Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
VACANCY BOARD
TUESDAY, February 8, 2011
6:45 PM

  1. Consider Interview for Vacant Auditor Position
  2. Consider Appointment for Vacant Auditor Position
  3. Public Comment
  4. Adjournment

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
TUESDAY, February 8, 2011
7:00 PM

  1. Call to Order
  2. Pledge of Allegiance
  3. Moment of Silence – Supervisor Carmen Battavio
  4. Ask if Anyone is Recording the Meeting
  5. Public Comment – Hearing of Residents (Optional)
  6. Chairman's Report The Board met in Executive Session Feb. 1, 2011 on a Pending Legal Matter
  7. Public Hearings - None
  8. Police Chief's Report - None
  9. Old Business Rental Equipment With Operators Group 5 Re-Bid
  10. New Business Discussion of TAG report with P & R Board; Consider Board's position on the Del Vacchio Special Exception approval for the property at 922 N. Chester Rd.; Consider RFP for a cell tower in the Township park; Consider attendance at Chester County Spring 2011 Convention on March 10, 2011; Consider purchase of new conference room chairs

F:\Data\Shared Data\Agendas\Board of Supervisors\2011\2082011.doc

  1. Consider proposed Multi-Use Building and Parking Ordinance Amendment
  2. Any Other Matter
  3. Approval of Minutes February 1, 2011
  4. Treasurer's Report Report – February 3, 2010
  5. Review Action List
  6. Correspondence, Reports of Interest Acknowledge letter from Mr. William Cass regarding the Del Vacchio Application for a Special Exception for the property at 922 N. Chester Rd.; Acknowledge receipt of the Philadelphia International Airport Capacity Enhancement Program Record of Decision
  7. Meetings & Dates of Importance February 8, 2011 Board of Supervisors 7:00 pm February 9, 2011 Conservancy Board 7:00 pm February 10, 2011 Historical Commission 7:00 pm February 10, 2011 Zoning Hearing Board Del Vacchio Holdings 7:30 pm February 14, 2011 Municipal Authority 7:00 pm February 15, 2011 Board of Supervisors Meeting Canceled February 21, 2011 President's Day – Office Closed February 22, 2011 Board of Supervisors 7:00 pm February 28, 2011 Deer Committee 7:00 pm March 1, 2011 Board of Supervisors 7:00 pm March 2, 2011 Planning Commission 7:00 pm March 3, 2011 Park & Recreation Board 7:00 pm March 7, 2011 Municipal Authority 7:00 pm
  8. Public Comment – Hearing of Residents
  9. Adjournment

F:\Data\Shared Data\Agendas\Board of Supervisors\2011\2082011.doc

The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.

REMINDER – Newsletter Article Submission Due Date:

Article Due Date Delivery Date
February 9, 2011 April 1, 2011

F:\Data\Shared Data\Agendas\Board of Supervisors\2011\2082011.doc

610-692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

January 28, 2011

To: Board of Supervisors
From: Mark Miller
Re: Rental Equipment With Operators Group 5 Re-Bid

We solicited bids for Rental Equipment With Operators, 12 bid packets were sent out and we received 6 bid packets. Bids were opened January 28, 2011 at 10:00 in the main Board Room.

The bids were as follows:

Reid Paving Contractors, Inc.Total Bid$66,600.00
Dan Malloy Paving Inc.Total Bid$68,400.00
P.J. Reilly Contracting Co. Inc.Total Bid$71,280.00
Warihay Enterprises, Inc.Total Bid$78,000.00
S.A. Macanga, Inc.Total Bid$85,200.00
Charlestown Paving CompanyTotal Bid$95,220.00

References were called and all of them were very positive, they said that Reid Paving does an excellent job and makes sure the customer is pleased with the finished product.
We would suggest that Reid Paving Contractors, Inc. from 1850 Swamp Pike, Gilbertsville, PA in the amount of $66,600.00 be awarded the bid for Rental Equipment With Operators Group 5.

F:\Data\Shared Data\Public Works Dept\Bids\Group Bid I-V\2011\2011\Group 5 Re-Bid Award Letter to BOS January 28.doc

Group 5 Rental Equipment With Operators

Contractor Description EST HRS. Hrly. Rate Total Total Price
Reid Paving Inc.
1850 Swamp Pike
Gilberstvill PA 19525
Paver 8' to16' with Screedman 120 $200.00 $24,000.00 $66,600.00 Reid
Vib. Roller 10 to 14 Ton 120 $110.00 $13,200.00
Vib Roller 5 to 8 Ton 120 $100.00 $12,000.00
Tri Axle Dump Truck 120 $75.00 $9,000.00
Laborers 120 $70.00 $8,400.00
Dan Malloy Paving
1060 Boot Road
Downingtown, PA 19335
Paver 8' to 16' with Screedman 120 $210.00 $25,200.00 $68,400.00 Malloy
Vib. Roller 10 to 14 Ton 120 $105.00 $12,600.00
Vib. Roller 5 to 8 Ton 120 $100.00 $12,000.00
Tri Axle Dump Truck 120 $75.00 $9,000.00
Laborers 120 $80.00 $9,600.00
P.J. Reilly Co. Inc.
223 Fellowship Road
P.O. Box 620
Eagle, PA 19480
Paver 8' to 16' with Screedman 120 $217.00 $26,040.00 $71,280.00 Reilly
Vib. Roller 10 to 14 Ton 120 $120.00 $14,400.00
Vib. Roller 5 to 8 Ton 120 $115.00 $13,800.00
Tri Axle Dump Truck 120 $80.00 $9,600.00
Laborers 120 $62.00 $7,440.00
Warihay Enterprises, Inc.
580 N. Colebrook Road
Manheim, PA 17545
Paver 8' to 16' with Screedman 120 $285.00 $34,200.00 $78,000.00 Warihay
Vib. Roller 10 to 14 Ton 120 $150.00 $18,000.00
Vib. Roller 5 to 8 Ton 120 $85.00 $10,200.00
Tri Axle Dump Truck 120 $70.00 $8,400.00
Laborers 120 $60.00 $7,200.00
S.A. Macanga
919 Camaro Run
West Chester, PA 19380
Paver 8' to 16' with Screedman 120 $295.00 $35,400.00 $85,200.00 Macanga
Vib. Roller 10 to 14 Ton 120 $125.00 $15,000.00
Vib. Roller 5 to 8 Ton 120 $125.00 $15,000.00
Tri Axle Dump Truck 120 $92.00 $11,040.00
Laborers 120 $73.00 $8,760.00
Contractor Description EST HRS. Hrly. Rate Total Total Price
Charlestown Paving
P.O. Box 434
Devault, PA 19432
Paver 8' to 16' with Screedman 120 $410.00 $49,200.00 $95,220.00 Charlestown
Vib. Roller 10 to 14 Ton 120 $102.00 $12,240.00
Vib. Roller 5 to 8 Ton 120 $108.00 $12,960.00
Tri Axle Dump Truck 120 $105.00 $12,600.00
Laborers 120 $68.50 $8,220.00

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Park & Recreation

The Park & Recreation department and programs are vital assets for the East Goshen community. With a comprehensive recreation program along with the active and passive East Goshen Parks, residents and friends of the East Goshen Township can enjoy outdoor, athletic, and fitness programs. These programs are what make East Goshen Township one of the premier communities of Chester County. However, with increasing economic pressures on municipalities, it is important to review and monitor the areas covered by the auspices of Park & Recreation to ensure the programs are being executed and the maintenance is being performed cost effectively as well as achieving maximum revenue potential.

To that end, the TAG reviewed three main areas under the heading of Park & Recreation. First, we examined the basic infrastructure of the park and open spaces. Could there be a modification of services that could garner savings for the Township? Next, we investigated the various programs and events associated with Park & Recreation. In particular, we evaluated program cost effectiveness. It was not only important to the TAG that programs cover their direct costs, but could also cover overhead and other indirect allocations. Finally, the TAG explored opportunities to generate new or increase existing program revenue. Programs and Events should be able to charge fees commensurate with the services that they provide. The TAG review and recommendations below strive to provide a fiscal balance while maintaining the quality of life within East Goshen Township.

Summary of Recommendations*

  • Self-Sustaining Park & Recreation Programs (104)
  • Institute Park and Recreation Sponsorship Program (88)
  • Formalize and Expand Relationship with the YMCA (90)
  • Create a Concession Stand at the East Goshen Township (Active) Park (52)
  • Increase Fees for Ball Fields (48)
  • Enable Online Registration and Payment for Park & Recreation Programs
  • Leverage Social Networking Tools to Increase Park & Recreation Program Participation
  • Expand Park & Recreation Program Partnerships

*Please note that the recommendations are hyperlinked; hover over the recommendation and press Ctrl+Click to follow the link

76

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Self-Sustaining Park & Recreation Programs (104)

Summary / Short Description:

The East Goshen Township Park and Recreation Programs should be self-funding / self-sustaining.

Background / Context / Rationale:

East Goshen’s parks are a centerpiece of the township and must be protected at all costs. However, since many residents do not directly benefit from the Park and Recreation services provided by the township, these programs should be self-funding / self-sustaining.

Currently, various Park and Recreation programs (clinics, classes, trips), etc. appear to be covering their expenses and/or making a minimal profit. However, when the salary and benefits of the Director of Recreation are allocated to each of the programs, the net loss for the Park and Recreation programs has exceeded $50,000 to $75,000 per year for the last 5 years. This does not account for the fees associated with maintaining the park as those fees will be incurred (in general) in order to maintain the park regardless of whether or not these programs exist.

Specific Recommendations and Considerations:

The programs that benefit a subset of township residents should be (at worst) cost neutral.
The Township (through the Park and Recreation Director) should develop a methodology to measure and monitor the true cost of these programs.
Some alternatives to be explored include (these are not mutually exclusive):

  • Increase the fees of the programs that are running at a loss AND/OR rationalize certain programs entirely
  • Obtain program sponsorship from local businesses to offset overhead expenses
  • Transition the Park and Recreation Director role to part time; marry it with a complimentary role (i.e. sponsorship development, concession stand management, etc.) to maintain current headcount

If the Park and Recreation programs cannot be made self-sustaining within a reasonable amount of time (12 to 18 months), including the cost of the Park and Recreation Director, the TAG believes more extreme measures should be explored including:

  • Transition the Park and Recreation Director role to part time
  • Eliminate the Park and Recreation Director role by either: Leveraging the Park and Recreation Board and volunteer staff to manage the Park and Recreation programs*; Transitioning to a privatized model that leverages the resources of the West Chester YMCA

*This may require reconstructing 1) the way in which the Park and Recreation Board operates and 2) the composition of the Board

77

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Ease of Implementation (i.e. effort): Medium to High – Depends on the chosen alternative

Costs: Low

Benefits: Medium to High – Depends on the chosen alternative but it could be as much as $50,000 to $75,000 annually

Probability of Capturing Benefits: TBD

Benefits:

  • Cost neutral Park and Recreation Program

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: Depends on the chosen alternative but it could be as much as $50,000 to $75,000 annually

Costs:

  • Not applicable

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Institute Park and Recreation Sponsorship Program (88)
  • Formalize and Expand Relationship with the YMCA (90)
  • Create a Concession Stand at the East Goshen Township (Active) Park (52)
  • Increase Fees for Ball Fields (48)

78

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Institute Park and Recreation Sponsorship Program (88)

Summary / Short Description:

Establish a formal sponsorship program for all Park and Recreation events and a targeted campaign to obtain sponsors.

Background / Context / Rationale:

In 2009, as a result of the slowing economy and poor sponsorship, the July 4th fireworks show was canceled. In 2010, the fireworks show was reinstated but the date was moved up and it was only made possible through a last minute contribution of $10,000 by Applebrook.

Currently, sponsors are obtained in an ad-hoc manner for each Park and Recreation event (i.e. Easter Egg Hunt, Pumpkin Festival, etc.). Frank Vattilano, Director of Recreation, is solely responsible for obtaining sponsors. However, sponsor candidates are typically contacted via mail and the response isn't overwhelming. Rather than seeking sponsors for each event individually, the township should seek to establish a formal program with varying levels of sponsorship that runs throughout the entire year. Sponsors would be prominently displayed at each township event and in the quarterly newsletter

West Goshen’s Park and Recreation Board and the Friends of West Goshen Parks (a non-profit group) have combined efforts to develop a sponsorship program for their Summer Concert Series. In 2010, the sponsors were as follows:
Platinum level sponsors:

  • Faulkner Auto of West Chester
  • Park Valley Associates
  • TD Bank

Gold level sponsor:

  • Fulton Bank

Silver level sponsor:

  • First National Bank of Chester County
  • Krapf's Coaches
  • West Goshen Automotive and Fleet Services

In return for their contributions, the sponsors are prominently displayed at each of the concerts and on the township’s website

Specific Recommendations and Considerations:

  • Develop a formal tiered sponsorship program (i.e. Gold, Silver, Bronze) that runs for the entire year
  • Display and recognize sponsors at each township event and consider displaying sponsor materials at other venues (baseball fields, pavilion, etc.)
  • Display sponsors in the quarterly newsletter
  • Display sponsors on the township website
  • Develop a door-to-door marketing campaign to obtain sponsorship

79

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Ease of Implementation (i.e. effort): Medium

Costs: Low

Benefits: Medium

Probability of Capturing Benefits: High

Benefits:

  • Assume total 2010 sponsorship contributions = $25,000
  • Assume a 50% to 100% increase in sponsorship contributions annually

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: $12,500 to $25,000 annually

Costs:

  • Incremental effort to develop sponsorship program and obtain sponsors to be consumed by township resources
  • Incremental effort to display sponsors at township events, in the newsletter and on the website to be consumed by township resources

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Formalize and Expand Relationship with the YMCA (90)
  • Self-Sustaining Park & Recreation Programs (104)

80

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Formalize and Expand Relationship with the YMCA (90)

Summary / Short Description:

East Goshen’s parks are a centerpiece of the township and must be protected at all costs. However, since many residents do not directly benefit from the Park and Recreation services provided by the township, these programs should be self-funding / self-sustaining. In addition to rationalizing the breadth of Park and Recreation services provided by the township and increasing the level of sponsorship, the township should seek to formalize their relationship the West Chester YMCA. A more robust relationship with the YMCA could result in significant revenue increases for the township and increased utilization of the township’s natural resources.

Background / Context / Rationale:

Currently, various Park and Recreation programs (clinics, classes, trips), etc. appear to be covering their expenses and/or making a minimal profit. However, when the salary and benefits of the Director of Recreation are allocated to each of the programs, the net loss for the Park and Recreation programs has exceeded $50,000 to $75,000 per year for the last 5 years. This does not account for the fees associated with maintaining the park as those fees will be incurred (in general) in order to maintain the park regardless of whether or not these programs exist.

