Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS Tuesday, May 12, 2015
7:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Public Comment – Hearing of Residents (Optional) 6. Chairman’s Report a. Announce that there will be a public meeting on June 11th at 7 pm to receive comments on the new Comprehensive Plan. The new Comprehensive Plan will be posted on the Township Web Page on May 27. b. Announce that there will be an Open House on the Paoli Pike Trail on June 16 at 6 pm and a presentation at the Board of Supervisors 7 pm meeting. d. Announce Community Day will be held on Saturday June 27th. 7. Public Hearings 8. Police/EMS Report – Chief Brenda Bernot Malvern Fire Co. - None Fire Marshal - None Goshen Fire Co. – April 2015 9. Financial Report – April 2015 10. Old Business a. Consider recommendation on East Boot Road Bridge b. Consider recommendation on Beverage Café Ordinance 11. New Business - None 12. Any Other Matter 13. Approval of Minutes - None 14. Treasurer’s Report a. May 7, 2015 15. Correspondence, Reports of Interest a. Acknowledge PennDOT’s letter regarding their speed study on East Strasburg Road b. Acknowledge Remedial Action Progress Report by Alliance c. Acknowledge receipt of John Babeic’s resignation from the Deer Committee 16. Dates of Importance May 12, 2015 Deer Committee 7:00 pm May 13, 2015 Conservancy Board 7:00 pm May 14, 2015 Historical Commission 7:00 pm May 14, 2015 Farmer’s Market Opens 3-7:00 pm EGT Park May 19, 2015 Municipal Primary Day 7-8:00 pm Board of Supervisors will not meet
F:\Data\Shared Data\Agendas\Board of Supervisors\2015\05122015 BlueHilites.doc
May 20, 2015 Futurist Committee 7:00 pm May 21, 2015 Commerce Commission 7:00 pm May 21, 2015 Trail Committee #1 7:00 pm May 25, 2015 Memorial Day Township Offices Closed May 27, 2015 Long Range Planning 9:30am-1pm Newsletter Deadlines for 2015: Fall: August 31 Winter: October 30 17. Public Comment – Hearing of Residents 18. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.
F:\Data\Shared Data\Agendas\Board of Supervisors\2015\05122015 BlueHilites.doc
Goshen Fire Company
Monthly Fire Report
April 2015
| Total Calls | 46 | Calls by Type | |
|---|---|---|---|
| Station 54 (Park Avenue) District | 30 | Building Fire | 3 |
| Station 56 (Boot Rd.) District | 16 | Vehicle Fire | |
| Brush Fire | 3 | ||
| Calls by Township | Cooking Fire | ||
| East Goshen | 15 | Aircraft Fire | |
| West Goshen | 13 | Electrical wiring problem | 1 |
| Westtown | 9 | Excessive Heat/ Scorch | |
| Willistown | 5 | Smoke or Odor Removal | 2 |
| West Chester Boro | 1 | Power Line Down | 2 |
| East Bradford Twp | 1 | Malicious AFA | 1 |
| West Whiteland Twp | 2 | False Fire Alarm | 15 |
| Good Intent | 3 | ||
| Oil Spill | |||
| Total Firefighters Responding | 511 | Vehicle Accident clean up | 1 |
| Average Turnout | 12 | MVA w/no injuries | 1 |
| Staff Hours | 309.01 | MVA w/ injuries | 1 |
| Total Time In Service | 22h 44m | Extrication from Vehicle | 2 |
| Extrication from Building | 1 | ||
| Property Value | $950,000 | Relocate | 1 |
| Property Loss | $3,200 | Medical Assist | 7 |
| Property Saved | $946,800 | Cancelled En Route | 2 |
| Firefighter Injuries | 0 | Civilian Injuries | 0 |
Major Incidents
| 4/02 | 169 Wyntre Brook Dr | Building (Assist 6) |
|---|---|---|
| 4/04 | MM 13.8 NB Rt 202 | Extrication (Assist 6) |
| 4/11 | 1155 N Chester Rd | Building |
| 4/15 | 106 Kent Ct | Extrication |
| 4/25 | 51 Line Rd | Dwelling (Assist 4) |
Goshen Fire Company
Ambulance Year-to-Date Statistics for 2015
| Category | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | TOT |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Calls | 312 | 317 | 287 | 306 | 1222 | ||||||||
| Career Only Crews (54%) | 163 | 168 | 166 | 167 | 664 | ||||||||
| Blended Crews (4%) | 7 | 12 | 12 | 15 | 46 | ||||||||
| Volunteer Only Crews (42%) | 142 | 137 | 109 | 124 | 512 | ||||||||
| Calls To: | |||||||||||||
| Bellingham | 61 | 44 | 31 | 33 | 169 | ||||||||
| Hershey Mill | 28 | 35 | 33 | 29 | 125 | ||||||||
| Ice Line | 3 | 5 | 1 | 9 | |||||||||
| Pembrooke | 12 | 11 | 14 | 7 | 44 | ||||||||
| QVC - Enterprise Drive | 2 | 2 | |||||||||||
| QVC - Wilson Drive | 1 | 5 | 6 | ||||||||||
| Solana of Willistown | 18 | 11 | 17 | 12 | 58 | ||||||||
| Wellington | 40 | 29 | 33 | 32 | 134 | ||||||||
| YMCA | 1 | 2 | 1 | 1 | 5 | ||||||||
| Type Calls | |||||||||||||
| Abdominal Pain | 5 | 6 | 5 | 4 | 20 | ||||||||
| Accident - Aircraft | 2 | 2 | |||||||||||
| Accident - Entrapment | 3 | 1 | 4 | ||||||||||
| Accident - Injuries | 3 | 10 | 5 | 2 | 20 | ||||||||
| Accident - Pedestrian | 1 | 1 | |||||||||||
| Accident - Serious | 2 | 5 | 7 | ||||||||||
| Accident - Unknown Injuries | 12 | 13 | 8 | 6 | 39 | ||||||||
| Alarm - Medical / CO | 8 | 9 | 3 | 6 | 26 | ||||||||
| Allergic / Medication Reaction | 3 | 1 | 1 | 5 | |||||||||
| Assault | 1 | 1 | |||||||||||
| Back Pain | 2 | 7 | 5 | 6 | 20 | ||||||||
| Burns - Fire | 1 | 1 | |||||||||||
| Cardiac /Resp Arrest | 2 | 4 | 6 | 3 | 15 | ||||||||
| Chest Pain | 15 | 16 | 19 | 15 | 65 | ||||||||
| Chest Pain - STEMI | 1 | 1 | |||||||||||
| Choking | 1 | 1 | |||||||||||
| CO Poisoning | 1 | 1 | |||||||||||
| Diabetic Emergency | 2 | 3 | 3 | 2 | 10 | ||||||||
| DOA | 1 | 5 | 2 | 2 | 10 | ||||||||
| Emotional Disorder | 9 | 7 | 8 | 12 | 36 | ||||||||
| Equestrian Accident | 1 | 1 | |||||||||||
| Exposure to Heat / Cold | 2 | 2 | |||||||||||
| Fall Victim | 63 | 64 | 56 | 60 | 243 | ||||||||
| Fracture | 2 | 1 | 1 | 1 | 5 | ||||||||
| Hazmat | 1 | 1 | |||||||||||
| Head Injury | 2 | 2 | 1 | 5 | |||||||||
| Heart Problems | 9 | 5 | 4 | 11 | 29 | ||||||||
| HEMORRHAGING | 7 | 6 | 5 | 6 | 24 | ||||||||
| Hyper Tension | 1 | 1 | 5 | 7 | |||||||||
| Hypo Tension | 6 | 1 | 3 | 4 | 14 | ||||||||
| Industrial Accident | 1 | 1 | |||||||||||
| Injured Person | 9 | 12 | 9 | 10 | 40 | ||||||||
| Laceration | 1 | 1 | 3 | 5 | |||||||||
| Overdose | 3 | 3 | 4 | 5 | 15 | ||||||||
| Respiratory Difficulty | 43 | 31 | 35 | 29 | 138 | ||||||||
| Seizures | 6 | 6 | 7 | 2 | 21 | ||||||||
| sick person | 55 | 60 | 39 | 47 | 201 | ||||||||
| Stabbing | 3 | 3 | |||||||||||
| Stand By - Event | 3 | 3 | |||||||||||
| Stand By - Fire | 20 | 23 | 18 | 18 | 79 | ||||||||
| Stroke/CVA | 5 | 7 | 14 | 10 | 36 | ||||||||
| Syncope / Fainting | 5 | 5 | 8 | 9 | 27 | ||||||||
| unconscious person | 6 | 6 | |||||||||||
| Unknown Nature | 3 | 2 | 3 | 2 | 10 | ||||||||
| Unresponsive Person | 8 | 2 | 8 | 3 | 21 | ||||||||
| Patients Treated (Total) | 258 | 255 | 240 | 252 | 1005 | ||||||||
| Patients Treated - Age 65 and Over | 195 | 191 | 179 | 180 | 745 | ||||||||
| Patients Treated (Total) - By ALS Units | |||||||||||||
| CCH Medic 91 | 54 | 51 | 55 | 54 | 214 | ||||||||
| Malvern Medic 4 | 34 | 24 | 38 | 33 | 129 | ||||||||
| Patients Transported (Total) - By Destination | |||||||||||||
| Brandywine Hospital | 2 | 2 | |||||||||||
| Bryn Mawr Hospital | 4 | 1 | 3 | 8 | |||||||||
| Chester County Hospital | 107 | 110 | 115 | 120 | 452 | ||||||||
| Paoli Memorial Hospital | 106 | 88 | 87 | 93 | 374 | ||||||||
| Riddle Hospital | 2 | 1 | 1 | 4 | |||||||||
| Total Patients transported | 221 | 199 | 203 | 217 | 840 | ||||||||
| Calls No Patients were transported | 91 | 118 | 84 | 89 | 382 | ||||||||
| Box Number Statistics - Number of Calls | |||||||||||||
| 0 | 2 | 2 | |||||||||||
| 120 | 1 | 1 | |||||||||||
| 1560604 | 1 | 1 | |||||||||||
| 323 | 2 | 2 | |||||||||||
| 402 | 1 | 1 | |||||||||||
| 404 | 1 | 1 | |||||||||||
| 405 | 1 | 2 | 3 | ||||||||||
| 484 | 3 | 2 | 4 | 7 | 16 | ||||||||
| 488 | 1 | 2 | 3 | ||||||||||
| 505 | 1 | 1 | |||||||||||
| 51 | 1 | 1 | |||||||||||
Page 1
Goshen Fire Company
Ambulance Year-to-Date Statistics for 2015
| Category | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | TOT |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 52 | 1 | 1 | |||||||||||
| 53 | 1 | 1 | |||||||||||
| 54 | 144 | 163 | 147 | 152 | 606 | ||||||||
| 55 | 1 | 1 | |||||||||||
| 56 | 160 | 145 | 132 | 140 | 577 | ||||||||
| 56-55 | 1 | 1 | |||||||||||
| 56-82 | 1 | 1 | |||||||||||
| 581 | 1 | 1 | |||||||||||
| 625 | 1 | 1 | |||||||||||
| Township Statistics - Number of Calls | |||||||||||||
| East Goshen Township | 192 | 176 | 166 | 165 | 699 | ||||||||
| East Whiteland Township | 1 | 1 | |||||||||||
| Middletown Township (Delaware) | 2 | 2 | |||||||||||
| Tredyffrin Township | 2 | 2 | |||||||||||
| West Chester Borough | 1 | 1 | |||||||||||
| West Goshen Township | 57 | 69 | 65 | 75 | 266 | ||||||||
| West Whiteland Township | 1 | 1 | 2 | ||||||||||
| Westtown Township | 29 | 39 | 28 | 31 | 127 | ||||||||
| Willistown Township | 32 | 28 | 28 | 34 | 122 | ||||||||
| Township Statistics - Hours in Service | |||||||||||||
| East Goshen Township | 166.4 | 152.8 | 139.4 | 143.9 | 602.5 | ||||||||
| East Whiteland Township | 0.1 | 0.1 | |||||||||||
| Middletown Township (Delaware) | 3.5 | 3.5 | |||||||||||
| Tredyffrin Township | 4.3 | 4.3 | |||||||||||
| West Chester Borough | 0.1 | 0.1 | |||||||||||
| West Goshen Township | 41.0 | 46.8 | 46.0 | 53.8 | 187.7 | ||||||||
| West Whiteland Township | 0.3 | 2.2 | 2.5 | ||||||||||
| Westtown Township | 22.2 | 27.7 | 27.5 | 23.3 | 100.8 | ||||||||
| Willistown Township | 28.4 | 22.9 | 24.3 | 33.5 | 109.0 | ||||||||
| Total Company Hours in Service | 1010.3 | ||||||||||||
| Township Statistics - Person Hours in Service (Total) | |||||||||||||
| East Goshen Township | 343.4 | 313.1 | 279.4 | 295.2 | 1231.1 | ||||||||
| East Whiteland Township | 0.1 | 0.1 | |||||||||||
| Middletown Township (Delaware) | 6.9 | 6.9 | |||||||||||
| Tredyffrin Township | 8.6 | 8.6 | |||||||||||
| West Chester Borough | 0.1 | 0.1 | |||||||||||
| West Goshen Township | 86.9 | 99.6 | 93.1 | 110.3 | 389.9 | ||||||||
| West Whiteland Township | 0.6 | 4.4 | 5.0 | ||||||||||
| Westtown Township | 46.8 | 55.4 | 50.6 | 50.0 | 202.7 | ||||||||
| Willistown Township | 58.2 | 46.1 | 48.6 | 70.1 | 223.0 | ||||||||
| Total Person Hours in Service | 2067.4 | ||||||||||||
| Career Hours in Service | 274.1 | 283.1 | 288.2 | 279.3 | 1124.7 | ||||||||
| Volunteer Hours in Service | 261.8 | 246.8 | 183.5 | 250.5 | 942.7 | ||||||||
| Township Statistics - Patients Treated (Total) | |||||||||||||
| East Goshen Township | 166 | 154 | 143 | 146 | 609 | ||||||||
| Middletown Township (Delaware) | 1 | 1 | |||||||||||
| Tredyffrin Township | 1 | 1 | |||||||||||
| West Goshen Township | 44 | 52 | 54 | 58 | 208 | ||||||||
| West Whiteland Township | 1 | 1 | |||||||||||
| Westtown Township | 22 | 25 | 20 | 22 | 89 | ||||||||
| Willistown Township | 26 | 22 | 23 | 25 | 96 | ||||||||
| Township Statistics - Patients Treated Age 65 and Over | |||||||||||||
| East Goshen Township | 135 | 128 | 117 | 115 | 495 | ||||||||
| Middletown Township (Delaware) | 1 | 1 | |||||||||||
| West Goshen Township | 28 | 28 | 28 | 32 | 116 | ||||||||
| Westtown Township | 9 | 16 | 13 | 15 | 53 | ||||||||
| Willistown Township | 23 | 18 | 21 | 18 | 80 | ||||||||
| Unit Statistics - Hours in Service | |||||||||||||
| A54-1 | 25.0 | 77.7 | 97.3 | 37.8 | 237.8 | ||||||||
| A54-2 | 101.5 | 57.0 | 16.7 | 81.6 | 256.8 | ||||||||
| A56-1 | 30.6 | 0.2 | 81.4 | 122.9 | 235.0 | ||||||||
| A56-2 | 101.3 | 123.0 | 41.9 | 14.4 | 280.7 | ||||||||
| Scratches (Total) | 2 | 9 | 11 | 10 | 32 | ||||||||
| 1st Call | 0 | 1 | 0 | 0 | 1 | ||||||||
| 2nd Call | 2 | 3 | 5 | 2 | 12 | ||||||||
| 3rd Call | 0 | 5 | 6 | 7 | 18 | ||||||||
| 4th Call | 0 | 0 | 0 | 1 | 1 | ||||||||
| Calls from 6AM to 5PM | 160 | 170 | 171 | 173 | 674 | ||||||||
| Calls from 5PM through 11PM | 95 | 96 | 66 | 90 | 347 | ||||||||
| Calls from 11PM to 6AM (Night Crew) | 57 | 51 | 50 | 43 | 201 | ||||||||
| Saturday Calls 8am to 6pm | 24 | 27 | 15 | 21 | 87 | ||||||||
| Sunday Calls 8am to 6pm | 26 | 31 | 27 | 34 | 118 | ||||||||
Page 2
Fire Police Year-To-Date Statistics
Goshen Fire Company
04/01/15 - 04/30/15
Report Created: 05/03/2015 20:00
| JAN | FEB | MAR | APR | TOT | |
|---|---|---|---|---|---|
| Calls | 38 | 48 | 36 | 45 | 167 |
| Hours In Service | 139 | 152 | 155 | 228 | 674 |
