Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Board of Supervisors\2016\080216 for web.doc

AGENDA EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS Tuesday, August 02, 2016

7:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence – Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chairman’s Report a. Announce that PA DEP is holding a public hearing to accept comments on the Mariner East II Project on Wednesday August 10, 2016 @ 6:30 PM at Sykes Student Union. You need to pre-register if you want to offer testimony. b. Announce that in September the Chester County Planning Commission will begin the process to update Landscapes2. 6. Public Hearing - none 7. Emergency Services Reports WEGO – none Goshen Fire Co. - none Malvern Fire Co – none Fire Marshal – Carmen Battavio 8. Financial Report – none 9. Old Business - none 10. New Business a. Consider RFP for a Land Planner for the Milltown and Hershey Mill Dams. b. Consider request from CTDI for a 5 K Race. c. Consider request for a file transfer from Ballard Spahr. 11. Any Other Matter 12. Approval of Minutes a. June 28, 2016 b. July 19, 2016 13. Treasurer’s Report – July 28, 2016 14. Correspondence, Reports of Interest a. Acknowledge receipt of a Certification of Population Density b. Acknowledge receipt of a letter about Jason Lang. c. Acknowledge receipt of a PennDOT notice concerning street signs. 15. Public Comment – Hearing of Residents 16. Adjournment The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda in order to accommodate the needs of other board members, the public or an applicant.

F:\Data\Shared Data\Agendas\Board of Supervisors\2016\080216 for web.doc

Dates of Importance Aug 2, 2016 Board of Supervisors 7:00pm Aug 3, 2016 Planning Commission 7:00pm Aug 4, 2016 Farmers Market 3:00pm Aug 4, 2016 Park and Recreation Commission 7:00pm Aug 8, 2016 Municipal Authority 7:00pm Aug 10, 2016 Conservancy Board 7:00pm Aug 11, 2016 Farmers Market 3:00pm Aug 11, 2016 Historical Commission 7:00pm Aug 16, 2016 Board of Supervisors 7:00pm Aug 17, 2016 Futurist Committee 7:00pm Aug 18, 2016 Farmers Market/Car Cruise 3:00pm/5:00pm Aug 25, 2016 Farmers Market 3:00pm Aug 27, 2016 Community Day 5:00pm Newsletter Deadlines for Winter of 2016: November 1

Article Viewer http://www.ahs.dep.pa.gov/NewsRoomPublic/articleviewer.aspx?id= ...

I of4

News Releases (NewsReleases.aspx)

Regional Releases CRegionalHome.aspx)

Subscribe to Email

Alerts (Subscriberlogin. aspx)

DEP Newsroom

Search News

Release

Archive (Search.aspx)

RSS Feeds (RSS.aspx)

Print ' (http://www.ahs.dep.pa.gov/NewsRoomPublic/Print.aspx?id=21004&typeid=1)

COMMONWEALTH OF PENNSYLVANIA

Dept. of Environmental Protection

Commonwealth News Bureau

Room 308, Main Capitol Building

Harrisburg PA., 17120

FOR IMMEDIATE RELEASE 07/8/2016

CON"(ACT: Neil Shader, DEP 717-787-1323

DEP Begins Technical Review of Pennsylvania Pipeline Project Permit Applications

HARRISBURG - The Pennsylvania Department of Environmental Protection

(DEP) has begun the technical review of all Chapter 102 and 105 permit

applications submitted by Sunoco Logistics, Inc. for the Pennsylvania Pipeline

Project (PPP), also commonly referred to as Mariner East 11.

The PPP is a proposed expansion of the existing Sunoco Mariner East pipeline

system. Sunoco recently upgraded its existing Mariner East I pipeline to transport

natural gas liquids from Ohio and the Pittsburgh area to its Marcus Hook Facility

in Delaware County. Most of the PPP is proposed to follow the same pipeline

corridor as Mariner East I and will traverse 17 counties in the southern tier of the

state.

7/29/2016 9:40 AM

Article Viewer http://www.ahs.dep.pa.gov/NewsRoomPublic/aiticleviewer.aspx?id= ...

2 of4

Because these pipelines will convey liquefied natural gas, they are regulated by

the Pipeline and Hazardous Materials Safety Administration (PHMSA), which falls

under the U.S. Department of Transportation. This project requires multiple

permits from DEP, including permits for earth disturbances of five acres or more

(Chapter 102), and permits for proposed activities located in, along, across or

projecting into a watercourse, floodway or body of water, including wetlands

(Chapter 105).

Due to the scope and complexity of the project, DEP will provide for enhanced

public participation opportunities by extending the comment period from 30 to 60

days and holding public hearings in the affected regions later this summer.

Comments submitted electronically and at the upcoming hearings should focus on

the relevant permits, not the overall pipeline.

"As an open and transparent agency, we take public comment and input very

seriously", said Acting Secretary Patrick McDonnell. "We want to provide the

public with several opportunities to review permit applications and provide

thoughtful, critical, and constructive feedback to aide in our technical review."

During the hearings, each speaker will have the opportunity to present up to three minutes of verbal testimony. To ensure that all speakers have a fair and equal opportunity to present their testimony, relinquishing of time to other speakers will be prohibited, and groups are asked to designate one speaker. All presenters should bring at least one copy of their comments and exhibits for submission to

DEP.

Questions and official public comments may be submitted to the following regional

resource accounts; please use the Southeast address for project-wide

submissions as they are they lead DEP region for this project.

Southeast Region: RA-EPWW-SERO@pa.gov (mailto:RA-EPWW-SERO@pa.gov)

Permit information for the Southeast region can be found here (http: //www. d ep. pa.gov/ About/Reg ion al/South east Reg ion/Commun ity%20 Information/Pages /Mariner-East-Pipe! ine-11.aspx).

The Southeast Region includes Chester and Delaware counties. The public

hearing in this region will be held:

• Chester County:

Wednesday August 10, 2016 - 6:30 P.M - 9:30 P.M. - Sykes Student Union at

West Chester University, 110 W. Rosedale Avenue, West Chester, PA 19382

7/29/2016 9:40 AM

Article Viewer http://www.ahs.dep.pa.gov/NewsRoomPublic/aiticleviewer.aspx?id= ...

3 of4

Those wishing to offer testimony at the hearing can pre-register by calling or

emailing: Virginia Cain, Community Relations Coordinator at 484-250-5808 or by

email at vicain@pa.gov (mailto:vicain@pa.gov). The department will also accept

written testimony by email or by sending comments to: RA-EPWW-

SERO@pa.gov (mailto:RA-EPWW-SERO@pa.gov) or mailing to Domenic Rocco,

Program Manager, Waterways and Wetlands, 2 E. Main St., Norristown, PA

19401. Written comments will be accepted until August 24th, 2016.

South-central Region: RA-EPWW-SCRO@pa.gov (mailto:RA-

EPWW-SCRO@pa.gov)

Permit information for the South central region can be found here (http://www.dep.pa.gov/About/Regional/Southcentra1Region/Community%20lnformation /Pages/Mariner-East-Pipeline-11.aspx).

The South-central Region includes Berks, Blair, Cumberland, Dauphin,

Huntingdon, Juniata, Lancaster, Lebanon, Perry and York counties. Dates and locations for three public hearings in this region are as follows:

• Blair County:

Monday, August 8, 2016 - 6:30 P. M - 9:30 P. M. - Blair County Convention

Center, One Convention Center Drive, Altoona, PA 16602

• Lebanon County:

Tuesday, August 9, 2016 - 6:30 P.M - 9:30 P.M. - Lebanon Valley Exposition

Center, 80 Rocherty Road, Lebanon, PA 17042

• Dauphin County:

Tuesday, August 16, 2016 - 6:30 P.M - 9:30 P.M. - PA Farm Show Complex,

Keystone Conference Center, 2300 N Cameron Street, Harrisburg, PA 17110

Those who wish to present testimony during these hearings are asked to register in advance by contacting John Repetz, Community Relations Coordinator at 717-705-4904 or by email at jrepetz@pa.gov (mailto:jrepetz@pa.gov). Written testimony may be sent via email or by sending comments to Scott Williamson,

Program Manager, Waterways and Wetlands, 909 Elmerton Avenue, Harrisburg, PA 17110 or RA-EPWW-SCRO@pa.gov (mailto:RA-EPWW-SCRO@pa.gov). Written comments will be accepted until August 24th, 2016.

Southwest Region: RA-EPWW-SWRO@pa.gov (mailto:RA-EPWW-SWRO@pa.gov)

Permit information for the Southwest region can be found here (http://www.dep.pa.gov/About/Regional/SouthwestRegion/Community%20lnformation/Pages /Mariner-East-Pipeline-11.aspx).

The Southwest Region includes Allegheny, Cambria, Indiana, Washington, and

7/29/2016 9:40 AM

Article Viewer http://www.ahs.dep.pa.gov/NewsRoomPublic/mticleviewer.aspx?id= ...

4 of4

Westmoreland counties. The public hearing in this region will be held:

• Westmoreland County:

Thursday, August 18, 2016 - 6:30 P.M - 9:30 P.M. - Founder's Hall

Amphitheatre, Westmoreland County Community College, 145 Pavilion Lane,

Youngwood, PA 15697

Those wishing to offer testimony for the Southwest Region hearing can register in

advance by contacting John Poister, Community Relations Coordinator at

412-442-4203 or by email at jpoister@pa.gov (mailto:jpoister@pa.gov). The

department will also accept written testimony by email or by sending comments to

Rita Coleman, Program Manager Waterways and Wetlands, 400 Waterfront Drive,

Pittsburgh, PA 15222 or RA-EPWW-SWRO@pa.gov (mailto:RA-

EPWW-SWRO@pa.gov). Written comments will be accepted until August 24th,

2016.

###

Return to List I Search for Articles I

Pennsylvania Department of Environmental Protection

Rachel Carson Building I 400 Market Street I Harrisburg, PA 17101

7/29/2016 9:40 AM

THE COUNTY OF CHESTER

COMMISSIONERS Terence Fan-ell Kathi Cozzone Michelle Kichline

Brian N. O'Leary, AICP Executive Director

East Goshen Township Mr. Louis Smith, Jr., Manager

1580 Paoli Pike West Chester, PA 193 80

PLANNING COMMISSION Government Services Center, Suite 270 601 Westtown Road P. 0. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515

July 22, 2016

JUL 2 5 2016

Re: County Comprehensive Plan Update

Dear Mr. Smith, Jr.,

Landscapes2, Chester County's award-winning Comprehensive Policy Plan, was adopted in 2009 to

bring growth and preservation together for Chester County. Much has changed in the years since adoption, including a significant economic recession and recovery, digital and technology advances, and growth in both population numbers and diversity. These changes have had significant implications for our natural and built environment.

Since its adoption, many of the key initiatives and actions from Landscapes2 have been advanced, including the County's open space initiative, municipal planning program, public transpmtation planning, and urban centers' revitalization program. Many achievements have been made possible through collaborative efforts, paiticularly with Chester County's municipalities.

Given these changes and achievements, it is now time to prepare a new comprehensive plan for the County, beginning with an examination of trends influencing growth and preservation. We look forward to obtaining input from all Chester County municipalities throughout the process to update Landscapes2, and we wanted to let you know what our next steps will be. In the coming week,

invitations will go out to individuals for participation in Stakeholder Team Meetings, which are designed to get input on current trends affecting Chester County. There will be two meetings for each of the following topics:

• Preservation • Agriculture • Housing • Utilities and Infrastructure • Economic Development . • Transportation • Community Health

Initial meetings will be held this fall, beginning in September. The second series of meetings will begin in January 2017. There will be many other oppmtunities for input throughout the update process, some of which are noted on the project timeline (enclosed). Additional details and opportunities for engagement will be available in the fall.

email: ccplanning@chesco.org W\NW .landscapes2.org website: www.chesco.org/planning

Page2 July 22, 2016 Re: County Comprehensive Plan Update

Should your municipality desire a presentation at a regional or municipal public meeting regarding the comprehensive plan update, or if you have questions regarding the process or meetings, please contact Susan Elks, AICP at selks@chesco.org or 610-344-6285.

