Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Agendas\Board of Supervisors\2015\09012015 Blue Highlites .doc
AGENDA EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS Tuesday, September 1, 2015
7:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman’s Report a. Announce 2016 Minimum Municipal Obligation for the following Pension Plans: Fire Pension Plan $48,617 Township Non-Uniformed Pension Plan $0 Township Non-Uniformed Defined Contribution Pension Plan $79,748 Police Commission Non-Uniformed Defined Contribution Pension Plan $9,500 6. Public Hearings - none 7. Police Report – none Malvern Fire Co. – July 2015 Fire Marshal – none Goshen Fire Co. – none 8. Financial Report – None 9. Old Business a. Park Master Plan Interviews Simone Collins (7:00 -7:25) Thomas Comitta Associates (7:30-7:55) b. Consider recommendation for 1641 Manley Road. 10. New Business a. Consider authorizing Chairman to execute PennDOT Master Casting Agreement and Attachment “B” b. Consider Historical Commission’s request to design plaque to honor Ben Rohrbeck c. Consider authorizing Local Traffic Advisory Committee to conduct public meeting to present traffic study to Hershey Mill Estates residents and distribute ballots. d. Consider removing tennis locks for the remainder of calendar year and revisit their need for 2016 e . Consider memo on ponds. 11. Any Other Matter - none 12. Approval of Minutes a. August 4, 2015 b. August 11, 2015 13. Treasurer’s Report a. August 27, 2015 14. Correspondence, Reports of Interest a. Acknowledge 2013- 2014 Liquid Fuels Audit b. Acknowledge letter indicating Sunoco Pipeline intends to apply for PA DEP permits
F:\Data\Shared Data\Agendas\Board of Supervisors\2015\09012015 Blue Highlites .doc
15. Public Comment – Hearing of Residents 16. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant. Dates of Importance Sept 07, 2015 Labor Day Township Office Closed Sept 09, 2015 Conservancy Board 7:00 pm Sept 10, 2015 Historical Commission 7:00 pm Sept 14, 2015 Municipal Authority 7:00 pm Sept 15, 2015 Trail Open House 6:30 pm Sept 15, 2015 Board of Supervisors 7:00 pm Trail Plan & Alignment Update Sept 16, 2015 Futurist Committee 7:00 pm Sept 17, 2015 Commerce Commission 7:00 pm Sept 29, 2015 Zoning Hearing Board 7:30 pm Newsletter Deadlines for 2015: Winter: October 30
Thomas J. Anderson & Associates, Inc.
MUNICIPAL PENSION SPECIALISTS
[Logo: TJA]
115 WESTTOWN RD., STE 101
WEST CHESTER, PA 19382
(610) 430-3385 FAX (610) 430-3387
August 11, 2015
Mr. Louis F. Smith
Secretary
EAST GOSHEN TOWNSHIP
1580 Paoli Pike
West Chester, PA 19380
[Stamp: AUG 1 3 2015]
RE: 2016 Financial Requirement and Minimum Municipal Obligation
Dear Louis:
Enclosed is the Financial Requirement and Minimum Municipal Obligation (MMO) for your municipality's Pension Plan(s) for the upcoming 2016 plan year. Act 205 requires that the Chief Administrative Officer (CAO) of the pension plan(s) shall submit to the governing body of the municipality the financial requirement of the pension plan(s) for the following plan year (2016). This annual report must be presented to the governing body on or before the last business day in September (September 30, 2015).
The payroll amount used in your 2016 budget was computed by obtaining from you, the earnings for the active full-time members of the pension plan(s) as of June 30, 2015 and then doubling this figure in order to arrive at the projected annual payroll for the year in which the budget is prepared. The budgeted administrative expenses were based upon the expenses reported in the plan(s)' most recent Act 205 Actuarial Report.
These reporting requirements will be closely monitored by the Department of the Auditor General in future audits. Therefore, if you should have any questions concerning any of the above, please do not hesitate to contact our office. Upon approval, please forward a signed copy of this budget for our records.
Sincerely,
[signature: James P. Kennedy]
JAMES P. KENNEDY
President
FINANCIAL REQUIREMENT AND MINIMUM MUNICIPAL OBLIGATION BUDGET FOR 2016
NAME OF MUNICIPALITY: EAST GOSHEN TOWNSHIP
COUNTY: CHESTER
FIRE PENSION PLAN
| Description | Value |
|---|---|
| 1 TOTAL ANNUAL PAYROLL Estimated Payroll |
$570,000 |
| 2 NORMAL COST AS A PERCENTAGE OF PAYROLL ( Derived from latest actuarial valuation ) 1/1/15 |
10.79% |
| 3 TOTAL NORMAL COST ( Item 1 x Item 2) |
$61,503 |
| 4 AMORTIZATION REQUIREMENT ( Derived from latest actuarial valuation ) |
$0 |
| 5 TOTAL ADMINISTRATIVE EXPENSES ( Derived from latest actuarial valuation ) |
$4,488 |
| 6 FINANCIAL REQUIREMENT ( + Item 3 + Item 4 + Item 5) |
$65,991 |
| 7 TOTAL MEMBERS CONTRIBUTIONS | $12,826 |
| 8 FUNDING ADJUSTMENT ( Derived from latest actuarial valuation ) |
$4,548 |
| 9 MINIMUM MUNICIPAL OBLIGATION ( + Item 6 - Item 7 - Item 8 ) |
$48,617 |
[signature]
Signature of Chief Administrative Officer
Date Certified to Governing Body
FINANCIAL REQUIREMENT AND MINIMUM MUNICIPAL OBLIGATION BUDGET FOR 2016
NAME OF MUNICIPALITY: EAST GOSHEN TOWNSHIP
COUNTY: CHESTER
NON-UNIFORMED PENSION PLAN
| Description | Value |
|---|---|
| 1 TOTAL ANNUAL PAYROLL Estimated Payroll |
$0 |
| 2 NORMAL COST AS A PERCENTAGE OF PAYROLL ( Derived from latest actuarial valuation ) 1/1/15 |
0.00% |
| 3 TOTAL NORMAL COST ( Item 1 x Item 2) |
$0 |
| 4 AMORTIZATION REQUIREMENT ( Derived from latest actuarial valuation ) |
$0 |
| 5 TOTAL ADMINISTRATIVE EXPENSES ( Derived from latest actuarial valuation ) |
$5,475 |
| 6 FINANCIAL REQUIREMENT ( + Item 3 + Item 4 + Item 5) |
$5,475 |
| 7 TOTAL MEMBERS CONTRIBUTIONS | $0 |
| 8 FUNDING ADJUSTMENT ( Derived from latest actuarial valuation ) |
$47,657 |
| 9 MINIMUM MUNICIPAL OBLIGATION ( + Item 6 - Item 7 - Item 8 ) |
$0 |
NOTE: Since the actuarial value of assets exceeds the actuarial present value of future benefits, there is no financial requirement or municipal obligation required for the year 2016
[signature]
Signature of Chief Administrative Officer
Date Certified to Governing Body
Thomas J. Anderson & Associates, Inc.
MUNICIPAL PENSION SPECIALISTS
TJA
115 WESTTOWN RD., STE 101
WEST CHESTER, PA 19382
(610) 430-3385 FAX (610) 430-3387
August 11, 2015
Mr. Louis F. Smith
Secretary
EAST GOSHEN TOWNSHIP
1580 Paoli Pike
West Chester, PA 19380
RE: 2016 Financial Requirement and Minimum Municipal Obligation
Dear Lewis:
Enclosed is the Financial Requirement and Minimum Municipal Obligation (MMO) for your municipality's Pension Plan(s) for the upcoming 2016 plan year. Act 205 requires that the Chief Administrative Officer (CAO) of the pension plan(s) shall submit to the governing body of the municipality the financial requirement of the pension plan(s) for the following plan year (2016). This annual report must be presented to the governing body on or before the last business day in September (September 30, 2015).
If you should have any questions concerning any of the above, please do not hesitate to contact me. Upon approval, please forward a signed copy of this budget for our records.
Sincerely,
[signature]
JAMES P. KENNEDY
President
FINANCIAL REQUIREMENT AND MINIMUM MUNICIPAL OBLIGATION BUDGET FOR 2016
NAME OF MUNICIPALITY: EAST GOSHEN TOWNSHIP
COUNTY: CHESTER
NON-UNIFORMED
DEF. CONT.
| Description | Value |
|---|---|
| 1. TOTAL ANNUAL PAYROLL ( Estimated payroll) |
1,500,960 |
| 2. RATE OF CONTRIBUTION AS A % OF PAYROLL (Derived from latest actuarial valuation) 1/1/15 |
5.00% |
| 3. TOTAL CONTRIBUTION COST (Item 1 times Item 2) |
75,048 |
| 4. TOTAL ADMINISTRATIVE EXPENSES | 4,700 |
| 5. TOTAL FINANCIAL REQUIREMENT (+Item 3 +Item 4 ) |
79,748 |
| 6. MINIMUM MUNICIPAL OBLIGATION | 79,748 |
[signature]
Signature of Chief Administrative Officer
Date Certified to Governing Body
FINANCIAL REQUIREMENT AND MINIMUM MUNICIPAL OBLIGATION BUDGET FOR 2016
NAME OF MUNICIPALITY: EAST GOSHEN TOWNSHIP
COUNTY: CHESTER
NON-UNIFORMED(COMM)
DEF. CONT.
| Description | Value |
|---|---|
| 1. TOTAL ANNUAL PAYROLL ( Estimated payroll) |
190,000 |
| 2. RATE OF CONTRIBUTION AS A % OF PAYROLL (Derived from latest actuarial valuation) 1/1/15 |
5.00% |
| 3. TOTAL CONTRIBUTION COST (Item 1 times Item 2) |
9,500 |
| 4. TOTAL ADMINISTRATIVE EXPENSES | 0 |
| 5. TOTAL FINANCIAL REQUIREMENT (+Item 3 +Item 4 ) |
9,500 |
| 6. MINIMUM MUNICIPAL OBLIGATION | 9,500 |
[signature]
Signature of Chief Administrative Officer
Date Certified to Governing Body
Malvern Fire Company EMS
2015 Statistics
| 2015 | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Totals | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Calls | 238 | 212 | 234 | 237 | 222 | 243 | 225 | 1611 | ||||||
| Call Types | Emer. Transfer | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Event Standby | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| Fire | 6 | 9 | 11 | 14 | 22 | 13 | 17 | 92 | ||||||
| Medical | 221 | 196 | 211 | 217 | 190 | 218 | 200 | 1453 | ||||||
| MVA | 11 | 6 | 12 | 6 | 9 | 12 | 8 | 64 | ||||||
| Relocate | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | ||||||
| Routine | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 | ||||||
| Strike | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| ALS/BLS | ALS | 178 | 158 | 168 | 173 | 149 | 169 | 141 | 1136 | |||||
| BLS | 60 | 54 | 66 | 64 | 73 | 74 | 84 | 475 | ||||||
| Municipalities | Charlestown Twp. | 6 | 8 | 11 | 1 | 3 | 7 | 6 | 42 | |||||
| E. Goshen Twp. | 59 | 40 | 41 | 49 | 39 | 49 | 47 | 324 | ||||||
| E. Whiteland Twp. | 28 | 26 | 33 | 33 | 40 | 35 | 26 | 221 | ||||||
| Easttown Twp. | 3 | 1 | 3 | 2 | 3 | 1 | 2 | 15 | ||||||
| Honey Brook Twp. | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | ||||||
| Malvern Boro. | 20 | 19 | 27 | 21 | 18 | 24 | 21 | 150 | ||||||
| Out of County | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 5 | ||||||
| Tredyffrin Twp. | 30 | 15 | 13 | 19 | 21 | 17 | 12 | 127 | ||||||
| W. Goshen Twp. | 3 | 4 | 1 | 1 | 1 | 0 | 0 | 10 | ||||||
| W. Pikeland Twp. | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 2 | ||||||
| W. Whiteland Twp. | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 2 | ||||||
| Westtown Twp. | 7 | 0 | 0 | 1 | 1 | 0 | 1 | 10 | ||||||
| Willistown Twp. | 80 | 94 | 104 | 110 | 96 | 109 | 109 | 702 | ||||||
| Hospital - Outcome | AI | 0 | 0 | 1 | 1 | 0 | 0 | 0 | 2 | |||||
| BMH | 4 | 2 | 2 | 0 | 3 | 1 | 1 | 13 | ||||||
| BMRH | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 | ||||||
| CCH | 9 | 11 | 10 | 15 | 7 | 11 | 13 | 76 | ||||||
| Care Transferred | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 | ||||||
| Fire Standby | 5 | 10 | 11 | 14 | 17 | 13 | 17 | 87 | ||||||
| Heli | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 | ||||||
| Lift Assist | 2 | 6 | 7 | 0 | 2 | 1 | 2 | 20 | ||||||
| No Services | 12 | 13 | 9 | 12 | 14 | 13 | 9 | 82 | ||||||
| PMH | 158 | 133 | 167 | 163 | 145 | 166 | 147 | 1079 | ||||||
| PVH | 0 | 1 | 1 | 0 | 0 | 0 | 1 | 3 | ||||||
| Public Service | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 2 | ||||||
| Recalled | 39 | 25 | 20 | 27 | 20 | 26 | 30 | 187 | ||||||
| Refusals | 5 | 5 | 4 | 2 | 9 | 7 | 3 | 35 | ||||||
| Released to BLS | 0 | 2 | 0 | 2 | 1 | 2 | 1 | 8 | ||||||
| RH | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 2 | ||||||
| Tx/No Transport | 4 | 2 | 2 | 0 | 0 | 3 | 1 | 12 | ||||||
| Assist/Assisted | Berwyn | 5 | 1 | 2 | 3 | 6 | 0 | 3 | 20 | |||||
| Elverson | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | ||||||
| E. Whiteland | 32 | 25 | 34 | 24 | 33 | 37 | 26 | 211 | ||||||
| GFAC | 4 | 2 | 0 | 0 | 1 | 1 | 2 | 10 | ||||||
| Goshen | 54 | 39 | 42 | 49 | 34 | 44 | 43 | 305 | ||||||
| Kimberton | 0 | 2 | 0 | 0 | 0 | 1 | 0 | 3 | ||||||
| Medic 91 | 2 | 2 | 0 | 0 | 1 | 0 | 3 | 8 | ||||||
| Newtown Square | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 2 | ||||||
| Out of Area | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | ||||||
| Paoli | 45 | 24 | 24 | 36 | 25 | 30 | 22 | 206 | ||||||
| Washington Hose | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 2 |
Malvern Fire Company EMS
2015 Statistics
| Uwchlan | 0 | 1 | 0 | 1 | 0 | 0 | 1 | 3 |
|---|
Malvern Fire Company
424 East King Street, Malvern, PA 19355
Main 610-647-0693 Fax 610-647-0249
www.malvernfireco.com
Monthly Fire Operations Report - July 2015
| Calls for Month: 37 | Year Total: 215 | |||
|---|---|---|---|---|
| Call Type | Malvern | Willistown | East Goshen | Other |
| Automatic Fire Alarm | 7 | 15 | 0 | 0 |
| EMS Assist | 1 | 1 | 0 | 0 |
| Fuel Spill | 1 | 0 | 0 | 0 |
| Gas Leak - Inside | 0 | 0 | 0 | 1 |
| Investigation - Inside | 1 | 1 | 0 | 0 |
| Motor Vehicle Accident | 0 | 1 | 0 | 1 |
| Structure Fire | 0 | 1 | 1 | 4 |
| Vehicle | 1 | 0 | 0 | 0 |
| MONTH TOTAL | 11 | 19 | 1 | 6 |
| YEAR TOTAL | 59 | 115 | 7 | 34 |
| Mutual Aid | Given | Received | Month Total | Year Total |
|---|---|---|---|---|
| Berwyn Fire Co. | 2 | 1 | 3 | 9 |
| CCH Medic 91 | 0 | 0 | 0 | 1 |
| East Whiteland Fire Co. | 3 | 1 | 4 | 26 |
| Fame Fire Co. | 0 | 0 | 0 | 1 |
| Goshen Fire Co. | 2 | 1 | 3 | 17 |
| Goodwill Fire Co. | 0 | 0 | 0 | 2 |
| Kimberton Fire Co. | 0 | 0 | 0 | 1 |
| Lionville Fire Co. | 0 | 0 | 0 | 3 |
| Newtown Sq. Fire Co. | 0 | 0 | 0 | 2 |
| Paoli Fire Co. | 0 | 1 | 1 | 9 |
| Radnor Fire Co. | 0 | 0 | 0 | 4 |
| Uwchlan EMS | 0 | 0 | 0 | 1 |
| West Whiteland Fire Co. | 0 | 0 | 0 | 1 |
| Total Value of Property & Contents | Total Month Loss | Total Year Loss | Total Saved |
|---|---|---|---|
| $2,575,000 | $1,200 | $476,200 | $2,098,800 |
| Number of Personnel Attending Calls | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 278 | 1,632 | 125.48 | 1,057.10 |
| Number of Training Sessions | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 3 | 33 | 70.5 | 902.75 |
| Number of Special Assignments | Year Total | Hours in Service | Year Total |
|---|---|---|---|
| 13 | 26 | 834.5 | 1,036.5 |
| Total Hours in Service (Month) | Total Hours in Service (Year) |
|---|---|
| 1030.48 | 2,996.35 |
Memo
East Goshen Township
Date: August 26, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: 1641 Manley Road
On April 22, 2014 Bill Mullray received approval to construct a single family dwelling on a lot at 1641 Manley Road. Since he was proposing to remove more than 20% of the trees on a wooded lot §205-61 of the Township Code requires him to plant replacement trees on an inch for inch basis for any trees removed over the 20%. The Code mandates three inch replacement tree unless a smaller size is specifically approved by the Board. The Board approved two inch trees in order to reduce the expense to Mullray. Since Mullray removed 123 inches of trees he was required to plant 62 two inch trees. The Code requires the replacement trees to be planted on the lot being developed or at some other location approved by the Board. The new owner of 1641 did not want the replacement trees.
Mr. and Mrs. Ed Last own the property immediately east of 1641 Manley Road. In order to obtain sight distance for the driveway for the new home, Mullray had to remove a number of trees that were located within the right of way of Manley Road. The trees that were removed screened the Last's home from Manley Road and the Last's would like to have this screening restored.
I previously recommended that the Board require Mullray to plant 20 trees on the Last's property in order to restore the screening and that the Conservancy Board and Park & Recreation Commission each be given 21 trees to be planted at locations of their choosing.
At your meeting on July 21, 2015 the Board tabled action on this matter pending receipt of the locations were the Conservancy Board and Park & Rec Commission would plant their respective trees.
The Conservancy Board intends to plant their trees in the Open Space on East Boot Road. The Park & Rec Commission did not make a decision. They wanted to wait for the Conservancy Board, in order to avoid any conflict, and I expect they will make a decision at their meeting on September 3rd.
Mullray has $31,355.77 remaining in the escrow account for this project. He would like to close out this project. The only outstanding items are confirmation that the sight distance is in compliance with the approved plan and planting the replacement trees.
Suggested Motion: I move that we authorize Bill Mullray to plant 20 trees on the Last property, 21 trees in the Open Space on East Boot Road as recommended by the Conservancy Board and 21 trees at locations chosen by the Park & Recreation Commission. And furthermore, that we authorize the release of the balance of funds on the escrow account once the trees have been planted, staked and initially watered; and the Code Department confirms that the sight distance is in compliance.
Cc: Ed Last
Bill Mullray
F:\Data\Shared Data\Property Management\53-6\53-6-129.1A (1641 Manley Rd.)\Memo re trees 071715.docx
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 692-8950
E-mail rsmith@eastgoshen.org
Date: August 21, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Penn DOT Master Casting Agreement
Penn DOT will be opening bids for the repaving on Greenhill Road, in mid-September and the road will be paved this fall. We have four sanitary sewer manholes in Greenhill Road, which will need to be raised. It is more cost effective to have Penn DOT raise the manholes as part of their paving contract.
Accordingly, we need to enter into an agreement with Penn DOT in order to have this work incorporated into the project.
Suggested Motion: I move that we adopt Resolution 2015-72 and authorize the Chairman to execute the Master Casting Agreement and Attachment B with Penn DOT.
F:\Data\Shared Data\Public Works Dept\PA DOT & Liquid Fuels\Memo re Master Casting Agreement 082115.docx
UCL43M 2015-72
MUNICIPAL RESOLUTION
BE IT RESOLVED by authority of the BOARD OF SUPERVISORS
(Borough Council, Board of Supervisors, etc.)
of the EAST GOSHEN TOWNSHIP, CHESTER
(Name of Municipality) (Name of County)
County, and it is hereby resolved by authority of the same, that
the CHAIRMAN of said Municipality/
(Chairman or Designated Title)
Authority be authorized and directed to sign the attached
Agreement on its behalf and the TOWNSHIP SECRETARY
(Sec. or Designated Title)
be authorized and directed to attest the same.
ATTEST: ________________________
EAST GOSHEN TOWNSHIP
(Name of Municipality)
BY ________________________
(Signature and Title) (Signature and Title)
I, LOUIS F SMITH, JR TOWNSHIP SECRETARY of the
EAST GOSHEN TOWNSHIP do hereby certify that
the foregoing is a true and correct copy of the Resolution
adopted
at a regular meeting of the
held the ________ day of ________________, 20____.
DATE: ________________________
(SEAL)
PA DOT MASTER CASTING AGREEMENT
Agreement No. 0601078
SAP Vendor No. 139277
FID No. 23-6005479
MASTER AGREEMENT FOR ADJUSTMENT OF INCORPORATED UTILITY FACILITIES
2014-2017
THIS AGREEMENT, numbered 0601078 in COMMONWEALTH files, made and entered into this ______ day of ______________, by and between the COMMONWEALTH of Pennsylvania, acting through the Department of Transportation, hereinafter called the COMMONWEALTH,
A N D
East Goshen Township, a Legal Entity qualified to do business in the COMMONWEALTH of Pennsylvania, with its principal place of business located at 1580 Paoli Pike, West Chester, PA 19380, acting through its proper officials hereinafter called UTILITY.
WITNESSETH
WHEREAS, the COMMONWEALTH proposes to improve, construct and/or reconstruct Section(s) of certain State Routes within the Counties of Bucks, Chester, Delaware and Montgomery located within Engineering District Number 6-0, Pennsylvania, pursuant to plans and specifications prepared or approved therefore by and on file with the Pennsylvania Department of Transportation; and,
WHEREAS, in the course of COMMONWEALTH'S project, certain of UTILITY'S castings may require adjustment and/or replacement; and,
WHEREAS, UTILITY may request COMMONWEALTH to include within said improvement and/or construction project the adjustment of certain of its castings by the execution of a Project Letter Agreement for each individual project, a copy of which is attached hereto as Attachment "B"; and,
WHEREAS, at the COMMONWEALTH'S option, the COMMONWEALTH is willing to include in such improvement and/or construction project, the requested casting adjustments, subject to reimbursement by the UTILITY; and,
WHEREAS, such adjustment(s) shall be made in accordance with and subject to the provisions of 67 PA Code, Chapter 459, Pennsylvania Department of Transportation Regulations Governing Occupancy of Highways by Utilities.
WHEREAS, all utility work performed pursuant to this Agreement must comply with the "Buy America" provisions in 23 U.S.C. §313 and 23 CFR Part 635.410.
NOW, THEREFORE:
In consideration of the foregoing premises and the mutual promises hereinafter set forth, and with intent to be legally bound hereby, the Parties hereto agree as follows:
1
1. If UTILITY desires to include the adjustment of all or a certain number of its castings in COMMONWEALTH'S improvement and/or construction project, UTILITY will execute a Letter Agreement, setting forth its requested adjustments, in the form which is attached hereto and incorporated herein as Attachment "B".
2. COMMONWEALTH will, at its option, provide for the adjustment of the UTILITY'S castings in accordance with the terms and conditions hereof.
3. Where replacement of castings is required, UTILITY shall provide the castings and deliver them on the site for installation by the COMMONWEALTH, subject to Paragraphs 4 and 5 of this Agreement.
4. The COMMONWEALTH shall perform the work required to adjust the castings to the proper elevation, on a full brick and mortar bed, in the following Counties: Bucks, Chester, Delaware and Montgomery at the following costs:
Type A - One-step adjustment of casting – applies where change in grade:
- (1) Does not exceed 3 inches or
- (2) Exceeds 3 inches but protrusion into roadway of casting reset to proposed final grade does not present a hazard to vehicular traffic.
Type B - Two-step adjustment of casting – applies where change in grade:
- (1) Exceeds 3 inches and
- (2) Protrusion into roadway of casting reset to proposed final grade presents a hazard to vehicular traffic.
Type C - One piece fabricated adjustable riser with one turnbuckle.
For adjustments of 0 inch to 3 inches.
Type D - One piece fabricated adjustable riser with one turnbuckle.
Adjustments greater than 3 inches.
9999-9950 0 to 15 inch diameter Casting Adjustment for Resurfacing - Type A - Concrete Base
Amount $484.00 each (Contract Item No. 9999-9950)
9999-9951 0 to 15 inch diameter Casting Adjustment for Resurfacing - Type A - Flexible Base
Amount $464.00 each (Contract Item No. 9999-9951)
9999-9952 16 to 36 inch diameter Casting Adjustment for Resurfacing - Type A - Concrete Base
Amount $553.00 each (Contract Item No. 9999-9952)
2
9999-9963 0 to 15 inch diameter Casting Riser Adjustment - Type C
Amount $250.00 each (Contract Item No. 9999-9963)
9999-9964 16 to 54 inch diameter Casting Riser Adjustment - Type C
Amount $404.00 each (Contract Item No. 9999-9964)
9999-9965 0 to 15 inch diameter Casting Riser Adjustment - Type D
Amount $279.00 each (Contract Item No. 9999-9965)
9999-9966 16 to 54 inch diameter Casting Riser Adjustment - Type D
Amount $465.00 each (Contract Item No. 9999-9966)
9999-9967 201 Box Adjustment for Resurfacing
Amount $808.00 each (Contract Item No. 9999-9967)
NOTE: Where agreed, the COMMONWEALTH shall purchase certain castings and perform any necessary work in accordance with the Department of Transportation's Publication 408 (2003), Section 104.03 titled "Extra Work" and the COMMONWEALTH shall be reimbursed by UTILITY in accordance with aforesaid section.
An example of the bid items for the above as they will appear in the Highway Contract is attached to this Agreement and incorporated herein as Attachment "A".
5. If UTILITY determines prior to bidding or during the course of construction, that one or more of its castings require replacement, the UTILITY may authorize the COMMONWEALTH to acquire the casting(s) on the open market or from the UTILITY.
6. Upon completion of the work by the COMMONWEALTH to the satisfaction of the UTILITY, the COMMONWEALTH shall certify to the UTILITY the adjustment costs, and the UTILITY shall pay to the COMMONWEALTH said costs within 60 days of receipt of an invoice from COMMONWEALTH.
7. Where the UTILITY supplies materials to the COMMONWEALTH, and/or performs any additional work either with its own contractor or its own forces, the UTILITY shall cooperate with the COMMONWEALTH in such a manner as not to interfere with or hinder the progress of the COMMONWEALTH'S construction and/or improvement project. In this connection, UTILITY will indemnify, save harmless and, if requested, defend the COMMONWEALTH, and all of its officers, agents and employees from losses resulting from any suits, actions or claims of any character, name and description, brought for or on account of any injuries or damages received or sustained by any person, persons, or property, during or as a result of the performance of the work on the aforesaid construction and improvement project if and only to the extent that the cause of such injury or damage is determined with finality to have been the conduct of UTILITY or UTILITY'S contractor, servants, agents and employees, whether the same be due to the use of defective materials, defective workmanship, neglect in safeguarding the work or to any act, omission, neglect or misconduct of UTILITY'S contractor, servants, agents and employees during the performance of said work.
4
8. (a) In the event of a controversy or claim arising from this Agreement, the UTILITY must, within six (6) months after the cause of action accrues, file a written notice of controversy or claim with the COMMONWEALTH'S Contracting Officer, identified below, for a determination. The Contracting Officer shall send his written determination to the UTILITY. The decision of the Contracting Officer shall be final and conclusive unless, within thirty (30) days after receipt of such written determination, the UTILITY then files a claim with the Board of Claims of the Commonwealth of Pennsylvania. Pending a final judicial resolution of a controversy or claim, the UTILITY shall proceed diligently with the performance of the Agreement in a manner consistent with the interpretation of the Contracting Officer; and the UTILITY shall compensate the COMMONWEALTH pursuant to the terms of the Agreement.
(b) The Contracting Officer for this Agreement is
District Executive
Pennsylvania Department of Transportation
Engineering District 6-0
7000 Geerdes Blvd
King of Prussia, PA, 19406
(c) In accordance with Section 1724(a)(2) of the Commonwealth Procurement Code, as amended, 62 Pa. C.S. § 1724(a)(2), the parties hereto expressly agree to utilize the Board of Claims to arbitrate disputes arising from this Agreement. If the UTILITY is dissatisfied with a final determination issued by the Contracting Officer in accordance with Paragraph 8(a), then it may file a statement of claim with the Board of Claims within six (6) months of the issuance of the Contracting Officer's determination or within six (6) months of the date the claim is deemed denied, whichever occurs first, as provided by Sections 1724(c) and 1725(a) of the Commonwealth Procurement Code, as amended, 62 Pa. C.S. §§ 1724(c), 1725(a).
9. Where the COMMONWEALTH performs casting adjustments by its contractor as provided above, the COMMONWEALTH agrees to require its contractor to indemnify and save the UTILITY and all of its officers, agents, and employees harmless from all suits, actions, or claims of any character, name, and description, relating to personal injury or property damage received or sustained during the performance of the work on the Project by or from the COMMONWEALTH'S contractor, its officers, agents, and employees, whether the same be due to the use of defective materials, defective workmanship, neglect in safeguarding the work or by or on account of any act, omission, neglect, or misconduct of the contractor, its officers, agents, and employees during the performance of said work and during the effective period of this Agreement.
Notwithstanding the arbitration provision in Paragraph 8, where the COMMONWEALTH performs casting adjustments by its own forces as provided above, the COMMONWEALTH agrees to pay for any loss, liability, or expense, related to any personal injury or property damage claim, which arises out of or relates to the COMMONWEALTH'S acts or omissions with respect to such work, where a final determination of liability on the part of the COMMONWEALTH is established by a court of law or where settlement has been agreed to by the COMMONWEALTH. This provision shall not be construed to limit the COMMONWEALTH'S rights, claims, or defenses which arise as a matter of law or pursuant to any other provision of this Agreement. This provision shall not be construed to limit the sovereign immunity of the COMMONWEALTH.