| Calls 2 Hours or Longer | 2 | 2 | 4 | 7 | 15 |
| NATURE | |||||
| AFA | 10 | 11 | 2 | 12 | 35 |
| Aircraft Incident | 1 | 1 | |||
| Ambulance Assist | 3 | 1 | 1 | 5 | |
| Appliance | 1 | 4 | 5 | ||
| Assist PD | 1 | 1 | |||
| Brush | 1 | 1 | 2 | 4 | |
| Building | 1 | 2 | 3 | ||
| CO Alarm | 1 | 4 | 1 | 1 | 7 |
| Dwelling | 2 | 2 | 1 | 5 | |
| Fire | 1 | 1 | |||
| Fuel Spill | 1 | 1 | |||
| Gas Leak | 2 | 2 | 4 | ||
| HazMat Incident | 1 | 1 | |||
| Mutual Aid | 1 | 1 | |||
| Mutual Aid to Malvern | 1 | 3 | 4 | ||
| Mutual Aid to West Chester | 4 | 1 | 5 | ||
| Mutual Aid to West Whiteland | 1 | 2 | 3 | ||
| MVA | 15 | 22 | 8 | 13 | 58 |
| Odor Investigation | 3 | 2 | 5 | ||
| Pedestrian Struck | 1 | 1 | |||
| Rescue | 1 | 1 | 2 | 4 | |
| Special Duty | 2 | 2 | |||
| Traffic Control Assist | 1 | 1 | 2 | ||
| Transformer | 1 | 1 | |||
| Trees & Wires | 1 | 2 | 1 | 1 | 5 |
| Vehicle Fire | 1 | 2 | 3 | ||
| TASKS | |||||
| Barricades | 1 | 1 | |||
| Barricades - Road Closed | 1 | 1 | |||
| Be Prepared To Stop Sign | 1 | 1 | |||
| Blocked Access | 17 | 25 | 23 | 22 | 87 |
| Closed Road | 15 | 10 | 13 | 9 | 47 |
| Closed Turn Lane | 11 | 5 | 4 | 6 | 26 |
| Cone Signs | 12 | 10 | 3 | 10 | 35 |
| Cones | 15 | 13 | 16 | 18 | 62 |
| Crowd Control | 8 | 4 | 5 | 6 | 23 |
| Emergency Scene Ahead Sign | 2 | 2 | |||
| Fire Line Tape | 1 | 2 | 3 | ||
| Flares | 7 | 7 | 3 | 2 | 19 |
| Night Scan | 2 | 3 | 5 | ||
| No Services Required | 7 | 9 | 3 | 5 | 24 |
| Recalled | 6 | 8 | 4 | 11 | 29 |
| Single Lane | 8 | 15 | 9 | 11 | 43 |
| MUNICIPALITIES | |||||
| East Goshen | 16 | 20 | 12 | 12 | 60 |
| East Whiteland | 1 | 1 | |||
| Other | 1 | 1 | |||
| Thornbury (CC) | 1 | 1 | |||
| West Chester | 3 | 3 | |||
| West Goshen | 10 | 14 | 12 | 15 | 51 |
| West Whiteland | 1 | 2 | 3 | ||
| Westtown | 5 | 10 | 4 | 8 | 27 |
| Willistown | 4 | 4 | 6 | 6 | 20 |
| CREW | |||||
| Abel, Bill | 27 | 13 | 4 | 44 | |
| Dunn, Peggy | 1 | 3 | 4 | ||
| Grothmann, Jason | 7 | 12 | 1 | 4 | 24 |
| Grothmann, Paul | 7 | 11 | 11 | 8 | 37 |
|---|---|---|---|---|---|
| Harlan, Bruce | 2 | 1 | 2 | 5 | |
| Herman, Ralph | 1 | 32 | 30 | 32 | 95 |
| Herzog, Gus | 12 | 13 | 6 | 25 | 56 |
| Keslick Jr., William | 10 | 8 | 2 | 20 | |
| Manley, John | 3 | 4 | 7 | ||
| Molnar, David | 20 | 26 | 14 | 24 | 84 |
| Myers, Charlie | 4 | 5 | 9 | 12 | 30 |
| Ohal, Sachin | 15 | 11 | 26 | ||
| Papahristos, Tino | 1 | 1 | |||
| Phiel, Bob | 8 | 20 | 7 | 22 | 57 |
| Rennard, Steven | 1 | 1 | 2 | ||
| Salas, Phil | 9 | 7 | 5 | 4 | 25 |
| Sherbourne, Scott | 1 | 2 | 2 | 5 | |
| Smith, Jack | 1 | 1 | |||
| Sullivan, Bob | 29 | 39 | 17 | 33 | 118 |
| Verno, Ralph | 2 | 2 | 9 | 13 | |
| Weigel, Jill | 2 | 3 | 5 | ||
| Crew Totals | 153 | 197 | 121 | 188 | 659 |
| Day Calls 06:00 - 18:00 | 22 | 33 | 28 | 38 | 121 |
| Night Calls 18:00 - 06:00 | 16 | 15 | 8 | 7 | 46 |
| TRF54 | |||||
| Responses | 11 | 18 | 15 | 10 | 54 |
| Mileage | 95 | 122 | 117 | 90 | 424 |
| TRF56 | |||||
| Responses | 1 | 1 | |||
| Mileage | 12 | 12 | |||
| UTL54 | |||||
| Responses | 4 | 5 | 9 | 5 | 23 |
| Mileage | 35 | 11 | 42 | 32 | 122 |
Memo
To: Board of Supervisors
From: Jon Altshul
Re: April 2015 Financial Report
Date: May 6, 2015
Net of pass-through accounts, the general fund had revenues of $4,218,703 and expenses of 3,489,167, for a year-to-date surplus of $729,537 through the end of April. Compared to the YTD budget, revenues were $192,042 over budget and expenses were $60,756 over budget, for a positive budget variance of $131,287. As of April 30th, the general fund balance was $5,107,202.
Net of core revenues, Public Works is over-budget by $176,597 due to overruns for snow ($76,345 over budget through April), stormwater expenses ($25,056 over budget due to Wineberry Lane and Grand Oak) and highway materials ($55,536 over budget due to the Westtown Road bridge repair). The remaining four operating departments were all under-budget.
Among core revenues, EIT receipts were under budget by $82,950, while Real Estate Transfer Tax was $193,367 over budget due to the two commercial sales in December 2014. Real Estate Tax was $18,907 over-budget.
Other funds
Other funds continue to be in a strong position through April.
- The State Liquid Fuels Fund had $430,791 and no expenses. The fund balance is $430,995.
- The Sinking Fund had $1,648 in revenues and $95,569 in expenses. The fund balance is $6,143,515.
- The Transportation Fund had $1,589 in revenues and $2,372 in expenses. The fund balance is $1,067,070.
- The Sewer Operating Fund had $1,048,125 in revenues and $933,837 in expenses. The fund balance is $707,828.
- The Refuse Fund had $338,122 in revenues and $333,820 in expenses. The fund balance is $753,201.
- The Sewer Sinking Fund had $896 in revenues and $9,718 in expenses. The fund balance is $1,941,490.
- The Operating Reserve Fund had $1,033 in revenues and no expense. The fund balance is $2,476,644.
- The Events Fund had $3 in revenues and no expenses. The fund balance is $30,009.
Pension Update
I also wanted to update you that the Pension Committee approved a new consolidated Investment Policy Statement at its May 6, 2015, meeting, a copy of which is attached. In addition, the table on the next page shows funding levels for the five plans and trusts overseen by the Committee, as of 3/31/15:
| Fund | Balance | % Funded |
|---|---|---|
| Non-Uniformed Defined Benefit Plan (FROZEN) | $1,971,436 | 139.1% |
| Non-Uniformed Defined Contribution Plan | $455,475 | n/a |
| Firefighter’s Defined Benefit Plan | $1,108,516 | 98.9% |
| WEGO Police Other Post-Employment Benefit Trust | $1,050,968 | n/a |
| WEGO Police Pension Trust | $523,451 | n/a |
EAST GOSHEN TOWNSHIP
APRIL 2015 FINANCIAL RESULTS
April 30, 2015
| Account Title | Annual Budget | Y-T-D Budget | Y-T-D Actual | Budget-Actual Variance |
|---|---|---|---|---|
| GENERAL FUND | ||||
| EMERGENCY SERVICES EXPENSES | 4,152,253 | 1,865,592 | 1,812,659 | (52,933) |
| PUBLIC WORKS EXPENSES | 2,497,796 | 633,403 | 815,613 | 182,210 |
| ADMINISTRATION EXPENSES | 1,805,260 | 561,664 | 549,048 | (12,616) |
| ZONING/PERMITS/CODES EXPENSES | 523,728 | 172,403 | 155,462 | (16,941) |
| PARK AND RECREATION EXPENSES | 582,149 | 137,850 | 98,805 | (39,045) |
| TOTAL CORE FUNCTION EXPENSES | 9,561,186 | 3,370,912 | 3,431,587 | 60,675 |
| EMERGENCY SERVICES REVENUES | 85,977 | 12,440 | 11,004 | (1,436) |
| PUBLIC WORKS REVENUES | 892,534 | 120,418 | 126,031 | 5,613 |
| ADMINISTRATION REVENUES | 301,179 | 71,272 | 103,285 | 32,013 |
| ZONING/PERMITS/CODES REVENUES | 291,300 | 63,164 | 82,587 | 19,423 |
| PARK AND RECREATION REVENUES | 132,987 | 25,948 | 32,185 | 6,237 |
| TOTAL CORE FUNCTION REVENUES | 1,703,977 | 293,242 | 355,092 | 61,850 |
| NET EMERGENCY SERVICES EXPENSES | 4,066,276 | 1,853,152 | 1,801,654 | (51,498) |
| NET PUBLIC WORKS EXPENSES | 1,605,262 | 512,985 | 689,582 | 176,597 |
| NET ADMINISTRATION EXPENSES | 1,504,081 | 490,392 | 445,763 | (44,629) |
| NET ZONING/PERMITS/CODES EXPENSES | 232,428 | 109,239 | 72,875 | (36,364) |
| NET PARK AND RECREATION EXPENSES | 449,162 | 111,902 | 66,621 | (45,281) |
| CORE FUNCTION NET SUBTOTAL | 7,857,209 | 3,077,670 | 3,076,495 | (1,175) |
| DEBT - PRINCIPAL | 476,000 | 0 | 0 | 0 |
| DEBT - INTEREST | 170,418 | 57,499 | 57,580 | 81 |
| TOTAL DEBT | 646,418 | 57,499 | 57,580 | 81 |
| TOTAL CORE FUNCTION NET | 8,503,627 | 3,135,169 | 3,134,075 | (1,094) |
| NON-CORE FUNCTION REVENUE | ||||
| EARNED INCOME TAX | 4,775,000 | 1,370,425 | 1,287,475 | (82,950) |
| REAL ESTATE PROPERTY TAX | 1,994,211 | 1,796,538 | 1,815,445 | 18,907 |
| REAL ESTATE TRANSFER TAX | 640,000 | 356,365 | 549,732 | 193,367 |
| CABLE TV FRANCHISE TAX | 455,616 | 113,904 | 113,784 | (120) |
| LOCAL SERVICES TAX | 310,000 | 88,970 | 88,259 | (711) |
| OTHER INCOME | 29,132 | 7,217 | 8,916 | 1,699 |
| TOTAL NON CORE FUNCTION REVENUE | 8,203,959 | 3,733,419 | 3,863,611 | 130,192 |
| NET RESULT | (299,668) | 598,250 | 729,537 | 131,287 |
U:\JAltshul\Quarterly reports\2015 Q2\4-30-15 General Fund Summary.xls
4/6/15
SUMMARY OF FUNDS REPORT (AKA "JOE REPORT")
ALL FUNDS APRIL 2015
* NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS
| GENERAL FUND* | LIQUID FUELS STATE FUND | SINKING FUND | TRANSPORT. FUND | REFUSE FUND | SEWER OP. FUND | SEWER SINK FUND | OPERATING RESERVE | EVENTS FUND | TOWNSHIP FUNDS | MUNICIPAL AUTHORITY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01/01/15 BEGINNING BALANCE | $4,458,873 | $204 | 6,237,436 | 1,067,853 | 748,898 | $593,541 | $1,950,312 | $2,475,611 | $30,006 | $17,562,735 | $1,589,177 |
| RECEIPTS | |||||||||||
| 310 TAXES | $3,861,050 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $3,861,050 | $0 |
| 320 LICENSES & PERMITS | $33,355 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $33,355 | $0 |
| 330 FINES & FORFEITS | $11,004 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $11,004 | $0 |
| 340 INTERESTS & RENTS | $43,680 | $80 | $1,648 | $797 | $325 | $203 | $896 | $1,033 | $3 | $48,664 | $512 |
| 350 INTERGOVERNMENTAL | $0 | $430,711 | $0 | $0 | $337,797 | $0 | $0 | $0 | $0 | $768,508 | $0 |
| 360 CHARGES FOR SERVICES | $136,623 | $0 | $0 | $0 | $0 | $1,047,921 | $0 | $0 | $0 | $1,184,544 | $15,142 |
| 380 MISCELLANEOUS REVENUES | $288,497 | $0 | $0 | $793 | $0 | $0 | $0 | $0 | $0 | $289,289 | $423 |
| 390 OTHER FINANCING SOURCES | $75,716 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $75,716 | $0 |
| $4,449,926 | $430,791 | $1,648 | $1,589 | $338,122 | $1,048,125 | $896 | $1,033 | $3 | $6,272,132 | $16,077 | |
| EXPENDITURES | |||||||||||
| 400 GENERAL GOVERNMENT | $399,867 | $0 | $34,389 | $0 | $0 | $0 | $9,718 | $0 | $0 | $443,974 | $0 |
| 410 PUBLIC SAFETY | $2,230,021 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $2,230,021 | $0 |
| 420 HEALTH & WELFARE | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 426 SANITATION & REFUSE | $24,563 | $0 | $0 | $0 | $333,820 | $800,073 | $0 | $0 | $0 | $1,158,456 | $63,494 |
| 430 HIGHWAYS,ROADS & STREETS | $698,832 | $0 | $61,180 | $2,372 | $0 | $0 | $0 | $0 | $0 | $762,385 | $0 |
| 450 CULTURE-RECREATION | $87,152 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $87,152 | $0 |
| 460 CONSERVATION & DEVELOPMENT | $1,183 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $1,183 | $0 |
| 470 DEBT SERVICE | $77,577 | $0 | $0 | $0 | $0 | $133,764 | $0 | $0 | $0 | $211,340 | $0 |
| 480 MISCELLANEOUS EXPENDITURES | $278,280 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $278,280 | $0 |
| 490 OTHER FINANCING USES | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| $3,797,476 | $0 | $95,569 | $2,372 | $333,820 | $933,837 | $9,718 | $0 | $0 | $5,172,791 | $63,494 | |
| 2015 SURPLUS/(DEFICIT)* | 652,450 | $430,791 | ($93,920) | ($783) | $4,303 | $114,288 | ($8,822) | $1,033 | $3 | $1,099,341 | ($47,417) |
| CLEARING ACCOUNT ADJUSTMENTS | ($4,122) | ||||||||||
| 04/30/15 BALANCE | $5,107,202 | $430,995 | $6,143,515 | $1,067,070 | $753,201 | $707,828 | $1,941,490 | $2,476,644 | $30,009 | $18,657,954 | $1,541,760 |
C:\Users\jaltshul\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\5W3C0U1Y\April 2015 Joe report.xlsx
Page 1 of 1
5/5/2015
EAST GOSHEN TOWNSHIP
PENSION & RETIREMENT PLAN
East Goshen Township
Incorporated 1817
Chester County, Pennsylvania
INVESTMENT POLICY STATEMENT
Combined statement for:
- Non-uniformed Defined Benefit Plan (Frozen)
- Non-uniformed Defined Contribution Plan
- Firefighters Defined Benefit Plan
- WEGO Police Pension Trust
- WEGO Other Post Employment Benefit Trust
PURPOSE
This document provides the framework for the management of East Goshen Township’s five pension and retirement funds. These five funds are as follows: 1) the frozen non-uniformed defined benefit plan; 2) the non-uniformed defined contribution plan; 3) the firefighters defined benefit plan; 4) the Westtown East Goshen Police Department (“WEGO”) Pension Trust and 5) the WEGO Other Post Employment Benefit Trust.1 The document is divided into five sections. As used herein, “Plan Sponsor” shall refer to the East Goshen Township Pension Committee.