Thank you,

. Brian N. O'Leary

Executive Director

Matthew Hammond Chair, Chester County Planning Commission

email: ccplanning@chesco.org www .landscapes2.org website: www.chesco.org/planning

Landscapes3 public process

Vision for tomorrow. Solutions for today.

WEARE

HERE

Stakeholder Meetings Round one

• Preservation

• Agriculture

• Housing

• Utilities & Infrastructure

• Transportation

• Economic Development

• Community Health

2016

Topical Surveys

Stakeholder Meetings Round two

• Preservation

• Agriculture

• Housing

• Utilities & Infrastructure

• Transportation

• Economic Development

•Community Health

2017

Steering Committee Meetings

• Central Region

• Eastern Region

• Northern Region

• Southwestern Region

• Southeastern Region

Public Meeting on Draft Vision

Public Opinion

Survey

Additional Public Outreach and Engagement

All meetings are open to the public, and all materials will be available online.

Draft Plan Review

• Regional Public Meetings

• Online Document Review

• Municipal Review

2018

Public Hearing

& Adoption Actions and Programs

2019 ..

Date: To: From: Re:

July 27, 2016 Board of Supervisors Caimen Battavio

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199 610-692-7171 Fax 610-692-8950 www .eastgoshen.org

Bellingham Longwood Building FM rep011

19:05-20:30 hrs

Dispatched by GFC to the above location due to a first floor toilet leak that flooded the basement common area of the Legacy Alzheimer wing.

Water damage included the loss of three smoke detectors in the common area.

The following was discussed with Supervisor on-duty Barbara Kenna.

Constant Fire Watch must be maintained until system is repaired. This should not present a problem as this is an area with a minimum of (2) staff on duty 24/7 in this wing. I requested the Fire Watch form with staff ID, time and notes be submitted to EG when the system is back on-line. Since the common area was affected with water damage, rooms B-1 through B-4 (resident units in affected area) residents can stay in their rooms, unless further water damage enters at a later date. If this were to happen, the residents would need to be temporarily relocated to another area. I had phone conversation with Maintenance Supervisor (Devon) and went over the same conditions as listed above.

Note- I was advised by GFC officer there is very poor or no radio reception in this as well as all other basement areas at Bellingham and Wellington. I highly advise booster systems be installed to enable communications between emergency personnel and EMS Services.

I request EG Code Department follow up tomorrow

Carmen R. Battavio

C:\Users\rick\AppData\Local\Microsoft\ Windows\ Temporary Internet Files\Content.Outlook\4FYCFA.'RJ\7 .27 .16 Legacy Unit.doc

Fire Marshal Report July 29, 2016

July 20, 2016 - Inspection at 2020 Valley Drive - no working smoke detectors

F:\Data\Shared Data\Fire Marshall Dept\2016\Report - 7-29-16.docx

Memo East Goshen Township

Date: July 25, 2016 To: Board of Supervisors From: Rick Smith, Township Manager Re: Land Planner Request for Proposals for Milltown and Hershey Mill Dam

I have drafted an RFP for the Land Planner to prepare a plan on how the area above each dam can be developed and/or utilized after the dam is breached.

The Comprehensive Plan and the Park, Recreation and Open Space Plan (the "Plans"), both of which were recently adopted, contain provisions related to public recreation space and open space, so I have requested that the land planner address how the plans that they will propose comply with the applicable provisions on the Plans as part of this project.

With regards to the timing of this project, it would be difficult for the land planner to prepare the Concept, Preliminary and Final Plans, until the final location of the stream channel(s) has

been established. We do not need the stream channel(s) locations for the Visioning session.

Gannet Fleming estimates that they would have stream channel locations at the three month mark. They are meeting with PA DEP to review the scope of work for both dams the second week of August, and I expect to have their proposal on the August 16th agenda.

Accordingly, I have proposed a due date of September 21. This would allow the Board to award the contract in October, have the visioning sessions in November, Concept Plan meetings in

December, Preliminary Plan meetings in January and Final Plan meetings in February.

F:\Data\Shared Data\Public Works Dept\Parks\Milltown Reservoir\Land Planner\Memo to BoS 072516.docx

1 Memo

2 East Goshen Township

3 1580 Paoli Pike

4 West Chester, PA 19380

5 Voice (610} 692-7171 6 E-mail rsmith@eastgoshen.org 7 8 Date: July 25, 2016 9 To: Prospective Land Planners 10 From: Rick Smith, Township Manager 11 Re: Request for Proposals - Milltown Dam and Hershey Mill Dam

12 East Goshen Township owns and operates the Milltown Dam and Hershey Mill Dam. Both dams 13 do not meet current PA DEP Dam Safety requirements. The Board of Supervisors intends to 14 partially breach the Milltown Dam and completely breach the Hershey Mill Dam.

15 The Board of Supervisors has determined that the area of the impoundment above the dams 16 would be suitable for use a public recreation area and/or open space, after the dams have been 17 breached and that the use and/or development of these areas should be consistent with the 18 East Goshen Township Comprehensive Plan and the Park, Recreation and Open Space Plan.

19 The Board of Supervisors is issuing this request for proposal (RFP) to qualified consultants to 20 develop a plan on how the area above each of the dams can be developed and/or utilized for 21 public recreation purposes and/or open space, after the dams have been breached.

22 Proposals must be e-mailed to the Township Manager on or before September 21, 2016 at 23 10:00 am.

24 Contact Information 25 Rick Smith, Township Manager 26 1580 Paoli Pike 27 West Chester PA 19380 28 Voice - 610-692-7171 29 E-mail rsmith@eastgoshen.org

30 31 32 33 Existing Conditions

34 Milltown Dam - The dam is located on Reservoir Road, just north of West Chester Pike 35 (TPN 53-6-87.1) on a property which contains 19.78 acres. This dam is currently in 36 operation and the impoundment is full. The actual location of the new stream channel

1

1 has not been established, however, it is anticipated that the location will be determined 2 by the end of November 2016. The dam will be partially breached (Alternative 10) as 3 described in the March 2016 Milltown Dam Assessment and Alternative Analysis. The 4 full report along with other information about the dam is available at 5 http://eastgoshen.org/about-us/milltown-dam

6 Hershey Mill Dam - The dam is located on Hershey Mill Road just north of Greenhill 7 Road (TPN 532-2J-130.l) on a property which contains 6.4 acres. The dam will be 8 completely breached. The dam is currently in operation and although the impoundment 9 has been drained, it has not been determined if the stream channels will remain in their 10 present location. It is anticipated that the location of the new stream channels will be 11 determined by the end of November 2016. Information about the Hershey Mill Dam is 12 available at http://eastgoshen.org/about-us/hershey-mill-dam

13 Comprehensive Plan 14 The Comprehensive Plan is available at http://eastgoshen.org/boards/comprehensive-plan- 15 task-force 16 17 Park, Recreation and Open Space Plan 18 The Park, Recreation and Open Space Plans is available at 19 http://eastgoshen.org/park-and-rec/open-space-plan

20 21 Inspection

22 The Milltown Dam and Hershey Mill Dam are considered passive parks and are therefore

23 available for inspection by the prospective consultants during daylight hours.

24 25 Role of Gannet Fleming 26 The Township has engaged Gannet Fleming to perform the engineering required to develop the 27 plans and obtain the permits required to breach the dams. One component of the engineering

28 will be the establishment of the new stream channel(s). It anticipated that the final location of 29 the new stream channel(s) will be determined by the end of November 2016.

30 31 Once the permits have been issued the Township will solicit bids for the work required to

32 breach the dams. At the present time it has not been determined if the improvements and/or 33 planting required pursuant to this project will be incorporated in the dam breaching contract. 34 35 Detailed Scope of Work and Phasing 36 The following phases are applicable to both dams and the assumption is that there will be 37 separate public meetings for each dam. 38 39 40 41 42

Phase 1- Visioning The consultant shall review the East Goshen Township Comprehensive Plan and the

Parks, Recreation and Open Space Plan (the "Plans") and identify the applicable provisions of both plans that would be relevant to this project. The consultant shall

2

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22

23

24 25 26 27

28

29

conduct a visioning session for the dam to determine what the residents would like to see at each dam.

In addition the consultant shall provide information about the project including a survey or questionnaire, suitable for posting on the Township web site, in order to solicit public comments from Township residents about this project. It is anticipated the comments would be accepted for a two week period. The consultant shall prepare a summary of all comments received from the visioning session and the posting and how those comments will be addressed ln Phase 2.

Phase 2 - Concept Plans Based on resident input from Phase 1 the consultant shall prepare a minimum of two Concept Plans for the area above the dam and a brief narrative citing how each achieves the applicable goals and objectives in the Plans. The Concept Plan and narrative shall be presented to the residents at a public meeting. The Township will post the Concept Plan and narrative on the Township web site and public comment will be solicited for two weeks. The consultant shall prepare a summary of all comments received on the Concept Plan and the posting and how those comments will be addressed in Phase 3.

Phase 3 - Preliminary Plan Based on resident input from Phase 2 the consultant shall prepare a Preliminary Plan and a brief narrative how this project achieves the applicable goals and objectives in the Plans. The Preliminary Plan and narrative shall be presented to the residents at a public meeting. The Township will post the Preliminary Plan and narrative on the Township web site and public comment will be solicited for two weeks. The consultant shall

prepare a summary of all comments received on the Preliminary Plans and the posting and how those comments will be addressed in Phase 4.

30 Phase 4 - Final Plan 31 Based on resident input from Phase 3 the consultant shall prepare a Final plan and a

32 narrative how this project achieves the applicable goals and objectives in the Plans. In 33 addition the consultant shall provide a cost estimate, a tentative phasing schedule and 34 a list of applicable grant programs. The Final Plan and cost estimate shall be suitable for 35 use for grant applications. The Final Plan, narrative, cost estimate and schedule shall be 36 presented to the residents at a public meeting. 37 38 Deliverables 39 The consultant shall prepare 24" X 36" presentation boards of the Concept, Preliminary 40 and Final Plans for use at the public meetings. The presentation boards and all other 41 deliverables shall be provided to the Township in the PDF format. The materials for

42 each meeting shall be provided to the Township for posting on the Township web site 43 at least five (5) days prior to the public meeting at which they will be discussed. 44

3

1 Public Meeting Presentation 2 The RFP contemplates that there will be separate Phase 1, 2, 3 & 4 public meetings 3 for each dam for a total of 8 public meetings. 4 5 Type of Contract 6 If a contract is entered into as a result ofthis RFP, the contents of the selected firm's 7 proposal will become contractual obligations of the firm. 8 9 Indemnification 10 The Consultant will indemnify and save harmless the Township and all its officers, 11 agents and employees from any actions, liabilities or claims resulting from 12 performance of this contract. 13 14 Insurance 15 A Certificate of Insurance acceptable to the Township shall be filed with the Township 16 upon acceptance of a proposal. In no case shall any commencement of work be 17 permitted until the required Certificate of Insurance has been provided and accepted 18 by the Township. 19 20 Consultant Responsibilities 21 The selected consultant will be required to assume responsibility for all services 22 offered in their proposal whether or not they perform them. Further, the Township 23 will consider the selected consultant to be the sole point of contact with regard to

24 this project. 25 26 Cost for the Preparation of the Proposal 27 This request for proposals does not, under any circumstances, commit the 28 Township to pay any cost incurred by any consultant prior to execution of the 29 agreement between the selected consultant and the Township. Each 30 prospective consultant is solely responsible for all costs associated with the 31 preparation of a response to this RFP.

