Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
Tuesday, October 16, 2012
7:00 PM
- Call to Order
- Pledge of Allegiance
- Moment of Silence – Supervisor Carmen Battavio
- Ask if anyone is recording the meeting
- Public Comment – Hearing of Residents (Optional)
- Chairman’s Report Recognition of years of service by former Park & Recreation Board members.
- Public Hearings - None
- Police/EMS Report – September 2012 – To Be Handed Out Westtown East Goshen Police Report; Goshen Fire Co.; Malvern Fire Co.; East Goshen Fire Marshal
- Financial Report – Update on 3 rd Quarter Report
- Old Business Continue discussions on 2013 budget; Consider staff motion to rescind recommendation for analysis of police options
- New Business Presentation by Peter R. Johnson & Co. regarding Job Classification and Compensation Study and Analysis; Consider staff recommendation for removal of street trees at 1403 Grand Oak Lane; Consider decreasing the number of members on the CDC; Consider sign request from Pulte HOA
- Any Other Matter
- Approval of Minutes October 9, 2012
- Treasurer’s Report Report – October 11, 2012
- Review Action List List – October 1, 2012
- Correspondence, Reports of Interest Acknowledge Mark Miller’s September 2012 Report; Acknowledge Benson Rohrbeck’s resignation from the Historical Commission effective at end of 2012 term
- Dates of Importance Date Event Time Oct 15, 2012 Commerce Devel Comm 7:00 PM Oct 24, 2012 Police Commission Meeting @ WEGO (New date and time) 4:30 PM Oct 29, 2012 EGT Neighborhood University 6 – 9:30 PM Nov 01, 2012 Park Commission 7:00 PM
F:\Data\Shared Data\Agendas\Board of Supervisors2A62012.doc
| Date | Event | Time |
|---|---|---|
| Nov 01, 2012 | General Election (Board of Supervisors will not meet) |
|
| Nov 07, 2012 | Pension Committee | 1:00 PM |
| Planning Commission | 7:00 PM | |
| Nov 08, 2012 | Historical Commission | 7:00 PM |
| Nov 12, 2012 | Office Closed for Veterans’ Day | |
| Nov 14, 2012 | Conservancy Board | 7:00 PM |
Winter 2013 Newsletter:
Article Submission Date – November 9, 2012
Posted to Website – January 2, 2013
- Public Comment – Hearing of Residents
- Adjournment
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.
F:\Data\Shared Data\Agendas\Board of Supervisors2A62012.doc
2
10 b.
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice 610-692-7171
Fax 610-692-8950
E-mail rsmith@eastgoshen.org
Date: October 11, 2012
To: Board of supervisors
From: Rick Smith
Re: PFM Study
At your meeting on September 4, 2012 the Board approved a motion to recommend that the Police Commission enter into a contract with PFM to prepare a comprehensive analysis of the cost for the various police options. While the Police Commission has not formally acted on the recommendation to date it would seem that the Board should rescind the recommendation as a housekeeping measure.
Motion- I move that the Board rescind its recommendation of September 4 to have PFM prepare an analysis of the costs for the various police options.
F:\Data\Shared Data\Police Dept2 Contract\PFM Study 101112.docx
610-692-7171
www.eastgoshen.org
11 b.
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 10, 2012
To: Board of Supervisors
From: Mark Miller
Re: Removal of Street Trees
William Keltz, 1403 Grand Oak Lane, requested permission to remove three pin oaks that are on his property and in the township right-of-way and which, he feels, represent a potential hazard to his home. We asked Harvey Lerman, ISA Certified Arborist, to look at the trees. His determination was:
- Pin Oak #1 – tree appeared healthy; no maintenance required
- Pin Oak #2 – tree appeared healthy; prune dead wood above Great Oak Lane
- Pin Oak #3 – dead wood & branch dieback evident throughout upper canopy; tree is declining; recommend removal
I recommend pruning Pin Oak #2 and removing Pin Oak #3.