- Investment goals and responsibilities,
- Investment policies and procedures,
- Asset allocation, target return, funding strategy and liability guidelines,
- Performance objectives, and
- Investment guidelines and review.
INVESTMENT GOALS AND RESPONSIBILITIES
- The investment goals state the philosophy and process for the management of plan assets.
- The overall goal of the five funds (the “Funds”) is to provide benefits for Township, Fire Company and WEGO employees and their beneficiaries through a carefully planned and executed investment program.
- The Plan Sponsors shall be responsible for the creation of the investment policies of the Funds and provide oversight for the management of the Funds’ assets.
- East Goshen Township will make the necessary contributions to the Funds annually as dictated by state law or, in absence of applicable state law, the agreements, resolutions or local ordinances governing each respective fund. Benefits will be funded through a combination of municipal contributions, member contributions, and investment earnings on the Funds’ assets.
- The Plan Sponsor shall select qualified investment managers and provide those managers with specific objectives and guidelines to manage the Plan’s assets, as outlined in this Policy Statement.
- The investment philosophy of the Funds is to create a management process with sufficient flexibility to capture investment opportunities as they may occur and maintain reasonable parameters to ensure prudence and care in the execution of the investment program.
- The Plan Sponsor seeks to produce a return on investment which is based on levels of investment risk that are prudent and reasonable given prevailing capital market conditions. While the Plan Sponsor recognizes the importance of the preservation of capital, it also recognizes modern portfolio theory, which maintains that varying degrees of investment risk will be rewarded with compensating returns. Consequently, prudent risk-taking is warranted and justifiable.
- The Plan Sponsor delegates individual investment decisions to the investment managers and, with the exception of investments in “restricted investments” as outlined in pages 5-6 of this document or investments that cause the asset allocation of any fund to be more than 10% greater or less than the target allocation (described in the “INVESTMENT GUIDELINES & REVIEW section), investment managers shall have the flexibility to invest in securities that they deem, in their professional judgment, to offer the best potential for returns and/or risk mitigation.
1 Funds #4 & #5 are intended to offset East Goshen’s proportionate share of the unfunded liabilities for WEGO’s pension and OPEB funds.
- The retirement investment program shall at all times comply with existing and future applicable state and federal regulations.
INVESTMENT POLICIES AND PROCEDURES
The policies and procedures of the investment program guide its implementation and outline the specific responsibilities of the Plan Sponsor and its investment managers. The investment policies of the Plan shall be based on a program that will consider:
- The financial condition of the Funds
- The expected long term capital market outlook
- The Plan Sponsor’s risk tolerance
- Changing demographics of current or future participants
- Anticipated inflation
- Short and long-term liabilities
- Liquidity needs
It will be the fiduciary responsibility of the Plan Sponsor to determine the specific allocation of the investments (the asset policy mix) among the various asset classes considered prudent given the Plan’s liability structure. The long-term allocation guidelines shall be expressed in terms of a target and ranges for each asset class to provide sufficient flexibility to take advantage of shorter-term market opportunities as they may occur.
The asset policy mix shall be sufficiently diversified to maintain a reasonable level of risk as determined by the Plan Sponsor without imprudently sacrificing return. The Plan Sponsor shall review the asset allocation of the Funds each year with current capital market assumptions to ensure the current asset mix will achieve the long-term goals of the retirement program.
In accordance with the asset allocation, target return, funding strategy and liability guidelines, the Plan Sponsor will develop a broad framework to guide the investment managers in making investment decisions and the investment manager shall make investment decisions consistent with the Plan Sponsor’s direction.
The procedures for the management of the Plan assets are:
- The Plan Sponsor will exercise its fiduciary responsibilities in regard to the investment program in accordance with the provisions of the Plan documents, resolutions or ordinances.
- The Plan Sponsor will conduct a formal review of the Plan’s asset allocation policies, investment structure, fund balance, changing workforce demographics and liquidity needs annually , at the conclusion of the prior year.
- The investments of the Plan shall be reviewed no less than quarterly (more often if unusual market conditions dictate) to ensure that policy guidelines continue to be appropriate and are met. The Plan Sponsor shall monitor investment returns on both an absolute and comparative basis.
ASSET ALLOCATION, TARGET RETURN, FUNDING STRATEGY AND LIABILITY GUIDELINES
The Plan Sponsor has adopted the following asset allocation and other policies for the five plans:
Non-Uniformed Defined Benefit Plan (Frozen)
| Target Stock Allocation | 70.00% |
|---|---|
| Total Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $2,795,844 |
| Future Funding Strategy | No future contributions planned at this time. MMO is $0 |
| Current Liability | $8,664/year |
| Medium-Term Liability | 7 additional eligible retirees within next 5 years |
| Liquidity Needs | Low, 1 current annuitant |
Non-Uniformed Defined Contribution Plan
| Target Stock Allocation | 60.00% |
|---|---|
| Target Fixed Income Allocation | 40.00% |
| Actuarial Target Rate of Return | 7.00% |
| Balance as of 3/31/15 | $455,475 |
| Future Funding Strategy | Contribute MMO (via state aid) |
| Current Liability | n/a |
| Medium-Term Liability | 22/26 participants are vested |
| Liquidity Needs | Medium |
Firefighters Defined Benefit Plan
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 7.00%2 |
| Balance as of 3/31/15 | $1,108,516 |
| Future Funding Strategy | Contribute at least MMO (via state aid) and 2.25% member contributions |
| Current Liability | $17,808/year |
| Medium-Term Liability | No additional eligible retirees until 2019 |
| Liquidity Needs | Low-Medium, currently 2 annuitants |
WEGO Police Pension Trust
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $523,451 |
| Future Funding Strategy | Annual contributions of approx. $250,000 through 2021 |
| Current Liability | None |
2 Despite the 70/30 stock/bond allocation which should generate about an 8% annual return, the 7% target return is used for the Firefighter’s DB Plan to maximize the plan’s eligibility for state pension aid.
| Medium-Term Liability | None |
|---|---|
| Liquidity Needs | Very Low |
WEGO Other Post Employment Benefit Trust
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $1,050,968 |
| Future Funding Strategy | Annual contributions of approx. $80,000 through 2031 |
| Current Liability | None |
| Medium-Term Liability | None |
| Liquidity Needs | Very Low |
Performance Objectives
All fund objectives will be incorporated in the quarterly and annual review of the Funds’ performance. Rates of return will be calculated based on a time-weighted rate of return formula.
The performance of the overall fund will measured relative to:
- The actuarial target rate of return
- Inflation rate, and
- Each fund’s level of risk tolerance
The first objective is achieving a rate of return equal to or greater than each fund’s actuarial interest rate, if applicable. If the fund’s assets grow at a rate equal to or greater than the actuarial rate, the fund’s funding condition will be maintained. Earning a lower return will generally result in increased levels of contributions.
The second objective is achieving a real return above inflation. The fund’s liabilities are sensitive to inflation as benefits are ultimately determined by future salaries. Failing to achieve the necessary real return may increase retirement costs.
The third objective is to maintain a risk level within the tolerance level of the plan fiduciaries.
INVESTMENT GUIDELINES & REVIEW
The Plan Sponsor has selected a number of investment options to implement its investment policies. Each option is retained to invest a specific allocation in accordance with its style and investment process as specified in the tables above. On an ongoing basis, the Plan Sponsor will monitor the investment managers for compliance with the investment guidelines and specific objectives.
Permitted investments
The investment manager may invest among the following asset categories:
- Cash and cash equivalents, including money market funds
- Individual bonds (U.S. Treasuries, corporate or municipal)
- Individual stocks
- Certificates of Deposit
- Mutual funds, including broad-based mutual funds which may own any of the restricted investments listed below as part of their portfolios.
- Exchanged Traded Funds
- Annuities
Restricted investments
The investment manager may invest in the following asset categories with the prior consent of the Plan Sponsors:
- Private Equity
- Limited Partnerships
- Precious Metals
- Hedge Funds
- Non-Liquid Assets
- Commodities
Asset Allocation
The Plan Sponsors recognize that market conditions may lend themselves to temporary investment allocations in either equities or fixed assets that are different than the Funds’ respective target allocations. Investment managers may determine when such diversions from the target allocations are appropriate, provided that the actual allocations are never more than 10% from the respective target allocations, unless prior consent is given from the Plan Sponsors.
ADOPTION OF INVESTMENT POLICY STATEMENT
Dated this 7TH day of MAY, 2015
SIGNED BY PLAN SPONSOR:
By: [Signature] (Co-Trustee)
[Signature] (Co-Trustee)
EAST GOSHEN TOWNSHIP
PENSION & RETIREMENT PLAN
East Goshen Township
Incorporated 1817
Chester County, Pennsylvania
INVESTMENT POLICY STATEMENT
Combined statement for:
- Non-uniformed Defined Benefit Plan (Frozen)
- Non-uniformed Defined Contribution Plan
- Firefighters Defined Benefit Plan
- WEGO Police Pension Trust
- WEGO Other Post Employment Benefit Trust
PURPOSE
This document provides the framework for the management of East Goshen Township’s five pension and retirement funds. These five funds are as follows: 1) the frozen non-uniformed defined benefit plan; 2) the non-uniformed defined contribution plan; 3) the firefighters defined benefit plan; 4) the Westtown East Goshen Police Department (“WEGO”) Pension Trust and 5) the WEGO Other Post Employment Benefit Trust.1 The document is divided into five sections. As used herein, “Plan Sponsor” shall refer to the East Goshen Township Pension Committee.
- Investment goals and responsibilities,
- Investment policies and procedures,
- Asset allocation, target return, funding strategy and liability guidelines,
- Performance objectives, and
- Investment guidelines and review.
INVESTMENT GOALS AND RESPONSIBILITIES
- The investment goals state the philosophy and process for the management of plan assets.
- The overall goal of the five funds (the “Funds”) is to provide benefits for Township, Fire Company and WEGO employees and their beneficiaries through a carefully planned and executed investment program.
- The Plan Sponsors shall be responsible for the creation of the investment policies of the Funds and provide oversight for the management of the Funds’ assets.
- East Goshen Township will make the necessary contributions to the Funds annually as dictated by state law or, in absence of applicable state law, the agreements, resolutions or local ordinances governing each respective fund. Benefits will be funded through a combination of municipal contributions, member contributions, and investment earnings on the Funds’ assets.
- The Plan Sponsor shall select qualified investment managers and provide those managers with specific objectives and guidelines to manage the Plan’s assets, as outlined in this Policy Statement.
- The investment philosophy of the Funds is to create a management process with sufficient flexibility to capture investment opportunities as they may occur and maintain reasonable parameters to ensure prudence and care in the execution of the investment program.
- The Plan Sponsor seeks to produce a return on investment which is based on levels of investment risk that are prudent and reasonable given prevailing capital market conditions. While the Plan Sponsor recognizes the importance of the preservation of capital, it also recognizes modern portfolio theory, which maintains that varying degrees of investment risk will be rewarded with compensating returns. Consequently, prudent risk-taking is warranted and justifiable.
- The Plan Sponsor delegates individual investment decisions to the investment managers and, with the exception of investments in “restricted investments” as outlined in pages 5-6 of this document or investments that cause the asset allocation of any fund to be more than 10% greater or less than the target allocation (described in the “INVESTMENT GUIDELINES & REVIEW section), investment managers shall have the flexibility to invest in securities that they deem, in their professional judgment, to offer the best potential for returns and/or risk mitigation.
1 Funds #4 & #5 are intended to offset East Goshen’s proportionate share of the unfunded liabilities for WEGO’s pension and OPEB funds.
- The retirement investment program shall at all times comply with existing and future applicable state and federal regulations.
INVESTMENT POLICIES AND PROCEDURES
The policies and procedures of the investment program guide its implementation and outline the specific responsibilities of the Plan Sponsor and its investment managers. The investment policies of the Plan shall be based on a program that will consider:
- The financial condition of the Funds
- The expected long term capital market outlook
- The Plan Sponsor's risk tolerance
- Changing demographics of current or future participants
- Anticipated inflation
- Short and long-term liabilities
- Liquidity needs
It will be the fiduciary responsibility of the Plan Sponsor to determine the specific allocation of the investments (the asset policy mix) among the various asset classes considered prudent given the Plan's liability structure. The long-term allocation guidelines shall be expressed in terms of a target and ranges for each asset class to provide sufficient flexibility to take advantage of shorter-term market opportunities as they may occur.
The asset policy mix shall be sufficiently diversified to maintain a reasonable level of risk as determined by the Plan Sponsor without imprudently sacrificing return. The Plan Sponsor shall review the asset allocation of the Funds each year with current capital market assumptions to ensure the current asset mix will achieve the long-term goals of the retirement program.
In accordance with the asset allocation, target return, funding strategy and liability guidelines, the Plan Sponsor will develop a broad framework to guide the investment managers in making investment decisions and the investment manager shall make investment decisions consistent with the Plan Sponsor's direction.
The procedures for the management of the Plan assets are:
- The Plan Sponsor will exercise its fiduciary responsibilities in regard to the investment program in accordance with the provisions of the Plan documents, resolutions or ordinances.
- The Plan Sponsor will conduct a formal review of the Plan's asset allocation policies, investment structure, fund balance, changing workforce demographics and liquidity needs annually , at the conclusion of the prior year.
- The investments of the Plan shall be reviewed no less than quarterly (more often if unusual market conditions dictate) to ensure that policy guidelines continue to be appropriate and are met. The Plan Sponsor shall monitor investment returns on both an absolute and comparative basis.
ASSET ALLOCATION, TARGET RETURN, FUNDING STRATEGY AND LIABILITY GUIDELINES
The Plan Sponsor has adopted the following asset allocation and other policies for the five plans:
Non-Uniformed Defined Benefit Plan (Frozen)
| Target Stock Allocation | 70.00% |
|---|---|
| Total Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $2,795,844 |
| Future Funding Strategy | No future contributions planned at this time. MMO is $0 |
| Current Liability | $8,664/year |
| Medium-Term Liability | 7 additional eligible retirees within next 5 years |
| Liquidity Needs | Low, 1 current annuitant |
Non-Uniformed Defined Contribution Plan
| Target Stock Allocation | 60.00% |
|---|---|
| Target Fixed Income Allocation | 40.00% |
| Actuarial Target Rate of Return | 7.00% |
| Balance as of 3/31/15 | $455,475 |
| Future Funding Strategy | Contribute MMO (via state aid) |
| Current Liability | n/a |
| Medium-Term Liability | 22/26 participants are vested |
| Liquidity Needs | Medium |
Firefighters Defined Benefit Plan
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 7.00%2 |
| Balance as of 3/31/15 | $1,108,516 |
| Future Funding Strategy | Contribute at least MMO (via state aid) and 2.25% member contributions |
| Current Liability | $17,808/year |
| Medium-Term Liability | No additional eligible retirees until 2019 |
| Liquidity Needs | Low-Medium, currently 2 annuitants |
WEGO Police Pension Trust
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $523,451 |
| Future Funding Strategy | Annual contributions of approx. $250,000 through 2021 |
| Current Liability | None |
2 Despite the 70/30 stock/bond allocation which should generate about an 8% annual return, the 7% target return is used for the Firefighter's DB Plan to maximize the plan's eligibility for state pension aid.
| Medium-Term Liability | None |
|---|---|
| Liquidity Needs | Very Low |
WEGO Other Post Employment Benefit Trust
| Target Stock Allocation | 70.00% |
|---|---|
| Target Fixed Income Allocation | 30.00% |
| Actuarial Target Rate of Return | 8.00% |
| Balance as of 3/31/15 | $1,050,968 |
| Future Funding Strategy | Annual contributions of approx. $80,000 through 2031 |
| Current Liability | None |
| Medium-Term Liability | None |
| Liquidity Needs | Very Low |
Performance Objectives
All fund objectives will be incorporated in the quarterly and annual review of the Funds' performance. Rates of return will be calculated based on a time-weighted rate of return formula.
