Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP PLANNING COMMISSION
East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380
Meeting Agenda Tuesday, March 24, 2026, at 7:00 PM
Planning Commission Members: John Stipe, Chairman Dan Truitt, Vice Chairman Daniel H. Daley Ernest Harkness William Kaufman Michael Koza Karen Martynick
Larry Massaro, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison
Agenda Items:
1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Chairman will ask if anyone is going to record the meeting. 3. Review of Tracking Log / Determine need for Workshop Meeting 4. Public Comment on Non-Agenda Items 5. Approval of Minutes a. February 24, 2026 6. Acknowledge Receipt of New Applications (Initial Submission) a. Subdivision and Land Development Applications b. Conditional Uses Applications
c. Zoning Hearing Board Variances d. Ordinance Amendments 7. Old Business a. 1409 Manley Road- Variance Application Review b. Zoning Ordinance Amendment Draft- AI Data Centers 8. New Business a. Westtown Township Comprehensive Plan Review 9. Liaison Reports 10. Correspondence 11. Announcements 12. Next Meeting – Tuesday, April 28, 2026, at 7:00 PM 13. Adjournment
Bold Items indicate new information to review or discuss.
PROJECT DESCRIPTION Date Filed Start Date
Twp. Engineer
Review
CCPC Review
Conserv.
Board Review
Extension
Date
PC Deadline
Meeting
BOS Deadline
Meeting
Hearing
Date
Final Action Deadline (90
days) Comments
Zoning Ordinance Amendment-
Data Centers n/a 11/25/2025 n/a n/a n/a n/a n/a n/a n/a n/a Discuss Data Center workshop and draft
amendments
1409 Manley Road- Dimensional Variance- 3 Lot Subdivision 2/13/2026 2/13/2026 n/a n/a n/a 5/15/2026 3/24/2026 4/16/2026 pending 5/15/2026 Resubmitted alternative layout, Steep Slope
analysis, and welands study
Westtown Comprehensive Plan 3/3/2026 3/3/2026 n/a n/a n/a n/a 3/24/2026 4/16/2026 n/a 4/17/2026 Review proposed Plan for recommended
comments
949 & 951 Cornwallis Drive- Lot Line Change- Sketch Plan 2/4/2026 2/24/2026 pending pending n/a n/a n/a n/a n/a n/a Will return to Planning Commission with
Preliminary/Final Plans
10-Year Comprehensive Plan Review n/a 4/22/2025 n/a n/a n/a n/a n/a n/a n/a n/a pending
PROJECTS COMPLETED IN 2026
Bold = New application or action required
East Goshen Township Planning Commission
Application Tracking Log
March 24, 2026
PENDING PROJECTS
PC 2-24-26 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION MEETING 3 February 24, 2026 4 5 The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, 6 February 24, 2026 at 7:00 pm in the Township Building. 7 Members present are highlighted: 8 John Stipe - Chairman 9 Dan Truitt, Vice Chairman 10 Dan Daley 11 Ernest Harkness – on phone 12 Willian Kaufman – on phone 13 Michael Koza 14 Karen Martynick 15 16 Also present was: 17 Kelly A. Krause, Zoning Officer 18 Larry Massaro , BOS Liaison 19 Ann Duffield, Supervisor 20 21 22 COMMON ACRONYMS: 23 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 24 BC – Brandywine Conservancy CVS – Community Visioning Session 25 CB – Conservancy Board SWM – Storm Water Management 26 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 27 28 FORMAL MEETING – 7 p.m. 29 1. John called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 30 moment of silence to remember our first responders and military. 31 2. John asked if anyone would be recording the meeting and if there were any public comments 32 about non-agenda items. There was no response. 33 3. The tracking log was checked and no need for a workshop meeting. 34 4. The minutes of the January 27, 2026 meeting were approved. 35 36 37 CHAIRMAN’S REPORT – 38 None 39 40 41 ACKNOWLEDGE RECEIPT OF NEW APPLICATIONS (INITIAL SUBMISSION)- 42 1. Subdivision and Land Development Applications 43 a. 949 & 951 Cornwallis Dr. Sketch Plan – Linda Layer spoke for Geoffrey and Nancy 44 Fay. She explained that there are two properties in the R2 zone which requires one acre. They want to 45 allow a flag lot for access to the larger house then subdivide into two lots. The smaller house will be 46 demolished. They are on public sewer and well water. Dan D. mentioned that he wants input from the 47 Township Engineer, Pennoni. The process is the PC reviews the Sketch Plan, then they come back to the 48 PC with a Preliminary Final Plan and then they go to the BOS. Ms. Layer commented that they wanted 49 feedback from the PC. No motion needed. 50 51 52 2. Zoning Hearing Board Variances 53
PC 2-24-26 draft 2
a. 1409 Manley Rd – Variance Application Review. George Naalouf, Engineer, and Dan 1 Campbell were present. Mr. Naalouf commented that they are proposing to subdivide into three lots with 2 single family homes with private driveways and sewers. Drainage systems will be in the rear. They are 3 requesting a variance because two lots aren’t meeting the required square footage. 4 Dan D. commented that if the variance is approved, they will come back with a subdivision plan. He 5 feels they aren’t providing the required 25 feet from the center of the street. They need to get a waiver. 6 He pointed out potential slope areas. He suggested that they get a plan review from the Township 7 Engineer. Possible wetlands were discussed. Karen mentioned that there was a pond on the property. 8 Mr. Campbell commented that when his brother purchased the property there was a pond on it. The pond 9 was fed by a pump and when he turned that pump off the water stopped and the pond dried up. Karen 10 feels that the property may be flooded in a big storm. 11 Dan T. pointed out that the ZHB will require a hardship for the request. He recommends doing two 12 houses instead of three. Lots are required to have 18,000 sq.ft. With the three houses it will be less than 13 that. 14 Public Comments: 15 1. Larry Johnson – He lives up the street from this property. He has been there since 1977. There was a 16 landscaping business there and the pond was always full. He feels there will be a problem with water. 17 Traffic is also a concern. He is against this plan. 18 2. Lynn Werkheiser – She lives at 17 Hill Street. Her parents, who are here, and sister also live near this 19 property. The current house is very old and she is devastated that it will be destroyed. She asked that 20 they address the water issues. She feels the driveways would be dangerous. They are not for this plan. 21 3. Larry Johnson mentioned that a few years ago all of the trees were removed. 22 Mr. Campbell commented that his brother bought the property in 2024 and passed away shortly after that. 23 Part of the property was covered in gravel for the landscaping company who also took down the trees. 24 They have removed much of the gravel. The house was built in the 1700’s and has problems. They did 25 put on a new roof and gutters and electrical to protect it. 26 Mr. Naalouf commented that they will check the wetlands and slopes and will consider changing the plan. 27 28 29 30 OLD BUSINESS – 31 1. Zoning Ordinance Amendment Draft = AI Data Centers 32 John will attend the AI convention. 33 Karen mentioned vibration studies. 34 Bill would want it geared to a smaller facility. 35 36 2. Comprehensive Plan – Larry Massaro commented that the Comprehensive Plan was discussed at the 37 last BOS meeting. Derick Davis scheduled a meeting with the County Planning Commission. A Vision 38 Partnership Plan is where the municipality would do the work but it was suspended to 2026. CPA is 39 another program where the township would get a consultant through the county and the county would pay 40 half of the cost. Larry is wondering if economic issues could be developed as part of the Comprehensive 41 Plan. Kelly mentioned that there is a grant for this but the application deadline is April 1st. Ernest feels 42 they need input from the other ABCs like they did in 2015. Larry questioned how sustainable our tax 43 base is, which is mostly from earned income tax. Dan T. spoke about land development. 44 45 46 NEW BUSINESS – 47 None 48 49 50 LIAISON REPORTS 51 1. Board of Supervisors - see Comprehensive Plan above. 52 53
PC 2-24-26 draft 3
ANY OTHER MATTER 1 None 2 3 CORRESPONDENCE 4 None 5 6 ADJOURNMENT 7 There being no further business, Dan T. made a motion to adjourn the meeting. Ernest seconded the 8 motion. The meeting was adjourned at 8:35 pm. 9 The next meeting will be held on Tuesday March 24, 2026 at 7 p.m. 10 11 Respectfully submitted, 12 13 14 15 16 Ruth Kiefer, Recording Secretary 17
Memorandum East Goshen Township 1580 Paoli Pike West Chester, PA 19380 610-692-7171 ext. 3103 kkrause@eastgoshen.org Date: March 19, 2026 To: East Goshen Township Planning Commission From: Kelly A. Krause, Zoning Officer Re: Zoning Hearing Board Application No. Z26-01 (Dimensional Variance) 1409 Manley Road/Campbell _____________________________________________________________________________ A Zoning Hearing Board application has been submitted by Andrew Campbell, 1409 Manley Road, West Chester, PA 19380 to allow the 1.204 acre parcel to be subdivided into three lots. The applicant is seeking relief from §240-10.G for two of the lots, which requires a minimum net lot area of 18,000 square feet. The proposed subdivision results in Lot 1 containing 17,133 square feet, Lot 2 containing 18,030 square feet, and Lot 3 containing 17,285 square feet. The existing single family detached dwelling is to be demolished, and a new single-family detached dwelling is proposed on each lot. The subject property is located within the R-3 Medium Density Residential District.
Background and General Information
• The public Right-of-Way for Manley Road is 33 feet. Generally, the property on each side of the road provides half of the width of the Right-of-Way from the center line of the cartway (16.5 feet). • The title line of the subject property does not follow the curve of Manley Road, extending past the center line of the cartway, with the westerly corner of the parcel extending over the road entirely. • The gross lot area for the parcel is 60,148 square feet, with a net lot area (minus the right- of-way) of 52,448 square feet. The existing street line lot width is 315 feet, which would generally net 5,205 square feet for a 33-foot-wide Right-of-Way (16.5 feet from centerline of the road). The configuration of the title line and location of the cartway results in a Right-of-Way area of 7,700 square feet. • The existing house is nonconforming in respect to the minimum front yard setback, providing 6.64 feet where a 30-foot minimum setback is required. The following information is attached:
1. Revised plan for 1409 Manley Road- 3 Single Family Dwellings 2. Alternative Subdivision Plan- 1 Semi-detached (Twin) and 1 Single Family Dwelling 3. Steep Slope Analysis Plan 4. Wetlands Study prepared by H. E. MacCombie, Jr., P.E., Consulting Engineers & Surveyors, Inc.
Memorandum Zoning Review Comments: The configuration of the title line, Right-of-Way, and cartway are unusual in that 2,481 square feet of the property extends past the center line of the road, averaging a width of approximately 23 feet where the property should provide 16.5 feet. The proposed lots meet all other area and bulk regulations for the district. Maximum Building and Impervious Coverage ratios do not appear to be significantly impacted by the reduced net lot area of the proposed parcels.
Draft Motion: Mr. Chairman, I move that we recommend to the Board of Supervisors to _________________ (vote in favor/oppose) the dimensional variance requested by Mr. Campbell to allow two of the three parcels in the proposed subdivision to contain a lot area fewer than 18,000 square feet.
CIVIL AND SITE DESIGN SPECIALISTS
BY ALPHA DESIGNS, LLC
P
E
N
N
S
Y
L
V
A
N
I
A
GEORGE S. MAALOUF ENGINEER
PROFESSIONAL
REGISTERED
PE074617
C
O
M
M
O
N
W
E
A
L
T
H
O
F
-
‑ ‑
CIVIL AND SITE DESIGN SPECIALISTS
BY ALPHA DESIGNS, LLC
P
E
N
N
S
Y
L
V
A
N
I
A
GEORGE S. MAALOUF ENGINEER
PROFESSIONAL
REGISTERED
PE074617
C
O
M
M
O
N
W
E
A
L
T
H
O
F
CIVIL AND SITE DESIGN SPECIALISTS
BY ALPHA DESIGNS, LLC
P
E
N
N
S
Y
L
V
A
N
I
A
GEORGE S. MAALOUF ENGINEER
PROFESSIONAL
REGISTERED
PE074617
C
O
M
M
O
N
W
E
A
L
T
H
O
F
—
—
—
—
—
—
—
—
--
‑ ‑
‑ ‑
610-356-9550 Herbert E. MacCombie, Jr., P.E.
FAX 610-356-5032 CONSULTING ENGINEERS & SURVEYORS, INC. 1000 PALMERS MILL ROAD MEDIA, PA 19063 REPLY TO: James W. MacCombie, P.E., P.L.S. P.O. BOX 118 Herbert E. MacCombie, III, Technician BROOMALL, PA 19008-0118
March 16, 2026 Mr. Andrew Campbell 1409 Manley Rd. West Chester, PA 19382 Re: Wetlands Investigation – 1409 Manley Rd. Dear Mr. Campbell: H. E. MacCombie, Jr., P.E., Consulting Engineers & Surveyors, Inc. (HEM) investigated the property for the presence of Wetlands and Regulated Waters of the U.S./Commonwealth of PA. on March 6, 2026. REGULATORY BACKGROUND AND DEFINITIONS Activities in wetlands are regulated at both the Federal and State level in Pennsylvania. The Pennsylvania Department of Environmental Protection (PADEP) regulates activities in wetlands under the authority of the Dam Safety and Encroachments Act (32 P.S. 693.1-693.28) of the Chapter 105 Dam and Waterway Management Program. Recognizing the potential for continued or accelerated degradation of the Nation’s waters, the United States Congress enacted the Clean Water Act (CWA). The objective of the Act is to maintain and restore the chemical, physical, and biological integrity of the waters of the United States. Under the CWA, The Army Corps of Engineers (ACOE) regulates wetland-filling activities under Section 404. Section 404 of the Act authorizes the Secretary of the Army, acting through the Chief of Engineers, to issue permits for the discharge of dredged or fill material into the waters of the United States, including wetlands. METHODOLOGY Wetlands are areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions including swamps, marshes, bogs, and similar areas. Diagnostic environmental characteristics of wetlands include vegetation, soils, and hydrology. By applying the principles outlined in the April 2012 Corps of Engineers Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region, the 1987 Corps of Engineers Wetlands Delineation Manual (Technical Report Y-87-1) with guidance provided by the ACOE memorandum dated 6 March 1992, Clarification and Interpretation of the 1987 Manual, wetlands are identified in the field using the three parameter approach which requires investigation of vegetation, soils, and hydrology. A minimum of one positive wetland indicator from each parameter must be found to make a positive wetland determination. Under certain circumstances, where one or more criterion is absent or disturbed the manual provides additional techniques used to identify
2
wetlands. Diagnostic environmental characteristics of wetlands include vegetation, soils, and hydrology. Wetlands have the following general characteristics:
Vegetation: The prevalent vegetation consists of macrophytes that are typically adapted to areas having hydrologic and soil conditions described in the preceding definition of “wetlands.” Hydrophytic species, due to morphological, and/or reproductive adaptation(s), have the ability to grow, effectively compete, reproduce, and/or persist in anaerobic soils conditions.
