Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
TUESDAY, AUGUST 17, 2010
7:00 PM

  1. Call to Order
  2. Pledge of Allegiance/Moment of Silence
  3. Ask if Anyone is Recording the Meeting
  4. Public Comment – Hearing of Residents (Optional)
  5. Approval of Minutes August 10, 2010
  6. Chairman’s Report
  7. Public Hearings - None
  8. Staff Reports Treasurers Report; Police – Chief John Dumond
  9. Old Business Action List; Consider Upgraded E-mail Services with Archiving Capability; Refuse Bid Options
  10. New Business Consider having ABC Appreciation event 2010; Consider request to provide area for Cub Scout Day Camp Program in 2011; Consider authorizing staff to apply for Hershey’s Mill Dam Removal Grants
  11. Any Other Matter
  12. Correspondence, Reports of Interest August 9, 2010 letter from Norma Morgan expressing appreciation for work done by Building Inspector Mike Merwin.
  13. Meetings & Dates of Importance August 16, 2010 Deer Management 7pm August 17, 2010 Board of Supervisors 7pm August 18, 2010 TAG 7pm August 24, 2010 Board of Supervisors 7pm

F:\Data\Shared Data\Agendas\Board of Supervisors\2010\081710.doc

August 31, 2010 Board of Supervisors 7pm
September 1, 2010 Planning Commission 7 pm
September 1, 2010 TAG 7 pm
September 2, 2010 Park & Recreation 7 pm
September 6, 2010 Labor Day - aOffice Closed
September 7, 2010 Board of Supervisors 7 pm
September 8, 2010 Conservancy 7 pm
September 9, 2010 Historical 7 pm
September 13, 2010 Municipal Authority 7 pm
September 14, 2010 Board of Supervisors 7 pm
September 15, 2010 TAG 7 pm
September 21, 2010 Board of Supervisors 7 pm
September 22, 2010 Zoning Hearing - Liberty Towers 7:30 pm
September 28, 2010 Board of Supervisors 7 pm
  1. Public Comment – Hearing of Residents
  2. Adjournment

F:\Data\Shared Data\Agendas\Board of Supervisors\2010\081710.doc

9.
a.
6 pgs

EAST GOSHEN TOWNSHIP
ACTION LIST

# Item Action Due Date
DPW 07-02 Hershey's Mill Dam 17-Aug-10
DPW 07-04 Park Bridge Permit 17-Aug-10
DPW 08-06 Recycling Contract 17-Aug-10
DPW 10-02 Ridley Creek Expansion Monthly Update 17-Aug-10
ADM 10-13 Sewer Metered Billing 24-Aug-10
FIN 10-03 Monthly Financial Reports 24-Aug-10
ADM 09-07 Web Site Upgrade Status 7-Sep-10
DPW 08-04 Invasive Species 7-Sep-10
DPW 09-03 Road Resurfacing 7-Sep-10
FIN 09-03 Historic Books 7-Sep-10
FIN 10-06 Friends of East Goshen Township 501c3 7-Sep-10
PCZ 09-06 WCF Tower @ Township Building 7-Sep-10
PCZ 10-03 Generator Installations 7-Sep-10
ADM 07-01 Review Wireless Ordinance 14-Sep-10
ADM 07-02 Pension Plan Conversion 14-Sep-10
ADM 09-02 Records Retention Resolution (Email System) 14-Sep-10
ADM 09-05 Energy Conservation in Twp Bldg 14-Sep-10
ADM 10-04 Information Systems Analysis 14-Sep-10
ADM 10-16 Performance Evaluations 14-Sep-10
ADM 10-19 USDA Geese Round Up 14-Sep-10
DPW 10-04 Pedestrian Crosswalk @ Township Park 14-Sep-10
FIN 10-07 Municipal Authority Funding 14-Sep-10
ADM 10-07 Printers 21-Sep-10
PCZ 06-01 Parking for Multi-Use Space in IP/BP District 21-Sep-10
PCZ 10-01 CTDI Parking 21-Sep-10
PCZ 10-04 Lieberman Early & Co 21-Sep-10

1 of 2

8/17/10]

