Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP PLANNING COMMISSION
East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380 Special Meeting Agenda Tuesday, July 14, 2026, at 7:00 PM
Planning Commission Members: John Stipe, Chairman Dan Truitt, Vice Chairman Daniel H. Daley Ernest Harkness William Kaufman Michael Koza Karen Martynick Larry Massaro, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison Agenda Items:
1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Chairman will ask if anyone is going to record the meeting. 3. Public Comment on Non-Agenda Items 4. Approval of Minutes a. June 23, 2026 5. Old Business a. Zoning Ordinance Amendment Draft- AI Data Centers 6. Liaison Reports 7. Correspondence 8. Announcements 9. Next Meeting – Tuesday, July 28, 2026, at 7:00 PM 10. Adjournment Bold Items indicate new information to review or discuss.
PC 6-23-26 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION MEETING 3 June 23, 2026 4 5 The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, 6 June 23, 2026 at 7:00 pm in the Township Building. 7 8 Members present are highlighted: 9 John Stipe – Chairman (Via Zoom) 10 Dan Truitt, Vice Chairman 11 Dan Daley 12 Ernest Harkness 13 Willian Kaufman 14 Michael Koza 15 Karen Martynick 16 17 Also present was: 18 Kelly A. Krause, Zoning Officer 19 Larry Massaro , BOS Liaison, Township Supervisor 20 Ann Duffield, Township Supervisor 21 22 23 COMMON ACRONYMS: 24 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 25 BC – Brandywine Conservancy CVS – Community Visioning Session 26 CB – Conservancy Board SWM – Storm Water Management 27 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 28 29 FORMAL MEETING – 7 p.m. 30 1. Dan T. called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for 31 a moment of silence to remember our first responders and military. 32 2. Dan T. asked if anyone would be recording the meeting and if there were any public 33 comments about non-agenda items. There was no response. 34 3. The tracking log was checked and a need for a workshop meeting will be discussed later. 35 4. The minutes of the May 26, 2026 meeting were approved. 36 37 38 CHAIRMAN’S REPORT – 39 None 40 41 42 ACKNOWLEDGE RECEIPT OF NEW APPLICATIONS (INITIAL SUBMISSION)- 43 None 44 45 46 OLD BUSINESS – 47 1. Review 949 & 951 Cornwallis Drive – Prelim/final Lot Line Change Plan 48 Nancy Fay, property owner, commented that information was received from Pennoni. Ernest commented 49 that the Pennoni letter mentioned the distance to the street line. Kelly explained that it does not meet the 50 code. Dan D. showed Ernest where it was on the plan. John mentioned that a stormwater management 51 plan will have to be provided. Dan D. asked Mrs. Fay about the chicken coop. She set it up in 1992. 52
PC 6-23-26 draft 2
Ernest made a motion to forward the Preliminary/Final plan to the Board of Supervisors recommending 1 approval conditioned on the stipulations in the Pennoni letter dated June 6, 2026. Dan T. seconded the 2 motion. The motion passed unanimously. 3 Geoffery Fay asked if the original owner purchased sewer add-ons. Kelly commented that there is 4 currently only 1 connection. Mr. Fay mentioned that there are a lot of small businesses on the street and 5 will a traffic study be done. Kelly suggested that he pettion the BOS to have a study done. 6 7 2. Zoning Ordinance Amendment Draft – AI Data Centers. 8 The revised draft of the Amendment was reviewed. Karen provided a copy of the West Bradford 9 ordinance. She mentioned that noise and vibration are major concerns. The other issue is setbacks. 10 Bill agrees that these are concerns. He feels the wording in the West Bradford sample is good. 11 Ernest feels some things should be added. One section 8A from Karen’s sample should be added. 12 He did some research on vibrations and feels the following should be considered: 13 • Add standard for blasting 14 • Require a noise and vibration study 15 • The draft from the County ordinance on water uses for cooling should be used. 16 • A letter from the water supplier should be required 17 Kelly reviewed what he suggested. 18 Dan D. mentioned the West Bradford sample included sound and vibration studies to be supplied by the 19 applicant using a qualified professional in 180 days or sooner if there are complaints. Six months is too 20 long. 21 John feels post construction vibration/noise study is needed. 22 Dan T. likes the wording in West Bradford’s sample. 23 The PC members will email their suggestions to Kelly. It was decided to hold a Workshop on July 14th 24 and AI Data Centers will be the only discussion. 25 Setbacks were discussed. 