Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
Tuesday, September 17, 2013
7:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Public Comment – Hearing of Residents (Optional) 6. Chairman’s Report a. Announce the passing of Nicholas Campbell, Malvern’s longtime Ambulance Chief and driving force to the establishment of Malvern’s paramedic service b. Comp Plan Update – 1st Tuesday (None) c. Friends of East Goshen – 1st Tuesday (None) 7. Public Hearings – QVC Conditional Use Application request to increase number of satellite dishes. 8. Police/EMS Report – To Be Handed Out Malvern Fire Co. – Monthly Fire Operations Report – August 2013 Fire Marshal – (None) Goshen Fire Co 9. Financial Report – August 2013 10. Old Business 11. New Business a. Consider staff recommendation for large format plan project b. Consider staff request for truck replacement c. Consider speed limits d. Consider open space and recreation plan update 12. Any Other Matter 13. Approval of Minutes a. September 3, 2013 14. Treasurer’s Report a. September 12, 2013 15. Review Action List
a. September 17, 2013 16. Correspondence, Reports of Interest a. Acknowledge Chief Bernot’s letter thanking Mark Miller and the Public Works Department for assisting the police department in locating a weapon lost in heavy undergrowth b. Acknowledge WEGO Police Commission Pension Plan Actual Cost Study and Summary-Returns 17. Dates of Importance Sept 16, 2013 Commerce Commission 7:00 PM Sept 17, 2013 Board of Supervisors 7:00 PM Sept 18, 2013 Police Commission – CANCELLED 5:30 PM
C:\Users\docstar\Desktop\09172013 agenda.doc
Sept 18, 2013 Zoning Hearing Board – CANCELLED 7:30 PM Sept 19, 2013 Farmers Market 3-7:00 PM Sept 23, 2013 Comp Plan Task Force 7:00 PM Sept 23, 2013 Applebrook Golf 11:00 AM Sept 24, 2013 Police Commission 5:30 PM Sept 24, 2013 Friends of East Goshen 7:00 PM Sept 26, 2013 Farmers Market 3-7:00 PM Sept 26, 2013 WC Area Council of Governments 7:00 PM East Goshen Township Building 18. Public Comment – Hearing of Residents 19. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.
C:\Users\docstar\Desktop\09172013 agenda.doc
Malvern Fire Company
http://www.malvernfireco.com/fullstory.php?id=599
[Logo: Malvern Fire Company, organized 1888, Station 4 badge and fire truck photo]
Malvern Fire Company
Serving our community since 1888
Chester County, PA Station 4
Member Access | Member E-Mail | Links | Guestbook
Navigation
- Home
- Archives
- Gallery
- Personnel
- Knox Box Program
- EMS Information
- History
- 1903 Antique Pumper
- Recruitment
- Apparatus
- Coverage Map
- Fire Prevention
[Image: EMS Star of Life] EMS Subscription Drive Information
[Image: Malvern Fire Company Rescue Station 1 badge, 1888]
Contact
424 E. King Street
PO Box 435
Malvern PA, 19355
Phone: 610-647-0693
Fax: 610-647-0249
Info@malvernfireco.com
Passing of Past EMS Chief Nicholas Campbell
09/01/2013 12:00 Hrs
The Malvern Fire Company regretfully announce the passing of Nicholas Harold Standing Campbell.
Over his more than forty years of service, Nick provided visionary leadership in numerous capacities within the region's fire and emergency services. His long-term service to the Malvern Fire Company included many years as EMS Chief, as well as numerous other operational and administrative positions. He began his professional career at Paoli Memorial Hospital, where he served in several capacities, including the Cardio Pulmonary Team and as the first Paramedic Supervisor for Medic 92.
Chief Campbell was ALS Director for Brandywine Hospital's Medic 93 and Skyflight care for much of his career. Under Nick's visionary leadership, Malvern Fire Company established the first fire department-based paramedic service in Chester County. His distinguished service included serving as President of the Chester County Emergency Medical Services Council. Nick was the recipient of numerous service awards, including the Margaret Hoover Brigham EMS Award.
Nick's life celebration service will be held on Saturday, September 7 at 2:00 p.m. at the Church of the Good Samaritan, 212 Lancaster Avenue, in Paoli, PA 19301. A visitation will be held on Friday, September 6 from 5:30 to 9:00 p.m. at the church. Participating departments should contact Chief Neil Vaughn at (484) 639-3060 or nvaughn@malvernfireco.com.
In lieu of flowers, memorials may be made to the Nick Campbell Memorial Education Fund, being established in recognition of his role in preparing and empowering a generation of health care providers, or in his name to the National Fallen Firefighters Foundation in Emmitsburg, Maryland.
Back
©2007 - 2013 Malvern Fire Company. All Rights Reserved
Click Here for Browser/Site Information
Contact Webmaster
1 of 2
9/3/2013 2:25 PM
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 9/12/2013
To: Planning Commission
From: Mark Gordon, Zoning Officer mb
Re: QVC Conditional Use / Satellite Dishes
Dear Board Members,
The Planning Commission has forwarded you a recommendation to approve the Conditional Use application of QVC Inc., to increase the number of satellite dishes. I have drafted a motion for your review and consideration.
Draft Motion:
Mr. Chairman, I move that we approve the Conditional Use application of QVC Inc. to increase the number of satellite dishes on their property from 6 to 12 with the following conditions:
- The entire fence line along the southern edge of the satellite area shall be screened as depicted on the Landscape Plan dated 7/2/2013 with deer resistant plantings; specific plant species have been recommended by the Conservancy Board. The Township can require additional plantings if needed within the first 18 months after installation.
- The vegetative screening shall be maintained so long as the satellite use exists on the property.
- Any changes to the satellite dishes within the satellite yard, moving forward, may occur without conditional use approval so long as the size of the dishes doesn't exceed the allowable building height in the district and changes are limited to within the satellite yard area depicted on the plans dated 7/18/2013.
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2013 Sat. Dish Expansion CU App\Draft Motion 09122013.doc
AREA CODE 610
692-7171
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
August 28, 2013
East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380
Re: QVC Inc. Conditional Use
Satellite Dishes
Dear Board Members:
At their meeting on August 7, 2013 the Planning Commission voted unanimously in favor of the following motion:
Madame Chairman, I move that we recommend that the Board of Supervisors approve the Conditional Use application of QVC Inc. to increase the number of satellite dishes on their property from 6 to 12 with the following conditions:
- The entire fence line along the southern edge of the satellite area shall be screened as depicted on the Landscape Plan dated 7/2/2013 with deer resistant plantings and the Township can require additional plantings if needed within the first 18 months after installation.
- The vegetative screening shall be maintained so long as the satellite use exists on the property.
- Any changes to the satellite dishes within the satellite yard moving forward may occur without conditional use approval so long as the size of the dishes doesn't exceed the allowable building height in the district and changes are limited to within the satellite yard area depicted on the proposed satellite yard plan dated 7/18/2013.
Sincerely,
Mark A. Gordon
Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2013 Sat. Dish Expansion CU App\PC Rec to BOS 08282013.doc
EAST GOSHEN
CONSERVANCY
[Drawing: Tree branches with leaves]
September 12, 2013
East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380
Re: QVC Inc. Conditional Use / Satellite Dishes
Deer Resistant Plantings
Dear Board Members:
At their meeting on September 12, 2013 the Conservancy Board voted unanimously in favor of the following motion:
Madame Chairman, I move that we recommend that the applicant, QVC, Inc., incorporate the following deer resistant plant species in the landscape design for the Satellite Yard area screening:
- Thuja - a/k/as the Green Giant - it will be an aggressive grower. You will want to plant this towards the back to provide for screening. This plant will do well when "topped off" so it will not interfere with the signals (which is most likely how they will maintenance these anyway). Deer Resistant.
- Pieries Japonica - you will want this in the foreground or the front. It is a nice evergreen flowering plant. It is a good grower, and deer resistant. Has nice color and contrast.
Sincerely,
Sandy / Mlb
Sandy Snyder, Esq.
Chairman
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2013 Sat. Dish Expansion CU App\CB Rec to BOS 09122013.doc
1580 PAOLI PIKE, WEST CHESTER, PA. 19380
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
July 31, 2013
Dear Property Owner:
The purpose of this letter is to inform you that the Township has received a Conditional Use Application from QVC, Inc. requesting to amend an existing conditional use approval for the use of satellite dishes on their property at 1365 Enterprise Drive.
QVC proposes to increase the number of satellite dishes on the property from 6 (six) to 12 (twelve). The existing satellite dishes are located within the fenced in area along the southern side of the building. The new satellite dishes will be located in the same area as the existing dishes and will be enclosed by a fence and the area will be landscaped.
Pursuant to Township ordinance all property owners within 1000 feet of the property seeking Conditional Use approval, are notified of the meeting dates when the application will be discussed. The scheduled dates of the public meetings for review and potential approval of this application are as follows:
August 7, 2013 - Planning Commission meeting (workshop 7:00 pm, formal meeting at 7:30 pm)
(Presentation of Application)
September 17, 2013 - Board of Supervisors meeting (7:00 pm)
(Conditional Use Hearing)
All meetings and workshops are held at the Township Building and are open to the public and subject to change. The application materials are available for review during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid service or other accommodation to observe or participate in the hearing, he or she should contact the Township at 610-692-7171 to discuss how those needs may be accommodated.
Please call me if you have any questions or need additional information.
Sincerely,
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2013 Sat. Dish Expansion CU App\QVC CU (Sat Dishes) 1000' notification 07312013.doc
Conditional Use Application and Checklist
East Goshen Township
[Seal]
To: Township Zoning Officer
Name of Applicant: QVC, Inc.
Applicant Address: 1200 Wilson Drive, West Chester, PA 19380, Attn: Frank M. Herb
Telephone Number: 610-251-5065 (Attn: Gregory J. Davis, Esq.) Fax: 610-408-4408
Email Address: gdavis@saul.com
Property Address: 1365 Enterprise Drive
Tax Parcel Number: 53-4-162, 163, 164, 165 & 174 Zoning District: BP-Business Park
Acreage: 28.228 acres
Description of Proposed Use:
Applicant's property is currently improved with, among other things, a satellite dish compound, containing six satellite dishes, located next to Applicant's office building in Goshen Corporate Park. As part of a necessary upgrade to its downlink systems, Applicant is proposing to remove three of the existing satellite dishes and install nine new ones, resulting in a net add of six dishes and a total of twelve on the property. Pursuant to §240-21.C(7) of the Zoning Ordinance, wireless communication facilities are permitted by conditional use in the BP zoning district where the subject property is located. Applicant is proposing landscaping and fencing to visually screen the satellite dishes and will comply with all of the applicable conditional use requirements for a wireless communications facility. Worthy of note is that the proposed installation of the new dishes will result in an impervious coverage reduction on the site.
Conditional Use is provided in Zoning Ordinance Section: 240-21.C(7)
We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.
[Signature] July 30, 2013
By: Gregory J. Davis, Attorney for Applicant Date
Attest: [Signature]
* Review the formal Planning Commission review procedure on page three.
730656.1 07/25/2013
Conditional Use Application and Checklist
Township Administration use only:
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.
Application Checklist:
| Item | Date Complete |
|---|---|
| 1. Completed Township Application Form: | 7-30-13 |
| 2. All related materials submitted: | 7-30 |
| 3. Township application and review fees paid: | 7-30 |
Application accepted as complete on 7-30-13 by [Signature]
Official Signature: [Signature] Title: Zoning Officer
Review Process Checklist
| Item | Date |
|---|---|
| 1. Start date: | 7-30-13 |
| 2. Date of first formal Planning Commission Meeting following Submission of complete application: | 8-7 |
| 3. Sent to Twp. Engineer: | NA |
| 4. Date presented to Planning Commission: | 8-7 |
| 5. Abutting Property Letter sent: | |
| 6. Date sent to CB: | 8-7 |
| 7. Date sent To MA: | " |
| 8. Date sent to HC: | " |
| 9. Date sent to PRB: | " |
| 10. Date sent to TAB: | " |
| 11. Date by which the PC must act: | 9-4 |
| 12. Date by which Board of Supervisors must act: | 9-17 |
| 13. Drop Dead Date; (Day 60): | 9-28 |
| 14. Conditional Use Hearing Date: | 9-17 |
| 15. Dates of hearing advertisement: | & |
| 16. Property Posted: |
F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 2 -
Conditional Use Application and Checklist
East Goshen Township Planning Commission
Procedure for processing Subdivision, Land Development, Conditional Use, Variance, and Special Exception Applications
August 19, 2002
2nd Revision: March 2, 2006
1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered “filed” by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.
2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.
3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applications shall begin the day a complete application is filed with the Township.
4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.
5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendation for denial of the application by the Planning Commission.
6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete application is submitted and accepted by the Township staff.
7. The application will remain on the Planning Commission’s agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.
8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.
9. Applications will be voted on only during the regular Planning Commission meetings.
10. The Chairman, in his sole discretion, may waive or modify any of this procedure.
F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 3 -
Narrative in Support of Conditional Use Application of QVC, Inc.
1365 Enterprise Drive
Section 240-31.C.(2). All conditional uses and special exceptions shall comply with the following standards:
(a) Not create a significant hazard to the public health and safety, including but not limited to fire, toxic or explosive hazards.
Applicant's proposal is limited to an area immediately adjacent to its office building (in Goshen Corporate Park) where six satellite dishes are currently located. As part of a necessary upgrade to its downlink system, Applicant is proposing to remove three of the existing dishes and install nine new ones, resulting in a total of twelve satellite dishes on the property. All of the current dishes receive, but do not transmit, radio signals and will all continue to be located in the area of the existing satellite dish compound, which will be expanded, and which is internal to Applicant's property. As a result, Applicant's proposal will not create any hazard to public health and safety or adversely impact neighboring properties.
(b) Be suitable for the property in question.
As stated above, Applicant's property is located within a corporate park and the proposed satellite dishes will be located internal to the property, immediately adjacent to Applicant's office building. As part of this Application, Applicant is also proposing to remove some old, decaying landscaping from the perimeter of the satellite dish compound and replace it with a new row of screen plantings, outside a proposed eight foot tall estate fence that will enclose the compound. Applicant is also proposing to remove an area of existing asphalt paving within the satellite dish compound and replace it with crushed stone in order to reduce the amount of impervious surface in that area of the property. The subject property is perfectly suitable for the existing satellite dish compound and is likewise suitable for the proposed, expanded compound and additional dishes.
(c) Be designed, constructed, operated and maintained so as to be in harmony with the character of the existing or intended development of the general vicinity.
With the proposed changes to Applicant's satellite dish compound, including the proposed screening referenced above and depicted on the plans submitted with the Conditional Use Application, the property, including the area of the dish compound, will remain in harmony with the character of the corporate park where Applicant's property is located.
730980.1 08/01/2013
(d) Not be detrimental to other property in the vicinity, including proper use of adequate setbacks, buffering, berming, locating of nuisance-causing facilities, screening and controls of operations to avoid conflicts. Where, in the opinion of the Board of Supervisors, the distance of setbacks and/or the methods of screening and buffering otherwise established by this chapter would be insufficient, additional screening, buffering and/or widths of setbacks shall be required as a condition of any approval.