The West Chester YMCA is thriving. They have reached record membership levels and have provided highly valued services to many of East Goshen's residents. However, in meeting with the YMCA executive team, the TAG learned the West Chester YMCA has met its capacity in a variety of ways. As an example, due to the physical constraints of their property, they are unable to expand their summer camp program which provides a fun and safe environment for children throughout the summer months. In addition, many of the YMCA’s sports programs leverage elementary school fields throughout the area. Unfortunately, the fees for these fields are increasing every year and many of them pale in comparison to the fields that are available in East Goshen Park. It appears that the YMCA would be willing to pay a premium if they were able to further leverage the township’s ball fields.

The West Chester YMCA desperately wants to expand their relationship with East Goshen but they are hesitant to approach the Board of Supervisors without being asked. They are huge contributor to the local community and they could bring so much more if they were provided with the means to do. Moreover, the YMCA’s vision – “To be a catalyst for improving the quality of life in our community” – is well aligned with the township’s vision – “Endeavor to be one of the premier communities in Chester County by continually improving the quality of life while at the same time, managing growth and development in a manner consistent with the protection of our environment and preservation of our natural and historic resources”. To that end, the TAG believes that the township can make far better use of their natural resources by creating a partnership with the YMCA.

81

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Specific Recommendations and Considerations:

  • Request a detailed proposal from the YMCA that illustrates how they would leverage East Goshen Park to expand their summer camp program
  • Request a detailed proposal from the YMCA that illustrates how they would leverage East Goshen Park to increase their usage of the ball fields
  • Develop a long-term strategy to partially or fully privatize and significantly expand upon the Park and Recreation programs, services and events

Ease of Implementation (i.e. effort): Medium

Costs: Low

Benefits: High

Probability of Capturing Benefits: High

Benefits:

  • Assume the annual net loss for the Park and Recreation Program is eliminated = $50,000 to $75,000 (very conservative)
  • Improved and expanded Park and Recreation programs and services

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: $50,000 to $75,000 annually

Costs:

  • Not applicable

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Self-Sustaining Park & Recreation Programs (104)
  • Institute Park and Recreation Sponsorship Program (88)
  • Increase Fees for Ball Fields (48)

82

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Create a Concession Stand at the East Goshen Township (Active) Park (52)

Summary / Short Description:

Create a concession stand at the East Goshen Township (Active) Park.
Estimated recurring annual impact: $5,000/yr*

* Based on estimated profit for five years less initial costs and averaged over five years

Background / Context / Rationale:

During April – October (7 months) the baseball, football, and soccer fields in the East Goshen Park are highly utilized. Currently, there are no concession stands at the active park. East Goshen Township could construct and staff a concession stand during the active times.

The concession stand that is in operation at the Westtown ball fields is being run by Kelly Sports and grosses approximately $50,000 per year.

Specific Recommendations and Considerations:

  • Assuming that the concession stand could make a $250 profit per week, the net revenue to the Township could be $7,000 per year. These figures are estimates and could vary.; In addition to the one time building and outfitting costs, there would be ongoing costs for supplies, utilities, and staff wages.; The Concession Stand could be staffed by college students.; A volunteer model (staffed by team parents, etc.) could be utilized but would most likely minimize revenue (e.g., if volunteers don’t show/leave early there is less revenue).
  • Alternate business models could be explored, such as licensing the concession stand to a vendor for an annual fee or foregoing the fixed structuring and entering into a licensing or revenue sharing model with mobile food/vending truck.

Ease of Implementation (i.e. effort): High

Costs: High

Benefits: Medium

Probability of Capturing Benefits: High

Benefits:

  • Increased revenue to the Township

83

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

  • Improved facilities at the Ball Fields

Total Estimated One Time Benefits: Not applicable

Total Estimated Recurring Benefits:

Profit per week$250
Weeks Concession stand would be open28
Estimated Annual Benefit$7,000

Costs:

  • One time concession stand construction $10,000

Total Estimated One Time Costs: $10,000 (based on Internet search of cost of concession buildings, plus estimate to outfit, run utilities, etc.)
Total Estimated Recurring Costs: Based estimate projections, concession stand would need to maintain a $250/wk profit. There are number of sites on the Internet that provide food concession stand business models. This profit target is a reasonable estimate.

Related Recommendations:

  • Self-Sustaining Park & Recreation Programs (104)

84

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Increase Fees for Ball Fields (48)

Summary / Short Description:

Increase the revenue from Park Fees from $12,000 per year to $24,000 per year over three years.

Background / Context / Rationale:

Currently, leagues, organizations, and teams can rent the baseball, football and soccer fields in the Active East Goshen Township Park. The current fee for a session is $15. There are three sessions per day (morning, afternoon, and evening). These fees can be increased to $30/session over a three year period.

Specific Recommendations and Considerations:

Over the next three years, the ball field rental fee should be increased $5.00 per session. This will double the park fee from $15/session to $30/session over three years. The revenue from park fees will increase from $12,000/year to $24,000/year. Since the ball fields are used by specific resident groups within the Township, this passes along the cost to maintain the fields to those who benefit directly. As part of the implementation of this recommendation, the complete three year fee structure increase should be communicated to the current teams and leagues that use the fields. By phasing in the fee increases over time, teams and leagues can adjust their fees, revenue, and expenses accordingly. There is a risk that by increasing the fees a team/league may decide to not use the East Goshen Township fields. However, based on the volume of athletic activity in the area and with a shortage of quality fields, identifying a replacement organization should not be a problem.

Ease of Implementation (i.e. effort): Low

Costs: Low

Benefits: Low

Probability of Capturing Benefits: High

Benefits:

  • Increase revenue for park fees from $12,000 per year to $24,000 per year.

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits:
Year 1: $4,000 increase over FY10 Budget
Year 2: $8,000 increase over FY10 Budget

85

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Year 3 thru n: $12,000 increase over FY10 Budget

Costs:

  • Not applicable

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Formalize and Expand Relationship with the YMCA (90)
  • Self-Sustaining Park & Recreation Programs (104)

86

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Enable Online Registration and Payment for Park & Recreation Programs

Summary / Short Description:

By accepting payment for Park & Recreation programs via credit card and/or PayPal from the township website, events and programs will attract more attendees. This will increase the revenue and assist with Park & Rec Programs becoming self sustaining. Based on the Park & Rec 5 year budget projection, the average revenue from Programs is $128,000. Assuming that accepting online registration and payment could increase participation/revenue, we are estimating that there will be a 5% increase in net program revenue (i.e. after expenses) or $6,400 per year.

Background / Context / Rationale:

Currently, payments for Park & Rec programs are made via cash or check that is mailed to or dropped off at the East Goshen Township Building. For many residents, this is not a convenient process. The Park & Rec Director believes more residents would attend programs if payments were accepted online.

Specific Recommendations and Considerations:

In order to implement this recommendation, the East Goshen Township website would need to be modified to accept online registration and online payments. While this should not be a major hurdle, it will take some effort. In addition to the web form modifications, East Goshen Township will need to select a payment process. East Goshen Township may be able to use direct online banking infrastructure through their financial institution. However, to get started, services like PayPal (www.paypal.com) and/or Google Checkout (www.checkout.google.com) could be utilized. These services charge a processing fee of 2.9% + $0.30 USD per transaction (lower fees apply for increased volume).

While utilizing online registration and payment may increase program participation, it will also increase direct costs. The goal of increasing program participation is to help the Park & Rec Programs achieve a participation level where they are covering both direct and indirect costs.

Ease of Implementation (i.e. effort): Medium

Costs: Low

Benefits: Low

Probability of Capturing Benefits: High

87

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Benefits:

  • Potential to increase revenue based on convenience of Payment

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: $6,400 annually

Costs:

  • There are fees associated with online payment services. The base processing fee of 2.9% + $0.30 USD per transaction (lower fees apply for increased volume).
  • However, the cost for these services is factored into the benefit calculation.
  • There will be a resource cost to modify the East Goshen Township website, but this cost should already be included in normal webmaster activities.

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Included in benefit estimate

Related Recommendations:

  • Self-Sustaining Park & Recreation Programs (104)
  • Work with Adjoining Townships for IT Support (116)

88

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Leverage Social Networking Tools to Increase Park & Recreation Program Participation

Summary / Short Description:

By increasing the advertising and promotion of the East Goshen Township Park & Recreation programs via online and social media tools (e.g., Facebook, Twitter), events and programs will attract more attendees. This will increase the revenue and assist with Park & Rec Programs becoming self sustaining. Based on the Park & Rec 5 year budget projection, the average revenue from Programs is $128,000. Assuming that improved promotions would increase participation/revenue, we are estimating that there will be a 5% increase in net program revenue (i.e. after expenses) or $6,400 per year.

Background / Context / Rationale:

Currently, the Park & Rec programs and events are publicized via the Township Newsletter, Park Billboard, and via Constant Contact. The Park & Rec Director believes more residents would attend programs if they were publicized more widely and online with current technology.

Specific Recommendations and Considerations:

In order to implement this recommendation, the East Goshen Township would need to create a Facebook page, a Twitter account, etc. A staff member (presumably the Park & Rec Director) would be responsible for updating and posting information. Currently, the Township uses Constant Contact. Approximately 500 residents (there are 8,500 households and 18,000 residents in East Goshen Township) are receiving e-mail updates for various Township items. In order for this recommendation to be successful there would need to be a 'push' to get more residents signed up for would need to be modified to accept online registration and online payments. Constant Contact could be utilized better to create more 'rich' e-mail announcements, invitations, etc. These could include links to online registration as well. The Park & Rec Board and Director would need to develop an action plan to sign up more residents for the online notification(s).

While utilizing online promotion will likely increase program participation, it will also increase direct costs. The goal of increasing program participation is to help the Park & Rec Programs achieve a participation level where they are covering both direct and indirect costs.

Ease of Implementation (i.e. effort): Medium

Costs: Low

Benefits: Low

Probability of Capturing Benefits: High

89

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Benefits:

  • Potential to increase of net revenue based on increased program participation

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: $6,400 annually

Costs:

  • The increased cost of participation is factored into the benefit calculation.
  • There will be a resource cost to create and monitor the social media sites, but this cost should already be included in normal Park & Rec Director's activities.

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Self-Sustaining Park & Recreation Programs (104)
  • Work with Adjoining Townships for IT Support (116)

90

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Expand Park & Recreation Program Partnerships

Summary / Short Description:

By expanding the organizations with whom East Goshen Township partners, there may be opportunity increase revenue for East Goshen Township.

Background / Context / Rationale:

East Goshen Township could increase the number of organizations that they partner with and allow use of the East Goshen Park. Organizations pay for use of the park or share in the registration fees as remuneration for park access.

Specific Recommendations and Considerations:

The Philadelphia Eagles hold a summer football camp in a neighboring municipality. East Goshen does not offer a football camp. East Goshen Township could host the Eagles' summer football camp. The Eagles would pay East Goshen Township $30/resident who attends the camp. East Goshen Township would be required to assist with the promotion of the camp on its website, newsletter, and other means. The camp would be open to both residents and non-residents. The existing camp is for 100 players. Assuming that 1/3 of the players would be from East Goshen Township, this would potentially net $900/year to East Goshen Township.

The East Goshen Township Park & Rec. department could look to create similar relationships with the Philadelphia Phillies (who host local summer camps in the area) and the Philadelphia Union (Soccer). For the basis of this recommendation, we will assume these relationships could net an additional $900/year to East Goshen Township.

An East Goshen Township resident has approached the Park & Rec. Director regarding hosting an Adult Physical Fitness Boot Camp in East Goshen Park. The resident would pay $130/month to East Goshen Township for use of the Park. Assuming this program could run for 4 months, this would net $500 to East Goshen Township. Additional programs could also be developed. For the basis of this recommendation, we will assume these types of relationships could net an additional $500/year.

In total, these recommendations could net East Goshen Township an additional $2,800/year. The goal of increasing partnerships and expanding programs is to help the Park & Rec Programs achieve a participation level where they are covering both direct and indirect costs.

91

East Goshen Township    Final Report – Oct 2010    Township Advisory Group (TAG)

Ease of Implementation (i.e. effort): Medium

Costs: Low

Benefits: Low

Probability of Capturing Benefits: High

Benefits:

  • Potential to increase of net revenue based on increased program participation

Total Estimated One Time Benefits: Not applicable
Total Estimated Recurring Benefits: $2,800 annually

Costs:

  • There will be a resource cost to collect and process registrations for these programs. However, these costs should already be included in the normal Township Staff and Park & Rec Director's activities.

Total Estimated One Time Costs: Not applicable
Total Estimated Recurring Costs: Not applicable

Related Recommendations:

  • Self-Sustaining Park & Recreation Programs (104)

92

1/11/11

Hi Thom;

Info on use of facilities:

Agreement with WCASD- East Goshen and WCASD have an agreement in effect to not charge each other for use of their respective facilities. Below is a comparison of use for 2010.

Comparative use of facilities as per agreement in 2010

Organization Facility Used Number of hours/days used
East Goshen Twp East Goshen Elementary Gymnasium and 4 classrooms 300 hrs during 102 days
WCASD One baseball field in East Goshen Park 165hrs during 55 days

Organizations using East Goshen Park Facilities

Organization EG Park Facility Used Number of days used Group size (approx.)
GVLL Little League field 88 See below
Softball Field 60
Baseball Field 69
Mill Creek Field 105
T Ball Fields 100
Several hundred kids
YMCA Soccer field 70 200
Pavilions 2 300
Sts Simon and Jude Football/Soccer and the Multi Purpose Field 62 150
Pavilion 2 100
St. Patrick's School Baseball Field 43 30
Soccer Field 21 40
Sts Peter and Paul Baseball Field 40 30
WC Girls Softball Association Baseball Field 41 30
Softball 47 25
WW Baseball Assoc Baseball Field 31 25
Villa Maria Academy Softball Field 4 20
USTA Tennis Teams 3 Tennis courts 14 20

