Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP PLANNING COMMISSION

East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380

REVISED Meeting Agenda Tuesday, October 27, 2026, at 7:00 PM

Planning Commission Members: John Stipe, Chairman Dan Truitt, Vice Chairman Daniel H. Daley Ernest Harkness William Kaufman Michael Koza Karen Martynick

Larry Massaro, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison

Agenda Items:

1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Chairman will ask if anyone is going to record the meeting. 3. Review of Tracking Log / Determine need for Workshop Meeting 4. Public Comment on Non-Agenda Items 5. Approval of Minutes a. September 22, 2026 6. Acknowledge Receipt of New Applications (Initial Submission) a. Subdivision and Land Development Applications b. Conditional Uses Applications

c. Zoning Hearing Board Variances d. Ordinance Amendments 7. Old Business a. 1409 Manley Road- Prelim/Final 3-Lot Subdivision b. Zoning Ordinance Amendment- Data Center CCPC Recommendations 10/23/2026

c. 917 Cornwallis Drive- Prelim/Final 3-Lot Subdivision (tentatively scheduled for 11/24/2026) 8. New Business a. 1352 Morstein Road- Prelim/Final 2-Lot Subdivision 9. Liaison Reports 10. Correspondence 11. Announcements 12. Next Meeting – Tuesday, November 24, 2026, at 7:00 PM 13. Adjournment

This agenda does not necessarily reflect the order in which the items will be heard.

Bold Items indicate new information to review or discuss.

PROJECT DESCRIPTION Date Filed Start Date

Twp. Engineer

Review

CCPC Review

Conserv.

Board Review

Extension

Date

PC Deadline

Meeting

BOS Deadline

Meeting

Hearing

Date

Final Action Deadline (90

days) Comments

1409 Manley Road- Prelim/Final 3-Lot Subdivision 9/8/2026 9/22/2026 10/23/2026 10/9/2026 10/14/2026 n/a 11/24/2026 12/15/2026 n/a 12/21/2026 Revised plans submitted

1352 Morstein Road Prelim/Final 2- Lot Subdivision 8/14/2026 8/25/2026 10/23/2026 9/10/2026 11/18/2026 n/a 10/27/2026 11/17/2026 n/a 11/23/2026 Requires pipeline study/recommendation Applicant met with MA regarding sewer on 9/14/2026

971 Cornwallis Drive- Prelim/Final 3-Lot Subdivision 5/14/2026 5/26/2026 6/23/2026 7/2/2026 10/14/2026 12/17/2026 11/24/2026 12/16/2026 n/a 12/17/2026 Pending plan revisions for PC & Conservancy

10-Year Comprehensive Plan Review n/a 4/22/2025 n/a n/a n/a n/a n/a n/a n/a n/a RFP issued

Westtown Comprehensive Plan 3/3/2026 3/3/2026 n/a n/a n/a n/a 3/24/2026 4/16/2026 n/a 4/17/2026 BoS recommended support 4/16/2026 949 & 951 Cornwallis Drive- Sketch Plan 2/4/2026 2/24/2026 4/13/2026 pending n/a n/a n/a n/a n/a n/a Prelim/Final Plan Submitted 1409 Manley Road- Dimensional Variance 2/13/2026 2/13/2026 n/a n/a n/a 5/15/2026 3/24/2026 4/16/2026 5/12/2026 5/15/2026 Variance granted on 5/12/2026 West Whiteland Comprehensive Plan 4/9/2026 n/a n/a n/a n/a n/a 4/28/2026 5/5/2026 n/a 6/3/2026 BoS recommended support 5/5/2026 17 Treemont Drive- Dimensional Variance 5/8/2026 5/8/2026 n/a n/a n/a n/a 5/26/2026 6/2/2026 6/9/2026 6/7/2026 Variance granted by ZHB 6/9/2026 949 & 951 Cornwallis Drive- Line Change 4/28/2026 4/28/2026 6/10/2026 pending n/a n/a 6/23/2026 7/21/2026 n/a 7/27/2026 Approved by BoS on 7/21/2026 Yardley Village HOA Open Space- Variance 7/9/2026 7/9/2026 n/a n/a n/a n/a 7/28/2026 8/18/2026 8/20/2026 9/7/2026 ZHB approved variance 9/10/2026 AquaThorncroft Drive- Conditional Use 8/24/2026 8/24/2026 pending n/a n/a n/a 10/27/2026 11/17/2026 10/20/2026 11/23/2026 BoS Hearing 10/20/2026 Zoning Amendment- Data Centers n/a 11/25/2025 n/a 9/3/2026 n/a n/a n/a n/a n/a n/a Requires CCPC review & BoS Hearing

PROJECTS COMPLETED IN 2026

Bold = New application or action required

East Goshen Township Planning Commission

Application Tracking Log

October 27, 2026

PENDING PROJECTS

PC 9-22-26 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION 3 September 22, 2026 4 5 The East Goshen Township Planning Commission held a regularly scheduled meeting on Tuesday, 6 September 22, 2026 at 7:00 pm in the Township Building. 7 8 Members present are highlighted: 9 John Stipe – Chairman 10 Dan Truitt, Vice Chairman 11 Dan Daley 12 Ernest Harkness 13 Willian Kaufman 14 Michael Koza 15 Karen Martynick 16 17 Also present was: 18 Kelly A. Krause, Zoning Officer 19 Larry Massaro , BOS Liaison, Township Supervisor 20 Ann Duffield, Township Supervisor 21 22 COMMON ACRONYMS: 23 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 24 BC – Brandywine Conservancy CVS – Community Visioning Session 25 CB – Conservancy Board SWM – Storm Water Management 26 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 27 28 FORMAL MEETING – 7 p.m. 29 1. John called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 30 moment of silence to remember our first responders and military. 31 2. John asked if anyone would be recording the meeting and if there were any public comments 32 about non-agenda items. There was no response. 33 3. The minutes of the July 28, 2026 meeting were approved. 34 35 CHAIRMAN’S REPORT – 36 None 37 38 OLD BUSINESS 39 1. Zoning Ordinance Amendment – Data Center Regulations Draft 40 Ernest mentioned that they received comments from several of the ABCs and Chester County 41 and that the current draft contains those comments. He reviewed the comments from other 42 groups. He spoke about the noise issue and DBC standards. He reviewed the Chester County 43 letter comments on generators, cooling, wastewater, batteries, etc. He reviewed Governor 44 Shapiro’s GRID standards which are being considered. Karen feels the pipeline comments 45 were good. Dan D. mentioned the noise issue. Dan T. thanked Ernest for all he did on this 46 project. He feels these regulations should apply to everyone in the I1 district. 47 Dan T. moved to approve the latest edits of the proposed Data Center Ordinance, all changes 48 that were discussed and send it to the BOS and the County. Bill seconded the motion. The 49 motion passed unanimously. 50 51 52 53

PC 9-22-26 draft 2

NEW BUSINESS 1 1. 1409 Manley Road - Prelim/Final 3-lot Subdivison – Those present for this were George 2 Maalouf, Andrew Campbell, and Christy Flynn. George thinks they did well on drainage and 3 meeting requirements. Easement size was discussed. Andrew spoke about the property. 4 Driveways were discussed. Right of way was discussed with Christy Flynn. Waivers were 5 discussed. 6 2. Aqua PA, between 620 & 622 Thorncroft Drive – Water Treatment Facility Expansion – Those 7 present from Aqua were Adin Ballas, Elizabeth Fox, and Jocelyn Juliano. Resident Kevin 8 Boylan, 708 Peach Tree Dr. was present. Adin reviewed the project to make water from the well 9 better. He explained that national standards were expanded. The existing wells have above 10 ground tanks that measure 3’ x 12’ high. Elizabeth explained that the existing ABC & D wells 11 are to be replaced and upgraded. She spoke about the existing building and how water goes 12 through it. An additional 240 sq. ft. is proposed. Proposing screening trees in the front. No 13 change to the driveway. John mentioned that Pennoni is requesting evergreen plantings. Dan D. 14 mentioned the noise level. Ernest suggested a pipeline study be considered. Dan T. asked if the 15 pumps are changing. They are replacing the pumps which are in the ground. John commented 16 that they need enough space for the project and future maintenance. 17 Kevin Boylan received a letter about this project since he is within 1,000 feet. He is pleased that 18 the plantings are included but he feels more needs to be included around the area. 19 Karen spoke about the need for additional landscaping/screening. Kelly explained future hearings 20 with BOS. 21 Dan T. moved that we recommend the BOS approve the Conditional Use application of Aqua 22 PA to expand and improve the groundwater well station located between 620 and 622 Thorncroft 23 Drive West Chester and incorporate additional screening in consultation with the Township 24 engineer. Mike seconded the motion. The motion passed unanimously. 25 26 27 LIASION REPORT 28 Board of Supervisors – Larry reported that the RFP for the Comp Plan went to 12 firms and is 29 being advertised. They began the budget process for 2027. He spoke about the Enewsletter that 30 will be available monthly. 31 32 ANY OTHER MATTER 33 None 34 35 36 CORRESPONDENCE 37 None 38 39 40 ADJOURNMENT 41 There being no further business, Dan T. made a motion to adjourn the meeting. Mike seconded the 42 motion. The meeting was adjourned at 8:20 pm. 43 The next regular meeting will be held on Tuesday October 27, 2026 at 7 p.m. 44 45 Respectfully submitted, 46 47 48 49 50 Ruth Kiefer, Recording Secretary 51

COUNTY COMMISSIONERS Josh Maxwell Marian D. Moskowitz Eric M. Roe

PLANNING COMMISSION 601 Westtown Road, Suite 270 West Chester, PA 19380 610-344-6285 www.chescoplanning.org Matthew J. Edmond, AICP Executive Director

October 23, 2026 Derek Davis, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Re: Zoning Ordinance Amendment - Data Centers # East Goshen Township – ZA-09-26-19116 Dear Mr. Davis: The Chester County Planning Commission has reviewed the proposed Zoning Ordinance Amendment as submitted pursuant to the provisions of the Pennsylvania Municipalities Planning Code, Section 609(e). The referral for review was received by this office on September 24, 2026. We offer the following comments to assist in your review of the proposed amendment. DESCRIPTION: 1. The Township proposes the following amendments to its Zoning Ordinance:

A. Add definitions for the following terms to Section 240-6.B: Closed-loop Cooling System; Data

Center; Data Center Accessory Use; Data Center Campus; Energy Generation System; and Sensitive Receptor. B. Add “Data Centers in accordance with § 240-31.C(3)(xx)” to the list of uses permitted by

conditional use in the I-1 Light Industrial District. C. Add Section 240-31.C(3)(xx), pertaining to standards for data centers. The proposed ordinance

language requires that all data center and data center accessory uses, whether buildings, structures, or equipment, shall be set back a minimum of 300 feet from any residentially zoned district and from the property boundary of all sensitive receptor uses. It also requires the data center facility and accessory structures to be fully screened in accordance with the criteria in Section 240-27C(3) of the Zoning Ordinance. Other issues addressed in this section include the following: Emergency Liaison requirements; Emergency Response Plan; Decommissioning Plan; Energy Sources, Power Lines, and Co-Location of Energy Generation Systems; Backup Power; Water Usage; Scale/Aesthetics; Noise and Vibration; and Condition of Approval.

