Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS

Tuesday, July 2, 2013
7:00 PM

JUDGE WILLIAM D. KRAUT WILL SWEAR IN JANET EMANUEL AS SUPERVISOR

  1. Call to Order
  2. Pledge of Allegiance
  3. Moment of Silence – Supervisor Carmen Battavio
  4. Ask if anyone is recording the meeting
  5. Public Comment – Hearing of Residents (Optional)
  6. Chairman’s Report Comp Plan Update – Announce the next meeting is scheduled for July 22, 2013
  7. Public Hearings
  8. Police/EMS Reports – None
  9. Financial Report Capital Reserve & Sewer Capital Reserve Funding Levels - June 25, 2013; Amendment to Sewer Capital Reserve Budget – June 27, 2013
  10. Old Business Comp Plan Update/Sustainable Communities Assessment (John Theilacker, Project Manager, will be present to answer any questions)
  11. New Business Consider PECO Natural Gas service to Cell Tower
  12. Any Other Matter
  13. Approval of Minutes June 5, 2013; June 18, 2013
  14. Treasurer’s Report June 27, 2013
  15. Review Action List July 2, 2013
  16. Correspondence, Reports of Interest Acknowledge Planning Commission 2013 Goals; Acknowledge Rose Hill Estates Condominiums – Property Concerns & Safety Violations; Staff response to Rose Hill Estates Condominiums Property Concerns & Safety Violations; Acknowledge Janet Emanuel’s resignation from the Zoning Hearing Board effective June 26, 2013
  17. Dates of Importance July 02, 2013 Board of Supervisors 7:00 PM July 03, 2013 Planning Commission 7:00 PM

F:\Data\Shared Data\Agendas\Board of Supervisors\2013\07022013.doc

Park Commission will not meet in July
July 04, 2013Independence Day
Office Closed
July 04, 2013Farmer’s Market3-7:00 PM
July 08, 2013Municipal Authority
CANCELLED
7:00 PM
July 10, 2013Conservancy Board7:00 PM
July 11, 2013Historical Commission7:00 PM
July 11, 2013Farmer’s Market3-7:00 PM
July 15, 2013Commerce Commission7:00 PM
July 16, 2013Board of Supervisors7:00 PM
July 17, 2013Police Commission
WEGO Police Station
5:30 PM
July 17, 2013Historical Commission w/s
Comp Plan as it relates to historical resources
6:30 PM
July 18, 2013Farmer’s Market3-7:00 PM
July 22, 2013Comp Plan Task Force7:00 PM
July 25, 2013Farmer’s Market3-7:00 PM
July 25, 2013Town Tours & Village Walks
Historic Goshenville
5:30 PM
July 1-Aug 2, 2013Youth Recreation Day Camp8:45-12:00 PM

Summer 2013 Newsletter:
Posted to Website – Approximately July 1, 2013

  1. Public Comment – Hearing of Residents
  2. Adjournment

The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.

F:\Data\Shared Data\Agendas\Board of Supervisors\2013\07022013.doc

Memo

To: Board of Supervisors
From: Jon Altshul
Re: Capital Reserve and Sewer Capital Reserve Funding Levels
Date: June 25, 2013

BACKGROUND

At the June 5 planning session, the Board directed staff to determine the appropriate funding level for both the capital reserve and the sewer capital reserve funds. The Board also expressed an interest in issuing a multi-year, inter-fund loan between the general fund and the sewer capital reserve fund to reimburse costs incurred by the Municipal Authority for the various diversion projects, as an alternative to traditional borrowing.

This memo lays out the following three issues:

  1. The appropriate funding levels for the capital reserve
  2. The appropriate funding levels for the sewer capital reserve
  3. Considerations for possible inter-fund borrowing

APPROPRIATE FUNDING LEVELS FOR THE CAPITAL RESERVE FUND

The Township transfers money from the general fund to the capital reserve fund based on the annual change in the “accumulated depreciation” of Township assets. For assets not totally depreciated, the replacement value equals the accumulated depreciation of that asset, adjusted for inflation. A simple example is that if a truck with a useful life of 10 years is purchased in 2008 for $20,000, it would have a replacement value of slightly more than $8,000 in 2012 (or 4 years * $2,000 + inflation) and slightly more than $14,000 in 2015 (7 years * $2,000 + inflation). For fully depreciated assets, the replacement value equals the total accumulated depreciation adjusted for inflation.

Mark, Rick and I updated the fixed asset worksheet to include a variety of existing capital assets that are not currently being amortized in the fixed asset replacement list, such as Park bridges, as well as the new assets that we plan to add this year, such as the Hershey Mill Dam restoration and the Geothermal project. A list of these assets is provided as Attachment #1. We did not include land or buildings. These additions added roughly $200,000 to the 2014 accumulated depreciation total, representing $2 million worth of assets.

ACCUMULATED DEPRECIATION OF FIXED ASSETS

2013 2014 2015 2016 2017 2018 2019
Accumulated Depreciation (Funding requirement) 3,654,198 4,133,218 4,606,578 5,043,718 5,478,726 5,913,975 6,340,252

For perspective, the capital reserve fund has a balance of $6,048,010 as of June 25, meaning that the capital reserve fund is presently overfunded by roughly $2.4 million.

At the planning session, the Board also discussed the possibility of paying for the nine “new” capital projects1 out of the capital reserve fund instead of the general fund, as was originally budgeted, and then transferring from the general fund to the capital reserve fund an amount equal to the purchase price of those assets to reimburse the capital reserve. A list of those projects is provided below2:

“NEW” CAPITAL ASSETS BUDGETED IN 2013 GENERAL FUND

Project Cost
Geothermal$500,250
Blacksmith Shop Roof$13,500
Energy Efficient Light Fixtures$11,000
Township Parking Lot$28,000
LED Sign (Boot/Paoli)$20,000
Amphitheater construction$8,000
Basketball court resurfacing$10,000
LED Sign (Park)$20,000
Hershey Mill Dam repair$240,000
TOTAL$850,750

To that end, I have provided as Attachment #2 a capital reserve detail sheet with three year-end scenarios:

  1. All capital purchases are paid from the capital reserve fund with no additional year-end transfer other than what was budgeted
  2. All capital purchases are paid from the capital reserve fund with an additional year-end transfer from the general fund to cover the cost of those projects
  3. The capital reserve pays for the budgeted projects only and receives the budgeted transfer only

As you’ll see, under all three of these scenarios, the capital reserve would finish the year with substantially more money than the 2014 funding requirement. Ultimately, the question before the board is a philosophical one: should the Board draw down the capital reserve fund or the general fund.

  • As currently budgeted, the general fund will have a year end fund balance of approximately $5.98 million or 60% of annual expenditures. If the capital reserve bears the cost of all capital purchases this year, the general fund should have a year-end fund balance of $6.83 million or nearly 69% of annual expenditures.

1 In this context, “new” refers to both new capital assets, such as the geothermal HVAC system, as well as existing capital assets, such as the Blacksmith Shop roof, that were not previously included in the fixed asset worksheet.
2 In addition, $33,200 for the Milltown Dam Spillway repair was appropriated from the capital reserve fund on June 5th. However, no funds were appropriated from the general fund to reimburse the capital reserve for this expense.

RECOMMENDATIONS:

  • Staff has no recommendation regarding whether funds should be appropriated from the capital reserve fund in 2013 to pay for the nine “new” projects, as both the general fund and the capital reserve fund are well positioned at this time.
  • If the Board decides to pay for the nine “new” capital expenses in 2013 from the capital reserve fund, there is no reason to increase the year-end transfer from the general fund beyond what was originally budgeted.

APPROPRIATE FUNDING LEVELS FOR THE SEWER CAPITAL RESERVE FUND

Mark, Rick and I also updated the fixed asset worksheet for the sewer capital reserve. Specifically, this worksheet now includes the generator, meter, pumps, controls and miscellaneous equipment at the four pump stations that will be operational when the diversion projects are complete; the equipment at the Ridley Creek Plant other than land, buildings and structures; the six Township-owned sewer meters; and $200,000 for miscellaneous gravity lines, force mains and manhole covers. A copy of these fixed assets is provided as Attachment #3. As a practical matter, we did not include all the sewer lines in the ground, as the cost of replacing all of those would be cost-prohibitive and would necessitate borrowing. As shown in the table below, the 2013 funding requirement is about $1.28 million, rising to $1.95 million in 2019. The current replacement value of all the assets in the fixed sewer asset worksheet is about $3.77 million.

ACCUMULATED DEPRECIATION OF FIXED SEWER ASSETS

2013 2014 2015 2016 2017 2018 2019
Accumulated Depreciation (Funding requirement) $1,281,868 $1,391,300 $1,499,364 $1,606,168 $1,716,484 $1,830,310 $1,947,648

For perspective, the current balance of the sewer capital reserve is $1,009,490. Net of the year-end transfer from the sewer operating fund (+$160,000), additional anticipated interest income (+$1,401) and remaining transfers to the Municipal Authority for the diversion projects (-$303,337) and other capital expenses (-$117,000), the sewer capital reserve should have a year-end balance of approximately $750,000 without any borrowing to reimburse the fund for the diversion projects. As further perspective, it is anticipated that the entire cost of the diversion projects, excluding the Reservoir Road project, will be $1.2 million between 2011 and 2013.

RECOMMENDATIONS:

  • The Sewer Capital Reserve should strive to maintain a fund balance at least equal to the accumulated depreciation of the fixed assets every year.
  • The Township should approve borrowing in an amount sufficient to reimburse the sewer capital reserve fund such that the projected balance of the sewer capital reserve fund equals approximately $1,391,300 at the beginning of 2014. This would correspond with approximately $650,000, slightly more than half of the cost of the diversion projects.

CONSIDERATIONS FOR POSSIBLE INTERFUND BORROWING

Over the past two weeks, the municipal bond market has been negatively impacted by indications that the Federal Reserve will unwind its bond buying program. Between May 13 and June 25th, rates on 10-

year fixed rate DelVal notes have jumped from 1.611% to 1.900%, while rates on 20-year notes have jumped from 2.598% to 2.853%. That said, it’s still a very good time to borrow and DelVal’s rates are still favorable to the “all-in true interest costs” that we were quoted last month if we were to issue bonds.

Rick and I spoke with our auditor about the Board’s suggestion that the General Fund reimburse the sewer capital reserve fund for the diversion projects instead getting a loan from DelVal. Our auditor indicated that while having a formal multi-year intra-fund loan is relatively rare, the Government Accounting Standards Board does have accounting guidelines on these transactions, although there is no formal guidance on the interest rate that should be levied.

The advantage of having an intra-governmental loan is that money can be “lent” at a lower rate than might be available in the private market and without issuance costs. For perspective, the nominal interest savings on a 10-year $650,000 loan at 1% compared to 1.9% is roughly $33,000.3 Including issuance costs, this would mean total 10-year savings of roughly $45,000. The disadvantage is that the general fund would be subjecting itself to some interest rate risk. That is, if bank rates go up after the loan is made, the general fund would miss out on interest income, which might be greater than the savings. In addition, it’s important to analyze the impact of such loans on the long-term general fund projections. We want to avoid borrowings that might erode too much of the general fund balance.

I have stressed tested various inter-fund borrowing scenarios and feel confident that an inter-fund loan with a repayment schedule of not more than 10 years and a principal amount of $650,000 would minimize interest rate risk and protect the general fund’s long-term solvency. Longer repayment schedules or principal values that also include the engineer’s estimate of $1.6 million for the Reservoir Road diversion project would not be advisable.

That said, we do plan to incur preliminary costs for the Reservoir Road project in 2014 and the additional issuance costs involved in borrowing $2.25 million versus $650,000 are minimal. In other words, while there may be some cost savings in doing a small interfund borrowing, we will need to borrow eventually, so it may make sense to do it all at once.

For perspective, debt service on a ten-year $2.25 million DelVal note would increase the variable sewer rate by about 76 cents per thousand gallons (compared with the current rate of $7.51/TG), while debt service on a 20-year note would increase the rate by roughly 39 cents per thousand gallons.

RECOMMENDATION

  • The Board should approve borrowing $2.25 million from DelVal to a) reimburse the sewer capital fund reserve fund for costs incurred in the four diversion projects and b) for future costs of the Reservoir Road diversion project.

3 An interest rate of 1% was chosen as an approximate midpoint between current long-term (5-year) CD rates of 1.7% and the Township’s average return on cash (.33%)

Page 1 of 5

ATTACHMENT #1

East Goshen Township
CAPITAL RESERVE FIXED ASSETS
Projection of Accumulated Depreciation

ItemDatePeriodLifetimeEstimated Replacement Cost201320142015
VEHICLES AND EQUIPMENT
2011 Ford F350 4X43/11/2011201110$33,0926,81710,52314,428
2012 Ford f3502012201210$37,0793,8197,86112,125
2011 Ford F3506/9/2010201010$41,82012,92317,73222,792
2003 Ford f350 4X48/29/2002200210$46,57547,97249,37050,767
5/2006 Ford F350 4x42006200610$55,24439,83146,84754,195
1/2012 Ford Escape xlt3/30/2012201210$26,1842,6975,5518,562
2005 Ford f3502005200510$40,89533,69739,01444,576
2003 Sterling Acterra utility body#########200210$130,992134,922138,852142,782
2005 Ford F550 4X45/25/2005200510$67,28555,44364,19073,341
2004 Ford F350 4x45/19/2004200410$46,81043,39349,61851,023
2007 Ford f3502008200810$51,53026,53832,77339,318
02/2009 Ford Rangler xlt3/4/2009200910$19,7648,14310,47512,926
11/2003 INT 42OO4/1/2004200410$160,490148,775170,120174,935
1988 Case 585 Tractor1988198810$52,63954,21855,79757,376
2010 Case 521E Loader2010201010$97,29730,06541,25453,027
2012 John Deere 5083 E Limited Util2012201210$43,3574,4669,19214,178
1999 John Deere Gator11/6/1998199810$12,85813,24413,63014,016
2008 John Deere Gator4/29/2008200810$6,9093,5584,3945,271
2003 CAT 430D BackHoe8/4/2003200310$136,437140,551144,644148,738
Sullair 185 CFM air compressor11/3/1999199910$15,70416,17516,64617,117
2010 Brush Bandit 1590XP Chipper9/13/2010201010$44,70413,81318,95424,363
Dyna Pac Roller cc1225/6/1997199710$39,20640,38341,55942,735
1989 Case 245 Tractor1989198910$36,70537,80638,90840,009
1999 Case C50 Tractor1999199910$28,26729,11529,96330,811
2000 New Holland tn65d Tractor4/27/2000200010$45,88847,26448,64150,018
1991 Case 380B1991199110$33,45734,46135,46536,469
1990 Hyster Forklift2/4/2010201010$1,809559767986
2005 CAT EXCAVATOR 302.5C2/24/2006200610$55,24439,83146,84754,195
2011 Leeboy Paver6/14/2011201110$94,58019,48330,07641,237
2003 Caterpillar 248 Skid Steer8/1/2003200310$54,01455,63557,25558,875
1997 Ford L85011/31/1997199710$130,688134,609138,529142,450
1997 Ford L85011/31/1997199710$130,688134,609138,529142,450
2013 Peterbilt348 (Truck 44)2013201310$140,809-14,92630,696
2005 FREIGHTLINER#########200510$127,797105,305121,918139,299
2005 FREIGHTLINER#########200510$127,797105,305121,918139,299
1998 Case C504/15/1998199810$28,93129,79930,66731,535
2012 Peterbilt348#########201110$160,50133,06351,03969,979
2007 O'Brian Jetter2008200810$48,43924,94630,80736,959
2009 Case 450CT/S32/20/2009200910$71,06329,27837,66346,475
2007 Ford Explorer2007200710$23,88814,76317,72520,831
2008 Sterling5/27/2009200910$142,45958,69375,50393,168
Subtotal$2,689,918$1,815,967$2,056,145$2,284,328
TRAILERS0
2003 Tilt Trailer20032003106,2546,4426,6306,817
1993 Haulmark19931993106,7576,9607,1637,366
1991 Int.19911991108,2668,5148,7629,010
1990 Interstate199019901028,15428,99929,84330,688
2001 Marthon TAR BUGGY9/19/20012001107,5177,7427,9688,193
WorkHorse 5 Ton Trailer4/11/20002000107,6487,8778,1078,336
Wells Fargo 18'4/24/20012001109,84710,14210,43810,733
10/2007 Big Tex10/1/20072007103,8132,3562,8293,325
Big Tex20062006106,8134,9135,7786,684
2006 Eager Beaver 20#########2006106,8134,9135,7786,684
Big Tex4/23/20082008103,6551,8822,3252,789
Subtotal95,53890,74095,619100,625
BACKHOE ATTACHMENTS
18" 24" 30" Buckets1998199820$5,6264,3464,7705,212
Frost Point2000200020$18,35512,28913,62015,005
Milling Head for skid steer2009200920$22,2074,5755,8857,262
Brushcutter - skid steer equip2009200920$8,8831,8302,3542,905
Subtotal0$55,071$23,039$26,629$30,384
PUMPS
Honda 2" GX-16020012001155,2514,3274,8245,342
Honda 3" GX-24020022002154,0753,0783,4563,850
Honda 3" GX-24020002000154,8954,3694,8425,335
07 Honda GX-16020032003155,9704,0994,6415,206
Honda 4" GX-34020022002155,5314,1784,6905,225
Honda 4" GX-34020082008154,3511,4941,8452,213
Electric 2" Pumps20102010154,1088461,1611,493
Subtotal034,18222,39225,46028,664
GENERATORS
Honda 1,000-EX2/2/19941994155,2795,4385,5965,754
Honda 3,800-EB9/16/20042004155,0823,1413,5914,062