32 33 Payment 34 Payment will be made within 30 days after receipt of an invoice for services 35 rendered. There will be no advance payments. 36 37 Time Limit for Questions 38 Consultants may submit questions prior to submitting a proposal. Questions must be 39 submitted by e-mail to the Township Manager by September 7, 2016 at 10:00 am. 40 41 Addendum(s) to the RFP

42 If it becomes necessary to revise any part of this RFP, addendum(s) will be posted on 43 the Township web site. 44

4

1 Response Date 2 To be considered, proposals must be e-mailed to the Township Manager on or before 3 September 21, 2016 at 10:00 am. Late submissions will not be considered. 4 5 Proposals 6 To be considered, consultants must submit by e-mail a complete response to this 7 RFP. The proposal must remain valid for 60 days. 8 9 Open Records 10 All responses to this RFP are subject to the Pennsylvania Right-to-Know Law. 11 12 Rejection of Proposals 13 The Township reserves the right to reject any and all proposals received as a result of 14 this request and to negotiate separately with competing consultants. 15 16 Selection of Consultant 17 The Board of Supervisors reserves the right to meet with one or more consultants 18 whose proposals, as to price and other factors, show them to be qualified, 19 responsible, and capable of performing the work. 20 21 Economy of Preparation 22 Proposals should be prepared simply and economically, providing a straightforward, 23 concise description of the consultant's ability to meet the requirements of the RFP. 24 25 Contents of the Proposal 26 Proposals must be submitted in the format outlined below. To be considered, the 27 proposal must respond to all requirements in this part of the RFP. Any other 28 information thought to be relevant, but not applicable to the enumerated categories, 29 should be provided as an appendix to the proposal. 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

Letter of Introduction Provide a letter of introduction that identifies the point person for this project.

Experience Describe the experience the firm and the point person for this project has with respect to projects involving the planning and development of public recreation areas and/or open space.

References Provide at least five (5) references of projects that are representative of the services requested for this project. Include a synopsis of each project and the name and telephone numbers ofthe contact person.

Schedule

5

1 2 3 4 5 6

7 8 9

10

Provide the proposed schedule for completion of the project. The schedule should assume that the location of the stream channel(s) will be established on December 1. 2016.

Cost Proposal Provide a cost proposal for the project. The cost proposal shall include any and all costs required to complete this project, including by not limited to materials, labor and equipment, and travel. The consultant is not required to delineate any wetlands or the floodplain. The Township will advertise all meetings.

11 Addendum(s) 12 If any addendum(s) are issued, please acknowledge date of addendum. 13 14 F:\Data\Shared Data\Public Works Dept\Parks\Milltown Reservoir\Land Planner\RFP 072516.docx

6

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 610-692-8950 mgordon@eastgoshen.org Fax: E-mail:

Date: 7/18/2016 To:

From:

Board of Supervisors • fi / ,, Mark Gordon, Township Zoning Officer fl..vl. ~ 1336 Enterprise Drive I CTDI 5 K Race Re:

Dear Board Members,

CTDI has requested to use Enterprise Drive for their second annual CTDI Cares SK Race on Sunday September 2S, 2016. The event was held on Enterprise Drive last year with no incidents reported. CTDI is requesting permission to restrict vehicular circulation on Enterprise Drive to One Way Traffic for the duration of the event. Ctdi will provide race marshals along the race course to control vehicle turning movements into individual property driveways.

Staff Recommendation:

Staff has issue with the temporary lane restriction for this short period of time. We would recommend the following conditions.

1. Notification of the event and the one way vehicle circulation shall be sent to all property owners along Enterprise Drive, the Goshen Fire Company and the Westtown East Goshen Regional Police Department. 2. Road barricades and Goshen Fire Police will be positioned where needed to direct the one way traffic into the outer lane of Enterprise Drive. 3. All Police, Fire Police and Goshen Fire Company expenses will be the responsibility of CTDI.

Draft Motion:

Mr. Chairman, I move that we approve the requested temporary one way traffic circulation on Enterprise Drive for the CTDI CARES SK Race on September 2S, 2016 with the following conditions:

1. Notification of the event and the one way vehicle circulation shall be sent to all property owners along Enterprise Drive, the Goshen Fire Company and the Westtown East Goshen Regional Police Department. 2. Road barricades and Goshen Fire Police will be positioned where needed to direct the one way traffic into the outer lane of Enterprise Drive. 3. All Police, Fire Police and Goshen Fire Company expenses will be the responsibility of CTDI.

F:\Data\Shared Data\Property Management\53-4\53-4-154 {1336 Enterprise dr)\Memo to BOS re. 5 K Race 07182016.doc

July 18, 2016

Dear Members of the East Goshen Township,

CTDI would like to request permission to hold our CTDI CARES 4th Annual SK Fun Run on Sunday, September 2S, 2016. In

addition to promoting health and wellness among our employee population, this event raises funds to assist our employees

and their families who encounter serious illness with financial assistance. CTDI would like to host the SK from our newest

facility on Enterprise Drive, 1336, utilizing the corporate parks enclosed circle. If approved, this would be the second year

utilizing the corporate for this race. Our race begins at 2:4Spm with an anticipated completion by 4:30pm. Event details, as

well as our proposed safety measures, are as follows:

• Date: Sunday, September 2S, 2016

• Traffic Adjustments: 2:00pm - 4:30pm

• Location: Enterprise Drive (Goshen Corporate Park Circle)

• Expected Attendees: 12S- lSO participants

• Race Course: Participants to use Inner circle/walking path side of the road

• EMT: Goshen Fire Company EMTs in attendance

• Traffic Restrictions:

o Drivers requiring vehicle access to the Corporate Park from Boot Road or Reservoir Road will be routed via

a one way traffic pattern using the outer lane of Enterprise Drive controlled by Race Marshalls

o All parking lots (Non-CTDI) that have business operations on Sunday will be monitored by CTDI Race

Marshalls/Flaggers prior to and during the entire race to control incoming and outgoing access, directing

all traffic along the previously described one way traffic pattern

Thank you in advance for your consideration. Please feel free to contact me via email at clofgren@ctdi.com or via phone at

610-793-8S20 with any questions.

Regards,

Courtney K. Lofgren

Director, Culture & Communications

Ballard Spaly

r735 Markee Street, 5rst Floor Philadelphia, PA 19w3-7599

TEL 215.665.8500

FAX 215.864.8999 www.ballardspahr.com

July 12, 2016

Via E-mail and U.S. Mail

Rick Smith Township Manager East Goshen Township

1580 Paoli Pike West Chester, PA 19380

Patrick J. Harvey Tel: 215.864.8240 Fax: 215.864.9148 harveyp@ballardspahr.com

JUL 2 5 20'16

Re: Transfer of Labor and Employment Files from Ballard Spahr LLP to Campbell, Durrant, Beatty, Palombo & Miller, P.C.

DearM~fr,,~

On August 31, 2016, we will be leaving Ballard Spahr LLP to join Campbell, Durrant, Beatty, Palombo & Miller, P.C. ("Campbell Durrant") as shareholders. We will be opening the Philadelphia area office of Campbell Durrant. The merger of our respective labor and employment law practices will result in Campbell Durrant being a state-wide municipal labor and employment practice. Campbell Durrant will continue the successful 35-year partnership with the Pennsylvania Municipal League (PML) and the PML's Public Employer Labor Relations Advisory Service (PELRAS).

We are excited about joining Campbell Durrant and look forward to continuing our representation of East Goshen Township at our new firm. In order to move all of your active and closed electronic records and files and hard copy files for active matters, to Campbell Durrant, you will need to authorize Ballard Spahr LLP to release and transfer the files to Campbell Durrant. Please sign the enclosed authorization and scan a copy to Vernon Wright at Ballard Spahr LLP, wrightv@ballardspahr.com with a CC or hard copy to one of us. This will authorize Ballard to deliver your electronic and paper files to our new firm of Campbell Durrant effective September 1, 2016.

We are looking forward to our new partnership with Campbell Durrant and our continued representation of East Goshen Township at our new firm. We also look forward to seeing you in the near future.

PJH/mj Enclosure

Atlanta I Baltimore I Bethesda I Delaware I Denver I Las Vegas I Los Angeles I New Jersey I New York I Philadelphia I Phoenix Salt Lake City I San Diego I Washington, DC I www.ballardspahr.com

Authorization for Transfer of Files to Campbell, Durrant, Beatty, Palombo & Miller, P.C.

East Goshen Township directs and authorizes Ballard Spahr LLP to transfer all electronic files

and all active hard copy files to Campbell, Durrant, Beatty, Palombo & Miller, P.C. as of September 1,

2016. All transferred files shall be sent to the attention of Patrick J. Harvey, Esquire and John P.

McLaughlin, Esquire. The hard copy files to be transferred include the following:

East Goshen Township (003212.00)

East Goshen Township Date

1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS SPECIAL MEETING 3 GOSHEN FIRE HOUSE 4 1320 PARK A VENUE, WEST CHESTER, PA 5 JUNE 28, 2016 - 7:00 pm 6 DRAFT MINUTES 7 8 9 Present: Chairman Senya D. Isayeff, Vice-Chairman Marty Shane, Supervisors Carmen 10 Battavio, Chuck Proctor; Janet Emmanuel; Township Manager Rick Smith, Township CFO Jon 11 Altshul, ABC Member Erich Meyer (Conservancy Board), Skip Brion (Township Solicitor). 12 13 Call to order & Pledge of Allegiance: 14 Senya called the meeting to order at 7:03 pm and asked Eric Neast to lead the assembly in the 15 Pledge of Allegiance. 16 17 Moment of Silence: 18 Carmen called for a moment of silence to honor the members of the military who keep us safe 19 both locally and abroad, and to extend prayers to all those affected in the recent Orlando 20 shootings tragedy. 21 22 Recording of Meeting: Baxter Wellman, Lochwood Lane, stated that he would be recording the 23 meeting. Senya acknowledged Adam Farence, Staff Writer for the Daily Local News, in the 24 assembly. 25 26 Chairman's Report: Senya introduced Eric Neast and David Graff of Gannett Fleming. 27 28 New Business: 29 Hershey's Mill Dam: Eric Neast gave a brief overview of the three repair options for Hershey's 30 Mill Dam and the associated costs involved, noting that cost estimates are now appearing to be 31 approximately 30% higher than initially quoted. The full report may be viewed under the About 32 Us tab at www.eastgoshen.org. 33 34 Phil Young, Hershey's Mill Estates, asked the Board if they considered using metal sheathing on 35 the downside of the dam as a repair, which he understood to cost approximately $100,000. 36 Carmen commented that the Board reviewed many options, including using metal sheathing, and 37 that the Department of Environmental Protection (DEP) would not allow it. 38 39 Gerry Connor, 36 Lochwood Lane, commented that the East Goshen residents are "being 40 herded", and asked why the Board is putting up with this. Gerry Connor also asked the Board 41 what would happen if nothing was done in this situation, and questioned the authority of "these 42 DEP people". Rick noted that the regulating entity in this matter is the DEP (Department of 43 Environmental Protection) which can impose fines of approximately $1,500 per day, and civil 44 actions against the Township if nothing is done. Senya also commented that safety and 45 insurance concerns needed to be addressed in this matter. Mr. Brion further commented that this

