Board of Supervisors

The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.

 


  • Five members, serving six-year terms
  • Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
  • Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
  • All township meetings are held at the Township Building and are open to the public.
  • View our meetings live via Zoom.
  • View township meetings on YouTube.
  • Executive Sessions are not public meetings

 

Board of Supervisors Term Expiration Date
 Cody Bright, Chair 2027
Barbara Emery, Vice Chair 2029
Peter Hicks 2029
Ann Duffield 2031
Larry Massaro 2031

Visit our YouTube Channel for meeting video recordings.

Resolutions

 

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA EAST GOSHEN TOWNSHIP

BOARD OF SUPERVISORS

Tuesday, February 20, 2018

7:00 PM

5 :45 PM Executive Session - Personnel Matter & Pending Legal Matter

1. Call to Order 2. Pledge of Allegiance 3. Moment of Silence - Supervisor Carmen Battavio 4. Ask if anyone is recording the meeting 5. Chai1man's Report a. The Board met in executive session prior to tonight's meeting to discuss a personnel matter and a pending legal matter. b. Acknowledge receipt of a letter from Sunoco announcing their intention to commence Horizontal Directional Drilling. c. Announce Giant is circulating a petition to place a referendum for alcohol sales on the ballot for the primary election. d. Announce that Township has been awarded a DVRPC grant in the amount of$483,000 for Segment A of the Paoli Pike Trail 6. Public Hearing - none 7. Emergency Services Reports WEGO - Chief Brenda Bernot Goshen Fire Co - 2017 Year-end Report Malvern Fire Co - January 2018 Fire Marshal -none 8. Financial Report - January 2018 9. Old Business a. Consider recommendation for Natural Lands Pond Study. 10. New Business a. Consider request from Futurist Committee to support Giant Liquor Referendum b. Consider recommendation for Branding Plan. c. Consider Stormwater Agreements and Grinder Pump Agreements for lots 2 and 3 at

1420 E. Strasburg Road. d. Consider Apartment for the Care of a Relative at 1040 King Road e. Consider recommendation from the Planning Commission to concerning the preparation of a Zoning Amendment for larger undeveloped properties. f. Consider Comp Plan Implementation Matrix. g. Consider recommendation from the Planning Commission concerning the preparation of a Zoning Overlay Amendment for the Paoli Pike Corridor. 11. Any Other Matter 12. Approval of Minutes a. February 6, 2018 13. Treasurer's Report-February 15, 2018 14. Liaison Reports -none

AGENDA Page -1- FEBRUARY 20, 2018

15. Conespondence, Reports of Interest a. January 30, 2018 Letter from Senator Killion re Senate Bill 656 b. January 30, 2018 Letter from FEMA approving the Township's Hazard Mitigation Plan c. February 15, 2018 Memo from Jason Lang on 2018 NRPA National Summer Camp Dance d. February 15, 2018 Memo from Jason Lang on Opioid Epidemic - Park & Recreation Support 16. Public Comment 17. Adjournment

Meetings & Dates of Importance

Feb 28,2018

Mar 01, 2018 Mar 06, 2018 Mar 07, 2018 Mar 08, 2018 Mar 12, 2018 Mar 14, 2018 Mar 19, 2018 Mar 19, 2018

Mar 20, 2018 Mar 30, 2018

Site visit @ Malvern Institute 10:00 am (Zoning Hearing Board & paities only) Park and Recreation Commission 7:00 pm Board of Supervisors 7:00 pm Planning Commission 7:00 pm Historical Commission 7:00 pm Municipal Authority 7:00 pm Conservancy Board 7:00 pm Futurist Committee 7:00 pm Zoning Hearing Board 7:00 pm Malvern Institute Board of Supervisors Township Office Closed

7:00 pm

Newsletter Deadlines for Summer of 2018: May 1st

The Chairperson, in his or her sole discretion, shall have the authority to reanange the agenda accommodate the needs of other board members, the public or an applicant.

Public Comment-Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment agenda which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting.

Constant Contact - Want more information about the latest news in the Township and surrounding area? East Goshen Township and Chester County offer two valuable resources to stay infmmed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the "E-notification & Emergency Alert" button on the left side of the homepage. Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!

AGENDA Page -2- FEBRUARY 20, 2018

Smart 911 - Smart911 is a new service in Chester County that allows you to create a Safety Profile at www .smart911 .com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency info1mation. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can aITive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search staii faster.

F:\Data\Shared Data\Agendas\Board of Supervisors\2018\02202018 Meeting.doc

AGENDA Page -3- FEBRUARY 20, 2018

--- :--,. , SUNOCO PIPELIN~

An ENERGY TRANSFER Partnership

BY CERTIFIED AND FIRST CLASS MAIL East Goshen Township

1580 Paoli Pike West Chester, PA 19380

Re: Mariner East 2 - Pennsylvania Pipeline Project Horizontal Directional Drilling Construction Notification and Private Water Supply/Well Sampling Offer

Dear East Goshen Township:

February 13, 2018

By

Sunoco Pipeline L.P. ("SPLP") is writing to inform you that a certain construction activity known as Horizontal Directional Drilling ("HDD") for Mari,ner East 2, also known as the Pennsylvania Pipeline Project, is located within 450 feet of your property boundary.

SPLP sent you a letter before construction activity began on the first of two HDDs that will occur in the area. This letter is intended to inform you that the second HDD will begin as soon as ten (10) days of the date of this letter.

As part of this construction activity, SPLP is offering private water supply/well testing at SPLP's expense if you have a private water supply/well located within 450 feet of the HDD alignment. SPLP will provide you copies of all test results from your private water supply/well. Please note that upon their request, we will provide the test results to the Pennsylvania Department of Environmental Protection as well.

• If you have already contacted the Sunoco representative for your area and requested that your private water . supply/well be tested, you do not need to take any further action in response to this letter.

• If you have not previously contacted the Sunoco representative for your area, SPLP is requesting that you do so

by calling Amy Johnson at (717) 208-7735, to provide SPLP with the following information:

1. If you have a private water supply/well on your property; 2. The location of your private water supply/well on your property; and, 3. If you would like to have your private water supply/well tested.

If you have not previously contacted the Sunoco representative for your area, and you would like to have your private water supply/well tested, you must contact the Sunoco representative for your area within the next then (10) days by calling Amy Johnson at (717) 208-7735. Your private water supply/well will be tested at a mutually-convenient time within ten (10) days of SPLP's receipt of your request for testing. If you do not contact the Sunoco representative, there will be no further contact from us regarding any private water supply/well testing. ·

If you have any questions or concerns, please do not hesitate to contact the Sunoco representative for your area by calling Amy Johnson at (717) 208-773 5.

Thank you for your cooperation. vtd/ y!(J{§

Mark McConnell Land Project Manager Representing Sunoco Pipeline L.P ..

Office: (814) 204-0450

Mr. Mark Gordon Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380

January 31, 2018

190 N INDEPENDENCE MALL WEST

8TH FLOOR

PHILADELPHIA, PA 19106-1520

Phone: 215-592-1800

Fax: 215-592-9125

www.dvrpc.org

RE: DVRPC 2018 Transportation Alternatives Set-Aside Program (TA Set-Aside)

Dear Mr. Gordon:

It is my pleasure to inform you that East Goshen Township has been awarded $483,000 for the

Paoli Trail, Segment A project for implementation via the DVRPC 2018 TA Set-Aside Program. Your application was one of ten projects regionally awarded from a pool of forty-seven applications in the Pennsylvania portion of the DVRPC region.

Project readiness and the capacity of the applicants to implement these projects in a timely manner was a major consideration in the selection of these projects for funding. Funds awarded through this program must be federally obligated by August 2020. PennDOT District 6-0 will provide assistance in guiding the project through the PennDOT Design Development process.

A DVRPC project manager will be contacting you in the following weeks to schedule a project kick- off meeting to define the scope and responsibilities for the steps required to advance your project. Please be advised that you should not proceed with any element of this project for which you expect to be reimbursed until after the kick-off meeting.

Congratulations on your·suc<:essful av\tard·-and we look forv.;ard to working with you to implement· your project. · · · ·

S~relY-

Bar)l. Seymour Executive Director

c: Charles Davies

Bryn Styche Ryan Gallagher

COMMONWEALTH of PENNSYLVANIA: BUCKS COUNTY I CHESTER COUNTY I DELAWARE COUNTY I MONTGOMERY COUNTY I CITY of PHILADELPHIA I CITY of CHESTER

STATE of NEW JERSEY: BURLINGTON COUNTY I CAMDEN COUNTY I GLOUCESTER COUNTY I MERCER COUNTY I CITY of CAMDEN I CITY of TREN'fON

, .,.,.,, 1::1:::1a1 '""'"" East Goshen Number of Calls 17 20 29 Total Numbers YTD

Calls Station 54 {Park Ave\ District 34 30 40 Station 56 (Boot Rd\ District 15 15 13 Total: 49 4S S3 Total Rrefighter Reseonding 369 414 402

Average Turnout 7.5 10.2 7.6

Staff Hours 132:S2:00 224:24:00 122:S3:00

Total Time In Service 27:52:35 68:41:00 21:49:28

Property Value $ S00,000.00 $ 1,346 500.00 $ 3 42S,OOO.OO

Prooertv Loss $ lS ODO.DO $ 446 SOD.OD $ 4 2SO.OO

Prooertv Saved $ 485 000.00 $ 900 000.00 $ 3 420 7SO.OO

Firefi~hter lniuries 0 0 0

Civilian lniuries 0 0 0

$

$

$

East Goshen Year to Date Statistics Goshen Fire Company Services.2017

... ....... l

26 23 23 22

37 30 28 34 14 16 13 18 51 46 41 52 428 3SO 364 482

8.4 7.6 8.9 8.8

121:41:00 113:19:00 16S:44:00 143:41:00

19:S8:2S 21:39:00 24:11:40 23:4S:OO

s,oos 000.00 $ - $ 62S 000.00 $ -

1 7SO.OO $ - $ 2 000.00 $

s 003 250.00 $ $ 623 000.00 $

0 0 1 0

0 0 0 0

i. - ·.-1 .. :. .. . •1•1 • h"(H.f, ... _ 'I HI • _•

32 18 29 32 22 293

33 28 37 so 36 417 24 15 24 21 20 ~ 208 59 43 61 71 S6 _gJ_ 443 307 SS9 602 4S6 S176

7.5 7.2 9.2 8.S 8.1 8.3

16S:26:00 113:55:00 141:43:00 319:26:00 1Sl:31:00 1916:35:00

33:21:19 28:43:00 2S:06:S9 72:32:29 27:38:04 395:18:59

$ 680 000.00 $ S30,000.00 $ 4Sl 500.00 $ S2S 000.00 $ 8,000.00 $ 13,096,000.00

$ 30 000.00 $ 100 000.00 $ 4 2S0.00 $ 2 SOD.OD S 8 ODO.OD $ 614 2SO.OO

$ 6SO ODO.DO $ 430 ODO.OD $ 447 250.00 $ S22 SOD.DO $ $ 12,481,750.00

0 0 0 0 0 1

0 0 0 0 0 0

udpated 2/2/201812:57 PM

iom . .,,,.,, ,,., ll'IJ!1:1

For East Goshen Onlv

Number of Calls 197 173 189 Hours in Service 168 lSl 1S5 Person Hours in Service 370.01 316.3 321.3 Patients Treated (total) 168 1S8 1S8 Patients Treated-65 & over 138 129 127 Total Numbers YTD

Calls 313 302 30S

Career Onlv Crews 166%) 191 21S 197

Blended Crews 118%) 62 33 33

Volunteer Only Crews 122%) 60 S4 75

Patients Treated Total 262 263 2S4 Patients Treated-Age 65 & over 190 202 188 Patient Treated (Total) by ALS Units

Brandywine Medic 93 1 0 0

CCH Medic 91 SS Sl 60 Malvern Medic 4 19 19 34 Medic 3 0 0 1 Total Patients transported 203 207 210 Calls No Patients were transported 110 95 9S Box Number Statistics-Number of Calls

51 1 0 0 52 1 3 0 S3 0 1 0 54 1S5 14S 156 S6 147 148 143 Career Hours in Service 393 392 362 Volunteer Hours in Service 163 123 163 Unit Statistics-Hours in Service

A54-1 20 66 67 AS4-2 96 31 34 - AS6-1 120 76 S6 A56-2 21 76 9S Calls from 6AM to lOPM 243 2S7 253 Calls from 6PM throu2h lOPM 62 61 64 Calls from lOPM to 6AM (Night Crew) 70 4S S2 Saturday Calls 6AM to 6PM 16 17 2S Sundav Calls BAM to 6PM 27 33 33

East Goshe11 Year to Date Statistics Goshen Fire Company Services 2n17

.!.1:.1:-t '"'""' '""

llll A

201 173 185 172 191.0 139 177 143 426.8 293 398 302 169 138 157 1S2 143 114 126 127

326 289 29S 281

180 194 196 20S

46 3S 49 47

100 60 so 29

270 227 243 236 202 16S 167 183

1 0 0 0 49 54 S5 46 26 20 21 21 0 0 0 0 219 192 197 194 107 97 98 87

0 0 0 0 0 0 0 0 0 0 0 0 166 141 1S3 132 15S 139 136 144 360 328 377 373 270 147 219 93

37 73 117 73 59 16 19 14 116 so S4 104 76 84 82 31 272 254 244 226 S7 63 42 74 S4 3S 51 SS 31 24 29 21 33.00 26 22 21

.I •ll[C1 .,,,.

183 144 303 150 llS

310

21S

4S

so

24S 164

0 S7 14 0 203 107

0 0 0 171 131 363 139

83 28 30 99 262 6S 48 17 26

· ...... ... ., .. :.. '• ··-· ........ .,. 'I •••• ,..

149 217 211 237 2287 117 17S 160 197 1917 243 376 33S 410 4094 121 181 16S 188 190S 93 143 142 lSS 15S2

273 34S 329 3SO I 3718 ._

186 238 249 273 2S39

32 74 41 37 S34

SS 33 39 40 64S

216 264 249 27S 3004 149 192 191 203 2196

0 0 0 0 2 46 48 42 67 630 22 27 27 34 284 0 0 0 0 1 177 226 208 237 2473 96 119 121 113 1245

0 0 0 1 0 0 0 4 0 0 0 1 143 163 142 151 1818 120 170 172 190 1795 29S 449 398 462 4552 161 146 124 131 1879

88 Sl 28 124 827 20 100 102 33 553 BS 33 88 103 915 26 89 34 2S 737 242 273 272 280 3078 S3 74 72 62 749 31 72 57 70 640 26 21 27 34 288 31 21 29 29 331

udpated 2/2/201812:57 PM

. , East Goshen Night Calls 4 7 1 Dav Calls 8 9 13

Duration of 2 Hours+ Crew Total 206 241 124 TRF54 resoonses 2 3 5 TRF54 mileage 12 11 34 TRF56 responses TRF56 mileage UTL54 responses 1 1 UTL54 mileage 4 15 Total Calls 12 16 14

Person Hours 40 40 31 AFA 1 2 2

Ambulance Assist 1 2 Appliance 2 1 Brush 2 Building 1 CO Alarm 1 1 Debris in Roadway Dwellin• 1 2 Electrical Fire Inside

Fire Forcible Entrv Fuel Soil! Gas Leak 1 1 Mutual Aid to Malvern MVA 7 3 5

Odor Investigation 1 Pedestrian Struck 1

Rescue Smoke in Building Special Duty Traffic Control Assist 1

Transformer 1 Trash 1 Trees & Wires 1 Vehicle Fire

East Goshen Year to Date Statistics Goshen Fire Company Services 2017

..

6 3 4 6 10 4 9 8 1 2 200 63 109 113 2 1 4 4 10 1 14 22 1 1 1 12 12 4 1 2 16 7 13 14 48 9 136 31 2 2 2 1 1

1 2 1 2

2 1

1 1 1 1 2 1

6 4 2 2 2 1

1 1 2

1 1

2 1

• T

4 10

233 3 16 1 12

14 44 5 1

1

4 2

1

2 7 7 10 61 12 11 7 8 109 1 1 2 7 105 217 154 169 1934 1 7 1 5 38 2 45 2 32 201 1 1 6 6 2 48 1 1 5 10 2 33 14 18 14 18 I 170 34 66 48 56 I 583 4 2 2 4 28 1 4 2 13 3 1 1 7 1 3 2 6 1 1 1 7 1 1 1 2 1 2 7 1 1 1 6 1 1 6 8 4 5 56 1 6 2 1 1 1 1 4 1 1 4 1 3 1 4 1 2

udpated 2/2/201812:57 PM

January:

Malvern Fire Company 424 East King Street Malvern, PA 19355

East Goshen Township

2018 EMS Statistics

42 Calls; 3 BLS (3 Transports); 39 ALS (29 Transp01is)

Main 610-647-0693 Fax 610-647-0249 www.malvemfireco.com

Memo

To: Board of Supervisors From: Jon Altshul Re: January 2018 Financial Report Date: February 9, 2018

Net of pass-through accounts, as of January 31st, the general fund had revenues of $275,524 and expenses of $979,306 for a year-to-date deficit of $703,782. Compared to the YTD budget, revenues were $43,158 under budget and expenses were $29,076 under budget for a negative budget variance of $14,082. As of January 31st, the general fund balance was $4,684,667.

On the expense side, Administration, Emergency Services and Public Work are all under budget, while Parks and Recreation and Codes are slightly over budget. On the revenue side, Earned Income Tax and Real Estate Transfer Tax were under budget, while Real Estate Property Tax and Other Income were over budget.

With that said, it1s impossible to draw any meaningful conclusions about the 2018 budget year after only one month, and January is always a historically slow month financially. Next month

1s financial report will reflect considerably more revenue from Q4 EIT remittances and 2018 real estate tax receipts and will provide the first meaningful snapshot of how the year has started.

Other funds

• The State Liquid Fuels Fund had $1 in revenues and $0 expenses. The fund balance was $503. • The Sinking Fund had $1,741 in revenues and $53,824 in expenses. The fund balance is $5,971,948. • The Transportation Fund had $465 in revenues and $0 in expenses. The fund balance is $1,079,622. • The Sewer Operating Fund had $315,677 in revenues and $116,434 in expenses. The fund

balance is $1,085,915. • The Refuse Fund had $83,733 in revenues and $85,337 in expenses. The fund balance is $612,525. • The Bond Fund had $7,970 in revenues and $56,707 in expenses. The fund balance is

$7,287,585. • The Sewer Sinking Fund had $685 in revenues and $6,832 in expenses. The fund balance is $2,156,531. • The Operating Reserve Fund had $605 in revenues and no expenses. The fund balance is $2,504,959.

EAST GOSHEN TOWNSHIP

GENERAL FUND SUMMARY

As of January 31, 2018

Annual YTD YTD

Account Title Budget Budget Actual Variance

EMERGENCY SERVICES EXPENSES 4,101,440 539,148 530,708 8,440

PUBLIC WORKS EXPENSES 2,637,576 176,468 173,751 2,717

ADMINISTRATION EXPENSES 2,218,972 227,588 205,458 22,130

CODES EXPENSES 465,911 36,178 41,309 {5,130)

PARK AND RECREATION EXPENSES 690,256 19,849 18,929 920

TOTAL CORE FUNCTION EXPENSES 10,114,155 999,231 970,154 29,077

EMERGENCY SERVICES REVENUES 77,628 2,538 2,192 (346)

PUBLIC WORKS REVENUES 1,010,195 208 240 32

ADMINISTRATION REVENUES 334,024 17,937 17,398 (539}

CODES REVENUES 259,725 14,304 16,971 2,667

PARK AND RECREATION REVENUES 140,976 9,344 7,390 {1,955}

TOTAL CORE FUNCTION REVENUES 1,822,548 44,331 44,190 (141)

NET EMERGENCY SERVICES 4,023,812 536,610 528,516 8,094 NET PUBLIC WORKS 1,627,381 176,260 173,511 2,749 NET ADMINISTRATION 1,884,948 209,651 188,061 21,590

NET CODES 206,186 21,874 24,338 (2,464)

NET PARK AND RECREATION 549,280 10,505 11,539 (1,034)

lcoRE FUNCTION NET SUBTOTAL 8,291,607 954,900 925,964 28,9361

DEBT - PRINCIPAL 549,000 0

DEBT- INTEREST 249,458 9,151 9,152 (1) I TOTAL DEBT 798,458 9,151 9,152 (1)1

!TOTAL CORE FUNCTION NET 9,090,065 964,051 935,117 28,934 I

NON-CORE FUNCTION REVENUE

EARNED INCOME TAX 5,181,600 213,704 160,083 {53,621}

REAL ESTATE PROPERTY TAX 2,026,129 572 15,955 15,383

REAL ESTATE TRANSFER TAX 575,000 47,916 40,245 {7,671}

CABLE TELEVIS.FRANCHISE 489,600

LOCAL SERVICES TAX 348,000 6,627 7,484 857

OTHER INCOME 469,736 5,532 7,567 2,035

!TOTAL NON CORE FUNCTION REVENUE 9,090,065 274,351 231,334 (43,017)1

NET RESULT 0 (689,700) (703,782) (14,082)

U:\JAltshul\Quarterly reports\Ql 2018\2018 -1- General Fund Summary.xlsx

RECEIP 310 320 330 340 350 360 380 390

01/01/18 BEGINNING BALANCE

TS

TAXES LICENSES & PERMITS FINES & FORFEITS INTERESTS & RENTS INTERGOVERNMENTAL CHARGES FOR SERVICES MISCELLANEOUS REVENUES OTHER FINANCING SOURCES

EXP EN 400 410 420 426 430 450 460 470 480 490

JITURES

GENERAL GOVERNMENT PUBLIC SAFETY HEAL TH & WELFARE SANITATION & REFUSE HIGHWAYS.ROADS & STREETS CULTURE-RECREATION CONSERVATION & DEVELOPMENT DEBT SERVICE MISCELLANEOUS EXPENDITURES OTHER FINANCING USES

2018 SURPLUS/(DEFICIT)*

CLEARING ACCOUNT ADJUSTMENTS

01/31/2018 ENDING BALANCE

U:\JA!tshul\Quarterly reports\01 2018\2018-01 All Funds Summary.x!sx

SUMMARY OF FUNDS REPORT (AKA "JOE REPORT")

ALL FUNDS JANUARY 2018 *NOTE: GENERAL FUND INCLUDES PASS-THROUGH ACCOUNTS

GENERAL LIQUID FUELS SINKING TRANSPORT. SEWER OP. REFUSE FUND* STATE FUND FUND FUND FUND FUND

$5,531,289 $502 6,024,031 1,079,157 886,672 614, 128

$230,276 $0 $0 $0 $0 $0 $170 $0 $0 $0 $0 $0 $2,192 $0 $0 $0 $0 $0 $16,496 $1 $1,741 $465 $205 $351 $0 $0 $0 $0 $0 $0 $28,677 $0 $0 $0 $315,473 $83,382 $4,212 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$282,023 $1 $1,741 $465 $315,677 $83,733

$103,813 $0 $6,772 $0 $0 $0 $678,392 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,716 $0 $0 $0 $88,194 $85,337 $145,605 $0 $0 $0 $0 $0 $15,494 $0 $46,227 $0 $0 $0 $120 $0 $825 $0 $0 $0 $9,461 $0 $0 $0 $28,241 $0 $150,272 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$1,109,874 $0 $53,824 $0 $116,434 $85,337

($827,851) $1 ($52,084) $465 $199,243 ($1,604)

($18,772)

$4,684,667 $ill, $5,971,948 $1,079,622 $1,085,915 $612,525

Page 1 of 1

SEWER SINK OPERATING TOWNSHIP MUNICIPAL BOND FUND RESERVE FUNDS AUTHORITY FUND

$2,162,678 $2,504,354 $18,057, 119 $142,331 7,336,323

$0 $0 $230,276 $0 $0 $0 $0 $170 $0 $0 $0 $0 $2,192 $0 $0 $685 $605 $20,548 $392 $7,970 $0 $0 $0 $0 $0 $0 $0 $427,531 $423 $0 $0 $0 $4,212 $0 $0 $0 $0 $0 $0 $0

$685 $605 $684,929 $815 $7,970

$0 $0 $110,585 $0 $0 $0 $0 $678,392 $0 $0 $0 $0 $0 $0 $0 $6,832 $0 $187,079 $43,354 $0 $0 $0 $145,605 $0 $0 $0 $0 $61,721 $0 $56,707 $0 $0 $945 $0 $0 $0 $0 $37,701 $0 $0 $0 $0 $150,272 $0 $0 $0 $0 $0 $0 $0

$6,832 $0 $1,372,301 $43,354 $56,707

($6,148) $605 ($687,372) ($42,539) ($48,738)

$2,156,531 $2,504,959 $18.096,669 I $99,792 $7,287,585

2/8/2018

Memo East Goshen Township

Date: To: From: Re:

July 6, 2017 Board of Supervisors Rick Smith, Township Manager Natural Land Pond Study

We have received the Pond Study from Natural Lands. The Board previously stated it intended to refer the Pond Study to the Conservancy Board for their review and to address the question of how the ponds should be prioritized. The Board also wanted a recommendation from Jon Altshul on the timing of the projects from a cash flow perspective. And the Board requested that we advertise for residents to serve on a pond committee(s) that would to provide input to the Conservancy Board.

We have six ponds in three neighborhoods. While we have seven interested residents from Pin Oaks and Marydell, the response for pond committee members is lacking for representation from Bow Tree and Hershey Mill Estates.

