Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
TUESDAY, AUGUST 17, 2010
7:00 PM
- Call to Order
- Pledge of Allegiance/Moment of Silence
- Ask if Anyone is Recording the Meeting
- Public Comment – Hearing of Residents (Optional)
- Approval of Minutes August 10, 2010
- Chairman’s Report
- Public Hearings - None
- Staff Reports Treasurers Report; Police – Chief John Dumond
- Old Business Action List; Consider Upgraded E-mail Services with Archiving Capability; Refuse Bid Options
- New Business Consider having ABC Appreciation event 2010; Consider request to provide area for Cub Scout Day Camp Program in 2011; Consider authorizing staff to apply for Hershey’s Mill Dam Removal Grants
- Any Other Matter
- Correspondence, Reports of Interest August 9, 2010 letter from Norma Morgan expressing appreciation for work done by Building Inspector Mike Merwin.
- Meetings & Dates of Importance August 16, 2010 Deer Management 7pm August 17, 2010 Board of Supervisors 7pm August 18, 2010 TAG 7pm August 24, 2010 Board of Supervisors 7pm
F:\Data\Shared Data\Agendas\Board of Supervisors\2010\081710.doc
| August 31, 2010 | Board of Supervisors | 7pm |
|---|---|---|
| September 1, 2010 | Planning Commission | 7 pm |
| September 1, 2010 | TAG | 7 pm |
| September 2, 2010 | Park & Recreation | 7 pm |
| September 6, 2010 | Labor Day - aOffice Closed | |
| September 7, 2010 | Board of Supervisors | 7 pm |
| September 8, 2010 | Conservancy | 7 pm |
| September 9, 2010 | Historical | 7 pm |
| September 13, 2010 | Municipal Authority | 7 pm |
| September 14, 2010 | Board of Supervisors | 7 pm |
| September 15, 2010 | TAG | 7 pm |
| September 21, 2010 | Board of Supervisors | 7 pm |
| September 22, 2010 | Zoning Hearing - Liberty Towers | 7:30 pm |
| September 28, 2010 | Board of Supervisors | 7 pm |
- Public Comment – Hearing of Residents
- Adjournment
F:\Data\Shared Data\Agendas\Board of Supervisors\2010\081710.doc
9.
a.
6 pgs
EAST GOSHEN TOWNSHIP
ACTION LIST
| # | Item | Action Due Date |
|---|---|---|
| DPW 07-02 | Hershey's Mill Dam | 17-Aug-10 |
| DPW 07-04 | Park Bridge Permit | 17-Aug-10 |
| DPW 08-06 | Recycling Contract | 17-Aug-10 |
| DPW 10-02 | Ridley Creek Expansion Monthly Update | 17-Aug-10 |
| ADM 10-13 | Sewer Metered Billing | 24-Aug-10 |
| FIN 10-03 | Monthly Financial Reports | 24-Aug-10 |
| ADM 09-07 | Web Site Upgrade Status | 7-Sep-10 |
| DPW 08-04 | Invasive Species | 7-Sep-10 |
| DPW 09-03 | Road Resurfacing | 7-Sep-10 |
| FIN 09-03 | Historic Books | 7-Sep-10 |
| FIN 10-06 | Friends of East Goshen Township 501c3 | 7-Sep-10 |
| PCZ 09-06 | WCF Tower @ Township Building | 7-Sep-10 |
| PCZ 10-03 | Generator Installations | 7-Sep-10 |
| ADM 07-01 | Review Wireless Ordinance | 14-Sep-10 |
| ADM 07-02 | Pension Plan Conversion | 14-Sep-10 |
| ADM 09-02 | Records Retention Resolution (Email System) | 14-Sep-10 |
| ADM 09-05 | Energy Conservation in Twp Bldg | 14-Sep-10 |
| ADM 10-04 | Information Systems Analysis | 14-Sep-10 |
| ADM 10-16 | Performance Evaluations | 14-Sep-10 |
| ADM 10-19 | USDA Geese Round Up | 14-Sep-10 |
| DPW 10-04 | Pedestrian Crosswalk @ Township Park | 14-Sep-10 |
| FIN 10-07 | Municipal Authority Funding | 14-Sep-10 |