Soil: Soils are present and have been classified as hydric, or they possess characteristics that are associated with reducing conditions. Hydrology: The area is inundated either permanently or periodically at mean water depths < 6.6 feet, or the soil is saturated to the surface at some time during the growing season of the prevalent vegetation. SITE VEGETATION No hydrophytic plant communities were identified within the study area. SITE SOILS Soils were sampled to a depth of at least 20 inches, or until refusal. Numerous soil samples were taken in a grid fashion in the lower eastern portion of the property. Representative soils consisted of fill or regraded subsoil with areas of topsoil. Samples were taken below the fill soil to obtain deeper, undisturbed, original soils. Fill soils were 10/YR 4/4, silt loam to depths of 1- 1.5.’ Original soils in the old pond area were a matrix of 10/YR 4/4 with a small percentage of mottles of 10/YR 4/3, and 10/YR 4/2. None of these soils are hydric. SITE HYDROLOGY The project landscape sits on a topographic slope descending west to east. The upper area sheds stormwater and road drainage from Broad St. Hydrology to the pond was solely driven by pumped well water. This artificial source was turned off in August of 2024 and the area has since dried up. There is no evidence of permanent and natural wetland hydrology presently. The National Wetlands Inventory Map depicts no wetlands within the project area. This information is derived from aerial photographs and typically only depicts wetlands of five acres or more.
3
SUMMARY AND CONCLUSIONS H. E. MacCombie, Jr., P.E., Consulting Engineers & Surveyors, Inc. (HEM) investigated for the presence of Wetlands and Regulated Waters of the U.S./Commonwealth of PA at the project site. The investigation confirmed the absence of these resources within the study area. Feel free to contact me if you have any questions or concerns. Sincerely, Christopher J. Mulvey, M.A., SPWS
4
REFERENCES Corps of Engineers Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (4/2012). Corps of Engineers Wetlands Delineation Manual (Technical Report Y-87-1) with guidance provided by the ACOE memorandum dated 6 March 1992, Clarification and Interpretation of the 1987 Manual (1987). US Army Corps of Engineers Eastern Mountains and Piedmont 2016 Regional Wetland Plant List. Munsell Soil Color Charts. Kollmorgan Corp, Baltimore, Maryland (1994). The U. S. Department of Agriculture, Natural Resources Conservation Services “Web Soil Survey of Delaware County” (2022). USFWS, National Wetlands Inventory Quad (2022).
5
Qualifications of Individual Conducting Wetlands Assessment
CHRISTOPHER J. MULVEY, M.A., SPWS
EXPERTISE: Wetland, Aquatic, and Terrestrial Ecology Wetland Delineation, Permit Applications, and Mitigation
Macroinvertebrate Studies Fisheries Biology and Impact Studies
Ecological Assessment Herbert E. Mac Combie, Jr., P.E, Consulting Engineers and Surveying, Inc. (2015-present) Wetland Ecologist, Technician, Broomall, PA EXPERIENCE: Great Valley Environmental (1997-2015) President Founded Great Valley Environmental Incorporated in 1997 to provide environmental consulting services to the public and private sectors. As president completed tasks including business development, report preparation, project management, proposal writing, public testimony, budget development/tracking, advertising, and administration. Over twenty-three years of experience in applied wetland ecology and fisheries biology. Completed more than 300 freshwater and tidal wetland assessments and delineations in Pennsylvania, Delaware, New Jersey, Maryland, and Michigan, requiring investigation of soils, vegetation, and hydrology as per Army Corps of Engineers, EPA, and Unified Federal methodologies (Professional Wetland Scientist (#1052). Designed mitigation/wetland creation plans for more than 30 wetland projects. Obtained State and Federal permits, including Army Corps of Engineers individual and joint permits, state general permits, federal nationwide permits, small project permits, and state water quality certification requests. Obtained dam waivers from the State of Pennsylvania. Participated in many wetland boundary jurisdictional determinations with the U.S. Army Corp of Engineers. Authored numerous wetland delineation reports which have been reviewed by the Pennsylvania Department of Environmental Protection, Delaware Department of Natural Resources and Protection, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the Environmental Protection Agency, the PA Fish Commission, county soil conservation districts, state historic and archaeological protection agencies, and several townships and municipalities. Conducted bog turtle and red-bellied turtle habitat studies and surveys. Completed habitat values and functions assessments. Conducted wetland investigations in disturbed wetland areas. Collected and identified macroinvertebrate communities and determined water quality using benthic diversity indices. Conducted lake and stream studies regarding fish communities, growth, aging, and habitat. Analyzed water quality/chemistry in streams and lakes. Patricia Ann Quigley, Inc. (1996-2015) Wetland Ecologist, Norristown, PA
6
EcoTerra, Inc. (1995-1997) Director of Ecological Services, Chadds Ford, PA Environmental Research and Consulting Inc. (1990-1991, 1994-1995) Project Manager, Chadds Ford, PA. Walter B. Satterthwaite Associates, Inc. (1991-1993) Biologist, West Chester, PA NTH/Russell Associates (1987-1990) Senior Environmental Specialist, Exton, PA Academy of Natural Sciences (1987) Fisheries Technician, Philadelphia, PA National Environmental Services (1985) Fisheries Technician, Lancaster, PA ACADEMIC BACKGROUND: M.A., Biology, West Chester University of Pennsylvania, 1994 B.S., Environmental Biology, Millersville University of Pennsylvania, 1985 Masters Thesis - Designed and implemented an in-site field study to assess the effects of acid precipitation on the growth and feeding of juvenile Smallmouth Bass (Micropterus dolomieui) in Lake Lacawac, Pennsylvania. This study involved raising of captive wild fish under reduced pH conditions and various feeding regimes, with a comparison to wild, uncaptive fish of similar ages. Follow-up laboratory work included quantitative analysis of food items, gut analysis of fish, otolith age determination, and data analysis. CERTIFICATIONS: Professional Wetland Scientist, Society of Wetland Scientists (# 1052) Registered Wetland Biologist, New Castle County, Delaware Eagle Scout - Boy Scouts of America (#539) SCUBA-NAUI (# PIN) PROFESSIONAL AFFILIATIONS: Society of Wetland Scientists – Professional Wetland Scientist Trout Unlimited, Valley Forge Chapter SPECIAL TRAINING: 40-hour Hazardous Waste Safety Training Course (OSHA 1910.120) PUBLICATIONS: Mulvey, C.J. "The Effects of pH and Feeding Level on Young-of-the-Year Smallmouth Bass (Micropterus dolomieui)," Masters Thesis, 70 pgs., 1994. TECHNICAL PRESENTATIONS: "The Effects of pH and Feeding Level on Young-of-the-Year Smallmouth Bass (Micropterus dolomieui)," Presented at the 5th Annual Pennsylvania Lake Management Society Meeting, 1994, 1st prize - student presentation. Field Trip to Constructed Wetlands, Embreeville, PA, 1st Annual Global Environmental Conference, Sponsored by EcoTerra, Inc., and West Chester University of Pennsylvania, March 1996.
7
Wetlands and macroinvertebrate presentations for elementary and middle school students in Chester County, PA, 2003 – 2009.
Key Take-Aways
Data Center Overview
Slides Attached
State Legislation Update
Slides attached
Impacts on Electricity Rates, the Electric Grid, and Generation Needs - Key Takeaways
- A 500 megawatt (MW) data center’s power consumption is equivalent to that of 415,000 homes or 45 industrial uses. - Data centers are anticipated to have a neutral to slightly positive impact on electricity distribution rates (data centers will pick up a larger share of costs to upgrade infrastructure). However, data centers are having a profound impact on electric generation prices due to rapidly growing demand for power and shrinking supply. - Residential electric utility bills have gone up by approximately $12 per month in PA over the past year, which is largely due to data centers’ demand for power, among other factors. - Electric utilities in PA are required to serve customers who wish to interconnect, though they are permitted to charge a fee for infrastructure upgrades needed to interconnect. PECO charges data centers the equivalent of 10 years of electric bills to secure a Transmission Service Agreement. - Electricity markets in PA are deregulated: electric distribution utilities are not permitted to generate electricity. This is becoming challenging as development of new generation is not keeping pace with demand, and electric utilities that have no control over generation are required to serve new customers.
- Municipalities should consider adopting/amending ordinances related to power generation facilities to specify zones in which they are permitted, setbacks, and other environmental controls. - Data centers can be incentivized to invest in and procure renewable energy. Municipalities can encourage on-site solar through reducing restrictions in solar ordinances.
Resources from Penn Future:
• Data center model ordinance: https://www.pennfuture.org/datacenters • https://www.pennfuture.org/Publication-Land-Use-Is-an-Environmental-Issue- PennFuture-Publishes-A-New-Guide-to-Help-Pennsylvania-Residents-Understand- and-Effectively-Participate-in-Land-Use-Decision-Making
Environmental and Community Impacts – Key Takeaways & Resources
- 17 hyperscale data centers have been proposed in the Delaware River Basin (PA, DE, NJ) - Data centers prefer to connect to public water for reliability reasons. - Data centers’ water needs for cooling vary dramatically seasonally and depending on the time of day. Data centers can store water onsite for use during peak cooling times to reduce the water utility’s need to scale up their infrastructure and increase water withdraws in summertime when surface water levels are often lowest.
o For water cooled data centers, municipalities can require a hydrogeological
study to assess how much water can be used without causing a detrimental impact. - Data centers produce significant temporary construction jobs, though permanent jobs are typically low. Economic impact analyses assume a high number of new jobs will be induced by new data center employment, and some studies have shown that actually job numbers are significantly lower (70% lower) than what was predicted. - Data centers require a backup power source for redundancy, and most use diesel generators. Generators are used for emergencies but also for curtailment during periods of grid stress. These generators can be 10-200x more polluting than power from the grid. As the grid becomes more stressed with more demand and the impacts of climate change, curtailment needs could occur with more frequency.
o Municipalities may wish to require data center proposals to prove they have
alternative plans for curtailment that don’t involve diesel generator use. o Municipalities should require generators to be Tier 4, which meet the highest
standards for reduced NOx and particulate matter emissions.
- All municipalities in PA must provide for data centers in their ordinances, with the exception of municipalities that are part of a multi-municipal plan with shared use agreement. In this case only one municipality in the group must provide for each use.
Resources from the Delaware River Basin Commission:
• Data Center microsite: https://www.nj.gov/drbc/programs/supply/datacenters.html
• Data Center FAQ: https://www.nj.gov/drbc/library/documents/DataCenters/DataCentersFAQ.pdf
• Pennsylvania Municipal League February News: River Basin Commissions and Data Centers: Planning for a Growing Industry with Intensive Water Demands, by Andrew Dehoff, P.E, SRBC Executive director, Kristen Bowman Kavanagh, P.E. DRBC Executive Director and Mike Nardolilli, ICPRB Executive Director: https://www.pml.org/2026/02/24/river-basin-commissions-and-data-centers- planning-for-a-growing-industry-with-intensive-water-demands/
Resources from NRDC:
• Why Data Centers Will Be Economic Development Duds Artificial intelligence may change the world, but the data centers that power AI are likely to be economically insignificant for Pennsylvania
• THE ETHICAL IMPLICATIONS OF AI AND JOB DISPLACEMENT
• Small Bottle, Big Pipe: Quantifying and Addressing the Impact of Data Centers on Public Water Systems
• Why 'zero-water' data centers require million dollar local water infrastructure upgrades: The implications of Small Bottle, Big Pipe: Quantifying and Addressing the Impact of Data Centers on Public Water Systems
• Who controls the future of data center governance?
• Data Center Boom Risks Health of Already Vulnerable Communities
Resources from the Better Data Center Project:
• Report: Diesel Generators at Data Centers: Status Impacts, and Protective Practices
Municipal Perspectives – Key Takeaways
- All municipalities must provide for data centers in their ordinances. Not all municipalities have a site where a data center would be minimally impactful to the community. The regulations a municipality adopts should relate to how impactful a proposed data center would be in the municipality’s unique context. - Municipalities should obtain information from the developer during the approval process related to projected water usage, power sources and power usage, and other impacts. Even if a municipality can’t regulate these things, they can be shared with the public to increase transparency. - The construction phase can be long and impactful: potentially a 24-hour operation. Municipal inspectors will be very busy during this time. - Municipalities should review their fee schedules as current fees might not cover review costs of application submissions related to data centers given their highly technical nature. - The scale and complexity of data center development could be beyond what local volunteer fire companies have the capacity to respond to. If a municipality pursues a community benefits agreement with the developer, augmenting capacity for emergency services could be an appropriate request.
Navigating the AI Data Center Boom: A National Perspective
Sarah K Friedman Co-Founder Better Data Center Project
Who we are, how we work and what we see:
Formed in 2025 by former federal workers seeking to continue public service, we offer non-partisan, pro-bono, science-backed services to communities including:
● Providing project-specific technical support on data centers and associated energy projects from 40 + energy, air quality, water and other experts ● Creating factual, science-based materials ● Identifying and socializing economic, social, and environmental best practices
Scale of need: 4-5 requests per week through word-of-mouth, providing technical assistance to 30+ community-based organizations and Tribes, requests from groups in 25 + states
Data Center Buildout in the US
[Map of the United States displaying data center buildout by county, with circle markers indicating demand capacity in megawatts (MW). Major concentrations appear in the Mid-Atlantic / Northern Virginia, Texas, California, the Pacific Northwest, and parts of the Midwest and Southeast.]
Data Center Demand Capacity by County
Infrastructure
Data Center Capacity by Status
Total
Units: MW
- 0 - 500
- 500 - 1500
- 1500 - 3500
- > 3500
Source: NREL
Grounding: what is a data center?
A facility that houses computer servers, networking equipment, and cooling systems used to store, process, and deliver data for cloud computing, AI, and other digital services.
Scale:
● Traditional data centers have moderate energy needs (5–10 MW); hyperscale AI data centers can consume as much power as entire cities ● Hyperscale campuses typically span 200–500+ acres — PAX-1 s approximately 700 acres ● Designed for near-continuous operation — built to be down only ~26 minutes per year ● Footprint may include substation (grid connected) or power plant (BYO power)
Scope and breadth of resource impacts:
● Huge energy and transmission demands ● Climate impacts from new and prolonged fossil fuel generation ● On-site diesel 'back-up' generation causing public health impacts — ● Massive indirect (energy) and direct (cooling) water use ● Cooling effluents can cause water quality impacts ● Conversion of ecological and agricultural land uses
Data centers are a resource intensive land use.