F:\Data\Shared Data\Public Works Dept\Memos to BOS`3 Grand Oak Lane Pin Oaks.doc
[Logo: BARTLETT TREE EXPERTS / SCIENTIFIC TREE CARE SINCE 1907]
1480 Phoenixville Pike, West Chester PA 19380
Tele: (610)594-4740 Fax: (610)594-4743
October 1, 2012
Mr. Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Mr. William Keltz 1403 Grand Oak Lane - Examination of Pin Oaks
Mr. Miller,
The following observations were recorded during my tree examination Saturday, September 15th:
Pin Oak (#1) left/front property - tree appears healthy; no maintenance required
Pin Oak (#2) left/front property - tree appears healthy; prune dead wood above Grand Oak Lane
Pin Oak (#3) left side of driveway - dead wood & branch dieback evident throughout upper canopy; tree is declining; recommend removal
Thank you for the opportunity to examine these trees. Should you have any questions or require additional information, please do not hesitate in contacting my office at 610-594-4740.
Sincerely,
Harvey S. Lerman, ISA Certified Arborist PD-0070, CTSP 737
Arborist/Representative, West Chester PA Office
[Stamp: RECEIVED BY: AUG 20 2012]
1403 Grand Oak Lane
West Chester, PA 19380
August 17, 2012
Township of East Goshen
1580 Paoli Pike
West Chester, Pa 19380
To: Board of Supervisors
Ref: Removal of Pin Oaks
Gentlemen:
A few years ago I requested permission to remove the three pin oaks that are on my property and on the township right-of-way and which belong to the township. Permission was denied. Again, I am requesting permission to remove them as those trees represent a potential hazard to my house.
Yours truly,
William L. Keltz
[Handwritten note:]
MARK
Suggest we
HAVE HARVEY L.
Look AT
Trees
Rick
11 c
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. 2012-64
A RESOLUTION INCREASING THE NUMBER
MEMBERS ON THE COMMUNITY DEVELOPMENT
COMMISSION
WHEREAS, Section 1542 of the Second Class Township Code allows the Board of Supervisors to undertake community development programs; and
WHEREAS, The June 21, 2005 Comprehensive Plan recommends that the Township take steps to “Promote redevelopment in commercial districts that enhances the character of the community”; and
WHEREAS, The October 2010 Final Report of the Township Advisory Group recommends that the Township take steps to “Minimize Commercial Vacancies”; and
WHEREAS, the Board of Supervisors has determined that the best way to accomplish these objectives is to establish a commission pursuant to the provisions of Section 1542 of the Township Code.
WHEREAS, on September 27, 2011 the Board of Supervisors adopted Resolution 2011-64 creating a Community Development Commission, consisting of 5 members, who shall serve at the pleasure of the Board.
WHEREAS, this Commission was tasked with developing and recommending programs to the Board of Supervisors that support the growth and enhancement of existing business and encourage and promote the redevelopment and use of commercial properties in East Goshen Township.
WHEREAS, after interviewing potential candidates the Board of Supervisors has determined that it would be appropriate to increase the number of members on the Commission.
BE IT RESOLVED THAT the Board of Supervisors of the East Goshen Township hereby creates a Community Development Commission, consisting of 9 members, who shall serve at the pleasure of the Board. The Commission shall be tasked with developing and recommending programs to the Board of Supervisors that support the growth and enhancement of existing business and encourage and promote the redevelopment and use of commercial properties in East Goshen Township.
(Signatures on next page)
F:\Data\Shared Data\ABC’S\Board of Supervisors\Resolutions22-64 Community Development Commission.doc
RESOLVED AND ADOPTED, this 3rd day of January, 2012.
ATTEST:
[signature]
Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
[signature]
[signature]
[signature]
[signature]
[signature: Charles W. Proctor III]
F:\Data\Shared Data\ABC'S\Board of Supervisors\Resolutions\2012\2012-64 Community Development Commission.doc
11 d.