| ADM 10-07 | Printers | 21-Sep-10 |
| PCZ 06-01 | Parking for Multi-Use Space in IP/BP District | 21-Sep-10 |
| PCZ 10-01 | CTDI Parking | 21-Sep-10 |
| PCZ 10-04 | Lieberman Early & Co | 21-Sep-10 |
1 of 2
8/17/10]
2 of 6
| # | Item | Action Due Date |
|---|---|---|
| FIN 09-02 | Capital Reserve Fund Analysis | 24-Sep-10 |
| DPW 08-01 | Public Works Service Outsourcing | 28-Sep-10 |
| ADM 08-02 | Review Comp Plan Action List (Ch 10) | 5-Oct-10 |
| ADM 09-04 | Quarterly Review of Right to Know Requests | 5-Oct-10 |
| ADM 09-08 | Police Scheduling | 5-Oct-10 |
| ADM 10-03 | Township Advisory Group | 5-Oct-10 |
| ADM 10-07 | Staffing Analysis | 5-Oct-10 |
| FIN 10-02 | Services List | 5-Oct-10 |
| ADM 10-02 | Annual Training Plan | 7-Oct-10 |
| DPW 08-02 | Quarterly Report on I&I | 12-Oct-10 |
| DPW 10-01 | Tree Vitalize Grant (Conservancy) | 12-Oct-10 |
| FIN 09-01 | Quarterly Summary of Pending Legal Cases | 13-Oct-10 |
| ADM 10-15 | Resolutions Book | 19-Oct-10 |
| ADM 10-7 | Emergency Operations Plan | 22-Oct-10 |
| FIN 10-05 | Quarterly Financial Reports - 2010 | 28-Oct-10 |
| ADM 09-13 | ABC Appreciation Event Guest List | 2-Nov-10 |
| ADM 09-10 | Soccer Fields @ Line Road | 7-Dec-10 |
| DPW 07-01 | Geese Management Program | 7-Dec-10 |
| ADM 10-01 | Employee Benefits | 19-Dec-10 |
| PCZ 09-01 | Telecom Registration and Reporting | 16-Feb-11 |
| PCZ 10-07 | Sunoco Reports | Ongoing |
2 of 2
8/17/10]
3 of 6
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Hershey's Mill Dam | No: | DPW 07-02 |
|---|---|---|---|
| List Date: | 5/22/2007 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| Grant declined. Committee formed to determine best option. Classification probably not changing. Hydrologic Study by advanced Geo Services. | |
| 4/6/2010 | Groups met 4/5. Board to discuss 4/13/10 |
| 4/13/2010 | Should we proceed with AGS or rebid work. What should be included in next phase of engineering work? |
| 5/4/2010 | Advanced GEO Proposal for breech analysis and potential solutions. |
| 6/1/2010 | Awaiting comments from Save the Dam group before taking action on GEO proposal. Phase 1 approved. |
| 7/6/2010 | Impoundment drained 6/30. Conceptual plans due for 7/20 meeting. Cost estimates due for 8/17. |
| 7/13/2010 | Solicitor OK with sale of Dam property. Checking with DEP. |
| 7/20/2010 | Options presented by Adv Geo. Pipe option out. Will price weir, breech, silt removal, ongoing maintenance, and check if required to remove silt under any scenario. |
| 8/10/2010 | Accepted proposal to have an appraisal done. Tentative award of $15,000 grant |
4 of 6
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Park Bridge Permit | No: | DPW 07-04 |
|---|---|---|---|
| List Date: | 7/24/2007 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| Awaiting response from ACOE. Engineering issues resloved. Easement language approved. Execute easement. | |
| 4/6/2010 | Permit issued. Work can start after June 15 per Fish & Boat Commission. Pulte soliciting quotes. Don contacting Joe McDonough about date for groundbreaking. |
| 6/15/2010 | Waiting on installation date from Pulte. |
| 7/13/2010 | Awaiting updated information from Pulte on schedule. |