5
10. It is agreed by the Parties hereto that, upon completion of said improvement and construction project, the aforesaid UTILITY facilities affecting the section of State highway so improved shall be subject to the terms and conditions of the COMMONWEALTH'S existing permit issued to UTILITY therefor and that UTILITY shall maintain and keep in good repair the said facilities adjusted under the terms of this Agreement in accordance with applicable State laws, except as otherwise provided hereafter.
11. Notwithstanding anything contained herein to the contrary in the event the Pennsylvania Public Utility Commission assumes jurisdiction of a specific project under the Public Utility Code of 1978, Act of July 1, 1978, P.L. 598, as amended, the Parties hereto agree to be bound by any orders of the Commission or decisions of an appropriate tribunal after the exhaustion of all appeals from such orders.
12. In the event that the UTILITY withdraws its request at a time subsequent to the awarding of the contract for construction, then in that case the UTILITY shall reimburse COMMONWEALTH for all necessary costs, if any, incurred by the COMMONWEALTH for necessary labor and materials, if any, employed in the adjustment of the UTILITY'S castings up to the time of withdrawal. UTILITY shall also be responsible for the cost of necessary materials ordered by the COMMONWEALTH for adjustment of the UTILITY'S castings prior to UTILITY'S withdrawal if the order for said materials cannot be cancelled and if the materials cannot be used elsewhere in the project. Costs incurred by the COMMONWEALTH for engineering requested by UTILITY shall be reimbursed to COMMONWEALTH by separate agreement.
13. In the event COMMONWEALTH decides not to construct the project or decides to delay the construction beyond the contemplated construction season, upon notification in writing to UTILITY of such cancellation or delay, the Project Letter Agreement (Attachment B) shall become null and void and neither Party shall be responsible to the other for any further costs. The failure of the COMMONWEALTH to give such notice in writing may be waived by the UTILITY and shall not preclude the discharge of UTILITY from all its obligations hereunder.
14. In the event COMMONWEALTH elects to adjust UTILITY'S castings with its own forces, rather than by contract, notice thereof in writing shall be given UTILITY by COMMONWEALTH, and UTILITY shall have the right to cancel or withdraw its agreement to have COMMONWEALTH include the adjustment of UTILITY'S castings in COMMONWEALTH'S improvement and/or construction project.
15. The Pennsylvania Right-to-Know Law, 65 P.S. §§ 67.101—3104, applies to this Agreement. Therefore, this Agreement is subject to, and East Goshen Township shall comply with, the clause entitled Contract Provisions – Right to Know Law 8-K-1532, attached as Attachment "C " and made a part of this Agreement. As used in this Agreement, the term "Contractor" refers to East Goshen Township.
16. It is further agreed that casting adjustment costs set forth in Paragraph 4 shall take effect for projects let by the COMMONWEALTH from October 1, 2014, and shall continue through September 30, 2017. This agreement shall not exceed a three year term.
6
IN WITNESS WHEREOF, the COMMONWEALTH and the UTILITY have caused this Agreement to be duly executed, ensealed and attested by their proper officials, pursuant to due and legal action authorizing the same to be done, the day and year first above written.
ATTEST:
by ________________________ ________________________
Signature Date
________________________
Title
EAST GOSHEN TOWNSHIP
by ________________________ ________________________
Signature Date
________________________
Title
If a Corporation, the President or Vice President must sign and the Secretary, Treasurer, Assistant Secretary or Assistant Treasurer must attest; if a sole proprietorship, only the owner must sign; if a partnership, only one partner need sign; if a limited partnership, only the general partner must sign.
If a Municipality or Authority a resolution for signature authority must be attached.
Do not write below this line – for Commonwealth use only
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
by ________________________ ________________________
District Utility Manager Date
PRELIMINARILY APPROVED
by ________________________ ________________________
Assistant Counsel Date
Funds Commitment Document Number ________________________
Certified Funds Available under SAP Number ________________________
SAP Cost Center ________________________
GL Account ________________________
Amount ________________________
SAP Vendor Number ________________________
by ________________________ ________________________
Signature Comptroller Date
APPROVED AS TO LEGALITY AND FORM
by ________________________ ________________________
Chief Counsel Date
by ________________________ ________________________
Deputy Attorney General Date
by ________________________ ________________________
Deputy General Counsel Date
$________________________
Preapproved form:
GC No. 18-FA-52.1
Appv'd OAG 04/16/2014
ATTACHMENT A
2014-2017
ITEM 9999-9950 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Concrete Base
9999-9951 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Flexible Base
9999-9952 16 to 36 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Concrete Base
9999-9953 16 to 36 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Flexible Base
9999-9954 37 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Concrete Base
9999-9955 37 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type A - Flexible Base
This work shall consist of the resetting or grade adjustment of an existing utility casting for a vertical height of 8 inches or less, in accordance with Section 606 (Grade Adjustment of Existing Miscellaneous Structures) and within reasonably close conformity to the lines and grades shown on the drawings or established by the engineer. The casting diameter shall be determined by measuring the diameter of the lid. The base course replaced shall be of the same type removed, either concrete or flexible.
The resetting or adjustment shall be completed in a one-step operation with no temporary work anticipated. Any other change to castings shall be the responsibility of the contractor and shall be repaired or replaced at his expense.
The existing castings shall be carefully removed and cleaned, the casting reset to the proper elevation on a brick and mortar bed in accordance with (the Utility Company's specifications if attached) Section 606. Inserts, extensions or risers are not acceptable under this item. Castings requiring replacement will be provided for and delivered to the site by the Utility Company for installation by the contractor.
This item will not include any adjustment to the conical section of a manhole. That work, if required, will be paid under Item 9999-9962 Utility Manhole Neck Rebuilding.
This work will be measured by the unit each, after completion and acceptance by the Utility and the Department.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department, complete in place as specified.
1
ATTACHMENT A (cont'd)
2014-2017
| ITEM | Description |
|---|---|
| 9999-9956 | 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Concrete Base |
| 9999-9957 | 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Flexible Base |
| 9999-9958 | 16 to 36 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Concrete Base |
| 9999-9959 | 16 to 36 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Flexible Base |
| 9999-9960 | 37 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Concrete Base |
| 9999-9961 | 37 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type B - Flexible Base |
This work shall consist of the resetting or grade adjustment of an existing utility casting for a vertical height of 8 inches or less, in accordance with Section 606 (Grade Adjustment of Existing Miscellaneous Structures) and within reasonably close conformity to the lines and grades shown on the drawings or established by the engineer. The casting diameter shall be determined by measuring the diameter of the lid. The base course replaced shall be of the same type removed, either concrete or flexible.
The adjustment (resetting) will be completed in a two-step operation when a casting reset at the proposed final grade will protrude more than 3 inches and may cause damage to vehicular traffic or be a safety hazard prior to paving. The first adjustment will be to a temporary grade that will permit traffic to move safely over the casting. The second adjustment will be to the final grade for paving. The contractor is permitted to use steel plates in lieu of the temporary (first) adjustment for a period not exceeding five calendar days. The contractor shall be required to provide a means of access to each utility facility so that one man may enter the facility within 30 minutes without special equipment or tools. The facility location and name of utility shall be temporarily marked for emergency use. Any other change to the castings shall be the responsibility of the contractor and shall be repaired or replaced at his expense.
The existing castings shall be carefully removed and cleaned, the casting reset to the proper elevation on a brick and mortar bed in accordance with the utility specifications if attached or with Section 606. Inserts, extensions or risers are not acceptable under this item. Castings requiring replacement will be provided for and delivered to the site by the Utility Company for installation by the contractor.
This item will not include any adjustment to the conical section of a manhole. That work, if required, will be paid under Item 9999-9962 Utility Manhole Neck Rebuilding.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department complete in place as specified.
2
ATTACHMENT A (cont'd)
2014-2017
ITEM 9999-9962 Utility Manhole Neck Rebuilding
This work shall consist of rebuilding manhole necks any size or type for a vertical distance in excess of eight inches and resetting the existing casting within reasonable close conformity to the lines and grades shown on the drawings or established by the engineer. Only those requiring rebuilding, as determined by the Utility Company and engineer, will be measured for payment.
The existing casting will be carefully removed and cleaned. The neck shall be adjusted using brick and mortar as required. The casting shall then be set and sealed with mortar on the neck at the proper elevation for paving. If the utility and the engineer determine that the existing manhole deck is in unsatisfactory condition or cannot be adjusted, then the neck shall be removed and rebuilt as required. Any exposed brick shall be parged. All work shall be in accordance with (the Utility Company's specifications if attached) Section 600 (Incidental Construction).
This work shall be measured by the vertical foot with a minimum measurement of one foot. Where a manhole is rebuilt for a height of more than one foot, the additional height will be measured and paid to the next foot.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department, complete in place as specified.
ITEM 9999-9963 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type C
9999-9964 16 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type C
This work shall consist of the resetting or grade adjustment of an existing utility casting by means of a one-piece prefabricated adjustment riser for a vertical height of greater than 0 inches and less than 3 inches in accordance with Section 606 (Grade Adjustment of Existing Miscellaneous Structures) and within reasonable close conformity to the lines and grades shown on the drawing or established by the engineer. The casting diameter shall be determined by measuring the diameter of the lid.
The resetting or adjustment shall be completed in a one-step operation with no temporary work anticipated. Any other change to casting shall be the responsibility of the contractor and shall be repaired or replaced at his expense.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department, complete in place as specified.
3
ATTACHMENT A (cont'd)
2014-2017
| ITEM | Description |
|---|---|
| 9999-9965 | 0 to 15 inch diameter Utility Casting Adjustment for Resurfacing - Type D |
| 9999-9966 | 16 to 54 inch diameter Utility Casting Adjustment for Resurfacing - Type D |
This work shall consist of the resetting or grade adjustment of an existing utility casting by means of a one-piece prefabricated adjustment riser for a vertical height of greater than 3 inches and less than 4 inches in accordance with Section 606 (Grade Adjustment of Existing Miscellaneous Structures) and within reasonable close conformity to the lines and grades shown on the drawing or established by the engineer. The casting diameter shall be determined by measuring the diameter of the lid.
The resetting or adjustment shall be completed in a one-step operation with no temporary work anticipated. Any other change to casting shall be the responsibility of the contractor and shall be repaired or replaced at his expense.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department, complete in place as specified.
Item 9999-9967 201 Box Adjustment for Resurfacing
This work shall consist of the resetting or grade adjustment of an existing utility 201 Box casting, in accordance with Section 606 (Grade Adjustment of Existing Miscellaneous Structures) and within reasonably close conformity to the lines and grades shown on the drawings or established by the engineer. The base course replaced shall be of the same type removed, either concrete or flexible.
The adjustment (resetting) will be completed in a two-step operation when a casting reset at the proposed final grade will protrude more than 3 inches and may cause damage to vehicular traffic or be a safety hazard prior to paving. The first adjustment will be to a temporary grade that will permit traffic to move safely over the casting. The second adjustment will be to the final grade for paving. The contractor is permitted to use steel plates in lieu of the temporary (first) adjustment for a period not exceeding five calendar days. The contractor shall be required to provide a means of access to each utility facility so that one man may enter the facility within 30 minutes without special equipment or tools. The facility location and name of utility shall be temporarily marked for emergency use. Any other change to the castings shall be the responsibility of the contractor and shall be repaired or replaced at his expense.
The existing casting will be carefully removed and cleaned, the casting reset to the proper elevation in accordance with the utility specifications if attached or with Section 606 (Grade Adjustment of Existing Miscellaneous Structures). Inserts, extensions or risers are not acceptable under this item. Castings requiring replacement will be provided for and delivered to the site by the Utility Company for installation by the contractor.
4
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department complete in place as specified.
Purchase of Sewer and Water Castings
Where it is determined prior to the Notice to Proceed Date, that the sewer and water castings are needed for adjustments due to type of resurfacing alternate selected, the contractor will be ordered to purchase the castings and will be reimbursed the amount of the invoice price plus ten percent for handling.
Where it is determined during construction, that the sewer and water castings are needed for adjustments, and upon concurrence by the Utility Company, the contractor will be ordered to purchase the castings in accordance with Section 104.03 (Extra work).
The existing casting shall be carefully cleaned, the casting adjusted to the proper elevation by placing the riser over the cover for initial fit and 100% contact, then tighten the turnbuckle with wrench for swedge fit in accordance with (the Utility Company's specifications if attached) Section 606. Turnbuckle will be installed so as not to protrude into manhole crawl area.
Only one (1) riser will be applied to each casting adjustment and will not be applied to existing risers.
Units with two-piece risers, vertical elevating bolts, or with more than one (1) turnbuckle will not be accepted.
This item will not include any adjustment to the conical section of a manhole. That work, if required, will be paid under Item 9999-9962 Utility Manhole Neck Rebuilding.
This work will be measured by the unit each, after completion and acceptance by the Utility and the Department.
This work will be paid for at the respective predetermined contract unit price each, which price will be indicated in the proposal by the Department, complete in place as specified.
5
Agreement No.
SAP Customer No.
ATTACHMENT B
2014-2017 PROJECT LETTER AGREEMENT
Incorporated Work
This Project Letter Agreement, numbered ________ in COMMONWEALTH files, made and entered into this __________ day of ____________, between the undersigned Parties pursuant to the terms and conditions of the Master Agreement for the adjustments of Incorporated Utility Facilities, bearing No. ____________ in COMMONWEALTH'S files, dated__________, between the undersigned Parties in consideration of the mutual promises herein contained, and with intent to be legally bound hereby, agree that the COMMONWEALTH, in accordance with this Project Letter Agreement dated as above, will make adjustments to the Utility's castings to accommodate construction on State Route/Work Order No. ______________ in ____________ County.
The estimated number of castings to be adjusted and the cost of each are shown on the attached listing. Casting adjustment costs are established by said Master Agreement, and are estimated to be a total cost of $____________. The Utility agrees to reimburse the COMMONWEALTH for this work in accordance with the Master Agreement. In the event the actual number of castings to be adjusted changes from the estimated number shown above, the Utility agrees to reimburse COMMONWEALTH for the actual number of adjusted castings based on the unit costs shown in the Master Agreement and Exhibit 1, incorporated herein and made a part hereof, to this Letter Agreement.
The Pennsylvania Right-to-Know Law, 65 P.S. §§ 67.101—3104, applies to this Agreement. Therefore, this Agreement is subject to, and Utility Name shall comply with, the clause entitled Contract Provisions – Right to Know Law, attached as Exhibit "2 " and made a part of this Agreement. As used in this Agreement, the term "Contractor" refers to Utility Name.
WHEREAS, all utility work performed pursuant to this Agreement must comply with the "Buy America" provisions in 23 U.S.C. §313 and 23 CFR Part 635.410.
All terms and conditions of said Master Agreement not inconsistent herewith, shall remain in full force and effect.
1
IN WITNESS WHEREOF, the COMMONWEALTH and the UTILITY have caused this Agreement to be duly executed, ensealed and attested by their proper officials, pursuant to due and legal action authorizing the same to be done, the day and year first above written.
ATTEST:
by ________________________ ____________________
Signature Date
by ________________________ ____________________
Signature Date
____________________________
Title
____________________________
Title
If a Corporation, the President or Vice President must sign and the Secretary, Treasurer, Assistant Secretary or Assistant Treasurer must attest; if a sole proprietorship, only the owner must sign; if a partnership, only one partner need sign; if a limited partnership, only the general partner must sign.
If a Municipality or Authority a resolution for signature authority must be attached.
Do not write below this line – for Commonwealth use only
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
by ____________________________________ ____________________
District Utility Manager Date
APPROVED AS TO LEGALITY AND FORM
PRELIMINARILY APPROVED
by ____________________________________ ____________________
Chief Counsel Date
by ____________________________________ ____________________
Assistant Counsel Date
Funds Commitment Document Number ____________________
Certified Funds Available under SAP Number ____________________
SAP Cost Center ____________________
GL Account ____________________
Amount ____________________
$ ____________________________________
SAP Vendor Number ____________________
by ____________________________________ ____________________
Signature Date
Comptroller
Preapproved form:
OGC No. 18-FA-52.1
Appv'd OAG 04/16/2014
2
ATTACHMENT B
2014-2017
Suburban
S.R.
County:
Utility:
EXHIBIT 1
PROJECT LETTER AGREEMENT
INCORPORATED WORK
Hereinafter set forth is the listing of anticipated castings which are being incorporated herein by this Agreement.
| Number of Castings | Bid Item | Unit Price | Total Cost |
|---|---|---|---|
| 9999-9950 | 484.00 | ||
| 9999-9951 | 464.00 | ||
| 9999-9952 | 553.00 | ||
| 9999-9953 | 527.00 | ||
| 9999-9954 | 864.00 | ||
| 9999-9955 | 824.00 | ||
| 9999-9956 | 816.00 | ||
| 9999-9957 | 694.00 | ||
| 9999-9958 | 814.00 | ||
| 9999-9959 | 860.00 | ||
| 9999-9960 | 1,330.00 | ||
| 9999-9961 | 1,474.00 | ||
| 9999-9962 | 391.00 | ||
| 9999-9963 | 250.00 | ||
| 9999-9964 | 404.00 | ||
| 9999-9965 | 279.00 | ||
| 9999-9966 | 465.00 | ||
| 9999-9967 | 808.00 |
3
Contract Provisions – Right to Know Law
a. The Pennsylvania Right-to-Know Law, 65 P.S. §§ 67.101-3104, (“RTKL”) applies to this Contract. For the purpose of these provisions, the term “the Commonwealth” shall refer to the contracting Commonwealth agency.
b. If the Commonwealth needs the Contractor’s assistance in any matter arising out of the RTKL related to this Contract, it shall notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Commonwealth.
c. Upon written notification from the Commonwealth that it requires the Contractor’s assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor shall:
- Provide the Commonwealth, within ten (10) calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Commonwealth reasonably believes is Requested Information and may be a public record under the RTKL; and
- Provide such other assistance as the Commonwealth may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, the Contractor must notify the Commonwealth and provide, within seven (7) calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Commonwealth will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Commonwealth determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Commonwealth determine that the Requested Information is clearly not exempt from disclosure, the Contractor shall provide the Requested Information within five (5) business days of receipt of written notification of the Commonwealth’s determination.
f. If the Contractor fails to provide the Requested Information within the time period required by these provisions, the Contractor shall indemnify and hold the Commonwealth harmless for any damages, penalties, costs, detriment or harm that the Commonwealth may incur as a result of the Contractor’s failure, including any statutory damages assessed against the Commonwealth.
Exhibit ”2”, Page 1 of 2
4
Contract Provisions – Right to Know Law
a. The Pennsylvania Right-to-Know Law, 65 P.S. §§ 67.101-3104, (“RTKL”) applies to this Contract. For the purpose of these provisions, the term “the Commonwealth” shall refer to the contracting Commonwealth agency.
b. If the Commonwealth needs the Contractor’s assistance in any matter arising out of the RTKL related to this Contract, it shall notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Commonwealth.
c. Upon written notification from the Commonwealth that it requires the Contractor’s assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor shall:
- Provide the Commonwealth, within ten (10) calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Commonwealth reasonably believes is Requested Information and may be a public record under the RTKL; and
- Provide such other assistance as the Commonwealth may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, the Contractor must notify the Commonwealth and provide, within seven (7) calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Commonwealth will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Commonwealth determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Commonwealth determine that the Requested Information is clearly not exempt from disclosure, the Contractor shall provide the Requested Information within five (5) business days of receipt of written notification of the Commonwealth’s determination.
f. If the Contractor fails to provide the Requested Information within the time period required by these provisions, the Contractor shall indemnify and hold the Commonwealth harmless for any damages, penalties, costs, detriment or harm that the Commonwealth may incur as a result of the Contractor’s failure, including any statutory damages assessed against the Commonwealth.
Revised February 1, 2010 Attachment “C” page 1 of 2
g. The Commonwealth will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Commonwealth decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, the Contractor shall indemnify the Commonwealth for any legal expenses incurred by the Commonwealth as a result of such a challenge and shall hold the Commonwealth harmless for any damages, penalties, costs, detriment or harm that the Commonwealth may incur as a result of the Contractor’s failure, including any statutory damages assessed against the Commonwealth, regardless of the outcome of such legal challenge. As between the parties, the Contractor agrees to waive all rights or remedies that may be available to it as a result of the Commonwealth’s disclosure of Requested Information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and shall continue as long as the Contractor has Requested Information in its possession.
Exhibit ”2”, Page 2 of 2
5
Memo
East Goshen Township
Date: August 17, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Ben Rohrbeck
I received the following e-mail from Chris Reardon.
As most of you know by now, Ben Rohrbeck, one of the true 'founding members' of the Historic Goshenville Blacksmith Shop, has passed away. Thank you for having the flag lowered, as a long serving member of the Historical Commission, a volunteer at all of our historic presentations, and as a Korean War vet. he is completely deserving of the honor!
The members of the Historical Commission have asked that you consider the mounting of a small plaque in the Blacksmith Shop to honor Ben. It is thanks to his hard work, his research, his donation of tools and other artifacts, his mentoring of numerous 'apprentice' blacksmiths and volunteers, and his hundreds of hours spent educating the children and adults in our community that has made Historic Goshenville come alive. We believe that a plaque is the least we can do to recognize his efforts.
With your permission, we will design and submit the plaque to you for approval, and then work with the appropriate maker to have it made. We further propose to have the plaque unveiled at our Historic Event on the first Saturday in June 2016. We hope that one or more of the Board of Supervisors would be available to present it.
F:\Data\Shared Data\ABC'S\Historical Commission\General\Rohrbeck 082615.docx
Local Traffic Advisory Committee
1580 Paoli Pike
West Chester, PA 19380
August 20, 2015
Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Re: Hershey Mill Estates
Dear Board Members:
At their meeting on August 20, 2015 the Local Traffic Advisory Committee (LTAC) discussed the possibility of installing speed humps in Hershey Mill Estates in order to deter cut thru traffic and reduce the speed of vehicles. The LTAC concluded that three speed humps could be installed on Tanglewood Drive. The approximate locations for the speed humps are 1523, 1541 and 1566 Tanglewood Drive. The Township Traffic Engineer will mark the centerline of each speed hump on the street prior to the Board’s meeting on September 1, 2015.
It was the consensus of the LTAC to recommend that the Board of Supervisors authorize the LTAC to conduct a public meeting to present this information to the residents and following this meeting distribute ballots to the residents.
Enclosed is a copy of Orth-Rodgers report for your use along with LTAC Process.
Sincerely,
Rick
Louis F. Smith, Jr.
Township Manager
Enclosure
Cc: Joe Devine, President Hershey’s Mill Estates HOA
F:\Data\Shared Data\ABC'S\Local Traffic Advisory Committee\Hershey Mill Estates\2014\Recommendation 082015.doc
REC 7-2-15
THE Burns GROUP
ENGINEERING AND CONSTRUCTION
MEMORANDUM
Hershey's Mill Estates – East Goshen Township
Traffic Calming Investigation
Per the October 21, 2014 HOA request and subsequent October 29, 2014 meeting of the LTAC at the Township building, Burns Engineering has compiled the results of traffic data collected at the intersections of Rt. 352 & Tanglewood Drive, Greenhill Road & Foxglove Lane and Hershey's Mill Road & Tanglewood Drive. Additional speed data was gathered near the intersections of Tanglewood & Candytuft and Tanglewood & the pool access.
License plate surveys were conducted at the access points to the community back on March 30 (PM peak period) and March 31 (AM peak period), 2015 while Immaculata University was in session. The survey was conducted between the hours of 7:00-9:30 AM and 4:00-6:00 PM in conjunction with roadway peak traffic periods and a review of the University's class schedules which indicated 13 – 8:00 AM, 2 – 9:00 AM and 26 – 9:30 AM classes being held. During the PM period, 1 – 4:00 PM, 11 – 4:30 PM, 1 – 5:00 PM, 1 – 5:30 PM and 5 – 6:00 PM classes were scheduled. These schedules indicate the majority of the commuting students might be seen during the survey period.
The license plate survey results indicate that we saw 15 AM cut-through motorists (out of a total 62 inbound motorists) and 6 PM cut-through motorists (out of a total 102 inbound motorists) observed.
Utilizing PennDOT's Traffic Calming Handbook, Publication No. 383 (July 2012) criteria, the following factor was evaluated:
Cut-through: When cut-through traffic is the primary issue, the cut-through traffic on the local residential street should be 40% or more of the total one hour, single direction volume. In addition, a minimum of 100 cut-through trips in one hour, in one direction, should be set as a minimum requirement.
As identified above, the 2 and 2.5 hour periods indicate 24.2% AM period cut-throughs and 5.9% PM cut-throughs. 48.3% of just the AM peak hour inbound trips are cut-throughs while 6.6% of the PM peak hour motorists are cutting through. The minimum number of 100 cut-throughs are not present, but due the low volumes experienced in the community, we feel this is not a relevant value to consider.
Another factor that was investigated was the speed of motorists traveling along Tanglewood Drive. Motorists' speeds were taken by use of a radar gun and found to be the following:
Tanglewood Drive (near Candytuft Lane)
– eastbound 33 MPH 85th percentile speed
– westbound 31 MPH 85th percentile speed
Burns Engineering, Inc. 222 Valley Creek Boulevard, Suite 140, Exton, PA 19341 phone: (610) 407-9700 fax: (215) 405-2510
Hershey's Mill Estates Traffic Calming Investigation
Page 2 of 2 – July 2, 2015
Tanglewood Drive (near pool access)
– eastbound 35 MPH 85th percentile speed
– westbound 32 MPH 85th percentile speed
The following criteria from the Traffic Calming Handbook was evaluated:
Speeding: When speeding is the primary concern, the 85th percentile speed should exceed 10 mph over the posted speed limit before traffic calming is considered.
- 85th percentile speed. (The 85th percentile speed is the speed at or below which 85 percent of the motorists on a street are traveling. This speed is often used as a measure of the upper limit of reasonable speeds for prevailing conditions.)
The posted speed of Tanglewood Drive is 25 MPH so we are seeing motorist speeds close to the 10 mph (35 MPH) criterion.
A quick comparison to the previous investigations we performed back in 2002 and 2007 indicated that cut-throughs and speeding were as follows:
| 2002 | 2007 | |
|---|---|---|
| Cut-Throughs | Not investigated | AM EB 54% WB 17% PM EB 7% WB 25% |
| Speeds | 32-35 mph | 25-30 mph |
Based on this current investigation, the trends within the development are relatively consistent over the years of investigations. Cut-through motorists during the AM period are over 40% of the total traffic seen within the development and presumably traveling at a higher rate of speed than the posted 25 mph speed limit. Speeds in general are above the posted limit and it is also assumed that several residents of the community travel above the posted limit.
The current findings, in our opinion, indicate a potential need for traffic calming measures due to the fact that residents have raised concerns numerous times since the formation of the LTAC. The 2007 investigation recommended pavement markings near the pool access area which has helped, but hasn't reduced speeding in the area. As the values indicate, speed and cut-throughs are very close to meeting criteria for traffic calming devises. Tanglewood Drive, in the areas between Candytuft & Mill Race, near 1545 Tanglewood and between Sleepy Hollow & Burning Bush, and in our opinion, is a candidate for traffic speed humps are proven to deter speeding while reducing the amount of cut-through motorists.
As per the LTAC process, the Township's Supervisors will first have to concur with these findings and then 70% of the community directly affected by device placement must agree to the implementation via survey.
Prepared By,
THE BURNS GROUP
Dean J. Kaiser
DEAN J. KAISER, P.E., PTOE
Principal Traffic Engineer
East Goshen Township Local Traffic Advisory Committee
The Local Traffic Advisory Committee (LTAC) consists of the Township Engineer, Township Traffic Engineer and a representative from the Goshen Fire Company and the Westtown East Goshen Regional Police Department.
The LTAC will coordinate all requests for traffic calming measures and make recommendations as to their installation or implementation to the Board of Supervisors.
Generally requests for traffic calming measures will only be considered from civic or homeowners associations unless one does not exist for the neighborhood or area in question. If a civic or homeowners association does not exist the LTAC may accept a petition signed by at least 10% of the homeowners in the neighborhood.
The review and approval process shall be generally in accordance with the procedure set forth in PennDOT Publication 383 (7-12) summarized as follows:
- Upon receipt of a request the LTAC shall meet with representatives from the neighborhood and determine the project area that would be directly affected by the installation of traffic calming measures.
- The Township Traffic Engineer shall perform a study to determine the average daily traffic volume, 85 th percentile speed, and the percentage of cut-through traffic (if needed) in the project area.
- The LTAC shall review the aforesaid study and make a recommendation to the Board of Supervisors as to whether some type of traffic calming measure would be appropriate to correct the problem and if so what measures should be considered.
- The Board of Supervisors (Board) shall review the request, traffic study, and recommendation and in their sole discretion shall determine whether or not the LTAC should proceed.
- Upon a positive decision from the Board the LTAC shall conduct at least one public meeting with the residents/businesses located within the project area to present the traffic calming measures that are proposed.
- The LTAC shall send a survey, outlining their findings, to each household and/or businesses in the project area seeking their approval to proceed with the installation of the traffic calming measure or measures.
- Upon the receipt of affirmative responses from 70% of those surveyed, the LTAC shall prepare a cost estimate of the selected measure or measures and
shall forward their recommendation with all appropriate information to the Board for their review and approval.
- The Board, in their sole discretion, shall act on the recommendation as they see fit and advise the LTAC of their decision.
F:\Data\Shared Data\ABC'S\Local Traffic Advisory Committee\LTAC Process 2014.doc
Memo
To: Board of Supervisors
From: Park Commission
Re: Tennis Keys – Analysis and Recommendation
Date: August 7, 2015
Overview:
The Park Commission conducted a trial period of keeping the tennis courts unlocked, with the hypothesis that unlocked courts would drive additional players to the courts. This trial period formally ended on July 15, but is still ongoing.
Analysis:
Play has significantly increased since the locks were removed. On a given weeknight when locked, 1-2 courts would be used between 5pm-8pm sporadically. Each Thursday, during the Farmers Market, the Director of Recreation has noted the number of players at 6pm and again at 7:15pm. On all occasions between May 15th and July 15th, there were at least 2 courts being used and on more than half the occasions all four playable courts were in use. Betsy Williams, Park Commission Member and tennis player, has seen similar increases in play on other weeknights and weekends. Play has at least doubled since the locks were removed. There have been neither signs of vandalism nor signs of bike or skateboard use.
Motion:
I move to remove the tennis court locks for the remainder of the calendar year and revisit their need for 2016.
Computer/H:/East Goshen Township/Budget
Memo
East Goshen Township
Date: August 24, 2015
To: Board of Supervisors
From: Rick Smith, Township Manager
Re: Pond Treatment
Background - In addition to the Milltown Reservoir and Hershey's Mill Pond (that has been drained) the Township has six ponds and/or wet retention basins (ponds).
