Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP PLANNING COMMISSION

East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380 Reorganization and Regular Meeting Agenda Tuesday, January 27, 2026, at 7:00 PM

Planning Commission Members: Daniel H. Daley Ernest Harkness William Kaufman Michael Koza Karen Martynick John Stipe Dan Truitt Larry Massaro, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison Agenda Items:

1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Reorganization/Appointments a. Motion to nominate candidates for the following seats:

i. Chairperson ii. Vice-Chairperson b. Establish Workshop Meeting Schedule (3rd Wednesday or 2nd Tuesday of the month) 3. Chairman will ask if anyone is going to record the meeting. 4. Review of Tracking Log / Determine need for Workshop Meeting 5. Public Comment on Non-Agenda Items 6. Approval of Minutes a. November 25, 2025 7. Acknowledge Receipt of New Applications (Initial Submission) a. Subdivision and Land Development Applications b. Conditional Uses Applications c. Zoning Hearing Board Variances d. Ordinance Amendments 8. Old Business a. Zoning Ordinance Amendment Draft- AI Data Centers b. Comprehensive Plan Discussion 9. New Business a. Planning Commission Accomplishments & Goals- Biennial Planning Session on March 10th 10. Liaison Reports 11. Correspondence 12. Announcements 13. Next Meeting – Tuesday, February 24, 2026, at 7:00 PM 14. Adjournment Bold Items indicate new information to review or discuss.

PROJECT DESCRIPTION Date Filed Start Date Twp.

Engineer

Review

CCPC

Review

Conserv.

Board

Review

Extension

Date

PC

Deadline

Meeting

BOS

Deadline

Meeting

Hearing

Date

Final Action

Deadline (90

days) Comments

Zoning Ordinance Amendment-

Data Centers n/a 11/25/2025 n/a n/a n/a n/a n/a n/a n/a n/a Review draft ordinance for consideration

10-Year Comprehensive Plan Review n/a 4/22/2025 n/a n/a n/a n/a n/a n/a n/a n/a

PROJECTS COMPLETED IN 2026

Bold = New application or action required

East Goshen Township Planning Commission

Application Tracking Log

January 27, 2026

PENDING PROJECTS

PC 11-25-25 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION MEETING 3 November 25, 2025 4 5 The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, 6 November 25, 2025 at 7:00 pm in the Township Building. 7 Members present are highlighted: 8 Chair – Ernest Harkness 9 Vice Chair – John Stipe 10 Dan Daley 11 Michael Koza 12 Michael Pagnanelli 13 Fred Pioggia 14 Dan Truitt 15 16 Also present was: 17 Kelly A. Krause, Zoning Officer 18 John Hertzog , BOS Liaison 19 Nathan Cline, Township Engineer 20 Mark Thompson, Township Solicitor 21 22 COMMON ACRONYMS: 23 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 24 BC – Brandywine Conservancy CVS – Community Visioning Session 25 CB – Conservancy Board SWM – Storm Water Management 26 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 27 28 FORMAL MEETING – 7 p.m. 29 1. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 30 moment of silence to remember our first responders, police, military, and all who protect us. 31 2. Ernest asked if anyone would be recording the meeting and if there were any public 32 comments about non-agenda items. There was no response. 33 3. The tracking log was checked and no need for a workshop meeting. 34 4. The minutes of the June 24, 2025 meeting were approved. 35 36 CHAIRMAN’S REPORT – 37 None 38 39 Acknowledge Receipt of New Applications (initial Submission)- 40 None 41 42 OLD BUSINESS – 43 None 44 45 NEW BUSINESS – 46 1. Zoning Ordinance Amendment Discussion – AI Data Center 47 Ernest commented that he felt the PC should start to discuss AI Data Centers. Do we need a special 48 ordinance, or should it be in the Industrial Zone? John S. asked if an application came in wouldn’t it be in 49 the I1 District? Kelly spoke about all items that would be considered. Noise seems to be a consideration. 50 Power can be supplied from local utilities companies. Water can be used to produce power for it. Some 51 centers have their own power source which only supplies the data center. Ernest feels there has to be a 52 security item. Mike P feels it is good to have this discussion but doesn’t feel this will come here. He 53