The performance of the overall fund will measured relative to:
- The actuarial target rate of return
- Inflation rate, and
- Each fund's level of risk tolerance
The first objective is achieving a rate of return equal to or greater than each fund's actuarial interest rate, if applicable. If the fund's assets grow at a rate equal to or greater than the actuarial rate, the fund's funding condition will be maintained. Earning a lower return will generally result in increased levels of contributions.
The second objective is achieving a real return above inflation. The fund's liabilities are sensitive to inflation as benefits are ultimately determined by future salaries. Failing to achieve the necessary real return may increase retirement costs.
The third objective is to maintain a risk level within the tolerance level of the plan fiduciaries.
INVESTMENT GUIDELINES & REVIEW
The Plan Sponsor has selected a number of investment options to implement its investment policies. Each option is retained to invest a specific allocation in accordance with its style and investment process as specified in the tables above. On an ongoing basis, the Plan Sponsor will monitor the investment managers for compliance with the investment guidelines and specific objectives.
Permitted investments
The investment manager may invest among the following asset categories:
- Cash and cash equivalents, including money market funds
- Individual bonds (U.S. Treasuries, corporate or municipal)
- Individual stocks
- Certificates of Deposit
- Mutual funds, including broad-based mutual funds which may own any of the restricted investments listed below as part of their portfolios.
- Exchanged Traded Funds
- Annuities
Restricted investments
The investment manager may invest in the following asset categories with the prior consent of the Plan Sponsors:
- Private Equity
- Limited Partnerships
- Precious Metals
- Hedge Funds
- Non-Liquid Assets
- Commodities
Asset Allocation
The Plan Sponsors recognize that market conditions may lend themselves to temporary investment allocations in either equities or fixed assets that are different than the Funds' respective target allocations. Investment managers may determine when such diversions from the target allocations are appropriate, provided that the actual allocations are never more than 10% from the respective target allocations, unless prior consent is given from the Plan Sponsors.
ADOPTION OF INVESTMENT POLICY STATEMENT
Dated this 7TH day of MAY, 2015
SIGNED BY PLAN SPONSOR:
By: [signature] (Co-Trustee)
[signature] [signature] (Co-Trustee)
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
| Date: | May 7, 2015 |
|---|---|
| To: | Board of Supervisors |
| From: | Rick Smith, Township Manager |
| Re: | East Boot Road Bridge |
Attached is the recommendation from Carroll for the East Boot Road Bridge and I would concur with their recommendation.
I also spoke to Paul Cardie at Carroll about the possibility of creating a pedestrian crossing on the bridge that would be separated from vehicles by some type of barrier. (See attached)
I would suggest that we have them include this option or something comparable into the design.
F:\Data\Shared Data\Public Works Dept\Bridges\East Boot Road\Carroll\Memo 050715.docx
36" & 48" COMPOSITE ADJACENT BOX BEAMS SUPPORTING SIDEWALK
(RAISED SIDEWALK DETAIL SIMILAR)
Engineering cross-section drawing of 36" and 48" composite adjacent box beams supporting a sidewalk, bridge barrier, pedestrian railing, and vertical reinforcement detail, with handwritten annotations.
Handwritten Annotations
- Deck & "Sidewalk" @ same elevation
- @ either end of bridge would need to extend w/ some type of railing (split rail fence?)
Cross-Section Labels
- VEHICULAR WIDTH
- BARRIER: 1'-6"
- SIDEWALK WIDTH
- #4 FOR SPACING, SEE SHEET 1
- 3'-6", 2'-11", 1'-1"
- 2 1/2" CLR.
- T, 5 1/2" MIN. (3)
- CL SIDEWALK RAIL
- REAR FACE
- CONSTR. JT. & V-NOTCH (RAKED FINISH)
- 2" CLR. (TYP.)
- #4, 2"
- 2%, SLOPED TOWARD BARRIER ** (OVER UNDERPASS ROADWAY)
- 2%, SLOPED AWAY FROM BARRIER (OTHER CONDITIONS)
- ** DRAIN RUNOFF THROUGH CONCRETE CURB WITH CURB DRAIN. SET SIDEWALK ELEVATION AT REAR FACE OF BARRIER 1" ABOVE GUTTERLINE ELEVATION. THIS MAY RESULT IN INCREASED COVER FOR TRANSVERSE DECK REINFORCEMENT BARS.
- PEDESTRIAN RAILING, SIDEWALK PROTECTIVE FENCE OR BARRIER. FOR ADDITIONAL DETAILS, SEE BC-701M, BC-711M OR BC-716M.
- ROTATE HOOK TO PROVIDE 1" CLR.
- 1" MIN. FOR OVERHANGS
- OVERHANG LIMITED TO 8" MAX.
VERTICAL REINFORCEMENT
(FOR DIMENSIONS "B" AND "C", SEE TABLE 2)
- 8 1/2", 1/4", 4" (TYP.)
- TOP OF CONCRETE DECK, 11", C, B
- INSIDE RAD. 2" (TYP.)
- ALTERNATE CONFIGURATION AS REQUIRED FOR EMBEDMENT IN BOX BEAM, 12", 8 1/2"
TABLE 2: B AND C DIMENSIONS FOR PA TYPE 10M BRIDGE BARRIER
| T | B (AT COMP. ADJ. BOX BEAMS SUPPORTING SIDEWALK OR RAISED SIDEWALK) | C (AT COMP. ADJ. BOX BEAMS SUPPORTING SIDEWALK OR RAISED SIDEWALK) |
|---|---|---|
| 5.5" | 1'-1 3/4" | 1'-1 1/2" |
| 6.0" | 1'-2 1/4" | 1'-2" |
| 6.5" | 1'-2 3/4" | 1'-2 1/2" |
| 7.0" | 1'-3 1/4" | 1'-3" |
| 7.5" | 1'-3 3/4" | 1'-3 1/2" |
| 8.0" | 1'-4 1/4" | 1'-4" |
NOTES:
1. FOR GEOMETRIC AND REINFORCEMENT DETAILS OF THE PA TYPE 10M BRIDGE BARRIER NOT SHOWN, SEE SHEET 1.
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
BUREAU OF PROJECT DELIVERY
STANDARD
Carroll Engineering Corporation logo
RECOMMENDATIONS FOR SUPERSTRUCTURE REPLACEMENT
EAST BOOT ROAD BRIDGE
OVER
EAST BRANCH OF RIDLEY CREEK
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA
MAY 6, 2015
PREPARED FOR:
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA 19380
PREPARED BY:
CARROLL ENGINEERING CORPORATION
949 EASTON ROAD
WARRINGTON, PA 18976
15-1912.001 (1519120005) Carroll Engineering Corporation
General Description
East Boot Road Bridge carries East Boot Road over the East Branch of Ridley Creek in East Goshen Township. The existing bridge; which was built in 1970, is a 29' single-span bridge with an overall width of 32.3'. The superstructure consists of eight adjacent pre-stressed concrete plank beams with a non-composite concrete deck and bituminous wearing surface. The beams appear to have been set level, with any cross-slope being imparted in the deck or wearing surface construction. The substructure consists of reinforced concrete abutments and u-wings.
Based on the 2014 Inspection Report; and confirmed by our visual review of the structure, the bridge superstructure is in poor condition due to deterioration of the concrete beams. The substructure is in satisfactory condition, with only minor hairline cracks and minor abrasion along the waterline. The four (4) cheek walls at the corners of both abutments have minor spalling and diagonal cracking at the beam seat elevation. No streambed scour or undermining was noted in the vicinity of the bridge.
The approach roadways carry one lane in each direction along a relatively flat roadway profile. Sidewalks do not exist at either approach; however, a pedestrian path crosses the roadway at the east approach and then travels west along the roadway shoulder, and across the bridge. Non-standard bridge railing and approach guiderail exist along both edges of the roadway/bridge.
Based on FEMA flood mapping information (see Appendix A) for the East Branch of Ridley Creek, the 100-year storm passes below the bridge under pressure flow, with some possible additional overtopping at the approaches.
Evaluation of Superstructure Replacement Options
The combination of the poor superstructure condition coupled with the satisfactory substructure and channel conditions, makes this bridge a prime candidate for superstructure replacement. There are various superstructure replacement types that are generally considered for the short span range of this structure. The types typically considered are:
- Adjacent Prestressed Box Beam with Composite Reinforced Concrete Deck
- Spread Prestressed Box Beam with Composite Reinforced Concrete Deck
- Spread Prestressed I-Beam with Reinforced Concrete Deck
- Steel I-Beam with Reinforced Concrete Deck
- Cast-in-Place Concrete T-Beam
For any of the above options to be considered, they should meet the following criteria, which are requirements for the given conditions:
- Structure Depth The proposed structure depth must be less than; or approximately equal to, the structure depth of the existing bridge. This is a requirement of PaDEP permitting for the bridge which dictates the existing bridge hydraulic opening cannot be reduced. This is especially necessary, given that the existing flood profile at the bridge indicates the 100-year storm elevation appears to fall at, or just above the bottom of the bridge superstructure. In addition, maintaining the existing roadway profile limits the amount of approach work that is necessary.
(5-6-15) 15-1912.001 (1519120005) 1 Carroll Engineering Corporation
- Structure Weight The proposed superstructure weight should be less than; or approximately equal to, the existing structure weight. This is required since the existing substructure and foundation subgrade was originally designed to support the weight of the existing bridge. Since the existing substructure is structurally sound, PennDOT should consider it adequate for re-use, as long as the proposed structure does not impart any additional load.
- Durability and Low Maintenance Each option should be looked at for its ability to provide longevity with the least amount of required maintenance. Given the low profile over the existing creek, the structure elements are all subject to the corrosive effects of a high moisture environment. In addition, the presence of high water surface elevations during heavy storm events has the potential to inundate the bridge superstructure. In addition to increasing corrosive effects, this can cause damage to the bridge and also lead to debris being lodged within its opening or between its members.
- Construction Cost Each option should be evaluated for its ability to meet the requirements previously stated in the most cost effective manner. For these types of projects, the key aspect to providing lower construction costs is the ability of the contractor to construct a given option in a reasonable time-frame. In addition to lowering construction costs, reducing the period of construction will help limit the detrimental effects on the public caused by temporary closure of the road.
Of the five (5) typical options noted previously, three appear to be infeasible due to their inability to meet the structure depth and/or weight criteria. Those options are: Spread Prestressed Box Beam with Composite Deck; Spread Prestressed I-Beam with Composite Deck; and, Cast-in-place Concrete T-Beam structure types. Both the Spread Box Beam and Spread I-Beam structures would provide structure depths significantly deeper than the existing bridge's structure depth of approximately 18". These extra depth superstructures could not meet PaDEP requirements for passing regulatory creek flows without also increasing the span of the bridge, which would change the project to a full structure replacement. In addition, this would extend the amount of approach roadway work necessary due to the associated change in roadway profile. The Cast-in-place Concrete T-Beam structure would also have a structure depth deeper than the existing. In addition, this type of superstructure would be significantly heavier than the existing, which would not allow for re-use of the existing substructure without modification.
The two structure types that could meet the structure depth and weight criteria are: Prestressed Adjacent Box Beam with Composite Deck; and, the Steel I-Beam with Composite Deck. In order to evaluate these two options further, we performed preliminary structural design calculations for both. Please see Appendix B for typical cross-sections of these bridge types. The Prestressed Adjacent Box Beam Superstructure cross-section consists of eight (8) 12" deep by 48" wide rectangular concrete beams with a 5.5" thick composite reinforced concrete deck. Two cross-sections for the Steel I-Beam Superstructure were analyzed; a superstructure with five (5) 18" deep beams at a standard 6.5' spacing; and, a superstructure with ten (10) 8" deep beams at a reduced 3.25' spacing. The 6.5' spacing of the I-beams was first analyzed since this beam spacing is relatively standard for this span range. However, at this spacing an 18" deep
(5-6-15) 15-1912.001 (1519120005) 2 Carroll Engineering Corporation
beam is required which; coupled with the 8" minimum required deck thickness, provides for a structure depth approximately 9" deeper than the existing bridge. In order to meet the existing structure depth requirements, we increased the number of steel beams to ten (10), which dropped the required beam depth to 8" but required the beam spacing to be tightened to 3.25'.
The eight (8) Prestressed Adjacent Box Beam superstructure and the ten (10) Steel I-Beam superstructure both closely match the existing bridge structure depth and both meet the weight limitation requirement. The Prestressed Adjacent Box Beam superstructure option is the more durable and maintenance free option of the two. Since the boxes are placed adjacent to each other, the bottom of the superstructure is closed and does not allow for the collection of debris during high flows. Additionally, this arrangement provides for better hydraulics under pressure flow, with its smooth, closed bottom surface. On the other hand, during high flows the spread arrangement of the I-Beam option promotes the accumulation of debris and is less hydraulically efficient. In addition, the painted surfaces of the I-beams will need to be maintained and recoated on a regular basis to prevent corrosion. Regular cleaning of debris from between the beams and especially at the bearings will be required to keep corrosion from occurring to the steel surfaces.
The estimated construction cost of the Adjacent Box Beam option is $400,000. The estimated cost of the Steel I-Beam option is $450,000. The main cost difference between the two would be in the overall time required for completion, and the amount of labor required to construct the deck of each option. In addition, the Steel I-Beam option would require the construction of a backwall at each abutment. The deck for the Adjacent Box Beam superstructure would take less time and labor to complete since no forms are required, and the placement of reinforcement is less complicated. With the remainder of the bridge work being relatively equal for both options, we would expect the Adjacent Box Beam option to take three (3) to four (4) weeks less time to complete than the Steel I-Beam option.
Other Project Considerations
- Safety Features The existing curb and railing system across the bridge consists of a 1' wide curb with structure-mounted vehicular guiderail. The guiderail is supplemented with a separate pedestrian pipe railing. We would propose the new bridge curb and railing system to consist of a standard PennDOT Type 10M Bridge Barrier with integral pedestrian top rail (see Appendix C). This barrier system incorporates a 1.5' wide concrete brush curb. Although this would provide a curb to curb dimension that is approximately 1' less than existing, it combines the vehicular and pedestrian railing requirement into one system. In addition, if the Township desires to maintain the existing curb to curb dimension, we could look to cantilever the curbs 6" off the deck as long as the overall weight limitations can still be maintained. With the Type 10M Bridge Barrier across the bridge, the approach guiderail at each corner would then consist of a PennDOT Standard Three Beam to 10M Bridge Barrier Transition Section (approximately 20 LF) and 25 LF of Type 2S Guiderail. The Type 2S Guiderail could be terminated outside the clear zone or with a crash attenuator if the required clear zone is not available.
(5-6-15) 15-1912.001 (1519120005) 3 Carroll Engineering Corporation
Finally, the approach railing could be provided in weathering steel if the Township desires to match the rustic appearance of the existing guiderail. If this is done, the Type 10M Bridge Barrier across the bridge would be painted to match.
- Paving Limits Since we anticipate the proposed profile will closely match existing, the required paving limits at the approaches could be limited to that which is necessary for the required abutment seat reconstruction work. This would amount to about 15' of paving at each end of the bridge. Beyond these limits, the roadway approaches could be milled and overlaid to whatever distance the Township chooses. However, we would recommend to extend the milling and overlay to at least an additional 50' at each approach.