2 of 6

# Item Action Due Date
FIN 09-02 Capital Reserve Fund Analysis 24-Sep-10
DPW 08-01 Public Works Service Outsourcing 28-Sep-10
ADM 08-02 Review Comp Plan Action List (Ch 10) 5-Oct-10
ADM 09-04 Quarterly Review of Right to Know Requests 5-Oct-10
ADM 09-08 Police Scheduling 5-Oct-10
ADM 10-03 Township Advisory Group 5-Oct-10
ADM 10-07 Staffing Analysis 5-Oct-10
FIN 10-02 Services List 5-Oct-10
ADM 10-02 Annual Training Plan 7-Oct-10
DPW 08-02 Quarterly Report on I&I 12-Oct-10
DPW 10-01 Tree Vitalize Grant (Conservancy) 12-Oct-10
FIN 09-01 Quarterly Summary of Pending Legal Cases 13-Oct-10
ADM 10-15 Resolutions Book 19-Oct-10
ADM 10-7 Emergency Operations Plan 22-Oct-10
FIN 10-05 Quarterly Financial Reports - 2010 28-Oct-10
ADM 09-13 ABC Appreciation Event Guest List 2-Nov-10
ADM 09-10 Soccer Fields @ Line Road 7-Dec-10
DPW 07-01 Geese Management Program 7-Dec-10
ADM 10-01 Employee Benefits 19-Dec-10
PCZ 09-01 Telecom Registration and Reporting 16-Feb-11
PCZ 10-07 Sunoco Reports Ongoing

2 of 2

8/17/10]

3 of 6

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Hershey's Mill Dam No: DPW 07-02
List Date: 5/22/2007 Completed Date:
Description:
Date Action
Grant declined. Committee formed to determine best option. Classification probably not changing. Hydrologic Study by advanced Geo Services.
4/6/2010 Groups met 4/5. Board to discuss 4/13/10
4/13/2010 Should we proceed with AGS or rebid work. What should be included in next phase of engineering work?
5/4/2010 Advanced GEO Proposal for breech analysis and potential solutions.
6/1/2010 Awaiting comments from Save the Dam group before taking action on GEO proposal.
Phase 1 approved.
7/6/2010 Impoundment drained 6/30. Conceptual plans due for 7/20 meeting. Cost estimates due for 8/17.
7/13/2010 Solicitor OK with sale of Dam property. Checking with DEP.
7/20/2010 Options presented by Adv Geo. Pipe option out. Will price weir, breech, silt removal, ongoing maintenance, and check if required to remove silt under any scenario.
8/10/2010 Accepted proposal to have an appraisal done.
Tentative award of $15,000 grant

4 of 6

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Park Bridge Permit No: DPW 07-04
List Date: 7/24/2007 Completed Date:
Description:
Date Action
Awaiting response from ACOE. Engineering issues resloved. Easement language approved. Execute easement.
4/6/2010 Permit issued. Work can start after June 15 per Fish & Boat Commission.
Pulte soliciting quotes.
Don contacting Joe McDonough about date for groundbreaking.
6/15/2010 Waiting on installation date from Pulte.
7/13/2010 Awaiting updated information from Pulte on schedule.
8/17/2010 Pulte has selecetd a contractor. Scheduling Pre Con Meeting

5 of 6

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Recycling Contract No: DPW 08-06
List Date: 9/22/2009 Completed Date:
Description:
Date Action
Investigate possible change of pick up to 2nd half of week and cost of collecting Compact Fluorescent Lamps (CFL's)
7/13/2010 Bids out. 5 Options Open bids 7/22.
7/27/2010 Bid results. Discuss options for 2011.
7/22/2010 Opened Bds
8/10/2010 Review options
8/17/2010 Additional info on rates

6 of 6

EAST GOSHEN TOWNSHIP
ACTION ITEM

Item: Ridley Creek Expansion Monthly Update No: DPW 10-02
List Date: 2/23/2010 Completed Date:
Description: Provide Monthly status update
Date Action
3/9/2010 Monthly Status Report Done
4/13/2010 Monthly Status Report Done
5/18/2010 Monthly Status Report Done
6/15/2010 Monthly Status Report Done
7/20/2010 Monthly Status Report Done
8/17/2010 Monthly Status Report - Distributed on August 10, 2010 Done
9/21/2010 Monthly Status Report

9.
b.
2 pgs

MEMO

TO: Rick Smith
FROM: Diane Degnan
RE: Upgraded E-mail Services with Archiving Capability
DATE: August 11, 2010

As requested, the following are costs associated with the purchase of an on-site Microsoft Exchange solution (from United Computer) versus the costs associated with upgrading to an off-site/hosted Microsoft e-mail service, or off-site/hosted generic e-mail service (provided by Bee.Net). The following information, unlike the information provided previously, is based on 30 users/mailboxes, and was obtained in response to your specific questions.