Page 2 of 5

ATTACHMENT #1

East Goshen Township
CAPITAL RESERVE FIXED ASSETS
Projection of Accumulated Depreciation

Item Acquisition Date Period Lifetime Estimated Replacement Cost 2013 2014 2015
Honda EB2500X 2003 2003 15 4,264 2,928 3,315 3,718
Subtotal 14,626 11,506 12,502 13,535
ROAD SAWS
TARGET PAC1V20H 1/16/1998 1998 10 6,429 6,622 6,815 7,008

Page 3 of 5

ATTACHMENT #1

East Goshen Township
CAPITAL RESERVE FIXED ASSETS
Projection of Accumulated Depreciation

ItemDatePeriodLifetimeEstimated Replacement Cost201320142015
Subtotal6,4296,6226,8157,008
SEWER EQUIPMENT
2000-RST Video Pipe Camera20002000106,1186,3026,4856,669
Mini Camera - Self Leveling7/23/201020101011,9313,6875,0596,502
Camera and Reel200020001012,23712,60412,97113,338
2001-RST Large Video Pipe Camera200120011081,02083,45185,88188,312
1992 Vistec. Robotic Pipe Camera199219921038,17939,32540,47041,615
Subtotal149,485145,368150,866156,437
SHOP EQUIPMENT
Lincoln Welder1/5/20072007104,7782,9533,5454,166
MIG Welder Miller 250x8/24/20002000104,8955,0425,1885,335
Table Saw20052005104,6013,7914,3895,015
Subtotal14,27311,78513,12214,516
MECHANICS TOOLS
Miller syncrowave 200 tig welder20102010104,8001,4832,0352,616
Miller bob cat 250 welder20092009103,9421,6242,0892,578
Rotary Lift TL07200720071022,03713,61916,35119,216
Subtotal30,77916,72620,47624,410
MOWERS
Woods C-1146/30/1999199910$23,55624,26324,96925,676
Woods C-1146/2/1998199810$24,10924,83325,55626,279
Woods D802001200110$12,00312,36312,72313,083
Exmark LZ2006200610$11,0497,9669,36910,839
Woods DS126200820087$8,5206,2687,7419,286
Rhino Flail/RHD882002200210$29,83730,73231,62732,522
Alamo Flail1988198810$34,74235,78436,82637,868
Mott Flail1999199910$54,96456,61358,26259,911
Spare Mott Mower1988198810$6,7386,9407,1427,344
Exmark LZ2007200710$10,7506,6437,9769,374
Exmark LZ2011201110$6,5451,3482,0812,854
Exmark LZ2011201110$6,5451,3482,0812,854
Exmark LZ2012201210$8,4348691,7882,758
Exmark LZ2012201210$8,4348691,7882,758
Boom Mower McConnel2007200710$9,5555,9057,0908,332
07 Exmark /Frontrunner200820084$10,97811,30811,63711,966
07 Exmark/ Frontrunner200720074$10,75011,07211,39511,717
Exmark LZ200720074$10,75011,07211,39511,717
2013 Exmark lazer z2013201310$9,435-1,0002,057
2013 Exmark lazer z2013201310$9,435-1,0002,057
Subtotal0307,130256,196273,448291,254
SNOW EQUIPMENT
Monroe 11 ft. Power Angle On #4120062006105,7704,1604,8935,660
Monroe 11 ft. Power Angle On #4220062006105,7704,1604,8935,660
Monroe 11 ft. Power Angle On #43#########201110----
Flink 11 ft. Power Angle On #371/31/19971997107,6787,9088,1398,369
Flink 11 ft. Power Angle On #381/31/19971997107,6787,9088,1398,369
Flink 11 ft. Power Angle On #4420132013106,009-6371,310
Flink 11 ft. Power Angle On #409/9/19991999106,6746,8747,0757,275
Fisher 8 ft. Power Angle On #18/27/20102010107,7462,3933,2844,222
Fisher 8 ft. Power Angle On #26/1/20002000105,8125,9876,1616,336
Fisher 8 ft. Power Angle On #310/2/19961996107,6177,8458,0748,302
Fisher 8.0 ft Angle On #410/2/19961996107,6177,8458,0748,302
Subtotal68,37055,08259,36763,804
PLOWS
Fisher 8' #52001200175,7015,8726,0436,215
8' Fisher #72003200375,4015,5635,7265,888
Monroe 11 One Way20102010710,7114,7286,4888,340
Monroe 11 Power Angle on #402010201075,0812,2433,0783,956
Fisher 9' Power2005200577,1577,3717,5867,801
Fisher 8' EZ-V #102006200674,6654,8054,9455,085
Fisher 8' EZ-V #142007200774,5394,0074,8114,947
Fisher 9' on # 272000200076,8837,0907,2967,503
Henke on Loader1/20/20102010108,6492,6723,6674,713
Subtotal058,78744,35349,64054,447
SALT SPREADERS
Elkin TK391998199810$5,1435,2985,4525,606
Elkin TK# 92006200610$4,2353,0543,5924,155

Page 4 of 5

ATTACHMENT #1

East Goshen Township
CAPITAL RESERVE FIXED ASSETS
Projection of Accumulated Depreciation

Item Period Lifetime Estimated Replacement Cost 2013 2014 2015
Elkin SPARE1993199310$6,3016,4906,6796,868
ELKIN TK #432011201110$5,6101,1561,7842,446
Elkin TK # 401999199910$5,0255,1765,3275,478
Elkin TD # 412005200510$6,3905,2656,0966,965
Elkin TK # 422005200510$6,3905,2656,0966,965
Elkin SPARE1997199710$5,8816,0576,2346,410
Elkin TK#371997199710$5,8816,0576,2346,410
Elkin TK# 381997199710$5,8816,0576,2346,410
Subtotal56,73849,87653,72757,713
BUILDINGS & MISC
Township Building Roof199319932591,31675,24481,30887,590
Public Works Roof1993199320127,842131,677135,513139,348
Public Works Annex2007200715.5305,769121,913146,374172,020
27 HVAC Units2008200815154,59153,07665,54778,635
HVAC Unit20102010158,6621,7842,4483,147
Fuel Dispensing System20102010129,7882,5203,4584,445
HVAC Blacksmith Shop20082008155,7261,9662,4282,912
HVAC Plank House20082008155,7261,9662,4282,912
Heat Pumps (Front Hallway & Lobby201220121514,2869812,0193,114
Sprinkler System201220122511,1474599451,458
Hershey Mill Dam Restoration2013201330240,873-8,51117,503
Public Works Infared Unit Heater20122012153,468238490756
Geothermal2013201350502,070-10,64421,890
Blacksmith Shop Roof201320132513,549-5741,181
Plank House Roof20122012255,049208428660
Energy Efficient Light Fixtures201320131217,954-1,5863,262
Twp Parking Lot (paving & curb)201320132028,102-1,4893,063
LED Sign (Boot & Paoli)201320131522,015-1,5563,199
PW Annex Heating (Rayvac)20072007154,9952,0582,4712,904
Milltown Dam Spillway201320132533,321-1,4132,906
Milltown Dam Valves201320132540,146-1,7023,501
Office Furniture199319932036,52637,62238,71839,814
Subtotal1,682,920431,714512,050596,222
Item
OFFICE EQUIPMENT
Desktop Computer (Fuel Delivery)2003200352,2522,3192,3872,454
Desktop Computer (Chas)2005200551,8711,9271,9832,039
Desktop Computers (AMS&RCSTP2006200654,6654,8054,9455,085
Desktop Computers2013201356,086-1,2902,653
Desktop Computers2009200958,5757,0669,0909,347
Desktop Computers2010201059,8546,0908,35610,741
Desktop Computers20122012513,3902,7585,6778,757
Laptop (Rick & PW Sewer)2011201154,3321,7852,7553,778
Laptop Computer2006200652,2102,2762,3422,409
Laptop Computer2007200752,1502,2142,2792,343
Laptop Computer (Mark M)2008200854,7184,8595,0015,142
Server2005200557,8568,0928,3288,563
Printer2004200456,6876,8887,0887,289
Phone System200520051023,25919,16522,18925,352
Security System200520051025,55921,06124,38427,860
Office Equipment20082008105,7262,9493,6414,369
Document Management201120111020,9724,3206,6699,144
Document Management200820081022,39511,53314,24317,087
Docstar Software Upgrade to 3.1 an201220121022,5242,3204,7757,365
Canon ipf 760 Multifunction Printer20122012108,4328691,7882,757
Pressure Sealer for invoices20042004109,9649,23610,56210,861
Subtotal213,477122,533149,773175,397
Miscellaneous Roads
GEO XT (GIS/GPS system)20122012107,9508191,6852,600
Mobile Radios20132013105,773-6121,258
Shoring Equipment19941994209,0008,8079,5409,810
Public Works Generator201220121525,0001,7173,5335,450
Truck Lift200720071527,00011,12413,35615,696
Traffic Signals2005200515450,000247,200286,200327,000
Subtotal524,723269,666314,927361,814
Park
LED Sign (Park)201320131520,073-1,4182,917
Basketball court & baskets201320131510,036-7091,459
Park Bathroom Roof20062006255,0171,4471,7021,969
Park Bathroom Fixtures20062006205,0171,8092,1272,461
Park backstops & fences200620062015,8375,7096,7157,768
Tennis courts surface, nets & fences200020001550,17044,78549,63454,685
Tot-Lot Equipment2002200220145,54782,45292,568103,120
Park exercise area200520052010,0344,1344,7865,468
Milltown Tot-Lot20012001205,0173,1003,4573,828

Page 5 of 5

ATTACHMENT #1

East Goshen Township
CAPITAL RESERVE FIXED ASSETS
Projection of Accumulated Depreciation

Item Period Lifetime Estimated Replacement Cost 2013 2014 2015
Pulte/Hassler Bridge 2010 25 108,108 13,362 18,335 23,567
Applebrook Bridge 2006 25 27,701 7,989 9,396 10,870
Tennis Court Bridge 1985 25 10,034 10,335 10,636 10,937
Park Bridge 2000 25 20,068 10,748 11,912 13,124
Amphitheater Construction 2013 25 8,029 - 340 700
Elevated walk next to Plank House 1985 25 83,281 85,780 88,278 90,777
Flagpole 2006 25 5,364 1,547 1,819 2,105
Floor for Hicks Pavillion 2012 50 11,817 243 501 773
Floor for Veterans Pavillion 2009 50 11,037 909 1,170 1,444
Roof for Hicks Pavillion 1998 25 8,027 4,961 5,446 5,950
Roof for Veterans Pavillion 2009 25 8,027 1,323 1,702 2,100
Subtotal 568,240 280,634 312,652 346,021
TOTALS 6,570,686 3,654,198 4,133,218 4,606,578
Category 1
Estimated Replacement Cost
2
2013
3
2014
2015
TWP 1,682,920 431,714 512,050 596,222
OFFICE 213,477 122,533 149,773 175,397
PARKS 568,240 280,634 312,652 346,021
PUBLIC WORKS 4,106,048 2,819,318 3,158,742 3,488,939
TOTAL 6,570,686 3,654,198 4,133,218 4,606,578

ATTACHMENT #2

EAST GOSHEN TOWNSHIP
CAPITAL RESERVE DETAIL SHEET
AS OF June 21, 2013

ADOPTED BUDGET 2013 YTD ACTUAL 2013 PROJECTED #1 2013
If all capital is paid from reserve, with no increase in general fund transfer
PROJECTED #2 2013
If all capital is paid from reserve, with Increase in general fund transfer
PROJECTED #3 2013
If only budgeted capital is paid from reserve*
"NEW" CAPITAL PURCHASES
Office Equipment
Subtotal New Office Eqp Capital Asset Purchases00000
Capitalizable Software
Subtotal New Capitalizable Software Purchases00000
Township Building
New LED Sign at Boot & Paoli21,93521,935
New Geothermal2,200501,250501,250
New Energy Efficient Light Fixtures17,88917,88917,889
Subtotal New Township Building Capital Purchases020,089541,074541,0740
Park and Recreation
New 3454-7450 Ampitheater4,8868,0008,000
New 3454-7450 LED Sign at Park21,93521,9350
Subtotal New Park Capital Asset Purchases04,88629,93529,9350
Hershey Mill Dam
New 3457-7450 HM Dam00240,000240,000
Subtotal New Hershey Mill Dam Expenses00240,000240,0000
Milltown Dam
New 03458-7450 Milltown Dam0033,20033,20033,200
Subtotal New Hershey Mill Dam Expenses0033,20033,20033,200
Machinery and Equipment
Subtotal New M&E Capital Asset Purchases00000
Traffic Lights and Signals
Subtotal New Stormsewer Projects0000
Subtotal New Capital Assets024,975844,209844,20933,200
REPLACEMENT CAPITAL PURCHASES
Office Equipment
Repl 3401-7400 Computer Workstations (4-5 per yr)12,5009,3369,3369,3369,336
Subtotal Replacement Office Eqp Capital Assets12,5009,3369,3369,3369,336
Capitalizable Software
Repl 3407-7400 Capitalizable replacement software
Subtotal Replacement Capitalizable Software00000
Township Building
Repl 3409-7400 Blacksmith Shop Roof13,50013,500
Repl 3409-7400 HVAC Units--1 per year5,8005,1315,1315,1315,131
Repl 3409-7400 Paving & Curb Replacement28,00028,000
Subtotal Replacement Township Bldg Capital Assets5,8005,13146,63146,6315,131
Park and Recreation
Repl 3454-7400 Tot Lot Equipment6,5006,5006,5006,500
Repl 3454-7400 Basketball Courts10,00010,000
Subtotal Replacement Park Capital Assets6,500016,50016,5006,500
Machinery and Equipment
Repl 3430-7400 Pickup Truck With Plow50,00050,00050,00050,000
Repl 3430-7400 Dump Truck-Large135,000135,000135,000135,000
Repl 3430-7400 Gator ATV12,00012,00012,00012,000
Repl 3430-7400 Large mower18,00012,40212,40212,40212,402
Repl 3430-7400 Snow Blower8,5008,5008,5008,500
Subtotal M&E Replacement Capital Assets223,50012,402217,902217,902217,902
Traffic Lights and Signals
Subtotal Traffic Lights and Signals00
Subtotal Capital Replacement Assets248,30026,869290,369290,369238,869
TOTAL CAPITAL NEW AND REPLACEMENTS248,30051,8441,134,5781,134,578272,069

U:\JAltshul\Capital Reserve Detail\3-31-13 Capital Reserve.xlsx     Page 1 of 2     12/16/2011

EAST GOSHEN TOWNSHIP

CAPITAL RESERVE DETAIL SHEET
AS OF June 21, 2013

Description ADOPTED BUDGET 2013 YTD ACTUAL 2013 PROJECTED #1 2013
If all capital is paid from reserve, with no increase in general fund transfer
PROJECTED #2 2013
If all capital is paid from reserve, with increase in general fund transfer
PROJECTED #3 2013
If only budgeted capital is paid from reserve*
Net of End-of-Year Transfers In 428,206 0 428,206 1,312,156 428,206
Net of Interest Income 16,000 3,934 16,000 16,000 16,000
TOTAL CAPITAL RESERVE REVENUE 444,206 3,934 444,206 1,328,156 444,206
TOTAL CHANGE IN CAPITAL RESERVE FUND BALANCE 195,906 -47,910 -690,372 193,578 172,137
BEGINNING OF YEAR FUND BALANCE 6,095,919 6,095,920 6,095,927 6,095,928 6,095,928
END OF YEAR/CURRENT FUND BALANCE 6,291,825 6,048,010 5,405,555 6,289,506 6,268,065

* Projection #3 includes Milltown Dam spillway, which was appropriated from capital reserve as a supplemental on June 5

U:\Altshu\Capital Reserve Detail\3-31-13 Capital Reserve.xlsx Page 2 of 2 12/16/2011

Page 1 of 1

Attachment #3

East Goshen Township
SEWER FIXED ASSETS
Projection of Accumulated Depreciation

Item Period Lifetime Estimated Replacement Cost 2013 2014 2015
HERSHEY MILL PUMP STATION
Pumps & Controls199525$149,998111,238120,838130,798
Meter199510$6,0006,1806,3606,540
Generator199520$49,99946,34950,34954,499
Muffin Monster200015$30,00026,78029,68032,700
Subtotal$235,997$190,547$207,227$224,537
HUNT COUNTRY PUMP STATION
Pumps & Controls198425$74,99977,24979,49981,749
Meter198410$5,0005,1505,3005,450
Generator200720$39,99912,36014,84017,440
Subtotal$119,998$94,759$99,639$104,638
ASHBRIDGE PUMP STATION---
Pumps & Controls198625$199,997205,997211,997217,997
Meter198610$6,0006,1806,3606,540
Generator198620$69,99972,09974,19976,299
Muffin Monster200715$30,00012,36014,84017,440
Subtotal$305,995$296,636$307,395$318,275
BARKWAY PUMP STATION
Pumps & Controls198610$149,998154,498158,998163,498
Meter198620$5,0005,1505,3005,450
Generator198615$39,99941,19942,39943,599
Hoist19860$6,0006,1806,3606,540
Subtotal$200,997$207,027$213,057$219,087
RIDLEY CREEK TREATMENT PLANT
Centrifuge201020$549,99284,974116,598149,873
4 Motive Pumps201020$20,0003,0904,2405,450
4 Sludge Pumps201020$8,0001,2361,6962,180
3 Filter Feed Pumps201020$12,0001,8542,5443,270
3 Chemical Pumps201015$8,3001,7102,3463,016
9 Blowers200020$25,00016,73718,55020,437
2 Disc Filters201020$349,99554,07474,19995,374
2 Sludge Grinder Pumps201015$12,0002,4723,3924,360
10 Bank UV System201020$99,99915,45021,20027,250
SBR Tank Equipment201020$399,99461,79984,799108,998
1 Screen201020$319,99549,43967,83987,199
4 Electronic Motive Valves201010$4,5001,3901,9082,452
1 Muffin Monster201015$35,9997,41610,17613,080
1 Generator199525$229,997170,565185,285200,557
1 Generator201025$229,99728,42839,00750,139
3 Flow Meters201015$15,0003,0904,2405,450
Misc Equipment201015$10,0002,0602,8273,633
3 Control Panels201020$124,99819,31226,50034,062
2 Motor Control Center201020$99,99915,45021,20027,250
Lab Equipment201010$99,99930,90042,39954,499
Subtotal$2,655,761$277,220$331,634$388,670
MISC SEWER ASSETS---
6 Sewer Meters201010$47,99914,83220,35226,160
Misc sewer lines & manholes197440$199,997200,847211,997217,997
$247,996$215,679$232,349$244,156
TOTALS$3,766,745$1,281,868$1,391,300$1,499,364

Memo

To: Board of Supervisors
From: Jon Altshul
Re: Amendment to Sewer Capital Reserve budget
Date: June 27, 2013

At its June 25th meeting, the Municipal Authority amended its 2013 budget to reflect the results of the Reserve Pump Station project bid (see the attached memo). Because the cost of this increase is borne by the Sewer Capital Reserve Fund, it will be necessary to approve an offsetting increase in the transfer to the Municipal Authority.