The majority of the Township ponds have an algae problem, which is common to ponds that that receive stormwater and surface runoff from suburban lawns. The December 1994 Weston Report (attached) is an excellent primer on this subject. Under the Township current action plan which dates back to 1997, the Township uses chemicals to control the algae and no longer mows to the water's edge. In addition we recently installed aerators at two of the ponds.
We spend ~$8,500 a year to control the algae at four of the ponds in addition to the electric cost for the aerators. The outfalls from the ponds (with the exception of the Bow Tree II & III Farm Pond) are inspected over a five year period as part of the MS4 program.
Current Status - On August 20, 2015 I inspected the six ponds and my comments are as follows:
Pin Oaks Farm Pond (.25 acres with an average depth of 4 feet) – The algae coverage was about 30%. The pond was drained and dredged 1996 or 97. We installed an aerator in 2007 ($7,500). According to our current pond contractor, it typically experiences an algae bloom after a rain event which is indicative of nutrients entering the pond. We currently treat this pond.
Bow Tree I Wet Basin (1 acre in area with an average depth of 2 feet) – The algae coverage was 100%. It does not have an aerator (it is not deep enough for an aerator to be effective). We attempted to treat it with barley in 2013 and it did not work. We currently are not treating this pond. The discharge from this pond was inspected on 10/2/14 did not have any of the indicators attributable to an illicit discharge.
Bow Tree II & III Farm Pond (1 acre in area with an average depth of 4 feet) – There was no algae on the pond. We installed an aerator in 2009 ($8,500). We currently treat this pond. This pond discharges to the Bow Tree II & III Wet Basin via a concrete channel.
Bow Tree II & III Wet Basin (1 acre in area with an average depth of 2 feet) – The algae coverage was 80%. It does not have an aerator (it is not deep enough for an aerator to be effective). We currently treat this pond.
Marydell Wet Basin (2 acres in area with an average depth of 2 feet) - The algae coverage was 50%. (On August 26 it was down to 25%) It does not have an aerator. In 2011 we looked into installing one at an estimate cost of $11,000. However, our pond contractor advised us the pond was not deep enough to make an aerator worthwhile, so we abandoned the idea. We currently
treat this pond. The discharge from this pond was inspected on 5/30/15 and observed to have a blue color with was attributed to the algae treatment.
Hershey Mill Estates Wet Basin (.25 acres in area with an average depth 3 feet) – There was no algae on the pond. It does not have an aerator. We attempted to treat it with barley in 2013 and it did not work. We currently do not treat this pond.
Based on antidotal information, with the exception of a few calls about the Bow Tree I Pond, the Township does not receive any calls from residents about the condition of the ponds.
Options
We could dredge the other ponds to remove the sediment and deepen the ponds.
Note: The Charter Chase HOA is currently in the process of dredging their pond (1.5 acres). A team of divers utilize a pump that pumps sediment laden water to a large silt bag. The bag retains that silt, which is allowed to dry for several months and then spread on the ground. The advantage is that they did not have to drain the pond and the cost was reasonable (<$50,000).
We could stop the chemical treatment and turn off the aerators. Obviously, the homeowners adjacent to the ponds would be opposed to this.
We could convert the ponds to “Constructed Wetlands” which are a Best Management Practice (BMP) approved by the PA DEP to improve water quality (See attached).
Note: Under the draft MS4 Permit being developed by PA DEP, in 2018 East Goshen will have to implement projects to remove sediment from stormwater and Constructed Wetlands BMPs do this effectively.
Continue with the current course of action.
Discussion
I do not think is worth dredging the other ponds. As noted above in order to control the algae at the Pin Oaks Pond we dredged it to remove the sediment and deepen the pond. However, 18 years later we need to have an aerator and use chemicals to control the algae at this pond.
I do not think stopping the chemical treatment and turning off the aerators is feasible.
I believe that converting the ponds to Constructed Wetlands, is something that should be explored. However, the new MS4 permit will not go into effect until 2018.
The current course of action appears to be working and the cost is minimal.
Recommendation - I have asked our pond contractor to obtain the required PA DEP permits to treat the other two ponds and I would recommend continuing with our current course of action, and expanding it to include the other two ponds as necessary.
F:\Data\Shared Data\Public Works Dept\Pond Treatment\Memo to BoS 082415.doc
East Goshen Township Ponds
Remedial Action Plans
Prepared for
EAST GOSHEN TOWNSHIP
PAOLI PIKE
WEST CHESTER, PA
Prepared by
ROY F. WESTON, INC.
Weston Way
West Chester, PA 19380
December, 1994
TABLE OF CONTENTS
| Section | Title | Page |
|---|---|---|
| 1.0 | INTRODUCTION | 1 |
| 2.0 | SITE DESCRIPTION | 2 |
| 3.0 | POTENTIAL REMEDIAL MEASURES | 4 |
| 3.1 | Nutrient Source Reduction | 5 |
| 3.1.1 | Residents | 5 |
| 3.1.2 | Geese | 6 |
| 3.2 | Pond Maintenance | 7 |
| 3.2.1 | Mechanical | 7 |
| 3.2.2 | Biological | 9 |
| 3.2.3 | Chemical | 9 |
| 4.0 | RECOMMENDED ACTION | 10 |
| 4.1 | Education Program | 10 |
| 4.2 | Treatment | 11 |
i
1.0 INTRODUCTION
East Goshen Township has retained WESTON to assess the condition of seven ponds located in the Township and recommend remedial actions, as a appropriate, that will resolve the concerns expressed by local residents as to the condition of the ponds. The investigation was prompted by resident reports to the Township of odor and aesthetic problems with the ponds.
This is a common problem with ponds which receive nutrient rich stormwater and surface runoff from surrounding land. The high nutrient loads provide an abundant food source for the propagation of algae and rooted aquatic plants. The seven ponds located in East Goshen Township were examined in November 1994 for the presence of algae and rooted plants as well as the condition and use of adjacent land that had the potential to lead to eutrophication problems. The presence of these plants cause clarity problems during growth that may not be aesthetically pleasing and when the algae or plants die-off, low dissolved oxygen levels resulting from the decay of the plant materials may produce unpleasant odors.
The principal nutrients which can cause the abundant growth of algae and other plants are nitrogen and phosphorus. Common sources of these nutrients in stormwater runoff include lawn fertilizer residuals, wildfowl feces (especially geese), and domestic and feral animal feces. It is also worth noting that animals and geese also contribute fecal coliform bacteria to the water bodies and possibly pathogenic bacteria. Measures to eliminate the sources of these nutrients as well as the institution of controls within the ponds themselves are essential for long term control of the algal and plant growth.
This report will discuss the structure and condition of the seven ponds, potential measures to control or eliminate the algal and plant growth and the permit requirements of the remedial measures.
1
2.0 SITE DESCRIPTION
The seven ponds investigated in East Goshen Township include an old farm pond in Pin Oaks development, a stormwater control pond in the Mary Dell development, three stormwater ponds in Bow Tree development, and the old mill pond and an associated contributory stormwater pond in Hershey Mills. The following description of the site conditions are as observed in November 1994 which is rather late in the season to observe the actual problems reported by the residents.
Pin Oaks Farm Pond
The Pin Oaks farm pond is located in a stream channel which collects water from the stream, an old spring house and stormwater sewer outlets. During November, the pond was receiving a significant flow from the springhouse via a 6 inch PVC pipe and the stream through a 36 inch culvert under Brian Drive. A goose population was present in the area which was probably a migratory population. The pond would probably support one or two nesting pairs during the spring and summer months. Plant life identified in the pond included the algal and macrophyte species Wolffia spp., Lemna minor, Spirogyra spp. and Utricularia spp. The pond is surrounded by residential development.
Mary Dell Pond
The Mary Dell pond is located in the Mary Dell development and is a stormwater pond with no surface water contribution. Four stormwater outlets empty into the pond; these inlets are; one at 18 inches, two at 30 inches and one at 48 inches. The outlet structure is a concrete riser which discharges to a stream. During the November visit, water was discharging from the pond, but no inflow was noted, suggesting that active underground seeps contribute to the flow. An old springhouse is located near the pond but it was dry and there was no structure to convey water to the pond.
2
A goose population was present, and the presence of cracked corn suggests that residents are feeding the geese. Again, it is expected that this population is migratory or overwintering and not present year round.
No algae or other vegetative growth was noted at this pond.
Bow Tree I
The first Bow Tree pond is located on a tributary to Ridley Creek and is a man-made stormwater control pond with two 12 inch stormwater sewer contributing to the pond in addition to normal creek flow. The outlet structure is two concrete risers connected to twin 36 inch culverts. As with the previous ponds, a goose populations was present. The algae identified included Spirogyra spp. and witches hair. The tributary stream channel upstream from the pond was severely eroded suggesting high velocity flows occur during storm events which would bring abundant suspended solids and nutrients into the pond.
Bow Tree II
The second and third Bow Tree ponds are connected via a concrete spillway and are stormwater control structures. The second Bow Tree pond is fed by two stormwater sewers, 36 and 48 inches in diameter and has no natural inlet. No overflow was occurring at the time of inspection suggesting that no significant seeps are present to feed the pond. A goose population was present around the pond. The algae present in November include witches hair and green filamentous algae. A large mouth bass was found in the concrete spillway.
Bow Tree III
This pond is connected to Bow Tree II via a concrete spillway. In addition to the flows received from the upstream pond, this pond also has 36 inch and 12 inch diameter stormwater sewers contributing flow. The outlet structure is a concrete riser with a 24 inch diameters discharge
3
culvert. This pond also has a goose population. No obvious algae were present in this pond.
Hershey Mill Pond I
The Hershey Mill pond was constructed as part of the original mill that was once present. The flow to this pond are two streams which flow through wetlands. The streams collect stormwater from an upstream development. The outlet structure is a rock spillway approximately 25 feet across which contained 6 inches of water during the November visit. Only three waterfowl were present in this pond. A substantial goose population was present downstream in a pond fed from the Hershey Mill Pond. The green algal species Spirogyra sp. was present in this pond.
Hershey Mill Pond II
The second Hershey Mill pond is a man-made stormwater control pond. The inlet structure is a 6 foot flat bottom culvert which carries stream flow under Tanglewood Road. An additional 12 inch culvert was dry at the time of WESTON's inspection. The man-made pond appears to be fairly deep with little to no vegetation growth apparent. No geese were present at this pond.
3.0 POTENTIAL REMEDIAL ACTIONS
On the assumption that the principal cause of the problems leading to complaints from surrounding residents is the inflow of nutrients producing excessive algal and plant growth which leads to decay and associated odors in the hot summer months, measures should be taken to control the sources and properly maintain the ponds. In regard to pond maintenance, it is important to understand that ponds, especially those designed into the sub-division surface water system as stormwater retention basins, will evolve and change with time. This can be relatively rapid change where significant flows are experienced and leads to considerable settling out of suspended sediment. In addition to the physical changes such as a reduction in the design
4
volume, the biology will also change as depths reduce or ingrowth from the perimeter takes place.
Stormwater run-off to the ponds, whether from a natural stream, stormwater channel, or over land sheet flow will carry nutrients to the ponds. Geese, other waterfowl, and certain wild animals such as raccoons, muskrat, opossums and others will deposit fecal material into the ponds directly.
With these in mind, two actions are necessary to control and minimize algal and plant growth in the East Goshen ponds:
- source reduction and elimination,
- pond maintenance actions.
Nutrient source reduction would decrease the frequency of the algal blooms and pond maintenance actions will improve conditions so that they are less conducive to algal blooms and pond weed growth. The following suggests the possible remedial measures to be used.
3.1 Nutrient Source Reduction
3.1.1 Residents
The residential sources of nutrients (mainly phosphorus and nitrogen) are most likely from the use of lawn fertilizer by the residential community surrounding the ponds and the natural streams, potentially from poorly operating septic systems or leaking sewers and from fecal matter deposited by domestic pets. Fertilizers will be carried from the lawns by sheet flow stormwater runoff and by leaching to the groundwater which may recharge the streams and ponds at times of low flow, especially if springs are a source of water.
5
Measures to control the use of fertilizers in areas that drain to these ponds would significantly reduce the problem. Suggested actions include a public education program using flyers or neighborhood meetings to advise the residents of the effects of the widespread application of fertilizers and overuse of fertilizers. If public education is not successful the township will need to consider the cost of repeated treatment to control the algal blooms or the institution of local ordinances to control the use of fertilizers. Controls to consider could include limiting the number of applications allowed per year, restriction to Fall applications when run-off would not lead to algal growth, or measures to limit the loading of nitrogen and phosphorus on a per square yard or per acre basis. Some liaison and discussion with major suppliers of lawn care services to develop a cooperative approach in key areas of the developments would be potentially beneficial to ensure carefully controlled applications rather than any attempt at the restriction of services.
Education is the key in this option since enforcement by the Township would be difficult to impossible. The objective would be to lead the residents to the understanding that control of this significant aspect of the problem lies in their hands rather than with the Township.
3.1.2 Geese
Control of the goose population is necessary to eliminate the contributions of nitrogen to the ponds. There are two aspects of this part of the problem which can be controlled by both the residents and the Township.
As a part of an education program the residents should be helped to understand that they need to discourage the geese from using the ponds. Feeding of geese by residents should be stopped.
Geese like to have easy access into and out of the water and mowed areas which provide grass shoots and roots for grazing. As they graze the areas around the pond the geese continually defecate. It is worth noting in materials provided to the residents that this represents a health hazard, especially to children who might play in the area. The Township can discourage the use
6
of the ponds by geese by changing the landscape of the pond margins so that they are unsuitable for geese. This can still be done in such a way that it remains aesthetical pleasing for the residents.
Landscaping to minimize use of the pond by geese would involve the planting of shrubs or high grasses adjacent to the edge. Geese would be less attracted to the pond if a vegetation barrier was present.
An alternative approach to discouraging geese is the placement of barriers in the ponds close to the margins. A typical and successful approach which has been shown to be effective is to set a monofilament wire approximately 2 feet from the edge of a pond.
3.2 Pond Maintenance
Maintenance measures consist of mechanical, biological and chemical treatments. The following is a discussion of these treatment types, and whether they are used for algae, or rooted aquatic vegetation.
3.2.1 Mechanical
Mechanical measures to control rooted aquatic vegetation include:
- drawdown - lowering the water elevation a few feet,
- raking/cutting - physical removal of rooted aquatics, and
- sediment covering - placement of a cover over the nutrient rich sediments.
Mechanical measures to control excess nutrients and the associated algal blooms include:
- dilution/flushing - introducing sufficient flow to remove nutrients, and
- Dredging - removal of nutrient rich sediments.
7
Drawdown is the lowering of the water level one to three feet to remove root aquatic plants. It is typically done in early September to February, and the exposed sediment and the roots are subject to freezing and drying which will kill the roots. It is necessary to have a variable level outlet structure to lower the outlet elevation. It has been shown that the use of this method to remove rooted aquatic vegetation usually causes an algal bloom the following summer due to the decay and mineralization of the exposed vegetation.
Raking or cutting for the removal of rooted aquatic plants may be more easily used for small ponds. It involves the removal of the plant biomass from the pond and should be conducted when the plant biomass is greatest in mid-summer. Since this is a labor intensive effort, it may be considered only for smaller ponds or areas with limited plant biomass.
Sediment covering involves the placement of sheeting over the sediments to inhibit the resuspension of nutrients and to prevent rooted plants from establishing. Holes are placed in the sheeting to allow for the release of gases from decomposition. Some difficulties associated with this method can include the establishment of plants in the areas where holes are placed, and, with plants re-establishing in the new sediment deposited on top of the cap.
Dilution or flushing is used to remove excess nutrient or to remove algae from the pond. Dilution involves increasing the flows through the system, particularly when concentrated nutrients would be present to dilute the levels and flush excess nutrients downstream. This measure would need a source of water sufficient to flush the systems within 2 to 3 weeks. The preferred method is to have continuous low flow additions to the pond rather than intermittent high flow flushes. Sources of water may be clear stream water (which does not receive the nutrient laden runoff) or groundwater wells. This system is not used often because an additional source of water is necessary and the outlet structure, as well as the downstream channel must be able to handle the additional flows. It is unlikely to be feasible in the case of the East Goshen ponds.
Dredging or sediment removal is an effective technique for removal of nutrients and increasing pond depth. Several types of dredging machines are available for use depending upon the size
8
of site. For this measure it is necessary to identify a disposal location for the dredged material. In addition, the return flow must be treated with aluminum (see below, chemical treatments) to remove soluble nutrients. This method has been highly successful, however sediment removal and disposal can be costly.
3.2.2 Biological
Two methods of biological control can be used to control algae and plants. The first is by the introduction of a herbivorous fish, namely the grass carp. The grass carp has been used successfully in the west, however since it is not a native species most states have banned the introduction of grass carp into state waters. Pennsylvania is one of those states.
The second method involves biomanipulation of the food chain by the introduction of excess zooplankton which will feed on algae. This measure is the only one where nutrient additions would need to remain the same. A detailed study of the aquatic organisms currently inhabiting the pond would be conducted. If these are desirable predator fish, the addition of zooplankton may be relatively easy. If, however, the predator fish are not desirable because of their feeding habits, the existing populations may need to be exterminated and the pond food chain reconstructed. Intensive studies of the physical and chemical nature of the pond would be necessary to use this type of measure. For this reason it will not be considered for a remedial option for East Goshen ponds.
3.2.3 Chemical
Chemical treatment of ponds should only be considered as a last resort due to the detrimental effects of chemicals on all pond life and possible downstream effects. The use of aluminum salts are the preferred treatment since they bind phosphorus under different types of aquatic conditions forming a floc which quickly settles. Since the addition of the aluminum salt is a one-time treatment, significant sources of phosphorus should be eliminated prior to its use, because these additions will not be bound up by the aluminum. If sufficient aluminum is use, a chemical
9
barrier to phosphorus will created by the settled floc. The use of aluminum will affect the pH and alkalinity of the waterbody. Recommended chemicals for treatment are aluminum compounds such as sodium aluminate and aluminum sulfate; use of this combination avoids low pH and high dissolved aluminum concentrations, however, information on the volume of the lake, pH and water hardness will be necessary to calculate the dosage requirement.
4.0 RECOMMENDED ACTION
East Goshen Township requested that the remediation of Pin Oaks Pond be addressed as a case example to demonstrate the feasibility of proposed actions.
4.1 Education Program
This is to some extent independent of dealing with one particular pond and should be considered as a necessary program throughout the Township.
- A simple descriptive piece should be written which explains the nature of the problem and its most probable causes and distributed to residents throughout the Township but especially in the developments where complaints originated. In addition, and depending on the severity of the complaints and extent of concern in the neighborhoods, the Township might consider offering a township meeting to explain the problem and discuss the potential solutions.
- Efforts should be made to interest local newspapers in featuring the problem, publishing the piece which the Township prepares for distribution to residents, and giving an account of the Township's proposed actions.
- The Township should seek a meeting with the area management of the lawn care companies which provide fertilizing services to homeowners. This meeting has two objectives. The first is to reassure the companies that he Township does not
10
seek to restrict provision of services and the second to convince these companies to be a part of the solution by ensuring strict control over amounts of fertilizer applied through training of their staffs.
- Depending on the perceived severity of the problem, the number complaints received, and the response to the education program, the Township might wish to consider the possibility of ordinances to control the use of fertilizer and the feeding of geese.
4.2 Treatment
Pin Oaks Pond has been receiving sediments and nutrients for a number of years from the old farm and from the current residential development so that a fairly deep, nutrient rich sediment is expected to be present. The township has two options for treatment, chemical treatment or dredging of sediment. The chosen option will depend on the needs of the township.
The first option, chemical treatment, is a relatively simple operation to treat the excess nutrient present. The following describes the recommended approach.
- Some initial, simple analysis will need to be conducted to determine the volume, pH and hardness of the water in order to calculate the amounts and appropriate aluminum compounds necessary to precipitate the phosphorus. The township should consider the addition of enough aluminum to precipitate the available, soluble phosphorus and create a barrier to effectively bury phosphorus in the sediments.
- In addition, the township will need to complete an application to the Pennsylvania Fish Commission for the addition of the selected compound.
11
- After treatment the bank areas around the pond should be planted with shrubs and tall grasses to discourage use of the pond by geese. If this is unacceptable to neighbors the alternative is to install a monofilament line just below the normal water surface height two feet out from the banks.
If mixing within the pond does not occur stirring up the bottom sediments this treatment method should be effective for several years. The literature reports this as an effective treatment for 2 to 7 years.
The second option is to dredge the pond sediments. This option would be more costly and require greater permitting, however it would have a dual benefit of removing the excess nutrients and increasing the depth of the pond. The option would most likely result in more long term treatment. The following is the recommended approach to this option.
- The stream should be temporarily diverted around the pond and the sediment dredged to the banks where it is allowed to dewater. The dewatered sediment should then be used as clean fill at an appropriate site elsewhere in the Township. If downstream channel and conveyance structures permit, the stream diversion should be maintained through the winter to allow the frost to kill vegetative growth within the pond. Influent water from the spring should also be diverted during this period. Normal flows should be restored in the spring towards the end of March.
- After restoration of flows, the Township has the option to treat the re-established water body with aluminum compounds to precipitate out any remaining phosphate. Prior to the application of the aluminum compounds a relatively simple analysis of the water chemistry including pH, hardness and alkalinity, as well as an estimate of the volume would be necessary in order to determine the
12
correct amount to apply. This application would be done at the time of low flow to avoid losing the chemical in the outflow.
- After the removal of the dewatered sediment the bank areas around the pond should be planted with shrubs and tall grasses to discourage use of the pond by geese. If this is unacceptable to neighbors the alternative is to install a monofilament line just below the normal water surface height two feet out from the banks.
- An upland disposal for the sediment will need to be identified. Sampling of the sediment will be necessary to demonstrate that no hazardous materials are present.
Permitting requirements for this option would involve notification of the U.S. Army Corps of Engineers of the proposed dredging. The action would be covered under Nationwide Permits No. 35 and 16, for the dredging of an existing basin and the return water from an upland disposal site, respectively. The information that would need to be submitted to the Army Corps of Engineers includes site plans, proposed excavation depth, hydrologic calculations for the diversion, soil and erosion control plans, estimated volume of dredge materials, identification of an upland disposal site, and chemical characterization of the dredged materials, as well as other information.
13
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
BMP 6.6.1: Constructed Wetland
[Photo: Constructed wetland marsh system planted with emergent vegetation]
Constructed Wetlands are shallow marsh systems planted with emergent vegetation that are designed to treat stormwater runoff.
| Key Design Elements | Applications & Functions |
|---|---|
|
Potential Applications
|
|
Stormwater Functions
|
|
|
Water Quality Functions
|
363-0300-002 / December 30, 2006 Page 151 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
Description
Constructed Wetlands are shallow marsh systems planted with emergent vegetation that are designed to treat stormwater runoff. While they are one of the best BMPs for pollutant removal, Constructed Wetlands (CWs) can also mitigate peak rates and even reduce runoff volume to a certain degree. They also can provide considerable aesthetic and wildlife benefits. CWs use a relatively large amount of space and require an adequate source of inflow to maintain the permanent water surface.
Variations
Constructed Wetlands can be designed as either an online or offline facilities. They can also be used effectively in series with other flow/sediment reducing BMPs that reduce the sediment load and equalize incoming flows to the CWs. Constructed Wetlands are a good option for retrofitting existing detention basins. CWs are often organized into four groups:
- Shallow Wetlands are large surface area CWs that primarily accomplish water quality improvement through displacement of the permanent pool.
- Extended Detention Shallow Wetlands are similar to Shallow Wetlands but use extended detention as another mechanism for water quality and peak rate control.
- Pocket Wetlands are smaller CWs that serve drainage areas between approximately 5 and 10 acres and are constructed near the water table.
- Pond/Wetland systems are a combination of a wet pond and a constructed wetland.
Although this BMP focuses on surface flow Constructed Wetlands as described above, subsurface flow CWs can also be used to treat stormwater runoff. While typically used for wastewater treatment, subsurface flow CWs for stormwater may offer some advantages over surface flow wetlands, such as improved reduction of total suspended solids and oxygen demand. They also can reduce the risk of vectors (especially mosquitoes) and safety risks associated with open water. However, nitrogen removal may be deficient (Campbell and Ogden, 1999). Perhaps the biggest disadvantage is the relatively low treatment capacities of subsurface flow CWs – they are generally only able to treat small flows. For more information, please consult the "References and Additional Resources" list.
363-0300-002 / December 30, 2006 Page 152 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
Applications
- Alternating bands of deeper water and shallow marsh.
[Diagram: Schematic plan of constructed wetland with alternating bands of deeper water and shallow marsh. Labels: FOREBAY; INTERNAL SIDE SLOPES NO STEEPER THAN 4 HORIZONTAL TO 1 VERTICAL; EMERGENT VEGETATION ZONES (LESS THAN 18"); EXTERNAL SIDE SLOPES NO STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL; EMBANKMENT; OUTLET STRUCTURE; EMERGENCY SPILLWAY; OPEN WATER ZONES (1.5' - 6' DEEP); Maintenance Access.]
- Wet Pond/Wetland System
[Diagram: Schematic plan of a Wet Pond/Wetland System. Labels: INFLOW; WET POOL; SPILLWAY; WETLAND POND BUFFER (25' MINIMUM); FOREBAY 4'-6' DEEP; HIGH MARSH WEDGES (0-6" DEEP); MICRO-POOL 4'-6' DEEP; AQUATIC BENCH; LOW MARSH ZONE (UP TO 18" DEEP); MAINTENANCE ACCESS; MAXIMUM SAFETY STORM LIMIT; SAFETY BENCH; EMERGENCY SPILLWAY; OUTFALL; RISER / BARREL; RISER IN EMBANKMENT.]
363-0300-002 / December 30, 2006 Page 153 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
- Pocket Wetland
MAINTENANCE ACCESS
SWALE
FOREBAY
LOW MARSH ZONE (UP TO 18" DEEP)
HIGH MARSH WEDGES (0-6" DEEP)
MICROPOOL
SAFETY BENCH (IF NECESSARY)
BUFFER
HALF ROUND TRASH RACK
EMERGENCY SPILLWAY
MAXIMUM SAFETY STORM LIMIT
HIGH MARSH
EMBANKMENT
RISER
EMERGENCY SPILLWAY
100-YR STORM
10-YR STORM
2-YR STORM
1-YR STORM
5 MAX
INFLOW
FOREBAY
LOW MARSH
PERM POOL
POND DRAIN
REVERSE PIPE
BARREL
ANTI SEEP COLLAR
STABLE OUTFALL
- Offline Constructed Wetland
- Retrofit of existing detention basins
363-0300-002 / December 30, 2006
Page 154 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
Design Considerations
- HYDROLOGY. Constructed Wetlands must be able to receive and retain enough flow from rain, runoff, and groundwater to ensure long-term viability. Hydrologic calculations (or a water balance) should be performed to verify this. Shallow marsh areas can become dry at the surface but not for greater than one month, even in the most severe drought. A permanent water surface in the deeper areas of the CWs should be maintained during all but the driest periods. A relatively stable normal water surface elevation will reduce the stress on wetland vegetation. A CWs must have a drainage area of at least 10 acres (5 acres for "pocket" wetlands) or some means of sustaining constant inflow. Even with a large drainage area, a constant source of inflow can improve the biological health and effectiveness of a Constructed Wetland. Pennsylvania's precipitation is generally well distributed throughout the year and is therefore suited for CWs.
- UNDERLYING SOILS. Underlying soils must be identified and tested. Generally hydrologic soil groups "C" and "D" are suitable without modification, "A" and "B" soils may require a clay or synthetic liner. Soil permeability must be tested in the proposed Constructed Wetland location to ensure that excessive infiltration will not cause the CWs to dry out. If necessary, CWs should have a highly-compacted subsoil or an impermeable liner to minimize infiltration.
- PLANTING SOIL. Organic soils should be used for Constructed Wetlands. Organic soils can serve as a sink for pollutants and generally have high water holding capacities. They will also facilitate plant growth and propagation and may hinder invasion of undesirable species.
- SIZE AND VOLUME. The area required for a CWs is generally 3 to 5 percent of its drainage area. CWs should be sized to treat the water quality volume and, if necessary, to mitigate the peak rates for larger events.
- VEGETATION. Vegetation is an integral part of a Wetland system. Vegetation may help to reduce flow velocities, promote settling, provide growth surfaces for beneficial microbes, uptake pollutants, prevent resuspension, provide filtering, limit erosion, prevent short-circuiting, and maintain healthy bottom sediments (Braskerud, 2001). Constructed Wetlands should have several different zones of vegetation as described in Table 6.6.1-1. The emergent vegetation zone (areas not more than 18" deep) should comprise about 60 to 65 percent of the normal water surface area, although recommendations in recent literature range from less than 50 to over 80 percent. Robust, non-invasive, perennial plants that establish quickly are ideal for CWs. The designer should select species that are tolerant of a range of depths, inundation periods, etc. Monoculture planting must be avoided due to the risk from pests and disease. Use local recommended plant lists.
Table 6.6.1-1
| Vegetation Zone | Description |
|---|---|
| Open Water | Areas between 18 inches and 6 feet deep |
| Emergent | Areas up to 18 inches deep |
| Low Marsh | Portion of Emergent Zone between 6 and 18 inches deep |
| High Marsh | Portion of Emergent Zone up to 6 inches deep |
| Ephemeral Storage | Area periodically inundated during runoff events |
| Buffer | Area outside of maximum water surface elevation |
363-0300-002 / December 30, 2006 Page 155 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
[Photo: Vegetated constructed wetland pond with surrounding trees]
- CONFIGURATION. General. Constructed Wetlands should be designed with a length to width ratio of at least 2:1 wherever possible. If the length to width ratio is lower, the flow pathway through the CWs should be maximized. CWs should not be constructed within 10 feet of the property line or within 50 feet of a private well or septic system. CWs should be designed so that the 10-year water surface elevation does not exceed the normal water surface elevation by more than 3 feet. Slopes in and around Constructed Wetlands should be 4:1 to 5:1 (H:V) wherever possible. Constructed wetlands should be located outside of any natural watercourse.; Forebay/Inflows. Constructed Wetlands should have a forebay at all major inflow points to capture coarse sediment, prevent excessive sediment accumulation in the remainder of the CWs, and minimize erosion by inflow. The forebays should contain 10 to 15 percent of the total permanent pool volume and should be 4 to 6 feet deep (at least as deep as other open water areas). They should be physically separated from the rest of the wetland by a berm, gabion wall, etc. Flows exiting the forebay should be non-erosive to the newly constructed CWs. Vegetation within forebays can increase sedimentation and reduce resuspension/erosion. The forebay bottom can be hardened to facilitate sediment removal. Forebays should be installed with permanent vertical markers that indicate sediment depth. Inflow channels should be fully stabilized. Inflow pipes can discharge to the surface or be partially submerged. CWs should be protected from the erosive force of the inflow to prevent the resuspension of previously collected sediment during large flows. [Photo: Excavator and workers constructing a wetland forebay with rock stabilization] Vegetation and Open Water Zones. About half of the emergent vegetation zone should be high marsh (up to 6" deep) and half should be low marsh (6" to 18" deep). Varying depths throughout the CWs can improve plant diversity and health. The open water zone (approx. 35 to 40% of the total surface area) should be between 18 inches and 6 feet deep. Allowing a limited 5-foot deep area can prevent short-circuiting by encouraging mixing, enhance aeration of water, prevent resuspension, minimize thermal
363-0300-002 / December 30, 2006 Page 156 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
impacts, and limit mosquito growth. Alternating areas of emergent vegetation zone (up to 18 inches deep) and open water zone – as shown in Figures 6.13-2 and 6.13-4 – can also minimize short-circuiting and hinder mosquito propagation.