The satellite dish compound is located immediately adjacent to Applicant's office building and is set back approximately 300 feet from the nearest property line. With the vegetative screening and fencing that are proposed as part of this project, and considering that the satellite dishes do not generate any noise, the compound will not be detrimental to any other properties in the vicinity.
(e) Be suitable in terms of permitting the logical, efficient and economic extension of public services and facilities such as central water supply, sanitary sewage and police and fire protection. The applicant shall prove that there is adequate access for fire-fighting and other emergency service equipment. The Board of Supervisors may establish additional conditions on approval to ensure such access, such as sufficient turning radii and cartway width for such equipment, the provision of adequate access for fire fighters to reach all sides of buildings and the provision of paved or compacted surfaces sufficient to support the weight of fire equipment.
The proposed improvements within Applicant's existing satellite dish compound will have no impact on public utilities or emergency protection.
(f) After considering any traffic improvements that the applicant may legally commit to fund or construct shall not create significant traffic safety hazards or cause serious traffic congestion.
Applicant is not proposing traffic improvements as part of this Application.
(g) Minimize adverse impacts upon the preservation and restoration of any historic building(s) on the subject property.
N/A
( h) Properly locate and design the proposed structures and other improvements to minimize disruption to existing natural topography, waterways, ponds, groundwater recharge, woods and other important natural resources on the site.
N/A
-2-
730980.1 08/01/2013
[Logo: Malvern Fire Company]
Malvern Fire Company
424 East King Street
P.O. Box 435
Malvern, PA 19355
Main 610-647-0693
Fax 610-647-0249
www.malvernfireco.com
Monthly Fire Operations Report - August 2013
| Calls for Month: 29 | Year Total: 208 | |||
|---|---|---|---|---|
| Call Type | Malvern | Willistown | East Goshen | Other |
| Automatic Fire Alarm | 1 | 10 | 1 | 1 |
| Carbon Monoxide Alarm | 0 | 0 | 0 | 1 |
| Cover Assignment | 0 | 0 | 1 | 0 |
| EMS Assist | 0 | 2 | 0 | 0 |
| Gas Leak - Outside | 0 | 1 | 0 | 1 |
| Mulch | 0 | 1 | 0 | 0 |
| MVA | 2 | 4 | 0 | 0 |
| Structure Fire | 0 | 0 | 0 | 2 |
| Wires | 0 | 0 | 0 | 1 |
| MONTH TOTAL | 3 | 18 | 2 | 6 |
| YEAR TOTAL | 33 | 117 | 9 | 49 |
| Mutual Aid | Given | Received | Month Total | Year Total |
|---|---|---|---|---|
| Alert Fire Co. | 0 | 0 | 0 | 2 |
| Berwyn Fire Co. | 0 | 0 | 0 | 5 |
| East Whiteland Fire Co. | 4 | 0 | 4 | 30 |
| Fame Fire Co. | 0 | 0 | 0 | 1 |
| Friendship Dive Rescue | 0 | 0 | 0 | 1 |
| Goodwill Fire Co. | 0 | 0 | 0 | 2 |
| Goshen Fire Co. | 1 | 0 | 1 | 13 |
| Lionville Fire Co. | 0 | 0 | 0 | 2 |
| Newtown Sq. Fire Co. | 0 | 0 | 0 | 5 |
| Paoli Fire Co. | 1 | 0 | 1 | 7 |
| Radnor Fire Co. | 1 | 0 | 1 | 5 |
| Total Value of Property & Contents | Total Month Loss | Total Year Loss | Total Year Saved |
|---|---|---|---|
| $4,480,000 | $20 | $5,520 | $4,474,480 |
| Number of Personnel Attending Calls | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 284 | 1,954 | 174.4 | 1,315.41 |
| Number of Training Sessions | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 4 | 33 | 148.5 | 1,324.75 |
| Number of Special Assignments | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 6 | 32 | 343.5 | 1,453.5 |
| Total Hours in Service (Month) | Total Hours in Service (Year) |
|---|---|
| 666.4 | 4,092.4 |
Memo
To: Board of Supervisors
From: Jon Altshul
Re: August 2013 Financial Report
Date: September 9, 2013
As of August 31, 2013, the general fund had year-to-date revenues of $7,183,145 compared to expenses of $5,681,792 for a positive variance of $1,501,353, excluding pass through accounts. Compared to the YTD budget, revenues were $334,662 over-budget, while expenses were $130,046 under-budget for a positive budget variance of $464,708. The general fund balance was $7,769,881.
Net of core revenues, both Administration and Parks and Recreation were slightly over-budget ($25,528 and $15,530, respectively), while the remaining departments were under-budget.
Among non-core revenues, earned income tax revenue had another strong month and is now $230,163 over-budget. Real estate transfer tax also had a strong month, with eight residential property transfers over $500,000.
Other funds continue to be in strong position.
- The State Liquid Fuels Fund has year-to-date (YTD) revenues of $644,133 and no expenses.
- The Sinking Fund has YTD revenues of $9,822 and expenses of $107,052. The fund balance is $5,998,698.
- The Transportation Fund has YTD revenues of $3,434 and no expenses. The fund balance is $1,052,857.
- The Sewer Operating Fund has YTD revenues of $2,295,317 and expenses of $2,000,958. The fund balance is $870,364.
- The Refuse Fund has YTD revenues of $746,936 and expenses of $669,151. The fund balance is $886,883.
- The Sewer Capital Reserve Fund has YTD revenues of $1,564 and expenses of $596,128. The fund balance is $881,786.
YEAR-END PROJECTIONS
I am now projecting that the general fund will finish the year with a positive budget variance of $543,764, a $16,079 improvement over what was reported to you a month ago. These projections correspond with a projected net increase in year end fund balance of $93,693.
The key drivers of this projection are the same as what was reported to you last month:
- Only engineering costs will be incurred in 2013 for the Hershey Mill Dam project, which corresponds with $240,000 in savings this year.
- Earned Income Tax continues to be on track to exceed budget by at least $150,000.
EAST GOSHEN TOWNSHIP
AUGUST 2013 FINANCIAL RESULTS
August 31, 2013
| Account Title | Annual Budget | Y-T-D Budget | Y-T-D Actual | Budget-Actual Variance |
|---|---|---|---|---|
| GENERAL FUND | ||||
| EMERGENCY SERVICES EXPENSES | 3,587,260 | 2,745,380 | 2,703,852 | (41,528) |
| PUBLIC WORKS EXPENSES | 2,344,518 | 1,317,332 | 1,229,120 | (88,212) |
| ADMINISTRATION EXPENSES | 2,120,392 | 905,825 | 978,334 | 72,509 |
| ZONING/PERMITS/CODES EXPENSES | 473,095 | 330,875 | 263,294 | (67,581) |
| PARK AND RECREATION EXPENSES | 789,482 | 372,228 | 366,994 | (5,234) |
| TOTAL CORE FUNCTION EXPENSES | 9,314,747 | 5,671,640 | 5,541,594 | (130,046) |
| EMERGENCY SERVICES REVENUES | 51,643 | 32,817 | 32,224 | (593) |
| PUBLIC WORKS REVENUES | 846,600 | 258,975 | 234,354 | (24,621) |
| ADMINISTRATION REVENUES | 309,797 | 165,085 | 212,065 | 46,980 |
| ZONING/PERMITS/CODES REVENUES | 275,825 | 194,781 | 280,761 | 85,980 |
| PARK AND RECREATION REVENUES | 116,183 | 99,895 | 79,311 | (20,584) |
| TOTAL CORE FUNCTION REVENUES | 1,600,048 | 751,553 | 838,716 | 87,163 |
| NET EMERGENCY SERVICES EXPENSES | 3,535,617 | 2,712,563 | 2,671,628 | (40,935) |
| NET PUBLIC WORKS EXPENSES | 1,497,918 | 1,058,357 | 994,766 | (63,591) |
| NET ADMINISTRATION EXPENSES | 1,810,595 | 740,740 | 766,268 | 25,528 |
| NET ZONING/PERMITS/CODES EXPENSES | 197,270 | 136,094 | (17,467) | (153,561) |
| NET PARK AND RECREATION EXPENSES | 673,299 | 272,333 | 287,683 | 15,350 |
| CORE FUNCTION NET SUBTOTAL | 7,714,699 | 4,920,087 | 4,702,878 | (217,209) |
| DEBT - PRINCIPAL | 436,000 | 0 | 0 | 0 |
| DEBT - INTEREST | 208,182 | 140,198 | 140,198 | 0 |
| TOTAL DEBT | 644,182 | 140,198 | 140,198 | 0 |
| TOTAL CORE FUNCTION NET | 8,358,881 | 5,060,285 | 4,843,076 | (217,209) |
| NON-CORE FUNCTION REVENUE | ||||
| EARNED INCOME TAX | 4,631,700 | 3,220,122 | 3,450,285 | 230,163 |
| REAL ESTATE PROPERTY TAX | 2,001,978 | 1,981,894 | 1,956,838 | (25,056) |
| REAL ESTATE TRANSFER TAX | 500,000 | 333,333 | 373,671 | 40,338 |
| CABLE TV FRANCHISE TAX | 410,000 | 304,032 | 321,043 | 17,011 |
| LOCAL SERVICES TAX | 315,000 | 226,916 | 212,500 | (14,416) |
| OTHER INCOME | 48,132 | 30,633 | 30,092 | (541) |
| TOTAL NON CORE FUNCTION REVENUE | 7,906,810 | 6,096,930 | 6,344,429 | 247,499 |
| NET RESULT | (452,071) | 1,036,645 | 1,501,353 | 464,708 |
U:\JAltshul\Quarterly reports\8-31-13 Summary report- Core Function.xls
9/9/13
SUMMARY OF FUNDS REPORT (AKA "JOE REPORT")
ALL FUNDS YEAR-TO-DATE ACTUALS-AS OF AUGUST 31, 2013
* NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
| GENERAL FUND* | LIQUID FUELS STATE FUND | CAPITAL RESERVE FD | TRANSPORT. FUND | REFUSE FUND | SEWER OP. FUND | SEWER CAP RESERVE | TOWNSHIP FUNDS | MUNICIPAL AUTHORITY | |
|---|---|---|---|---|---|---|---|---|---|
| 1/1/13 BEGINNING BALANCE | $6,429,604 | $61 | $6,095,927 | $1,049,423 | $809,099 | $576,005 | $1,476,350 | $16,436,469 | $61,884 |
| RECEIPTS | |||||||||
| 310 TAXES | $6,344,282 | $6,344,282 | |||||||
| 320 LICENSES & PERMITS | $31,636 | $31,636 | |||||||
| 330 FINES & FORFEITS | $32,224 | $32,224 | |||||||
| 340 INTERESTS & RENTS | $89,704 | 719 | $9,822 | $2,688 | $1,615 | $825 | $1,564 | $106,937 | $52 |
| 350 INTERGOVERNMENTAL | $0 | 363,306 | $363,306 | ||||||
| 360 CHARGES FOR SERVICES | $440,650 | $745,321 | $2,294,493 | $3,480,464 | $12,838 | ||||
| 380 MISCELLANEOUS REVENUES | $582,996 | $746 | $583,742 | $423 | |||||
| 390 OTHER FINANCING SOURCES | $199,169 | $280,109 | $479,278 | $602,000 | |||||
| $7,720,661 | $644,133 | $9,822 | $3,434 | $746,936 | $2,295,317 | $1,564 | $11,421,868 | $615,313 | |
| EXPENDITURES | |||||||||
| 400 GENERAL GOVERNMENT | $756,636 | $14,467 | $771,103 | ||||||
| 410 PUBLIC SAFETY | $3,552,867 | $3,552,867 | |||||||
| 420 HEALTH & WELFARE | $77,622 | $77,622 | |||||||
| 426 SANITATION & REFUSE | $0 | 669,151 | $1,456,277 | $33,128 | $2,158,556 | $616,437 | |||
| 430 HIGHWAYS,ROADS & STREETS | $750,682 | $59,364 | $810,046 | ||||||
| 450 CULTURE-RECREATION | $315,421 | $33,220 | $348,641 | ||||||
| 460 CONSERVATION & DEVELOPMENT | $4,151 | $4,151 | |||||||
| 470 DEBT SERVICE | $160,885 | $505,681 | $666,566 | ||||||
| 480 MISCELLANEOUS EXPENDITURES | $456,274 | $456,274 | |||||||
| 490 OTHER FINANCING USES | $280,109 | $39,000 | $563,000 | $882,109 | |||||
| $6,354,647 | $0 | $107,052 | $0 | $669,151 | $2,000,958 | $596,128 | $9,727,936 | $616,437 | |
| 2013 SURPLUS/DEFICIT | $1,366,014 | $644,133 | -$97,229 | $3,434 | $77,785 | $294,359 | -$594,564 | $1,693,932 | -$1,124 |
| CLEARING ACCOUNT ADJUSTMENTS | -$25,737 | ||||||||
| 8/31/13 BALANCE | $7,769,881 | $644,194 | $5,998,698 | $1,052,857 | $886,883 | $870,364 | $881,786 | $18,104,664 | $60,760 |
U:\JAltshul\2013 YE Projections\2013 BUDGET SUMMARY-ALL FUNDS (JOE REPORT) PROJECTIONS-AUGUST.xls
Page 1 of 2
9/9/2013
EAST GOSHEN TOWNSHIP
AUGUST 2013 YEAR-END PROJECTIONS
August 31, 2013
| Account Title | Annual Budget | Y-T-D Actual | Y/E Projection | Budget-Actual Variance |
|---|---|---|---|---|
| GENERAL FUND | ||||
| EMERGENCY SERVICES EXPENSES | 3,587,260 | 2,703,852 | 3,545,900 | (41,360) |
| PUBLIC WORKS EXPENSES | 2,344,518 | 1,219,479 | 2,500,925 | 156,407 |
| ADMINISTRATION EXPENSES | 2,120,392 | 987,976 | 2,133,167 | 12,775 |
| ZONING/PERMITS/CODES EXPENSES | 473,095 | 263,294 | 410,707 | (62,388) |
| PARK AND RECREATION EXPENSES | 785,482 | 366,994 | 571,177 | (214,305) |
| TOTAL CORE FUNCTION EXPENSES | 9,310,747 | 5,541,594 | 9,161,875 | (148,872) |
| EMERGENCY SERVICES REVENUES | 51,643 | 32,224 | 48,542 | (3,101) |
| PUBLIC WORKS REVENUES | 846,600 | 234,354 | 985,123 | 138,523 |
| ADMINISTRATION REVENUES | 309,797 | 212,065 | 370,042 | 60,245 |
| ZONING/PERMITS/CODES REVENUES | 275,825 | 280,761 | 335,625 | 59,800 |
| PARK AND RECREATION REVENUES | 114,183 | 79,311 | 111,029 | (3,154) |
| TOTAL CORE FUNCTION REVENUES | 1,598,048 | 838,716 | 1,850,361 | 252,313 |
| NET EMERGENCY SERVICES EXPENSES | 3,535,617 | 2,671,628 | 3,497,358 | (38,259) |
| NET PUBLIC WORKS EXPENSES | 1,497,918 | 985,125 | 1,515,802 | 17,884 |
| NET ADMINISTRATION EXPENSES | 1,810,595 | 775,910 | 1,763,125 | (47,470) |
| NET ZONING/PERMITS/CODES EXPENSES | 197,270 | (17,467) | 75,082 | (122,188) |
| NET PARK AND RECREATION EXPENSES | 671,299 | 287,683 | 460,148 | (211,151) |
| CORE FUNCTION NET SUBTOTAL | 7,712,699 | 4,702,878 | 7,311,514 | (401,185) |
| DEBT - PRINCIPAL | 436,000 | - | 436,000 | - |
| DEBT - INTEREST | 208,182 | 140,198 | 208,182 | - |
| TOTAL DEBT | 644,182 | 140,198 | 644,182 | - |
| TOTAL CORE FUNCTION NET | 8,356,881 | 4,843,076 | 7,955,696 | (401,185) |
| NON-CORE FUNCTION REVENUE | ||||
| EARNED INCOME TAX | 4,631,700 | 3,450,285 | 4,781,700 | 150,000 |
| REAL ESTATE PROPERTY TAX | 2,001,978 | 1,956,838 | 1,986,557 | (15,421) |
| REAL ESTATE TRANSFER TAX | 500,000 | 373,671 | 510,000 | 10,000 |
| CABLE TV FRANCHISE TAX | 410,000 | 321,043 | 418,000 | 8,000 |
| LOCAL SERVICES TAX | 315,000 | 212,500 | 305,000 | (10,000) |
| OTHER INCOME | 48,132 | 30,092 | 48,132 | - |
| TOTAL NON CORE FUNCTION REVENUE | 7,906,810 | 6,344,429 | 8,049,389 | 142,579 |
| NET RESULT | (450,071) | 1,501,353 | 93,693 | 543,764 |
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 9/6/2013
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer
Re: Large Format Plan Project Recommendation
Board Members,
As you may remember, the Code Department has been working on collecting information on how to utilize the Townships' archive of electronically scanned large format documents and to scan the newer large format documents (the "Plans"). An RFP was issued on August 8, 2013 to and we received four responses with costs ranging from $1.25 to $2.00 per sheet to scan and label the new plans. The per sheet cost included a charge to develop and install a system to access the plans.