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice 610-692-7171
Fax 610-692-8950
E-mail rsmith@eastgoshen.org
Date: October 10, 2012
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Preserve at Applebrook
We are in receipt of a request from the Preserve at Applebrook HOA to install two freestanding signs. (attached)
Sign A is proposed to be located at the right side of the entrance on East Boot Road. The HOA has an easement at the entrance for landscaping and signage. The Zoning Ordinance (Section 240-31C(3)(vv)[19]) permits two off premises signs. In 2006 the Board approved the two signs at the entrance that were installed by Pulte. (See attached)
Sign B is proposed to be located at the entrance of Hibberd and Gristmill. It would have to be located on HOA property. The Zoning Ordinance 240-22Q(6) permits 1 free standing sign (20 sq. ft. max)
There are two issues
Zoning:
The question for the Board is whether or not it wants to allow the HOA to install sign A. The HOA would need to remove one of the existing signs to comply with the Zoning Ordinance.
Sign B would be permitted provided it is located on the HOA property.
Wording:
Mark and I discussed the term “private community” that appears on both signs with the solicitor who opined that the wording is technically correct since the HOA owns the roadway within the Preserve at Applebrook property. However, it does not prohibit anyone from utilizing the road and the police cannot enforce it.
Cc: Jim Dehaven
F:\Data\Shared Data\Property Management\53-4\53-4-89 (Pulte)\HOA\Memo re Signs 101012.docx
Rick Smith
From: jim dehaven <[illegible]>
Sent: Friday, October 05, 2012 11:52 AM
To: Rick Smith
Subject: Entrance Signs at Applebrook Preserve
Rick,
Please see attached photos of two signs we would like to install, with township approval, in our community.
The small sign that reads “Private Community” would be installed at the front entrance on the right hand side (pipeline side) in the landscape bed. SIGN A
The larger sign would be located in the “boulder bed” at the rear of the community at the intersection of Hibbered & Grist Mill. SIGN B
Please let me know if you have any questions. I look forward to hearing from you.
Thanks, - Jim
1
Elevation drawings of two proposed maroon and gold post-mounted community signs (labeled A and B) with dimensions.
Sign A:
- Dimensions: 24 in x 15 in
- Text: PRIVATE COMMUNITY
Sign B:
- Dimensions: 36 in x 24 in
- Text: PRESERVE at APPLEBROOK / PRIVATE COMMUNITY
[Drawing of proposed entry plaque.]
Dimensions: 18" x 18"
Text on plaque:
PRESERVE
AT
APPLEBROOK
3 PROPOSED ENTRY PLAQUE
SCALE: 2"=1'-0"
Construction detail drawing showing a cross-section of a masonry stone veneer pillar and concrete footing with a flush plaque insert.
- MATCH VENEER)
- THIC SLAB,
- S)
- ) SUBMIT SAMPLE)
- RY STONE)
- ) SUBMIT SAMPLE)
- TO
- NG)
- D POST
- RADE
- T CORES
- D BACKFILL
- BGRADE
- NG
- 3" / 1'-6" / 3"
- 6"
- 18" x 18" PLAQUE INSERT FLUSH WITH VENEER
- 3'-0"±
- 3'-0"
13 a.
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
October 9, 2012 – 7:00pm
Draft Minutes
This special workshop meeting was held at Fugett Middle School.
Present: Chairman Senya D. Isayeff, Vice-Chairman Thom Clapper, and Supervisors Carmen Battavio, and Chuck Proctor. Also present were Township Manager Rick Smith and Jon Altshul, CFO.
Call to Order & Pledge of Allegiance
Senya called the meeting to order at 7:00pm and asked Peter Mylonas to lead the Pledge of Allegiance.
Moment of Silence
Carmen called for a moment of silence to honor the troops.
Recording of Meeting
The following individuals indicated they would be recording the meeting:
Gerard Ruffenach, Reservoir Road
Leo Sinclair, Lockwood Lane
Public Comment on Non-Agenda Items
None.
Chairman’s Report
Senya asked Carmen to read a prepared joint statement (attached) of the Westtown Township and East Goshen Township Board of Supervisors regarding the Westtown-East Goshen Regional Police Department (WEGO).
Senya mentioned that last night Westtown Township adopted a motion to ratify the Collective Bargaining Agreement with the Westtown-East Goshen Police Association.