A detailed explanation of the financial position of the Sewer Capital Reserve fund can be found on page 3 of my other memo in this packet.

Suggested Motion: I move that we amend the 2013 Sewer Capital Reserve Fund budget to increase the Transfer to the Municipal Authority (09492-0700) by $43,000 from $786,769 to $829,769.

[Stamp: FILE]

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: June 21, 2013
To: Municipal Authority
From: Rick Smith, Township Manager
Re: 2013 Budget

Now that we have firm numbers for the Reserve Pump Station Diversion Project it would be appropriate to amend the Budget.

Suggested Motion: I move that we amend the 2013 Municipal Authority Budget as follows:

Item 2013 Approved Change 2013 Revised
Transfer from Sewer Cap Reserve $786,769 +$28,000 $43,000 $814,769 $829,769
Reserve Pump Station - Engineer $25,000 +11,000 $36,000
Reserve Pump Station - Construction $93,000 +$17,000 $32,000 $110,000 $125,000

ok Per MA 6/25/13

F:\Data\Shared Data\Finance Dept\Budget\MA Request 062113.docx

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 6/12/2013
To: Board of Supervisors
From: Mark Gordon, Zoning Officer [initialed]
Re: Comprehensive Plan Update / Sustainable Communities Assessment

Dear Board Members,

The CPTF and the Planning Commission have reviewed the Sustainable Communities Assessment prepared by the Brandywine Conservancy. The assessment outlines the current practices of East Goshen Township laying a framework for recommendations during the comprehensive plan update process. This draft includes comments from the Township civil engineer, traffic engineer and Municipal authority engineer.

Please forward any comments the Board may have to the CPTF for their meeting on July 22. At that point your comments can be included and a final document can be prepared for action to be taken by the Board.

Discuss on 7-2-13

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Memo to BOS re SCA 06122013.doc

AREA CODE 610
692-7171

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 12, 2013

East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380

Re: Comprehensive Plan Update / Sustainable Communities Assessment

Dear Board Members,

The CPTF and the Planning Commission have reviewed the Sustainable Communities Assessment prepared by the Brandywine Conservancy as part of the Comprehensive Plan Update process. The assessment outlines the current practices of East Goshen Township laying a framework for recommendations during the comprehensive plan update process.

The Planning Commission unanimously passed the following motion at their meeting on June 5, 2013.

Madame Chairman, I recommend that the Board of Supervisors review and acknowledge the Sustainable Communities Assessment prepared by the CPTF and forward any recommendations they have to the CPTF for inclusion in the document.

Sincerely,

[Signature]
Mark A. Gordon
Zoning Officer

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\PC Rec to BOS SCA 06122013.doc

Sustainable Communities Assessment—Executive Summary

The Sustainable Communities Assessment, or SCA, is a Conservancy tool designed to analyze a municipality's land-use decision framework, through the lens of sustainability. The process is explained in more detail below, but first, what is the purpose?

Purpose

By agreeing to conduct the SCA at the start of the Comprehensive Plan Update process, East Goshen Township is indicating its interest in furthering sustainability and, in particular, its desire to infuse the ideas of sustainability throughout its new Plan. As described in more detail below, the SCA will indicate areas where township practices promote sustainability (and can be built upon), as well as areas where the township is deficient and could use improvement. The township will derive the greatest benefit by being open to this frank discussion of where it promotes, and where it impairs, sustainability.

Process

Planners at the Conservancy conducted a detailed review of East Goshen's Code—primarily your Zoning Ordinance, Subdivision and Land Development Ordinance, and Stormwater Management Ordinance; as well as other chapters to the extent they were relevant (see p.2 of the SCA for a comprehensive list of Code chapters that were reviewed). In addition to reviewing the Code, we looked at your plans, studies, and reports—specifically, your 2005 Comprehensive Plan; your 1993 Open Space, Recreation, and Environmental Resources Plan (OSRER); your 1994 Act 537 Plan; and your 1997 Act 209 Study.

Symbol Meaning
+ Promotes sustainable community practices
x Needs improvement; is a barrier to sustainable practices
n Neither promotes nor impedes

While reviewing this long list of documents, we kept in mind the elements of sustainability (identified at the bottom of page 1 of the SCA), and the list of indicators within each element (pp.4–24). For each element, there might be a +, an x, or an n (or a combination of each), along with a reference to the Code or a plan, and a brief explanatory comment. For example, the first such comment, on p.4 under Natural Resource Protection, is:

+ Comp Plan. Objective to prohibit development in highly sensitive environmental areas, and the use of best management practices in design and land development to protect natural resources.

This means we believe that the 2005 Comprehensive Plan's objective to prohibit development in highly sensitive environmental areas promotes community sustainability. Similarly, the comment

x OSRER. Has not been updated since 1993.

indicates that we judge the age of the OSRER to be an impediment to greater sustainability.

Reviewing the SCA

While we are experienced professionals, you know your township best. Our limited experience with your township is likely to result in a few misinterpretations of your Code or one of your plans. We rely on your guidance, that of your staff and consultants, and your appointed Task Force, to help us prioritize the use of the SCA in updating the Comprehensive Plan. Which deficiencies are most in need of correction? Which positive elements could most effectively be used to even greater extent? Your comments are invaluable in this regard.

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

SUSTAINABLE COMMUNITIES ASSESSMENT FOR EAST GOSHEN TOWNSHIP, CHESTER COUNTY

2nd DRAFT—5/24/12/2013

“A healthy environment, one that is supported by sound land-use policies, is essential for healthy communities and strong local economies.”

Overview

Between February and April of 2013, staff from the Brandywine Conservancy's Environmental Management Center (EMC) conducted a focused assessment of East Goshen Township's ordinances, plans, and policies (collectively, the “framework”) as these pertain to community sustainability. Using the focused assessment approach allowed EMC staff to investigate East Goshen's broad and complex framework given limited time and resources, laying the groundwork for clear recommendations for future action during the comprehensive planning process.

It may be helpful to define the term “sustainability”. Sustainability is widely accepted to refer to: an approach that meets the needs of the existing generation while not compromising the needs of future generations, and/while protecting the rights of both. It is also commonly understood to mean the responsible use of natural resources such that renewable ones are not drawn down beyond their ability to regenerate, and non-renewable ones are used to the minimum possible extent. For example, applying this definition to the land-use component of East Goshen's environmental framework would mean an approach which promotes the redevelopment of underused commercial centers to have a mix of uses, which would conserve vital natural resources and promote a strong local economy.

Sustainability is often represented by the graphic shown here, at the center of the three nested circles: “environment,” “society,” and “economy.” While this assessment looks principally at the outer, environmental, circle, it is clear that a healthy environment, one that is supported by sound land-use policies, is essential for healthy communities and strong local economies.

Diagram: Three nested circles labeled from innermost to outermost: Economy (inner circle), Society (middle circle), and Environment (outer circle).

Specifically, we evaluated the following facets of sustainability: (1) Natural Resource Protection; (2) Water Quality & Quantity; (3) Land Use & Community Character; (4) Global Warming & Climate Change; (5) Renewable Energy & Energy Conservation; (6) Mobility & Transportation; (7) Community Health & Safety; and (8) Food Production & Security. Given the assessment's focus on ordinances, plans, and policies, we did not evaluate any of the Township's operations as they relate to sustainability (e.g., municipal vehicle types and fuels used; procurement of supplies). Nor did we address the major components of the societal and economic circles (e.g., local economies), since we believe these issues may better be addressed through the comprehensive planning process per se. However, that being said, it would be impossible to entirely disentangle so-called “environmental impacts” from the social and economic dimensions.

Page 1 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Methodology

EMC staff attended two meetings in support of the focused assessment, held at the start of the process to gather information and perspective, on February 25th; and another on April 22nd to discuss this draft assessment. Present at both meetings were staff from the Township. In addition, written comments regarding the draft were provided by the Township's civil, sewer, and traffic engineers. This revision incorporates many of the comments received, and once accepted by the Task Force, will be forwarded to the Board of Supervisors for review and comment. The final SCA will be made part of the Township's comprehensive plan update, and its findings will be addressed through various recommendations for plan implementation and consultants from the Township. The final report will be made public May 27th, at the monthly meeting of the Comprehensive Plan Task Force, in support of comprehensive planning efforts. The intent is that this be an iterative process involving the interplay of multiple knowledgeable stakeholders. Extensive research and analysis was conducted to perform the actual assessment, using either the electronic or paper versions of the following documents:

Plans, Studies, and Reports East Goshen Township Code
  • Comprehensive Plan (2005)
  • Open Space, Recreation, and Environmental Resources Plan (1993)
  • Act 537 Plan (1994)
  • Act 209 Study (1997)
  • Ch. 106. Burning, Outdoor
  • Ch. 129. Energy Conservation
  • Ch. 131. Erosion and Sediment Control
  • Ch. 156. Noise
  • Ch. 188. Sewers
  • Ch. 194. Solid Waste
  • Ch. 195. Stormwater Management
  • Ch. 205. Subdivision and Land Development
  • Ch. 218. Trees
  • Ch. 240. Zoning

Page 2 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Results and Recommendations

The results of the focused assessment of East Goshen's efforts are provided in the charts that start on this page. These charts are organized according to the issues evaluated, while the symbols “+” and “x” are used to indicate the strengths and weaknesses, respectively, of the Township's current regulations, plans, and policies as they relate to environmental sustainability. For the same criteria, the letter “n” is used to note a neutral, or adequate, evaluation; i.e., the Township's efforts are neither significantly strong nor notably weak.

Eventually, as the comprehensive planning process continues and as East Goshen's priorities are better understood, recommendations will be developed that will address the most important deficiencies, and build on the greatest strengths, of the township. To do so now, without a clear understanding of the township's vision for a sustainable future, would be premature.

Key Documents & Abbreviations Zoning Districts
Comp Plan: East Goshen Township Comprehensive Plan §240-8: R-1 Low Density Open Space Residential §240-14: C-1 Community Commercial §240-19: I-1 Light Industrial
OSRER: Open Space, Recreation, and Environmental Resources Plan §240-9: R-2 Low Density Residential §240-15: C-2 Local Convenience Commercial §240-20: I-2 Planned Business, Research and Limited Industrial Park
Act 537 Plan (Wastewater Plan) §240-10: R-3 Medium Density Residential §240-16: C-4 Planned Highway Commercial §240-21: BP Business Park
Act 209 Study (Traffic Impact Study) (Wastewater Plan) §240-11: R-4 High Density Suburban Residential §240-17: C-5 Government, Finance and Office HR Historic Resource Overlay
Act 209 Study (Traffic Impact Study) §240-12: R-5 Urban Residential

Page 3 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Natural Resource Protection

Category Findings & Comments

General comments

These apply to all items below.

+ Comp Plan. Objective to prohibit development in highly sensitive environmental areas, and the use of best management practices in design and land development to protect natural resources.

+ OSRER. Resource priorities have been mapped.

x OSRER. Has not been updated since 1993.

+ §205-14. The township has established a Conservancy Board that reviews all sketch, preliminary and final plans and makes recommendations for the purpose of preserving the township's natural features.

+ §§205-30 and -31. Preliminary and final plans to include Conservation Plan.

+ §240-25. Requires all uses to be “developed in a manner consistent with the preservation of the quality of the existing environment and of any natural amenities present on the site.”

+ §240-28. Single-family cluster development provides for opportunities to protect natural and cultural features.

Protect: floodplains

Floodplain protection serves both to protect private property and conserve valuable ecological resources, and should consider downstream users.

+ Zoning Map. Floodplains depicted on Zoning Map.

+ §205-8. Basements, cellars and slab foundations prohibited.

+ §240-26. Alluvial soils included within floodplains.

n §240-26. Existing non-conforming uses and structures shall not be expanded or enlarged, except under certain conditions.

x §240-26. Floodplain regulations largely focus on avoiding property damage and don't ensure protection of floodplain vegetation or prevent impervious surfaces therein. Protection of the floodplain's ecology also ensures the health, safety, and welfare of township residents, rather than maintaining ecological function (e.g., there is no requirement to keep the floodplain vegetated).

Protect: riparian buffers

Riparian buffers provide multiple benefits, from stormwater mitigation to wildlife habitat to aesthetics and more. Research has shown that benefits grow as the width of the buffer grows.

+ Ch. 195, §401.C. Stormwater management hierarchy prioritizes riparian buffers.

+ Ch. 195, §404.A(2). Riparian buffers to be maintained with appropriate native vegetation.

n Ch. 195, §404.A(2). Riparian buffers to be minimum of 50'. Ridley Creek is a state-designated HQ waterway, and so carries a mandatory 150' buffer (when subject to an NPDES permit).

+ Ch. 195, Appendix C. Stormwater management ordinance includes “Riparian Buffer Technical Reference Guide.”

n Ch. 195, §404.A(2). Riparian buffers to be minimum of 50'. A better standard would include two zones, each 50' wide. Furthermore, Ridley Creek is a state-designated HQ waterway, and so carries a mandatory 150' buffer.

Page 4 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Protect: woodlands & hedgerows

It is hard to overstate the value of mature woodlands, which include wildlife habitat, stormwater mitigation, soil conservation, carbon sequestration, mitigation of temperature extremes, improved property values, and much more.

+ Comp Plan. Woodlands mapped.

+ §218-2. Ordinance prohibits damage to trees on township streets and property.

+ §218-3. Requires the removal of diseased trees.

n §205-7. Definition of Tree Protection Zone extends to the drip line. Tree roots typically extend twice that distance, however, and soil compaction over the roots can damage a tree.

+ §§205-30 and -31. Preliminary and final plans to include location of all trees 6" dbh or greater, and specifications for protecting existing trees that are to remain through construction.

+ §205-59. Existing trees to be preserved whenever possible.

+ §205-61. 80% of trees on wooded lots to be retained; up to 50% of trees may be removed if they are replaced on an inch-for-inch basis (among other conditions) on the same site or elsewhere in the township.

+ §205-63. Extensive requirements for protection of trees during construction activities.

n §205-63.A(6). Damaged tree limbs to be pruned immediately. Should note that limbs should be pruned under the supervision of an arborist.

x §240-6. “Forest” defined as a community of trees covering at least 10 acres. Interior woodlands may cover an area as small as ~3,600 sq. ft., or 0.08 acres.

n §240-31.1. Detailed regulations for timber harvesting, but these regulations contain no recognition of the ecological value of the woodlands.

Protect: prime agricultural soils

Prime agricultural soils, essentially a non-renewable resource, produce an extensive array of crops with minimal energy input, and provide other significant benefits, such as infiltration, when left undisturbed.

n Comp Plan. Prime ag soils have been mapped.

x Ch. 240. Aside from definition of “prime agricultural land” and ability to protect open space through clustering, no specific provision for protection of remaining prime farmland soils or farms.

x Ch. 240. There is no Agricultural district. While the majority of East Goshen is mapped as a “suburban landscape” by Chester County, portions in the east are considered to be “rural landscapes.”

n Ch. 240, Article II. Farming permitted by right in R-1 and R-2 districts.

n Ch. 240, Article IV. Farming permitted by right in I-1, I-2, and BP districts.