Thanks,

Frank Vattilano

1-6-10

2010 Recreation Participation Numbers

Weekly Programs Season # of People # of EG residents # of EG Hseholds % EG residents Age or Category
Aerobics Fall/Win/Spr/Su 85 44 40 21 to 88yrs
Girls Vball Clinic Spring 22 21 21 95 12yrs to 15yrs
Learn to Skate Winter 18 18 16 100 3yrs to 5yrs
Petite Soccer Clinic Fall/Spr 43 38 36 88 3yrs to 5yrs
Elem. Soccer Clinic Summer 13 12 10 92 5yrs to 14yrs
Mature Driver Ed. Winter 14 14 10 100 Senors 55 and up
Mini Sports Clinic Summer 7 7 7 100 3yrs to 5yrs
Tai Chi Fall 4 4 4 100 18yrs to 55yrs
Tennis Clinics Summer 100 75 70 75 5yrs to 18yrs
Youth Rec Camp Summer 230 212 170 92 5yrs to 12yrs
Yth. Rec Volunteers Summer 90 88 80 98 13yrs to 22yrs
Water Walking 3 Seasons 36 36 30 100 Seniors 55 andup
Yoga 4 seasons 40 36 34 90 18yrs to seniors
Zumba for Seniors Fall 8 7 7 88 55yrs and up
612 535
Trips
New York City Fall 90 72 55 80 8yrs to 86yrs
Cape Cod,Mass.
(joint trip with WG and WC)
Spring 52 24 12 46 40yrs to 80yrs
Washington, DC Spring 72 58 41 81 12yrs to 80+ yrs
Phila Flower Show Spring 25 11 9 80 35yrs to 70+yrs
ttl 165 117
Special Events you can reg. for
Applebrook Golf Fall/Spr 170 66 60 39 25yrs to 70yrs
Neighbors Day Fall 75 60 30 100 5yrs to 60yrs
Fishing Clinic Summer 30 30 13 100 8yrs to 62yrs
Township Yard Sale Fall 250 250 250 100 21yrs to 75yrs
Township Yard Sale Spring 300 300 300 100 21yrs to 75yrs
Parents Night Out Winter 25 23 12 92 5yrs to 10yrs
729 665
Special Events you don't register for Estimates
Pumpkin Fest Fall 1000 800 80 1yr to 70+yrs
Shredding Day
(16,500 lbs of paper)
Fall
shredded
200 150 75 30yrs to 70+yrs
Egg Hunt Spring 800 700 88 1yrs to 60+yrs
Fireworks Summer 400 300 75 1yrs to 80+yrs
Preschool Entertain. Summer 400 300 75 1yrs to 50yrs
ttl 2800 2250
Ttl # of EG resident registrations 1506 1317
Subtracting the EG residents from the totals who registered for more than one program 1187 1031
Est. total of EG resident participant activity in recreation events >3700

2-1-11 PER FRANK BOTH NUMBERS ARE CORRECT

FYI

EAST GOSHEN TOWNSHIP
PARK & RECREATION BOARD
RECOMMENDATIONS TO BOARD OF SUPERVISORS
FEBRUARY 8, 2011

The Park & Recreation Board presents the following recommendations in response to the TAG Committee Recommendations Summary:

#30 – Self-Sustaining Park & Recreation Programs (104)

  • Summer Youth Program Apply for grants; Charge an additional fee for field trips; Continue to evaluate fees and increase as needed
  • Eliminate overtime for Park & Recreation Director as much as possible
  • Use more volunteers in all programs
  • Pumpkin Festival – Charge for pumpkins or eliminate them and have a Fall Festival
  • Get more sponsors/generate more revenue Apply possible income from a cell tower in the park to the Park & Recreation budget

#31 – Institute Park and Recreation Sponsorship Program (88)

  • Develop a business plan
  • Suggest that businesses make a donation in several payments
  • Expand outside of East Goshen for sponsors
  • If a business sponsors an entire event use their name in the event title, i.e. TD Bank Fall Festival
  • Work with 501(3)c committee to raise funds

#32 – Formalize and Expand Relationship with the YMCA (90)

  • Pursue YMCA’s proposal dated February 3, 2011 for a 10 week Summer Program from June 20, 2011 to August 26, 2011 using facilities in the North end of East Goshen Park. Monday through Friday, 6:30 am to 6:30 pm, 50-75 campers.

#33 – Create a Concession Stand at East Goshen Township (Active) Park (52)

  • Get information from Carmen Battavio and the YMCA for possible contacts
  • Contact Kelly’s Sporting Goods for information on their program
  • Look into soliciting bids Give timeframe (April to October, days/week, hours/day); Give locations; List services needed, i.e. ice cream, hot dogs, soda, snacks
  • At this time, the Board recommends a mobile, not a permanent concession stand

#34 – Increase Fees for Ball Fields (48)

  • The following are the increased fees for 2011:
Use/Facility 2011Fee Deposit 2010 fee
Pavilion Fees (1-100 people) $100 $50 $85
Pavilion Fees over 100 people, $200 $100 $150

(includes non-residents and any corporate permits)
(never issued permits for non-residents before)

Use/Facility 2011Fee Deposit 2010 fee
Satellite Parks per event $50 $25 $40
Tennis Court Key-residents $30 0 $15
Tennis Court Key-non-residents $50 0 $30
Tennis Court use by groups $30 * $15
*for 3 courts / per unit of time
Field Use Fee per unit $30 $15
Summer Youth Program/week resident $70 0 $60
Summer Youth Program/week non-resident $90 0 $70
Summer Youth Program/week discount for a family with 3+ kids $7 0 $5
Volleyball Sand Court/unit $30 $15

#35 – Enable Online Registration and Payment for Park & Recreation Programs

Frank will work with AMS on setting up online registration and payment program

#36 – Leverage Social Networking Tools to Increase Park & Recreation Program Participation

  • Use Twitter and Facebook to announce events
  • Use student volunteers to assist with this program

#37 – Expand Park & Recreation Program Partnerships

  • Develop a business plan to increase the number of organizations using the park and sponsoring programs

#38 – Reduce the Frequency of Grounds Maintenance and Mowing (26)

  • There will be no change to the mowing in East Goshen Park (active park)
  • In 2010 the frequency of mowing in certain areas of Applebrook Park (inactive) was reduced.
  • Develop a plan and schedule for maintenance and mowing for both parks to reduce costs.

C:\Documents and Settings\Owner\My Documents\My Word\PR TAG Recs 020811.doc

AREA CODE 610
692-7171

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

February 3, 2010

East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380

Re: Del Vacchio Holdings
Special Exception Application
53-4-54 / 922 N. Chester Road

Dear Board Members:

At their meeting on February 2, 2011 the Planning Commission voted unanimously in favor of the following motion:

Mr. Chairman, I move that we recommend that the Board of Supervisors support the Special Exception application of Del Vacchio Holdings, who is seeking an alteration to the existing legal nonconforming use with the following conditions and in accordance with the plans titled:

  • Landscape Planting List dated 02-02-2011
  • Legal Non-Conforming Use Impervious Cover Calculations dated 01-24-2011
  • Existing Site Conditions dated 01-5-2011 with no revisions
  • Satellite Image w / Overlay dated 01-5-2011 with no revisions
  • Satellite Image dated 01-5-2011 with no revisions
  • Conceptual Drawings Phase 1and 2 dated 01-05-2011 and last revised 01-24-2011
  • Landscape Plan Phase 1 and 2 dated 02-02-2011 with no revisions
  • Storage Bin Detail dated 01-25-2011 with no revisions
  1. The buildings identified on the plan and during the testimony as buildings to be removed shall be removed prior to the issuance of a Use and Occupancy certificate for the new barn style building.
  2. The new barn style building (having maximum footprint 4000 sq. ft.) may be erected as a replacement for the existing permitted buildings that are part of the legal non-conformity as shown on the plans that were submitted by the applicant.
  3. The proposed barn style building shall have a wooden exterior and shall be similar in appearance to the existing sales building.

F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Rec to BOS 02032011.doc

  1. The rear of the property (the area of the property west of the bins) shall be returned to a grass and/or wild flower meadow condition as shown on the plans. The existing trees shall remain to the maximum extent possible. Should Township regulations require, a grading plan shall be submitted to the Township and a permit issued prior to any earth disturbance in the rear of the property.
  2. The single family home shall remain as such and shall not be parleyed into a part of the non-conforming use. The applicant may build the Phase II single family dwelling provided that the existing residential structure is removed prior to the issuance of a Use and Occupancy permit for the Phase II dwelling. The Township may provide a 60 day temporary Use and Occupancy for the Phase II dwelling prior to the demolition of the existing residence if the owner of the property is residing in the existing residence and is moving into the new Phase II dwelling. The applicant shall post a bond to insure that the existing residential dwelling is removed.
  3. All stormwater controls required by the Township Ordinances for the Phase II single family dwelling shall be installed in conjunction with the Phase II dwelling.
  4. The Phase I landscaping shall be installed prior to the issuance of a Use and Occupancy Certificate for the new Barn Building. The Phase II landscape screening shall be installed prior to the Issuance of a building permit for the new single family home. Applicant agrees to maintain all landscaping in perpetuity. Landscaping shall be installed as depicted in the Phase II Conceptual Drawings.
  5. Retail sales of mulch and the delivery of mulch and other landscape materials to the property shall be limited to the hours between 9 A.M. and 5 P.M. Monday through Saturday and no storage of manure shall be permitted on the property.
  6. The loading and unloading of landscape materials and equipment onto trucks or trailers shall not occur before 7 A.M. and not after 6 P.M.
  7. Upon the completion of Phases I and II, as shown on the plans, no additional expansion of buildings pertaining to the legal Non-conforming use shall be permitted unless approved by the Township Zoning Hearing Board.
  8. Lighting shall be limited to safety and security lighting mounted to the buildings which cast light downward so as not to create a glare condition, in accordance with §240-24.H.
  9. All vehicle maintenance shall be conducted inside of the new barn building.
  10. The storage bins having a total square footage of 1,400 sq ft shall be constructed as depicted on the plan and a maximum of one material storage bin (not to exceed 250 sq ft) may be covered with a roof and that area shall be included in the total building coverage area tabulation. The covered storage bin depicted on the plans shall be the only bin used for salt storage.
  11. As depicted on the plan all business vehicles and employee parking shall be located to the rear of the existing single family home in an area not to exceed 10,250 square feet.

F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Rec to BOS 02032011.doc

  1. Business vehicles having a gross vehicle weight in excess of 33,000 pounds shall not be permitted to be parked or stored on the property.
  2. The applicant agrees not to store or display any hardscaping materials (i.e. brick pavers, stone, etc.) in front of the existing sales building.
  3. The rubber tire or track loader used for retail sales shall be equipped with a bucket having a maximum size of one cubic yard.
  4. The applicant will follow all applicable Federal, State and Local laws and secure all proper permits prior to construction of the improvements depicted on the plan or use of the existing buildings on the property.
  5. The storage of bulk fuel materials shall not be permitted on the property.
  6. Employee parking shall be permitted in the parking area depicted on the plans to the rear of the sales building.
  7. The customer parking in front of the existing single family home shall not be increased in size and shall be signed for customer parking only.
  8. Prior to the issuance of the permit for the new barn building the applicant shall demonstrate that the proposed total impervious area on the property is less than the total impervious area shown on the existing conditions plan.
  9. The conditions and orders, which are still applicable, outlined in the previous Zoning Hearing Board decisions for this property still apply except as modified with the subject Special Exception.
  10. The existing shade structures as shown on the plans, may remain, provided that they are only covered with a porous fabric. These structures shall not be considered buildings for the purpose of calculating building coverage.

Sincerely,

Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Property Management\53-4\53-4-54 (922 N. Chester Rd.)\ZHB SE Hearing 2011\PC Rec to BOS 02032011.doc

593494_1

FILE COPY

EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION
1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

Name of Applicant: Del Vacchio Holdings, LLC

Applicant Address: c/o Brian L. Nagle, Esquire, MacElree Harvey, Ltd., 17 West Miner Street, Post Office Box 660, West Chester, PA 19381-0660

Telephone Number: 610.436.0100 Fax Number: 610.429.4486

Email Address: bnagle@macelree.com

Property Address: 922 North Chester Road, West Chester, PA 19380

Tax Parcel Number: 53-4-54 Zoning District: R-2 Acreage: 4 acres

Purpose of Application (check one)

  • [ ] Variance ( Type: [ ] Use Variance [ ] Dimensional Variance)
  • [X] Special Exception
  • [ ] Appeal determination of the Zoning Officer
  • [ ] Other

Sections of Zoning Ordinance in which relief is sought:

Section 240-40.C(2)(e)

Description of the Zoning Relief requested and the future use of the property:

Please see attached narrative.

We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.

MacElree Harvey, Ltd.
By: Harry J. DiDonato, Esquire
Attorney in Fact

December 28, 2010
Date

*Please review the formal application and review procedures on page three.

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 1 -

EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION
1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.

Applicant Name: Del Vacchio Holdings, LLC

Application Process Checklist (Administration use only):

Item Date Complete
1. Completed Township Application Form: 12-28-2010
2. All related materials submitted: 12-28-2010
3. Township application and review fees paid: 12-28-2010

Application accepted on 12-28-2010 by MARK GORDON

Official Signature: Mark Gordon
Title: ZONING OFFICER

Review Process Checklist

Item Date
1. Start date: 12-28
2. Date of first formal Planning Commission Meeting following complete application: 1-5-11
3. Date sent to CCPC: —
4. Date sent to Township Engineer: —
5. Date presented to Planning Commission: 1-5
6. Date sent to CB: 12-30
7. Date sent To MA: "
8. Date sent to HC: "
9. Date sent to PRB: "
10. Date sent to TAB: "
11. Date by which the PC must act: 2-2-11
12. Date by which Board of Supervisors must act: 2-8
13. Drop Dead Date; (Day 60): 2-25
14. Zoning Hearing Date: 2-10-2011
15. Dates of public advertisement: 1/19/11 & 1/25/11

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 2 -

EAST GOSHEN TOWNSHIP
ZONING HEARING BOARD APPLICATION
1580 PAOLI PIKE WEST CHESTER, PA 19380-6199
PHONE (610)-692-7171 FAX (610)-692-8950

Procedures for the processing and review of Subdivision, Land Development, Conditional Use, Variance, and Special Exception Applications

August 19, 2002
2nd Revision: March 2, 2006

  1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered “filed” by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.
  2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.
  3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applications shall begin the day a complete application is filed with the Township.
  4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.
  5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendation for denial of the application by the Planning Commission.
  6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete application is submitted and accepted by the Township staff.
  7. The application will remain on the Planning Commission’s agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.
  8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.
  9. Applications will be voted on only during the regular Planning Commission meetings.
  10. The Chairman, in his sole discretion, may waive or modify any of this procedure.

Zoning Hearing Board Procedural Rule for Hearing Continuances: ADOPTED: May 13, 2009

  1. The Zoning Hearing Board may grant one application for hearing continuance. Subject to the limited circumstances referenced in paragraph 2 below, the rescheduled hearing shall be held unless the applicant withdraws the application.
  2. The continuance after the first one shall only be granted in an extraordinary circumstance.
  3. The Zoning Hearing board has the sole discretion whether to grant any continuance.

F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Zoning Hearing App 080409.doc - 3 -

593844_1
040779.55992

BEFORE THE ZONING HEARING BOARD OF EAST GOSHEN TOWNSHIP

IN RE: SPECIAL EXCEPTION APPLICATION OF DEL VACCHIO HOLDINGS, LLC

NARRATIVE IN SUPPORT OF APPLICATION FOR SPECIAL EXCEPTION

I. Introduction.

Del Vacchio Holdings, LLC is the equitable owner (the “Owner”) of a 4 acre property located on Route 352 North of Paoli Pike in East Goshen Township, Chester County, Pennsylvania, with an address of 922 North Chester Road (the “Property”). Owner hereby requests, by and through its undersigned counsel, that the East Goshen Township Zoning Hearing Board grant a special exception permitting the alteration of the existing legal non-conforming use of the Property pursuant to Section 240-40.C(2)(e) of the East Goshen Township Zoning Ordinance. The alteration sought is the replacement of a greenhouse building with a new barn-style building to be utilized in connection with the Proposed Use, as set forth below. The Township Zoning Officer, by memorandum dated December 21, 2010, confirmed that the Proposed Use constitutes a permissible continuation of the legal non-conforming use. See Zoning Officer's memorandum, attached hereto as Exhibit “A.”