Accordingly, I would suggest the following course of action. The Board request the Conservancy Board review the Pond Study and provide their recommendations, including the prioritization, by the end of June. The Board appoints the interested residents to the Pin Oak & Marydell Pond

Committee that is tasked with working with the Conservancy Board with respect to various improvements to be made at the Pin Oaks and Marydell Ponds. In order to avoid a potential conflict this Committee should not be involved in the prioritization. In order to maximize the resident's opportunity to participate the Township should send out letters to all of the affected residents once the Conservancy Board has determined the meeting schedule for the ponds. Lastly Jon would be requested to provide his report to the Board by the end of June as well.

The above schedule would put the Board be in position to make its decision in September. As you know there is funding in the 2018 budget for Ponds and if we had a good fall weather wise, we could start work on some of the improvements in 2018 and put funding in the budget for 2019.

Suggested Motion - I move that we request that the Conservancy Board review the Pond Study and provide their recommendation, including the prioritization, to the Board by the end of June.

In addition the Board hereby appoints the following residents to the Pin Oak & Marydell Pond Committee. This Committee is tasked with working with the Conservancy Board with respect to various improvements to be made at the Pin Oaks and Marydell Ponds , however to avoid any potential conflict this Committee should not be involved in the prioritization. In order to maximize the opportunities for residents to provide input, the Township should send out letters to all of the affected residents once the Conservancy Board has determined the meeting schedule for the ponds. Lastly, Jon is hereby requested to provide his report to the Board by the end of June as well.

F:\Data\Shared Data\Public Works Dept\Pond Treatment\2017\Memo to Bos 21618.doc

Study of Ponds

East Goshen Township

Chester County, PA

FEBRU A R Y 2 01 8

I

Natural Lands

Study of Ponds

East Goshen Township

Chester County, PA

FEBRUARY 2018

I

Natural Lands

Hildacy Preserve

1031 Palmers Mill Road Media, PA 19063 610-353-5587 natlands.org

with contributions from

Toth Brothers Clearing and Dredging

Aquascapes Unlimited, Inc. Brandywine Science Center, Inc.

Pennoni

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

table of contents

background ......................................................................................... 1

approach ............................................................................................... 1

additional challenges .................................................................. 2

goals of this study ......................................................................... 3

context ................................................................................................... 4

meaning of the results ................................................................ 6

general recommendations ........................................................ 7

pond profiles ................................................................................... 13

conclusion ........................................................................................ 38

appendix 1 - subconsultant reports &

cost estimates ................................................. 39

appendix 2 - supporting documents ............................. 77

provided in digital format

Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

to what is causing the problems. A landscape architect

or engineer then determines the causes. A construction

company with experience in ponds and basins advises

on the pond structures. An aquatic plant and pond

management professional provides insights on the pond

itself. Finally, the landscape architect or engineer provides

recommendations for how to change the surroundings

and the ponds themselves, to address the causes of the

problems, rather than simply treating the symptoms.

In order to provide a holistic approach, a diverse team

of professionals is required to examine the water, plants

and other natural and manmade features which affect the

ponds. Natural Lands subcontracted with Toth Brothers,

Clearing and Dredging, Inc., to assess the levels of

sedimentation, the functionality of the existing structures

and provide recommendations regarding dredging

and construction. Natural Lands also consulted with Aquascapes Unlimited, on plantings and aeration. East

Goshen Township hired the Brandywine Science Center

to perform laboratory tests to determine the quality of the

water, including percentages of chemicals, in each pond.

Pennoni, the Township Engineer, also provided insights in

an advisory role. Information provided by each consultant

has been used to conduct a comprehensive study of the six

ponds and basins, focused on reducing algae and sediment

and improving water quality.

Dredging may be necessary at some of the ponds, as they have filled with sediment. CREDIT: Toth Brothers Clearing and Dredging

2 I Natural Lands

additional challenges

The ponds can be improved from their current state. The

amount of algae can be reduced. The number of fish

kills can be reduced, if not eliminated. The ponds can be

dredged of the excess sediment which fills them now. But it

is likely that the ponds will never be perfect. They will never

be completely algae free. They will never be in a perfect

natural balance. They will never be maintenance free when

it comes to sediment. Three important truths will challenge

work around these ponds forever:

1. Ponds do not occur naturally in southeastern

Pennsylvania;

2. These are not just ponds, they are stormwater

management areas;

3. Some algae is natural and normal.

In Pennsylvania, the combination of hydrology, soils and

geology and topography, does not support the existence

of ponds. We often see wetlands, springs and vernal pools,

but not large ponds, like the ones examined in this study.

Wetlands typically exist in floodplains, or in low lying areas

near streams. They are shallow, with a fluctuating depth,

and sometimes flowing water. Springs are fairly common,

and often exist in groups, close together. Springs more

typically act as headwaters, with their flows combining to

form streams. Vernal pools could be described in laymen's

terms as large, seasonal puddles. They are extremely

Berms, dams or other types of impoundments maintain water levels, as ponds do not occur naturally in southeastern Pennsylvania.

background

The East Branch Chester Creek and the Ridley Creek played

a significant role in East Goshen's agricultural past. These

major streams and their many tributaries which stretch

across the township provided water for the farms which

once dominated the landscape. Farmers often dammed

a tributary, or diverted water from them, to create a pond,

easily collect water or feed their animals. Now, most of

the farms are gone, but some of the ponds remain. They

now provide the residents with aesthetic beauty and some

recreational use. Some ponds have been created to manage

stormwater, while others have been retro fit by developers,

as residential developments have replaced the farms.

No longer serving a utilitarian role, and surrounded by

homes, the beauty and overall health of the ponds has been

called into question. Many of them are filled with sediment,

overrun by geese, and covered with algae for long periods

of time, particularly in the summer. Fish kills have also been

reported over the past few summers. Recent tests show

that by some measures, the ponds do not meet standards

for water quality for their current uses. Natural Lands has

examined these issues, worked with the Township and

partners, and has prepared this report on the causes of

these problems and potential solutions.

Natural Lands draws on our experience managing

43 nature preserves, including the Willisbrook Preserve, nearby in Willistown Township.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

approach

Natural Lands owns and operates 43 nature preserves,

many of which are former farms. Some of these properties

include ponds. In most cases, we have converted the ponds

into wetlands, a more natural state. Ponds do not occur

naturally in Pennsylvania, making their maintenance an

ongoing battle against nature.

Natural Lands' ponds are different than those found

throughout East Goshen. The six ponds included in this

study are large and manage stormwater. They also serve the

residents as they provide aesthetic beauty and recreational

opportunities. Therefore, we do not recommend converting

any of the ponds included in this study, to wetlands, as it

would upset the neighbors and require extensive redesign.

Pond ecology and management are complicated,

especially when stormwater management is involved.

Where ponds have become filled with sediment and water

quality is degraded, its important to take a holistic view of

the factors affecting the ponds. Scientists are needed to

test water samples to determine the levels of chemicals

and sediment in the water. The test results provide clues

Natural Lands 11

important for wildlife, especially amphibians such as frogs

and salamanders, but they are much smaller in size and

disappear in the dry months.

Where ponds do exist in our area, they are man-made.

They all have a water source, such as a pipe carrying

stormwater, or an existing stream. Sometimes a spring

feeds a pond too. They also all have either a dam on one

end, or raised berms completely surrounding the water,

holding it in place. They also all have a place where water

can flow out if the pond overflows. The outfall is usually

in the form of a spillway, where water simply flows over an

edge, or a piped structure, which acts as a drain, diverting

water through a dam or side, towards a nearby stream.

Ponds like these are in a constant battle against nature

and time. The concrete pipe structures degrade over

time. Trees can take root and tear them apart. The berms,

typically made of clay, can also subside or fall apart over the

course of many years. Over time, the man made features

which hold the water in place, simply fall apart without

ongoing monitoring, maintenance and repairs. Additionally,

the forces of nature work against ponds, trying to return

them to a natural condition. Where water flows in, it brings

sediment to fill the depression. Where water flows out, it

can erode the areas around the structures or tear at the

berms themselves, again, with the ability to undermine the

berms which hold the water. Without ongoing intervention,

over the course of time, nature would fill the ponds with

sediment, tear apart the impoundments and restore the

areas to stream channels and wetlands.

The ponds examined in this study are primarily

stormwatermanagementareas. In addition to the natural

Inlets feed stormwater, and sediment and pollutants, from the streets into the ponds.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

forces at play, man-made forces also affect the ponds.

Stormwater inlets in the neighborhoods surrounding the

ponds bring even more water into the ponds. The forces

of erosion and sedimentation which are naturally present

in stream systems are exacerbated with the addition of

stormwater, making it even more difficult to keep the ponds

in balance. Stormwater also brings other issues, as the

water typically carries pollutants, such as motor oil and

gasoline, fertilizers, soaps and other substances which

end up in the pond water. These substances can affect the

water chemistry in ways which encourage algae growth.

The presence of some algae is natural and normal. This

study was commissioned in part because some of the

ponds were completely covered in algae in the warmer

months. The residents consider this an eyesore. More

importantly, a pond completely covered in algae is not a

healthy pond. The recommendations included in this study

seek to reduce the amount of algae in the ponds, but not

to completely eliminate it. Algae are plants which occur

naturally in water bodies, so some should be expected. But

just like in a forest, its not healthy for one plant species to

dominate the ecosystem. We seek to reduce the amount of

algae, and bring it back into balance within a healthier pond

ecosystem. The community will need to accept some algae

in the ponds.

goals of this study

Each pond and basin in the study is different, but they all

serve the same basic functions- to manage stormwater,

look attractive and serve the residents of the community.

Some of the ponds and basins were designed as

stormwater management measures, collecting piped

water through inlets and pipes, while others collect sheet

flow from their surroundings. They are all in plain view of

residents, some providing the view from the front window,

while others provide scenic beauty to backyards. The ponds

could also serve as recreational areas, for fishing, or as a

setting for walking paths. With these ideas in mind, the

study set out to achieve the following goals:

1. Assess the overall functionality of the ponds - Toth

Bros, with Natural Lands, inspected the ponds,

Natural Lands I 3

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

measured them for depth and depth of sediment, and

visually assessed structures such as inlets, outflows

and emergency spillways, to ensure that they were

safe and functional.

2. Assess overall health of the ponds - In accordance

with the existing and potential uses for the

ponds, Natural Lands has reviewed the laboratory

tests performed by Brandywine Science Center,

highlighted deficiencies at each pond and prepared

recommendations for improvement.

3. Provide recommendations to reduce the amount of

seasonal algae growth, improve aesthetic beauty and

provide recreational opportunities - The ponds, with

some improvement, can become centers for passive

recreation within each neighborhood, providing

people with a place to walk, watch birds and animals,

fish or simply enjoy the scenery.

context

Detailed descriptions and recommendations related to

each individual pond are found later in this report. However,

a number of findings and existing conditions relate to most

or all of the ponds in the study. Some are results of similar

land management approaches at each of the ponds, while

others, such as the state of the watershed throughout

As stormwater management measures, the ponds feature outfall structures, which allow water to escape when the ponds fill too high.

4 I Natural Lands

southeastern Pennsylvania, are outside of the control of the

Township. The following section provides a description of

the state of the ponds, the effects of their surroundings and

an overview of some of the common issues.

disconnection from the people

When we visited the ponds, we saw little evidence to

suggest that the nearby residents visit or use the ponds

on a regular basis. There were no social trails or tracks,

no garbage and few other signs of use. We did see some

evidence of fishing, with some line stuck in branches over

the ponds, but even that was minimal. Comments at the

public meetings seemed to confirm that the residents

rarely visit the ponds, mostly due to the presence of geese

and their waste. There are also few amenities to draw

people to the sites.

The closest residents enjoy the views of the ponds, but

even they rarely visit the water's edge. They don't have a

connection to the water, or to the birds, amphibians and

fish that depend on it. They view the ponds from afar and

have little reason to think about the processes, natural and

man-made, which affect the ponds, their water quality and

the animals that depend on it.

The ponds get covered with algae in the summer, and

sometimes fish die, but the causes aren't obvious. Only

when people visit the ponds and begin to care about them,

will they ask questions like: Where is this water coming

from? Is it clean? Is it good for the fish? Is it causing

algae? Is there some way I can help? The neighborhoods

surrounding the ponds can play a vital role in improving

the ponds' health, but first they need a reason to care.

Through a holistic approach to improving the ponds

health, places can be made which benefit the ponds,

the wildlife that depends on them and the people who

surround them.

state of the watersheds

East Goshen Township is divided between the East Branch

Chester Creek and Ridley Creek watersheds. Each creek

has watershed wide issues which sometimes manifest

themselves at East Goshen's pond sites. Every pond in the

study is connected to a creek, whether as a headwater

pond from which a tributary flows, or as a collection point

along the stream. This means that the state of the ponds

and the state of the creeks will forever affect one another.

The Pennsylvania Department of Environmental

Protection (DEP) has classified all streams in East Goshen

as impaired, due to siltation, water flow variability or

unknown reasons. All tributaries of the East Branch

Chester Creek are additionally impaired due to other

habitat alterations. The Chester County Water Resource

Authority (CCWRA) has produced a series of maps

available on their website, depicting these classifications.

(See Appendix 2 for relevant maps.) DEP defines these

impairments as follows:

• Siltation -Aggradations of "clean" sediments or

soils in excess of what the stream channel can

transport. Results in smothering of habitat for macro

invertebrates and fishes.

• Water/Flow Variability- Changes in hydrologic regime

caused by water releases, increased surface runoff from

impervious surfaces during storm events, scouring

and drought results in unstable environment for macro

invertebrates and fishes. Habitat alterations include

stream widening, substrate paving, shallower pools,etc.

• Other Habitat Alterations - Habitat changes due

to severe bank erosion, removal or lack of riparian

vegetation, and concrete channels and streambeds.

These three impairments demonstrate that the connected

streams face some of the same issues as the ponds, namely

siltation and a high degree of sediment. Additionally, the

fact that the streams are not listed as impaired due to

Area streams are typically eroded, due to high stormwater volumes, which carry sediment into the ponds.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

any nutrient or chemical load, shows that any nutrient or

chemical issues in the ponds are localized, and not the

result of flowing in from the surrounding streams.

surrounding development, erosion, and sedimentation

Streams throughout the state have been overwhelmed

with stormwater, leading to degradation, erosion, siltation

and water flow variability. The ponds in this study are being

similarly affected. Five of the ponds are fed by inlets and

pipes, which convey stormwater directly from the Township

streets into the ponds. The Hershey's Mill Pond is the

only one which does not have a direct input from an inlet.

However, the stream which feeds the pond does accept

stormwater through a number of inlets on Tanglewood and

Millstream Drives. With the stormwater comes sediment

and chemicals, washed off the streets and neighboring

residential properties.

The amount of impervious surfaces including roofs,

driveways, sidewalks and streets, appears typical of most

suburban communities, but generates more stormwater

runoff than the streams and ponds can handle. The

hydrologic cycle has been thrown out of balance. In a heavy

storm, large amounts of water flow powerfully through the

pipes and inlets. When they reach the streams and ponds,

the force of the water erodes the banks and channel. The

eroded material, sediment, drops out of the water and

settles when the water slows down as it reaches the ponds.

Over time, enough sediment fills the ponds to reduce their

Wide streets, rooftops, driveways and other impervious surfaces create runoff, which increases flow into the stormwater system.

Natural Lands I 5

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

holding capacities, thereby making them shallower and

affecting the pond ecology.

chemical testing results

Brandywine Science Center tested the water from each of

the six ponds for each of the following:

• Dissolved Oxygen

• Nitrogen - in the form of Nitrate, Nitrite and Ammonia

• pH

• Phosphorous

• Fecal Coliform

The results were then compared to the standards set forth

by Penn State Extension, in their web publication titled,

"Water Quality Concerns for Ponds" (see Appendix 7 for

details). The standards are established differently for each

potential use of a pond. For the purpose of this study, the

standards set forth for ponds being used for "Beauty" and

"Fishing" were utilized. The ponds support populations of

bass, sunfish, catfish and carp.

The chemical test results showed that every pond failed

to meet acceptable standards for at least one category.

Every pond showed higher than preferred phosphorous

levels for pond beauty. Bow Tree Pond 1 had less dissolved

oxygen than acceptable for pond beauty. A number of

ponds showed too much nitrogen, in various forms,

for fishing. The full chemical test results produced by

Geese frequent lawn areas surrounding the ponds, leaving their waste, which contributes nutrients into the ponds and makes the surroundings unpleasant.

6 I Natural Lands

Brandywine Science Center are included as an appendix

to this report. Additional details are included in the pond

profiles included later in this report.

Penn State Extension recommends testing pond

water at least on an annual basis. Where bacteria levels

are found to be high, the Township may wish to test

more frequently, to confirm initial results, measure the

effectiveness of improvement strategies, and to identify

seasonal fluctuations.

meaning of the results

In some cases, the results of chemical testing show us

the presence or amount of a certain chemical or bacteria,

which is unhealthy, and may require some action to

eliminate it. But in other cases, the results of the chemical

tests provide clues as to why certain things are happening

in the ponds. For instance, the presence of phosphorous or

nitrogen in the water is not in itself a problem. Phosphorous

and nitrogen are in fertilizers we use to grow food and in

soap which we put on our bodies. But high quantities of

these chemicals can start chain reactions which result in

many of the problems we see in the ponds.

phosphorous, nitrogen and algae

"A shallow, nutrient rich pond, exposed to sunlight with

little water flowing through it will be teeming with algae

and aquatic plants," according to "Pond Ecology," an article

posted online by the Penn State Extension. Every pond

tested showed high levels of phosphorous, a nutrient

known to encourage algae growth. Additionally, four ponds

showed Nitrogen levels, in various forms, which could be

detrimental to fish or pond aesthetics. Phosphorous and

nitrogen can travel on soil particles in sediment. They also

come from animal waste and decomposing plant material.

Many fertilizers used in commercial and residential settings

also contain phosphorous and nitrogen and can wash into

the neighboring ponds and streams with stormwater.

The ponds in East Goshen are largely surrounded by

grass lawns, which are preferred by Canada geese. The

combination of goose waste and grass clippings adjacent to

the ponds is likely contributing to the phosphorous levels

in the water. Additionally, sediment washing into the ponds

may also carry phosphorous. These factors are all likely

contributing heavily to the algae growth in the ponds.

warm water and dissolved oxygen

Dissolved oxygen is an important component of water

quality. Fish need dissolved oxygen to breathe and aerobic

bacteria, which play a crucial role in breaking down waste

materials, also depend on it. Ponds with consistently

moving water tend to have higher levels of dissolved

oxygen. Dissolved oxygen is also incorporated into ponds

through photosynthesis conducted by aquatic plants.

Cooler water also tends to hold more dissolved oxygen than

warmer water.

The Marydel I and Bow Tree 1 ponds each had low levels

of dissolved oxygen. At Bow Tree 1, oxygen levels were low

enough to affect the aesthetics at the pond, as well as fish

communities. At Marydel!, dissolved oxygen levels were high

enough to support good aesthetics, but not high enough

to adequately support trout and bass communities. These

ponds do not feature aerators. Hershey's Mill also does not

feature an aerator, but had adequate dissolved oxygen levels,

likely due to the running water which flows continuously in

and out of the pond through the connected stream.

When ponds have low levels of dissolved oxygen, fish can't breathe and die.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

general recommendations

The results of the chemical tests combined with the results

of Toth Bros. field analysis, reveals three important steps to

improve the health and beauty of the ponds:

• Reduce Phosphorous and Nitrogen Levels

• Increase Dissolved Oxygen Levels

• Reduce Sediment Levels

A number of measures can be implemented to take these

steps. Some are as simple as planting trees and changing

mowing schedules, while others, such as installing forebays,

will require additional engineering and further study.

Friends groups or similar community organizations could

be created to assist the Township in implementing these

recommendations.

reduce phosphorous and nitrogen

There are three main approaches which can be taken to

reduce the amount of phosphorous and nitrogen entering

the ponds. All are relatively simple and straightforward.

These include the installation of vegetated buffers,

reduction in use of fertilizers and other chemicals and

reduction of the goose population.

implement vegetated buffers

Most of the ponds are bordered on at least one side by

areas of mown grass, with little tree, shrub or herbaceous

plant material nearby. Mowed grass provides a relatively

unimpeded course for stormwater to flow into a pond,

wetland or stream. This stormwater, flowing quickly

over turfgrass, carries with it sediment, grass clippings,

animal waste and any chemicals, such as fertilizers, which

may have been applied in the area. All of these bring

phosphorous and nitrogen into the waterway.

Vegetated buffers made up of trees, shrubs and more

hardy herbaceous materials would help to filter nutrients

out before reaching the ponds. (See Appendix 2 for planting

list.) When water flows over turf grass, it is able to flow

quickly. The short and narrow grass blades do little to slow

Natural Lands I 7

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

the water. Additionally, soil under turf grass is typically very

compacted, as turf has shallow roots which do not keep

the soil loose and aerated. Therefore, the water is able to

flow quickly through the turfgrass over the hard soil. This

fast moving water is able to carry sediment and flow into

the ponds.

The addition of vegetated buffers would go a long way

· towards protecting the ponds. Trees, shrubs and herbaceous

materials such as meadow grasses and perennials keep

the soil healthier and act as physical barriers. When water;

carrying the nutrients towards the ponds, encounters a

vegetated buffer, it is slowed down. As the water slows

down, it is forced to drop its sediment and nutrient load

before reaching the pond. Additionally, as the water slows

down, it has a better chance to infiltrate directly into the soil,

before ever reaching the pond. Infiltrating more stormwater

into the ground helps protect not only the ponds, but also

the streams they are connected to, by reducing the amount

of stormwater that enters them. Too much stormwater is

causing the watershed wide degradation of streams, leading

to sedimentation and siltation. Additionally, measures which

encourage infiltration may help East Goshen Township meet

state mandated MS4 requirements.

The Township could establish buffers by seeding the

turfgrass areas with meadow seed mixes and planting

additional trees and shrubs. Alternatively, but less

effectively, the Township could simply reduce the mowing

frequency of the turfgrass, allowing it to grow taller and

thicker. Mowing could be done just once or twice a year,

to eliminate woody plants, vines and other invasive plant

Buffer plantings at the edges of the ponds would help to stabilize the banks, shade the water and filter and absorb stormwater flowing into the ponds.

8 I Natural Lands

species. When the grass is mowed, the clippings should be

collected, so as not to be allowed to wash into the ponds.

Most current buffer ordinances require vegetated buffers

on areas within 100-150 feet of the banks of ponds, streams

or wetlands. A similar width would be appropriate for East

Goshen's ponds.

limit the introduction of soaps, fertilizer and other chemicals

Fertilizers and other products, including soap, can contain

phosphorous and nitrogen as main ingredients. While

fertilizers help lawns and landscape plants grow, they are

detrimental to pond health. Where stormwater flows over

lawns and landscaped areas, it can pick up fertilizers, and

other chemicals, and carry them into the ponds. While

it does not appear that the Township uses fertilizers in

close vicinity to the ponds, neighboring residents may. The

Township should further inform nearby residents as to the

damage that fertilizers can do, as they can encourage the

growth of algae by adding nutrients to the water.

Many car washing soaps also contain phosphates. So

when a resident washes their car in their driveway, or

on the street, these soap phosphates drain to an inlet

and eventually reach a stream or pond. The phosphates

then promote the growth of algae. Residents should be

encouraged to use biodegradable, phosphate free soaps,

wash their cars on pervious surfaces such as grass or visit a

commercial car wash, which are regulated and required to

drain the used water to a water treatment plant, rather than

into our streams.

Swimming pool water can also contain phosphates. It

is illegal in Pennsylvania to drain a pool to a storm sewer

system. Residents should be reminded to always drain their

pools in accordance with local and state regulations.

reduce the goose populations

Waste from geese and other animals can contribute to the

nutrient loads in the ponds. Aside from that, their waste can

make an open space unenjoyable for residents who don't

want to walk through it. Additionally, the geese themselves

can be unfriendly and discourage people from using the

open space. Goose management is an issue municipalities

throughout the area are dealing with. Measures to control

populations include addling eggs, dispatching dogs and

placing silhouettes or other decoys of predators.

These measures may work to some degree. However,

in Natural Lands' experience, we find the best way to

discourage geese is to remove their habitat. Geese like

open, mowed grass areas, as they easily detect predators.

At our preserves, we strive to eliminate grass areas, for

many reasons. We have largely eliminated geese from our

preserves simply by eliminating their habitats. Meadows

and other vegetation, as described above, provide the dual

benefit of filtering water and eliminating goose habitat.

Eliminating grass areas will reduce the goose populations,

leading to less waste in the ponds and in the surrounding

neighborhoods. (See "From Mowing to Meadows" in

Appendix2.)

