 5-4-22 draft 2
MEMO to The EGT Planning Commission/ Malvern Institute Land Development Application (Second PC Review)
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 5/26/2022 To: Planning Commission From: Mark Gordon, Township Zoning Officer Re: Malvern Institute/ Land Development Application (Second PC Review)
Planning Commission Members,
The Township has received a Land Development Application and Plan for the Malvern Institute proposing several development improvements on the property and which also addresses the requirements outlined in the November 25, 2020 Zoning Hearing Board Decision and Order (D&O), issued on Dec 1, 2020. The ZHB D&O outlines the ZHB approval for the following:
1. A special exception to expand the floor area serving the legal non-conforming use 2. A variance from the maximum 25% increase in total floor area, permitting an expansion of 34.04% (Second story addition) 3. A variance from the four foot maximum height limitation for fences in the front yard 4. A variance for the 24 foot driveway width requirement, to permit a 22 foot driveway width 5. A variance for the 18 month time limit for the applicant to implement the relief granted.
The Malvern Institute presented their plans to the PC last month (May 4, 2022) and they are back to discuss the 5/25/2022 Pennoni Assoc. review letter. The Township engineer (Pennoni Associates) has reviewed the revised plans dated June 28, 2021 last revised on April 20, 2022; that review letter is enclosed for your review.
STAFF COMMENTS
Staff, the Township Engineer and the Township Solicitor met with the Ml to discuss the review letter in detail and all parties are working to address the final administrative and minor comments.
A resubmission of the plan is required for Final Plan approval, with reviews by staff, the Twp. Engineer, and the Township Solicitor prior to coming to the Planning Commission for a recommendation for Final Plan approval.
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\2021 Land Dev. App\Memo to PC 05262022.doc
MEMO to The EGT Planning Commission/ Malvern Institute Land Development Application (Second PC Review)
The Conservancy Board Comments have been noted in the Pennoni review letter and will be incorporated in the final plan submission.
The Historical Commission's recommendation not to support the waiver request has been discussed internally and staff does not believe that a Historic Resource Impact Study will provide much benefit for the project, and supports the applicants request for a waiver from. The Malvern Institute is the only historic resource within 250' of this project, and it has been significantly renovated over the years prior to the adoption of the Historic Preservation Ordinance and has been adaptively as a Treatment Center use for nearly 75 years. The extensive additions and modifications to the resource have enhanced the adaptive reuse of the structure and we believe the proposed improvements outlined in the Land Development plan will reinforce the existing use and thus assist in its preservation.
At this time staff is satisfied that the applicant has addressed the review comments in the Pennoni letter sufficiently enough to warrant a recommendation for Preliminary approval, and supports action by the Planning Commission to move this application on the Board of Supervisors.
DRAFT MOTION
The Planning Commission has reviewed the Land Development Application and Plan as well as the associated Zoning Hearing Board approval for the Malvern Institute, granting Special Exception and Zoning Variances for the expansion of the use. The expansion of the use consists of the following:
1. Second story addition to the existing single story wing at the rear of the property 2. A new smoking pavilion in the front of the property 3. A new greenhouse at the rear of the main building 4. Associated parking lot and driveway expansions
5.
Associated improvements as ordered by the Zoning Hearing Board within the Special
Exception and Zoning Variance Decision and Order The applicant has requested a waiver from the Historic Resources Impact Study requirement (§240-38.10), which may be waived by the Board of Supervisors. The Planning Commission has no objection to this waiver request due to the modifications that have already been made to this historic resource over the years and prior to the adoption of the Historic Preservation Ordinance.
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors grant preliminary plan approval for the Land Development application and plan prepared for Malvern Institute, prepared by Chester Valley Engineers, dated June 28, 2021, last revised April 20, 2022, with the following condition:
1. All comments outlined in the Pennoni Associates plan review letter Dated May 25, 2022 are addressed and reflective in the Final Plan submission
F:\Data\Shared Data\Property Management\53-2\53-2-18 (940 King Rd)\2021 Land Dev. App\Memo to PC 05262022.doc
EGOST 00124
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
May 25, 2022
RE: Malvern Institute, LLC, 940 West King Road Preliminary Land Development - 2nd Submission
Dear Marie
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907 F: 610-429-8918
www.pennoni.com
As requested, we have reviewed the following information, prepared by Chester Valley Engineers, Inc. regarding the referenced submission:
• "Preliminary Land Development Plans for Malvern Institute" (15 sheets) dated June 28, 2021, revised April 20, 2022;
• 11Stormwater Calculations Worksheet" dated June 28, 2021, revised April 20, 2022;
• "WB-40 Delivery Vehicle Exhibit" dated April 21, 2022; and
• Engineer's response letter dated April 25, 2022.
The applicant/owner, Malvern Institute, is proposing various improvements to UPI 53-2-18 (9.6 acres) which includes a 2nd story building addition, greenhouse, smoking pavilion, additional parking spaces, fence with associated landscaping, lighting and stormwater management. The site is located on the south side of King Road (SR 2022) opposite Madeline Drive, within the R-2 Residential District. A small portion of the site UPI 53- 2B-13 (1.0 acre) is located within Willistown Township however no improvements are proposed on this parcel. The property is served by public water and public sanitary sewer.
The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December 1, 2020 for the following:
1. A special exception from §240-40.C(2)(e) to expand the floor area of the main building on the property serving the Applicant's legal nonconforming use; 2. A variance from the maximum 25% increase in total floor area of structures devoted to a nonconforming use per §240-40.C(2)(c) in order to permit a 34.04% floor area expansion pursuant to the initial (original) proposal or a 52.92% floor area expansion pursuant to the alternate (revised) proposal; 3. A variance from the four foot (4') maximum height limitations of §240-32.E{2) in order to construct a six foot (6') tall estate fence in the front yard of the property; 4. A variance from the 24-foot driveway minimum width regulation of §240-33.C{lO) in order to permit a 22-foot wide driveway for two-way traffic at night; 5. A variance from the 250-foot minimum setback requirement of §240-31.C{2)(mm) in order to permit the first floor of the new building made the subject of the revised proposals to be setback 45.1 feet from the neighboring residential properties;
EGOST00124 Mark A. Gordon, Zoning Officer
May 25. 2022 Page 2 Malvern Institute
6. A variance from the 18-month time limit in §240-58.D so that any relief here granted will not lapse or
become null and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and 7. Such other relief necessary and appropriate to permit the Applicant's proposed expansion of its nonconforming use.