Our review of the RFP's and in speaking with all of the respondents led us to better understand the complexity of this project. Two of the four respondents were not confident that they could integrate the scanned images into our current document management system and GIS system.
We met with AMS (our current financial and permitting software provider) who gave us a presentation of the module we can add to our existing Permitting Software to search, view, e-mail and print the plans. We would also be able to access the plans with our GIS system.
Below is a list of costs for the AMS software application
| Item | Cost |
|---|---|
| Imaging Software | $3,000.00 |
| Data Conversion | $1,500.00 |
| GIS Export | $850.00 |
| Software Maintenance/ Year | $990.00 |
| Total | $6,340.00 |
While we have scanned approximately 15,000 plan sheets over the last 10 years, we estimate that there are approximately 5400 plan sheets that need to be scanned.
Knowing all of this now, we requested a revised quote from the 4 RFP respondents for scanning and labeling the 5,400 plans within four months of board approval.
F:\Data\Shared Data\Code Dept\Document Managment\Large Format Project 2013\BoS Draft Motion re LFP Project 09102013 Rick.doc
Recommendation:
I recommend that the project be split into two parts; with part 1 being the purchase the module and part 2 being the scanning.
Our Graduate Intern Travis DeCaro has been a huge asset during the RFP process and I'm recommending that we extend Travis' internship with East Goshen through the completion of this project. Travis is a diligent worker and has assisted the Finance, Administration, Recreation and Code Departments on a number of projects over the last several weeks. Keeping Travis on throughout this project will maximize our efficiency and insure a smooth implementation.
Draft Motions:
1. I move that we purchase the software upgrade from AMS for the large format imaging database application at a cost of $6,340.
2. I move that we contract with AMS to complete the document scanning portion of this project for $6,750.
3. I move that we extend Travis DeCaro's internship with the Township through the completion of the large format document project.
F:\Data\Shared Data\Code Dept\Document Managment\Large Format Project 2013\BoS Draft Motion re LFP Project 09102013 Rick.doc
September 11, 2013
To: Board of Supervisors
From: Mark Miller
Re: Truck Replacement
We are scheduled to replace the 1996 Sterling dump truck this year. Plowing and salting has taken a toll on this truck. Key components are rusted out (cross members, cab mounts, see photos).
The plow frame mounts are bent and twisted. I would also point out that Ford Motor Company no longer makes this truck; therefore, parts are difficult to locate. If we don't replace this vehicle it will need engine repairs as its performance has deteriorated. We also need to replace the clutch and fly wheel.
The replacement truck will have several features on it to combat rust. Below is a breakdown of the special features should you approve the purchase.
Severe weather package
Allison automatic transmission, heavy duty service
350 horsepower diesel
Aluminum dump body
Air over hydraulic controls
11 foot Monroe power angle plow
Stainless steel salt spreader
950 gallon brine tank
Brine system with speed control
Trailer package
All LED lighting
Pricing Information is as follows:
| Manufacturer: | Truck: | Trade: | Net: |
|---|---|---|---|
| G.L. Sayre International | $160,384.00 | $23,000 | $137,384.00 |
| G.R. International | $157,851.00 | $7,500 | $150,351.00 |
| G.L. Sayre Peterbilt | $160,033.00 | $23,000 | $137,033.00 |
| Hunter Peterbilt | $159,307.00 | $7,500 | $151,807.00 |
I recommend that G.L. Sayre and Intercon Equipment be awarded the contract in the amount of $137,033.00 which is COSTARS pricing.
F:\Data\Shared Data\Public Works Dept\Equipment Purchases 2013\96 Ford Sterling replacement 2013 July 30 - Copy.docx
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: September 9, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Speed Limits
Section 225-44 of the Township Code establishes speed limits for the various streets in the Township. As a general rule the main township streets, such as Ellis Line and Reservoir Road are 35 MPH while the streets in most of the developments, such as Bowtree, Hershey Mill Estates, and Grand Oak are 25 MPH.
A review of this section indicates that there are a number of "development" streets, the majority of which are cul-de-sacs that are listed at 35 MPH.
These streets are: Amalfi Drive, Atlee Drive, Bramble Lane, Chambord Place, Great Oak Circle, Green Acres Lane, Hunters Circle, Jaclyn Drive, Joshua Lane, Larch Lane, Meadowbrook Lane, Old Orchard Lane, Pheasant Run, Pine Rock Road, Pond View Lane, Raewyck Lane, Springhouse Lane, Sturbridge Circle, Sturbridge Lane, Willow Pond Road and Wyllpen Drive.
There is a provision in the PA Vehicle Code that permits the establishment of a 25 MPH speed limit on this type of street.
I have asked the Police Department for their comments (see attached).
I would recommend that you reduce the speed limits on these streets, in order to bring them into conformance with the other developments.
F:\Data\Shared Data\Admin Dept\Township Code\Vehicles & Traffic\Vehicles and Traffic 2013\Memo 090913.docx
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 9/12/2013
To: Board of Supervisors
From: Mark Gordon, Zoning Officer
Re: Openspace and Recreation Plan Update
Dear Board Members,
After speaking with Rick and Ann Toole from Toole recreation I have drafted the following recommendation for the Openspace and Recreation Plan Taskforce.
Recommended makeup of the Openspace and Recreation Plan Task Force (ORTF):
| Board of Supervisors | 1 |
|---|---|
| Planning Commission Member (Chair) | 1 |
| Park Board | 1 |
| Conservancy Board | 1 |
| Historical Commission | 1 |
| Commerce Development Commission | 1 |
| Toole Recreation Planning | 1 |
| Brandywine Conservancy | 1 |
| Director of Recreation | 1 |
| Zoning Officer | 1 |
| Total | 10 |
- The Municipal Authority can be consulted on as needed basis.
- We will have a recording secretary for the meetings.
- I recommend that each Board and Commission identify primary and alternate ORTF members. Only primary members need to attend the meetings however in the event of a conflict this provides an identified alternate who can attend.
- The meetings will be held on the 3rd Thursday of the month. The Kick-Off Meeting for the Openspace and Recreation Plan Update will be October 17, 2013.
- If you concur with these recommendations I can forward a letter to the Boards and Commissions outlining the approach for the formation of the Task Force, and advertise the meetings.
F:\Data\Shared Data\Admin Dept\Open Space Plan 2013\Memo to BOS 09122013.doc
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
September 3, 2013
Draft Minutes
Present: Chairman Senya D. Isayeff, Vice-Chairman Carmen Battavio, Supervisors Marty Shane, Chuck Proctor and Janet Emanuel. Also present were Township Manager Rick Smith, CFO Jon Altshul, Erich Meyer (Park & Rec) and Ginnie Newlin (Conservancy Board).
Call to Order & Pledge of Allegiance
Senya called the meeting to order at 7:00pm and asked State Rep. Dan Truitt to lead everyone in the Pledge of Allegiance. (Rep. Truitt had stopped by to say hello but was unable to stay for the meeting.)
Moment of Silence
Carmen called for a moment of silence to remember the troops and all those in uniform who help keep us safe.
Recording of Meeting
No one recorded the meeting.
Public Comment on Non-Agenda Items
None.
Chairman's Report
Comprehensive Plan Update - Janet reported that the last meeting of the Comprehensive Plan Task Force was very productive. They had a brainstorming session on priorities and "focal" areas. The biggest change to the Comprehensive Plan will be in format. The Task Force has scheduled a special meeting for September 11 where they will discuss the Town Center concept.
Shredding Event – Senator Dominic Pileggi will hold a Community Shredding Event on September 21 at the State Farm building in Concordville.
Public Hearing on Ordinance to Authorize Borrowing of $2,500,000 for Sewer Projects
The Board held a public hearing to consider an ordinance authorizing the borrowing of $2,500,000 for sewer projects. Lucien Calhoun of the Delaware Regional Finance Authority was present. Marty moved to adopt the ordinance. Carmen seconded the motion. Public comments were made by residents Ginnie Newlin and Bill Egan. The Board voted unanimously to approve the motion. A court reporter was present and will provide a complete transcript of the proceedings.
Financial Policies
Senya announced that this matter would be tabled until the September 17 meeting.
9/9/2013 September 3, 2013 BOS Minutes Page 1 of 5
Openspace Plan
Rick summarized an August 28 memo from Mark Gordon on this topic. Staff recommends awarding the Openspace and Recreation Plan update contract to Toole Recreation Planning for $26,370 and adding Option 3 for the conceptual study of the Paoli Pike Multi-Use Path for $3,500 for a total of $29,870. The Plan should remain a standalone plan and not be included with the Comp Plan Update.
Carmen moved to award the Openspace Plan Update to Toole Recreation Planning for $29,870 per the recommendation of staff. Janet seconded the motion.
Marty said this will save the Township money by because an entirely new Openspace Plan will not have to be created to replace the old one. Additionally, having a start on the trail issue may give the Township an advantage when applying for grant money.
Public Comment: Mike Broennle, Hunters Circle – Said he supported the motion, and this is a great opportunity for the Township to get in on early funding. A trail is greatly needed by residents for recreational purposes and as a means to get to and from their jobs.
Public Comment: Bill Egan, Mill Creek – Said he would like the Township to spend money on installing the approved Line Road trail before approving an expenditure to study the possibility of putting in a trail along Paoli Pike. Marty noted that the cost to install the Line Road trail is prohibitive due to ADA requirements.
Public Comment: Ginnie Newlin – Asked if the Township would consider putting in more "native" trail along Line Road. Rick said he would have to look into it.
There was no further discussion or public comment. The Board voted unanimously to approve the motion.
Request for Additional Services Regarding Comprehensive Plan
The Board discussed a request from John Theilacker of the Brandywine Conservancy to have the Township pay the Environmental Management Center an additional $1,500 for himself and Steve Kehs of Triad Associates to attend The Commerce Commission's Breakfast Forum on October 3 and Lunch Forum on November 7.
Janet said the Township needs to make sure the commercial zones are attractive to businesses and consumers. Carmen said he supports the request, as the Commerce Commission is highly regarded by Township businesses.
Senya said he was disappointed by the request from Mr. Theilacker and cannot justify the additional expense of $1,500 for the Comprehensive Plan.
Carmen moved to send a letter to Mr. Theilacker and Mr. Kehs, again inviting them to the Commerce Commission events at no charge but tactfully declining to reimburse them for attending. Marty seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
9/9/2013 September 3, 2013 BOS Minutes Page 2 of 5
Police Committee to Explore Possibility of Expansion
Carmen repeated his motion from the last meeting: He moved to approve the formation of a committee consisting of one or more supervisors each from East Goshen, Westtown and West Goshen along with the Township Managers and the Police Chiefs. The committee will be tasked with developing an RFP for the study of the feasibility of adding West Goshen to WEGO, as well as identifying the various legal and operational issues that will need to be addressed. Chuck seconded the motion.
Marty questioned whether there will be a financial benefit to WEGO and/or East Goshen. Before a committee is formed, he would like Rick and Jon to meet with Kathy Brill and Chief Bernot to do some rough "back of the envelope" calculations to see if this would be a worthwhile endeavor. He would also like the Township's labor attorney, Joe Rudolf, to come meet with the Board to discuss the issues of a potential merger. If both exercises indicate that it makes sense to move forward, then a committee can be created. Marty said he could not support a motion to form a committee without these two exercises taking place.
Janet wondered how a determination could be made as to the feasibility of the project until a committee is formed and East Goshen and Westtown talk to West Goshen.
Marty said because service levels would not go down, it's possible that expansion of WEGO could actually increase East Goshen's costs, in which case he sees no reason to proceed. In addition, the legal issues of absorbing the West Goshen force could be quite complex. Having the additional information he is seeking would give the committee (if formed) a jumpstart.
Carmen agreed it's important to meet with Joe Rudolf, but he doesn't see why a committee cannot be formed at the same time as the preliminary calculations are completed.
Carmen modified his motion to reflect that at the same time as the committee is formed, the staff will do the "back of the envelope" calculations Marty has requested and the Board will meet with Joe Rudolph. Chuck seconded the modified motion.
Chuck noted that WEGO has the benefit of a Police Chief who has experience overseeing 250+ officers as well as extensive experience in budgeting. He agreed it may be a good idea for the Board to meet with Joe Rudolph, but suggested the committee (not just East Goshen staff) do the preliminary calculations Marty has requested
Senya cited a recent article he read about the concept of regional policing and noted some of the "pros" to regional policing it contained. Even if no money is saved up front, there is improved coordination of police response. There is also an increased use of technology leading to cost savings, and consolidation of records. He then read a list of other "pro" from the article.
Chuck said Chief Bernot has recently suggested WEGO purchase some equipment that West Goshen currently owns. If the police forces merge, that equipment could be shared and housed in a centralized location, saving WEGO the $70-$80K it would cost to purchase the equipment.
9/9/2013 September 3, 2013 BOS Minutes Page 3 of 5
Senya said some of the "cons" in the article include loss of local control, loss of citizen contact, and multiple chiefs vying for few positions.