6/28/2016 June 28, 2016 BOS Minutes Page 1 of7

1 matter has been under consideration for the past nine years. The DEP has labelled the dam as 2 unsafe and the Board would be faced with liability issues if they did nothing. 3 4 Mike Lynch, 1226 Upton Circle, stated he supports the lowest cost solution and that long term 5 costs should be considered. 6 7 Kathryn Sloan, 1202 Burning Bush Lane, stated that she has a view from her house of the pond, 8 which was the reason for buying her home. She said there are no fish left in the pond and she 9 favors the solution to maintain the pond. Rick stated that after the DEP earmarked the dam as 10 unsafe, the Township was unable to acquire insurance coverage from its current agency, and had 11 to shop for insurance on the secondary market. 12 13 Ed Townsend, 1202 Lochwood Lane, asked if any consideration was given to the water table, soil 14 settling, and neighboring foundations cracking in the absence of the pond. Mr. Townsend also 15 asked if there was ever a working mill at the dam site, and that he would like to see the 16 preservation of the dam for historical purposes. Rick stated that a working mill did once exist, 17 however the dam for it was located further upstream. 18 19 Jan Weir, 1213 Hershey's Mill Estates, stated she favors the partial breach option as it has the 20 lowest cost factor and would maintain some of the original features of the pond. Rick stated that 21 in a partial breach there would be no pond remaining, but there would be a small waterfall over 22 the dam. 23 24 Mr. Suske, Hershey's Mill Estates, asked the Board what would happen to the pond area in a full 25 breach scenario. Marty said that upstream restoration would be required to make the area 26 attractive. 27 28 Bob Sullivan, 33 Waterview Road, commented that East Goshen is becoming "citified", and that 29 there are very few open spaces left. He further asked the Board how much does the Township 30 want to spend to make the area look nice. 31 32 Jim Brandolini, 1200 Burning Bush Lane, stated that he has witnessed the long journey 33 surrounding the Hershey's Mill Dam remedy. He is looking to sell his home in the not too 34 distant future and wants to see something done. Mr. Brandolini expressed his sadness to lose the 35 historical feature of the dam and pond, and wants to know what the end product will look like. 36 Rick stated that the deadline for action is December 1, 2018, whether it be fixing or breaching 37 the dam. Eric Neast stated that in a full breach the resulting area would mimic the original 38 environment. 39 40 Jack Kilkellen, 1467 Greenhill Road, expressed his desire to fix the dam, and that the Board 41 should not just be considering the cheapest solution. 42 43 Ron McGill, 1050 Hershey Mill Road, stated that he owns the Hershey's Mill House and wants 44 the pond and dam restored. He opined that it is the Township's duty to maintain the original 45 intent of this feature when it had been gifted to the Township. He expressed his opinion that if 46 the dam is fully breached, Mr. DeReimer' s home will be turned into a floodplain, and that the

6/28/2016 June 28, 2016 BOS Minutes Page 2 of7

1 Township should create a fund for Mr. DeReimer to make up for his property value loss and for 2 the "taking" of Mr. DeReimer's property. 3 4 Neil DeReimer, 1034 Hershey Mill Road, expressed his opinion that ifthe dam is fully breached, 5 his home will become a floodplain. Mr. DeReimer also stated that his earlier fundraising efforts 6 had been thwarted due to his personal situation and asked the Board to hold off from making a 7 decision until December 2018. Carmen stated that seven years ago when the Board was prepared 8 to vote on this matter, he changed his vote to breach in order to give Mr. DeReimer and others 9 the opportunity to raise funds to repair the dam. Within those seven years, Mr. DeReimer's 10 fundraising group did nothing. Senya commented that seven years ago, monies had been 11 presented to help defray costs of breaching the dam, and that these funds are now lost. Mr. Brion 12 stated that the Board cannot wait another year for Mr. DeReimer's fundraising efforts, as the 13 permitting process would take that long. Mr. Brion also clarified that the Township is not 14 "taking" anyone's property. 15 16 Ed Tomlinson, stated that he lives within 2,000 feet of the dam and that this is the first time he 17 has ever received notice of this topic. Rick clarified that notices are sent to those residents 18 within 1000 feet of the dam. Senya stated that the Board and Township have promoted fully the 19 success of the Friends of Hershey's Mill Dam and that Chuck Proctor has offered his legal 20 services, gratis, in helping the organization off the ground. Chuck noted for the record that the 21 entity of The Friends of Hershey's Mill Dam was created but the members of this group never 22 filed the paperwork with the Internal Revenue Service in order to create it as a 5013( c ). 23 24 Bob Sullivan, 33 Waterview Road, wished to remind the Board that if the decision to breach the 25 dam is made tonight, the dam will be gone forever. 26 27 Marty commented that he and the entire Board understand the desire of the residents in the 28 assembly to maintain the Hershey's Mill Dam, and that they do not relish the decision before 29 them. Marty motioned to recommend a full breach of Hershey's Mill Dam, and to authorize the 30 Township Manager to begin the permitting process with the DEP and for construction to begin 31 after a contractor is chosen. Carmen seconded. 32 33 Shirly Fox, East Boot Road, commented that Board is not willing to spend $600,000 to remedy 34 Hershey's Mill Dam, but they are willing to spend $8 million to create the "path to nowhere". 35 36 Neil DeReimer, 1034 Hershey Mill Road, asked Marty why he has chosen the full breach option. 37 Marty responded that it is the most effective way of handling the situation. 38 39 Shirley Beck, 1225 Foxglove Lane, stated that her deceased husband would be very disappointed 40 in what is happening. She urged the Board not to make the decision tonight, and commented that 41 the "Board does not know what they are talking about". 42 43 Ron McGill, 1050 Hershey Mill Road, asked how much was spent on the tree plantings in 44 Applebrook Park. Senya stated that the trees in Clymer' s Woods were paid for by the YMCA. 45 46 The Board voted unanimously in favor of the motion.

6/28/2016 June 28, 2016 BOS Minutes Page 3 of7

1 Senya called for a short break in the meeting at 8:50 p.m. 2 3 Milltown Dam: Eric Neast gave a brief synopsis of the dam and the possible solutions, with 4 associated costs and diagrams. David Graff recapped the sediment report, stating that the 5 sediment is classified as "Cleanfill". 6 7 Mike Lemekhe, 4 Reservoir Road, stated that he sent an email to the Board. Mr. Lemekhe stated 8 his opinion that Option 7 would solve the DEP problem, but believes there would be uncertainty 9 about how to handle the sediment, and asked in Option 8, if the sediment would be stabilized. 10 Mr. Lemekhe also expressed concern for an increase of mosquitoes as well as urging the Board 11 to give a picture of the area when it's complete and knowing how this would impact their home 12 values. Eric Neast stated his belief that Option 7 was a viable option, and that the costs to 13 remove the sediment would be approximately $3.5 million. 14 15 Baxter Wellman, 46 Lochwood Lane, stated that he takes offense at the Board's claim that no 16 residents had written or showed concern for this issue. 17 18 Antoinette Shorer, 28 Reservoir Road, expessed her desire at maintaining the reservoir and dam, 19 as she lives near it and sees it every day, and thought the Township should run a fundraiser 20 towards this effort. 21 22 Jim Sealey, 47 Lochwood Lane, asked Mr. Neast if he favored Option #7, and whether the 23 sediment would be placed onto private property. Mr. Neast said he preferred Option #7. Marty 24 answered that the land in this area has been surveyed and the sediment would not be placed on 25 other properties. 26 27 Paul Knox, 40 Lochwood Lane, read a statement from Mr. Cab Willem (who was not present at 28 the meeting), and also stated his preference to save the dam and reservoir. Mr. Knox also stated 29 that his group should be allowed enough time to re-petition residents with the new information 30 and pricing models provided by Gannett Fleming, as this information was not known when their 31 first petition was signed. Mr. Knox further commented that the Hershey's Mill group had seven 32 years to raise funds and his group should be granted similar timing. 33 34 Carmen commented on the June 27, 2016 email the Board received from Chuck Heppler about 35 possible funding sources. Mr. Heppler asked Carmen to keep the list private. 36 37 Mike Lynch, 1226 Upton Circle, commented that he is not personally attached to the Milltown 38 Dam, and recommended to the Board that they not consider long term debt options in the 39 remedy. Marty discussed the Township's operating expenses and capital expenditures as well as 40 the Township's current and future concerns, and ways in which to keep the Township 41 competitive and attractive to future home buyers. Marty further commented on the Township's 42 current AAA credit rating, and the Board does not want to jeopardize that or to raise taxes. 43 44 Allen Seltzer, 1464 Glenbrook Lane, asked whether the DEP could, at some point in the future, 45 change the standards with which they classify dams. Mr. Neast answered that this is a possibility 46 so the most viable options would be to fully restore the dam or to fully breach it.

6/28/2016 June 28, 2016 BOS Minutes Page 4 of7

1 2 Chuck Heppler, l 2A Reservoir Road, thanked the Board for considering his new fundraising plan 3 and had concerns about Option #8-Decommission the Dam. Mr. Heppler expressed concern 4 for the quantity of sediment that would be moved around creating too much of a slope to the 5 stream which would be hazardous to children and general public usage. Mr. Neast said the 6 grading would be at a 2% slope in this scenario, and that for Options 8, 9, and 10, there would be 7 no more than a 3 to 1 grading slope to the stream area. Mr. Heppler continued to state his 8 preference for Option #7, as he bought his home because of the reservoir and that he has grown 9 to love fishing in it. Mr. Heppler suggested that a larger parking area could be created, as well as 10 walking trails to allow more residents to eajoy the reservoir. 11 12 Senya asked how the reservoir residents would feel about this area being opened up to a larger 13 population of people. Carmen commented that it would not be fair to limit parking and that if 14 the dam was fully repaired, it would not be fixed to benefit only the 36 homes that are adjacent to 15 the dam. 16 17 Baxter Wellman, 46 Lochwood Lane, thanked the Board for all their hard work in this matter and 18 feels that the reservoir is unsafe for their children and security measures need to be installed 19 surrounding it. Mr. Wellman stated that he has issues with intruders in the wooded areas 20 surrounding his home, but he would want the reservoir area to become another East Goshen Park 21 area for all to enjoy. 22 23 Vincent McGinnis, 32 Lochwood Lane, stated he would be very happy to see more people 24 enjoying the reservoir. 25 26 Steve DiAntonio, 6 Reservoir Road, stated he bought his home because of the reservoir, and also 27 wanted to know where the equipment would access the reservoir and where it would be stored. 28 He also inquired why the Board has not had more communications with Westtown Township in 29 this matter. Mr. Neast answered that the equipment would access the reservoir at the crest of the 30 dam and also at the easement on the downside of the dam. Senya stated that the Board is in 31 contact and communication with Westtown Township and they are fully aware ofthis issue. 32 33 Todd Bechtold, 1467 Lochwood Lane, commented that the Board should be presenting detailed 34 visual renderings of the final product with cost estimates before a vote can be taken. Senya 35 stated that the process would begin with DEP permitting, which would take approximately 13 36 months to complete, that a path has not been chosen, but whatever path is chosen, the Board is 37 committed to making it look as high quality as possible. 38 39 Chuck Heppler, l 2A Reservoir Road, commented that Greenways Funding would qualify in this 40 effort. Senya corrected Mr. Heppler by stating that Greenways Funding only grants monies for 41 drinking water and recreational reservoirs, and Milltown Reservoir does qualify as that type of 42 reservoir. 43 44 Jim McBride, 34 Lochwood Lane, appreciates the Boards tireless efforts in this matter, and 45 inquired about the Airport Road Reservoir. Rick stated that the water company owns the Airport 46 Road Reservoir.