- Outlet. Outlet control devices should be in open water areas 4 to 6 feet deep comprising about 5 percent of the total surface area to prevent clogging and allow the CWs to be drained for maintenance. Outlet devices are generally multistage structures with pipes, orifices, or weirs for flow control. Orifices should be at least 2.5 inches in diameter and should be protected from clogging. Outlet devices should be installed in the embankment for accessibility. It is recommended that outlet devices enable the normal water surface to be varied. This allows the water level to be adjusted (if necessary) seasonally, as the CWs accumulates sediment over time, if desired grades are not achieved, or for mosquito control. The outlet pipe should generally be fitted with an anti-seep collar. Online facilities should have an emergency spillway that can safely pass the 100-year storm with 1 foot of freeboard. All outflows should be conveyed downstream in a safe and stable manner.
- Safety Benches. All areas that are deeper than 4 feet should have two safety benches, each 4 to 6 feet wide. One should be situated about 1 to 1.5 feet above the normal water elevation and the other 2 to 2.5 feet below the water surface.
- CONSTRUCTED WETLAND BUFFER. To enhance habitat value, visual aesthetics, and wetland health, a 25-foot buffer should be added from the maximum water surface elevation. The buffer should be planted with trees, shrubs, and native ground covers. Existing trees within the buffer should be preserved. If soils in the buffer will become compacted during construction, soil restoration should take place to aid buffer vegetation.
- MAINTENANCE ACCESS. Permanent access must be provided to the forebay, outlet, and embankment areas. It should be at least 9 feet wide, have a maximum slope of 15%, and be stabilized for vehicles.
- PLAN ELEMENTS. The plans detailing the Constructed Wetlands should clearly show the CWs configuration, elevations and grades, depth/vegetation zones, and the location, quantity, and propagation methods of wetland/buffer vegetation. Plans should also include site preparation techniques, construction sequence, as well as maintenance schedules and requirements.
- REGULATION. Constructed Wetlands that have drainage areas over 100 acres, embankments greater than 15 feet high, or a capacity greater than 50 acre-feet may be regulated as a dam by PADEP (see Title 25, Chapter 105 of the Pennsylvania Code).
Detailed Stormwater Functions
Volume Reduction Calculations
Although not typically considered a volume-reducing BMP, Constructed Wetlands can achieve some volume reduction through evapotranspiration, especially during small storms. An evapotranspiration study could be done to account for potential volume reduction credit. Hydrologic calculations that should be performed to verify that the CWs will have a viable amount of inflow can also predict the water surface elevation under varying conditions. The volume stored between the predicted water level and the lowest outlet elevation will be removed from the storm that occurs under those conditions.
Peak Rate Mitigation Calculations
Peak rate is primarily controlled in Constructed Wetlands through the transient storage above the normal water surface. See in Section 8 for Peak Rate Mitigation methodology.
363-0300-002 / December 30, 2006 Page 157 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
Water Quality Improvement
Constructed Wetlands improve runoff quality through settling, filtration, uptake, chemical and biological decomposition, volatilization, and adsorption. Constructed Wetlands are effective at removing many common stormwater pollutants including suspended solids, heavy metals, total phosphorus, total nitrogen, toxic organics, and petroleum products. The pollutant removal effectiveness varies by season and may be affected by the age of the wetland. It has been suggested that Constructed wetlands do not remove nutrients in the long term unless vegetation is harvested because captured nutrients are released back into the water by decaying plant material. Even if this is true, nutrients are generally released gradually and during the non-growing season when downstream susceptibility is generally low (Hammer, 1990). See in Section 8 for Water Quality Improvement methodology which addresses pollutant removal effectiveness of this BMP.
Construction Sequence
- Separate wetland area from contributing drainage area: All channels/pipes conveying flows to the Constructed Wetland must be routed away from the wetland area until it is completed and stabilized.; The area immediately adjacent to the Constructed Wetland must be stabilized in accordance with the PADEP’s Erosion and Sediment Pollution Control Program Manual (2000 or latest edition) prior to construction of the wetland.
- Clearing and Grubbing: Clear the area to be excavated of all vegetation.; Remove all tree roots, rocks, and boulders.; Fill all stump holes, crevices and similar areas with impermeable materials.
- Excavate bottom of Constructed Wetland to desired elevation (Rough Grading).
- Install surrounding embankments and inlet and outlet control structures.
- Grade and compact subsoil.
- Apply and grade planting soil. Matching design grades is crucial because aquatic plants can be very sensitive to depth.
- Apply geo-textiles and other erosion-control measures.
- Seed, plant and mulch according to Planting Plan
- Install any anti-grazing measures, if necessary.
- Follow required maintenance and monitoring guidelines.
363-0300-002 / December 30, 2006
Page 158 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
[Photograph showing installation or maintenance work in a stormwater management facility]
Maintenance Issues
Constructed Wetlands must have a maintenance plan and privately owned facilities should have an easement, deed restriction, or other legal measure to prevent neglect or removal. During the first growing season, vegetation should be inspected every 2 to 3 weeks. During the first 2 years, CWs should be inspected at least 4 times per year and after major storms (greater than 2 inches in 24 hours). Inspections should access the vegetation, erosion, flow channelization, bank stability, inlet/outlet conditions, and sediment/debris accumulation. Problems should be corrected as soon as possible. Wetland and buffer vegetation may require support – watering, weeding, mulching, replanting, etc. – during the first 3 years. Undesirable species should be removed and desirable replacements planted if necessary.
Once established, properly designed and installed Constructed Wetlands should require little maintenance. They should be inspected at least semiannually and after major storms as well as rapid ice breakup. Vegetation should maintain at least an 85 percent cover of the emergent vegetation zone. Annual harvesting of vegetation may increase the nutrient removal of CWs; it should generally be done in the summer so that there is adequate regrowth before winter. Care should be taken to minimize disturbance, especially of bottom sediments, during harvesting. The potential disturbance from harvesting may outweigh its benefits unless the CWs receives a particularly high nutrient load or discharges to a nutrient sensitive waterbody. Sediment should be removed from the forebay before it occupies 50 percent of the forebay, typically every 3 to 7 years.
Cost Issues
The construction cost of Constructed Wetlands can vary greatly depending on the configuration, location, site-specific conditions, etc. Typical construction costs in 2004 dollars range from approximately $30,000 to $65,000 per acre (USEPA Wetlands Fact Sheet, 1999). Costs are generally most dependent on the amount of earthwork and the planting. Annual maintenance costs have been reported to be approximately 2 to 5 percent of the capital costs although there is very little data available to support this.
Specifications:
The following specifications are provided for information purposes only. These specifications include information on acceptable materials for typical applications, but are by no means exclusive or limiting.
363-0300-002 / December 30, 2006
Page 159 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
The designer is responsible for developing detailed specifications for individual design projects in accordance with the project conditions.
- Excavation The area to be used for the CWs should be excavated to the required depth below the desired bottom elevation to accommodate any required impermeable liner, organic matter, and/or planting soil.; The compaction of the subgrade and/or the installation of any impermeable liners will follow immediately.
- Subsoil Preparation Subsoil shall be free from hard clods, stiff clay, hardpan, ashes, slag, construction debris, petroleum hydrocarbons, or other undesirable material. Subsoil must not be delivered in a frozen or muddy state.; Scarify the subsoil to a depth of 8 to 10 inches with a disk, rototiller, or similar equipment.; Roll the subsoil under optimum moisture conditions to a dense seal layer with four to six passes of a sheepsfoot roller or equivalent. The compacted seal layer shall be at least 8 inches thick.
- Impermeable Liner If necessary, install impermeable liner in accordance with manufacturer’s guidelines.; Place a minimum 12 inches of subsoil on top of impermeable liner in addition to planting soil.
- Planting Soil (Topsoil) See Local Specifications for general Planting Soil requirements.; Use a minimum of 12 inches of topsoil in marsh areas of the Wetland. If natural topsoil from the site is to be used it must have at least 8 percent organic carbon content (by weight) in the A-horizon for sandy soils and 12% for other soil types.; If planting soil is being imported it should be made up of equivalent proportions of organic and mineral materials.; Lime should not be added to planting soil unless absolutely necessary as it may encourage the propagation of invasive species.; The final elevations and hydrology of the wetland zones should be evaluated prior to planting to determine if grading or planting changes are required.
- Vegetation Plant Lists for Constructed Wetlands can be found in Appendix B. No substitutions of specified plants will be accepted without prior approval of the designer. Planting locations shall be based on the Planting Plan and directed in the field by a qualified wetland ecologist.; All wetland plant stock shall exhibit live buds or shoots. All plant stock shall be turgid, firm, and resilient. Internodes of rhizomes may be flexible and not necessarily rigid. Soft or mushy stock shall be rejected. The stock shall be free of deleterious insect infestation, disease and defects such as knots, sun-scald, injuries, abrasions, or disfigurement that could adversely affect the survival or performance of the plants.; All stock shall be free from invasive or nuisance plants or seeds such as those listed in Appendix B.; During all phases of the work, including transport and onsite handling, the plant materials shall be carefully handled and packed to prevent injuries and desiccation. During transit and onsite handling, the plant material shall be kept from freezing and shall be kept covered, moist, cool, out of the weather, and out of the wind and sun. Plants shall be watered to maintain moist soil and/or plant conditions until accepted.; Plants not meeting these specifications or damaged during handling, loading, and unloading will be rejected.
363-0300-002 / December 30, 2006
Page 160 of 257
Pennsylvania Stormwater Best Management Practices Manual
Chapter 6
- Detailed planting specifications can be found in Appendix B.
- Outlet Control Structure Outlet control structures shall be constructed of non-corrodible material.; Outlets shall be resistant to clogging by debris, sediment, floatables, plant material, or ice.; Materials shall comply with applicable specifications (PennDOT or AASHTO, latest edition)
References
Auckland Regional Council, 2003. Stormwater Management Devices: Design Guidelines Manual, Auckland, New Zealand
Braskerud, B.C. “Influence of Vegetation on Sedimentation and Resuspension of Soil Particles in Small Constructed Wetlands,” Journal of Environmental Quality, Vol. 30: pp. 1447-1457, 2001.
California Stormwater Quality Association, 2003. California Stormwater Best Management Practices Handbook: New Development and Redevelopment.
Campbell, C. and Ogden, M. Constructed Wetlands in the Sustainable Landscape. John Wiley & Sons Inc., 1999.
Caraco, D. and Claytor, R. Stormwater BMP Design Supplement for Cold Climates. 1997. USEPA BMP Fact Sheet
Atlanta Regional Commission. Georgia Stormwater Management Manual. 2004.
Hammer, D. (Editor). Constructed Wetlands for Wastewater Treatment. Lewis Publishers, 1990.
Center for Watershed Protection and Maryland Department of the Environment, 2000. 2000 Maryland Stormwater Design Manual, Baltimore, MD
University of California: Division of Agriculture and Natural Resources. Managing Mosquitos in Surface Flow Constructed Treatment Wetlands. 1998.
New Jersey Department of Environmental Protection, 2004. New Jersey Stormwater Best Management Practices Manual.
Pennsylvania Department of Environmental Protection, 2000. Erosion and Sediment Pollution Control Program Manual.
City of Portland Environmental Services, 2002. City of Portland Stormwater Management Manual: Revision #2.
Wetlands: Characteristics and Boundaries. Committee on Characterization of Wetlands, National Research Council (1995)
363-0300-002 / December 30, 2006
Page 161 of 257
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
AUGUST 4, 2015 – 7:00 pm
DRAFT MINUTES
Present: Chairman Marty Shane, Vice-Chairman Senya D. Isayeff, and Supervisors Janet Emanuel, Chuck Proctor, Carmen Battavio, Township Manager Rick Smith, Township CFO Jon Altshul and ABC Member Erich Meyer (Conservancy Board).
Call to order & Pledge of Allegiance:
Marty called the meeting to order at 7:00 pm and asked Carmen to lead the Pledge of Allegiance.
Moment of Silence:
Carmen called for a moment of silence to honor the members of the military around the world who serve to keep us safe and for their families.
Recording of Meeting:
No one indicated that they would be recording the meeting.
Candace Mulholland and Adam Farence, reporter and staff writer for the Daily Local News, advised the Board that they would be in attendance for the duration of the meeting.
Chairman’s Report:
- Marty announced that the Board will meet in Executive Session at 6:00 pm on August 5, 2015, to discuss a Police labor contract matter.
- Marty acknowledged Dan Truitt and staff member Joe Mobile in the audience.
- Marty recognized Roger P. Adams , P.E., Chief of Bureau of Waterways Engineering & Wetlands, Division of Dam Safety and Desmond Reynolds , P.E., Chief, Eastern Section, Bureau of Waterways Engineering & Wetlands, Division of Dam Safety, representatives from the Department of Environmental Protection, who were present and prepared to discuss the update on Dam Safety requirements.
Roger commented on the dams in Dan Truitt’s District, and most specifically about Milltown Dam, having been completed in 1924 as a water supply dam. East Goshen Township became the owner of it in 1985. As part of the National Dam Inspection Program, during the 1970’s, Milltown Dam (MTD) was classified as a “high hazard” dam because of the potential loss of life downstream in extreme rainfall conditions. At this time, the national standard was the Probable Maximum Precipitation (PMP), which was 34 inches of rainfall within a 24 hour period. In 1981, Milltown Dam only passed 30% of the PMP standard.
Marty asked about the classifications of dams. Roger said dams are rated in the following ways: A Dams— the largest, over 100 ft in depth; B Dams – 40-100 ft of depth; and C Dams – under 40 ft. in depth. The other standard is Hazard Potential Standards. #1 Dams have the potential to put over 10 lives at risk with property loss, #2 Dams have the potential to put 1-10 lives at risk;
8/4/2015
August 4, 2015 BOS Minutes
Page 1 of 7
#3 Dams may cause road flooding and some property damage; and #4 Dams cause no property damage. Hershey Mill Dam (HMD) is classified as a C-3 Level Dam; and Milltown Dam is classified as a C-1 Dam. Roger also brought copies of the evacuation plans for both Milltown Dam and Hershey Mill Dam. Rick commented that these evacuation plans are also published on the Township website.
Paul Knox, 40 Lochwood Lane, asked if any studies have been completed on flood protection that Milltown Dam provides and what the DEP’s recommendation would be for handling the MTD. Roger commented that there is no current study on flood protection provided by MTD, and that MTD has 5 feet of available storage before it tops over the dam. Roger said that the DEP is not biased about how to best handle the MTD situation and that they would work with the owners of the dam to handle this situation in the best manner possible.
John Smith, 26 Lochwood Lane: inquired about the changing standards of the DEP regarding rainfall levels for Dams. In 1985 the standard was 24 inches of rainfall for a 24 hour period, and now the standard is 36” within a 24 hour period. Roger answered that the system is now based on National Oceanic and Atmospheric Administration (NOAA) standards which increased the precipitation amounts and that the 2011 regulation change is based on the hazard potential of people downstream of the dam.
Richard Swenson, 20 Reservoir Road, asked what happens to the people downstream in the case of 36” of rain without the dam, and also in light of the high level of silt build up in the reservoir. Roger commented that half of the sediment would run out in this scenario.
Jim Brandolini, 1200 Burning Bush Lane, commented that he lives very close to the Hershey’s Mill Dam (HMD) and he has never seen the dam overflow. Greenhill Road floods, but he sees this more as a result of poor storm sewer drainage than due to the dam itself. He feels that if this dam is breached, there would a lot of property damage along Greenhill Road and asked how the amount of water draining through this area would be handled? Roger answered that HMD only needs to pass the 100 year water standard.
Chuck Heppler, 12A Reservoir Road, commented that MTD always has a level of water running over the top of the dam, and asked how the DEP would handle the loss of wildlife if the dam were breached. Roger said that the dam is at greatest risk when the entire reservoir is at maximum level and when the earthen part of the dam is topped over and that the PA Boat and Fish Commission would be involved in a dam breach scenario to protect wildlife. Mr. Heppler also asked whether there are any funding resources for dam reinforcement. Roger affirmed that there is state funding for breaching dams. Roger also commented that the DEP has no official timeline in this situation, but they want to see progress in handling the MTD situation.
Mike Lemicke, 4 Reservoir Road, questioned the accuracy of the water storage capacity numbers of the MTD Reservoir by the DEP and asked whether these dimensions could change or be changed as part of the Gannett Fleming study. He also asked if the DEP sees any environmental issues in a breach scenario. Roger said the DEP capacity numbers for the MTD Reservoir are studied very seriously and they are sure that there is an imminent issue at hand. He also stated that the DEP has not looked at environmental issues in this matter.
8/4/2015
August 4, 2015 BOS Minutes
Page 2 of 7
Chuck Heppler, 12A Reservoir Road, asked if there was another study being done by the DEP that would change the current number standards and when it would be completed. Roger said that there is a new study underway regarding Top Probable Mass, but that it would be completed in one to two years and that it would not be of help in the MTD situation because of timing.
Karen Jones, 21 Lochwood Lane, asked what would happen if the Township decided to do nothing with the MTD. Roger said the Township could be subject to legal action, including fines, if no progress is made regarding the MTD.
Antoinette Schorn, 28 Reservoir Road, said she has lived across from the MTD for over 48 years and has never seen a problem with flooding. She said the dam and reservoir are very dear to her heart, that she loves to see the multitude of wildlife in and around the area. She feels this area is a place of serenity and wonder and asked why the government can’t find the money necessary to rehab and fix the dam.
Georgine Whittum, 33 Lochwood Lane, asked what happens to the big drop-off on the downside of the dam if there is a breach, what happens to all the built up sediment in the reservoir, whether there are any models as to what the area would look like in a breach, and why there is building going on downstream of the Dam. She also asked if there was some need to breach the dam as opposed to spending the money to correct the dam? Rick answered that there is no building allowed in the 100 year flood plain area downstream and that diagrams are on the Township website that illustrate what the area would look like after a breach. Roger said that the built up sediment in the Reservoir would be removed in stages with stabilizing methods.
Jim Sealey, 47 Lochwood Lane, inquired about the Gannet Fleming study and the loss of life calculations. Marty commented that the Township decision will be based mostly on the findings in the Gannett Fleming report and that the Township will weigh all costs against the loss of life calculations. Marty also said that Hershey Mill Dam and the associated potential loss of life is very low compared to the MTD situation.
Jim Brandolini, 1200 Burning Bush Lane, asked if there was a way of reducing the water volume in the reservoirs and whether the Township could add a drainage pipe to the reservoir and/or re-contour the reservoirs. Roger answered that the water that flows through this area would still need to be addressed.
Eric Neast, from Gannett Fleming, said that a drainage pipe would not help in a 100 year storm scenario and that Gannett Fleming will look at overtopping designs and protections. He said another option would be to make the dam smaller and reduce the height of the dam so that it would no longer be under the DEP regulatory control. He also stated that the sediment buildup would most likely be an issue and that in a breach situation the Township would need to consider water channeling options. Marty commented that the Township had already considered reducing the reservoir size, but that the residents were opposed to this.
8/4/2015
August 4, 2015 BOS Minutes
Page 3 of 7
Georgine Whittum, 33 Lochwood Lane, thanked Mr. Neast for his explanation and commented that no one knows where the natural pattern of the water will flow in a breach situation, and that it may be more costly to handle the rechanneling of the water in a breach remedy.
Karen Jones, 21 Lochwood Lane, asked if there has been consideration given to water rechanneling in a breach remedy, and what happens to the current zoning in such a scenario? Marty answered that the Township is all built out in that area.
Carmen commented that he has noticed our storm patterns appear to occur more quickly and severely and asked if the DEP could be overreacting to these changes. Roger said that the DEP doesn’t create the storm reports, rather they are created by NOAA.
Chuck commented that he sees the MTD filling up with silt and significantly reducing the amount of water it can hold. He has noticed the same situation occurring in Ridley and Chester Creeks. Considering this situation problematic and one that would most likely require an expensive remedy, he suggested that the Township look at this issue on the whole and not just as it relates to dams.
Senya asked Roger what other communities have done in similar situations and whether Roger can provide a list of those communities with contact information. Roger answered that his department oversees approximately 25 dam removals per year and that he will look into this request and get back to the Board with names and contact information. Marty concurred that this was a good idea.
Senya asked Roger how much time could pass with the Township doing nothing about MTD before the DEP would start legal action. Roger said that would depend on where the MTD sits on the DEP’s list of “high hazard dams”. Roger was not able to say where the MTD is on that list, but that the list undergoes review every year.
Marty asked Roger how long the Township would have after the Gannett Fleming report is finalized and the Township had time to review it before the DEP would require the Township to start taking action on the MTD. Roger answered that DE{ would consider after approximately six months from the Gannett Fleming report finalization a reasonable amount of time for the Township to formulate a plan on MTD and to commence the remedy.
Marty asked for confirmation that if the MTD was built/reinforced to withstand a 100 year rainfall standard it would provide adequate protection downstream. Roger said that was correct.
Rick asked how the roadway downstream would be affected in overtopping situations during severe rainfall. Roger indicated that this would be something the Township would need to consider and that special concrete configurations are recommended for roadways in these types of areas.
Senya summarized that he sees the major issues to be weighed surrounding the MTD issue and other similar Dams that require rehabilitation are: the potential loss of life downstream of them; how much flood protection they provide; and the aesthetic nature they provide to the community.
8/4/2015
August 4, 2015 BOS Minutes
Page 4 of 7
Roger pointed out that the Federal Permit for the Hershey Mill Dam expires in June 2016. The Federal authorities are working to have that permit converted when it expires, to coincide with the State Permit which expires on December 31, 2018.
Roger thanked the Township and its residents for their thoughts and comments and expressed his empathy for the emotional nature of this situation.
At 9:30 p.m., Marty thanked Roger and Eric for their time in meeting with the Board and the residents of East Goshen Township, and called for a five minute break in the meeting.
New Business:
- Consider New Kent Apartments Final Plan Revision: Chuck moved to approve the Final Plan revisions for the Approved New Kent II Land Development dated 10/9/12, approved on 8/6/2013 and last revised on 6/15/15 with the following condition: The applicant shall convert both 309 and 312 Hampton Court into one bedroom units with dens prior to the issuance of any use and occupancy for the new building. Senya seconded, with condition that the written motion needed to correct the date of “last revised on 6/15/15” to “last revised on 7/15/15”. The Board unanimously voted in favor of this motion.
- Consider East Goshen Park Master Plan Proposal: Marty tabled this discussion to the August 11, 2015 Board meeting.
Old Business:
- Consider Delaware Valley Health Trust: Carmen motioned that the Township staff should be directed to take any steps necessary to ensure that the Township can transition to the Delaware Valley Health Trust. Senya seconded. The Board voted unanimously in favor of this motion.
New Business (Continued):
- Consider Authorizing the Chairman to execute the stormwater agreement for 1406 Bramble Lane: The Board unanimously authorized the execution of this agreement.
- Consider Township Newsletter Policy: Carmen motioned to adopted Resolution 2015 – 133 establishing guidelines for the East Goshen Township Newsletter. Chuck seconded. The Board voted unanimously to adopt this Resolution.
- Consider E-waste Event Dates: Carmen motioned to authorize the Township staff to coordinate an e-waste event on November 21, 2015, and in subsequent years, in the spring and fall of each year on Saturdays mutually convenient to the Township and the recycling vendor. Janet seconded. The Board voted unanimously to authorize the Township staff in this matter.
8/4/2015
August 4, 2015 BOS Minutes
Page 5 of 7
Any Other Matter:
- Consider Letter from Chester County 20/20: Senya asked the Board to consider a $100 general expense contribution to the Chester County 20/20 group. Carmen made a motion to this effect. Senya seconded. The motion passed unanimously.
- Consider East Goshen Township Namechange: Senya asked the Board to consider a name change of East Goshen Township to Goshenville Township. The other four Board members were not agreeable to this suggestion.
Approval of Minutes:
The Board reviewed and corrected the draft minutes of the July 21, 2015 meeting. Marty said the minutes would stand approved as corrected.
Treasurer’s Report:
See attached Treasurer’s Report for July 30, 2015. The Board reviewed the Treasurer’s Report and the current invoices. Carmen moved to graciously accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Marty seconded the motion. The Board voted unanimously to approve the motion.
Correspondence, Reports of Interest:
- The Board acknowledged receipt of Karen Martynick’s letter regarding Sycamore trees and the Township’s response.
- The Board acknowledged receipt of the Carroll Engineering letter re: General Permit no. 11 and E. Boot Road Bridge.
Adjournment:
There being no further business, Senya made a motion to adjourn the meeting at 10:12 pm. Janet seconded the motion. The motion passed unanimously.
Respectfully submitted,
Christina Rossetti Hartnett
Recording Secretary
Attachment: Treasurer’s Report for July 30, 2015
8/4/2015
August 4, 2015 BOS Minutes
Page 6 of 7
July 30, 2015
TREASURER'S REPORT
2015 RECEIPTS AND BILLS
| Category / Receipt Item | Receipt Amount | Expenditure Item | Expenditure Amount |
|---|---|---|---|
| GENERAL FUND | |||
| Real Estate Tax | $1,851.17 | Accounts Payable | $42,539.17 |
| Earned Income Tax | $48,400.00 | Electronic Pmts: Health Insurance | $0.00 |
| Local Service Tax | $5,100.00 | Credit Card | $0.00 |
| Transfer Tax | $0.00 | Postage | $0.00 |
| General Fund Interest Earned | $0.00 | Debt Service | $0.00 |
| Total Other Revenue | $23,726.53 | Payroll | $94,293.97 |
| Total Receipts: | $79,077.70 | Total Expenditures: | $136,833.14 |
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total State Liqud Fuels: | $0.00 | ||
| SINKING FUND | |||
| Receipts | $0.00 | Total Expenditures: | $86,473.00 |
| Interest Earned | $0.00 | ||
| Total Sinking Fund: | $0.00 | ||
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Sinking Fund: | $0.00 | ||
| SEWER OPERATING FUND | |||
| Receipts | $93,985.24 | Accounts Payable | $281,424.70 |
| Interest Earned | $0.00 | Debt Service | $0.00 |
| Total Sewer: | $93,985.24 | Credit Card | $1,238.58 |
| Total Expenditures: | $282,663.28 | ||
| REFUSE FUND | |||
| Receipts | $37,658.64 | Expenditures: | $13,878.30 |
| Interest Earned | $0.00 | ||
| Total Refuse: | $37,658.64 | ||
| SEWER SINKING FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Sewer Sinking Fund: | $0.00 | ||
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Operating Reserve Fund: | $0.00 | ||
| Events Fund | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Events Fund: | $0.00 | ||
8/4/2015
August 4, 2015 BOS Minutes
Page 7 of 7
EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS MEETING
1580 PAOLI PIKE
AUGUST 11, 2015 – 7:00 pm
DRAFT MINUTES
Present: Chairman Marty Shane, Vice-Chairman Senya D. Isayeff, and Supervisors Janet Emanuel, Chuck Proctor, Carmen Battavio, Township Manager Rick Smith, Township Solicitor Kristen Camp, Township Director of Code Enforcement/Zoning Officer Mark Gordon, ABC Member Erich Meyer (Conservancy Board), Township Finance Dept. Member Brian McCool.
Call to order & Pledge of Allegiance:
Marty called the meeting to order at 7:00 pm and asked Senya to lead the Pledge of Allegiance.
Moment of Silence:
Carmen called for a moment of silence to honor the members of the military who keep us safe and send Godspeed to all those who have lost their lives in the line of duty.
Recording of Meeting:
Colleen Pimer, a court stenographer, was acknowledged and would be recording the Public Hearing.
Candace Mulholland, reporter for the Daily Local News, was acknowledged and was present for the meeting.
Michaelle Bond, a staff writer for The Inquirer, was present for the meeting.
Chairman’s Report: Marty recognized his fellow Board of Supervisors, Township staff and Solicitor, Court Stenographer and Newspaper Reporters who were present for the meeting.
- Marty announced that the draft Township Comprehensive Plan is available for review on the Township website. He commented that this Plan is created every ten years and that it maps out the vision for the Township moving forward.
- Marty commented that the Board met in executive session on August 5, 2015 to discuss a police labor contract issue.
- Marty acknowledged the success of the 2 nd Annual East Goshen Township-Immaculata University Entrepreneurial Academy that took place on July 20 to 23, 2015. He commended the local businesses that opened their doors to this endeavor.
Public Hearings:
- The Board held a public hearing to consider an Ordinance amending the East Goshen Township Zoning Ordinance of 1997, as amended, Section 240-6 to add a definition for “Dogs” and Section 240-32.A (1) concerning keeping of animals and household pets as an accessory use. Marty made a motion to adopt. Janet seconded. The motion passed 3-2, with Senya and Chuck opposed. A court stenographer was present and will provide a full transcript of the hearing.
8/11/2015
August 11, 2015 BOS Minutes
Page 1 of 3
- The Board held a public hearing to consider an Ordinance of East Goshen Township regulating dogs in the Township. The Board continued the public hearing to the October 6, 2015 Board meeting to allow the Township Solicitor time to make wording changes. A court stenographer was present and will provide a full transcript of the hearing.
- The Board held a public hearing to consider an Ordinance of the Township of East Goshen, Chester County, Pennsylvania, repealing Ordinance No. 129-E-2012 and reinstating the West Chester Area Council of governments Board of Appeals. Carmen made a motion to adopt. Senya seconded. The motion passed unanimously. A court stenographer was present and will provide a full transcript of the hearing.
Financial Report: Marty presented the July 2015 Financial Report. He commented that “in revenue” should be added to the wording under Other Funds—The State Liquid Fuels Fund had $430,954 (in revenue) and no expenses.