II. The Current Use

The current use is the same as the Proposed Use except that the Proposed Use includes plans to eliminate impervious coverage and restore the rear of the Property to an open grass and landscaped condition, add additional perimeter buffering, and replace certain existing greenhouse buildings with a new and attractive barn style building. With respect to the retail use of the Property, the current legal owner maintained the following retail sales: 1) bedding plants, hanging baskets and shrubs in the spring and in the summer; and 2) corn, tomatoes and vegetables in the summer; and 3) small bottled fertilizers, flowers and pottery year-round; and 4) Christmas trees, wreaths, roping, poinsettias and greens during the Christmas season; and 5)

2

corn stalks, gourds, and pumpkins in the Fall; and 6) year-round seasonal items for sale including flowers, pottery, cards, candles and vases and other sundries.

III. The “Proposed Use”

The Proposed Use of the Property is to continue the existing legal nonconforming use of the Property as a landscape service center, with limited retail sales, and related outdoor storage. It also includes continued use of the existing residential dwelling for single family residential occupation. The details of the Proposed Use are as follows:

a. Off-site Landscaping Services: Landscape service center includes providing remote landscaping services to clients/customers of the Owner. This includes landscaping for homes and businesses as well as seasonal exterior decoration, primarily related to exterior Christmas decoration, and off-season storage of same in some cases. Six bins are proposed to house mulch, stone and top soil. The top soil bin is proposed to be under roof.

b. Minor Retail Sales: The Proposed Use will include the continuance of minor and seasonal retail sales of plants and flowers and other nursery products. While low volume retail sale of the limited mulch options may occur, no full service multi-varietal mulch sales are proposed. The Owner will reserve the right to continue the planting and maintenance of nursery stock in the existing field areas. See Section II above regarding details of retail sales which the Owner plans to continue.

c. Front Yard: While a parking area will remain in the front yard, no other front yard storage is proposed.

d. Vehicles: The vehicle fleet for the Proposed Use includes 1 large stake body truck, 2 low-boy dump trucks and 3 enclosed box trucks. These vehicles would be stored in the paved area shown on the sketch plan to the rear and side of the

3

main buildings, and significantly set back from the front yard of the Property as shown on the sketch.

e. Other Equipment: Other equipment includes 2 enclosed trailers, 1 open skid steer trailer, and 1 small 4' x 8' open trailer. Owner also has a mulch blower, leaf loader, 2 skid steers and a tractor with various attachments. This equipment would be stored in the paved area shown on the sketch plan to the rear and side of the main buildings and significantly set back from the front yard of the Property as shown on the sketch. Some of the equipment will be stored indoors and much of the equipment will be stored indoors or otherwise under roof during off-season periods of time. Modest replacement or additional equipment or vehicles is anticipated.

f. Replacement Building: The Property has existing buildings and building pad areas totaling 24,877 +/- square feet. As shown on the sketch, the Proposed Use includes the permanent removal of 12 buildings located on the Property, including some buildings that have been temporarily removed. The removed buildings will include 9 greenhouses, 2 sheds and one garage. The Zoning Officer determined that certain of the existing buildings or building pads were never properly authorized by the Township. Nevertheless, the Zoning Officer has determined that the proposed 5,000 square foot barn type building (the “Barn”) can be accommodated within the recognized impervious coverage area of existing buildings, as shown on the sketch plans submitted herewith and attached hereto. The Barn will house a two to three bay service area for service and maintenance of the vehicles and equipment that are used for the business, as outlined above. The building will also encompass office and storage areas, for use pertaining to the landscaping services and minor retail sales.

4

g. Far rear of Property: As shown on the sketch plan, all buildings will be removed from the far rear of the Property, and that area will be returned to green space. Owner would like to reserve the right to, in the future, remove the existing residential dwelling and construct a new residential dwelling in the area toward the rear of the Property. A 3,000 square foot future residential footprint and drive is shown on the sketch. There are also exposed well pipes, which if left uncovered, will be prone to freezing which may damage the system and prevent water availability. A solution will have to be devised to address this problem.

h. Increased buffering: The Owner is proposing new increased buffering to be located a various points around the perimeter of the Property, as shown on the sketch plans.

IV. Conclusion

Owner will establish compliance with the applicable Special Exception standards during the hearing before the Zoning Hearing Board in support of approval of the Special Exception for the alteration of the non-conforming use in the form of the construction of the aforementioned replacement building.

Respectfully submitted,

Brian L. Nagle

Del Vacchio Holdings, LLC.
922 North Chester Road, West Chester
Landscape Planting List
2/2/2011

PHASE #1

Qty Botanical Name Common Name Size
Trees
8 Abies concolor White Fir 7/8'
1 Aesculus Horsechestnut 7 Gallon
2 Amelanchier canadensis Amelanchier 8/9'
3 Cercis canadensis Redbud 7/8'
6 Cornus florida Flowering Dogwood 8/9'
3 Malus Flowering Crabapple 2.0/2.5"
6 Picea abies Norway Spruce 8/9'
1 Prunus x yedoensis Yoshino Cherry 2.0/2.5"
1 Quercus rubra Red Oak 2.5/3.0"
Shrubs
8 Forsythia x intermedia Forsythia 4/5'
7 Hamamelis Witchhazel 30/36"
6 Hydrangea 'quercifolia' Oak Leaf Hydrangea 5 Gallon
2 Syringea 'president lincoln' Lilac 5 Gallon
2 Syringea 'angel white' Lilac 5 Gallon
2 Syringea 'sensation' Lilac 5 Gallon
9 Viburnum 'shasta' Doublefile Viburnum 30/36"
8 Viburnum dentatum Arrowwood Viburnum 30/36"
Transplants
19 Ilex opaca American Holly n/a
1 Picea pungens 'glauca' Colorodo Blue Spruce n/a

PHASE #2

Quan. Botanical Name Common Name Size
Trees
3 Amelanchier canadensis Amelanchier 8/9'
Transplants
4 Ilex opaca American Holly n/a
1 Picea pungens 'glauca' Colorodo Blue Spruce n/a

Del Vacchio Holdings, LLC.
922 North Chester Road
Legal Non-Conforming Use Impervious Coverage Calculations
01/24/11

Structures
Conforming Structures Dimensions 1983 Variance (Legal Nonconforming) Area (s.f.) 1994 Special Exception (Legal Nonconforming) Area (s.f.) Proposed Phase I, 2011 Special Exception Area (s.f.) Proposed Phase II, 2011 SE (~ 2014) Area (s.f.)
Existing Residential Dwelling ~24X36 + porches 890 890 890 0
New home (Proposed for ~ 2014-15, Phase II) ~ 60X50 0 0 0 3000
TOTALS (s.f.) 890 890 890 3000
Structures associated with the legal nonconforming use
Accessory Building (Original Sales Building) 14X24 336 - - -
Sales Building (1994) 36X36 - 1,296 1,296 1,296
Garage 24X36 864 864 - -
Greenhouse 10x12 120 120 - -
Greenhouse 14X76 1,064 1,064 - -
Greenhouse 28X96 2,688 2,688 - -
Work shed 12X20 240 240 - -
Proposed Barn Style Building (2011, Phase I), incl covered storage, covered walkway, & utility area 4,000 4,000
Covered topsoil bin 250 250
TOTALS (s.f.) 5312 6272 5546 5546

-726 -12%

Impervious Cover Existing Phase I Phase II
Pergolas 2,073 2,073 2,073
Sales Building 864 864 864
Greenhouses 19,106 - -
Garage 864 - -
Work shed 240 - -
Driving/Parking Areas (paved & hardpack) 12,680 16,000 17,200
Display Area (front of sales building) 727 1,096 1,096
Material Storage (including soil bin) 1,500 1,400 1,400
Proposed Barn Style Building (2011, Phase I) - 4,000 4,000
Residence - Home 890 890 3,000
Residence - Driveway - - 6,200
TOTALS (s.f.) 38,944 26,323 35,833
% of Impervious Cover 22.35% 15.11% 20.57%

-3,111 -8%

*Colored areas represent changes from one time period to the next

Existing Site Conditions

Site plan drawing showing existing site conditions at 922 North Chester Road, West Chester, PA 19382, along RT 352, including nine greenhouses, storage areas, two sheds, a detached garage, a house, a sales building, and two pergolas.

Drawing Labels

  • GH #1
  • GH #2
  • GH #3
  • GH #4
  • GH #5
  • GH #6
  • GH #7
  • GH #8
  • GH #9
  • STONE STORAGE AREA
  • TOPSOIL/PEAT/CONTAINER STORAGE AREA
  • SHED
  • SHED
  • DETACHED GARAGE
  • HOUSE
  • SALES BUILDING
  • PERGOLA
  • PERGOLA
  • RT 352

Title Block

Date: 01-05-2011

Revisions:

Project: Existing Site Conditions
922 North Chester Road
West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: 1" = 50'

Satellite Image w/ Overlay

Aerial satellite photograph with a site plan overlay showing the property boundary and existing buildings and storage areas at 922 North Chester Road, West Chester, PA 19382.

Overlay Labels

  • GREENHOUSE (9 structures)
  • STONE STORAGE AREA
  • TOPSOIL/PEAT/CONTAINER STORAGE AREA
  • SHED (2 structures)
  • DETACHED GARAGE
  • HOUSE
  • SALES BUILDING
  • PERGOLA (2 structures)

Title Block

Date: 01-05-2011

Revisions:

Project: Satellite Image w/ Overlay
922 North Chester Road
West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: na

Satellite Image

Aerial satellite photograph showing the property boundary outlined in yellow at 922 North Chester Road, West Chester, PA 19382.

Title Block

Date: 01-05-2011

Revisions:

Project: Satellite Image
922 North Chester Road
West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: na

Conceptual Drawings Phase 1 & 2

Site plan drawing showing the proposed Phase 1 and Phase 2 conceptual layout for 922 North Chester Road, West Chester, PA 19382, along RT 352.

Drawing Labels

  • LAWN AREA
  • RELOCATE RESIDENCE w PHASE II
  • NURSERY STOCK AREA
  • RELOCATE PERGOLA
  • COVERED STORAGE 450 SQ FT
  • BARN STYLE BUILDING & COVERED WALKWAY BETWEEN BUILDINGS 3,400 SQ FT
  • UTILITY PAD 150 SQ FT
  • EXISTING SALES BUILDING
  • DISPLAY AREA
  • EXISTING PERGOLA
  • FUEL STORAGE
  • SOIL
  • MULCH
  • MULCH
  • STONE
  • SAND
  • 1, 2, 3, 4, 5 (parking spaces)
  • 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 (parking spaces)
  • PARKING SPACES TO BE ADDED WITH PHASE II
  • EXISTING HOME FOOTPRINT
  • DRIVEWAY ORIENTATION TBD
  • EXISTING SIGN BED
  • RT 352

Title Block

Date: 01-05-2011

Revisions: 01-19-2011, 01-24-2011

Project: Conceptual Drawings Phase 1 & 2
922 North Chester Road, West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: 1" = 50'

Landscape Plan Phase 1 & 2

Colored landscape architectural site plan showing proposed and existing plantings, buildings, storage bins, and parking layout for Phase 1 and Phase 2 at 922 North Chester Road, West Chester, PA 19382, along RT 352.

Planting and Site Labels

  • EX. PINE
  • HOLLIES (TR)
  • ARROWWOOD VIBURNUM
  • FLOWERING DOGWOOD
  • WITCH-HAZEL
  • RED OAK
  • FLOWERING DOGWOOD
  • EX. EUONYMUS
  • EX. ARBORVITAE
  • EX. WHITE PINE CLUSTER
  • HOLLIES (TR)
  • YOSHINO CHERRY
  • RED HORSECHESTNUT
  • REDBUD
  • EX RIVER BIRCH
  • AMELANCHIER
  • LILAC
  • OAK LEAF HYDRANGEA
  • LAWN AREA
  • RELOCATE RESIDENCE w PHASE II
  • NURSERY STOCK AREA
  • PERGOLA
  • FUEL STORAGE
  • COVERED STORAGE
  • BARN STYLE BUILDING & COVERED WALKWAY BETWEEN BUILDINGS
  • UTILITY PAD
  • EXISTING SALES BUILDING
  • DISPLAY AREA
  • EXISTING PERGOLA
  • SOIL
  • MULCH
  • MULCH
  • STONE
  • SAND
  • HOLLIES (TR)
  • BLUE SPRUCE (TR)
  • HOLLIES (TR)
  • 1, 2, 3, 4, 5 (parking spaces)
  • 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 (parking spaces)
  • PARKING SPACES TO BE ADDED WITH PHASE II
  • AMELANCHIER
  • BLUE SPRUCE (TR)
  • EX. HOLLY
  • EX. RHODODENDRON
  • PHASE II LANDSCAPE
  • EXISTING SIGN BED
  • RT 352
  • EX. ARBORVITAE (MATURE)
  • NORWAY SPRUCE
  • WHITE FIR
  • FORSYTHIA
  • SHASTA VIBURNUM
  • CRABAPPLE

Title Block

Date: 02-02-2011

Revisions:

Project: Landscape Plan Phase 1 & 2
922 North Chester Road, West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: n/a

Storage Bin Detail

Architectural plan view and front elevation view showing dimensions and construction details for a five-bay storage bin structure with a covered soil bin at 922 North Chester Road, West Chester, PA 19382.

PLAN VIEW

  • Overall width: 70' 0"
  • Overall depth: 20' 0"
  • Bay widths (left to right): 10', 10', 10', 16', 12'
  • PARKING LOT
  • COVERED SOIL BIN

FRONT VIEW

  • Unroofed bin wall height: 8' 0"
  • Covered bin wall height: 12' 0"
  • Covered bin total height to top of hoop: 20' 6"
  • METAL HOOP STRUCTURE COVERED WITH FABRIC TOP, FRONT, AND BACK

Title Block

Date: 01-25-2011

Revisions:

Project: Storage Bin Detail
922 North Chester Road, West Chester, PA 19382

Del Vacchio Landscapes, Inc.
P.O. Box 237
Edgemont, PA 19028
P. 610-353-5643 F. 610-355-2494
www.delvacchiolandscapes.com

Designed By: Vince Del Vacchio
Scale: 1" = 10'

DRAFT

[Township of East Goshen Chester County, Pennsylvania Incorporated 1817 seal]

REQUEST FOR PROPOSALS

PLANNING AND CONSTRUCTION OF A WIRELESS COMMUNICATIONS FACILITY

TOWNSHIP OF EAST GOSHEN

FEBRUARY 11, 2011

Due Date / Time: March 3, 2011, 4:00 P.M. Local Time

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 1

TABLE OF CONTENTS

Cover Page

Table of Contents

Introduction

Specifications

  • 1. General
  • 2. Schedule of Events
  • 3. Basic Facility Standards
  • 4. Required Information
  • 5. Compensation Schedule

Conclusion

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 2

Introduction

East Goshen Township is soliciting proposals from consultants to manage the process of development of Township property as locations for Wireless Communication Antenna Support Structure(s) (Cell Tower(s)), to include the construction of said towers at consultants expense, in accordance with the Request for Proposals (RFP).