250-300 feet was considered. 26 27 28 NEW BUSINESS 29 1. Discuss letter to Senator Committa in opposition of House Bill 2186 to mandate Accessory Dwelling 30 Units (ADUs) as a by-right accessory use. 31 Karen suggested sending the letter to all of the other senators in Chester County. Dan D. does not object 32 to this because it supplies housing to more people. John will sign the letter. 33 Dan T. moved to send the letter as is. Ernest seconded the motion. The motion passed unanimously. 34 Karen suggested that the BOS send a letter too. 35 36 2. Review 971 Cornwallis Drive 3 lot Subdivision, Prelim/Final Plan 37 Janet Huggins, 968 Cornwallis Drive, asked what it would take to get public water. 38 There was no representative for the property. Dan D. explained what would normally happen. He 39 discussed the plan. The Emergency Access Drive was discussed. Kelly commented that the wetlands 40 plan was received today. Dan spoke about the grading of the lots and its impact on stormwater 41 management. John and Bill would like to walk the property. This was tabled until the next meeting. 42 43 44 LIAISON REPORTS 45 1. Board of Supervisors - Larry mentioned that there was some feedback from the BOS about the Data 46 Center Ordinance. He sent them an email explaining what is being done. He mentioned that one of Ann 47 Duffield’s neighbors is an IT guy and wrote a piece about Data Centers for Dumbies. When Larry was 48 running for office last year, he had 4 conversations with residents about ADUs. We should look at our 49 ordinance to see if it is too restrictive for certain families. 50 51 52 53
PC 6-23-26 draft 3
1 ANY OTHER MATTER 2 None 3 4 CORRESPONDENCE 5 None 6 7 ADJOURNMENT 8 There being no further business, Dan T. made a motion to adjourn the meeting. Karen seconded the 9 motion. The meeting was adjourned at 8:30 pm. 10 The next regular meeting will be held on Tuesday July 28, 2026 at 7 p.m. A Workshop will be held on 11 Tuesday, July 14, 2026 at 7 p.m. 12 13 Respectfully submitted, 14 15 16 17 18 Ruth Kiefer, Recording Secretary 19
Page 1 of 10
§ 240-6 Definitions; word usage.
B. Definitions. When used in this chapter, the following words, terms and phrases shall have the following meanings, unless expressly stated otherwise or unless the context clearly indicates otherwise.
CLOSED-LOOP COOLING SYSTEM – A cooling system that circulates a single contained coolant or fluid that is not discharged to the environment as a normal part of operation (may include plate-and-frame heat exchangers, rear-door heat exchangers, immersion, or other sealed liquid cooling approaches).
DATA CENTER – A facility used primarily for the storage, management, processing, and transmission of digital data, which houses computer or network equipment, systems, servers, appliances and other associated components related to digital data operations.
The facility may also include air handlers, power generators, water cooling and storage facilities, utility substations, and other associated utility infrastructure to support sustained operations at the Data Center.
DATA CENTER ACCESSORY USE – Ancillary uses or structures secondary and incidental to a Data Center use, including but not limited to: administrative, logistical, fiber optic, storage, and security buildings or structures; sources of electrical power such as generators used to provide temporary power when the main source of power is interrupted; electrical substations; utility lines, domestic and non-contact cooling water and wastewater treatment facilities; water holding facilities; pump stations; water towers; environmental controls (air conditioning or cooling towers; fire suppression, and related equipment), and security features, provided such Data Center Accessory Uses/structures are located on the same tract or assemblage of adjacent parcels developed as a unified development with a Data Center.
DATA CENTER CAMPUS – A data center campus includes all of the structures and real estate owned, controlled, leased or otherwise occupied primarily for the use and purpose as Data Center(s), including: (i) Data Center(s); (ii) Data Center Accessory Uses; and (iii) all other systems, equipment, piping, conduit and other ancillary equipment, structures, and other appurtenances that are incidental to and/or needed for the construction, support, operation, repair, maintenance, and/or protection of the Data Center(s) and/or the data center campus.
ENERGY GENERATION SYSTEM – Any energy generation system designed or used to supply power directly to a Data Center during normal operations, including solar, wind, fossil fuel, fuel cells, or nuclear energy generating systems.