Page: 2 Re: Zoning Ordinance Amendment - Data Centers # East Goshen Township – ZA-09-26-19116

BACKGROUND: 2. The County Planning Commission reviewed an earlier version of this zoning amendment on September 3, 2026 (CCPC# ZA-08-26-19049). We acknowledge, and endorse, that several of the comments from our previous letter have been addressed by the Township (e.g., standards for on- site energy (battery) storage systems have been added – refer to Section 240-31.C(3)(xx)[7][g]). Other revisions to the proposed ordinance language include the following:

• The definition of “Qualified Professional” has been deleted. • The requirements for a water feasibility study in Section 240-31.C(xx)[9][d] have been revised. • Section 240-31.C(3)(xx)[9][h], Cooling Fluid Containment and Leak Prevention, has been added. • Section 240-31.C(3)(xx)[10], Scale/Aesthetics, which addresses building façade design, has been added. • Section 240-31-C(3)(xx)[13], Condition of Approval, has been added. LANDSCAPES: 3. The Township’s I-1 Light Industrial District, which is generally situated on the east side of Airport Road from the north side of Wilson Drive to the south side of East Wrights Lane, is located within the Suburban Center Landscape designation of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Center Landscape is regional economic, population and transportation centers with varying land uses, accommodating substantial future growth of medium to high intensity. Repurposing obsolete structures and sites and encouraging sustainable development will be critical as suburban centers grow, and transportation infrastructure and amenities will need to expand to create an integrated multimodal network. As stated in our previous review, the proposed zoning amendment is consistent with the objectives of the Suburban Center Landscape. However, careful consideration of the potential impacts of a data center will need to be addressed if a plan for a data center development is submitted at a future date. COMMENTS: 4. For clarity purposes, we recommend that the last sentence in Section 240-31.C(3)(xx)[4] be revised to state the following: “In addition to Section 240-27.C(3), the applicant shall include an elevation/rendering of the data center from significant vantage points along roadways, and from residential areas.” 5. Section 240-31.C(3)(xx)[7][a] indicates that any energy generation system designed or used to supply power directly to a data center during normal operations shall not be considered part of the data center use but shall be subject to existing municipal or utility regulations. The Township should consider the addition of zoning regulations for power generation systems, if they haven’t already done so. 6. While Section 240-31.C(3)(xx)[8] does address emission standards for diesel generators utilized for backup power, the Township does not require that diesel generators meet Tier 4 emission standards of the U.S. Environmental Protection Agency, as set forth on page 15 of the Data Center Ordinance Guide (Item #1, Backup Power Ordinance Language). If the Township is going to allow this lower emission standard, then we recommend, as stated in our previous review, that the Township expressly prohibit generators from being used for required or voluntary curtailment/demand response programs with the utility or with PJM Interconnection (the regional grid operator).

Page: 3 Re: Zoning Ordinance Amendment - Data Centers # East Goshen Township – ZA-09-26-19116

RECOMMENDATION: The Chester County Planning Commission endorses the Township’s efforts in the development of this zoning ordinance amendment. The Township should consider the comments in this letter before acting on the proposed amendment. We request an official copy of the decision made by the Township Supervisors, as required by Section 609(g) of the Pennsylvania Municipalities Planning Code. This will allow us to maintain a current file copy of your ordinance.

Sincerely,

Paul Farkas Senior Review Planner cc: Christopher Bashore, Township Manager, West Goshen Township

1 | 2

GME ENGINEERING

(By Alpha Designs, LLC) CIVIL ENGINEERS, AND SITE DESIGNERS

1117 Carolina Ave, West Chester, PA 19380 P: (610)732-0707

October 6, 2026

To: Kelly Krause Director of Code Enforcement, Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380 kkrause@eastgoshen.org

Re: Campbell, 1409 Manley Road Preliminary/Final Minor Subdivision & Land Development Plan Review

Dear Ms. Krause,

In response to the review letter issued by the township engineer Mr. Nathan Cline from Pennoni Associates Inc. dated September 22, 2026, we offer the following responses.

ZONING HEARING BOARD CONDITIONS

1. Applicant shall comply with any and all applicable and/or customary building, construction, and/or fire code requirements, including inspections and permitting.

Response: Acknowledged.

2. Applicant shall comply with any and all applicable zoning ordinance requirements, including, but not limited to, area and bulk requirements and design standards of the R-3 (Medium Density Residential) Zoning District, except for the limited, dimensional relief granted by the Board.

Response: Acknowledged.

3. Applicant shall comply with any and all applicable federal, state, and local laws and ordinances, and shall obtain all governmental approvals and permits necessary for the proposed development and/or redevelopment of the property.

Response: Acknowledged.

2 | 2

4. The dimensions of the proposed lots shall not exceed the dimensions set forth in the application, plans, and depictions made part of the hearing record, including all amendments thereto, and shall be in substantial conformity, as set forth within the application materials and as described during the applicant’s and applicant’s representative’s hearing testimony.

Response: Acknowledged.

5. The existing home on the property shall be preserved, as desired and testified to, by the applicant. Should it be determined that the existing home on the property will not be or cannot be preserved as required, the applicant shall reapply and reappear before the East Goshen Township Zoning Hearing Board seeking associated zoning relief.

Response: Acknowledged.

ZONING

1. To obtain more flexibility in placing buildings in all residential subdivisions of two or more lots, an average building setback line of 40 feet and a minimum building setback line of 30 feet shall be required. (§240-10.G) The existing front yard setback of the existing dwelling on Lot 2 is only 6 feet; this is an existing nonconformity and we have no objection to the proposed house locations on Lots 1 & 3.

Response: Acknowledged.

2. Required sight distances as shown on Sheet 2 are less than required. (§240-23.D(11))

Response: labeling is revised to indicate the correct distance.

3. Please confirm if steep or very steep slopes are present; none are indicated on the plan (§240-25.C(2)(a)[1] & §240-25.C(6)).

Response: no steep slopes are available on site because no available slopes extend 50 ft or more (SALDO Section 240-25-C.6). See attached analysis plan.

4. The minimum right-of-way for minor or local streets shall be 50 feet; please clarify how the proposed right-of-line location/width has been determined. (§240-27.A(3)(a)) .

Response: Since the Manley Raod was mostly built on the subject property, it was determined that 16.5 feet width on the property side is suitable.

5. For all new lots that abut an existing street which has a right-of-way less than that specified in Subsection A(3), the front and/or side street yard

3 | 2

requirements shall be increased by the difference between the existing right- of-way and the right-of-way specified in Subsection A(3). It is the intention of this requirement to provide for a reasonable setback to accommodate the potential widening of the existing street. (§240-27.A(4)).

Response: The difference between the existing 16.5-ft right-of-way and the 25-ft right-of-way is 8.5 ft. The minimum front yard becomes 30 + 8.5 = 38.5 ft. The proposed front yards on Lot 1 and Lot 2 are 39.08 ft and 38.84 ft respectively.

SUBDIVISION AND LAND DEVELOPMENT

6. The plans are labeled “Preliminary/Final Minor Subdivision Plan.” If the applicant wishes to submit a joint preliminary and final application, relief shall be requested from the requirement of preliminary plan approval prior to final plan application. Additionally, the plan title shall be revised to note “Subdivision and Land Development Plan.”

Response: A waiver request from section 205-31 is added to the revised cover sheet.

The plan labeling is revised as requested.

7. Preliminary and final plans shall include a landscape plan. (§205-30.D, §205-33.D & E).

Response: A Landscape plan is included with this submission.

8. A “Will Serve” letter shall be provided from Aqua to confirm availability of capacity for connection to public water. (§205-30.C(4)(b)).

Response: A “Will Serve” letter is included with this submission.

9. Applicant shall submit a copy of the letter from the Department of Environmental Protection approving the Act 537 planning module or exemption. (§205-33.B(22)(a) & (b))

Response: The exemption is being sought. We are waiting for township approval before we resubmit the request to the DEP.

10. All trees to be retained shall be protected from equipment damage by enclosing the tree(s) at the edge of the tree protection zone (TPZ) with sections of snow fence or other fencing (§205-63.A(1))

Response: A note has been added to revised sheet C6 to protect the existing trees as requested.

4 | 2

STORMWATER

11. Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris. Leaf guards or equivalent should be provided for downspout piping. (§195-20.O)

Response: The roof drain detail (CNST-1) on detail sheet C7 shows a leaf strain. The piping system is a closed system between the leaf strain and the infiltration pit and no debris/leaf is expected to enter the system.