Protect: wetlands & hydric soils

Wetlands have been called “the kidneys of the Earth” for their ability to filter pollutants and maintain water quality. They also provide important wildlife habitat and can be a source of beauty.

+ Comp Plan OSRER. Wetlands and hydric soils mapped.

x §205-7. Definition of Wetland Margin/Freeboard provides only a limited buffer, or possibly none at all in some cases.

nx §240-25. Requires delineation of all wetlands on a site; and requires a 20' setback for all structures buffer from identified wetland boundaries. Setback However, this buffer is not a protected buffer however only intended to permit movement of construction vehicles.

Page 5 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Protect: steep slopes

Steep slopes require protection primarily to prevent soil erosion and to protect downslope areas from flooding, but also provide valuable habitat.

+ Comp Plan & OSRER. Steep and very steep slopes have been mapped.

+ §205-7. Definition of Steep Slopes includes slopes of 15% grade or higher.

n- §§205-7 and 240-6. “Very steep slopes” never explicitly defined (but can be inferred).

+ §§205-30 and -31. Preliminary and final plans to include location of all steep (>15%) and very steep (>25%) slopes.

+ §240-6. Definition of Steep Slopes includes slopes of 15% grade or higher.

+ §240-25. Provides for extensive regulations of development on steep (>15%) and very steep (>25%) slopes.

Protect: rare species

No one wants to be a party to extinction, which famed wildlife biologist E.O. Wilson refers to as “the death of birth.”

+ Comp Plan & OSRER. Serpentine formations have been mapped.

+ OSRER. PNDI sites mapped.

+ §240-25. Requires delineation of all Serpentine rock formations, as well as the identification of all rare or endangered plants present.

Protect: air quality

From the municipal perspective, the primary means of protecting air quality are, (1) to provide for dense, mixed-use development that promotes human-scale transportation choices; and (2) to provide for green infrastructure, which cleanses the air of pollutants.

+ Ch. 106. Burning of municipal waste, brush, grass, and leaves is prohibited.

Identify, map and protect greenways

Greenways represent a unique opportunity to connect disparate areas into one single whole, while also providing a showcase of a place's ecological wealth. They provide opportunities for recreation and non-vehicular mobility, and also provide wildlife with vital connections between natural areas.

+ OSRER. Open space areas and greenway corridors have been mapped. Unclear if up-to-date.

Page 6 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Water Quality and Quantity

Water Conservation

Ordinance prevents depletion of groundwater and surface water supplies

It is important to ensure that water resources are not used at an unsustainable rate, both to protect ecological integrity and to ensure a sustainable water supply for human use.

+ OSRER. Aquifers and headwater areas mapped.

+ §131-6.C(1). Post-construction runoff to roughly equal pre-construction and maximize infiltration.

+ §188-8. Ordinance prohibits pumping of ground and surface water, by means of a sump pump or floor drain, into sewer system.

+ §240-25.D. Prohibits activities which may result in pollution of groundwater.

Permit/promote harvested/recycled water (e.g., greywater systems, rain barrels) use

Such measures reduce water consumption and save money and energy.

n No provisions.

Identify native and drought-tolerant plants for use in required landscaping plans

Native plants are already adapted to the existing hydrologic conditions, and so do not require the extensive watering typical of introduced species.

+ Board Resolution 2011-20 added a recommended list of approved Township tree and street tree species, nearly all of which are native. x No general requirement for native plant use.

Water and Sewer Infrastructure

Utilize existing public water/sewer lines before expanding or increasing capacity

Controlling expansion of sewage capacity & water supply is a key element in growth management.

n Ch. 205. New buildings placed within certain distance of public sewer line must hook into system.

Has a maintenance program for on-lot disposal systems (OLDS)

Ongoing maintenance of OLDS is essential for protecting water quality and ensuring the long-term viability of such systems.

+ Ch. 188, Article II. Routine maintenance and regular pumping of on-lot sewage disposal systems mandated by ordinance, with regular inspections by the township.

Page 7 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

Ensure the future land-use plan directs any expansion of water, sewer, stormwater capacities

Proper growth management links the expansion of public utilities to community-created plans.

+ Comp Plan. Recommends Act 537 Plan be updated, as needed, to be consistent with Comp. Plan. n Comp Plan. All of East Goshen is planned for development, and this development is required to connect to public infrastructure.

Update the community's Act 537 plan based on the future land-use plan

Since the future land-use plan represents the community's vision, the sewage plan (Act 537 Plan) should be consistent with it.

n Act 537 Plan. Act 537 Plan has been updated/amended as development plans are approved for specific properties. However, this ad hoc approach could be much improved. x Act 537 Plan. Dated 1995. The Plan itself notes that its timeframe is 1993–2002.

Encourage spray/drip irrigation where use of existing treatment is not an option

Spray/drip irrigation ensures the integrity of the local hydrologic cycle better than stream discharge plants, which send water and nutrients downstream, often requiring costly system design, operation, and upgrades.

Act 537 Plan:
+ East Goshen has one remainingtwo spray irrigation system – systems – Lockwood Chase (103 EDUs) and Hershey's Mill (2,032 EDUs).
n PublicHowever, the majority of sewage is treated at the Ridley Creek Sewage Treatment Plant (0.754 MGD) and the West Goshen (Chester Creek) Wastewater Treatment Facility (1.000.975 MGD).
n East Goshen has one community on-lot treatment plant at Willow Pond (28 EDUs).

Stormwater Management

Recommendation / Practice Township Inventory / Assessment

Implement stormwater BMPs / green infrastructure

BMPs, aka “green infrastructure,” represent low-cost, environmentally-integrated techniques for stormwater management, and can also create community amenities.

nCh. 195, Stormwater Management:
The township's stormwater management ordinance will soon be greatly revised, pending the completion of the county's Act 167 process. Those portions that will not be revised are largely the result of state mandates.
n §302.B. For new impervious coverage that is exempted from quantity controls, infiltration only required to deal with 1" of runoff; if site conditions preclude infiltration, then detention of 1" is acceptable.
+ Ch. 195, §401.C. Stormwater management hierarchy prioritizes riparian buffers and infiltration.
n Ch. 195, §401.D. Applicants “highly encouraged” to use BMPs and to minimize new impervious surface.
x Ch. 195, §403. Broadly speaking, the focus on peak discharge has led to poor water-qualityquantity outcomes, and is inconsistent with the new emphasis on volume control. (i.e.,

Page 8 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

[struck: flooding).]
+ [struck: Ch. 195,] §406.O. Roof drains must discharge into a BMP providing infiltration.
n [struck: Ch. 195,] §404.D. Design of stormwater management systems "should" consider protection of aquatic and wildlife habitat, streambank erosion, and volume control.
n[struck: x Ch. 195,] Appendix B. Storm frequency table, from 1986, outdated. Storm intensities now much greater and more frequent.

Require Low Impact Development techniques

Low Impact Development (LID) is a design approach that focuses on conservation and use of natural features to protect water quality on-site.

n Ch. 195, §401.D. Applicants "highly encouraged" to use innovative site design techniques that minimize new impervious surface.
+ Ch. 195, §406.N. Minimization of impervious surfaces and infiltration are required.
+ §205-44.E(2). Board may reduce right-of-way and cartway widths. No provision is made for minor narrowing streets, in appropriate circumstances (to reduce impervious coverage).

Require routine maintenance of stormwater management facilities

Like all infrastructure, stormwater management facilities are subject to degradation over time, and therefore benefit from ongoing maintenance.

+ Ch. 195, §702. Drainage plan shall contain an operations and maintenance plan.
+ [struck: Ch. 195, §702.C. If the township accepts dedication of any stormwater management facilities, the developer is required to post financial security up to 15% of the cost of construction of that facility.]
+ Ch. 195, §704. The Township Engineer shall conduct routine inspection[struck: maintenance] of all stormwater management facilities.
+ Ch. 195, §705. East Goshen Township has a stormwater management fund, which developers are required to pay into when facilities are accepted by the township for dedication.

+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Page 9 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Land Use and Community Character

Land-Use Planning

Recommendation / Practice Township Inventory / Assessment

Steer growth and new development to the most appropriate places within community/region

Steering growth to existing population centers, such as villages, towns and cities preserves open space and helps to ensure more efficient use of existing infrastructure, while also promoting a sustainable local economy.

n Comp Plan. The Future Land-Use Map shows nearly all of East Goshen to beas developed.
n Zoning Map. All of East Goshen is zoned for development.

Participate in multi-municipal/regional land use planning

Many issues are best dealt with on a regional rather than municipal basis, and efficiencies of scale can reduce burden on local budgets.

+ Comp Plan. Objective 2E supports regional planning.
+ East Goshen participates in the West Chester Regional Planning Commission, established in 1959; and the West Chester Area Council of Governments.

Ensure planning policies and regulations are consistent with regional growth management plans

A municipality's policies and regulations are the tools which implement the local plan, and it only makes sense for them all to work in concert.

n Comp Plan and Landscapes2. Most of East Goshen lies within the “Suburban Landscape,” as identified in Landscapes2. This is largely consistentconsonant with East Goshen's development pattern.

Increase density/intensity in urban and village areas where appropriate

Greater intensity of use and density of population can reduce the per capita cost of infrastructure, helping a municipality's dollars to go farther, while also promoting a sustainable local economy.

+n Comp Plan. Township's southwest corner planned for urban and high density residential (3-14 du's/ac).
n Small areasCh. 240. Areas in the southwest of the township have been zoned R-5 Urban Residential, and C-4 Planned Highway Commercial that allows two-story apartments and townhouses by conditional use approval.
+ Ch. 240, Article II. The R-4 and R-5 districts permit apartments at a density of 14.5 DUs/ac.

Encourage and/or incentivize infill development and redevelopment of previously-disturbed

+ Comp Plan. Several objectives in the Land-Use chapter support redevelopment at higher intensities, along with preservation of the remaining open space in the township.

Page 10 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

lands

Open space is a resource with limited capacity for regeneration, so it makes sense to encourage infill development and redevelopment of previously-disturbed lands.

Adopt and implement Smart Growth principles

Smart growth principles encourage the concentration of development in existing walkable & bikeable communities; transit-oriented development; mixing of uses; a range of housing & transportation options; a sense of place; distinct community boundaries; the preservation of open space and critical environmental resources; and community involvement in land-use decisions.

n Comp Plan. Recommends the development of a Town Center, which may, unfortunately, has not have been implementedborn fruit.
+ Ch. 205, Article V. The township highly encourages the submittal of sketch plans, which often lead to better developments, as well as less cost to the developer.
+ §205-58. Developers required to consider reserving space within their developments to accommodate community facilities such as schools.
x Ch. 240. Requires a generally suburban development pattern, which segregates uses and requires residents to be auto-reliant.
+ Ch. 240. Generally promotes the preservation of sensitive environmental features and open space.

Allow for Traditional Neighborhood Development

TNDs aim to be complete neighborhoods, with a mix of housing types, a network of well-connected streets and blocks, humane public spaces, and have amenities such as stores, schools, and places of worship within walking distance of residences.

x Ch. 240.n Ch. 240. No such provisions, although little vacant land remains in the township to warrant adding this tool. How redevelopment is someday managed to produce more sustainable developments needs to be considered.No such provisions.

Adopt Transferable Development Rights ordinance

TDRs are a market-based tool, often used for the preservation of farmland and natural areas, by transferring the “development rights” from these areas to areas with the infrastructure to support more intense/dense development.

x No provisions.

Update municipal comprehensive plan to promote sustainability

n Comp Plan. The Comprehensive Plan reflects East Goshen's intentions to preserve remaining historic resources, open space, and particularly its commitment to protecting woodlands.

Page 11 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

Municipal sustainability begins with the comprehensive plan, which can help to set the vision and subsequent priorities for sustainability.

Nevertheless, much could be done to better promote sustainability, such as the creation of mixed-use zones and higher-density, more walkable neighborhoods.
n The Town Center concept could potentially promote economic and social sustainability goals, yet the Plan's recommendations have not been pursued to date.has not yet taken off.

Character and Aesthetics

Recommendation / Practice Township Inventory / Assessment

Preserve, through zoning and other means, the community's significant historical resources

A community's historical resources are its connection to its past and help to define it as a unique place, worthy of respect and stewardship.

+ Comp Plan. Several objectives calling for the protection of the township's historic resources.
+ OSRER. Scenic and historic resources mapped.
+ §205-14. The township has established a Historical Commission that reviews all sketch, preliminary and final plans (when applicable) and makes recommendations for the purpose of preserving and promoting the township's historic and cultural amenities.
+ §240-20. Provides for protection of National Register of Historic Places-eligible buildings.
+ §240-38.2. East Goshen Township maintains a historic resources inventory.
+ §240-38.9. All requests for a demolition permit for historic resources must be forwarded to both the Historical Commission and the Board of Supervisors. An impact study is also required.

Encourage and promote, through zoning, the adaptive reuse of historic buildings

A key element in historic preservation is the preservation of the usefulness of the historic structure, which often relies on creative reuse opportunities.

+ §240-38.5. A variety of uses are permitted in historic structures, in addition to the uses permitted in the underlying zoning district.

Preserve through ordinance incentives significant cultural and scenic resources

In some cases, historic preservation is best achieved through other parts of the Code.

+ Comp Plan. Objective to protect scenic vistas.
+ §240-38.6. The Board may modify area and bulk requirements to facilitate re-use of historic resources.

Enact ordinances limiting both noise and light pollution

The livability of a place can be dramatically affected, for good or ill, by noise and lighting.

+ Ch. 156. Township has adopted a thorough noise ordinance.
n §240-24. Township repeats noise provisions, but in a different format, which may cause confusion.
+ §240-8.E(7). In PRDs, lighting shall not be located so as to shine into habitable rooms or yards.
n §§240-24.G(2) and .H, and 240-27.C(7). Glare to be minimized.
n §240-24.H. Light and glare controls.
n §§240-24.H(2) and 240-27.C(7)(b). Allows use of translucent covers of Full cut-off luminaires,

Page 12 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

which reduces glare but still permits some not required.
x §240-27.E(7). Required lighting could be designed so as to generate avoidable light pollution.

Global Warming & Climate Change

Greenhouse Gas Pollution Reduction

Recommendation / Practice Township Inventory / Assessment

Enact ordinances to encourage mixed use/Transit-Oriented Developments (TODs)

Mixed-use and transit-oriented development is the hallmark of strong, well-planned communities. By reducing reliance on fossil fuels, they also have a positive impact on climate change.

+ §240-16. Single-family detached dwellings and townhouses are permitted in the C-5 Highway Commercial district.
+ §240-20. Single-family detached dwellings in various configurations are permitted in the I-2 district.
n+ §240-29.D. “Convenience commercial” permitted within planned apartment developments. However, the density of the surrounding population is not sufficient to support such commercial areas.

Enact ordinances to allow live-work units and home-based businesses in residential zoning districts

In existing residential districts, a certain degree of “mixed-ness” may be achieved by permitting and encouraging live-work units and home-based businesses. In an economy struggling to provide full employment, opportunities to work at home may allow a person to remain in his/her home.

+ §§240-9.E, -10.E, -11.E, and -12.E. R-2, R-3, R-4, and R-5 districts permits home occupations, home-related businesses and no-impact home-based businesses as accessory uses.

Incentivize green building techniques for new developments and redevelopment projects

“Green” buildings have been shown to have greater value, be more affordable to maintain, be more attractive to certain demographics, and to have a high return-on-investment in terms of local employment.

x No such provisions have been made. Examples include density bonuses for LEED-certified construction; and the adoption of the Green Building Code (with state approval).

Promote and incentivize reforestation on open

x No provisions within ordinances that require reforestation with new or re-development.

Page 13 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

space

Reforestation provides greater habitat, variety of landscape, stormwater mitigation, and a sink for atmospheric carbon dioxide, the primary greenhouse gas pollutant.

+ Conservancy Board actively pursues reforestation of Township-owned properties.

Encourage use of human-scale transportation (public transit, biking, walking)

Studies have shown that communities which provide opportunities for non-motorized transport are healthier, happier, and have more disposable income. Such communities also emit fewer greenhouse gas pollutants through their reduced reliance on fossil fuels.

x §205-56. Sidewalks not required. The Federal Highway Administration recommends that, in single-family developments of about ¼ DU/ac, that sidewalks be placed on one side of the street.

Develop, adopt and implement a Climate Action Plan to reduce greenhouse gas emissions

A Climate Action Plan (CAP) is one way a community can consciously reduce its negative impact on the global climate, while also saving energy, reducing per capita infrastructure costs, and saving money.

x The township has not adopted a CAP. However, as part of the Philadelphia metropolitan region, a greenhouse gas emissions and energy consumption inventory for the township has already been completed by DVRPC. This is a critical step in the development of a CAP.

Climate Change Adaptation

Recommendation / Practice Township Inventory / Assessment

Build resilience by developing, adopting and implementing an adaptation component to Climate Action Plan in the face of present, and projected future, impacts of climate change

By many measures, climate change has already occurred and is already intensifying local weather patterns; this may be expected to continue.

x The township has not adopted a CAP.