PC 11-25-25 draft 2

was involved in one in West Virginia. Mike K spoke about ones his company is involved in. He 1 suggested putting it in I1. The power source is a discussion. Ernest explained the process and 2 requirements of nuclear power near residential areas. We should include all the items we can under I1 as 3 a conditional use. Kelly feels the noise ordinance could have some changes for these uses. John H spoke 4 about the noise ordinance. 5 6 LIAISON REPORTS 7 1. Board of Supervisors - John reported that they finalized the WEGO Police agreement. They selected 8 a new Police Chief. They signed off on the 2026 Budget which was balanced. 9 Ernest thanked John for his service. 10 11 ANY OTHER MATTER 12 None 13 14 CORRESPONDENCE 15 None 16 17 ADJOURNMENT 18 There being no further business, John S. made a motion to adjourn the meeting. Fred seconded the 19 motion. The meeting was adjourned at 8:00 pm. 20 The next meeting will be held on Tuesday December 23, 2025 at 7 p.m. 21 22 Respectfully submitted, 23 24 25 26 27 Ruth Kiefer, Recording Secretary 28

§ 240-6 Definitions; word usage. B. Definitions. When used in this chapter, the following words, terms and phrases shall have the following meanings, unless expressly stated otherwise or unless the context clearly indicates otherwise.

DATA CENTER – A facility used primarily for the storage, management, processing, and transmission of digital data, which houses computer or network equipment, systems, servers, appliances and other associated components related to digital data operations. The facility may also include air handlers, power generators, water cooling and storage facilities, utility substations, and other associated utility infrastructure to support sustained operations at the Data Center. DATA CENTER ACCESSORY USE – Ancillary uses or structures secondary and incidental to a Data Center use, including but not limited to: administrative, logistical, fiber optic, storage, and security buildings or structures; sources of electrical power such as generators used to provide temporary power when the main source of power is interrupted; electrical substations; utility lines, domestic and non-contact cooling water and wastewater treatment facilities; water holding facilities; pump stations; water towers; environmental controls (air conditioning or cooling towers; fire suppression, and related equipment), and security features, provided such Data Center Accessory Uses/structures are located on the same tract or assemblage of adjacent parcels developed as a unified development with a Data Center. The use shall not include energy generation systems used or intended to be used to supply power to the Data Center during normal operations. § 240-19 I-1 Light Industrial District.

C. Permitted conditional uses. The following principal uses may be permitted in the I-1 District in accordance with § 240-31:

(34) Data Centers in accordance with § 240-31C(3)(xx). (34) (35) Any lawful use not otherwise permitted in the Township.

§ 240-31 Conditional uses; additional standards for specific principal uses.

C. Standards for conditional uses and special exception uses and certain permitted-by- right uses.

(3) Specific standards for specific principal uses (including but not limited to conditional uses and special exception uses). Each of the following principal uses shall meet the following additional specific standards. In addition, each conditional or special exception use shall meet the general standards in Subsection C(2). The following specific standards shall be met for the applicable use, unless a more restrictive standard is established by another section of this chapter:

(xx) Data Centers

[1] In addition to the Supplementary studies as required pursuant to Chapter 205, Subdivision and Land Development, an applicant shall submit the following:

[a] A sound study conducted by a professional acoustical expert that the sound generated by a Data Center and/or Data Center Accessory Uses during normal operations does not exceed the noise and nuisance regulations of Chapter 156.

[b] A vibration study prepared by a qualified professional that demonstrates that no vibration from the Data Center, Data Center Accessory Uses, or associated equipment will be perceptible to the human sense of feeling beyond the property line. [c] The applicant shall provide documentation from the applicable electric service provider and water service provider certifying that that the necessary capacity is available and that electric service provider and water service provider will serve the Data Center. Known impacts on electric/water rates or availability for other uses directly attributable to the Data Center project shall be noted. [d] If the use is to rely upon nonpublic sources of water, the applicant shall provide a water feasibility study. The purpose of the study is to determine if there is an adequate supply of water for the proposed use and to estimate the impact of the use on existing wells, groundwater, and surface waters in the vicinity. No Data Center shall be approved unless the water feasibility study demonstrates that the anticipated water supply yield is adequate for the project and that the proposed water withdrawals and discharges will not endanger or adversely affect the quantity or quality of groundwater supplies or surface waters in the vicinity. [2] Any energy generation system designed or used to supply power directly to a Data Center during normal operations, including solar, wind, fossil fuel, or nuclear energy generating systems, shall not be considered part of the Data Center use. Such systems shall be considered a separate use and shall be approved according to the zoning regulations applicable to such use.