12. Conveyance facilities to or exiting from stormwater management facilities shall be designed to convey the design flow to or from the facility. Conveyance capacity calculations shall be provided. (§195-24.D)

Response: A section is included the design section to size the pipes upstream of the infiltration pits including the roof drains. The culverts draining the infiltration pits are part of the routing calculations provided in Appendix C

13. Storm pipe profiles for all stormwater conveyance piping shall be provided to demonstrate adequate cover and slope. (§195-28.B(13))

Response: pipe profiles are added to new sheet C10.

14. A stormwater operations and maintenance (O&M) plan shall be submitted to the municipality for review and approval for all existing and proposed permanent BMP’s manmade conveyances or other stormwater facilities identified on the SWM site plan. The party responsible for long term SWM maintenance should be specified on the drawings. Long-term maintenance requirements should be listed on the plans. (§195-37.B)

Response: A statement is added to revised sheet 1 under “Person Responsible for BMP Operation signature Block”

15. The municipality shall inspect SWM BMPs, facilities and/or structures installed under this chapter to ensue BMPs, facilities and/or structures continue to function as intended. Persons installing stormwater controls or BMPs shall be required to pay a specific amount to the Municipal Stormwater Control and BMP Operation and Maintenance Fund. The deposit shall cover the cost of periodic inspections performed by the Municipality for a period of 10 years. (§195-42.A(1))

Response: Under the construction sequence, notes are included requiring the contractor to call the Township Engineer prior to and during the construction of the BMPs.

16. The minimum outlet orifice size is 3-inch diameter; the proposed outlet structure details indicate 2- and 2.5-inch diameter orifices. (§195-21.D)

Response: The design is revised to use 3” orifices.

5 | 2

17. The proposed driveway improvements on Lot 2 should be indicated on the E&S plan. (§195-19.A(2))

Response: The plan is revised to show the new driveway.

18. It appears that upstream undisturbed drainage area from Manley Road will drain into infiltration bed SWM-3. All upstream areas draining into proposed stormwater systems shall be accounted for in the stormwater calculations. (§195-28.B(18)(b))

Response: The flows follow a drainage path along the edge of the existing pavement of Manley Road. The area south of the drainage path is excluded from the revised drainage analysis. The driveway entrance is redesigned to prevent offsite flows from entering the site.

19. It appears that drainage area from Manley Road is intended to drain to infiltration bed SWM-1. However, an existing topographic ridge parallel to the roadway appears to prevent runoff from being collected by the proposed drainage systems. The grading or the drainage area boundaries should be revised for consistency. (§195-28.B(18)(b))

Response: The drainage areas are revised to take into consideration the existence of the ridge which prevents the flow from reaching the pit. The subject area is not being affected by the development, and it is being excluded from any analysis. The driveway entrance is redesigned to prevent offsite flows from entering the site.

20. The swale along the western property line should have a flat bottom width to accommodate the size of the drainage inlets that are proposed in the bottom of swale. Additionally, the grading should be clarified in the vicinity of the inlet with top elevation 347.0. If the intention is to depict a berm on the downgrade side of the inlet, the berm should have a top width of at least 2 feet. (§195-15.L)

Response: Sheet 4 is revised to show a berm at elevation 348 because the top of the yard drain is 347. A note is added indicating the width of the berm to be 2 ft.

21. All drainage inlets should be labeled with a unique identification number so that they may be differentiated. (§195-15.L)

Response: revised as requested.

22. The proposed grading on the drainage area boundary plan in the Stormwater Report does not match the Proposed Grading and Drainage Details Plan. (§195-28.B(16))

6 | 2

Response: An updated drainage map reflecting the latest grading is added to the revised drainage report.

23. Separate Points of Interest should be analyzed at Lot 1 – one on the western property line and one on the eastern property line where runoff concentrates and exits the development property. (§195-22.F and §195-19.H)

Response: The revised analysis takes into consideration the two points of analysis.

24. The Time of Concentration flow path on Lot 1 as shown on the existing conditions drainage plan in the Stormwater Report does not follow the flow channel depicted by the existing contours. (§195-28.B(14))

Response: The Tc path is revised to follow the grading. The revision is reflected in the calculations. Due to the short drainage path, the Tc used is 5minutes for all sub-watershes.

25. On the drainage plans in the Stormwater Report, label all drainage subareas to match the hydrologic model in the Report. (§195-28.E)

Response: Labeling is provided on the revised drainage plans.

26. It is our understanding that a pond existed on the property in the rear of the area that is proposed to be Lot 1, but has apparently been removed. Information should be provided about when the pond was removed, how it was made to hold water, and whether there could be soil conditions associated with the pond that would adversely affect infiltration performance at infiltration bed SWM-1. (§195-20.I)

Response: A wetland report is included with this submission indicating that no wetlands are present. The site is dry. The owner stated during Township meetings that the pond was fed by a pump, and once the pump was turned off, the pond dried. Although a pond previously existed, the infiltration testing showed acceptable infiltration rates.

27. Drainage easements on Lots 1 and 2 in favor of Lot 3 shall be provided wherever concentrated flows of stormwater are to occur. It is recommended that defined conveyance channels be added to the grading, and that those channels be located toward the rear of Lots 1 and 2 so as to minimize interference with use of their backyard areas. (§195-15.G).

Response: To minimize grading, a blanket drainage easement in favor of Lots 2 and 3 is granted, allowing Lots 1 and 2 to adjust grades and add improvements as long as an alternative drainage pathway is provided. This ensures that flows from Lot 3 onto Lot 2, and from Lots 2 and 3 onto Lot 1, are not obstructed. The note is added to revised sheet 1.

7 | 2

28. Plan view details shall be provided for the proposed infiltration beds to depict the internal piping layout, manner of connection of pipes draining to the infiltration bed, manner of connection to the outlet structure, and how the interior of the system can be accessed for maintenance. (§195-28.B(13)).

Response: a plan view is added to revised sheet 4 for each pit indicating the pipes layout and the connection between the pipes. The outlet structures will be used as means of service. Cleanouts are added for each roof drain connection for maintenance purposes.

29. Several compost filter socks are not located parallel to the topographic contour and will not function properly. (§195-19.A(2)).

Response: compost filter socks are adjusted. The main filter socks receiving most of the flow are set parallel to the contour lines. The perimeter filter socks are intentionally not parallel to the contour lines and are intended to divert incidental flows from crossing onto neighboring properties.

30. Where concentrated flows drain to a compost filter sock, a different sediment control will likely be needed as filter socks are not intended manage concentrated flows. (§195-19.A(2)).

Response: The rock filter outlet is displayed on the plans where the concentrated flows are expected. Only one location is expected and that is on lot 3.

31. Additional drainage inlets should be provided to collect areas draining to infiltration bed SWM-3 via overland flow before they reach the outlet structure. (§195-28.B(16)).

Response: A yard drain is set lower than the outlet structure with a 6” pipe slopped toward the drainage pit.

SANITARY SEWER

32. The attached Sanitary Sewer Lateral detail shall be incorporated into the plan set, and all conflicting details should be removed from the plans. Further, proposed materials, slopes, cleanouts, etc. should be revised on plan views for consistency with the attached detail.

Response: revised as requested.

33. The proposed sanitary sewer lateral material shall be revised to be SDR26 PVC. It shall to transition to SCH40 PVC at the cleanout per the attached Sanitary Sewer Lateral detail. (§188-31.B.(1)(a)).

Response: revised as requested.

8 | 2

34. The Lot 1 sanitary sewer lateral should be relocated to provide a minimum separation of 10 feet from the proposed infiltration facility.

Response: Revised as requested. The dimension is added to the revised plan.

35. The Lot 1 stormwater basin outlet pipe is proposed to discharge in very close proximity to an existing sanitary sewer manhole. We recommend the outlet location be adjusted to avoid discharge of stormwater onto the sanitary sewer manhole.

Response: The outlet pipe is extended as far as possible without encroaching into the neighboring property. The 100-yr flow discharging for this pipe is minimal (0.41 cfs- refer to page 127 of Appendic C)

36. The stormwater pipe should be indicated and labeled on the sanitary sewer profile to identify if there is a crossing conflict.

Response: the stormwater pipes are added to the profile.

37. The existing public sewer manholes are identified with approximate invert elevations. The inverts should be field surveyed to provide exact elevations, and the plans updated accordingly.

Response: The inverts are matched with an existing survey recorded under Record Plan 4850. The owner will conduct a physical check to verify the accuracy of the pipes invert elevations shown on the plan before final plan approval. The existing depth of the sewer pipes will allow the installation of laterals with slopes 2% or greater between the proposed houses and the existing sewer pipe.

38. Proposed sanitary sewer lateral invert elevations should be provided at the building connection, each cleanout, and the connection to the existing sanitary sewer main.

Response: Information added to the profiles.

39. We recommend the existing sanitary sewer easement be modified to be widened to be 10 feet from the actual sewer main location across the entire property.

Response: The easement is provided as requested. On the revised plans.

GENERAL

40. Township road numbers for Manley Road (T-483) and Walnut Hill Road (T-451) should be added to the plans.

9 | 2

Response: label added to the road name.

41. The Site Survey Plan (Sheet 9) notes “existing house to be demolished”; this note should be removed.

Response: The plan is revised accordingly.

42. The plans should note the existing well to be abandoned in accordance with Chester County Health Department regulations.

Response: a Note is added to revised sheet 3.

43. We recommend all plan sheets be recorded.

Response: Acknowledged.