We offer the following comments (new comments are in bold/italics):
DECISION AND ORDER
1. The Applicant shall restrict and limit the treatment program at the King Road facility (the "Facility") to in-patient treatment only.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and correct copy of the submission shall be provided to the parties hereto.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of incoming and outgoing persons and vehicles. The location of all video cameras shall be depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that any vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times in addition, the Applicant shall implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the locations of the required cameras are not indicated on the plans, as required.
Acknowledged. Sheet 13 includes the entire Decision and Order.
Outstanding. We were not able to locate the proposed video camera locations on the plans.
4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than 180 days from final, unappealable and unappealed zoning approval.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 3 Malvern Institute
The Township confirmed the application was accepted in a timely fashion on June 28, 2021.
5. King Rood is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development plan review, along the entire western and southern boundaries of the Property except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color(s} shall be fully revealed during the land development plan review.
Pending. The required fence is indicated per the above; the detail for the fence is indicated on Sheet 12A. Board of Supervisors approval is required.
6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling of any and all fond development plan review proceedings conducted by the Township Planning Commission and Boord of Supervisors pursuant to this Order.
The Township confirmed a letter was sent to all property owners within 1000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.
7. The Applicant shall submit and implement a landscape plan in accordance with §240-27.C{2} for the western and southern portions of the property except for any areas within the floodplain.
Pending. A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. See additional comments below, and via the Conservancy Board.
8. The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C{3}, for so long as the Property is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet in height. These plantings are intended to mitigate the view of the 8-foot fence from the neighboring properties. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant's landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence.
Pending. A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as 10-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. See additional comments below, and via the Conservancy
Board.
9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans submitted with the land development application for the review of the Board of Supervisors as part of the land development approval.
EGOST 00124 May 25, 2022 Mark A. Gordon, Zoning Officer
Note: a. The fence and landscaping are indicated as required.
Page 4 Malvern Institute
b. It may be appropriate to substitute a more deer resistant species for the proposed mountain laurel; please review with the Conservancy Board. c. We will defer to the Conservancy Board for additional comments. Pending (a-c). See additianal comments regarding landscaping be/aw, and via the Conservancy Board. d. The applicant shall submit the fencing plan to Willistown Township for review and comment and a determination if any permits are required. Pending. Applicant indicates fencing details will be caardinated with Willistown Tawnship pending preliminary appraval by East Goshen.
10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the 8-foot fence and the estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility.
Resolved. The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.
11. All proposed fencing shall be shown in detail in the land development plan and shall be continually maintained by the owner.
Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.
Pending. The applicant notes maintenance requirements will be provided with the final plan.
12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style. The location of all proposed fencing shall be shown in plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, if available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the
improvements for which financial security must be posted by the Applicant.
Note:
• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted. • Fence manufacturer for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier
Pending. Sheet 13 includes the entire Decision and Order, and additional information is to be provided.
13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western property lines other than the garden, the greenhouse, and the pedestrian walking paths.
EGOST 00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 5 Malvern Institute
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order, and nothing is proposed in these
areas.
14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as are necessary to mitigate potential noise form these facilities.
Resolved. Sufficient buffers/screens appear to be provided for these existing and proposed areas. Future areas appear to be passive in nature.
15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion. Staff and visitors
shall be restricted to smoking in the front of the building.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.
Acknowledged. Sheet 13 includes the entire Decision and Order.
16. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and filtration system to minimize the effects of smoke on the surrounding property.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Pending. The "Smoke Eater" is identified on the plan, and the applicant indicates additional details will be provided at a later date.
17. The Applicant shall screen the new smoking pavilion from the neighboring properties to the west and north with the 8-foot fence described above.
Resolved. The required fence is indicated.
18. The Applicant shall demonstrate during the land development application review that the "Smoke Eater" can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Pending. The "Smoke Eater" is identified on the plan, and the applicant indicates additional details will be provided at a later date.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 6 Malvern Institute
19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Pending. Sheet 13 includes the entire Decision and Order, and they applicant indicates details will be provided to the Township.
20. The following site improvements shall be completed prior to issuance of a building permit for the vertical building addition or barn renovations:
a. Parking lot renovations; b. Installation of estate fence and the 8-foot fence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures; d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.
We recommend the applicant address these conditions as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
21. The Applicant shall construct and maintain all walking paths with pervious wood chips.
No modifications to the trail are proposed. However, we recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Resolved. Sheet 13 includes the entire Decision and Order.
22. The Applicant shall comply with the parking a/location presented on the Plan.
Resolved. The parking appears to meet Code requirements (see Sheet 4)
23. The Applicant shall agree to permit the outdoor patient activities on the property only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between 10 p.m. and 11:30 p.m. A maximum of 4 patients at any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between 11:30 p.m. and 7 a.m.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any further expansion of the treatment center for a period of 30 years. The deed restriction shall be
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 7 . Malvern Institute
enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.
Nothing appears to have been provided to address this condition. We recommend that a draft document be submitted to the Township for the Township Solicitor's review prior to recording.
Acknowledged. Sheet 13 includes the entire Decision and Order, and the applicant indicates a draft deed restriction will be submitted under separate cover; defer to Township Solicitor.
25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors' calls.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Acknowledged. Sheet 13 includes the entire Decision and Order; note further the applicant's response regarding specifics.
26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status
of the expansion project, identify any issues that the Facility has encountered in the last year with neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by mail of the scheduling of this annual presentation.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decisian and Order.
2 7. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient's identity or to require the police to respond but simply to advice the police that someone has left the Facility.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged, Sheet 13 includes the entire Decision and Order; note further the applicant's response regarding specifics.