Old Business:
Consider East Goshen Park Master Plan Proposal: Carmen motioned that upon the recommendation of Jason Lang, the Board select the firm of Simone Collins for the East Goshen Park Master Plan Project. Senya seconded. Marty suggested that this award should go to the firm that has had the greatest success in securing grant money. Rick commented that Simone Collins has secured $15 million in grant money between the years of 1993 to 2014.
Mark Gordon commented that the Simone Collins proposal was first rate and the best of all the proposals, but he raised concern about the Project Manager that was proposed by Simone Collins. He felt that Tom Comitta’s firm offered the next best proposal, and given that his firm has done so much previous work in the Township Park, that perhaps it would be advisable to consider them further.
Senya suggested tabling this motion and meeting further with the Simone team. Janet recommended meeting with both the Simone and Comitta teams at the September 1, 2015 Board meeting, starting at 7:00 p.m. for 15 minute meetings each. The Board unanimously agreed that this was the best course of action.
New Business:
Consider Water Meters Used For Commercial Sewer Billing: Brian McCool discussed his recommendation to adopt Resolution 2015-134 requiring the installation of water meters at commercial properties that have a well or deduct meter and that the Township pay for the water meter and the property owner will be responsible for the installation. Both Marty and Mark Gordon felt it would be more appropriate for the Township to not only supply the new water meters, but to also install them to avoid any faulty installations. Marty made this motion. Carmen seconded. The Board was in unanimous agreement on this motion.
Any Other Matter:
Consider Storm Water Agreement for 612 Meadow Drive Carmen made a motion to authorize the Chairman to execute the agreement, Janet seconded. The Board was in unanimous agreement on this motion.
8/11/2015
August 11, 2015 BOS Minutes
Page 2 of 3
Consider Item regarding the Paoli Pike Trail: Mark Gordon discussed a recommended change to the Paoli Pike Trail as had been initially proposed. It is recommended that from Airport Road to Boot Road the Trail would run along the north side of Paoli Pike, with the crossing of Boot Road between the Sunoco Station and the CVS. The Trail would then continue on the south side of Paoli Pike between the CVS and East Goshen Park. All were in favor of this.
Treasurer’s Report:
See attached Treasurer’s Report for August 6, 2015. The Board reviewed the Treasurer’s Report and the current invoices. Chuck noted that the algae treatments in the Bow Tree ponds are not effective and the associated costs are a waste of money. Senya asked for an explanation of the Preschoolers entertainment costs for a particular Township event. Carmen moved to graciously accept the Treasurer’s Report and the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to authorize payment of the invoices just reviewed. Janet seconded the motion. The Board voted unanimously to approve the motion.
Correspondence, Reports of Interest:
- The Board acknowledged receipt of the July 29, 2015 Remedial Action Progress Report for the Sunoco Station.
Adjournment:
There being no further business, Carmen made a motion to adjourn the meeting at 9:22 pm. Janet seconded the motion. The motion passed unanimously.
Respectfully submitted,
Christina Rossetti Hartnett
Recording Secretary
Attachment: Treasurer’s Report for August 6, 2015
8/11/2015
August 11, 2015 BOS Minutes
Page 3 of 3
August 6, 2015
TREASURER'S REPORT
2015 RECEIPTS AND BILLS
| Category / Receipt Item | Receipt Amount | Expenditure Item | Expenditure Amount |
|---|---|---|---|
| GENERAL FUND | |||
| Real Estate Tax | $952.47 | Accounts Payable | $258,772.90 |
| Earned Income Tax | $431,973.25 | Electronic Pmts: Health Insurance | $0.00 |
| Local Service Tax | $1,703.14 | Credit Card | $1,238.58 |
| Transfer Tax | $0.00 | Postage | $0.00 |
| General Fund Interest Earned | $3,033.88 | Debt Service | $0.00 |
| Total Other Revenue | $22,181.71 | Payroll | $49,928.00 |
| Total Receipts: | $459,844.45 | Total Expenditures: | $309,939.48 |
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $54.92 | ||
| Total State Liqud Fuels: | $54.92 | ||
| SINKING FUND | |||
| Receipts | $0.00 | Total Expenditures: | $68,974.10 |
| Interest Earned | $9,178.36 | ||
| Total Sinking Fund: | $9,178.36 | ||
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $206.00 | ||
| Total Sinking Fund: | $206.00 | ||
| SEWER OPERATING FUND | |||
| Receipts | $114,130.87 | Accounts Payable | $10,262.75 |
| Interest Earned | $41.52 | Debt Service | $0.00 |
| Total Sewer: | $114,172.39 | Credit Card | ($1,238.58) |
| Total Expenditures: | $9,024.17 | ||
| REFUSE FUND | |||
| Receipts | $33,371.47 | Expenditures: | $5,748.79 |
| Interest Earned | $14.88 | ||
| Total Refuse: | $33,386.35 | ||
| SEWER SINKING FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $230.84 | ||
| Total Sewer Sinking Fund: | $230.84 | ||
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $267.04 | ||
| Total Operating Reserve Fund: | $267.04 | ||
| Events Fund | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.68 | ||
| Total Events Fund: | $0.68 | ||
August 27, 2015
TREASURER'S REPORT
2015 RECEIPTS AND BILLS
| Category / Receipt Item | Receipt Amount | Expenditure Item | Expenditure Amount |
|---|---|---|---|
| GENERAL FUND | |||
| Real Estate Tax | $3,045.30 | Accounts Payable | $172,333.33 |
| Earned Income Tax | $309,500.00 | Electronic Pmts: Health Insurance | $44,141.95 |
| Local Service Tax | $66,900.00 | Credit Card | $1,071.69 |
| Transfer Tax | $76,695.63 | Postage | $1,000.00 |
| General Fund Interest Earned | $0.00 | Debt Service | $14,831.76 |
| Total Other Revenue | $165,281.15 | Payroll | $133,451.08 |
| Total Receipts: | $621,422.08 | Total Expenditures: | $366,829.81 |
| STATE LIQUID FUELS FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total State Liqud Fuels: | $0.00 | ||
| SINKING FUND | |||
| Receipts | $0.00 | Total Expenditures: | $4,851.00 |
| Interest Earned | $0.00 | ||
| Total Sinking Fund: | $0.00 | ||
| TRANSPORTATION FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Sinking Fund: | $0.00 | ||
| SEWER OPERATING FUND | |||
| Receipts | $237,672.09 | Accounts Payable | $43,870.46 |
| Interest Earned | $0.00 | Debt Service | $32,424.54 |
| Total Sewer: | $237,672.09 | Credit Card | $0.00 |
| Total Expenditures: | $76,295.00 | ||
| REFUSE FUND | |||
| Receipts | $63,065.39 | Expenditures: | $68,752.28 |
| Interest Earned | $0.00 | ||
| Total Refuse: | $63,065.39 | ||
| SEWER SINKING FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Sewer Sinking Fund: | $0.00 | ||
| OPERATING RESERVE FUND | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Operating Reserve Fund: | $0.00 | ||
| Events Fund | |||
| Receipts | $0.00 | Expenditures: | $0.00 |
| Interest Earned | $0.00 | ||
| Total Events Fund: | $0.00 | ||
EAST GOSHEN TOWNSHIP
MEMORANDUM
TO: BOARD OF SUPERVISORS
FROM: BRIAN MCCOOL
SUBJECT: PROPOSED PAYMENTS OF BILLS
DATE: 08-27-15
Please accept the attached Treasurer’s Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer’s Report and each register item be approved for payment.
The attached Treasurer’s Report includes three weeks of revenues and expenses.
General Fund expenses include $51,288 for stormwater piping for work that was done in the spring, $14,491 for the remainder of the 2014 auditing expense, $5,697 for the Paoli Pike trail feasibility study and $9,872 for comprehensive plan expenses.
General Fund revenue includes $117,304 for franchise fee revenue and strong EIT, LST and Transfer Tax receipts.
Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.
F:\Data\Shared Data\Finance Dept\Treasurers' Reports\2015\08-27-2015\08-27-15.docx
Invoice Summary Reporthttps://service.ibx.com/ebp/engine/presentation/statementsection?OP...
Independence
REGULAR
INVOICE SUMMARY
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
West Chester, PA 19380
| BILL ACCOUNT NUMBER: | 1500030001 | INVOICE NUMBER: | 150812262622 |
|---|---|---|---|
| BILL ACCOUNT NAME: | EAST GOSHEN TOWNSHIP | INVOICE MONTH(S): | September 2015 |
| CLIENT NUMBER: | 150003 | PREPARED DATE: | 8/12/2015 |
| CLIENT NAME: | EAST GOSHEN TOWNSHIP | PAYMENT DUE DATE: | 9/1/2015 |
PRIOR BILLING INFORMATION
| Last Bill Amount | $12,140.05 | |
|---|---|---|
| Payments Received Through 08/11/2015 | ($12,140.05) | |
| BALANCE FORWARD | $0.00 |
CURRENT CHARGES
| Premium Summary | $12,140.05 |
|---|---|
| Member Rate Detail | |
| TOTAL CURRENT CHARGES | $12,140.05 |
| TOTAL DUE | $12,140.05 |
Click Here for Paper Payment
close this window
1 of 18/14/2015 8:28 AM
Invoice Summary Reporthttps://service.ibx.com/ebp/engine/presentation/statementsection?OP...
Independence
REGULAR
INVOICE SUMMARY
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
West Chester, PA 19380
| BILL ACCOUNT NUMBER: | 1500030002 | INVOICE NUMBER: | 150812247169 |
|---|---|---|---|
| BILL ACCOUNT NAME: | EAST GOSHEN TOWNSHIP | INVOICE MONTH(S): | September 2015 |
| CLIENT NUMBER: | 150003 | PREPARED DATE: | 8/12/2015 |
| CLIENT NAME: | EAST GOSHEN TOWNSHIP | PAYMENT DUE DATE: | 9/1/2015 |
PRIOR BILLING INFORMATION
| Last Bill Amount | $18,194.12 | |
|---|---|---|
| Payments Received Through 08/11/2015 | ($18,194.12) | |
| BALANCE FORWARD | $0.00 |
CURRENT CHARGES
| Premium Summary | $17,832.99 |
|---|---|
| Member Activity Processed Through 08/11/2015 | ($2,166.78) |
| Member Rate Detail | |
| TOTAL CURRENT CHARGES | $15,666.21 |
| TOTAL DUE | $15,666.21 |
Click Here for Paper Payment
close this window
1 of 18/14/2015 8:28 AM
Invoice Summary Reporthttps://service.ibx.com/ebp/engine/presentation/statementsection?OP...
Independence
REGULAR
INVOICE SUMMARY
EAST GOSHEN TOWNSHIP
EAST GOSHEN TWP
1580 PAOLI PIKE
West Chester, PA 19380
| BILL ACCOUNT NUMBER: | 1500030003 | INVOICE NUMBER: | 150812247176 |
|---|---|---|---|
| BILL ACCOUNT NAME: | EAST GOSHEN TOWNSHIP | INVOICE MONTH(S): | September 2015 |
| CLIENT NUMBER: | 150003 | PREPARED DATE: | 8/12/2015 |
| CLIENT NAME: | EAST GOSHEN TOWNSHIP | PAYMENT DUE DATE: | 9/1/2015 |
PRIOR BILLING INFORMATION
| Last Bill Amount | $16,335.69 | |
|---|---|---|
| Payments Received Through 08/11/2015 | ($16,335.69) | |
| BALANCE FORWARD | $0.00 |
CURRENT CHARGES
| Premium Summary | $16,335.69 |
|---|---|
| Member Rate Detail | |
| TOTAL CURRENT CHARGES | $16,335.69 |
| TOTAL DUE | $16,335.69 |
Click Here for Paper Payment
close this window
1 of 18/14/2015 8:29 AM
EAST GOSHEN TOWNSHIP
MONTHLY DEBT PAYMENT BREAKDOWN
August 25, 2015
GENERAL FUND:
| Interest payment | Principal payment | Loan Description | Original loan amount | Remaining Principal | Retirement Date |
|---|---|---|---|---|---|
| $10,771.41 | $0 | Multi purpose 9 projects | $5,500,000 | $2,999,000 | 2023 |
| $3,623.55 | $0 | Applebrook Park | $3,000,000 | $1,071,000 | 2019 |
| $436.80 | $0 | Spray Irrigation | $287,000 | $126,000 | 2021 |
SEWER FUND:
| Interest payment | Principal payment | Loan Description | Original loan amount | Remaining Principal | Retirement Date |
|---|---|---|---|---|---|
| $1,289.67 | $0 | Sewer Operations Munic Authority | $1,128,000 | $365,000 | 2018 |
| $25,014.00 | $0 | RCSTP Expansion | $9,500,000 | $7,580,000 | 2032 |
| $6,120.87 | $0 | Diversion Projects | $2,500,000 | $2,409,000 | 2033 |
U:\bmccool\2015\Debt Service\08\08 - 2015 - Debt Service Report for Treasurer's Report.xlsx
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 1
MARP05 run by BARBARA 4 : 51 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2762 | AJB A.J. BLOSENSKI INC. | ||||||||
| 44610 2 | 01452 3204 | COMMUNITY DAY 30 EVENT BOXES (ONLY CHARGED FOR 5) 25 DONATED |
58147571 | 08/18/15 | 08/18/15 | 60.00 | |||
| 60.00 | |||||||||
| 1657 | AQUA PA | ||||||||
| 44618 1 | 01411 3630 | HYDRANT & WATER SERVICE 000309987 0309987 6/30-7/31/15 HY6 |
080315 HY6 | 08/18/15 | 08/18/15 | 137.52 | |||
| 44619 1 | 01411 3630 | HYDRANT & WATER SERVICE 000310033 0310033 6/30-7/31/15 186 |
080315-279 | 08/18/15 | 08/18/15 | 4,637.79 | |||
| 44619 2 | 01411 3631 | HYDRANTS - RECHARGE EXPENSE 000310033 0310033 6/30-7/31/15 93 |
080315 279 | 08/18/15 | 08/18/15 | 2,318.90 | |||
| 7,094.21 | |||||||||
| 82 | ASSOCIATED TRUCK PARTS | ||||||||
| 44615 1 | 01430 2330 | VEHICLE MAINT AND REPAIR STARTER KIT AND STARTER CORE |
990204 | 08/18/15 | 08/18/15 | 369.76 | |||
| 44616 1 | 01430 2330 | VEHICLE MAINT AND REPAIR CREDIT - STARTER CORE CHARGE |
991276 | 08/18/15 | 08/18/15 | -80.00 | |||
| 44617 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS RAINCAP FOR GENERATOR |
992692 | 08/18/15 | 08/18/15 | 12.52 | |||
| 302.28 | |||||||||
| 3569 | BALFORD FARMS | ||||||||
| 44620 1 | 01452 2000 | SUMMER PROGRAM SUPPLIES FRUIT DRINKS - SUMMER CAMP 6/30 & 7/17 |
199164&222997 | 08/18/15 | 08/18/15 | 209.08 | |||
| 209.08 | |||||||||
| 1998 | BARCO PRODUCTS COMPANY | ||||||||
| 44621 1 | 01116 1000 | CLEARING ACCOUNT 6' MEMORIAL BENCH CHAMBERS/CELLUCCI |
071500129 | 08/18/15 | 08/18/15 | 837.05 | |||
| 44622 1 | 01116 1000 | CLEARING ACCOUNT 6' MEMORIAL BENCH MARINO/RICCI-AVIL |
071500508 | 08/18/15 | 08/18/15 | 837.05 | |||
| 1,674.10 | |||||||||
| 113 | BARTLETT TREE EXPERTS | ||||||||
| 44623 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS APPLY SULFUR TO TWP.PIN OAK |
36378840-0 | 08/18/15 | 08/18/15 | 102.00 | |||
| 102.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 2
MARP05 run by BARBARA 4 : 51 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 3433 | BURNS ENGINEERING INC. | ||||||||
| 44625 1 | 01408 3130 | ENGINEERING SERVICES PROF.SERVICE 1/1/15-4/26/15 - HERSH MILLS ESTATES |
1R | 08/18/15 | 08/18/15 | 2,263.50 | |||
| 2,263.50 | |||||||||
| 2041 | BUTCH'S TRUCK ACCESSORIES | ||||||||
| 44626 1 | 01430 2330 | VEHICLE MAINT AND REPAIR SEAT COVERS - TRUCK #10 |
65038 | 08/18/15 | 08/18/15 | 210.00 | |||
| 210.00 | |||||||||
| 2034 | CHERRY VALLEY TRACTOR SALES | ||||||||
| 44631 1 | 01438 2465 | STORM DAMAGE RAYCO CHIPPER RENTAL 7/6-8/3/15 |
06283 | 08/18/15 | 08/18/15 | 6,000.00 | |||
| 6,000.00 | |||||||||
| 259 | CHESTER COUNTY 2020 | ||||||||
| 44628 1 | 01401 3000 | GENERAL EXPENSE DONATION 2015 |
072115 | 08/18/15 | 08/18/15 | 100.00 | |||
| 100.00 | |||||||||
| 3488 | CINTAS CORPORATION #287 | ||||||||
| 44629 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 8/12/15 CLEAN MATS |
287426102 | 08/18/15 | 08/18/15 | 52.50 | |||
| 44629 2 | 01487 1910 | UNIFORMS WEEK END 8/12/15 CLEAN UNIFORMS |
287426102 | 08/18/15 | 08/18/15 | 203.78 | |||
| 44630 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 8/05/15 CLEAN MATS |
287422993 | 08/18/15 | 08/18/15 | 52.50 | |||
| 44630 2 | 01487 1910 | UNIFORMS WEEK END 8/05/15 CLEAN UNIFORMS |
287422993 | 08/18/15 | 08/18/15 | 225.92 | |||
| 534.70 | |||||||||
| 2996 | CNS CLEANING COMPANY | ||||||||
| 44632 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS JANITORIAL SERVICE - AUGUST 2015 |
45117 | 08/18/15 | 08/18/15 | 870.00 | |||
| 44632 2 | 01409 3840 | DISTRICT COURT EXPENSES JANITORIAL SERVICE - AUGUST 2015 |
45117 | 08/18/15 | 08/18/15 | 255.00 | |||
| 1,125.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 3
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 3249 | COMCAST 8499-10-109-0107712 | ||||||||
| 44634 1 | 01401 3210 | COMMUNICATION EXPENSE 0107712 8/5-9/4/15 E.G. PARK LED |
080215 | 08/18/15 | 08/18/15 | 103.63 | |||
| 103.63 | |||||||||
| 3490 | COMCAST 8499-10-109-0111284 | ||||||||
| 44633 1 | 01401 3210 | COMMUNICATION EXPENSE 0111284 8/9-9/8/15 SPEC.VIDEO PW |
080215 | 08/18/15 | 08/18/15 | 10.65 | |||
| 10.65 | |||||||||
| 317 | CONTRACTOR'S CHOICE | ||||||||
| 44635 1 | 01437 2460 | GENERAL EXPENSE - SHOP CHAIN LOOP & 12" BAR |
00192608 | 08/18/15 | 08/18/15 | 41.41 | |||
| 41.41 | |||||||||
| 1990 | CRYSTAL SPRINGS | ||||||||
| 44636 1 | 01401 2100 | MATERIALS & SUPPLIES SPLENDA, COFFEE & HOT CHOCOLATE |
3154612 080715 | 08/18/15 | 08/18/15 | 164.27 | |||
| 164.27 | |||||||||
| 3099 | DELAWARE VALLEY LASER SKIRMISH | ||||||||
| 44637 1 | 01452 3204 | COMMUNITY DAY 3 HOUR LASER SKIRMISH - COMM.DAY |
07523-2 | 08/18/15 | 08/18/15 | 1,250.00 | |||
| 1,250.00 | |||||||||
| 2555 | FASTENAL | ||||||||
| 44639 1 | 01437 2460 | GENERAL EXPENSE - SHOP USS THR-HARD 1/2 YZ & ZINC HEX LAGNUTS |
PAMAV18670 | 08/18/15 | 08/18/15 | 33.33 | |||
| 33.33 | |||||||||
| 3570 | FAUNCE, ELIZABETH | ||||||||
| 44640 1 | 01452 3717 | HIGH SCHOOL ENTREPRENEURIAL ACADEMY REIMBURSEMENT FOR HS ENTRE SUPPLIES |
080515 | 08/18/15 | 08/18/15 | 21.66 | |||
| 21.66 | |||||||||
| 2631 | GRAPHIC IMPRESSIONS OF AMERICA INC. | ||||||||
| 44641 1 | 01401 2110 | STATIONERY BOS LETTERHEAD |
15-4767 | 08/18/15 | 08/18/15 | 104.00 | |||
| 104.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 4
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2087 | KDI INC. | ||||||||
| 44642 1 | 01401 3840 | RENTAL OF EQUIP. -OFFICE LEXMARK/XM1145 CONTRACT OVERAGE CHG 5/9/15 - 8/8/15 |
485053 | 08/18/15 | 08/18/15 | 6.53 | |||
| 6.53 | |||||||||
| 719 | KEEN COMPRESSED GAS COMPANY | ||||||||
| 44643 1 | 01437 2460 | GENERAL EXPENSE - SHOP VARIOUS CYLINDERS OF GASES |
83053587 | 08/18/15 | 08/18/15 | 55.29 | |||
| 44644 1 | 01437 2460 | GENERAL EXPENSE - SHOP LEASE 100 CF ARGON CYLINDER |
72007574 | 08/18/15 | 08/18/15 | 59.00 | |||
| 114.29 | |||||||||
| 2442 | KENT AUTOMOTIVE | ||||||||
| 44645 1 | 01430 2330 | VEHICLE MAINT AND REPAIR SAW BLADES & FLOORING SCREWS |
9303443373 | 08/18/15 | 08/18/15 | 518.17 | |||
| 518.17 | |||||||||
| 1529 | KRAPF JR. & SONS INC., GEORGE | ||||||||
| 44646 1 | 01452 2010 | SUMMER PROGRAM FIELD TRIPS YTH.CAMP TRIPS TRANSPORT. OASIS FUN CTR, FRENCH CRK.PK.(2),REGAL CINEMA,CHUCK-E-CHEESE & ARNOLDS FAM.CTR. |
SB08159400 | 08/18/15 | 08/18/15 | 2,195.00 | |||
| 2,195.00 | |||||||||
| 3308 | LANG, JASON | ||||||||
| 44647 1 | 01452 3509 | ROBOTICS PROGRAM ROBOTIC LEGO SUPPLIES |
080515 | 08/18/15 | 08/18/15 | 19.99 | |||
| 44647 2 | 01452 3717 | HIGH SCHOOL ENTREPRENEURIAL ACADEMY HS ENTRE. ACADEMY SUPPLIES |
080515 | 08/18/15 | 08/18/15 | 290.31 | |||
| 44647 3 | 01452 2000 | SUMMER PROGRAM SUPPLIES YTH CAMP SUPPLIES |
080515 | 08/18/15 | 08/18/15 | 280.41 | |||
| 590.71 | |||||||||
| 765 | LENNI ELECTRIC CORPORATION | ||||||||
| 44648 1 | 01434 3610 | STREET LIGHTING STREETLIGHT MAINT. JULY-SEPT.2015 |
150817 | 08/18/15 | 08/18/15 | 117.00 | |||
| 117.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 5
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2861 | LITTLE INC., ROBERT E. | ||||||||
| 44649 1 | 01430 2330 | VEHICLE MAINT AND REPAIR MOWER PARTS - V-BELT |
03-347186 | 08/18/15 | 08/18/15 | 135.88 | |||
| 135.88 | |||||||||
| 2225 | MAIL FINANCE | ||||||||
| 44650 1 | 01401 3840 | RENTAL OF EQUIP. -OFFICE POSTAGE MACHINE RENTAL 6/5-9/4/15 |
H5459933 | 08/18/15 | 08/18/15 | 522.00 | |||
| 522.00 | |||||||||
| 829 | MASTER'S TOUCH | ||||||||
| 44652 1 | 01454 3740 | EQUIPMENT MAINT. & REPAIR EXTERM.SERVICE - AUG.2015 E.G.PARK |
17168 | 08/18/15 | 08/18/15 | 84.00 | |||
| 44653 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS EXTERM.SERVICE - AUG.2015 TWP.&PW |
17010 | 08/18/15 | 08/18/15 | 104.00 | |||
| 44654 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS EXTERM.SERVICE - AUG.2015 BLKSMTH. |
17167 | 08/18/15 | 08/18/15 | 190.00 | |||
| 44655 1 | 01409 3840 | DISTRICT COURT EXPENSES EXTERM.SERVICE - AUG.2015 DC & POL. |
17009 | 08/18/15 | 08/18/15 | 58.00 | |||
| 436.00 | |||||||||
| 2622 | MIDDLETON, CHRISTIAN | ||||||||
| 44657 1 | 01487 4600 | TRAINING & SEMINARS-EMPLY REIMBURSMENT FOR REQUIRED DCED TRAINING |
081815 | 08/18/15 | 08/18/15 | 70.00 | |||
| 70.00 | |||||||||
| 36 | MYERS INC., ALLAN A. | ||||||||
| 44658 1 | 01438 2455 | MATER. & SUPPLY-RESURFAC. 2.34 TONS 15-C28 25mm 64-22-3-30 |
30-00081103 | 08/18/15 | 08/18/15 | 94.50 | |||
| 44659 1 | 01438 2455 | MATER. & SUPPLY-RESURFAC. 3.59 TONS 15-C28 25mm 64-22-3-30 |
30-00080939 | 08/18/15 | 08/18/15 | 144.97 | |||
| 239.47 | |||||||||
| 1554 | OFFICE DEPOT | ||||||||
| 44660 1 | 01401 2100 | MATERIALS & SUPPLIES TONER & SCISSORS |
782400341001 | 08/18/15 | 08/18/15 | 203.77 | |||
| 203.77 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 6
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1029 | PDM SERVICE COMPANY INC | ||||||||
| 44661 1 | 01452 3204 | COMMUNITY DAY SOUND SYSTEM RENTAL - COMMUN.DAY |
2015-11432-2 | 08/18/15 | 08/18/15 | 1,145.00 | |||
| 1,145.00 | |||||||||
| 2593 | PECO - 18510-39089 | ||||||||
| 44666 1 | 01454 3600 | UTILITIES 18510-39089 7/2-8/3/15 BOW TRE PUMP |
080715 | 08/18/15 | 08/18/15 | 75.38 | |||
| 75.38 | |||||||||
| 1032 | PECO - 99193-01302 | ||||||||
| 44664 1 | 01409 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 99193-01302 6/25-7/27/15 |
080715 | 08/18/15 | 08/18/15 | 1,609.55 | |||
| 44664 2 | 01454 3600 | UTILITIES 99193-01302 6/25-7/27/15 |
080715 | 08/18/15 | 08/18/15 | 55.94 | |||
| 1,665.49 | |||||||||
| 1052 | PENNONI ASSOCIATES INC. | ||||||||
| 44667 1 | 01408 3130 | ENGINEERING SERVICES SERVICE THRU 7/26/15 GRANT ASSIST. |
647546 | 08/18/15 | 08/18/15 | 231.25 | |||
| 44668 1 | 01408 3130 | ENGINEERING SERVICES SERVICE THRU 7/26/15 ANNUAL PA DEP DAM INSPECT. |
647554 | 08/18/15 | 08/18/15 | 4,000.00 | |||
| 44669 1 | 01436 3130 | STORMWATER ENGINEERING SERV. THRU 7/26/15 2014 STORM SEWER |
647553 | 08/18/15 | 08/18/15 | 381.50 | |||
| 44670 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 GOSHEN MEADOWS |
647547 | 08/18/15 | 08/18/15 | 1,077.50 | |||
| 44671 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 MANLEY RD.LOT 1 |
647548 | 08/18/15 | 08/18/15 | 142.50 | |||
| 44672 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 SUNNY RIDGE |
647549 | 08/18/15 | 08/18/15 | 1,291.25 | |||
| 44673 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 YARDLEY VILL. |
647550 | 08/18/15 | 08/18/15 | 403.75 | |||
| 44674 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 NEW KENT |
647551 | 08/18/15 | 08/18/15 | 801.25 | |||
| 44675 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 FALCONE |
647555 | 08/18/15 | 08/18/15 | 297.50 | |||
| 44676 1 | 01408 3131 | ENGINEER.& MISC.RECHARGES SERV. THRU 7/26/15 CHARTER CHASE |
647558 | 08/18/15 | 08/18/15 | 503.00 | |||
| 9,129.50 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 7
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1005 | PENNSYLVANIA ONE CALL SYSTEM | ||||||||
| 44677 1 | 01438 3840 | EQUIPMENT RENTAL MONTHLY ACTIVITY - JULY 2015 |
0000649534 | 08/18/15 | 08/18/15 | 39.11 | |||
| 39.11 | |||||||||
| 3101 | PONY RIDES BY DONNA | ||||||||
| 44679 1 | 01452 3204 | COMMUNITY DAY PONY RIDES & PETTING ZOO - COMM.DAY |
061415-R | 08/18/15 | 08/18/15 | 1,000.00 | |||
| 1,000.00 | |||||||||
| 2342 | POWERPRO EQUIPMENT | ||||||||
| 44680 1 | 01438 2455 | MATER. & SUPPLY-RESURFAC. PREMIX MORTAR, MASONRY & SAND |
P01563 | 08/18/15 | 08/18/15 | 900.00 | |||
| 44681 1 | 01438 2455 | MATER. & SUPPLY-RESURFAC. MORTAR & RED MATTEX |
P01457 | 08/18/15 | 08/18/15 | 629.50 | |||
| 1,529.50 | |||||||||
| 2711 | R.S. SALES & SERVICE INC. | ||||||||
| 44682 1 | 01409 3745 | PW BUILDING - MAINT REPAIRS REPAIR ICE MACHINE |
67866 | 08/18/15 | 08/18/15 | 758.00 | |||
| 758.00 | |||||||||
| 1161 | REILLY & SONS INC | ||||||||
| 44683 1 | 01430 2320 | VEHICLE OPERATION - FUEL 305.0 GALLONS DIESEL |
88067 | 08/18/15 | 08/18/15 | 527.04 | |||
| 527.04 | |||||||||
| 1212 | SAYRE INC., G.L. | ||||||||
| 44684 1 | 01430 2330 | VEHICLE MAINT AND REPAIR AMBER FNDR LITES |
1-252090054 | 08/18/15 | 08/18/15 | 54.00 | |||
| 44685 1 | 01430 2330 | VEHICLE MAINT AND REPAIR TRUCK REPAIR - 2008 STERLING NEW GASKETS |
1-252090161 | 08/18/15 | 08/18/15 | 356.59 | |||
| 410.59 | |||||||||
| 2287 | SHIRLEY, SUSAN D. | ||||||||
| 44686 1 | 01414 3100 | COURT REPORTERS TRANSCRIPT - PUBLIC HEARING 7/7/15 |
080415 | 08/18/15 | 08/18/15 | 125.50 | |||
| 125.50 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 8
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1783 | STATE WORKERS INSURANCE FUND | ||||||||
| 44687 1 | 01411 6000 | VOLUNTEER FIREFIGHTER WORKERS COMP POLICY# 05918452 INSTALL 9 OF 11 |
073115 | 08/18/15 | 08/18/15 | 4,070.00 | |||
| 4,070.00 | |||||||||
| 1389 | UNRUH TURNER BURKE FREES | ||||||||