44. Please note additionally: a. Pipeline Awareness Study – Not required, no pipeline with 660 feet per County mapping b. Fire Marshal – Pending c. County Planning – Pending d. Conservancy Board – Pending e. PADEP Sewage Facilities Planning Module - Pending f. Aqua PA Will Serve – Pending g. Historic Commission – Pending h. Traffic Study/PENNDOT – Not applicable i. NPDES/Conservation District – Not applicable (less then one acre of disturbance) j. East Goshen Conservancy Board – Pending

Response: Acknowledged

Yours truly,

GME Engineering

George Maalouf, PE

610-732-0707

gmaalouf@alphadesigns-pa.com

Memorandum East Goshen Township 1580 Paoli Pike West Chester, PA 19380 610-692-7171 ext. 3103 kkrause@eastgoshen.org Date: October 22, 2026 To: East Goshen Township Planning Commission From: Kelly A. Krause, Zoning Officer Re: Preliminary/Final 3-Lot Subdivision Plan 1409 Manley Road/Campbell Plans dated 8/1/2026, last revised on 10/4/2026 _____________________________________________________________________________________ At the Planning Commission meeting of September 22, 2026, concerns were raised regarding the existing width of the right-of-way of Manley Road, versus the 50-foot width required, pursuant to §240-27 (Design Standards) of the East Goshen Township Zoning Ordinance. While §240-27.A(1) & (3) establishes the minimum right-of-way width for new/future streets, §240-27.A(4) provides additional yard requirements for new lots created on existing streets where the right-of-way is less than the minimum width. Manley Road currently provides a 33- foot right-of-way where 50-feet is the minimum required. In accordance with §240-27.A(4), the new lots are required to provide an additional 8.5 feet of front yard, for a total setback of 38.5 feet from the existing right-of-way. The proposed location of each new house meets this requirement. However, the additional front yard setback should be noted and memorialized on the plan. § 240-27 Design standards.

A. Establishment of future rights-of-way widths for streets.

(1) Minimum widths. Minimum rights-of-way widths as specified in Subsection A(3) shall be provided for all new streets.

(3) Minimum widths.

(a) Minimum future street rights-of-way are as follows:

Street Classification Minimum Future Right-of-Way (feet) Minor or local street 50** (4) Yard requirements for new lots on existing streets. For all new lots that abut an existing street which has a right-of-way less than that specified in Subsection A(3), the front and/or side street yard requirements shall be increased by the difference between the existing right-of-way and the right-of-way specified in Subsection A(3). It is the intention of this requirement to provide for a reasonable setback to accommodate the potential widening of the existing street.

Memorandum The above-referenced plans were presented to the East Goshen Township Conservancy Board on October 17, 2026, and received recommendations from the Chester County Planning Commission on October 9, 2026. Both recommendations have been attached for your review. Draft Motion: Mr. Chairman, I move that we recommend to the Board of Supervisors to _________________ (approve/deny) the Preliminary/Final Minor Subdivision Plan of 1409 Manley Road, West Chester, subject to addressing the recommendations of the Township Engineer and staff.

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

-

“ ”

PS

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

-

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

—

—

—

—

—

—

—

—

-

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

’

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

GENERAL NOTES:

—

—

—

—

—

—

—

—

C9 OF 10

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

—

—

—

—

—

—

—

—

--

‑ ‑

‑ ‑

AR QP NS AR QP

NS

PLANTING NOTES: 1. ALL EXISTING VEGETATION IS TO BE PROTECTED FROM DAMAGE UNLESS THEY ARE LABELED "TO BE REMOVED". PROVIDE TREE PROTECTION FENCING AT DRIPLINE, AS SHOWN ON THE PLANS AND DETAILS FOR THE LIFE OF THE WORK OR UNTIL EQUIPMENT ACCESS IS NO LONGER NEEDED. REPAIR OR REPLACE DAMAGED MATERIALS WITH COMPARABLE MATERIALS AS DETERMINED BY LANDSCAPE ARCHITECT, AT NO EXPENSE TO THE OWNER. 2. CONTRACTOR TO CALL PA ONE CALL PRIOR TO ANY SITE DISTURBANCE. CONTRACTOR IS LIABLE FOR DAMAGE TO ANY AND ALL PUBLIC AND PRIVATE UTILITIES, WATER AND SEWER LINES. 3. ALL PLANT MATERIAL SHALL CONFORM TO THE STANDARDS OF NURSERY STOCK OF THE AMERICAN ASSOCIATION OF NURSERYMEN AND AS PER CURRENT EDITION OF ANSI Z60.1, AMERICAN STANDARD FOR NURSERY STOCK. 4. THE LANDSCAPE CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE (1) FULL YEARS AFTER THE DATE OF ACCEPTANCE. UNSATISFACTORY PLANT MATERIAL (IN THE OPINION OF THE LANDSCAPE ARCHITECT) SHALL BE REPLACED WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 6. NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE PERMITTED WITHOUT WRITTEN AUTHORIZATION OF THE LANDSCAPE ARCHITECT OR HIS REPRESENTATIVE. THIS SHALL APPLY TO SUBSTITUTIONS OF SPECIES, SIZE AND QUANTITY. 7. ALL LANDSCAPE AREAS TO BE MULCHED WITH 3" OF TRIPLE-SHREDDED BARK MULCH, NOT TO COME INTO CONTACT WITH THE STEMS OR TRUNKS OF THE PLANTS.

PLAN NOTES: 1. REFERENCE "PRELIMINARY / FINAL MINOR SUBDIVISION PLAN" SET SHEETS 1-9 DATED 10/01/2026 PREPARED BY ALPHA DESIGNS, LLC / GME ENGINEERING.

WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL

x

x

PLAN

§ 205-62 STREET TREES. TREES WITH A MINIMUM CALIPER OF THREE INCHES SHALL BE PROVIDED WHERE DEEMED ADVISABLE BY THE TOWNSHIP PLANNING COMMISSION AND/OR SUPERVISORS. STREET TREES SHALL BE INSTALLED ON FORTY-FOOT CENTERS ON THE SAME SIDE OF THE STREET. TREE VARIETIES PERMITTED WILL BE DETERMINED BY THE BOARD OF SUPERVISORS BUT MUST BE CHOSEN FROM A LIST ADOPTED BY THE BOARD IN A RESOLUTION AS AMENDED FROM TIME TO TIME.

STREET TREE COMPLIANCE SCHEDULE GROSS REQUIRED STREET TREES: 8 DEFICIT DUE TO STRUCTURAL CONFLICT: 1 (SEE NOTE 1) EXISTING TREE CREDIT: 1 (SEE NOTE 2) TREES PROPOSED ON-SITE: 6

SUPPLEMNETARY PLAN NOTES

MATURE TREE PRESERVATION AND PLAN BALANCE: THE APPLICANT REQUESTS A PRESERVATION CREDIT FOR 1 EXISTING 36" MATURE TREE AS DESIGNATED ON THIS PLAN, LOCATED AT THE SOUTHWEST CORNER OF LOT ONE.

STRUCTURAL CONFLICT: LOT TWO FRONTAGE CONFLICT WITH EXISTING STRUCTURE. 2.

1.

ALL NEWLY PROPOSED STREET TREES MATCH THE MUNICIPAL APPROVED LIST IN ACCORDANCE WITH RESOLUTION NO. 2020-20

3.

316.11 LF FRONTAGE / 40 OC TREE SPACING = 7.9 (8) STREET TREES REQUIRED STREET TREE CALCULATION

PROPOSED TREE

TREE TO BE REMOVED

PLAN KEY

PA LICENSE #: LA-002922

LANDSCAPE PLAN SCALE: 1" = 20'

LANDSCAPE PLAN SHEET 1 of 1 DWG NO: DATE: SCALE:

CAMPBELL PROPERTY 1409 MANLEY ROAD EAST GOSHEN TOWNSHIP

LANDSCAPE ARCHITECT:

PROJECT:

TITLE:

1047-02 09/30/2026 AS NOTED

REVISED: .

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN STAGE - STOP AND CALL

Pennsylvania One Call System, Inc

COUNTY COMMISSIONERS Josh Maxwell Marian D. Moskowitz Eric M. Roe

PLANNING COMMISSION 601 Westtown Road, Suite 270 West Chester, PA 19380 610-344-6285 www.chescoplanning.org Matthew J. Edmond, AICP Executive Director

October 9, 2026 Derek Davis, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Re: Preliminary/Final Subdivision - 1409 Manley Road # East Goshen Township – SD-09-26-19100 Dear Mr. Davis: A Preliminary/Final Subdivision Plan entitled "1409 Manley Road", prepared by GME Engineering, and dated August 1, 2026, was received by this office on September 10, 2026. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed subdivision for your consideration. PROJECT SUMMARY: Location: North side of Manley Road, east of Walnut Hill Road Site Acreage: 1.30 Lots/Units: 1 existing lot; 3 proposed lots Non-Res. Square Footage: 0 Proposed Land Use: Single Family Residential Municipal Land Use Plan Designation: Low Density Residential UPI#: 53-6F-32.4 PROPOSAL: The applicant proposes the creation of 3 single family residential lots. The existing dwelling will remain on Lot #2. The project site, which will be served by public water and public sewer, is located in the R-3 Medium Density Residential zoning district. The Variance Request table on Sheet 1 indicates that, on May 12, 2026, the Township Zoning Hearing Board granted a variance from the minimum lot size requirements set forth in Section 240-10.G of the Township Zoning Ordinance, with five conditions of approval. RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed, and all Township issues should be resolved before action is taken on this subdivision plan.