SENSITIVE RECEPTOR – Buildings used for residences (including institutional uses with a residential component), schools, daycare centers, preschools, hospitals, community centers, and similar institutional uses.
Page 2 of 10
§ 240-19 I-1 Light Industrial District.
C. Permitted conditional uses. The following principal uses may be permitted in the I-1 District in accordance with § 240-31:
(34) Data Centers in accordance with § 240-31C(3)(xx).
(34) (35) Any lawful use not otherwise permitted in the Township.
§ 240-31 Conditional uses; additional standards for specific principal uses.
C. Standards for conditional uses and special exception uses and certain permitted-by-right uses.
(3) Specific standards for specific principal uses (including but not limited to conditional uses and special exception uses). Each of the following principal uses shall meet the following additional specific standards. In addition, each conditional or special exception use shall meet the general standards in Subsection C(2). The following specific standards shall be met for the applicable use, unless a more restrictive standard is established by another section of this chapter:
(xx) Data Centers
[1] All Data Center and Data Center Accessory Use buildings shall be set back a minimum of
300 feet from any residentially zoned district and from the property boundary of all Sensitive Receptor uses.
[2] The owner of the data center shall provide the Township with an emergency liaison that
may be reached 24 hours a day, seven days a week, in the event of an emergency.
[3] The owner of the data center shall submit an emergency response plan to the Township
Fire Marshal for review and approval, which shall be implemented and followed in the event of an emergency at the facility. The emergency response plan shall include coordination with local emergency responders, as applicable.
[4] The data center facility and accessory buildings shall be fully screened in accordance with
the criteria set forth in § 240-27C(3).
[5] In addition to the Supplementary studies as required pursuant to Chapter 205, Subdivision
and Land Development, an applicant shall submit the following:
[a] A noise and vibration study as described in the Noise and Vibration section (XXX).
[b] No use shall produce any heat perceptible at or beyond the lot boundaries, as
demonstrated by qualified professional analysis conducted in accordance with applicable state and federal standards.
[c] No use shall emit potentially harmful radiation in excess of levels permitted under
applicable state and federal standards, as demonstrated by qualified professional analysis.
[d] The applicant shall provide documentation from the applicable electric service
provider certifying that that the necessary capacity is available and that electric
Page 3 of 10
service provider will serve the Data Center. Known impacts on electric availability for other uses directly attributable to the Data Center project shall be noted. An analysis in accordance with applicable utility, state, and federal standards, shall show Data Center operation shall not cause electrical interference or fluctuations in line voltage on and off the operating premises.
[e] A Pipeline awareness study in accordance with § 205-40.1, with review and
recommendation made by the East Goshen Township Pipeline Task Force.
[f] Any system designed for cooling and operation of the facility (electricity, water, or
other means) shall be demonstrated, through qualified professional analysis and in accordance with applicable state and federal standards, to be adequate and to not negatively impact the surrounding region.
[g] A Decommissioning Plan prepared by a qualified professional shall be submitted.
The plan shall outline the procedures for safe shutdown, removal of equipment, disposal or recycling of materials, and site restoration. The plan shall address at a minimum the following:
[i] Owner shall submit a notification of closure if operations are permanently
ceased.
[ii] Decommissioning shall begin within 1 year of cessation of data center
operations, or upon notice of abandonment by the operator, whichever occurs first. An extension of 1 year may be granted by the Board of Supervisors if the property owner can demonstrate that they are actively marketing the site for a compatible replacement use. Decommissioning shall be completed within 18 months thereafter, unless granted an extended for good cause.
[iii] All above-ground structures, equipment, and accessory facilities shall be
removed.
[iv] Hazardous materials, including batteries, fuel, or refrigerants, shall be
disposed of in compliance with state and federal law.
[v] Disturbed soils shall be stabilized and re-vegetated.
[vi] Any utility connections shall be safely disconnected and capped.
[vii] The site shall be restored to a condition compatible with surrounding land
uses or consistent with the most restrictive adjacent zoning district.
[6] Data Centers shall be designed and constructed to meet the current USGBC LEED BD+C:
Data Centers rating system, or equivalent design standard, as approved by the municipal engineer.
[7] Energy Sources, Power Lines, and Co-Location of Energy Generation Systems.