Marty said he is not opposed to regionalization. He has no doubt that Rick, Jon, Kathy Brill and Chief Bernot can do what he is asking. There is quite a lot to consider when thinking about absorbing an entire police force.
There was no further discussion and no public comment. The Board voted 4:1 and the motion passed. Marty was opposed to the motion.
Carmen moved to nominate Senya and Chuck to represent East Goshen on the Police Committee. Janet seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Escrow Release for Ashleybrook Estates
This matter was tabled.
Any Other Matter
Jon reported that Travis has refined the interactive agenda, and has also figured out how to compress the entire packet into a file size of under 4MB.
Review of Minutes
The Board reviewed and corrected the draft minutes of August 6 and August 20. Senya stated that the minutes would stand approved as corrected.
Treasurer's Report & Expenditure Register Report
See attached Treasurer's Report for August 29, 2013.
The Board reviewed the Treasurer's Report and the current invoices. Carmen moved to accept the Treasurer's Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Action List
Hershey Mill Dam – The Township is still waiting to hear back from DEP.
Act 167 Ordinance – Rick and Mark attended seminars on August 7 and 28. They are working on a draft ordinance for the Township.
Correspondence & Reports of Interest
Senya acknowledged receipt of a letter from resident Donald Ruddy regarding his variance application for 1410 Linden Lane.
Meetings & Dates of Importance
Senya noted the upcoming meetings as listed in the agenda.
9/9/2013 September 3, 2013 BOS Minutes Page 4 of 5
Public Comment on Non-Agenda Items
Ginnie Newlin requested that the Township issue "kinder, gentler" communications to its residents. She recently received a form letter she found to be much too harsh. After a lengthy discussion, Senya suggested Ms. Newlin rewrite the letter for the Township's review and consideration.
Adjournment
There being no further business, the meeting was adjourned at 8:29pm.
Submitted by:
Anne Meddings
Recording Secretary
Attachment: Treasurer's Report
9/9/2013 September 3, 2013 BOS Minutes Page 5 of 5
August 29, 2013
TREASURER'S REPORT
2013 RECEIPTS AND BILLS
GENERAL FUND
| Real Estate Tax | $2,471.55 | Accounts Payable | $64,830.44 |
|---|---|---|---|
| Earned Income Tax | $39,400.00 | Electronic Pmts: | |
| Local Service Tax | $24,400.00 | Health Insurance | $0.00 |
| Transfer Tax | $0.00 | Credit Card | $1,821.49 |
| General Fund Interest Earned | $0.00 | Postage | $0.00 |
| Total Other Revenue | $129,905.31 | Debt Service | $0.00 |
| Payroll | $73,000.00 | ||
| Total Receipts: | $196,176.86 | Total Expenditures: | $139,651.93 |
STATE LIQUID FUELS FUND
| Receipts | $0.00 | ||
|---|---|---|---|
| Interest Earned | $0.00 | ||
| Total State Liquid Fuels: | $0.00 | Expenditures: | $0.00 |
CAPITAL RESERVE
| Interest Earned | $0.00 | Expenditures: | $0.00 |
|---|
TRANSPORTATION FUND
| Interest Earned | $0.00 | Expenditures: | $0.00 |
|---|
SEWER OPERATING
| Receipts | $239,563.60 | Accounts Payable | $12,167.74 |
|---|---|---|---|
| Interest Earned | $0.00 | Debt Service | $0.00 |
| Total Sewer: | $239,563.60 | Total Expenditures: | $12,167.74 |
REFUSE
| Receipts | $77,944.91 | ||
|---|---|---|---|
| Interest Earned | $0.00 | ||
| Total Refuse: | $77,944.91 | Expenditures | $66,493.31 |
SEWER CAPITAL RESERVE
| Interest Earned | $0.00 | Expenditures | $0.00 |
|---|
EAST GOSHEN TOWNSHIP
ACTION LIST
| New additions are in bold | September 17, 2013 |
|---|---|
| Item | Date |
| Comcast Franchise Renewal | September 17, 2013 |
| Hershey's Mill Dam | October 1, 2013 |
| Comp Plan | October 1, 2013 |
| Open Space Plan | October 1, 2013 |
| Act 167 Ordinance | October 1, 2013 |
| Quarterly Report on Comp Plan Goals for ABCs | October 15, 2013 |
| Quarterly Report Municipal Authority Projects | October 15, 2013 |
| Quarterly Financial Reports | October 15, 2013 |
| Quarterly Report on I&I | October 15, 2013 |
| Quarterly Review of Right to Know Requests | October 15, 2013 |
F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\Action List 091713.xlsx
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Comcast Franchise | No: | 10 |
|---|---|---|---|
| List Date: | 12/18/2013 | Completed Date: | |
| Description: | Execute Comcast Franchise Agreement | ||
| Date | Action |
|---|---|
| 4/16/2013 | Kristin has been in contact with Kevin at Comcast, He wants to finish up some other agreement before starting on East Goshen's |
| 7/16/2013 | Kevin wants to use the Verizon agreement as a model. Kristin is marking up a draft agreement. |
| 8/20/2013 | Kristin is marking up a draft agreement. |
| 9/17/2013 | No sctivity |
F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\10 Comcast Franchise Renewal.xlsx
Westtown-East Goshen Regional Police Department
1041 Wilmington Pike
West Chester, PA 19382
September 9, 2013
RECEIVED SEP 10 2013
Mr. Louis F. Smith, Jr.
Township Manager, East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Dear Mr. Smith,
On August 20, 2013, our officers responded to a shooting incident that occurred at a residence in the 1600 block of Ivy Lane. On the following day, as the investigation progressed, the Criminal Investigation Division developed information that the weapon utilized during the incident had been hidden somewhere in the rear of the property. After members of our department and other assisting agencies spent several hours trying to locate the weapon in the heavy undergrowth behind the residence with no results, Detective Lieutenant William Cahill contacted Mr. Mark Miller, the East Goshen Director of Public Works, for assistance.
Mr. Miller immediately responded to the scene with the following members of the Public Works Department to assist our agency: Michael Carpenter, Steven Hero, Edward Kilgore, Kevin Miller, and George Thompson. When the Public Works Department arrived at the scene, they were well equipped with a metal detector, chain saws, bee repellant, and even water for the team. Despite the intense heat and humidity on that day, the Public Works Department worked for numerous hours clearing out the undergrowth so that the weapon could ultimately be located. Although locating a loaded weapon is always a priority, it is important to note that the property on Ivy Lane borders a church and therefore, the importance of finding the weapon in a timely manner cannot be emphasized enough.
We would like to express our deep gratitude to the members of the East Goshen Public Works Department who assisted us on August 21, 2013. Their assistance was instrumental in ensuring that the weapon was located before public safety was jeopardized. It is once again evidence of the exemplary level of interagency cooperation that exists between our departments. We are fortunate to work with such outstanding individuals who are dedicated to serving the community.
Sincerely,
Brenda M. Bernot
Chief of Police
Jon Altshul
From: Jon Altshul [jaltshul@eastgoshen.org]
Sent: Friday, September 13, 2013 9:06 AM
To: 'rsmith@eastgoshen.org'
Cc: 'Kathy Brill'
Subject: Analysis of WEGO pension
Attachments: WEGO pension plan returns 1995-present.xlsx; WEGO pension sensitivity study.pdf
Rick:
This email addresses 3 issues raised in last week's Finance Committee meeting:
1) Actual returns for WEGO pension plan
- With Kathy's help, I've attached historical returns for the WEGO pension plan invested with Key Financial dating back to 1995.
- As you'll see, the nominal annual return (before inflation) has been 6.43% over the past 18 years; the real return has been 3.84%.
2) How much we'd need to save to have the WEGO pension plan 90% funded within 10 years.
- Right now, WEGO has an unfunded actuarial liability of $4,825,356 (actuarial value) and $5,638,745 (market value). 90% of those amounts are $4.34m and $5.07m respectively.
- Based on my discussion with the pension consultants at Anderson, barring any unforeseen changes (e.g. lots of resignations; disability pensions; big market losses/gains; etc), those values will hold steady (rising only for inflation) for the next 10 years.
- The consultants guesstimated that annual contributions of $500,000 per year for 10 years would make the plan fully funded. When I play around in Excel, I calculate that WEGO would be 90% funded with annual contributions of about $432,000 and 100% funded at about $480,000, assuming 3% returns after inflation. At 56% of total costs, EGT's share would be about $242,000 and $269,000 respectively.
3) Impact of changing actuarial assumptions/target return on MMO
- Right now the target return for the WEGO pension plan is 8%. However, there is an assumption of 5% salary growth per year, meaning that the real return is 3%.
- I have also attached a mini-actuarial study from Beyer-Barber showing what would happen to the MMO if you tinkered with the target return and/or the salary growth assumptions. Long story short, every .5% decrease in the target return increases the MMO by about $100,000 and every .5% decrease in salary growth decreases the MMO by about $35,000.
- In other words, it may make sense to recommend a change in the target return of the fund to, say, 6.5% or even 6% instead of simply contributing more than the MMO (as described in option #2) in order to ensure that WEGO's pension plan is able to close its unfunded liability within a reasonable amount of time.
Please let me know if you have any questions.
Jon Altshul
1
Chief Financial Officer
East Goshen Twp
jaltshul@eastgoshen.org
610-692-7171
2
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
ACTUARIAL COST STUDY
AS OF JANUARY 1, 2013
Prepared by:
BEYER-BARBER COMPANY
Employee Benefit and Actuarial Consultants
1136 Hamilton Street, Suite 103
Allentown, Pa 18101
(610) 435-9577
Dated: September 10, 2013
In Cooperation With:
Thomas J. Anderson & Associates, Inc.
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
TABLE OF CONTENTS
| PAGE NO. | |
|---|---|
| SUMMARY OF PROPOSED ASSUMPTION CHANGES | 1 |
| SUMMARY OF RESULTS | 2 |
| SUMMARY OF ACTUARIAL COST STUDY AS OF JANUARY 1, 2013 | 3 |
| ACTUARIAL CERTIFICATION | 4 |
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
SUMMARY OF PROPOSED ASSUMPTION CHANGES
CURRENT ASSUMPTIONS
Currently, the plan has an 8.0% interest rate assumption and 5.0% salary scale assumption.
PROPOSED ASSUMPTIONS
It is requested to study the effect on plan costs created by the following four scenarios:
Scenario 1: Reduce the interest rate assumption to 7.5%.
Scenario 2: Reduce the interest rate assumption to 7.0%.
Scenario 3: Reduce the interest rate assumption to 7.5% and reduce the salary scale assumption to 4.5%.
Scenario 4: Reduce the interest rate assumption to 7.0% and reduce the salary scale assumption to 4.0%.
-1-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
SUMMARY OF RESULTS
The ensuing pages show the effect on the 2013 plan year costs with the proposed assumption changes as follows:
CURRENT ASSUMPTIONS
The 2013 plan year costs based on the current assumptions are shown as a foundation for comparison in order to measure the effect on plan costs associated with the proposed assumptions changes. These costs are not meant to be confused with the municipality's 2014 minimum municipal obligation budget amount that was already communicated and determined based on the January 1, 2013 actuarial valuation.
PROPOSED ASSUMPTIONS
The following page illustrates the development of the estimated Minimum Municipal Obligation (MMO) of each scenario based on assets determined using the actuarial smoothing method which was used in the January 1, 2013 actuarial valuation. The development of the MMO based on the market value of assets is also shown and should be taken into consideration since the cost based on the market value of assets is ultimately what the plan will experience.
This study has been based on census and plan asset data as of January 1, 2013.
It should be noted that this study only measures the effect of the proposed assumptions changes on the 2013 plan year costs due to unpredictable future events that will occur after January 1, 2013. Furthermore, this study has been based on the plan status as of January 1, 2013 and any future change in plan membership and/or trust fund performance may have an impact on these calculations.
This study uses an estimated state aid unit value of $3,500.
-2-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
SUMMARY OF ACTUARIAL COST STUDY AS OF JANUARY 1, 2013
| Item | CURRENT PLAN | SCENARIO 1 | SCENARIO 2 | SCENARIO 3 | SCENARIO 4 |
|---|---|---|---|---|---|
| A. NORMAL COST | |||||
| 1. Dollar Amount | 311,097 | 347,622 | 388,761 | 325,761 | 341,679 |
| 2. Valuation Covered Payroll | 2,301,027 | 2,301,027 | 2,301,027 | 2,301,027 | 2,301,027 |
| 3. Percentage of Covered Payroll(1)/(2) | 13.52% | 15.11% | 16.90% | 14.16% | 14.85% |
| B. ESTIMATED ADMINISTRATIVE EXPENSES | 5,250 | 5,250 | 5,250 | 5,250 | 5,250 |
| C. ACCRUED LIABILITY AND ASSETS | |||||
| 1. Actuarial Accrued Liability | 13,156,713 | 13,904,509 | 14,721,583 | 13,796,290 | 14,494,003 |
| 2(a). Actuarial Value of Assets | 8,331,357 | 8,331,357 | 8,331,357 | 8,331,357 | 8,331,357 |
| 3(a). Unfunded Actuarial Liability Based on Actuarial Value | 4,825,356 | 5,573,152 | 6,390,226 | 5,464,933 | 6,162,646 |
| 2(b). Market Value of Assets | 7,517,968 | 7,517,968 | 7,517,968 | 7,517,968 | 7,517,968 |
| 3(b). Unfunded Actuarial Liability Based on Market Value | 5,638,745 | 6,386,541 | 7,203,615 | 6,278,322 | 6,976,035 |
| D. AMORTIZATION CONTRIBUTION | |||||
| 1. Based on Actuarial Value of Assets | 568,349 | 633,960 | 702,624 | 622,556 | 679,272 |
| 2. Based on Market Value of Assets | 656,338 | 719,678 | 786,087 | 708,274 | 762,735 |
| E(1). MMO BASED ON ACTUARIAL VALUE | |||||
| 1. Total financial requirement of the Plan (A1)+(B)+(D1) | 884,696 | 986,832 | 1,096,635 | 953,567 | 1,026,201 |
| 2. Less Estimated Mandatory Member Contributions | 115,051 | 115,051 | 115,051 | 115,051 | 115,051 |
| 3. Less Estimated State Aid | 161,000 | 161,000 | 161,000 | 161,000 | 161,000 |
| 4. Net Minimum Municipal Obligation (1)-(2)-(3) | 608,645 | 710,781 | 820,584 | 677,516 | 750,150 |
| E(2). MMO BASED ON MARKET VALUE | |||||
| 1. Total financial requirement of the Plan (A1)+(B)+(D2) | 972,685 | 1,072,550 | 1,180,098 | 1,039,285 | 1,109,664 |
| 2. Less Estimated Mandatory Member Contributions | 115,051 | 115,051 | 115,051 | 115,051 | 115,051 |
| 3. Less Estimated State Aid | 161,000 | 161,000 | 161,000 | 161,000 | 161,000 |
| 4. Net Minimum Municipal Obligation (1)-(2)-(3) | 696,634 | 796,499 | 904,047 | 763,234 | 833,613 |
-3-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
ACTUARIAL CERTIFICATION
The actuarial computations have been performed under the supervision of and reviewed by the undersigned based on employee census and asset data from the Municipality, and the current Plan provisions.
