Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP PLANNING COMMISSION

East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380 2025 Reorganization and Regular Meeting Agenda Tuesday, April 22, 2025, at 7:00 PM

Planning Commission Members: Daniel H. Daley Ernest Harkness Michael Koza Mike Pagnanelli Fred Pioggia John Stipe Dan Truitt John Hertzog, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison Agenda Items:

1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Reorganization/Appointments a. Motion to nominate candidates for the following seats:

i. Chairperson ii. Vice-Chairperson 3. Chairman will ask if anyone is going to record the meeting. 4. Review of Tracking Log / Determine need for Workshop Meeting 5. Public Comment on Non-Agenda Items 6. Approval of Minutes a. December 10, 2024 7. Acknowledge Receipt of New Applications (Initial Submission) 8. Subdivision and Land Development Applications 9. Conditional Uses Applications 10. Zoning Hearing Board Variances 11. Ordinance Amendments 12. Old Business 13. New Business- a. 2015 Comprehensive Plan, Preliminary 10-year review/discussion 14. Liaison Reports 15. Correspondence 16. Announcements 17. Next Meeting – Tuesday, May 27, 2025 at 7:00 PM

Bold Items indicate new information to review or discuss.

PROJECT DESCRIPTION Date Filed Start Date Twp.

Engineer

Review

CCPC

Review Extension

Date PC Deadline

Meeting

BOS

Deadline

Meeting

Hearing

Date

Final Action

Deadline (90

days) Comments

10-Year Comprehensive Plan Review n/a 4/22/2025 n/a n/a n/a n/a n/a n/a na/ Discuss the 2015 Comprehensive Plan- No action to be taken at this

meeting

1338 Morstein Road- WCU Foundation 16 Lot Subdivision 2/5/2024 2/27/2024 9/13/2024 5/13/2025 n/a 5/13/2025 NA 5/13/2025 Finalization of agreements and plan revisions- seeking final BoS

approval at 5/13/2025 meeting

PROJECTS COMPLETED IN 2025

Bold = New application or action required

East Goshen Township Planning Commission

Application Tracking Log

APRIL 22, 2025

PENDING PROJECTS

PC 12-10-24 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION MEETING 3 December 10, 2024 4 5 The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, 6 December 10, 2024 at 7:00 pm in the Township Building. 7 Members present are highlighted: 8 Chair – Ernest Harkness 9 Vice Chair – John Stipe 10 Dan Daley 11 Michael Koza 12 Michael Pagnanelli 13 Fred Pioggia 14 Dan Truitt 15 16 Also present was: 17 Duane Brady, Fire Marshall 18 Kelly A. Krause, Zoning Officer 19 John Hertzog , BOS Liaison 20 Nathan Cline, Township Engineer 21 Mark Thompson, Township Solicitor 22 23 COMMON ACRONYMS: 24 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 25 BC – Brandywine Conservancy CVS – Community Visioning Session 26 CB – Conservancy Board SWM – Storm Water Management 27 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 28 29 FORMAL MEETING – 7 p.m. 30 1. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 31 moment of silence to remember our first responders, police, military, and all who protect us. 32 2. Ernest asked if anyone would be recording the meeting and if there were any public 33 comments about non-agenda items. There was no response. 34 3. The tracking log was checked and no need for a workshop meeting. 35 4. The minutes of the November 26, 2024 meeting were approved. 36 37 CHAIRMAN’S REPORT – 38 None 39 40 Acknowledge Receipt of New Applications (initial Submission) 41 None 42 . 43 44 Subdivision and Land Development Applications 45 1. 1365/1373 Enterprise Dr, CTDI – Final Land Development Plan – Jeremy Maziarz of CVE was 46 present. He commented that they made minor changes on the plans. Pennoni’s letter parts 3 & 5 were 47 reviewed. There is no increase in the number of employees so no additional restrooms are needed. There 48 is an existing fountain which they are replacing with a new one. 49 Dan D. made a motion to recommend approval of the Final Land Development Plan of Communications 50 Test Design, Inc. & Parsons 1365 LLC, for the property located at 1365/1373 Enterprise Drive to the 51

PC 12-10-24 draft 2

Board of Supervisors, upon addressing the remaining outstanding items to the satisfaction of Township 1 Consultants and staff. Dan T. seconded the motion. The motion passed unanimously. 2 3 CONDITIONAL USES AND VARIANCES - None 4 5 6 ZONING HEARING BOARD VARIANCES - None 7 8 9 ORDINANCE AMENDMENTS - None 10 11 12 OLD BUSINESS -None 13 14 15 NEW BUSINESS – 16 1. 2025 Goals – The BOS is only having the ABCs meeting every two years, so the next meeting will be 17 in 2026. However, they do want a letter listing the Commission’s 2025 goals by March. Ernest wrote a 18 list of goals for everyone to review and discuss next month. 19 20 LIAISON REPORTS 21 None 22 23 ANY OTHER MATTER –None. 24 25 26 CORRESPONDENCE - None 27 28 29 ADJOURNMENT 30 There being no further business, Dan T. made a motion to adjourn the meeting. Fred seconded the 31 motion. The meeting was adjourned at 7:35 pm. 32 The next meeting will be held on Tuesday January 28, 2025 at 7 p.m. 33 34 Respectfully submitted, 35 36 37 38 39 Ruth Kiefer, Recording Secretary 40

Pennsylvania Municipalities Planning Code Article III – Comprehensive Plan Section 301. Preparation of Comprehensive Plan.

(c) The municipal or multimunicipal comprehensive plan shall be reviewed at least every ten years. The municipal or multimunicipal comprehensive plan shall be sent to the governing bodies of contiguous municipalities for review and comment and shall also be sent to the Center for Local Government Services for informational purposes. The municipal or multimunicipal comprehensive plan shall also be sent to the county planning commissions or, upon request of a county planning commission, a regional planning commission when the comprehensive plan is updated or at ten-year intervals, whichever comes first, for review and comment on whether the municipal or multimunicipal comprehensive plan remains generally consistent with the county comprehensive plan and to indicate where the local plan may deviate from the county comprehensive plan. East Goshen Township Code Chapter 63 Planning Commission § 63-4 Qualification of members; powers and duties. The qualifications of members of the Commission and its duties and powers shall be as prescribed in the Pennsylvania Municipalities Planning Code Act of July 31, 1966, 247, Article II, Sections 201 through 211,[1] provided that the Board of Supervisors may assign to said Commission such other duties as it may deem appropriate which are not inconsistent with the powers and duties provided by said Code.

[1] Editor's Note: See 53 P.S. § 10201 et seq. Pennsylvania Municipalities Planning Code Article II – Planning Agencies Section 209.1. Powers and Duties of Planning Agency. (a) The planning agency shall at the request of the governing body have the power and shall be required to:

(1)Prepare the comprehensive plan for the development of the municipality as set forth in this act, and present it for the consideration of the governing body.

East Goshen Township Comprehensive Plan 2015

R e g i o n a l T r a n s p o r t a t ion Corridors A d a p t i v e R e u s e Neighborhoods F u n c t i o n a l C l a s s i f i c a t i o n COG Land Use Intensity Open Space Plan Boot Rd. Redevelopment 19380 Developable Land E x i s t i n g L a n d U s e G r o w t h A r e a s F u t u r i s t C o m m i t t ee Regional Influences Goals & Objectives T r a n s p o r t a t i o n Hershey’s Mill Village L o c a l T r a f f i c A d v i s o r y C o m m i t t e e WEGO Rt. 352 Historic G o s h e n v i l l e P a r k & R e c r e a t i o n C o m m i s s i o n Strategic Plan Paoli Pike Promenade R e c r e a t i o n & O p e n S p a c e O l d R o u t e 2 0 2 Paoli Pike 2017 Future L a n d U s e R i d l e y C r e e k Chester Creek Green Infrastructure Conservancy Board Water Resources D e n s i t y O v e rl a y A r e a s Route 3 Bicentennial Committee W o o d l a n d s E a s t G o s h e n P a r k P r i o r i t i e s P a t h w a y s Historical Commission Commercial Service Areas C o r r i d o r s Commercial Corridors W C R e g i o n Trails C o m m e r c e C o m m i s s i o n

1817

Rt. 352

Greenhill Rd.