Two of the ponds tested, Hersheys Mill and Marydel!,

also showed higher concentrations of fecal coliform. This

could be due to large amounts of goose waste, or other

animal waste, finding its way into the water system. The

Township may wish to monitor this result through ongoing

testing. Should the goose population be reduced, but

the fecal coliform measurements remain high, it could be

an indication of a sewage leak in close proximity to the

stormwater system or the ponds.

increase dissolved oxygen

Dissolved oxygen is an important component of the

overall health of the ponds. The testing performed by

Brandywine Science Center revealed that Bow Tree Pond

1 has insufficient dissolved oxygen for beauty and for

fishing. Marydel! Pond has insufficient levels of dissolved

Over the past few decades, its been determined that conventional basins are ineffective in managing stormwater, leading to degradation of area streams.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

oxygen for fishing. Dissolved oxygen is not a problem in

most of the ponds, as aerators or stream flow keep the

water moving, which dissolves more oxygen into it. Below,

the report describes relatively simple ways to increase

dissolved oxygen.

provide shade over the water

Previous sections of this report described the filtering

and infiltration benefits of vegetated buffers. By planting

trees as part of these buffers, close to the pond edges,

they can also potentially increase the amount of dissolved

oxygen that the water can hold. Cooler water can hold more

dissolved oxygen than warmer water. Planting large tree

species, such as oaks and maples near the shorelines will

provide shade to cool the water.

decrease plant and animal waste

Plant and animal waste can increase nutrient levels in

ponds, as already described in this report, but it can also

cause the elimination of dissolved oxygen. Aerobic bacteria

act in the process of breaking down and decomposing

plant and animal waste. An abundance of this waste can

lead to an abundance of the bacteria, which will exhaust

the supply of oxygen. Low levels of dissolved oxygen can

lead to fish kills and algae growth. Recommendations for

reducing the goose populations and the amount of plant

waste through changes in mowing regimes and plant types

have been described previously in this report. The same

recommendations can help increase dissolved oxygen.

install aquatic plants

As aquatic plants "breathe", they process carbon dioxide and

produce oxygen. This oxygen is released into the water. The

ponds currently have very few aquatic plants. More aquatic

plants of diverse, native species, could be introduced to

the ponds at their edges, through bench plantings. (See

Appendix 2 for planting list.) Sediment from within the ponds

could be regraded to create a shallow "bench," a gradually

sloped ramp down into the pond. Aquatic plants could

be planted on the bench. The plants would help to clean

and filter the pond water, while providing habitat and food

sources for other aquatic species, while, most importantly,

providing more dissolved oxygen. Additionally, benches

could make the ponds safer; as they would eliminate any

steep drop-offs from the pond banks into the water.

Natural Lands I 9

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Coverage of approximately 40-60% of the pond surface

with aquatic plants would be ideal for shading the water

and introducing additional dissolved oxygen. This ratio

of aquatic plants would lead to a balanced population of

algae, rather than complete algae coverage as happens

now. Additionally, aquatic plants at this ratio would help

reduce phosphates, likely to 0% during the growing season,

as they would utilize and process the nutrients.

install aeration systems

The Pin Oaks Pond and Bow Tree 2 & 3 Pond each feature

aeration systems, which contribute to the health and

beauty of the ponds. The aerators keep water in motion,

which makes it harder for algae to get established. More

importantly, they incorporate more dissolved oxygen into

the water, which helps keep healthy levels of bacteria which

break down nutrients and waste. Fish rely on dissolved

oxygen to breath, and they die off when not enough

Aquatic plants can provide habitat and shade, compete with algae, and increase levels of dissolved oxygen.

10 I Natural Lands

dissolved oxygen is present. After dredging, to a minimum

depth of four feet, aerators should be considered for

installation at Bow Tree 1 Pond, the Bow Tree 2 & 3 Basin

and Marydel! Pond.

Further study and consultation with a pond maintenance

professional will be required to install an aeration system,

but some labor can be carried out by the Township staff. A

system of aerators would consist of grids of pipe which rest

on the bottom of the ponds, fed with air through hoses from

a compressor in a cabinet on land. Electricity would also

need to be extended to the cabinet. The compressor sends

air to the grids, which then allows the air to bubble out,

creating a column of oxygen, which mixes with the water and

helps keep the water circulating horizontally and vertically.

Aeration systems can be installed when the ponds are

full, using boats and cables, or they can be coordinated with

dredging, and installed more easily when the ponds are dry.

Township staff can likely install one aeration system with

assistance from a consultant, and then install additional

systems on their own. The Pentair Aquatics 4GL54-230

system would be appropriate for the ponds. The system

is designed to serve ponds with a surface up to 3,4 of an

acre, but multiple systems can be installed to handle larger

ponds (see Appendix 2).

reduce sediment levels

Sediment is entering the ponds in two ways-through

direct sheet flow into the ponds off of the surrounding

land, and through stormwater flowing through pipes into

the ponds. There is already too much sediment in four of

the ponds, while the other two will need to be addressed

in the near future. Therefore, the methods for reducing

sediment address elimination of the sediment already in

the ponds, and reducing the amount of sediment which

enters in the future.

dredge the ponds as necessary

Toth Brothers Clearing and Dredging, Inc. "floated" each

of the ponds. Using a small boat, Mike Toth entered each

pond, and using a variety of instruments, measured the

pond depths and depth of sediment. Additionally, he

inspected the associated structures and visually assessed

other attributes of each pond. Considering the existing

conditions of stormwater management throughout the

watersheds, it appears that dredging will remain part of

ongoing maintenance well into the future. Maintaining a

proper pond depth is an important factor of pond health.

Most of the ponds are filling with sediment, which can add

nutrients and contribute to warming of the water, which

encourages growth of algae. Dredging is an important

aspect of pond maintenance now, but we believe that

recommendations in this plan can lessen the frequency or

amount of necessary dredging in the future.

Toth Brothers found that four of the ponds are in need of

dredging in the very near future. These are Hershey's Mill,

Marydel!, Bow Tree Farm Pond 1 and Bow Tree 2 & 3 Pond.

The remaining two ponds, Bow Tree 2 & 3 Basin and the

Pin Oak Pond, can wait to be dredged and/or reassessed

in five years. In addition to dredging, Toth Bros also found

a number of structural issues which should be addressed.

These issues are described further in the pond profiles

later in the report. Additionally, Toth Bros. full reports are

included in the appendix to this document.

install forebays

Forebays are smaller ponds or catchment areas which filter

sediment out of water as it enters a larger body. Forebays

are typically planted with wet tolerant or aquatic plant

species and constructed from rock or earth. As water

flows out of a pipe, into a pond or basin, it first flows into

the forebay. The water hits the rocks and plants, slows

down and drops the sediment there, before entering the

Where stormwater flows uncontrolled over mowed lawn, it creates channels, erodes the soil, and carries sediment downstream, into ponds and basins.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

pond. Installation of fore bays would reduce the amount

of sediment which reaches the ponds. As nitrogen and

phosphorous can cling to sediment, they too would be

reduced. (See Appendix 2 for details.)

Not all of the ponds and basins would be suitable to

be retrofit with a forebay. It appears that forebays may be

appropriate for use at Marydel!, Pin Oak and Bow Tree 1, as

these ponds all take on a great deal of sediment and receive

heavy storm water flows. Bow Tree 2 & 3 Pond and Basin are

in good shape and are functioning well without fore bays.

Hershey's Mill Pond is fed by a stream which flows through

the pond and out over the dam. This stream should not be

modified with a forebay, as it is in generally good shape.

Forebay design would require additional study and

engineered design. Forebays would not eliminate sediment

from the system, but would capture it and keep in one

section of the existing pond. This would make it easier

to remove the sediment as it builds up. Sediment could

then be removed more often, but from a smaller area of

the ponds. This could mean that the sediment could be

removed more cheaply, with simpler equipment such as a

vacuum truck, rather than entering the pond with heavy

equipment.

implement vegetated buffers

Vegetated buffers were previously described at length

in the section regarding reduction of phosphorous and

nitrogen. While buffers help to eliminate nutrients, they

Vacuum trucks can be used to clean out ponds where sediment is more localized in forebays. This can be a less costly option than dredging.

Natural Lands 1 11

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

are also effective at filtering out sediment and stabilizing

shorelines and streambanks. Buffers should be installed

along pond banks where they can intercept sheet flow.

Trees and shrubs should also be planted where channelized

water flows through the landscape and into the ponds. In

these situations, the roots of the trees and shrubs will help

stabilize the channels and hold the soil in place, rather than

allowing it to be carried into the ponds. (See Appendix 2 for

planting list.)

inlet filter bags

Much of the sediment entering the ponds comes directly

from water piped through inlets along the Township streets.

Therefore, protecting the inlets and keeping sediment from

ever getting into the stormwater system would benefit

the ponds. The PA DEP Erosion and Sediment Pollution

Control Program Manual lists inlet filter bags as an effective

sediment barrier. However, they should only be used where

an inlet has a %-acre maximum drainage area. They also

need to be inspected on a weekly basis and after each

runoff event and need to be cleaned out when they are

half full. Inlet filter bags require more annual care, but may

reduce the frequency and cost of dredging. (See Appendix 2

for details.)

Due to the quantity of inlets feeding the ponds, inlet

filter bags should be used strategically. The township could

install them at the inlets feeding Pin Oak, Hershey's Mill, or

What is a Rain Garden?

N11 \ure'' \Vator Fiiter: R<\ln g Mdens 11te shallow landscaped

dopreu li;11u !hill cilp lu re , c h~ .1n and absorb ) torrnwa \(! I

ru nofl from roofs, parklny lots and road s.

both, as there are only 13 inlets between them. This small

number of filter bags could likely be managed by Township

staff, who could also track their time spent maintaining

them. The Township could then determine whether to

expand use of inlet filter bags by measuring the amounts

of silt captured in the bags and continuing to test the pond

water quality.

rain gardens and rain barrels

Sediments and chemicals are carried to the ponds with

stormwater. By capturing stormwater and infiltrating it in

place or collecting it for reuse, homeowners can do their

part to keep the ponds healthy. Residential properties are

the primary producers of stormwater, as roofs, driveways

and turf grass all generate runoff during storms. This is the

water which eventually carries sediment, chemicals and

nutrients to the ponds. Rain gardens on private properties

can help to capture water and infiltrate it into the ground,

rather than allowing it to drain to pipes. (See Appendix 2 for

details.) Rain gardens can also benefit native pollinators,

birds and small mammals, by providing food sources

and habitat. Rain barrels can also help protect ponds. By

draining roof drains into barrels, the water can be collected

for garden use before it reaches the inlets. When this

collected water is used in the garden in smaller quantities

at a time, it can infiltrate into the ground, watering plants

and recharging ground water supplies.

Runofl is co!!ec t\.'.'d " om paved I

and o ther hJ rd ~u il.J C.:>r. a nd ' I

tl01tlvo plants do not 1.:-quirt' f'or 11ll zcr · and holp litli.' • pollutanh.

cJlr cc1ed Into l h ~ gard c:n '-...

fl.\ tlve p1..i nl5 p1 ovidr. lood nnd habh .-it for birds, bul t<'illil'.!S .ind o thm pollJn,, lors.

'-._ I A typlc.11 Min g ;11d;;>n fr, bt"l\·/1H!n sh and nine lnrhcs decp.

Rain gardens provide habitat and food for native birds, mammals, bees and butterflies, and capture stormwater and infiltrate it into the ground.

12 I Natural Lands

Rain barrels capture stormwater running off of roofs, keeping it out of the stormwater system. This water can be used to water gardens.

friends groups and community organizations

The citizens of East Goshen have demonstrated that they

care about the future of the ponds, by attending the series of public meetings as part of the planning process. They

stood up and spoke of how much they enjoy having the

ponds. Many of them also expressed an interest in helping

the situation however they can, whether through planting

rain gardens on their properties, or by volunteering. An

opportunity exists to rally the residents together to take

action to improve the ponds.

It is important to connect the residents to the ponds,

for them to see the effects of the surroundings on the

water quality. Friends groups dedicated to each pond, or

organized by community would help to keep the neighbors

connected. More importantly, they could empower the

citizens to make positive change at the ponds, by working

alongside with the Township, as partners. Friends groups

could take some of the workload off the Township and

the Conservancy Board, and could also strengthen the

communities, by bringing neighbors together and by giving

them ownership of their community spaces.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

The Conservancy Board could work with the Township

staff, including the Parks and Recreation Director, to create

friends groups for each pond or community. They may wish

to refer to the Philadelphia Park Friends Group Toolkit, a 48-

page guide to establishing friends groups, available on the

Philadelphia Parks and Recreation website (www.phila.gov/

ParksandRecreation/getinvolved).

pond profiles

The six ponds face many of the same issues. All of them

tested high for phosphorous. All of them are receiving too

much sediment and need to be dredged immediately or

likely within the next 5to10 years. Many of them have low

levels of dissolved oxygen, making it difficult to support

fish communities and contributing to algae problems.

However, each pond sits within its own landscape and is

affected differently by its surroundings. Therefore, each

pond requires a different approach to improvement.

Strategies for improving each pond are outlined below in

the individual pond profiles.

The ponds in East Goshen provide beauty and recreational opportunities to the surrounding neighborhoods.

Natural Lands I 13

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Hershey's Mill Estates

Uses:

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater Location:

Drainage Area:

Depth of Water:

Aerators:

Notable Chemical Testing Results:

Beauty

0.30 acres

1.22 acres

2- Tanglewood Drive 2- Millstream Drive 1 - Bell Flower Lane

One stream flow over regulated dam

Ridley Creek

King Road, West of Frazier Road, East Whiteland Township

243 acres

6inches

None

High Phosphorous and Nitrogen (Ammonia-N and Nitrate-N)

general description

The Hershey's Mill Pond is located on Tanglewood Drive,

near the intersection with Hershey Mill Road, on a 1.22-acre

parcel. The pond is fed by an Unnamed Tributary to the

Ridley Creek, which flows directly through the pond. No

inlets feed the pond. However, a number of inlets feed the

stream upstream of the pond. The stream also flows though

the Lockwood homeowners association open space, where

it may be connected the pond/basin there. It is unclear, but

an upstream farm and apartment complex could also be

contributing stormwater to the creek.

Where the stream enters the pond, it flows through

healthy woodland, which is providing buffering, cooling

the streamwater and stabilizing the streambanks.

Approximately 3/4 of the pond's banks are surrounded by

forest. The remaining bank features some mature trees

and mowed grass. This bank separates the pond from

Tanglewood Drive.

14 I Natural Lands

Hershey's Mill Pond Watershed

Hershey's Mill Pond stormwater management system consists of five inlets (pink squares) which convey stormwater to the pond. CREDIT: East Goshen Township

The Hershey's Mill pond is quite full of sediment, with an

average depth of water of only 6 inches. As the pond sits

on a small parcel, with little mowed grass around it and is

relatively well buffered, it appears likely that most of the

pond's issues are being caused by upstream conditions.

strategies for improvement

dredging

The pond is full of sediment and has a very shallow depth

of water. It is unclear whether the pond can accommodate

adequate stormwater in a major storm event. It is likely

that the upstream forest is acting as a floodplain for the

stream in these situations and absorbing some stormwater. Per Toth Bros. findings and recommendations, this pond

should be dredged in the very near future.

The stream feeding the Hershey's Mill Pond is well shaded and appears relatively healthy.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

inlet filter bags

As it appears that most of the sediment entering the

pond is coming from offsite, it is imperative to capture this

sediment before it enters the stormwater system. Inlet

filter bags should be considered for use in the five inlets in

Tanglewood and Millstream Drives and Bell Flower Lane,

which feed the stream. These could be installed as a pilot

project, to determine whether the bags provide enough

impact in light of the time required to maintain them.

stream buffer plantings with partners

Where the stream flows through land owned by East Goshen

Township, it is well buffered. However, upstream of the pond,

the stream flows through private residential properties, and

land owned by the Lockwood Community Association and

the Convent of the Servants of the Immaculate Heart of

Mary. Aerial photography of these properties shows gaps

in forest cover along the stream here. It may be that the

stream is eroding the banks in these areas and carrying

the sediment downstream to the pond. There could also

be sheet flow off neighboring properties carrying sediment

and nutrients downstream into the pond. East Goshen Township should work with these neighbors to educate them about the effects of stormwater on the streams and ponds, and work with them to plant trees and install other

better management practices on their own properties.

The grass area near the pond attracts geese and could he planted with trees and shrubs.

Natural Lands 115

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

rain gardens and rain barrels

The residents upstream could do their part by reducing

the amount of water entering the stormwater system by

installing rain gardens and rain barrels. Lower volumes of

water entering the stream would also reduce the amount of

sediment and nutrients entering the pond.

pond edge tree and shrub plantings

The pond is well buffered on three sides by forest. A few

large trees exist along Tanglewood Drive. However, there are

gaps where additional trees and shrubs could be planted

to provide shade and cover for fish and help keep the water

cool. Shrub plantings would also reduce the area to be

mowed, thereby reducing the chance for grass clippings to

enter the pond and increase nutrient levels.

conclusion

Upstream conditions appear to be the major cause of the

issues in this pond. The pond should be dredged to return

it to its designed/intended condition. Then upstream

mitigation measures, including buffer plantings, inlet filter

bags, rain gardens, rain barrels and other BMPs, should be

implemented to reduce sediment loads. Finally, additional

vegetation should be planted around the pond edges to

beautify, provide fish habitat and reduce nutrient levels.

The Hershey's Mill Pond adds beauty to the neighborhood entrance road.

16 I Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

~

· ~ " ~ ~ - (lj ti) 8 ;: :l'"d I I D

tj i:: zj •

Natural Lands 117

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Bow Tree 1 Pond

Uses:

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater

Beauty and Potentially Fishing/Habitat

1.37 acres

6 acres (connected downstream to 42- acre open space)

96(±)

Two 5-foot diameter concrete structures

Ridley Creek

Location: 537 Beaumont Circle

Drainage Area: Less than 10 acres

Depth of Water: Varies 4 inches to 2 feet

Aerators: None

Notable Chemical Bow Tree l Pond Watershed Testing Results: Phosphorous, Nitrogen (Ammonia-N) and Low Dissolved Oxygen

general description

The Bow Tree 1 Pond is the primary stormwater management

area for the Bow Tree 1 development. It is fed by an unnamed

tributary to the Ridley Creek, with its headwaters within the

The Bow Tree l Pond is fed by 96 inlets (pink squares).

CRED IT: East Goshen Township

18 I Natural Lands

development, at 537 Beaumont Circle and 1606 Herron Lane.

The pond and tributary collect stormwater through no fewer

than 96 inlets spread throughout the development.

The pond sits mostly within a 6-acre open space parcel

which fronts on Bow Tree Drive. It is surrounded by private

lots on two sides and connects to a larger open space parcel

which contains the tributary as it flows out of the pond.

Much of the south side of the pond is buffers by woodlands.

The remaining three sides are surrounded by large swaths of

mown lawn on steep slopes, sloping down to the pond.

strategies for improvement

dredging

With a variable depth between 4 inches and 2 feet, the

pond has accumulated a great deal of sediment. The

sediment has likely come from the steep slopes of

mown grass surrounding the pond as well as with water

conveyed through the stormwater system. Per Toth Bros.

recommendations, this pond should be dredged in the near

future. The dredged spoils can be spread on the surrounding

hillside. However, without additional plantings, the spoils

could ultimately be washed back into the pond over time.

aerator system

Installation of an aeration system would help to increase

dissolved oxygen levels. The pond surface is currently

approximately 1.37 acres. At this size, two aeration systems

would be necessary. Should the Township also install a

forebay, it may be possible to reduce the pond surface area

in need of aeration, as forebays do not need to be aerated.

Aeration would only be recommended if the pond is first

dredged to a minimum depth of 4 feet.

fore bay

Ninety-six inlets feed the two pipes and one tributary which

lead into the pond. These three stormwater sources all

enter the pond on the south bank. A large forebay could

potentially be constructed which would capture water

flowing in from all three sources. A forebay could collect

sediment in a portion of the pond, rather than allowing it to

spread across the entire pond. Ongoing sediment removal,

through dredging or vacuuming could then be focused on a

smaller area.

upstream BMPs and education

With over 300 units contributing to the stormwater

system in Bow Tree 1, education of the residents could

make a difference in protecting the pond's health. Every

resident who installs a rain barrel or rain garden can help

to decrease the amount of sediment, water volume and

nutrients which make their way into the pond. Every

Sediment entering the pond through the stormwater system has collected and formed an island, complete with vegetation.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

resident who chooses to take their car to a commercial car

wash helps to keep phosphorous and other pollutants out

of the ecosystem.

vegetated buffers

At the pond site, a shift in land management and the

implementation of vegetated buffers would benefit

the pond. The hillsides of mown grass are contributing

sediment and nutrients to the ponds. There is very little

shade over the water. The turf grass areas co~ld be

converted to meadows, which would require less frequent

mowing and would keep grass clippings from washing into

the pond. Additionally, deep rooted meadow plants will help

stabilize the soil, reduce erosion and decrease the amount

of sediment washing directly into the pond.

Additional trees would also help buffer the pond and

stabilize the soil. Trees could also shade the water; cooling

it down, which would help to increase the dissolved oxygen

level. More trees could also make the open space a more

appealing place to visit.

vegetated infiltration swale

A linear rain garden called a vegetated infiltration swale

could also be implemented parallel to the edge of the pond.

This swale would be designed to catch any stormwater

which escapes the meadow uphill, before it reaches the

basin. It would be planted with meadow grasses and

flowering perennials. The water, captured in the swale,

would keep nutrients, sediment and grass clippings from

ever reaching the basin. It would also encourage the water

to infiltrate directly into the ground, rather than entering

the basin and the stream system. Soil and infiltration tests,

and potentially an engineering study would be necessary

to determine whether a vegetated infiltration swale would

function here.

aquatic plants

Installation of aquatic plants would also benefit the pond

by increasing the dissolved oxygen levels, shading the water

and providing habitat for fish. Aquatic plants, covering

approximately 40-60% of the water surface would also

further beautify the pond and contribute to the aesthetic

value of the open space.

Natural Lands 119

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

conclusion

The future health of the Bow Tree 1 Pond is in the hands

of the residents who surround it. The stormwater which

leaves their streets and properties provides the water for

the pond, but also the nutrients and sediments which are

20 I Natural Lands

causing its problems. It is necessary to dredge the pond

soon, and this pond will continue to require dredging

into the future unless significant changes are made to

the stormwater management upstream and immediately

surrounding the pond.

Fortunately, the Bow Tree 1 Pond holds much greater

potential than it currently utilizes. A rehabilitated pond

could become the centerpiece of a reinvigorated passive

open space park. Grass trails could be cut into a newly

planted meadow, where birds nest and butterflies hunt for

nectar. Trees could provide shade over benches and the

pond could be the place to admire ducks, catch tadpoles

or chase dragonflies. As the pond site connects to an

additional 150 acres of township owned open space, it

could become a hub or entrance to a larger trail system.

Transforming the pond area into a cherished open space,

which contributes to the lives of the residents, will help to

make them care more about how their actions affect the

pond and the creatures which live in it.

LEFT: Aquatic plants, such as lillies, can provide habitat, shade, and dissolved oxygen.

BELOW: Buffer plantings have grown around some edges of the pond, but more plantings would improve the pond's health.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

~ J .! ~ n "! t~n

t~ I. •{!i , A b "iH .!i !!ti : 'l.l ii- 1 ~I-: e " =' ~

~ ~

~ '*

u ! : t ! H

..--< ~ c rU C/l 8 "

~ ~j}3

~~ ~'"d ~ ~ ~ t ·' ill~ I I D

- ~ )' !¥ ~ Hi; u zj _; ~ i:

~ ; IJ L £ E - !l k°• ;;

Natural Lands I 21

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Bow Tree 2 & 3 Pond

Uses:

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater Location:

Drainage Area:

Depth of Water:

Aerators:

Notable Chemical Testing Results:

Beauty and Fish Habitat

0.95 acres

47.4 acres (8 acres focus)

21

1 concrete channel emptying into Bow Tree 2 & 3 Basins

Ridley Creek

Inlets on Bow Tree Drive and Beaumont Circle

30 acres

Average depth of 4 feet

5

Phosphorous and Nitrogen (Ammonia-NJ

general description

The Bow Tree 2 & 3 Pond is in relatively good condition.

It is fed by 21 inlets spread throughout the Bow Tree

development, as well as sheet flow from surrounding

residential properties and a steeply sloped hillside above.

Water flows out of the pond into a concrete channel, which

Twenty-one inlets (pink squares) feed the Bow Tree 2 & 3 Pond, which then feeds the Basin. CREDIT: East Goshen Township

22 I Natural Lands

Bow Tree 2 & 3 Pond and Basin Watershed

then feeds into the Bow Tree 2 & 3 Basin, and ultimately

into the Ridley Creek. The pond is surrounded by backyards

and has one access between homes on Bow Tree Drive.

The pond holds five aerators which keep the water

moving and keep the dissolved oxygen at adequate levels.

Nutrients, phosphorous and nitrogen (Ammonia-N) are

high. This pond is also collecting sediment, but does not

require immediate dredging.

The pond is surrounded mostly by mowed grass, but

some edge vegetation and mature tree stands exist as well.

The pond is at a low point in comparison to the surrounding

homes' backyards. Stormwater is flowing from the

backyards, over the mown areas and into the pond, likely

The five aerators at the Bow Tree 1 & 2 pond keep the water well oxygenated.

carrying grass clippings and nutrients with it. The property

lines are in close proximity to the pond edges, as close as a

few feet in some areas, making major site improvements on

the Township owned land difficult.

strategies for improvement

dredging

Toth Bros. report states that they would not recommend

dredging at this point and that they see this pond to be in

good shape for the next five years. The pond is receiving

sediment with the most impact likely coming from the

inlets which feed it. The pond should be reassessed for

dredging in 2022, at which point a more comprehensive

effort could also be implemented around multiple

improvement strategies.

mark property boundaries

When private spaces border public spaces, it is typical

for residents to encroach on publicly owned property.

This sometimes takes the form of placing buildings

over property lines, but more often it is more subtle, like

dumping grass clippings on Township property, or mowing

beyond property lines. Should the Township wish to engage

in any altered management of the land surrounding the

pond and basin at Bow Tree 2 & 3, the property lines should

be delineated with permanent markers and the Township

should reach out the residents to explain why.

The grass areas around the pond attract geese, which leave their waste and add nutrients to the pond.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

mowing to meadows

Most of the area surrounding the pond is too narrow for the

installation of a meadow, which would help to slow down

stormwater on its way to the ponds. However, the Township

could simply mow the area less frequently, allowing the

grass to grow taller and thicker. This would allow the grass

to help slow and filter stormwater and also discourage

geese. Mowing the area only once or twice a year would

keep woody species, trees and shrubs, from establishing.