28. Applicant shall obtain a building permit for the vertical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.
The Township confirmed that the applicant shall secure a building permit for the vertical building addition no later than December 31, 2023 and the barn renovations no later then December 31, 2024.
EGOST00124 Mark A. Gordon. Zoning Officer
May 25, 2022 Page 8 Malvern Institute
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order. Note the building application deadline for the second story is approximately 18-months away.
ZONING
1. The applicant is reminded of the general performance standards of §240-24.
Acknowledged.
2. A permit is required from the Township for any construction within the identified floodplain. (§240- 26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as 'future1
•
Resolved. It has been clarified that improvements labeled as Juture' are not to be implemented at this time.
3. Please clarify specific ADA ramp details to be utilized in accordance with PENN DOT standard details. (§240-33 .B(7)(b))
Resolved. Details have been provided (Sheet 12A).
4. Per §240-33.((10), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.
Resolved. The island has been modified to provide a minimum 22-foot-wide lane.
5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a loading and unloading space for the vehicle. (§240-33.0(2))
Resolved. An adequate truck turning exhibit has been provided.
SUBDIVISION AND LAND DEVELOPMENT
6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(S))
Resolved. Note #2 on Sheet 2 has been revised.
7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.
Pending. No sidewalks are proposed; defer to Planning Commission, Conservancy Board and Board of Supervisors.
STORMWATER MANAGEMENT
8. Please indicate the Line of Interest/Point on Analysis on the drainage area plan.
Resolved. The Point of Analysis has been clarified.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 9 Malvern Institute
9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)
Outstanding. Soils testing is currently being completed.
10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.
Outstanding. See Comment No. 9, above.
11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and subgrade stability. The applicant should provide soils tests for the infiltration BMP. (§195-20.1)
Outstanding. See Comment No. 9, above.
12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system. (§195-20.N)
Outstanding. Permanent inlet filters upstream of the infiltration BMP are to be installed; please indicate these inlets an the PCSM plan.
13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.
Resolved. The elevations have been clarified.
14. The Peak Rate calculations appear to consider only SWM Ill outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§195-22)
Resolved. The Point of Analysis has been clarified.
15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by, the Conservation District or municipality (as applicable) for a determination of adequacy prior to construction of the revised features. (§195-27.A(3))
Resolved. The statement has been provided (Sheet 1).
16. The applicant should provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))
Resolved. The signature block has been provided (Sheet 1).
17. The applicant should provide an easement around the stormwater management BMP"s; alternately a blanket easement can be provided. (§195-27.B(18)(c)
Resolved. A blanket easement is proposed.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25. 2022 Page 10 Malvern Institute
18. The applicant should provide the documents required per §195-27.F and §195-37 regarding a Stormwater Operations & Management Plan and Agreement, to be recorded.
Pending. The applicant indicates this will be provided prior to plan recording.
19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP's. (§195-37)
Outstanding. Please include O&M procedures which address maintenance of the inlet filters.
20. Please provide a sediment barrier downslope of SW108.
Resolved. This is now indicated.
21. The limit of disturbance does not include any fencing, landscaping improvements nor 'future' improvements.
Outstanding. We will defer to the Chester County Conservation District's recommendation.
GENERAL
22. Multiple improvements are indicated as 'future'. It is unclear if they are intended to be included as part of the overall approval.
Resolved. The applicant confirmed that all improvements labeled as Juture' are not to be
implemented at this time.
23. We recommend adding an additional arrow at the circle in addition to ONE WAY signage.
Resolved. Striping, signage and a detail are provided.
24. The applicant shall confirm the height of the proposed walls, if more than four (4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.
Pending. These may be provided at the building permit stage; the Township will require a structural review by Pennoni and a separate building permit for the retaining wall.
25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.
Acknowledged.
26. We recommend a detail for the dumpster enclosure be provided.
Resolved. A trash enclosure detail is provided (Sheet 12A}
27. An additional 'decorative fence' is indicated within the interior of the site; please provide a detail for this fence.
Pending. The applicant will provide additional clarity regarding fencing.
28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.
EGOST00124 May 25, 2022 Mark A. Gordon, Zoning Officer
Pending. The applicant will provide additional clarity regarding fencing.
29. Fencing sound attenuation details should be provided.
Pending. The applicant will provide additional clarity regarding fencing.
30. Please additionally note the status of the following reviews/permits:
Page 11 Malvern Institute
a. NPDES Permit (PADEP/CCCD) (§195-15.C(2), -16.A, -17.A); (limit of disturbance is indicated as 0.90 acres)
Not applicable; pending resolution of Comment No. 21, above.
b. Planning Module (PADEP) (§240-24.F, §205-33.B(22)(a)) - Resolved.
c. Sanitary Sewer (Municipal Authority) -Correspondence has not yet been received.
d. On-lot Wells (CCHD)- Not applicable
e. Highway Occupancy Permit (PennDOT) - Not applicable
f. Fire/Emergency- Correspondence has not yet been received.
g. Historic Resource (Historical Comm.) -See September 28, 2021 comments.
h. Landscaping (Conservancy Board) -See September 28, 2021 comments.
i. County Planning-See July 28, 2021 correspondence.
j. Willistown Township - Correspondence has not yet been received; see D&D Comment No. 9d.
NEW COMMENTS
31. Unless otherwise permitted by the township (e.g., for safety, security, or all-night operations), lighting shall be controlled by automatic switching devices, such as time clocks or combination motion detectors and photocells to permit extinguishing or output reduction as required in the latest edition of the Energy Conservation Code.
32. We recommend substitutions for Mountain laurel and Blue Holly; it is our opinion that in this area, these plants are not deer tolerant/resistant, and both have a harder time rejuvenating after being deer browsed extensively.
33. The Plant Legend has two (2) different plants indicated as "PO"; please adjust.
34. We recommend a substitute far Douglas Fir; it is susceptible to two forms of needlecast in this area and if untreated will cause premature death.