Boot Rd.

Paoli Pike

Paoli

Pike

Strasburg Rd.

West Chester Pike

Rt. 352

Rt. 3

North Chester Rd.

East

Adopted: October 20, 2015; Draft #6: 8-31-15

East Goshen Township Comprehensive Plan 2015

Primary Participants:

This Comprehensive Plan was prepared with the guidance and assistance of many persons. We thank everyone for the successful completion of the Comprehensive Plan 2015!

Board of Supervisors

E. Martin Shane, Chairman Senya D. Isayeff, Vice Chairman Janet L. Emanuel, Chairperson, Comprehensive Plan Task Force Carmen R. Battavio Charles W. Proctor, III, Esquire

Commerce Commission

John Stipe

Conservancy Board

Sandy Snyder John Scheidt

Futurist Committee

Tom Kilburn

Historical Commission

Chris Reardon Kathryn Yahraes

Municipal Authority

Dana Pizarro Jack Yahraes

Park & Recreation Commission

Christine Taraborelli Ann Marie Moore

Planning Commission

Daniel H. Daley, P.E., Chairman Adam Knox, Vice Chairman Monica Close Albert Zucarello Jim McRee Dan Landis Lori Kier Brad Giresi

Township Staff

Louis F. “Rick” Smith, Township Manager Mark Gordon, Director of Code Enforcement/Zoning Officer

Consultants

Thomas Comitta Associates, Inc. Town Planners & Landscape Architects

Thomas J. Comitta, AICP, CNU-A, RLA Erin L. Gross, Assoc. APA, Assoc. ASLA

Chester County Planning Commission

Jeannine Speirs

A full list of participants appears in Appendix B-2.

i

East Goshen Township Comprehensive Plan 2015

The Contents of this Comprehensive Plan 2015 include:

Section Page

1. Executive Summary 1-1

2. Introduction 2-1

3. Goals & Objectives 3-1

4. Population & Housing Projections 4-1

5. Housing Plan 5-1

6. Land Use Plan 6-1

7. Economic Development Strategy 7-1

8. Transportation and Circulation Systems Plan 8-1

9. Community Facilities and Services Plan 9-1

10. Utilities Plan 10-1

11. Natural Resources Protection Plan 11-1

12. Energy Conservation Strategy 12-1

13. Historic Resources Protection Plan 13-1

14. Plan Relationships 14-1

15. Compatibility Statement 15-1

16. Implementation Strategies 16-1

Section Page

Appendix A

A-1 Regional Perspective & Influences A-1

A-2 Demographics A-2

A-3 Land Use A-3

A-4 Economic Development A-4

A-5 Transportation and Circulation Systems A-5

A-6 Community Facilities and Services A-6

A-7 Natural Resources A-7

A-8 Energy Conservation A-8

A-9 Historic Resources A-9

A-10 Sustainable Communities Assessment A-10

A-11 Housing A-11

A-12 Utilities A-12

Appendix B

B-1 Public Participation Summary B-1

B-2 Task Force Members B-2

ii

Environmentally

Sound

Socially Equitable

Fiscally Responsible

East Goshen Township

Preserving the Past Serving the Present Protecting the Future

1-1

East Goshen Township Comprehensive Plan 2015

1. Executive Summary:

In order for East Goshen Township to maintain our status as a Premier Suburban Community, we need to enhance our strengths, and minimize our weaknesses.

Our focus is to be in sync with our Vision and Mission Statements as follows:

Vision: Endeavor to be one of the premier communities in Chester County by continually improving the quality of life while, at the same time, managing growth and development in a manner consistent with the protection of our environment and preservation of our natural and historic resources.

Mission: East Goshen will provide the basic infrastructure and services to ensure the health, safety and welfare of our residents, to enhance the quality of life, protect the environment and natural and historic resources, and provide for a balanced tax base to support the residents’ desires.

Our strengths include stable and attractive residential neighborhoods, viable places for employment, and diverse opportunities for commerce, recreation, open space, and education. Our quality of life is enhanced with the natural, historic, and cultural fabric of our 10.16 square mile Community. In 2017, we will be 200 years young, with a view toward continued enhancement, improvement, and sustainability.

So that we may continue to celebrate our assets with our residents, business persons, and visitors, we need to: improve the function and attractiveness of our Town Center; expand opportunities at our 55 acre East Goshen Park; increase opportunities for pedestrian linkages and walkability; grow our corporate business parks; improve commerce along West Chester Pike; and balance growth with our natural, historic, and cultural resources.

This Comprehensive Plan 2015 is intended to provide a framework for a path forward from 2015 to 2025. Ultimately, the implementation of this Plan will involve many partnerships between our elected and appointed officials and all those who live, work, shop, learn, and play in East Goshen.

Within the next 10 years we can accomplish innovations that are context sensitive, practical, and meaningful for our children, millennials, families, seniors, workers, and visitors.

Together, we can achieve our Values of: Resident Satisfaction; Fiscal Responsibility; Employee Value; Health, Welfare and Safety; Integrity; Environmental Commitment; and Heritage.

Boot Road

Paoli

Pike

Strasburg Road

Chester Pike

Rt. 352

Paoli

Pike

North Chester Rd.

Rt. 3 West

East

Greenhill Road

East Goshen Township Comprehensive Plan 2015

2. Introduction:

East Goshen Township is about a five minute drive from West Chester Borough, the County Seat. The travel time from East Goshen Township to either the City of Philadelphia or the City of Wilmington, Delaware, is approximately 45 minutes. East Goshen had more than 18,000 residents in 2014, and is one of six municipalities forming the West Chester region.

East Goshen Township’s elected officials devote their time to fostering strong community pride. Much of the effort is reflected through sound municipal planning and fiscal management. This document follows from the 2005 East Goshen Township Comprehensive Plan and is intended for use over the next 10 years. This Plan was developed by a Task Force of elected and appointed officials. It addresses topics such as land use, economic development, transportation, natural and historic resource protection, and parks and recreation.

The findings and recommendations of this Plan provide a framework to be referenced by the Board of Supervisors in collaboration with the Authorities, Boards, and Commissions (collectively, the “ABCs”), when considering future growth and change.

Chapters 3 through 13 are organized: to describe areas of emphasis and a “Big Picture” view of the Topics; and to depict key plans, maps, and graphics. A series of Appendices flow from these Chapters and provide additional details.

Chapter 16 provides an implementation strategy consistent with the overarching view of: protecting the health, safety, and welfare of our residents; maintaining East Goshen’s overall economic prosperity; enhancing the Township’s built environment; protecting natural and historic resources; sustaining successful recreational programs; and protecting and improving the quality of life that we all enjoy. Implementation steps include one of three levels of priority.

1 - Higher Priority Initiatives include those that the Task Force feels are the most urgent and achievable.

2 - Medium Priority Initiatives do not rise to the level of being a top priority, but are recognized as being important.

3 - Lower Priority Initiatives include actions that are considered to be useful, but are not as critical as #1 and #2.

East Goshen Township formed our Comprehensive Plan Task Force by including members from each of its ABCs. Task Force representatives and their affiliations are summarized in Appendix B. The Task Force was supported by Township staff and consultants, and additional input and guidance were provided by the staff of the Chester County Planning Commission.

This Plan reflects the needs and desires of East Goshen Township residents, and business owners and operators. Through Township efforts, public input and participation during the devel- opment of this plan were encouraged by: publicly advertising each meeting of the Task Force; posting Task Force meeting minutes and Plan work products on the Township website; and special public meetings and hearings advertised by the Township and held prior to Board of Supervisors’ adoption of this Comprehensive Plan.