Proposal shall be received by the Township no later than the DUE DATE: March 3, 2011, 4:00 P.M. Local Time. Deliver to:

East Goshen Township
Attn: Mark A. Gordon, Township Zoning Officer
1580 Paoli Pike
West Chester, PA 19380

The Board of Supervisors of East Goshen Township will grant due consideration to any features of the specifications submitted by the proposers and does hereby reserve the right to choose the proposal which in their judgment is best suited for the intended purposes, and which serves the best interest of East Goshen Township.

EAST GOSHEN TOWNSHIP
By: Mark A. Gordon
Township Zoning Officer

DATED: March 3, 2011

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 3

Specifications

1. General

The East Goshen Township Board of Supervisors is soliciting proposals for an independent firm to manage the process of developing Township owned property as locations for a cellular tower(s), including the construction and operation of said tower(s) at firm's expense.

Initially the Township has interest the Township Park to locate a cellular tower and It is expected that the consultant shall be granted lease options at the township park, through the life of the agreement, to construct and maintain, at firm's expense, a cellular tower and all associated equipment and structures.

2. Schedule of Events

The proposed schedule for the proposal proceeding, selection and contract negotiation is as follows:

Issue Request for Proposals:February 11, 2011
Cutoff for Written Questions:February 23, 2011
Proposals DueMarch 3, 2011
Issue "Intent to Award"March 17, 2011
Finalize Contract LanguageMarch 31, 2011
Ordinance ApprovalJune 7, 2011
Estimate Contract Start DateJuly 1, 2011

Any Changes to this schedule will be posted on our website, www.eastgoshen.org

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 4

3. Basic Facility Standards

The Wireless Communication Facility (Tower) shall meet the following minimum site standards

  • Located in the Township Park, Northeast of Veterans Pavilion and West of the soccer fields in or near the wooded area (see tower site diagram)
  • The tower shall not exceed 150 feet in height from the average ground elevation at the base of the tower
  • The maximum compound area shall be 10,000 square feet and shall be screened by a minimum 8 ft wooden shadowbox fence
  • No equipment, except for the tower and antennas mounted on the tower, shall be taller than the height of the fence
  • The entire facility perimeter shall have an attractive landscaping buffer
  • Details showing how five (5) to seven (7) wireless communications carriers can be accommodated on the tower
  • All service lines from Paoli Pike to the tower compound shall be underground

4. Required Information

Proposals shall include the following information

  • Current client list with at least three (3) active Municipal Clients including municipal contact information, a description of the tower location and pictures of the tower.
  • Sample standard lease agreement
  • Sample standard contract for services

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 5

  • Evidence that carriers have a need in this general area
  • Evidence that carriers have a desire to locate in this general area.
  • At least (2) pictorial options of tower configurations to meet the site standards outlined herein
  • Constructions sequence / schedule beginning at Building Permit Application submission and ending with a functioning "On Air" operational tower
  • A statement of accuracy of the proposal contents

5. Compensation Schedule

Proposals will have a detailed compensation schedule that outlines the revenue model proposed and the actual dollars paid to East Goshen Township for the life of the Tower assuming five (5), six (6), and seven (7) carriers are located at the site.

Conclusion

East Goshen welcomes this opportunity to provide a very desirable service to the residents of East Goshen Township. Recognizing that our Township Park is a premier resource to the residents of East Goshen Township and the surrounding communities, the successful must present a proposal that is sensitive to the environmental and aesthetic impacts of this type of facility.

East Goshen Township reserves the right to reject without notice any proposals that do not address all aspects of this request and expects all proposals to be complete and accurate.

F:\Data\Shared Data\Admin Dept\WCF RFP 2011\REQUEST FOR PROPOSALS 02032011 Draft.doc 6

East Goshen Township Park

Aerial parcel map of East Goshen Township Park at 1661 Paoli Pike, West Chester, showing the proposed park tower site marked with an X.

Map Labels and Legend

  • East Goshen Township Park, 1661 Paoli Pike, West Chester
  • PAOLI PIKE
  • X
  • Legend: Proposed Park Tower Site: X

Chester County Association of Township Officials

P.O. Box 371 West Grove, PA 19390
(717) 633-9755 FAX:(717) 633-9463

President:
Andy Paravis
North Coventry Township
Executive Committee:
Christine McNeil
East Vincent Township

Past President:
Joseph E. Toner III
Uwchlan Township
1st Vice President:
E. Martin Shane
East Goshen Township

Mark J. Blair
West Bradford Township
2nd Vice President:
Dr. Robert White
West Goshen Township

Virginia McMichael
E. Whiteland Township
Treasurer:
Betsy E. Huber
Upper Oxford Twp.

Victor Mantegan
Penn Township
Secretary:
Patricia A. Morrison
Trish Fagan, Asst.

Richard E. Hicks
East Marlborough Twp.

CHESTER COUNTY SPRING 2011 CONVENTION
MARCH 10, 2011

The Annual Spring Convention of the Chester County Association of Township Officials will be held Thursday, March 10th at the Desmond Great Valley Hotel located One Liberty Boulevard, Great Valley Corp. Center, Malvern, Pa. Coffee and Danish will be available beginning at 8:00a.m. outside the banquet room on the main level. Exhibitor displays will be open at 8:00a.m. The program begins at 9:00a.m. in the banquet room. There will be a table near the banquet room where you can pick up the directories. Elevators are available to get to the conference area on the third floor for the break-out sessions. Section 1401 of the Township code permits Supervisors, Tax Collectors, Managers, Auditors, Solicitors, Engineers, Township Treasurers, and Secretaries to attend County Conventions to be reimbursed for attending.

During the general session PSATS will bring us up to date on legislation. As always there will be short topics of interest discussed. When finalized we will bring you updates via the website.

Topics for the four break-out sessions this year will be as follows:

10:45am (1) Economic Valley of Open Space
10:45am (2) Trends in Smart Growth and Effective Planning Strategies-Chester County Planning Commission
10:45am (3) What will be the new State government impact on Local municipalities?
10:45am (4) Police, Fire & Ambulance-Present and Future-interactive panel discussion

As each of these programs is finalized we will bring you any updates via the website.

Registration fee: $50.00 per person which included lunch. We would appreciated if you could arrange to have payment no later than the day of the convention. Of course if this does not match up with your meeting schedule, just let me know when the check will be mailed. Printed badges will be held for your pick up upon arrival at the Convention as we did at the Fall Convention. The table for picking up badges will be in the same location as the picking up the directories for your township. Badges rather than a meal ticket will be your admission to lunch. The week of the convention it works much better to email me at pmorrison9755@yahoo.com with any questions or changes.

Website: www.ccato.org

E-Mail: secretary@ccato.org

Chester County Association of Township Officials

P.O. Box 371 West Grove, PA 19390
(717) 633-9755 FAX:(717) 633-9463

DEADLINE FOR REGISTRATING TO ATTEND THE CONVENTION IS
March 7, 2011

PLEASE FAX THIS FORM TO
CCATO
PATRICIA A. MORRISON, SECRETARY

FAX (717) 633-9463

____________________ (TOWNSHIP) WILL HAVE ____________ ATTENDING THE CHESTER COUNTY SPRING CONVENTION ON MARCH 10 2011. A CHECK IN THE AMOUNT OF ____________ @ $50.00 PER PERSON- REGISTRATION WHICH INCLUDED LUNCH

LIST THE NAMES OF INDIVIDUALS ATTENDING FOR NAME BADGES AND THEIR TITLE (MANAGER, SUPERVISOR, ETC.)

Website: www.ccato.org

E-Mail: secretary@ccato.org

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 1/27/2011
To: Board of Supervisors
From: Mark Gordon, Township Zoning Officer [signature]
Re: Furniture / New Conference Room Chairs

Dear Board Members:

The chairs you sit in at your conference table will be 18 years old next month, and they are showing their age. We have five chairs in our downstairs conference room that pre-date this building and were purchased in the mid eighty's when the addition was build onto the old building, making them ~25 years old.

We'd like to purchase 14 new mock leather high back conference room chairs to replace the current chairs. The chairs downstairs are very unstable and rickety and the chairs in the upstairs conference room are very worn and uncomfortable.

I have the attached a quote from Rubenstein's for the same style chairs we have throughout the office. The $107 chair is made in China and very uncomfortable, I sat in it and you guys would not like this chair. The $219 chair is the same chair we have in most of the office downstairs and is very comfortable. We do not have the mock leather version however I sat in one at the Rubenstein's showroom and it is a very comfortable chair. We compared the Rubenstein's quote with several other chairs on the state COSTARS program and found the same price range as quoted by Rubenstein's. We have had great results with our furniture purchases through Rubenstein's in the past and these chairs have a five year warranty that Rubenstein's will service.

I recommend that the board approve this purchase of new conference room chairs (5330-4 Supra High Back Mock Leather) for $3,066 from Rubenstein's and use the funds available in capital reserve. I will have one of the chairs for you to demo on Tuesday night.

F:\Data\Shared Data\Admin Dept\OFFICE EQUIPMENT\Memo to BOS re Office Chairs 01272011.doc

RUBINSTEIN'S

SINCE 1915

QUOTATION

Submitted by: Brian C. Ward
email: brianw@rubinsteins.com
tel: 610 696 1150 ext145 fax 610 696 8239

DATE: 12/22/10
Name: East Goshen
Telephone: Nacey 610 692 7171

Item Number Description QTY LIST PRICE SELL PRICE EXTENDED SELL
5330-4 SUPRA HIGH BACK TILTER
GRADE 4 BLACK FABIC
IN STOCK LEAD TIME 1-2 WEEKS
14 $ 453.00 $ 235.00 $ 3,290.00
5330-4 SURPA HIGH BACK TILER
MOCK LEATHER
LEAD TIME 3-4 WEEKS
14 $ 421.00 $ 219.00 $ 3,066.00
11616B Leather Managers Swivel Tilt 14 $ 225.00 $ 107.00 $ 1,498.00

14. **********DELIVERY AND ASSMEBLY ADDITIONAL

15. prices quoted good for 21 days

16. special order items cannot be cancelled or returned

17. allow 3-4 WEEKS unless otherwise stated in order

30% deposit required on special order items

Signature of Acceptance: ____________________

AREA CODE 610
692-7171

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

February 3, 2011

East Goshen Township
Board of Supervisors
1580 Paoli Pike
West Chester, Pa. 19380

Re: Multi-Use Building and Parking Ordinance Amendment

Dear Board Members:

As you are aware the Planning Commission has been working on the Multi-Use Building and Parking Ordinance Amendment for some time and made the following motion at their meeting on February 2, 2011 for your consideration.

Mr. Chairman, I move that we recommend that the Board of Supervisors approve the proposed amendment to the Zoning Ordinance which will establish a definition for Multiple Use Buildings and effectively improve the parking requirements for Multiple Use Buildings.

I have enclosed the Ordinance for your review and consideration. If you have no major comments we can forward this onto the County Planning Commission for their review and comment.

Sincerely,
[signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer

F:\Data\Shared Data\Admin Dept\Township Code\BP and I Parking 2010\PC Rec to BOS 02032011.doc

EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO.

AN ORDINANCE OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 240 OF THE EAST GOSHEN TOWNSHIP CODE, TITLED, "ZONING", SECTION 240-6 TO ADD A DEFINITION FOR "MULTIPLE USE BUILDING"; SECTIONS 240-19.C(1), 240-21.C(1) AND 240-31.C(3)(v) REGARDING MULTIPLE USES IN THE I-1 AND BP DISTRICTS; AND SECTION 240-33.A(1) TO AMEND THE REQUIRED NUMBER OF OFF-STREET PARKING SPACES FOR OFFICES, INDUSTRIAL, WHOLESALE, WAREHOUSING AND MULTIPLE USE BUILDINGS.

BE IT ENACTED AND ORDAINED, by the Board of Supervisors of East Goshen Township, that Chapter 240 of the Code of the Township of East Goshen, titled, "Zoning", shall be amended as follows:

SECTION I. Section 240-6 titled, "Definitions" shall be amended by adding the following definition in proper alphabetical order:

Multiple Use Building: A building which has more than one use and which may or may not consist of different businesses or tenants. A building which houses an industrial use may also contain a maximum of 10% of gross floor area which is dedicated to offices accessory to the industrial use without such building being defined as a multiple use building. However, if a building containing an industrial use contains more than 10% of gross floor area devoted to office use, such building shall be defined as a multiple use building.

SECTION II. Section 240-19.C(1) shall be amended to state as follows:

(1) Multiple uses in a Multiple Use Building with uses that are permitted in this Section by right or by conditional use and when specifically approved pursuant to Section 240-31.C(3)(v).

SECTION III. Section 240-21.C(1) shall be amended to state as follows:

(1) Multiple uses in a Multiple Use Building with uses that are permitted in this Section by right or by conditional use and when specifically approved pursuant to Section 240-31.C(3)(v).

1

SECTION IV. Section 240-31.C(3)(v) shall be amended to state as follows:

(v) Multiple uses in a Multiple Use Building in the I-1 District pursuant to Section 240-19.C(1) and in the BP District pursuant to Section 240-21.C(1). The following shall apply if an existing building is to be converted or if a new building is built for multiple uses:
[1] Each use shall have a minimum of 5,000 square feet of contiguous floor space. Separate users which are the same type of principal use may make up the minimum 5,000 square feet of floor space.
[2] A development plan shall be submitted and conform to Chapter 205, Subdivision and Land Development, as well as Sections 240-24 and 240-27.

SECTION V. The parking table referenced in Section 240-33.A(1)(a) shall be amended as follows:

E. Retail and commercial services uses

Minimum Off-Street Parking Requirements

Use Minimum Off-Street Parking Spaces Plus the Following Minimum Off-Street Parking Spaces
8. Office 4 per 1,000 sq ft of gross floor area or 1 space per each employee on the largest shift, whichever is greater

F. Industrial, wholesale and warehousing uses

Use Minimum Off-Street Parking Spaces Plus the Following Minimum Off-Street Parking Spaces
1. Industrial, wholesale, warehousing uses 1 space per 1,000 sq. ft. of gross floor area or 1 space per employee on the largest shift, whichever is greater 1 space per company vehicle based at the facility, plus a minimum of 4 spaces per principal building for visitors
2. Multiple Use Building Calculate using the aggregate number of parking spaces required for each use in the building (i.e., for office use, warehouse use, etc.)

2

SECTION VI. Severability. If any sentence, clause, section or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.

SECTION VII. Repealer. All Ordinances or parts of Ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.

SECTION VIII. Effective Date. This Ordinance shall become effective five days after its enactment as law provides.

ENACTED AND ORDAINED this _____ day of _______________, 2011.