6/28/2016 June 28, 2016 BOS Minutes Page 5 of7

1 Senya thanked everyone in the assembly for being patient and polite during the long meeting. 2 Marty motioned to recommend Option #10-Partial Breach - Reduce Hazard Class, and to 3 authorize the Township Manager to begin the permitting process with the DEP and for 4 construction to begin after a contractor is chosen. Janet seconded. Carmen commented that in 5 deference to Chuck Heppler, he recommends to defer the vote for three to four months in order 6 for Mr. Heppler's group the time to pursue raising at least $1 million. Marty commented that 7 those fundraising efforts would need to be at least $3 .1 million and asked the assembly if they 8 are willing to be in the dam business and pass this issue along to future generations. 9 10 Bob Korman, 30 Lochwood Lane, stated he was one of the 1300 signers of the original petition, 11 he doesn't understand how the price to fix has grown so much, and he still wants the dam 12 repaired. 13 14 Senya commented that the Board has an obligation to future generations and they cannot turn a 15 blind eye to this matter. The Board does not want to create a wetland as part of the solution, but 16 would rather seek funding to make the new area a world class facility. Sen ya further commented 17 that many of the names and organizations on Mr. Heppler's fundraising list are already 18 contributing to other Township efforts. 19 20 The Board voted 4/1 in favor of the motion. Carmen was opposed. 21 22 Senya motioned to seek proposals from land planners to develop a plan on how the area above 23 the dam could be restored and/or utilized once the dam was breached and made a commitment to 24 the residents that the Board will work diligently to make the new area a world class facility. 25 Chuck seconded. 26 27 Dan Swengle, asked how the Board would make the new area a world class facility. Marty 28 commented that the Board will seek input from all residents for what would be included in the 29 newarea. 30 31 Baxter Wellman, 46 Lochwood Lane, thanked the Board for listening to the full assembly for the 32 evening even though the Board knew all along it was going to choose Option #10. 33 34 Melissa McGinnis, 32 Lochwood Lane, asked how this area can be turned into a park, and that 35 she does not see how it can be turned into a beautiful area. 36 37 Gerry O'Connor, 36 Lochwood Lane, asked how long this process would take. Senya stated it 38 would take between 2 to 3 years to complete. 39 40 Carl Civic, 28 Waterview Road, asked why the Board feels renovating the dam is not viable and 41 asked the Board to put this matter up for a referendum vote. Marty said that a referendum is very 42 hard to accomplish. 43 44 The Board voted unanimously in favor of the motion. Jon commented that the tax rate would be 45 doubled for the next two to three years if the Board were to fix the dam. Senya commented that

6/28/2016 June 28, 2016 BOS Minutes Page 6 of7

1 the dam would still be classified as a high hazard dam no matter how much money was spent to 2 fix it and this would not be fair for future generations. 3 4 Adjournment: 5 There being no further business, the Board voted unanimously to adjourn at 11 :51 p.m. 6 7 Respectfully submitted, 8 Christina Rossetti Hartnett 9 Recording Secretary 10 11

6/28/2016 June 28, 2016 BOS Minutes Page 7 of7

1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 July 19, 2016 - 7:00 pm 5 DRAFT MINUTES 6 7 8 Present: Chairman Senya D. Isayeff, Vice-Chairman Marty Shane, Carmen Battavio, Janet 9 Emanuel, Chuck Proctor, Township Manager Rick Smith, CFO Jon Altshul, and ABC Member 10 Erich Meyer (Conservancy Board). 11 12 Call to order & Pledge of Allegiance: 13 Senya called the meeting to order at 7:00 pm and asked Erich Meyer to lead the assembly in the 14 Pledge of Allegiance. 15 16 Moment of Silence: 17 Senya called for a moment of silence to honor the military and remember the police officers 18 recently lost. 19 20 Recording of Meeting: None. 21 22 Chairman's Report: Senya reported that the Township had been awarded a $52,500 grant for a 23 Paoli Pike Corridor Master Plan from DVRPC. He also reported that the Township was not 24 awarded a Greenways, Trails and Recreation Program grant for the proposed playground 25 renovation. Rick observed that the Township has applied for another grant for the playground 26 renovation as well, so there's still a chance we'll be successful. 27 28 Financial Report: Jon reported that the Township had a positive budget variance of $36,853 29 through the end of June and that he expects to the General Fund to finish the year with a positive 30 budget variance of $100,000. 31 32 "No Truck" Signs at the Preserve at Applebrook: 33 Rick reported that if our solicitor receives a positive response from the Preserve at Applebrok' s 34 solicitor regarding the installation of "No Truck" and "Except Local Deliveries" signs along 35 Hibberd Lane, we can schedule a public hearing to adopt the ordinance. He added that the 36 Township has incurred $18,775 in legal cost related to Hibberd Lane so far this year. 37 38 Consider Authorizing Submission for a CFA-Multimodal Transportation Fund Grant for 39 Segments D-E of the Paoli Pike Trail 40 Carmen made a motion to authorize application for the PennDOT Multimodal Transportation 41 Fund in the amount of$1,528,600 and approve matching funds in the amount f $1,089,400. Janet 42 seconded the motion. The motion passed unanimously. 43 44 Update on Changes to the MS4 Permit

7/19/2016 July 19, 2016 BOS Minutes Page 1of4

1 Rick explained that our MS4 permit will expire in 2018 and that to prepare for a new permit we 2 will need to plan to reduce stream sediment by 10% and create a map of impervious surfaces. He 3 added that he expects expenses in 2017 of approximately $40,000 for a report on these issues. 4 5 Rick also noted that West Chester Borough recently announced that it will levy a stormwater fee 6 on property owners based on impervious surfaces in order to require tax exempt properties, such 7 as West Chester University, schools and churches to pay for their share of stormwater costs. Rick 8 noted that East Goshen currently pays for stormwater costs from its general fund and asked 9 whether the Board would be interested in levying a separate stormwater fee instead. Rick 10 observed that East Goshen has substantially fewer tax exempt parcels than some other 11 municipalities in the area. 12 13 Any Other Matter 14 Rick noted that Kevin Camey, 1325 Park Avenue, dropped his appeal of his zoning violation for 15 an improper home-based business and has relocated his business to Delaware County. As part of 16 the negotiated settlement, he will reimburse the township for legal expenses incurred related to 17 this issue. He asked the Board to consider a motion to execute the agreement. Janet made a 18 motion to authorize the Chairman to execute the settlement agreement with Mr. Camey. Carmen 19 seconded the motion. The motion passed unanimously. 20 21 Marty asked Rick to begin including the Action List in the agenda moving forward, which Rick 22 agreed to do. 23 24 Senya noted that he had been asked by the FAME Fire Company to send a fundraising letter to 25 Sunoco Logistics on FAME's behalf and asked for the Board's approval. Carmen made a motion 26 to authorize Senya to sign a fundraising letter on FAME Fire Company's behalf to Sunoco 27 Logistics. Chuck seconded the motion. The motion passed unanimously. 28 29 Senya announced the resignation of Dolores Higgins and Ellen Carmody from the Historical 30 Commission. Rick stated he would advertise for replacements. 31 32 Senya provided an update on the Sunoco Logistics pipeline, as he and Rick had attended a 33 meeting with Sunoco earlier in the day. He reported that Sunoco has applied for permits through 34 DEP and that a public hearing on those permits will be held on Wednesday, August 10th from 35 6:30pm-9:30pm at the Sykes Student Union on the campus of West Chester University. He 36 added that public comments on the permits are due back to DEP by August 24th. 37 38 Senya reported that Tom Commita, Rick, himself and representatives of the West Chester Area 39 School District are scheduled to meet about the Township's Local Economic Revitalization and 40 Tax Assistance (LERTA) proposal on August 15th. 41 42 Janet inquired about whether a Township committee would be created to assist with the Paoli 43 Pike Corridor Master Plan. The Board agreed that the Trail Committee could be assigned with 44 this responsibility. 45 46 Approval of Minutes

7/19/2016 July 19, 2016 BOS Minutes Page 2 of 4

1 Carmen made a motion to approve the minutes of June ih. Senya seconded the motion. The 2 motion passed unanimously. 3 4 Marty suggested that Rick, Jon, Carmen and himself meet with the Goshen Fire Company to 5 discuss financial matters prior to August 1 ih. 6 7 Treasurer's Report: 8 See attached Treasurer's Report for July 14th, 2016. The Board reviewed the Treasurer's 9 Report and the current invoices. Carmen moved to graciously accept the Treasurer's Report and 10 the Expenditure Register Report as recommended by the Treasurer, to accept the receipts and to 11 authorize payment of the invoices just reviewed. Marty seconded. The Board voted 12 unanimously to approve the motion. 13 14 Public Comment: 15 None 16 17 Adjournment: 18 There being no further business, Janet motioned to adjourn the meeting at 7:35 pm. Chuck 19 seconded. The Board voted unanimously to adjourn. 20 21 Respectfully submitted, 22 Jon Altshul 23 24 Attachment: Treasurer's Report/or July 14, 2016 25

7/19/2016 July 19, 2016 BOS Minutes Page 3 of4

July 14, 2016

TREASURER'S REPORT

2016 RECEIPTS AND BILLS

I GENERAL FUND

Real Estate Tax $6,255.66 Accounts Payable $378,919.25 Earned Income Tax $91,957.45 Electronic Pmts: Local Service Tax $2,759.00 Credit Card $0.00 Transfer Tax $53,004.19 Postage $2,000.00 General Fund Interest Earned $517.40 Debt Service $13,099.73 Total Other Revenue $524,447.88 Payroll $117,392.62 Total Receipts: $678,941.58 Total Expenditures: $511,411.60

!STATE LIQUID FUELS FUND

Receipts $0.00 Interest Earned $62.12 Total State Liqud Fuels: $62.12 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $4,730.00 Interest Earned $455.65 Credit Card $0.00 Total Sinking Fund: $455.65 Total Expenditures: $4,730.00

!TRANSPORTATION FUND

Receipts $396.25 Interest Earned $198.25 Total Sinking Fund: $594.50 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $43,008.64 Receipts $184,27 4.17 Debt Service $30,836.43 Interest Earned $67.30 Credit Card $0.00 Total Sewer: $184,341.47 Total Expenditures: $73,845.07 I REFUSE FUND

Receipts $47,526.75 Interest Earned $95.35 Total Refuse: $47,622.10 Expenditures: $66,932.91

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $257.07 Total Sewer Sinking Fund: $257.07 Expenditures: $17,699.21

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $258.51 Total Operating Reserve Fund: $258.51 Expenditures: $0.00 I Events Fund

Receipts $0.00 Interest Earned $1.00 1 Total Events Fund: $1.00 Expenditures: $0.00

7/19/2016 July 19, 2016 BOS Minutes Page 4 of 4

July 28, 2016

TREASURER'S REPORT 2016 RECEIPTS AND BILLS

jGENERAL FUND

Real Estate Tax $2,634.88 Accounts Payable $84,693.66 Earned Income Tax $70,900.00 Electronic Pmts: Local Service Tax $900.00 Credit Card $0.00 Transfer Tax $0.00 Postage $1,000.00 General Fund Interest Earned $2,514.12 Debt Service $0.00 Total Other Revenue $26 690.67 Payroll $114,795.76 Total Receipts: $103,639.67 Total Expenditures: $200,489.42

!STATE LIQUID FUELS FUND

Receipts $0.00 Interest Earned $0.00 Total State Liqud Fuels: $0.00 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $3,945.00 Interest Earned $5,055.30 Credit Card $0.00 Total Sinking Fund: $5,055.30 Total Expenditures: $3,945.00

!TRANSPORTATION FUND

Receipts $0.00 Interest Earned $0.00 Total Sinking Fund: $0.00 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $51,504.65 Receipts $118,032.91 Debt Service $0.00 Interest Earned $0.00 Credit Card $0.00 Total Sewer: $118,032.91 Total Expenditures: $51,504.65

!REFUSE FUND

Receipts $46,049.20 Interest Earned $0.00 Total Refuse: $46,049.20 Expenditures: $932.78

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $0.00 Total Sewer Sinking Fund: $0.00 Expenditures: $0.00

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $0.00 Total Operating Reserve Fund: $0.00 Expenditures: $0.00

!Events Fund

Receipts $0.00 Interest Earned $0.00 Total Events Fund: $0.00 Expenditures: $0.00

TO:

FROM:

SUBJECT:

DATE:

---.. ~----~· ======

EAST GOSHEN TOWNSHIP

MEMORANDUM

BOARD OF SUPERVISORS

BRIAN MCCOOL

PROPOSED PAYMENTS OF BILLS

07-28-2016

Please accept the attached Treasurer's Report and Expenditure Register Repmi for consideration by the Board of Supervisors. I recommend the Treasurer's Report and each register item be approved for payment.