Communities ill-equipped for this moment.
Social context places pressure on local communities:
● Federal deregulation and state streamlining of permitting removes backstops ● Austerity reduces local government capacity and increases pressure for new development ● NDAs shielding project information, complex and opaque ownership, and speed-to-power timeline impedes trust and community engagement
Economics are dissimilar from previous land uses:
● Electricity bill increases for existing residential and business customers ● Large subsidies exchanged for very few permanent jobs ● Sales and use exemptions (36 states) and other incentives limit revenue capture ● Industry unknowns including capital reinvestment and stranded asset issues ● Economic benefits haphazard: not tied to capital investment or impact scale
Best practices are emerging around this use.
What local governments are designing:
● Planning— moratorium/pauses, constitution use permit, improved notic ● Transparency, reporting, and monitoring — no NDAs, frequent monitoring, public data, meetings ● Air quality — baseline and health-impact studies, consistent monitoring, Tier 4, renewable, emergency-only (back-up) ● Electricity: renewables, identify bill impacts, low-income protections ● Water protections — studies, finding of sustained yield, conservation plan/commitments reporting and monitoring ● Land and resource protection — ecological surveys, setbacks, agency and Tribal coordination ● Siting — avoiding RE, AG, , setbacks, consent-based siting ● Economics — capturing full equipment value,, community-governed funds ● Decommissioning– proportional bonds, plans, real penalties
●
Levers for improved outcomes.
Land use and
Zoning
Municipal Ordinances
Energy and Transmission
Planning
Developer Agreements
State legislation
What Data centers as conditional use, limit location, strong public health protections, setbacks, on-site diesel use restrictions, water conservation, studies
Technology- agnostic ordinances to include conditions: CBAs, local hire, no NDAs water conservation
Engagement in PUC and regional grid processes to ensure no cost-shifting, low-income bill reduction, additive clean energy to serve communities
Binding agreements incorporated into land use approval with air, water and energy protections and proportional fund with uses determined by community
Legislation ensuring corporations pay their taxes and energy/grid costs, transparency, local hire, limit fossil fuels, water conservation and reporting
Examples Strafford County Data Center Special Regulations
Cleveland Community Benefit Ordinance; Tucson ordinance limiting NDAs
Michigan large load tariff
Henrico County CBA: Affordable Housing Trust Fund
OR Power Act, 70- Proposed VA legislation
BDCP does not endorse any of these specific examples
[Presentation slide with slate blue background and gold geometric corner design.]
End
Pennsylvania Data Center Legislation
Presented by Steve Petro
Executive Director
Pennsylvania House Energy Committee
Context
• Democrats control the PA House with a 102-101 advantage
• Republicans control the PA Senate with a 27-23 advantage
• Governor Shapiro is a pro- business Democrat
Types of Legislation
1. New measures to bring data centers to PA
2. Mitigation of impacts
a) Consumer impacts
b) Environmental impacts
c) Community impacts
3. Revisions to the sales and use tax exemption
4. Moratoriums
New Measures to Encourage Development
• SB939 – Rothman (R) – Create regulatory “sandbox” for licensing data centers and AI products.
• SB991 – Bartolotta (R) – Accelerating data center permitting, using state to identify sites
Consumer Impacts
• HB1834 – Matzie (D) – Would give PUC authority to regulate cost impacts on rate payers due to data centers, plus supplemental LIHEAP funding
• SB1114 – Muth - (D) – Prevent cost shifting onto ratepayers
• SB897 / HB1272 – Coleman (R) / Stambaugh (R) - Would allow EDCs to build generation in a shortfall
• Senate CSM – Boscola (D) – Package to prevent ratepayers from subsidizing infrastructure
• Senate CSM – L Williams (D) – Data centers to pay for infrastructure and customer assistance programs
• House CSM – C Williams (R) – Would require data centers to pay for infrastructure and to bring their own generation. Would require EDCs to enter into long-term power purchase agreements for residential and business power.
Environmental Impacts
• HB2150 – Mullins (D) – Reporting requirements for energy and water use
• HB2246 – Webster (D) – Reporting and enforcement for water usage
• Senate CSM – Brown (R) – Mandating pre-application water analysis
Community Impacts
• HB2151 – Donahue (D) – Would create a model ordinance for municipal zoning
• HB2153 – Olsommer (R) – Any increase in property tax revenue due to data centers must be used for property tax relief
• House CSM – Walsh (R) – Legislative package to create standards for development
• House CSM – Sappey (D) – Collaboration on emergency preparedness
• Senate CSM – Brown - Study future viability of data centers
Amending the Sales and Use Tax Exemption
• HB2198 – Vitali (D) – Would repeal the sales and use tax for data centers
• HB2061 – Fiedler (D) – Mandates prevailing wage for sales tax exemption
• House CSM – Steele (D) – Mandates energy efficiency standards for sales tax exemption
• Senate CSM – Kearney (D) – Conditions eligibility for sales tax exemption on 100% clean energy production
Moratoriums
• Senate CSM – Muth – Three-year statewide Moratorium on development to study data centers
Governor Shapiro’s GRID Plan
• Self supplied or fully-funded power generation
• Transparency and community engagement
• Local hiring and workforce development
• Environmental and water protection standards
Memorandum East Goshen Township 1580 Paoli Pike West Chester, PA 19380 610-692-7171 ext. 3103 kkrause@eastgoshen.org Date: March 19, 2026 To: East Goshen Township Planning Commission From: Kelly A. Krause, Zoning Officer Re: Westtown Township Comprehensive Plan Amendment Adjacent Municipality Review/Comment Period (PA MPC Section 302(a)) _____________________________________________________________________________ Pursuant to Section 302(a) of the PA Municipalities Planning Code, the Township has received proposed amendments to the Comprehensive Plan of Westtown Township for review and comment as an adjacent municipality. The proposed amendments are limited to the following sections:
1. Chapter Seven: Open Space, Parks, Recreation and Trails 2. Chapter Eleven: Future Land Use and Housing 3. Official Zoning Map of Westtown Township 4. Future Land Use Map Most notably, the amendments focus on three parcels abutting the westerly side of Route 202:
1. Crebilly Preserve, 201 W. Street Road (UPI 67-4-29.4) 2. Darlington Inn, 1190 Old Wilmington Pike (UPI 67-4-29.4B) 3. Westminster Presbyterian Church, 10 W Pleasant Grove Road (UPI 67-4-29.4A) The proposed amendments to the Zoning Map and Future Land Use Map are not located within close proximity to East Goshen Township, with the closest distance to the edge of the subject property to the municipal boundary line being approximately 3 miles by direct distance (i.e. “as the crow flies”). Minor text amendments to Chapter Eleven (Future Land Use and Housing) relate to the “Mixed Use” areas shown on the Future Land Use Map. No substantial changes are proposed for the existing Future Use designation for Mixed Use along Route 3. Draft Motion: Mr. Chairman, I move that we recommend to the Board of Supervisors to provide the following comments in response to the Westtown Comprehensive Plan amendment:
or Mr. Chairman, I move that we recommend to the Board of Supervisors that no action is needed.
1
W E S T T O W N T O W N S H I P
1039 Wilmington Pike P.O. Box 79 West Chester, PA 19382 Westtown, PA 19395 (610) 692-1930 FAX (610) 692-9651 www.westtownpa.org
VIA EMAIL
March 3, 2026 East Goshen Township c/o Derek Davis 1580 Paoli Pike West Chester, PA 19380 Re: Westtown Township Comprehensive Plan Amendments - 2026 Dear Mr. Davis, Westtown Township has drafted a text and map amendment to its comprehensive plan, adopted in 2019, to be consistent with the proposed amendments to the Township Official Zoning Map, which was last amended on July 17, 2017, that include the following:
• Rezoning of Crebilly Preserve (UPI. 67-4-29.4) from A/C Agricultural/Cluster Residential to T-Township zoning district;
• Rezoning of the 2-acre property (known as Darlington Inn) (no new UPI issued yet; located at the northwestern corner of Route 202 and 926) from A/C Agricultural/Cluster Residential to C-1 Neighborhood and Highway Commercial District; and
• Rezoning of the Westminster Presbyterian Church property (UPI. 67-4-29.4A) from A/C Agricultural/Cluster Residential to R-3 Residence-Office district.
The Municipalities Planning Code requires that zoning ordinances be generally consistent with the Comprehensive Plan (§603(j)), but it does not require that the Comprehensive Plan be amended first. Recommendation is to adopt both amendments concurrently to ensure the zoning amendments are aligned with the future land use map and relevant chapters of the Comprehensive Plan and there are no conflicts with the future land use designations. The Plan amendments include the following:
• Proposed zoning amendment to Crebilly Preserve is consistent with preservation goals and referendum support. The Plan Chapters are recommended to be revised to reflect the passing of referendum and recent acquisition of Crebilly Preserve as well as progress made on the implementation of Oakbourne Park Master Plan.
• Proposed amendment to Darlington Inn property is not consistent with the Future Land Use map. It displays the newly created property as Open Space. The Future Land Use map and Plan Chapters are recommended to be revised to allow mixed-use designation that supports adaptive reuse of the historic Inn, context-sensitive commercial development, reinforcement of an existing commercial node at a major intersection, and concentration of development.
2
• Proposed amendment to Westminster Presbyterian Church is not consistent with the Future Land Use map. It displays the areas surrounding the main church building as Neighborhood Conservation, which is supportive of in-fill residential development, but which does not include multi-family in-fill or any significant density increase. The Plan Chapter is recommended to be revised to support the church’s plan for attainable housing.
At its meeting on February 17, 2026, the Westtown Township Board of Supervisors authorized the draft amendments to be sent to all adjacent municipalities, the Chester County Planning Commission, and the West Chester Area School District. You are receiving this letter in accordance with Section 302(a) of the Municipalities Planning Code (MPC) for your review and comment. Pursuant to Section 302 of the MPC, any comments you wish to make regarding the plan must be received within forty-five (45) days of the receipt of this letter, or no later than April 17, 2026.
A public hearing for the plan is tentatively scheduled for April 20, 2026 at the Westtown Township Municipal Building, 1039 Wilmington Pike, West Chester, PA 19382. The plan amendment materials are enclosed with this letter.
Thank you,
Liudmila Carter Zoning Officer
Birmingham
Township
East Goshen
Township East Bradford Township
Willistown
Township
Thornbury
Township
West Chester Borough
West Goshen
Township
Ge
neral Howe DR
W Street RD
Wilmington PK
Supplee WY
E Street RD
C
hes
t
er
fie
l
d DR
James DR
W Hilltop RD
Sissinghu
r
st DR
Pennsbury DR