The development of this East Goshen Township Comprehensive Plan 2015 was largely funded through generous planning grant assistance from the Chester County Vision Partnership Program of the Chester County Board of Commissioners.

2-1

1971 Aerial Photograph Showing Primary Roads, Crossroads Commercial Areas, and a Predominant Agricultural and undeveloped Landscape.

A Look Back

As a result of growth since the 1960’s East Goshen Township has been transformed from a primarily Agricultural land base (as shown in the 1971 Aerial Photograph), to its currently diverse Residential, Commercial, Institutional, Recreational, and Industrial land base. As a result of the growth since the 1960’s, new roads, neighborhoods, businesses, workplaces, schools, and parks have been built. We should continue to promote the types of development that have been successful, and transform the Places to be improved.

8

5

2

2

6

5 3

11

2

3

East Goshen Township Comprehensive Plan 2015

2-2

In contrast with the 1971 aerial photograph shown on page 2-1, the 2011 aerial photograph illustrates less than 10% of the lands as Agricultural or undeveloped.

Therefore, we need to concentrate on:

+ maintaining and improving the 90% of the Township that is already developed;

+ finding new ways to enhance Places that could improve our quality of life; and

+ enhancing the main road and highway corridors, as well as increasing our tax base.

The main areas in need of improvement, as indicated above in bold type and as shown on the map (encircled), include:

+ West Chester Pike Corridor; and

+ Paoli Pike Corridor.

These important needs are described in detail in the sections that follow.

In addition to the Places or Areas to be Improved, the most Loved Public Places include: East Goshen Park, Applebrook Trails, Hershey’s Mill Golf Course, the Blacksmith Shop, and the Plank House.

Places or Areas to be Improved Map (and Loved Public Places)

“Places or Areas to be Improved”, as identified by the East Goshen Township Comprehensive Plan Task Force include:

Boot Road Streetscape; Goshen Firehouse Area; Greenhill Road; Goshen Village Shopping Center; Hershey’s Mill Utility Area; Intersections Along North Chester Road; Paoli Pike Paths and Signage; Paoli Pike Pedestrian Gathering Places; Paoli Pike Pedestrian/Bike Access; Pepper Mill Restaurant Area; North Chester Road Streetscape; Tot Lot at East Goshen Park; and West Chester Pike Corridor.

East Goshen Township Comprehensive Plan 2015

3. Goals & Objectives:

These overarching Goals & Objectives are the “Big Ideas” of this Comprehensive Plan 2015. While there are numerous action items to be addressed over the next 10 years of change, these Statements provide the “Big Picture” lens through which to view our preferred path forward.

A. Grow Gracefully

Encourage Smart Growth that “Adds Value” to East Goshen Township as a Premier Suburban Community.

Discourage development/redevelopment that detracts from our Premier vision.

Maintain the current character of lower and medium intensity development.

B. Balance “Where to Build” and “Where Not to Build”

Direct development and encourage redevelopment in the West Chester Pike Corridor and in the Town Center.

Protect the natural resources and historic resources of our community.

Maintain a pattern of Greenways that promote environmental health and sustainability.

Promote Green Infrastructure in existing development.

C. Enhance the Town Center

Enhance the Town Center, with amenities such as Sidewalks, Crosswalks, Shade Trees, Street Lights, and Pedestrian Gathering Areas.

Re-purpose and expand the built environment to create additional locations for shops, stores, businesses, housing, and public spaces.

Promote walkability and opportunities for Pedestrian Gathering Areas along The Paoli Pike Promenade.

3-1

D. Enhance Recreational Opportunities

Expand Recreational Facilities, Activities and Programs at East Goshen Park, for persons of all ages and abilities. Enhance linkages to the Park through the Paoli Pike Trail

Expand Farmers Market hours and vendors.

E. Enhance Commerce

Promote new Uses, such as Hotels, Cafes, and Incubator Businesses, in appropriate locations.

Expand opportunities for Commerce in the Town Center.

Enhance Commerce in the West Chester Pike Corridor.

F. Enable Mixed-Use

Promote opportunities for compact, mixed-use, walkable development in the Town Center.

Expand opportunities for mixed-use within the West Chester Pike Corridor.

Consider opportunities for mixed-use near West Chester Pike & Ellis Lane.

G. Improve Transportation & Circulation

Maintain the quality of the road network.

Expand the efficiency of vehicular circulation.

Expand pedestrian circulation along Paoli Pike.

Expand pedestrian circulation along Greenways.

H. Improve Community Facilities & Services

Expand municipal services in sync with community needs and budget limitations.

Pursue regional relationships in the provision of community facilities and services.

Nurture partnerships with existing businesses and institutions, in order to share facilities and programs.

Legend: Single-family Residential (2.0 persons per lot) Two-family Residential (4.0 persons per lot) Multi-family Residential Mixed-Use Residential/ Commercial

Population Density

East Goshen Township Comprehensive Plan 2015

4. Population & Housing Projections:

Trend

In 2010, according to the U.S. Census, East Goshen Township had:

+ 18,026 persons; and + 8,655 total housing units.

This translates to 2.08 persons per housing unit.

From 2000 to 2010, the population increased by 1,201 persons or 7.1% (from 16,825 to 18,026 persons).

During the same 10 year period, the housing units increased by 1,159 or 15.46% (from 7,496 to 8,655 units).

The reason that the numerical population increase of 1,201 persons closely matches the numerical housing unit increase of 1,159 units (for an average of 1.036 persons per unit) was due to the senior housing units (e.g. Wellington, Bellingham, and some of Hershey’s Mill) where there is typically one person per housing unit. This skews the overall Township wide figure of 2.08 persons per housing unit. Further, as indicated in Appendix A-2, page A-2-11, the Owner Occupied Household Size is 2.40 person per housing unit.

Another trend worth noting pertains to the Aging of the Population. Please refer to Appendix A-2, page A-2-8.1., wherein considerable increases are reflected for persons in age groups 55 to 59, 60 to 64, 65 to 74, 75 to 84, and 85+.

Population Density

East Goshen Township has an overall population density of 2.8 persons per acre (18,026 persons on 6,489.6 total acres). However, when considering the acreage of existing residential land use (3,215 acres), the actual population density is 5.6 persons per acre.

As can be seen on the Population Density Map, most of the population resides in Single-Family Dwellings. Multi-family Dwellings are located primarily in the West Chester Pike Corridor and at Hershey's Mill Village.

Please refer to Appendix A-2, Demographics, for additional details.

4-1

East Goshen Township Comprehensive Plan 2015

4. Population & Housing Projections:

Projections

The Population Projections for 2020 and 2030, in context with potential housing units are listed below.

Year Population Persons Per Potential 2010 Net Forecast Unit Units Units Change

2020 19,202 2.08 9,231 8,655 576

2025 ( average of 2020 and 2030 . . . . . . . . . . . . . . . . . . . . . . . . . 1,061)

2030 21,221 2.08 10,202 8,655 1,547

Note: Potential Units = Existing and New

Since this Plan looks toward 2025, theoretically, there could be 1,061 additional housing units over the next 10 years.

However, as shown in the Build Out Analysis, East Goshen Township only has the current “capacity” to house 574 persons in 276 lots/dwelling units.

Since East Goshen Township is already 90% developed, we can not fit an additional 300 dwelling units by 2020, and 785 dwelling units by 2025.

Therefore, the only ways to accommodate more housing units is through redevelopment, and the further subdivision of existing lots, especially in the West Chester Pike Corridor.

4-2

Build Out Analysis

Build Out Analysis Summary by Zoning District

District Net Acreage Possible Lots

R-2 337.4 262

R-3 8.1 12

R-5 1.7 2

Total 347.1 276

Note: Based on the Average Household size of 2.08 persons (per the 2010 Census) 276 Lots could “house” 574 additional persons. However, if we use 2.40 persons per unit, we could accomodate 662 more persons.