35. Comment No. 1 from the Conservancy Board states that the applicant shall provide additional landscaping in the parking Jot islands and on the east and west side of the parking Jot; please clarify the additional landscaping proposed.
36. Access gates into the fenced buffer area are recommended along the south and west property lines areas for maintenance.
EGOST00124 May 25, 2022 Mark A. Gordon, Zoning Officer
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PENNONI
Nathan M. Cline, PE Township Engineer
cc: Derek Davis, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) Brian Nagle, Esq., MacElree Harvey (via e-mail) Malvern Institute for Psychiatric & Alcoholic Studies (via e-mail) Rick Stratton, PE, Chester Valley Engineers, Inc. (via e-mail) Kristin Camp, Esq., Buckley Brion (via e-mail)
Page 12 Malvern Institute
C1'
83 Chestnut Road P.O. Box 447 Paoli, PA 19301
ChesterVa I ley
610-644-4623 610 8893143 Fax
I ii www.chesterv.com
April 25, 2022
Mr. Mark Gordon Director of Code Enforcement East Goshen Township
1580 Paoli Pike West Chester, PA 19380
Re: Preliminary Land Development Plan Malvern Institute - 940 King Road CVE Project No. 21465-0000
Dear Mr. Gordon:
On behalf of our client, Malvern Institute for Psychiatric & Alcoholics Studies, we are submitting the following response in support of an application for a Preliminary Land Development. The following documents have been enclosed in support of the application:
• Eleven (l I) copies of a Preliminary Land Development Plan for Malvern Institute, dated June 28, 2021, last revised on April 20, 2022; • Eleven (11) copies of a Stonnwater Calculations Worksheet, dated June 28, 2021, last revised April 20, 2022. • Eleven (11) copies ofa WB-40 Delivery Vehicle Exhibit, dated April 21, 2022.
We offer the following responses to the review comments from the Pennoni review letter dated August 16, 2021. Comments are repeated below and responses to each follow in bold, italicized text:
The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December 1, 2020 for the following: I. A special exception from §240-40.C(2)(e) to expand the floor area of the main building on
the property serving the Applicant's legal nonconforming use;
2. A variance from the maximum 25% increase in total floor area of strnctures devoted to a nonconforming use per §240-40.C(2)(c) in order to permit a 34.04% floor area expansion pursuant to the initial (original) proposal or a 52.92% floor area expansion pursuant to the alternate (revised) proposal;
3. A variance from the four foot (4 ') maximum height limitations of §240-32.E(2) in order to construct a six foot (6') tall estate fence in the front yard of the property;
E,t. 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 2
4. A variance from the 24-foot driveway minimum width regulation of §240-33.C(I0) in order to pe1mit a 22-foot wide driveway for two-way traffic at night;
5. A variance from the 250-foot minimum setback requirement of §240-3 l .C(2)(mm) in order to permit the first floor of the new building made the subject of the revised proposals to be setback 45.1 feet from the neighboring residential properties;
6. A variance from the 18-month time limit in §240-58.D so that any relief here granted will not lapse or become nnll and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and
7. Such other relief necessary and appropriate to permit the Applicant's proposed expansion of its nonconforming use.
Decision and Order
1. The Applicant shall restrict and limit the treatment program at the King Road facility (the "Facility") to in-patient treatment only.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). It should be noted that Malvern Institute is licensed only for in-patient treatment. To the extent that a narrative response is requested, the responses in this letter shall constitute the narrative response.
2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and correct copy of the submission shall be provided to the
parties hereto.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans).
3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of incoming and outgoing persons and vehicles. The location of all video cameras shall be
Eal 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 3
depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that auy vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times in addition, the Applicant shall implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff.
We recommend the applicant address this condition as a nan-ative response, to be included on the plan and recorded with the final plan. Note the locations of the required cameras are not indicated on the plans, as required.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). During the overnight hours, 9pm to Jam, security services are provided by Stonegate Services Group. During all other times, Malvern Institute has an on-staff security guard on site. Proposed video camera locations are
shown on the plan. The video monitoring station is staffed at all times.
4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than 180 days from final, unappealable and unappealed zoning approval.
This condition has been met.
5. The Township confirmed the application was accepted in a timely fashion on June 28, 2021. King Road is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development plan review, along the entire western and southern boundaries of the Property except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color(s) shall be fully revealed during the land development plan review.
The required fence is indicated per the above; the detail for the fence is indicated on Sheet
12A. Board of Supervisors approval is required.
Acknowledged.
6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling ofany and all land development plan review proceedings conducted by the Township Planning Commission and Board of Supervisors pursuant to this Order.
E,l 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 4
The Township confirmed a letter was sent to all property owners within 1000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.
Acknowledged.
7. The Applicant shall submit and implement a landscape plan in accordance with §240- 27.C(2) for the western and southern po1iions of the prope1iy except for any areas within the floodplain.
A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.
Acknowledged.
8. The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C(3), for so long as the Property is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet
in height. These plantings are intended to mitigate the view of the 8-foot fence from the neighboring prope1iies. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant's landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence.
A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as I 0-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.
Acknowledged.
9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans
E,t 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminmy Land Development Application Page 5
submitted with the land development application for the review of the Board of Supervisors as part of the land development approval. Note:
a. The fence and landscaping are indicated as required.
Acknowledged.
b. It may be appropriate to substitute a more deer resistant species for the proposed mountain laurel; please review with the Conservancy Board.
The native species of Mountain laurel (Kalmia latifolia) is noted to be deer resistant I tolerant. Deer will eat almost anything when they are hung1y enough. Kalmia is able to withstand the deer browse should the deer chose to eat the plant. We would recommend retaining the Mountain laurel as an evergreen component to the property buffer.
c. We will defer to the Conservancy Board of additional comments.
Acknowledged.
d. The applicant shall submit the fencing plan to Willistown Township for review and
comment and a dete1mination if any permits are required.
The fence details will be coordinated with Willistown Township upon receipt of Prelimina,y Approval from East Goshen Township.
10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the
8-foot fence and the estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility.
The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.
Acknowledged.