Page: 2 Re: Preliminary/Final Subdivision - 1409 Manley Road # East Goshen Township – SD-09-26-19100

Site Plan Detail, Sheet 2: Preliminary/Final Subdivision - 1409 Manley Road

Page: 3 Re: Preliminary/Final Subdivision - 1409 Manley Road # East Goshen Township – SD-09-26-19100

COUNTY POLICY: LANDSCAPES: 1. The project site is located within the Suburban Landscape designation of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and affordability. Additionally, roads, sidewalks and paths with convenient access to parks and community facilities should be provided. Furthermore, low to medium density mixed use development and infill development, community institutional uses such as schools and senior housing, and land available for new industrial and heavy commercial uses in appropriate locations, should be taken into consideration for planning activities in this designation. The proposed subdivision is consistent with the objectives of the Suburban Landscape. WATERSHEDS 2045: 2. Watersheds 2045, the County-wide integrated water resources plan and Act 167 Stormwater Management Plan, indicates the proposed development is located within the Chester Creek watershed. The Watersheds 2045 plan’s highest priority objectives within this watershed are: improving stormwater management to increase infiltration and protect baseflow; restoring stream channels and vegetated riparian corridors; addressing legacy and emerging contaminants; reducing nutrient pollution; and promoting source water protection methods. Watersheds 2045 can be accessed at www.chesco.org/watersheds2045. PRIMARY ISSUES: Access and Circulation: 3. We suggest that, due to the site’s proximity to Route 3 along with the recommendations provided in the County Planning Commissions’ Active Transportation Inventory (ATI) municipal report for the Township, the applicant dedicate the land up to the ultimate right-of-way line for both roadway and potential sidewalk improvements. Sidewalks are an essential design element in the Suburban Landscape. Natural Features Protection: 4. The plan and 2026 aerial photography indicate that a portion of the site is wooded. Given the project's location in a watershed designated as Trout Stocking and Migratory Fishes, the applicant should minimize the removal of trees on the property to the greatest extent possible to reduce the volume of stormwater generated and to preserve in-stream temperatures that support trout and other aquatic species. The “limits of disturbance” should be delineated to protect all trees that are intended to remain, and orange construction fencing should be placed at the “limit of disturbance” to prevent unintended intrusion into these areas by construction equipment. Additional native trees and shrubs should be provided to replace and mitigate the loss of removed trees.

Page: 4 Re: Preliminary/Final Subdivision - 1409 Manley Road # East Goshen Township – SD-09-26-19100

Stormwater Management: 5. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (August 2022) and the associated Act 167 stormwater management ordinance standards adopted by each municipality. 6. To ensure that the stormwater management controls continue to function as designed, the applicant should include information on the frequency and proper inspection, operation, and maintenance of these systems in an Inspection, Operation and Maintenance Plan. Underground retention basins require maintenance, such as regular gutter and inlet cleaning, to ensure original performance of the practice is maintained. 7. On Lot 1, the soil stockpile is proposed to be located upslope and adjacent to the proposed underground retention basin on that lot. Sediment produced from the soil stockpile could potentially compromise the function of the underground retention basin. The applicant should consider relocating the proposed soil stockpile location to an area that will not drain to the underground retention basin. ADMINISTRATIVE ISSUES: 8. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds, the Assessment Office, and the municipality. This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail. Sincerely, Paul Farkas Senior Review Planner cc: Andrew Campbell GME Engineering Estate of Patrick M. Campbell Chester County Water Resources Authority

From: Walter Wujcik <wujcikwalt@aol.com> Sent: Monday, October 19, 2026 8:44 PM To: Ashley Nowak <anowak@eastgoshen.org> Subject: Conservancy Board Comments on Proposed Subdivision Landscape Plans Hi Ashley, The following are the Conservancy Board comments on the two proposed subdivision landscape plans we reviewed at our meeting last week. Proposed Subdivision - 1409 Manley Road The East Goshen Conservancy Board (EGCB) reviewed the Preliminary/Final 3 – Lot Subdivision Plan for 1409 Manley at its monthly meeting on October 14, 2026, and offers the following comments:

• The EGCB is in agreement with proposed number of street trees (six) to be planted during development. We understand the 36-inch Tulip Popular tree at the west end of the site will remain and be counted as the seventh street tree.

• The EGCB suggested and the developer agreed to replace the two proposed Willow Oak street trees with White Oak trees.

• The developer will provide a revised plan showing all plants (trees, shrubs, etc.) to be placed on the site prior to installation. All plants will conform to current East Goshen Township regulations.

• The EGCB understands that the 24-inch Magnolia tree in the middle of the subdivision has been removed.

Memorandum East Goshen Township 1580 Paoli Pike West Chester, PA 19380 610-692-7171 ext. 3103 kkrause@eastgoshen.org Date: October 22, 2026 To: East Goshen Township Planning Commission From: Kelly A. Krause, Zoning Officer Re: 1352 Morstein Road- TJ Ward Chester County UPI No. 53-1-13 Preliminary/Final 2-Lot Subdivision Plan _____________________________________________________________________________ Preliminary/Final plans have been submitted for the above-referenced property to subdivide an irregular “L” shaped lot with a net lot area of 2.42 acres into two parcels: Lot 1 to provide frontage along Morstein Road with a net lot area of 49,583 square feet (1.14 acres), and Lot 2 to provide frontage along Great Oak Circle containing a net lot area of 54,694 square feet (1.26 acres). A new single-family dwelling is proposed to be constructed on each lot. The property is located within the R-2 Low Density Residential District (§240-9). The property had previously been occupied by one single family dwelling, demolished in January 2025. Both lots are proposed to be serviced by public water and public sewer. A 20-foot-wide sanitary sewer easement is proposed along the westerly property line of Lot 1 for the construction of a sewer lateral benefiting Lot 2. A 10-foot-wide drainage easement is proposed through a portion of the rear yard of Lot 2, connecting a stormwater basin benefiting Lot 1. §240-23B(2)(c) requires the front yard setback for “flag” lots to begin at the minimum width of the building line. The plan currently shows a 20’ side yard setback where the lot widens, where it should be 45’. The subject parcel is located within the 1,000-foot pipeline corridor consultation zone of the Williams Gas Pipeline-Transco, and appears to be within 660 feet of the center line of a pipeline, requiring a Pipeline Study. The applicant has met with the Municipal Authority in regards to the proposed sanitary sewer, as the Township’s proposed extension of the sewer main is expected to take several years. Options for interim public sewer connections have been discussed. Please see the Township Engineer’s review letter for additional comments. The Chester County Planning Commission has reviewed the plans and issued a recommendation on September 10, 2026. A copy of this letter has been attached.

COUNTY COMMISSIONERS Josh Maxwell Marian D. Moskowitz Eric M. Roe

PLANNING COMMISSION 601 Westtown Road, Suite 270 West Chester, PA 19380 610-344-6285 www.chescoplanning.org Matthew J. Edmond, AICP Executive Director

September 10, 2026 Derek Davis, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Re: Preliminary Subdivision - 1352 Morstein Road # East Goshen Township – SD-08-26-19084 Dear Mr. Davis: A Preliminary Subdivision Plan entitled "1352 Morstein Road", prepared by NePo Associates Inc., and dated July 15, 2026, was received by this office on August 26, 2026. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed subdivision for your consideration. PROJECT SUMMARY: Location: South side of Morstein Road, and the east side of Great Oak Circle Site Acreage: 2.40 Lots/Units: 1 existing lot; 2 proposed lots Non-Res. Square Footage: 0 Proposed Land Use: Single Family Residential Municipal Land Use Plan Designation: Low Density Residential UPI#: 53-1-13 PROPOSAL: The applicant proposes the creation of two single family residential lots. The existing dwelling will be removed. While vehicular access to Lot 1 will be provided from Morstein Road, vehicular access to Lot 2 will be provided from Great Oak Circle. The project site, which will be served by public water and public sewer, is located in the R-2 Low Density Suburban Residential zoning district. RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed, and all Township issues should be resolved before action is taken on this subdivision plan.

Page: 2 Re: Preliminary Subdivision - 1352 Morstein Road # East Goshen Township – SD-08-26-19084

Site Plan Detail, Sheet 2: Preliminary Subdivision - 1352 Morstein Road

Page: 3 Re: Preliminary Subdivision - 1352 Morstein Road # East Goshen Township – SD-08-26-19084

COUNTY POLICY: LANDSCAPES: 1. The project site is located within the Suburban Landscape designation of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and affordability. Additionally, roads, sidewalks and paths with convenient access to parks and community facilities should be provided. Furthermore, low to medium density mixed use development and infill development, community institutional uses such as schools and senior housing, and land available for new industrial and heavy commercial uses in appropriate locations, should be taken into consideration for planning activities in this designation. The proposed subdivision is consistent with the objectives of the Suburban Landscape. WATERSHEDS 2045: 2. Watersheds 2045, the County-wide integrated water resources plan and Act 167 Stormwater Management Plan, indicates the proposed development is located within the Ridley Creek watershed. The Watersheds 2045 plan’s highest priority objectives within this watershed are: prioritizing stormwater management to reduce runoff and flooding; protecting first order streams and vegetated riparian corridors; and expanding water-based recreational opportunities and access. Watersheds 2045 can be accessed at www.chesco.org/watersheds2045. PRIMARY ISSUES: 3. The plan and 2026 aerial photography indicate that a portion of the site is wooded. Mature trees and shrubs reduce the volume and impacts of stormwater runoff by intercepting precipitation, increasing evapotranspiration, and stabilizing soil through root growth. The removal of trees should be limited to the minimum area needed for the dwellings and support facilities. The “limits of disturbance” should be delineated to protect all trees that are intended to remain, and orange construction fencing should be placed at the “limit of disturbance” to prevent unintended intrusion into these areas by construction equipment. Additional native trees and shrubs should be incorporated into the landscaping plans to replace and mitigate the loss of removed trees. ADMINISTRATIVE ISSUES: 4. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (August 2022) and the associated Act 167 stormwater management ordinance standards adopted by each municipality. 5. The Post Construction Operation & Maintenance Notes table on Sheet 6 indicates that the maintenance of the permanent stormwater management facilities, which include a rain garden on Lot 2, shall be the responsibility of the individual lot owner. Ongoing efforts by the municipality may be needed to educate the homeowners so that they can fully understand and fulfill the operation and maintenance requirements for these facilities, particularly in regard to the on-going maintenance of the rain garden plantings. 6. The site plan depicts the location of a 10 foot wide drainage easement along the eastern portion of Lot 2. The details of this easement should be incorporated into the deeds of the proposed lots.