(See Appendix 2 for "From Mowing to Meadows.')

rain gardens and rain barrels

The residents upstream could help in reducing the amount

of water entering the stormwater system by installing rain

gardens and rain barrels. Lower volumes of water entering

the stream would also reduce the amount of sediment

and nutrients entering the pond. The residents whose

backyards surround the Bow Tree 2 & 3 Pond and Basin

could install rain gardens along their rear property lines

to catch the water flowing off of their properties and into

the ponds. Rain gardens and rain barrels do require some

maintenance. These measures are completely voluntary.

vegetated buffers

Additional trees would help buffer the pond and stabilize

the soil. Trees could also shade the water, cooling it down,

which would help to increase the dissolved oxygen level

and make the water more suitable for some fish species.

More trees could also make the open space a more

appealing place to visit for the surrounding residents.

The concrete channel which connects the pond to the basin could benefit from tree and shrub plantings which would help to shade the water and keep it cool.

Natural Lands I 23

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

conclusion

The aerators in the Bow Tree 2 & 3 Pond are doing the

majority of the work in keeping the pond from being

covered over by algae. The pond is in relatively good

condition and sediment levels are acceptable but should

be reassessed in 2022. At that point, the Township should

consider undertaking a more comprehensive approach to

land management, education and stormwater infiltration as

a means to improving the ongoing health of the pond.

24 Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

f.fe,l , j l t I

~ i !~ ~! 1p

~

H~.i ;;. a

-f~~i~ ...

~

~

. ! "f ...-< ; ~ ~ I ·~H <U Ul 8 ;:: ~ ! ': 1i • -ii S'"d ~ · )t•• i.i i ~ ~ 1tj i:; - I I D

d~~t zj ~ I!-; i ~ ~ t. -.i~ I IE t°J: u ., ;;

Natural Lands I 25

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Bow Tree 2 & 3 Basin

Uses:

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater Location:

Drainage Area:

Beauty and Potentially Fishing/Habitat

1.17 acres

47.4 acres (8 acres focus)

28

1 to Ridley Creek

Ridley Creek

Bow Tree 2 & 3 Pond and Inlets throughout Bow Tree

30 acres

Depth of Water: Average 1.5 feet

Aerators: None

Notable Chemical Testing Results: Phosphorous

general description

Like the Bow Tree 1 & 2 Pond, the basin is also largely

surrounded by residential backyards. It is also surrounded

by some steeply sloped, mown lawns on three sides which

are contributing sheet flow to the basin. The fourth side

opens up to a large swath of wooded Township open space.

The banks of the basin are relatively steep and feature little

edge vegetation. The outflow from the pond travels through

Twenty-eight inlets {pink squares) convey stormwater into the Basin. CREDIT: East Goshen Township

2 6 I Natural Lands

Bow Tree 2 & 3 Pond and Basin Watershed

a concrete channel into the basin. An additional 28 inlets in

Bow Tree 1 & 2 also feed the basin.

The Bow Tree 2 & 3 Basin is not in as good a condition as

its neighbor, the pond. It tested high for phosphorous and

needs dredging and structural repair of the channel. Scrub

vegetation has also grown into the channel, impeding the

water flow.

strategies for improvement

Toth Bros. recommends dredging of the basin as the

average depth is 1.5 feet. Additionally, the concrete channel

should be repaired and brush should be removed where it is

impeding the flow of the water.

The Bow Tree 2 & 3 Basin is covered in algae in the summer months.

aerator system

Installation of an aeration system would help to increase

dissolved oxygen levels. The pond surface is currently

approximately 1.17 acres. At this size, two aeration systems

would be necessary. Should the Township also install a

forebay, it may be possible to reduce the pond surface area

in need of aeration, as forebays do not need to be aerated.

Aeration would only be recommended if the pond is first

dredged to a minimum depth of 4 feet.

vegetate steep banks

The basin is surrounded by steep banks on the north east

end. All of the pond edges should be planted with trees

and shrubs to shade the water and provide fish and animal

habitat. Additional vegetation could also help stabilize the

steeper slopes and make them safer if people walk along

the top of the berm. More vegetation would also make the

basin less appealing to geese.

trees over channel

The channel which leads from the pond to the basin

conveys water at a shallow depth, typically less than one

inch, and in full sun. Warm water contributes to lowered

levels of dissolved oxygen and reduced suitability for

fish habitat. Trees should be planted along the length of

the channel to help shade the water flowing through it.

Additionally, trees and shrubs would help to camouflage

the channel, making the site more aesthetically pleasing.

Some edge vegetation helps to filter stonnwater and also provides a barrier for people who may walk on the berm.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

rain gardens and rain barrels

The residents upstream could do their part by reducing

the amount of water entering the stormwater system by

installing rain gardens and rain barrels. Lower volumes of

water entering the stream would also reduce the amount

of sediment and nutrients entering the pond. The residents

whose backyards surround the Bow Tree 2 & 3 Pond and

Basin could install rain gardens along their rear property

lines to catch the water flowing off of their properties and

into the ponds.

infiltration swale and meadow plantings

The hill to the southeast of the basin stretches

approximately 240 feet from the edge of the pond to the

neighboring resident's backyard. The average slope of the

The channel which connects the pond and basin has been damged by overgrown vegetation, which causes water to stop, stagnate and grow algae.

Natura!Lands I 27

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

hillside is approximately 10%. The hillside is mowed on a

regular basis to keep the turfgrass short. Its likely that large

volumes of stormwater flow down this hillside, carrying

nutrients, sediment and grass clippings with it. The hillside

could be converted to a meadow, which would discourage

geese from gathering there as well as slowing, filtering and

infiltrating the stormwater.

A vegetated infiltration swale could also be implemented

parallel to the edge of the basin. This swale would

essentially act as a linear rain garden, to catch any

stormwater which escapes the meadow, before it reaches

the basin. It would be planted with meadow grasses and

flowering perennials. The water, captured in the swale,

would keep nutrients, sediment and grass clippings from

ever reaching the basin. It would also encourage the water

to infiltrate directly into the ground, rather than entering

the basin and the stream system. Soil and infiltration tests,

and potentially an engineering study would be necessary

to determine whether a vegetated infiltration swale would

function here.

28 I Natural Lands

conclusion

When this basin is dredged, it would be a good time to

implement the additional strategies to ensure the long

term health of the basin. When residents see the cost,

difficulty and scale of dredging, it may be the right time to

begin educating them on the actions they can take to help

improve the health of the basin. Once the basin is dredged

back to its ideal condition, it would be logical to implement

the other physical changes, such as tree planting, and

meadow and rain garden installation, to help it stay in the

best condition possible, for as long as possible.

See previous section for plan.

Marydell Pond

Uses:

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater Location:

Drainage Area:

Beauty and Potentially Fishing/Habitat

1.98 acres

16.6 acres

19

1- Flows to smaller ponds, then East Branch Chester Creek

East Branch Chester Creek

Subdivision inlets and spring

<24 acres

Depth of Water: 1.5 to 5 feet

Aerators: None

Notable Chemical Testing Results: Phosphorous, Nitrogen (Ammonia-N), and Low Dissolved Oxygen

general description

The Marydel I Pond sits within a 16-acre open space parcel

surrounded by the Marydel! subdivision. The space is

mostly mowed lawn, with a forested area to the northwest.

Barker Drive runs along the eastern edge of the property,

approximately 30 feet in elevation above the surface of

the pond. The horizontal distance from the road to the

pond is approximately 330 feet. It appears that the space is

relatively unused, aside from some fishing, as evidenced by

some stray fishing line. Kids sled there in the winter as well.

A hockey goal in the pond suggests that residents use the

pond for skating and ice hockey in the winter as well. The

neighbors used to hold civic events in the lawn area, but

don't any longer as the goose population and goose waste

has made the space unpleasant to use.

The Conservancy Board recently planted a dozen trees

along the northeastern edge of the pond. They are in

rough, double rows, ranging in distance from the shoreline

from approximately 10-40 feet. The trees are a mix of

oaks, birches and redbuds. These three native species will

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Marydell Pond Watershed

1422

l

1416

I 141 2

1410

Nineteen inlets (pink squares) feed the Marydell Pond stormwater management system. CREDIT: East Goshen Township

Natural Lands I 29

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

provide food and habitat to a variety of mammals, birds

and insects. They are also all tolerant of wet soils and are

appropriate for a pond side planting. The mix of species will

grow to three different heights, providing an understory and

canopy layer. The redbuds will likely grow to approximately

30 feet in height, the birches to 50-70 feet in height, with

the oaks most likely topping out around 80 feet in height. At

maturity, the birches and oaks should provide some shade

to the pond.

In addition to shade, the trees will also provide some

stormwater management. They are planted at the bottom

of a slope, near the pond edge. As they grow and establish

their root systems, they will help to stabilize the soil, slow

flowing water and reduce erosion. They are the first step

in establishing a vegetated buffer, recommended at all

the ponds. In the future, the Conservancy Board could

supplement these trees with more trees, further uphill

to widen the buffer. Additionally, shrubs could be added

beneath the trees once the canopies begin to connect.

The pond is fed by 19 inlets throughout the subdivisions,

sheet flow across the vast hillside, a spring and a few

channelized, intermittent waterways across the lawn area.

The eastern pond edges lack significant vegetation for the

most part, save for the newly planted trees and a few other

more mature shade trees. The western edge is bordered

by forest. The large lawn area is often occupied by geese,

as evidenced by their abundant waste. One outlet drains

pond water to an unnamed tributary of the East Branch

Chester Creek.

The trees planted at Marydell include oaks, birches and redbuds, native species which w ill shade the pond, filter stormwater and provide habitat for native birds, insects and mammals.

30 I Natural Lands

The Marydell Pond seems to be affected by every

negative impact possible. Geese occupy the site and leave

an abundance of waste. The pond water is exposed to full

sun, with little shade. There is little edge vegetation for fish

habitat and no significant vegetated buffers on three sides,

allowing stormwater to sheet flow into the pond. Finally,

28 inlets drain stormwater from the neighboring yards and

streets directly into the pond, bringing sediment, nutrients

and chemicals into the water. These factors have led to the

pond being low in dissolved oxygen, high in phosphorous

and nitrogen and in need of dredging and physical repair.

strategies for improvement

dredging and repairs

Toth Bros. recommends dredging this pond and spreading

the sediment on the hillside above. Additionally, the

outflow structure should be repaired simultaneously.

two forebays

Only 19 inlets feed the four pipes and one swale which lead

into the pond. Three pipes feed the pond at its north end,

while one pipe and the swale feed the pond at its south

end. Two forebays, one north and one south, would be

necessary to capture sediment as it exits the pipes and

swale. The foorebays would collect sediment in smaller

areas of the pond, rather than allowing it to spread across

the entire pond. Ongoing sediment removal, through

dredging or vacuuming could then be focused on two

smaller areas.

A sycamore tree is growing out of the outlow structure at Marydell and should be removed.

aerator system

Installation of an aeration system would help to increase

dissolved oxygen levels. The pond surface is currently

approximately 1.98 acres. At this size, two aeration systems

would be necessary. Should the Township also install two

forebays, it may be possible to reduce the pond surface

area in need of aeration, as forebays do not need to be

aerated. Aeration would only be recommended if the pond

is first dredged to a minimum depth of 4 feet.

meadow plantings and vegetated swale

The vast mowed hillsides surrounding the pond on three

sides allow stormwater to sheet flow directly into the

pond. As the water flows through the grass, it carries

clippings, sediment and nutrients into the pond. The large

grass hillsides between the pond and the road could be

converted to meadow plantings, which would help to

slow, filter and infiltrate the water before it reaches the

pond. Beyond the initial costs of installation, meadow

maintenance would likely be less costly than the typical

lawn maintenance, as meadows need to be mowed only a

few times per year.

A vegetated infiltration swale could also be implemented

parallel to the edge of the basin. This swale would

essentially act as a linear rain garden, to catch any

stormwaterwhich escapes the meadow, before it reaches

the basin. It would be planted with meadow grasses and

flowering perennials. The water, captured in the swale,

would keep nutrients, sediment and grass clippings from

ever reaching the basin. It would also encourage the water

The Marydell pond features some edge plantings, but more plantings would provide more shade and better filter stormwater.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

to infiltrate directly into the ground, rather than entering

the basin and the stream system. Soil and infiltration tests,

and potentially an engineering study would be necessary

to determine whether a vegetated infiltration swale would

function here.

vegetated buffers

The Marydel I Pond site lacks vegetation, aside from the

wooded areas along the western edge. The pond would

benefit from additional plantings which could help to filter

runoff, stabilize the soil and shade the water. More trees

would also make the site more aesthetically pleasing and

comfortable during the hotter seasons. Buffer plantings

should be planted along the pond banks and where

stormwater runoff is channelizing and forming intermittent

streams down the hillside.

aquatic plants

The Marydel I Pond tested low for dissolved oxygen. Fish

need dissolved oxygen to breathe and aerobic bacteria,

which break down decaying matter in the water, are also

dependent on dissolved oxygen. The introduction of native

aquatic plants would be an effective method for increasing

dissolved oxygen levels. Should this pond be dredged, some

of the spoils could be graded into the banks to create a

shallow bench underwater, on which to plant the aquatic

plant species.

inlet filter bags

This plan recommends a pilot program for the use of inlet

filter bags at inlets feeding the Pin Oak and Hershey's

Mill Ponds. These two ponds are fed by a total of 13 inlets

between them. The Marydel! Pond is fed by 19 inlets, which

is the third fewest of the six ponds. Inlet filter bags should

be considered for use at Marydel I based upon review of the

results of the pilot program at Pin Oak and Hershey's Mill.

Should inlet filter bags be found to be effective there, the

Township could incrementally increase their use. Marydel!

would be the next logical step, based on the relatively low

number of inlets.

upstream BMPs and education

With the surrounding neighborhood contributing to the

stormwater system in Marydell, education of the residents

could make a difference in protecting the pond's health.

Natural Lands I 31

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Every resident who installs a rain barrel or rain garden can

help to decrease the amount of sediment, water volume

and nutrients which make their way into the pond. Every

resident who chooses to take their car to a commercial car

wash helps to keep phosphorous and other pollutants out of the ecosystem.

conclusion

The Marydel! Pond open space has the potential to be

transformed into a passive park which could become a

new centerpiece of the neighborhood. The strategies for

improvement would be designed in a manner to improve

the ponds health as well as encourage use by the residents.

Grass walking paths could bring residents comfortably

to the pond. Meadow plantings would discourage geese

from inhabiting the site. More trees would provide summer

shade and habitat for birds. The pond and the 16 acres

surrounding it could be transformed into a natural area

with gathering space for neighborhood events, educational

programs and recreational events.

32 I Natural Lands

Some aquatic plants, like duckweed, are growing naturally in the pond.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

I ID

Natural Lands I 33

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Pin Oak Pond

Uses: Beauty and Potentially Fishing/Habitat

Approximate Surface Area:

Parcel Size:

Inlets:

Outlets:

Watershed:

Headwater

0.46 acres

4.6 acres

8

East Branch Chester Creek

Location: Inlets on Brian and Richard Drives

Drainage Area: 42.4 acres

Depth of Water: 2 to 6 feet

Aerators:

Notable Chemical Testing Results: Phosphorous

general description

The Pin Oak Pond rests in a more intimate setting than

the others. It sits along a quiet street, on a smaller parcel,

adjacent only to a few homes. It's a small pond at just under

a half acre. It is clearly well loved by the neighborhood, as

residents asked what we were doing at every site visit.

151 ~< '" ;;,~/

/ 1524 l 1525 1528 ·1530 I

1516

5

0 3

\

Only eight inlets (pink squares) feed the Pin Oak Pond, making it suitable for an inlet filter bag pilot program CREDIT: East Goshen Township

34 I Natural Lands

Pin Oak Pond Watershed

The pond is just a few feet from Brian Drive to the east

and a private residence to the north. The majority of the 4.6-

acre parcel on which it resides, lies to the west and south

of the pond. Most of the area to the west is mowed grass,

stretching from the banks of the pond to the residents'

Some edges of the pond are well vegetated, but more plantings would help to stabilize the banks.

rear yards, just about 250 feet away. Due to the slopes, it

appears that most of the sheet flow from the grass area

is missing the pond, but likely flowing directly into the

unnamed tributary of the East Branch Chester Creek, to

which the pond drains as well.

The pond is fed by a series of eight inlets on Brian and

Richard Drives. The inlets channel water into a single

pipe which feeds the pond. The pond banks near the

pipe have scoured, creating a "neck" from the pipe to the

pond. It appears that water likely rushes out of the pipe at

high velocities, carrying sediment and scouring the pond

banks before slowing down in the body of the pond and

dropping its sediment there. In addition to sedimentation,

the pond also has a few structural issues. The emergency

spillway has failed and a 60-foot stretch of shoreline is

being undercut. Water drains from the pond through an

outlet structure, but is also leaking through the spillway and

making a new channel towards the creek.

The water tested high for phosphorous. Unlike many

of the other ponds, it does not appear that sheet flow off

the adjacent lawn is a major culprit. It is more likely that

the phosphorous is being carried in with sediment, or

washing in from the inlets in the form of fertilizers or

other chemicals.

The existing channel entering the pond could potentially be converted into a forebay, to capture sediment in a smaller area before it enters the pond.

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

strategies for improvement

dredging and fore bay

Toth Bros. recommends dredging this pond in

approximately 2022. Between now and then, the Township

could prepare the pond for a major makeover. In addition to

fixing the spillway, this pond could be fitted with a forebay. A

fore bay is a smaller ponding area, designed to slow water's

velocity, so that it drops sediment there, rather than in the

open water of the pond. The "neck" referred to earlier could

potentially be fashioned into a spillway. If the sediment

were concentrated here, future removal of sediment could

be achieved with lighter equipment, such as vacuum

trucks, at a lesser cost. It is also possible that the water

rushing in through the neck is causing the undercutting

of the opposite bank. Installation of a fore bay, designed

to slow the water on entry, could also reduce future

undercutting and could allow the bank to be stabilized

through tree plantings.

tree plantings

Much of the land surrounding the pond is unstable, due

to the forces of the pond water. Additional trees planted

around the pond would help to hold the soil and stabilize

the land, keeping more sediment from entering the stream.

The existing spillway is unstable, and should be reconstructed. Additionaly plantings could also help to stabilize the banks.

Natural Lands I 35

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

inlet filter bags

As only eight inlets feed the pipes which lead to the

pond, inlet filter bags could greatly reduce the amount

of sediment entering the stormwater system off of the

residential properties and streets.

upstream BMPs and education

With the surrounding neighborhood contributing to the

effects on the Pin Oak Pond, education of the residents

could make a difference in protecting the pond's health.

Every resident who installs a rain barrel or rain garden can

help to decrease the amount of sediment, water volume

and nutrients which make their way into the pond. Every

resident who chooses to take their car to a commercial car

wash helps to keep phosphorous and other pollutants out

of the ecosystem.

conclusion

The Pin Oak Pond site is well loved by the neighboring

residents, but could serve them better. The site connects

to another 75 acres of adjacent open space. The

recommendations for improving the pond's health could

be implemented in a way to transform the site into a

neighborhood passive park and trailhead. Trees intended

to stabilize the pond banks would also shade visitors.

Meadows intended to infiltrate ground water would

also provide habitat for birds and interest for walkers.

Beautifying the site, upgrading it to better serve the

neighbors and strengthening their connections to it are the

best ways to get them to care about the health of the pond

and make positive changes to improve it.

The aerator in the Pin Oak pond helps keep the water moving and well oxygenated, which benefits water quality and the fish that live in the pond.

36 I Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

~ Jr

~ ,I j 1·, t ! j

t~. 11

!~

~

- ~ •I,! u E 1 ~ tiH .~ HH

°!': ;;. a I ..

~

1' ~

~ " H

.--< c i ~ '!' cu (/J E

~!r.J 8 ;: ~ ;

;~ t:i'O s. · - H I I D

! ! t ~ ·t rt;@ I"'· • ·Hi H Z,_:i • ~ lg ti E

Natural Lands I 37

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

conclusion

East Goshen's ponds are each unique, slightly different from

each other. but face the same issues as most ponds and

basins within southeastern Pennsylvania. They are already

full of sediment, deposited over decades. They aren't well

planted and aren't supported by a robust ecosystem.

They continue to accept stormwater carrying sediment

and pollutants. Every pond has slightly different needs for

improvement, but the same general recommendations are

relevant to each of East Goshen's Ponds.

All of the ponds need to be dredged, now or in the future.

All of the ponds need more plantings. All of the ponds

need better filtration of the stormwater which enters them.

And in addition to these physical changes, there needs to

be social change as well. As long as the people who live

around the ponds don't care about them, it will be very

difficult for anyone to keep them in good health.

The ponds are all in need of some improvement, but

East Goshen has the right people in leadership and the

community, to make sure that the ponds are well cared

for in the future. The residents are interested and see

an opportunity to transform the ponds into important

centerpieces for their communities. They see that these

can be beautiful places to gather, to watch birds, to fish,

to follow butterflies and frogs and to simply enjoy the

outdoors. Through the recommendations in this report, the

community can make this a reality.

The ponds in East Goshen hold great potential as small neighborhood parks, where people can hold events, enjoy the wcenery of simply go for a walk in nature.

38 I Natural Lands

appendix 1

subconsultant reports & cost estimates

1A: Water Quality Laboratory Tests

18: Site Inspection Report Outlines

1C: Cost Estimates

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

Natural Lands 39

LAB#

714897

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETT SQUARE, PA 19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABO RA TORY REPORT

FOR

Hershey Mill Estates

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

0.21 mg/L SM 5210 D

9.0 mg/L SM 4500 OG

16.4 mg/L SM 4500-N03- D

<0.01 mg/L SM 4500-N02- B

7.22 SU SM 4500-H+ B

0.09 mg/L SM 4500-P E

48 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DATE OF REPORT

DATE/TIME ANALYZED

10/13/17 18:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/17 17:32

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill

Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

9:00

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

LAB#

714902

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETT SQUARE, PA 19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABO RA TORY REPORT

FOR

Bow Tree I

Retention Pond

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

1.33 mg/L SM 5210 D

4.9 mg/L SM 4500 OG

2.4 mg/L SM 4500-N03- D

0.272 mg/L SM 4500-N02- B

7.08 SU SM 4500-H+ B

0.13 mg/L SM 4500-P E

240 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DATE OF REPORT

DATE/TIME ANALYZED

10/13/17 18:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/17 17:37

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill

Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

8:45

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

LAB#

714900

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETT SQUARE, PA 19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABORATORY REPORT

FOR

Bow Tree II & Ill

Farm Pond

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

<0.10 mg/L SM 5210 D

7.2 mg/L SM 4500 OG

2.47 mg/L SM 4500-N03- D

0.282 mg/L SM 4500-N02- B

7.38 SU SM 4500-H+ B

0.17 mg/L SM 4500-P E

29 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DATE OF REPORT

DATE/TIME ANALYZED

10/13/17 18:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/17 17:36

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

8:30

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

LAB#

714901

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETT SQUARE, PA 19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABO RA TORY REPORT

FOR

Bow Tree II & Ill

Retention Pond

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

<0.10 mg/L SM 5210 D

7.8 mg/L SM 4500 OG

2.51 mg/L SM 4500-N03- D

0.115 mg/L SM 4500-N02- B

7.18 SU SM 4500-H+ B

0.09 mg/L SM 4500-P E

35 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DATE OF REPORT

DATE/TIME ANALYZED

10/13/1718:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/17 17:37

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill

Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

8:45

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

LAB#

714898

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETT SQUARE, PA 19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABORATORY REPORT

FOR

Mary Dell

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

0.20 mg/L SM 5210 D

5.2 mg/L SM 4500 OG

2.28 mg/L SM 4500-N03- D

<0.01 mg/L SM 4500-N02- B

7.02 SU SM 4500-H+ B

<0.06 mg/L SM 4500-P E

570 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DATE OF REPORT

DATE/TIME ANALYZED

10/13/17 18:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/1717:34

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

9:15

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

LAB#

714899

ORIGIN

OF

SAMPLE

SOURCE

OF

SUPPLY

SAMPLE

COLLECTED

BY

TRANSPORT

INFORMATION

SAMPLE ID:

ANALYSIS

AMMONIA-N

DISSOLVED OXYGEN

NITRATE-N

NITRITE-N

pH

T-PHOSPHORUS (P)

FECAL COLIFORM

<Less Than

BRANDYWINE SCIENCE CENTER INC.

204 LINE ROAD KENNETTSQUARE, PA19348

DEP# 15-301

NAME

ADDRESS

CITY/STATE

TOWNSHIP

POND

SPRING

TREATED

LAB STAFF

(610) 444-9850

LABO RA TORY REPORT

FOR

Pin Oaks

x MANNER

OF

COLLECTION

WELL DRILLER SAMPLE

OTHER East Goshen INFORMATION

ICE/REFRIG x

RESULT UNITS METHOD

<0.10 mg/L SM 5210 D

8.2 mg/L SM 4500 OG

2.77 mg/L SM 4500-N03- D

0.112 mg/L SM 4500-N02- B

7.40 SU SM 4500-H+ B

0.07 mg/L SM 4500-P E

22 mg/L SM 9222 D

Client:

COUNTY

INSIDE TAP

OUTSIDE TAP

HOLDING TANK

SAMPLE DATE

SAMPLE TIME

DATE RECEIVED

TIME RECEIVED

DA TE OF REPORT

DATE/TIME ANALYZED

10/13/17 18:30

10/13/17 10:35

10/14/17 14:30

10/14/17 12:30

10/13/17 17:35

10/16/17 17:05

10/13/17 12:00

Henry D. Clemens Ill

Laboratory Director

SM refers to Standard Methods for the Examination of Wastewater

and Water, 18th Edition, APHA-AWWA-WPCF.