Senya moved to ratify the Police Commission’s vote in favor of entering into the Collective Bargaining Agreement with the Westtown-East Goshen Police Association and authorize the Chairman of the Board of Supervisors of East Goshen Township to execute the Collective Bargaining Agreement with the Westtown-East Goshen Police Association and the Memorandums of Understanding for Officers Cam and Poehner, contingent upon Thornbury Township’s approval of the Police Services Agreement. He further moved to ratify the Police Commission’s vote in favor of entering into the Police Services Agreement with Thornbury, contingent upon Thornbury Township’s approval of the same. Chuck Proctor seconded the motion.
10/10/2012 October 9, 2012 BOS Minutes Page 1 of 2
Public Comments on Chairman’s Report
Dr. Howard Jones, Kennett Way, asked if the agreement with Thornbury is open ended or on a time limit. Senya commented that Thornbury will meet tomorrow, Wednesday, October 10, 2012 at 8:00 am.
Anthony Ruggieri, President, WEGO Police Association, stated that he is happy to be here until 2018 to serve the residents. He thanked the many residents who supported the police. It is encouraging to know that what they do every day is appreciated by the residents. He listed some of the things that make a valuable officer. He urged everyone to support this agreement and promised that the officers will be there 24/7.
Gerard Ruffenach, Reservoir Road, stated that he wants the agreement to be reconsidered. We don’t have the details of the pension and health care plans. He accused the police of abusing the plan in the past.
Les Neri, President Pennsylvania Fraternal Order of Police, stated that he has been to many parts of Pennsylvania for this type of negotiation. He feels the agreement meets everyone’s needs. He sees it as a move forward to continue one of the best regionals in Pennsylvania.
There being no further comments, Senya asked for a vote on the motion. The motion passed unanimously.
Minutes
The Chairman noted that the minutes of the October 2, 2012 meeting were approved.
Workshops
Senya announced that the workshops scheduled for the 2nd and 4th Tuesday of the month will be suspended.
Adjournment
There being no further business, Chuck moved to adjourn the meeting and Senya seconded the motion. The meeting was adjourned at 7:20pm.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
10/10/2012 October 9, 2012 BOS Minutes Page 2 of 2
15 a.
EAST GOSHEN TOWNSHIP
ACTION LIST
New additions are in bold
| 16-Oct-12 | ||
|---|---|---|
| # | Item | Date |
| PCZ 12-01 | Comp Plan | 16-Oct-12 |
| ADM 11-13 | Quarterly Report Municipal Authority Projects | 16-Oct-12 |
| FIN 11-05 | Quarterly Financial Reports | 16-Oct-12 |
| DPW 08-02 | Quarterly Report on I&I | 16-Oct-12 |
| ADM 09-04 | Quarterly Review of Right to Know Requests | 16-Oct-12 |
| DPW 07-02 | Hershey's Mill Dam | 13-Nov-12 |
| ADM 10-22 | TAG Action List | 13-Nov-12 |
| ADM 12-4 | Light Fixtures ay Municipal Complex | 13-Nov-12 |
Action List 101612.xlsx 1
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Comp Plan | No: | PCZ 12-1 |
|---|---|---|---|
| List Date: | 2/7/2011 | Completed Date: | |
| Description: | Update Com Plan | ||
| Date | Action |
|---|---|
| 2/7/2012 | Consider applying for Vission Partnership Grant. At 2/7 meeting BoS requested Staff develop RFP for Consultant |
| 3/20/2012 | Working on RFP |
| 4/17/2012 | Working on RFP |
| 5/15/2012 | RFP Isssued |
| 6/19/2012 | Contracted with Brandywine Conservancy on 6/5 |
| 7/17/2012 | Working on grant application which is due 8/15/12 |
| 8/21/2012 | VP Grant Application submitted 8/15/12 |
| 10/16/2012 | CCPC recommended grant for approval |
[Seal: CHESTER COUNTY PENNSYLVANIA] [Seal: CHESTER - WILLIAM PENN PROPRIATOR AND GOVENOR]
THE COUNTY OF CHESTER
|
COMMISSIONERS Ronald T. Bailey, AICP |
PLANNING COMMISSION |
|---|
[Stamp: RECEIVED BY: SEP 28 2012]
September 26, 2012
Mark Gordon
Zoning Officer
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Dear Mr. Gordon:
On behalf of the Chester County Planning Commission, I am pleased to inform you that your Vision Partnership Program grant application for the East Goshen Township Comprehensive Plan update in the amount of $28,050.00 has been recommended for funding.