- Substructure Modifications/Repairs The substructure modifications typically required for superstructure replacements are limited to removal and reconstruction of approximately 1' to 1.5' of the top of each abutment stem. This allows for removal of any damaged portions of the existing bridge seat, as well as removal of any dowels that may be present holding the existing beams to the abutments. It would also allow for adjustments to be made to the beam seat elevations that may be necessary and to impact the required roadway cross-slope. In addition, to allow for removal of the existing beams and installation of new beams, the "cheek walls" at each corner of the bridge will need to be removed and reconstructed. In addition to the modifications noted above, we will detail the location of any other necessary repairs to the abutments and/or wing walls. We would expect these to consist of crack repairs and concrete spall repairs. Depending on the extent of these repairs, the Township may elect to have a concrete coating placed on the abutment and wing faces to provide a uniform appearance.
Summary of Recommended Scope of Construction
- Remove existing deck, beams and cheek walls;
- Reconstruct top of abutments/bearing seats;
- Install (8) 12" deep by 48" wide prestressed adjacent box/plank beams;
- Install 5.5" minimum composite reinforced concrete deck with 2% cross-slope;
- Install 1'-6" wide by 1'-1" tall brush curb and Type 10 Bridge Barrier with hand rail;
- Reconstruct cheek walls;
- Perform concrete repairs to exposed faces of abutments and wing walls;
- Install PennDOT standard guiderail at each approach;
- Perform necessary full depth pavement reconstruction in vicinity of abutments and mill an overlay pavement at each approach;
- Reinstall pavement markings; and,
- Topsoil, seed, and mulch all disturbed areas.
(5-6-15) 15-1912.001 (1519120005) 4 Carroll Engineering Corporation
APPENDIX A
FEMA Flood Mapping
(5-6-15) 15-1912.001 (1519120005) Carroll Engineering Corporation
National Flood Insurance Program (NFIP) Flood Insurance Rate Map (FIRM) excerpt for the Township of East Goshen (420277), Chester County, Pennsylvania (Panel 215 of 350, Map Number 42029C0215F, Map Revised September 29, 2006, Map Scale 1" = 1000', Joins Panel 0160).
Map Title Block and Legend Labels
- NFIP / PANEL 0215 F
- FIRM FLOOD INSURANCE RATE MAP: CHESTER COUNTY, PENNSYLVANIA (ALL JURISDICTIONS)
- PANEL 215 OF 350 (SEE MAP INDEX FOR FIRM PANEL LAYOUT)
- CONTAINS: E. GOSHEN, TWP OF (420277, 0215, F); THORNBURY, TWP OF (420293, 0215, F); W. GOSHEN, TWP OF (420299, 0215, F); WESTTOWN, TWP OF (420304, 0215, F); WILLISTOWN, TWP OF (420307, 0215, F)
- MAP NUMBER: 42029C0215F
- MAP REVISED: SEPTEMBER 29, 2006
- Federal Emergency Management Agency
Map Features and Labels
- Township of East Goshen 420277; Township of West [Goshen]
- Waterways: Ridley Creek, West Branch Ridley Creek, East Branch Ridley Creek, Tributary 1 to East Branch Ridley Creek, Tributary 2 to East Branch Ridley Creek, Tributary 3 to East Branch Ridley Creek, Tributary 5 of Ridley Creek, Tributary 1 of Tributary 5 of Ridley Creek, Tributary 2 of Tributary 5 of Ridley Creek, Tributary 6 of Ridley Creek, Tributary 7 of Ridley Creek, East Branch Chester Creek, Tributary 8 of East Branch Chester Creek, Tributary 10 of East Branch Chester Creek, Tributary 11 of East Branch Chester Creek, Tributary 12 of East Branch Chester Creek, Tributary 1, Hunters Run, Tributary 3 to Hunters Run
- Roads: Paoli Pike, Boot Road, Chester Road, Cornwallis Dr, Vista Pl, Monte Vista Drive, Linden Lane, Reservoir Road, Barker Dr, Gateswood Lane, Gateswood Dr, Bramble Lane, Brian Dr, Anne Dr, Mark Dr, Strasburg Road, Christine Lane
- Flood Zones and Annotations: Zone A, Zone AE, Zone X, Limit of Study, Limit of Floodway, Limit of Detailed Study, Footbridge, Bridge
Flood profile graph (Panel 81P) showing elevation in feet (NAVD 88) versus stream distance in feet above confluence with Ridley Creek for East Branch Ridley Creek in Chester County, PA.
Title Block
- FLOOD PROFILES: EAST BRANCH RIDLEY CREEK
- FEDERAL EMERGENCY MANAGEMENT AGENCY: CHESTER COUNTY, PA (ALL JURISDICTIONS)
- 81P
Axes and Feature Labels
- Vertical Axis: ELEVATION IN FEET (NAVD 88) (360 to 450)
- Horizontal Axis: STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH RIDLEY CREEK (0 to 7200)
- Locations Along Stream: CONFLUENCE WITH RIDLEY CREEK, BOOT ROAD, MONTE VISTA DRIVE, PRIVATE DRIVE
- Cross Section Markers: A, B
Legend
- 0.2% ANNUAL CHANCE FLOOD
- 1% ANNUAL CHANCE FLOOD
- 2% ANNUAL CHANCE FLOOD
- 10% ANNUAL CHANCE FLOOD
- STREAM BED
- CROSS SECTION LOCATION
APPENDIX B
Typical Bridge Cross-Sections
(5-6-15) 15-1912.001 (1519120005) Carroll Engineering Corporation
Engineering cross-section drawing of prestressed adjacent box beams with a composite reinforced concrete deck for Bridge No. 5, East Boot Rd over Ridley Creek (Drawing No. 1).
Drawing Labels and Dimensions
- PRESTRESSED ADJACENT BOX BEAMS WITH COMPOSITE REINFORCED CONCRETE DECK
- PA TYPE 10M BRIDGE BARRIER WITH PEDESTRIAN RAIL
- 29'-1 15/16" RAIL TO RAIL
- 29' CURB TO CURB
- 5 1/2" MIN CONC COMPOSITE DECK
- 3'-6"
- 1'-1"
- (8) - 12" x 48" P/S CONC PLANKS + (7) 1/2" JOINTS = 32'-3 1/2"
Title Block
- CEC Carroll Engineering Corporation (www.carrollengineering.com)
- BRIDGE NO. 5 EAST BOOT RD OVER RIDLEY CREEK
- PREPARED FOR: EAST GOSHEN TOWNSHIP
- SITUATED IN: EAST GOSHEN TWP, CHESTER COUNTY, PA
- DATE: 5/6/15
- JOB NO.: [blank]
- SCALE: NTS
- DWG. NO.: 1
Engineering cross-section drawing of steel I-beams with a composite reinforced concrete deck for Bridge No. 5, East Boot Rd over Ridley Creek (Drawing No. 2).
Drawing Labels and Dimensions
- STEEL I-BEAMS WITH COMPOSITE REINFORCED CONCRETE DECK
- PA TYPE 10M BRIDGE BARRIER WITH PEDESTRIAN RAIL
- 29'-1 15/16" RAIL TO RAIL
- 29' CURB TO CURB
- 8" MIN CONC COMPOSITE DECK
- 3'-6"
- 1'-1"
- 1'-4 1/2" (both ends)
- (10) - W8x58 - 9 SPACES @ 3'-3" = 29'-3"
Title Block
- CEC Carroll Engineering Corporation (www.carrollengineering.com)
- BRIDGE NO. 5 EAST BOOT RD OVER RIDLEY CREEK
- PREPARED FOR: EAST GOSHEN TOWNSHIP
- SITUATED IN: EAST GOSHEN TWP, CHESTER COUNTY, PA
- DATE: 5/6/15
- JOB NO.: [blank]
- SCALE: NTS
- DWG. NO.: 2
APPENDIX C
PennDOT Standard Type 10M Bridge Barrier
(5-6-15) 15-1912.001 (1519120005) Carroll Engineering Corporation
Commonwealth of Pennsylvania Department of Transportation (PennDOT) Standard Drawing BC-709M (Sheet 1 of 12) for PA Type 10M Bridge Barrier Miscellaneous Details, with a red outline highlighting the Alternate Sidewalk Rail section.
Title Block
- COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, BUREAU OF PROJECT DELIVERY
- STANDARD: PA TYPE 10M BRIDGE BARRIER MISCELLANEOUS DETAILS
- RECOMMENDED NOV. 21, 2014 / SHEET 1 OF 12 / BC-709M
Drawing Sections and Labels
- TYPICAL RAIL: BARRIER SECTION, ELEVATION-POST, ANCHOR BAR DETAIL, PLAN - POST (RAILING POST W6 x 25, TS 5" x 3 1/2" x 3/8" RAIL TUBE (TYP.), BASE PL., ANCHOR BAR, DELINEATOR AT EACH POST, DRAIN HOLE)
- ALTERNATE SIDEWALK RAIL (circled in red; CHANGE 1, CHANGE 3): BARRIER SECTION, ELEVATION-POST (AT ALTERNATE SIDEWALK), ANCHOR STUD DETAIL, SECTION A-A (TS 2" x 2" x 1/4" RAIL TUBE, TS 5" x 3 1/2" x 3/8" RAIL TUBE, RAIL SUPPORT ANGLE L 5" x 3" x 3/8", RAILING POST W6 x 25, DELINEATOR AT EACH POST, BASE PL., SIDEWALK)
- DELINEATOR DETAIL: TYPE V RETROREFLECTIVE SHEETING
- GENERAL NOTES (1 through 15): Material, fabrication, galvanizing, welding, and bolt tightening specifications in accordance with Publication 408 and AASHTO/ASTM standards
- REFERENCE DRAWINGS: BC-708M (Thrie-Beam to PA Type 10M Bridge Barrier Transition Connection), BC-711M (Aluminum Protective Barrier), BC-720M (Aluminum or Steel Bridge Hand Railing), BC-721M (Electrical Details), BC-734M (Anchor Systems), BC-736M (Reinforcement Bar Fabrication Details), BD-652M (Concrete Deck Slab Details), BC-762M (Tooth Expansion Dam for Prestressed Concrete and Steel Beam Bridges), BC-767M (Neoprene Strip Seal Dam for Prestressed Concrete and Steel I-Beam Bridges), BC-799M (Mechanically Stabilized Earth Retaining Walls), RC-20M (Concrete Pavement Joints), RC-50M (Guide Rail to Bridge Barrier Transition)
AREA CODE 610
692-7171
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
5/7/2015
Board of Supervisors
1580 Paoli Pike
West Chester PA 19380
Re: Beverage Café in the C-2
Dear Board Members,
At their meeting last night the Planning Commission reviewed the draft ordinance to permit a Beverage Café use within a shopping center in the C-2 District and made the following motion:
Mr. Chairman I move that we recommend the Board of Supervisors approve the Zoning Ordinance amendment permitting a Beverage Café use within a shopping center in the C-2 District with the following conditions:
- The minor edits outlined in the attached copy of the draft ordinance be incorporated into the final draft.
- Remove section six because this proposed parking standard for shopping centers will render the Goshen Village Shopping Center nonconforming.
Sincerely,
[signature]
Mark A. Gordon
Township Zoning Officer
Enclosure
F:\Data\Shared Data\Admin Dept\Township Code\Fast Food Rest. w Drive Thruu in the C-2\PC Recomendation to BOS re Beverage Cafe in C-2 05072015.doc
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. ___-2015
AN ORDINANCE AMENDING THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE OF 1997, AS AMENDED, SECTION 240-6 TO ADD A DEFINITION FOR BEVERAGE CAFÉ AND SHOPPING CENTER; SECTION 240-15.C TO ADD A NEW SUBPARAGRAPH (9) TO ALLOW A BEVERAGE CAFÉ IN A SHOPPING CENTER BY CONDITIONAL USE; SECTION 240-22.H TO ESTABLISH REGULATIONS FOR MENU BOARDS, BILLS OF FARE AND PRICE LISTS; SECTION 240-22.P TO AMEND THE SIGN REGULATIONS FOR SIGNS ERECTED IN THE COMMERCIAL DISTRICT; SECTION 240-31.C(3)(cc) TO ADD CONDITIONAL USE REGULATIONS FOR A BEVERAGE CAFÉ; SECTION 240-33 TO ADD A PARKING REQUIREMENT OF FIVE SPACES PER 1,000 SQUARE FEET OF GROSS FLOOR AREA FOR A SHOPPING CENTER; AND TO DELETE SECTION 240-20.G(3).
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township, that the East Goshen Township Zoning Ordinance of 1997, as amended, which is codified in Chapter 240 of the East Goshen Township Code, titled, "Zoning", shall be amended as follows:
SECTION 1. Section 240-6, titled, "Definitions", shall be amended to include the following definitions:
Beverage Café – a building measuring not more than 3,500 square feet of gross floor area where beverages and light fare normally and customarily associated with coffee shops or tea rooms are served for on-site or off-site consumption. Beverage café may also offer for sale coffee beans, tea, containers, mugs, coffee or tea brewing equipment and other related products. A beverage café shall not be considered a fast food restaurant and may have a drive-through lane.
Shopping Center- The multiple use of a single property for a group of nonresidential uses, such as, but not limited, to, retail stores, restaurants and personal services, that are owned and maintained by a common entity. The shopping center shall be planned and designed as an integrated unit with common vehicular and pedestrian access, parking, utilities and stormwater management facilities.
SECTION 2. Section 240-15.C shall be amended to add a new subparagraph (9) as follows:
“(9) Beverage café with or without drive-through service in a shopping center.”
SECTION 3. Section 240-22.H shall be amended as follows:
“§240-22.H. Menu Boards, bills of fare or price lists.
(1) Notwithstanding anything in this Ordinance to the contrary, menu boards for restaurants shall be permitted provided that all of the following conditions are met:
(a) the menu board is 3 square feet or less in area;
(b) the letters and numbers on the menu board are a maximum of 3 inches in height; and
(c) the sign is located on the building next to the entrance of the establishment or in the window next to the entrance to the establishment.
(2) Notwithstanding anything to the contrary in this Ordinance, menu boards associated with a beverage cafe with drive-through service in a shopping center permitted pursuant to Section 240-15.C(9) shall be permitted provided that all of the following conditions are met:
(a) the menu board shall not exceed eight feet in height, including the base, as measured from the elevation of the vehicle drive-through;
(b) the menu board shall not exceed fifty square feet in area;
(c) if the menu board is illuminated it shall only be internally illuminated shall be internally illuminated and may only be illuminated during normal business hours;
(d) the menu board shall be located so as not to obstruct traffic or sight lines of vehicles in a shopping center; and
(e) landscaping shall be planted to minimize the visibility of the menu board from any public street.”
SECTION 4. Section 240-22.P shall be amended as follows:
“P. Signs permitted in commercial districts. Only the following types of signs are permitted in a commercial district:
2
(1) Exempt signs as provided in Subsection J.
(2) Temporary signs as provided in Subsection I.
(3) Signs relating to the principal use on a lot, with a maximum of one commercial establishment in accordance with the following regulations:
(a) Wall sign. One wall sign shall be permitted for the commercial establishment. Such sign shall not exceed two square feet in area for each linear foot of wall-signable area, but not exceed 60 square feet.
(b) A freestanding sign not to exceed 10 square feet in area. No more than one freestanding sign shall be permitted on each street frontage.
(c) A window sign not to exceed 20% of window area to which it is attached.
(4) Signs relating to the principal use on a lot, including more than one commercial establishment are permitted in accordance with the following regulations:
(a) Wall sign. One wall sign shall be permitted for each commercial establishment. Such sign shall not exceed two feet in height or be longer than 75% of the linear length of the individual commercial establishment, with a maximum size of 32 square feet.; Two wall signs shall be permitted provided that if the commercial establishment is in a stand-alone building in a shopping center., two wall signs shall be permitted.
[1] All newly placed wall signs attached to the same building:
[a] Shall be generally consistent in proportion with existing signs.
[b] Shall not be box-type signs if at least 75% of the existing signs are not box-type signs.
[c] Shall maintain common vertical and horizontal lines with other signs in a manner consistent with the architecture of the building.