| 8/17/2010 | Pulte has selecetd a contractor. Scheduling Pre Con Meeting |
5 of 6
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Recycling Contract | No: | DPW 08-06 |
|---|---|---|---|
| List Date: | 9/22/2009 | Completed Date: | |
| Description: | |||
| Date | Action |
|---|---|
| Investigate possible change of pick up to 2nd half of week and cost of collecting Compact Fluorescent Lamps (CFL's) | |
| 7/13/2010 | Bids out. 5 Options Open bids 7/22. |
| 7/27/2010 | Bid results. Discuss options for 2011. |
| 7/22/2010 | Opened Bds |
| 8/10/2010 | Review options |
| 8/17/2010 | Additional info on rates |
6 of 6
EAST GOSHEN TOWNSHIP
ACTION ITEM
| Item: | Ridley Creek Expansion Monthly Update | No: | DPW 10-02 |
|---|---|---|---|
| List Date: | 2/23/2010 | Completed Date: | |
| Description: | Provide Monthly status update | ||
| Date | Action |
|---|---|
| 3/9/2010 | Monthly Status Report Done |
| 4/13/2010 | Monthly Status Report Done |
| 5/18/2010 | Monthly Status Report Done |
| 6/15/2010 | Monthly Status Report Done |
| 7/20/2010 | Monthly Status Report Done |
| 8/17/2010 | Monthly Status Report - Distributed on August 10, 2010 Done |
| 9/21/2010 | Monthly Status Report |
9.
b.
2 pgs
MEMO
| TO: | Rick Smith |
|---|---|
| FROM: | Diane Degnan |
| RE: | Upgraded E-mail Services with Archiving Capability |
| DATE: | August 11, 2010 |
As requested, the following are costs associated with the purchase of an on-site Microsoft Exchange solution (from United Computer) versus the costs associated with upgrading to an off-site/hosted Microsoft e-mail service, or off-site/hosted generic e-mail service (provided by Bee.Net). The following information, unlike the information provided previously, is based on 30 users/mailboxes, and was obtained in response to your specific questions.
Option #1) On-Site Microsoft Exchange/provided by United Computer:
| Initial Equipment Cost: | $5,007 |
|---|---|
| Equipment Installation Cost: | $5,190 |
| Software Cost: | $5,778 |
| - minus approx. $2,000, as original proposal was based on 40 users/mailboxes | |
| TOTAL | $13, 975 |
| Software Maintenance Cost per Year | $300 (after 1st year) |
| Cost to Load Existing E-mails into System | N/A |
| (included in equipment installation cost above) | |
| Cost for Support | UNDETERMINED |
NOTE: While United Computer originally recommended the purchase of an Exchange Server, they too would now recommend a hosted solution for the Township.
Option #2) Off-Site Microsoft Exchange/hosted by Bee.Net:
| Initial Equipment Cost: | -0- |
|---|---|
| Equipment Installation Cost: | -0- |
| Software Cost: | -0- |
| Software Maintenance Cost per Year | -0- |
| Cost to Load Existing E-mails into System | -0- |
| Cost for Support | -0- |
$14/mth per user/mailbox
$5,040/yr based on 30 users/mailboxes
2 of 2
Option #3) Off-Site Generic/hosted by Bee.Net:
| Initial Equipment Cost: | -0- |
|---|---|
| Equipment Installation Cost: | -0- |
| Software Cost: | -0- |
| Software Maintenance Cost per Year | -0- |
| Cost to Load Existing E-mails into System | -0- |
| Cost for Support | -0- |
$7/mth per user/mailbox
$2,520/yr based on 30 users/mailboxes
* Our current fee is $2/mth per user/mailbox. Annual internet fee would not change.