I 1. All proposed fencing shall be shown in detail in the land development plan and shall be
continually maintained by the owner.
PAOLI
Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.
E,t 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 6
Acknowledged. Maintenance requirements will be provided with the Final Plan.
12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style. The location of all proposed fencing shall be shown in plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, if available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the improvements for which financial security must be posted by the Applicant.
Note:
• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted.
• Fence manufacture for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier
Acknowledged.
13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western property lines other than the garden, the greenhouse, and the pedestrian walking paths.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Patient activities in these areas is limited to the greenhouse, the garden, and the walking path.
14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as are necessary to mitigate potential noise form these facilities.
To be discussed further with all parties.
Acknowledged.
E,t 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 7
15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion. Staff and visitors shall be restricted to smoking in the front of the building.
We recommend the applicant address this condition as a nanative response, to be included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). Upon installation of the smoking pavilion, patients will
be informed of the rule that all smoking shall occur withi"n the designated area. Staff will be employed to enforce the rule.
16. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and filtration system to minimize the effects of smoke on the surrounding property.
We recommend the applicant address this condition as a nanative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
The smoke-eater is indicated 011 the plans. Details for the smoke-eater, which was shown and explained during the proceedings, will also be included in the architectural package.
17. The Applicant shall screen the new smoking pavilion from the neighboring prope1ties to the west and nmth with the 8-foot fence described above.
The required fence is indicated.
Acknowledged.
18. The Applicant shall demonstrate during the land development application review that the "Smoke Eater" can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.
PAOLI
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Details for the smoke-eater, which was shown and explained during the proceedings,
will also be included in the architectural package, Additional information fi'om the smoke-eater manufacturer will be provided to the Township. The project architect is seeking confirmation fi'om a proper installation contractor that the unit will ftmction as
Eal 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 8
intended upon installation. This will be provided prior to final land development approval.
19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Details for the sound attenuation for the new generator will be provided to the Township.
20. The following site improvements shall be completed prior to issuance of a building petmit for the vetiical building addition or barn renovations:
a. Parking lot renovations; b. Installation of estate fence and the 8-foot fence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures; d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.
We recommend the applicant address these conditions as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. It is recommended that the Township inspect the improvements listed
above as they are implemented on site.
21. The Applicant shall construct and maintain all walking paths with pervious wood chips.
No modifications to the trail are proposed. However, we recommend the applicant address
this condition as a narrative response, to be included on the plan and recorded with the final plan.
The walking path is shown on the plans. The path will be maintained in good order by the Malvern Institute staff and landscaping contractor which is on site on a weekly basis during the spring, summer and fall seasons.
22. The Applicant shall comply with the parking allocation presented on the Plan.
PAOLI
The parking appears to meet Code requirements ( see Sheet 4)
Eal 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvem Institute Preliminary Land Development Application Page 9
Acknowledged.
23. The Applicant shall agree to permit the outdoor patient activities on the pro petty only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between 10 p.m. and 11 :30 p.m. A maximum of 4 patients at any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between
11 :30 p.m. and 7 a.m.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged outdoor patient activity will be limited between the hours of 10PM and
7AM and will be conducted under staff supervision during these hours.
24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any futiher expansion of the treatment center for a period of 30 years. The
deed restriction shall be enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.
Nothing appears to have been provided to address this condition. We recommend that a draft docmnent be submitted to the Township for the Township Solicitor's review prior to recording.
A draft deed restriction will be submitted under separate cover.
25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors' calls.
PAOLI
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
During business hours M-F 8A-4:30P a contact hierarchy has been established to communicate to leadership on site consisting of Executive Director, Clinical Director, and the shift supervisor. Outside of these hours the shift supervisor/clinical lead designee will be properly trained to respond appropriately to neighbors' calls.
Eat 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page JO
26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status of the expansion project, identify any issues that the Facility has encountered in the last year with neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by mail of the scheduling of this annual presentation.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. The executive director or other assigned staff will present the report on
an annual basis.
27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient's identity or to require the police to respond but simply to advice the police that someone has left the Facility.
We recommend the applicant address this condition as a nairntive response, to be included on the plan and recorded with the final plan.
Acknowledged. Malvern Treatment Center will alert Westtown East Goshen Regional
Police Department of AWOL discharges by calling the radio room at 610-692-5100 and requesting to make notification that there was a volunteer walk-off This is the requested method of communication as directed by the Westtown East Goshen Regional Police Depa,·tment.
28. Applicant shall obtain a building permit for the ve1iical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.
The Township confirmed that the applicant shall secure a building permit for the ve1iical building addition no later than December 31, 2023 and the barn renovations no later then December 31, 2024. We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged.
Zoning
Eal 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 11
1. The applicant is reminded of the general performance standards of §240-24.
The applicant acknowledges the general performance standards of §240-24.
2. A permit is required from the Township for any construction within the identified floodplain. (§240-26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as 'future'.
Improvements formerly indicated as "future" are not planned to be implemented at this
time. In the event that the Applicant chooses to install them in the future, all necessary permits will be obtained by the Township and other applicable agencies.
3. Please clarify specific ADA ramp details to be utilized in accordance with PENNDOT standard details. (§240-33.B(?)(b))
The specific ADA ramp detail proposed for the site has been added to revised plans on sheet 12A.
4. Per §240-33.C(I0), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.
The geomehy of the island and one-way drive has been revised to provide a minimum 22 foot wide drive lane near theji-ont door of the building.
5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a loading and unloading space for the vehicle. (§240-33.D(2))
The largest vehicle that delivers to the Malvern Institute is a WB-40 trailer. The loading area for this vehicle is on the east side of the building. An exhibit demonstrating the maneuvering of a WB-40 trailer is enclosed with this submission.
Subdivision And Land Development
6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(S))
Language in note #2 on sheet 2 has been revised to provide information about the site benchmark.
7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.
E,l 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 12
There are no sidewalks or paths proposed along the public ROW by this plan.