Westbourne RD
Stetson Sc
h
ool DR
M
c
Daniel
DR
Pied
mont R
D
Cockburn DR
Johnnys WY
Oakbourne RD
Carlyle RD
S Matlack
ST
Flin
t
lockRD
Bobolink LA
Centre School WY
Penns Grant DR
S Garden CI
Bartrams LA
Bowers
DR
S Walnut ST
No
r
w
o
od
RD
Overhill RD
E Pleasant
Grove RD
Wickerton DR
Goo
d
win
LA
Manley RD
Fa
v
onius WY
Westtown RD
S Deerwo
od DR
Barnsworth LA
St
ati
on W
Y
Kilduff
CI
Broadway AV
Ap
p
le
b
e
rry WY
Martone DR
F
arm LA
Pheasa nt Run RD
Cha
r
les RD
Cavanaugh CT
Hi
llt
o
p RD
West Chester PK
N Chester RD
Tr
a
p
p
ers Run RD
O
a
klea
LA
F
o
x
P
L
Carmac RD
Jennifer
LA
Kerwood
RD
Rollinview DR
E
N
i
els L
A
Freemont DR
W
est Ch
ester BP
Green LA
Clearview RD
Fielding DR
Garden CI
Nectar LA
Chateau DR
Thr
u
sh LA
Ma
croo
m
AV
Ar
d
r
o
ssan AV
Londonderry DR
R
ussell LA
Serpentin
e
DR
Jacqueline DR
Edgewood Chase DR
Larchwood RD
Farmview DR
Daly
DR
Ed
inbu
rg
h
D
R
M
u
s
ket LA
Stanton AV
A
p
pletree RD
Ad
dison PL
Ashley RD
Ki
r
k
ca
l
dy DR
Wren LA
Ridge RD
Pl
umly RD
John
A
n
t
h
o
ny DR
Whitt
l
eby
C
T
Shady Grove WY
N
D
e
erwood DR
W
N
i
els LA
Kno
ll WY
Swinburne RD
Maplewoo
d
R
D
Jeroma LA
Carrie LA
Chickadee
LA
W
e
stt
o
wn Lake DR
Carter
P
L
Marlboro RD
Shiloh
Hill DR
East School LA
Robins Nest LA
Trellis LA
Grant RD
W Pleasant G
rove RD
Gages LA
W
e
st
Scho
o
l LA
S Coventr
y LA
Westcroft PL
Gilpin
D
R
Oak LA
Wood LA
Kolbe LA
Cider
Knoll WY
H
ummingbird
LA
Cheyney DR
Hunt DR
Woodland RD
S New ST
S Concord RD
Walnut Hill RD
Wind
e
r
m
e
r
e RD
Butternut RD
H
i
n
chle
y
R
N
E Hilltop RD
Stafford DR
D
od
g
son R
D
Tow
e
r
C
o
u
r
se DR
P
y
nchon Hall
R
D
Stable LA
Th
o
rne
D
R
Old Wilmingto
n
PK
Tunbridg
e RD
S Chester RD
Sage
RD
Chesterville WY
Dalmally DR
Woodstock LA
D
u
nvegan
RD
Skiles BL
Spring Line DR
B
eechwood RD
Coventry
LA
L
o
fting LA
Diane DR
Halifa
x
CT
Ponds Edge RD
Elk LA
Friend
s Meeti
ng LA
Windy Knoll
RD
Gen
e
r
a
l Greene DR
Robin DR
Shiloh RD
W
o
odtone DR
Cardinal DR
Picket WY
Bay
w
o
od
RD
B
a
rnview LA
PD 67 Access RD
Carolyn DR
Powderhorn DR
Woodcrest RD
Talle
y
ran
d RD
Creamery LA
Lake DR
West
Lynn DR
Evie LA
Shippen
LA
Louise
LA
Avonl
ea CI
Kimberly LA
Carroll Brown WY
Blen
h
ei
m
RD
Le
s
lie LA
Westwood DR
Hidde
n
Po
n
d WY
Dogwood
L
A
Sharon
CI
Tyson DR
E Sage
RD
Zone District
Agricultural/Cluster Residential
Commercial
Highway Commercial
Township
Planned Office Campus
Multi-Use
Rural-Suburban Residential
Suburban Residential
Semi-Urban Residential
µ
Westtown Township Chester County, Pennsylvania
Zoning Map
0 1,000 2,000 3,000 4,000 Feet
Map created: March 13, 2017
Base data from CHESCO GIS, 2017
E Street Rd
Shiloh Rd
S New St
Oakbourne Rd
Westtown Rd
Wilmington Pk
W Street Rd
S Chester Rd
Johnnys Wy
S Concord Rd
Little Shiloh Rd
Overhill Rd
Walnut Hill Rd
West Chester Pk
Westbourne Rd
Manley Rd
E Pleasant Grove Rd
Leslie La
Robin Dr
Jacqueline Dr
Carmac Rd
Diane Dr
Green La
Hunt Dr
Farm La
Sage Rd
Goodwin La
W Pleasant Grove Rd
Woodland Rd
Shady Grove Wy
Marlboro Rd
Ponds Edge Rd
Lake Dr
Skiles Bl
Cider Knoll Wy
Cheyney Dr
Kerwood Rd
Plumly Rd
Stable La
Ridge Rd
Dogwood La
Westtown Rd
Ashley Rd
Dalmally Dr
Pennsbury Dr
Garden Cir
Wood La
Kimberly La
General Howe Dr
Piedmont Rd
Dunvegan Rd
Wickerton Dr
Cockburn Dr
Cardinal Dr
Hummingbird La
Tyson Dr
Fielding Dr
Powderhorn Dr
Carroll Brown Wy
Woodcrest Rd
Kolbe La
Larchwood Rd
Edgewood Chase Dr
Russell La
Creamery La
Spring Line Dr
Westtown Wy
West Lynn Dr
Grant Rd
Trellis La
Broadway Av
Westwood Dr
E Hilltop Rd
S Matlack St
W Hilltop Rd
Carlyle Rd
S Garden Cir
Carolyn Dr
Coventry La
Londonderry Dr
Gilpin Dr
Westcroft Pl
Franklin Dr
Gages La
Hidden Pond Wy
Stafford Dr
Blenheim Rd
Sharon Cir
Beechwood Rd
Chesterfield Dr
Clearview Rd
Carrie La
Knoll Wy
Jeroma La
Thorne Dr
Picket Wy
Chesterville Wy
Dodgson Rd
Avonlea Cir
N Chester Rd
Wren La
Martone Dr
James Dr
Sissinghurst Dr
Carter Pl
Woodtone Dr
General Greene Dr
Tunbridge Rd
Louise La
Windy Knoll Rd
Bobolink La
Dunning Dr
Supplee Wy
Butternut Rd
Shiloh Hill Dr
Chickadee La
Talleyrand Rd
W Niels La
Shippen La
Hinchley Rn
Stanton Av
Woodstock La
S Coventry La
Elk La
Addison Pl
Swinburne Rd
S Walnut St
Fox Pl
Nectar La
Whittleby Ct
Maplewood Rd
Pynchon Hall Rd
Musket La
Norwood Rd
Thrush La
Old Wilmington Pk
Appletree Rd
E Niels La
Farmview Dr
Hilltop Rd
Oaklea La
Kirkcaldy Dr
Chateau Dr
E Sage Rd
N Deerwood Dr
Kilduff Cir
Jennifer La
Macroom Av
Edinburgh Dr
Barnview La
Serpentine Dr
Freemont Dr
John Anthony Dr
Ardrossan Av
Charles Rd
Rollinview Dr
Station Wy
Baywood Rd
Lofting La
West Chester ByPass
Bowers Dr
Cavanaugh Ct
Barnsworth La
Appleberry Wy
Favonius Wy
Pheasant Run Rd
S Deerwood Dr
Lees Link La
S Concord Rd
Carter Pl
Fielding Dr
Manley Rd
Larchwood Rd
Old Wilmington Pk
Oakbourne Rd
Westtown Rd
Westbourne Rd
Preserve La
West Chester Railroad - SEPTA
Street Rd
Old Hawthorne Dr
Dunvegan Rd
E Pleasant Grove Rd
E Street Rd
Oakbourne Rd
E Street Rd
Shiloh Rd
Ponds Edge Rd
Carroll Brown Wy
Johnnys Wy
Overhill Rd
Hinchley Rn
E Street Rd
CHESTER CREEK
EAST BRANCH CHESTER
RADLEY RUN
EAST BRANCH CHESTER
RADLEY RUN
WESTTOWN LAKE
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
WILLISTOWN TOWNSHIP
CHESTER COUNTY
EDGMONT TOWNSHIP
DELAWARE COUNTY THORNBURY TOWNSHIP
DELAWARE COUNTY THORNBURY TOWNSHIP
CHESTER COUNTY
WEST GOSHEN TOWNSHIP
CHESTER COUNTY
Chester Creek WWTP
EAST BRADFORD TOWNSHIP
CHESTER COUNTY
BIRMINGHAM TOWNSHIP
CHESTER COUNTY
private property
Sarah W. Starkweather Elementary School
G. A. Stetson Middle School Church of the Loving Shepherd
St. Maximilian Kolbe
Westminster Presbyterian
Larchbourne
Oakbourne Mansion
and Park
Tyson Park
Westtown
School
Edgewood
Chase
Park
Pennwood
Park
Penn Wood
Elementary
School
Sts. Simon and
Jude Church
£ ¤ 202
£ ¤ 202
£ ¤ 3
£ ¤ 3
£ ¤ 352
£ ¤ 926
RADLEY RUN
Park
Westtown-
Thornbury Elementary
School
1025
Bayard Rustin
High School
950
1570
Advent Lutheran
Church
1601
West Chester University
Oakbourne Park
R-1 A/C
T
R-1
R-1
R-1
T
R-2
R-2
R-2
A/C
R-2
R-3
A/C
R-2
R-1
R-1
R-2
A/C
M-U
R-2
R-3
R-1
T
C-1
R-1
R-3
R-1
POC
T
R-1
C-1
C-2
T
R-3
POC
C-1
C-2
C-1
C-1
R-1
R-1
R-1
C-1
0
0
201
406
1250
0
1100
1
0
1020
1013
0
0
0
1629
0
0
501
0
1100
0
1335
0
1055
901
0
1050
1121
10
15
1014
1060
0
0 0
1061
0
1071
0
1123
17
0
901
0
957
816
1503 0
506
0
1502
1147
1431
1130
0
1470
1119
1190
825
733
1146
1501
750
1157
0
0
607
1570
1624
0
1646
1085
734
900
0
0
1190
1030
1648
635
5
0
907
708
710
1011
0
1100
645
131
0
1163
1500
0
0
1078
0
1066
0
0
0
1090
0
0
901
1445
932
10
0
1518
716
1076
0
1066
1129
1017
1020
100
1007
2
0
1051
510
711
1115
1401
110
911
0
0
107
1030
804
1650
817
915
1150
25
0
1045
1509
1059
0
1615
940
0
1335
501
0
103
605
1041
100
500
1123
1091
6
7
909
8
189
5
975
3
1001
4
620
0
2
123
1501
1601
918
303
200
0
187
627
1
1150
8
602
1632
0
2
1
1568
1655
0
801
617
1635
1407
1007
1570
1443
501
188
1057
1066
314
907
900
926
923
410
621
117
0
950
1121
119
409
1010
1411
191
990
0
1028
1006
605
911
1021
705
6
1119
1099
926
655 201
803
507
590
111
913
0
0
1058
801
924
515
0
1654
1090
1534
915
919
1006
1000
921
1055
1108
1010
1189
905
908
502
1030 1053
1191
1634
1008
959
911 0
708
1645
1137
916
806
1128
190
7
306
9
1012
1030
625
1652
1631
1069
1622
1091
505
907
1017
715
584
949
1130
20
7
193
1015
209
6
1426
18
1119
1050
1132
825
1408
530
8
923
1413
704
1409
1028
519
301
1149
413
6
1189
1193
602
1654
1193
1660
637
97
1
936
16
702
606
633
102
819
809
1
1510
5
503
192
629
5
8
608
943
16
1627
1633
822
5
641
951
1402
1023
921
5
8
1023
1014
9
1081
0
605 1050
1008
1054
1535
9
1120
520
1065
308
203
615
1118
10
2
2
616
817
625
1147
1018
711
1638
905
725
700
911
400
1631
5 3
12
406
706
919
1107
907
1403
1079
1646
1134
624
99
645
1012
1085
627
208
7
1056
3
1530
904
205
940
1540
611
1048
935
580
713
1004
194
500
816
100
703
1533
824
906
1004
1535
1449
1150
1030
1066
1050
0
523
502
1105
113
818
1428
0
901
1
1433
1065
1001
1111
1408
1120
3
921
915
312
709
201
827
202
127
614
930
804
903
1592
1077
423
909
104
129
945
620
605
610
917
1004
824
1420
906
905
1140
901
1115
1127
501
705
401
408
615
1083
1423
929
1518
1008
1425
206
1003
1148
808
1187
1429
811
629
1423
104
1421
113
807
729
826
201
1028
1073
1187
934
1042
807
1013
1408
928
502
807
920
904
707
99
904
751
0
1191
917
809
904
602
906
803
927
902
908
604
803
1183
910 801
2
1430
1100
211
1199
607
608
623
1531
6
823
703
4
820
609
1650
505
755
937
915
1014
1053
1043
606
1407
8
1405
1534
902
917
912
606
818
605
704
1025
607
1432
206
202
1651
705
811
203
705
6
6
1033
1630
821
600
919
1
714
503
1402
702
919
1103
610
605
811
911
1409
936
753
1002 1063
186
901
903
918
1024
503
0
0
503
411
308
600
805
906
633
800
601
209
1130
502
908
611
200
400
1084
1412
4
509
208
917
1154
1457
9 609
703
810
928
815
1189
611
406
409
6
606
806
601 611
802
914
1106
903
915
1009
915
611
1131
901
910
500
923
604
207
905
412
203
804
700
117
1000
1001
415
603
1004
119
115
132
1006
902
1070
7
503
926
603
609
498
505
808
913
4
813
1017
916
816
323
511 917
601
903
829
908
810
1415
610
1052
911
818
925
1126
1023
0
1100
606
918
1156
905
617
502
205
913
812
403
701
1020
9
1196
1408
413
1178
103
116
608
809
7
407
603
817
405
200
806
12
609
1195
604
903
1025
904
311
8
902
707
1428
1508
612
1026
502
1061
8
930
604
610
602
602
603
601
901
605
701
630
1038
201
609
700
600
603
607
207
607
608
600 601
309
922
916
919
1109
613
923
818
109
604
619
1002
1051
998
606
504
900
1416
607
904
917
913
202
605
301
603
308
916
901
920
200
609
305
605
314
927
613
1153
1032
909
601
607
121 600
925
634
608
203
1000
207
906
901
700
507
1417
1154
318
701
604
1096
202
808
212
206
632
635
303
605
712
939
606
209
511
0
828
901
914
813
205
602
0
417
1101
822
1103
1001
504
912
306
204
1013
967
816
304
909
911
1027
912
122
605
202
3
309
200
1150
1542
600
1000
307
607
1015
609
805
300
910
1506
938
302
701
120
811
700
1060
313
7
101
703
315
310
317
1056
602
0
1009
600
601
810
204
910
604
813
319
932
619
1411
606
902
1057
814
206 321
106
1101
608
603
1059
908
1090
1059
600
1068
204
1009
812
702
816
920
909
1111
207
815
930
600
914
405
320
204
823
815
930
607
1071
602
1116
1410
911
600
1022
403
334
906
501 509
705
131
601
1017
903
506
912
307 405
625
1451
904
921
905
1529
732
417
421
1003
604 608
1132
1518
1056
913
1413
820
605 415
924
312
302
1100
902
905
900
1007
904
5
820
1442
500
1149
1037
914
410
412
1406
707
1546
918
1151
608
906
1531
1023
402
1002
1197
801
507
309
210
509
312
900
307
401
407
115
906
1004
406
300
908
208
900
1016
922
818
821
501
407
305
915
303
404
1000
910
723
1192
1002
111 419
113
910
1091
913
912
908
721
117
1194
1135
918
402
400
911
926
912
717
1415
911
400
1017
310
914
725
312
730
925
910
1049
1016
916
1078
802
301
631
920
119
732
916
1134
1004
1072
1001
501
920
903
727
115
1414
909
913
915
907
912
728
913
918
1104
1107
408
1011
808
208
1062
1115
902
503
634
814
9
919
117
1025
924
314
931
729
816 806
726
1409 1191
206
722
804
902
907
420
1033
1091
1404
1104
1423
814
1404
204
1018
119
913
610
905
1152
1614
1136
1142
1541
1164
800
909
116
201
917
422
305
902
1045
118
1127
200
1119
121
1412
1410
101
1408
1009
1060
200
1141
1018
1109
1400
1419
1427
118 116
928
104
1111
210
1165
915
1151
1153
1126
1064
1131
1044
1023
114
724
1114
1016
207
1506
102
205
1428
929
203
1019
416
110
1021
203
1024
1180
800
1192
1055
327
821
731
201 105
122
1013
1542
1426
1117
1005
931
926
925
1506
0
1505
1415
1049
114
925
0
701
1056
98
1428
1017
1104
1410
932
1190
1194
1501
1107
1064
1047
1106
1021
120
7
612
1508
121
1413
115
1406
1530
1020
1000
1020
1139
1051
1026
904
1001
1003
1013
1042
123
1054
1411
1034
1155
1116
1011 1400
310
1534
1 1002
1006
1198
1439
103
124
1117
922
1196
1003
1100
1655
1177
1425
11
1458
1011
1118
11
112