This actuarial cost study is based in part on information provided by the Municipality. Such information may or may not be accurate or complete, but any inaccuracies or omissions are not material and are not too numerous or flagrant as to suggest that there may be substantial inconsistencies in the computations. Therefore, this actuarial study is substantially accurate and complete based on the available data and fairly discloses the actuarial position of the aforementioned possible improvements to the Plan.
In my opinion, each actuarial assumption used in combination in this actuarial cost study represents my best estimate of anticipated experience under the Plan based on the available data as of the date of the last actuarial valuation. Furthermore, each actuarial assumption used in this actuarial cost study is (a) reasonable, taking into account the past experience of the plan and reasonable expectations, and (b) would, in the aggregate, result in a total contribution equivalent to that which would have been determined if each such assumption were reasonable.
9/10/13
Date
Lawrence C. Brisman, EA, MAAA, MSPA
Enrolled Actuary #11-04972
Beyer-Barber Company
1136 Hamilton Street, Suite 103
Allentown, PA 18101
-4-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
2014 MINIMUM MUNICIPAL OBLIGATION EXHIBIT
| CURRENT PLAN 8% Interest 5% Salary |
SCENARIO 1 7.5% Interest 5% Salary |
SCENARIO 2 7% Interest 5% Salary |
SCENARIO 3 7.5% Interest 4.5% Salary |
SCENARIO 4 7% Interest 4% Salary |
|
|---|---|---|---|---|---|
| 1 TOTAL ANNUAL PAYROLL (Estimated Payroll) |
2,599,736 | 2,599,736 | 2,599,736 | 2,599,736 | 2,599,736 |
| 2 NORMAL COST AS A PERCENTAGE OF PAYROLL (Derived from 1/1/13 actuarial valuation) |
13.52% | 15.11% | 16.90% | 14.16% | 14.85% |
| 3 TOTAL NORMAL COST (Item 1 x Item 2) |
351,484 | 392,820 | 439,355 | 368,123 | 386,061 |
| 4 AMORTIZATION REQUIREMENT (Derived from 1/1/13 actuarial valuation) |
568,349 | 633,960 | 702,624 | 622,556 | 679,272 |
| 5 TOTAL ADMINISTRATIVE EXPENSES (Derived from 1/1/13 actuarial valuation) |
5,250 | 5,250 | 5,250 | 5,250 | 5,250 |
| 6 FINANCIAL REQUIREMENT (Item 3 + Item 4 + Item 5) |
925,083 | 1,032,030 | 1,147,229 | 995,929 | 1,070,583 |
| 7 TOTAL MEMBERS CONTRIBUTIONS | 129,988 | 129,988 | 129,988 | 129,988 | 129,988 |
| 8 FUNDING ADJUSTMENT (Derived from 1/1/13 actuarial valuation) |
0 | 0 | 0 | 0 | 0 |
| 9 MINIMUM MUNICIPAL OBLIGATION (Item 6 - Item 7 - Item 8) |
795,095 | 902,042 | 1,017,241 | 865,941 | 940,595 |
| 10 ACT 44 AMORTIZATION REDUCTION (Item 4 times 25%) |
142,087 | 158,490 | 175,656 | 155,639 | 169,818 |
| 11 ACT 44 MINIMUM REDUCED MUNICIPAL OBLIGATION (Item 9 - Item 10) |
653,008 | 743,552 | 841,585 | 710,302 | 770,777 |
| 12 Minimum Municipal Obligation Based Upon Market Value of Assets | 883,084 | 987,760 | 1,100,704 | 951,659 | 1,024,058 |
Summary-Returns of WEGO Pension Plan
| Last 12 months | Last 3 years | Last 5 years | Last 10 years | Since inception (1995) | |
|---|---|---|---|---|---|
| Nominal return (before inflation) | 13.96% | 7.48% | 2.24% | 7.26% | 6.43% |
| Real return (after inflation) | 11.89% | 3.82% | -0.21% | 4.59% | 3.84% |
| Year | Pension Plan Returns | Inflation | Real return |
|---|---|---|---|
| 1995 | 14.11% | 2.81% | 11.30% |
| 1996 | 7.99% | 2.93% | 5.06% |
| 1997 | 16.33% | 2.34% | 13.99% |
| 1998 | 18.29% | 1.55% | 16.74% |
| 1999 | 18.85% | 2.19% | 16.66% |
| 2000 | 0.00% | 3.38% | -3.38% |
| 2001 | -9.69% | 2.83% | -12.52% |
| 2002 | -16.36% | 1.59% | -17.95% |
| 2003 | 24.50% | 2.27% | 22.23% |
| 2004 | 11.48% | 2.68% | 8.80% |
| 2005 | 8.39% | 3.39% | 5.00% |
| 2006 | 12.49% | 3.24% | 9.25% |
| 2007 | 6.58% | 2.85% | 3.73% |
| 2008 | -31.34% | 3.85% | -35.19% |
| 2009 | 31.05% | -0.34% | 31.39% |
| 2010 | 13.29% | 1.64% | 11.65% |
| 2011 | -3.82% | 3.16% | -6.98% |
| 2012 | 13.96% | 2.07% | 11.89% |
| 2013* | 10.36% |
*Thru 9/6/13
Engineering site plan titled "EXISTING SATELLITE YARD PLAN" (Sheet 1 of 2) showing existing satellite dishes, generators, concrete pads/walks, parking spaces, utilities, topography, and a location map inset.
EXISTING SATELLITE YARD PLAN
CONDITIONAL USE APPLICATION FOR DOWNLINK SYSTEMS UPGRADE
QVC NETWORK INC.
QVC PROJECT# C13611504003
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
LOCATION MAP
SCALE 1" = 2000' (SITE indicated)
EXISTING FEATURES LEGEND
- 202: EXISTING 1' CONTOURS
- 210: EXISTING 5' CONTOURS
- X 212.20: EXISTING SPOT ELEVATION
- EXISTING FENCE LINE
- EXISTING EDGE OF PAVING
- EXISTING CURB
- FLOOD PLAIN
- EcB2 / BdA: SOILS LINE AND DESCRIPTION
- W: EXISTING UNDERGROUND WATER MAIN
- E: EXISTING UNDERGROUND ELECTRIC
- T: EXISTING UNDERGROUND TELEPHONE
- G: EXISTING UNDERGROUND GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING FIRE LINE
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING TREE & SHRUB LINE
- (1): SATELLITE DISH #
- EXISTING ASPHALT PAVING
- SATELLITE DISH
SITE COVERAGE SUMMARY (SATELLITE YARD)
| COVER TYPE | EXISTING (S.F.) |
|---|---|
| GENERATORS | 1,647 |
| CONCRETE WALK/PADS | 3,338 |
| SATELLITE FOUNDATIONS | 1,466 |
| BITUMINOUS PAVING/WALK | 6,738 |
| IMPERVIOUS TOTAL: | 13,189 S.F. |
| NON-COMPACTED CRUSHED STONE | 17,297 |
| GRASS/LAWN | 4,227 |
| NON-IMPERVIOUS TOTAL: | 21,524 S.F. |
| SITE COVERAGE TOTAL: | 34,713 S.F. |
NOTES:
1. EXISTING SATELLITE DISHES NO. 2, 3 AND 5 ARE TO BE REMOVED AS PART OF THE PROPOSED SYSTEMS UPGRADE.
Plan Labels
- FACADE ABOVE FIRST FLOOR
- BRICK PAVERS WALKWAY
- WALL MOUNTED DISH
- EXISTING EGRESS DOOR FROM STAIR 23 DOORSILL [illegible]
- CABLE RUN
- EXISTING DISH (1, 2, 3, 4, 5, 6)
- CONCRETE WALK, GENERATOR, CONCRETE, 10' FENCE, GATE
- BITUMINOUS PAVING, STOP SIGN, STOP, HC parking spaces (5, 7, 10, 11, 14)
- N/F QVC NETWORK INC. D.B. 1487 PG. 367 UPI 53-4-164
- IMPERVIOUS AND TOPOGRAPHY FROM SURVEY LINES
- SUPPLEMENTAL FIELD SURVEY PERFORMED 8-8-13
- Scale in Feet: 1" = 20'
Title Block & General Notes
COPYRIGHT [illegible]
UNIFORM PARCEL IDENTIFIER:
NOTE TO USER OF THESE PLANS [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20131960395
EXCAVATIONS, TRENCHING, AND SHORING [illegible]
SEE SHEET ___ FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
PENNSYLVANIA ONE CALL SYSTEM, INC. CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776 POCS SERIAL NUMBER: 20131960395
Professional Engineer Seal: COMMONWEALTH OF PENNSYLVANIA REGISTERED PROFESSIONAL ENGINEER JEREMY D. MAZUR PE-050557-E
Chester Valley Engineers, Inc., Main Office: 83 Chestnut Road, P.O. Box 447, Paoli, PA 19301, (610) 644-4623, (610) 889-3143 Fax, cve@cvalengr.com, http://www.cvalengr.com
PROJECT NO. 18522-2000 | SCALE: 1"=20' | DATE: 07/19/13 | DRAWN BY: RT | CHECKED BY: JM | SHEET 1 OF 2
Engineering site plan titled "PROPOSED SATELLITE YARD PLAN" (Sheet 2 of 2) showing existing and proposed satellite dishes (numbered 1 through 12), generators, concrete walks, crushed stone areas, parking, and utilities.
PROPOSED SATELLITE YARD PLAN
CONDITIONAL USE APPLICATION FOR DOWNLINK SYSTEMS UPGRADE
QVC NETWORK INC.
QVC PROJECT# C13611504003
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
LOCATION MAP
SCALE 1" = 2000' (SITE indicated)
EXISTING FEATURES LEGEND
- 202: EXISTING 1' CONTOURS
- 210: EXISTING 5' CONTOURS
- X 212.20: EXISTING SPOT ELEVATION
- EXISTING FENCE LINE
- EXISTING EDGE OF PAVING
- EXISTING CURB
- FLOOD PLAIN
- EcB2 / BdA: SOILS LINE AND DESCRIPTION
- W: EXISTING UNDERGROUND WATER MAIN
- E: EXISTING UNDERGROUND ELECTRIC
- T: EXISTING UNDERGROUND TELEPHONE
- G: EXISTING UNDERGROUND GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING FIRE LINE
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING TREE & SHRUB LINE
- (1): SATELLITE DISH #
- EXISTING ASPHALT PAVING
- SATELLITE DISH
SITE COVERAGE SUMMARY (SATELLITE YARD)
| COVER TYPE | EXISTING (S.F.) | PROPOSED (S.F.) |
|---|---|---|
| GENERATORS | 1,547 | 1,547 |
| CONCRETE WALK/PADS | 3,338 | 3,832 |
| SATELLITE FOUNDATIONS | 1,466 | 3,451 |
| BITUMINOUS PAVING/WALK | 6,738 | 435 |
| IMPERVIOUS TOTAL: | 13,189 S.F. | 9,365 S.F. |
| PROPOSED IMPERVIOUS REDUCTION (NET): | -3,824 S.F. | |
| NON-COMPACTED CRUSHED STONE | 17,297 | 23,890 |
| GRASS/LAWN | 4,227 | 1,458 |
| NON-IMPERVIOUS TOTAL: | 21,524 S.F. | 25,348 S.F. |
| PROPOSED NON-IMPERVIOUS INCREASE (NET): | +3,824 S.F. |
Plan Labels
- (1) EXISTING 9M SATELLITE DISH
- [2] PROPOSED 7.0M SATELLITE DISH
- [3] PROPOSED 7.0M SATELLITE DISH
- (4) EXISTING 4.8M SATELLITE DISH
- [5] PROPOSED 7.3M SATELLITE DISH
- (6) EXISTING 3.8M SATELLITE DISH
- [7] PROPOSED 9.1M SATELLITE DISH
- [8] PROPOSED 5.6M SATELLITE DISH
- [9] PROPOSED 3.6M SATELLITE DISH
- [10] PROPOSED 3.6M SATELLITE DISH
- [11] PROPOSED 3.8M SATELLITE DISH
- [12] PROPOSED 3.8M SATELLITE DISH
- FACADE ABOVE FIRST FLOOR, BRICK PAVERS WALKWAY, WALL MOUNTED DISH
- EXISTING EGRESS DOOR FROM STAIR 20 DOORSILL 425.94
- CONCRETE WALK, GENERATOR, CONCRETE, 10' FENCE, GATE
- N/F QVC NETWORK INC. D.B. 1487 PG. 367 UPI 53-4-164
- IMPERVIOUS AND TOPOGRAPHY FROM SURVEY LINES
- SUPPLEMENTAL FIELD SURVEY PERFORMED 8-8-13
- Scale in Feet: 1" = 20'
Title Block & General Notes
COPYRIGHT [illegible]
UNIFORM PARCEL IDENTIFIER:
NOTE TO USER OF THESE PLANS [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20131960395
EXCAVATIONS, TRENCHING, AND SHORING [illegible]
SEE SHEET ___ FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
PENNSYLVANIA ONE CALL SYSTEM, INC. CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776 POCS SERIAL NUMBER: 20131960395
Professional Engineer Seal: COMMONWEALTH OF PENNSYLVANIA REGISTERED PROFESSIONAL ENGINEER JEREMY D. MAZUR PE-050557-E
Chester Valley Engineers, Inc., Main Office: 83 Chestnut Road, P.O. Box 447, Paoli, PA 19301, (610) 644-4623, (610) 889-3143 Fax, cve@cvalengr.com, http://www.cvalengr.com
PROJECT NO. 18522-2000 | SCALE: 1"=20' | DATE: 07/19/13 | DRAWN BY: RT | CHECKED BY: JM | SHEET 2 OF 2
Architectural landscape drawing sheet LA-1.1 showing the Landscape Demolition Plan, Landscape Plan, Plant Schedule, and Shrub Planting Detail for the QVC Downlink Systems Upgrade at Founder's Park.