[3] Any system designed for cooling and operation of the facility (electricity, water, or other means) will be adequate and will not negatively impact the surrounding region.

[4] The use will not cause electrical interference or fluctuations in line voltage on and off the operating premises.

[5] No use shall produce any heat perceptible at or beyond the lot boundaries.

[6] No use shall emit potentially harmful radiation.

[7] The owner of the data center shall provide the Township with an emergency liaison that may be reached 24 hours a day, seven days a week, in the event of an emergency.

[8] The owner of the data center shall prepare and file with the Township an emergency response plan which shall be followed in the event of an emergency at the facility.

[9] The data center facility and accessory buildings shall be fully screened in accordance with the criteria set forth in § 240- 27C(3).

EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO. ________________

AN ORDINANCE OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, AMENDING AND SUPPLMENTING THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE OF 1997, AS AMENDED, IN ORDER TO DEFINE AND ADD SPECIFIC REQUIREMENTS FOR DATA CENTERS AND DATA CENTER ACCESSORY USES WITHIN THE I1 LIGHT INDUSTRIAL ZONING DISTRICT BY CONDITIONAL USE, AND TO PROVIDE FOR REQUIRED SEVERABILITY, REPEALER AND CODIFICATION PROVISIONS. BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that the East Goshen Township Zoning Ordinance of 1997, as amended, which is codified in Chapter 240 of the East Goshen Township Code, titled, “Zoning”, shall be amended and supplemented as follows: SECTION 1. Section 240-6.B, titled, “Definitions”, shall be amended and supplemented to include the following definitions:

DATA CENTER – A facility used primarily for the storage, management, processing, and transmission of digital data, which houses computer or network equipment, systems, servers, appliances and other associated components related to digital data operations. The facility may also include air handlers, power generators, water cooling and storage facilities, utility substations, and other associated utility infrastructure to support sustained operations at the Data Center.

DATA CENTER ACCESSORY USE – Ancillary uses or structures secondary and incidental to a Data Center use, including but not limited to: administrative, logistical, fiber optic, storage, and security buildings or structures; sources of electrical power such as generators used to provide temporary power when the main source of power is interrupted; electrical substations; utility lines, domestic and non-contact cooling water and wastewater treatment facilities; water holding facilities; pump stations; water towers; environmental controls (air conditioning or cooling towers; fire suppression, and related equipment), and security features, provided such Data Center Accessory Uses/structures are located on the same tract or assemblage of adjacent parcels developed as a unified development with a Data Center. The use shall not include energy generation systems used or intended to be used to supply power to the Data Center during normal operations. SECTION 2. Section 240-19.C(34) I-1 Light Industrial District, Permitted conditional uses, shall be amended and supplemented as follows:

(34) Data Centers in accordance with § 240-31C(3)(xx). (34) (35) Any lawful use not otherwise permitted in the Township. SECTION 3. Section 240-31.C(3), Conditional uses; additional standards for specific principal uses, shall be supplemented as follows:

(xx) Data Centers

[1] In addition to the Supplementary studies as required pursuant to Chapter 205, Subdivision and Land Development, an applicant shall submit the following:

[a] A sound study conducted by a professional acoustical expert that the sound generated by a Data Center and/or Data Center Accessory Uses during normal operations does not exceed the noise and nuisance regulations of Chapter 156.

[b] A vibration study prepared by a qualified professional that demonstrates that no vibration from the Data Center, Data Center Accessory Uses, or associated equipment will be perceptible to the human sense of feeling beyond the property line.

[c] The applicant shall provide documentation from the applicable electric service provider and water service provider certifying that that the necessary capacity is available and that electric service provider and water service provider will serve the Data Center. Known impacts on electric/water rates or availability for other uses directly attributable to the Data Center project shall be noted.