| 44688 1 | 01414 3141 | LEGAL - ZONING HEARING BOARD LEGAL SERV. 5/29-7/22/15 N.SMITH |
128902 | 08/18/15 | 08/18/15 | 1,612.31 | |||
| 1,612.31 | |||||||||
| 2829 | VERIZON - TWP.FIOS 11627 | ||||||||
| 44689 1 | 01401 3210 | COMMUNICATION EXPENSE JULY 28 - AUGUST 27, 2015 TWP.FIOS |
072815-11627 | 08/18/15 | 08/18/15 | 79.99 | |||
| 79.99 | |||||||||
| 2050 | VILLAGE MEDICAL | ||||||||
| 44691 1 | 01487 1550 | DRUG & ALCOHOL TESTING DRUG & ALCOHOL TEST - B.MCCOOL |
00123790-00 | 08/18/15 | 08/18/15 | 73.00 | |||
| 73.00 | |||||||||
| 3571 | WEST CHESTER AREA SCHOOL DISTRICT | ||||||||
| 44692 1 | 01452 2025 | SUMMER PROGRAM GENERAL EXPENSE CUSTODIAL - 7/20,7/27 & 7/30/15 FOR SUMMER CAMP |
080515 | 08/18/15 | 08/18/15 | 195.00 | |||
| 195.00 | |||||||||
| 3335 | WHITESIDE, SANDY | ||||||||
| 44693 1 | 01452 3701 | LADIES & YOUTH TENNIS JR.TENNIS INSTRUCTION AUGUST 2015 |
081315 | 08/18/15 | 08/18/15 | 1,616.07 | |||
| 1,616.07 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 9
MARP05 run by BARBARA 4 : 51 PM
03 SINKING FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2889 | MARSH CREEK SIGNS | ||||||||
| 44651 1 | 03430 7400 | CAPITAL REPLACEMENT - HWY EQUIP GRAPHICS & LETTERING - TRUCKS #4 & #10 |
10243 | 08/18/15 | 08/18/15 | 396.00 | |||
| 396.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 10
MARP05 run by BARBARA 4 : 51 PM
05 SEWER OPERATING
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 40 | ALLIED CONTROL SERVICES | ||||||||
| 44614 1 | 05420 3700 | C.C. METERS-MAINT.& REPRS. ON-SITE INSPECTION & CALIBRATION SERVICE 7/10/15 |
308399 | 08/18/15 | 08/18/15 | 810.75 | |||
| 810.75 | |||||||||
| 2918 | ALS ENVIRONMENTAL | ||||||||
| 44611 1 | 05422 4500 | R.C. STP-CONTRACTED SERV. LAB TESTS - RCSTP 7/21-7/28/15 |
40-164220 | 08/18/15 | 08/18/15 | 156.00 | |||
| 44612 1 | 05422 4500 | R.C. STP-CONTRACTED SERV. LAB TESTS - RCSTP 7/24-8/3/15 |
40-166321 | 08/18/15 | 08/18/15 | 48.00 | |||
| 44613 1 | 05422 4500 | R.C. STP-CONTRACTED SERV. LAB TESTS - RCSTP 7/28-8/4/15 |
40-169058 | 08/18/15 | 08/18/15 | 314.00 | |||
| 518.00 | |||||||||
| 151 | BLOSENSKI DISPOSAL CO, CHARLES | ||||||||
| 44624 1 | 05422 4502 | R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 8/3/15 |
10311 | 08/18/15 | 08/18/15 | 181.00 | |||
| 181.00 | |||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | ||||||||
| 44627 2 | 05422 4502 | R.C. SLUDGE-LAND CHESTER WEEK 8/3/15 - 8/7/15 |
41106 | 08/18/15 | 08/18/15 | 603.00 | |||
| 603.00 | |||||||||
| 431 | EJ USA INC. (EAST JORDAN) | ||||||||
| 44638 1 | 05420 3702 | C.C. COLLEC.-MAINT.& REPR. MANHOLE & SEWER COVERS |
3863653 | 08/18/15 | 08/18/15 | 3,649.80 | |||
| 44638 2 | 05422 3701 | R.C. COLLEC.-MAINT.& REPR MANHOLE & SEWER COVERS |
3863653 | 08/18/15 | 08/18/15 | 3,649.80 | |||
| 7,299.60 | |||||||||
| 829 | MASTER'S TOUCH | ||||||||
| 44656 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS EXTERM.SERVICE - AUG.2015 RCSTP |
17011 | 08/18/15 | 08/18/15 | 33.00 | |||
| 33.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 11
MARP05 run by BARBARA 4 : 51 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2827 | PECO - 04725-43025 | ||||||||
| 44663 1 | 05420 3602 | C.C. COLLECTION -UTILITIES 04725-43025 7/8-8/6/15 WYLPEN PUMP |
080715 | 08/18/15 | 08/18/15 | 498.66 | |||
| 498.66 | |||||||||
| 1031 | PECO - 99193-01204 | ||||||||
| 44665 1 | 05420 3602 | C.C. COLLECTION -UTILITIES 99193-01204 6/25 - 7/30/15 |
080715 | 08/18/15 | 08/18/15 | 390.99 | |||
| 44665 2 | 05420 3600 | C.C. METERS - UTILITIES 99193-01204 6/25 - 7/30/15 |
080715 | 08/18/15 | 08/18/15 | 9.96 | |||
| 44665 3 | 05422 3601 | R.C. COLLEC.-UTILITIES 99193-01204 6/25 - 7/30/15 |
080715 | 08/18/15 | 08/18/15 | 65.53 | |||
| 44665 4 | 05422 3600 | R.C STP -UTILITIES 99193-01204 6/25 - 7/30/15 |
080715 | 08/18/15 | 08/18/15 | 10,009.09 | |||
| 10,475.57 | |||||||||
| 1035 | PENDERGAST SAFETY EQUIP. | ||||||||
| 44662 1 | 05420 3702 | C.C. COLLEC.-MAINT.& REPR. EXOFIT NEX HARNESSES |
1079230-01R | 08/18/15 | 08/18/15 | 259.85 | |||
| 44662 2 | 05422 3701 | R.C. COLLEC.-MAINT.& REPR EXOFIT NEX HARNESSES |
1079230-01R | 08/18/15 | 08/18/15 | 259.84 | |||
| 44662 3 | 05422 3700 | R.C. STP-MAINT.& REPAIRS EXOFIT NEX HARNESSES |
1079230-01R | 08/18/15 | 08/18/15 | 259.84 | |||
| 779.53 | |||||||||
| 1005 | PENNSYLVANIA ONE CALL SYSTEM | ||||||||
| 44677 2 | 05422 3701 | R.C. COLLEC.-MAINT.& REPR MONTHLY ACTIVITY - JULY 2015 |
0000649534 | 08/18/15 | 08/18/15 | 39.11 | |||
| 44677 3 | 05422 3702 | R.C. COLLECTION-MAINT. & REP I&I MONTHLY ACTIVITY - JULY 2015 |
0000649534 | 08/18/15 | 08/18/15 | 39.11 | |||
| 78.22 | |||||||||
| 1082 | PIPE DATA VIEW | ||||||||
| 44678 1 | 05420 3701 | C.C. INTERCEPT.-MAINT.&REP REPAIR LEAK MANHOLE - RESERVOIR RD. |
14172 | 08/18/15 | 08/18/15 | 700.00 | |||
| 700.00 | |||||||||
| 2773 | VERIZON - PW FIOS 9583 | ||||||||
| 44690 1 | 05422 3601 | R.C. COLLEC.-UTILITIES JULY 28 - AUGUST 27, 2015 PW FIOS |
072815-9583 | 08/18/15 | 08/18/15 | 89.99 | |||
| 89.99 | |||||||||
East Goshen Township Fund Accounting
BATCH 1 of 4
Report Date 08/18/15
Expenditures Register
GL-1508-49014
PAGE 12
MARP05 run by BARBARA 4 : 51 PM
06 REFUSE
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2762 | AJB A.J. BLOSENSKI INC. | ||||||||
| 44610 1 | 06427 4500 | CONTRACTED SERV. RESIDENTIAL PICK-UP AUGUST 2015 |
58147571 | 08/18/15 | 08/18/15 | 56,396.70 | |||
| 56,396.70 | |||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | ||||||||
| 44627 1 | 06427 4502 | LANDFILL FEES WEEK 8/3/15 - 8/7/15 |
41106 | 08/18/15 | 08/18/15 | 5,577.49 | |||
| 5,577.49 | |||||||||
| 135,041.63 | |||||||||
0 Printed, totalling 135,041.63
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 50,604.12 | GENERAL FUND |
| 03 | 03 | 396.00 | SINKING FUND |
| 05 | 05 | 22,067.32 | SEWER OPERATING |
| 06 | 06 | 61,974.19 | REFUSE |
| 135,041.63 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1508 | 135,041.63 |
| 135,041.63 |
East Goshen Township Fund Accounting
BATCH 2 of 4
Report Date 08/19/15
Expenditures Register
GL-1508-49021
PAGE 1
MARP05 run by BARBARA 11 : 36 AM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 3572 | PPM PROGRESSIVE PIPELINE MANAGEMENT | ||||||||
| 44694 1 | 01436 2450 | STORMWATER MATERIALS & SUPPLIES GLENBROOK LN. SLIPLINING-CORRUGATED METAL STORM MAIN |
15-4465 | 08/19/15 | 08/19/15 | 51,288.00 | |||
| 51,288.00 | |||||||||
| 51,288.00 | |||||||||
0 Printed, totalling 51,288.00
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 51,288.00 | GENERAL FUND |
| 51,288.00 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1508 | 51,288.00 |
| 51,288.00 |
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 1
MARP05 run by BARBARA 4 : 21 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2226 | 21ST CENT.MEDIA-PHILLY #884433 | ||||||||
| 44698 1 | 01401 3400 | ADVERTISING - PRINTING NOTICE - PAOLI PK.TRAIL |
682742 | 08/21/15 | 08/21/15 | 65.90 | |||
| 44699 1 | 01401 3400 | ADVERTISING - PRINTING NOTICE - PUBLIC HEARING 8/11 |
684845 | 08/21/15 | 08/21/15 | 376.70 | |||
| 44699 2 | 01401 3400 | ADVERTISING - PRINTING NOTICE - 2 PUBLIC HEARINGS 8/11 |
685021 | 08/21/15 | 08/21/15 | 236.84 | |||
| 44699 3 | 01401 3400 | ADVERTISING - PRINTING NOTICE - LOCAL TRAFFIC ADVISORY |
694533 | 08/21/15 | 08/21/15 | 68.49 | |||
| 44699 4 | 01401 3400 | ADVERTISING - PRINTING NOTICE - COMP.PLAN TASK FORCE |
697892 | 08/21/15 | 08/21/15 | 68.49 | |||
| 44699 5 | 01401 3400 | ADVERTISING - PRINTING NOTICE - W.C. COG |
705326 | 08/21/15 | 08/21/15 | 78.85 | |||
| 895.27 | |||||||||
| 6 | ABC PAPER & CHEMICAL INC | ||||||||
| 44700 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS BOWLS, C-FOLD TOWELS, URINAL BLOCKS PLASTIC UTENSILS & PAPER PLATES |
064022 | 08/21/15 | 08/21/15 | 274.77 | |||
| 44701 1 | 01454 2000 | MAINTENANCE SUPPLIES MOP BUCKET & WRINGER COMBOS |
064338 | 08/21/15 | 08/21/15 | 110.72 | |||
| 44702 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS TRASH CAN LINERS |
064433 | 08/21/15 | 08/21/15 | 143.24 | |||
| 44702 2 | 01454 2000 | MAINTENANCE SUPPLIES TRASH CAN LINERS |
064433 | 08/21/15 | 08/21/15 | 84.57 | |||
| 613.30 | |||||||||
| 2898 | AQUASCAPES UNLIMITED | ||||||||
| 44703 1 | 01454 3711 | POND TREATMENT POND SERVICE - BOW TREE, MARYDELL & PIN OAK 8/3/15 |
1173 | 08/21/15 | 08/21/15 | 891.00 | |||
| 891.00 | |||||||||
| 1998 | BARCO PRODUCTS COMPANY | ||||||||
| 44704 1 | 01116 1000 | CLEARING ACCOUNT MEMORIAL BENCH - GIANFORTE |
071501169 | 08/21/15 | 08/21/15 | 837.05 | |||
| 837.05 | |||||||||
| 3213 | BEST LINE EQUIPMENT | ||||||||
| 44705 1 | 01438 3840 | EQUIPMENT RENTAL HYDRAULIC BRKR RENTAL 7/27-8/23/15 |
R05062 | 08/21/15 | 08/21/15 | 1,825.75 | |||
| 1,825.75 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 2
MARP05 run by BARBARA 4 : 21 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | ||||||||
| 44708 1 | 01404 3140 | LEGAL - ADMIN LEGAL SERVICE - 7/16/15 - 8/10/15 |
6979 | 08/21/15 | 08/21/15 | 530.10 | |||
| 44708 2 | 01413 3140 | LEGAL - TWP CODE LEGAL SERVICE - 7/16/15 - 8/10/15 |
6979 | 08/21/15 | 08/21/15 | 760.20 | |||
| 1,290.30 | |||||||||
| 3573 | CEDAR VALLEY EXTERIORS | ||||||||
| 44710 1 | 01362 4100 | BUILDING PERMITS REFUND - CANCELLED PERMIT |
082115 | 08/21/15 | 08/21/15 | 105.40 | |||
| 105.40 | |||||||||
| 1198 | CHESTER COUNTY SPCA | ||||||||
| 44711 1 | 01410 5400 | S.P.C.A. CONTRACT ANIMAL CONTROL ACTIVITY - JULY 2015 |
280 | 08/21/15 | 08/21/15 | 640.00 | |||
| 640.00 | |||||||||
| 3488 | CINTAS CORPORATION #287 | ||||||||
| 44712 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS WEEK END 8/19/15 CLEAN MATS |
287429300 | 08/21/15 | 08/21/15 | 52.50 | |||
| 44712 2 | 01487 1910 | UNIFORMS WEEK END 8/19/15 CLEAN UNIFORMS |
287429300 | 08/21/15 | 08/21/15 | 226.28 | |||
| 278.78 | |||||||||
| 2491 | COMCAST 8499-10-109-0107472 | ||||||||
| 44713 1 | 01401 3210 | COMMUNICATION EXPENSE 0107472 8/17-9/16/15 PW TV |
080815 | 08/21/15 | 08/21/15 | 10.65 | |||
| 10.65 | |||||||||
| 3250 | COMCAST 8499-10-109-0107704 | ||||||||
| 44714 1 | 01401 3210 | COMMUNICATION EXPENSE 0107704 8/23-9/22/15 P&BOOT LED |
081315 | 08/21/15 | 08/21/15 | 103.63 | |||
| 103.63 | |||||||||
| 317 | CONTRACTOR'S CHOICE | ||||||||
| 44715 1 | 01437 2600 | SHOP - TOOLS 2 KNOBS |
00192943 | 08/21/15 | 08/21/15 | 4.98 | |||
| 44716 1 | 01437 2460 | GENERAL EXPENSE - SHOP STIHL 9" ABRASIVE WHEEL & PAINT |
00193045 | 08/21/15 | 08/21/15 | 183.13 | |||
| 188.11 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 3
MARP05 run by BARBARA 4 : 21 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2997 | DOMINION DENTAL SERVICES INC. | ||||||||
| 44717 1 | 01213 1000 | DENTAL INSURANCE W/H SEPTEMBER 2015 PREMIUM |
1985809 | 08/21/15 | 08/21/15 | 971.40 | |||
| 971.40 | |||||||||
| 418 | EAGLE POWER AND EQUIPMENT | ||||||||
| 44718 1 | 01430 2330 | VEHICLE MAINT AND REPAIR CYLINDER & SPRING |
T443926 | 08/21/15 | 08/21/15 | 117.74 | |||
| 117.74 | |||||||||
| 489 | FISHER & SON COMPANY INC | ||||||||
| 44719 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS 6 50LB BAGS BUILDERS MIX |
0000151565-IN | 08/21/15 | 08/21/15 | 354.00 | |||
| 354.00 | |||||||||
| 1634 | FRITZ INC., WILLIAM H. | ||||||||
| 44720 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS SIMPSON SCREWS |
109552 | 08/21/15 | 08/21/15 | 87.47 | |||
| 44721 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS LUMBER & SCREWS - GLENBRK LN.BRIDGE |
109336 | 08/21/15 | 08/21/15 | 1,043.91 | |||
| 1,131.38 | |||||||||
| 3188 | GAP HILL ALUMINUM SHOP | ||||||||
| 44722 1 | 01454 2000 | MAINTENANCE SUPPLIES RAILING FOR BLEACHERS |
8101 | 08/21/15 | 08/21/15 | 1,370.00 | |||
| 1,370.00 | |||||||||
| 3566 | GATTIMORRISSON CONSTRUCTION SERVICE INC. | ||||||||
| 44723 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS EPOXY - GLENBRK BRIDGE |
334717 | 08/21/15 | 08/21/15 | 170.00 | |||
| 170.00 | |||||||||
| 3574 | HAGER, DANIEL | ||||||||
| 44726 1 | 01367 3504 | GOLF APPLEBROOK/HMV REFUND - 6/30 GOLF TOURNAMENT UNABLE TO ATTEND |
081915 | 08/21/15 | 08/21/15 | 95.00 | |||
| 95.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 4
MARP05 run by BARBARA 4 : 21 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 594 | HAMMOND & MCCLOSKEY INC. | ||||||||
| 44727 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS BACKFLOW PREVENTER CHECK - TWP.YARD WESTTOWN RD. |
7363 | 08/24/15 | 08/24/15 | 538.00 | |||
| 44728 1 | 01454 3000 | GENERAL EXPENSE CLEAN URINAL DRAIN - PARK RESTROOM |
7362 | 08/24/15 | 08/24/15 | 280.19 | |||
| 44729 2 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS BACKFLOW PREVENTER TESTING - TWP. BUILDING (3) |
7364 | 08/24/15 | 08/24/15 | 330.00 | |||
| 1,148.19 | |||||||||
| 2717 | HIGGINS & SONS INC., CHARLES A. | ||||||||
| 44730 1 | 01433 2500 | MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR- RT.352 & GREENHL |
40023 | 08/24/15 | 08/24/15 | 1,036.00 | |||
| 1,036.00 | |||||||||
| 641 | HOOBER INC. | ||||||||
| 44731 1 | 01430 2330 | VEHICLE MAINT AND REPAIR WHEEL RIM |
T875686-2 | 08/24/15 | 08/24/15 | 348.00 | |||
| 348.00 | |||||||||
| 679 | INTERCON TRUCK EQUIPMENT | ||||||||
| 44732 1 | 01430 2330 | VEHICLE MAINT AND REPAIR ASPHALT TARP |
1047893-IN | 08/24/15 | 08/24/15 | 104.00 | |||
| 104.00 | |||||||||
| 765 | LENNI ELECTRIC CORPORATION | ||||||||
| 44735 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS REPLACE LIGHT SENSOR - LADIES ROOM |
150758 | 08/24/15 | 08/24/15 | 102.50 | |||
| 44736 1 | 01409 3840 | DISTRICT COURT EXPENSES INSTALL BALLAST & LAMPS - DIST.CT. |
150759 | 08/24/15 | 08/24/15 | 140.25 | |||
| 242.75 | |||||||||
| 2861 | LITTLE INC., ROBERT E. | ||||||||
| 44737 1 | 01430 2330 | VEHICLE MAINT AND REPAIR BELT & KNOB FOR MOWERS |
03-350364 | 08/24/15 | 08/24/15 | 145.61 | |||
| 145.61 | |||||||||
| 787 | LOW-RISE ELEVATOR CO. INC | ||||||||
| 44738 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS BASIC MAINTENANCE - AUGUST 2015 |
63473 | 08/24/15 | 08/24/15 | 40.00 | |||
| 40.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 5
MARP05 run by BARBARA 4 : 21 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 808 | MAILLIE FALCONIERO & CO. | ||||||||
| 44739 1 | 01402 3110 | AUDITING EXPENSE BALANCE DUE - 2014 EXAM & AUDIT OF TWP. FINANCIAL STATEMENTS |
1000047636 | 08/24/15 | 08/24/15 | 9,891.00 | |||
| 44739 2 | 01402 3110 | AUDITING EXPENSE ASSISTANCE RE: CONVERTING RECORDS FROM CASH BASIS TO ACCRUAL |
1000047636 | 08/24/15 | 08/24/15 | 4,600.00 | |||
| 14,491.00 | |||||||||
| 2693 | MULCH & MORE | ||||||||
| 44740 1 | 01454 3710 | LANDSCAPING 4 CUBIC YDS BLACK DYED MULCH |
45664-3 | 08/24/15 | 60.00 | ||||
| 60.00 | |||||||||
| 36 | MYERS INC., ALLAN A. | ||||||||
| 44741 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS 2.07 TONS 16-B51 19MM 64-22 3-30 |
30-00081631 | 08/24/15 | 08/24/15 | 89.80 | |||
| 44742 1 | 01438 2450 | MATERIALS & SUPPLIES-HIGHWAYS 3.05 TONS 16-B51 19MM 64-22 3-30 |
30-00081941 | 08/24/15 | 08/24/15 | 132.32 | |||
| 222.12 | |||||||||
| 1641 | NAPA AUTO PARTS | ||||||||
| 44744 1 | 01430 2330 | VEHICLE MAINT AND REPAIR 15W40 OIL 12QTS |
2-634353 | 08/24/15 | 08/24/15 | 38.40 | |||
| 44745 1 | 01430 2330 | VEHICLE MAINT AND REPAIR BATTERY CORE RETURNS |
2-633673 | 08/24/15 | 08/24/15 | -30.00 | |||
| 8.40 | |||||||||
| 3334 | NATIONWIDE EMPLOYEE BENEFITS | ||||||||
| 44743 1 | 01486 1560 | HEALTH,ACCID. & LIFE SEPTEMBER 2015 PREMIUM |
041888 | 08/24/15 | 3,384.86 | ||||
| 44743 2 | 01213 1010 | VOL. LIFE INSURANCE W/H SEPTEMBER 2015 PREMIUM |
041888 | 08/24/15 | 145.40 | ||||
| 3,530.26 | |||||||||
| 1554 | OFFICE DEPOT | ||||||||
| 44746 1 | 01401 2100 | MATERIALS & SUPPLIES ENVELOPES W/CLASPS |
785486052001 | 08/24/15 | 08/24/15 | 26.49 | |||
| 44747 1 | 01401 2100 | MATERIALS & SUPPLIES HP TONER |
785486229001 | 08/24/15 | 08/24/15 | 136.16 | |||
| 44748 1 | 01401 2100 | MATERIALS & SUPPLIES KEYBOARD TRAY |
786040229001 | 08/24/15 | 08/24/15 | 212.95 | |||
| 375.60 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 6
MARP05 run by BARBARA 4 : 21 PM
01 GENERAL FUND
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1065 | PETTY CASH | ||||||||
| 44749 1 | 01401 2100 | MATERIALS & SUPPLIES KITCHEN SUPPLIES, INK CARTRIDGES & PAPER TOWELS & PLATES |
082015 | 08/24/15 | 08/24/15 | 94.04 | |||
| 44749 2 | 01401 3000 | GENERAL EXPENSE SUPPLIES FOR T.DARLINGTON PARTY - DOLLAR STORE & GIANT |
082015 | 08/24/15 | 08/24/15 | 69.48 | |||
| 44749 3 | 01401 3000 | GENERAL EXPENSE SMART CTS CLEANERS- CLEAN US FLAGS |
082015 | 08/24/15 | 08/24/15 | 120.00 | |||
| 44749 4 | 01401 3250 | POSTAGE PKGS. TO FLOURTOWN & HORSHAM |
082015 | 08/24/15 | 08/24/15 | 19.05 | |||
| 44749 5 | 01454 2000 | MAINTENANCE SUPPLIES MOP & GLO FOR PARK BATHROOMS |
082015 | 08/24/15 | 08/24/15 | 20.76 | |||
| 323.33 | |||||||||
| 1082 | PIPE DATA VIEW | ||||||||
| 44750 1 | 01432 2460 | SNOW - MATERIALS & SUPPLIES VACUUM BRINE TANKS & CATCH BASINS |
14202 | 08/24/15 | 08/24/15 | 732.50 | |||
| 44750 2 | 01436 2450 | STORMWATER MATERIALS & SUPPLIES VACUUM BRINE TANKS & CATCH BASINS |
14202 | 08/24/15 | 08/24/15 | 732.50 | |||
| 1,465.00 | |||||||||
| 3576 | POWERS, JESS | ||||||||
| 44751 1 | 01367 3701 | LADIES & YOUTH TENNIS REFUND FOR TENNIS PROGRAM -RACHEL NOT ABLE TO ATTEND |
081815 | 08/24/15 | 08/24/15 | 65.00 | |||
| 65.00 | |||||||||
| 2539 | PRECISION MECHANICAL SERVICES | ||||||||
| 44752 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS REPAIR A/C PLANK HOUSE |
SC-10232 | 08/24/15 | 08/24/15 | 303.00 | |||
| 303.00 | |||||||||
| 1876 | RANSOME RENTAL COMPANY LP | ||||||||
| 44753 1 | 01430 2330 | VEHICLE MAINT AND REPAIR VEE BELTS |
PCO40019988 | 08/24/15 | 08/24/15 | 53.83 | |||
| 44754 1 | 01430 2330 | VEHICLE MAINT AND REPAIR VEE BELT |
PCO40019989 | 08/24/15 | 08/24/15 | 21.89 | |||
| 44755 1 | 01430 2330 | VEHICLE MAINT AND REPAIR CREDIT RE: TO DUPLICATE PAYMENT |
PC040016750-C | 08/24/15 | 08/24/15 | -61.52 | |||
| 14.20 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 7
MARP05 run by BARBARA 4 : 21 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1161 | REILLY & SONS INC | ||||||||
| 44756 1 | 01430 2320 | VEHICLE OPERATION - FUEL 484.3 GALLONS DIESEL |
88353 | 08/24/15 | 08/24/15 | 841.71 | |||
| 44757 1 | 01430 2320 | VEHICLE OPERATION - FUEL 312.7 GALLONS GASOLINE |
88354 | 08/24/15 | 08/24/15 | 607.58 | |||
| 1,449.29 | |||||||||
| 1297 | STAPLES CREDIT PLAN | ||||||||
| 44759 1 | 01401 2100 | MATERIALS & SUPPLIES SHARPIES, WITE-OUT, CLOROX WIPES & BINDERS |
46907 | 08/24/15 | 08/24/15 | 38.83 | |||
| 38.83 | |||||||||
| 2257 | THOMAS COMITTA ASSOCIATES INC. | ||||||||
| 44760 1 | 01414 3050 | ZONING CONSULTANTS COMP.PLAN CONSULTING 4/30-6/25/15 |
062615 | 08/24/15 | 08/24/15 | 5,890.35 | |||
| 44761 1 | 01414 3050 | ZONING CONSULTANTS COMP.PLAN CONSULTING 6/26-7/31/15 |
073115 | 08/24/15 | 08/24/15 | 3,981.70 | |||
| 9,872.05 | |||||||||
| 1470 | WESTTOWN TOWNSHIP | ||||||||
| 44763 1 | 01410 5310 | REGIONAL POLICE BLDG INTEREST AUGUST 2015 - INTEREST |
083015 | 08/24/15 | 08/24/15 | 1,555.63 | |||
| 44763 2 | 01410 5320 | REGIONAL POLICE BLDG PRINCIPAL AUGUST 2015 - PRINCIPAL |
083015 | 08/24/15 | 08/24/15 | 8,750.00 | |||
| 10,305.63 | |||||||||
| 1983 | YALE ELECTRIC SUPPLY CO | ||||||||
| 44764 1 | 01454 2000 | MAINTENANCE SUPPLIES MASON BOXES, TERMINAL ADAPTORS & LOCKNUTS - APPLEBROOK SIGN |
S104040575.001 | 08/24/15 | 08/24/15 | 9.24 | |||
| 44765 1 | 01409 3745 | PW BUILDING - MAINT REPAIRS LIGHTS FOR BIG SHOP |
S104089065.001 | 08/24/15 | 08/24/15 | 234.00 | |||
| 243.24 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 9
MARP05 run by BARBARA 4 : 21 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 05 | SEWER OPERATING | ||||||||
| 151 | BLOSENSKI DISPOSAL CO, CHARLES | ||||||||
| 44706 1 | 05422 4502 | R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 8/10/15 |
10312 | 08/21/15 | 08/21/15 | 181.00 | |||
| 181.00 | |||||||||
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | ||||||||
| 44707 1 | 05429 3140 | ADMIN - LEGAL LEGAL SERVICE - 6/18-8/11/15 |
6980 | 08/21/15 | 08/21/15 | 729.03 | |||
| 729.03 | |||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | ||||||||
| 44709 2 | 05422 4502 | R.C. SLUDGE-LAND CHESTER WEEK 8/10/15 - 8/15/15 |
41182 | 08/21/15 | 08/21/15 | 642.53 | |||
| 642.53 | |||||||||
| 563 | GRAINGER | ||||||||
| 44724 1 | 05420 3700 | C.C. METERS-MAINT.& REPRS. LANTERN BATTERIES |
9808889548 | 08/21/15 | 08/21/15 | 166.08 | |||
| 166.08 | |||||||||
| 583 | HACH COMPANY | ||||||||
| 44725 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS PROBE SENSORS |
9514221 | 08/21/15 | 08/21/15 | 3,567.66 | |||
| 3,567.66 | |||||||||
| 594 | HAMMOND & MCCLOSKEY INC. | ||||||||
| 44729 1 | 05422 3700 | R.C. STP-MAINT.& REPAIRS BACKFLOW PREVENTER TESTING - RCSTP |
7364 | 08/24/15 | 08/24/15 | 110.00 | |||
| 44729 3 | 05420 3702 | C.C. COLLEC.-MAINT.& REPR. BACKFLOW PREVENTER TESTING- GREENHL |
7364 | 08/24/15 | 08/24/15 | 110.00 | |||
| 220.00 | |||||||||
| 3575 | KODY, SUSAN | ||||||||
| 44733 1 | 05364 1000 | REVENUE - SEWER FEES SEWER REFUND DUE TO DEMO PERMIT ISSUED 11/30/12 |
081815-S | 08/24/15 | 08/24/15 | 353.03 | |||
| 353.03 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 10
MARP05 run by BARBARA 4 : 21 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2439 | VERIZON -7041 | ||||||||
| 44762 1 | 05422 3601 | R.C. COLLEC.-UTILITIES AUGUST 7 - SEPTEMBER 6, 2015 |
080715-7041 | 08/24/15 | 08/24/15 | 234.02 | |||
| 234.02 | |||||||||
East Goshen Township Fund Accounting
BATCH 3 of 4
Report Date 08/24/15
Expenditures Register
GL-1508-49086
PAGE 11
MARP05 run by BARBARA 4 : 21 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 06 | REFUSE | ||||||||
| 197 | BUCKLEY BRION MCGUIRE & MORRIS | ||||||||
| 44707 2 | 06427 3140 | LEGAL SERVICES LEGAL SERVICE - 6/18-8/11/15 |
6980 | 08/21/15 | 08/21/15 | 729.03 | |||
| 729.03 | |||||||||
| 241 | C.C. SOLID WASTE AUTHORITY | ||||||||
| 44709 1 | 06427 4502 | LANDFILL FEES WEEK 8/10/15 - 8/15/15 |
41182 | 08/21/15 | 08/21/15 | 5,416.07 | |||
| 5,416.07 | |||||||||
| 3575 | KODY, SUSAN | ||||||||
| 44734 1 | 06364 2000 | REVENUE - REFUSE FEES REFUSE REFUND DUE TO DEMO PERMIT ISSUED 11/30/12 |
081815-R | 08/24/15 | 08/24/15 | 632.99 | |||
| 632.99 | |||||||||
| 70,591.70 | |||||||||
| 0 Printed, totalling | 70,591.70 | ||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 57,720.26 | GENERAL FUND |
| 05 | 05 | 6,093.35 | SEWER OPERATING |
| 06 | 06 | 6,778.09 | REFUSE |
| 70,591.70 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1508 | 70,591.70 |
| 70,591.70 |
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 1
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 01 | GENERAL FUND | ||||||||
| 1657 | AQUA PA | ||||||||
| 44769 1 | 01409 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309828 0309828 7/16-8/17/15 TB |
081915-TB | 08/27/15 | 08/27/15 | 119.90 | |||
| 44770 1 | 01409 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309820 0309820 7/16-8/17/15 FR |
081915 FR | 08/27/15 | 08/27/15 | 192.00 | |||
| 44771 1 | 01409 3600 | TWP. BLDG. - FUEL, LIGHT, WATER 000309801 0309801 7/21-8/20/15 BS |
082415 BS | 08/27/15 | 08/27/15 | 16.00 | |||
| 44772 1 | 01409 3605 | PW BLDG - FUEL, LIGHT, SEWER & WATER 000496917 0309798 7/16-8/17/15 PW |
081915 PW | 08/27/15 | 08/27/15 | 149.90 | |||
| 477.80 | |||||||||
| 3433 | BURNS ENGINEERING INC. | ||||||||
| 44777 1 | 01408 3130 | ENGINEERING SERVICES PROF.SERVICE 6/29-7/26/15 WATERVIEW SPEED STUDY |
3 | 08/27/15 | 08/27/15 | 481.50 | |||
| 481.50 | |||||||||
| 317 | CONTRACTOR'S CHOICE | ||||||||
| 44779 1 | 01454 2000 | MAINTENANCE SUPPLIES NAILER & PINS - APPLEBRK SIGN |
00193105 | 08/27/15 | 08/27/15 | 113.51 | |||
| 113.51 | |||||||||
| 320 | CONWAY POWER EQUIPMENT | ||||||||
| 44780 1 | 01430 2330 | VEHICLE MAINT AND REPAIR ROCKER SWITCH, SPARK PLUGS & AIR FILTERS |
4924 | 08/27/15 | 08/27/15 | 46.46 | |||
| 44781 1 | 01430 2330 | VEHICLE MAINT AND REPAIR CASTER WHEEL KIT - MOWERS #11 |
7292 | 08/27/15 | 08/27/15 | 65.38 | |||
| 111.84 | |||||||||
| 418 | EAGLE POWER AND EQUIPMENT | ||||||||
| 44782 1 | 01430 2330 | VEHICLE MAINT AND REPAIR TAK BUCKET SIDE CUTTER-SKIDD STEER |
T443999 | 08/27/15 | 08/27/15 | 82.25 | |||
| 82.25 | |||||||||
| 2555 | FASTENAL | ||||||||