Adapt: heat

x No specific provisions.
+ Nevertheless, the township has a clear commitment to woodland protection, which can mitigate

Page 14 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

Steadily increasing temperatures, with increasing incidence of extreme temperatures, can be expected with very high scientific confidence. Local governments can take steps to adapt to this. Examples include green infrastructure installation, modifying any acceptable plants lists to include heat- and drought-tolerant plants, etc.

high temperatures. See notes elsewhere; particularly the Natural Resources Protection section.

Adapt: water

Climate scientists also have high confidence that one consequence of climate change is an intensifying hydrologic cycle: generally, precipitation will occur less frequently but, when it does occur, there will be more of it. Local governments need to prepare for increasing incidence of flash flooding interspersed with drought.

x No specific provisions.
x Ch. 195, Appendix B. Storm frequency table, from 1986, outdated. Storm intensities now much greater and more frequent.
n The township's commitment to riparian and wetland buffers helps to mitigate against flooding, but these buffers could be much stronger. See the Natural Resources Protection section.

Renewable Energy and Energy Conservation

Renewable Energy

Recommendation / Practice Township Inventory / Assessment

Allow solar panels by-right when accessory to a principal use

As the most accessible distributed, renewable energy technology for private property owners, it is important to reduce barriers to their installation whenever possible.

+ §240-9.E(10), -10.E(10), -11.E(10), and -12.E(10). In R-2, R-3, R-4, and R-5 districts, solar energy systems are explicitly permitted as accessory uses.
n §240-8.E. Solar energy systems not listed explicitly as a permitted accessory use in R-1 district (nevertheless, §240-32.O permits accessory systems in all districts).
+ Ch. 240, Article III. Solar energy systems permitted accessory uses in all commercial districts.
+ Ch. 240, Article IV. Solar energy systems permitted accessory uses in all industrial and business park districts.
+ §240-32.O. Solar energy systems permitted by right as accessory uses in all districts.

Establish a minimum percentage of solar-oriented lots or buildings in new developments

x Ch. 205. No such provisions.
x Ch. 240, Article II. No such provisions.

Page 15 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

One major barrier to installation of solar systems on roofs is the orientation of the building. In the northern hemisphere, solar works best on south-facing slopes.

Permit small wind energy conversion systems (WECS) in all zoning districts

Small wind energy systems have minimal impacts, and are an important part of the overall energy mix.

+ §240-11.E(11) and -12.E.(11). In R-3 and R-4 districts, wind energy systems are permitted accessory uses.
x Ch. 240, Article II. Wind energy systems not permitted in the R-1 and R-2 residential districts.
x Ch. 240, Article III. Wind energy systems not permitted in any commercial district.
+ §240-19. Wind energy systems permitted accessory uses in I-1.
x Ch. 240, Article IV. Wind energy systems not permitted in any other industrial or business park districts.
n §240-32.T Supplemental regulations for windmills.
x §240-32.T(4) and (5). Restrictions on height and setback makes development of wind energy in East Goshen nearly impossible.

Energy Efficiency and Conservation

Recommendation / Practice Township Inventory / Assessment

Encourage new & renovated residential/commercial buildings to achieve LEED, Energy Star, or comparable standards

In the U.S., buildings are responsible nearly half of all energy consumed. Any effort to reduce total energy consumption, therefore, must include building energy efficiency as a crucial element. Energy-efficient buildings also tend to be more attractive investments and therefore have more stable real estate value.

n Ch. 129. The Township has official adopted the International Energy Conservation Code, 2003 Edition (the use of an updated version of this is already mandated by the state legislature through the UCC).

Add an energy element to the comprehensive plan

Energy is the most crucial input to the economy, and it is arguable that comprehensive plans which do not consider energy are not truly comprehensive.

n Comp Plan. There is no energy conservation element in the present plan. However, one will be incorporated into the update.

Page 16 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Mobility and Transportation

Non-vehicular Transportation

Recommendation / Practice Township Inventory / Assessment

Encourage Transit-Oriented Development (TOD)

Mixed-use and transit-oriented development is the hallmark of strong, well-planned communities. By reducing reliance on fossil fuels, they also have a positive impact on climate change.

+ §§240-11.A & -12.A. Specific intent of R-4 and R-5 districts to locate higher density in areas near public transit.
x Ch. 240. While the R-4 and R-5 districts are specifically intended to offer higher densities in areas located near public transit, they are still single-use districts and could be more “TOD-like” by permitting some commercial and other uses by-right.

Establish sidewalks in residential, village, downtown areas

Sidewalks are the key element in safe, walkable, livable neighborhoods.

x §205-56. Sidewalks not required.

Require bike racks at appropriate locations in new/infill developments

Appropriately-located bike racks can make cycling significantly easier and more attractive, while also protecting landscaping and infrastructure, which otherwise becomes the default bike “rack.”

x No such provisions.

Establish maximum block widths that encourage, rather than discourage, walking and bicycling; and help to disperse traffic, reducing congestion.

Block width is a strong determinant in the friendliness of an area for pedestrian and cycling activity.

x §205-54. Minimum block width set at 600', with no consideration for the needs of pedestrians except for blocks exceeding 1,000' in length. Blocks in walkable areas are typically on the order of 250–500' in width. If that is not deemed feasible in a suburban context, however, then a mid-block path system could be required to improve pedestrian access. Paths should be clearly indicated and probably paved.
n §205-54. Crosswalks required for blocks exceeding 1,000' in length.

Page 17 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Roads and Streets

Recommendation / Practice Township Inventory / Assessment

Codify “complete streets” principles in the SALDO and embrace PennDOT's new Smart Transportation design standards which emphasize context-sensitive design

Complete streets designed and maintained to ensure accessibility to all users, including motorized and non-motorized traffic and public transit. Such streets would include sidewalks, crosswalks, medians and raised crosswalks where necessary, pedestrian signals, bulb-outs, staggered parking, street trees, pervious paving and other green infrastructure measures, etc.

x Comp Plan. Goal to optimize mobility and minimize congestion at odds with objective to minimize cut-through traffic in neighborhoods. A well-connected street network disperses traffic and is of benefit to both motorists and non-motorists.
x Ch. 205, Article IX. Complete Streets principles (particularly the needs of non-motorized users) not explicitly considered.
x §205-56. Sidewalks not required.
n §205-62. Street trees at 3" dbh to be provided as determined by the Board of Supervisors or Planning Commission.

Eliminate the creation of new cul-de-sacs

Cul-de-sacs discourage connectivity, thus fostering more driving (and fossil fuel consumption) than otherwise would be necessary. Traditional neighborhoods only rarely incorporate these elements.

x §205-42-D and -F. New minor/local public streets to be designed to discourage through traffic; and use of cul-de-sacs not discouraged. Each provision concentrates traffic and reduces mobility.

Use future land-use plan to direct expansion of road capacities

A well-planned community is one in which the land-use plan and the street plan are coordinated to create the community's vision for itself.

+ Comp Plan. Recognizes connection between land-use and transportation.
x The township has no Official Map.
+ Act 209 Study. East Goshen has adopted a traffic impact fee based on a land-use assumptions report.

Maximize existing road capacity (e.g., traffic calming, travel demand management [TDM], etc.) before constructing new roads

Often, much can be done to use existing road capacity more efficiently, reducing or eliminating the need for new roads. This reduces capital

+ Comp Plan. Objective to use travel demand management and improve public transit to better utilize existing road capacity.

Page 18 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

construction costs and ongoing maintenance costs, which can be considerable.

Plan road improvements to prioritize safety and pedestrian/bike uses

A road that has been designed with pedestrians and cyclists in mind is one which attracts such users, which promotes public health, a sense of community, saves energy and money, and can promote and support a human-scale business district.

n §205-54. Crosswalks required for blocks exceeding 1,000' in length.

Parking

Recommendation / Practice Township Inventory / Assessment

Establish a range of parking standards for commercial uses

Appropriate parking standards can have far-reaching impacts on a community's development pattern. Often, maximum parking standards are warranted, rather than minimum (which unnecessarily increases the cost of development).

x 240-33. Relies on minimum parking standards only; no provision for maximum limits.

Ordinances should require porous pavement, shade trees, landscape buffers in parking lots

Such “green infrastructure” elements can result in a vastly superior built environment, from an aesthetic as well as a functional point-of-view.

+ §240-27.C(1). 5% of interior of parking areas to be landscaped.

Permit on-street parking wherever possible and appropriate

The benefits of on-street parking are many: it provides a natural buffer between traffic and pedestrians, it reduces impervious surface, it reduces the cost of development, it reduces the urban heat island effect, it results in a more pleasing

x 240-30.D. On-street parking explicitly not permitted to count towards parking requirements in Townhouse developments.
nx On-street parking not otherwise addressed, although on-street parking is permitted on all streets within developments.

Page 19 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

built environment, etc.

Permit shared parking in non-residential zoning districts

Shared parking, like on-street parking, has multiple benefits, such as the reduction of impervious surface, the reduced cost of development, and the reduced consumption of land.

x 240-33. No provision made for shared parking, although 240-33.B.(6) allows a single parking lot to be used for more than one use provided each use's required parking is fully accommodated.

Promote parking demand management techniques

Parking Demand Management involves the efficient use of parking facilities through motorist information and enforcement. There are two major components to parking management: pricing and supply management. Benefits may include increased throughput, efficient use of the system, reduced demand and increased roadway capacity.

n While the Township Code has no specific provisions, some local employers are known to make use of this technique.x No such provisions.

Trails

Recommendation / Practice Township Inventory / Assessment

Require the establishment and maintenance of pedestrian/bike trails that connect to public facilities, parks, open space, schools, business/shopping

Multi-use trails are a crucial element in a region's transportation network, and encourage walking and cycling for work, play and shopping. Trails have also been shown to significantly increase adjacent real estate values.

+ Comp Plan. Objective to develop trail segments to connect residential communities to parks, open space, and area merchants.
+ Comp Plan. Objective to explore use of pedestrian and bike paths as alternative transportation network.
+ §240-8. R-1 district requires 15% of tract (1/3 of total common open space) to be devoted to uses that include paths and trails.
n §205-56. The Board of Supervisors may require sidewalks and/or paths at their discretion.

Page 20 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Community Health and Safety

Public Health and Safety

Recommendation / Practice Township Inventory / Assessment

Require street trees and sidewalks in residential areas and village/downtown areas

In addition to making for a more inviting environment for pedestrians, such amenities have been shown to improve public health.

x §205-56. Sidewalks not required.
+ Board Resolution 2011-20 added a list of approved Township tree and street tree species nearly all of which are native.
n §205-62. Street trees at 3" dbh to be provided as determined by the Board of Supervisors or Planning Commission.

Provide adequate active and passive recreational opportunities

Exercise is a key element in an individual's health, and it has been shown that people exercise more regularly when given opportunity's to do so close to home and work.

+ Comp Plan. Regional coordination of recreation programs.
+ §205-14. The township has established a Park and Recreation Board that reviews all sketch, preliminary and final plans (when applicable) and makes recommendations for the purpose of preserving and promoting the township's park and recreation facilities.
+ §205-58. Developers required to make available open space for passive and active recreation.
+ §205-64. Requires provision of common open space at 20% of total lot area in mobile home parks.

Solid Waste and Recycling

Recommendation / Practice Township Inventory / Assessment

Require recycling centers/stations in new developments over a certain size

In our modern society, the production of waste is nearly unavoidable, but there are many ways in which it can be minimized and, in some instances, eliminated. Recycling permits the more efficient use of natural resources, while also encouraging a more beautiful, livable environment.

+ §194-3. Source-separation of recyclable materials mandated throughout the township; and leaf-waste pickup provided in spring and fall.
n §194-8. Recycling centers permissible for multi-family residential complexes.
+ §194-9. Commercial, institutional, and municipal establishments required to recycle.
n §194-8. Recycling centers permissible for multi-family residential complexes.

Adopt a construction debris demolition ordinance or require construction waste management plan

A great deal of the waste generated by our modern society comes from development and

+ §194-6.D. Curbside disposal of building materials and hazardous materials prohibited.

Page 21 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

redevelopment. A municipality can significantly reduce this waste stream by requiring construction waste to be reused or recycled.

Require salvage/material recycling in demolition permit or land development approval

Much of the waste generated from development and redevelopment isn't waste at all, and can be recycled back into productive use. Furthermore, a great deal of the waste reaching landfills is from development projects; builders have a responsibility to reduce this flow, which is a burden on us all.

x No such provisions.

Housing Diversity and Accessibility

Recommendation / Practice Township Inventory / Assessment

Create incentives to promote a diverse housing supply that includes affordable housing

A diverse community is a much more robust community, both economically and socially.

+ Comp Plan. Supports housing diversity.
+ §240-12. R-4 district permits apartments and townhouses.
+ §240-29. Planned apartment developments permitted in R-4, R-5, and C-4 districts.
+ §240-30. Townhouse developments permitted in R-4, R-5, and C-4 districts.

Locate housing within walking distance of businesses, services, employment centers, public transportation

Such a development pattern encourages walking and cycling, which can greatly improve the public's health, rather than driving, which reduces it.

+ §§240-11.A & -12.A. Specific intent of R-4 and R-5 districts to locate higher density in areas near public transit and shopping.

Permit smaller lot sizes in appropriate residential zoning districts

Smaller lot sizes can promote greater diversity of uses, which a complete neighborhood must have and which promotes walking and cycling.

+ §240-10 and -11. R-3 and R-4 district permits 12,000-ac and 10,000-ac lots (respectively) for semi-detached dwellings.

Permit accessory dwelling units (in addition to primary residence) on residential lots

n §240-32.C. Provision for apartment for care of a relative that must be converted once vacated. x No such provisions.

Page 22 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

One way to provide affordable housing is to permit accessory dwelling units. Often called “in-law quarters,” they may also allow extended families to live close together, which has numerous public and private benefits.

Permit second-story (and greater) residential uses in commercial and mixed-use zoning districts

Perhaps the one element which most simply distinguishes towns and villages from residential areas is the existence of vertical mixing of uses, with retail/offices/etc. on the ground floor and homes above. Such patterns also promote walking and cycling, which improves the public health.

x No such provisions.
n There is a laundry on West Chester Pike in a building that also contains two apartments.

Food Production and Security

Recommendation / Practice Township Inventory / Assessment

Incentivize through ordinances the permanent preservation of agricultural lands

Agricultural lands are a non-renewable resource that, in a world of ever-increasing population, warrant protection.

x No ordinanceTDR or other provisions, other than cluster, that protect, or incentivize the preservation. East Goshen itself, of remainingcourse, has no agricultural landsuses left. However, there may be potential for a regional program.

Permit a broad range of agricultural uses by right in rural and semi-rural areas

One way to steward the agricultural economy is to permit it to diversify by allowing complementary uses.

n Comp Plan. Contains an agricultural land-use category but no specific agricultural zoning.
x Ch. 240. There is no Agricultural district.
n Ch. 240, Article II. Farming permitted by right in R-1 and R-2 districts.
n Ch. 240, Article IV. Farming permitted by right in I-1, I-2, and BP districts.

Permit farmers' markets, farm stands, community gardens in public/open spaces,

+ §240-10.E(17). Seasonal sale of farm products permitted in R-3 district, as an accessory use.
+ §240-34.B. Seasonal sale of farm products permitted in C-1 district.

Page 23 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Recommendation / Practice Township Inventory / Assessment

residential vegetable gardens

These are all key elements in the agricultural economy, and in particular help to promote the culture of agriculture.

Permit small-scale farming uses (e.g., egg production) w/ complementary structures in all residential or mixed-residential zoning districts

Small plots and micro-animal operations are capable of producing a great deal of food for families and their neighbors, thus representing an important element of food security.

x §240-32.A. Keeping of chickens limited to lots of two acres or more. n No specific provisions.

Permit small-scale manufacture of food products within appropriate zoning districts

Such operations help to promote local foods and support a local economy, while also providing food security.

n No specific provisions.

Allow composting as part of gardening and small-scale farming uses

Composting is a way to divert one of the primary sources of municipal waste away from the waste stream and back into productive use: soil. All sustainable agricultural operations, as well as home gardens, much incorporate composting.

n No specific provisions, but accessory composting on residential lots implicitly permitted. -

Require or encourage fruit and nut trees as part of landscaping requirements

Another important piece of the food security puzzle is “edible landscaping.” Native fruit and nut trees can provide a food source for humans as well as birds and other wildlife.

x No specific provisions.

Page 24 of 25

BRANDYWINE CONSERVANCY
ENVIRONMENTAL MANAGEMENT CENTER

Conclusions and Summary

East Goshen has taken steps to towards sustainability at the municipal level, within the framework of its policies, plans, and regulations as they relate to environmental, social, and economic issues. Specifically, the township has adopted strong policies into its code to protect natural resources within the context of a suburban landscape: East Goshen has good policies for woodland protection, steep slope protection, and riparian buffer protection. The Conservancy Board's efforts to reforest Township-owned properties benefit several sustainability aspects, and encouraging the use of native plants for on-site landscaping and street trees is a positive step. The township also has a clear commitment to the preservation of its cultural heritage. Since a community's natural environment and cultural history are two of its most fundamentally defining aspects, these commitments are laudable—and should be built upon.