As a next step, a grant contract will be drafted, detailing the full conditions of the grant award. We will be in contact with you and your consultant shortly in regard to the grant contract and the scope of work which will become a part of the contract.
Once finalized, the contract will be sent to you and your consultant for signatures. Upon its signature by the Chester County Commissioners, work on the project may commence. Please be aware that any work completed prior to a fully executed contract will not be eligible for funding under this grant award.
We look forward to working with you on this important planning project and appreciate your support of Landscapes2. If you have any questions, please feel free to contact Carol Stauffer at 610-344-6285 or cstauffer@chesco.org.
Sincerely,
[signature]
Ronald T. Bailey, AICP
Executive Director
RTB/CJS/kp
cc: Senya Isayeff, Chairman, Board of Supervisors
John Theilacker, AICP, Brandywine Conservancy
E-mail: ccplanning@chesco.org • www.landscapes2.org • Website: www.chesco.org/planning
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Municipal Authority Projects | No: | ADM 11-13 |
|---|---|---|---|
| List Date: | 2/17/2011 | Completed Date: | |
| Description: | Identify Municipal Authority projects, develop schedule and determine funding mechanism. | ||
| Date | Action |
|---|---|
| 4/5/2011 | Memo attached |
| 4/5/2011 | Update costs and check with DVRFA |
| 5/24/2011 | Report attached |
| 6/28/2011 | Lockwood - Currently meeting with property owners about easements, HMPS & Reserve Ps- Act 537 approval received 6/6/11. Marydell PS - Comments received from agencies. Public Notice in the Local on 6/25/11. Reservoir Rd PS - No Action. We are proceeding on the assumption that Sewer Capital Reserve Fund monies will be used to fund the expenses until a borrowing. |
| 7/26/2011 | See Attached Report |
| 10/18/2011 | Lockwood - E&S Plans submitted to PADEP, Pennoni is working on closure plan for STP. One half of the ROWs have been obtained. MaryDell - Act 537 Revision submitted to PADEP RSCSTP - Project Completed |
| 1/17/2012 | RCSTP - Completed, Audit filed with State. Lockwood - We have all permits. Going out for Bid in January. Marydell - We have Act 537 Plan Approval Reserve PS and HMPS - Currently reviewing pipe layout |
| 4/17/2011 | RCSTP - Completed Lockwood - Construction to starte in April. Marydell, Reserve PS and HMPS - In final design |
| 7/17/2012 | RCSTP - Completed Lockwood - pipework completed, working on plant.. Marydell, Reserve PS and HMPS - In final design see attached |
| 11/16/2012 | See attached |
EGMA 1200
[Logo: Pennoni]
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Daniel Barbato, P.E.
Authority Engineer
DATE: October 4, 2012
SUBJECT: Engineer’s Report
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- We will continue to assist with operations support and plant troubleshooting, and review operator reports as we receive them.
LCSTP Elimination
- No further activity. The project has been completed, and our understanding is that final payment was made.
Hershey’s Mill PS Diversion and Reserve PS Elimination
- DEP issued the GP-5 “General Permit for Utility Line Stream Crossing” for the Hershey Mill PS Diversion on August 31, 2012.
- DEP has reviewed the GP-5 “General Permit for Utility Line Stream Crossing” permit applications for the Reserve PS Diversion and has verbally informed us that the permit is application is acceptable subject to a bog turtle screening by the Army Corps of Engineers (ACOE). We submitted a bog turtle screening request to the ACOE on October 3, 2012. They informed us they will attempt to provide a bog turtle habitat determination within 30 days. If there is no habitat, then DEP can issue the GP-5 permit. If there is habitat, we will have to coordinate impact mitigation strategies with Fish and Wildlife Service.
- The Chester County Conservation District (CCCD) issued Erosion and Sediment Pollution Control Plan adequacy letters for the Hershey Mill PS and Reserve PS projects on September 4 and September 11 respectively.