[a] Any energy generation system designed or used to supply power directly to a Data
Center during normal operations, including solar, wind, fossil fuel, fuel cells, or
Page 4 of 10
nuclear energy generating systems, shall not be considered part of the Data Center use but shall be subject to existing municipal or utility regulations. Such systems shall be considered a separate principal use and shall be approved according to all applicable state and federal regulations along with municipal zoning regulations applicable to such use. The applicant shall select, design, and locate the energy generation systems to limit noise, emissions, and visual impacts to adjacent and nearby uses as much as possible. Data center principal buildings shall be located between energy generation systems and residential districts or any other sensitive receptors.
[b] Electric Utility Substations on the same property as the Data Center they serve shall
be located on the side or rear of a Data Center principal building so they are screened from public view and shall not be located in a required front yard. On-site substations do not require a buffer or screening between the Data Center Principal Building and the substation.
[c] Data Center electric utility substations visible from an arterial roadway shall include
a combination of year-round opaque landscaping and screening walls to minimize visual impact.
[d] Burying power lines serving the property is strongly encouraged. On-site power lines
of 34.5 kV and below shall be buried.
[e] Proposed substations on a parcel that abuts a zoning district boundary other than
industrial, and/or a boundary with a property with a sensitive receptor shall be set back a minimum of 300 feet from the property line. If abutting both another industrial-zoned parcel and use, substations shall meet the requirements for accessory uses in the underlying zoning district.
[8] Backup Power
[a] Diesel generators shall meet the emission standards of the U.S. Environmental
Protection Agency for Backup Emergency Deisel Generators.
[b] Diesel generators shall undergo annual testing, and reports shall be provided to the
municipality to ensure that data center equipment is performing as designed and that emissions from the data center do not exceed permitted limits.
[c] Emergency energy generation that uses diesel, gasoline, or another fossil fuel shall
be used only at the following times:
[i] When the primary source of energy is not available due to an emergency
outage.
[ii] During routine maintenance, or readiness testing for a short duration of time
and capped at 100 hours per year.
[iii] Routine maintenance testing of back-up fossil fuel-powered generators is
restricted to the hours of 9 am through 3 pm Monday through Friday.
[d] Use for peak shaving or supplying power to the grid is prohibited.
Page 5 of 10
[9] Water Usage
[a] No principal use on a data center site shall use private groundwater wells or direct
withdrawals from surface watercourses as its primary source of water for cooling purposes if a public water source is available.
[b] Data centers shall be designed to include a closed-loop water circulation system
to cool data center processing equipment. An applicant may propose an alternative cooling system that can be demonstrated to use less water and energy than closed- loop systems to the satisfaction of the municipal engineer.
[c] If the proposed source is from a public system, the applicant shall submit certified
documentation that the public authority has the capacity to supply the water needed.
[d] If the data center will utilize nonpublic water sources, the applicant shall provide a
water feasibility study, prepared by a qualified professional. The purpose of the water feasibility study is to determine if an adequate supply of water is present to support the proposed data center's water use and to evaluate the potential adverse effects on the quantity and quality of existing wells or nearby surface waters.
The water feasibility study shall include, at minimum, the following information:
[i] Calculations of the projected water needs, including seasonal fluctuations.
[ii] A geologic map of the proposed project area within a radius of at least one
mile from the site property boundary.
[iii] The location of all existing and proposed wells within 1,000 feet of the site
property boundary with a notation of the capacity of all high-yield wells.
[iv] The location of all surface waters within 1,000 feet of the site property
boundary and all known point sources of pollution.
[v] A determination of the long-term safe yield of the water source.
[vi] A determination that the proposed water supply system poses no adverse
impacts on the quantity and quality of water in nearby wells, streams, and the groundwater table.
[vii] Identification of how water will be recycled, treated, or released into
surrounding water bodies.
[viii] A statement of the qualifications and the signature(s) of the person(s)
preparing the study.
[e] No approvals shall be granted until all required state and regional permits have been
obtained (i.e., PADEP, SRBS, DRBC).
[f] The applicant shall provide a drought response plan to demonstrate compliance
with state, water supplier, and local drought declaration requirements.
[g] Wastewater disposal analysis:
Page 6 of 10
[i] The applicant shall submit an analysis of wastewater disposal needs to
either a public sewer system or private system, indicating the quantity of wastewater generation expected. Wastewater shall include sewage and water discharged as part of the data center's HVAC system.
[ii] Any untreated wastewater generated is prohibited to be discharged to
stormwater systems or surface waters.