Stormwater Management
8. Please indicate the Line of Interest/Point on Analysis on the drainage area plan.
The basis for analyses of project stormwater is that the outflow Ji-om SWM #1, when combined with ru11off Ji-om buildout site disturbance that bypasses the basin, meets or exceeds ordi11ance criteria. Since the project is a proposed re-developme11t, it is 11ot necessa,y to control rate or volume of runoff Ji-om existing site areas that will not be
made impervious i11 connection with the project. See Note 4 on page 1 of the Stormwater Report for a more detailed discussio11 of the calculational basis for the analysis and
design of the proposed stormwater control system.
Given the above, the designated POI could be at a11y point on the creek downstream of all proposed disturbance (for the purposes of stormwater analyses and erosio11 control, areas of proposed landscape e11hance111e11t only are not considered "disturbance'').
Therefore, we could designate the creek just downstream of the outlet for SW 108 (see Stormwater Calculatio11 Worksheet) as the POI if11ecessa,y to designate such.
9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)
Soils testing will be provided with the final stormwater design prior to Final La11d Development Approval.
10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.
PAOLI
Since i11filtration testing at the site had11 't yet been u11dertaken at the time the stonnwater system was designed, the outlet works was designed to retain, at the lowest ope11ing (IE 527.37 ft. ms[, see Sheet SA, Detail: Outlet Control@SW 103) a volume (3,010 CF, see Stormwater Report, page A19) exceedillg the required infiltration volume (2,991 CF, Stormwater Report, page 2) to ensure compliance without reliance on infiltration occurring duri11g the 2-yr. design rainfall eve11t. The indicated Proposed Infiltratio11
Volume 3,010 CF on page 2 ca11 be considered consavative. The volume calculated within HydroCAD on page A3 (3,326 CF) is the infiltration volume that would be realized if the measured field infiltration rate yields a design infiltration rate of 0.11 in/hr. The actual 2 -yr. infiltratio11 will be at least 3,010 CF, but could be theoretically as high as 5,340 CF (entire 2-yr. SWM #1 inflow volume) iftlte design infiltration rate is high e11ough.
Eal 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 13
11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and sub grade stability. The applicant should provide soils tests for the infiltration BMP. (§ 195-20.I)
Soils testing will be provided with the final stormwater design prior to Final Land Development Approval.
12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system. (§ 195-20.N)
Permanent inlet filters are proposed for the new drainage inlets upstream of the
infiltration basin. A detail for the inlet filters has been added to sheet BB.
13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.
As indicated on page A17 of Stormwater Report, the top of aggregate of SWM #1 is IE
525. 75' + 3.42'= 529.17'. This is consistent with the elevations indicated for SWM #1 on Sheet 5 of 15, Grading & Utilities Plan; Sheet BA of 15, Post Construction Stormwater Management Details, Detail: SWM#l, and on the Stormwater Calculation Worksheet.
The 2-yr. peak elevation (527.48) within SWM #1, us indicated on Page A3, while (slightly) above the invert (527.37) of the lowest opening in the outlet control at SW 103, is below the top of wall within SW 103, and is well below the top of aggregate of SWM #1.
Furthermore, given the basin's footprint of 3,922 SF [(58' x 55') + (24' x 30.5')} and a storage volume (3010 CF) below the lowest opening (527.37) in the outlet control, the
hydraulic head (of infiltration) is 9.2", and for total storage (6109 CF) at top of bed (529.17), the hydraulic head is 18. 7", both well below the DEP recommended maximum depth of 24" oupage 16 of 21, Appendix C of the PENNSYLVANIA Stormwater BMP Manual December 30, 2006.
14. The Peak Rate calculations appear to consider only SWM # I outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§ 195-22)
PAOLI
The basis of analyses for project stormwater is explained in the response to comment 8. The Table, Peak Rate Control, on page 2 of the Stormwater Report lists proposed and existing peak flows Ji-om project (ie, new impervious smfaces) area, as well as allowable flow Ji-om project area given ordinance criteria. The enclosed revised Stormwater
Calculation Worksheet has been revised to identify the areas of new impervious and the areas where existing impervious cover is being redeveloped with impervious cover. The
Eal 1955
EAGLE
Mr. Mark Gordon April 25, 2022 Malvern Institute
Chester Valley Engineers
Preliminary Land Development Application Page 14
diffel'ence between pl'oposed and allowable pl'oject peak flows is the l'equil'ed attenuation of peak flow to SWM #1 to ensu/'e that the peak sum of bypass flow and SWM #1 dischal'ge will meet ol'dinance requirements at the POL It can be seen that the actual peak outflow ft'om SWM #1 is less than allowable peak SWM #1, pal'ticulal'ly for ft'equent storms (I-JO-years). See pages A2-A8 of the Stormwater Report for the data
presented in the referenced table.
15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to,
and approved by, the Conservation District or municipality (as applicable) for a dete1mination of adequacy prior to construction of the revised features. (§ l 95-27.A(3))
A statement by the applicant certifying compliance with this requirement has been added
to the cover sheet of the l'evised plans.
I 6. The applicant should provide the required signature block signed and sealed by the
qualified licensed professional responsible for the preparation of the SWM site plan.(§ 195- 27.A( 4))
The required signature block has been added to the cover sheet.
17. The applicant should provide an easement around the stormwater management BMP's; alternately a blanket easement can be provided. (§195-27.B(IS)(c)
A note has been added to the cover sheet providing a blanket easement to East Goshen
Township to inspect the stormwater management facilities.
18. The applicant should provide the documents required per§ 195-27.F and § 195-37 regarding a Sto1mwater Operations & Management Plan and Agreement, to be recorded.
The Stormwater Operations & Management and Agreement will be provided f01· l'eview and approval by the Township prior to plan l'ecordation.
19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP's. (§ 195-37)
Operations and Maintenance notes are provided within the plan set. This will serve as the Operations and Maintenance Plan upon l'ecordation of the Final Land Development Plan.
20. Please provide a sediment barrier downslope ofSW108.
Eal 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institnte Preliminary Land Development Application Page 15
Compost filter sock has been added downslope of SW] 08.