- We revised the four (4) sanitary sewer easement legal descriptions and exhibits for the diversion projects – one (1) for the Hershey’s Mill PS and three (3) for the Reserve PS –
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-10-04.docx
EGMA 1200
to include construction limits. The revised documents were forwarded to the Township and Authority Solicitor.
- We expect to submit the Reserve Closure Plan and Hershey Mill PS Water Quality Management Permit Amendment to DEP by October 9, 2012.
- We also prepared draft bidding documents for each project. The projects will be bid separately, so separate bidding documents have been prepared. The Hershey Mill PS bidding documents and bid plans will be forwarded to the Township for review by the end of October. The Reserve PS bidding document and bid plans will be forwarded to the Township for review following once the bog turtle impacts are resolved.
Marydell PS Elimination
- DEP has verbally informed us that the Pump Station Closure Plan has been approved and that a formal approval letter should be issued by October 5, 2012.
- We prepared an easement legal description and exhibit for the shopping center. Once the easement is obtained, all third party approvals and permits will be in place, and the project can be put out to bid.
- We are finalizing the bidding document and bid plans. We anticipate forwarding the documents to the Township by October 15 for review, with the intent of having the documents completed and ready for the Authority to provide direction to advertise at their November 12 meeting.
Hershey’s Mill Muffin Monster
- DEP issued an approval letter for the Muffin Monster installation on September 11, 2012. No other third-party approvals are required for this project.
- We have obtained a formal price quotation from the Muffin Monster supplier, which we have forwarded to the Township for approval. The quotation includes materials and start-up. Construction will be performed by Public Works.
Semi-Annual Sewer System (formerly “CO&A”) Status Report
- We analyzed portable and permanent meter data from January-August 2012 and met with Mr. Smith and Mr. Miller to discuss our findings and recommendations for I/I investigations and future metering. We prepared the semi-annual sewer system status report and submitted it to the Township. This is the first internal-only report since the semi-annual CO&A submissions to DEP are no longer required.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-10-04.docx
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Quarterly 2011 Financial Reports | No: | FIN 10-05 |
|---|---|---|---|
| List Date: | 2/16/2010 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| 4/19/2010 | Provide Q1 Reports. Done |
| 7/27/2010 | Provide Q2 Reports. Budget Savings: 2008 Budget vs. 2010 Budget Provide list of Variances and Impact Items ($2500 threshold) Disbursements by Fund State Fund chargebacks detailed DPW breakouts for full costing Snow, Roads, Sewer, Parks Overtime Report |
| 10/26/2010 | Provide Q3 Reports. |
| 1/25/2011 | Pending review by Finance Group |
| 4/26/2011 | Pending review by Finance Group |
| 5/3/2011 | March report in packet. Quarterly report will be expanded to include April and distributed for the Financial Planning Session on 5/26. |
| 7/26/2011 | See your Financial Binder sent out 7/22/2011 |
| 10/25/2011 | See your Financial Binder sent out 10/21/11 |
| 3/6/2012 | See report |
| 4/17/2012 | See report |
| 7/17/2012 | See report |
| 10/16/2012 | See report |
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Quarterly Report on I & I | No: | DPW 08-02 |
|---|---|---|---|
| List Date: | 12/9/2008 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| 1/12/2010 | Distribute Quarterly Report. Done |
| 4/20/2010 | Distribute Quarterly Report. Done |
| 5/4/2010 | Rick to provide memo on expenses. Will become part of regular report. Done |
| 7/13/2010 | Distribute Quarterly Report. Done |
| 10/12/2010 | Distribute Quarterly Report. |
| 10/26/2010 | MG: Mark Miller to provide Qtr. update |
| 1/25/2011 | Distribute Quarter Report |
| 4/26/2011 | Report attached |
| 7/26/2011 | Report attached |
| 10/18/2011 | Report attached |
| 1/10/2012 | Report attached |
| 4/17/2012 | Report attached |