General Fund expenses include a payment in the amount of $13,350 storm water materials.

Batch 4 reflects three journal entries done to correct errors discovered in the Quarter 1 and Quarter 2 charge back from the sewer fund to the general fund to properly allocate administrative overhead costs.

Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.

F:\Data \Shared Data\Finance Dept\ Treasurers' Reports \2016 \ 07-28-2016 \ 07-28-2016 Memo. docx

~ast Goshen Township Fund Accounting

~eport Date 07/20/16

.fARP05 run by BARBARA 11 38 AM

/ender Req # Budget# Sub# Description

05 SEWER OPERATING

1393 US POSTMASTER 48110 1 05429 3250 ADMIN.- POSTAGE UTILITY BILL - QTR.3 2016

06 REFUSE

1393 US POSTMASTER 48111 1 06427 3250 POSTAGE UTILITY BILL - QTR.3 2016

FUND SUMMARY

Fund Bank Account Amount Description

05 05 06 06 932.78 SEWER OPERATING 932.78 REFUSE

1,865.56

PERIOD SUMMARY

Period Amount

1607 1,865.56

1,865.56

BATCH 1OF6

Expenditures Register

GL-1607-53746

Invoice Number Req Date Check Dte Recpt Dte Check#

072016S 07/20/16 07/20/16

072016R 07/20/16 07/20/16

0 Printed, totaling

PAGE

Amount

932.78

932.78

932.78

932.78

1,865.56 1,865.56

1

~ast Goshen Township Fund Accounting

Report Date 07/22/16

:.1ARP05 run by BARBARA 2 11 PM

~endor Req # Budget# Sub# Description

01 GENERAL FUND

N . ASHWORTH 1 DANIELLE 48116 1 01367 3240 PARK FEES DEPOSIT RETURN FOR PAVILION RENTAL

3569 BALFORD FARMS 48117 1 01452 2000 SUMMER PROGRAM SUPPLIES 9 CASES ORANGE DRINK 48117 2 01452 2000 SUMMER PROGRAM SUPPLIES 9 CASES ORANGE DRINK

3353 COMMONWEALTH FINANCING AUTHORITY

Expenditures Register

GL-1607-53798

BATCH 2 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount .

072016 07/22/16 07/22/16 50.00

50.00

768483 07/22/16 07/22/16 104.54

863635 07/22/16 07/22/16 104.54

209.08

48118 1 01452 2000 SUMMER PROGRAM SUPPLIES 071816 07 /22/16 07/22/16 100.00 GRANT APPLICATION

100.00

638 HOME DEPOT CREDIT SERVICES 48119 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 071316 07/22/16 07/22/16 39.42 WASHERS 1 WATER NOZZLES 1 KEY WRENCH

& HOSE REPAIR 48119 2 01432 2460 SNOW - MATERIALS & SUPPLIES 071316 07/22/16 07/22/16 99.84 BIRD DETERENT - SALT BIN 48119 3 01437 2460 GENERAL EXPENSE - SHOP 071316 07/22/16 07/22/16 436.00 ROUND-UP CONCENTRATE 48119 4 01454 3740 EQUIPMENT MAINT. & REPAIR 071316 07/22/16 07/22/16 29.98 DECKMATE SCREWS - PARK RAILINGS 48120 1 01437 2460 GENERAL EXPENSE - SHOP 071316-2 07/22/16 07/22/16 29.96 BATTERIES FOR CAMERA

l

?ast Goshen Township Fund Accounting

Report Date 07/22/16

MARP05 run by BARBARA 2 11 PM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

638 HOME DEPOT CREDIT SERVICES 48119 5 05422 3701 R.C. COLLEC.-MAINT.& REPR HOSE FITTINGS - RCSTP & BATTERIES

FUND SmlMARY

Fund Bank Account Amount Description

01 01 05 05 994.28 GENERAL FUND 61.92 SEWER OPERATING

1,056.20

PERIOD SmlMARY

Period Amount

1607 1,056.20

1,056.20

BATCH 2 OF 6

Expenditures Register

GL-1607-53798

Invoice Number Req Date Check Dte Recpt Dte Check#

071316 07/22/16 07/22/16

0 Printed, totaling

PAGE

Amount

61.92

697.12

1,056.20 1,056.20

2

~ast Gos4en Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

82 ASSOCIATED TRUCK PARTS

1198

48128 1 01430 2330 VEHICLE MAINT AND REPAIR TRUCK LIGHTS

BRANDYWINE VALLEY SPCA 48129 1 01410 5400 S.P.C.A. CONTRACT STRAY ANIMAL RECV'D/PICKUP

JUNE 2016 48129 2 01410 5400 S.P.C.A. CONTRACT ANIMAL CONTROL ACTIVITY JUNE 2016 48129 3 01410 5400 S.P.C.A. CONTRACT

Expenditures Register

GL-1607-53876

Batch 3 of 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

71930 07/27/16 07/27/16 07/27/16 11710 185.42

185.42

958 07/27/16 07/27/16 07/27/16 11711 700.00

958 07/27/16 07/27/16 07/27/16 11711 40.00

958 07/27/16 07/27/16 07/27/16 11711 50.00 UNCLAIMED STRAY BOARDING CONTRACT -

JUNE 2016

2695 BRICKHOUSE ENVIRONMENTAL 48130 1 01454 3100 PROFESSIONAL SERVICES WATER QUALITY TESTING PARK FOUNTAINS

3598 CEDAR HOLLOW RECYCLING 48131 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 949.21 TONS OF CONSTRUCTION MATERIAL

790.00

201279 07/27/16 07/27/16 07/27/16 11712 315.00

315.00

00011514 07/27/16 07/27/16 07/27/16 11713 10,528.84

---~-- --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2491 COMCAST 8499-10-109-0107472 48132 1 01401 3210 COMMUNICATION EXPENSE 0107472 7/17-8/16 PW TV

1990 CRYSTAL SPRINGS 48133 1 01401 2100 MATERIALS & SUPPLIES SUGAR & COFFEE

10,528.84

072716 07/27/16 07/27/16 07/27/16 11714 10.53

10.53

3154612 070816 07/27/16 07/27/16 07/27/16 11715 78.26

78 .26

1

East Goshen Township Fund Accounting Batch 3 of 6

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Expenditures Register

GL-1607-53876

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

2075 ELVERSON SUPPLY COMPANY 48134 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS QT GLAZING COMPOUND 48135 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS QT GLAZING COMPOUND 48136 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 1 GALLON OF PURE WHITE PAINT

553 GORDON, MARK A. 48137 1 01401 3300 AUTO ALLOWANCE 18 MILES @ .54 - MEETING IN TREDDYFERIN 48137 2 01401 2100 MATERIALS & SUPPLIES CELL PHONE SCREEN PROTECTORS FOR RICK & MARK G.

594 HAMMOND & MCCLOSKEY INC. 48138 1 01409 3745 PW BUILDING - MAINT REPAIRS INSTALLED ADDITIONAL HOSE FAUCET IN

PW GARAGE - 6/27

275575

275632

276289

071416

071416

7799

48139 1 01409 3840 DISTRICT COURT EXPENSES 7804 INSTALLED 30 GALLON ELECTRIC HOT WATER HEATER@ DIST. COURT

2717 HIGGINS & SONS INC., CHARLES A.

627

48140 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG.

48141 1

48142 1

48143 1

48144 1

48145 1

SIGNAL REPAIR @ WC PIKE & CHESTER HOLLOW INTERSECTION

HIGHWAY MATERIALS INC. 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 8.01 TONS 9.5H .3<3 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 14.99 TONS 9.5H .3<3 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 16.98 9.5H .3<3 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 12.97 TONS 9.5H .3<3 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 8.04 TONS 9.5H .3<3

42334

1640345MB

1640386MB

1640428MB

1640410MB

11044173MB

07/27/16 07/27/16 07/27/16 11716 9.79

07/27/16 07/27/16 07/27/16 11716 9.79

07/27/16 07/27/16 07/27/16 11716 60.00

79.58

07/27/16 07/27/16 07/27/16 11717 9.72

07/27/16 07/27/16 07/27/16 11717 60.00

69. 72

07/27/16 07/27/16 07/27/16 11718 273.49

07/27/16 07/27/16 07/27/16 11718 1,225.80

1,499.29

07/27/16 07/27/16 07/27/16 11719 97.50

97.50

07/27/16 07/27/16 07/27/16 11720 380.07

07/27/16 07/27/16 07/27/16 11720 711.28

07/27/16 07/27/16 07/27/16 11720 805.71

07/27/16 07/27/16 07/27/16 11720 615.43

07/27/16 07/27/16 07/27/16 11720 381.50

2,893.99

2

.East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

694 J&L BUILDING MATERIALS INC 48146 1 01454 3740 EQUIPMENT MAINT. & REPAIR SCREWS, GUTTER COIL, DOUNSPOUT, ELBOW, CLAY 48147 1 01454 3740 EQUIPMENT MAINT. & REPAIR SOFFIT & TRIM COIL

2442 KENT AUTOMOTIVE 48148 1 01430 2330 VEHICLE MAINT AND REPAIR CIRCULAR SAW

739 KNOX EQUIPMENT RENTALS INC. 48149 1 01438 3840 EQUIPMENT RENTAL STUMP GRINDER RENTAL 07/06

Expenditures Register

GL-1607-53876

Batch 3 of 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

03743491 07/27/16 07/27/16 07/27/16 11721 287.44

03696058 07/27/16 07/27/16 07/27/16 11721 722. 87

9304180448 07/27/16 07/27/16 07/27/16 11722 242.01

242.01

01-358502-02 07/27/16 07/27/16 07/27/16 11723 372.95

J ' ' .,,,_,., r,>7~0 372.95 T ' " "11!.'\tl\.S':;t.. 'T~ D \¥.-\v'""\' ;> .. b ~ ..... " " . • t ,o !f':i~I u.y..,...~ €.-vi.\~r,.<tq .M"t1"l , + .... efC«. 765 LENNI ELECTRIC CORPORATION 48153 1 .01409 7400 CAP REPLACEMENT - TWP BLDG LED CONVERSION OF TWP LOT LIGHTS 48154 1 01409 3840 DISTRICT COURT EXPENSES REPLACED 2 - 4 LAMP BALLASTS REPLACED 4 - F32 TB LAMPS 48157 1 01409 3745 PW BUILDING - MAINT REPAIRS REPLACED (6) 250W MH BALLASTS REPLACED (6) 250W MH MOGUL LAMPS

160703 07/27/16 07/27/16 07/27/16 11724 3,477.20

160663 07/27/16 07/27/16 07/27/16 11724 216.44

160683 07/27/16 07/27/16 07/27/16 11724 769.92

------ --------- ------- ---- -----------------------~~-~~--;~(..,-~~;~J--~~ ~i~)i~~:i~\~c::i- ~-------- ----~- -::-~~~~;~~~

tL· ,~W'\.'\-tXMa..t~na-..\., ls~rei,12s. · 3068 _ MILLER CONCRETE PRODUCTS INC. ,A.C. S.\~ 48158 1 01438 2450 TERIALS & SUPPLIES-HIGHWAYS 70264 07/27/16 07/27/16 07/27/16 11725 13,350.00

3334

BIKE GRATES, RISERS & ADJUSTMENT BLOCKS

NATIONWIDE EMPLOYEE BENEFITS 48161 1 01486 1560 HEALTH,ACCID. & LIFE JULY PREMIUM 48161 2 01213 1010 VOL. LIFE INSURANCE W/H JULY 2016 PREMIUM

080070

-~ 080070

07/27/16 07/27/16 07/27/16 11726

07/27/16 07/27/16. 07/27/16 11726 145.40

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ~----------- ..