Legend:

Subdividable Lots and Estimated Lot Yield Numbers

6

East Goshen Township Comprehensive Plan 2015

5. Housing Plan:

The hallmarks of our Housing Plan for East Goshen Township include:

5.1. encouraging the maintenance and improvement of the existing housing stock;

5.2. continuing to provide opportunities for a variety of housing types;

5.3. encouraging infill opportunities by providing for additional dwelling units, without adversely impacting the character of existing neighborhoods; 5.4. redeveloping selected properties along West Chester Pike in order to provide for new housing opportunities;

5.5. encouraging mixed uses and mixed housing types where appropriate;

5.6. encouraging the redevelopment of vacant and/or underperforming lots to create new housing opportunities; and

5.7. fostering opportunities for aging in place.

One housing challenge is to find opportunities and places to accommodate new residential units. We may be able to foster Aging in Place, whereby residents might live, work, learn, and play, with housing choices such as retirement residences, apartments, or In-Law Suites. Another housing challenge is to have housing that is affordable to seniors, empty nesters, millennials, and young families as first time homebuyers.

However, since we have the capacity for 276 more residential lots, we can expand our housing stock on selected properties over the next 10 to 20 years. In addition, new housing opportunities might be found through redevelopment, and adaptive reuse of buildings. West Chester Pike is the most viable redevelopment opportunity area in East Goshen Township. We can accommodate additional housing in the West Chester Pike Corridor, and accommodate a wide variety of new and innovative uses.

While new housing opportunities are hatched, the most directly achievable housing initiative pertains to the maintenance and improvement of the existing housing stock.

Please refer to Appendix A-11 for additional details.

5-1

Existing Land Use

The existing Single-Family Detached Residential Land Use comprises about 47% of our Township’s land base. Therefore, we need to maintain and improve the existing housing stock as a primary aspect of our Housing Plan.

These lots and homes are one of the most important aspects of our stable, premier, suburban community character. By continuing to maintain and improve the existing housing stock, we will continue to be home to the workers in our nearby businesses.

Legend:

Agricultural

Open Space/ Recreation

Single-family Residential

Two-family Residential

Multi-family Residential

Mixed-Use Residential/ Commercial

Commercial

Industrial

Institutional

Utility/ Maintenance

Vacant

East Goshen Township Comprehensive Plan 2015

6. Land Use Plan:

The Future Land Use Plan embodies the retention of Existing Land Use, and the Vision for growth and change over the next 10 years.

The overall numerical thresholds for Future Land Use include: maintaining about 55% of the land base for diverse housing types (as residential land use currently comprises about 53.6% of the Township);

maintaining about 27% of the land base for open space and recreation (as open space/recreation land use currently comprises about 27.2% of the Township);

growing the commerical-industrial-work place areas toward 10% of the land base (compared to an existing 7%); and

maintaining about 8% of the land base for other diverse opportunities, including institutional and mixed-use.

6-1

Future Land Use Plan

The Key Elements of the Future Land Use Plan include:

6.1. transforming the Town Center into a viable, walkable, visitable Place;

6.2. transforming the Paoli Pike Corridor into a walkable, connected artery;

6.3. transforming the West Chester Pike Corridor into a more functional and attractive artery;

6.4. continuing to receive guidance from the Authorities, Boards and Commissions (ABC’s);

6.5. continuing effective governance by the East Goshen Township Board of Supervisors; and

6.6. continuing to accommodate a diverse mix of residential, commercial, institutional, light industrial, and recreational uses.

Please refer to Appendix A-3 for additional details.

Low Density Residential

Medium Density Residential

High Density Residential

Planned Community

Town Center

Commercial

Business Park Industrial

Greenway/ Open Space

West Chester Pike Corridor

Paoli Pike Corridor

Legend:

Future Land Use Plan

Town Center

West Chester Pike

East Goshen Township Comprehensive Plan 2015

7. Economic Development Strategy:

In addition to the residential tax base in East Goshen Township, our corporate business parks, commercial enterprises, and industries provide substantial value in the form of taxes, jobs, and close-to-home employment.

We are located in close proximity to the West Goshen Shopping Center, as well as the Wegmans and Target at Uptown Worthington. These places have commercial service areas of 3 to 5 miles, and adequately serve East Goshen Township with the types of goods and services that they offer. We are also close to West Chester Borough and Malvern Borough communities, that thrive because of their unique restaurants, and destination and specialty retail establishments.

The implication of these nearby commercial enterprises is that we need to focus on promoting smaller scale commercial opportunities, as well as specialty retail.

We should pursue an economic development strategy focused on several “gap” opportunities, and closer-to-home opportunities, including:

7.1. promoting the enhancement of business opportunities in the Town Center;

7.2. promoting the enhancement of business opportunities along the West Chester Pike Corridor;

7.3. allowing for new uses and smaller incubator businesses in the corporate parks and the industrial park;

7.4. continuing the use of East Goshen Park for the Farmers Market and other context-sensitive enterprises and activities;

7.5. utilizing the Commerce Commission with the business community, in order to identify and address needs pertaining to business growth and expansion;

7.6. providing opportunities for shared parking opportunities for smaller commercial establishments; and

7.7. continuing No-Impact Home-Based Businesses, Home Occupations, and Home-Related Businesses.

In addition, we need to focus on other Land, Labor, and Capital considerations as outlined in Appendix A-4.

7-1

East Goshen Township exists in the “universe” of Commercial Service Areas in our immediate Region. Opportunities and limitation for certain types of commercial development need to be viewed in the context of the supply and demand for nearby goods and services.

Therefore, we need to be strategic about how to best set the stage for new economic development opportunities in light of existing nearby commerce and business.

Commercial Service Areas indicating that we are already well served by Shopping Centers, Supermarkets, and Convenience Stores

2-mile Service Area Radius of Wawa Convenience Stores

3-mile Service Area Radius of Acme and Giant Supermarkets

5-mile Service Area Radius of Wegmans and Target in Great Valley at Uptown Worthingtown

Commercial Service Areas

Legend:

East Goshen Township Comprehensive Plan 2015

8. Transportation & Circulation Systems Plan:

The Transportation and Circulation Systems Plan, involves two modes of travel:

+ vehicular mobility, flow, and safety; and

+ pedestrian mobility, safety, and exercise.

The key elements to our Vehicular and Pedestrian Transportation and Circula- tion Systems include:

8.1. continuing to provide safe, well-maintained roads throughout the Township;

8.2. identifying and implementing regional highway improvement projects that enhance mobility, safety, and reduce congestion;

8.3. minimizing speeding vehicular traffic on the local roadways, and minimizing cut-through vehicular traffic within neighborhoods;

8.4. implementing vehicular traffic flow and traffic calming improvements for select roads and intersections;

8.5. reducing vehicular traffic by supporting public transportation opportunities and travel demand management techniques;

8.6. increasing pedestrian circulation along Paoli Pike, especially in the form of a “Paoli Pike Promenade” with Sidewalks and Crosswalks, as well as increasing pedestrian circulation and pedestrian safety along Greenways, with Trails, Walkways, and Crosswalks; and

8.7. implementing the East Goshen Township Act 209 Transportation Plan.

These key elements are addressed in greater detail in Appendix A-5.

8-1

Transportation Routes & Corridors of Development

Proposed Paoli Pike Promenade: Section at East Goshen Township Building (TCA: 2-23-15)

East Goshen Township exists within the framework of the regional and sub-regional Transportation Routes, and related Corridors of Development.

Over the next 10 years, we need to capitalize on these areas as an important enhancement Strategy. Therefore, by improving the land use/transportation connection along the West Chester Pike Corridor, the Paoli Pike Corridor, and along the frontages of the Business Parks and the Industrial Park, we can focus on a more functional circulation network.

Legend:

Corridors of Development along main Transportation Routes

Boot Road

Paoli Pike

West Chester Pike

Rt. 352

Rt. 3

North Chester Road

East Strasburg Rd.

Greenhill Rd.