Still, there is room for improvement on East Goshen's path to sustainability. Within the Natural Resources Protection section, floodplain protection could be enhanced by protecting natural vegetation and pervious soils within.better recognizing its ecological value. In Water Quality and Quantity, East Goshen should consider a more comprehensiverequiring native or non-invasive plants in landscaping plans, and should also update to its Act 537 Plan rather than piece-meal as development proposals are accepted. For Land-Use and Community Character, adopting special standards for parcels with underused commercial space, for example by permitting their reuse as a mixed residential/commercial community, could greatly promote sustainability and the local economy. In Global Warming & Climate Change, East Goshen should strongly consider developing a Climate Action Plan that focuses on both mitigation (carbon pollution reduction) and adaptation (to existing and future unavoidable climate change). In the Renewable Energy & Energy Conservation section, the single most important step would be to develop anand energy conservation element into its comprehensive plan update—and implement it. Within the Mobility & Transportation section, it would be very useful to develop an Official Map, adopt a “complete streets” ordinance, and revisit parking standards. For Community Health & Safety, East Goshen should revise its SALDO to require sidewalks in all zoning districts, and should consider allowing commercial and residential uses to mix within a single building (commercial below, residential above). Finally, in Food Production & Security, East Goshen has permitted most of its agricultural lands to be developed; those that remain ought to be provided with incentives for preservation and used for growing productsprotected. If that could be offered locally. The proves infeasible, then the township should also consider adopting provisions to permit and support small-scale farming operations, or the keeping of chickens on smaller lots, in appropriate districts.

Seeking sustainability requires both continued vigilance and extensive patience. Accordingly, the recommendations described briefly above are intended to broadly guide efforts to achieve sustainability, above and beyond the Township's existing efforts. It is notable that many actions can be taken that promote sustainability within a variety of areas. Such actions ought to be prioritized. For example, expanding resource protection regulations can reduce greenhouse gas emissions while also providing protection from flooding, as well as having wildlife habitat, community health, and economic benefits. Decisions regarding which of the recommendations to implement, or which are even feasible, should be considered first by the Planning Commission in consultation with Township staff and consultants, appointed and advisory officials, and the public, with recommendations provided to the Board of Supervisors. EMC staff is ready to answer questions, provide additional information, and otherwise assist as the Township proceeds with its comprehensive plan update, and with implementation of this report.

Page 25 of 25

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 6/27/2013
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: PECO Natural Gas service to Cell Tower.

Dear Board Members:

As you may know our cell tower location here has be classified as a Critical Site for both Verizon Wireless and AT&T. This classification requires them to have emergency backup power in the event of long term power outages. Both Verizon and AT&T are going to be installing emergency generators for this purpose and they will be fueled by NG.

PECO has developed a plan to provide that service for the carriers and requires Authorization from the Board to begin the work. We met with PECO on site and they have identified all issues with Liberty and with the Township and are prepared to begin this work upon approval from the Township.

I will notify the District Court and WEGO of the conflicts that will arise and advise the contractors of the access requirements for police and court operations during construction.

Please authorize the enclosed resolution.

F:\Data\Shared Data\Property Management\53-4\53-4-77.1 (PW Annex)\Tower documents\Memo to BOS 06272013.doc

EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA

RESOLUTION NO. 2013-71

A RESOLUTION GRANTING A RIGHT OF WAY
TO PECO ENERGY COMPANY

WHEREAS, PECO ENERGY COMPANY has requested that East Goshen Township grant a Right of Way for the installation of PECO ENERGY COMPANY facilities at the East Goshen Township property located at 1570 Paoli Pike.

BE IT RESOLVED THAT the Board of Supervisors of East Goshen Township, in Chester County, Pennsylvania hereby grants PECO ENERGY COMPANY a Right of Way for the installation and maintenance of facilities at the East Goshen Township property at 1570 Paoli Pike and that the Township Manager is authorized to execute the documents for the same.

I HEREBY CERTIFY that the forgoing is a true and correct copy of the resolution adopt by the East Goshen Township Board of Supervisors at their public meeting on July 2, 2013.

___________________________________
Township Secretary

F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2013\2013-71 PECO Right of Way.doc

\WODC\07581080\000.dgn 6/6/2013 1:01:05 PM

1 INSTALL 328 FEET OF 1.25-INCH HP PLASTIC SERVICE
METERING - 3-20 METERS     LOAD - 600 CFH EACH     DELIVERY - 12.2 WC

Map Labels: PAOLI PIKE (SR 2014), TALLMADGE DR, 2SW, 8SW, 86-0, 13-0, 74-0, 94-0, PARKING, 1, BANK, 1570 EAST GOSHEN TWP BLDG

CUSTOMER CONTACT: RON EVANS    267-716-1993

CUSTOMER'S CONTRACTOR RESPONSIBILITIES:

  • METER SUPPORT STUCTURE IN ACCORDANCE TO PECO STANDARDS AS BUILDINGS ARE NOT FOOTERED TO GROUND
  • CAP FUEL LINE
  • PERFORM PRESSURE TEST
  • TIE-IN FUEL LINE, AND CALL COMMERCIAL METERING 610-490-3156 IN ADVANCE TO SCHEDULE AN APPOINTMENT FOR AN INSPECTION AND TURN-ON.

WO# 07581080

OFFICIAL PLAN
PREPARED FOR:

GRANT NO. W-19864
APPROVED
BY ____________
FOR East Goshen Twp.
DATE ____________

STOP - CALL BEFORE YOU DIG ! 1-800-242-1776

PCN NUMBER:
REQUEST NUMBER: 68442306
ELECTRIC QUAD: 4882A1
KEY MAP: 48A
GAS QUAD: 140B
POCS: REQUIRED
DATE CALLED:
ROW: REQUIRED
ROW QUAD:
PERMIT: STATE
MAINT. STATE FIGURE: PATA 16
PECO STANDARD:
CATHODIC PROTECTION:
PROJECT ENGINEER: CINDY COFFMAN

SCALE: 1" = 50'

PECO ENERGY VERIZON WIRELESS
1570 PAOLI PIKE
WEST CHESTER, PA 19380
EAST GOSHEN TOWNSHIP    (215)
ESTIMATOR-DESIGNER: RGP DATE: 06/06/13
GAS W.O.: 07581080

draft

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
ANNUAL PLANNING SESSION
June 5, 2013

The East Goshen Township Board of Supervisors held an Annual Planning Session at the Township Building on Wednesday, June 5, 2013 at 10:00 a.m. Board of Supervisor members present were: Senya Isayeff, Chairman; Carmen Battavio, and E. Martin Shane. Others present were: Rick Smith, Township Manager; Jon Altshul, Chief Financial Officer; Mark Gordon, Director of Code Enforcement; Mark Miller, Director of Public Works; Frank Vattilano, Director of Recreation; and staff members Brian McCool, Barbara Phillips and Tia Piccolo. This public meeting was advertised in the Daily Local News on May 6, 2013.

Call to Order

Jon called the meeting to order at 10:00 am. He asked Brian McCool to lead the Pledge of Allegiance. Jon asked for a moment of silence to remember our troops here and abroad. Jon asked if anyone would be recording the meeting. There was no response.

Public Comment

Senya commented that he feels it is remarkable that East Goshen Township is in such good financial condition. He mentioned that at the Community Visioning Session held for the residents Monday night, some of the residents that attended that meeting have been here as far back as 40-50 years. He thanked all the past board members for the great job they did in managing the Township.

Jon mentioned that a letter was received from PennDOT requesting that the Township’s general fund reimburse the Township’s state liquid fuels fund $280,000.00 for blacktop materials for the years 2008-2010. Jon explained that this would make Public Works expenses appear high for the remainder of the year, but that the expense would be zeroed out at the end of the year when the funds are transferred back to the general fund. The $280,000.00 has been moved into the State Liquid Fuels Fund.

Financial Outlook for 2014

Jon feels that, compared to last year, the anxiety over the economics both local and national, is easing. Interest rates for mortgages are starting to go up. He put all the projections together he could find which show most factors are positive. Inflation is the concern; 2% is projected. He feels the township is on a sustainable projection for the next 10 years. The GFOA recommends a 2-month reserve for expenses which equals 17%. East Goshen is in an ideal position.

Jon explained the assumptions he used. The next WEGO MMO will be received this summer. Tom Anderson advised WEGO to keep this fund flat but Jon wondered if this was realistic. The current contribution to the police OPEB (medical retirement benefit) is $335,000. Jon explained the required reporting for this. Rick mentioned that any current pension expenses are being paid from the operating account. Senya commented that at some point in the future, there will be more employees retiring, so he feels the township needs to continue increasing funding. Rick

F:\Data\Shared Data\Minutes\Board of Supervisors\2013\BOS Annual Planning Session 060513 drafta.doc
1

mentioned that an actuarial study/assessment is being done to determine where the pension is at this point.

Revenue assumptions were discussed. Jon mentioned that permit fees were received from Mars Drinks and he anticipates some from Goshen Meadows in 2014. Health insurance premiums are projected to increase 18% in 2014. He used an 8% increase thereafter. The Township’s insurance broker has recommended locking the health insurance in earlier – perhaps December 2013, to prevent the rate increase in 2014.

Jon reported that the Township’s Workers Comp with SWIF for the volunteer firefighters may increase 14%. For Workers Comp covering non-firefighters with MRM, the increase is anticipated to be 20%.

For this report, Jon also included some anticipated one-time expenses such as improvements to the Township Website. Jon feels it doesn’t represent the Township as well as it could. Carmen mentioned that he uses interns from West Chester University for his business website. Marty feels that, in the near future, all plans will have to be processed digitally. Mark Gordon commented that Township is working on this.

Carmen, as a fire marshal related issue, feels the Township is reactive not proactive in this area. Some calls are coming in about fire exists and emergency lighting. Right now, since there are no yearly inspections of businesses, is there a liability? Mark Gordon answered that home based businesses are approved by the Township initially and thereafter only if a change in use is made. He will check with the Township solicitor. The new inspector that he just hired has a lot of fire background so a program could be developed at a cost.

Departmental “Wants & Needs”

Mark Miller would like to make the brine for next year. West Goshen is getting too commercialized. A brine tank could fit in the old salt bin area. Mark also has some people who would buy brine from us. Carmen commented that West Goshen is probably running the program to meet costs and make a profit. If we can recoup the cost, it would be worth considering. Marty wants a cost/benefit analysis.

Mark would like to purchase an Iron Worker which is a fabrication tool to cut steel. The cost is $18,000 for a new machine.

Mark would like to purchase a vehicle code scanner for $7,800, which would cover engines, transmissions and electrical systems.

Mark Gordon mentioned records management, which continues to grow. Some plans are old and we need to have an electronic record of them. We have most of the equipment, but last year an estimate for labor was $25,000. Rick commented that the Township is still required to keep the paper copy on file. Mark mentioned that there is a backup procedure for the server.

Mark Miller asked for clarification on budget items. When the capital fund items are set up, they cover requests for replacement equipment. Should funds be allocated for unanticipated items. Marty would want justification for the need when it is an unanticipated request. He feels the funds should come from the Capital Reserve Fund and that when assets that are either new or that are not currently being amortized are needed, an amount equal to cost of the new asset should be transferred from the general fund to the capital reserve fund. He would like to have

F:\Data\Shared Data\Minutes\Board of Supervisors\2013\BOS Annual Planning Session 060513 drafta.doc
2

this set up as a policy. Rick mentioned that in the past, funds were put in the capital fund for unanticipated expenses. Marty feels the reserve should be enough to replace anticipated replacements over the next 5 years. He wants an analysis to find out what that amount should be.

2014 Budget Schedule

Jon reviewed the timeframe for the 2014 budget with the final proposed budget advertised in November and adopted on December 3, 2013, with December 17 as a back-up date if there’s any slippage in the schedule. Carmen made a motion to post the budget schedule on the Township website. Marty seconded the motion. The motion passed unanimously.

Municipal Authority

The Board considered an increase in the Sewer Capital Reserve Budget by $230,000.00 for diversion projects. Bonds can be set for a 10-20 year payback. Carmen asked if, instead of bonds, can funds be borrowed from the General Fund and repaid. Marty feels that the Township should continue to use bonds. Interest rates are very low now. Rick mentioned that they will have the last bid in June and should have the total amount to borrow shortly thereafter. Jon and Rick met with a consultant from Janney Capital Markets to discuss the pros and cons of issuing general obligation bonds versus getting a loan from Delaware Valley Regional Finance Authority. Jon did an analysis which compares the yield on $1.5 million loan/bond based on data as of May 13 – 14th. Also the closing costs for a loan would be about $12,000 while bonds would have an issuance cost of $40,000-50,000. In both cases, the Township would have to be formally rated by a credit rating agency such as S&P which could cost $5,000-8,000. Carmen made a motion to amend the Sewer Capital Reserve Fund by $230,000 as per the June 5, 2013 memo from Jon Altshul. Senya seconded the motion. The motion passed unanimously.

Farmers Market

Jon explained that there were no funds allocated for marketing the Farmers Market. However, $5,000.00 was included for Amphitheater Events. Since the amphitheater won’t be ready to use in 2013, he is recommending that the $5,000 be transferred to the Farmers Market for marketing. Marty wants to know how the $5,000 will be used. Carmen explained that people need to know about the market so communication needs to be increased. Senya made a motion to reallocate $5,000 from the amphitheater to the Farmers Market. Marty seconded the motion. The motion passed unanimously.

Milltown Dam Spillway Repair

Marty made a motion to increase the Capital Reserve Fund Budget by $33,220 for the Milltown Dam Spillway project. Carmen seconded the motion. The motion passed unanimously.

Reallocation of Capital Expenses

Jon explained that that given the change in the capital policy that had been discussed today, he wanted to hold off on discussing the proposal to reallocate the cost of the eight capital projects across individual line-items.

F:\Data\Shared Data\Minutes\Board of Supervisors\2013\BOS Annual Planning Session 060513 drafta.doc
3

The Board approved a change in the date for the Township staff picnic to Friday June 14th because of anticipated bad weather on June 7th.

Senya complimented Jon on presenting the most comprehensive report he has seen in the past 4 years.

The meeting was adjourned at 11:45 am.

Respectfully submitted,

Ruth Kiefer, Recording Secretary

F:\Data\Shared Data\Minutes\Board of Supervisors\2013\BOS Annual Planning Session 060513 drafta.doc
4

EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
June 18, 2013
Draft Minutes

Present: Chairman Senya D. Isayeff, Vice-Chairman Carmen Battavio, and Supervisors Marty Shane and Chuck Proctor. Also present were Township Manager Rick Smith, CFO Jon Altshul and Director of Code Enforcement Mark Gordon. ABC members in attendance were Erich Meyer & Heidi Karpa (Park & Rec) and Ginnie Newlin (Conservancy Board).

Call to Order & Pledge of Allegiance

Senya called the meeting to order at 7:00pm and asked resident Andrew Moore to lead everyone in the Pledge of Allegiance.

Moment of Silence

Carmen asked for a moment of silence to remember the troops and officers who help keep us safe.

Recording of Meeting

No one recorded the meeting.

Public Comment on Non-Agenda Items

None.

Chairman’s Report

Senya welcomed Boy Scout Andrew Moore of Troop 93, who was in attendance for his Communications badge. Andrew is a Star Scout heading into the 8th grade at Fugett Middle School. A certificate will be mailed to Scout Moore in recognition of his attendance at the meeting.

Senya announced that the next Comprehensive Plan meeting is scheduled for June 24 at 7:00pm at the Township Building.

Senya also announced that at their June 11 meeting the Board regretfully acknowledged receipt of Dr. Thom Clapper’s resignation from the Board due to unforeseen family circumstances. The Board will hold a public meeting on June 25 to interview Janet Emanuel and Montajean Gay and select one of them to fill the unexpired term of Dr. Clapper.

Goshen Meadows Subdivision & Land Development Plan

Dennis O’Neill of Herbert E. MacCombie, Jr. & Associates summarized the Land Development application of Goshen Meadows Investors L.P. for their property at 1325 West Chester Pike. He asked for the Board to consider final approval of the application. The plan is for 62 two-bedroom apartment units. Two of the units and a leasing office will be put into the historic house on the property. The applicant has met with the Township’s Historical Commission and Conservancy Board.

6/25/2013 June 18, 2013 BOS Minutes Page 1 of 10

Public Comment: Randy Waltermyer, Chester County Planning Commission – Said he believes this development would be an ideal location for a bus shelter based on the information he’s reviewed as Transportation Director for the Chester County Planning Commission. Senya asked who would provide the bus shelter and Mr. Waltermyer said sometimes advertisers such as Clear Channel will put up and maintain the shelters in exchange for the ad revenue. Sometimes the developers put up the shelters and maintain them or have the HOA maintain them. Mr. Waltermyer said TMACC would be a good group to consult with on this matter. In addition, the Delaware Valley Regional Planning Commission recently worked with Septa in publishing a guide for bus stop design which would be another good place to start.

Senya asked if a bus shelter would be put into the ROW and Mr. Waltermyer said yes, generally.

Mr. Scott Fagan of Goshen Meadows Investors said they would certainly be willing to look into adding a bus shelter, and it would be considered an amenity for the community.

Public Comment: Mike Broennle, Wyllpen Farms – Recommended that if a bus stop is installed, it be accessible via a paved path, and not stand in isolation so that people have to walk through wet grass to reach it.

Senya told Mr. Fagan the Board would encourage Goshen Meadows Investors to consider adding a bus shelter and said the Township staff would be happy to provide assistance in any way.