Page: 4 Re: Preliminary Subdivision - 1352 Morstein Road # East Goshen Township – SD-08-26-19084

7. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accordance with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds, the Assessment Office, and the municipality. This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail. Sincerely, Paul Farkas Senior Review Planner cc: TJ Ward Construction, LLC NePo Associates, Inc.

1352 MORSTEIN ROAD

East Goshen Township, Chester County, Pennsylvania

PRELIMINARY SUBDIVISION PLAN — SHEET 1 OF 6

[Engineering subdivision plan drawing showing the proposed 2-lot subdivision at 1352 Morstein Road (T-387) and Great Oak Circle, including site location map, legend, zoning requirements table, plan set directory, and certification signature blocks.]

SITE LOCATION MAP

Scale: 1"=1000' [Inset map indicating SITE at Morstein Road and Great Oak Circle, with Glenloch, South Valley Hills, and North Indicator]

LEGEND

  • EXISTING PROPERTY LINE
  • BUILDING SETBACK LINE
  • EXISTING TREE LINE
  • PROPOSED TREE LINE
  • EXISTING WATER COURSE
  • EXISTING TREE TO REMAIN
  • EXISTING TREE TO BE REMOVED

ZONING INFORMATION: AREA AND BULK REQUIREMENTS

R-2 LOW DENSITY SUBURBAN RESIDENTIAL DISTRICT

Description Required Existing Lot 1 Proposed Lot 2 Proposed
Lot Area 1.00 ac. min. 2.49 ac. (Gross)
2.43 ac. (Net)
1.23 ac. (Gross)
1.14 ac. (Net)
1.26 ac. (Gross)
1.26 ac. (Net)
Lot Width
@ Building Setback
@ Right-of-Way

150 ft min.
60 ft min.

118.27 ft.
118.27 ft.

225.1 ft.
225.1 ft.

150.4 ft.
118.2 ft.
Building Setback Line
Front Yard
Rear Yard
Side Yard

45 ft min.
50 ft min.
20 ft min.

156.7 ft.
50.6 ft.
11.8 ft.

46.3 ft.
118.5 ft.
60.6 ft.

222.4 ft.
122.7 ft.
26.1 ft.
Impervious Coverage 35% max. 4.7% 10.6% 12.6%
Building Coverage 25% max. 3.0% 7.1% 6.4%
Height of Structure 30 ft max. 25 ft. 30 ft max. 30 ft max.

PLAN SET DIRECTORY

  • 1. PRELIMINARY SUBDIVISION PLAN
  • 2. PRELIMINARY GRADING/SWM PLAN
  • 3. PRELIMINARY CONSERVATION PLAN
  • 4. NOTES
  • 5. SITE DETAILS
  • 6. POST CONSTRUCTION SWM PLAN

PLAN LABELS AND DIMENSIONS

  • MORSTEIN ROAD T-387 (35 MPH) — 20'± WIDE CARTWAY, EXISTING 33' WIDE RIGHT-OF-WAY, PROPOSED 50' WIDE RIGHT-OF-WAY
  • GREAT OAK CIRCLE (50' WIDE) — 22'± WIDE CARTWAY
  • Lot 1: 53,509 SF (GROSS), 49,583 SF (NET); 45' BUILDING SETBACK, 20' BUILDING SETBACK, 50' BUILDING SETBACK, PROPOSED 20' WIDE ACCESS EASEMENT
  • Lot 2: 54,694 SF; 20' BUILDING SETBACK, 50' BUILDING SETBACK, PROPOSED 10' WIDE DRAINAGE EASEMENT
  • Boundary Bearings & Distances: N 63°05'10" E 225.01', R=13713.93' A=225.11', 19.56', 14.72', 20.01', S 26°21'20" E 223.09', 152.19', 390.00', S 25°14'06" E 127.83', S 26°21'20" E 129.03', N 69°36'52" E 10.00', S 63°38'40" W 400.00', N 26°21'20" W 118.27', N 63°38'40" E 175.00', 176.00', N 26°21'20" W 31.73', 218.25', 269.54', S 26°21'20" E 218.53', N 63°05'10" E 205.01', 225.01', 209.25', 10.07', 5.69'
  • Monuments: CONC. MON. TO BE SET, IRON PIN TO BE SET, IP. FD., IP. FD. (BENCHMARK)
  • Adjoining Property Owners: N/F BURNS, GARY & PATRICIA, 53-1-12, DB V63, Pg 391; N/F TILLES, ERIC & JOANNE, 53-10-1, DB 9806, Pg 951; N/F DIGIOVANNI, SALVATORE & ROSE, 53-10-2, DB 20046, Pg 0305; N/F GREGORY, PETER & MARGARET, 53-10-3, DB 5069, Pg 2283; N/F BURKE, JASON & LAUREN, 53-1-11.5, DB 9866, Pg 397; N/F SCHULTE, KEVIN & JENNIFER, 53-1-11, DB 9222, Pg 502

CERTIFICATIONS AND APPROVAL BLOCKS

OWNER:

OWNER, ACKNOWLEDGEMENT OF PLAN AND OFFER OF DEDICATION

WE, _________________________, HAVE LAID OUT UPON OUR LAND, SITUATED IN THE TOWNSHIP OF EAST GOSHEN, COUNTY OF CHESTER AND COMMONWEALTH OF PENNSYLVANIA LOTS ACCORDING TO THIS PLAN WHICH IS INTENDED TO BE RECORDED. WITNESS MY HAND AND SEAL THIS _________ DAY OF ________________ 20____.

ON THIS, THE _____________ DAY OF ___________________, 20____ BEFORE ME, A NOTARY PUBLIC IN AND FOR THE COMMONWEALTH OF PENNSYLVANIA, THE UNDERSIGNED OFFICER/OWNER, PERSONALLY APPEARED ___________________, WHO ACKNOWLEDGED HIMSELF TO BE THE _____________________________ OF _________________ WHO ACKNOWLEDGED THE COMPANY TO BE THE OWNER OF THIS SUBDIVISION, AND, BEING AUTHORIZED TO DO SO, EXECUTED THE FOREGOING INSTRUMENT FOR THE PURPOSES THEREIN CONTAINED BY SIGNING THE NAME OF THE OWNER BY HIMSELF, AS MANAGER.

NOTARY PUBLIC SIGNATURE / MY COMMISSION EXPIRES

ENGINEER:

THESE PLANS ARE PREPARED IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE COMMONWEALTH OF PENNSYLVANIA, CHESTER COUNTY AND THE TOWNSHIP OF EAST GOSHEN.

DANIEL POPPLEWELL, P.E. / PE - 039244 - E

SURVEYOR:

I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED FROM AN ACTUAL FIELD SURVEY PERFORMED BY ME IN ACCORDANCE WITH THE "MINIMUM STANDARDS OF PRACTICE FOR PROFESSIONAL LAND SURVEYORS IN THE COMMONWEALTH OF PENNSYLVANIA" AS ADOPTED BY THE PENNSYLVANIA SOCIETY OF LAND SURVEYORS AND THAT ALL THE EXISTING MONUMENTS, PIPES, STONES, ETC. ARE AS SHOWN.

LESLIE P. GIERSCH / SU-049227-E

BOARD OF SUPERVISORS:

REVIEWED BY RESOLUTION OF THE BOARD OF SUPERVISORS OF EAST GOSHEN TOWNSHIP THIS ___________ DAY OF ____________________ 20 _____.

(CHAIRMAN) / (MEMBER) / (MANAGER)

TOWNSHIP ENGINEER:

REVIEWED BY THE EAST GOSHEN TOWNSHIP ENGINEER, THIS _________ DAY OF _________________ 20____.

TOWNSHIP ENGINEER

PLANNING COMMISSION:

REVIEWED BY THE EAST GOSHEN TOWNSHIP PLANNING COMMISSION, THIS _____ DAY OF _______________ 20 _____.

CHAIRMAN / MEMBER

RECORDER OF DEEDS — CHESTER COUNTY:

RECORDED IN THE OFFICE OF THE RECORDER OF DEEDS OF CHESTER COUNTY, WEST CHESTER, PA IN PLAN BOOK_________, PAGE _____ ON THE _________ DAY OF _____________, 20 ____.

DEPUTY RECORDER OF DEEDS

Chester County Recorder of Deeds

TITLE BLOCK AND OWNER/APPLICANT

OWNER/APPLICANT: TJWARD CONSTRUCTION LLC, 642 LANCASTER AVENUE, MALVERN, PA 19355, 610-496-4010

PRELIMINARY SUBDIVISION PLAN: NePo ASSOCIATES, INC., Engineers, Surveyors & Environmental Scientists, 458 E. KING ROAD, MALVERN, PA 19355, (610) 429-0605, PE -39244-E

Date: 7/15/26 | Scale: 1"=30' | Drawn By: MWN | Checked By: D.P.P. | Project Eng.: D.P.P. | Project No.: 446-01 | Dwg. No.: 446-01-1 | Issued: | SHEET 1 OF 6

1352 MORSTEIN ROAD

East Goshen Township, Chester County, Pennsylvania

PRELIMINARY GRADING/SWM PLAN — SHEET 2 OF 6

[Engineering grading and stormwater management plan drawing showing existing and proposed contours, trees to remain or be removed, proposed houses on Lot 1 and Lot 2, SWM Basin 1, SWM Basin 2, and Rain Garden.]