East Goshen Township Comprehensive Plan 2015

9. Community Facilities and Services Plan:

The elements of the Community Facilities and Services Plan for which East Goshen Township has a dominant role, include:

9.1. maintaining and expanding the Open Space, Recreation, and Trails Network;

9.2. developing the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown;

9.3. maintaining and upgrading East Goshen Park;

9.4. continuing to provide high quality Recreation Services;

9.5. continuing to provide high quality Police, Fire and EMS Services;

9.6. continuing the provisions of effective administrative, public works, and related services; and

9.7. continuing to support important and viable Community Facilities.

9-1

Open Space, Recreation, and Trails Plan

In addition to providing high quality existing Services by East Goshen Township personnel as outlined above, under items 9.4., 9.5., and 9.6., a 10 year look forward regarding our open space, recreational resources and trails could yield:

9.1.1. extensions to the Trails to form an overall Greenway network;

9.2.1. the construction of the Paoli Pike Trail; and

9.3.1. upgrades and enhancements to the facilities at East Goshen Park.

Please refer to Appendix A-6 for additional details.

East Goshen Park Note: Concurrent with this Comprehensive Plan, East Goshen Township is preparing an Update to the “Parks, Recreation, and Open Space Plan”.Please refer to the East Goshen Township Parks, Recreation, and Open Space Plan Update, 2015, for the overarching goal: “To continue to provide premier parks and recreation facilities and services while protecting the Township’s scenic beauty,natural resources, and open space”. To achieve this goal, East Goshen Township identified four key objectives: (1) Take care of and improve parks and recreational facilities; (2) Promote scenic beauty, open space, and natural resources; (3) Engage citizens in active healthy living and lifelong enrichment through recreation opportunities; and (4) Continue to provide operational excellence and financial sustainablity for the parks, recreation, and open space network through public and private support.

Legend:

Township Owned Recreation and Open Space

Active

Passive

Other Recreation and Open Space Private

Protected Lands

Trails

Existing Proposed

Community Facilities

1. Township Complex

2. EG Elementary School

3. Price Fields WCASD

4. Goshen Fire Company

1. 2.

3.

4.

East Goshen Township Comprehensive Plan 2015

10. Utilities Plan:

The Utilities Plan focuses on key elements of our Infrastructure including:

10.1. continuing to provide effective sewage disposal and wastewater treatment with oversight of the Municipal Authority;

10.2. continuing to provide effective solid waste disposal, and recycling services;

10.3. maintaining the role of the East Goshen Township Municipal Authority for evaluating sewered and unsewered areas;

10.4. cooperating with Aqua on public water supply;

10.5. maintaining effective Stormwater Management, under the PA MS4 regulations, as well as PA Chapter 93, and State and Federal Stormwater Management Regulations; and

10.6. regulating pipelines to protect land uses and the environment.

Ultimately, the land within our Sewered Areas are the places where innovations in land use can occur. In the Un-Sewered Areas, we need to maintain a low intensity of development. In the Sewered Areas we can more effectively consider various redevelopment proposals, and mixed-use development proposals. Fortunately, all of the West Chester Pike Corridor, and all of our Business Park and Industrial Park lands are sewered. Therefore, we can accommodate changes to land use in these Higher Intensity Areas without concerns for adverse sewage effects.

Relative to pipelines, we need to evaluate the extent to which our Ordinances require measures to mitigate potential adverse impacts on land uses and the natural environment. If we find that our Ordinances need to be strengthened, then Amendments should be made to both the Zoning Ordinance, and the Subdivision & Land Development Ordinance.

Please refer to Appendix A-12 for additional details.

10-1

Sanitary Sewer Service Areas

Legend:

Ridley Creak STP Service Area

Westtown Service Area

Hershey’s Mill Service Area

West Goshen Service Area

East Whiteland Service Area

Un-Sewered Areas

Pennoni: April 2015

East Goshen Township Comprehensive Plan 2015

11. Natural Resources Protection Plan:

11-1

Natural Features Map

The Key elements of the Natural Resources Protection Plan include:

11.1. protecting the Riparian Areas along Ridley and Chester Creeks and their tributaries;

11.2. considering opportunities for a Greenway Network along Chester and Ridley Creeks;

11.3. preserving and enhancing Street Trees;

11.4. continuing the advocacy role of the Conservancy Board;

11.5. continuing riparian buffer plantings throughout the Township;

11.6. continuing to control invasive species;

11.7. improving woodland protection standards;

11.8. reviewing and updating tree replacement standards as needed;

11.9. reviewing and updating criteria for non-buildable areas; and

11.10. improving and enhancing our green infrastructure.

All initiatives to improve and enhance our “green infrastructure’ will add value in East Goshen. The premier neighborhoods with maturing vegetation will, over time, have an ”old shade character” that will increase the value of these neighborhoods. The Streetscapes that will have new Street Trees will be transformed to have a “shade canopy” that will increase the attractiveness of our accessways. The waterways with conserved and newer riparian buffer plantings will become more stabilized and biologically diverse. Therefore, our challenge will be to protect as many trees as possible, and to replace trees that may be removed when accommodating planned growth.

In addition to protecting existing vegetation, and planting new native (non-invasive) vegetation, our natural resources will be better protected when respecting our hydrological resources. In the future, we will need to tread lightly in the woods and along our waterways in order to enhance our environmental health.

Please refer to Appendix A-7 for additional details pertaining to the Natural Resources Protection Plan.

Also, please refer to Appendix A-10 relative to a commentary on Sustainability.

Legend:

Woodlands

Flood Plains

Bodies of Water

Serpentine Outcroppings

East Goshen Township Comprehensive Plan 2015

12. Energy Conservation Strategy:

Energy Conservation over the next 10 years in East Goshen Township should focus on practical and achievable results, including:

12.1. creating more compact, mixed-use, walkable places;

12.2. advocating energy conservation for residents, businesses, and institutions;

12.3. advocating green building and site development practices;

12.4. promoting and enhancing the protection of Woodlands;

12.5. designating areas for compact car parking, in order to reduce the size of off-street parking lots;

12.6. encouraging park and ride facilities, shared parking, and increased public transportation; and

12.7. providing conservation tips on the Township website.

These initiatives are addressed in further detail in Appendix A-8, and Appendix A-10.

12-1

East Goshen Township Comprehensive Plan 2015

13. Historic Resources Protection Plan:

The two most significant clusters of Historic Resources in our Township are found at:

+ Goshenville - along Rt. 352 at Paoli Pike and East Boot Road, where the Blacksmith Shop, Plank House, and Goshen Friends Meeting are located; and

+ Rocky Hill - around the intersection of Rt. 352 and Strasburg Road.

The characteristics of these properties that are either on or eligible for the National Register of Historic Places include: buildings located close to the frontage roads; buildings typically two stories in height; and simple building proportions.

Key considerations for the Historic Resources Protection Plan include:

13.1. continuing the East Goshen Historical Commission (EGHC) programs at the Blacksmith Shop and Plank House, and refinement of the Township Historic Property Inventory;

13.2. continuing to have the EGHC comment on applications for subdivision and land development involving and adjacent to Historic properties;

13.3. continuing to have the EGHC provide educational information for the Township website and Newsletter;

13.4. utilizing the characteristics of Goshenville and Rocky Hill to guide the character of nearby development;

13.5. reviewing Historic Preservation requirements; and

13.6. considering simplified Historic Preservation Standards.

Please refer to Appendix A-9 for additional details. Also, in Appendix A-9 is information pertaining to East Goshen Township and the Battle of the Clouds.

13-1

Historic Resources Map

Legend:

Class 1. On the National Register of Historic Places or Eligible for the National Register

Class 2. Properties of Local Historical Significance

East Goshen Township Comprehensive Plan 2015

14. Plan Relationships:

All the Plans in Chapters 5 through 13 relate well to one another, from the perspectives of Land Use, Housing, Economic Development, Transportation & Circulation, Community Facilities & Services, Utilities, Natural Resources Protection, Energy Conservation, and Historic Resources Protection.