ATTEST:

____________________
Secretary
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS

____________________
Senya D. Isayeff, Chairman

____________________
Thom Clapper Ph.D, Vice-Chairman

____________________
E. Martin Shane, Member

____________________
Carmen Battavio, Member

____________________
Donald R. McConathy, Member

3

EAST GOSHEN TOWNSHIP
ACTION LIST

# Item Action Due Date
ADM 08-02Review Comp Plan Action List (Ch 10)8-Feb-11
PCZ 06-01Parking for Multi-Use Space in IP/BP District8-Feb-11
ADMI 10-22TAG Action List22-Feb-11
PCZ 09-01Telecom Registration and Reporting22-Feb-11
DPW 07-02Hershey's Mill Dam1-Mar-11
ADM 07-01Review Wireless Ordinance8-Mar-11
ADM 07-02Pension Plan Conversion Committee8-Mar-11
ADM 10-02Annual Training Plan8-Mar-11
FIN-10-10Energy Usage at Township Building15-Mar-11
DPW 10-5Street Signs29-Mar-11
ADM 09-04Quarterly Review of Right to Know Requests5-Apr-11
DPW 08-02Quarterly Report on I&I26-Apr-11
FIN 09-01Quarterly Summary of Pending Legal Cases26-Apr-11
FIN 10-05Quarterly Financial Reports - 201026-Apr-11
DPW 08-04Invasive Species1-Sep-11
DPW 11-1Reccomendation from CB on NLT Plan1-Sep-11
ADM 09-05Energy Conservation in Twp BldgCompleted
ADM 09-07Web Site Upgrade StatusCompleted
ADM 09-08Police SchedulingCompleted
ADM 09-09ARCView System (GIS)Completed
ADM 09-10Soccer Fields @ Line RoadCompleted
ADM 09-112010 Sponsorships: Fireworks & Leaf BagsCompleted
ADM 09-12Deer Management CommitteeCompleted
ADM 09-13ABC Appreciation Event Guest ListCompleted
ADM 10-01Employee BenefitsCompleted
ADM 10-03Township Advisory GroupCompleted

Action List 020811.xlsx 1 of 3 2/2/2011

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item:Parking for Multi-Use Space in IP/BP District No:PCZ 06-01
List Date:8/2/2006 Completed Date:
Description:
Date Action
PC to review and recommend changes/No formal recommendation yet.
3/16/2010Memo from Mark Gordon: Planning Commission has resurrected topic and will discuss at their April 7 Meeting.
4/22/2010MG: No update from PC
6/2/2010MG: PC to review draft ordinance revision
7/13/2010August Planning Commission item.
7/22/2010MG: PC discussed this item at length during their 7/21 WS and will forward a draft recommendation to the Board of Supervisors in August.
8/31/2010MG: PC asked for some more information, still working on this item.
9/21/2010will be on 10/6 PC agenda for discussion
10/12/2010PC discussed on 10/6. PC requested that Mark obtain additional information.
11/9/2010PC discussed on 11/4
12/14/2010BoS ok with PC recommendation on 12/7. Set back to PC to address definition of multi-principal use
2/8/2011PC recommended approval of revised ordinance

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item:Review Comp Plan Action List (Ch 10) No:ADM 08-02
List Date:5/20/2008 Completed Date:
Description:
Date Action
4/19/2010Didn't get to discuss at meeting. Reschedule.
5/11/2010Review progress to date and discuss how to proceed. Memo from Joe.
5/25/2010Rick & Joe to meet with ABC's to distribute lists and explain reporting needs.
7/13/2010Comp Plan will be added to agendas for next ABC meetings.
Rick & joe to meet with staff liaisons.
10/5/2010Update
1/18/2011Staff is in the process of comparing ABC Goals to the Comp Plan Action List
2/8/2011See attached report

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: August 12, 2010
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Comp Plan Action List (Chapter 10)

Background - The Comprehensive Plan adopted on June 21, 2005 identified a series of action items that need to be completed in order to accomplish the goals set forth in the Plan. These action items are set forth in Chapter 10 of the Plan. The Board asked that each ABC should use their respective list of action items as a basis for determining their goals for 2011.

The ABC's presented their goals for 2011 at the Planning Session on January 8, 2011. I have cross referenced each ABC's goals, were applicable, with the ABC's Action Items from Chapter 10.

F:\Data\Shared Data\ABC'S\Goals\COMP PLAN GOALS\Memo to BoS 020411.doc

2011
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
JANUARY REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/9/11; Need by 5/11/11; Need by 8/10/11; Need by 11/9/11
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March); 2 nd Quarter (June); 3 rd Quarter (September); 4 th Quarter (December)
  3. Respond to capacity requests in 45 days or less.
  4. Implement I & I Plan
  5. Conduct a sewer facilities tour after RCSTP construction is complete

RIDLEY CREEK PROJECT

  1. Monitor construction. #2, 4
  2. Invite Board of Supervisors and all other ABC members to tour the plant.
  3. Open House at the RCSTP
  4. Have Siemens conduct a training session for Miller and Township Employees on the new SBR unit. (This would be in lieu of us going to the Siemens' facility in the mid-west.) #2, 4.

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project. #2
  2. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project. #2
  3. Obtain Act 537 Plan approval for the Marydell PS Abandonment project. #2
  4. Obtain construction permits, solicit bids and start construction of the Marydell PS Abandonment project. #2

F:\Data\Shared Data\ABCS\Municipal Authority\Goals\2011\011011.doc

Comprehensive Plan Actions
Municipal Authority

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
7B-4
1
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the need to provide sewer service across Township boundaries. 1 - On-going 1 - High Consider the cost-effectiveness of extending services to areas outside the Township. Evaluation of service extensions on a case-by-case basis, and through cost-factor analysis prior to requests made. Active
7B-5
2
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Provide for the upgrading of existing public sewer lines and wastewater treatment facility. 1 - On-going 1 - High Evaluate the existing sewer system lines and connections to ensure the system is free of stormwater infiltration and other problems. Municipal Authority Capital Improvements Budget Active
7B-3
3
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 1 - On-going 2 - Medium Review the Township Act 537 Plan at a minimum of bi-annually or as often as necessary. Township Act 537 Plan Completed and On-Going
7B-5
4
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Provide for the upgrading of existing public sewer lines and wastewater treatment facility. 1 - On-going 2 - Medium Evaluate new technologies and existing equipment needs. Municipal Authority Capital Improvements Budget Completed and On-Going
7B-3
5
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 2 - Immediate 1 - High Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan. Township Act 537 Plan No Action
7B-3
6
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township. 2 - Immediate 2 - Medium Based on the review of the Act 537 Plan, implement recommendations and updates as necessary. Township Act 537 Plan Completed and On-Going

Page 1 of 1

Goals and Objectives for 2011 Park and Recreation Board

Immediate Goals

  1. Increase revenues by: a. increasing fees contributed by contractors we hire for recreation programs ie Soccer, tennis, yoga, etc. b. increased unit fee for field permits and pavilion permits c. reaching out to sponsors of special events d. Use of grants to cover costs for any necessary programs.. #2
  2. Participate in education workshops that involve creative ideas for fund raising. #3
  3. Work with Friends of East Goshen committee to find funding.
  4. Expand scope of partnerships for revenue purposes, i.e. with the Philadelphia Eagles for their football camp and with neighboring municipalities when possible.
  5. Find ways to increase Recreation program exposure using modalities like Facebook and Twitter. #2
  6. Modify our Summer Youth Camp to maximize participation and revenue.
  7. Modify our Park Permit Rules and Regulations.
  8. Make use of top students at local schools for creative ideas, grant writing and other tasks.
  9. To utilize scout projects to enhance our park system.

Long Range Goals

  1. Make Youth Recreation camp pay for itself 2 yr
  2. To implement a management plan (5 year) to clarify our vision for Applebrook Park #4 mowing versus meadow; active versus passive invasive control
  3. Streamline registrations by use of online payments
  4. To build and install a bathroom at Applebrook Park
  5. To consider additional members to the Park and Recreation board.

Comprehensive Plan Actions
Parks & Recreation Board

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
6B-1
1
Develop and promote recreational activities for a diverse population. Evaluate existing recreation programs annually and provide financial and staff support to enhance programs. 1 - On-going 1 - High Implement an evaluation system through the Township website for program feedback. Township website survey for program evaluation Completed
6B-1
2
Develop and promote recreational activities for a diverse population. Evaluate existing recreation programs annually and provide financial and staff support to enhance programs. 1 - On-going 1 - High Continue to pursue a range of programs suitable for all age groups and economic means. Park and Recreation Evaluation Active
6C-1
3
Participate in and plan for regional recreation programs, activities, and facilities. Continue to coordinate with West Chester area athletic directors and parks and recreation directors to evaluate and consider developing regional recreation programs for the West Chester Region. 1 - On-going 1 - High Meet with West Chester area athletic and parks directors to coordinate regional programs and activities. Coordination with municipal athletic directors, parks directors; coordinated programming Active
6A-1
4
Provide stewardship for the protection and effective utilization of Township owned land. Review Township-owned parks and open space lands and develop a resource management maintenance program. 1 - On-going 2 - Medium Implement the management maintenance program Annual Budget, Capital Improvements Plan Active
6A-1
5
Provide stewardship for the protection and effective utilization of Township owned land. Review Township-owned parks and open space lands and develop a resource management maintenance program. 2 - Immediate 1 - High Develop a management maintenance program to reduce environmental impact. Integrated Resource Management Plan for Township parks and open space based on results of the in-house evaluation. Completed and On-Going
6A-1
6
Provide stewardship for the protection and effective utilization of Township owned land. Review Township-owned parks and open space lands and develop a resource management maintenance program. 2 - Immediate 2 - Medium Evaluate the current methods used to maintain the Township's parks and open space lands. In-house evaluation No Action
4C-3
7
Protect scenic vistas and public and privately owned open space from the impacts of development. Review the Township Open Space and Recreation Plan. 3 - Short-term 2 - Medium Ensure compatibility of the Township Open Space Plan and Linking Landscapes. Township Open Space, Recreation, and Environmental Resources Plan, Open Space subcommittee No Action

Page 1 of 1

Conservancy Board

Mission Statement

Protect and nurture East Goshen's natural resources and educate East Goshen citizens of their importance.

Accomplishments for 2010

  • Worked with the Public Works Department to train some of their employees about trees and plantings and how to maintain them - reforesting and meadows in Applebrook Park.
  • Reviewed the Township's riparian buffer ordinance - new PA state law.
  • Reviewed the Stewardship Assessment done for the township by Natural Lands Trust Center for Conservation Landowners with Park and Rec - joint walks and meetings with P&R.
  • Partnered with West Chester University to monitor the growth and benefits of forest restoration - Applebrook Park at Paoli & Line Roads.
  • Partnered with Chester Ridley Crum (CRC) Watershed to plant 80 trees at Chester Creek restoration area - Township open space along Reservoir Road.
  • Assisted Public Works with replacing the Conservancy wetland sign in East Goshen Park and replacing the Bird signs in Applebrook Park.
  • Expanded the existing planting of warm season grasses at Township open space along Reservoir Road to Baldwin Road.

Goals for 2011

  1. Increase the riparian buffer plantings throughout the Township.
  2. Continue control of invasive plants species in Township wetlands. #3
  3. Call for good environmental practices through articles in the Township Newsletter. #2, 3, 4
  4. Continue looking for ways to increase recycling in the Township. #1
  5. Create environmental education for residence around storm water control, such as rain gardens and rain barrels. #2
  6. Implement the Stewardship Assessment done for the township by Natural Lands Trust Center for Conservation Landowners. #8
  7. Coordinate with Park & Rec to initiate a revitalization of street trees in the Township using available grants. (new)

Comprehensive Plan Actions
Conservancy Board

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
7B-2
1
Ensure adequate Township sewer, solid waste, and recycling services to meet the needs of residents and businesses. Pursue regional approaches to water resource management. 1 - On-going 1 - High Participate in regional partnerships with municipalities within the Chester and Ridley Creek watersheds to address the key concerns of water supply and quality, including stormwater management Multi-municipal planning groups, coordination among conservation/environmental boards Active
9E-2
2
Create an awareness, with residents, of the goals and objectives of the Comprehensive Plan. Create a public information program to inform residents about their role in the improvement of water quality and stormwater runoff. 1 - On-going 1 - High Inform residents about the importance of stormwater quality and impacts of harmful runoff downstream. Information pamphlets for distribution at Township Building, articles in Township newsletter and website Completed
7G-1
3
Evaluate the feasibility to develop a program for maintenance and preservation of Township owned ponds. Review existing environmental studies of Township ponds and evaluate feasibility of recommendations. 1 - On-going 2 - Medium Provide information to residents on natural maintenance of ponds and best management practices for areas close to ponds. Pamphlets available at the Township Building and website, Township Newsletter Active
9E-3
4
Create an awareness, with residents, of the goals and objectives of the Comprehensive Plan. Promote resident awareness of environmental issues. 1 - On-going 2 - Medium Publicize community projects and success stories to create community awareness of local conservation and preservation efforts. Prepare press releases and announcements for distribution, follow-up articles in Township newsletter and on website. Completed and On-Going
9E-3
5
Create an awareness, with residents, of the goals and objectives of the Comprehensive Plan. Promote resident awareness of environmental issues. 1 - On-going 2 - Medium Provide a list of contacts where residents can get information on other environmental subjects and natural resource programs from Federal, State, and County agencies. Research on environmental contacts, posting on Township website Completed and On-Going
4A-1
6
Prohibit development and redevelopment within highly sensitive environmental areas. Promote preservation of large land tracts. 1 - On-going 3 - Low Inform landowners about the benefits of preservation and the available programs. Pamphlets, Township Newsletter and website, information available from requisite County and State agencies No Action
4C-1
7
Protect scenic vistas and public and privately owned open space from the impacts of development. Promote citizen awareness of environmental issues. 1 - On-going 3 - Low Provide information on various environmental and conservation programs and advocates. Pamphlets, Township newsletter and website Completed and On-Going
4C-1
8
Protect scenic vistas and public and privately owned open space from the impacts of development. Promote citizen awareness of environmental issues. 1 - On-going 3 - Low Provide residents with information on the benefits of using native plants. Pamphlets, Township newsletter and website Completed and On-Going
4A-2
9
Prohibit development and redevelopment within highly sensitive environmental areas. Protect serpentine as a unique natural resource. 3 - Short-term 3 - Low Complete an inventory of serpentine outcroppings. Serpentine Study No Action

Page 1 of 1

EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE
WEST CHESTER, PENNSYLVANIA
19380

January 8, 2011

Re: Annual Goals for 2011

Dear East Goshen Supervisors:

Please review the following goals for 2011 for our meeting January 8, 2011.