120
127
108
900
1118
1154
922
1401
1148
0
1035
600
1198
1182
1070
1405
1185
1024
1461
1527
1115
1002
1030
1061 1012
122
1194
1005
1066
1009
1105
1032
1063
1412
1508
310
1009
1414
1111
1043
125
1019
1095
1067
1459
1012
1113
1532
1410
1425
1197
1002
1416
1022
1036
1060
1509
1075
1450
1504
100
1092
1025
1063
1513
1108
1055
1184
20
1160
1042
1415
927
1027
97
1059
1185
1503
1097
1129
1402
1061
1183
1188
1152
1012
1192
1006
1626
1096
1004
1114
1543
1003
1053
1021
1019
1019
1540
1162
1113
1500
1010
1152
329
1523
1024
1013
1062
1002
1505
1112
1038
1085
1154
1422
1002
1507
1156
110
1504
1009
1001
1407
1418
1402
1540
1186
1119
928
1048
1061
1054
1056
1090
1064
1025
1036
1008
1053
1549
1014 1173
807
1055
1011
1000
1116
1120
1059
1056
1121 1003
1156
1506
1046
1543
1128
1008
1004
1410
1138
1008
1614 1015
1136
1542
1620
1155
1014
1166
1085
1419
1452
1015
1530
943
3 1106
907
1009
942
1005
1004
1510
1182
1018
1115
1500 1037
1103
1003
1003
1158
1421
1172
1005
1120
1538
1528
1427
1008
1409
1102
1012
1015
1155
1110
1507
1057
927
1507
1001
1050
1010
1168
1417
1089
1408
1405
1007
1543
1153
1003
1004
200
1539
1025
1044
1130
1428
1547
1418
1513
1412
1051
1176
1102
1414
1422
923
1455
1152
1546
1057
1108
17
1065
1015
1055
1151
1170
1058
1026
1013
1064
1164
1430
1023
1538
1058
1073
1009
1505
1184
1421
1424
1102
1065
1417
1430
908
1010
1158
1011
1432
1066
1428
917
1174
1137
1434
1117
1048
1108
1429
1412
1007
1104
1022
1016
1010
107
1155
1010
209
1095 1068
1046
1503
1415
1418
1603
1133
20
1512
309
1545
1025
1525 1058
1509
1501
1021
1418
1001
1410
1406
1417
1053
12
1122
1422
1157
1411
106
1006
1049
1420
1014
1006
1055
1412
1163
16
1015
1055
1023
1006
1110
1000
1111
1512
1015
1424
1014
1418
1061
1196
1057
1431
1533
1424
1418
1056
1011
1416
1005
1423
1433
1028
1101
1119
1002
1159
1024
1065
1434
1008
1008
901
1069
1540
320
1027
1548
1516
1010
1407
1018
1408
1425
1508
1022
1055
1402
1057
207
1411
1007
1153
1429
1449
1421
1421
1537
108
1510
1421
1507
1436
1020
1001
1012
1034
1013 1547
1410
1539
1001
1060
1116
1019
1000
1003
1007
1092
115
1002
1616
1011
1007
19
1062
1430
1017 1080
1417
1404
1007
1001
1058
10
1010
1006
1514
1047
1424
1018
1423
1422
1412
10
1426
1514
1541
1104
1022
315
1063
1015
1045
1053
1409
1415
1079
1412
1014
1520
1080
313
1050
1420
1003
1409
1403
1023
1078
1407
1051
1005
1030
1022
1010
1524
1416
1417
1005
1409
1432
1517
1134
1199
1423
1083 1115
1400
1016
1425
1407
1404
1040
1016
1140
1005
1419
1005
1528
1419
1008
1413
1516
1075
1016
1408
1606
112
1119
1414
1005
1065
1650
1539
1046
1004
1082
100
1511
1199
1421
1056
1606
1020
1421
1403
1120
1060
1551
1543
1012
1535
1023
13
1536
1197
904
929
1549
307
1093
0
8
1416
1426
324
1000
1017
1014
1406
117
1403
1004
1505
1002
1406
811
1547
1406
1143
1410
1555
1034
1424
1656
1012
1545
1545
1118
0
1061
1054
1409
1082
1543
1513
1604
116
1405
1142
1605
1121
1065
1514 1510
1504
1512
1187
1124
1401
1526
1044
1512
1112
1521
1128
1524
24
1506
1601
1533
1068
1516
1090
1015
1057
1051
1518
1054
1545
1522
1032
1639
1502
1016
1088
1077
1146
305
1508
1006
314
1523
1122
0
1611
305
1074
1618
1157
1136
1025
1501
15
1151
1553
1013
1072
1086
1408
335
1081
1525
1067
1084
1504
305
1080
1071
1607
1404
9
1066
1541
1541
1135
1506
1501
1005
102
1547
1052
1059
1419
1407
12
1508 1510
1000
1063
1512
1195
1519
1420
1506
1551 1063
1078
121
1050
1019
1074
1431
1073
111
1501
1050
1549
1602
1076
1003
1061
1075
1609
1441
1620
1005
1608
304
1505
1610
1078
1503
1515
109
1020
1016
1018
1075
1080
1053
1022
1051
1031
1047
1059
1503
1058
1600
1002
215
1056
1504
910
1019
907
1014
1434
1095
1505
1007
1043
219
1612
1509
1054
101
1507
1003
1413
1052
1017
303
0
1161
954
301
1406
1126
1074
1480
301
1035
1067
1004
114
1613
1010
1405
1012
1121
1044
1008
303
317
1046
202
304
1195
200
0
1036
1076
1015
1000
1403
302
1599
215
409
1433
1401
1460
1536
1001
1548 1538
300
1510
905
306
1521
909
1014
403
1512
19
1122
1039
1514
303
1402
207
1004
135
133
1615
302
14
809
1516
326
1031
208
17 15
1107
16
1109
308
1520
1630
903
102
1642
1522
104
909
1524
1550
1556
1137
1618
118
1026
104
502
328
209
316
1528
311
319
16
11
401
18
1518
309
1640
1038
825
1530
307
1544
11
500
1557
404
14
1532
947
402
10
208 945
400
1534
211
306
1015
310
17
306
1538
908
15
1540
950
103
1551
1002
1542
201
308
13
303
321
331
12
1546
129
332
203
1548
204 206
313
217
10
312
1425
202
1550
13
1116
322
314
11
1111
1538
11
1029
321
204
1150
815
309
1170
0
103
204
105
319
1006
311
101
805
1156
325
312
1111
821
106
107
307
221
318
13
300
311
1552
113
1193
811
1539
205
114 823
15
320
12
218
12
225
112
119
13
14
104
10
16
103
16
0
902
105
10
18
923
100
106
313
19
14
16
318
212
115
15
14
300
7
220
5
1409
1113
12
111
744
1126
214
931
200
11
310
5 922
905
1120
211
224
111
921
13
903
106
306
943
16
205
333
827
207
914
801
105
330
312
1144
913
1132
1122
316
719
817
123
1125
304 314
210
110
312 310 306
205
301
1107
308
900
1172
831
929
323
1130
1135
1549
1112
925
226
308
15
819
212
1114
803
103
105
935
303
1010
1129
925
310
1169
109
928
309
302
1004
908
912
1511
926
911
804
920
919
107
1150
1117
311
1139
1138
907
901
944
918
1127
945
304
1114
100
1133
301
1124
309
1122
129
941
1180
926
1123
211
305
812
303
1105
1124
215
1135
910
213
200
210
1018
924
833
116
311
307
845
200
1118
921
944
1662
108
1021
813
600
930
214
933
1121
121
111
835
218
305
122
701
113
305
213
906
918
910
943
919
313
307
920
1120
220
1002
303
222
218
311
916
224
216
1137 205
203
208
206
1139
800
203
829
832
204
922
939
802
309
1025
934
202
1001
103
1172
223
315
942
206
941
307
1148
614
1547
916
939
1011
216
1187
305 309
940
217
202
914
203
1117
942
204
308
219
306
117
304
912
300
1125
916
221
303
223
108
923
1107
940
1027
903
202
1158
113
1116
906
910
310
912
119
206
904
317
102
1168
902
207
1132
937
1118
205
1011
209
1121 1130
1123 1135
225
1123
1125
302
1131
1131
937
1142
208
101
201
1127
909
1114
1129
127
1131
927
1137
1133
1110
1125
1023
1110
908
1143
836
1181
1117
6
100
915
107
1136
1000
1133
1134
1004
1111
124
1108
1022
917
1023 1001
1112
108
1160
1026
4
1121
1033
134
1110
1115
105
104
1182
1031
1121
1112
125
1525
1129
1620
1109
106
619
107
1144
105
1622
1134
1008
1552
1178
1186
109
1115
1176
1142
1534
1102
1508
1113
10
1123
1015
1534
1009
913
1550
1106
1019
1174
1146
105
1102
12
108
1190
117
110
1121
1533
1123
14
1532 1544
1554
1146
1011
1511
1545
1104
112
969
1546
1548
1536 1538
1175
1430
1540
1531
1134
1157
107
1552
1510 1552
1523
1511
1546 1512 1542
108
1148
1550
103
1532
1014
1536 1514 1122
106
1548
1521 1519
1554 1516
1132
1173
1162
1519
1120
1001
1002
1517
1130
1160
1535
1551
1518
1177
1128
1544
1515
1520
1513
1174
101
1516
1126
1520
1008
1538
1017
1518
105
1535
1513
102
1124
100
1517
1000
1542
109
1519 1555
1170
1540
101
1100
106
104
1180
1521
102
1515 1553
1533
1136
730
1008
108
1537
1019
1539 1541
1108
1545
1513
1198
1543
1555 1553
1021
116 114
1171
1539
1556
1547
1199
1009
1144
110
1017
104
1161
636
101
1549 1541
106
1018
1543
1007
1151
1015
1161
112
1162
1016
1109
1106
1007
1014
106
1104
1002
1173 1181
1163
1147
118
1189
1116
102
1005
120
1155
1013
1171
1003
1013
1005
103
1107 1105 1103
1183
1163 1169
1002
1021
104
1004
1149
617
1016
103
1004
1010
1557
107
1523
1522
1012
1004
1006
1016
627
1032
623
1056
732
1523
1003
1557
630 615
611 635
1000
1000 1001
634
1040
1110
1195
45
613
47
1037
734
1010
1041
736
1033
1014
740
607
632
738
605
1021
1023
1001
1035
1007
1005
1025
625
30
22
802
724
742
1012
751
631
603
814
10
42 40
810
1022 1030
28 24
609
1031
1043
601
1003
733
46
852
1027
1019
1017
749
1039
48
911
1015
735
1016
1018
1038 1020
945
812
617
613
920
601
943
917 919
926
603
610 608
118
204
202
1007
611
101
0
111
1066
807
1084
119
1159
1035
1163
0
107
209
1124
949 951 953 955
109
909
403
0
405 407 401
200
1023
1141
907
304
1009
1517 1515
1005
1125
1151
1145
1175
1183
1177 1179 1181
1176
1147 1145
1149
1184
11
0
800
746
762 760
1018
750
1015
1009 1010
1001
1592
748
957
19
752 758 756
18
34
754
1163
16
1044
36
12
727
824
1009
826
638
729
639
1059 1057
1052
1046
1050
1048
1054
1011
839 731
1600
804
24
1013 1045
633
806 808
1028
850
819
520
753755
550
725
1017
1029
1053
1047
1049
1055
1051
615
637 1114
822
0
818
834 838
816
634
809
853
832 844
848
846
836
840
913
805
619
828 823
842
820
857
632
558
1547 514
830
929 931
833
856
626
635
536
1581 616
923
618
633
611
1640
939
921
937
600
927
933
627
619
607 609
629 625
605 601
631
935
623
511
941
559
500
612
621
541
534 513
837
563
523
835
928
924
932 930
606 539
821
501
1616
922
611
22
572
585
1618
1584
608 525 609 610
855 807
614
1617
1601
1558 1582
854
1600 1563
546 548 544
560
542
540
1561
562
538
1598 1580
1542
564
510 504508 506
1638
524
1544
522
502
532
566
528
1590
530
568 1636
1592
570
503 505 507 515 517 519
1634
531
1560
1611
529
1594
543 545 537 557
602
583
604
1609
581 579 577
617
575
573
1613
1632
612
569
567
1607
614
551
616
547
553
1605 1603
555
1630
1614
1602
1612 1610 1604
1596
1628
1620
1577
1578
1573
1557 1555 1551 1553
1576
600 503
105
1134
2206
1200
2409
1705
1208 406
605
2711
2701
2742 2748
200
2722
2730
808
303 2712
811
2729
2732
2709
2721 2725
2720
2740
2749
2739
2710
901
2731
2741
2716 302
2747 2735
700
2715
703
201 2703 2704
2713
2706
0
902 905
601 906 502
104
1105
2702
301 307
604
300
100
607
1501
1103 1500
2303
2600
2503 2501
1704
2304
1802
1702
1903
1006
1301
1800
304
1404
2009 2010
2307
1204
2102
203
1801
1205
2002
1309
1102
2406
1506 1507
1009
2101 1604
2602
2000
2003
2302
1308
1001
1304
603
1002
2405
204
1107
1402
2606
1108 1109
22002309
2006
2104
1300
1700
2300
2100
150515021807
2604
2204
1000
500
2400 2401
1110
1600
Document Path: W:\GIS\Projects\Westtown\ArcMap\Zoning 2025\Zoning 2025.aprx
Zoning Districts and Boundaries
Effective June 20, 2011 Amended January 29th, 2026
Sources
Zoning Dataset: http://www.arcgis.com/home/item.html?id=29f3799cdbcb4c0589eedb92fbe6bb8c ; December 27, 2017 Parcel Dataset: https://chesco.org/3486/GIS-Data ; November 29, 2017 Road Dataset: https://chesco.org/3486/GIS-Data Hydric Datasets: https://chesco.org/3486/GIS-Data Municipal Boundary Dataset: https://chesco.org/3486/GIS-Data
( IN FEET ) 1 inch = 500 ft.
GRAPHIC SCALE
0 500 1,000 1,500 2,000 250 Chester County Pennsylvania "
®
P.O. Box 79 Westtown, PA 19395
610-692-1930 www.westtownpa.org
Railroad Tracks
Municipal Boundary
Lakes
Parcels
Church
Private School
Public School
Westtown Township Property
Zoning Districts
A/C - Agricultural/Cluster Residential
C-1 - Neighborhood and Highway Commercial
C-2 - Highway Commercial
M-U - Multi-Use
POC - Planned Office Campus
R-1 - Residential District
R-2 - Residential District
R-3 - Residence-Office District
T - Township
Westtown Township
Westtown Township
Zoning Map
Chester County, Pennsylvania
949 Easton Road Warrington, PA 18976
Phone: 215-343-5700
Fax: 215-343-0875
www.carrollengineering.com
C a r r o l l E n g i n e e r i n g C o r p o r a t i o n C a r r o l l E n g i n e e r i n g C o r p o r a t i o n
COPYRIGHT © - 2015 CARROLL ENGINEERING CORPORATION - ALL RIGHTS RESERVED - THESE DOCUMENTS WERE PREPAREDBY, AND ARE OWNED BY, CARROLL ENGINEERING CORPORATION; AND AS SUCH, REPRESENT INSTRUMENTS OF PROFESSIONAL SERVICE WITH RESPECT TO THE PROJECT FOR WHICH THEY WERE SPECIFICALLY DESIGNED AND TO THE LISTED
CLIENT AND/OR APPLICANT. THE DOCUMENTS AND INFORMATION ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY THE LISTED CLIENT/APPLICANT, OR BY OTHERS, ON EXTENSIONS OR MODIFICATION OF THE PROJECT OR ANY OTHER PROJECT. THE REPRODUCTION OF A COPY OF THESE PLANS, OR REUSE OF THESE DOCUMENTS, AND/OR THE COPYING
OF ANY PORTION OF INFORMATION SHOWN ON THESE PLANS IS NOT PERMITTED AND IN NO CIRCUMSTANCE WILL BE APPROVED WITHOUT AN ASSIGNMENT OF COPYRIGHT PRIVILEGES.