The East Goshen Township Board of Supervisors, the Staff, and the ABC’s, all keep a careful watch on operations, needs, initiatives, and opportunities pertaining to growth management. While this Plan sets forth perspectives on which to focus over the next 10 years, the day-to-day life of East Goshen Township is properly managed and nurtured through on-going communications, meetings, work sessions, staff meetings, website updates, newsletter updates, and other outreach initiatives.

There are, however, several consequences of the interrelationships of the plan components worth noting. The Land Use Intensity Areas, shown as Higher, Medium, and Lower, embody the overarching view for Places that need to be enhanced and/or improved and/or energized, as well as the Places to be stabilized, or conserved.

The Higher Land Use Intensity Areas that can be enhanced and/or improved and/or energized include:

The Town Center Area along Paoli Pike from Boot Road to North Chester Road; The West Chester Pike Corridor; The Brandywine Industrial Park on Wilson Drive, between Airport Road and Boot Road; The Industrial Area of Goshen Corporate Park West on Airport Road; and The Goshen Corporate Park along Paoli Pike and Boot Road.

The areas shown in the orange color on the map depicting Land Use Intensity Areas are the places where most of the development and redevelopment should occur in East Goshen Township over the next 10 years. It is important to note that the “Big Picture” of Land Use Intensity relates well to the Future Land Use recommendations. In addition, the desired Places or Areas to be Improved are primarily located within the Higher Land Use Intensity Areas.

The Plans in Chapters 5 through 13 also are consistent with the Chester County Comprehensive Policy Plan, Landscapes 2, relative to land use, housing, natural resources, open space and greenways, historic resources, utilities, economic development, and energy conservation. The majority of East Goshen Township is desig- nated as a “Suburban” Landscape Growth Area on the Landscapes 2 Plan titled “Livable Landscapes”. Only a small portion of East Goshen Township is designated on the same plan as a “Rural” Landscape. Fortunately, the County’s Rural Landscape designation coincides with Open Space lands in East Goshen Township.

14-1

Higher Land Use Intensity Areas

These Areas represent the Corridors, Sites, and Places that need to be enhanced and/or improved and/or energized.

Medium Land Use Intensity Areas

These Areas represent the many Stable Neighborhoods and properties that should be maintained

Lower Land Use Intensity Areas

These Areas represent the overall Greenway Network of Parks, Open Spaces, Riparian Buffers, and Woodlands

Places or Areas to be Improved

Legend:

Land Use Intensity Areas: Higher, Medium, Lower: 2015 to 2025

Low Density Residential

Medium Density Residential

High Density Residential

Planned Community

Town Center

Legend:

Commercial

Business Park Industrial

Greenway/ Open Space

West Chester Pike Corridor

Paoli Pike Corridor

Future Land Use

The encircled areas signify “Places or Areas to be Improved” as indicated by the Task Force. These Places and Areas correspond in large part to the Higher Land Use Intensity Areas.

The Non-Residential Land Uses and the High Density Residential Land Uses coincide with the Higher Intensity Land Uses and the “Places or Areas of be Improved”.

East Goshen Township Comprehensive Plan 2015

15. Compatibility Statement:

The existing and proposed development in East Goshen Township is generally compatible with the existing and proposed development in contiguous portions of neighboring municipalities. This compatibility can be seen in the map depicting the East Goshen Township Zoning Districts, in context with the border conditions in West Whiteland, East Whiteland, Willistown, Westtown, and West Goshen Townships, as described below.

West Whiteland - Along our northwest boundary, a neighborhood of 1 acre lots exists in an R-1 District. In East Goshen our adjoining R-2 District is also zoned for 1 acre lots. Both areas are already developed and compatible.

East Whiteland - Along our northeast boundary, a neighborhood with 1 acre lots exists in an R-1 District. In East Goshen, our adjoining R-2 District is both already developed and compatible. In addition, Villa Maria Academy in East Whiteland, although zoned for 22,000 square foot lots, is a stable campus with no development planned at this time. Villa Maria and our R-2 District are compatible.

Willistown - Along our eastern boundary, most of the land in Willistown is already developed and is compatible with the R-2 zoning in East Goshen. Willistown’s RU-Rural/Agricultural/Preserved/Suburban Low Density Zoning District has density restrictions that reinforce the compatibility between Willistown and East GoshenTownships, including a 4 acre lot area minimum in Willistown.

Westtown - The lands adjoining East Goshen are compatibility zoned in Westtown for low to moderate intensity residential development, as well as for compatible commercial development along West Chester Pike.

West Goshen - Along our western boundary the land uses and zoning are compatible, in terms of residential, commercial, and industrial zoning. Our neighborhoods, business parks, and stores are compatible with like-type development and zoning in West Goshen.

Please refer to Appendix A-1 for additional details regarding the Regional Perspective and Influences. In particular, at the end of Appendix A, there is a description of several detailed but minor differences in the zoning districts along the municipal boundaries.

15-1

East Goshen Township Existing Zoning Districts & 2010 Aerial Photograph

West Whiteland Township

East Whiteland Township

West Goshen Township

Willistown Township

Westtown Township

Note: The existing and proposed land use, as well as the existing zoning districts of East Goshen Township, compare favorably with the existing and proposed land use and the existing zoning districts of the adjoining municipalities, except as described at the end of Appendix A-1.

Objective Priority

Completion Time Frame

(1)

Responsibility

(2) Method of Implementation

(3)

Potential

Funding Sources (2) Primary Other

5. Housing Plan

5.1.

Encouraging the maintenance and improvement of the existing housing stock * on-going PS Development,

Plan Review PS

5.2. Continuing to provide opportunities for a variety of housing types. * on-going BOS PC ZO PS

5.3.

Encouraging infill opportunities by providing for additional dwelling units, without adversely impacting the character of existing neighborhoods.

* on-going PC BOS, FC ZO, SLDO, Plan Review PS

5.4.

Redeveloping selected properties along West Chester Pike in order to provide for new housing opportunities.

3 2 to 10 years PS Development,

Plan Review PS

5.5. Encouraging mixed uses and mixed housing types where appropriate. * on-going BOS PC ZO PS

5.6.

Encouraging the Redevelopment of vacant and/or underperforming lots to create new housing opportunities.

3 5 to 10 years PC PS Development,

Plan Review PS

5.7. Fostering opportunities for aging in place. 2 2 to 10 years BOS PC ZO PS, CCC

6. Land Use Plan

6.1. Transforming the Town Center into a viable, walkable, visitable Place.

1 1 to 10 years PS BOS, PC Plan Review, Development PS, PT

6.2.

Transforming the Paoli Pike Corridor into a walkable, connected, artery.

1 1 to 10 years BOS PC, PT,

CCC Special Study PT, DVRPC

6.3.

Transforming the West Chester Pike Corridor into a more functional and attractive artery.

2 2 to 20 years PS BOS, PC, PT Special Study PT, PS, DVRPC

6.4.

Continuing to receive guidance from the Authorities, Boards and Commissions (ABC’s). * on-going BOS PC, ABC’s Meetings, Workshops GF

6.5.

Continuing effective governance by the East Goshen Township Board of Supervisors. * on-going BOS Meetings, Hearings GF

6.6.

Continuing to accommodate a diverse mix of residential, commercial, institutional, light industrial, and recreational uses.

* on-going BOS PC, FC ZO, Plan Review PS

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

Our implementation strategies are consistent with our overarching view of: protecting the health, safety, and welfare of our residents; maintaining East Goshen’s overall economic prosperity; enhancing the Township’s built environment; protecting natural and historic environments; sustaining successful recreational programs; and protecting and improving the quality of life that we all enjoy.

Priority: Implementation steps include one of three levels of priority, as follows:

1 - Higher Priority Initiatives include those that the Task Force feels are the most urgent and achievable;

2 - Medium Priority Initiatives do not rise to the level of being a top priority, but are recognized as being important; and

3 - Lower Priority Initiatives include actions that are considered to be useful, but are not as critical as #1 and #2.