LANDSCAPE PLAN (LA-1.1)
Landscape Demolition Plan
Scale: 1/8"=1'
- Arborvitae Hedge to be Removed
- Euonymus Hedge to be Removed
- Juniper Mass to be Removed
- Yew Hedge to be Removed
- (2) Oak to be Removed
- Yew Hedge to be Removed
- (3) Maples to be Removed
- (3) Pines to be Removed
- (4) Viburnum to be Removed
Landscape Plan
Scale: 1/8"=1'
- (9) Arborvitae
- (16) Dragon Lady Holly
- (20) Alleghany Viburnum
Plant Schedule
| No. | Botanical Name | Common Name | Size |
|---|---|---|---|
| 16 | Ilex x aquipernyi 'Meschick' | Dragon Lady Holly | 6'-7' Ht. |
| 9 | Thuja x 'Green Giant' | Green Giant Arborvitae | 5'-6' Ht. |
| 20 | Viburnum x rhytidophylloides 'Alleghany' | Alleghany Viburnum | 3'-4' Ht. |
SHRUB PLANTING DETAIL - B&B TREES IN ALL SOIL TYPES
NTS - SECTION (Diagram showing shrub root ball placement, mulch depth, earth saucer, and soil backfill notes [illegible])
Title Block
QVC DOWNLINK SYSTEMS UPGRADE
FOUNDER'S PARK, 1365 Enterprise Drive, West Chester PA 19380
HSA - Heckendorn Shiles Architects, 347 East Conestoga Road, Wayne, Pennsylvania 19087-2547, main office 610-994-3500, website www.hsarch.com
Structural Engineer: PROVIDENCE ENGINEERING, 10 Eisenhower Blvd., Lancaster, PA 17603
MEP/FP Engineer: KUPPER ENGINEERING, 101 Jackson Avenue, Glenside, PA 19038
Site/Civil Engineer: CHESTER VALLEY ENGINEERS, 83 Chestnut Road, Paoli, PA 19301
Landscape Architect: SHEARON ENVIRONMENTAL DESIGN, 5160 Militia Hill Road, Plymouth Meeting, PA 19462
Date: 09/03/2013 | Description: PROGRESS PRINT
Project No.: 13-010 | Plot Scale: 1'=1' | Sheet Title: LANDSCAPE PLAN | Sheet No.: LA-1.1
Color photograph of a red East Goshen Township dump truck parked in front of a material storage shed with its hood tilted open and its dump body raised, with a second red East Goshen Township truck partially visible in the background on the left.
- 37
- LOUISVILLE
- EAST GOSHEN TOWNSHIP
Color photograph of the underbody of a vehicle showing a rusted oil pan and a yellow engine oil dipstick handle.
Labels: Oil Pan.
Color photograph showing severe rust and deterioration on vehicle cab mounts.
Labels: Cab Mounts, Rusted out.
Color photograph showing vehicle fender and hood mounting bracket with rust along the metal edge and mounting bolt.
Labels: Fender & Hood mounts.
Color photograph showing severe rust corrosion along the curved edge of vehicle cab and fuel tank mounts.
Labels: Cab and fuel tank Mounts.
Color photograph showing a horizontal metal fatigue crack across a dump body cross member.
Labels: Dump body cross Members, Metal fatigue.
Color photograph showing a crack and rust along the dump body sub frame.
Labels: Dump body Sub frame.
Color photograph of plow frame mounts bolted to the truck frame, showing stress cracking in the metal beneath the bolts.
Labels: Plow Frame Mounts on truck Frame.
Color photograph of the underside of the truck showing the truck and body frame, hydraulic lines, and rust accumulation.
Labels: Truck and body frame.
Color photograph inside the vehicle cab showing the base of the brake pedal and severe rust perforation in the floorboard.
Labels: Inside cab brake Pedal & floor rusting out.
Color photograph inside the vehicle cab showing heavy corrosion and flaking rust on the driver seat pedestal.
Labels: Driver Seat Pedestal.
September 11, 2013
To: Board of Supervisors
From: Mark Miller
Re: Truck Replacement
We are scheduled to replace the 1996 Sterling dump truck this year. Plowing and salting has taken a toll on this truck. Key components are rusted out (cross members, cab mounts, see photos).
The plow frame mounts are bent and twisted. I would also point out that Ford Motor Company no longer makes this truck; therefore, parts are difficult to locate. If we don't replace this vehicle it will need engine repairs as its performance has deteriorated. We also need to replace the clutch and fly wheel.
The replacement truck will have several features on it to combat rust. Below is a breakdown of the special features should you approve the purchase.
- Severe weather package
- Allison automatic transmission, heavy duty service
- 350 horsepower diesel
- Aluminum dump body
- Air over hydraulic controls
- 11 foot Monroe power angle plow
- Stainless steel salt spreader
- 950 gallon brine tank
- Brine system with speed control
- Trailer package
- All LED lighting
Pricing Information is as follows:
| Manufacturer: | Truck: | Trade: | Net: |
|---|---|---|---|
| G.L. Sayre International | $160,384.00 | $23,000 | $137,384.00 |
| G.R. International | $157,851.00 | $7,500 | $150,351.00 |
| G.L. Sayre Peterbilt | $160,033.00 | $23,000 | $137,033.00 |
| Hunter Peterbilt | $159,307.00 | $7,500 | $151,807.00 |
I recommend that G.L. Sayre and Intercon Equipment be awarded the contract in the amount of $137,033.00 which is COSTARS pricing.
F:\Data\Shared Data\Public Works Dept\Equipment Purchases 2013\96 Ford Sterling replacement 2013 July 30 - Copy.docx
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: September 9, 2013
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Speed Limits
Section 225-44 of the Township Code establishes speed limits for the various streets in the Township. As a general rule the main township streets, such as Ellis Line and Reservoir Road are 35 MPH while the streets in most of the developments, such as Bowtree, Hershey Mill Estates, and Grand Oak are 25 MPH.
A review of this section indicates that there are a number of “development” streets, the majority of which are cul-de-sacs that are listed at 35 MPH.
These streets are: Amalfi Drive, Atlee Drive, Bramble Lane, Chambord Place, Great Oak Circle, Green Acres Lane, Hunters Circle, Jaclyn Drive, Joshua Lane, Larch Lane, Meadowbrook Lane, Old Orchard Lane, Pheasant Run, Pine Rock Road, Pond View Lane, Raewyck Lane, Springhouse Lane, Sturbridge Circle, Sturbridge Lane, Willow Pond Road and Wyllpen Drive.
There is a provision in the PA Vehicle Code that permits the establishment of a 25 MPH speed limit on this type of street.
I have asked the Police Department for their comments (see attached).
I would recommend that you reduce the speed limits on these streets, in order to bring them into conformance with the other developments.
F:\Data\Shared Data\Admin Dept\Township Code\Vehicles & Traffic\Vehicles and Traffic 2013\Memo 090913.docx
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 9/12/2013
To: Board of Supervisors
From: Mark Gordon, Zoning Officer
Re: Openspace and Recreation Plan Update
Dear Board Members,
After speaking with Rick and Ann Toole from Toole recreation I have drafted the following recommendation for the Openspace and Recreation Plan Taskforce.
Recommended makeup of the Openspace and Recreation Plan Task Force (ORTF):
| Position / Board | Count |
|---|---|
| Board of Supervisors | 1 |
| Planning Commission Member (Chair) | 1 |
| Park Board | 1 |
| Conservancy Board | 1 |
| Historical Commission | 1 |
| Commerce Development Commission | 1 |
| Toole Recreation Planning | 1 |
| Brandywine Conservancy | 1 |
| Director of Recreation | 1 |
| Zoning Officer | 1 |
| Total | 10 |
- The Municipal Authority can be consulted on as needed basis.
- We will have a recording secretary for the meetings.
- I recommend that each Board and Commission identify primary and alternate ORTF members. Only primary members need to attend the meetings however in the event of a conflict this provides an identified alternate who can attend.
- The meetings will be held on the 3rd Thursday of the month. The Kick-Off Meeting for the Openspace and Recreation Plan Update will be October 17, 2013.
- If you concur with these recommendations I can forward a letter to the Boards and Commissions outlining the approach for the formation of the Task Force, and advertise the meetings.
F:\Data\Shared Data\Admin Dept\Open Space Plan 2013\Memo to BOS 09122013.doc
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
September 3, 2013
Draft Minutes
Present: Chairman Senya D. Isayeff, Vice-Chairman Carmen Battavio, Supervisors Marty Shane, Chuck Proctor and Janet Emanuel. Also present were Township Manager Rick Smith, CFO Jon Altshul, Erich Meyer (Park & Rec) and Ginnie Newlin (Conservancy Board).
Call to Order & Pledge of Allegiance
Senya called the meeting to order at 7:00pm and asked State Rep. Dan Truitt to lead everyone in the Pledge of Allegiance. (Rep. Truitt had stopped by to say hello but was unable to stay for the meeting.)
Moment of Silence
Carmen called for a moment of silence to remember the troops and all those in uniform who help keep us safe.
Recording of Meeting
No one recorded the meeting.
Public Comment on Non-Agenda Items
None.
Chairman’s Report
Comprehensive Plan Update - Janet reported that the last meeting of the Comprehensive Plan Task Force was very productive. They had a brainstorming session on priorities and “focal” areas. The biggest change to the Comprehensive Plan will be in format. The Task Force has scheduled a special meeting for September 11 where they will discuss the Town Center concept.
Shredding Event – Senator Dominic Pileggi will hold a Community Shredding Event on September 21 at the State Farm building in Concordville.
Public Hearing on Ordinance to Authorize Borrowing of $2,500,000 for Sewer Projects
The Board held a public hearing to consider an ordinance authorizing the borrowing of $2,500,000 for sewer projects. Lucien Calhoun of the Delaware Regional Finance Authority was present. Marty moved to adopt the ordinance. Carmen seconded the motion. Public comments were made by residents Ginnie Newlin and Bill Egan. The Board voted unanimously to approve the motion. A court reporter was present and will provide a complete transcript of the proceedings.
Financial Policies
Senya announced that this matter would be tabled until the September 17 meeting.
9/9/2013 September 3, 2013 BOS Minutes Page 1 of 5
Openspace Plan
Rick summarized an August 28 memo from Mark Gordon on this topic. Staff recommends awarding the Openspace and Recreation Plan update contract to Toole Recreation Planning for $26,370 and adding Option 3 for the conceptual study of the Paoli Pike Multi-Use Path for $3,500 for a total of $29,870. The Plan should remain a standalone plan and not be included with the Comp Plan Update.
Carmen moved to award the Openspace Plan Update to Toole Recreation Planning for $29,870 per the recommendation of staff. Janet seconded the motion.
Marty said this will save the Township money by because an entirely new Openspace Plan will not have to be created to replace the old one. Additionally, having a start on the trail issue may give the Township an advantage when applying for grant money.
Public Comment: Mike Broennle, Hunters Circle – Said he supported the motion, and this is a great opportunity for the Township to get in on early funding. A trail is greatly needed by residents for recreational purposes and as a means to get to and from their jobs.
Public Comment: Bill Egan, Mill Creek – Said he would like the Township to spend money on installing the approved Line Road trail before approving an expenditure to study the possibility of putting in a trail along Paoli Pike. Marty noted that the cost to install the Line Road trail is prohibitive due to ADA requirements.
Public Comment: Ginnie Newlin – Asked if the Township would consider putting in more “native” trail along Line Road. Rick said he would have to look into it.
There was no further discussion or public comment. The Board voted unanimously to approve the motion.
Request for Additional Services Regarding Comprehensive Plan
The Board discussed a request from John Theilacker of the Brandywine Conservancy to have the Township pay the Environmental Management Center an additional $1,500 for himself and Steve Kehs of Triad Associates to attend The Commerce Commission’s Breakfast Forum on October 3 and Lunch Forum on November 7.
Janet said the Township needs to make sure the commercial zones are attractive to businesses and consumers. Carmen said he supports the request, as the Commerce Commission is highly regarded by Township businesses.
Senya said he was disappointed by the request from Mr. Theilacker and cannot justify the additional expense of $1,500 for the Comprehensive Plan.
Carmen moved to send a letter to Mr. Theilacker and Mr. Kehs, again inviting them to the Commerce Commission events at no charge but tactfully declining to reimburse them for attending. Marty seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
9/9/2013 September 3, 2013 BOS Minutes Page 2 of 5
Police Committee to Explore Possibility of Expansion
Carmen repeated his motion from the last meeting: He moved to approve the formation of a committee consisting of one or more supervisors each from East Goshen, Westtown and West Goshen along with the Township Managers and the Police Chiefs. The committee will be tasked with developing an RFP for the study of the feasibility of adding West Goshen to WEGO, as well as identifying the various legal and operational issues that will need to be addressed. Chuck seconded the motion.
Marty questioned whether there will be a financial benefit to WEGO and/or East Goshen. Before a committee is formed, he would like Rick and Jon to meet with Kathy Brill and Chief Bernot to do some rough “back of the envelope” calculations to see if this would be a worthwhile endeavor. He would also like the Township’s labor attorney, Joe Rudolf, to come meet with the Board to discuss the issues of a potential merger. If both exercises indicate that it makes sense to move forward, then a committee can be created. Marty said he could not support a motion to form a committee without these two exercises taking place.
Janet wondered how a determination could be made as to the feasibility of the project until a committee is formed and East Goshen and Westtown talk to West Goshen.
Marty said because service levels would not go down, it’s possible that expansion of WEGO could actually increase East Goshen’s costs, in which case he sees no reason to proceed. In addition, the legal issues of absorbing the West Goshen force could be quite complex. Having the additional information he is seeking would give the committee (if formed) a jumpstart.
Carmen agreed it’s important to meet with Joe Rudolf, but he doesn’t see why a committee cannot be formed at the same time as the preliminary calculations are completed.
Carmen modified his motion to reflect that at the same time as the committee is formed, the staff will do the “back of the envelope” calculations Marty has requested and the Board will meet with Joe Rudolph. Chuck seconded the modified motion.
Chuck noted that WEGO has the benefit of a Police Chief who has experience overseeing 250+ officers as well as extensive experience in budgeting. He agreed it may be a good idea for the Board to meet with Joe Rudolph, but suggested the committee (not just East Goshen staff) do the preliminary calculations Marty has requested.
Senya cited a recent article he read about the concept of regional policing and noted some of the “pros” to regional policing it contained. Even if no money is saved up front, there is improved coordination of police response. There is also an increased use of technology leading to cost savings, and consolidation of records. He then read a list of other “pro” from the article.
Chuck said Chief Bernot has recently suggested WEGO purchase some equipment that West Goshen currently owns. If the police forces merge, that equipment could be shared and housed in a centralized location, saving WEGO the $70-$80K it would cost to purchase the equipment.
9/9/2013 September 3, 2013 BOS Minutes Page 3 of 5
Senya said some of the “cons” in the article include loss of local control, loss of citizen contact, and multiple chiefs vying for few positions.
Marty said he is not opposed to regionalization. He has no doubt that Rick, Jon, Kathy Brill and Chief Bernot can do what he is asking. There is quite a lot to consider when thinking about absorbing an entire police force.
There was no further discussion and no public comment. The Board voted 4:1 and the motion passed. Marty was opposed to the motion.
Carmen moved to nominate Senya and Chuck to represent East Goshen on the Police Committee. Janet seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Escrow Release for Ashleybrook Estates
This matter was tabled.
Any Other Matter
Jon reported that Travis has refined the interactive agenda, and has also figured out how to compress the entire packet into a file size of under 4MB.
Review of Minutes
The Board reviewed and corrected the draft minutes of August 6 and August 20. Senya stated that the minutes would stand approved as corrected.
Treasurer’s Report & Expenditure Register Report
See attached Treasurer’s Report for August 29, 2013.
The Board reviewed the Treasurer’s Report and the current invoices. Carmen moved to accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Chuck seconded the motion. There was no discussion or public comment. The Board voted unanimously to approve the motion.
Action List
Hershey Mill Dam – The Township is still waiting to hear back from DEP.
Act 167 Ordinance – Rick and Mark attended seminars on August 7 and 28. They are working on a draft ordinance for the Township.
Correspondence & Reports of Interest
Senya acknowledged receipt of a letter from resident Donald Ruddy regarding his variance application for 1410 Linden Lane.