Option #1) On-Site Microsoft Exchange/provided by United Computer:

Initial Equipment Cost: $5,007
Equipment Installation Cost: $5,190
Software Cost: $5,778
- minus approx. $2,000, as original proposal was based on 40 users/mailboxes
TOTAL $13, 975
Software Maintenance Cost per Year $300 (after 1st year)
Cost to Load Existing E-mails into System N/A
(included in equipment installation cost above)
Cost for Support UNDETERMINED

NOTE: While United Computer originally recommended the purchase of an Exchange Server, they too would now recommend a hosted solution for the Township.

Option #2) Off-Site Microsoft Exchange/hosted by Bee.Net:

Initial Equipment Cost: -0-
Equipment Installation Cost: -0-
Software Cost: -0-
Software Maintenance Cost per Year -0-
Cost to Load Existing E-mails into System -0-
Cost for Support -0-

$14/mth per user/mailbox
$5,040/yr based on 30 users/mailboxes

2 of 2

Option #3) Off-Site Generic/hosted by Bee.Net:

Initial Equipment Cost: -0-
Equipment Installation Cost: -0-
Software Cost: -0-
Software Maintenance Cost per Year -0-
Cost to Load Existing E-mails into System -0-
Cost for Support -0-

$7/mth per user/mailbox
$2,520/yr based on 30 users/mailboxes

* Our current fee is $2/mth per user/mailbox. Annual internet fee would not change.

While the Microsoft software has more features, Burt feels it is geared more towards a corporate client, and that none of those added features would be needed by a municipality. Our current provider, has provided us with good service for several years, and can now assist us with any option. Both Burt and those at Bee.Net feel the less expensive, generic, off-site/hosted option could be customized to meet our needs. As discussed, I would concur with the recommendation to accept Bee.Net’s proposal to provide us with the Quick version of off-site/hosted e-mail service including archiving for an additional $5/mth per user/mailbox.

If at any time, it is determined that the generic software does not meet our needs, we would not be restricted from then changing over to Microsoft Exchange via an on-site solution or off-site/hosted solution, or even back to our current service.

Burt’s offer to attend a meeting, and personally explain this information in more detail to the Board still stands.

dld

F:\Data\Users\DIANE\081110memoreemailupgrade.doc

9. c. 2 pg

August 13, 2010

2011 Estimated Quarterly Refuse Costs

2010 / 2011 Item2011 Amount2012 Item2012 Amount2013 Item2013 Amount
2010 Refuse Costs$1,239,591
2010 Hauler Costs$802,321
2010 Net Cost (Total-Hauler)$437,270$450,388$463,900
Inflator (See Note)3%Inflator3%Inflator3%
2011 Net Cost$450,3882012 Net Cost$463,9002013 Net Cost$477,817
Single family units329132913291
2011 Net Cost per Unit$136.852012 Net Cost per Unit$140.962013 Net Cost per Unit$145.19
Drawdown from Fund Balance ($220,000) Per QTR$16.71Drawdown from Fund Balance Per QTR$16.71Drawdown from Fund Balance Per QTR$16.71

Note: For the purpose of this analysis I assumed that the "Net Cost" would increase at the rate of 3% per year.
Note: I also leveled the cost for all three years
Note: I also used $220,000 a year from the fund balance to reduce the rate