VIOLATION OF THIS RESTRICTION SHALL BE CONSIDERED A VIOLATION OF THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF CORPORATE ASSETS, BOTH OF WHICH SHALL BE PROSECUTED TO THE FULLEST EXTENT OF CURRENT STATUTES. IN THE EVENT OF ANY UNAUTHORIZED USE, THE PERSON INITIATING THE USE SHALL ACCEPT ALL RESPONSIBILITY, BOTH
FOR COPYRIGHT VIOLATION AND PROFESSIONAL LIABILITY, FOR ANY CLAIMS, DAMAGES, LOSSES, AND EXPENSES ARISING FROM THE UNAUTHORIZED REPRODUCTION, MISUSE, OR
MISAPPROPRIATION OF THESE DOCUMENTS OR INFORMATION SHOWN ON SAID DOCUMENTS.
DATE: JOB NO: 15-5704 SCALE: 1" = 500 ft. 1/29/2026
630 Freedom Business Ctr., 3rd Fl. King of Prussia, PA 19406
Phone: 610-489-5100
105 Raider Boulevard, Suite 206 Hillsborough, NJ 08844
Phone: 908-874-7500
Fax: 908-874-5762
101 Lindenwood Drive, Suite 225 Malvern, PA 19355 Phone: 484-875-3075
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-1
CHAPTER ELEVEN: FUTURE LAND USE AND HOUSING
A key component of the Comprehensive Plan is to develop Future Land Use and Housing Plans that reflect the Township’s goals and objectives, and respond to existing land use conditions as well as zoning. Because Westtown is largely developed in a residential context, and available land for both development and redevelopment is limited, these two issues have been combined into one Plan element.
One key to this Plan element is the development of a Future Land Use Plan, included and described herein. Of further importance is the provision of guidance for updating Township land development regulations, most notably in this case, the Zoning Ordinance and Zoning Districts Map. Understanding current land uses and zoning is the first step to this update.
Maps pertaining to this chapter are found after page 11-12.
Jefferson at Westtown Apartments, 2018.
Walking Trails at Oakbourne Park, 2018
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-2
Key Issues
Westtown Township is primarily a bedroom community characterized by low density and mostly single-family housing, which is largely supported, if not encouraged, by existing zoning. Based on the extensive assessment in the background discussion below, several key issues emerge for future planning.
Consider Specific Regulation of Institutional Uses
Why Is This Important?
Westtown Township has a remarkably high percentage of large institutional uses. Most of these are located in low-density residential areas and zoning districts, where they are non-conforming uses. While these uses have traditionally been good neighbors to the residential areas surrounding them, many of these institutions will continue to grow and evolve.
Current residential zoning districts may not be able to adequately address these needsthe operational, space, or infrastructure needs of these institutions.
Consideration of a dedicated institutional zoning district or more flexible regulatory provisions could better accommodate institutional growth while ensuring that surrounding neighborhoods are protected through appropriate scale, buffering, and design standards.
In addition, some institutional properties may present opportunities for residential redevelopment, allowing the Township to achieve broader housing objectives without compromising neighborhood character.A
new institutional zoning district could better accommodate the future needs of these institutions as well as afford additional protections to the surrounding areas.
Provide for Housing Diversity
Why Is This Important?
There are limited opportunities for diverse housing choices remaining in the Township, in the face of the predominance of the single-family detached homes and the nearly fully developed nature of the Township. Over the planning horizon, demand is expected to increase for housing options that accommodate a range of households, including seniors seeking to age in place, young professionals, and workforce households, as discussed in Chapter Four. More diverse housing choices are anticipated to be in demand over the planning period of this document, particularly in regard to accommodating growing populations both aging-in-place and millennials, as also discussed in Chapter Four.
Strategically located institutional properties — particularly larger parcels along arterial corridors, such as the Westminster Presbyterian Church property at West Pleasant Grove Road and Route 202, can support context-sensitive multifamily residential development.
Furthermore, the Township should ensure that residential redevelopment and renovations can accommodate accessibility requirements, including ADA compliance, and provide services that allow aging residents to remain in their homes and communities as long as possible. Zoning and land development regulations should be
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-3
structured to facilitate such housing opportunities without imposing undue burden.
Notably, the aging population will require new and increasing services if they are to stay in their homes and communities as long as possible. Additionally, the Township will need to ensure that necessary building renovations and retrofits, such as ADA accessible ramps are reasonably accommodated within its Ordinances without undue burden.
Promote Access to Open Spaces and Walkable Places
Why Is This Important?
The majority of Westtown streets and neighborhoods do not have sidewalks or trails, making it difficult to access anywhere in the Township without the use of a car. The demand for more opportunities to walk, whether for recreation and exercise, or for daily tasks, is increasing across the County, state, and nation.
In the Township, the results of the online survey and community forums, demonstrate a strong desire by many (but not all) to create these opportunities going forward. How the Township chooses to develop and redevelop in the near future will determine its ability to address these needs.
Access to and permanency of, nearby open spaces are key to maintaining a high quality of life in a largely suburban landscape. Proximity to open space also contributes to property values.
Provide for New Mixed-Use Development in Aging Commercial Areas
Why Is This Important?
A diverse and vibrant commercial base is important to the Township’s tax base, as well as its ability to serve residents’ daily needs close to home. Because Westtown’s limited commercial spaces along Route 202 and Route 3 are mostly built-out, it is even more important that they be healthy and attractive.
As the shopping centers, and business centers parks, and other commercial properties along these corridors age, they become candidates for redevelopment or infill development -(the complete or partial demolition replacement of existing buildings and other features, in order toinfrastructure to construct create something new, more efficient, and more versatile uses. and potentially different).
Zoning plays a central role in guiding such redevelopment, determining whether sites simply replicate historic patterns or can be reimagined to achieve broader community
goals, such as increased walkability, energy
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-4
efficiency, mixed-use functionality, improved infrastructure, and reduced conflicts or nuisances.Through zoning, redevelopment can simply repeat the designs and patterns of the past or it can represent an opportunity to more effectively use land to meet the community’s goals, whether to be more energy efficient, more walkable, offer more uses, expand infrastructure, reduce nuisances, etc.
Amish Market, 2018
Consideration of what redevelopment in Westtown should look like as well as how to keep these centers vibrant in the future is a key land use issue.
Underutilized uses often detract from the character and safety of community. Infill development makes better use of existing infrastructure and promotes compact growth that aligns with long-term municipal investment. It further revitalizes these spaces, increases property values and attracts new businesses. By concentrating commercial activity in already established areas, infill development can stimulate local economies and provide opportunities for small businesses.
Infill development that incorporates or is adjacent to historic buildings helps maintain the unique identity of the community. Preserving and reusing historic structures adds authenticity and continuity to new commercial spaces, avoiding incompatible development.
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-5
Future Action and Policy Considerations
• Consider a new Institutional Zoning District(s) to better tailor regulations to the needs of the Township’s many institutions.
• Expand commercial/mixed use zoning along Route 202 to encompass existing residential properties, where deemed appropriate current residences are oriented towards the highway, providing encouraging for such properties to be combined and converted to commercial or mixed-uses, especially where redevelopment can be located beyond the ultimate right-of-way of Route 202 and with alternative access rather than direct access to Route 202.
• Enable a greater mix of uses in all existing commercial and office park areas, to provide for in-fill or redevelopment with a greater degree of mixed uses, sharing infrastructure and stormwater management needs, including the incorporation of residential uses, notably on upper floors.
• Incorporate requirements into zoning ordinances to encourage that new development and redevelopment create pedestrian connections (trails and/or sidewalks) to surrounding neighborhoods, and incorporate open
spaces and protection of natural resources.
• Review zoning and other ordinances to ensure that home renovations and/or possibilities to add “elder cottages” as accessory dwellings on existing residential properties, can be reasonably accommodated to help residents age in place.
• Consider establishment of incentive provisions to provide for a reasonable percentage of affordable housing in appropriate locations.
• Adjust non-residential parking standards to reflect opportunities to reduce impervious coverage where mixed-use development may have complimentary or shared parking needs.
• Review regulatory provisions to ensure that home renovations or retrofits intended to help residents age in place in their own homes can be reasonably accommodated.
• Consider incentive provisions to encourage new mixed use development, specifically via adaptive reuse of historic buildings for nonresidential purposes, especially if such properties are located along highways.
• Support initiatives that increase the supply of attainable housing options.
Revise local regulation to provide for the following:
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-6
Background Discussion
Existing Land Use & Zoning at a Glance
The Existing Land Use Map depicts the extent of various existing land uses in the Township, while the pie chart below illustrates the relative percentages of each use category (Figure 1). As shown, the Township’s land use can be characterized as follows:
Housing (5553%)
The 2010 Census states that 72.4% of Township homes are single family detached, with the remaining 27.6% made up of multi-family units. There are no mobile homes within the Township. The single- family units typically exist on lots between 0.10 and 1.0 acres, with a few larger single- family parcels scattered throughout the Township.
Agriculture (1411%)
Farmland under active cultivation is a key defining characteristic of the Westtown landscape. Open fields and crops are visible from many roadsides, as well as the farmsteads and agricultural related businesses that support them. This rural character is threatened as development pressure continues to increase in the region. It has the potential to permanently impact the character of Westtown and alter the quality of life for residents. The preservation of agricultural open space is a top priority of this comprehensive plan as discussed elsewhere.
Wooded (16%)
Natural resources such as woodlands and the stream corridors these woodlands are often concentrated around, make up a large, but declining percentage of the Township’s land use. They are predominantly found on privately owned
53.2%
15.8%
10.5%
4.8%
7.8%
2.7%
2.2%
1.7%
1.3%
Westtown Township Existing Land Use Categories (percentage)
Residential: Single-Family
Wooded
Agriculture
Vacant
Recreation
Community Services
Residential: Multi-Family
Commercial
Other (transportation, utility, or water)
Figure 1: Percentage of existing land use categories in the Township
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-7
lands but contribute considerably to the Township’s overall character as well as to the health of its air and water resources as discussed more fully in Chapter 5: “Natural Resources”.
Recreation (48%)
Westtown Township owns and maintains multiple park and open space properties, containing approximately 318 522 acres, although not all categorized as “recreation.” These include Crebilly Preserve, Oakbourne Park, Tyson Park, and Larchbourne Park. The Open Space, Recreation, and Environmental Resources Plan (2014) fully explored the goals and objectives for making the best use of these open spaces, except for Crebilly Preserve that has been acquired in December 2024. This Plan and its role in the Comprehensive Plan update are fully discussed under “Open Space, Parks, Recreation and Trails.”
Commercial Uses (2%)
Commercial uses are concentrated along Route 3 and portions of Route 202. These include a small office park, shopping centers, and stand-alone establishments. Commercial development is important in terms of the services available to residents, but also for the tax base. Due to the relatively small amount of commercial space in Westtown, its tax base is heavily reliant on residential real estate taxes.
Community Services (Institutional) Uses (3%)
The Township has an unusually high percentage of institutional uses and community service institutions within its boundaries. The actual acreage in
institutional ownership is significantly higher than 3% of the Township’s land area, but the land use categories are measured on the basis of the surface use of the land, not ownership. The largest institutional property in the Township is Westtown School, encompassing approximately 600 acres in the center of the Township. As an example of land use measurement, only the core school campus is measured as Community Services while significant acreage is counted as woodland and agriculture.
West Chester Area School District maintains another 213 acres of land that includes the high school, middle school, and three elementary schools. There are also numerous churches, parochial schools, and nonprofits groups with properties across the Township. It is clear that these institutions provide invaluable services to the Township. However, they do not add to the tax base and are often located in established residential neighborhoods with little room for growth.
Vacant land (5%)
With less than 5% of the Township land undeveloped, the Township considers itself built-out. This means that there is additional pressure on the vacant and agricultural lands to be developed.
Other lands (1%)
This includes lands categorized as “transportation,” “utility,” or “water” (mainly Westtown Lake and several ponds). Neither transportation nor utilities are mapped to infer their true impact. For example, all roads could arguably be mapped as “transportation,” but are not.
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-8
Existing Zoning
As shown on the Westtown Township Zoning Districts Map, the Township is divided into nine (9) distinct zoning districts. The pie chart below illustrates the relative percentage of land in each district (Figure 2).
Not surprisingly, the map largely reflects and maintains the predominant land use patterns discussed above, with the largest zoning district being the R-1 Rural Suburban Residential District, followed by the R-2 Suburban Residential, and Agricultural/Cluster Residential, and R-2 Suburban Residential. With the exception of the R-3 Residence-Office District (3.1%) and M-U Multi-Use Districts (1.6% of Township land), all other zoning districts are single use districts meaning they only allow one type of use (commercial, residential, industrial, or office) per lot.
What is not reflected on the Zoning Districts Map is the large amount of institutional uses in the Township. This is because these uses are permitted and regulated under other existing districts, notably existing residential zoning districts. Typically, however, they are not uses permitted-by-right in those districts but subject to special exception or conditional use approval. This is a common practice, as many churches, elementary schools, and other uses were originally intended to blend into the development patterns of a neighborhood.
However, as institutions grow to reflect changing and growing demands, it becomes increasingly important to more carefully consider their impacts on the surrounding community.
Development Potential under Existing Zoning
Assuming that existing zoning regulations remained the same, an analysis of what
46.0%
19.2%
21.5%
3.1%
6.8%
1.6%
1.0%
0.6%
0.3%
Westtown Township Existing Zoning Districts (percentage)
R-1 - Rural-Suburban Residential
A/C - Agricultural/Cluster Residential
R-2 - Suburban Residential
R-3 - Residence-Office
T - Township
M-U - Multi-Use
C-1 - Commercial
POC - Planned Office Campus
C-2 - Highway Commercial
Figure 2: Percentage of Existing Zoning Districts in the Township
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-9
could feasibly be built in the Township was conducted. The results of this analysis conclude:
• There are nearly 1,200900 potentially developable acres or 2116% of the Township land area. This includes vacant, other undeveloped lands (including agricultural lands and Westtown School lands outside the core campus), and large residential parcels (over five acres) with one dwelling, not constrained by floodplains, wetlands, or stream buffers.