21. The limit of distnrbance does not include any fencing, landscaping improvements nor 'future' improvements.
Installation of the fencing and landscaping will not alter the grading and is therefore
not included in the LOD. Improvements identified on the plan as "future" are not planned to be implemented at this time. In the event that the Applicant chooses to install them in the future, necessary permits will be obtained fi'om the Township and other applicable agencies.
General
22. Multiple improvements are indicated as 'future'. It is unclear if they are intended to be included as part of the overall approval.
Improvements identified on the plan as "future" are not planned to be implemented at
this time. In the event that the Applicant chooses to install them in the future, necessa,y permits will be obtained from the Township and other applicable agencies.
23. We recommend adding an additional arrow at the circle in addition to ONE WAY signage.
A directional arrow and sign have been added to the circle and a one-way sign detail has been added to sheet 12A on the revised plan.
24. The applicant shall confirm the height of the proposed walls, if more than four (4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.
Final wall designs will be provided prior to Final Land Development Approval.
25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.
Acknowledged.
26. We recommend a detail for the dumpster enclosure be provided.
A trash enclosure detail has been added to sheet 12A of the revised plans.
27. An additional 'decorative fence' is indicated within the interior of the site; please provide a detail for this fence.
Eol 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvem Institute Preliminary Land Development Application Page 16
Final fence and wall details will be provided prior to Final Land Development Approval.
28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.
Proposed fence along the western property bounda,y and behind the southwestern
portion of the main building are intended to be sound attenuation fencing. The limits of sound attenuation fencing will be established prior to final Land Development Approval.
29. Fencing sound attenuation details should be provided.
A detail for sound attenuation fencing is provided on the plans. Specifications for the
sound attenuation fencing will be provided prior to final Land Development Approval.
30. Please additionally note the status of the following reviews/permits:
PAOLI
a. NPDES Permit (PADEP/CCCD) (§195-15.C(2), -16.A, -17.A) - Not applicable
(limit of disturbance is indicated as 0.88 acres) Not applicable. b. Planning Module (PADEP) (§240-24.F, §205-33.B(22)(a)) - Correspondence has
not yet been received. There are no additional EDU's required for the improvements proposed by this plan. c. Sanitaiy Sewer (Municipal Authority)- Correspondence has not yet been received
Not applicable. d. On-lot Wells (CCHD) - Not applicable.
Not applicable. e. Highway Occupancy Permit (PennDOT) -Not applicable Not applicable. f. Fire/Emergency - Correspondence has not yet been received Acknowledged. g. Historic Resource (Historical Comm.) - Correspondence has not yet been received
Acknowledged. h. Landscaping (Conservancy Board) - Correspondence has not yet been received.
Acknowledged. i. County Planning - See July 28, 2021 correspondence Acknowledged. The County comments will be taken under advisement. J. Willistown Township - Correspondence has not yet been received Acknowledged.
Eel 1955
EAGLE
Mr. Mark Gordon April 25, 2022
Malvern Institute
Chester Valley Engineers
Preliminary Land Development Application Page 17
We trust the above items constitute a complete submission adequate for your review. Should you have any questions or require additional information, I can be reached at 610-644-4623 xl 03 or by email at rstratton@chesterv.com.
Very truly yours, Chester Valley Engineers, Inc.
Richard F. Stratton, P .E. Senior Project Manager
Enclosures: as noted
cc: Kevin Williams, Malvern Institute Brian L. Nagle, MacElree Harvey, Ltd.
E, 1955 PAOLI EAGLE
MEMO
Date: From: To: Re:
May 26, 2022 Derek Davis, Township Manager Planning Commission Paoli Pike Alternate Trail - Segment B
Dear Commission Members,
At their May 3 rd board meeting, the board decided that they would like various ABCs to review the very preliminary options laid out by Pennoni for a possible Paoli Pike Alternate Route for Segment B.
Attached are the latest conceptual plans from Pennoni that reflect those conversations they've had as a board thus far. Again, this is very early on in the process so the board would like any and all comments so that they can all be taken under consideration.
A short memo back to the board with some bullet points on the overall thoughts of the commission would be helpful.
Thank you.
U:\DDavis\Planning CommissionlPPTIPaoliPikeA!tTrail - SegmentB.docx
PAOLI PIKE TRAIL EAST GOSHEN TOWNSHIP, PA Opinion of Probable April 26, 2022 OPTION Cl OPTIONC2 OPTIONC3 Construction Cost
SEGMENTl SEGMENT 2 SEGMENT3 SEGMENT4 SEGMENTS
Item Unit Cost Unit Quantitv Cost Quantity Cost Quantitv Cost Quantity Cost Quantitv Cost Quantitv Cost Quan•au Cost Quantitv Cost Pavement markings over existing asphalt paVi'ng $
15