3,709_.37

3

East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Expenditures Register

GL-1607-53876

Batch 3 of 6

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

3679 NETCARRIER TELECOM INC. 67846

3680

48163 1 01401 3210 COMMUNICATION EXPENSE 7/1/16 - 7/31/16

NETCARRIER TELECOM INC. 67891 48162 1 01401 3210 COMMUNICATION EXPENSE 7/1/16 - 7/31/16

3146 PILEGGI INC. I JAMES A.

387285

387293

48169 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 5922 6/17 HAUL OUT FILL TO CEDAR HOLLOW

2108 SIDELINES SPORTSWEAR & PROMOTIONS 48171 1 01487 1910 UNIFORMS 5105 (36) SAFETY GREEN T-SHIRTS WITH LOGO ·49172 1 01487 1910 UNIFORMS FOREST GREEN LONG SLEEVE BUTTON

DOWN WITH LOGO

2289 SUNBELT RENTALS 48173 1 01438 3840 EQUIPMENT RENTAL 81 STREET BROOM 3 WHEEL

3604 SUPERIOR PLUS ENERGY SERVICES 48174 1 01430 2320 VEHICLE OPERATION - FUEL 98.2 GALLONS GASOLINE 48175 1 01430 2320 VEHICLE OPERATION - FUEL 225 GALLONS DIESEL

3317 SWANK MOTION PICTURES INC. 48176 1 01452 5150 AMPHITHEATER CONCERTS 8/26/16 SHOWING OF STAR WARS

5104

61214594-001

644055

530907

RG 1327391

07/27/16 07/27/16 07/27/16 11727 358.85

358.85

07/27/16 07/27/16 07/27/16 11728 130.52

130.52

07/27/16 07/27/16 07/27/16 11729 722. 50

722.50

07/27/16 07/27/16 07/27/16 11730 304.20

07/27/16 07/27/16 ·07/27/16 11730 54.98

359.18

07/27/16 07/27/16 07/27/16 11731 303.80

303.80

07/27/16 07/27/16 07/27/16 11732 165.94

07/27/16 07/27/16 07/27/16 11732 358.83

524. 77

07/27/16 07/27/16 07/27/16 11733 678.00

678. 00

4

East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

2933 TRANS-FLEET CONCRETE

1470

48177 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 9 CYDS 3500 AIR CONCRETE

WESTTOWN TOWNSHIP 48182 1 01410 5310 REGIONAL POLICE BLDG INTEREST JULY INTEREST 48182 2 01410 5320 REGIONAL POLICE BLDG PRINCIPAL JULY PRINCIPAL

Expenditures Register

GL-1607-53876

Batch 3 of 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

138437 07/27/16 07/27/16 07/27/16 11734 990.00

990.00

072716 07/27/16 07/27/16 07/27/16 11735 1,380.63

072716 07/27/16 07/27/16 07/27/16 11735 9,166.66

5

East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Vendor Req # Budget# Sub# Description

03 SINKING FUND

3521 CARROLL ENGINERRING CORPORATION 48181 1 03459 7450 CAPITAL - E. BOOT RD BRIDGE PROF. SERVICE 5/30/16-6/26/16 E. BOOT RD BRIDGE

Batch 3 of 6

Expenditures Register

GL-1607-53876

Invoice Number Req Date Check Dte ·Recpt Dte Check#

201279 07/27/16 07/27/16 07/27/16 1038

PAGE

Amount

3,945.00

3,945.00

6

·East Goshen Township Fund Accounting Batch 3 of 6

Report Date 07/27/16

MARPOS run by BRIAN 1 50 PM

Expenditures Register

GL-1607-53876

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

05 SEWER OPERATING

3140 ACE DISPOSAL CORP 48126 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 105930 PORTABLE TOILETS STAND BY 6/7-6/28 48127 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 105929 PORTABLE TOILETS STAND BY 6/23 BARKWAY

1624 L/B WATER SERVICE INC 48150 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 3699033 2 SINGLE BAND FULL CIRCLE REPAIR CLAMPS 48151 1 05422 7420 R.C. COLLEC.-CAPITAL 3698953 (80) 211 STAINLESS STEEL PIPES, TYPE 304 48151 2 05422 7420 R.C. COLLEC.-CAPITAL 3698953 (2) SINGLE BAND FULL CIRCLE REPAIR CLAMPS

765 LENN! ELECTRIC CORPORATION 48152 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 160679 SS STRUT FOR STOCK 48155 1 05422 3700 R.C. STP-MAINT.& REPAIRS 160665 REPLACED INFLUENT PUMP #3, REMOVED 2 PUMPS, REPLACED 3/4 11 ROB ROY PIPE SLEEVE 48156 1 05422 7420 R.C. COLLEC.-CAPITAL 160675 HUNT COUNTRY CONDUIT & LED LIGHTS

797 M&S SERVICE COMPANY 48160 1 05420 3701 C.C. INTERCEPT.-MAINT.&REP SERVICE CALL - BARKWAY

3136 MGK INDUSTRIES INC. 48159 1 05422 7420 R.C. COLLEC.-CAPITAL REPLACED BASE ELBOWS, GUIDE RAILS & PRECAST TOP SLAB

1683-16

5227

07/27/16 07/27/16 07/27/16 2486 3,000.00

07/27/16 07/27/16 07/27/16 2486 125.00

3,125.00

07/27/16 07/27/16 07/27/16 2487 241.43

07/27/16 07/27/16 07/27/16 2487 1,427.20

07/27/16 07/27/16 07/27/16 2487 177. 00

1,845.63

07/27/16 07/27/16 07/27/16 2488 388.66

07/27/16 07/27/16 07/27/16 2488 812.00

07/27/16 07/27/16 07/27/16 2488 6,929.56

8,130.22

07/27/16 07/27/16 07/27/16 2489 280.00

280.00

07/27/16 07/27/16 07/27/16 2490 13,700.00

13,700.00

7

East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 : 50 PM

Vendor Req # Budget# Sub# Description

3675 NETCARRIER TELECOM INC. 67889 48183 1 05420 3602 C.C. COLLECTION -UTILITIES 7/1/16 - 7/31/16

3676 NETCARRIER TELECOM INC. 67890

3677

3678

2827

48167 1 05422 3600 R.C STP -UTILITIES 7/1/16 - 7/31/16

NETCARRIER TELECOM INC. 67887 48164 1 05420 3602 C.C. COLLECTION -UTILITIES 7/1/16 - 7/31/16

NETCARRIER TELECOM INC. 67888 48165 1 05420 3602 C.C. COLLECTION -UTILITIES 7/1/16 - 7/31/16

PECO - 04725-43025

Expenditures Register

GL-1607-53876

Batch 3 of 6

PAGE

Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

387291 07/27/16 07/27/16 07/27/16 2493 46.97

46.97

387292 07/27/16 07/27/16 07/27/16 2494 41.86

41. 86

387289 07/27/16 07/27/16 07/27/16 2491 47.28

47.28

387290 07/27/16 07/27/16 07/27/16 2492 46.99

46.99

48168 1 05420 3602 C.C. COLLECTION -UTILITIES 071116 07/27/16 07/27/16 07/27/16 2495 430.45 04725-43025 6/7/16-7/7/16 WYLLPEN PUMP

1238 SEELEY & CO. INC., JT 48170 1 05422 7420 R.C. COLLEC.-CAPITAL HUNT COUNTRY - MAINTENANCE

2231 ULINE

2439

48178 1 05422 3700 R.C. STP-MAINT.& REPAIRS 24" FLOOR FAN

VERIZON -7041 48179 1 05422 3601 R.C. COLLEC.-UTILITIES JULY 7 - AUG 6, 2016

68631

78170996

070716-7041

430.45

07/27/16 07/27/16 07/27/16 2496 13,626.00

13,626.00

07/27/16 07/27/16 07/27/16 2497 377. 07

377.07

07/27/16 07/27/16 07/27/16 2498 196.98

196.98

100,150.69 40 Printed, totaling 100,150.69

8

East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 1 50 PM

Vendor Req # Budget# Sub# Description

FUND SUMMARY

Fund Bank Account Amount Description

01 01 03 03 05 05

54,311.24 GENERAL FUND 3,945.00 SINKING FUND 41,894.45 SEWER OPERATING

100,150.69

PERIOD SUMMARY

Period Amount

1607 100,150.69

Batch 3 of 6

Expenditures Register

GL-1607-53876

Invoice Number Req Date Check Dte Recpt Dte Check#

PAGE

Amount

9

~ast Goshen Township Fund Accounting

Report Date 07 /22/16

:4ARP05 run by BARBARA 2 41 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

430 EAST GOSHEN TWP - SEWER

430

48121 1 01380 0120 INSURANCE CLAIMS AND DIVIDENDS REVERSE PYMT. QTR.2 SEWER CHGBK. PROPERTY & CASUA;LTY INSURANCE 48121 2 01380 0120 INSURANCE CLAIMS AND DIVIDENDS QTR.2 2016 PROP.& CASUALTY SEWER CHARGE BACK

EAST GOSHEN TWP - SEWER 48122 1 01392 0500 TRANSF. FROM SEWER OPER. REVERSE PYMT. TO 01 TWP.MGR.BOND 48122 2 01392 0500 TRANSF. FROM SEWER OPER. REVERSE PYMT. TO 01 FINAN.DIR.BOND

05 SEWER OPERATING

425 EAST GOSHEN TOWNSHIP - GENERAL 48123 1 05429 3500 ADMIN.- INSURANCE

Expenditures Register

GL-1607-53802

BATCH 4 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

072116-1 07/22/16 07/22/16 07/22/16 11707

072116-1 07/22/16 07/22/16 07/22/16 11707

072116-2 07/22/16 07/22/16 07/22/16 11709

072116-2 07/22/16 07/22/16 07/22/16 11709

6,957.00

072116 07/22/16 07/22/16 07/22/16 2485 80.95 QTR.2 2016 SEWER CHGBK. TWP . MGR. BND 48123 2 05429 3500 ADMIN.- INSURANCE QTR.2 2016 SEWER CHGBK. FIN.DIR.BND