Chemical Analyses performed in accordance with" STANDARD METHODS FOR THE EXAMINATION

OF WATER AND WASTEWATER, 18th EDITION APHA-AWWA-WPCF.

East

Goshen

Township

10/13/2017

9:00

10/13/2017

10:30

10/27/2017

ANALYST

HC

HC

HC

HC

HC

HC

MJ

s

CLEA.Kl!VG & HEDGING, JJNC.

JOSEPH TOTH " MICHAEL TOTH

P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 t: 215-257-3665

e: tothbros71 78@comcast.net

www. totl1brothers. com

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Hersheys Mill pond

Location- Vicinity 1511 Tanglewood Drive

Date of Inspection- 11/1/17

Water Quality East Branch Chester Creek; TSF I MF

PNDI Status: - No permit required

Watershed Area: 243 acres

Coordinates- 40 01.033 I 75 33.648

DREDGING INFORMATION:

Pond has a maximum water depth this date of 6 inches overall. It

seriously needs dredging. Sediment load is 6 feet or 4442 cubic yards. This dredge material must be hauled off-site at a cost of

$132,000.

SUGGEST:

This should be considered a "Regulated" dam due to the drainage area/watershed & dam height.

This is a very sensitive dredging project, as the private pond just

Below has been an issue for more than 20 years and is in serious need of dredging. We do not want to give the owner any reason to

consider the Township's work part of his concern.

CJLEAIUNG & DREDGING, llNC.

JOSEPH TOTH o MICHAEL TOTH

P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 f: 215-257-3665

e: tothbros7178@comcast.net

www. tothbrotl1ers. com

~-· ·-~--.----- ' --- . - ; WET· EXCAVATION _ _ • . LAND CLEARING ., DEMOLITION i,..:_:-,_~=-~--'* -~~- ~ -"=-"'~--- -·- •. _...._ '~~ .... ·---·-;11......__ ~"'.:."'Jb-.~ :_~-*· ... ·-· •• ---· --"• • .__,_. __ ~~::i;...,,....__ .......... .A

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Bow Tree 1 Pond

Location- 1631 Bow Tree Drive

Date of Inspection- 1111/17

Water Quality Ridley Creek; TSF IMF

PNDI Status: NIA No Permit Required

Watershed Area: <10 acres

Coordinates- 39 59.036 I 75 31.951

DREDGING INFORMATION:

Pond has a maximum depth of2 feet surrounding (2) 5 foot diameter concrete outflow structures including steel trash racks, all in good repair. The pond has a minimum depth of 4 inches, thus it is in need of dredging with an average sediment load of 7 ,64 7 cubic yards. This dredged material could be blended with existing contours at a cost of$ 130,000

SUGGESTION:

All components appear to be working fine at this farm pond

[Photograph: Concrete outflow structure surrounded by bare tree branches and water in a wooded basin.]

Outflow Structure in GooD condition

outlet struc. Bow Tree #1 Good Shape

CLEAR.ING & DREDGING,, INC ..

JOSEPH TOTH MICHAEL TOTH P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 f: 215-257-3665

e: totl1bros7178@corncast.net

www.tothbrothers.com

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Bow Tree 2 & 3 Pond

Location- Vicinity 1679 Bow Tree Drive

Date of Inspection- 11/1/17

Water Quality- Ridley Creek; TSF IMF

PNDI Status: N/ A No Permit Required

Watershed Area: 30 acres

Coordinates- 39 59.137/ 75 32.27

SILT LEVELS:

Pond has a maximum depth now of 5.5 feet at outlet and a tninimum depth of 1.5 feet at inlet; average sediment load of 5, 733

cubic yards. This old farm pond was dug at 11 feet at the outlet; this is the reason for the large ainounts of sediment. However, the water depth is still favorable for a healthy pond. At this point we would not recommend dredging as on average there is 4 feet of water.

SUGGESTION: We see this pond to be in good shape for the next 5 years. The aeration system is working great at the Bow tree Farm Pond.

CLEARING & DH.EDGING, lNCa

JOSEPH TOTH 0 MICHAEL TOTH

P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 f: 215-257-3665

e: tothbros 7178@con1cast.net

www.tothbrothers.com

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Bow Tree 2 & 3 Basin

Location- Vicinity 1679 Bow Tree Drive

Date of Inspection- 11/1/17

Water Quality- Ridley Creek; TSP IMF

PNDI Status: NIA No Permit Required

Watershed Area: 30 acres

Coordinates- 39 59.137/ 75 32.27

SILT LEVELS:

Pond has a maximum depth of 2.5 surrounding concrete outflow structure and a minimum depth of 1 foot surrounding the inlet, with an average sediment load of 1060 cubic yards. Average water depth is 1.5 feet overall. Pond needs dredging. Estimated cost $20,000

SUGGESTION:

Minor brush clearing should be done at pond inlet; concrete retaining walls have failed in 2 sections; however it is stable with root growth. Estimated Clearing cost. .. $1,500

[Photograph: concrete-walled drainage channel with shallow water, a damaged grassy bank with overgrown brush on the left and a lawn at the upper right.]

Minor brush clearing
should be done to
facilitate future inspection
and storm flows.

Channel 2 of 3

[Photograph: Concrete drainage channel leading to brush and pond.]

Bow Tree Inlet to 3

,\ '\ ' 'I I

3 '1~ -~ ~-0-- .o 0

-~ ~ d ~ ~Y:+ \ Ee I I 'i; , ,~ f ~ i..+

\

1110\1 f.--..gd ·1s .-'Y- ~]