While the Microsoft software has more features, Burt feels it is geared more towards a corporate client, and that none of those added features would be needed by a municipality. Our current provider, has provided us with good service for several years, and can now assist us with any option. Both Burt and those at Bee.Net feel the less expensive, generic, off-site/hosted option could be customized to meet our needs. As discussed, I would concur with the recommendation to accept Bee.Net’s proposal to provide us with the Quick version of off-site/hosted e-mail service including archiving for an additional $5/mth per user/mailbox.
If at any time, it is determined that the generic software does not meet our needs, we would not be restricted from then changing over to Microsoft Exchange via an on-site solution or off-site/hosted solution, or even back to our current service.
Burt’s offer to attend a meeting, and personally explain this information in more detail to the Board still stands.
dld
F:\Data\Users\DIANE\081110memoreemailupgrade.doc
9. c. 2 pg
August 13, 2010
2011 Estimated Quarterly Refuse Costs
| 2010 / 2011 Item | 2011 Amount | 2012 Item | 2012 Amount | 2013 Item | 2013 Amount |
|---|---|---|---|---|---|
| 2010 Refuse Costs | $1,239,591 | ||||
| 2010 Hauler Costs | $802,321 | ||||
| 2010 Net Cost (Total-Hauler) | $437,270 | $450,388 | $463,900 | ||
| Inflator (See Note) | 3% | Inflator | 3% | Inflator | 3% |
| 2011 Net Cost | $450,388 | 2012 Net Cost | $463,900 | 2013 Net Cost | $477,817 |
| Single family units | 3291 | 3291 | 3291 | ||
| 2011 Net Cost per Unit | $136.85 | 2012 Net Cost per Unit | $140.96 | 2013 Net Cost per Unit | $145.19 |
| Drawdown from Fund Balance ($220,000) Per QTR | $16.71 | Drawdown from Fund Balance Per QTR | $16.71 | Drawdown from Fund Balance Per QTR | $16.71 |
Note: For the purpose of this analysis I assumed that the "Net Cost" would increase at the rate of 3% per year.
Note: I also leveled the cost for all three years
Note: I also used $220,000 a year from the fund balance to reduce the rate
| 2011 | 2011 Cost | 2012 | 2012 Cost | 2013 | 2013 Cost |
|---|---|---|---|---|---|
| Option 1 - Unlimited 2x week | |||||
| Hauler cost per unit per month | $17.97 | Hauler cost per unit per month | $17.97 | Hauler cost per unit per month | $17.97 |
| Hauler cost per unit per year | $215.64 | Hauler cost per unit per year | $215.64 | Hauler cost per unit per year | $215.64 |
| Net Cost | $136.85 | Net Cost | $140.96 | Net Cost | $145.19 |
| Cost per year | $352.49 | Cost per year | $356.60 | Cost per year | $360.83 |
| Cost per Qtr | $88.12 | Cost per Qtr | $89.15 | Cost per Qtr | $90.21 |
| Leveled Cost per Qtr. | $89.16 | Leveled Cost per Qtr. | $89.16 | Leveled Cost per Qtr. | $89.16 |
| Leveled Cost per Qtr & Fund Bal. | $72.45 | Leveled Cost per Qtr & Fund Bal. | $72.45 | Leveled Cost per Qtr & Fund Bal. | $72.45 |
| Option 2 - Unlimited 1x week | |||||
| Hauler cost per unit per month | $14.89 | Hauler cost per unit per month | $14.89 | Hauler cost per unit per month | $14.89 |
| Hauler cost per unit per year | $178.68 | Hauler cost per unit per year | $178.68 | Hauler cost per unit per year | $178.68 |
| Net Cost | $136.85 | Net Cost | $140.96 | Net Cost | $145.19 |
| Cost per year | $315.53 | Cost per year | $319.64 | Cost per year | $323.87 |