FUND SUMMARY

Fund Bank Account Amount Description

01 01 05 05 21,047.44 GENERAL FUND 881.65 SEWER OPERATING

PERIOD SUMMARY

Period Amount

1607 . 21,929.09

21,929.09

072116 07/22/16 07/22/16 07/22/16 2485 800.70

881. 65

21,929.09 3 Printed, totaling 21,929.09

1

~ast Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRI.l\N 3 06 .PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

2445 PROTECTION BUREAU, THE

3604

48188 1 01409 3840 DISTRICT COURT EXPENSES CENTRAL STATION MONITORING SERVICE 8/1/16 - 7/31/17

SUPERIOR PLUS ENERGY SERVICES 48189 1 01430 2320 VEHICLE OPERATION - FUEL 542 GALLONS BIODIESEL

Expenditures Register

GL-1607-53880

BATCH 5 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

184382 07/27/16 07/27/16 07/27/16 11739 360.00

360.00

336055 07/27/16 07/27/16 07/27fl6 11740 829.21

829.21

l

,East Goshen Township Fund Accounting

Report Date 07/27/16

MARP05 run by BRIAN 3 06 PM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

3043 MAIN POOL & CHEMICAL COMP. 48187 1 05422 2440 R.C. STP- CHEMICALS INC.

Expenditures Register

GL-1607-53880

BATCH 5 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1655242 07/27/16 07/27/16 07/27/16 2499 2,040.60 1790 GAL. ALUMINUM SULFATE SOLUTION 48187 2 05422 2440 R.C. STP- CHEMICALS 245 50 LB. BAGS SODIUl4 CARBONATE LITE

FUND SUMMARY

Fund Bank Account Amount Description

01 01 05 05 1,189.21 GENERAL FUND 5,678.85 SEWER OPERATING

6,868.06

PERIOD SUMMARY

Period Amount

1607 6,868.06

6, 868. 06

1655242 07/27/16 07/27/16 07/27/16 2499

3 Printed, totaling

3,638.25

5,678.85

6,868.06 6,868.06

2

gast Goshen Township Fund Accounting

~eport Date 07/28/16

MARP05 run by BRIAN 1 42 PM

Vendor Req .# Budget# Sub# Description

01 GENERAL FUND

2898 AQUASCAPES UNLIMITED 48190 1 01454 3711 POND TREATMENT POND SERVICE - PIN OAK & BOW TREE

Expenditures Register

GL-1607-53896

BATCH 6 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1529 07/28/16 07/28/16 07/28/16 11741 1,342.00

48191 . 1 01454 3711 POND TREATMENT 1514 07/28/16 07/28/16 07/28/16 11741 886.39 POND SERVICE - PIN OAK, MARYDELL & BOW TREE

2360 AQUILilNTE CONCRETE 48193 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 1 YARD CONCRETE - SARATOGA DR

2717 HIGGINS & SONS INC., CHARLES A. 48195 1 01433 2500 !o!AINT. REPAIRS.TRAFF.SIG. 2016 INSPECTIONS - TRAFFIC LIGHTS, FLASHERS & SCHOOL SIGNALS

2,228.39

40889 07/28/16 07/28/16 07/28/16 11742 143.10

143.10

42339 07/28/16 07/28/16 07/28/16 11743 4,780.00

4,780.00

1

East Goshen Township Fund Accounting

Report Date 07/28/16

MARP05 run by BRIAN 1 42 PM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

3720 FRANC ENVIRONMENTAL INC. 48194 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. HI-VAC TRUCK & CREW - CLEAN 5 PUMP STATIONS 48194 2 05422 3700 R.C. STP-MAINT.& REPAIRS

Expenditures Register

GL-1607-53896

BATCH 6 OF 6

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

98590 07/28/16 07/28/16 07/28/16 2500 685.00

98590 07/28/16 07/28/16 07/28/16 2500 685.00 HI-VAC TRUCK & CREW TO CLEAN 5 PUMP STATIONS 48194 3 05422 3701 R.C. COLLEC.-MAINT.& REPR HI-VAC TRUCK & CREW TO CLEAN 5 PUMP STATIONS

FUND SUMMARY

Fund Bank Account Amount Description

01 01 05 05 7,151.49 GENERAL FUND 21055.00 SEWER OPERATING

9,206.49

PERIOD SUMMARY

Period Amount

1607 9,206.49

9,206.49

98590 07/28/16 07/28/16 07/28/16 2500

4 Printed, totaling

685.00

2,055.00

9,206.49 9,206.49

2

THE COUNTY OF CHESTER

COMMISSIONERS Terence Farrell Kathi Cozzone Michelle Kichline

OFFICE OF THE COMMISSIONERS 313 W. Market Street, Suite 6202 P.O. Box 2748 . West Chester, PA 19380-0991

(610) 344-6100

Certification of Population Density

East Goshen Township

JUL 2 S 2016

As of the 2010 decennial Census of the United States, East Goshen Township, with a population of

18,026 people and a land area of 10.13 square miles, had a population density in 2010of1,779 persons

per square mile, which meets the standard of at least 300 inhabitants to the square mile listed in the

Pennsylvania First Class Township Code as a qualification for a township to be a township of the first

class.

Terence Farrell, Chairman of the Board of Commissioners

Swab, Chief Clerk

(seal)

23 Wistar Rd. Paoli, PA 19301 July 27, 2016

Mr. E. Martin Shane, Chair Board of Supervisors East Goshen Township

1580 Paoli Pike West Chester, PA 19380-6199

RE: Jason Lang, Director of Parks & Recreation

Dear Mr. Shane & Board of Supervisors,

Our grandchildren, East Goshen residents, have attended the Summer Recreation Camp program for several years running, including this summer. We would like to thank EG Township for offering and supporting this wonderful program.

More important, we want to encourage you - as a governing Board - to recognize the amazing job that Jason Lang does in organizing and supervising this program! The quality of activities and trips, and the caring and attention of his camp staff, are superior, and the smiles on our grandchildren' s faces tell the "fun" story of each day.

Other townships (our own included) have summer "camp" programs, but we are quite confident that East Goshen' s is of such high quality because of Jason's leadership!

Yours truly, ~4'M~

Russ & Bob Sprague

-..- • - ~ .. ..,, -- - f ~ • -~ - ' - •

FONT DESIGN FOR STREET NAME SIGNS

The Federal Highway Administration (FHWA) has terminated its approval of the Clearview Highway font,

which PennDOT had specified as the standard font for freeway guide signs and conventional highway street

name signs. Standard Alphabets for Traffic Control Devices, more commonly referred to as Highway Gothic, is

now the only approved font for the design of traffic signs.

FHWA has not issued a mandate on the replacement of signs using the Clearview font, but all future sign

installations are to use the Highway Gothic font. This means existing signs may remain in use for their

normal service life but should be replaced with a sign using Highway

Gothic, when appropriate, as part of routine maintenance.

i E Main st

Highway Gothic is a modified version of the standard Gothic

font and was originally developed in the late 1940s by the California

Department ofTransportation. The font has six configurations known

as letter series (B, C, D, E, E (modified), and F). Each series increasingly

widens the individual letter sizing and expands the spacing between the

03-1 street name sign with

Highway Gothic font.

pennsylvania DEPARTMENT OF TRANSPORTATION

LOCAL TECHNICAL ASSISTANCE PROGRAM

400 North Street, 6th Floor Harrisburg, PA 17120 1-800-FOR-LTAP • FAX (717) 783-9152 www.ltap.state.pa.us

letters.

Street name signs (D3-l) and most other guide signs must be

designed separately because of variability in the message or legend that limits the ability to standardize sizes.

PennDOT Publication 236, Handbook of Approved Signs, provides the minimum requirements for street name

signs (D3-l). Additionally, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) states that letters

used on street name signs (D3-l) must be composed of a combination oflowercase letters with initial uppercase

letters.

Table 2D-2 from the MUTCD shows the appropriate letter height for each roadway type sign. For signs

on most local roadways, an initial letter uppercase height of 6 inches should be used. However, on streets with

speed limits of 25 miles per hour or less, letter size can be as small as 4 inches for uppercase and 3 inches for

lowercase letters. No matter the roadway type sign, the lowercase letter height is always three-quarters the height

of the initial uppercase. Note that there is no relation between letter style and case: street name signs still

need to use mixed-case lettering in the Highway Gothic font.

Table 2Da2. Recommended Minimum Letter Heights on Street Name Signs

fleeommendw Minimum Type of Milunting Type ofstroot or High\wy Speed Limit Letter Height

Initial UPf-ler-Case Lower-Case

CNerhMd M types All spee<J limits 12 rnhe3 9 inches

Past-maunted ~'-.tti-lan= Mora thmilO rrq;h 8 inches Binc-hea

POEl-maunted ~Mti-- lane 40 mph or B!IS 6 im::hes 4.S iruchas

Pcs1-mount-=d 2-lane All sperl limits 6 incit83' 4.5 inches'

•On b oal wo-lare 51n=e1B wtlh spe.=-j limits 01 25 mph or 1"1s;, 4-inch initial ~'PJ:Er- cas<: 1-:tlera 1"uh 3-inc4-l lam r-c,3s~ letters ma:1• te u!*d_

To aid in the development of guide signs, the FHWA publication Standard Highway Signs outlines the

following design guidelines for guide signs:

• Whenever practical, the overall dimension of the sign should be in multiples of 6 inches.

0 Wider spacing between letters and narrower letter sizing is more favorable than wider letters and

narrower spacing. Use of Series B alphabet is optimal for street name signs.

Sign and letter sizing may be increased to provide additional emphasis or where there is a need for

greater legibility. As a rule-of-thumb, letter height should be 1 inch for every 40 feet of desired legibility.

This means that a motorist should be able to read the lowercase letter heights of a street name sign on a

local road at a minimum distance of 180 feet.

PennDOT Publication 236 also provides guidance on acceptable

colors for use on street name signs. While white letters on a green

background are recommended, white letters on a brown background,

white letters on a blue background, or black letters on a white background

are also acceptable. Whichever color scheme is chosen, the same should

be used for all signs within the municipality. Also, street name signs must

be retroreflective and maintained to the standards established in Section

2A.07 of the MUTCD. The border, as shown on the image on the front

page of this tech sheet, is optional.

To assist in the design process, FHWA has created an online resource

for calculating the length of text for street signs. The Standard Alphabets

F G ( MlN.)

A .,

Highway Sign Word Length Calculator is a convenient tool to quickly

determine the letter width, spacing, and total length of the text for a

sign. The calculator can be found on FHWA's MUTCD webpage, http://

mutcd.fhwa.dot.gov/lrnowledge/hwy _sign_calculator/ index.cfm.

Before purchasing any signs, municipalities should refer to PennDOT

Bulletin 15 to ensure they are using approved materials from an approved

manufacturer. For additional information on all sign design and

requirements, refer to the publications listed below.

• 2009 MUTCD, Section 2D

• FHWA's Standmd Highway Signs

0 PennDOT Publication 236, Handbook of Approved Signs

G ( MI N. l >I

')~

I

D

B E a1:n St

c E

I D 0

DIMENSIONS - IN

SIGN SIZE c D E F G Ax B

VAR. x 6

11 4* 1 3* 2 1

VAR. x 9

11 6* 1.5 4.5* 3 1.4

VAR. x 12" 8* 2 6* 4 2

- If you have any questions, you can call LTAP at 1-800-FOR-LTAP for assistance.

2