Meetings & Dates of Importance
Senya noted the upcoming meetings as listed in the agenda.
9/9/2013 September 3, 2013 BOS Minutes Page 4 of 5
Public Comment on Non-Agenda Items
Ginnie Newlin requested that the Township issue “kinder, gentler” communications to its residents. She recently received a form letter she found to be much too harsh. After a lengthy discussion, Senya suggested Ms. Newlin rewrite the letter for the Township’s review and consideration.
Adjournment
There being no further business, the meeting was adjourned at 8:29pm.
Submitted by:
Anne Meddings
Recording Secretary
Attachment: Treasurer’s Report
9/9/2013 September 3, 2013 BOS Minutes Page 5 of 5
August 29, 2013
TREASURER'S REPORT
2013 RECEIPTS AND BILLS
GENERAL FUND
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Real Estate Tax | $2,471.55 | Accounts Payable | $64,830.44 |
| Earned Income Tax | $39,400.00 | Electronic Pmts: | |
| Local Service Tax | $24,400.00 | Health Insurance | $0.00 |
| Transfer Tax | $0.00 | Credit Card | $1,821.49 |
| General Fund Interest Earned | $0.00 | Postage | $0.00 |
| Total Other Revenue | $129,905.31 | Debt Service | $0.00 |
| Payroll | $73,000.00 | ||
| Total Receipts: | $196,176.86 | Total Expenditures: | $139,651.93 |
STATE LIQUID FUELS FUND
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Receipts | $0.00 | ||
| Interest Earned | $0.00 | ||
| Total State Liquid Fuels: | $0.00 | Expenditures: | $0.00 |
CAPITAL RESERVE
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Interest Earned | $0.00 | Expenditures: | $0.00 |
TRANSPORTATION FUND
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Interest Earned | $0.00 | Expenditures: | $0.00 |
SEWER OPERATING
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Receipts | $239,563.60 | Accounts Payable | $12,167.74 |
| Interest Earned | $0.00 | Debt Service | $0.00 |
| Total Sewer: | $239,563.60 | Total Expenditures: | $12,167.74 |
REFUSE
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Receipts | $77,944.91 | ||
| Interest Earned | $0.00 | ||
| Total Refuse: | $77,944.91 | Expenditures | $66,493.31 |
SEWER CAPITAL RESERVE
| Receipts | Amount | Expenditures | Amount |
|---|---|---|---|
| Interest Earned | $0.00 | Expenditures | $0.00 |
EAST GOSHEN TOWNSHIP
ACTION LIST
| New additions are in bold | September 17, 2013 |
|---|---|
| Item | Date |
| Comcast Franchise Renewal | September 17, 2013 |
| Hershey's Mill Dam | October 1, 2013 |
| Comp Plan | October 1, 2013 |
| Open Space Plan | October 1, 2013 |
| Act 167 Ordinance | October 1, 2013 |
| Quarterly Report on Comp Plan Goals for ABCs | October 15, 2013 |
| Quarterly Report Municipal Authority Projects | October 15, 2013 |
| Quarterly Financial Reports | October 15, 2013 |
| Quarterly Report on I&I | October 15, 2013 |
| Quarterly Review of Right to Know Requests | October 15, 2013 |
F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\Action List 091713.xlsx
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Comcast Franchise | No: | 10 |
|---|---|---|---|
| List Date: | 12/18/2013 | Completed Date: | |
| Description: | Execute Comcast Franchise Agreement | ||
| Date | Action |
|---|---|
| 4/16/2013 | Kristin has been in contact with Kevin at Comcast, He wants to finish up some other agreement before starting on East Goshen's |
| 7/16/2013 | Kevin wants to use the Verizon agreement as a model. Kristin is marking up a draft agreement. |
| 8/20/2013 | Kristin is marking up a draft agreement. |
| 9/17/2013 | No sctivity |
F:\Data\Shared Data\ABC'S\Board of Supervisors\To Do Schedule\2013\10 Comcast Franchise Renewal.xlsx
[Emblem: Westtown-East Goshen Regional Police]
Westtown-East Goshen Regional Police Department
1041 Wilmington Pike
West Chester, PA 19382
September 9, 2013
[Stamp: RECEIVED SEP 10 2013]
Mr. Louis F. Smith, Jr.
Township Manager, East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Dear Mr. Smith,
On August 20, 2013, our officers responded to a shooting incident that occurred at a residence in the 1600 block of Ivy Lane. On the following day, as the investigation progressed, the Criminal Investigation Division developed information that the weapon utilized during the incident had been hidden somewhere in the rear of the property. After members of our department and other assisting agencies spent several hours trying to locate the weapon in the heavy undergrowth behind the residence with no results, Detective Lieutenant William Cahill contacted Mr. Mark Miller, the East Goshen Director of Public Works, for assistance.
Mr. Miller immediately responded to the scene with the following members of the Public Works Department to assist our agency: Michael Carpenter, Steven Hero, Edward Kilgore, Kevin Miller, and George Thompson. When the Public Works Department arrived at the scene, they were well equipped with a metal detector, chain saws, bee repellant, and even water for the team. Despite the intense heat and humidity on that day, the Public Works Department worked for numerous hours clearing out the undergrowth so that the weapon could ultimately be located. Although locating a loaded weapon is always a priority, it is important to note that the property on Ivy Lane borders a church and therefore, the importance of finding the weapon in a timely manner cannot be emphasized enough.
We would like to express our deep gratitude to the members of the East Goshen Public Works Department who assisted us on August 21, 2013. Their assistance was instrumental in ensuring that the weapon was located before public safety was jeopardized. It is once again evidence of the exemplary level of interagency cooperation that exists between our departments. We are fortunate to work with such outstanding individuals who are dedicated to serving the community.
Sincerely,
Brenda M. Bernot
Chief of Police
Jon Altshul
From: Jon Altshul [jaltshul@eastgoshen.org]
Sent: Friday, September 13, 2013 9:06 AM
To: 'rsmith@eastgoshen.org'
Cc: 'Kathy Brill'
Subject: Analysis of WEGO pension
Attachments: WEGO pension plan returns 1995-present.xlsx; WEGO pension sensitivity study.pdf
Rick:
This email addresses 3 issues raised in last week's Finance Committee meeting:
1) Actual returns for WEGO pension plan
- With Kathy's help, I've attached historical returns for the WEGO pension plan invested with Key Financial dating back to 1995.
- As you'll see, the nominal annual return (before inflation) has been 6.43% over the past 18 years; the real return has been 3.84%.
2) How much we'd need to save to have the WEGO pension plan 90% funded within 10 years.
- Right now, WEGO has an unfunded actuarial liability of $4,825,356 (actuarial value) and $5,638,745 (market value). 90% of those amounts are $4.34m and $5.07m respectively.
- Based on my discussion with the pension consultants at Anderson, barring any unforeseen changes (e.g. lots of resignations; disability pensions; big market losses/gains; etc), those values will hold steady (rising only for inflation) for the next 10 years.
- The consultants guesstimated that annual contributions of $500,000 per year for 10 years would make the plan fully funded. When I play around in Excel, I calculate that WEGO would be 90% funded with annual contributions of about $432,000 and 100% funded at about $480,000, assuming 3% returns after inflation. At 56% of total costs, EGT's share would be about $242,000 and $269,000 respectively.
3) Impact of changing actuarial assumptions/target return on MMO
- Right now the target return for the WEGO pension plan is 8%. However, there is an assumption of 5% salary growth per year, meaning that the real return is 3%.
- I have also attached a mini-actuarial study from Beyer-Barber showing what would happen to the MMO if you tinkered with the target return and/or the salary growth assumptions. Long story short, every .5% decrease in the target return increases the MMO by about $100,000 and every .5% decrease in salary growth decreases the MMO by about $35,000.
- In other words, it may make sense to recommend a change in the target return of the fund to, say, 6.5% or even 6% instead of simply contributing more than the MMO (as described in option #2) in order to ensure that WEGO's pension plan is able to close its unfunded liability within a reasonable amount of time.
Please let me know if you have any questions.
Jon Altshul
1
Chief Financial Officer
East Goshen Twp
jaltshul@eastgoshen.org
610-692-7171
2
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
ACTUARIAL COST STUDY
AS OF JANUARY 1, 2013
Prepared by:
BEYER-BARBER COMPANY
Employee Benefit and Actuarial Consultants
1136 Hamilton Street, Suite 103
Allentown, Pa 18101
(610) 435-9577
Dated: September 10, 2013
In Cooperation With:
Thomas J. Anderson & Associates, Inc.
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
TABLE OF CONTENTS
| SECTION | PAGE NO. |
|---|---|
| SUMMARY OF PROPOSED ASSUMPTION CHANGES | 1 |
| SUMMARY OF RESULTS | 2 |
| SUMMARY OF ACTUARIAL COST STUDY AS OF JANUARY 1, 2013 | 3 |
| ACTUARIAL CERTIFICATION | 4 |
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
SUMMARY OF PROPOSED ASSUMPTION CHANGES
CURRENT ASSUMPTIONS
Currently, the plan has an 8.0% interest rate assumption and 5.0% salary scale assumption.
PROPOSED ASSUMPTIONS
It is requested to study the effect on plan costs created by the following four scenarios:
Scenario 1: Reduce the interest rate assumption to 7.5%.
Scenario 2: Reduce the interest rate assumption to 7.0%.
Scenario 3: Reduce the interest rate assumption to 7.5% and reduce the salary scale assumption to 4.5%.
Scenario 4: Reduce the interest rate assumption to 7.0% and reduce the salary scale assumption to 4.0%.
-1-
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
SUMMARY OF RESULTS
The ensuing pages show the effect on the 2013 plan year costs with the proposed assumption changes as follows:
CURRENT ASSUMPTIONS
The 2013 plan year costs based on the current assumptions are shown as a foundation for comparison in order to measure the effect on plan costs associated with the proposed assumptions changes. These costs are not meant to be confused with the municipality's 2014 minimum municipal obligation budget amount that was already communicated and determined based on the January 1, 2013 actuarial valuation.
PROPOSED ASSUMPTIONS
The following page illustrates the development of the estimated Minimum Municipal Obligation (MMO) of each scenario based on assets determined using the actuarial smoothing method which was used in the January 1, 2013 actuarial valuation. The development of the MMO based on the market value of assets is also shown and should be taken into consideration since the cost based on the market value of assets is ultimately what the plan will experience.
This study has been based on census and plan asset data as of January 1, 2013.
It should be noted that this study only measures the effect of the proposed assumptions changes on the 2013 plan year costs due to unpredictable future events that will occur after January 1, 2013. Furthermore, this study has been based on the plan status as of January 1, 2013 and any future change in plan membership and/or trust fund performance may have an impact on these calculations.
This study uses an estimated state aid unit value of $3,500.
-2-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
SUMMARY OF ACTUARIAL COST STUDY AS OF JANUARY 1, 2013
| Item | CURRENT PLAN | SCENARIO 1 | SCENARIO 2 | SCENARIO 3 | SCENARIO 4 |
|---|---|---|---|---|---|
| A. NORMAL COST | |||||
| 1. Dollar Amount | 311,097 | 347,622 | 388,761 | 325,761 | 341,679 |
| 2. Valuation Covered Payroll | 2,301,027 | 2,301,027 | 2,301,027 | 2,301,027 | 2,301,027 |
| 3. Percentage of Covered Payroll(1)/(2) | 13.52% | 15.11% | 16.90% | 14.16% | 14.85% |
| B. ESTIMATED ADMINISTRATIVE EXPENSES | 5,250 | 5,250 | 5,250 | 5,250 | 5,250 |
| C. ACCRUED LIABILITY AND ASSETS | |||||
| 1. Actuarial Accrued Liability | 13,156,713 | 13,904,509 | 14,721,583 | 13,796,290 | 14,494,003 |
| 2(a). Actuarial Value of Assets | 8,331,357 | 8,331,357 | 8,331,357 | 8,331,357 | 8,331,357 |
| 3(a). Unfunded Actuarial Liability Based on Actuarial Value | 4,825,356 | 5,573,152 | 6,390,226 | 5,464,933 | 6,162,646 |
| 2(b). Market Value of Assets | 7,517,968 | 7,517,968 | 7,517,968 | 7,517,968 | 7,517,968 |
| 3(b). Unfunded Actuarial Liability Based on Market Value | 5,638,745 | 6,386,541 | 7,203,615 | 6,278,322 | 6,976,035 |
| D. AMORTIZATION CONTRIBUTION | |||||
| 1. Based on Actuarial Value of Assets | 568,349 | 633,960 | 702,624 | 622,556 | 679,272 |
| 2. Based on Market Value of Assets | 656,338 | 719,678 | 786,087 | 708,274 | 762,735 |
| E(1). MMO BASED ON ACTUARIAL VALUE | |||||
| 1. Total financial requirement of the Plan (A1)+(B)+(D1) | 884,696 | 986,832 | 1,096,635 | 953,567 | 1,026,201 |
| 2. Less Estimated Mandatory Member Contributions | 115,051 | 115,051 | 115,051 | 115,051 | 115,051 |
| 3. Less Estimated State Aid | 161,000 | 161,000 | 161,000 | 161,000 | 161,000 |
| 4. Net Minimum Municipal Obligation (1)-(2)-(3) | 608,645 | 710,781 | 820,584 | 677,516 | 750,150 |
| E(2). MMO BASED ON MARKET VALUE | |||||
| 1. Total financial requirement of the Plan (A1)+(B)+(D2) | 972,685 | 1,072,550 | 1,180,098 | 1,039,285 | 1,109,664 |
| 2. Less Estimated Mandatory Member Contributions | 115,051 | 115,051 | 115,051 | 115,051 | 115,051 |
| 3. Less Estimated State Aid | 161,000 | 161,000 | 161,000 | 161,000 | 161,000 |
| 4. Net Minimum Municipal Obligation (1)-(2)-(3) | 696,634 | 796,499 | 904,047 | 763,234 | 833,613 |
-3-
WESTTOWN-EAST GOSHEN
POLICE COMMISSION PENSION PLAN
ACTUARIAL CERTIFICATION
The actuarial computations have been performed under the supervision of and reviewed by the undersigned based on employee census and asset data from the Municipality, and the current Plan provisions.
This actuarial cost study is based in part on information provided by the Municipality. Such information may or may not be accurate or complete, but any inaccuracies or omissions are not material and are not too numerous or flagrant as to suggest that there may be substantial inconsistencies in the computations. Therefore, this actuarial study is substantially accurate and complete based on the available data and fairly discloses the actuarial position of the aforementioned possible improvements to the Plan.
In my opinion, each actuarial assumption used in combination in this actuarial cost study represents my best estimate of anticipated experience under the Plan based on the available data as of the date of the last actuarial valuation. Furthermore, each actuarial assumption used in this actuarial cost study is (a) reasonable, taking into account the past experience of the plan and reasonable expectations, and (b) would, in the aggregate, result in a total contribution equivalent to that which would have been determined if each such assumption were reasonable.