LEGEND

  • EXISTING PROPERTY LINE
  • BUILDING SETBACK LINE
  • EXISTING TREE LINE
  • PROPOSED TREE LINE
  • EXISTING WATER COURSE
  • EXISTING SURFACE CONTOUR
  • PROPOSED SURFACE CONTOUR
  • EXISTING SANITARY SEWER
  • PROPOSED SANITARY SEWER
  • EXISTING WATER SERVICE
  • PROPOSED WATER SERVICE
  • EXISTING GAS SERVICE
  • PROPOSED GAS SERVICE
  • EXISTING ELECTRIC SERVICE
  • PROPOSED ELECTRIC SERVICE
  • SURFACE SOIL TYPE
  • LIMIT OF DISTURBANCE
  • EXISTING TREE TO REMAIN
  • EXISTING TREE TO BE REMOVED

PLAN LABELS AND FEATURES

  • MORSTEIN ROAD T-387 (35 MPH) — 20'± WIDE CARTWAY, EXISTING 33' WIDE RIGHT-OF-WAY, PROPOSED 50' WIDE RIGHT-OF-WAY
  • GREAT OAK CIRCLE (50' WIDE) — 22'± WIDE CARTWAY
  • Lot 1: 53,509 SF (GROSS), 49,583 SF (NET) PROPOSED HOUSE: FFE=575.65, BSMT=565.65; EXISTING RESIDENCE (TO BE REMOVED) FFE=574.53; EXISTING DRIVEWAY (TO BE REMOVED); SWM BASIN 1: SW-1 T/G=573.25 INV.=571.58, 72 LF 8" SDR35 @ 2.0%, SW-2 T/G=571.50, SW-3 T/G=571.50
  • Lot 2: 54,694 SF PROPOSED HOUSE: FFE=570.49, BSMT=560.49; SWM BASIN 2: EXISTING SHED, SW-4 T/G=569.00, SW-5 T/G=567.00, 142 LF 6" PVC @ 1.0%; RAIN GARDEN: 2.4% SLOPE, 1.0%, 1.0%, EXISTING 6' HIGH FENCE
  • Adjoining Property Owners: N/F BURNS, GARY & PATRICIA, 53-1-12, DB V63, Pg 391; N/F TILLES, ERIC & JOANNE, 53-10-1, DB 9806, Pg 951; N/F DIGIOVANNI, SALVATORE & ROSE, 53-10-2, DB 20046, Pg 0305; N/F GREGORY, PETER & MARGARET, 53-10-3, DB 5069, Pg 2283; N/F BURKE, JASON & LAUREN, 53-1-11.5, DB 9866, Pg 397; N/F SCHULTE, KEVIN & JENNIFER, 53-1-11, DB 9222, Pg 502
  • SEE SHEET 4 FOR GENERAL NOTES

TITLE BLOCK

PRELIMINARY GRADING/SWM PLAN: NePo ASSOCIATES, INC., Engineers, Surveyors & Environmental Scientists, 458 E. KING ROAD, MALVERN, PA 19355, (610) 429-0605, PE -39244-E

Date: 7/15/26 | Scale: 1"=30' | Drawn By: MWN | Checked By: D.P.P. | Project Eng.: D.P.P. | Project No.: 446-01 | Dwg. No.: 446-01-2 | Issued: | SHEET 2 OF 6

1352 MORSTEIN ROAD

East Goshen Township, Chester County, Pennsylvania

PRELIMINARY CONSERVATION PLAN — SHEET 3 OF 6

[Engineering conservation and erosion control plan drawing showing soil classifications, limits of disturbance, filter socks, stabilized construction entrances, concrete washout areas, and soil stockpiles for Lot 1 and Lot 2.]

LEGEND

  • EXISTING PROPERTY LINE
  • BUILDING SETBACK LINE
  • EXISTING TREE LINE
  • PROPOSED TREE LINE
  • EXISTING WATER COURSE
  • EXISTING SURFACE CONTOUR
  • PROPOSED SURFACE CONTOUR
  • EXISTING SANITARY SEWER
  • PROPOSED SANITARY SEWER
  • EXISTING WATER SERVICE
  • PROPOSED WATER SERVICE
  • EXISTING GAS SERVICE
  • PROPOSED GAS SERVICE
  • EXISTING ELECTRIC SERVICE
  • PROPOSED ELECTRIC SERVICE
  • SURFACE SOIL TYPE
  • LIMIT OF DISTURBANCE
  • EXISTING TREE TO REMAIN
  • EXISTING TREE TO BE REMOVED
  • FILTER SOCK
  • ORANGE TREE PROTECTION FENCING

SOILS LEGEND

Symbol Name, Slope Soil Classification
GgB Glenelg silt loam, 3–8% slopes B
MaA Manor loam, 0–3% slopes B
UugB Urban lands-Udorthents, 0–8% slopes C

Source: Soil Survey of Chester County, Pennsylvania.

PLAN LABELS AND FEATURES

  • MORSTEIN ROAD T-387 (35 MPH)
  • GREAT OAK CIRCLE (50' WIDE)
  • Soil Symbols on Map: GgB, MaA, UugB
  • Lot 1: 53,509 SF (GROSS), 49,583 SF (NET) PROPOSED HOUSE: FFE=575.65, BSMT=565.65; CONCRETE WASHOUT; STABILIZED CONSTRUCTION ENTRANCE; SOIL STOCKPILE; LIMIT OF DISTURBANCE: 19,200sf; SWM BASIN 1
  • Lot 2: 54,694 SF PROPOSED HOUSE: FFE=570.49, BSMT=560.49; FILTER SOCK (TYP.); STABILIZED CONSTRUCTION ENTRANCE; LIMIT OF DISTURBANCE: 22,727sf; CONCRETE WASHOUT; RAIN GARDEN, ST-1; SOIL STOCKPILE; SWM BASIN 2
  • SEE SHEET 4 FOR CONSERVATION NOTES

TITLE BLOCK

PRELIMINARY CONSERVATION PLAN: NePo ASSOCIATES, INC., Engineers, Surveyors & Environmental Scientists, 458 E. KING ROAD, MALVERN, PA 19355, (610) 429-0605, PE -39244-E

Date: 7/15/26 | Scale: 1"=30' | Drawn By: MWN | Checked By: D.P.P. | Project Eng.: D.P.P. | Project No.: 446-01 | Dwg. No.: 446-01-3 | Issued: | SHEET 3 OF 6

1352 MORSTEIN ROAD

East Goshen Township, Chester County, Pennsylvania

POST CONSTRUCTION SWM PLAN — SHEET 6 OF 6

[Engineering post-construction stormwater management plan drawing showing Lot 1 and Lot 2 proposed dwellings, SWM Basin 1, SWM Basin 2, Rain Garden, site location map, legend, operation and maintenance notes, and certification blocks.]

SITE LOCATION MAP

Scale: 1"=1000' [Inset map indicating SITE at Morstein Road and Great Oak Circle, with Glenloch and South Valley Hills]

LEGEND

  • EXISTING PROPERTY LINE
  • BUILDING SETBACK LINE
  • EXISTING TREE LINE
  • PROPOSED TREE LINE
  • EXISTING WATER COURSE
  • EXISTING SURFACE CONTOUR
  • PROPOSED SURFACE CONTOUR
  • EXISTING SANITARY SEWER
  • PROPOSED SANITARY SEWER
  • EXISTING WATER SERVICE
  • PROPOSED WATER SERVICE
  • EXISTING GAS SERVICE
  • PROPOSED GAS SERVICE
  • EXISTING ELECTRIC SERVICE
  • PROPOSED ELECTRIC SERVICE
  • EXISTING TREE TO REMAIN
  • EXISTING TREE TO BE REMOVED

POST CONSTRUCTION OPERATION & MAINTENANCE NOTES:

THE INTENT OF THE POST DEVELOPMENT STORMWATER MANAGEMENT PLAN IS TO IDENTIFY ON SITE BEST MANAGEMENT BEST PRACTICES' FACILITIES, COLLECTIVELY REFERRED TO HEREIN AS BMP'S, ON THE PROJECT AND TO PROVIDE THE BUILDER AND PROPERTY OWNER WITH AN OUTLINE OF LONG-TERM STRATEGIES FOR THEIR MANAGEMENT. THE PRIMARY GOAL IS TO PROVIDE A COST-EFFICIENT MANAGEMENT STRATEGY FOR THE PROJECT'S BMP'S.

THE BUILDER SHALL CONSTRUCT AND/OR INSTALL ALL IMPROVEMENTS INCLUDING PLANTINGS, INFILTRATION FACILITIES, STORM DRAINAGE, STORMWATER MANAGEMENT BASINS AND OTHER LANDSCAPE BUFFERING FEATURES IDENTIFIED ON THE APPROVED PLANS.

THE MAINTENANCE AND ENHANCEMENT OF BMP'S SHALL BE GOVERNED BY THIS PLAN AND PERFORMED BY THE PROPERTY OWNER AFTER CONSTRUCTION OF THE IMPROVEMENTS. THIS PLAN ALSO PROVIDES THE FLEXIBILITY FOR THE OWNER TO PLANT FLOWERS AND/OR ADDITIONAL NATIVE SHRUBS AND TREES, SO LONG AS SUPPLEMENTAL LANDSCAPING DOES NOT CONFLICT WITH GUIDELINES DESCRIBED HEREIN.

THE INDIVIDUAL PROPERTY OWNER WILL OWN, MAINTAIN, AND FUND THE MANAGEMENT OF ALL BMP'S DESCRIBED IN THIS DOCUMENT. THE BMP'S SHALL BE MAINTAINED ON AN ONGOING BASIS IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN THIS PLAN.

STORMWATER MANAGEMENT FACILITIES SHALL ALSO BE INSPECTED AND AS-BUILT DURING AND UPON COMPLETION OF INSTALLATION OF THOSE FACILITIES BY A REGISTERED PROFESSIONAL ENGINEER. UPON COMPLETION OF THE STORMWATER MANAGEMENT FACILITIES INSPECTION, A REPORT OUTLINING THE FINDINGS WILL BE SUBMITTED TO THE BUILDER. IF PROBLEMS ARE OBSERVED, CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY. IF MAJOR REPAIR IS REQUIRED, THE REPORT WILL BE FORWARDED TO THE TOWNSHIP, FOR THE TOWNSHIP ENGINEER TO APPROVE.