20112011 Cost20122012 Cost20132013 Cost
Option 1 - Unlimited 2x week
Hauler cost per unit per month$17.97Hauler cost per unit per month$17.97Hauler cost per unit per month$17.97
Hauler cost per unit per year$215.64Hauler cost per unit per year$215.64Hauler cost per unit per year$215.64
Net Cost$136.85Net Cost$140.96Net Cost$145.19
Cost per year$352.49Cost per year$356.60Cost per year$360.83
Cost per Qtr$88.12Cost per Qtr$89.15Cost per Qtr$90.21
Leveled Cost per Qtr.$89.16Leveled Cost per Qtr.$89.16Leveled Cost per Qtr.$89.16
Leveled Cost per Qtr & Fund Bal.$72.45Leveled Cost per Qtr & Fund Bal.$72.45Leveled Cost per Qtr & Fund Bal.$72.45
Option 2 - Unlimited 1x week
Hauler cost per unit per month$14.89Hauler cost per unit per month$14.89Hauler cost per unit per month$14.89
Hauler cost per unit per year$178.68Hauler cost per unit per year$178.68Hauler cost per unit per year$178.68
Net Cost$136.85Net Cost$140.96Net Cost$145.19
Cost per year$315.53Cost per year$319.64Cost per year$323.87
Cost per Qtr$78.88Cost per Qtr$79.91Cost per Qtr$80.97
Leveled Cost per Qtr.$79.92Leveled Cost per Qtr.$79.92Leveled Cost per Qtr.$79.92
Leveled Cost per Qtr & Fund Bal.$63.21Leveled Cost per Qtr & Fund Bal.$63.21Leveled Cost per Qtr & Fund Bal.$63.21

F:\Data\Shared Data\Refuse Recycling\2010 Bid\Bid Results.xls

2 of 2

20112011 Cost20122012 Cost20132013 Cost
Option 3 - 1 can 2x week
Hauler cost per unit per month$17.06Hauler cost per unit per month$17.57Hauler cost per unit per month$18.10
Hauler cost per unit per year$204.72Hauler cost per unit per year$210.84Hauler cost per unit per year$217.20
Net Cost$136.85Net Cost$140.96Net Cost$145.19
Cost per year$341.57Cost per year$351.80Cost per year$362.39
Cost per Qtr$85.39Cost per Qtr$87.95Cost per Qtr$90.60
Leveled Cost per Qtr.$87.98Leveled Cost per Qtr.$87.98Leveled Cost per Qtr.$87.98
Leveled Cost per Qtr & Fund Bal.$71.27Leveled Cost per Qtr & Fund Bal.$71.27Leveled Cost per Qtr & Fund Bal.$71.27
Option 4 - 1 can 1x week
Hauler cost per unit per month$15.30Hauler cost per unit per month$15.76Hauler cost per unit per month$16.23
Hauler cost per unit per year$183.60Hauler cost per unit per year$189.12Hauler cost per unit per year$194.76
Net Cost$136.85Net Cost$140.96Net Cost$145.19
Cost per year$320.45Cost per year$330.08Cost per year$339.95
Cost per Qtr$80.11Cost per Qtr$82.52Cost per Qtr$84.99
Leveled Cost per Qtr.$82.54Leveled Cost per Qtr.$82.54Leveled Cost per Qtr.$82.54
Leveled Cost per Qtr & Fund Bal.$65.83Leveled Cost per Qtr & Fund Bal.$65.83Leveled Cost per Qtr & Fund Bal.$65.83
Option 5 - 1 can 1x week - ala carte leaf, yard waste, etc.
Hauler cost per unit per month$12.25Hauler cost per unit per month$12.62Hauler cost per unit per month$13.00
Hauler cost per unit per year$147.00Hauler cost per unit per year$151.44Hauler cost per unit per year$156.00
Net Cost$136.85Net Cost$140.96Net Cost$145.19
Cost per year$283.85Cost per year$292.40Cost per year$301.19
Cost per Qtr$70.96Cost per Qtr$73.10Cost per Qtr$75.30
Leveled Cost per Qtr.$73.12Leveled Cost per Qtr.$73.12Leveled Cost per Qtr.$73.12
Leveled Cost per Qtr & Fund Bal.$56.41Leveled Cost per Qtr & Fund Bal.$56.41Leveled Cost per Qtr & Fund Bal.$56.41

F:\Data\Shared Data\Refuse Recycling\2010 Bid\Bid Results.xls

10.
b.
1 pg

From: H MOORE [mailto:annfletchermoore@verizon.net]
Sent: Wednesday, June 30, 2010 4:29 PM
To: Rick Smith
Subject: agenda for August

Hi Rick,

I am wondering what Tuesday might have open space on the BOS agenda? Myself and Jim Langer a District Executive from Boy Scouts of America-Lenni Lenape District-would like to come and make a presentation to them. I run a cub scout day camp program in July for boy scouts, and we are looking for a new area to hold the event next year 2011.