. ~i ~~ii~ ?~ of-- .... ~ ) 0 (:s1

~~~ft ~ ~ ~·- .

[Photograph: Concrete outflow structure in pond water with low-flow orifice.]

CLEA 'JYG & DREDGING, NC.

JOSEPH TOTH " M ICHAEL TOTH

P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 f: 215-257-3665

e: tothbros7178@comcast.net

wvvw. tothbrothern .com

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Marydell Pond

Location- Vicinity 509 Baker Drive

Date of Inspection- 11/1117

Water Quality East Branch Chester Creek

PNDI Status: NIA No Permit Required

Watershed Area: <24 acres

Coordinates- 39.98333 / 75.54861

DREDGING INFORMATION:

Currently, pond has a maximum depth of 5 feet at the dilapidated top section brick outflow structure and a minimum depth of 1. 5

feet. This pond is in need of dredging; current silt average is 3.5 feet overall totaling 5, 690 cubic yards.

ESTIMATED COSTS:

Dredge material could be blended in with existing contours at a

cost of $100,000.

Suggestion # 1- Repair brick outflow structure- Cost if done simultaneously with dredging would be $3,000. Should Township request this repair with pond full; estimated cost would be $5,000.

Note; Emergency spillway is in good condition; mowed lawn.

[Photograph: Failing pond outflow structure overgrown with sycamore tree.]

Outlet structure
10" Sycamore Tree
with roots to base
of structure.
Top 2' must be
replaced.

Failing Outflow structure at Marydell Pond 10" Sycamore Roots 8' long to floor

[Photograph: Close-up of deteriorating circular brick and concrete pond outflow structure in water.]

[Photograph: Interior of circular drainage culvert with wooden braces and hanging roots.]

Base in good shape 2' Top Sec falling apart

[Photograph: Upward view inside brick drainage shaft showing hanging tree root systems.]

Tree Roots to Floor

CLEARING & DHEDG NG ... ffNC ..

JOSEPH TOTH 0 MICHAEL TOTH P.O. Box 426 Sellersville, PA 18960

p: 215-368-7178 f: 215-257-3665

e: tothbros7178@comcast.net

W'vVW. tothbmthers. com

: . - WET.EXCAVATION • LAND CLEARING • DEMOLITION . ·~ ~\·-,;:...._~,,.• - ~·- ... ·~! ~ -~...,.-..:,.,.,- ;7F"•-' ' • _ •• --~- _. ·.r~_,._ ... ,.,-:._ r • - - - ~ _: - -.....,... ............. -· .. ,'1111

November 3, 2017

SITE INSPECTION REPORT OUTLINE

PROJECT NAME: Pin Oak Pond

Location- Vicinity 1524 Brian Drive

Date of Inspection- 11/1/17

Water Quality- East Branch Chester Creek; TSF/MF

PNDI Status: NI A No Permit Required

Watershed Area: 42.4 acres

Coordinates- 3958.746 / 75 32.569

DREDGING INFORMATION:

Pond has a maximum depth of 6.5 feet at aerator, approximately 2 feet at the inlet & an average sediment load of 3.5 feet; total sediment 860 cubic yards. It has been 20 years & the Township could wait another 5 years of so to dredge this pond.

Suggestion #I: The emergency spillway introduces water to the lawn area, this site should be abandoned and replaced with a mild geo-web/grass swale overtop existing outflow pipe-

Estimated cost - $5,000.00

Suggestion #2- Sixty feet of shoreline at the 30" white pines is under cutting; this could be easily corrected with stone rip-rap approximately 15 ton & fabric- Estimated cost $3,500.00

ESTIMATED COSTS:

Estimated Costs; Suggestions #1 & #2- $8,500.00

[Photograph: Emergency spillway rip-rap channel next to pond.]

Emergency Spillway
to be abandoned
and relocated
over top barrel
pipe (outlet)

Emg Spillway on Pin Oak pond

[Photograph: Grassy earthen drainage swale leading across lawn toward pond.]

Pin Oak Emg Spillway to abandon

Rough Cost Estimates

The following rough cost estimates have been compiled through the use of cost estimating software,

opinions of other experts and past experience. These estimates are intended to provide the Township

with a rough estimate of costs for improvements to each pond. It should be noted that additional study

or more detailed landscape or engineering design may be necessary in order to prepare detailed,

construction cost estimates. Also, permit applications and associated fees or costs have not been

included.

The following notes apply to the estimates as footnoted throughout the spreadsheets.

(1) Trees may be available at subsidized costs through grant programs including TreeVitalize

Watersheds and the Arbor Day Foundation.

(2) Labor costs may be reduced through the use of volunteers.

(3) Labor costs may be reduced through the use of Township staff.

(4) Consulting costs for aeration system installation may only be necessary for the first installation.

Township staff may be able to handle installation without a consultant on subsequent

installations. Therefore, this fee should only be accounted for once.

(5) Estimates for meadows include typical per acre costs for herbicide treatments, purchase of seed

and spreading of seeds. However, these costs can be eliminated if the Township chooses to

simply reduce the frequency of mowing in order to establish a tall grass meadow.

(6) These costs may be reduced ifthe item is implemented in concert with dredging, while the pond

is empty.

Hershey's Mill Estate - Rough Cost Estimate

A. Pond U~grades UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Dredging LS NA 1 $ 132,000.00 $ 132,000.00 $ $ $ 132,000.00

Forebay Construction EA NA 0 $ $ $ $ $

Structural Repairs LS NA 0 $ $ $ $ $ SUBTOTAL $ 132,000.00 $ $ 132,000.00

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 0 $ 3,071.00 $ $ $ $

Consulting Day NA 0 $ 1,000.00 $ $ $ $

Electricity Source LS NA 0 $ 10,000.00 $ $ $ $ SUBTOTAL $ $ $

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 35 $ 70.00 $ 2,450.00 $ 140.00 $ 4,900.00 $ 7,350.00

Tree Tubes (2) EA 60" ht 35 $ 2.50 $ 87.50 $ 5.00 $ 175.00 $ 262.50

Shrubs (2) EA 24-36" ht 35 $ 36.00 $ 1,260.00 $ 70.00 $ 2,450.00 $ 3,710.00 Deer Mesh Fence 7' ht x (shrubs) (2) LF 1 $ 125.00 $ 125.00 $ 200.00 $ 200.00 $ 325.00 lOOLF

Perennials EA SP2 0 $ 6.00 $ $ 2.00 $ $

Meadow AC NA 0 $ 2,000.00 $ $ $ $

Aquatic Plants EA 2" Plug 0 $ 1.00 $ $ 2.00 $ $

Plug Planting Fence LF NA 0 $ 1.50 $ $ 3.50 $ $ SUBTOTAL $ 3,922.50 $ 7,725.00 $ 11,647.50

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Rain Garden/Swale Bed

CY Prep 0 $ 13.00 $ $ $

Inlet Filter Bags EA Varies 5 $ 100.00 $ 500.00 $ $ $ 500.00

Install by Twp hour NA 10 $ 40.00 $ 400.00 $ $ $ 400.00

SUBTOTAL $ 900.00 $ $ 900.00

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches EA 4' 0 $ 500.00 $ $ 1,000.00 $ $

Gazebo EA 8'x 10' 0 $ 4,000.00 $ $ 8,000.00 $ $

Split Rail Fence LF 4' height 0 $6 $ $ 12.00 $ $

SUBTOTAL $ $ $

TOTAL: $ 144,547.50

Bow Tree 1 Pond - Rough Cost Estimate

A. Pond U(!grades UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Dredging LS NA 1 $ 130,000.00 $ 130,000.00 $ $ $ 130,000.00

Forebay Design EA NA 1 $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00

Forebay Construction LS NA 1 $ 15,000.00 $ 15,000.00 $ $ $ 15,000.00

Structural Repairs LS NA 0 $ $ $ $ $ SUBTOTAL $ 150,000.00 $ $ 150,000.00

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 2 $ 3,071.00 $ 6,142.00 $ $ $ 6,142.00

Consulting (4) Day NA 2 $ 1,000.00 $ 2,000.00 $ $ $ 2,000.00

Install by Twp hour NA 16 $ 40.00 $ 640.00 $ $ $ 640.00

Trenching (3) B.C.Y. NA 11 $ $ $ 6.00 $ 66.00 $ 66.00

Mobilization Backhoe LS NA 1 $ 1,000.00 $ 1,000.00 $ $ $ 1,000.00

Wire (Electricity) LF UF-B 200 $ 0.40 $ 80.00 $ $ $ 80.00

Conduit (Electricity) LF 3/4" D 200 $ 0.30 $ 60.00 $ $ $ 60.00

SUBTOTAL $ 9,922.00 $ 66.00 $ 9,988.00

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 150 $ 70.00 $ 10,500.00 $ 140.00 $ 21,000.00 $ 31,500.00

Tree Tubes (2) EA 60" ht 150 $ 2.50 $ 375.00 $ 5.00 $ 750.00 $ 1,125.00

Shrubs (2) EA 24-36" ht 150 $ 36.00 $ 5,400.00 $ 70.00 $ 10,500.00 $ 15,900.00 Deer Mesh Fence

(shrubs) (2) EA 7' ht x lOOLF 5 $ 125.00 $ 625.00 $ 200.00 $ 1,000.00 $ 1,625.00

Perennials (2) EA SP2 2000 $ 6.00 $ 12,000.00 $ 2.00 $ 4,000.00 $ 16,000.00

Meadow (5) AC NA 1 $ 2,000.00 $ 2,000.00 $ $ $ 2,000.00

Aquatic Plants EA 2" Plug 1000 $ 1.00 $ 1,000.00 $ 2.00 $ 2,000.00 $ 3,000.00

Plug Planting Fence LF NA 500 $ 1.50 $ 750.00 $ 3.50 $ 1,750.00 $ 2,500.00

SUBTOTAL $ 32,650.00 $ 41,000.00 $ 73,650.00

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Rain Garden/Swale Bed CY Avg .75'

Prep depth x 3'W 41 $ 13.00 $ $ 533.00 $ 533.00

Inlet Filter Bags EA Varies 0 $ 100.00 $ $ 200.00 $ $

SUBTOTAL $ $ 533.00 $ 533.00

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches (3) EA 4' 5 $ 500.00 $ 2,500.00 $ 1,000.00 $ 5,000.00 $ 7,500.00

Gazebo EA 8'x 10' 0 $ 4,000.00 $ $ 8,000.00 $ $

Split Rail Fence LF 4' height 0 $ 6.00 $ $ 12.00 $ $

SUBTOTAL $ 2,500.00 $ 5,000.00 $ 7,500.00

TOTAL: $ 241,671.00

Bow Tree 2 & 3 Pond - Rough Cost Estimate

A. Pond U~grades UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Dredging LS NA 0 $ $ $ $ $

Forebay Construction EA NA 0 $ $ $ $ $

Structural Repairs LS NA 0 $ $ $ $ $

SUBTOTAL $ $ $

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 0 $ 3,071.00 $ $ $ $

Consulting (4) Day NA 0 $ 1,000.00 $ $ $ $

Trenching (Electricity) B.C.Y. NA 0 $ $ $ 6.00 $ $

Mobilization Backhoe LS NA 0 $ 1,000.00 $ $ $ $

Wire (Electricity) LF UF-B 0 $ 0.40 $ $ $ $

Conduit (Electricity) LF 3/4" D 0 $ 0.30 $ $ $ $

SUBTOTAL $ $ $

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 15 $ 70.00 $ 1,050.00 $ 140.00 $ 2,100.00 $ 3,150.00

Tree Tubes (2) EA 60" ht 15 $ 2.50 $ 37.50 $ 5.00 $ 75.00 $ 112.50

Shrubs (2) EA 24-36" ht 15 $ 36.00 $ 540.00 $ 70.00 $ 1,050.00 $ 1,590.00 Deer Mesh Fence

(shrubs)(2) EA 7' ht x lOOLF 1 $ 125.00 $ 125.00 $ 200.00 $ 200.00 $ 325.00

Perennials EA SP2 0 $ 6.00 $ $ 2.00 $ $

Meadow AC NA 0 $ 2,000.00 $ $ $ $

Aquatic Plants EA 2" Plug 0 $ 1.00 $ $ 2.00 $ $

Plug Planting Fence LF NA 0 $ 1.50 $ $ 3.50 $ $

SUBTOTAL $ 1,752.50 $ 3,425.00 $ 5,177.50

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Rain Garden/Swale Bed

CY Avg .75' Prep depth x 3'W 0 $ 13.00 $ $ $

Inlet Filter Bags EA Varies 0 $ 100.00 $ $ 200.00 $ $

SUBTOTAL $ $ $

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches (3) EA 4' 2 $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 3,000.00

Gazebo EA 8'x 10' 0 $ 4,000.00 $ $ 8,000.00 $ $

Split Rail Fence (3) LF 4' height 216 $ 6.00 $ 1,296.00 $ 12.00 $ 2,592.00 $ 3,888.00

SUBTOTAL $ 2,296.00 $ 4,592.00 $ 6,888.00

TOTAL: $ 12,065.50

Bow Tree 2 & 3 Basin - Rough Cost Estimate

A. Pond U~grades UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Dredging LS NA 1 $ 20,000.00 $ 20,000.00 $ $ $ 20,000.00

Forebay Construction EA NA 0 $ $ $ $ $

Brush Clearing (3) LS NA 1 $ 1,500.00 $ 1,500.00 $ $ $ 1,500.00

SUBTOTAL $ 21,500.00 $ $ 21,500.00

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 1.56 $ 3,071.00 $ 4,790.76 $ $ $ 4,790.76

Consulting (4) Day NA 2 $ 1,000.00 $ 2,000.00 $ $ $ 2,000.00

Install by Twp hour NA 16 $ 40.00 $ 640.00 $ $ $ 640.00

Trenching (3) B.C.Y. NA 40 $ $ $ 6.00 $ 240.00 $ 240.00

Mobilization Backhoe LS NA 1 $ 1,000.00 $ 1,000.00 $ $ $ 1,000.00

Wire (Electricity) LF UF-B 480 $ 0.40 $ 192.00 $ $ $ 192.00

Conduit (Electricity) LF 3/4" D 480 $ 0.30 $ 144.00 $ $ $ 144.00

SUBTOTAL $ 8,766.76 $ 240.00 $ 9,006.76

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 50 $ 70.00 $ 3,500.00 $ 140.00 $ 7,000.00 $ 10,500.00

Tree Tubes (2) EA 60" ht 50 $ 2.50 $ 125.00 $ 5.00 $ 250.00 $ 375.00

Shrubs (2) EA 24-36" ht 50 $ 36.00 $ 1,800.00 $ 70.00 $ 3,500.00 $ 5,300.00 Deer Mesh Fence 7' ht x (shrubs)(2) EA 2 $ 125.00 $ 250.00 $ 200.00 $ 400.00 $ 650.00 lOOLF Perennials (2) EA SP2 1000 $ 6.00 $ 6,000.00 $ 2.00 $ 2,000.00 $ 8,000.00

Meadow (5) AC NA 1 $ 2,000.00 $ 2,000.00 $ $ $ 2,000.00

Aquatic Plants EA 2" Plug 0 $ 1.00 $ $ 2.00 $ $

Plug Planting Fence LF NA 0 $ 1.50 $ $ 3.50 $ $

SUBTOTAL $ 13,675.00 $ 13,150.00 $ 26,825.00

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Rain Garden/Swale Bed CY Avg .75'

Prep (6) depth, 3'W 28 $ 13.00 $ $ 364.00 $ 364.00

Inlet Filter Bags EA Varies 0 $ 100.00 $ $ 200.00 $ $

SUBTOTAL $ $ 364.00 $ 364.00

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches (3) EA 4' 2 $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 3,000.00

Gazebo EA 8'x 10' 0 $ 4,000.00 $ $ 8,000.00 $ $

Split Rail Fence (3) LF 4' height 72 $ 6.00 $ 432.00 $ 12.00 $ 864.00 $ 1,296.00

SUBTOTAL $ 1,432.00 $ 2,864.00 $ 4,296.00

TOTAL: $ 61,991.76

Marydel! Pond - Rough Cost Estimate

A. Pond Uggrades UNIT SIZE QTY. UNIT PRICE MAT'L COST LABOR LABOR COST TOTAL

Dredging LS NA 1 $ 100,000.00 $ 100,000.00 $ $ $ 100,000.00

Forebay Design EA NA 2 $ 5,000.00 $ 10,000.00 $ $ $ 10,000.00

Forebay Construction LS NA 1 $ 20,000.00 $ 20,000.00 $ $ $ 20,000.00

Structural Repairs (6) LS NA 1 $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00

SUBTOTAL $ 135,000.00 $ $ 135,000.00

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 2.66 $ 3,071.00 $ 8,168.86 $ $ $ 8,168.86

Consulting (4) Day NA 2 $ 1,000.00 $ 2,000.00 $ $ $ 2,000.00

Install by Twp hour NA 16 $ 40.00 $ 640.00 $ $ $ 640.00

Trenching (3) B.C.Y. NA 55 $ $ $ 6.00 $ 330.00 $ 330.00

Mobilization Backhoe LS NA 1 $ 1,000.00 $ 1,000.00 $ $ $ 1,000.00

Wire (Electricity) LF UF-B 660 $ 0.40 $ 264.00 $ $ $ 264.00

Conduit (Electricity) LF 3/4" D 660 $ 0.30 $ 198.00 $ $ $ 198.00

SUBTOTAL $ 12,270.86 $ 330.00 $ 12,600.86

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 150 $ 70.00 $ 10,500.00 $ 140.00 $ 21,000.00 $ 31,500.00

Tree Tubes (2) EA 60" ht 150 $ 2.50 $ 375.00 $ 5.00 $ 750.00 $ 1,125.00

Shrubs (2) EA 24-36" ht 110 $ 36.00 $ 3,960.00 $ 70.00 $ 7,700.00 $ 11,660.00 Deer Mesh Fence 7' htx (shrubs) (2) EA 4 $ 125.00 $ 500.00 $ 200.00 $ 800.00 $ 1,300.00 lOOLF Perennials EA SP2 0 $ 6.00 $ $ 2.00 $ $ Meadow AC NA 0 $ 2,000.00 $ $ $ $

Aquatic Plants EA 2" Plug 1100 $ 1.00 $ 1,100.00 $ 2.00 $ 2,200.00 $ 3,300.00

Plug Planting Fence LF NA 550 $ 1.50 $ 825.00 $ 3.50 $ 1,925.00 $ 2,750.00

SUBTOTAL $ 17,260.00 $ 34,375.00 $ 51,635.00

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL Rain Garden/Swale Bed Avg .75' Prep CY

depth, 3'W 0 $ 13.00 $ $ $

Inlet Filter Bags EA Varies 0 $ 100.00 $ $ 200.00 $ $

SUBTOTAL $ $ $

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches (3) EA 4' 5 $ 500.00 $ 2,500.00 $ 1,000.00 $ 5,000.00 $ 7,500.00

Gazebo EA 8'x 10' 0 $ 4,000.00 $ $ 8,000.00 $ $

Split Rail Fence LF 4' height 0 $ 6.00 $ $ 12.00 $ $

SUBTOTAL $ 2,500.00 $ 5,000.00 $ 7,500.00

TOTAL: $ 206,735.86

Pin Oak Pond - Rough Cost Estimate

A. Pond U1;1grades UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Dredging LS NA 0 $ $ $ $ $

Forebay Design EA NA 1 $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00

Forebay Construction EA NA 1 $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00

Structural Repairs LS NA 1 $ 8,500.00 $ 8,500.00 $ $ $ 8,500.00

SUBTOTAL $ 18,500.00 $ $ 18,500.00

B. Aeration UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

PentAir System EA NA 0 $ 3,071.00 $ $ $ $

Consulting Day NA 0 $ 1,000.00 $ $ $ $

Installation hour NA 0 $ 40.00 $ $ $ $

Trenching (Electricity) B.C.Y. NA 0 $ $ $ 6.00 $ $

Mobilization Backhoe LS NA 0 $ 1,000.00 $ $ $ $

Wire (Electricity) LF UF-B 0 $ 0.40 $ $ $ $

Conduit (Electricity) LF 3/4" D 0 $ 0.30 $ $ $ $ SUBTOTAL $ $ $

C. Plantings UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Trees (1)(2) EA 1" cal 15 $ 70.00 $ 1,050.00 $ 140.00 $ 2,100.00 $ 3,150.00

Tree Tubes (2) EA 60" ht 15 $ 2.50 $ 37.50 $ 5.00 $ 75.00 $ 112.50

Shrubs (2) EA 24-36" ht 15 $ 36.00 $ 540.00 $ 70.00 $ 1,050.00 $ 1,590.00 Deer Mesh Fence 7' htx (shrubs) EA 1 $ 125.00 $ 125.00 $ 200.00 $ 200.00 $ 325.00 lOOLF Perennials EA SP2 0 $ 6.00 $ $ 2.00 $ $

Meadow (5) AC NA 1.5 $ 2,000.00 $ 3,000.00 $ $ $ 3,000.00

Aquatic Plants EA 2" Plug 0 $ 1.00 $ $ 2.00 $ $

Plug Planting Fence LF NA 0 $ 1.50 $ $ 3.50 $ $ SUBTOTAL $ 4,752.50 $ 3,425.00 $ 8,177.50

D. BMPs UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Rain Garden/Swale Bed CY Avg .75'

Prep depth, 3'W 0 $ 13.00 $ $ $

Inlet Filter Bags EA Varies 8 $ 100.00 $ 800.00 $ $ $ 800.00

Install by Twp hour NA 16 $ 40.00 $ 640.00 $ $ $ 640.00

SUBTOTAL $ 1,440.00 $ $ 1,440.00

E. Other Features UNIT SIZE QTY. UNIT PRICE MAT'LCOST LABOR LABOR COST TOTAL

Benches EA 4' 3 $ 500.00 $ 1,500.00 $ 1,000.00 $ 3,000.00 $ 4,500.00

Gazebo EA 8'x 10' 1 $ 4,000.00 $ 4,000.00 $ 8,000.00 $ 8,000.00 $ 12,000.00

Split Rail Fence LF 4' height 0 $ 6.00 $ $ 12.00 $ $ SUBTOTAL $ 5,500.00 $ 11,000.00 $ 16,500.00

TOTAL: $ 44,617.50

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

76 Natural Lands

STUDY OF PONDS - EAST GOSHEN TOWNSHIP

appendix 2

supporting documents - provided in digital format

2A: PSU Materials - Water Quality

2B: Chester County Water Resource Authority maps

2C: East Goshen Township Stormwater Management Quad Maps

2D: DEP-Stormwater Inlet Bag Detail

2E: TreeVitalize Watershed Grant Information

2F: Forebay Detail

2G: Philadelphia Water Department Residential Rain Garden Information

2H: Rain Barrel Assembly Instructions

21: Downspout Planter Details

2J: Wetland Planting Guide

2K: Pentair Aeration Products

2L: Meadows in Southeastern Pennsylvania

2M: From Mowing to Meadows article in County Lines Magazine

2N: Aquatic Plant List

20: Buffer Plant List

Natural Lands 77

I

Natural Lands

Hildacy Preserve

1031 Palmers Mill Road

Media, PA 19063

610-353-5587

natlands.org

Memo

To: Board of Supervisors From: Jon Altshul Re: Consider RFP and process for branding plan Date: February 14, 2018

As you know, the Paoli Pike Corridor Master Plan identified developing a "branding plan" as a Tier I priority for the Township. A new Township branding design could be used for street signs along arterial roads (e.g. "Welcome to East Goshen"), proposed wayfinding signs, the website, letterhead, the newsletter and email signature lines; in short, any media with the Township's imprimatur. To that end, the Township budgeted money in the 2018 general fund budget for this purpose.

We would propose the following process for designing and ultimately selecting a new branding design:

1) The Township issues an RFP to qualified designers/design firms requesting the following information (late February):

• Examples of corporate, non-profit or municipal branding designs. • Biographies of designers assigned to the East Goshen project. • A narrative response to the question "What should people think of when they think of East Goshen Township?" • A proposed timeline for project completion. • A best and final cost proposal.

2) The BOS selects the winning firm based on recommendations and input from Township Staff and the Futurist Committee (April)

3) With input from Township staff and the Futurist Committee, the winning firm develops 3-5 branding designs for the Township (late Spring/early Summer).

4) Upon receipt of the 3-5 designs, Township staff coordinates a fun, month-long resident survey to select the most popular design. Addresses would be verified to ensure that only Township resident votes are counted.

5) At a Township-sponsored event in late summer/early fall (e.g. a Farmer's Market), the winning design is formally announced, based on the survey results, with great fanfare and excitement.

I have attached a Draft RFP for the branding plan for the Board's consideration. I will also be meeting concurrently with the Futurist Committee about this RFP and the proposed process on Tuesday evening.

East Goshen Township

Request for Proposals

Township Rebranding Plan

Background: East Goshen Township, Chester County, Pennsylvania (population 18, 026} is accepting

proposals from qualified designers to rebrand the Township. This rebranding effort would involve a

redesign across all Township-owned media, including, but not limited to, the Township

1s various road

signs at the Township line along arterial roads ("Welcome to East Goshen}/}, the website, the newsletter,

official letterhead, email signature lines and future wayfinding signs along the Paoli Pike Corridor.

The need to rebrand the Township was identified in the Paoli Pike Corridor Master Plan, adopted in

December 2017. A copy of the plan can be found on the Township's website (www.eastgoshen.org),

under Boards>Paoli Pike Corridor Master Plan Committee.

East Goshen takes great pride in being a premier place to live, work and play in Chester County. East

Goshen Township has a number of natural features and historic structures that the general public

associates with East Goshen, as listed below:

1} The SS-acre active Township Park, featuring a brand new "destination playground 11 (to be completed

in early spring 2018}, tennis and pickleball courts, a butterfly garden, an amphitheater, walking paths,

and four ball fields for organized sports. The Park hosts a Farmers Market every Thursday during warmer

months and various large-scale community events throughout the year, including Community Day

(fireworks, food and family-friendly activities and games in early summer), the Egg Hunt in early spring,

and the Pumpkin Fest in the fall.

2} A 100-acre passive park (Applebrook Park) directly across Paoli Pike from the Township Park.

3} The historic Goshenville district, which features the Blacksmith Shop built in the 1740s; the Plank

House, a historic home from the early 1800s; and two Quaker meeting houses from the mid-1800s. The

Blacksmith Shop and Plank House are owned by the Township and are open to the public at various

times throughout the year. The Blacksmith Shop is featured on the Township

1s current logo. In addition,

various other historic structures, recalling the Township

1s early history as a Quaker farming community,

dot the landscape.

4) The Paoli Pike Corridor, which is expected to be transformed over the next decade, with construction

of a 2.7 mile pedestrian/bike path (engineering is on-going and construction is expected to begin

sometime next year); zoning changes that will hopefully transform the area between North Chester

Road and Boot Road into a traditional Town Center; and wayfinding signs and traffic calming features

that will encourage residents to stop in East Goshen rather than simply passing through on their way to

West Chester or Paoli. More information about the Paoli Pike Trail can be found on the website under

Boards>Trail Committee.

Detail about the selection process and next steps:

After the deadline for this RFP, the Township's Board of Supervisors will select a winning designer, with

input from Township Staff and the Township's Futurist Committee. The winning designer will then be

asked to submit between three and five design proposals for the Township. Township Staff and

members of the Futurist Committee will be available to assist the winning firm in person or by phone as

needed during this process.

Upon receipt of the three to five design proposals, Township Staff will conduct an on-line survey of

Township residents to gauge which design proposal is most popular among Township residents, in order

to get buy-in from the community about how they'd like to see their Township branded. We expect that

resident voting will remain open for approximately one month, with results announced in late summer

at a Township-sponsored event, such as a weekly Farmer's Market.

Regardless of which design is ultimately selected, all the proposed designs from the winning designer

shall become the property of East Goshen Township, and, at its sole discretion, the Township reserves

the right to use any submitted design in the future.

The winning design firm shall also make itself available, as needed, to assist third parties, such as sign

companies, website designers, printers, etc in implementing the design throughout all Township-owned

media.

Required Information:

To be considered, your proposal must address the following required items:

1) At least 5 (and preferably more) examples of corporate, non-profit and/or municipal branding

designs that you or your firm has developed.

2) Brief biographies of all designers who would be assigned to this project and either a full or partial

list of corporate, non-profit or municipal branding designs that each has worked on.

3) A narrative response to the question: "What should people think when they think of East Goshen

Township?"

4) A proposed time line for completion of the project.

5) A best and final cost proposal.

Brevity of responses is encouraged.

Additional information: Please contact Jon Altshul at jaltshul@eastgoshen.org or 610-692-7171 for

additional information.

Deadline: An electronic copy of the proposal can be emailed to Jon Altshul at jaltshul@eastgoshen.org.

and must be received by not later than Friday, April 13, 2018 at Spm.

Additional disclosures: If a contract is entered into as a result of this RFP, the contents of the selected

vendor's proposal will become contractual obligations of the firm. Negotiations may be undertaken with

one or more vendors whose proposals as to price and other factors show them to be qualified,

responsible, and capable of performing the work. This request for proposals does not, under any

circumstances, commit the Township to any cost incurred by any vendor prior to the execution of the

agreement. Each prospective vendor is solely responsible for all costs associated with the preparation of

a response to this RFP. The Township reserves the right to reject any and all proposals received as a

result of this request and to negotiate separately with competing vendors.

F:\Data\Shared Data\Paoli Pike Corridor Master Plan\RFP for Rebranding.docx

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 2/13/2018 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer Re: Operation and Maintenance Agreements

Dear Board Members:

I have the following Storm water management and Grinder Pump Operation and Maintenance Agreements for the Board's approval.

SWM Operation Agreement:

1420 E. Strasburg Rd. (Lots 2 and 3)

Grinder Pump Agreement:

1420 E. Strasburg Rd. (Lots 2 and 3)

Draft Motion: I move that we authorize the Chairman to execute the storm water management and grinder pump operation and maintenance agreements for 1420 E. Strasburg Rd. (Lots 2 and 3).

F:\Data\Shared Data\Code Dept\Storm Water Managmeent O&M Agreements\2018\Memo to BOS 01112018.doc

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 2/13/2018 To: Board of Supervisors From: Mark Gordon, Township Zoning Officer ~ Re: Apartment for the Care of a relative (In-Law Suite Agreement)

Dear Board Members:

The owners of 1040 King Rd. have decided to convert the addition they are currently building on their property into an Apartment for the care of a relative. The Owners Mr. and Mrs. Roberts are converting the living space into an In-Law Suite for Mrs. Roberts' parents who are elderly and need care.

Draft Motion: I move that we authorize the Chairman to execute the Apartment for the care of a relative agreement (Section 240-32.C Agreement) for 1040 King Rd.

F:\Data\Shared Data\Property Management\53-2\53-2-111040 King Road\Memo to BOS re. In Law Suite 02132018.doc

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 2/13/2018 To: Board of Supervisors i / From: Mark Gordon, Township Zoning Officer AvltJ.."() Re: New Residential Development Regulations

Dear Board Members,

The Township Planning Commission and Staff is seeking the Board of Supervisors' consideration and input on the development of a Zoning Ordinance (ZO) amendment that would apply to the larger undeveloped or under developed residential properties in the Township.

The current Single Family Openspace Development (SFOD) regulation (§240-36) provides an openspace preservation development option for properties zoned R-2 and R-4, for clustering of single family homes however it does not consider semi-detached (Carriage Homes or Twins) or a multi-family (townhouses) options. The SFOD requires a tract size of at least 8 acres, 55% of which must be set aside for openspace.

The primary motivation of this endeavor is to consider additional residential development options for the larger parcels in the Township which have significant natural and cultural resources. A Carriage Home or Townhouse Openspace development could facilitate the preservation of Historic Resources and the natural areas that exist on larger residential properties within the Township.

There are 26 properties greater than 8 acres in East Goshen. Subtracting those within the BP and I districts and those which are deed restricted from further development leaves us with 16 properties with a lot size greater than 8 acres.

There could be other opportunities if lots were combined but this is a starting point. The lot sizes range from 8.0 acres to 87.28 acres. I used 8 acres as a starting point because that's the lot size requirement for SFOD's today.

F:\Data\Shared Data\Code Dept\New Openspace Development Regulation 2018\Memo to BOS 02132018 re. New Openspace Development Regs.doc

The Comp Plan, Openspace Plan and the Paoli Pike Corridor Master Plan support the concept of having a diverse range of housing options that preserve openspace and historic resources as well as promote pedestrian and bicycle connections.

The following sections of the Township Comprehensive Plan and the Paoli Pike Corridor

Master support this concept.

The Township Comprehensive Plan: Objective 6.7 -Continue to provide for a variety of housing options within the Township to accommodate a diverse population.

Recommendation 6.7.1- Evaluate the Zoning Ordinance in Light of housing choices for changing demographics and income diversity.

Objective 6.8 - Preserve the Character of existing residential housing neighborhoods.

Recommendation 6.8.1-Consider adopting provisions in the Zoning and Subdivision & Land Development Ordinance that encourage innovative design for new residential development while respecting the character of surrounding neighborhoods.

Paoli Pike Corridor Master Plan: The Land Use Overview of the Paoli Pike Corridor Master Plan identifies a demand for additional housing units in the Township. Based on the population projections and the build out analysis, more diverse housing options are needed.

Staff Recommendation: Staff is of the opinion that there is support in both the PPCMP and the Comp Plan to warrant moving forward with a planning effort to develop a draft amendment to the existing SFOD ordinance or a to develop a new residential openspace development that will meet these identified goals and objectives. Staff and the Planning Commission believe that the services of a planning consultant are necessary to properly develop this draft ordinance. Thomas Comitta Associates is intimately familiar with the planning efforts undertaken by the Township over the last few years and would be a good fit to assist the township in this effort.