LF 900 $ 13,500 $ 900 $ 13,500 $ $ 900 $ 13,500 $ $ New Trail: Asphalt paved at orade $ 130 LF 2,550 $ 331,500 2,550 $ 331,500 3,350 $ 435,500 2,400 s 312,000 1,600 $ 208,000 150 S 19,500 $ 850 $ 110,500 New Trail: boardwalk condition $ 1,000 LF 1,150 $ 1,150,000 1,700 $ 1,700,000 250 $ 250,000 s 750 $ 750,000 $ 850 $ 850,000 250 $ 250,000 New Trail: at•orade/wet area condition $ 250 LF $ 700 $ 175,000 $ $ $ s 600 $ 150,000 $ Earthwork/Grading $ 5,000 LS 4 $ 20,000 8 $ 40,000 2 $ 10,000 1 $ 5,000 2 $ 10,000 1 $ 5,000 4 $ 20,000 2 $ 10,000 Landscapin11 $ 5,000 LS 3 $ 15,000 2 $ 10,000 1 $ 2,500 1 $ 5,000 1 $ 5,000 s 2 $ 10,000 2 $ 10,000 Clearing (additional) $ 5,000 LS $ 2 $ 10,000 $ $ $ s 2 $ 10,000 1 $ S,000 ADA Ramps $ 6,500 EA 2 $ 13,000 2 $ 13,000 6 $ 39,000 4 $ 26,000 2 $ 13,000 1 $ 6,500 $ 1 $ 6,500 Post/rail fence $ 25 LF 1,200 $ 30,000 1,500 $ 37,500 700 $ 17,500 $ 600 $ 15,000 so $ 1,250 150 S 3,7S0 1,100 $ 27,500 Si1:1na1:1e {specialty) $ 3,000 LS 1 $ 3,000 1 S 3,000 1 $ 3,000 1 s 3,000 $ s s s Stormwater Management $ 25,000 LS 1 $ 25,000 1 $ 25,000 2 $ 50,000 1 s 2S,000 1 $ 25,000 $ 1 $ 25,000 1 $ 2S,000 Wetland Mitieation $ 25,000 LS 1 $ 25,000 3 $ 75,000 $ $ 1 $ 25,000 s 2 $ 50,000 1 $ 2S,000 Trail Head Amenities $ 5,000 EA 1 $ 5,000 1 $ 5,000 1 $ 5,000 1 $ S,000 $ $ 1 $ S,000 1 $ 5,000 Mobilization $ 50,000 LS 1 $ 50,000 1 $ 50,000 1 $ 50,000 $ 20,000 s 20,000 $ 5,000 $ 20,000 $ 10,000
Subtotal $ 1,667,500 $ 2,475,000 $ 862,500 $ 401,000 $ 1,071,000 $ 37,250 s 1,143,750 $ 484,500
Continaency 20'¼ $ 333,500 $ 495,000 $ 172,500 $ 80,200 $ 214,200 $ 7,450 s 228,750 s 96,900 General Conditions 10% $ 166,750 $ 247,500 $ 86,250 s 40,100 $ 107,100 $ 3,725 s 114,375 s 48,450 Subtotal Construction $ 2,167,750 s 3,217,500 $ 1,121,250 $ S21,300 $ 1,392,300 $ 48,425 s 1,486,875 $ 629,850
Soft Costs (20%) $ 433,5S0 $ 643,500 $ 224,250 $ 104,260 .. $ 160,000 $ 9,685 s 297,375 s 125,970 Construction Admin (5%) $ 108,388 $ 160,875 $ 56,063 $ 26,065 $ 69,615 $ 2,421 $ 74,344 $ 31,493
TOTAL PER SEGMENT $ 2,709,688 $ 4,021,875 $ 1,401,563 $ 651,625 $ 1,621,915 $ 60,531 $ 1,858,594 $ 787,313
. . . !' / . ';_i, • '., ' 1' .,· ' . .. :,·, .. , :•_·' µ>, llli . . , ..
11/' -;, -· Ji ,..,.., . , I \\. . . ,.;.,.(\;., ! , . \ :A•, . \;'.,,-_,.'. ,.!.,hf· ·- -· ·.· . .
Option C: Corporate Park Alignment
Current Trail Segments
Potential Trail Alignment (off-street)
■ ■ ■ ■ a, Potential Trail
Alignment (on-street)
Enterprise Loop
, ... ... ,, - .
r Option C:
Corporate Park Alignment
Trail Alignment
Trail Alignment - boardwalk
Easement Needed
Floodway
100-yr floodplain
200-yr floodplain
.,fl •
,• ,. . .. .
Raoli Bil<e mriail
... . ... ... '':'"• ·-·": Corporate Park Alignment '• Individual Segments
Enterprise Drive
Paoli Pike
Parking Lot
Streams,de
EGOST00022
Derek Davis, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
April 26, 2022
RE: Paoli Pike Trail Segment B - Alternate Routes
Dear Derek:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennonl.com
Over the preceding months we have at your request explore al erna -ive mutes for connecting the remaining gap (Segment B) of the Paoli Pike Trail. After considering altern tives, the Township's preference was to more clbsely investigate "Option C" for the trail cor i6or to be locate t rough Goshen Corporate Park. In February 2021 we presented potential alig ments related to Option C. .f\ffe consideration, the Township narrowed the possibilities and has asked us to i vestigate the remaining cno·ces more closely. Accordingly, please see attached diagrams and further a alysis of this option.
Trail Alignment Options
•
Disadvantages: Significantly more costly due to the increased length of boardwalk necessary.
• Option C3 is located through the Corporate Park, in landscaped spaces alongside Reservoir Drive and Enterprise Drive, then cuts generally through parking lots and along the rear of the Hicks Property south of Linden Drive.
Advantages: Ample room for off-road segment within the landscaped space to the side of
Enterprise Drive. Avoids the low-lying wet area in the SE corner of the park.
EGOST00022 Derek Davis, Township Manager
April 26, 2022 Page 2 Paoli Pike Trail Segment B Alt. Routes
Disadvantages: Trail strays sooner from Paoli Pike, which may be the more desirable route for trail users.
As shown on Diagram 2, Options Cl and C2 encounter areas within the 100-yr floodplain of the East Branch of Chester Creek, and likely contains regulated wetlands. A boardwalk-type structure will be needed to traverse the wetlands and flood-prone areas, and a stream crossing will be necessary. Easements will be required along the western edge of the Corporate Park, and along the back edge of the Hicks property and
neighboring property that borders Goshen Parkway.
Diagram 3 shows that individual segments (numbered 1 through 5) can be combined to create a desired route. For instance:
• Segments 1 and 2 can be combined to create an independ nt loop within the southeast quadrant of ,r the corporate park (also shown on Sheet 1 as "Enterprise Loop").
• A complete trail route can be created by combining either segment 1 or 2 with either segment 3 or 4, along with segment 5.
Potential costs
A rough order-of-magnitude estimate for cost of desi n and construction is show in t e attached table. Costs are associated with the individual trail segments 1 tliough 5 shown on Diagram 3 .
•
Next Steps
•
• •
Sincerely,
PENNONI
Nathan Cline, PE Township Engineer
U :\Accounts\EGOST\EGOST00022 - Paoli Pike Trail Segment B Alt Rte Feasi\DOC PREP