UPON COMPLETION OF THE IMPROVEMENTS, THE PROPERTY OWNER SHALL BE RESPONSIBLE FOR THE MAINTENANCE AND MANAGEMENT OF THE FOLLOWING AREAS, DESCRIBED BELOW:

1. LANDSCAPED AREAS:

LANDSCAPED AREAS INCLUDE ALL ORNAMENTAL TREES AND SHRUBS, EXISTING WOODLANDS, MEADOW AREA, AND MAINTAINED LAWN AREAS LOCATED ON THE PROJECT. MANAGEMENT AND MAINTENANCE TASKS FOR EACH OF THESE AREAS ARE AS FOLLOWS:

  • A. ORNAMENTAL TREES AND SHRUBS — ORNAMENTAL TREES AND SHRUBS ARE LOCATED THROUGHOUT THE PROJECT AND INCLUDE NATIVE CANOPY AND UNDERSTORY TREES, EVERGREENS AND SHRUBS. A CERTIFIED ARBORIST OR LANDSCAPE ARCHITECT SHALL INSPECT NEWLY PLANTED TREES AND SHRUBS ANNUALLY FOR THE FIRST 5 YEARS, PRUNING, FERTILIZING, AND REPLANTING WHERE NECESSARY. TREES SHOULD BE PRUNED TO A LOWEST BRANCHING HEIGHT OF 8 FEET. DISEASED OR DEAD TREES AND SHRUBS SHALL BE REPLACED WITH THE SAME SPECIES DESCRIBED ON THE APPROVED LANDSCAPE PLANS, UNLESS THE OWNER'S CONSULTANT FINDS SITE CONDITIONS FAVOR OTHER SPECIES. REPLACEMENT PLANTINGS SHALL BE OF NATIVE ORIGIN ONLY.
  • B. LAWN AREAS — LAWN AREAS ARE LOCATED THROUGHOUT THE PROJECT. ALL LAWN AREAS SHALL BE MOWED AS NECESSARY AND MAINTAINED WITH GOOD GRASS COVER. THE HOMEOWNER SHALL HAVE THE RIGHT TO INSTALL ADDITIONAL LANDSCAPING IN THE LAWN AREAS.

2. WOODLAND AREAS:

TO ENSURE WOODED AREAS SUPPORT NATIVE PLANTS AND WILDLIFE AND AFFORD SCENIC ENJOYMENT, PERIODIC REMOVAL VIA MECHANICAL MEANS AND CHEMICAL ERADICATION OF INVASIVE SPECIES MAY BE NECESSARY, PARTICULARLY ALONG WOODLAND EDGES. DYING, DISEASED, OR DEAD TREES, WHICH POSE RISKS TO HUMAN HEALTH AND SAFETY, MAY BE REMOVED.

SPECIFIC MAINTENANCE TASKS IN THE FIRST YEAR INCLUDE:

  • A. EARLY SPRING THROUGH LATE SUMMER — REMOVE NON-NATIVE VINES AND SHRUBS BY MANUAL MEANS AND BRUSH CUTTING, USING AMBUSHER AS NECESSARY ALONG WOODLAND EDGES. MANUALLY PRUNE VINES FROM TREES AND SHRUBS. APPLY GLYPHOSATE HERBICIDE (ROUNDUP) TO NEW VINE GROWTH IN CLEARED AREAS AS NECESSARY.

MAINTENANCE TASKS IN THE SECOND AND SUBSEQUENT YEARS INCLUDE:

  • A. WINTER THROUGH SPRING — ASSESS AREA AND IDENTIFY ADDITIONAL LOCATIONS FOR CLEARING INVASIVE SPECIES, LIMITING SIZE AND LOCATION BASED ON ABILITY TO REPLANT AND MANAGE WITH NATIVE TREES AND SHRUBS. CONTINUE AMBUSHER CLEARING IN IDENTIFIED AREAS. PLANT ADDITIONAL OAKS, SHRUBS AND FLOWERING TREES IN NEWLY CLEARED AREAS. CONTINUE TO PLANT FLOWERING TREES ALONG EDGES, AND GRADUALLY REPLACE FLOWERING DOGWOOD WITH WITCH-HAZEL AND SHADBUSH IN THE UNDERSTORY.

3. STORMWATER MANAGEMENT FACILITIES:

STORMWATER MANAGEMENT FACILITIES LOCATED ON THE PROJECT INCLUDE INDIVIDUAL SUBSURFACE STORMWATER BASINS. THESE FACILITIES SHALL BE MANAGED IN GOOD, CLEAN, UNOBSTRUCTED AND PROPER OPERATING CONDITION. INSPECTION OF THESE FACILITIES BY THE HOMEOWNER SHALL TAKE PLACE ON AN ANNUAL BASIS. INSPECTION SHALL ALSO TAKE PLACE FOLLOWING 3" OR GREATER STORM EVENTS.

STORMWATER MANAGEMENT FACILITIES ARE LOCATED TO THE REAR OF THE PROPOSED DWELLINGS AND UNDER THE PROPOSED PARKING AREA INCLUDE SUBSURFACE INFILTRATION BASIN, INLETS, CULVERTS AND GRASS SWALES. THESE FACILITIES SHALL BE MANAGED IN GOOD, CLEAN, UNOBSTRUCTED, AND PROPER OPERATING CONDITION. INSPECTION OF THESE FACILITIES BY THE PROPERTY OWNER SHALL TAKE PLACE ON AN ANNUAL BASIS. INSPECTION SHALL ALSO TAKE PLACE FOLLOWING A MAJOR STORM EVENTS.

INLETS AND SUBSURFACE SWM BASIN REMOVE GRATES AND RIMS ANNUALLY TO INSPECT FOR LEAKS AND STRUCTURAL INTEGRITY. ALL DEBRIS AND SEDIMENT TO BE REMOVED EVERY SIX (6) MONTHS. ALL SEDIMENT AND DEBRIS TO BE DISPOSED IN ACCORDANCE WITH CURRENT AND COUNTY REGULATIONS WITHIN THE LIMITS OF THEIR RESPECTIVE LOTS.

THE PROPERTY OWNER IS RESPONSIBLE FOR ANNUAL AND POST-STORM INSPECTIONS OF BMP'S AFTER SETTLEMENT ON THIS PROPERTY. THEY SHALL MAKE NOTE OF THE FOLLOWING CONDITIONS FOR EACH STORMWATER MANAGEMENT FACILITY:

  • A. SWALES 1. LOOK FOR BARE AREAS WITHIN THE SWALES. THESE AREAS SHOULD NOT BE ERODED OR BARE.; 2. ENSURE SWALES ARE CLEAR OF OBSTRUCTIONS.; 3. ENSURE SWALES ARE NOT OVERGROWN WITH UNDERBRUSH AND TREES.
  • B. INFILTRATION AREAS 1. EXAMINE GRATES ABOVE INLET BOXES ADJACENT TO INFILTRATION AREAS. ENSURE THAT GRATES ARE FREE OF DEBRIS.; 2. LOOK FOR STANDING WATER IN THE BOTTOM OF THE INLET BOXES. INLET BOXES SHOULD EMPTY WITHIN 3 DAYS AFTER A STORM EVENT.; 3. IF PROBLEMS SUCH AS EROSION OR FACILITY MALFUNCTION ARE OBSERVED, THE ASSOCIATION SHALL CONTACT THE TOWNSHIP ENGINEER AND TAKE IMMEDIATE CORRECTIVE ACTION AS NECESSARY.

IF PROBLEMS SUCH AS EROSION OR FACILITY MALFUNCTION ARE OBSERVED, THE BUILDER/OWNER SHALL CONTACT THE TOWNSHIP ENGINEER AND TAKE IMMEDIATE CORRECTIVE ACTION AS NECESSARY.

THE ACTIVITIES AND TASKS REQUIRED BY THIS PLAN SHALL BE CONDUCTED TO PRESERVE AND PROTECT THE BMP'S.

APPLICANT ACKNOWLEDGEMENT

I, _______________________ (APPLICANT), HEREBY ACKNOWLEDGE THAT ANY REVISION TO THE APPROVED SWM SITE PLAN SHALL BE SUBMITTED TO AND APPROVED BY THE MUNICIPALITY, AND THAT A REVISED EROSION AND SEDIMENT CONTROL PLAN SHALL BE SUBMITTED TO APPROVED BY THE MUNICIPALITY FOR A DETERMINATION OF ADEQUACY PRIOR TO THE CONSTRUCTION OF THE REVISED FEATURES.

APPLICANT SIGNATURE / APPLICANT PRINT / DATE

ENGINEERS CERTIFICATION

I, DAN POPPLEWELL, ON THIS _____ DAY OF ____________, 20____, HEREBY CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE SWM SITE PLAN MEETS ALL DESIGN STANDARDS AND CRITERIA OF THE EAST GOSHEN TOWNSHIP STORMWATER MANAGEMENT ORDINANCE NUMBER 195.

DANIEL POPPLEWELL, P.E., PE-39244E CIVIL ENGINEER / DATE

PLAN LABELS AND TITLE BLOCK

  • MORSTEIN ROAD T-387 (35 MPH) | GREAT OAK CIRCLE (50' WIDE)
  • Lot 1: 53,509 SF (GROSS), 49,583 SF (NET); PROPOSED HOUSE FFE=575.65, BSMT=565.65; SWM BASIN 1
  • Lot 2: 54,694 SF; PROPOSED HOUSE FFE=570.49, BSMT=560.49; SWM BASIN 2; RAIN GARDEN
  • OWNER/APPLICANT: TJWARD CONSTRUCTION LLC, 642 LANCASTER AVENUE, MALVERN, PA 19355, 610-496-4010
  • POST CONSTRUCTION SWM PLAN: NePo ASSOCIATES, INC., Engineers, Surveyors & Environmental Scientists, 458 E. KING ROAD, MALVERN, PA 19355, (610) 429-0605, PE -39244-E
  • Date: 7/15/26 | Scale: 1"=30' | Drawn By: MWN | Checked By: D.P.P. | Project Eng.: D.P.P. | Project No.: 446-01 | Dwg. No.: 446-01-6 | SHEET 6 OF 6