  1. Continue to work with Applicants and support their efforts to comply with the MPC, East Goshen Township Zoning and East Goshen Township Comprehensive Plan.
  2. Monitor new technology developments and evaluate their potential impact on current zoning and the Township Comprehensive Plan and make necessary recommendations to the Board of Supervisors for proactive changes.
  3. Continue to prioritize and update the Planning Commission Comprehensive Plan Action Items to remain current with changing technology, market conditions and the environment. ALL
  4. Encourage and support enrollment in continuing education for members of the Planning Commission.
  5. Encourage interaction with Planning Commission members from surrounding municipalities through various functions. #5, 10

Very Truly Yours,

George Martynick
Chairman

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
3B-1
1
Encourage design and layout of housing that maximizes the preservation of open space and the protection of environmentally sensitive land. Encourage the use of clustering methods for new development of vacant lands. 1 - On-going 1 - High Ensure common open space includes natural resources that connect to form natural corridors for wildlife habitat. Zoning Ordinance Active
4B-1
2
Promote the use of best management practices in design and land development that protect the air quality, water resources, wetlands, and floodplains from the impacts of development. Recommend the use of porous pavement to reduce impervious coverage. 1 - On-going 1 - High Promote the use of porous paving materials. Zoning Ordinance Active
8F-2
3
Investigate alternative transportation needs including pedestrian and bike paths, and connect these routes with major centers of activity and recreation. Consider the addition of sidewalks to increase pedestrian circulation and safety. 1 - On-going 1 - High Coordinate the construction of new sidewalks with the development of a potential trail network. See Recommendation 6D-2. Should a trail network be advocated relative to Recommendation 6D-1, then coordinate with sidewalk improvements to avoid duplication of improvements. Active
8F-2
4
Investigate alternative transportation needs including pedestrian and bike paths, and connect these routes with major centers of activity and recreation. Consider the addition of sidewalks to increase pedestrian circulation and safety. 1 - On-going 1 - High Consider sidewalk improvements in all future development proposals. Coordination of sidewalk improvements should include contributions through new development proposals on roadways specifically linking developments on Township roads classified as collector or arterial; Subdivision and Land Development Ordinance. Active
2E-2
5
Encourage and support regional planning initiatives that promote best planning practices. Continue participation in the West Chester Regional Planning Commission (WCRPC). 1 - On-going 2 - Medium Support development of other regional initiatives of interest to East Goshen. Special Study, Zoning Ordinance revisions Active
3A-2
6
Preserve the character and diversity of existing residential neighborhoods. Encourage rehabilitation of housing in transitional neighborhoods. 1 - On-going 2 - Medium Encourage redevelopment of existing housing stock and development of vacant sites in older. neighborhoods by providing for flexibility in the types of residential uses permitted. Zoning Ordinance Active
4D-1
7
Protect the headwaters of the Ridley Creek and the Chester Creek. Promote protection of riparian forest buffers. 1 - On-going 2 - Medium Encourage applicants to use local volunteer groups to help with planting of riparian forest buffers, in coordination with the Conservancy Board. Township newsletter, website Active

Page 1 of 6

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
8D-4
8
Reduce traffic by implementing and optimizing appropriate travel demand management techniques and public transportation opportunities. Coordinate the establishment of local travel demand management programs with regional employers. 1 - On-going 2 - Medium Work with area and regional employers and the Chester County TMA to establish programs designed to address travel demand. Coordinate efforts to establish and promote alternatives either as options for employees or mandated within local employer operations; options to manage travel demand include: carpool/vanpool programs, flex time provision, bus circulators (local busing from parking to employment and between employers). Investigate grant programs available through PennDOT and DVRPC to provide cost incentives to employers/employees. No Action
8E-1
9
Identify regional highway improvement projects to enhance mobility and safety and reduce congestion. Continue to discuss and plan transportation issues at a regional level. 1 - On-going 2 - Medium Monitor transportation improvements in adjacent townships and through the WCRPC. Monitor all roadway improvements and other initiatives of adjacent townships and the WCRPC. Active
8E-1
10
Identify regional highway improvement projects to enhance mobility and safety and reduce congestion. Continue to discuss and plan transportation issues at a regional level. 1 - On-going 2 - Medium Work with adjacent townships and the West Chester Region to continually plan for implementation of improvements along corridors of mutual interest. Road Corridor Studies done on a multi-municipal level with adjacent townships and with WCRPC. An example is the current Paoli Pike corridor study with West Goshen and Willistown. Active
2A-2
11
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 2 - Immediate 1 - High Establish a shared parking strategy that reduces the number of total parking spaces required for adjacent commercial and noncommercial uses. Zoning Ordinance, reference to Subdivision and Land Development Ordinance; Shared parking should incorporate a calculation that identifies peak hours of operation of adjacent uses to identify the number of adjacent parking spaces that could be shared. Active
2A-2
12
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 2 - Immediate 1 - High Re-examine existing minimum parking requirements and, using the most recent available parking generation data, reduce the amount of parking required. Zoning Ordinance To Be Addressed
2A-2
13
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 2 - Immediate 1 - High Encourage alternative paving of parking areas to include the use of porous paving systems. Zoning Ordinance Active
2C-1
14
Encourage higher density uses along major roads and highways. Encourage multi-story development of commercial areas to create greater diversity of use. 2 - Immediate 1 - High Consider an increase in structure height in commercial districts to reduce impervious coverage and increase open space. Zoning Ordinance No Action

Page 2 of 6

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
3B-1
15
Encourage design and layout of housing that maximizes the preservation of open space and the protection of environmentally sensitive land. Encourage the use of clustering methods for new development of vacant lands. 2 - Immediate 1 - High Provide a density bonus for increased open space. Zoning Ordinance Active
4A-2
16
Prohibit development and redevelopment within highly sensitive environmental areas. Protect serpentine as a unique natural resource. 2 - Immediate 1 - High Revise the Subdivision and Land Development Ordinance to include location and size of any serpentine outcroppings. Subdivision and Land Development Ordinance Active
4A-3
17
Prohibit development and redevelopment within highly sensitive environmental areas. Promote woodland preservation. 2 - Immediate 1 - High Revise the Subdivision and Land Development Ordinance to promote use of native plants and prohibit invasive species. Subdivision and Land Development Ordinance Active
4A-3
18
Prohibit development and redevelopment within highly sensitive environmental areas. Promote woodland preservation. 2 - Immediate 1 - High Update Subdivision and Land Development Ordinance Definitions section. Subdivision and Land Development Ordinance Active
4A-3
19
Prohibit development and redevelopment within highly sensitive environmental areas. Promote woodland preservation. 2 - Immediate 1 - High Review specifications for a Tree Protection Zone (TPZ). Subdivision and Land Development Ordinance Completed
4D-2
20
Protect the headwaters of the Ridley Creek and the Chester Creek. Promote protection of wetlands. 2 - Immediate 1 - High Revise the Subdivision and Land Development Ordinance to include wetlands margins, permitted uses, and setbacks. Zoning Ordinance, Subdivision and Land Development Ordinance To Be Addressed
8C-5
21
Implement traffic improvements for key roads and intersections. Revise the Road Functional Classification designations to reflect current conditions and future needs. 2 - Immediate 1 - High Consider implementing the revised functional road classifications for PennDOT roads within the Township after Chester County and PennDOT reach agreement on the definitions. Comprehensive Plan, traffic and road improvement design studies, Subdivision and Land Development Ordinance requirements for new development, evaluation of impacts on Zoning Ordinance provisions. No Action
4A-4
22
Prohibit development and redevelopment within highly sensitive environmental areas. Identify protected resources on subdivision and land development plans. 2 - Immediate 2 - Medium Revise the Subdivision and Land Development Ordinance to require the location of first order streams (headwaters), and riparian forest buffers. Subdivision and Land Development Ordinance No Action
2A-2
23
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 3 - Short-term 1 - High Review landscaping regulations to provide more flexibility in the design and improvement of nonconforming and combined sites. Incorporate into Subdivision and Land Development Ordinance No Action
2A-2
24
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 3 - Short-term 1 - High Provide greater flexibility in the use of common driveways, including providing design or use incentives that allow for business owners to redesign existing parking areas to create greater driving and access safety. Subdivision and Land Development Ordinance, references to Zoning Ordinance; incentives should be tied to reductions in landscape buffer requirements, setbacks, or parking. Active

Page 3 of 6

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
2A-2
25
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 3 - Short-term 1 - High Consider an increase in structure height in commercial districts to reduce impervious coverage and increase open space. Zoning Ordinance No Action
2E-1
26
Encourage and support regional planning initiatives that promote best planning practices. Adopt revisions to the Township Zoning Ordinance to achieve consistency with adjacent township comprehensive plans and zoning ordinances. 3 - Short-term 1 - High Review the Zoning Ordinance for provisions to address incompatible land uses along the borders, and adopt revisions as needed. Zoning Ordinance Completed
5B-2
27
Protect the Township's historical structures from the impacts of development. Consider the creation of additional Local Historic Districts. 3 - Short-term 1 - High Establish an historic overlay zoning district for the Rocky Hill historic area. Zoning Ordinance (prior to amendments, through Rocky Hill study of existing developed conditions) No Action
2A-1
28
Promote redevelopment in commercial districts that enhances the character of the community. Designate commercial districts as redevelopment areas, and create incentives through zoning to redevelop existing business sites as well as vacant or underutilized properties. 3 - Short-term 2 - Medium Consider adopting an Ordinance to capture any proposed additional public rights-of-way. Ordinance No Action
2B-1
29
Develop innovative design standards for future residential, commercial, and industrial development and redevelopment that minimizes impact on the environment and maximizes preservation of open space. Amend cluster design regulations to create a site design "blueprint" that defines future design parameters for new residential, commercial, and industrial development. 3 - Short-term 2 - Medium Develop and adopt cluster design regulations appropriate to the Business Park (BP) district. Zoning Ordinance No Action
2B-2
30
Develop innovative design standards for future residential, commercial, and industrial development and redevelopment that minimizes impact on the environment and maximizes preservation of open space. Adopt provisions that encourage flexibility for infill opportunities, while maintaining the existing character of local neighborhoods. 3 - Short-term 2 - Medium Encourage cluster development of Low Density Residential (LDR) areas that protects existing historic structures and natural resources. Zoning Ordinance, Subdivision and Land Development Ordinance Completed
2B-2
31
Develop innovative design standards for future residential, commercial, and industrial development and redevelopment that minimizes impact on the environment and maximizes preservation of open space. Adopt provisions that encourage flexibility for infill opportunities, while maintaining the existing character of local neighborhoods. 3 - Short-term 2 - Medium Review and revise the existing lot area, width, and yard regulations of the R-3 district to reflect the existing lot sizes within the district. Zoning Ordinance (R-3 District) No Action
2C-1
32
Encourage higher density uses along major roads and highways. Encourage multi-story development of commercial areas to create greater diversity of use. 3 - Short-term 2 - Medium Evaluate the restriction allowing only one principal use per commercial lot and revise C-4 district area and bulk standards to reflect additional potential uses and multi-use development. Zoning Ordinance No Action

Page 4 of 6

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
3C-1
33
Promote redevelopment in residential districts to preserve the character of East Goshen. Ensure redevelopment is suited in scale and character to the existing neighborhood. Review zoning regulations that inhibit affordable housing development or redevelopment. 3 - Short-term 2 - Medium Review area and bulk regulations in the residential districts. Zoning Ordinance (prior to amendments, a study of area and bulk regulations in the residential districts) No Action
3C-1
34
Promote redevelopment in residential districts to preserve the character of East Goshen. Ensure redevelopment is suited in scale and character to the existing neighborhood. Review zoning regulations that inhibit affordable housing development or redevelopment. 3 - Short-term 2 - Medium Review impervious coverage requirements in all residential districts. Zoning Ordinance No Action
4B-1
35
Promote the use of best management practices in design and land development that protect the air quality, water resources, wetlands, and floodplains from the impacts of development. Recommend the use of porous pavement to reduce impervious coverage. 3 - Short-term 2 - Medium Review impervious coverage regulations. Zoning Ordinance Active
4D-1
36
Protect the headwaters of the Ridley Creek and the Chester Creek. Promote protection of riparian forest buffers. 3 - Short-term 2 - Medium Revise the Subdivision and Land Development Ordinance to include standards to limit or prohibit disturbance within a specified distance from the stream or water body. Subdivision and Land Development Ordinance Completed
4D-1
37
Protect the headwaters of the Ridley Creek and the Chester Creek. Promote protection of riparian forest buffers. 3 - Short-term 2 - Medium Require the establishment and maintenance of riparian forest buffers. Zoning Ordinance, Subdivision and Land Development Ordinance No Action
8D-2
38
Reduce traffic by implementing and optimizing appropriate travel demand management techniques and public transportation opportunities. Support establishment of a subscription bus service. 3 - Short-term 2 - Medium Investigate and, if warranted, support the establishment of a subscription bus service. Study the parameters for a subscription bus service, including total costs, interviews with employers re costs and contributions opportunities, and survey employees for interest in alternative commuting choice. No Action
8D-3
39
Reduce traffic by implementing and optimizing appropriate travel demand management techniques and public transportation opportunities. Identify and support organized park and ride locations. 3 - Short-term 2 - Medium Communicate with local businesses and institutions that may have ideal locations for park and ride lots. Negotiate with local businesses/institutions for use of parking areas, fees, liability, etc. No Action
8D-3
40
Reduce traffic by implementing and optimizing appropriate travel demand management techniques and public transportation opportunities. Identify and support organized park and ride locations. 3 - Short-term 2 - Medium Identify possible locations for park and ride lots and support park and ride lots already in existence. Field survey of local parking lots and already existing park and ride lots. Evaluate commuting patterns to determine effective future locations depending on transit availability. No Action

Page 5 of 6

Comprehensive Plan Actions
Planning Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
2A-2
41
Promote redevelopment in commercial districts that enhances the character of the community. Adopt design standards that create unifying visual features within existing commercial districts, primarily through landscaping, access control, sign regulation, and pedestrian/bicycle facilities. 4- Long-term 2 - Medium Develop and approve a sign plan in accordance with a Corridor Design Plan. Sign Plan – defines a common design theme and parameters to implement along designated Corridors. Zoning Ordinance for consistency with the Sign Plan. To Be Addressed
2B-1
42
Develop innovative design standards for future residential, commercial, and industrial development and redevelopment that minimizes impact on the environment and maximizes preservation of open space. Amend cluster design regulations to create a site design "blueprint" that defines future design parameters for new residential, commercial, and industrial development. 4- Long-term 3 - Low Consider cluster design as a by-right development, with the current conventional design converted to a conditional use approval. Zoning Ordinance (R-2 and R-4 Districts only) No Action
2B-1
43
Develop innovative design standards for future residential, commercial, and industrial development and redevelopment that minimizes impact on the environment and maximizes preservation of open space. Amend cluster design regulations to create a site design "blueprint" that defines future design parameters for new residential, commercial, and industrial development. 4- Long-term 3 - Low Consider raising the minimum common open space requirement to 50% for residential development, with a smaller percentage for commercial and industrial cluster development. Zoning Ordinance Active
2D-1
44
Preserve and enhance the concept of a Town Center. Hold a workshop to develop a unifying design concept for the Town Center. 4- Long-term 3 - Low Hold a workshop to invite members of the public, design professionals, business owners, community leaders, and public officials to develop a common design concept and parameters for the Town Center. Public Design Workshop incorporating:- Small group sessions with design professional to identify existing assess and concerns;- Potential design solutions to unify the Town Center;- Ordinance amendments to address design recommendations;- A growth plan to maintain economic viability of the Goshen Village Shopping Center. No Action
4C-2
45
Protect scenic vistas and public and privately owned open space from the impacts of development. Consider a scenic road overlay district. 4- Long-term 3 - Low Consider the creation of a Scenic Road Overlay District. Update of Scenic Road inventory, Zoning Ordinance No Action