• This land is located primarily in residential zoning districts, where a variety of unit types is permitted.
• There is the potential to build approximately 1,000750 housing units under current zoning, however, given the character of the Westtown School lands and large residential properties, not more than 500 units should be expected during the 10-20 year planning horizon of this Plan. Depending on the zoning options chosen, these houses could be a range of single family, two- family, townhouse or apartments.
Future Land Use Map
The Future Land Use Map groups the Township into the following general categories:
• Neighborhood Conservation; • Mixed Use Areas; • Open Space; and • Greenway Corridors.
These categories reflect the intended future character of the areas as generally mapped, including existing and future development
over the 10-20 year planning horizon of this Plan. They are not specifically mapped on the basis of ownership or current zoning. Future zoning amendments will may likely further clarify future development and/or redevelopment potential consistent with the policies of this Plan.
Neighborhood Conservation
The concept of Neighborhood Conservation applies to protection and enhancement of economic viability and the quality of life in established and potential future residential neighborhoods throughout the Township. It does not apply to areas mapped for Mixed Use.
As noted above, Westtown’s neighborhoods are sprinkledinclude a range of with institutional uses that, which, todayin some cases, are often no longer inconsistent aligned with the scale or residential character of surrounding residential development. While such uses may be legally and even non-conforming, their long-term viability and compatibility warrant thoughtful policy consideration. to residential zoning, particularly concerning area and bulk and parking requirements. They raise a number of issues in terms of preservation of neighborhood character. Yet to the extent that they qualify as “non- conforming,” they are “protected” in a sense, and privy to special consideration for non-conforming uses, including expansion. The Township may consider zoning strategies that better integrate institutional properties into surrounding neighborhoods. A separate zoning classification would enable the Township to regulate them more appropriately. Existing institutional properties are indicated with red property boundaries on the Future Land Use Map.
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-10
A key component to Neighborhood Conservation is to encourageencouraging long-term economic viability through opportunities for reinvestment, sensitive redevelopment, and/or enhancement of existing neighborhoods. and their quality of life. While Neighborhood Conservation emphasizes protection of established residential character, it also recognizes the importance of providing a broader range of housing opportunities to meet evolving demographic and economic conditions.
While this is dependent on many factors influencing viability are, mostly market relateddriven, Township policies can shape outcomes through thoughtful land use planning. some can be influenced by Township policy and action. Such issues, some of which are discussed further in other sections of this Plan,These land use planning considerations include but are not limited to:
• Provide for housing diversity
In appropriate locations, particularly along arterial corridors, near existing infrastructure, and on properties of sufficient size, the Township may consider permitting multifamily residential development to expand housing choices for seniors, young professionals, and workforce households, to support attainable housing opportunities, and to provide sensitive transitions between differing land use intensities.
Institutional properties, particularly those located along major roadways such as Route 202, may present unique opportunities for residential use that support community goals while preserving neighborhood stability.
• Property maintenance standards and enforcement
Existing regulation and enforcement policies should be reviewed periodically to ensure that inadequate property maintenance is not creating unsafe conditions or harming neighboring property values.
• Provisions for “elder cottages” or accessory dwellings
Potential to erect accessory dwelling forms should be considered as a means to permit “aging in place;” while accessory dwellings are permanent, “elder cottages” are often required to be removed when the intended residency ceases.
In all cases, accessory dwellings should comply with design standards to ensure neighborhood compatibility and adequate wastewater disposal; imposition of the special exception approval process is a logical means to ensure appropriate design and placement.
• Provision for context-sensitive “in- fill” residential development
Appropriate zoning and land development standards should be considered to provide for residential development that fills in vacant or underdeveloped parcels in keeping with neighborhood character. In select locations with appropriate infrastructure and access, moderate increases in residential density may be considered where consistent with Township housing objectives and compatibility standards. This would not include non-residential or most multi-family in-fill, or any significant
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-11
density increase, where not otherwise considered appropriate.
• Provision for pedestrian and bicycle interconnections
Provision for non-motor-vehicle connections should be encouraged between residential neighborhoods and nearby parks, open spaces, schools and commercial/mixed use areas.
• Open space access
Efforts should be continued to promote the permanent protection of open space in locations both proximate and easily accessible to residential neighborhoods.
• Historic preservation
Preservation of historic structures and landscapes is an important part of conservation of neighborhood character, even where requiring additional use opportunities to support economic viability of historic structures.
• Traffic-calming
It is important to consider installation of “traffic-calming” measures in residential neighborhoods confronted by significant through traffic, which otherwise subverts efforts to promote conservation of neighborhood character; this has recently been accomplished along Jacqueline Drive, for example.
• Sewer and water service
Especially in areas where lots of one- acre or less predominate, existing programs to promote on-going viability of on-lot systems, as well as the potential availability of public water and public sewer service, are particularly important to long-term economic viability.
As discussed elsewhere in this Plan, public water service is generally available throughout the Township but not all homes are connected; public sewer service is not available in some areas of the Township, but is unnecessary given the success of the SMP.
Oakbourne Park, 2018
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-12
Mixed Use Areas
Mixed Use Areas have beenare generally mapped in areas that include existing hubs of commercial development along major corridors, notably Routes 3 and 202. These include shopping centers and office parks, institutional uses, and/or under-developed or transitional commercial areasproperties positioned to benefit from coordinated redevelopment.
The key future land use issue objective is promotion to promote of thoughtful in-fill development and redevelopment that provides for a complementary mix of uses and design standards consistent withthat are complementary to overall community development objectivesgoals.
Key issues to provide for such complementary development include:
• Redevelopment Opportunities
Redevelopment and in-fill development can be used to enhance a sense of place, property values and community amenities. Redevelopment and new in- fill development also might be incentivized with higher intensity and greater mixed-use provisions, subject to meeting a variety of community objectives.
• Mixed Uses
While Mixed Use Areas are primarily located along established commercial corridors, the Township recognizes that certain strategically located properties — particularly those situated at major roadway intersections — may be appropriate for inclusion within the Mixed Use designation.
The Township should carefully consider a broad range of diverse commercial, office, service, multi-family residential and even institutional uses that may be compatible, subject to appropriate design standards, and sharing infrastructure and stormwater management needs, including the incorporation of residential uses on upper floors above non-residential uses. Zoning and land development provisions which may hamper mixed-use development should be amended.
• Parking Requirements
Parking requirements tend to disproportionately influence land use, impervious cover and stormwater requirements, forcing even compatible uses farther apart and deterring non- motor vehicular interconnection. Shared parking among compatible uses and structured parking, where development intensity makes it economically viable, should be incorporated into redevelopment opportunities.
• Interconnections
Establish design standards, including proximity of new structures to others and to existing developed properties, placement of parking areas and infrastructure, etc., to facilitate pedestrian and bicycle interconnections throughout the mixed-use areas. Provide incentives and/or require connections where practicable to adjacent neighborhoods and open spaces.
Open Spaces
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-13
Open Spaces are indicated on the Future Land Use Map as a land use category. They also are studied in greater detail as a separate component of this Plan, “Open Space, Parks, Recreation and Trails,” with specific discussion of key issues and recommendations.
As a land use, the Township has included as open spaces remnant and historically significant agricultural lands, municipal parks and open spaces, homeowners’ association open spaces, and schools. While schools also include a significant building footprint, they often may be available for recreational or other community purposes. Key issues for open space as a land use include:
• Permanency of Open Space
The Township should regularly evaluate the conservation status of open spaces and promote the establishment of conservation easements to formalize long-term protection of open spaces. The Township should consider an open space referendum to enable specific generation of revenue earmarked toward open space conservation. The Township also should consider establishing conservation easements to guarantee permanence of Township- owned parks, trails and open spaces.
• Economic Viability of Private Open Space
Long-term economic viability of significant privately-owned open spaces should be promoted, especially agricultural and institutional lands, potentially including land use incentives linked to conservation requirements.
• Sustainable Use of Open Space
Open space designated through subdivision plans and Township-owned open spaces are vulnerable to inappropriate use or unsustainable land management practices. Management of such open spaces should be periodically reviewed and sustainable practices promoted.
• Interconnection of Open Spaces
Trail connections between open spaces and adjoining neighborhoods should be extended where feasible.
Trail at Bayard Rustin High School, 2018
Westtown Township Comprehensive Plan Chapter Eleven: Future Land Use and Housing
www.westtownpa.org | 11-14
Greenway Corridors
“Greenway” Corridors are relatively narrow linear corridors of natural resources largely following stream courses throughout the Township. As a land use category, they are not necessarily related to designated open space, but are defined by the presence of constraining natural resources such as wetlands, floodplains, riparian buffers, and adjoining steep slopes concentrated in a linear corridor. All of these resources are discussed in greater detail in the Plan component “Natural Resources.”
Greenway Corridors are largely envisioned for a conservation focus, but because of their linear nature may also be the logical setting for trail interconnections where such access may be negotiated.
A significant percentage of the lands within Greenway Corridors is privately owned. The Greenway Corridor designation does not presuppose ultimate public ownership nor undue regulation of private lands. The designation is intended to draw attention and planning focus to the value of these areas of concentrated natural resources as well as the environmental and recreational value of their linear nature.
Most of the natural resource areas that comprise Greenway Corridors are regulated to constrain or reasonably limit development potential, regardless of ownership; however, some natural resource conservation provisions are limited in their applicability today. Natural resource regulation is discussed further under “Natural Resources.”
Walk in the woods at Oakbourne Park, 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-1
CHAPTER SEVEN: OPEN SPACE, PARKS, RECREATION AND TRAILS
Westtown Township is valued by residents and visitors for its rural features - the working farmlands, woodlands, and parkland nestled amidst the otherwise suburban landscape. However, the Township has been steadily losing these features to development.
Though the Township’s previous Comprehensive Plan recommended several actions regarding land preservation, development has continued. With less than 8% of the Township land left undeveloped, the Township faces some key choices.
The Township adopted an Open Space, Recreation, and Environmental Resources (OSRER) Plan Update in May of 2014. This plan was developed with significant public feedback regarding residents’ views, which clearly indicated the importance of open space conservation, enhancing the park system, and providing opportunities for trails.
This Comprehensive Plan Update incorporates the goals, objectives and strategies of that Plan, reaffirming the findings and further prioritizing the strategies.
This chapter, in addition to providing a brief overview of the OSRER Plan, looks at the following topics:
• Agricultural Lands • Protected Natural Features • Municipal Parks & Open Spaces • Schools • Homeowners Association (HOA) Open Space • Recreation • Trails
Maps pertaining to this chapter are found after page 7-12.
Picnic area at Oakbourne Park, 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-2
Key Issues
Open space resources are also an important element of the local landscape, critically helping to endow the Township with its sense of place and even quality of life. Local planning that integrates and protects open space resources will encourage patterns of development, redevelopment, and neighborhood conservation that enhance Westtown’s sense of place. Based on the more detailed analysis and inventories presented in the background discussion below, key issues regarding open space resources in Westtown are identified here.
Preserve Remaining Open Space
Why Is This Important?
Open spaces that define the character of the Township continue to be lost
In 1990, 45% of the Township was either agricultural or wooded (DVRPC). In 2010, that number was down to 32%, representing a loss of nearly 800 acres.
The development of agricultural and natural woodlands translates into more than additional housing units and traffic. It is an increase in stormwater runoff and loss of opportunities for trails and recreation, as well as alteration to the Township’s character, beloved by many.
Throughout the development of this plan update, Westtown residents have emphasized the importance of consistently
protecting remaining called for greater efforts toward open space preservation.
Pennsylvania Act 153 provides, via referendum, for municipalities to establish dedicated revenuefunding for purchase of interests in open space, whether acquisition of lands in fee simple or through conservation easements:
• Purchase – fee simple acquisition Purchasing land outright provides the Township with full ownership and control, allowing the creation of new parks, trails, and public recreation facilities. While the costliest option, fee simple acquisition offers maximum flexibility for long-term public benefit.While this is the costliest option for the Township, it provides full control of the land and can be the best option for providing new parkland and trails for its residents.
In 2023, Westtown Township voters approved an Act 153 Open Space Referendum, providing the Township with a dedicated source of revenue to acquire land or interests in land for permanent open space preservation. The successful passage of the Act 153 referendum affirms the community’s commitment to preserving Westtown’s natural and agricultural landscapes and provides a mechanism for the Township to proactively acquire and protect key open space parcels in the years ahead. • Conservation Easements A conservation easement allows a private property to remain under private ownership and control, while limiting therestricting certain uses, such as
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-3
residential or commercial development, to those specified in the easement, such as agriculture or trails. Conservation easements are commonly used to preserve agricultural, ecological, or recreational values. farmland and enable the work to continue. Easements are often a lower-cost alternative to fee simple purchase and reduce the Township’s responsibility for property management while ensuring permanent protection of open space.Because the land remains in private ownership, the cost of purchasing the conservation easement is less than the cost of purchasing the property outright, and it spares the Township the need to manage the property.
Currently, four private properties in Westtown are under conservation easements with Natural Lands.
Westtown Township recognizes that, even with significant amount of land already preserved, additional opportunities may arise to expand the Township’s network of protected open space.
Working farmland is particularly vulnerable
Working farms serve many purposes and provide benefits to the community at large including locally grown food, maintenance of scenic views, preservation of historic structures, providing for groundwater recharge, and contributing to the character of the township.
Additionally, agricultural lands demand fewer services from the Township than commercial or residential development,
helping to maintain service levels and expenditures.
The largest remaining open spaces in the Township are actively farmed and under private ownership and in one case are part of a private boarding school. However, as farmers age and new recruits are more difficult to find, the Township should endeavor to build and maintain open lines of communication with these landowners in order to increase the chances of meeting the goals of both parties.
Enhance Connectivity of Open Spaces and Access to Them
Why Is This Important?
Existing open space lacks connectivity and non-motor- vehicular access
Open spaces and natural areas more effectively serve both the human and natural worlds when connected into continuous networks called greenways. Oftentimes, these networks follow a stream corridor or ridgeline, and they allow for wildlife migration, biodiversity, and the creation of trails for transportation and recreation. In Westtown the opportunities to connect existing open spaces and create such greenways are limited and running out.
There is clear demand for safe places to walk or bicycle
The majority of Westtown streets and neighborhoods do not have sidewalks or trails, making it difficult to access the many parks, schools, and other destinations in the Township without the use of a car. Better access to recreation opportunities and/or
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-4
new parkland is particularly absent in the eastern and western most areas of the Township.
The demand for more opportunities to walk, whether for recreation and exercise, or for daily tasks, is increasing across the County and the nation. In the Township, the results of the online survey and community forums, demonstrate a strong desire by many to create such opportunities going forward.