| 44783 1 | 01454 2000 | MAINTENANCE SUPPLIES HEX LAG SCREWS & SHIELDS - APPLBRK. SIGN |
PAMAV18812 | 08/27/15 | 08/27/15 | 52.79 | |||
| 52.79 | |||||||||
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 2
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 473 | FASTSIGNS | ||||||||
| 44784 1 | 01401 2100 | MATERIALS & SUPPLIES NAMEPLATE - CHRISTINA HARTNETT |
368-38458 | 08/27/15 | 08/27/15 | 29.91 | |||
| 44785 1 | 01401 2100 | MATERIALS & SUPPLIES NAMEPLATES- LORI KIER & BRAD GIRESI |
368-38566 | 08/27/15 | 08/27/15 | 46.00 | |||
| 75.91 | |||||||||
| 569 | GREAT VALLEY LOCKSHOP | ||||||||
| 44786 1 | 01409 2400 | TWP. BLDG. - MATERIALS & SUPPLIES INSTALL 9 VOLT BATTERIES-FRONT SAFE |
0000107311 | 08/27/15 | 08/27/15 | 37.50 | |||
| 37.50 | |||||||||
| 2717 | HIGGINS & SONS INC., CHARLES A. | ||||||||
| 44787 1 | 01433 2500 | MAINT. REPAIRS.TRAFF.SIG. TRAF.LIGHT REPAIR - ELLIS & E. STRASBURG |
40088 | 08/27/15 | 08/27/15 | 65.00 | |||
| 65.00 | |||||||||
| 638 | HOME DEPOT CREDIT SERVICES | ||||||||
| 44788 1 | 01401 3025 | DEER MANAGEMENT EXPENSE RED & WHITE SPRAY PAINT |
081315 | 08/27/15 | 08/27/15 | 30.08 | |||
| 44788 2 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS HOSE NOZZLES |
081315 | 08/27/15 | 08/27/15 | 21.94 | |||
| 44788 3 | 01430 2330 | VEHICLE MAINT AND REPAIR CRIMP BRSH, STRINGER WHEEL, DEMON CONICALS & BROOM-TRK #8 DOOR PULL, HINGES & GATE HOOK-STEVE'S TRUCK |
081315 | 08/27/15 | 08/27/15 | 93.95 | |||
| 44788 4 | 01437 2460 | GENERAL EXPENSE - SHOP SAW BLADES, WIRE BRUSHES, DOOR PULL BRICKHAMMER, SANDING BELTS & SCREWS |
081315 | 08/27/15 | 08/27/15 | 139.92 | |||
| 44788 5 | 01437 2600 | SHOP - TOOLS SHOP VAC. |
081315 | 08/27/15 | 08/27/15 | 99.00 | |||
| 44788 6 | 01454 2000 | MAINTENANCE SUPPLIES PARK RESTROOM SHELVES, BROOMS, SPRAYERS, DUST PAN & BRUSH & BATTERIES |
081315 | 08/27/15 | 08/27/15 | 132.83 | |||
| 517.72 | |||||||||
| 694 | J&L BUILDING MATERIALS INC | ||||||||
| 44789 1 | 01454 2000 | MAINTENANCE SUPPLIES SPRING HOUSE ROOF MATERIALS -APPLBK PARK |
03579181 | 08/27/15 | 08/27/15 | 1,216.95 | |||
| 1,216.95 | |||||||||
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 3
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 1030 | LEVEL 3 | ||||||||
| 44790 1 | 01401 3210 | COMMUNICATION EXPENSE AUGUST 20 - SEPTEMBER 19, 2015 |
106130304 | 08/27/15 | 08/27/15 | 988.75 | |||
| 988.75 | |||||||||
| 1817 | LOWES BUSINESS ACCOUNT/GECF | ||||||||
| 44791 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS ROLLER & SEAM REPAIR - 2ND FL.WALLP APER |
081715 | 08/27/15 | 08/27/15 | 5.40 | |||
| 44791 2 | 01454 2000 | MAINTENANCE SUPPLIES ROUNDUP FOR THE PARK |
081715 | 08/27/15 | 08/27/15 | 98.10 | |||
| 103.50 | |||||||||
| 3551 | MCMAHON ASSOCIATES INC. | ||||||||
| 44792 1 | 01414 3050 | ZONING CONSULTANTS PROF.SERVICE 6/27-7/31/15 PAOLI PK. TRAIL |
145371 | 08/27/15 | 08/27/15 | 5,596.54 | |||
| 5,596.54 | |||||||||
| 2622 | MIDDLETON, CHRISTIAN | ||||||||
| 44793 1 | 01487 4600 | TRAINING & SEMINARS-EMPLY TAX COLLECTOR TRAINING REIMBURSEMNT |
082415 | 08/27/15 | 08/27/15 | 35.00 | |||
| 35.00 | |||||||||
| 2342 | POWERPRO EQUIPMENT | ||||||||
| 44794 1 | 01454 2000 | MAINTENANCE SUPPLIES STUCO & KEYSTONE MASONRY |
P01905 | 08/27/15 | 08/27/15 | 15.50 | |||
| 15.50 | |||||||||
| 1876 | RANSOME RENTAL COMPANY LP | ||||||||
| 44795 1 | 01452 5150 | AMPHITHEATER CONCERTS LIGHTOWER RENTAL 8/14-8/17/15 MOVIE |
K17127-01 | 08/27/15 | 08/27/15 | 120.00 | |||
| 44796 1 | 01452 5150 | AMPHITHEATER CONCERTS LIGHTOWER RENTAL 8/14-8/17/15 MOVIE |
K17126-01 | 08/27/15 | 08/27/15 | 120.00 | |||
| 240.00 | |||||||||
| 3459 | SASS-MOORE SERVICE CORPORATION | ||||||||
| 44801 1 | 01409 3740 | TWP. BLDG. - MAINT & REPAIRS INSTALL ADDITIONAL CO2 SENSOR |
0065138-2 | 08/27/15 | 08/27/15 | 1,678.00 | |||
| 1,678.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 4
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 2278 | TOP C.R.O.P.S. | ||||||||
| 44797 1 | 01454 3710 | LANDSCAPING DAM WEED CONTROL |
791 | 08/27/15 | 08/27/15 | 570.00 | |||
| 570.00 | |||||||||
| 2273 | VERIZON - 0527 | ||||||||
| 44799 1 | 01409 3605 | PW BLDG - FUEL,LIGHT,SEWER & WATER AUGUST 15 - SEPTEMBER 14, 2015 |
081515-0527 | 08/27/15 | 08/27/15 | 181.95 | |||
| 181.95 | |||||||||
| 2868 | VERIZON-1420 | ||||||||
| 44800 1 | 01409 3840 | DISTRICT COURT EXPENSES AUGUST 16 - SEPTEMBER 15, 2015 |
081615-1420 | 08/27/15 | 08/27/15 | 78.94 | |||
| 78.94 | |||||||||
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 5
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 03 | SINKING FUND | ||||||||
| 3521 | CARROLL ENGINERRING CORPORATION | ||||||||
| 44778 1 | 03459 7450 | CAPITAL - E. BOOT RD BRIDGE PROF.SERVICE 6/29-7/26/15 E.BOOT RD BRIDGE |
197198 | 08/27/15 | 08/27/15 | 4,455.00 | |||
| 4,455.00 | |||||||||
East Goshen Township Fund Accounting
BATCH 4 of 4
Report Date 08/27/15
Expenditures Register
GL-1508-49137
PAGE 6
MARP05 run by BARBARA 3 : 37 PM
| Vendor | Req # | Budget# Sub# | Description | Invoice Number | Req Date | Check Dte | Recpt Dte | Check# | Amount |
|---|---|---|---|---|---|---|---|---|---|
| 05 | SEWER OPERATING | ||||||||
| 1658 | AQUA PA | ||||||||
| 44773 1 | 05420 3602 | C.C. COLLECTION -UTILITIES 000300141 0300141 7/16-8/17/15 GH |
081915 GH | 08/27/15 | 08/27/15 | 16.00 | |||
| 44774 1 | 05420 3602 | C.C. COLLECTION -UTILITIES 000363541 0357724 07/16-8/17/15 BK |
081915 BK | 08/27/15 | 08/27/15 | 16.00 | |||
| 44775 1 | 05420 3602 | C.C. COLLECTION -UTILITIES 000309826 0309826 7/21-8/20/15 TH |
082415 TH | 08/27/15 | 08/27/15 | 18.00 | |||
| 44776 1 | 05422 3601 | R.C. COLLEC.-UTILITIES 001533998 1087842 7/21-8/20/15 TWN |
082415 TWN | 08/27/15 | 08/27/15 | 521.20 | |||
| 571.20 | |||||||||
| 2914 | TOWLER, SCOTT A. | ||||||||
| 44798 1 | 05422 4500 | R.C. STP-CONTRACTED SERV. SERVICES RE: RCSTP - JULY 2015 |
15-070131-2 | 08/27/15 | 08/27/15 | 15,138.59 | |||
| 15,138.59 | |||||||||
| 32,885.74 | |||||||||
| 0 Printed, totalling | 32,885.74 | ||||||||
FUND SUMMARY
| Fund | Bank Account | Amount | Description |
|---|---|---|---|
| 01 | 01 | 12,720.95 | GENERAL FUND |
| 03 | 03 | 4,455.00 | SINKING FUND |
| 05 | 05 | 15,709.79 | SEWER OPERATING |
| 32,885.74 | |||
PERIOD SUMMARY
| Period | Amount |
|---|---|
| 1508 | 32,885.74 |
| 32,885.74 |
ATTACHMENT 1 OF 1
MEETING DATE 9/1/15
PLGIT 1107.1010
| DATE | DESCRIPTION | TOTAL | 1401.2100 | 1401.3000 | 1407.2130 | 1452.2000 | 1452.2010 | 1452.3717 |
|---|---|---|---|---|---|---|---|---|
| RICK SMITH | ||||||||
| 6/30/2015 | WP ENGINE | 29.00 | 29.00 | |||||
| 7/2/2015 | HP Home Store - Toner - Credit | -7.78 | -7.78 | |||||
| 7/7/2015 | AT& T DATA - IPAD | 14.99 | 14.99 | |||||
| 7/15/2015 | J&A Gourmet - Terry's Retirement Party | 206.25 | 206.25 | |||||
| 7/15/2015 | AT& T DATA - IPAD | 14.99 | 14.99 | |||||
| Subtotal | $257.45 | |||||||
| MARK MILLER | ||||||||
| 7/8/2015 | AT& T DATA - IPAD | 30.00 | 30.00 | |||||
| Subtotal | $30.00 | |||||||
| JASON LANG | ||||||||
| 7/2/2015 | Walmart - Camp Supplies | 73.43 | 73.43 | |||||
| 7/7/2015 | Walmart - Camp Supplies | 124.34 | 124.34 | |||||
| 7/14/2015 | Michaels - Camp Supplies | 65.93 | 65.93 | |||||
| 7/17/2015 | Walmart - Camp & HS Entre. Camp Supplies | 200.31 | 104.99 | 95.32 | ||||
| 7/22/2015 | Regal Cinema - Summer Camp Field Trip | 115.00 | 115.00 | |||||
| 7/24/2015 | Chuck E Cheese - Summer Camp Field Trip | 205.23 | 205.23 | |||||
| Subtotal | $784.24 | |||||||
| GRAND TOTAL | 1,071.69 | -7.78 | 206.25 | 88.98 | 368.69 | 320.23 | 95.32 | |
J/E's made: [X]
Ad to Master Cred.Card List: [X]
ATTESTATION ENGAGEMENT
Township of East Goshen
Chester County, Pennsylvania
15-208
Liquid Fuels Tax Fund
For the Period
January 1, 2013 to December 31, 2014
August 2015
Commonwealth of Pennsylvania
Department of the Auditor General
Eugene A. DePasquale • Auditor General
Commonwealth of Pennsylvania
Department of the Auditor General
Harrisburg, PA 17120-0018
Facebook: Pennsylvania Auditor General
Twitter: @PAAuditorGen
www.PaAuditor.gov
EUGENE A. DEPASQUALE
AUDITOR GENERAL
Independent Auditor's Report
The Honorable Leslie Richards
Secretary
Department of Transportation
Harrisburg, PA 17120
We examined the accompanying Forms MS-965 With Adjustments for the Liquid Fuels Tax Fund of the Township of East Goshen, Chester County, for the period January 1, 2013 to December 31, 2014. The municipality's management is responsible for the Forms MS-965. Our responsibility is to express an opinion on the Forms MS-965 With Adjustments based on our examination.
Our examination was conducted in accordance with attestation standards established by the American Institute of Certified Public Accountants and the standards applicable to attestation engagements contained in Government Auditing Standards issued by the Comptroller General of the United States. An examination includes examining, on a test basis, evidence supporting the Township of East Goshen, Chester County's Forms MS-965 for the period January 1, 2013 to December 31, 2014 and performing such other procedures as we considered necessary in the circumstances. We believe that our examination provides a reasonable basis for our opinion.
We are mandated by Section 403 of The Fiscal Code, 72 P.S. § 403, to audit each municipality's Liquid Fuels Tax Fund to ensure that funds received are expended in accordance with applicable laws and regulations. Government Auditing Standards issued by the Comptroller General of the United States include attestation engagements as a separate type of audit. An attestation engagement performed pursuant to Government Auditing Standards involves additional standards that exceed the standards provided by the American Institute of Certified Public Accountants. Accordingly, this attestation engagement complies with both Government Auditing Standards and Section 403 of The Fiscal Code.
As described in Note 4, the adjustments included on the Forms MS-965 With Adjustments are made by the Department of the Auditor General.
Independent Auditor's Report (Continued)
In our opinion, the Forms MS-965 With Adjustments present, in all material respects, the information required by the Pennsylvania Department of Transportation for the Liquid Fuels Tax Fund of the Township of East Goshen, Chester County, for the period January 1, 2013 to December 31, 2014, in conformity with the criteria set forth in Note 1.
In accordance with Government Auditing Standards, we are required to report all deficiencies that are considered to be significant deficiencies or material weaknesses in internal control; fraud and noncompliance with provisions of laws or regulations that have a material effect on the Forms MS-965; and any other instances that warrant the attention of those charged with governance; noncompliance with provisions of contracts or grant agreements, and abuse that has a material effect on the Forms MS-965. We are also required to obtain and report the views of responsible officials concerning the findings, conclusions, and recommendations, as well as any planned corrective actions. We performed our examination to express an opinion on whether the Forms MS-965 are presented in accordance with the criteria described above and not for the purpose of expressing an opinion on the internal control over reporting on the Forms MS-965 or on compliance and other matters; accordingly, we express no such opinions.
A deficiency in internal control exists when the design or operation of a control does not allow management or employees, in the normal course of performing their assigned functions, to prevent, or detect and correct, misstatements on a timely basis. A material weakness is a deficiency, or combination of deficiencies, in internal control such that there is a reasonable possibility that a material misstatement of the Forms MS-965 will not be prevented, or detected and corrected, on a timely basis. A significant deficiency is a deficiency, or a combination of deficiencies, in internal control that is less severe than a material weakness, yet important enough to merit attention by those charged with governance.
Our consideration of internal control over reporting on the Forms MS-965 was for the limited purpose of expressing an opinion on whether the Forms MS-965 are presented in accordance with the criteria described above and would not necessarily identify all deficiencies in internal control that might be material weaknesses or significant deficiencies. Given these limitations, during our engagement we did not identify any deficiencies in internal control that we consider to be material weaknesses. However, material weaknesses may exist that have not been identified.
Independent Auditor's Report (Continued)
As part of obtaining reasonable assurance about whether the Forms MS-965 are free from material misstatement, we performed tests of the Township of East Goshen, Chester County's compliance with certain provisions of laws, regulations, contracts, and grant agreements, noncompliance with which could have a direct and material effect on the determination of amounts on the Forms MS-965. However, providing an opinion on compliance with those provisions was not an objective of our engagement, and accordingly, we do not express such an opinion. The results of our tests disclosed no instances of noncompliance or other matters that are required to be reported under Government Auditing Standards. However, we did note a matter that, while not required to be included in this report by Government Auditing Standards, has been included in the finding below:
- Nonpermissible Expenditure - Recurring.
We are concerned that the municipality failed to correct our prior examination finding for nonpermissible expenditures. The failure to purchase stone that is approved by the Department of Transportation could result in the municipality having to reimburse $1,094.80 to its Liquid Fuels Tax Fund. The municipality should strive to comply with the recommendations and corrective actions noted in this report.
This report is intended solely for the information and use of the Pennsylvania Department of Transportation and the management of the Township of East Goshen, Chester County, and is not intended to be and should not be used by anyone other than these specified parties.
We appreciate the courtesy extended by the Township of East Goshen, Chester County, to us during the course of our examination. If you have any questions, please feel free to contact Michael B. Kashishian, CPA, CGAP, CFE, Director, Bureau of County Audits, at 717-787-1363.
June 15, 2015
Eugene A. DePasquale
Auditor General
CONTENTS
| Page | |
|---|---|
| Background | 1 |
| Financial Section: | |
| 2013 Form MS-965 With Adjustments | 2 |
| 2014 Form MS-965 With Adjustments | 5 |
| Notes To Forms MS-965 With Adjustments | 8 |
| Finding And Recommendations: | |
| Finding - Nonpermissible Expenditure - Recurring | 12 |
| Summary Of Prior Examinations' Recommendations | 13 |
| Summary Of Exit Conference | 14 |
| Report Distribution | 15 |
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
BACKGROUND
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
Background
The Liquid Fuels Tax Municipal Allocation Law, Title 72 P.S. § 2615.5, provides municipalities other than counties (townships, boroughs, cities, towns, home rule, and optional plan governments) with an annual allocation of liquid fuels taxes from the state's Motor License Fund to be used for the maintenance and repair of streets, roads, and bridges for which the municipality is responsible. The allocation of these funds to municipalities is based: (1) 50 percent on the municipality's proportion of local road mileage to the total local road mileage in the state, and (2) 50 percent on the proportion of a municipality's population to the total population in the state.
The Vehicle Code, Title 75 P.S. § 9511, provides municipalities with annual maintenance payments to be received from the Motor License Fund for functionally local highways that were transferred to a municipality from the Commonwealth of Pennsylvania.
Each municipality must deposit the Liquid Fuels Tax Fund money and annual maintenance payments that it receives into a special fund called the Municipal Liquid Fuels Tax Fund or State Fund. A municipality may not deposit any other monies into this fund except when the municipality does not have enough money in the special fund to meet the payments called for by its current annual budget for road and bridge purposes. In this case, the municipality may borrow money or transfer money from its General Fund to its Liquid Fuels Tax Fund.
The Department of Transportation has been given the regulatory authority for the administration of these funds. To qualify for its annual allocation, each municipality shall submit the following documents and information to the Department of Transportation:
- Evidence that the treasurer is bonded in accordance with the law, or that its treasurer is a bank requiring no bond by January 31 of each year.
- A report indicating the manner in which its liquid fuels tax allocation was expended in the previous year (Form MS-965) by January 31 of each year.
- A report of elected and appointed officials by January 31 of each year.
- A Survey of Financial Condition by March 15 of each year.
Department of Transportation Publication 9 contains the policies and procedures that govern the use of Liquid Fuels Tax Fund money. However, if there is a difference between Publication 9 and any legislation, the legislation shall govern.
1
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2013 FORM MS-965 – SECTION 1
WITH ADJUSTMENTS
| Expenditure Summary | Reported | Adjustments (Note 4) |
Adjusted Amount |
|---|---|---|---|
| Major equipment purchases | $ - | $ - | $ - |
| Minor equipment purchases | - | - | - |
| Computer/Computer related training | - | - | - |
| Agility projects | - | - | - |
| Cleaning streets and gutters | - | - | - |
| Winter maintenance services | 35,860.09 | - | 35,860.09 |
| Traffic control devices | 7,571.75 | - | 7,571.75 |
| Street lighting | 8,936.83 | - | 8,936.83 |
| Storm sewers and drains | - | - | - |
| Repairs of tools and machinery | - | - | - |
| Maintenance and repair of roads and bridges | 16,444.72 | - | 16,444.72 |
| Highway construction and rebuilding projects | 461,586.61 | - | 461,586.61 |
| Miscellaneous (Summary of 2008-2010 examination recommendation) | - | 114,189.93 | 114,189.93 |
| Total (To Section 2, Line 5) | $ 530,400.00 | $ 114,189.93 | $ 644,589.93 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
2
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2013 FORM MS-965 – SECTION 2
WITH ADJUSTMENTS
| Fund Balance | Reported | Adjustments (Note 4) |
Adjusted Amount |
|---|---|---|---|
| 1. Balance, January 1, 2013 | $ 60.90 | $ - | $ 60.90 |
| Receipts: | |||
| 2. State allocation | 360,985.89 | - | 360,985.89 |
| 2a. Turnback allocation | 2,320.00 | - | 2,320.00 |
| 2b. Interest on investments (Note 3) | 1,266.45 | - | 1,266.45 |
| 2c. Miscellaneous (Summary of 2008-2010 examination recommendation) | 165,918.62 | 114,189.93 | 280,108.55 |
| 3. Total receipts | 530,490.96 | 114,189.93 | 644,680.89 |
| 4. Total funds available | 530,551.86 | 114,189.93 | 644,741.79 |
| 5. Expenditures (Section 1) | 530,400.00 | 114,189.93 | 644,589.93 |
| 6. Balance, December 31, 2013 | $ 151.86 | $ - | $ 151.86 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
3
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2013 FORM MS-965 – SECTION 3
WITH ADJUSTMENTS
| Equipment Balance | Reported | Adjustments | Adjusted Amount |
|---|---|---|---|
| 1. Prior year equipment balance | $ 60.90 | $ - | $ 60.90 |
| 2. Add: Current year equipment allocation (20% of Lines 2 + 2a, Section 2) |
72,661.18 | - | 72,661.18 |
| 3. PENNDOT approved adjustments |
- | - | - |
| 4. Total funds available for equipment acquisition |
72,722.08 | - | 72,722.08 |
| 5. Less: Major equipment expenditures |
- | - | - |
| 6. Remainder | 72,722.08 | - | 72,722.08 |
| 7. Equipment balance available for subsequent year (Lesser of Line 6 or Section 2 balance, but not less than zero) |
$ 151.86 | $ - | $ 151.86 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
4
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2014 FORM MS-965 – SECTION 1
WITH ADJUSTMENTS
| Expenditure Summary | Reported | Adjustments | Adjusted Amount |
|---|---|---|---|
| Major equipment purchases | $ - | $ - | $ - |
| Minor equipment purchases | - | - | - |
| Computer/Computer related training | - | - | - |
| Agility projects | - | - | - |
| Cleaning streets and gutters | - | - | - |
| Winter maintenance services | 2,662.23 | - | 2,662.23 |
| Traffic control devices | 1,042.71 | - | 1,042.71 |
| Street lighting | - | - | - |
| Storm sewers and drains | - | - | - |
| Repairs of tools and machinery | - | - | - |
| Maintenance and repair of roads and bridges | - | - | - |
| Highway construction and rebuilding projects | 394,352.97 | - | 394,352.97 |
| Miscellaneous | - | - | - |
| Total (To Section 2, Line 5) | $ 398,057.91 | $ - | $ 398,057.91 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
5
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2014 FORM MS-965 – SECTION 2
WITH ADJUSTMENTS
| Fund Balance | Reported | Adjustments | Adjusted Amount |
|---|---|---|---|
| 1. Balance, January 1, 2014 | $ 151.86 | $ - | $ 151.86 |
| Receipts: | |||
| 2. State allocation | 390,858.51 | - | 390,858.51 |
| 2a. Turnback allocation | 2,320.00 | - | 2,320.00 |
| 2b. Interest on investments (Note 3) | 535.62 | - | 535.62 |
| 2c. Miscellaneous (Summary of prior examination recommendations) | 4,396.01 | - | 4,396.01 |
| 3. Total receipts | 398,110.14 | - | 398,110.14 |
| 4. Total funds available | 398,262.00 | - | 398,262.00 |
| 5. Expenditures (Section 1) | 398,057.91 | - | 398,057.91 |
| 6. Balance, December 31, 2014 | $ 204.09 | $ - | $ 204.09 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
6
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
2014 FORM MS-965 – SECTION 3
WITH ADJUSTMENTS
| Equipment Balance | Reported | Adjustments | Adjusted Amount |
|---|---|---|---|
| 1. Prior year equipment balance | $ 151.86 | $ - | $ 151.86 |
| 2. Add: Current year equipment allocation (20% of Lines 2 + 2a, Section 2) |
78,635.70 | - | 78,635.70 |
| 3. PENNDOT approved adjustments | - | - | - |
| 4. Total funds available for equipment acquisition | 78,787.56 | - | 78,787.56 |
| 5. Less: Major equipment expenditures | - | - | - |
| 6. Remainder | 78,787.56 | - | 78,787.56 |
| 7. Equipment balance available for subsequent year (Lesser of Line 6 or Section 2 balance, but not less than zero) | $ 204.09 | $ - | $ 204.09 |
Notes to Forms MS-965 With Adjustments are an integral part of this report.
7
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
NOTES TO FORMS MS-965 WITH ADJUSTMENTS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
1. Criteria
Section 1
This section of Form MS-965 With Adjustments provides a summary of Liquid Fuels Tax Fund expenditures by category. Categories requiring explanation include:
- Major equipment purchases are purchases of road machinery and road equipment with varying yearly costs in excess of the amounts indicated below: Prior To 2012 2012 2013 2014 $4,000.00 $10,000.00 $10,200.00 $10,300.00
- Minor equipment purchases are purchases of road machinery and road equipment with varying yearly costs, or less, than the amounts indicated below: Prior To 2012 2012 2013 2014 $4,000.00 $10,000.00 $10,200.00 $10,300.00
- Agility projects are exchanges of services with the Department of Transportation.
Section 2
This section of Form MS-965 With Adjustments provides information on the fund balance. Categories requiring explanation include:
- The state allocation is generally received from the Department of Transportation during the first week in April of each year. The amount the municipality receives is based half on its population and half on its road mileage.
- The turnback allocation is generally received from the Department of Transportation during the first week in April of each year. A municipality receives a yearly turnback allocation based on road mileage for all roads that were transferred to the municipality from the Commonwealth of Pennsylvania through the Highway Transfer Program.