3
[d] Should be generally consistent in materials, font style and type size with other signs attached to the same building.
[2] An applicant for construction of a new principal building intended to include more than one establishment is strongly encouraged to submit a proposed set of standards that the building owner intends to use to control the types and colors of signs to ensure compatibility among the signs.
[3] See Subsection K which prohibits certain types of signs, such as flashing and above-the-roofline signs.
[4] Wall sign alternative. In lieu of the wall sign referred to in Subsection P(4)(a), each commercial establishment in the structure shall be permitted to erect one freestanding sign in accordance with the following requirements:
[a] Each freestanding sign shall have a maximum size of 10 square feet and a maximum height of 10 feet.
[b] Each freestanding sign shall be located immediately in front of its respective establishment.
[c] All portions of the freestanding sign shall be located no more than 10 feet from the respective establishment.
[d] The freestanding signs shall comply with all front, rear and side yard requirements and they shall comply with the setback requirements for the zoning district.
(a) (b) Freestanding signs.
[1] A shopping center use in the C-2 District or within a PRD may have a freestanding sign with a maximum area of 120 square feet and a maximum height of 14 feet on each street frontage. No more than one freestanding sign shall be permitted on each street frontage.
[2] All other freestanding signs shall not exceed 10 square feet in area nor five feet in height. No more than one freestanding sign shall be permitted on each street frontage.
(c) Window signs. The cumulative size of window signs is not to exceed 20% of the window area to which it or they are attached.
4
Such signs may contain the names or businesses of the occupants of the facilities.
(d) All signs on the structure shall be of the same design and lit in a similar manner and shall be architecturally compatible with the structure.
(5) Sign bonus. Each permitted 10 square feet maximum freestanding sign in a commercial district may be increased in size to a maximum of 20 square feet if the sign is not internally illuminated and is constructed of relief-cut wood (other than plywood).
(6) Any sign (as defined in § 240-6, which includes but is not limited to graphics and logos) attached to or incorporated into functional elements of a building or development (including but not limited to awnings, canopies or murals) that serve an advertising or use identification purpose shall be considered to be a sign, and specifically shall be regulated by all provisions of this section for the applicable zoning district.”
SECTION 5. Section 240-31.C(3)(cc) shall be amended as follows:
“(cc) Restaurant and beverage café.
[1] Any restaurant or beverage café with a drive-through shall be designed to allow safe pedestrian movement on the property and with sufficient stacking capacity to prevent backups of traffic onto a street.
[2] All outdoor trash dumpsters shall be totally screened as required by § 240-27C(4).”
SECTION 6. The chart in Section 240-33 shall be amended to add the following use:
“E.13. Shopping Center 5 spaces per 1,000 square feet of gross floor area of all buildings in the shopping center whether attached or detached (not including loading and unloading space).”
SECTION 7. Section 240-20.G(3) shall be deleted.
SECTION 8. Severability. If any sentence, clause, section or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
5
SECTION 9. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 10. Effective Date. This Ordinance shall become effective in five (5) days from the date of adoption.
ENACTED AND ORDAINED this _____ day of ______________, 2015.
ATTEST:
______________________________
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
______________________________
E. Martin Shane, Chairman
______________________________
Senya D. Isayeff, Vice-Chairman
______________________________
Carmen Battavio, Member
______________________________
Charles W. Proctor, III, Esquire, Member
______________________________
Janet L. Emanuel, Member
F:\Data\Shared Data\Admin Dept\Township Code\Fast Food Rest. w Drive Thruu in the C-2\364340 042815 05062015 EGTPC Comments.docxF:\Data\Shared Data\Admin Dept\Township Code\Fast Food Rest. w Drive Thruu in the C-2\364340 042815 050515 clean.docx
6
May 7, 2015
TREASURER'S REPORT
2015 RECEIPTS AND BILLS
GENERAL FUND
| Real Estate Tax | $7,054.56 | Accounts Payable | $302,765.28 |
|---|---|---|---|
| Earned Income Tax | $631,965.05 | Electronic Pmts: | |
| Local Service Tax | $2,088.99 | Health Insurance | $0.00 |
| Transfer Tax | $0.00 | Credit Card | $0.00 |
| General Fund Interest Earned | $469.68 | Postage | $0.00 |
| Total Other Revenue | $23,871.05 | Debt Service | $0.00 |
| Total Receipts: | $665,449.33 | Payroll | $43,632.18 |
| Total Expenditures: | $346,397.46 |
STATE LIQUID FUELS FUND
| Receipts | $0.00 | Expenditures: | $0.00 |
|---|---|---|---|
| Interest Earned | $53.13 | ||
| Total State Liqud Fuels: | $53.13 |
SINKING FUND
| Receipts | 3,726.30 | Total Expenditures: | $18,233.00 |
|---|---|---|---|
| Interest Earned | 424.25 | ||
| Total Sinking Fund: | $4,150.55 |
TRANSPORTATION FUND
| Receipts | 0.00 | Expenditures: | $0.00 |
|---|---|---|---|
| Interest Earned | 199.10 | ||
| Total Sinking Fund: | $199.10 |
SEWER OPERATING FUND
| Receipts | $113,262.81 | Accounts Payable | $188,626.75 |
|---|---|---|---|
| Interest Earned | $57.75 | Debt Service | $0.00 |
| Total Sewer: | $113,320.56 | Credit Card | $0.00 |
| Total Expenditures: | $188,626.75 |
REFUSE FUND
| Receipts | $47,320.90 | Expenditures: | $64,982.09 |
|---|---|---|---|
| Interest Earned | $17.35 | ||
| Total Refuse: | $47,338.25 |
SEWER SINKING FUND
| Receipts | $0.00 | Expenditures: | $0.00 |
|---|---|---|---|
| Interest Earned | $223.69 | ||
| Total Sewer Sinking Fund: | $223.69 |
OPERATING RESERVE FUND
| Receipts | $0.00 | Expenditures: | $0.00 |
|---|---|---|---|
| Interest Earned | $258.28 | ||
| Total Operating Reserve Fund: | $258.28 |
Events Fund
| Receipts | $0.00 | Expenditures: | $0.00 |
|---|---|---|---|
| Interest Earned | $0.66 | ||
| Total Events Fund: | $0.66 |
EAST GOSHEN TOWNSHIP
MEMORANDUM
| TO: | BOARD OF SUPERVISORS |
|---|---|
| FROM: | BRIAN MCCOOL |
| SUBJECT: | PROPOSED PAYMENTS OF BILLS |
| DATE: | 05-07-15 |
Please accept the attached Treasurer’s Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer’s Report and each register item be approved for payment.
Earned Income Tax receipts were well above average. In fact, the disbursement received on May 5th ($513,200) was the second highest EIT disbursement ever. Sinking Fund revenue includes a payment of $3,726 from PECO’s smart equipment incentive program related to the geothermal project.
General Fund expenses include the monthly contribution to WEGO in the amount of $257,724. Sinking Fund expenses include $18,233 for two new lawn mowers. Sewer Fund expenses include a payment to West Goshen Township in the amount of $179,145 for 1st quarter operations and maintenance costs, which is somewhat higher than anticipated.
Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.
F:\Data\Shared Data\Finance Dept\Treasurers' Reports\2015\05-07-2015\05-07-15.docx
East Goshen Township Fund Accounting
BATCH 1 of 2
Report Date 05/06/15 Expenditures Register PAGE 1
GL-1505-47477
MARP05 run by BARBARA 4 : 26 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | |||||||||
| 1471 | WESTTOWN-EAST GOSHEN POLICE | |||||||||
| 43649 | 1 | 01410 5300 | POLICE GEN.EXPENSE MAY 2015 CONTRIBUTION |
050115 | 05/06/15 | 05/01/15 | 05/06/15 | 9025 p | 257,723.97 | |
| 257,723.97 | ||||||||||
| 257,723.97 | ||||||||||
| 1 Prepaids, totalling | 257,723.97 | |||||||||
| 0 Printed, totalling | 0.00 | |||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 257,723.97 | GENERAL FUND |
| 257,723.97 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1505 | 257,723.97 |
| 257,723.97 |
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 1
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | |||||||||
| 3286 | 3M COGENT INC. | |||||||||
| 43650 | 1 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE CAMP STAFF BACKGRND CHKS. - KEEFER, MCTEAR & MCCRORY |
263294 | 05/07/15 | 05/07/15 | 77.25 | |||
| 77.25 | ||||||||||
| 1941 | AG-INDUSTRIAL INC | |||||||||
| 43651 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR CHECK OPERATION & REPAIR FORD TRACTOR - PARTS & LABOR |
WN09538 | 05/07/15 | 05/07/15 | 755.69 | |||
| 755.69 | ||||||||||
| 68 | AMS APPLIED MICRO SYSTEMS LTD. | |||||||||
| 43654 | 1 | 01401 3120 | CONSULTING SERVICES APRIL 2015 |
60795 | 05/07/15 | 05/07/15 | 1,097.00 | |||
| 43654 | 2 | 01414 5001 | ZONING IT CONSULTING APRIL 2015 - GEO PLAN |
60795 | 05/07/15 | 05/07/15 | 28.00 | |||
| 1,125.00 | ||||||||||
| 3368 | AMZ ENTERTAINMENT | |||||||||
| 43655 | 1 | 01452 3210 | FARMERS MARKET EXPENSE BAL.DUE - FARMER'S MKT.CHARACTERS |
00044991-15-2 | 05/07/15 | 05/07/15 | 900.00 | |||
| 900.00 | ||||||||||
| 67 | APPLEBROOK GOLF CLUB | |||||||||
| 43656 | 1 | 01452 3505 | GOLF DAY - APPLEBROOK GOLF OUTING 5/11/15 3 GOLFERS |
050715 | 05/07/15 | 05/07/15 | 375.00 | |||
| 375.00 | ||||||||||
| 1657 | AQUA PA | |||||||||
| 43657 | 1 | 01411 3630 | HYDRANT & WATER SERVICE 000310033 0310033 3/31-4/30/15 186 |
050115 279 | 05/07/15 | 05/07/15 | 4,696.50 | |||
| 43657 | 2 | 01411 3631 | HYDRANTS - RECHARGE EXPENSE 000310033 0310033 3/31-4/30/15 93 |
050115 279 | 05/07/15 | 05/07/15 | 2,348.25 | |||
| 43658 | 1 | 01411 3630 | HYDRANT & WATER SERVICE 000309987 0309987 3/31-4/30/15 HY6 |
050115 HY6 | 05/07/15 | 05/07/15 | 137.52 | |||
| 7,182.27 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/08/15 Expenditures Register PAGE 2
GL-1505-47508
MARP05 run by BARBARA 9 : 43 AM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 2898 | AQUASCAPES UNLIMITED | |||||||||
| 43659 | 1 | 01454 3711 | POND TREATMENT 19 BALES STRAW & BIOLOGICAL TRTMNT. PIN OAK, BOW TREE & MARYDELL |
884 | 05/07/15 | 05/07/15 | 1,259.00 | |||
| 1,259.00 | ||||||||||
| 2360 | AQUILANTE CONCRETE | |||||||||
| 43726 | 1 | 01436 2450 | STORMWATER MATERIALS & SUPPLIES CONCRETE - RED OAK LANE |
40577 | 05/08/15 | 05/08/15 | 135.00 | |||
| 135.00 | ||||||||||
| 82 | ASSOCIATED TRUCK PARTS | |||||||||
| 43661 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR AIR DRYER #40 |
966220 | 05/07/15 | 05/07/15 | 234.25 | |||
| 234.25 | ||||||||||
| 102 | B&D COMPUTER SOLUTIONS | |||||||||
| 43662 | 1 | 01401 3120 | CONSULTING SERVICES APRIL 2015 |
00002964 | 05/07/15 | 05/07/15 | 2,000.00 | |||
| 2,000.00 | ||||||||||
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | |||||||||
| 43665 | 1 | 01404 3140 | LEGAL - ADMIN LEGAL SERV. 3/26-4/22/15 |
5685 | 05/07/15 | 05/07/15 | 939.69 | |||
| 43665 | 2 | 01413 3140 | LEGAL - TWP CODE LEGAL SERV. 3/26-4/22/15 |
5685 | 05/07/15 | 05/07/15 | 2,614.10 | |||
| 43665 | 3 | 01414 3110 | LEGAL - CODES LEGAL SERV. 3/26-4/22/15 |
5685 | 05/07/15 | 05/07/15 | 2,413.00 | |||
| 43665 | 4 | 01414 3141 | LEGAL - ZONING HEARING BOARD LEGAL SERV. 3/26-4/22/15 |
5685 | 05/07/15 | 05/07/15 | 1,542.80 | |||
| 43665 | 5 | 01438 1510 | LEGAL - PUBLIC WORKS LEGAL SERV. 3/26-4/22/15 |
5685 | 05/07/15 | 05/07/15 | 114.00 | |||
| 7,623.59 | ||||||||||
| 3488 | CINTAS CORPORATION #287 | |||||||||
| 43667 | 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 4/29/15 CLEAN MATS |
287379176 | 05/07/15 | 05/07/15 | 52.50 | |||
| 43667 | 2 | 01487 1910 | UNIFORMS WEEK END 4/29/15 CLEAN UNIFORMS |
287379176 | 05/07/15 | 05/07/15 | 247.51 | |||
| 300.01 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 3
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 3410 | CLASS 8 PARTS INC. | |||||||||
| 43668 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR DOME LENS |
C722903 | 05/07/15 | 05/07/15 | 4.05 | |||
| 4.05 | ||||||||||
| 2912 | CONTINENTAL FIRE & SAFETY INC. | |||||||||
| 43669 | 1 | 01413 2600 | MINOR EQUIP.PURCH. & REP. AEDS - CODE VEHICLES |
E2465 | 05/07/15 | 05/07/15 | 3,105.00 | |||
| 43670 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR ZICO FIXED & VARIABLE STRAPS |
E2461 | 05/07/15 | 05/07/15 | 884.90 | |||
| 3,989.90 | ||||||||||
| 3507 | D'ANGELO, GINA | |||||||||
| 43672 | 1 | 01367 3100 | SUMMER PROGRAM REFUND DUE TO YTH CAMP OVERPAYMENT |
043015 | 05/07/15 | 05/07/15 | 95.00 | |||
| 95.00 | ||||||||||
| 3352 | GAP POWER RENTALS PLUS LLC | |||||||||
| 43673 | 1 | 01437 2460 | GENERAL EXPENSE - SHOP SAW KIT & BATTERY PACK |
1142997 | 05/07/15 | 05/07/15 | 264.35 | |||
| 264.35 | ||||||||||
| 2574 | HARMONY HILL NURSERIES LLC | |||||||||
| 43676 | 1 | 01454 3710 | LANDSCAPING 4 TARPS |
015173 | 05/07/15 | 05/07/15 | 192.00 | |||
| 192.00 | ||||||||||
| 2717 | HIGGINS & SONS INC., CHARLES A. | |||||||||
| 43677 | 1 | 01433 2500 | MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR-ELLIS & STRASBURG |
39239 | 05/07/15 | 05/07/15 | 65.00 | |||
| 65.00 | ||||||||||
| 2401 | HIGGINS, DOLORES | |||||||||
| 43678 | 1 | 01462 2490 | MATERIALS & SUPPLIES REIMBURSEMENT FOR STORAGE BINS, EVENT MATERIALS & CLOTHING MATERIAL |
043015 | 05/07/15 | 05/07/15 | 184.28 | |||
| 184.28 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 4
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 627 | HIGHWAY MATERIALS INC. | |||||||||
| 43679 | 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS 18 TONS 9.5H, .3<3, 64-22 PATCHING |
1636025MB | 05/07/15 | 05/07/15 | 963.00 | |||
| 963.00 | ||||||||||
| 3508 | KEIDEL, VINCENT | |||||||||
| 43684 | 1 | 01432 2500 | SNOW - MAINTENANCE & REPAIRS REIMBURSEMENT FOR DAMAGED MAILBOX |
030515 | 05/07/15 | 05/07/15 | 25.00 | |||
| 25.00 | ||||||||||
| 2442 | KENT AUTOMOTIVE | |||||||||
| 43685 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR HEX RETHREADING DIE & WIRE WHEEL |
9303225517 | 05/07/15 | 05/07/15 | 198.72 | |||