Open space at Oakbourne Park, 2018
Sidewalk along Skiles Blvd., 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-5
Enhance Recreational Value
Why Is This Important?
The OSRER Plan concluded that the Township’s existing park system provides a solid foundation for recreation, but could better serve the community and strengthen Westtown’s green image if planned and managed in a coordinated manner, with a single vision in mind.
Oakbourne Park, for example, is considered a community gem. A master plan has been developed in 2021 that defined a new vision for Oakbourne Park as a premier historic year-round recreation destination that welcomes and captivates residents and visitors with its heritage, beauty, and vast recreation opportunities. Following the adoption of the plan, the Township completed revitalization of the Park’s Athletic Core, upgrading the well-used but tired facilities to more playable and comfortable for all visitors. A year later, much needed improvements to the Oakbourne Mansion Core parking lot has been completed to provide greater capacity and to enhance visitor’s experience. Further implementation of master plan requires additional investments.
for this specific park and for all Township parks could ensure that community needs, including trails, are planned for and met through planned capital expenditures and careful management by township staff. Crebilly Preserve, a 204-acre historic farm property, was acquired in 2024 after seven years of collaborative public-private efforts to protect the land from development. These efforts included the passage of the Open Space Referendum by a majority vote in 2023, along with significant support from
state, county, and private funding sources. Since its acquisition, the Township has completed the demolition of obsolete buildings and the decommissioning of septic systems and wells to ensure a hazard-free site. In addition, the legacy agricultural fields have been transitioned to meadow through a partnership with a local farmer. Now that the land is permanently protected, the Township must provide for public access. Before improvements can be constructed and a long-term stewardship strategy implemented, a master plan is needed to reaffirm the community’s vision, satisfy funding conditions, and to prioritize future capital expenditures.
In 2025, the Township hired a full-time Program Coordinator to strengthen and expand community programming. While the Township is not large enough to justify a full-time Parks and Recreation Department, having a dedicated point of contact allows for more consistent planning, communication, and promotion of Township-sponsored events. This new role provides structure and continuity, ensuring that programs are organized, well- advertised, and responsive to community needs and interests. parks and recreation planning could be more formalized with a
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-6
single point of contact who offers more consistent promotion, communication, as well as plans and executes consistent township sponsored events.
Continue to expandExpanded recreational programming is desirable to meet public needs
Newly provided programs and Current recreational offerings are heavily focused on a variety of activities suitable for residents of all ages and abilities. The Westtown Township Community Calendar provides residents with an easy way to stay informed about upcoming recreational programs and community events. It serves as a central hub for Township activities and opportunities to get involved.youth sports, with current sports fields at capacity and demand on the rise. However, such facilitiesprogramming should always be balanced with the recreational opportunities and demands from other all segments of the current and future population, particularly older residents.
Soccer fields at Oakbourne Park, 2018
Tennis Courts at Oakbourne Park, 2018
Fire circle at Oakbourne Park, 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-7
Future Action and Policy Considerations
• Consider initiation of a referendum allowing Township residents to vote on whether to establish a dedicated tax for open space protection for remaining large parcels that may become available for sale, including Crebilly Farm.
• Maintain strong relationships with large landowners including Westtown School, and the Stratton family , and the Stokes family in order to actively assist in keeping those open spaces undeveloped and actively farmed.
• Evaluate the Township zoning ordinance for potential barriers versus incentives for viable agricultural related businesses. • Seek and support collaborative efforts with other agencies, conservation organizations, and owners of valuable open spaces to achieve permanent land conservation.
• Develop best management practices for land stewardship of Township- owned open spaces, to improve the ecological performance of these resources and to educate and inspire private land owners
• Complete Implement Oakbourne Park Master Planmaster park plans for all
Township parks, including improvements and maintenance and management plans strategies for all structures and facilities.
• Evaluate opportunities to expand park, recreation and trail facilities in the underserved areas of the Township, specifically (west of Route 202 and east of Route 352).
• Develop and implement Crebilly Preserve Master Park, including maintenance and stewardship plan. In the event that development may occur at Crebilly Farm, ensure the land development plan includes trails and unconstrained lands suitable for active and/or passive recreation. In the event that Crebilly Farm can be protected as open space through acquisition or conservation easements, the Township should develop a plan for trails and other suitable amenities throughout the site to increase resident access to passive recreation. Access to Crebilly Farm should prioritize existing trail networks and linking nearby residential neighborhoods via non-motorized trails or paths.
• Evaluate ability to allocate a greater percentage of the Township budget for parks and recreation and leverage this base amount with other funding sources (fees, grants, gifts, sponsorships, etc.). • Evaluate the ability of existing Township staffing and appointed Commissions and Committees to support the goals and objectives of the OSRER Plan.
Preserve and enhance open space and recreational resources
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-8
Background Discussion
Existing Open Space Inventory
Agricultural Lands
The largest tracts of remaining undeveloped land in the Township are the iconic 322-acre Crebilly Farm west of Route 202 and north of Route 926, the lands north and south of the Westtown School, which are owned by the School, the Stokes Farm east of Shiloh Road, and the Stratton Farm in the south- eastern corner of the Township. Most of these lands are in agricultural use, with some woodland and other natural features.
Agricultural Lands along S. Concord Rd, 2018
Protected Natural Features
These include woodlands, hillsides, and surface waters that provide for stormwater recharge, flood control, passive recreation, and wildlife habitat. The developed nature of the Township makes these remaining resources all the more critical to preserve.
Natural area restoration is also needed to alleviate flooding, reduce erosion, and create better environments for people as
well as nature. Natural resources are mapped and discussed in more detail in the Natural Resources Section.
Municipal Parks and Open Space
Westtown Township owns and maintains its multiple parks and open spaces, containing approximately 318 522 acres as indicated on the Parks and Open Spaces Map. The largest passive recreation park is the 204 90+ acre Oakbourne ParkCrebilly Preserve, and the largest active park is the 90+ acre Oakbourne Park, which serves provides various facilities for the entire community.
Open spaces within developments, such as the Plum Run Open Space along Spring Line Drive, provide residents with the opportunity to walk out their front doors and enjoy nature. Others, such as the Westwood Drive Open Space, are more hidden and difficult to access, making them useful only to a few residents.
Some of the parcels, such as the Cobblefield Open Space, are more utilitarian. Cobblefield holds a sewage pump station, while many others contain stormwater management facilities.
Playground at Tyson Park, 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-9
Schools
There are five public schools and three private schools that call Westtown “home.” Each of these have their own land and recreational facilities, which may be used by the public to varying degrees, but nonetheless contribute to the overall network of green spaces in Westtown Township.
Westtown School, the largest landowner in the Township, owns over 600 acres of land, containing myriad recreational fields and facilities, in addition to its working farmland.
Five additional schools, owned and operated by the West Chester Area School District, contain a total of 255 acres of land throughout the Township. There also are two parochial schools in the Township: St. Maximilian Kolbe and Saints Simon and Jude; these have limited open space and recreational facilities.
Homeowners Association (HOA) Open Space
Westtown Township has several HOAs, which collectively own approximately 70 acres of land. These HOA open spaces vary in size and are indicated on the Parks and Open Spaces Map.
2014 Open Space, Recreation, and Environmental Resources Plan Update
The Township adopted an Open Space, Recreation, and Environmental Resources (OSRER) Plan Update in May of 2014. This plan was developed with significant public feedback regarding residents’ views, one of which was the clear indication of the importance of open space preservation.
The OSRER Plan set forth three goals:
1. Make Westtown “forever green” by preserving natural, historic, and scenic places.
Objectives for this goal focus on enhancing water quality in the Chester and Goose Creeks, preserving remaining open spaces, and managing open spaces to enhance their health and environmental benefits. 2. Foster fitness, wellness, and play with programs and facilities for Westtown Township residents.
Objectives here hone in on making the best use of park facilities through master planning, engaging residents in park planning in order to enhance opportunities and health, and trail planning.
3. Allocate financial and human resources that support the implementation of the plan.
Objectives here focus on developing partnerships, engaging residents, recruiting volunteers, and building staff.
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-10
Further, the plan provided the following priorities for which open space lands to protect:
“Large” Parcels
Saving the last large, remaining tracts, is a priority as they present the last opportunities to conserve these tracts from being subdivided into house lots and streets. Given the developed nature of the Township, five (5) acres constitutes a “large” parcel. The Protected & Unprotected Open Space Map indicates permanently protected lands and undeveloped lands over five acres in area.
Specifically, the preservation of Crebilly Farm is a top priority. There are currently no farmland or open space protections on this property. The Township should seek to preserve this land through fee simple acquisition or conservation easements, as appropriate, to retain this land as open space and for passive recreation.
Connections
In public forums, meetings with stakeholder groups and in Open Space Task Force discussions, the importance of linking open space – both natural areas and trails, became evident. Therefore, parcels that connect to an existing open space system are of high priority for conservation.
Financial Leverage
The high cost of real estate in Westtown Township means that public funds could play a significant role in open space preservation.
Projects that involve private and non-profit partners who bring funding to the project; projects that can leverage County and State grant programs; and projects where the landowner is making a donation should be elevated to a high priority.
Green Infrastructure
”Green Infrastructure” uses natural processes to replace some, but not all, mechanical, chemical, or structural components.
For Westtown, green infrastructure could include tree planting, and restoration of degraded forests and stream banks. Such greening improves water quality, reduces stormwater runoff impacts such as flooding, and improves habitat for plants and animals. In the process, green infrastructure contributes to the quality of life for residents.
Making green infrastructure a priority could also be a design approach in new developments, such as adding rain gardens to commercial parking lots and using development open space for stormwater infiltration.
Bioswale at Tyson Park, 2015
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-11
Township Parks, Recreation and Trails
While Township residents have access to many public, semi-public, and private park lands and recreation facilities within the region, this section examines parks and recreation within the Township.
The table below summarizes the Township’s five six (56) parks totaling 118 322 acres with their associated service areas and amenities, as recommended by the National Park and Recreation Association (NPRA).
The NPRA service area recommendation is a guideline intended to gauge the geographic area served by each type of park, as well as the adequacy of those services in relation to the size of the population. Overlaying the service areas for the individual parks highlights potential gaps in the system, and thus residents who may not have equal opportunity to recreational services in the township.
Within the OSRER Plan, each park is assessed individually and a list of recommended improvements as well as
maintenance needs is provided. Overall, the assessment observes the following:
• When analyzing park locations, it is notable that all majority of the parks are located on the western area of the townshipbetween Route 202 and Route 352, leaving the eastern and western most areas of the township underserved.
The lack of facilities in these areas is exacerbated by the difficult access to existing facilities in the rest of the township. As discussed in other sections of this Plan, Route 202 is impassible unless riding in a vehicle. Crossing Route 352 on foot is less intimidating than Route 202, while the absence of sidewalks and shoulders along Route 926 make even a short distance on foot challenging.
• Several Eexisting parks lack the cohesive identity that could come from signage, branding, and complimentary equipment and amenities.
Unified planning of the parks as a system would better serve township residents, creating a sum greater than
Park Name Acres Park Type Service Area Uses
Crebilly Preserve 204 Community Park Passive recreation
Oakbourne 90 Community Park 3 miles Active and passive recreation
Pennwood 16.5 Neighborhood Park ½ mile Passive recreation
Tyson 5 Mini Park ¼ mile Active and passive recreation
Edgewood Chase 3.6 Mini Park ¼ mile Passive recreation
Larchbourne 2 Neighborhood Park ½ mile Active and passive recreation
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-12
its parts, and thus strengthening the township’s “forever green” image.
• Gaudenzia House, a privately owned facility that helps people affected by chemical dependency, mental illness and related conditions, is located in the center of Oakbourne Park. In the long run, this property should be acquired if it comes up for sale. In the near term, additional landscape buffering and possibly fencing could be used to better signal that it is a separate property.
Recreation
Active and passive recreation opportunities are important aspects of community life. As is common in Chester County, the Township’s primary role in regards to recreation is to:
• Facilitate recreation by enhancing facilities at existing parks;
• Support the efforts of other, third party organizations, who coordinate scheduled programs for a wide variety of sporting activities; and
• Promote Park and Recreation events through the Township newsletter, website, and social media.
There are six main sports organizations that practice and play their games in Township parks, although none are organized in Westtown. When polled, all of these organizations reported increasing participation, lack of facilities, or overused fields. Additional facilities and programming
are provided to specific groups through WCASD and Westtown School.
As the existing fields and facilities are currently booked, there are some options for non-league play. The multipurpose field at Oakbourne Park provides opportunities for non-league play, such as kickball, ultimate Frisbee, and flag football.
As the population ages, balancing the focus on youth sports programming with local options that better serve older residents, such as the Chester County Senior Centers, need to be considered.
When the residents of Westtown were surveyed during the OSRER Plan as well as
the Comprehensive Plan, the top recreational interests cited were walking, biking, experiencing nature, and fitness and
wellness, as well as the desire for annual
township sponsored events such as Westtown Day and Summer Movie Nights.
Oakbourne Park entrance sign, 2018
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-13
Trails
Many of the Township’s open spaces feature trails of varying size, both existing and proposed. These are indicated on the Trails Map following Chapter Nine.
The most diverse is at Oakbourne Park where visitors can enjoy a trail system that connects active recreation areas, the historic Oakbourne Mansion, the playground, community garden, and the earthen trails in the natural areas.
At Bayard Rustin High School and adjacent Rustin Walk development, paved paths run along Shiloh Road and access the area with an assortment of routes and loops.
At the Westtown School, a combination of paved driveways, service roads and trails connect to unpaved, mowed grass trails, which weave through much of the area.
However, accessing these existing trail systems still requires arrival by car for all but those located immediately adjacent to the sites. The vast majority of streets in the township do not have sidewalks, while some have sidewalks on one side. The major roads, including South New Street, and Routes 202, 926 and 352, do not have pedestrian amenities. Without trails or sidewalks, pedestrians use the shoulders or walk in the roads, presenting the potential for conflicts with vehicles.
According to the OSRER Plan, the township parks provide the best and earliest opportunity for additional trails, as well as the potential to connect these trails on a greater scale.
At Oakbourne Park, trails could be provided along East Pleasant Grove Road, giving pedestrians and cyclists a safer, off road option. Where trails already exist in close proximity to the roads, additional spurs could be constructed to connect to the roads, allowing people to walk from the roads to the main trails.
Trail at Oakbourne Park, 2018
Community gathers for “Westtown Day” at
Oakbourne Park, 2017
Westtown Township Comprehensive Plan Chapter Seven: Open Space, Parks, Recreation and Trails
www.westtownpa.org | 7-14
(THIS PAGE INTENTIONALLY LEFT BLANK)