| Cost per Qtr | $78.88 | Cost per Qtr | $79.91 | Cost per Qtr | $80.97 |
| Leveled Cost per Qtr. | $79.92 | Leveled Cost per Qtr. | $79.92 | Leveled Cost per Qtr. | $79.92 |
| Leveled Cost per Qtr & Fund Bal. | $63.21 | Leveled Cost per Qtr & Fund Bal. | $63.21 | Leveled Cost per Qtr & Fund Bal. | $63.21 |
F:\Data\Shared Data\Refuse Recycling\2010 Bid\Bid Results.xls
2 of 2
| 2011 | 2011 Cost | 2012 | 2012 Cost | 2013 | 2013 Cost |
|---|---|---|---|---|---|
| Option 3 - 1 can 2x week | |||||
| Hauler cost per unit per month | $17.06 | Hauler cost per unit per month | $17.57 | Hauler cost per unit per month | $18.10 |
| Hauler cost per unit per year | $204.72 | Hauler cost per unit per year | $210.84 | Hauler cost per unit per year | $217.20 |
| Net Cost | $136.85 | Net Cost | $140.96 | Net Cost | $145.19 |
| Cost per year | $341.57 | Cost per year | $351.80 | Cost per year | $362.39 |
| Cost per Qtr | $85.39 | Cost per Qtr | $87.95 | Cost per Qtr | $90.60 |
| Leveled Cost per Qtr. | $87.98 | Leveled Cost per Qtr. | $87.98 | Leveled Cost per Qtr. | $87.98 |
| Leveled Cost per Qtr & Fund Bal. | $71.27 | Leveled Cost per Qtr & Fund Bal. | $71.27 | Leveled Cost per Qtr & Fund Bal. | $71.27 |
| Option 4 - 1 can 1x week | |||||
| Hauler cost per unit per month | $15.30 | Hauler cost per unit per month | $15.76 | Hauler cost per unit per month | $16.23 |
| Hauler cost per unit per year | $183.60 | Hauler cost per unit per year | $189.12 | Hauler cost per unit per year | $194.76 |
| Net Cost | $136.85 | Net Cost | $140.96 | Net Cost | $145.19 |
| Cost per year | $320.45 | Cost per year | $330.08 | Cost per year | $339.95 |
| Cost per Qtr | $80.11 | Cost per Qtr | $82.52 | Cost per Qtr | $84.99 |
| Leveled Cost per Qtr. | $82.54 | Leveled Cost per Qtr. | $82.54 | Leveled Cost per Qtr. | $82.54 |
| Leveled Cost per Qtr & Fund Bal. | $65.83 | Leveled Cost per Qtr & Fund Bal. | $65.83 | Leveled Cost per Qtr & Fund Bal. | $65.83 |
| Option 5 - 1 can 1x week - ala carte leaf, yard waste, etc. | |||||
| Hauler cost per unit per month | $12.25 | Hauler cost per unit per month | $12.62 | Hauler cost per unit per month | $13.00 |
| Hauler cost per unit per year | $147.00 | Hauler cost per unit per year | $151.44 | Hauler cost per unit per year | $156.00 |
| Net Cost | $136.85 | Net Cost | $140.96 | Net Cost | $145.19 |
| Cost per year | $283.85 | Cost per year | $292.40 | Cost per year | $301.19 |
| Cost per Qtr | $70.96 | Cost per Qtr | $73.10 | Cost per Qtr | $75.30 |
| Leveled Cost per Qtr. | $73.12 | Leveled Cost per Qtr. | $73.12 | Leveled Cost per Qtr. | $73.12 |
| Leveled Cost per Qtr & Fund Bal. | $56.41 | Leveled Cost per Qtr & Fund Bal. | $56.41 | Leveled Cost per Qtr & Fund Bal. | $56.41 |
F:\Data\Shared Data\Refuse Recycling\2010 Bid\Bid Results.xls
10.
b.
1 pg
From: H MOORE [mailto:annfletchermoore@verizon.net]
Sent: Wednesday, June 30, 2010 4:29 PM
To: Rick Smith
Subject: agenda for August
Hi Rick,
I am wondering what Tuesday might have open space on the BOS agenda? Myself and Jim Langer a District Executive from Boy Scouts of America-Lenni Lenape District-would like to come and make a presentation to them. I run a cub scout day camp program in July for boy scouts, and we are looking for a new area to hold the event next year 2011.