| 198.72 | ||||||||||
| 2303 | KING, GIDEON | |||||||||
| 43686 | 1 | 01437 2460 | GENERAL EXPENSE - SHOP FLASHLIGHT & BLADES |
176049 | 05/07/15 | 05/07/15 | 114.54 | |||
| 114.54 | ||||||||||
| 765 | LENNI ELECTRIC CORPORATION | |||||||||
| 43688 | 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS PLANK HOUSE - DISCONNECT POST LIGHT |
150453 | 05/07/15 | 05/07/15 | 51.25 | |||
| 43689 | 1 | 01434 3610 | STREET LIGHTING LED POLE LIGHT |
150450 | 05/07/15 | 05/07/15 | 723.74 | |||
| [Handwritten note:] STREET LIGHT WENT BAD - REPLACED WITH LED | ||||||||||
| 774.99 | ||||||||||
| 800 | MACANGA INC. | |||||||||
| 43690 | 1 | 01436 3840 | STORMWATER EQUIPMENT RENTAL DOZER RENTAL - NO OPERATOR 4/7 |
042015 | 05/07/15 | 05/07/15 | 400.00 | |||
| 43690 | 2 | 01438 3840 | EQUIPMENT RENTAL DOZER RENTAL - WITH OPERATOR 4/8 |
042015 | 05/07/15 | 05/07/15 | 900.00 | |||
| 43690 | 3 | 01438 3840 | EQUIPMENT RENTAL ROLLER RENTAL 4/8 |
042015 | 05/07/15 | 05/07/15 | 350.00 | |||
| 43690 | 4 | 01438 3840 | EQUIPMENT RENTAL ROLLER RENTAL 4/9 |
042015 | 05/07/15 | 05/07/15 | 350.00 | |||
| 43690 | 5 | 01438 3840 | EQUIPMENT RENTAL DOZER RENTAL - WITH OPERATOR 4/9 |
042015 | 05/07/15 | 05/07/15 | 900.00 | |||
| 43690 | 6 | 01454 3723 | BALL FIELDS ROLLER RENTAL 4/10/15 |
042015 | 05/07/15 | 05/07/15 | 350.00 | |||
| 43690 | 7 | 01454 3722 | SOCCER FIELDS ROLLER RENTAL 4/13/15 |
042015 | 05/07/15 | 05/07/15 | 350.00 | |||
| 3,600.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 5
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | |||||||||
| 2225 | MAIL FINANCE | |||||||||
| 43691 | 1 | 01401 3840 | RENTAL OF EQUIP. -OFFICE POSTAGE MACHINE RENTAL 3/5-6/4/15 |
H5311434 | 05/07/15 | 05/07/15 | 522.00 | |||
| 522.00 | ||||||||||
| 1641 | NAPA AUTO PARTS | |||||||||
| 43692 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR AIR & FUEL FILTERS |
2-624516 | 05/07/15 | 05/07/15 | 226.09 | |||
| 43693 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR MOLDED CREEPER & LED CORD |
2-623732 | 05/07/15 | 05/07/15 | 126.62 | |||
| 43694 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR HITCH PINS |
2-623990 | 05/07/15 | 05/07/15 | 11.92 | |||
| 43695 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR RETURN - LED CORD |
2-623988 | 05/07/15 | 05/07/15 | -67.37 | |||
| 43696 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR SABER II 3WT LE |
2-623899 | 05/07/15 | 05/07/15 | 59.95 | |||
| 357.21 | ||||||||||
| 1554 | OFFICE DEPOT | |||||||||
| 43697 | 1 | 01401 2100 | MATERIALS & SUPPLIES GLUE STICKS & LETTER PKS. |
768013224001 | 05/07/15 | 05/07/15 | 49.20 | |||
| 43698 | 1 | 01401 2100 | MATERIALS & SUPPLIES CARTONS - 8"SHEAR |
7673560950001 | 05/07/15 | 05/07/15 | 23.98 | |||
| 43699 | 1 | 01401 2100 | MATERIALS & SUPPLIES D-RING BINDERS |
767355973002 | 05/07/15 | 05/07/15 | 10.08 | |||
| 43700 | 1 | 01401 2100 | MATERIALS & SUPPLIES RECEIPT BOOKS, INK, POST-IT FLAGS & POST-ITS |
767355973001 | 05/07/15 | 05/07/15 | 31.06 | |||
| 114.32 | ||||||||||
| 2352 | PECO - 99193-01400 | |||||||||
| 43701 | 1 | 01434 3610 | STREET LIGHTING 99193-01400 3/27-4/27/15 |
050215 | 05/07/15 | 05/07/15 | 802.78 | |||
| 43701 | 2 | 01434 3610 | STREET LIGHTING CHAMPION SALES TAX CREDIT |
050215 | 05/07/15 | 05/07/15 | -300.00 | |||
| 43701 | 3 | 01433 2470 | UTILITIES - TRAFFIC LIGHTS 99193-01400 3/27-4/27/15 |
050215 | 05/07/15 | 05/07/15 | 721.03 | |||
| 43701 | 4 | 01433 2470 | UTILITIES - TRAFFIC LIGHTS CHAMPION SALES TAX CREDIT |
050215 | 05/07/15 | 05/07/15 | -400.00 | |||
| [Handwritten note:] THEY SHOULD NOT HAVE BEEN CHARGING US SALE TAX | ||||||||||
| 823.81 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 6
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 3153 | PECO - 01360-05046 | |||||||||
| 43704 | 1 | 01409 7505 | BOOT & PAOLI LED SIGN 1360-05046 3/31-4/29/15 LED BOOT RD |
042915 | 05/07/15 | 05/07/15 | 45.96 | |||
| 45.96 | ||||||||||
| 1555 | PECO - 45168-01609 | |||||||||
| 43702 | 1 | 01409 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER 45168-01609 3/26-4/23/15 |
042715 | 05/07/15 | 05/07/15 | 723.09 | |||
| 43702 | 2 | 01409 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER CHAMPION SALES TAX CREDIT |
042715 | 05/07/15 | 05/07/15 | -400.00 | |||
| 323.09 | ||||||||||
| 2592 | PECO - 45951-30004 | |||||||||
| 43703 | 1 | 01454 3600 | UTILITIES 45951-30004 3/23-4/22/15 RESTROOMS |
042415 | 05/07/15 | 05/07/15 | 449.44 | |||
| 449.44 | ||||||||||
| 2591 | PECO - 59500-35010 | |||||||||
| 43705 | 1 | 01454 3600 | UTILITIES 59500-35010 3/27-4/27/15 POND PUMP |
042915 | 05/07/15 | 05/07/15 | 34.49 | |||
| 34.49 | ||||||||||
| 1785 | PENNSYLVANIA STATE POLICE | |||||||||
| 43706 | 1 | 01401 3000 | GENERAL EXPENSE BACKGRND CHK. R13595121 COMBES |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 2 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13586933 MCTEAR |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 3 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13610363 ZIMMERMAN |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 4 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13610529 MOORE |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 5 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13614504 BURGOS |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 6 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13658154 LEWIS |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 7 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13658206 HOLCOMBE |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 8 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13658478 ALBERTO, T. |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 9 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13658567 ALBERTO, L. |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| 43706 | 11 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE BACKGRND CHK. R13666573 WAGNER |
050415 | 05/07/15 | 05/07/15 | 10.00 | |||
| [Handwritten note:] NEW STATE LAW AS A RESULT OF SANDUSKY CASE. | ||||||||||
| 100.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 7
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | |||||||||
| 3509 | PETRELLIS, LUANN | |||||||||
| 43707 | 1 | 01432 2500 | SNOW - MAINTENANCE & REPAIRS REIMBURSEMENT FOR DAMAGED MAILBOX |
032415 | 05/07/15 | 05/07/15 | 25.00 | |||
| 25.00 | ||||||||||
| 3475 | PPM Services Inc. | |||||||||
| 43708 | 1 | 01409 3840 | DISTRICT COURT EXPENSES REPAIR LEAK DISTRICT CT. LOBBY |
050515 | 05/07/15 | 05/07/15 | 520.00 | |||
| 520.00 | ||||||||||
| 1161 | REILLY & SONS INC | |||||||||
| 43709 | 1 | 01430 2320 | VEHICLE OPERATION - FUEL 360.0 GALLONS DIESEL |
83493 | 05/07/15 | 05/07/15 | 737.28 | |||
| 43710 | 1 | 01430 2320 | VEHICLE OPERATION - FUEL 598.4 GALLONS DIESEL |
83708 | 05/07/15 | 05/07/15 | 1,264.42 | |||
| 43711 | 1 | 01430 2320 | VEHICLE OPERATION - FUEL 199.8 GALLONS GASOLINE |
83709 | 05/07/15 | 05/07/15 | 417.58 | |||
| 2,419.28 | ||||||||||
| 1300 | SEI STEPHENSON EQUIPMENT INC. | |||||||||
| 43713 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR FUEL NOZZLES |
80016535 | 05/07/15 | 05/07/15 | 39.89 | |||
| 39.89 | ||||||||||
| 3258 | SENN REPAIRS | |||||||||
| 43714 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR REPAIRS & PARTS - PETERBILT #46 |
1256 | 05/07/15 | 05/07/15 | 942.47 | |||
| 43715 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR REPAIRS & PARTS - PETERBILT #45 |
1261 | 05/07/15 | 05/07/15 | 942.47 | |||
| 1,884.94 | ||||||||||
| 2108 | SIDELINES SPORTSWEAR & PROMOTIONS | |||||||||
| 43716 | 1 | 01487 1910 | UNIFORMS HUNTER GREEN JACKET W/EGT EMBLEM |
4396 | 05/07/15 | 05/07/15 | 74.95 | |||
| 74.95 | ||||||||||
| 1896 | SPRINGER BROTHERS INC | |||||||||
| 43717 | 1 | 01409 3745 | PW BUILDING - MAINT REPAIRS REPAIR WORK SHOP ROOFS |
15222 | 05/07/15 | 05/07/15 | 843.00 | |||
| 843.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 8
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | |||||||||
| 3510 | SYNA TEK | |||||||||
| 43719 | 1 | 01454 2000 | MAINTENANCE SUPPLIES WHITE BUNKER SAND WITH DELIVERY |
93700 | 05/07/15 | 05/07/15 | 1,382.63 | |||
| 43719 | 2 | 01454 3721 | VOLLEYBALL COURTS WHITE BUNKER SAND WITH DELIVERY |
93700 | 05/07/15 | 05/07/15 | 1,382.63 | |||
| 2,765.26 | ||||||||||
| 2829 | VERIZON - TWP.FIOS 11627 | |||||||||
| 43720 | 1 | 01401 3210 | COMMUNICATION EXPENSE APRIL 28 - MAY 27, 2015 |
042815-11627 | 05/07/15 | 05/07/15 | 79.99 | |||
| 79.99 | ||||||||||
| 2942 | VERIZON WIRELESS | |||||||||
| 43722 | 1 | 01401 3210 | COMMUNICATION EXPENSE MARCH 21 - APRIL 20, 2015 |
9744268768 | 05/07/15 | 05/07/15 | 1,164.79 | |||
| 1,164.79 | ||||||||||
| 2699 | WIGGINS AUTO TAGS INC. | |||||||||
| 43723 | 1 | 01430 2330 | VEHICLE MAINT AND REPAIR REPLACE LICENSE PLATE |
042115 | 05/07/15 | 05/07/15 | 16.00 | |||
| 16.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 9
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 03 | SINKING FUND | |||||||||
| 320 | CONWAY POWER EQUIPMENT | |||||||||
| 43671 | 1 | 03430 7400 | CAPITAL REPLACEMENT - HWY EQUIP LAZER X TRACTORS - 2 |
1086 | 05/07/15 | 05/07/15 | 18,233.00 | |||
| 18,233.00 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 10
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 05 | SEWER OPERATING | |||||||||
| 2918 | ALS ENVIRONMENTAL | |||||||||
| 43653 | 1 | 05422 4500 | R.C. STP-CONTRACTED SERV. LAB TESTS - RCSTP 4/14-4/16/15 |
40-127672 | 05/07/15 | 05/07/15 | 126.00 | |||
| 126.00 | ||||||||||
| 151 | BLOSENSKI DISPOSAL CO, CHARLES | |||||||||
| 43663 | 1 | 05422 4502 | R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 4/27 |
10297 | 05/07/15 | 05/07/15 | 181.00 | |||
| 181.00 | ||||||||||
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | |||||||||
| 43664 | 1 | 05429 3140 | ADMIN - LEGAL LEGAL SERV. 3/26-4/22/15 MUNICIPAL CLAIMS |
5686 | 05/07/15 | 05/07/15 | 1,138.03 | |||
| 1,138.03 | ||||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | |||||||||
| 43666 | 2 | 05422 4502 | R.C. SLUDGE-LAND CHESTER WEEK 4/23/15 - 4/30/15 |
40125 | 05/07/15 | 05/07/15 | 495.13 | |||
| 495.13 | ||||||||||
| 583 | HACH COMPANY | |||||||||
| 43674 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS AMMONIA - TNT |
9338208 | 05/07/15 | 05/07/15 | 98.72 | |||
| 43675 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS PHOSPHORUS & NITRATE TNT |
9342355 | 05/07/15 | 05/07/15 | 531.78 | |||
| 630.50 | ||||||||||
| 694 | J&L BUILDING MATERIALS INC | |||||||||
| 43680 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS MAPLE MONOGRAM, J-CHANNEL, ALUM. START.STRIP, TRIM COIL, QUAD LIGHT, ROOFING NAILS & ZIP SCREWS |
03506278 | 05/07/15 | 05/07/15 | 2,176.16 | |||
| 43681 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS CREDIT FOR RETURNS INV.03506278 |
03511834 | 05/07/15 | 05/07/15 | -213.05 | |||
| 43682 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS CREDIT FOR RETURNS INV.03506278 |
03508608 | 05/07/15 | 05/07/15 | -7.47 | |||
| 43683 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS OSCP WOODGRAIN LIGHT MAPLE |
03506624 | 05/07/15 | 05/07/15 | 51.60 | |||
| [Handwritten note:] Vinyl SIDING AT OLD CONTROl BldG | ||||||||||
| 2,007.24 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register PAGE 11
GL-1505-47500
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 1193 | RUBINSTEIN'S | |||||||||
| 43712 | 1 | 05429 3000 | ADMIN.-GENERAL EXPENSE SEWER DEPT. - BINDERS & PEN |
2095361-0 | 05/07/15 | 05/07/15 | 32.76 | |||
| 32.76 | ||||||||||
| 1896 | SPRINGER BROTHERS INC | |||||||||
| 43718 | 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS REPAIR BUILDING - RCSTP |
15227 | 05/07/15 | 05/07/15 | 4,790.88 | |||
| [Handwritten note:] CONTROL BldG SIDING + ROOF REPAIR | ||||||||||
| 4,790.88 | ||||||||||
| 2773 | VERIZON - PW FIOS 9583 | |||||||||
| 43721 | 1 | 05422 3601 | R.C. COLLEC.-UTILITIES APRIL 28 - MAY 27, 2015 |
042815-9583 | 05/07/15 | 05/07/15 | 79.99 | |||
| 79.99 | ||||||||||
| 1431 | WEST GOSHEN TOWNSHIP | |||||||||
| 43725 | 1 | 05420 3850 | C.C. WEST GOSHEN OPER/MAINT 1ST QTR.2015 OPERATIONS & MAINTEN. SEWAGE TREATMENT SYSTEM |
042315 | 05/07/15 | 05/07/15 | 179,145.22 | |||
| 179,145.22 | ||||||||||
East Goshen Township Fund Accounting
BATCH 2 of 2
Report Date 05/07/15 Expenditures Register GL-1505-47500 PAGE 12
MARP05 run by BARBARA 4 : 36 PM
| Vendor | Req # | Budget# | Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| 06 | REFUSE | |||||||||
| 2762 | AJB A.J. BLOSENSKI INC. | |||||||||
| 43652 1 | 06427 | 4500 | CONTRACTED SERV. RESIDENTIAL PICK-UP MAY 2015 |
55100098 | 05/07/15 | 05/07/15 | 56,396.70 | |||
| 43652 2 | 06427 | 4500 | CONTRACTED SERV. LESS REPLACEMENT COST RESIDENT'S TRASH CAN |
55100098 | 05/07/15 | 05/07/15 | -21.17 | |||
| 56,375.53 | ||||||||||
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | |||||||||
| 43664 2 | 06427 | 3140 | LEGAL SERVICES LEGAL SERV. 3/26-4/22/15 MUNICIPAL CLAIMS |
5686 | 05/07/15 | 05/07/15 | 1,138.02 | |||
| 1,138.02 | ||||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | |||||||||
| 43666 1 | 06427 | 4502 | LANDFILL FEES WEEK 4/23/15 - 4/30/15 |
40125 | 05/07/15 | 05/07/15 | 7,468.54 | |||
| 7,468.54 | ||||||||||
| 316,883.15 | ||||||||||
| 0 Printed, totalling | 316,883.15 | |||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 45,041.31 | GENERAL FUND |
| 03 | 03 | 18,233.00 | SINKING FUND |
| 05 | 05 | 188,626.75 | SEWER OPERATING |
| 06 | 06 | 64,982.09 | REFUSE |
| 316,883.15 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1505 | 316,883.15 |
| 316,883.15 |
OS-7 (10-08)
pennsylvania
DEPARTMENT OF TRANSPORTATION
www.dot.state.pa.us
April 28, 2015
LRB-ABP-FJH-DCC
Chester County – East Goshen Township
S.R. 2010 – East Strasburg Road
ID# 1226i
Speed Study
Mr. Rick Smith, Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
This is in response to your letter requesting that the Department conduct a speed study on East Strasburg Road between Dutton Mill Road and North Chester Road.