Completion Time Frame: is meant as an estimate of the time frame in which a specific Initiative can be completed.

Responsibility: identifies which of the East Goshen Township ABC’s are most responsible for overseeing the Implementation of each Initiative.

Implementation Method: identifies whether the Initiative will require such actions as an ordinance amendment, physical improvement, special study, meetings, workshops, plan review, or development.

Potential Funding Source: addresses potential funding sources that could be used to supple- ment Township funds. These include state funding sources - the Department of Conservation and Natural Resources (DCNR), the Department of Community & Economic Development (DCED), the Department of Environmental Protection (DEP), grants from federal Community Development funds , and grants from the Chester County Board of Commissioners.

The Board of Supervisors should use this Implementation Matrix as a guide to monitor progress on the various Initiatives. Therefore, the Board of Supervisors should periodically review and update the Implementation Matrix to reflect current Township priorities.

Notes: 1. The Initiatives listed in this Section are supplemented by expanded lists in the Appendices. 2. Whenever there is an “On-Going” initiative, an asterisk ( ) is indicated as these items are constant.

16-1

Notes: (1) The Township can use this Implementation Matrix as a guide to monitor progress on various Initiatives. Therefore, this Implementation Matrix should be periodically reviewed and updated to reflect current Township priorities.

(2) BOS = Board of Supervisors; PC = Planning Commission; PR = Parks & Recreation Commission; MA = Municipal Authority; CB = Conservancy Board; HC = Historic Commission; CC = Commerce Commission; FC = Futurist Committee; PS = Private Sector; PT = Penn DOT; DCNR: PA Department of Conservation and Natural Resources; DCED = PA Department of Community & Economic Development; DEP = Department of Environmental Protection; CCC = Chester County Commissioners; DVRPC = Delaware Valley Regional Planning Commission.

(3) ZO = Zoning Ordinance; SLDO = Subdivision and Land Development Ordinance; GF = General Fund

Implementation Matrix

*

Objective Priority

Completion Time Frame

(1)

Responsibility

(2) Method of Implementation

(3)

Potential

Funding Sources (2) Primary Other

7. Economic Development Strategy

7.1.

Promoting the enhancement of business opportunities in the Town Center. * on-going BOS PC, CC,

FC

ZO, SLDO, Plan Review PS, GF

7.2.

Promoting the enhancement of business opportunities along the West Chester Pike Corridor. * on-going BOS PC, CC,

FC

ZO, SLDO, Plan Review PS, GF

7.3.

Allowing for new uses and smaller incubator businesses in the corporate parks and the industrial park.

1 1 to 10 years BOS PC, CC,

FC

ZO, Plan Review,

Development PS

7.4.

Continuing the use of East Goshen Park for the Farmers Market and other context-sensitive enterprises and activities.

* on-going BOS PR Programs, Development GF

7.5.

Utilizing the Commerce Commission with the business community, in order to identify and address needs pertaining to business growth and expansion.

* on-going CC BOS

Workshops,

Newsletter,

Website

PS

7.6.

Providing opportunities for shared parking opportunities for smaller commercial establishments.

2 2 years BOC PC ZO, SLDO PS

7.7.

Continuing No-Impact Home-Based Businesses, Home Occupations, and Home- Related Businesses. * on-going BOS PC, PS ZO, SLDO PS

8. Transportation & Circulation Systems Plan

8.1.

Continuing to provide safe, well-maintained roads throughout the Township. * on-going BOS PT Maintenance GF, PT

8.2.

Identifying and implementing regional highway improvement projects that enhance mobility, safety, and reduce congestion.

1 1 to 10 years BOS PT, DVRPC Special Study PT, DVRPC

8.3.

Minimizing speeding vehicular traffic on the local roadways and minimizing cut-through vehicular traffic within neighborhoods.

* on-going BOS PT Maintenance, Development PT, PS

8.4.

Implementing vehicular traffic flow and traffic calming improvements for select roads and intersections.

2 2 to 10 years BOS PT Plan Review, Maintenance PT, GF

8.5.

Reducing vehicular traffic by supporting public transportation opportunities and travel demand management techniques.

* on-going BOS DVRPC Special Study DVRPC, PT

Objective Priority

Completion Time Frame

(1)

Responsibility

(2)

Method of Implementation

(3)

Potential

Funding Sources (2) Primary Other

8. Transportation & Circulation Systems Plan (continued)

8.6.

Increasing pedestrian circulation along Paoli Pike, especially in the form of a “Paoli Pike Promenade” with Sidewalks and Crosswalks, as well as increasing pedestrian circulation and pedestrian safety along Greenway, with Trails, Walkways, and Crosswalks.

1 1 to 10 years BOS PC, PR Special Study,

ZO, SLDO

GF, CCC,

DVRPC,

DCNR

8.7. Implementing the East Goshen Township Act 209 Transportation Plan * on-going BOS PC Plan Review PS

9. Community Facilities and Services Plan

9.1.

Maintaining and expanding the Open Space, Recreation, and Trails Network.

2 2 to 20 years BOS PC, PR,

CB Special Study GF, CCC, DCNR

9.2.

Developing the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen, from West Goshen to Willistown.

1 1 to 10 years BOS PC, PR, PT, CCC Special Study GF, PT, CCC,

DCNR

9.3. Maintaining and upgrading East Goshen Park. * on-going BOS PR Maintenance, Rec Fee in Lieu GF, DCNR

9.4. Continuing to provide high quality Recreation Services. * on-going BOS PR Programs GF, DCNR

9.5. Continuing to provide high quality Police, Fire and EMS services. * on-going BOS Maintenance GF, DCED

9.6.

Continuing the provisions of effective administrative, public works, and related services. * on-going BOS MA Maintenance GF

9.7. Continuing to support important and viable Community Facilities. * on-going BOS PR Maintenance GF

10. Utilities Plan

10.1.

Continuing to provide effective sewage disposal and wastewater treatment with oversight of the Municipal Authority.

* on-going BOS MA Development PS

10.2.

Continuing to provide effective solid waste disposal, and recycling services. * on-going BOS MA Maintenance GF

10.3.

Maintaining the role of the East Goshen Township Municipal Authority for evaluating sewered and unsewered areas.

* on-going BOS MA Special Study,

Plan Review

PS

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

16-2

Objective Priority

Completion Time Frame

(1)

Responsibility

(2)

Method of Implementation

(3)

Potential

Funding Sources (2) Primary Other

12. Energy Conservation Strategy (continued)

12.5.

Designating areas for compact car parking, in order to reduce the size of off-street parking lots.

2 2 to 5 years BOS PC ZO, SLDO, Plan Review PS

12.6.

Encouraging park and ride facilities, shared parking, and increased public transportation. * on-going BOS

PT, CCC, DVRPC

BOS, DVRPC,

CCC, PT

PT, DVRPC,

BOS

12.7.

Providing conservation tips on the Township website. * on-going BOS CB Website GF

13. Historic Resources Protection Plan

13.1.

Continuing the East Goshen Historical Commission (EGHC) programs at the Blacksmith Shop and Plank House, and refinement of the Township Historic Property Inventory.

* on-going HC BOS HC Programs,

Special Study GF

13.2.

Continuing to have the EGHC comment on applications for subdivision and land development involving and adjacent to Historic properties.

* on-going HC PC SLDO PS

13.3.

Continuing to have the EGHC provide educational information for the Township website and Newsletter. * on-going HC Website, Newsletter GF

13.4.

Utilizing the characteristics of Goshenville and Rocky Hill to guide the character of nearby development.

3 5 years HC PC, BOS ZO, SLDO CCC, GF

13.5.

Reviewing Historic Preservation requirements. 1 1 to 5 years HC PC ZO, SLDO CCC, GF

13.6.