9/10/13
Date
Lawrence C. Brisman, EA, MAAA, MSPA
Enrolled Actuary #11-04972
Beyer-Barber Company
1136 Hamilton Street, Suite 103
Allentown, PA 18101
-4-
WESTTOWN-EAST GOSHEN POLICE COMMISSION PENSION PLAN
2014 MINIMUM MUNICIPAL OBLIGATION EXHIBIT
| Line / Description | CURRENT PLAN 8% Interest 5% Salary |
SCENARIO 1 7.5% Interest 5% Salary |
SCENARIO 2 7% Interest 5% Salary |
SCENARIO 3 7.5% Interest 4.5% Salary |
SCENARIO 4 7% Interest 4% Salary |
|---|---|---|---|---|---|
| 1 TOTAL ANNUAL PAYROLL ( Estimated Payroll ) | 2,599,736 | 2,599,736 | 2,599,736 | 2,599,736 | 2,599,736 |
| 2 NORMAL COST AS A PERCENTAGE OF PAYROLL ( Derived from 1/1/13 actuarial valuation ) | 13.52% | 15.11% | 16.90% | 14.16% | 14.85% |
| 3 TOTAL NORMAL COST ( Item 1 x Item 2 ) | 351,484 | 392,820 | 439,355 | 368,123 | 386,061 |
| 4 AMORTIZATION REQUIREMENT ( Derived from 1/1/13 actuarial valuation ) | 568,349 | 633,960 | 702,624 | 622,556 | 679,272 |
| 5 TOTAL ADMINISTRATIVE EXPENSES ( Derived from 1/1/13 actuarial valuation ) | 5,250 | 5,250 | 5,250 | 5,250 | 5,250 |
| 6 FINANCIAL REQUIREMENT ( Item 3 + Item 4 + Item 5) | 925,083 | 1,032,030 | 1,147,229 | 995,929 | 1,070,583 |
| 7 TOTAL MEMBERS CONTRIBUTIONS | 129,988 | 129,988 | 129,988 | 129,988 | 129,988 |
| 8 FUNDING ADJUSTMENT ( Derived from 1/1/13 actuarial valuation ) | 0 | 0 | 0 | 0 | 0 |
| 9 MINIMUM MUNICIPAL OBLIGATION ( Item 6 - Item 7 - Item 8 ) | 795,095 | 902,042 | 1,017,241 | 865,941 | 940,595 |
| 10 ACT 44 AMORTIZATION REDUCTION ( Item 4 times 25% ) | 142,087 | 158,490 | 175,656 | 155,639 | 169,818 |
| 11 ACT 44 MINIMUM REDUCED MUNICIPAL OBLIGATION ( Item 9 - Item 10) | 653,008 | 743,552 | 841,585 | 710,302 | 770,777 |
| 12 Minimum Municipal Obligation Based Upon Market Value of Assets | 883,084 | 987,760 | 1,100,704 | 951,659 | 1,024,058 |
Summary-Returns of WEGO Pension Plan
| Last 12 months | Last 3 years | Last 5 years | Last 10 years | Since inception (1995) | |
|---|---|---|---|---|---|
| Nominal return (before inflation) | 13.96% | 7.48% | 2.24% | 7.26% | 6.43% |
| Real return (after inflation) | 11.89% | 3.82% | -0.21% | 4.59% | 3.84% |
| Year | Pension Plan Returns | Inflation | Real return |
|---|---|---|---|
| 1995 | 14.11% | 2.81% | 11.30% |
| 1996 | 7.99% | 2.93% | 5.06% |
| 1997 | 16.33% | 2.34% | 13.99% |
| 1998 | 18.29% | 1.55% | 16.74% |
| 1999 | 18.85% | 2.19% | 16.66% |
| 2000 | 0.00% | 3.38% | -3.38% |
| 2001 | -9.69% | 2.83% | -12.52% |
| 2002 | -16.36% | 1.59% | -17.95% |
| 2003 | 24.50% | 2.27% | 22.23% |
| 2004 | 11.48% | 2.68% | 8.80% |
| 2005 | 8.39% | 3.39% | 5.00% |
| 2006 | 12.49% | 3.24% | 9.25% |
| 2007 | 6.58% | 2.85% | 3.73% |
| 2008 | -31.34% | 3.85% | -35.19% |
| 2009 | 31.05% | -0.34% | 31.39% |
| 2010 | 13.29% | 1.64% | 11.65% |
| 2011 | -3.82% | 3.16% | -6.98% |
| 2012 | 13.96% | 2.07% | 11.89% |
| 2013* | 10.36% |
*Thru 9/6/13
Photograph of a red East Goshen Township dump truck with the hood tilted open and the dump bed raised.
37
LOUISVILLE
EAST GOSHEN TOWNSHIP
Photograph of a rusted engine area and underside of a vehicle with a dipstick visible.
Oil Pan
Photograph of rusted vehicle cab mounts with wood blocking and a bracket.
Rusted out
Cab Mounts
Photograph showing fender and hood mounting components with bolt, bushing, and surface rust.
Fender & Hood mounts
Photograph showing rusted curved bracket edge of vehicle cab and fuel tank mounts.
Cab and fuel tank Mounts
Photograph showing a crack and metal fatigue along the dump body cross member.
Dump body cross members, Metal fatigue.
Photograph showing corrosion and cracked seam along the dump body sub frame.
Dump body Sub frame
Photograph of plow frame mounts bolted to the truck frame with visible cracking and rust.
Plow Frame Mounts on truck Frame
Photograph showing underside view of truck and body frame with hydraulic hoses and surface rust.
Truck and body frame
Photograph of the vehicle cab interior showing severe rusting at the brake pedal base and floorboard.
Inside cab brake pedal & floor rusting out.
Photograph showing heavy corrosion and rust flaking on the driver seat pedestal base.
Driver Seat Pedastal
Engineering site plan titled "EXISTING SATELLITE YARD PLAN" (Sheet 1 of 2) showing existing satellite dishes, generators, concrete pads/walks, parking spaces, utilities, topography, and a location map inset.
EXISTING SATELLITE YARD PLAN
CONDITIONAL USE APPLICATION FOR DOWNLINK SYSTEMS UPGRADE
QVC NETWORK INC.
QVC PROJECT# C13611504003
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
LOCATION MAP
SCALE 1" = 2000' (SITE indicated)
EXISTING FEATURES LEGEND
- 202: EXISTING 1' CONTOURS
- 210: EXISTING 5' CONTOURS
- X 212.20: EXISTING SPOT ELEVATION
- EXISTING FENCE LINE
- EXISTING EDGE OF PAVING
- EXISTING CURB
- FLOOD PLAIN
- EcB2 / BdA: SOILS LINE AND DESCRIPTION
- W: EXISTING UNDERGROUND WATER MAIN
- E: EXISTING UNDERGROUND ELECTRIC
- T: EXISTING UNDERGROUND TELEPHONE
- G: EXISTING UNDERGROUND GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING FIRE LINE
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING TREE & SHRUB LINE
- (1): SATELLITE DISH #
- EXISTING ASPHALT PAVING
- SATELLITE DISH
SITE COVERAGE SUMMARY (SATELLITE YARD)
| COVER TYPE | EXISTING (S.F.) |
|---|---|
| GENERATORS | 1,647 |
| CONCRETE WALK/PADS | 3,338 |
| SATELLITE FOUNDATIONS | 1,466 |
| BITUMINOUS PAVING/WALK | 6,738 |
| IMPERVIOUS TOTAL: | 13,189 S.F. |
| NON-COMPACTED CRUSHED STONE | 17,297 |
| GRASS/LAWN | 4,227 |
| NON-IMPERVIOUS TOTAL: | 21,524 S.F. |
| SITE COVERAGE TOTAL: | 34,713 S.F. |
NOTES:
1. EXISTING SATELLITE DISHES NO. 2, 3, AND 5 ARE TO BE REMOVED AS PART OF THE PROPOSED SYSTEMS UPGRADE.
Plan Labels
- FACADE ABOVE FIRST FLOOR
- BRICK PAVERS WALKWAY
- WALL MOUNTED DISH
- EXISTING EGRESS DOOR FROM STAIR 20 DOORSILL 425.94
- CABLE RUN
- EXISTING DISH (1, 2, 3, 4, 5, 6)
- CONCRETE WALK, GENERATOR, CONCRETE, 10' FENCE, GATE
- BITUMINOUS PAVING, STOP SIGN, STOP, HC parking spaces (5, 7, 10, 11, 14)
- N/F QVC NETWORK INC. D.B. 1487 PG. 367 UPI 53-4-164
- IMPERVIOUS AND TOPOGRAPHY FROM SURVEY LINES
- SUPPLEMENTAL FIELD SURVEY PERFORMED 8-8-13
- Scale in Feet: 1" = 20'
Title Block & General Notes
COPYRIGHT [illegible]
UNIFORM PARCEL IDENTIFIER:
NOTE TO USER OF THESE PLANS [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20131960395
EXCAVATIONS, TRENCHING, AND SHORING [illegible]
SEE SHEET ___ FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
PENNSYLVANIA ONE CALL SYSTEM, INC. CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776 POCS SERIAL NUMBER: 20131960395
Professional Engineer Seal: COMMONWEALTH OF PENNSYLVANIA REGISTERED PROFESSIONAL ENGINEER JEREMY D. MAZUR PE-050557-E
Chester Valley Engineers, Inc., Main Office: 83 Chestnut Road, P.O. Box 447, Paoli, PA 19301, (610) 644-4623, (610) 889-3143 Fax, cve@cvalengr.com, http://www.cvalengr.com
PROJECT NO. 18522-2000 | SCALE: 1"=20' | DATE: 07/19/13 | DRAWN BY: RT | CHECKED BY: JM | SHEET 1 OF 2
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Engineering site plan titled "PROPOSED SATELLITE YARD PLAN" (Sheet 2 of 2) showing numbered satellite dishes, generators, concrete walks, crushed stone areas, parking, and a location map.
PROPOSED SATELLITE YARD PLAN
LOCATION MAP
SCALE 1" = 2000'
EXISTING FEATURES LEGEND
- EXISTING 1' CONTOURS
- EXISTING 5' CONTOURS
- EXISTING SPOT ELEVATION
- EXISTING FENCE LINE
- EXISTING EDGE OF PAVING
- EXISTING CURB
- FLOOD PLAIN
- SOILS LINE AND DESCRIPTION
- EXISTING UNDERGROUND WATER MAIN
- EXISTING UNDERGROUND ELECTRIC
- EXISTING UNDERGROUND TELEPHONE
- EXISTING UNDERGROUND GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING FIRE LINE
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING TREE & SHRUB LINE
- SATELLITE DISH #
- EXISTING ASPHALT PAVING
- SATELLITE DISH
SITE COVERAGE SUMMARY (SATELLITE YARD)
| COVER TYPE | EXISTING (S.F.) | PROPOSED (S.F.) |
|---|---|---|
| GENERATORS | 1,547 | 1,547 |
| CONCRETE WALK/PADS | 3,338 | 3,832 |
| SATELLITE FOUNDATIONS | 1,466 | 3,451 |
| BITUMINOUS PAVING/WALK | 6,738 | 435 |
| IMPERVIOUS TOTAL: | 13,189 S.F. | 9,365 S.F. |
| PROPOSED IMPERVIOUS REDUCTION (NET): | -3,824 S.F. | |
| NON-COMPACTED CRUSHED STONE | 17,297 | 23,890 |
| GRASS/LAWN | 4,227 | 1,458 |
| NON-IMPERVIOUS TOTAL: | 21,524 S.F. | 25,348 S.F. |
| PROPOSED NON-IMPERVIOUS INCREASE (NET): | +3,824 S.F. |
Plan Labels
- Dishes 1 and 4: EXISTING SATELLITE DISH, size [illegible]
- Dishes 2, 3 and 5: PROPOSED 7.3m SATELLITE DISH
- Dish 6: EXISTING SATELLITE DISH, size [illegible]
- Dishes 7 to 12: PROPOSED SATELLITE DISH, sizes [illegible]
- EXISTING EGRESS DOOR FROM STAIR 20, DOORSILL 425.94
- N/F QVC NETWORK INC. D.B. 1487 PG. 367 UPI 53-4-164
- Scale in Feet: 1" = 20'
Title Block and Notes
UNIFORM PARCEL IDENTIFIER:
PENNSYLVANIA ACT 187 REQUIREMENTS
PENNSYLVANIA ONE CALL SYSTEM, INC. CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776
Remaining general notes: [illegible]
[Seal] [Signature]
CONDITIONAL USE APPLICATION FOR DOWNLINK SYSTEMS UPGRADE
QVC NETWORK INC.
QVC PROJECT# C13611504003
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc.
PROJECT NO. 18522-2000 | SCALE: 1"=20' | SHEET 2 OF 2
Architectural landscape drawing sheet LA-1.1 showing the Landscape Demolition Plan, Landscape Plan, Plant Schedule, and Shrub Planting Detail for the QVC Downlink Systems Upgrade at Founder's Park.
LANDSCAPE PLAN (LA-1.1)
Landscape Demolition Plan
Scale: 1/8"=1'
- Arborvitae Hedge to be Removed
- Euonymus Hedge to be Removed
- Juniper Mass to be Removed
- Yew Hedge to be Removed
- (2) Oak to be Removed
- Yew Hedge to be Removed
- (3) Maples to be Removed
- (3) Pines to be Removed
- (4) Viburnum to be Removed
Landscape Plan
Scale: 1/8"=1'
- (9) Arborvitae
- (16) Dragon Lady Holly
- (20) Alleghany Viburnum
Plant Schedule
| No. | Botanical Name | Common Name | Size |
|---|---|---|---|
| 16 | Ilex x aquipernyi 'Meschick' | Dragon Lady Holly | 6'-7' Ht. |
| 9 | Thuja x 'Green Giant' | Green Giant Arborvitae | 5'-6' Ht. |
| 20 | Viburnum x rhytidophylloides 'Alleghany' | Alleghany Viburnum | 3'-4' Ht. |
SHRUB PLANTING DETAIL - B&B TREES IN ALL SOIL TYPES
NTS - SECTION (Diagram showing shrub root ball placement, mulch depth, earth saucer, and soil backfill notes [illegible])
Title Block
QVC DOWNLINK SYSTEMS UPGRADE
FOUNDER'S PARK, 1365 Enterprise Drive, West Chester PA 19380
HSA - Heckendorn Shiles Architects, 347 East Conestoga Road, Wayne, Pennsylvania 19087-2547, main office 610-994-3500, website www.hsarch.com
Structural Engineer: PROVIDENCE ENGINEERING, 10 Eisenhower Blvd., Lancaster, PA 17603
MEPFP Engineer: KUPPER ENGINEERING, 101 Jackson Avenue, Glenside, PA 19038
Site/Civil Engineer: CHESTER VALLEY ENGINEERS, 83 Chestnut Road, Paoli, PA 19301
Landscape Architect: SHEARON ENVIRONMENTAL DESIGN, 5160 Militia Hill Road, Plymouth Meeting, PA 19462
Date: 09/03/2013 | Description: PROGRESS PRINT
Project No.: 13-09.0 | Plot Scale: 1'=1' | Sheet Title: LANDSCAPE PLAN | Sheet No.: LA-1.1