Carmen moved to grant final approval of the Goshen Meadows Investors, L.P. Subdivision and Land Development application and plans dated October 17, 2012 and last revised on May 17, 2013 with the following conditions:

  1. The Applicant shall address all remaining comments outlined in the Township Engineer’s review letter dated May 31, 2013 prior to approval.
  2. The Plan shall not be released for recording until all the escrow for the improvements depicted on the plans has been posted.
  3. The Applicant shall pay 10% of the sewer tap-in fee for the entire project to reserve the sewer capacity for the project prior to the plans being released for recording.
  4. The Applicant shall pay an Impact Fee of $396.25 per trip for the project prior to the issuance of any building permit.
  5. The Applicant will follow all applicable federal, State and local laws and secure all proper permits prior to construction of the improvements depicted on the plans.

Marty seconded the motion.

Marty asked about open space for recreation. Mr. O’Neill said for passive recreation they plan to rehab the small stream crossing on the property (it currently leads to an old tennis court), clear out the invasive plants and create a soft mulch trail that will circle to the north part of the property. This trail will connect with the existing path to the swimming pool. Pathways with benches and landscaping will be installed in the area between Buildings C and D. A 2,500-ft area behind Building 5 will be designated as a dog run and pet play area. The existing swimming pool provides active recreation for the community. In total, approximately 5½ % of the property will be designated recreational space.

6/25/2013 June 18, 2013 BOS Minutes Page 2 of 10

Mark Gordon noted there is a bus shelter across the street at the Rose Valley Apartments which blends into its surroundings and is well used. It would be good to have another bus shelter at the Goshen Meadows property.

Architect Herb Schultz gave a brief presentation of the layout plans for the units and showed artistic renderings of the outside of the buildings. Carmen asked about the HVAC and was told the units would be equipped with electric heat pumps.

Senya noted that the original developer of Goshen Meadows created it as a “pipeline” community to attract people who would get established in the Township and eventually purchase a home in East Goshen. This plan will continue that vision.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Police Report

Chief Brenda Bernot gave an update on recent cases. She reported that 5 out of 9 laptops stolen from the PA Leadership Charter School on May 9 have been recovered, and she is confident an arrest will soon be made. The stolen laptops were being sold on Ebay by a Delaware resident. A 19-year-old resident of Valley Drive was arrested for possession of marijuana and paraphernalia, and the neighbors who had reported suspicious activity at the address were very pleased about the arrest. A peddler who was working Williams Way without a permit was cited. A resident with the beginning stages of dementia who was reported missing was found in Montgomery County with a disabled vehicle, and reunited with his family.

Traffic violations have been light, although there continue to be violations near East Goshen Elementary. A speed trailer was installed on Cornwallis Drive but the officers noted there were not many violations at that location either with or without the trailer. Chief Bernot said she and the officers are pleased the Board recently approved the purchase of two mobile LED speed signs which will be another tool to help the police address traffic concerns.

Marty had a PPU question, and Chief Bernot said she is confident that by October the PPUs will be where they need to be.

On June 19 at police headquarters Officer Steve Wassel will be promoted to the rank of Sergeant and part-time officer Jorge Rodriguez will be promoted to the status of full-time officer. The public is invited to the Westtown-East Goshen Police Commission meeting on June 19, 2013 at 5:00pm at Police Headquarters to congratulate them on their well deserved promotions. In addition, newly hired part-time Officer Ditter will be introduced at that time.

Senya thanked Chief Bernot for the update.

Central Chester County Bicycle and Pedestrian Circulation Plan

Randy Waltermyer, Transportation Director for the Chester County Planning Commission, was present to seek the Township’s endorsement of the Central Chester County Bicycle and Pedestrian Circulation Plan by a non-binding resolution. He last briefed the East Goshen Board

6/25/2013 June 18, 2013 BOS Minutes Page 3 of 10

on this Plan back in December 2012. The Plan has already been endorsed by East Caln, East Bradford, and West Goshen. The Borough of West Chester will consider endorsement at their meeting on June 19. The CCPC is also seeking endorsement by Downingtown and West Whiteland. Mr. Waltermyer explained this is a 25-year program framed out to be implemented in a piecemeal fashion and combined into land development decisions on a local level.

Marty moved to endorse the Central Chester County Bicycle and Pedestrian Circulation Plan by resolution and to encourage the Comprehensive Plan Task Force to include the Plan in the 2015 East Goshen Township Comprehensive Plan update. Carmen seconded the motion.

Marty stated that while the Township is working on the Comprehensive Plan it would be a good time to update the Open Space/Park & Rec plan which hasn’t been updated for approximately 20 years. The Township will need to survey the residents to get their input. Marty also mentioned he would like one day to see a path leading from the school to the Township Park. Randy Waltermyer noted that some State grant money will be forthcoming which might be available for such a project.

Public Comment: Ginnie Newlin, Devon Lane – Asked who will be installing the bicycle/pedestrian paths and Mr. Waltermyer explained that it will differ based on the location.

Senya noted the $2.8M price tag associated with the East Goshen portion of the proposed trails as presented in the report provided by Mr. Waltermyer. He asked if the Board endorses the plan and passes a resolution knowing this price tag, will East Goshen be responsible for financing the project. Mr. Waltermyer said the cost estimates noted in the report should not be misinterpreted as being the entire responsibility of the various municipalities. Carmen said although he is personally behind the plan to add the bicycle/pedestrian paths, he does not authorize moving forward with any plans for an East Goshen expenditure on this project. Mr. Waltermyer stated that the text at the back of the report indicates there is no discrete obligation by the endorsing municipalities to finance the project.

Public Comment: Bill Egan, Mill Creek – Asked if the paths in the Township Park are bike friendly. Heidi Karpa stated the Applebrook side of the park can be used by bicyclists. Mr. Egan stated he does not want the Township to spend any money on newly conceived trails until the Applebrook trail along long Line Road, approved some time ago, is constructed.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Senya told Mr. Waltermyer he knows a great deal of hard work, passion and enthusiasm has gone into this plan, and the Township appreciates his interest and energy for this concept. Mark Gordon echoed Senya’s sentiments.

6/25/2013 June 18, 2013 BOS Minutes Page 4 of 10

Finance Report

Jon Altshul summarized his memo of June 11 to the Board. As of May 31, the General fund had a positive variance of $1,657,217. The YTD budget had a positive variance of $349,070. Senya reported that the Township will be getting a new business soon called IMX Medical Management Services. Mark Gordon said IMX is settling on the “black box” at 1700 Paoli Pike tomorrow. They will have 70 employees at the location to start, with plans for growth at this new location. They have an existing site in Bala Cynwyd. Senya noted that the purchase of 1700 Paoli Pike will leave only one vacant commercial building in the Township, and Mark Gordon said there is rumored to be a sale pending for that last building.

Malvern Fire Company

Rick reported that Malvern responded to a gas leak incident in East Goshen in May.

Peddling and Solicitation Ordinance

Rick summarized the changes made to the policy under the guidance of the Township Solicitor. The ordinance now allows for the establishment of a “Do Not Solicit” list that can be posted online, and all references to “Township Secretary” have been changed to “Township Manager.” The Board must determine the time limits for peddling/solicitation.

Marty explained the concept of the “Do Not Solicit” list for the benefit of the audience. Carmen stated he is opposed to allowing peddling/solicitation until 8:00pm.

Senya made a motion to move forward with the changes made to the ordinance per the recommendation of the Township Solicitor, and to advertise the ordinance change. Marty seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Personnel Manual

Jon reported that the Personnel Manual was updated per the Board’s discussion of June 4. In addition, the staff researched the concept of PTO (Paid Time Off) and determined there was no benefit to switching Township employees over to a PTO model at this time.

Marty moved to authorize a resolution amending the personnel manual as per the staff’s recommendation, except that the employee incentive award payment will be in the round amount of $200 instead of the $204.61 mentioned in Jon Altshul’s June 12 memo to the Board. Chuck seconded the motion.

Marty asked Rick if future decisions by the Board affecting the Personnel Manual would need to be memorialized by resolution, or made a matter of practice. Rick said they could be made a matter of practice.

There was no further discussion and no public comment. The Board voted unanimously to approve the motion.

6/25/2013 June 18, 2013 BOS Minutes Page 5 of 10

Comprehensive Plan/Sustainable Communities Assessment

Mark Gordon reported that the Comprehensive Plan Task Force (CPTF) and the Planning Commission have reviewed the Sustainable Communities Assessment prepared by the Brandywine Conservancy. The CPTF would like the Board’s comments on the Assessment in advance of the next CPTF meeting on July 22. Rick suggested the Board members individually review the assessment and send their comments to Mark Gordon, who will compile them. Marty and Chuck noted how detailed the Assessment is, and advised the other Supervisors to allow plenty of time for its review. Chuck said it may actually go too far in depth. Senya noted that the East Goshen banner hanging in the Board room is actually a concise summary of the Comprehensive Plan. The Board agreed to discuss this matter at the first meeting in July.

LED Signs Bids

Rick reported that six bids were received (see attached list), with one rejected for being incomplete. The staff recommends the bid be awarded to Visual Information Services Corp.

Marty moved to accept the recommendation of staff and award the bid for two double-sided outdoor LED signs to Visual Information Services Corp. of Bowmansville, PA in the amount of $43,869.00. Carmen seconded the motion.

Marty said these signs will be a good investment for the Township. The messages can easily be updated as frequently as needed from the Township Building, with no need to send out someone from Public Works. Rick noted the Public Works crew will construct masonry bases for the units, and an East Goshen Township sign will be put at the top of each screen. Marty asked Rick how long the signs last and Rick said the bulbs alone are good for about 10 years.

Public Comment: Mike Broennle, Wyllpen Farms – Asked if the signs scroll up and repeat the messages and Senya said yes.

Chuck asked if the plan is to turn off the units at night. Rick said the signs have timers and can be set to turn on and off whenever the Township wants. It was pointed out that the bulbs will last even longer if the units are turned off at night.

There was no further discussion or public comment. The Board voted unanimously to approve the motion.

Road Widening

Rick summarized a July 11 memo from Mark Miller regarding the need to widen the intersection of Strasburg and Dutton Mill Roads for safety reasons. In order to widen the road, however, a large rock must be removed. The Public Works crew is unable to move this rock on their own and recommends hiring Earth Core to remove it. Per Mark the total cost for this job will be approximately $17,900 which includes $5,500 in Township labor. Marty asked if this involves any overtime and Rick said no. Carmen moved to accept the recommendation of Mark Miller to hire Earth Core to remove the large rock at the intersection of Strasburg and Dutton Mill Roads. Marty seconded the motion. There was no further discussion and no public comment. The Board voted unanimously to approve the motion.

6/25/2013 June 18, 2013 BOS Minutes Page 6 of 10

Clymer’s Woods at Applebrook

The Board again discussed the issue of the grass growing among the trees in Clymer’s Woods at the corner of Line Road and Paoli Pike. Carmen moved to continue to mow the grass among the trees until the trees grow high enough to choke out the grass and prevent it from growing.

Marty said he would second the motion but would like it enhanced to specify that the location be kept mowed and trimmed like a manicured lawn, and furthermore that all grassy open space within the Township be kept in this manner as a general practice. He stated that the Township should not have an unsightly eyesore such as Clymer’s Woods. East Goshen is known best of all for the Applebrook Park, and having such an unkempt area right at Applebrook reflects badly on the Township. Senya noted that the Board agreed at a previous meeting to have the Clymer’s Woods area mowed once per month during the growing season.

Public Comment: Ginnie Newlin, Conservancy Board – Said East Goshen will look “extremely ignorant” and “behind the times” if the grass is kept short. The grass should be left alone and allowed to grow to protect habitat. The grass should only be cut twice per year. She added that the whole of East Goshen Township Park should be kept as a meadow with strips of lawn mowed only in certain places.

Public Comment: Erich Meyer, Conservancy Board – Said he thinks there is room for compromise. He suggested mowing the edges of Clymer’s Woods more regularly. That will help define the area and show there is clear intent, instead of having it look neglected. He reminded everyone that an agreement was reached at a previous meeting to mow the interior grass (between and under the trees) once per month to a 5” height. Heidi Karpa agreed. Erich added that once the trees start growing taller they will start to choke out the grass and there won’t be as much grass to mow.

Senya noted that it was also agreed at a previous meeting that the Conservancy Board would have a sign installed at the site explaining the reforestation project.

Public Comment: Bill Egan, Mill Creek – Said he concurred with everything Ginnie Newlin said, and added that he wants the Township to consider introducing native understory shrubs and putting mulched leaves under the trees. Ginnie said she concurred with these suggestions.

Marty stated that in his opinion Applebrook should be kept mowed “like a lawn.”

Carmen moved to follow the suggestion of Erich Meyer for the remainder the summer. The perimeter of Clymer’s Woods will be mowed short to frame the area. This perimeter will be a width of approximately 4 feet wide from the edge toward the interior, and the area from the trail outward to the roadway will also be kept mowed. Heidi Karpa pointed out that instead of saying 4 feet in width the motion could specify “one mower swath.” Carmen was fine with this. He added that the interior grass between and under the trees is to be maintained at the highest setting available on the current mowing equipment. In case any trees fall within the mower swath, common sense should prevail and the grass should not be mowed too near the trees. Chuck seconded the motion.

6/25/2013 June 18, 2013 BOS Minutes Page 7 of 10

Public Comment: Bill Egan, Mill Creek – Said all grassy open space maintained by the Township should be cut at the highest setting, which is best for the environment. In fact, he recalls reading this very advice in a Township newsletter.

There was no further discussion or public comment on the motion. The Board voted and the motion passed unanimously.

Marty moved to mow the remainder of the grass in Applebrook to a height of 4”. Chuck seconded the motion.

Public Comment – Heidi Karpa, Park & Rec – Said it’s not as simple as just picking a height for the grass. Because this is the third year in a row this issue has been discussed by the Board, she suggested allowing the Conservancy Board to work with Public Works to develop a plan designating which areas of Township Open Space should be mowed and to what heights. Ginnie Newlin noted that the Natural Lands Trust already provided the Township with such a delineated plan.

Marty changed his motion to state that the interior of the park may be kept as meadow but the area from the trail out toward the roadway must be mowed. (No height was specified). The interior need only be mowed a width of two mower swaths in. Chuck seconded the revised motion. There was no further discussion or public comment. The motion passed unanimously.

Any Other Matter

Vacancy Board - Senya noted there is an opening on the Vacancy Board. Anyone interested in applying should contact the Township.

COG - Senya stated that Dr. Clapper’s resignation has created an opening for a COG representative. Carmen moved to nominate Senya Isayeff as COG representative. Marty seconded the motion. There was no discussion or public comment. The motion passed unanimously.

Dates of Importance - Senya said he failed to mention at the last meeting that June 12 marked East Goshen’s 196th birthday, and that Friday June 14 was Flag Day.

Thom Clapper - Senya asked if the Board would like to honor Dr. Clapper at a future meeting for his years of service to the Township. The other Board members said they would definitely like to do this but the June 25 meeting would probably not be the best time; it will have to be at another meeting.

Community Day Novelty Items – Heidi Karpa said the Park & Rec Commission would like to add $400 to the Community Day budget for glow sticks and glow-light necklaces. These items will be sold to raise funds for Community Day. The seed money would be returned to the Township after the event. Jon noted that the Township will also charge sales tax on the items. Marty moved to approve the request for another $400 for the Community Day budget. Carmen seconded the motion. Senya said he enjoyed seeing all the glow sticks and glow necklaces last year. There was no further discussion or public comment. The motion passed unanimously.

6/25/2013 June 18, 2013 BOS Minutes Page 8 of 10

Geese – Rick reported that a census of the geese taken last week yielded only 16 birds. Therefore the roundup for this year has been cancelled as it would involve only 8 birds.

Muffin Monster – The Board reviewed a June 14 request from Mark Miller to replace the Muffin Monster grinder located at the Ashbridge Pumping Station with a refurbished unit at a cost of $8,250.00. Carmen moved to authorize the expenditure of $8,250.00 for a refurbished Muffin Monster. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Friends of East Goshen – Chuck reported there has been a delay in filing for 501(c)3 status for the Friends due to increased red tape at the IRS and a requirement for additional paperwork. However, the amendment has been filed and the wheels are in motion.

Review of Minutes

The Board agreed to table review of the June 4 and June 11 minutes to a future meeting.

Treasurer’s Report & Expenditure Register Report

See attached Treasurer’s Report for June 13, 2013.
The Board reviewed the Treasurer’s Report and the current invoices. Marty moved to accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Carmen seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Action List

Employee Picnic – Rick reported the picnic was held on June 14. Three employees – Joanne Morgan, Steve Biondi and ________ were recognized for their 25-year service anniversaries.

Applebrook Golf Outings – Rick reported that the terms and conditions of the Township’s use of the Applebrook Golf Club facilities have been tentatively revised per a meeting with Hank Belber on June 13. The terms and conditions will be valid through 2018. The only change is that the September 2013 outing will be held on the fourth Monday instead of the fourth or fifth Tuesday. Marty moved to finalize the agreement with the Applebrook Golf Club as outlined in the June 18 letter from Senya Isayeff to Hank Belber. Carmen seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.

Light Fixtures at Municipal Complex – The retrofitting of the fixtures has been completed.

New Item - The Board agreed that staff should add “Update the Open Space/Park & Rec Plan” to the Action List.