Thanks,
Ann Marie

7/12/2010

610-692-7171
www.eastgoshen.org

10.
C.
2 pgs

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

MEMO

TO: Rick Smith
FROM: Nancy Scheiderman
RE: Potential Grant Sources to Support Hershey’s Mill Dam Removal
DATE: August 12, 2010

The following are two possible sources of funding for removal of the Hershey’s Mill Dam.

  • Fish Conservation Freshwater Fish Keystone focuses on species and habitats species that occur in the US identified as high priorities for the nation. Freshwater fish (anadromous and catadromous) and associated aquatic life such as mussels, crayfish and other invertebrates are included in the Keystone. Goal is to find best conservation investments, fund the best solutions and deliver measurable results for fish conservation. Offered through National Fish & Wildlife Foundation, 1133 Fifteenth Street, N.W., Suite 1100, Washington, D.C. 20005 T 202-857-0166 F 202-857-0162 Focus on species and habitats identified. Individual Initiatives are: Apache Trout, Eastern Brook Trout, Russian River Coho, Sierra Nevada Meadow Restoration, Upper Colorado Native Fishes, and Upper Klamath Basin. The following three themes are believed to be critical for conserving freshwater fish, aquatic organisms’, and their habitats: Water Flows, Climate Change and Adaptation, Imperiled Fish – Apache Trout and Upper Klamath Basin. Grant Cycles: Preproposal: September 1, 2010 Full Proposal: November 1, 2010 Notification: March 31, 2010
  • Open Rivers Initiative Through its Open Rivers Initiative NOAA’s Restoration Center provides technical expertise and financial assistance to remove dams and barriers and restore habitat for the many species that migrate between the ocean and the nation’s freshwater rivers and

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Grants\Memo to Rick 081210.doc

202

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

streams. Since its inception NOAA has removed more than 90 dams and stream blockages.

Anticipates $6 million in project funding with focus on implementing projects that will directly benefit migratory species such as salmon, sturgeon, shad, river herring, striped bass, and American eel.

NOAA is working to restore and protect the ecological health of the nation’s rivers and streams by removing dams, installing fish passage structures such as fish ladders and removing other migratory fish barriers such as undersized culverts from streams and rivers.

Applications must be received by www.grants.gov, postmarked, or provided to a delivery service by 11:59 PM EST on November 17, 2010.

Administered by the NOAA Restoration Center within the Office of Habitat Conservation. Typical awards will range from $200,000 to $750,000.

Contact: Tisa Shostik NOAA Fisheries Service NOAA Restoration Center
1315 East-West Highway
Silver Spring, MD 2091
Tisa.shostik@noaa.gov
301-713-0174

F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Grants\Memo to Rick 081210.doc

11.
a.
1pg

[Stamp: RECEIVED BY: ____________________
AUG 9 - 2010]

East Goshen Township

1580 Paoli Pike

West Chester, Pa 19380

August 9, 2010

Dear Administrators,

I feel that a compliment is needed in regard to your Building Inspector: Mike

This gentleman deserves a 5-Star appreciation from me in my attempt to correct an overdue replacement of crumbling steps in Goshen Valley One managed by Robert H. Wise Management Co. Even my request from the manager, Patti, for an orange cone to be placed on those steps 4 months prior and nothing was done. I don't know what she thinks an orange cone is for. Obviously, she never looked at those steps.

In desperation, after a call to the inspector's office, Mike got the job done post-haste with management scrambling to abide with his request.

Thank you, thank you, thank you for having such an expert building inspector who really cares that our community abides by the rules set down to make our township a very desirable place to call home in Chester County.

But, much to my dismay, I am considering moving after 22 years here because of repairs that are not taken care of here in Goshen Valley I. $5,000.20 in condo fees in 22 years. And for what? The deterioration in some places is incredible.

Sincerely,

[Signature: Norma Morgan]

Norma Morgan, 704 Valley Dr., West Chester, PA 19382-6411