Planning Commission Recommendation: The Planning Commission has forwarded their recommendation to the Board; see attached.

Recommended Draft Motion: Mr. Chairman, I move that we authorize the Staff to solicit a proposal from Thomas Comitta Associates Inc., to work with the Planning Commission on the development of an openspace development option that includes either semidetached dwellings and/or townhouse dwellings into the Zoning Ordinance.

F:\Data\Shared Data\Code Dept\New Openspace Development Regulation 2018\Memo to BOS 02132018 re. New Openspace Development Regs.doc

610-692-7171

www.eastgoshen .org BOARD OF SUPERVISORS

EAST G O SHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380- 6199

February 13, 2018

East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380

Re: New Openspace Development Ordinance

Dear Board Members:

At their meeting on February 7, 2018 the Planning Commission voted unanimously in favor of the following motion:

Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors authorize the Staff and the Planning Commission to begin the process of drafting a zoning ordinance to permit semidetached dwellings and/or townhouse dwellings as an option for a residential openspace development option.

Sinc?JL

Mark A. Gordon Township Zoning Officer

F:\Data\Shared Data\Code Dept\New Openspace Development Regulation 2018\PC Rec to BOS 02132018.doc

Memo East Goshen Township

Date: To: From: Re:

February 15 2018 Board of Supervisors Rick Smith, Township Manager Review of 2015 Comp Plan Implementation Matrix

One of the goals the Board set for itself for 2018 is to review the Implementation Matrix in the 2015 update to the Comp Plan.

Attached is a copy of the matrix with comments on what has transpired with respect to some of the action items.

The matrix listed 8 action items that had a high priority (1 ).

It would seem that the Board should review these 8 actions items and decide if all of them still warrant their current high priority ranking, and if the completion time frame, responsibility, etc. are still appropriate.

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\Memo to BoS 021518.doc

COMP PLAN UPDATE- Last revised February 15, 2018 1

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

5. Housing Plan

Encouraging the 5.1 . maintenance and * on-going PS Development, PS improvement of the Plan Review existing housing stock Continuing to provide * 5.2. opportunities for a variety on-going BOS PC zo PS of housing types. Encouraging infill opportunities by providing 5.3. for additional dwelling * on-going PC BOS, FC ZO, SLDO, PS units, without adversely Plan Review impacting the character of existing neighborhoods. Redeveloping selected Presented LERTA to WCASD in 2016 properties along West Development, 2017 -WCASD is not interested in LERTA 5.4. Chester Pike in order to 3 2 to 10 years PS PS provide for new housing Plan Review

opportunities. Encouraging mixed uses * 5.5. and mixed housing types on-going BOS PC zo PS where appropriate. Encouraging the Presented LERTA to WCASD in 2016 Redevelopment of vacant Development, 2017 - WCASD is not interested in LERTA 5.6. and/or underperforming 3 5 to 10 years PC PS Plan Review PS lots to create new housing opportunities. 5.7. Fostering opportunities for 2 2 to 10 years BOS PC zo PS, CCC aqinq in place.

6. Land Use Plan

Transforming the Town fia'i1 Review, Obtained grant or Paoli Pike Master Corridor Plan in 2016 6.1. Center into a viable, -----=11 1 to 10 years PS BOS, PC PS, PT Adopted Paoli Pike Master Corridor Plan 12119/17 walkable, visitable Place. Development

Transforming the Paoli Obtained grants for Paoli Pike Trail Segments C to Gin 2016 6.2. Pike Corridor into a

i:!J 1to10 years BOS PC, PT, Special Study PT, DVRPC Dbtained grants for all Segments except B. walkable, connected, CCC artery. Transforming the West 6.3. Chester Pike Corridor into 2 2 to 20 years PS BOS, Special Study PT, PS, DVRPC a more functional and PC,PT attractive arterv. Continuing to receive 6.4. guidance from the * on-going BOS PC, Meetings, Workshops GF Authorities, Boards and ABC's Commissions (ABC's).

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE- Last revised February 15, 2018 2

Continuing effective 6.5. governance by the East * on-going Goshen Township Board BOS Meetings, Hearings GF

of Supervisors. Continuing to accommodate a diverse 6.6. mix of residential, * on-going commercial, institutional, BOS PC, FC ZO, Plan Review PS

light industrial, and recreational uses.

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

7. Economic Development Strategy

Promoting the !Adopted Paoli Pike Master Plan 12119/17 7.1 . enhancement of * on-going BOS PC, CC, ZO, SLDO, PS, GF business opportunities in FC Plan Review the Town Center. Promoting the Presented LERTA to WCASD in 2016 enhancement of * PC, CC, ZO, SLDO, 2017 WCASD is not interested in LERTA 7.2. business opportunities on-going BOS FC Plan Review PS,GF along the West Chester Pike Corridor. Allowing for new uses and smaller incubator PC, CC, ZO, Plan Revie,m 7.3. businesses in thLc [1 1to10 years sos PS corporate parks and the FC Develop~

industrial park. Continuing the use of East Goshen Park for 7.4. the Farmers Market and * on-going BOS PR Programs, GF other context-sensitive Development enterprises and activities. Utilizing the Commerce Commerce Commission was disbanded on 1/4/2016 Commission with the business community, in *

Workshops, 7.5. order to identify and on-going cc BOS Newsletter, PS address needs Website pertaining to business growth and expansion. Providing opportunities for shared parking 7.6. opportunities for smaller 2 2 years BOC PC ZO,SLDO PS commercial establishments.

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE - Last revised February 15, 2018 3

Continuing No-Impact Home-Based * 7.7. Businesses, Home on-going BOS PC, PS ZO, SLDO PS Occupations, and Home- Related Businesses.

8. Transportation & Circulation Systems Plan

Continuing toprovide Re decked Bridge on East Boot Road in 2016 8.1. safe, well-maintained * on-going BOS PT Maintenance GF, PT roads throughout the Township. Identifying and Adaptive Signal Project to West Chester Pike was let in implementing regional February 2018 8.2. highway improvement 1 1 to 10 years BOS PT, Special Study PT, DVRPC projects that enhance DVRPC mobility, safety, and reduce congestion. Minimizing speeding January 2018 - Installed temporary speed humps in Wyllpen vehicular traffic on the Farms during Dutton Mill Road Bridge closure 8.3. local roadways and * on-going BOS PT Maintenance, PT,PS minimizing cut-through Development vehicular traffic within neighborhoods. Implementing vehicular traffic flow and traffic Plan Review, 8.4. calming improvements 2 2 to 10 years BOS PT PT, GF for select roads and Maintenance

intersections. Reducing vehicular traffic by supporting 8.5. public transportation * on-going BOS DVRPC Special Study DVRPC,PT opportunities and travel demand management techniques.

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE- Last revised February 15, 2018 4

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources

8. Transportation & Circulation Systems Plan (continued)

Increasing pedestrian Obtained grants for Paoli Pike Trail Segments C to Gin 2016 circulation along Paoli Obtained grants for all Segments except B Pike, especially in the form of a "Paoli Pike

Promenade" with Sidewalks and Special Study, GF, CCC, 8.6. Crosswalks, as well as ill 1to10years BOS PC, PR DVRPC, increasing pedestrian ZO, SLDO DCNR circulation and pedestrian safety along Greenway, with Trails, Walkways, and Crosswalks. Implementing the East * 8.7. Goshen Township Act on-going BOS PC Plan Review PS 209 Transportation Plan

9. Community Facilities and Services Plan

Maintaining and 9.1. expanding the Open 2 2 to 20 years BOS PC, PR, Special Study GF, CCC, Space, Recreation, and CB DCNR Trails Network. Developing the Paoli Pbtained grants for Paoli Pike Trail Segments C to Gin 2016 Pike Trail to create the Pbtained grants for all Segments except B linkage between West PC, PR, GF, PT, CCC, 9.2. Chester and Malvern, 1 1to10 years BOS PT, CCC Special Study DCNR through East Goshen, from West Goshen to Willistown. Maintaining and * Maintenance, Pbtained grants for Playground Renovations in 2016 9.3. upgrading East Goshen on-going BOS PR GF, ~tarted construction in Fall of 2017 Park. Rec Fee in Lieu DCNR Continuing to provide * 9.4. high quality Recreation on-going BOS PR Programs GF, Services. DCNR Continuing to provide *

1/2118 - Updated Emergency Services resolution to address 9.5. high quality Police, Fire on-going BOS Maintenance GF, k:hange in Advance Life Support provider. and EMS services. DCED Continuing the provisions of effective * 9.6. administrative, public on-going BOS MA Maintenance GF works, and related services. Continuing to support * 9.7. important and viable on-going BOS PR Maintenance GF Communitv Facilities.

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE- Last revised February 15, 2018 5

10. Utilities Plan

Continuing to provide Update West Goshen Sewer Agreement effective sewage 10.1. disposal and wastewater * on-going BOS MA Development PS treatment with oversight of the Municipal Authority. Continuing to provide Rebid refuse and recycling contract in 2016 10.2. effective solid waste * on-going BOS MA Maintenance GF disposal, and recycling services. Maintaining the role of the East Goshen 10.3. Township Municipal * on-going BOS MA Special Study, PS Authority for evaluating Plan Review sewered and unsewered areas.

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources(2)

10. Utilities Plan (continued)

10.4. Cooperating with Aqua * on-going PS Development PS on Public Water Supply

Maintaining effective * 10.5. Stormwater on-going BOS DEP Plan Review PS Management Regulating pipelines to * 10.6. protect land uses and on-going BOS DEP Plan Review CCC, PS the environment.

11. Natural Resource Protection Plan

Protecting the Riparian PC, Milltown Dam and Hershey Mill Dam Park Projects are in 11.1. Areas along Ridley and * on-going BOS DEP, CB, DCNR, DEP PS,DCNR,DEP progress Chester Creeks and their tributaries. DCNR

Considering opportunities for a * PC, PR, Special Study, 11.2. Greenway Network on-going BOS DCNR,GF along Chester and DCNR Plan Review

Ridley Creeks.

11.3. Preserving and * on-going BOS PC.CB Plan Review PS enhancing Street Trees.

Continuing the advocacy * Website, 11.4. role of the Conservancy on-going CB BOS GF Board. Plan Review

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE - Last revised February 15, 2018 6

Continuing riparian CB planted trees on East Boot Road in 2016

11 .5. buffer plantings 1 1 to 20 years CB OCNR Planting GF, DCNR CB planted trees in Marydel! in 2017 throughout the Township.

11.6. Continuing to control * on-going CB DCNR DEP, PS invasive species. Plan Review

11 .7. Improving woodland

2 2 to 5 years BOS PC,CB ZO, SLDO GF, CCC protection standards.

Reviewing and updating ZO, SLDO, 11 .8. tree replacement 2 2 to 5 years BOS PC, CB GF, CCC standards as needed. Plan Review

Reviewing and updating ZO, SLDO, 11 .9. criteria for non-buildable 2 2 to 5 years BOS PC, CB GF, CCC areas. Plan Review

Improving and * ZO, SLDO, 11 .10. enhancing Green on-going BOS PC,PS GF, DCNR Infrastructure Plan Review

12. Energy Conservation Strategy

Creating more compact, 12.1. mixed-use, walkable * on-going PS BOS, Plan Review, PS, DCED places. PC, FC Development

Advocating energy

12.2. conservation for * on-going BOS PC, CB, Website, GF, DEP residents, businesses, FC Newsletter and institutions. Advocating green 12.3. building and site * on-going BOS PC, CB, ZO, SLDO, GF, DEP, development practices. FC Special Study DVRPC

Promoting and 12.4. enhancing the protection * on-going BOS PC, CB, ZO, SLDO, PS, DCNR of Woodlands. DCNR Plan Review

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources

12. Energy Conservation Strategy (continued)

Designating areas for 12.5. compact car parking, in 2 2 to 5 years BOS PC ZO, SLDO, PS order to reduce the size Plan Review of off-street parking lots. Encouraging park and PT, 12.6. ride facilities, shared * on-going BOS CCC, BOS, DVRPC, PT, DVRPC, parking, and increased CCC, PT BOS public transoortation. DVRPC

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

COMP PLAN UPDATE- Last revised February 15, 2018 7

Providing conservation 12.7. tips on the Township * on-going BOS CB Website GF website.

13. Historic Resources Protection Plan

Continuing the East Goshen Historical Commission (EGHC) programs at the * HC Programs, 13.1. Blacksmith Shop and on-going HC BOS Special Study GF Plank House, and refinement of the Township Historic Property Inventory. Continuing to have the EGHC comment on applications for * 13.2. subdivision and land on-going HC PC SLDO PS development involving and adjacent to Historic properties. Continuing to have the EGHC provide * Website, 13.3. educational information on-going HC Newsletter GF for the Township website and Newsletter. Utilizing the characteristics of 13.4. Goshenville and Rocky 3 5 years HC PC, BOS ZO,SLDO CCC, Hill to guide the GF character of nearby development. Reviewing Historic 13.5. Preservation 1 1 to 5 years HO PC ZO, SLDO CCC, requirements. GF

Considering simplified 13.6. Historic Preservation 2 2 to 5 years HC PC ZO,SLDO CCC, Standards. GF

F:\Data\Shared Data\Admin Dept\Comp Plan\2015 Update\Annual Updates\2018\020718.docx

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 2/13/2018 To: Planning Commission ~ / t From: Mark Gordon, Township Zoning Officer ~ Re: Paoli Pike Corridor Zoning Overlay

Dear Board Members,

As you know the Paoli Pike Corridor Master Plan identified a number of tasks to be accomplished in order to Enhance Goshenville and create a town center feel. The Planning Commission has discussed the land use issues identified in the plan and would like to begin the planning effort to create a Zoning Overlay for the Paoli Pike Corridor as identified in the plan. This will effectively convert the vision of the PPCMP into a text amendment to the Zoning Ordinance.

This endeavor is highlighted in the following Township Planning Initiatives:

The Township Comprehensive Plan: Objective 7.1- Promote the enhancement of Business opportunities in the Town Center.

Recommendation 7.1.1-Consider infill development and redevelopment options

Paoli Pike Corridor Master Plan: The Land Use Overview of the Paoli Pike Corridor Master Plan identifies initiatives

needed to enhance the Paoli Pike Corridor and Goshenville (Town Center), they are: - Zoning Ordinance Text Amendment - Zoning Map Amendment - SALDO Amendments Ref. 5-12 of the PPCMP

F:\Data\Shared Data\Code Dept\PP Corridor Overlay\Memo to BOS 02132018 re. Paoli Pike Corridor Overlay.doc

Staff Recommendation: Staff is of the opinion that there is support in both the PPCMP and the Comp Plan to warrant moving forward with a planning effort to develop a Zoning Overlay for the Paoli Pike corridor. We envision the project to include the following: - Zoning Ordinance Text Amendment - Zoning Map Amendment - SALDO Amendments

Recommended Draft Motion: Mr. Chairman, I move that we authorize township Staff to solicit a proposal from Thomas Comitta Associates Inc. to work with the Planning Commission on the development of the Paoli Pike Corridor Master Plan policy recommendation to create a Goshenville Overlay District.

F:\Data\Shared Data\Code Dept\PP Corridor Overlay\Memo to BOS 02132018 re. Paoli Pike Corridor Overlay.doc

1 EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, FEBRUARY 6, 2018 5 DRAFT MINUTES 6 7 Present: Chairman Marty Shane; Vice Chairman Carmen Battavio; Supervisors 8 David Shuey, Janet Emanuel and Mike Lynch; Township Manager Rick Smith; Jon 9 Altshul, Finance Director; Park & Recreation Director Jason Lang and Conservancy 10 Board Chairman Erich Meyer. 11 12 Call to Order & Pledge of Allegiance 13 Marty called the meeting to order at 7:00 p.m. and led the pledge of allegiance. 14 15 Moment of Silence 16 Carmen called for a moment of silence to honor our troops and the victims of recent 17 school shootings. 18 19 Recording 20 None. 21 22 Chairman's Report 23 Marty made the following announcements: 24 • The Board met in Executive Session prior to tonight's meeting to discuss a 25 legal matter and on January 30, 2018, to discuss a personnel matter. 26 • Enbridge will be doing routine maintenance work on the Texas Eastern 27 Pipeline Right-of-Way 28 • The public comment period for the Adelphia Gateway Project closes on 29 February 13, 2018, at 5pm. 30 31 Marty also acknowledged Ginnie Newlin's resignation as the Township's Poet 32 Laureate and presented Ms. Newlin with a Certificate of Appreciation for her many 33 contributions to the Township over the years. 34 35 Fire Marshall Report 36 Carmen reported on a garage fire in the Lochwood-Chase development and praised 37 a fast thinking mother, several neighbors and the Goshen, East Whiteland and 38 Malvern fire companies for successfully containing it. 39 40 Consider Special Exception and Variance Request for the Malvern Institute 41 Marty stated that because he was not at the first meeting on this matter, he deferred 42 to Carmen to chair this portion of the meeting. Carmen asked for additional public 43 comments on topics that were not discussed at the January z3rd meeting and stated 44 that the public comment period would end after 30 minutes. Kristin provided the 45 Board with an overview of what their options for tonight's meeting were.

2/6/18 February 6, 2018 1

1 Specifically, she noted that if the Board moved to oppose the Malvern Institute's 2 application, it would forfeit the right to recommend that the Zoning Hearing Board 3 impose any conditions on the applicant, in the event that the Zoning Hearing Board 4 approves the application. 5 6 Debbie Marovick, 8 Brookmont Drive, stated that she has documentation on 74 7 incidents that have occurred at the Malvern Institute since 2015. These incidents 8 include disorderly conduct, alcohol use, car vandalism, drug paraphernalia and 9 transfer of possible contraband from cars entering the parking lot to patients. She 10 has spoken with both the police and Malvern Institute management about these 11 issues. Malvern Institute management repeatedly tells her that they're trying to 12 address these issues, but that that no improvements are ever made. 13 14 Paige Fenimore, 3 Treemont Drive, raised concerns that the application violates the 15 Township's parking ordinance. Ms. Camp noted that the Township's parking 16 ordinance would not apply to a non-conforming use. 17 18 Terri Relick, 12 Treemont Drive, stated that she is disappointed by the Township 19 and that, in her opinion, the application violates the allowable square footage 20 requirement in the zoning ordinance. She added that she disagrees with the 21 common law doctrine of natural expansion; that she doesn't like the conditions that 22 the Planning Commission recommended; and that she doubts that those conditions 23 can be enforced. 24 25 Scott Relick, 12 Treemont Drive, stated that he believes the Township has 26 previously allowed the Malvern Institute to over-expand in violation of its zoning 27 ordinance. He added that by over-building, the Institute has been able to add new 28 beds, which has caused overcrowding and, in turn, has necessitated more expansion. 29 Ms. Camp noted that the Township doesn't regulate the number of beds in a 30 treatment center and that the number of beds is regulated at the state level. 31 32 Ms. Fenimore stated that in addition to the footprint expansion, the Institute now 33 uses both its basement and its attic for its operations. She stated that the Township 34 does not know if permits were ever pulled to finish basement or attic space. 35 36 Joanne Murphy, 20 Brookmont Drive, asked how this expansion would benefit the 37 Township. Ms. Camp explained the doctrine of natural expansion, as well as the 38 constitutional principles of property law that the Board needs to wrestle with in 39 making its decision. 40 41 Marty suggested that concerned residents should invite experts to testify on their 42 behalf at the Zoning Hearing Board hearing about why the application should be 43 denied. 44 45 Deb Lyon, 5 Brookmont Drive, raised concerns that the proposed 8-foot fence would 46 be an eyesore that may not help to contain noise.

2/6/18 February 6, 2018 2

1 2 Lisa O'Neil, 10 Brookmont Drive, voiced her objection to the proposed smoking 3 pavilion. 4 5 Tom McElwee, 6 Line Road (Willistown Twp), also raised concerns about the impact 6 of the proposed 8-foot wall on property values. 7 8 Mark Thompson, the attorney representing the Relicks and the O'Neils, stated that 9 he disagreed with Ms. Camp over the beds and parking issues. 10 11 Brian Nagle, MacElree Harvey representing the applicant, stated that it was his 12 understanding based on previous meetings with neighbors that conditions at the 13 Malvern Institute had improved over the past several years. Marty asked Mr. Nagle 14 how long the present owners have owned the property. Mr. Nagle was not certain 15 when the transaction occurred. 16 17 Mike asked Mr. Nagle if his client would be comfortable postponing the Zoning 18 Hearing Board hearing 2-4 weeks so that the Board of Supervisors had more time to 19 deliberate. 20 21 Ms. Relick raised more concerns about the proposed fence; specifically that it will 22 hurt property values and won't prevent drugs from passing through or over it. 23 24 Janet suggested that the specific details of the fence be hammered out during the 25 land development stage. Carmen expressed concern about potentially removing the 26 fence as a condition, because if the Zoning Hearing Board approves the application 2 7 without the fence condition, adding a fence can't become a new demand at a later 28 time if the neighborhood changes its mind. 29 30 Janet observed that ultimately the final decision on the application will be made by 31 the Zoning Hearing Board. She made the following motion: 32 33 Mr. Chairman, I move that the Board of Supervisors take "no position" on the special exception 34 and variances requested by the Malvern Institute or the legal argument advanced by the 35 Applicant with respect to the right to expand the legal non-conforming treatment center use 36 based on the doctrine of natural expansion. Should the ZHB determine that the Applicant has 37 met its legal burden and is entitled to expand the non-conforming use either by the grant of 38 variances, special exception or based on the doctrine of natural expansion of a nonconforming 39 use, the Board of Supervisors recommends that the ZHB impose the following conditions on the 40 Applicant in order to mitigate the impacts that the expansion of the non-conforming use will 41 have on the surrounding community. The Board of Supervisors authorizes the Township 42 Solicitor and the Township Engineer to enter an appearance on behalf of the Board of 43 Supervisors at the zoning hearing and advocate that the following conditions be imposed in any 44 decision approving the expansion of the treatment center. 45

2/6/18 February 6, 2018 3

1 1. The Applicant shall restrict the drug and alcohol treatment programming at the King 2 Road facility (the "Facility") to in-patient treatment only. 3 4 2. The Applicant shall limit the number of patients receiving treatment at the Facility to a 5 maximum of 80 patients on-site at any one time. The Applicant shall forward a letter to 6 the Commonwealth of PA Department of Drug and Alcohol Programing or successor 7 licensing agency agreeing to permanently cap the licensing of the facility to 80 in- 8 patients in perpetuity. 9 10 3. The Applicant shall add cameras at the front entrance and at various locations along the 11 main driveway entrance to supplement its existing video security system. The video 12 cameras shall be set up and monitored to alert staff and security personnel of incoming 13 and outgoing pedestrians at the front driveway entrance. The eastern parking lot gate 14 shall be locked by 11 p.m. to ensure that any vehicle entering the site must approach 15 the main building. The Applicant shall have no less than one security guard on site 16 during the nighttime shift when the clinical staff is reduced in number. In addition, the 17 Applicant shall implement and maintain the use of security cameras which are 18 continually monitored by properly trained staff including a certified clinical supervisor 19 during the overnight shift. 20 21 4. The Applicant may build only a one story addition as identified in the site plan dated 22 02/24/2017, last revised 12/11/2017 (the "Plan") to facilitate the expansion of the use. 23 The new addition shall be set back a minimum of 45 feet from any property line. 24 25 5. The Applicant shall submit a land development application that includes the proposed 26 improvements to the Property which are approved in the Zoning Hearing Board Decision 27 and which are consistent with the testimony and exhibits presented at the zoning 28 hearing and with the conditions of approval within 180 days of final unappealable, and 29 unappealed zoning approval. 30 31 6. King Road is assumed to run in and east-west direction for the purpose of this condition. 32 The Applicant shall install and maintain an 8 foot high fence, approved by the Board of 33 Supervisors, along the entire western and southern boundaries of the Property except 34 for any areas within the floodplain. 35 36 7. The Applicant shall submit and implement a landscape plan in accordance with §240- 3 7 27 .C.(2) of the East Goshen Code for the western and southern portions of the property 38 except for any areas within the floodplain. 39 40 The Applicant shall plant and maintain the aforesaid buffer yard landscaping in 41 accordance with §240-27.C.(3), as long as the Property is used as a treatment center, 42 subject to accommodation of the fence and wood chip walking path within said buffer 43 yard landscaping. Provided however that the high-level screen shall consist of a 44 combination of evergreen and deciduous trees planted with specimens no less than ten 45 feet in height. These plantings are intended to mitigate the view of the 8 foot fence 46 from the neighboring properties. As part of the land development plan approval 4 7 process, the Applicant shall meet with the Conservancy Board to present its proposed 48 landscape plan. The Conservancy Board shall provide recommendations to the Board as

2/6/18 February 6, 2018 4

1 to whether the Applicant's landscape plan complies provides a completely planted 2 visual barrier or landscape screen to mitigate the view of the fence. 3 4 9. King Road is assumed to run in and east-west direction for the purpose of this condition. 5 The Applicant shall install 6 foot high estate fencing and deer resistant landscaping to 6 buffer the fencing along the eastern property boundary in accordance with the 7 Willistown Township ordinances. The Applicant shall install deer resistant understory 8 landscape buffer plantings in the wooded area on the eastern side of the Property prior 9 to the installation of any proposed walking paths and/or meditation areas on the east 10 side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape 11 plans submitted with the land development application and shall be approved by the 12 Board of Supervisors as part of land development. 13 14 10. King Road is assumed to run in and east-west direction for the purpose of this condition. 15 The Applicant shall install 6 foot high estate fencing along the right of way line for King 16 Road. The fencing shall go around the pump station. This fencing shall be connected to 17 the 8 foot fence and the estate fencing referred to in this condition and condition 9. The 18 purpose of the fencing referred to in this condition and conditions 6 and 9 are to limit 19 ingress and egress to the main entrance of the Facility. 20 21 11. The proposed fencing shall be detailed on the land development plan and shall be 22 continually maintained by the owner. 23 24 12. The Applicant shall identify the fencing types and styles and provide details, samples 25 and/or images if available, of each style of fencing in the land development plan. The 26 fencing shall be approved by the Board of Supervisors during land development. 27 28 13. The Applicant shall agree to permit no recreational activity in the area between the 29 existing and/or proposed building and the southern and western property lines other 30 than the garden, the greenhouse, and the pedestrian walking paths. 31 32 14. The Applicant shall identify the existing and proposed active recreation areas on the 33 land development plan. If Applicant proposes to add new outdoor recreation facilities 34 that are not shown and approved on the land development plan, they shall be reviewed 35 by the Township Engineer who shall recommend the installation of appropriate sound 36 attenuation measures if necessary to mitigate potential noise from these facilities. 37 38 15. The Facility shall be restricted to one outdoor smoking area for patients (smoking 39 pavilion). The Applicant shall agree to require all patients to smoke within the limit of 40 the smoking pavilion. Staff and visitors shall be restricted to smoking in the front of the 41 building. 42 43 16. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and 44 filtration system to minimize the effects of smoke for the surrounding property owners. 45 46 17. The Applicant shall screen the new smoking pavilion from the neighboring properties to 47 the west and north with a temporary 8 foot fence which shall remain in place until the 48 one story addition is built.

2/6/18 February 6, 2018 5