Based on the request, an engineering and traffic study was completed to determine whether or not a speed reduction from the existing 40 MPH is justified. The engineering parameters that were evaluated included observations of vehicular speeds and their movements, an analysis of reportable crash reports and sight distance restrictions for vehicles pulling out of existing side roads onto East Strasburg Road. The results of these studies produced an average 85th percentile speed of 50 MPH. Neither the analysis of crash data nor the review of sight distance restrictions along this stretch of roadway identified anything that would suggest a further reduction of the 40 MPH speed limit. So based on the engineering parameters reviewed, a reduction in the speed limit is not justified.
While performing the speed limit study, there were instances of very high speeds indicating that stronger enforcement could be beneficial. Additionally, based on a review, it was determined that sufficient regulatory and warning signs exist along this stretch of East Strasburg Road.
If you have any questions, please contact Mr. Donald Centofante at (610) 205-6596.
Very truly yours,
Ashwin B. Patel, P.E.
Acting District Traffic Engineer
060/DCC/maf
Engineering District 6-0 | 7000 Geerdes Boulevard | King of Prussia, PA 19406-1525 | 610.205.6596
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: May 7, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Sunoco Remediation Report
We received the Remedial Action Progress Report for the First Quarter of 2015 from Sunoco and 2 of the test wells have a MTBE reading above the State Limit (20 ug/l).
The executive summary is attached and a complete copy of the report is available for review at the Township Building.
F:\Data\Shared Data\Property Management\53-4\53-4-2 (1431 Paoli Pike)\Sunoco\Memo to BOS 050715.doc
Remedial Action Progress Report
First Quarter 2015
Sunoco Station # 0004-7969
1425 Paoli Pike
West Chester, PA
General Information
| Sunoco Remediation Associate: | Bill Brochu |
|---|---|
| Consultant: | Environmental Alliance, Inc. (Alliance) 5341 Limestone Road Wilmington, DE 19808 |
| Alliance Program Manager: | Joe Rossi |
| Alliance Project Manager: | Chris Thoeny |
| PADEP Case Manager: | Lauren Mapleton – PADEP Southeast Regional Office |
| PADEP Facility ID#: | 15-20353 |
| County: | Chester |
| Municipality: | East Goshen Township |
SITE OVERVIEW
- The site is an active retail gasoline station and A-Plus convenience store.
SITE HISTORY
- In July of 1989, Sunoco retained Groundwater and Environmental Services, Inc. (GES) to conduct a hydrogeologic investigation upon the acquisition of the Site. GES installed 4 monitoring wells, collected soil samples, and completed an initial groundwater sampling event. Analytical results indicated the presence of total BTEX and total petroleum hydrocarbons (TPH) in the two samples that were located nearest the underground storage tank (UST) field.
- In the fall of 1989, Sunoco upgraded the UST system onsite. Upgrade activities included: the removal of four 4,000 gallon steel USTs which were replaced with three 10,000 gallon fiberglass USTs and the removal of two 550 gallon heating and waste oil tanks that were replaced with two 275 gallon aboveground storage tanks (ASTs).
- In December 1992 and January 1993, Sunoco completed service station upgrades, which included the abandonment of the on-site water supply well.
- In January 1995, the Pennsylvania Department of Environmental Resources (PADER) issued a letter in which no further investigative activities were deemed necessary. Subsequently, all monitoring wells were abandoned by B. L. Myers on January 27, 1995.
- In October 2006, Sunoco upgraded the dispensers and product piping at the Site. During upgrade activities contamination was detected beneath one of the dispensers and was confirmed through a grab soil sample. Benzene was detected above Pennsylvania
Page 1
ENVIRONMENTAL ALLIANCE, INC.
Department of Environmental Protection (PADEP) statewide health standard (SHS) and a notice of release (NOR) was submitted to the PADEP by Alliance on October 16, 2006.
- On January 17 th and 18 th , 2007, Alliance conducted soil borings and the installation of four monitoring wells. The monitoring wells were sampled on February 6 th and April 25 th , 2007.
- In August 2007, Alliance submitted a Site Characterization Report (SCR) to the PADEP. The SCR was disapproved based on further site characterization being needed.
- On September 19 th and 20 th , 2007, Alliance installed an additional four monitoring wells to help further delineate any potential migration of contaminants of concern.
- In accordance with a letter from the PADEP dated March 3, 2008, Alliance conducted an extensive well search, in which no drinking wells were identified between the Site and the closest down-gradient sensitive receptor, Ridley Creek.
- On September 3, 2008, Alliance installed two offsite monitoring wells and one onsite monitoring well. The offsite wells (MW-9 and MW-10) were installed for further horizontal delineation of potential contaminants of concern. The onsite well (MW-7B) was installed for vertical delineation of potential contaminants of concern.
- In December 2008, a slug test was performed on monitoring well MW-7B to calculate the hydraulic conductivity of the bedrock aquifer beneath the site.
- On May 27 th and 28 th , 2009 Alliance installed additional overburden and shallow bedrock wells at off site (MW-9 and 9B, MW-10 and 10B, and MW-11 and MW-11B) and onsite locations (MW-2B and MW-8B).
- On November 3 rd through 5 th , 2009 Alliance installed additional monitoring wells onsite (MW-12, MW-12B and MW-5B) and off site (MW-13 and 13B and MW-14 and 14B).
- On November 9, 2009, Alliance submitted a Status Report for Site Characterization to the PADEP.
- On February 1, 2010, Alliance submitted a Site Characterization Report (SCR) to the PADEP selecting the Site Specific Standard (SSS) as the clean up standard for the site. The SCR was approved by the PADEP in a letter dated April 21, 2010.
- On June 10, 2010, Alliance submitted a Remedial Action Plan (RAP) to the PADEP in which a groundwater pump and treat remediation system was selected as the remedial strategy for the site. The RAP was approved by the PADEP in a letter dated July 21, 2010.
- Start up/shake down procedures for the groundwater remediation system were initiated on June 15, 2010. The permanent operation date for the groundwater remediation system is June 28, 2010.
- Operation and Maintenance (O&M) of the remediation system has been ongoing since June 28, 2010.
- On August 28, 2012, Alliance submitted a request to PADEP by e-mail on behalf of Sunoco, to modify the groundwater sampling plan during active remediation to a reduced list of wells. PADEP agreed to a reduced groundwater sampling plan per an August 28, 2012 e-mail. The following wells were removed from the quarterly groundwater sampling scope MW-2 & 2B; MW-5 & 5B; MW-9 & 9B; MW-10 & 10B; MW-13 &13B. All the wells will remain in place, secured with a water tight manhole and locking well plug (wells will not be abandoned). Once active pumping is ceased, the wells will be returned to the sampling plan, or a modified sampling plan to meet post remediation monitoring needs will be developed in participation with PADEP.
Page 2
ENVIRONMENTAL ALLIANCE, INC.
- A Notice of Intent (NOI) was submitted to PADEP on September 6, 2012, for renewal of the NPDES Permit, to continue operation of the remediation system. Coverage under the statewide permit was extended in a letter from PADEP dated October 24, 2012.
- On September 27 2012, Alliance installed a regenerative air blower at the Site to aid in sub-surface remediation. The blower was installed in the remediation shed, and tied into piping runs connected to MW-7B. The purpose of the blower is to provide additional hydraulic influence at well MW-7B and possibly extract hydrocarbon vapors from the de-watered bedrock surrounding MW-7B. All extracted vapors are passed through activated vapor-phase granular carbon prior to discharge to the atmosphere.
- Per the November 26, 2013 letter submitted to PADEP (Notification of Suspension of Remedial Actions), the remediation system was temporarily shutdown on December 31, 2013. Per the notification, the system would remain off for at least one quarter while the aquifer response is evaluated.
- The remediation system was restarted on April 18, 2014.
- On December 31, 2014, the remediation system was shut down indefinitely to further evaluate baseline MTBE concentrations and trends at the Site.
SITE INFORMATION
| Well Specifications: | Fourteen 2-inch diameter overburden monitoring wells (MW-1 through MW-14); Eight 2-inch diameter shallow bedrock wells (MW-2B, MW-5B, MW-9B, MW-10B, MW-11B, MW-12B, MW-13B, & MW-14B); Two 6-inch diameter deep wells (MW-7B, & MW-8B). |
|---|---|
| Geology: | Soils consist of greenish gray and orange clay and micaceous silt underlain by Precambrian age, medium grained felsic gneiss. Depth to bedrock reported during drilling ranged from 20-feet (MW-14B) to 48-feet (MW-8B). Bedrock is gradationally overlain by a thick mantle of saprolite identified in most borings. |
| Groundwater Elevation: | Overburden: 82.54 feet (MW-12) to 75.18 feet (MW-14) Shallow Bedrock: 82.54 feet (MW-12B) to 75.15 feet (MW-14B). |
| Hydraulic Gradient: | Shallow: 0.011 feet per foot to the northeast. Deep: 0.010 feet per foot to the northeast. |
| Hydraulic Conductivity: | 4.75 feet per day (shallow); 1.75 feet per day (deep). |
| Groundwater Sampling Frequency: | Quarterly. |
| Analytical Method: | Benzene, Toluene, Ethylbenzene, Total Xylenes (BTEX), Methyl tertiary-butyl ether (MTBE), Isopropylbenzene, Naphthalene via Environmental Protection Agency (EPA) Method 8260B. |
| Soil Quality: | Soil quality data from October 2006 dispenser sampling indicated Benzene above SHS at sample Disp/Line 2. Soil quality data from well installation in January 2007, indicated MTBE above SHS at MW-3 (11-12 feet). |
Page 3
ENVIRONMENTAL ALLIANCE, INC.
| Separate-Phase Hydrocarbons: | Separate-phase hydrocarbons (SPH) have never been detected in the site monitoring wells. |
|---|
RISK ASSESSMENT
| Potentially Sensitive Receptors: | There are 34 known wells identified by the Environmental Data Resources, Inc. radius report (utilizing the Federal and Pennsylvania well databases) within a 0.5-mile radius. The East Branch of Ridley Creek lies approximately 900 feet northeast of the site. |
|---|---|
| Closest Known Well: | One Federal Public Supply well was identified within a one-half mile radius to the east of the site. |
| Municipal Water Supply: | Aqua Pennsylvania, Inc. |
SITE ACTIVITIES THIS REPORTING PERIOD
- A groundwater sampling event was completed on January 5, 2015 and included collection of liquid-level data from all onsite and off-site wells and collection of groundwater quality samples from MW-1, MW-3, MW-4, MW-6, MW-7, MW-7B, MW-11, MW-11B, MW-12, MW-12B, MW-14, and MW-14B (per reduced scope).
- Maps depicting groundwater elevation and analytical data for the shallow (overburden) and deep (shallow bedrock) monitoring wells are included as Figures 1 and 2, respectively. Historical groundwater elevation and analytical data are summarized in Table 1. A copy of the laboratory results is included in Appendix A. Graphs showing the concentration history of MTBE at select monitoring wells are presented in Appendix B.
- The remediation system remained off for the first quarter 2015; therefore, no discharge monitoring reports were submitted in January, February, or March 2015 in accordance with the National Pollutant Discharge Elimination System (NPDES) Permit for the Site.
REMEDIATION SYSTEM INFORMATION
- Type of System: Vacuum Enhanced Groundwater Extraction (VEGE).
- Permanent Operation Dates: Groundwater : June 28, 2010 to December 31, 2013; April 18, 2014 to December 31, 2014.; SVE : September 27, 2012 to December 23, 2012; March 19, 2013 to December 31, 2013; May 22, 2014 to December 31, 2014.
- Extraction Points: MW-1, MW-2, and MW-7B.
- Extraction Points Utilized: MW-7B.
- Recovery Equipment: Grundfos ES-7 Electric Submersible Pump & Gast R4 SVE blower.
- Liquid-Phase Treatment Equipment: GeoTech Lo-Profile Air Stripper, (2) 200 lb. liquid granular activated carbon (LGAC) vessels.
- Vapor-Phase Treatment Equipment: vapor-phase granular activated carbon.
- Groundwater Discharge Location: Storm Sewer.
- Approximate gallons pumped and treated this Reporting Period: 0
Page 4
ENVIRONMENTAL ALLIANCE, INC.
- Average Groundwater Recovery Rate this Reporting Period: 0 GPM.
- Total Groundwater Recovered through December 31, 2014: 3,665,497 gallons. Totalizer replaced 4/18/14 at 1,363,333 gallons.
- Total Dissolved-Phase MTBE Recovered through December 31, 2014: 128.19 pounds.
FUTURE SITE ACTIVITIES
- Quarterly groundwater monitoring and sampling will continue using the August 28, 2012 revised sampling plan. The next sampling event is scheduled for April 2015.
- Operation of the remediation system has been suspended as of December 31, 2014 to evaluate non-pumping aquifer conditions.
- Based on the suspension of operation of the remediation system monthly no Discharge Monitoring Reports (DMR) will be submitted this period.
ATTACHMENTS
| Figure 1 | Groundwater Analytical and Gradient Map - Overburden (Shallow) Wells January 5, 2015 |
|---|---|
| Figure 2 | Groundwater Analytical and Gradient Map - Shallow Bedrock (Deep) Wells January 5, 2015 |
| Table 1 | Groundwater Elevation Data and Analytical Summary |
| Appendix A | Groundwater Sampling Laboratory Analytical Reports |
| Appendix B | Groundwater Concentration Graphs |
Page 5
ENVIRONMENTAL ALLIANCE, INC.
1647 Yardley Drive
West Chester, PA
May 5, 2015
MAY 7 2015
Louis F. Smith
Township Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Dear Rick,
I hereby tender my resignation from the Deer Management Committee as of this date. I thank you and the Board of Supervisors for providing me the opportunity of working for the betterment of the residents of East Goshen by dealing with the deer management issues. I have learned how the township cares and provides for the concerned citizens of our community by offering the opportunities to participate in the governance of East Goshen.
I have enjoyed working with the committee members, East Goshen employees and the members of the Board of Supervisors. Our travel schedule during the year has precluded the opportunity to attend scheduled meetings. Stepping down will provide other interested citizens the chance to serve our township.
Thanks for the opportunity to serve.
I send my best wishes to members of the Deer Committee and the Supervisors for the forward thinking and County leadership provided by this group in dealing with Deer overpopulation and its attendant effects on the land and citizens safety.
Sincerely,
John S. Babiec, Jr.