| 7/17/2012 | Mark has televised 8,000 feet in the Ridley Creek System and repaired 4 leaks. Made multiple lateral repairs in both systems, repaired a broken lateral in Ashbridge (10-12,000 GPD) and continued monitoring with portable flow meters. |
| 11/16/2012 | Please see report from Pennoni |
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Quarterly Review of Right to Know Requests | No: | ADM 09-04 |
|---|---|---|---|
| List Date: | 2/10/2009 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| 4/6/2010 | Distribute copies of report. Report to be modified to include time to complete request and date of pick-up Done |
| 7/13/2010 | Distribute copies of report. Done |
| 10/5/2010 | Distribute copies of report. Done |
| 1/3/2011 | Distribute copies of report. Done |
| 4/5/2011 | Report attached Done |
| 7/12/2011 | Report attached Done |
| 10/11/2011 | Report attached Done |
| 1/10/2012 | Wiil be distributed at meeting |
| 4/17/2012 | Wiil be issued for the 5/1 meeting |
| 5/1/2012 | Report issued Done |
| 7/17/2012 | Report attached |
| 10/16/2012 | Report attached |
Memo
To: Board of Supervisors
From: Nancy Scheiderman
Re: Request for Information
Date: September 2012
July August September 2012
17 requests for information were received. The information requested breaks down as follows:
Permits – 9
Environmental Issues – 1
Property Documents, Building Plans – 4
Ethics Forms – 1
Contracts (for online legal research providers) – 1
All EGT Property Owners Names, Addresses, and PropertyAssessments – 1
F:\Data\Shared Data\Admin Dept\RFI\2012\Q Report July August September 2012.doc
610-692-7171
www.eastgoshen.org
16 a.
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 5, 2012
To: Board of Supervisors
From: Mark Miller
Re: Sept. Monthly Report 2012
During the Month of September we completed the removal of ten trees along Wyllpen Drive; to reduce cost we rented a 75 foot bucket truck and took the trees down in house. The Public Works Department cleared the sewer right-of-ways by removing heavy brush and downed trees from Wilson Drive to Westtown Way. All manholes were marked.
We began training on the new GPS unit; once the training is completed we will begin gathering data.
We re-built a half dozen inlets in Supplee Valley and flushed several storm sewer lines.
On September 18th we had a storm blow in; causing several trees to come down and creating a traffic nightmare due to the power outage throughout the Township.
Road repairs were performed in Indian Hills; we milled out asphalt that fractured and started to breakup. The final paving at the Ridley Creek Plant was completed.
We are currently installing and replacing inlets and storm drains on Margo lane; in preparation for the road paving that is scheduled for the end of the month.
F:\Data\Shared Data\Public Works Dept\Memos to BOS\Memo to BOS for September Monthly Report 2012 .docx
Photograph showing tree removal work on Wyllpen Drive using a truck-mounted crane (Elliott L60) with a worker in the tree canopy and crew members on the ground.
Handwritten note: Tree removal on Wyllpen Dr.
[Handwritten on sticky note: Wyllpen Tree's]
[Photograph of large cut tree trunks loaded and secured with tie-down straps on a flatbed trailer.]
Photograph of cut tree trunks loaded onto a red truck bed, showing internal decay and hollow sections inside the wood.
Handwritten note: Tree's from Wyllpen Showing condition
Photograph of East Goshen Township Public Works crew, red dump trucks, and a CAT excavator performing storm pipe trenching and installation along Margo Lane.
Handwritten note: Pipe work Margo Ln.
Photograph of a Caterpillar (CAT) mini-excavator, trench compactor, crew members, and red dump trucks lined up along a residential street during roadside pipe trenching work.
Photograph of an operator in a CAT 302.5C mini-excavator using a boom-mounted compactor attachment to compact a roadside trench.
Handwritten note: Mini Excavator compacting the trench.
[Handwritten: 16 b]
Rick Smith
From: bensonrohrbeck@verizon.net
Sent: Sunday, October 07, 2012 5:06 AM
To: rsmith@eastgoshen.org
Subject: Historical Commission Member
Hello Rick:
I have decided to end my service on the Historical Commission at the end of my 2012 term. This is due to age (I'll be 80 in February) and related health problems. I will, as I'm able, to volunteer at the Blacksmith Shop.
Is there any action I should take to make this official?
Benson Rohrbeck
1