Thanks,
Ann Marie
7/12/2010
610-692-7171
www.eastgoshen.org
10.
C.
2 pgs
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
MEMO
| TO: | Rick Smith |
|---|---|
| FROM: | Nancy Scheiderman |
| RE: | Potential Grant Sources to Support Hershey’s Mill Dam Removal |
| DATE: | August 12, 2010 |
The following are two possible sources of funding for removal of the Hershey’s Mill Dam.
- Fish Conservation Freshwater Fish Keystone focuses on species and habitats species that occur in the US identified as high priorities for the nation. Freshwater fish (anadromous and catadromous) and associated aquatic life such as mussels, crayfish and other invertebrates are included in the Keystone. Goal is to find best conservation investments, fund the best solutions and deliver measurable results for fish conservation. Offered through National Fish & Wildlife Foundation, 1133 Fifteenth Street, N.W., Suite 1100, Washington, D.C. 20005 T 202-857-0166 F 202-857-0162 Focus on species and habitats identified. Individual Initiatives are: Apache Trout, Eastern Brook Trout, Russian River Coho, Sierra Nevada Meadow Restoration, Upper Colorado Native Fishes, and Upper Klamath Basin. The following three themes are believed to be critical for conserving freshwater fish, aquatic organisms’, and their habitats: Water Flows, Climate Change and Adaptation, Imperiled Fish – Apache Trout and Upper Klamath Basin. Grant Cycles: Preproposal: September 1, 2010 Full Proposal: November 1, 2010 Notification: March 31, 2010
- Open Rivers Initiative Through its Open Rivers Initiative NOAA’s Restoration Center provides technical expertise and financial assistance to remove dams and barriers and restore habitat for the many species that migrate between the ocean and the nation’s freshwater rivers and
F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Grants\Memo to Rick 081210.doc
202
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
streams. Since its inception NOAA has removed more than 90 dams and stream blockages.
Anticipates $6 million in project funding with focus on implementing projects that will directly benefit migratory species such as salmon, sturgeon, shad, river herring, striped bass, and American eel.
NOAA is working to restore and protect the ecological health of the nation’s rivers and streams by removing dams, installing fish passage structures such as fish ladders and removing other migratory fish barriers such as undersized culverts from streams and rivers.
Applications must be received by www.grants.gov, postmarked, or provided to a delivery service by 11:59 PM EST on November 17, 2010.
Administered by the NOAA Restoration Center within the Office of Habitat Conservation. Typical awards will range from $200,000 to $750,000.
Contact: Tisa Shostik NOAA Fisheries Service NOAA Restoration Center
1315 East-West Highway
Silver Spring, MD 2091
Tisa.shostik@noaa.gov
301-713-0174
F:\Data\Shared Data\Public Works Dept\Parks\HME Dam\Grants\Memo to Rick 081210.doc
11.
a.
1pg
[Stamp: RECEIVED BY: ____________________
AUG 9 - 2010]
East Goshen Township
1580 Paoli Pike
West Chester, Pa 19380
August 9, 2010
Dear Administrators,
I feel that a compliment is needed in regard to your Building Inspector: Mike
This gentleman deserves a 5-Star appreciation from me in my attempt to correct an overdue replacement of crumbling steps in Goshen Valley One managed by Robert H. Wise Management Co. Even my request from the manager, Patti, for an orange cone to be placed on those steps 4 months prior and nothing was done. I don't know what she thinks an orange cone is for. Obviously, she never looked at those steps.
In desperation, after a call to the inspector's office, Mike got the job done post-haste with management scrambling to abide with his request.
Thank you, thank you, thank you for having such an expert building inspector who really cares that our community abides by the rules set down to make our township a very desirable place to call home in Chester County.
But, much to my dismay, I am considering moving after 22 years here because of repairs that are not taken care of here in Goshen Valley I. $5,000.20 in condo fees in 22 years. And for what? The deterioration in some places is incredible.
Sincerely,
[Signature: Norma Morgan]
Norma Morgan, 704 Valley Dr., West Chester, PA 19382-6411