[iii] If wastewater will be conveyed and/or treated by a public system, the
applicant shall submit documentation certified by the public authority that the public authority can support the conveyance and treatment needed.
[iv] If the data center is to rely upon a private system of wastewater disposal, a
wastewater feasibility study shall be required. The purpose of the study is to determine if there is an adequate capacity to dispose of wastewater and that the disposal technique does not pose adverse impacts on surrounding water bodies. A wastewater feasibility study shall include the following information at a minimum:
[A] Calculations of the projected wastewater generation including the
sources of wastewater.
[B] A geologic map of the area with a radius of at least one mile from the
site property boundary.
[C] The location of all existing and proposed wells within 1,000 feet of
the property boundary, with reference to the capacity of all high- yield wells.
[D] The location of all surface waters within 1,000 feet of the property
boundary and all known point sources of pollution.
[E] Identification of the process by which water will be recycled or
released into surrounding water bodies.
[F] A determination that the proposed wastewater disposal system has
no adverse impact on the quantity and quality of water in nearby wells, surface waters, and the groundwater table.
[G] A statement of the qualifications and the signature(s) of the
person(s) preparing the study.
[10] Noise and Vibration.
[a] The applicant shall submit a pre-construction noise and vibration study with the
conditional use application prepared and sealed by a qualified professional. Such qualified professional shall be an engineer licensed in the Commonwealth of Pennsylvania or other environmental or technical professional with demonstrated education, training and experience in acoustical noise or vibration analysis applicable to the scope of work being performed (defined herein as "Qualified
Page 7 of 10
Professional") to include the predicted noise and vibration levels from the operation of the Data Center.
[b] Simultaneous Operation Assumption. All noise evaluations, studies, modeling, and
compliance determinations shall assume the concurrent operation of all generators, cooling systems, mechanical equipment, and other noise-producing devices operating at maximum rated capacity, unless a more restrictive operating condition is required by approval.
[c] Within 90 days following issuance of a use and occupancy certificate and
commencement of operations at the Data Center, the applicant shall submit to the Township an as-built post-construction noise and vibration study. The study shall:
[i] Be conducted by a Qualified Professional using applicable ANSI standards
and generally accepted criteria.
[ii] Demonstrate compliance with all applicable noise regulations set forth in the
Data Center Noise Standards Tables at the end of this section. Compliance shall be demonstrated using objective sound level limits expressed in A‑weighted decibels (dBA), measured and evaluated in accordance with standardized methodologies acceptable to the Township.
[iii] Include sound measurements taken at all property lines.
[iv] Include measurements taken during normal operations, peak cooling load,
and during operation of emergency generators under load.
[v] Address low‑frequency noise impacts, including compliance with
applicable decibels (dBC) limits set forth in the Data Center Noise Standards Tables.
[vi] Vibration Standards to be used in the study. Vibration shall be evaluated
using three distinct criteria:
[A] Building Damage: Ground vibration shall not exceed 0.2 to 0.5
inches per second peak particle velocity (PPV), measured in accordance with USBM RI 8507 or successor standard; and,
[B] Human Perception: Vibration levels shall not exceed 65 VdB,
measured in accordance with ISO 2631‑1 or successor standard.
[C] Vibration at nearest Residential Receptor Limit shall use standard
ISO 2631-2 / FTA and not to exceed 72 Vd(B).
[vii] Identify all measurement locations, instrumentation used, calibration
documentation, testing methodology, operational conditions during testing, and meteorological conditions.
[viii] The timing of the post construction noise and vibration study shall not
preclude enforcement by the Township at any time upon identification of a violation. The applicant shall provide reasonable access to monitoring data,
Page 8 of 10
equipment specifications, and operating conditions to the Township Engineer, designee or other consultant acting on behalf of the Township.
[d] If the post construction study demonstrates non-compliance with any applicable
noise or vibration standard, the applicant shall, within 30 days of written notice from the Township, submit a corrective action plan prepared by a Qualified Professional. All violations shall be fully remediated within a timeframe approved by the Township, but in no event later than 90 days following Township notice of non- compliance, unless extended by the Township for good cause shown.
[e] If the pre-construction noise study establishes a baseline sound level in excess of
the maximum sound level permitted under Data Center Noise Standards Tables, the post-construction study shall demonstrate that operations of the proposed use do not increase baseline ambient sound levels. Sound levels within 1 dBA of ambient sound levels will meet this requirement.