Correspondence & Reports of Interest

Senya acknowledged receipt of the 2nd Quarter Annual Planning Session Goals from the Commerce Commission and also the Municipal Authority.

6/25/2013 June 18, 2013 BOS Minutes Page 9 of 10

Meetings & Dates of Importance

Senya noted the upcoming meetings as listed in the agenda.

Adjournment

There being no further business, the meeting was adjourned at 9:57pm.

Anne Meddings
Recording Secretary

Attachments:

  • LED Sign Bid Results
  • Treasurer’s Report

[DRAFT]

6/25/2013 June 18, 2013 BOS Minutes Page 10 of 10

LED Sign Bid Results June 12, 2013

Company Total Cost
Visual Information Services Corp.
P.O. Box 349
Bowmansville PA 17507
$43,869.00
Signs Plus
4242 McIntosh Lane
Sarasota, FL 34232
Also submitted an option for LED signs with Fixed ID Cabinet: $25,219 per location - Total $50,438
$42,918.00 Bid incomplete (no bid bond)
Chadmark Associates
313 Woodbridge lane
Media, PA 19063
$45,850.00
Vis Signs/ Visual Information Systems Inc.
517 Milbeth Drive Suite 100
Pittsburgh, PA 15228
$46,835.00
Forman Sign Company
10447 Drummond Road
Philadelphia, PA 19154
$48,990.00
KC Sign Company
142 Conchester Highway
Aston, PA 19014
$49,200.00

F:\Data\Shared Data\Public Works Dept\Bids\LED Signs\Spreadsheet for LED bid results Book1.xlsx Page 1

June 13, 2013

TREASURER'S REPORT
2013 RECEIPTS AND BILLS

GENERAL FUND

Receipts Amount Expenditures Amount
Real Estate Tax $43,084.32 Accounts Payable $542,513.25
Earned Income Tax $34,000.00 Electronic Pmts:
Local Service Tax $0.00 Health Insurance $54,778.54
Transfer Tax $0.00 Credit Card $0.00
General Fund Interest Earned $1,433.08 Postage $0.00
Total Other Revenue $59,887.57 Debt Service $18,082.89
Payroll $94,000.00
Total Receipts: $138,404.97 Total Expenditures: $709,374.68

STATE LIQUID FUELS FUND

Receipts Amount Expenditures Amount
Receipts $280,108.55 Expenditures: $0.00
Interest Earned $108.06
Total State Liquid Fuels: $280,216.61

CAPITAL RESERVE

Receipts Amount Expenditures Amount
Interest Earned $770.62 Expenditures: $23,022.04

TRANSPORTATION FUND

Receipts Amount Expenditures Amount
Interest Earned $310.31 Expenditures: $0.00

SEWER OPERATING

Receipts Amount Expenditures Amount
Receipts $107,680.30 Accounts Payable $58,698.24
Interest Earned $115.61 Debt Service $313,774.67
Total Sewer: $107,795.91 Total Expenditures: $372,472.91

REFUSE

Receipts Amount Expenditures Amount
Receipts $37,092.34 Expenditures $69,450.37
Interest Earned $49.23
Total Refuse: $37,141.57

SEWER CAPITAL RESERVE

Receipts Amount Expenditures Amount
Interest Earned $208.34 Expenditures $5,850.00

EAST GOSHEN TOWNSHIP
ACTION LIST

July 2, 2013

New additions are in bold

# Item Date
1 Hershey's Mill Dam July 2, 2013
4 Comp Plan July 2, 2013
5 Comp Plan Goals for ABCs July 16, 2013
8 Quarterly Report Municipal Authority Projects July 16, 2013
9 Quarterly Financial Reports July 16, 2013
10 Quarterly Report on I&I July 16, 2013
11 Quarterly Review of Right to Know Requests July 16, 2013
13 Comcast Franchise Renewal July 16, 2013
14 Open Space Plan August 6, 2013

Action List 070213.xlsx 1

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Hershey's Mill Dam | No: 1

List Date: 5/22/2007 | Completed Date:

Description: Bring Dam into compliance with DEP requirements or dispose of dam

Note I have hidden the 2010 comments to save space

Date Action
1/3/2011 Update from Neil DeReimer
2/1/2011 Update from Neil DeReimer
3/1/2011 Update tabled to 3/8
3/8/2011 Update from Neil DeReimer
3/24/2011 American Rivers/NOAH grant denied
4/5/2011 Update from Neil DeReimer
5/10/2011 Update from Neil DeReimer
6/7/2011 Update from Neil DeReimer
7/12/2011 Update from Neil DeReimer
8/9/2011 Update from Neil DeReimer
11/1/2011 Update from Neil DeReimer and see attached
12/6/2011 Update from Neil DeReimer
12/9/2011 Submited grant application to Americn Rivers (decision by 3/9/12)
1/3/2012 contacted PADEP about meeting
2/7/2012 Conference call with DEP scheduled for 2/2/12
3/7/2012 Contract with Walsh executed on 2/7. Status report attached
4/3/2012 Status report attached
5/1/2012 Status report attached
6/5/2012 Status report attached
7/3/2012 Status report attached
8/7/2012 Presentation to BoS. BoS agreed to send 1,000 foot letter and invite residents once rendering is done
10/2/2012 Presentation - Ok to send plans to DEP
11/13/2012 Plans sent to DEP
12/4/2012 Status Report attached
1/7/2013 Per DEP we should have comments on plans by mid January
2/5/2013 DEP advised that we need to submit for an NPDES permit and provide them with an O&M Manual. The engineer has submitted the NPDES Application and is preparing the O&M Manual
3/5/2013 Revised plans sent to DEP on 2/18
5/7/2013 Comment letter received. Engineer will re-submit next week.
6/4/2013 Verbal Report at Meeting -Engineer waiting on info from structural engineer
7/2/2013 Verbal Report at Meeting

F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\1 Hershey's Mill Dam.xlsx

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Comp Plan | No: 4

List Date: 2/7/2011 | Completed Date:

Description: Update Comp Plan

Date Action
2/7/2012 Consider applying for Vision Partnership Grant. At 2/7 meeting BoS requested Staff develop RFP for Consultant
3/20/2012 Working on RFP
4/17/2012 Working on RFP
5/15/2012 RFP Issued
6/19/2012 Contracted with Brandywine Conservancy on 6/5
7/17/2012 Working on grant application which is due 8/15/12
8/21/2012 VP Grant Application submitted 8/15/12
10/16/2012 CCPC recommended grant for approval
1/15/2013 Contract executed. Memo on task force makeup in 1/15 agenda
2/19/2013 Comp Plan Task created. Kick off meeting scheduled for February 25. 2013
3/5/2013 Verbal Update on 2/25/13 meeting
5/7/2013 The public visioning session is scheduled for June 3,2013
6/4/2013 Verbal Update on Visioning Session
7/2/2013 Board to review "sustainability section" on 7/2

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 6/25/2013
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: 2013 Goals

Dear Board Members:

At their meeting on June 5th the Planning Commission reviewed their 2013 goals. Here is an update of their progress to date:

Solar energy regulations:
The commission has agreed to look at some surrounding municipal ordinances to develop a framework for a proposed amendment to our regulations. Sample ordinances will be looked at during their July meeting.

Zoning Ordinance amendment regulations:

The commission completed a review of the Zoning ordinance in an attempt to determine inconsistencies in the ordinance. This exercise proved to be valuable to the commissions' knowledge of the ordinances and helped to identify where there may be areas for improvement.
Since completing the ordinance review the commission has worked on a couple of minor edits to language surrounding animal husbandry in order to help clarify the regulations.
The commission has also discussed using the comprehensive plan update as a guide to future Zoning Ordinance amendments in order to more effectively recommend amendments to the ordinance.

F:\Data\Shared Data\ABC'S\Planning Commission\Goals\2013\Memo to BOS 06252013.docx

June 18, 2013

TO: EAST GOSHEN TOWNSHIP – BOARD OF SUPERVISORS
East Goshen Township Building
1580 Paoli Pike
West Chester, PA 19380-6199

FROM: LESLIE M. PARTEM, MD
Rose Hill Estates Luxury Condominiums
1324 West Chester Pike, Suite #204
West Chester, PA 19382

[Stamp: RECEIVED JUN 21 2013 BY]

Re: Rose Hill Estates Luxury Condominiums - Property Concerns & Safety Violations

Dear East Goshen Township Board of Supervisors,

I would like to bring your attention to an item on the Rose Hill Estates Luxury Condominium Property, which needs your immediate action. The Condominium Association on the Rose Hill Estates Luxury Condominium property, for years comprised of multiple Zarelli family members (the original builders of the property) renting out their own condominium properties to multiple tenants, has created a conflict of interest in regards to the enforcement of property rules and regulations on the condominium property in question. Subsequently, the renters are not abiding by the same rules and regulations (if at all) as the owners of the properties, thereby negatively affecting the enjoyment of the property for those condominium owners, as well as negatively influencing the values of the properties in question.

The situation has drastically deteriorated on the Rose Hill Estates Luxury Condominium Property and needs your immediate attention. The Condominium Board has failed to take any actions of enforcement on the property, as is their direct role (in the absence of a Management company on site). The Association has failed to even take action on basic items, such as enforcing peace and quiet on the property. There have been numerous property inhabitant violations, with multiple non-related people living in units together. Additionally, many such rentals do not adhere to the rules of the properties.

First and foremost, there exists a serious concern as to the number of unrelated individuals residing in these single-family condominium units. These units are currently being rented out to multiple non-related tenants residing in a single unit meant by square-footage and design to be occupied by a single family. Not only is this a safety and a fire hazard, but it also creates an issue with building code regulations and other concerns (such as parking, trash removal, water usage, etc)

Secondly, despite numerous notifications and complaints (see attached letter dated October 8, 2012), no action has been taken to address unsupervised minors on the property. Several of the tenants who have moved into rentals on the Rose Hill Estates Condominium property are with several children (in fact, there have been numerous unsupervised children running around the property, causing havoc, noise disturbances, car damage from skateboarding, rollerblading and playing sports on the premises of the car parking lot, as well as extensive property damage). The children run around the property completely unsupervised at all hours of the day and night – there is even a large-sized, two-story camping tent sitting outside on the property of Unit #202 (a clear fire hazard, not to mention, directly going against condominium property regulations as far as what is allowed to be placed on shared common grounds of the property).

1 | Page

In addition to violating multiple building and property codes, rentals and owners alike are allowing their dogs to roam freely on the property without any leashes or supervision, posing both a threat to other inhabitants, as well as disrupting the property landscaping. Along with the unsupervised dogs (after which no one is cleaning up), the unsupervised children create a serious danger on the property, considering that a child was already hit by a vehicle passing by on the parking lot. The fact that these kids are freely playing soccer, kickball and multiple sports such as baseball and skateboarding directly on the parking lot (which clearly is not a playground!) has caused widespread damage to many parked vehicles. To make matters worse, these unsupervised children, whose parents are currently renting units at the Rose Hill Estates Luxury Condominium Buildings A, B & C (and other unsupervised and unruly children who come to join them from the Rose Hill Apartment properties), have been spotted damaging landscaping, ripping out siding, and more significantly, throwing stones into the insides of the air conditioning units. Police reports on damaged vehicles are available upon request.

All these items are a direct result of no enforcement by the Condominium Association and no Management Company appointed to oversee daily items on the property in question. Please be advised that since the Condominium Association has failed to take any actions on multiple occasions, immediate action to address and resolve this problem is expected from the Board of Supervisors. Not only are multiple items raised in this letter safety violations, fire hazards and life-threatening conditions, but these are Luxury Condominiums (not apartments) and proper standards must be kept up by the Association, especially in regards to tenants placed into the Luxury Condominium units.

I trust that immediate actions will be taken to remedy these concerns by the Township, Board and authorities. Please note that local, state and federal authorities have been contacted about the seriousness of these matters. Should the media, police or fire re-enforcement be necessary, proper notification actions will be taken as well.

Please do not hesitate to contact me if you have any questions or concerns.

Best regards,

Leslie M. Partem, MD
Condominium #204, Building B
Rose Hill Estates Luxury Condominiums

2 | Page

[Two photographs showing a camping tent set up on the grass near air conditioning units outside a building. Date/time stamp: 06 17 2013 09 51]

[Two photographs showing a camping tent erected on the grass adjacent to air conditioning units and bushes. Date/time stamp: 06 17 2013 09 51]

[Photograph showing a camping tent erected on the lawn near trees and air conditioning equipment outside a building. Date/time stamp: 06/16/2013 10:20]

October 8, 2012

TO: ROSE HILL ESTATES LUXURY CONDOMINIUMS
Condominium Association
1322 West Chester Pike
West Chester, PA 19382

FROM: LESLIE M. PARTEM, MD
Rose Hill Estates Luxury Condominiums
1324 West Chester Pike, Suite #204
West Chester, PA 19382

Re: Rose Hill Estates Luxury Condominiums - Property Disturbances, Damage to Parked Vehicles, Damage to Air Conditioning Units and Unsupervised Children Running Around and Causing Disturbance

Dear Rose Hill Estates Condominium Association,

I would like to bring your attention to an item on the Rose Hill Estates Condominium Property, which needs to be addressed immediately by the Condominium Association. In the last two-three months, ever since the new tenants moved into one of your rentals on the Rose Hill Estates Condominium property with several children, there have been numerous unsupervised children running around the property, causing havoc, noise disturbances, car damage from skateboarding, rollerblading and playing sports on the premises of the car parking lot, as well as extensive property damage.

The children run around the property completely unsupervised at all hours of the day and night. This is extremely dangerous to their well-being, as a child was already hit by one of the speeding vehicles passing by on the parking lot. The fact that they are freely playing soccer, kickball and multiple sports such as baseball and skateboarding directly on the parking lot has caused widespread damage to many parked vehicles. Two-three cars have already been scratched on the lot and a windshield has been cracked as a result of these reckless and inappropriate actions by these unsupervised underage children. Additionally, many of the families living in the Rose Hill Estates have infants sleeping during the day and night, so it does not help to have a stampede of unsupervised children running around screaming at the top of their lungs.

To make matters worse, these unsupervised children, whose parents are currently renting units at the Rose Hill Estates Luxury Condominium Buildings A & B (and other unsupervised and unruly children who come to join them from the Rose Hill Apartment properties), have been spotted damaging landscaping, ripping out siding, and more significantly, throwing stones into the insides of the air conditioning units. If this continues, then we will hold the rental landlords directly responsible for damage sustained to the Condominium properties.

Please be advised that both the Police and the Township have been notified and immediate action to resolve this problem is expected on behalf of the Condominium Association and the appropriate Landlords of properties in question. These are Luxury Condominiums, not a playground or a zoo and proper standards must be kept up by the Association, especially in regards to tenants placed into the Luxury Condominium units.

Best regards,

Leslie M. Partem, MD
Condominium #204, Building B
Rose Hill Estates Luxury Condominiums

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

June 26, 2013

Leslie Partem, M.D.
1324 West Chester Pike
Unit 204
West Chester, PA 19380

Re: T.P.N. 53-6-1951 / Response to your Letter to the Board of Supervisors

Dr. Partem:

The Township has received your letter dated June 18, 2013 and the Board will acknowledge your letter at their meeting on July 2, 2013 at 7:00 PM at the Township Building.

I have read your letter and offer the following in response:

  1. Unrelated residents: The Township code allows for no more than three unrelated persons to occupy a residential unit. I will discuss the complaint with the property manager in order to determine if violations are occurring.
  2. Unsupervised Minors: The presence of children on the property is not a matter for Township involvement. As we have discussed before, the presence of children on the property in itself is not a matter for Township enforcement. If property damage is being created by these individuals it is a matter for the Police and the Homeowners Association to address.
  3. Unleashed Dogs: The property in question is a privately owned property and the Township regulations do not prohibit unleashed dogs on private property. This is another matter for the HOA to address with the community residents. I will discuss this issue with the property manager and advise her/him of the safety concerns associated with unleashed dogs on the private community property.
  4. Tent on Community property: The Township code does not prohibit the recreational use of a tent on the community common ground. You provided pictures of a recreational tent erected in the community common area. The community common areas are available for use by all residents of the community, this is another matter for the HOA to address with the residents should they deem it to be a violation of the community rules and regulations.

Should you have any questions, please contact me.

F:\Data\Shared Data\Property Management\53-6\53-6-1951 (1324 West Chester Pk. Unit 204)\Letter to Dr. Partem 06262013.doc

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

Sincerely,

Mark A. Gordon
Township Zoning Officer

Cc: Rose Hill Condominiums

F:\Data\Shared Data\Property Management\53-6\53-6-1951 (1324 West Chester Pk. Unit 204)\Letter to Dr. Partem 06262013.doc

Janet L. Emanuel
704 Inverness Drive
West Chester, PA 19380

[Stamp: RECEIVED JUN 27 2013 BY]

June 26, 2013

Louis F. Smith, Jr.
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Re: Resignation from Zoning Hearing Board

Dear Rick:

Please accept my resignation from the Zoning Hearing Board as of June 25, 2013. Since I was appointed as Township Supervisor, I am unable to continue as chairman of that Board. At present there is nothing on our agenda, but should something arise before my replacement is named, I have great confidence in fellow members, John Nicholson and Peter Mylonas. It has been a pleasure working with them.

Very truly yours,

Janet L. Emanuel

cc: Senya D. Isayeff