[d] If the use is to rely upon nonpublic sources of water, the applicant shall provide a water feasibility study. The purpose of the study is to determine if there is an adequate supply of water for the proposed use and to estimate the impact of the use on existing wells, groundwater, and surface waters in the vicinity. No Data Center shall be approved unless the water feasibility study demonstrates that the anticipated water supply yield is adequate for the project and that the proposed water withdrawals and discharges will not endanger or adversely affect the quantity or quality of groundwater supplies or surface waters in the vicinity.

[2] Any energy generation system designed or used to supply power directly to a Data Center during normal operations, including solar, wind, fossil fuel, or nuclear energy generating systems, shall not be considered part of the Data Center use. Such systems shall be considered a separate use and shall be approved according to the zoning regulations applicable to such use.

[3] Any system designed for cooling and operation of the facility (electricity, water, or other means) will be adequate and will not negatively impact the surrounding region.

[4] The use will not cause electrical interference or fluctuations in line voltage on and off the operating premises.

[5] No use shall produce any heat perceptible at or beyond the lot boundaries.

[6] No use shall emit potentially harmful radiation.

[7] The owner of the data center shall provide the Township with an emergency liaison that may be reached 24 hours a day, seven days a week, in the event of an emergency.

[8] The owner of the data center shall prepare and file with the Township an emergency response plan which shall be followed in the event of an emergency at the facility.

[9] The data center facility and accessory buildings shall be fully screened in accordance with the criteria set forth in § 240-27C(3).

SECTION 4. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein. SECTION 5. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance. SECTION 6. Codification. General Code is hereby authorized to make non-substantive formatting and numbering changes necessary to clarify references to other sections of Township ordinances and/or codification and to bring the Ordinance into conformity with Township ordinances/codification.

SECTION 7. Effective Date. This Ordinance shall become effective on [DATE], 2026 and shall remain in force and effect until otherwise amended by the Township. ENACTED AND ORDAINED this ______ day of __________________, 2026. ATTEST: EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS _______________________________ Derek J. Davis, Secretary Cody Bright, Chairman ________________________________ Barbara Emery, Vice-Chairwoman

_______________________________ Peter Hicks, Member

_______________________________ Ann Duffield, Member ________________________________ Larry Massaro, Member

East Goshen Township Planning Commission. Report on 2024 & 2025 Accomplishments and Proposed 2026 & 2027 goals – Date March 10, 2025 Planning Commission significant accomplishments for 2024 & 2025: Projects Reviewed

• Conditional Use Application: 1306 West Chester Pike 1344 (BOS Approved 4/16/24) • Subdivision and Land Development Application: Morstein Road Sketch Plan (PC discussion) • Subdivision and Land Development Application: Timbermill- 301 Reservoir Road (BOS Approved 6/18/24 and 9/3/24) • Subdivision and Land Development Application: Millstone Meadows- 1010 Hershey Mill Rd (BOS Approved 9/3/24) • Subdivision and Land Development Application: 14 Reservoir Road (BOS Approved 9/17/24) • Preliminary Land Development Application: Enterprise Drive- CTDI (BOS Approved 10/15/24) • Conditional Use Application: 1671 & 1681 E. Strasburg Road- Connors (BOS Approved 11/19/24) • Conditional Use Application: 1302 Goshen Pkwy – ZEKS (PC recommended approval 10/22/24 BOS approved on 12/17/24.) • Note: Malvern Institute Land Development Application has expired with no further action. • Subdivision and Land Development Application for 1344 Morstein Rd. (Board Approved 12/16/25) • Subdivision and Land Development Application for 1338 Morstein Rd. (Board Approved 12/16/25) Initiatives Completed

• Revised PC bylaws • Developed new member information package Planning Commission Goals for 2026 & 2027:

• Support East Goshen Township Comprehensive Plan 2015 ten-year review per Pennsylvania Municipalities Planning Code Article III – Comprehensive Plan. • Develop Data Center Ordinance. • Timely review of Subdivision and Land Development Applications and Variances when submitted.