[f] Objective Noise Standards. Noise limits shall be established by land use category,
measurement location, time‑of‑day, and averaging period, and shall include provisions for instrumentation and low‑frequency noise evaluation.
[g] The Township may require additional noise and vibration testing upon receipt of
substantiated complaints or following material modification, replacement, or addition of mechanical equipment, cooling systems, generators, or other vibration- generating equipment.
[h] If initial monitoring or complaints indicate a probable violation, the Township may
require interim mitigation measures, which may include operational modifications, equipment limitations, or temporary curtailment of specific noise producing activities until compliance is demonstrated.
[i] Data Center Noise Standards Tables
Data Center Noise Standards Tables
The following tables establish objective noise limits, modeling requirements, and enforcement procedures applicable to Data Center use. These standards shall supersede noise standards set forth in any noise chapters or noise provisions of the Code for Data Centers only.
Table 1: Data Center Noise Limits, Measurement, and Compliance Requirements
Requirement Category Applicable Uses
Applicable Uses Data Centers, including all accessory mechanical equipment, generators, cooling systems, and substations
Measurement Basis A-weighted sound levels (dBA), unless noted otherwise for low- frequency noise
Page 9 of 10
Receptor Locations Measurements and modeling shall be conducted at or beyond the nearest property line
Operating Condition Assumption
All compliance evaluations shall assume simultaneous operation of all generators, cooling equipment, and other noise-producing devices at maximum rated capacity
Table 2: Numeric Noise Limits by Zoning Use
Receiving Land Use Daytime (7:00 AM – 10:00 PM)
Nighttime (10:00 PM – 7:00 AM)
Residential 55 dBA Leq (1-hour) 45 dBA Leq (1-hour)
Mixed-Use / Commercial 60 dBA Leq (1-hour) 50 dBA Leq (1-hour)
Industrial 65 dBA Leq (1-hour) 55 dBA Leq (1-hour)
Short-term tonal or impulsive noise exceeding the above limits by 5 dBA or more shall constitute a violation.
Table 3: Low-Frequency Noise Criteria
Parameter Requirement
Frequency Sensitivity C-weighted sound levels (dBC), capturing enhanced sensitivity to low-frequency noise
Measurement Metric Equivalent continuous sound level (Leq, 1-hour) in dBC
Measurement Locations At the nearest property line
Daytime Limit (7:00 AM – 10:00 PM) 70 dBC Leq (1-hour)
Nighttime Limit (10:00 PM – 7:00 AM) 60 dBC Leq (1-hour)
Tonal / Narrowband Noise
Clearly perceptible low-frequency tonal noise shall require mitigation regardless of overall dBC compliance, as determined by the Qualified Professional or the Township based on clearly perceptible tonal characteristics
Applicability Limits apply under simultaneous operation of all generators, cooling systems, and mechanical equipment
Table 4: Modeling and Study Requirements
Page 10 of 10
Requirement Standard
Pre-construction Study Required with conditional use application
Post-construction Verification Required within 180 days of commencement of operations
Prepared By Qualified Professional with demonstrated noise expertise
Modeling Methodology ISO 9613-2, CadnaA, SoundPLAN, or equivalent accepted industry model
Meteorological Assumptions Downwind propagation, ISO-conservative conditions
Equipment Data Manufacturer sound power levels and octave-band spectra
Low-Frequency Evaluation Required where large generators or cooling systems are used
Table 5: Measurement Procedures
Element Requirement
Instrumentation Type 1 or Type 2 ANSI-certified sound level meter
Calibration Pre- and post-measurement field calibration required
Measurement Duration
Minimum 15 minutes per location unless otherwise specified. Sound level limits expressed as hourly equivalent levels (Leq, 1‑hour) may be evaluated using shorter‑duration measurements, including the minimum durations identified in this table, where such measurements are conducted under steady‑state operating conditions and are representative of normal operations.
Operating Conditions Measurements shall include peak cooling load and generator operation under load
Background Noise Baseline ambient levels documented prior to construction
Table 6: Compliance
Item Requirement
Material Increase Definition An increase of ≥ 3 dBA above baseline ambient sound level
Violation Determination Exceedance of numeric limits or material increase
Retesting Authority Township may require additional testing following substantiated complaints or equipment change