8
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
NOTES TO FORMS MS-965 WITH ADJUSTMENTS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
1. Criteria (Continued)
Section 2 (Continued)
- Expenditures include the total transferred from Section 1.
Section 3
This section of Form MS-965 With Adjustments determines if the municipality expended Liquid Fuels Tax Fund money in excess of the permissible amount for equipment and the balance that the municipality may carry forward for the purchase of equipment to the subsequent year.
Department of Transportation Publication 9 requires that the amount expended for equipment purchases in a given year not exceed the sum of the equipment balance carried forward from the previous year and 20 percent of the current year’s Liquid Fuels Tax Fund allocation and, if applicable, 20 percent of the turnback allocation plus other Department of Transportation approved adjustments.
If the municipality spent in excess of the amount listed on Line 4, the excess must be reimbursed to the Liquid Fuels Tax Fund.
The equipment balance to be carried forward for the subsequent year is the lesser of the amount on Line 6 or the ending fund balance on Line 6 of Section 2, but not less than zero.
Basis Of Presentation
The financial activities of the municipality are accounted for in separate funds. The Liquid Fuels Tax Fund is used to account for state aid revenues from the Pennsylvania Department of Transportation used primarily for building and improving local roads and bridges. The Forms MS-965 have been prepared in accordance with reporting requirements prescribed by the Pennsylvania Department of Transportation as a result of the Fuels Tax Act 655, dated 1956 and as amended, which does not constitute a complete presentation of the entity’s assets, liabilities, expenses, and fund balance. Accordingly, the presentation of Forms MS-965 With Adjustments is restricted to the Liquid Fuels Tax Fund, which represents a segment of the entity.
9
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
NOTES TO FORMS MS-965 WITH ADJUSTMENTS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
1. Criteria (Continued)
Basis Of Accounting
The accompanying Forms MS-965 With Adjustments are prepared in accordance with reporting requirements prescribed by the Pennsylvania Department of Transportation. Under this method, revenues are recognized when received and expenditures are recorded when paid.
General Fixed Assets
General fixed assets are recognized as expenditures at the time of purchase. No depreciation has been provided on the heavy equipment used to maintain and repair roads and bridges.
2. Deposits
The Second Class Township Code, Title 53 P.S. § 68204, authorizes the township to deposit its funds in the following:
- Deposits in savings accounts or time deposits, other than certificates of deposit or share accounts of institutions having their principal place of business in the Commonwealth of Pennsylvania and insured by the Federal Deposit Insurance Corporation (FDIC) or other like insurance. For any amount above the insured maximum, the depository shall pledge approved collateral.
- Certificates of deposit purchased from institutions insured by the FDIC or other like insurance to the extent that such accounts are so insured. For any amounts in excess of the insured maximum, such deposits shall be collateralized by a pledge or assignment of assets. Certificates of deposit may not exceed 20 percent of a bank’s total capital surplus or 20 percent of a savings and loan or savings bank’s assets minus liabilities.
Deposits consist of receipts and deposits in a financial institution. Pennsylvania statutes require all deposits to be insured and, for any amount above the insured maximum, to be secured with approved collateral as defined.
10
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
NOTES TO FORMS MS-965 WITH ADJUSTMENTS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
2. Deposits (Continued)
There were no deposits exposed to custodial credit risk as of December 31, 2014. Custodial credit risk, as defined by GASB No. 40, includes deposits that are not covered by depository insurance and the deposits are uncollateralized, collateralized with securities held by the pledging financial institution, or collateralized with securities held by the pledging financial institution’s trust department or agent but not in the municipality’s name.
Fund Balance
The fund balance as of December 31, 2014 consists of the following:
| Cash | $204.09 |
|---|
3. Interest On Investments
Our examination disclosed that the municipality deposited idle liquid fuels tax money in an interest-bearing account which earned $1,266.45 during 2013, and $535.62 during 2014, thus providing additional funds for road maintenance and repairs.
11
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
FINDING AND RECOMMENDATIONS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
Finding - Nonpermissible Expenditure - Recurring
We cited the municipality for nonpermissible expenditures in our prior two reports with the most recent being for the period January 1, 2011 to December 31, 2012. However, our current examination disclosed that the municipality expended $1,094.80 during 2014 from the Liquid Fuels Fund for the purchase of Type 2A Modified stone, which is a nonpermissible expenditure.
Stone approved by the Department of Transportation are listed in the Department of Transportation Specifications Publication 408, Section 703.2. Type 2A Modified stone is not approved for use by municipalities in Publication 408.
This condition occurred because the municipality failed to comply with our prior examination recommendation to purchase stone that is approved by the Department of Transportation.
The failure to purchase stone that is approved by the Department of Transportation could result in the municipality having to reimburse $1,094.80 to its Liquid Fuels Tax Fund.
Recommendations
We recommend that the municipality reimburse $1,094.80 to its Liquid Fuels Tax Fund upon official notification by the Department of Transportation.
We further recommend that, in the future, the municipality purchase stone that is approved by the Department of Transportation.
Management’s Response
The municipal officials offered no formal response at this time
Auditor’s Conclusion
This is a recurring finding. We strongly recommend that the municipality comply with our recommendations.
12
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
SUMMARY OF PRIOR EXAMINATIONS’ RECOMMENDATIONS
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
Summary Of 2008-2010 Examination Recommendation
In our 2008-2010 report we recommended that the Department of Transportation review our examination finding to determine if the municipality should reimburse $280,108.55 to its Liquid Fuels Tax Fund for the failure to obtain project approval.
During our prior examination we reviewed a letter dated May 28, 2013 from the Department of Transportation informing the municipality to reimburse $280,108.55 to its Liquid Fuels Tax Fund. We noted that the municipality reimbursed this amount to its Liquid Fuels Tax Fund on June 4, 2013.
Additionally, during our current examination we reviewed a letter dated September 9, 2013, from the Department of Transportation, informing the municipality that the reimbursement of $114,189.93 of the $280,108.55 would not be required. The municipality transferred this amount from its Liquid Fuels Tax Fund to its General Fund on September 17, 2013.
Summary Of 2011-2012 Examination Recommendations
In our 2011-2012 report we recommended that the Department of Transportation review our examination finding to determine if the municipality should reimburse $4,396.01 to its Liquid Fuels Tax Fund for nonpermissible expenditures.
During our current examination we reviewed a letter dated July 10, 2014, from the Department of Transportation informing the municipality to reimburse $4,396.01 to its Liquid Fuels Tax Fund. We noted that the municipality reimbursed this amount to its Liquid Fuels Tax Fund on July 22, 2014.
In our 2011-2012 report we also recommended that the municipality comply with the Liquid Fuels Tax Municipal Allocation Law regarding permissible expenditures.
During our current examination we noted that the municipality did not comply with our recommendation (see Finding).
13
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
SUMMARY OF EXIT CONFERENCE
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
An exit conference was held May 6, 2015. Those participating were:
TOWNSHIP OF EAST GOSHEN
Mr. Jon Altshul, Chief Financial Officer/Treasurer
DEPARTMENT OF THE AUDITOR GENERAL
Ms. Anne Fota, Auditor
The results of the examination were presented and discussed in their entirety.
14
TOWNSHIP OF EAST GOSHEN
CHESTER COUNTY
LIQUID FUELS TAX FUND
REPORT DISTRIBUTION
FOR THE PERIOD
JANUARY 1, 2013 TO DECEMBER 31, 2014
This report was initially distributed to:
The Honorable Leslie Richards
Secretary
Department of Transportation
Township of East Goshen
Chester County
1580 Paoli Pike
West Chester, PA 19380
| The Honorable E. Martin Shane | Chairman of the Board of Supervisors |
|---|---|
| Mr. Jon Altshul | Chief Financial Officer/Treasurer |
This report is a matter of public record and is available online at www.PaAuditor.gov. Media questions about the report can be directed to the Pennsylvania Department of the Auditor General, Office of Communications, 229 Finance Building, Harrisburg, PA 17120; via email to: news@PaAuditor.gov.
15
Tt TETRA TECH
[Stamp: RECEIVED AUG 25 2015]
August 24, 2015
Louis Smith
Manager
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
| Reference: | Sunoco Pipeline, L.P. (SPLP) Pennsylvania Pipeline Project – Chester County, PA Notice of Application to PADEP (Chapter 105 Water Obstruction/Encroachment) |
|---|
Dear Manager:
This municipal notice, under the requirements of Acts 14, 67, 68, and 127, is to inform you that our client, Sunoco Pipeline, L.P. (SPLP), intends to apply for a Pennsylvania Department of Environmental Protection (PADEP) Chapter 105 Water Obstruction and Encroachment permit application for the following proposed project:
| Project Name: | Pennsylvania Pipeline Project (“Project”) |
|---|---|
| Applicant Name: | Sunoco Pipeline, L.P. 535 Fritztown Road Sinking Spring, PA 19608 |
| Project Description: | The Project involves the installation of approximately two parallel pipelines within a 306-mile, 50-foot-wide right-of-way (ROW) from Houston, Washington County, Pennsylvania to SPLP’s Marcus Hook facility in Delaware County, Pennsylvania with the purpose of interconnecting with existing SPLP Mariner East pipelines. A 20-inch diameter pipeline would be installed within the ROW from Houston to Marcus Hook (306 miles) and a second, up to 20-inch diameter pipeline, will also be installed in the same ROW. The second line is proposed to be installed from SPLP’s Delmont Station, Westmoreland County, Pennsylvania to the Marcus Hook facility, paralleling the initial line for approximately 255 miles. This project will require crossing various streams and wetlands in the project area, including direct temporary disturbances to streams and wetlands at installation locations. Once installation has been completed, trenches will be backfilled with the excavated material, and water/wetland resources will be restored to preconstruction contours and stabilized with native vegetation. Erosion and sedimentation control best management practices will be used during all phases of construction. |
Tetra Tech
285 Ellicott St, Buffalo, New York 14203
Tel 716.849.9419 Fax 716.849.9420 www.tetratech.com
Page 2
| Site Location: | Enclosed you will find a location map with the Project indicated and the General Information Form. |
|---|
Please submit any comments concerning this project within 30 days from date of receipt of this letter to:
Pennsylvania Department of Environmental Protection (PADEP)
Southeast Regional Office
2 E. Main Street
Norristown, PA 19401-4915
Phone: 484-250-5900
Should you have questions regarding this matter, please do not hesitate to contact me at (484) 541-8077 or Robin.Dingle@tetratech.com.
Sincerely,
Tetra Tech, Inc.
[Signature: Robin Dingle]
Robin Dingle, PWS, PMP
Environmental Manager
Enclosures: Location Map and General Permit Registration Form
| cc: | Christopher P. Embry, SPLP TT File 112IC05958 |
|---|
1300-PM-BIT0001 5/2012
Form
pennsylvania
DEPARTMENT OF ENVIRONMENTAL PROTECTION
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
GENERAL INFORMATION FORM – AUTHORIZATION APPLICATION
Before completing this General Information Form (GIF), read the step-by-step instructions provided in this application package. This version of the General Information Form (GIF) must be completed and returned with any program-specific application being submitted to the Department.
| Related ID#s (If Known) | DEP USE ONLY | |
|---|---|---|
| Client ID# | APS ID# | Date Received & General Notes |
| Site ID# | Auth ID# | |
| Facility ID# | ||
CLIENT INFORMATION
| DEP Client ID# 0 |
Client Type / Code NPACO |
|
|---|---|---|
| Organization Name or Registered Fictitious Name Sunoco Pipeline, L.P. (SPLP) |
Employer ID# (EIN) 23-3102656 |
Dun & Bradstreet ID# 11-339-2331 |
| Individual Last Name NA |
First Name | MI Suffix SSN |
| Additional Individual Last Name NA |
First Name | MI Suffix SSN |
| Mailing Address Line 1 535 Fritztown Road |
Mailing Address Line 2 | |
| Address Last Line – City Sinking Spring |
State PA ZIP+4 19608 |
Country USA |
| Client Contact Last Name Gordon |
First Name Matthew |
MI L Suffix |
| Client Contact Title Project Manager |
Phone 610-670-3284 |
Ext |
| Email Address MLGordon@sunocologistics.com |
FAX | |
SITE INFORMATION
| DEP Site ID# | Site Name Pennsylvania Pipeline Project |
||
|---|---|---|---|
| EPA ID# | Estimated Number of Employees to be Present at Site | NA | |
| Description of Site Installation of 23.6 miles of a natural gas pipeline through Chester County in southeast PA. |
|||
| County Name Chester |
Municipality Refer to attached Supplemental Information |
City [ ] Boro [ ] Twp [ ] | State |
| County Name | Municipality | City [ ] Boro [ ] Twp [ ] | State |
| Site Location Line 1 Refer to Attachment 8 (Location Map) |
Site Location Line 2 | ||
| Site Location Last Line – City | State | ZIP+4 | |
| Detailed Written Directions to Site Begin at the intersection of West Main St. (Route 23) and South Chestnut St. (Route 82) in the borough of Elverson, Pennsylvania. Travel for approximately 0.55 mile west on West Main St. until it intersects the Project right-of-way. This location is also the Chester County line. |
|||
| Site Contact Last Name Gordon |
First Name Matthew |
MI L |
Suffix |
| Site Contact Title Project Manager |
Site Contact Firm Sunoco Pipeline, L.P. |
||
| Mailing Address Line 1 535 Fritztown Road |
Mailing Address Line 2 | ||
Page 1 of 7
1300-PM-BIT0001 5/2012
| Mailing Address Last Line – City Sinking Spring |
State PA |
ZIP+4 19608 |
|---|---|---|
| Phone 610-670-3284 |
Ext FAX | Email Address MLGordon@sunocologistics.com |
| NAICS Codes (Two- & Three-Digit Codes – List All That Apply) 23 and 493190 |
6-Digit Code (Optional) 237120, 486210 |
|
| Client to Site Relationship OWNOP |
||
FACILITY INFORMATION
| Modification of Existing Facility | Yes | No |
|---|---|---|
| 1. Will this project modify an existing facility, system, or activity? | [X] | [ ] |
| 2. Will this project involve an addition to an existing facility, system, or activity? | [X] | [ ] |
If “Yes”, check all relevant facility types and provide DEP facility identification numbers below.
| Facility Type | DEP Fac ID# | Facility Type | DEP Fac ID# |
|---|---|---|---|
| [ ] Air Emission Plant | [ ] Industrial Minerals Mining Operation | ||
| [ ] Beneficial Use (water) | [ ] Laboratory Location | ||
| [ ] Blasting Operation | [ ] Land Recycling Cleanup Location | ||
| [ ] Captive Hazardous Waste Operation | [ ] MineDrainageTrmt/LandRecyProjLocation | ||
| [ ] Coal Ash Beneficial Use Operation | [ ] Municipal Waste Operation | ||
| [ ] Coal Mining Operation | [ ] Oil & Gas Encroachment Location | ||
| [ ] Coal Pillar Location | [X] Oil & Gas Location | Unknown | |
| [ ] Commercial Hazardous Waste Operation | [ ] Oil & Gas Water Poll Control Facility | ||
| [ ] Dam Location | [ ] Public Water Supply System | ||
| [ ] Deep Mine Safety Operation -Anthracite | [ ] Radiation Facility | ||
| [ ] Deep Mine Safety Operation -Bituminous | [ ] Residual Waste Operation | ||
| [ ] Deep Mine Safety Operation -Ind Minerals | [ ] Storage Tank Location | ||
| [ ] Encroachment Location (water, wetland) | [ ] Water Pollution Control Facility | ||
| [ ] Erosion & Sediment Control Facility | [ ] Water Resource | ||
| [ ] Explosive Storage Location | [ ] Other: |
| Latitude/Longitude Point of Origin |
Latitude | Longitude | ||||
|---|---|---|---|---|---|---|
| Degrees | Minutes | Seconds | Degrees | Minutes | Seconds | |
| Enters County at | 40 | 9 | 21 | 75 | 50 | 35 |
| Horizontal Accuracy Measure | Feet NA | --or-- Meters | ||||
| Horizontal Reference Datum Code | [ ] North American Datum of 1927 [X] North American Datum of 1983 [ ] World Geodetic System of 1984 |
|||||
| Horizontal Collection Method Code | SURVY, GPSDF, GISDR, | |||||
| Reference Point Code | CTROD | |||||
| Altitude | Feet NA | --or-- Meters | ||||
| Altitude Datum Name | [ ] The National Geodetic Vertical Datum of 1929 [ ] The North American Vertical Datum of 1988 (NAVD88) |
|||||
| Altitude (Vertical) Location Datum Collection Method Code | NA | |||||
| Geometric Type Code | POINT | |||||
| Data Collection Date | 2014 and 2015 | |||||
| Source Map Scale Number | NA Inch(es) = Feet | --or-- Centimeter(s) = Meters | ||||
PROJECT INFORMATION
Project Name
Pennsylvania Pipeline Project
Project Description
Installation of two parallel pipelines within an approximately 306-mile, 50-foot-wide right-of-way (ROW) from Houston, Washington County, Pennsylvania to SPLP’s Marcus Hook facility in Delaware County, Pennsylvania with the purpose of interconnecting with existing SPLP Mariner East pipelines. A 20-inch diameter pipeline would be installed within the ROW from Houston to Marcus Hook (306 miles) and a second, up to 20-inch diameter pipeline, would also be installed in the same ROW from SPLP’s Delmont Station to Marcus Hook (for approximately 255 miles) (Refer to Attachment 9 of the Joint Application). Approximately 23.6 miles are located in Chester County in southeast PA.
Page 2 of 7
1300-PM-BIT0001 5/2012
| Project Consultant Last Name Schaeffer |
First Name Brad |
MI | Suffix |
|---|---|---|---|
| Project Consultant Title Environmental Project Manager |
Consulting Firm Tetra Tech, Inc. |
||
| Mailing Address Line 1 285 Ellicott Street |
Mailing Address Line 2 | ||
| Address Last Line – City Buffalo |
State NY |
ZIP+4 14203 |
|
| Phone 716-849-9419 |
Ext 117 |
FAX 716-849-9420 |
Email Address brad.schaeffer@tetratech.com |
| Time Schedules | Project Milestone (Optional) |
|---|---|
| August 2015 | Water Crossing and Erosion Control Permit Submittals |
| August 2015 | State T&E Clearances |
| October 2015 | USFWS Clearance |
| April 2016 | Construction |
| 1. | Have you informed the surrounding community and addressed any concerns prior to submitting the application to the Department? | [X] Yes [ ] No |
|---|---|---|
| 2. | Is your project funded by state or federal grants? Note: If “Yes”, specify what aspect of the project is related to the grant and provide the grant source, contact person and grant expiration date. Aspect of Project Related to Grant Grant Source: Grant Contact Person: Grant Expiration Date: |
[ ] Yes [X] No |
| 3. | Is this application for an authorization on Appendix A of the Land Use Policy? (For referenced list, see Appendix A of the Land Use Policy attached to GIF instructions) Note: If “No” to Question 3, the application is not subject to the Land Use Policy. If “Yes” to Question 3, the application is subject to this policy and the Applicant should answer the additional questions in the Land Use Information section. |
[X] Yes [ ] No |
LAND USE INFORMATION
Note: Applicants are encouraged to submit copies of local land use approvals or other evidence of compliance with local comprehensive plans and zoning ordinances.
| 1. | Is there an adopted county or multi-county comprehensive plan? | [X] Yes [ ] No |
|---|---|---|
| 2. | Is there an adopted municipal or multi-municipal comprehensive plan? | [X] Yes [ ] No |
| 3. | Is there an adopted county-wide zoning ordinance, municipal zoning ordinance or joint municipal zoning ordinance? Note: If the Applicant answers “No” to either Questions 1, 2 or 3, the provisions of the PA MPC are not applicable and the Applicant does not need to respond to questions 4 and 5 below. If the Applicant answers “Yes” to questions 1, 2 and 3, the Applicant should respond to questions 4 and 5 below. |
[X] Yes [ ] No |
| 4. | Does the proposed project meet the provisions of the zoning ordinance or does the proposed project have zoning approval? If zoning approval has been received, attach documentation. | [X] Yes [ ] No |
| 5. | Have you attached Municipal and County Land Use Letters for the project? | [X] Yes [ ] No |
Page 3 of 7
1300-PM-BIT0001 5/2012
COORDINATION INFORMATION
Note: The PA Historical and Museum Commission must be notified of proposed projects in accordance with DEP Technical Guidance Document 012-0700-001 and the accompanying Cultural Resource Notice Form.
If the activity will be a mining project (i.e., mining of coal or industrial minerals, coal refuse disposal and/or the operation of a coal or industrial minerals preparation/processing facility), respond to questions 1.0 through 2.5 below.
If the activity will not be a mining project, skip questions 1.0 through 2.5 and begin with question 3.0.
| No. | Question | Yes | No |
|---|---|---|---|
| 1.0 | Is this a coal mining project? If “Yes”, respond to 1.1-1.6. If “No”, skip to Question 2.0. | ☐ Yes | ☐ No |
| 1.1 | Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be equal to or greater than 200 tons/day? | ☐ Yes | ☐ No |
| 1.2 | Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be greater than 50,000 tons/year? | ☐ Yes | ☐ No |
| 1.3 | Will this coal mining project involve coal preparation/ processing activities in which thermal coal dryers or pneumatic coal cleaners will be used? | ☐ Yes | ☐ No |
| 1.4 | For this coal mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? | ☐ Yes | ☐ No |
| 1.5 | Will this coal mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? | ☐ Yes | ☐ No |
| 1.6 | Will this coal mining project involve underground coal mining to be conducted within 500 feet of an oil or gas well? | ☐ Yes | ☐ No |
| 2.0 | Is this a non-coal (industrial minerals) mining project? If “Yes”, respond to 2.1-2.6. If “No”, skip to Question 3.0. | ☐ Yes | ☐ No |
| 2.1 | Will this non-coal (industrial minerals) mining project involve the crushing and screening of non-coal minerals other than sand and gravel? | ☐ Yes | ☐ No |
| 2.2 | Will this non-coal (industrial minerals) mining project involve the crushing and/or screening of sand and gravel with the exception of wet sand and gravel operations (screening only) and dry sand and gravel operations with a capacity of less than 150 tons/hour of unconsolidated materials? | ☐ Yes | ☐ No |
| 2.3 | Will this non-coal (industrial minerals) mining project involve the construction, operation and/or modification of a portable non-metallic (i.e., non-coal) minerals processing plant under the authority of the General Permit for Portable Non-metallic Mineral Processing Plants (i.e., BAQ-PGPA/GP-3)? | ☐ Yes | ☐ No |
| 2.4 | For this non-coal (industrial minerals) mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? | ☐ Yes | ☐ No |
| 2.5 | Will this non-coal (industrial minerals) mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? | ☐ Yes | ☐ No |
Page 4 of 7
1300-PM-BIT0001 5/2012
| 3.0 | Will your project, activity, or authorization have anything to do with a well related to oil or gas production, have construction within 200 feet of, affect an oil or gas well, involve the waste from such a well, or string power lines above an oil or gas well? If “Yes”, respond to 3.1-3.3. If “No”, skip to Question 4.0. | [ ] Yes [X] No |
|---|---|---|
| 3.1 | Does the oil- or gas-related project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water (including wetlands)? | [ ] Yes [ ] No |
| 3.2 | Will the oil- or gas-related project involve discharge of industrial wastewater or stormwater to a dry swale, surface water, ground water or an existing sanitary sewer system or storm water system? If “Yes”, discuss in Project Description. | [ ] Yes [ ] No |
| 3.3 | Will the oil- or gas-related project involve the construction and operation of industrial waste treatment facilities? | [ ] Yes [ ] No |
| 4.0 | Will the project involve a construction activity that results in earth disturbance? If “Yes”, specify the total disturbed acreage. 4.0.1 Total Disturbed Acreage 214 acres |
[X] Yes [ ] No |
| 5.0 | Does the project involve any of the following? If “Yes”, respond to 5.1-5.3. If “No”, skip to Question 6.0. |
[X] Yes [ ] No |
| 5.1 | Water Obstruction and Encroachment Projects – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water? | [X] Yes [ ] No |
| 5.2 | Wetland Impacts – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a wetland? | [X] Yes [ ] No |
| 5.3 | Floodplain Projects by the commonwealth, a Political Subdivision of the commonwealth or a Public Utility – Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a floodplain? | [X] Yes [ ] No |
| 6.0 | Will the project involve discharge of stormwater or wastewater from an industrial activity to a dry swale, surface water, ground water or an existing sanitary sewer system or separate storm water system? | [ ] Yes [X] No |
| 7.0 | Will the project involve the construction and operation of industrial waste treatment facilities? | [ ] Yes [X] No |
| 8.0 | Will the project involve construction of sewage treatment facilities, sanitary sewers, or sewage pumping stations? If “Yes”, indicate estimated proposed flow (gal/day). Also, discuss the sanitary sewer pipe sizes and the number of pumping stations/treatment facilities/name of downstream sewage facilities in the Project Description, where applicable. 8.0.1 Estimated Proposed Flow (gal/day) |
[ ] Yes [X] No |
| 9.0 | Will the project involve the subdivision of land, or the generation of 800 gpd or more of sewage on an existing parcel of land or the generation of an additional 400 gpd of sewage on an already-developed parcel, or the generation of 800 gpd or more of industrial wastewater that would be discharged to an existing sanitary sewer system? 9.0.1 Was Act 537 sewage facilities planning submitted and approved by DEP? If “Yes” attach the approval letter. Approval required prior to 105/NPDES approval. |
[ ] Yes [X] No [ ] Yes [X] No |
| 10.0 | Is this project for the beneficial use of biosolids for land application within Pennsylvania? If “Yes” indicate how much (i.e. gallons or dry tons per year). 10.0.1 Gallons Per Year (residential septage) 10.0.2 Dry Tons Per Year (biosolids) |
[ ] Yes [X] No |
| 11.0 | Does the project involve construction, modification or removal of a dam? If “Yes”, identify the dam. 11.0.1 Dam Name |
[ ] Yes [X] No |
Page 5 of 7
1300-PM-BIT0001 5/2012
| 12.0 | Will the project interfere with the flow from, or otherwise impact, a dam? If “Yes”, identify the dam. 12.0.1 Dam Name |
☐ Yes ☒ No |
|---|---|---|
| 13.0 | Will the project involve operations (excluding during the construction period) that produce air emissions (i.e., NOX, VOC, etc.)? If “Yes”, identify each type of emission followed by the amount of that emission. 13.0.1 Enter all types & amounts of emissions; separate each set with semicolons. To Be Determined |
☒ Yes ☐ No |
| 14.0 | Does the project include the construction or modification of a drinking water supply to serve 15 or more connections or 25 or more people, at least 60 days out of the year? If “Yes”, check all proposed sub-facilities. 14.0.1 Number of Persons Served 14.0.2 Number of Employee/Guests 14.0.3 Number of Connections 14.0.4 Sub-Fac: Distribution System ☐ Yes ☐ No 14.0.5 Sub-Fac: Water Treatment Plant ☐ Yes ☐ No 14.0.6 Sub-Fac: Source ☐ Yes ☐ No 14.0.7 Sub-Fac: Pump Station ☐ Yes ☐ No 14.0.8 Sub-Fac: Transmission Main ☐ Yes ☐ No 14.0.9 Sub-Fac: Storage Facility ☐ Yes ☐ No |
☐ Yes ☒ No |
| 15.0 | Will your project include infiltration of storm water or waste water to ground water within one-half mile of a public water supply well, spring or infiltration gallery? | ☐ Yes ☒ No |
| 16.0 | Is your project to be served by an existing public water supply? If “Yes”, indicate name of supplier and attach letter from supplier stating that it will serve the project. 16.0.1 Supplier’s Name 16.0.2 Letter of Approval from Supplier is Attached ☐ Yes ☐ No |
☐ Yes ☒ No |
| 17.0 | Will this project involve a new or increased drinking water withdrawal from a stream or other water body? If “Yes”, should reference both Water Supply and Watershed Management. 17.0.1 Stream Name |
☐ Yes ☒ No |
| 18.0 | Will the construction or operation of this project involve treatment, storage, reuse, or disposal of waste? If “Yes”, indicate what type (i.e., hazardous, municipal (including infectious & chemotherapeutic), residual) and the amount to be treated, stored, re-used or disposed. 18.0.1 Type & Amount Non-hazardous/Construction related C&D waste will be disposed; Amount Unknown. |
☐ Yes ☒ No |
| 19.0 | Will your project involve the removal of coal, minerals, etc. as part of any earth disturbance activities? | ☐ Yes ☒ No |
| 20.0 | Does your project involve installation of a field constructed underground storage tank? If “Yes”, list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit. 20.0.1 Enter all substances & capacity of each; separate each set with semicolons. |
☐ Yes ☒ No |
| 21.0 | Does your project involve installation of an aboveground storage tank greater than 21,000 gallons capacity at an existing facility? If “Yes”, list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit. 21.0.1 Enter all substances & capacity of each; separate each set with semicolons. |
☐ Yes ☒ No |
Page 6 of 7
1300-PM-BIT0001 5/2012
| 22.0 | Does your project involve installation of a tank greater than 1,100 gallons which will contain a highly hazardous substance as defined in DEP’s Regulated Substances List, 2570-BK-DEP2724? If “Yes”, list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit. 22.0.1 Enter all substances & capacity of each; separate each set with semicolons. |
☐ Yes ☒ No |
|---|---|---|
| 23.0 | Does your project involve installation of a storage tank at a new facility with a total AST capacity greater than 21,000 gallons? If “Yes”, list each Substance & its Capacity. Note: Applicant may need a Storage Tank Site Specific Installation Permit. 23.0.1 Enter all substances & capacity of each; separate each set with semicolons. |
☐ Yes ☒ No |
| 24.0 | Will the intended activity involve the use of a radiation source? | ☐ Yes ☒ No |
CERTIFICATION
I certify that I have the authority to submit this application on behalf of the applicant named herein and that the information provided in this application is true and correct to the best of my knowledge and information.
Type or Print Name __________________________________________________________________
Signature ________________________ Title ________________________ Date ________________________
Page 7 of 7
Pennsylvania Pipeline Project
Chester County: General Information Form Supplemental Information
| Municipality | City | Borough | Township | Municipal Comprehensive Plan | Municipal Zoning Ordinance |
|---|---|---|---|---|---|
| West Nantmeal | X | Y | Y | ||
| East Nantmeal | X | Y | Y | ||
| Wallace | X | Y | Y | ||
| Upper Uwchlan | X | Y | Y | ||
| Uwchlan | X | Y | Y | ||
| West Whiteland | X | Y | Y | ||
| East Whiteland | X | X | Y | ||
| West Goshen | X | Y | Y | ||
| Elverson | X | Y | Y | ||
| East Goshen | X | Y | Y | ||
| Westtown | X | Y | Y |