Considering simplified Historic Preservation Standards. 2 2 to 5 years HC PC ZO, SLDO CCC, GF

Objective Priority

Completion Time Frame

(1)

Responsibility

(2)

Method of Implementation

(3)

Potential

Funding Sources (2) Primary Other

10. Utilities Plan (continued)

10.4. Cooperating with Aqua on Public Water Supply * on-going PS Development PS

10.5. Maintaining effective Stormwater Management * on-going BOS DEP Plan Review PS

10.6. Regulating pipelines to protect land uses and the environment. * on-going BOS DEP Plan Review CCC, PS

11. Natural Resource Protection Plan

11.1.

Protecting the Riparian Areas along Ridley and Chester Creeks and their tributaries. * on-going BOS

PC, DEP, DCNR

CB, DCNR, DEP PS, DCNR, DEP

11.2.

Considering opportunities for a Greenway Network along Chester and Ridley Creeks. * on-going BOS PC, PR,

DCNR

Special Study,

Plan Review DCNR, GF

11.3. Preserving and enhancing Street Trees. * on-going BOS PC, CB Plan Review PS

11.4. Continuing the advocacy role of the Conservancy Board. * on-going CB BOS Website, Plan Review GF

11.5.

Continuing riparian buffer plantings throughout the Township.

1 1 to 20 years CB DCNR Planting GF, DCNR

11.6. Continuing to control invasive species. * on-going CB DCNR DEP, Plan Review PS

11.7. Improving woodland protection standards. 2 2 to 5 years BOS PC, CB ZO, SLDO GF, CCC

11.8. Reviewing and updating tree replacement standards as needed.

2 2 to 5 years BOS PC, CB ZO, SLDO, Plan Review GF, CCC

11.9. Reviewing and updating criteria for non-buildable areas.

2 2 to 5 years BOS PC, CB ZO, SLDO, Plan Review GF, CCC

11.10. Improving and enhancing Green Infrastructure * on-going BOS PC, PS ZO, SLDO, Plan Review GF, DCNR

12. Energy Conservation Strategy

12.1.

Creating more compact, mixed-use, walkable places. * on-going PS BOS, PC, FC

Plan Review, Development PS, DCED

12.2.

Advocating energy conservation for residents, businesses, and institutions. * on-going BOS PC, CB,

FC

Website, Newsletter GF, DEP

12.3.

Advocating green building and site development practices. * on-going BOS PC, CB,

FC

ZO, SLDO, Special Study

GF, DEP,

DVRPC

12.4.

Promoting and enhancing the protection of Woodlands. * on-going BOS PC, CB,

DCNR

ZO, SLDO, Plan Review PS, DCNR

East Goshen Township Comprehensive Plan 2015

16. Implementation Strategies:

16-3

Build Out Analysis

Legend:

Subdividable Lots and Estimated Lot Yield Numbers

6

Build Out Analysis

Legend:

Subdividable Lots and Estimated Lot Yield Numbers

6

1 2 3 4 5 6 7 8 9

10 11 12

13 14

15 16 17 18 19

Summary of Comments on East Goshen Township Comprehensive Plan

Page: 1

Number: 1 Author: kkrause Subject: Polygon Date: 4/15/2025 1:15:15 PM 1338 Morstein Rd- 3 EGT Lots (2025)

Number: 2 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:15:57 PM 1469 Morstein Road- 20.6 acres

Number: 3 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:14:32 PM 1336 Morstein Road- 2.5 acres

Number: 4 Author: kkrause Subject: Polygon Date: 4/15/2025 1:45:50 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:46:20 PM 990 Hershey Mill Rd- 1.4 acres with SFD

Number: 5 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:38:51 PM 980 Hershey Mill Road- 34.7 acres with wetlands & floodplain

Number: 6 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:37:41 PM 1470 Morstein Road- 8.4 acres with wetlands & floodplain

Number: 7 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:47:12 PM 1000 Hershey Mill Rd- 6 acres with 1 SFD

Number: 8 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:33:14 PM 1460 Morstien Road- 9.6 acres (undeveloped)

Number: 9 Author: kkrause Subject: Polygon Date: 4/15/2025 1:47:27 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:47:58 PM 1010 Hershey Mill Rd- 14 Lot Subdivision (2025)

Number: 10 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:13:55 PM 1331 Greenhill Lane- 13.7 acres

Number: 11 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:06:00 PM 1225 N. Chester Road- 3 acres

Number: 12 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:05:32 PM 1605 Old Orchard Lane- 3 acres

Number: 13 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:03:51 PM 1152 N. Chester Ave- 4.5 acres

Number: 14 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:03:12 PM 1145 N Chester Ave- 2.8 acres

Number: 15 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:01:25 PM 1619 Highland Avenue- 2 acres

Number: 16 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:00:33 PM 961 Cornwallis Drive- 3.3 acres

Number: 17 Author: kkrause Subject: Polygon Date: 4/15/2025 12:57:37 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:58:04 PM 957A Cornwallis Dr- Built 2016

Number: 18 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:54:30 PM 953A Cornwallis Drive- 3.02 acres

Number: 19 Author: kkrause Subject: Polygon Date: 4/15/2025 12:51:01 PM

Comments from page 1 continued on next page

Build Out Analysis

Legend:

Subdividable Lots and Estimated Lot Yield Numbers

6

20 2122

23 24

25 26 27

28 29

30

31 32 33 34 35 36

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:53:09 PM 953A Cornwallis Dr-

Number: 20 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:59:45 PM 966 Cornwallis Drive- Undeveloped

Number: 21 Author: kkrause Subject: Polygon Date: 4/15/2025 12:49:03 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:49:49 PM 943 Cornwallis Drive- 2 Lots (2016)

Number: 22 Author: kkrause Subject: Polygon Date: 4/15/2025 12:47:32 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:47:28 PM 930 N. Chester Rd- 2 Lots (2016)

Number: 23 Author: kkrause Subject: Polygon Date: 4/15/2025 12:32:20 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:32:45 PM 1555 Colonial Lane- 4 Lots (2014)

Number: 24 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:45:21 PM 1601 Paoli Pike- 7 Lot Subdivision Recorded 1978- 8.8 acres

Number: 25 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:31:58 PM 1408 Paoli Pike- 15.2 acres

Number: 26 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:07:06 PM 1714 E. Boot Road- 4.7 acres

Number: 27 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:25:54 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:30:57 PM 1422 Larch Lane- 1 existing SFD, 2.0 acres

Number: 28 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:25:24 PM 401 Ellis Lane

Number: 29 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:25:41 PM 200 Reservoir Road

Number: 30 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:07:49 PM 1725 Towne Drive- 11 acres

Number: 31 Author: kkrause Subject: Polygon Date: 4/15/2025 12:24:03 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:24:36 PM 301 Reservoir Rd- 5 Lots (2025)

Number: 32 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:23:13 PM 410 N. Chester Rd- Undeveloped

Number: 33 Author: kkrause Subject: Polygon Date: 4/15/2025 12:19:55 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:20:21 PM 411 Misak Drive- Built 2018

Number: 34 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:22:56 PM 408 N Chester Rd- Undeveloped

Number: 35 Author: kkrause Subject: Polygon Date: 4/15/2025 12:16:04 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:24:47 PM 1420 E Strasburg Rd- 3 Lots (2017)

Number: 36 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:17:41 PM

Comments from page 1 continued on next page

Build Out Analysis

Legend:

Subdividable Lots and Estimated Lot Yield Numbers

6

37

38 39

40

1532 E Strasburg Rd

Number: 37 Author: kkrause Subject: Sticky Note Date: 4/15/2025 12:17:23 PM 1514 E Strasburg Rd

Number: 38 Author: kkrause Subject: Polygon Date: 4/15/2025 1:11:36 PM

Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:12:23 PM 324 Dutton Mill Lane- 1 SFD (2023) Unable to be further developed

Number: 39 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:12:50 PM 320 Dutton Mill Lane- 2.8 acres

Number: 40 Author: kkrause Subject: Sticky Note Date: 4/15/2025 1:08:57 PM 240 Dutton Mill Road- 7.3 acres