Page 6 of 6

(111110)

2011 GOALS AND OBJECTIVES
EAST GOSHEN TOWNSHIP – HISTORICAL COMMISSION

IMMEDIATE GOALS

  1. Explore new approaches to the presentation of the Plank House and Blacksmith Shop utilizing more interactive activities and period presentations. Emphasize attracting new and repeat visitors. HIGH #1, 3, 4, 5, 6, 7, 11
  2. Implement a media campaign to promote historical activities. MEDIUM #6
  3. Enhance the historical section on the web site. HIGH #6

LONG-TERM GOALS

  1. Work on the County GIS Historical Project for East Goshen Township with the assistance of the County Historic Preservation Officer. MEDIUM
  2. Continue development of the third program for the Township using a "first person interpreter" approach in an effort to complete the series of Pre-Revolution, Revolution, Post Revolution and Civil War. MEDIUM #1
  3. Investigate designs and develop requirements for plaques to be made available to local historical houses. LOW
  4. Fine-tune the 10-year implementation timeline of the Action Plan for the Historic Commission as identified in Chapter 10 of the Township's Comprehensive Plan. MEDIUM ALL
  5. Involve residents in the process of nominating the Rocky Hill Historic District and the Hershey's Mill Historic District for inclusion on the National Register of Historic Places. LOW #23

(continued)

2011 GOALS AND OBJECTIVES
EAST GOSHEN TOWNSHIP – HISTORICAL COMMISSION

ONGOING HISTORICAL COMMISSION RESPONSIBILITIES AND ACTIVITIES

  1. Maintain the development of a strong volunteer program beyond the Commission members that will provide more staff to help with events and special projects. Continue to involve other ABC's in local historic events and programs. HIGH
  2. Plan and implement two Living History Days or a Living History Day and a County event. HIGH #1
  3. Continue to work on the marketing aspects of the "Images of America" history book for East Goshen Township. MEDIUM #5
  4. Maintain an awareness of the roles, responsibilities, duties and contributions of the Historical Commission. MEDIUM
  5. Continue comprehensive research of the prior property owners for the resources on the Inventory List of Historic Resources. Continue to update the chain of title for the entries on the Inventory of Historic Resources. Complete the chain of title for new entries. Begin comprehensive auditing of Historical Commission file contents for properties. MEDIUM
  6. Enhance the Oral History Program. Recruit additional volunteers to help. MEDIUM
  7. Continue to implement as well as review and recommend changes to the Board of Supervisors for the Historic Preservation Ordinance. As the Commission identifies new resources, add them to the Historic Inventory list. HIGH
  8. Promote our Township in the community through participation in historic-related events and activities including work with groups such as the Chester County Historical Society (CCHS), Chester County Historical Preservation Network (CCHPN), the Regional Historic Group and others. MEDIUM
  9. Provide articles for every Township newsletter. HIGH
  10. Develop a 5-year and 10-year plan for maintenance of the Plank House and Blacksmith Shop. MEDIUM
  11. Re-evaluate continued participation in the Adopt-A-Highway Program. LOW
  12. Investigate sources for grant money and implement if possible. MEDIUM #9

NOVEMBER 11, 2010 -- Goals Approved by the EGT Historical Commission

Comprehensive Plan Actions
Historical Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
5A-1
1
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 1 - On-going 1 - High Encourage the use of approved historical names for all new developments and roads. Develop list of approved names Completed
5B-1
2
Protect the Township's historical structures from the impacts of development. Compile additional information for the Historic Resource Inventory. 1 - On-going 1 - High Update the historical documentation for properties on the Historic Resource Inventory. Historic Resource Inventory following PHMC guidelines for survey techniques Active
5C-1
3
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Utilize historic re-enactment events to showcase period daily life activities. 1 - On-going 1 - High Provide sponsorship and facilities for re-enactment events. Township contributions, sponsorship and grants. Active
5C-1
4
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Utilize historic re-enactment events to showcase period daily life activities. 1 - On-going 1 - High Continue to re-enact the typical life of Goshenville residents in the 18th and 19th centuries. Recruit additional volunteers, distribute information, Township newsletter, other media including website, newspapers, radio and TV, schools and self-guided tours. Coordinate with the Chester County Historical Society and other local historians. Active
5A-1
5
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 1 - On-going 2 - Medium Develop informational programs. Township Recreation program to include speakers at special events encompassing historical events and locations of significance with in the Township. Active
5A-1
6
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 1 - On-going 2 - Medium Prepare and distribute informational materials. Township Newsletter, website, at the Township Building and at selected sites Active
5A-1
7
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 1 - On-going 2 - Medium Involve volunteer organizations and individuals in implementation strategies. Identify and contact prospective organizations and individuals Active
5A-1
8
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 1 - On-going 2 - Medium Develop and provide local historical information for use in local schools. Work with local school curriculum staff Active
5B-1
9
Protect the Township's historical structures from the impacts of development. Compile additional information for the Historic Resource Inventory. 1 - On-going 2 - Medium Investigate opportunities for grants or funding to update the Historic Resource Inventory. Research grant requirements and apply for funding as applicable. Active
5B-4
10
Protect the Township's historical structures from the impacts of development. Encourage creation of preservation easements or other private property legal mechanisms. 1 - On-going 2 - Medium Develop materials to promote voluntary historic preservation. Research grant requirements and apply for funding as applicable; develop incentives associated with the program in order to encourage voluntary participation. Active
5C-1
11
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Utilize historic re-enactment events to showcase period daily life activities. 1 - On-going 2 - Medium Coordinate re-enactments with other activities of a historical nature. Other historical organizations throughout the County. Completed and On-Going
5D-1
12
Preserve Rocky Hill, Milltown and Hershey's Mill as historic areas. Create an historic re-enactment to highlight activities and practices of daily life in Rocky Hill, Milltown, and Hershey's Mill. 1 - On-going 2 - Medium Prepare to coordinate re-enactments with similar activities for Goshenville. Other historical organizations throughout the County. Completed and On-Going
5A-3
13
Create an awareness of the historical and cultural significance of East Goshen. Encourage National Register-eligible sites to complete the application process. 1 - On-going 3 - Low Assist in the preparation of application materials to nominate eligible structures, sites, and districts for the National Register. Identify resources and become familiar with the application process No Action

Page 1 of 3

Comprehensive Plan Actions
Historical Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
5C-2
14
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Prepare an outline and description of the historic character of buildings and structures in Goshenville, including former sites. 2 - Immediate 1 - High Develop programs describing the background and emergence of Goshenville. Distribute information and promote programs through Township newsletter, website, newspapers, local radio, television, schools, and self-guided tours. Active
5A-2
15
Create an awareness of the historical and cultural significance of East Goshen. Create greater involvement in and recognition of Historical Commission tasks. 3 - Short-term 1 - High Develop design guidelines for the preservation and protection of historic resources. Research existing applicable design guidelines and adapt for the Township. Completed
5B-1
16
Protect the Township's historical structures from the impacts of development. Compile additional information for the Historic Resource Inventory. 3 - Short-term 1 - High Evaluate the historical documentation and establish preservation priorities. Evaluation and listing of resource preservation priorities. Active
5C-2
17
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Prepare an outline and description of the historic character of buildings and structures in Goshenville, including former sites. 3 - Short-term 1 - High Prepare a written document with historic photographs and site area plans showing Goshenville. Document Goshenville in a booklet or brochure, distribute to local public libraries, school libraries, and historic properties in the Goshenville Historic District, and at the Township Building. To Be Addressed
5A-1
18
Create an awareness of the historical and cultural significance of East Goshen. Create an information program emphasizing the historic past of East Goshen. 3 - Short-term 2 - Medium Develop and implement a local plaque program for historic structures and properties. Complete certification process through the Pennsylvania Historic and Museum Commission; develop and implement guidelines Unfunded
5B-5
19
Protect the Township's historical structures from the impacts of development. Promote adaptive reuse of historical resources. 3 - Short-term 2 - Medium Review ordinances to enhance the benefits of adaptive reuse that maintain historic resources. Historic Preservation Ordinance, Zoning Ordinance, Subdivision and Land Development Ordinance Completed
5C-1
20
Preserve Goshenville as the historic and cultural centerpieces of East Goshen. Utilize historic re-enactment events to showcase period daily life activities. 4- Long-term 1 - High Develop additional events to re-enact the typical life of Rocky Hill, Milltown, and Hershey's Mill residents in the 18th and 19th centuries. Township contributions, sponsorships and grants. Unfunded
5D-1
21
Preserve Rocky Hill, Milltown and Hershey's Mill as historic areas. Create an historic re-enactment to highlight activities and practices of daily life in Rocky Hill, Milltown, and Hershey's Mill. 4- Long-term 1 - High Develop an event to re-enact the typical life of Rocky Hill and Milltown residents, and of works at Hershey's Mill, in the 18th and 19th centuries. Coordinate development of this event with the Chester County Historical Society, the Historical Commission, and local historians Unfunded
5D-1
22
Preserve Rocky Hill, Milltown and Hershey's Mill as historic areas. Create an historic re-enactment to highlight activities and practices of daily life in Rocky Hill, Milltown, and Hershey's Mill. 4- Long-term 1 - High Provide sponsorship and facilities to enable the re-enactment to occur. Township contributions, sponsorships and grants Unfunded
5B-2
23
Protect the Township's historical structures from the impacts of development. Consider the creation of additional Local Historic Districts. 4- Long-term 2 - Medium Review historical documentation to see if additional Local Historic District(s) should be created Review information Active

Page 2 of 3

Comprehensive Plan Actions
Historical Commission

Sub # Title Sub Title Timeframe for Completion Priority Recommendations and Actions Method of Implementation Status
5B-4
24
Protect the Township's historical structures from the impacts of development. Encourage creation of preservation easements or other private property legal mechanisms. 4- Long-term 2 - Medium Establish program guidelines to encourage private historic preservation measures. Historical Commission working with individual property owners, local land trusts, and the Township to secure various preservation mechanisms such as the sale or donation of easements, deed restrictions, and restrictive covenants, which can be implemented on a one-on-one basis with individual owners of historic properties. Active
5B-3
25
Protect the Township's historical structures from the impacts of development. Consider pursuing recognition in the Certified Local Government (CLG) Program. 4- Long-term 3 - Low Investigate and consider application for recognition as a Certified Local Government (CLG). CLG application process as required by the PHMC. This action requires completion of implementation actions under Recommendations 5B-1 and 5B-2. No Action

Page 3 of 3

WILLIAM F. CASS
915 Vista Drive, West Chester, PA 19380-6041 USA ☼ TEL. & FAX 610/429-1872
rangercass@verizon.net

January 26, 2011

RECEIVED BY: JAN 3 1 2011

Mr. Senya Isayeff
Chairman, Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380-6199

RE: DELVACCHIO HOLDINGS APPLICATION FOR AN EXEMPTION AT 922 NORTH CHESTER ROAD

Dear Chairman Isayeff:

Once upon a time, I was a young entrepreneur starting a business. Although that was almost thirty years ago, it was a wonderful era. In that regard, I certainly can identify with Mr. DelVacchio and certainly wish him well as he tries to expand his landscape business.

However, my wife and I are opposed to his establishing a landscape business diagonally across Rte. 352 from our residence at the corner of North Chester Road and Vista Drive. We would much sooner see the old McGinty property sold to a developer who would put three to four luxury homes on those four acres. We encourage you to rezone the property as exclusively residential.

I thought Jim McFee's objection based on noise was ridiculous – the amount of stone trucked in would be minimal. The township trash haulers make a lot more noise than a pick-up truck offloading a yard or so of gravel. That is a non-issue as far as we are concerned. However, we do have some serious objections.

First, we are concerned about the amount of heavy truck traffic on Rte. 352. We have more than enough traffic as it is. In recent years, McGinty's mulch business fell off to nothing, and it never amounted to much in the first place. We do not want great, heavy noisy rigs making a lot of commotion several times a week.

Second, we do not want several of Del Vacchio's unsupervised young workers living in the old McGinty residence. Such a situation does not fit into a "mature neighborhood" such as ours. Our vote would be to raze the place to make way for several new homes whose owners' lifestyles and concern for property would probably be more consistent with that of families already living in this neighborhood.

Third, putting three or four homes on the old McGinty property might make this area less attractive to deer. The township's Deer Discussion Committee has never amounted to anything in controlling the deer over the years, so maybe eliminating some deer habitat will make a difference in this immediate area. We are tired of having deer creating a road hazard and chewing flowers and shrubs to ribbons.

Fourth, mulch may be malodorous for those living next to it. For others, the molds that grow in the mulch are allergens to many people – including us. Chester County is notorious for mold spores, and what we do not need is another source just across the street.

We hope that Mr. DelVacchio does indeed build his business. We would prefer that it be done from a location that is more “commercial,” i.e., several miles from 922 North Chester Road.

Thank you for considering our thoughts in this matter.

William F. Cass
Sarah M. Cass

U. S. Department Of Transportation
Federal Aviation Administration

Harrisburg Airports District Office
3905 Hartzdale Drive, Suite 508
Camp Hill, PA 17011
717-730-2830
717-730-2838 (fax)

January 25, 2011

Subject: Release of the Philadelphia International Airport Capacity Enhancement Program Record of Decision

Dear Elected or Appointment Official:

Enclosed is a copy of the Philadelphia International Airport (PHL) Capacity Enhancement Program (CEP) Record of Decision (ROD). The ROD was issued on January 4, 2011 on the FAA website (http://www.faa.gov/airports/environmental/records_decision/) and the EIS web site (www.phl-cep-eis.com). The ROD presents the Federal Aviation Administration’s (FAA’s) final determinations and environmental approvals for the federal actions necessary to implement the CEP.

The Final Environmental Impact Statement assessed, in detail, the potential impact of two build alternatives for the proposed CEP, as well as the “No-Action Alternative” of not constructing these improvements. The FAA selected Alternative A, the preferred alternative, for implementation because it best meets the purpose and need for improvements at PHL. FAA received comments on the FEIS. Although not required, FAA prepared responses to substantive comments which can be found in Attachment A of the ROD. The Project includes the following: extend Runway 8-26 to the east, extend Runway 9R-27L to the east and add a fourth parallel east-west runway. The Project will also reconstruct and enlarge the terminal complex, increasing it from 120 to approximately 150 gates. Impacts associated with the Project and mitigation measures to address these impacts are outlined in the ROD.

Sincerely,

Susan McDonald
Environmental Protection Specialist