1 2 18. The Applicant shall demonstrate during the land development application review that 3 the "Smoke Eater" system can effectively ventilate and filter cigarette smoke in the 4 proposed smoking pavilion. 5 6 19. The Applicant shall install sound attenuation blankets or similar sound dampening 7 material inside the existing emergency generator fencing to mitigate noise from the 8 generator. 9 10 20. The following site improvements shall be completed prior to issuance of a building 11 permit for the building addition or barn renovations: 12 a. Parking lot renovations; 13 b. Installation of estate fence and the 8 foot fence; 14 c. Installation of the smoking pavilion, including the installation of screening and 15 smoke mitigation measures; 16 d. Installation of sound blankets inside the generator fencing; 17 e. Installation of plantings as required on the landscape plan that is approved as 18 part of the land development plans. 19 20 21. The Applicant shall construct and maintain all walking paths with pervious wood chips. 21 22 22. The Applicant shall comply with the parking allocation presented on the Plan. 23 24 23. The Applicant shall agree to only permit outdoor patient activities on the property 25 between the hours of 7 AM and 10 PM, with the following exceptions. A maximum of 8 26 patients at any one time, with active staff supervision shall be permitted to use the 27 smoking pavilion between 10 PM and 11:30 PM. A maximum of 4 patients at any one 28 time, with active supervision from staff shall be permitted to use the smoking pavilion 29 between 11:30 PM and 7 AM. 30 31 24. In the event that the Applicant's requested relief is granted, the Applicant shall record a 32 deed restriction with the Chester County Recorder of Deeds that prohibits any further 33 expansion of the treatment center for a period of 30 years. The deed restriction shall be 34 enforceable by the Township. 35 36 25. The Applicant shall establish and adhere to a written protocol for responding to 37 neighbors who contact the Facility to complain about adverse impacts from the 38 operation of the Facility. This protocol shall require that a properly trained employee 39 respond to neighbor's calls and advise the neighbors how to respond to a situation 40 where a patient has left the Facility and is seeking assistance from the neighbors. 41 42 26. The Applicant shall annually make a presentation to the Board of Supervisors at a public 43 meeting to provide an update on the state of affairs at the Facility. This report shall 44 advise the Board on the status of the expansion project, identify any issues that the 45 Facility has encountered in the last year with neighboring property owners and identify 46 any new programs or policies that the Facility has implemented to improve the 4 7 relationship with neighbors. 48

2/6/18 February 6, 2018 6

1 27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall 2 notify the Westtown East Goshen Regional Police Department of such fact provided that 3 such notification does not violate any patient privacy laws. The intent of this 4 notification is not to reveal the patient's identify or to require the police to respond but 5 simply to advise the police that someone has left the Facility. 6 7 28. If Applicant is granted zoning relief to expand the Facility, it shall obtain a building 8 permit for the building addition within three years from the date of an unappealed and 9 unappealable zoning decision and it shall obtain a building permit for the barn 10 renovations within four years from the date of an unappealed and unappealable zoning 11 decision. 12 13 14 Mike seconded the motion. Marty noted that one effect of Condition 23 would be 15 that the meditation area would be off limits at night. 16 17 Carmen asked Mr. Nagle whether his client would accept these conditions if the 18 Zoning Hearing Board granted the relief. Mr. Nagle stated that if the Zoning Hearing 19 Board approves the single story addition, his client would accept all of these 20 conditions and would not appeal them. 21 22 The motion passed 5-0. 23 24 Consider Recommendation for Community Day 25 Jason stated that the Park & Recreation Commission had recommended that 26 Community Day be held on Saturday, June 30th this year. Marty asked whether this 27 date might conflict with July 4th vacation plans for Township residents. 28 29 Janet moved to hold the 2018 Community Day on June 30, 2018. Carmen seconded. 30 The motion passed 5-0. 31 32 Consider Recommendation to Replace the Street Sweeper 33 Mike noted that we budgeted only $145,000 for the street sweeper, but that the 34 price was $173,400. Jon stated that $203,000 has depreciated in the sinking fund for 35 the replacement of this asset and that therefore Township has more than enough 36 available cash to replace the street sweeper. 37 38 Carmen made a motion to purchase a Tymco street sweeper through Golden 39 Equipment at a price of$173,400, net of trade-in. Janet seconded. The motion 40 passed 5-0. 41 42 Consider Recommendation for PennDOT Mowing Agreement 43 Mike made a motion to adopt Resolution 2018-58A. David seconded the motion. The 44 motion passed 5-0. 45 46 Consider Recommendation for Paoli Pike Right-of-Way

2/6/18 February 6, 2018 7

1 Mike made a motion to authorize the Chairman to execute the Amended Easement 2 and Right-of-Way for a Public Road for 1591 Paoli Pike, 1599 Paoli Pike, 1601 Paoli 3 Pike and 1595 Paoli Pike. David seconded. The motion passed 5-0. 4 5 Consider Adelphia Gateway Pipeline Project 6 Rick stated that Adelphia filed an application with the Federal Energy Regulatory 7 Commission (FERC) for Certificates of Public Convenience and Necessity to allow for 8 the acquisition, construction and operation of pipeline facilities in Pennsylvania and 9 Delaware. He recommended that the Board file a petition to intervene and seek 10 party status in this matter with FERC. 11 12 Lex Pavlo, 611 S. Speakman Lane, told the Board that he and his group have met 13 with a number oflegislators aboutAdelphia's proposed repurposing of the existing 14 pipeline. He noted that he spoke with U.S. Rep. Ryan Costello and that Rep. Costello 15 seemed receptive to reviewing federal regulations, particularly those governing the 16 Pipeline and Hazardous Materials Safety Administration, which are very old at this 17 point. 18 19 David made a motion to direct the Manager to have Margie Morris, Esq, file a 20 petition to intervene and seek party status before FERC on Adelphia's application. 21 Janet seconded. The motion passed 5-0. 22 23 Consider Recommendation for Adelphia Gateway Easement 24 Rick reported that Adelphia had offered the Township $250 for an easement 25 running through the Wentworth open space, where a valve is currently located. It is 26 Rick's understanding that Adelphia would like to install a "blow down" assembly at 27 this location, although he has some unanswered questions about what this means. 28 He also observed that there is ambiguous language in the draft easement agreement 29 that makes reference to pipelines (plural) and may allow for the conveyance of any 30 kind of natural gas. He recommended that the Board take no action on this matter 31 right now while he gathers more information. The Board agreed to take no action on 32 the easement for the time being. 33 34 Consider Recommendations for ABC Goals 35 Janet made a motion to approve the 2018 ABC goals as drafted. Carmen seconded. 36 The motion passed 5-0. 37 38 Consider Recommendation for Escrow Release for Lexington at 1304 Goshen 39 Parkway 40 Rick explained that this project had been finished for some time, but that due to 41 BB&T acquiring Susquehanna Bank some years prior, the developer had lost track of 42 the account and was only now requesting the final release. Mike made a motion to 43 authorize the final escrow release of $24,144 for 1304 Goshen Parkway to bring the 44 remaining balance to $0. Carmen seconded. The motion passed 5-0. 45 46 Approval of Minutes for January 16 and 23. 2018

2/6/18 February 6, 2018 8

1 David made a motion to approve the minutes of January 16 and 23, 2018, as 2 corrected. Janet seconded. The motion passed 5-0. 3 4 Treasurer's Report 5 Carmen moved to graciously accept the Treasurer's Report and the Expenditure 6 Register Report as recommended by the Treasurer, to accept the receipts and to 7 authorize payment of the invoices just reviewed. Janet seconded. The motion 8 passed 5-0. 9 10 Correspondence. Reports of Interest 11 The Board acknowledged the following correspondence and reports of interest: 12 • January 2018 Liquid Fuels Audit. Marty thanked Barbara Phillips and Susan 13 Smith for their hard work on this. 14 • Sunoco Station Remediation Letter 15 • 1/22/18 letter from Senator Killion regarding HB 1620 16 • 1/25/18 letter from PennDOT regarding the resurfacing of North Chester 17 Road 18 • 1/22/18 SARS Title III Tier II Report from Mars Drinks 19 • Letter from the Futurist Committee regarding the Paoli Pike Corridor Master 20 Plan 21 22 Public Comment 23 Robert Plummer, 1339 Park Ave, raised concerns about a firewood/lumber business 24 operating on Strasburg Road. Jon took his phone number and said that he'd pass the 25 matter on to the Codes Department in the morning. 26 27 Adjournment 28 There being no further business, Janet motioned to adjourn the meeting at 9:50 pm. 29 Carmen seconded the motion. The motion passed 5-0. 30 31 Respectfully submitted, 32 ]on Altshul 33 Recording Secretary 34 35 Attachments: February 1, 2018 Treasurer's Report

2/6/18 February 6, 2018 9

February 1, 2018

TREASURER'S REPORT

2018 RECEIPTS AND BILLS

!GENERAL FUND

Real Estate Tax $15,561.33 Accounts Payable $37,085.57 Earned Income Tax $64,500.00 Electronic Pmts: Local Service Tax $3,400.00 Credit Card $2,674.37 Transfer Tax $40,244.68 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $0.00 Total Other Revenue $25,217.83 Payroll $175,540.51 Total Receipts: $148,923.84 Total Expenditures: $215,300.45

!STATE LIQUID FUELS FUND

Receipts $0.00 Interest Earned $0.00 Total State Liqud Fuels: $0.00 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $1,860.78 Interest Earned $0.00 Credit Card $0.00 Total Sinking Fund: $0.00 Total Expenditures: $1,860.78

jTRANSPORTATION FUND

Receipts $0.00 Interest Earned $0.00 Total Sinking Fund: $0.00 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $32,621.24 Receipts $293,612.41 Debt Service $0.00 Interest Earned $0.00 Credit Card $0.00 Total Sewer: $293,612.41 Total Expenditures: $32,621.24

!REFUSE FUND

Receipts $74,681.99 Interest Earned $0.00 Total Refuse: $74,681.99 Expenditures: $74,972.10

!BOND FUND

Receipts $0.00 Interest Earned $0.00 Total Sewer Sinking Fund: $0.00 Expenditures: $11,533.26

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $0.00 Total Sewer Sinking Fund: $0.00 Expenditures: $6,832.39

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $0.00 1 Total Operating Reserve Fund: $0.00 Expenditures: $0.00

2/6/18 February 6, 2018 10

February 15, 2018

TREASURER'S REPORT 2018 RECEIPTS AND BILLS

I GENERAL FUND

Real Estate Tax $313,719.90 Accounts Payable $596,655.32 Earned Income Tax $715,100.76 Electronic Pmts: Local Service Tax $66,554.21 Credit Card $0.00 Transfer Tax $55,097.10 Postage $0.00 General Fund Interest Earned $6,607.51 Debt Service $9,460.82 Total Other Revenue $154,273.15 Payroll $127,824.56 Total Receipts: $1,311,352.63 Total Expenditures: $733,940.70

!STATE LIQUID FUELS FUND

Receipts $0.00 Interest Earned $0.58 Total State Liqud Fuels: $0.58 Expenditures: $0.00

!SINKING FUND

Receipts $0.00 Accounts Payable $19,105.55 Interest Earned $1,740.68 Credit Card $0.00 Total Sinking Fund: $1,740.68 Total Expenditures: $19,105.55

!TRANSPORTATION FUND

Receipts $0.00 Interest Earned $464.97 Total Sinking Fund: $464.97 Expenditures: $0.00

!SEWER OPERATING FUND

Accounts Payable $301,398.28 Receipts $162,037.46 DebtSeNice $28,240.59 Interest Earned $203.49 Credit Card $0.00 Total Sewer: $162,240.95 Total Expenditures: $329,638.87 I REFUSE FUND

Receipts $43,066.55 Interest Earned $356.32 Total Refuse: $43,422.87 Expenditures: $67,810.45

!BOND FUND

Receipts $0.00 Interest Earned $7,969.85 Total Sewer Sinking Fund: $7,969.85 Expenditures: $0.00

!SEWER SINKING FUND

Receipts $0.00 Interest Earned $684.84 Total Sewer Sinking Fund: $684.84 Expenditures: $8,525.48

!OPERATING RESERVE FUND I

Receipts $0.00 Interest Earned $604.54 Total Operating Reserve Fund: $604.54 Expenditures: $0.00

EAST GOSHEN TOWNSHIP

MONTHLY DEBT PAYMENT BREAKDOWN

February 28, 2018

GENERAL FUND:

Interest Principal Year of Loan Original Remaining Retirement

payment payment Issuance Description loan amount Principal Date

$7,589.19 $0 2003 Multi purpose $5,500,000 $2,113,000 2023

9 projects

$1,563.10 $0 1999 Apple brook $3,000,000 $462,000 2019

Park

$308.53 $0 2000 Spray $287,000 $89,000 2021 Irrigation

SEWER FUND:

Interest Principal Loan Original Remaining Retirement

payment payment Description loan amount Principal Date

$22,859.10 $0 2008 RCSTP $9,500,000 $6,927,000 2032

Expansion

$5,381.49 $0 2013 Diversion $2,500,000 $2,118,000 2033

Projects

U:\bmccool\2018\Journal Entries\Debt Service\2018- Debt Service Report for Treasurers Report.xlsx

TO:

FROM:

SUBJECT:

DATE:

EAST GOSHEN TOWNSHIP

MEMORANDUM

BOARD OF SUPERVISORS

BRIAN MCCOOL

PROPOSED PAYMENTS OF BILLS

02-15-2018

Please accept the attached Treasurer's Report and Expenditure Register Report for consideration by the Board of Supervisors. I recommend the Treasurer's Report and each register item be approved for payment.

General Fund Revenues include the receipt of 4th quarter franchise fees from Comcast in the amount of $65,480 and receipt of the penultimate TCDI grant reimbursement for the Paoli Pike Master Plan in the amount of $26,060. EIT revenue is well above average due to receipt of 4th quaiier remittances.

General Fund expenses include the monthly contribution to WEGO for $365,994, $64,315 for road salt and $49,140 for health insurance.

Sinking Fund expenses include $19, 106 for a new server and PCs.

Sewer Fund expenses include a payment of $171,161 to West Goshen Township for 4th quarter operating expenses and $101, 790 for 1st quarter charges for Summit House and Cider Knoll. Please advise if the Board decides to make any changes or if the reports are acceptable as drafted.

C:\Users\bmccool\AppData\Local\Microsoft\ Windows\ Temporary Internet Files\ Content.Outlook\SUUMSKOC\ 02- 15-2018 Memo JA.docx

East Goshen Township Fund Accounting

Report Date 02/02/18

MARP05 run by BARBARA 1 30 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

1471 WESTTOWN-EAST GOSHEN POLICE 53961 1 01410 5300 POLICE GEN.EXPENSE FEBRUARY 2018 CONTRIBUTION

FUND SUMMARY

Fund Bank Account Amount Description

01 01 365,993.72 GENERAL FUND

365,993.72

PERIOD SUMMARY

Period Amount

1802 365,993.72

365,993.72

Expenditures Register

GL-1802-61760

BATCH10F5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

020118 02/02/18 02/01/18 02/02/18 14836 p 365,993.72

1 Prepaids, totaling 0 Printed, totaling

365,993.72

365,993.72 365,993.72 0.00

1

East Goshen Township Fund Accounting

Report Date 02/06/18

MARP05 run by BARBARA 1 35 PM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

1470 WESTTOWN TOWNSHIP 53966 1 01410 5310 REGIONAL POLICE BLDG INTEREST JANUARY 2018 - INTEREST 53966 2 01410 5320 REGIONAL POLICE BLDG PRINCIPAL JANUARY 2018 - PRINCIPAL

FUND SUMMARY

Fund Bank Account Amount Description

01 01 10,688.96 GENERAL FUND

10,688.96

PERIOD SUMMARY

Period Amount

1802 10,688.96

10,688.96

Expenditures Register

GL-1802-61807

BATCH 2 OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

013118 02/06/18 02/06/18 1,105.63

013118 02/06/18 02/06/18 9,583.33

10,688.96

10,688.96 0 Printed, totaling 10,688.96

1

East Goshen Township Fund Accounting

Report Date 02/07/18

MARP05 run by BARBARA 10 17 AM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

2228 EAST GOSHEN TWP. - TAX COLLECTOR

Expenditures Register

GL-1802-61814

BATCH 3 OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

53967 1 01409 4300 WIRELESS TOWER TAX PAYMENTS 020118 02/07/18 02/07/18 02/07/18 14842 265.41 E.GOSHEN TWP. TAX 2018 ACCT. 17220 PARCEL #53-04-0077.0100

FUND SUMMARY

Fund Bank Account Amount Description

01 01 265.41 GENERAL FUND

265.41

PERIOD SUMMARY

Period Amount

1802 265.41

265.41

1 Printed, totaling

265.41

265.41 265.41

1

East Goshen Township Fund Accounting

Report Date , 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

BATCH 40F 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

2226 21ST CENT.MEDIA NEWS #884433

6

68

1657

82

53986 1 01401 3400 ADVERTISING - PRINTING NOTICE - 1/22 MUN.AUTH.MTG.

ABC PAPER & CHEMICAL INC 53987 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS AIR FRESHENER 53988 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS AIR FRESHENER, C-FOLD TOWELS & TOILET TISSUE 53988 2 01409 3745 PW BUILDING - MAINT REPAIRS AIR FRESHENER, C-FOLD TOWELS & TOILET TISSUE

AMS APPLIED MICRO SYSTEMS LTD. 53993 1 01401 3120 CONSULTING SERVICES JANUARY 2018 53993 2 01414 5001 ZONING IT CONSULTING JANUARY 2018 - GEO PLAN 53994 1 01401 3120 CONSULTING SERVICES W2'S, ENVELOPES & LABOR

AQUA PA 53995 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 309801 0309801 12/27/17 -1/23/18 BS 53996 1 01411 3630 HYDRANT & WATER SERVICE 309987 309987 12/29/17 -1/31/18 HY6 53997 1 01411 3630 HYDRANT & WATER SERVICE 310033 310033 12/29/17 -1/31/18 186 53997 2 01411 3631 HYDRANTS - RECHARGE EXPENSE 310033 310033 12/29/17 -1/31/18 93

ASSOCIATED TRUCK PARTS 54001 1 01432 2500 SNOW - MAINTENANCE & REPAIRS LED WORKLAMPS

1509087 02/13/18 02/13/18 ' 65.90

65.90

087247A 02/13/18 02/13/18 46.17

087247 02/13/18 02/13/18 96.42

087247 02/13/18 02/13/18 96.42

239.01

64231 02/13/18 02/13/18 1,097.00

64231 02/13/18 02/13/18 28.00

64193 02/13/18 02/13/18 210.45

1,335.45

012518 BS 02/13/18 02/13/18 16.80

020118 HY6 02/13/18 02/13/18 137.52

020118 279 02/13/18 02/13/18 4,696.50

020118 279 02/13/18 02/13/18 2,348.25

7,199.07

207737 02/13/18 02/13/18 190.20

190.20

1

East Goshen Township Fund Accounting

Report Date ' 02/14/18

MARP05 run by BARBARA 10 : 23 AM

Expenditures Register

GL-1802-61923

BATCH 40F 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

102

119

B&D COMPUTER SOLUTIONS 54002 1 01401 3120 CONSULTING SERVICES JANUARY 2018 & RTK EMAIL SEARCHES

BEE.NET INTERNET SERVICES 54003 1 01401 3210 COMMUNICATION EXPENSE BEE MAIL ACCTS. FEBRUARY 2018

1198 BRANDYWINE VALLEY SPCA 54006 1 01410 5400 S.P.C.A. CONTRACT STRAY PICK-UP JANUARY 2018

3927 CARGILL INC. 54009 1 01432 2460 SNOW - MATERIALS & SUPPLIES 23.13 TONS DEICER 54010 1 01432 2460 SNOW - MATERIALS & SUPPLIES 199.28 TONS DEICER 54011 1 01432 2460 SNOW - MATERIALS & SUPPLIES 74.01 TONS DEICER 54012 1 01432 2460 SNOW - MATERIALS & SUPPLIES 25.74 TONS DEICER

259 CC2020/MPP

00003149

201802007

1272

2903824362

2903858425

2903861816

2903866327

54014 1 01487 4600 TRAINING & SEMINARS-EMPLY 020918

233

MASTER PLANNER COURSES (2) - ERNIE

HARRNESS

CCATO 54013 1 01401 3080 CCATO EXPENSES SPRING CONFERENCE-R.SMITH, M.SHANE, M.LYNCH, D.SHUEY, J.EMANUEL, M. GORDON, J.LANG & J. ALTSHUL

020918

02/13/18 02/13/18 2,150.00

2,150.00

02/13/18 02/13/18 315.00

315.00

02/13/18 02/13/18 103.00

103.00

02/13/18 02/13/18 1,362.82

02/13/18 02/13/18 11, 741.58

02/13/18 02/13/18 4,360.67

02/13/18 02/13/18 1,516.60

18, 981. 67

02/13/18 02/13/18 310.00

310.00

02/13/18 02/13/18 520.00

520.00

2

East Goshen Township Fund Accounting BATCH 4 OF 5

Report Date 02/14/18 Expenditures Register PAGE GL-1802-61923 MARP05 run by BARBARA 10 : 23 AM

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

3488 CINTAS CORPORATION #287 54015 1 01487 1910 UNIFORMS 287105361 02/13/18 02/13/18 171. 94

SMB KEEN SAFETY SHOES - M.MILLER 54016 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287105360 02/13/18 02/13/18 119.24

WEEK END 1/3/18 CLEAN MATS 54016 2 01487 1910 UNIFORMS 287105360 02/13/18 02/13/18 382.01 WEEK END 1/3/18 CLEAN UNIFORMS 54017 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287109083 02/13/18 02/13/18 119.24 WEEK END 1/10/18 CLEAN MATS 54017 2 01487 1910 UNIFORMS 287109083 02/13/18 02/13/18 382.01 WEEK END 1/10/18 CLEAN UNIFORMS 54018 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287112807 02/13/18 02/13/18 119.24 WEEK END 1/17/18 CLEAN MATS 54018 2 01487 1910 UNIFORMS 287112807 02/13/18 02/13/18 382.01 WEEK END 1/17/18 CLEAN UNIFORMS 54019 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287116658 02/13/18 02/13/18 119.24 WEEK END 1/24/18 CLEAN MATS 54019 2 01487 1910 UNIFORMS 287116658 02/13/18 02/13/18 382.01

WEEK END 1/24/18 CLEAN UNIFORMS 54020 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287120617 02/13/18 02/13/18 119.24

WEEK END 1/31/18 CLEAN MATS 54020 2 01487 1910 UNIFORMS 287120617 02/13/18 02/13/18 382.01 WEEK END 1/31/18 CLEAN UNIFORMS 54021 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 287124561 02/13/18 02/13/18 119. 24 WEEK END 2/07/18 CLEAN MATS 54021 2 01487 1910 UNIFORMS 287124561 02/13/18 02/13/18 394.51 WEEK END 2/07/18 CLEAN UNIFORMS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

2996 CNS CLEANING COMPANY 54022 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS JANITORIAL SERVICE - FEBRUARY 2018 54022 2 01409 3840 DISTRICT COURT EXPENSES JANITORIAL SERVICE - FEBRUARY 2018

497 COLLIFLOWER INC.

296

54023 1 01432 2500 SNOW - MAINTENANCE & REPAIRS HOSE MENDERS

COMCAST 8499-10-109-0028306 54025 1 01401 3210 COMMUNICATION EXPENSE 0028306 FEBRUARY 2018

51875

51875

Ll0858-001

012218

3, 191. 94

02/13/18 02/13/18 870.00

02/13/18 02/13/18 255.00

1,125.00

02/13/18 02/13/18 3.50

3.50

02/13/18 02/13/18 104.90

104.90

3

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 : 23 AM

Expenditures Register

GL-1802-61923

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

3490 COMCAST 8499-10-109-0111284 54024 1 01401 3210 COMMUNICATION EXPENSE 020418 02/13/18 0111284 2/9-3/8/18 SPEC.VIDEO PW

317 CONTRACTOR'S CHOICE

1990

3613

364

3941

3872

54026 1 01437 2460 GENERAL EXPENSE - SHOP SPROCKETS, SPARK PLUG, CHAIN, FUEL FILTER & AIR FILTER

CRYSTAL SPRINGS 54027 1 01401 2100 MATERIALS & SUPPLIES CREAMER, SWEETENERS & COFFEE

DELAWARE VALLEY HEALTH TRUST 54028 1 01486 1560 HEALTH,ACCID. & LIFE FEBRUARY 2018 PREMIUM - MED/RX 54028 2 01213 1000 DENTAL INSURANCE W/H FEBRUARY 2018 PREMIUM - DENTAL

DELCHESTER PUBLIC WORKS ASSOC 54029 1 01401 3000 GENERAL EXPENSE 2018 MEMBERSHIP RENEWAL (10)

DISCOVERY BENEFITS INC. 54034 1 01487 1500 MISC. EMPLOYEE BENEFITS JANUARY 2018 FSA SERVICES

EAGLE TERMITE & PEST CONTROL 54033 1 01409 3745 PW BUILDING - MAINT REPAIRS EXTERM.SERVICE - JAN.2018 PW 54035 1 01409 3840 DISTRICT COURT EXPENSES EXTERM.SERVICE - JAN.2018 DIST.CT 54037 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS EXTERM.SERVICE - JAN.2018 TWP.

00219908 02/13/18

3154612 011918 02/13/18

14160 02/13/18

14160 02/13/18

020118 02/13/18

0000847004-IN 02/13/18

191856 02/13/18

191857 02/13/18

191854 02/13/18

02/13/18 16.88

16.88

02/13/18 58.99

58.99

02/13/18 157.58

157.58

02/13/18 49,140.36

02/13/18 1,345.00

50,485.36

02/13/18 75.00

75.00

02/13/18 51.50

51.50

02/13/18 45.00

02/13/18 50.00

02/13/18 105.00

200.00

4

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 : 23 AM

Expenditures Register

GL-1802-61923

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

430 EAST GOSHEN TWP - SEWER

430

54043 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER QTR.1-2018 SEWER TWP.

EAST GOSHEN TWP - SEWER

010118T

54044 1 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 010118PW QTR.1-2018 SEWER PW

3752 EASTERN SALT COMPANY INC. 54039 1 01432 2460 SNOW - MATERIALS & SUPPLIES INV072430 215.09 TONS ROCK SALT 54040 1 01432 2460 SNOW - MATERIALS & SUPPLIES INV072796 260.45 TONS ROCK SALT 54041 1 01432 2460 SNOW - MATERIALS & SUPPLIES INV074280 246.83 TONS ROCK SALT 54042 1 01432 2460 SNOW - MATERIALS & SUPPLIES INV073164 25.08 TONS ROCK SALT

218 EVANGELISTA, CHARO 54046 1 01452 3712 YOGA EXPENSE 7041 YOGA INSTRUCTION - WINTER SESS.l

1731 FARINOLA INC, MV 54047 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 218400

3942

QUARTERLY ELEVATOR INSPECTION 1/23

FERGUSON & MCCANN INC. 54048 1 01430 2325 MAINTENANCE AND REPAIRS - FUEL TANK 41290 PREVENTATIVE MAINTENANCE 2 TANKS

2958 FREIGHTLINER OF LANCASTER 54049 1 01430 2330 VEHICLE MAINT AND REPAIR NRG/27-SWA-llOR PRESSURE SWITCH

268357DE

02/13/18 02/13/18 136 .20

136.20

02/13/18 02/13/18 194.86

194.86

02/13/18 02/13/18 13,045.21

02/13/18 02/13/18 15,796.30

02/13/18 02/13/18 14,970.24

02/13/18 02/13/18 1,521.10

45,332.85

02/13/lf 02/13/18 3,502.00

3,502.00

02/13/18 02/13/18 110. 00

110. 00

02/13/18 02/13/18 579.00

579.00

02/13/18 02/13/18 112 .17

112.17

5

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

2631 GRAPHIC IMPRESSIONS OF AMERICA INC. 54050 1 01401 2110 STATIONERY 18-9312 BOS WINDOW ENVELOPES W/TINT

3131 GREAT AMERICA FINANCIAL SERVICES 54051 1 01401 3840 RENTAL OF EQUIP. -OFFICE 22055571 FEB.2018 - LANIER MP C5503 COPIER

679 INTERCOM TRUCK EQUIPMENT

719

2442

54053 1 01432 2500 SNOW - MAINTENANCE & REPAIRS MONROE - BEARING THRUST & SPRING

KEEN COMPRESSED GAS COMPANY 54054 1 01437 2460 GENERAL EXPENSE - SHOP VARIOUS GAS CYLINDERS 54055 1 01430 2330 VEHICLE MAINT AND REPAIR CONTACT TIP ADAPTERS & NOZZLES

KENT AUTOMOTIVE 54056 1 01433 2450 MATERIALS & SUPPLIES - SIGNS EAR STRAP BUCKLES 54057 1 01430 2600 MINOR EQUIP. PURCHASE HEAVY DUTY SWIVEL CASTERS 54058 1 01430 2330 VEHICLE MAINT AND REPAIR SLIP PLATE PENETRANT

2813 LAYFIELD, RUBY 54059 1 01452 3711 PILATES PILATE INSTRUCT. - WINTER SESS.l

3932 LEMUS FINE ARTS INC. 54060 1 01452 3601 MISCELLANEOUS EVENTS CLAY SCULPTURE INSTRUCT. JAN-FEB 18

1060512-IN

83168511

30456991

9305518790

9305489144

9305500491

020118

2504

02/13/18 02/13/18 144.00

144. 00

02/13/18 02/13/18 305.00

305.00

02/13/18 02/13/18 162.24

162.24

02/13/18 02/13/18 71. 72

02/13/18 02/13/18 48.78

120.50

02/13/18 02/13/18 196.29

02/13/18 02/13/18 134.41

02/13/18 02/13/18 179.97

510.67

02/13/18 02/13/18 340.85

340.85

02/13/18 02/13/18 733.13

733.13

6

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 : 23 AM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

765 LENNI ELECTRIC CORPORATION 54061 1 01409 3745 PW BUILDING - MAINT REPAIRS INSTALL LED LIGHTS - SALT BIN 54062 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS INSTALL NEW LIGHTS - TWP SIGN 54064 1 01452 3720 HOLIDAY TREE CELEBRATION

Expenditures Register

GL-1802-61923

BATCH 40F 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

180114 02/13/18 02/13/18 960.00

180115 02/13/18 02/13/18 305.50

171273 02/13/18 02/13/18 107.00 REPLACE GFI FOR CHRITMAS TREE CORD 54066 1 01409 3745 PW BUILDING - MAINT REPAIRS 180104 02/13/18 02/13/18 2,805.08 INSTALL PW STORAGE LIGHTING

4,177.58

2861 LITTLE INC., ROBERT E. 54067 1 01430 2330 VEHICLE MAINT AND REPAIR 03-523025 02/13/18 02/13/18 172 .51 JDC-SEAT & STIHL SG llYR 54068 1 01437 2460 GENERAL EXPENSE - SHOP 03-523051 02/13/18 02/13/18 89.99 ST-APRON CHAPS 32

262.50

3943 MULL, ANGELA 54070 1 01367 3020 TRIPS 821154 02/13/18 . 02/13/18 90.00 REFUND - UNABLE TO ATTEND DC TRIP

90.00

1641 NAPA AUTO PARTS 54071 1 01430 2330 VEHICLE MAINT AND REPAIR 2-728594 02/13/18 02/13/18 17.57 OIL & AIR FILTER 54072 1 01430 2330 VEHICLE MAINT AND REPAIR 2-728595 02/13/18 02/13/18 54.87 OIL & AIR FILTERS 54073 1 01430 2330 VEHICLE MAINT AND REPAIR 2-727896 02/13/18 02/13/18 180.24 HEADS & BRACES 54074 1 01430 2330 VEHICLE MAINT AND REPAIR 2-727906 02/13/18 02/13/18 38.15 BRACE 54075 1 01430 2330 VEHICLE MAINT AND REPAIR 2-728125 02/13/18 02/13/18 59.99 SPRAYER 54076 1 01430 2330 VEHICLE MAINT AND REPAIR 2-728954 02/13/18 02/13/18 412.35 OIL & AIR FILTERS 54077 1 01430 2330 VEHICLE MAINT AND REPAIR 2-729746 02/13/18 02/13/18 329.42 FUEL, OIL & AIR FILTERS ------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

1,092.59

7

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

PAGE

Vendor Req # Budget# Sub# Description Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

1540 NELSON, PAMELA 54078 1 01452 3710 ZUMBA 020918

3679

ZUMBA REGISTRATIONS 11/22/17-2/9/18

NETCARRIER TELECOM INC. 67846 54085 1 01401 3210 COMMUNICATION EXPENSE 2/1/18 - 2/28/18

3680 NETCARRIER TELECOM INC. 67891 54079 1 01401 3210 COMMUNICATION EXPENSE 2/1/18 - 2/28/18

969 O'ROURKE & SONS INC.

3548

1554

54094 1 01430 2330 VEHICLE MAINT AND REPAIR FLAT BAR

OFFICE BASICS 54086 1 01401 2100 MATERIALS & SUPPLIES USB DRIVES 54087 1 01401 2100 MATERIALS & SUPPLIES BINDER CLIPS - XLARGE 54088 1 01401 2100 MATERIALS & SUPPLIES USB DRIVES (6) 54089 1 01401 2100 MATERIALS & SUPPLIES 8.5xll PICTURE FRAME 54090 1 01401 2100 MATERIALS & SUPPLIES PRINTER CARTRIDGES

OFFICE DEPOT 54091 1 01401 2100 MATERIALS & SUPPLIES LTR. FILE POCKETS, STAPLES, BINDER CLIPS & FOLDERS 54092 1 01401 2100 MATERIALS & SUPPLIES BINDER CLIPS - REFUND 54093 1 01401 2100 MATERIALS & SUPPLIES TONER, OFFICE DUSTER, LEGAL FOLDERS

498172

498179

R38952

1-821902

I-827948

I-831636

I-835368

I-835142

101317945001

101785800001

998857400001

02/13/18 I 02/13/18 985.15

985.15

02/13/18 02/13/18 370.03

370.03

02/13/18 02/13/18 136.93

136.93

02/13/18 02/13/18 20.00

20.00

02/13/18 02/13/18 49.45

02/13/18 02/13/18 36.87

02/13/18 02/13/18 59.34

02/13/18 02/13/18 11.28

02/13/18 02/13/18 189.00

345.94

02/13/18 02/13/18 97.43

02/13/18 02/13/18 -16.65

02/13/18 02/13/18 207.31

288.09

8

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

2352 PECO - 99193-01400 54098 1 01434 3610 STREET LIGHTING 020118 02/13/18 02/13/18 776.73 99193-01400 12/22/17-1/26/18 54098 2 01433 2470 UTILITIES - TRAFFIC LIGHTS 020118 02/13/18 02/13/18 674.50 99193-01400 12/22/17-1/26/18

1,451.23

3153 PECO - 01360-05046 54100 1 01409 7505 BOOT & PAOLI LED SIGN 020218 02/13/18 02/13/18 46.27 01360-05046 12/28/17-1/30/18 BOOT RD. LED

46.27

2593 PECO - 18510-39089 54102 1 01454 3600 UTILITIES 020518 02/13/18 02/13/18 101. 22 18510-39089 1/3-2/2/18 BOW TRE PUMP

101. 22

1555 PECO - 45168-01609 54097 1 01409 3840 DISTRICT COURT EXPENSES 012918 02/13/18 02/13/18 2,350.96 45168-01609 12/21/17-1/25/18 GAS 54097 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 012918 02/13/18 02/13/18 1,148.86 45168-01609 12/21/17-1/25/18 ELEC.

3,499.82

2592 PECO - 45951-30004 54101 1 01454 3600 UTILITIES 012318 02/13/18 I 02/13/18 380.50 45951-30004 12/18/17-1/22/18 RESTRO OMS

380.50

2591 PECO - 59500-35010 54099 1 01454 3600 UTILITIES 012918 02/13/18 02/13/18 27.70 59500-35010 12/21/17-1/25/18 POND PUMP

27.70

1032 PECO - 99193-01302 54096 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 020718 02/13/18 02/13/18 4,598.09 99193-01302 12/22/17-1/31/18 54096 2 01454 3600 UTILITIES 020718 02/13/18 02/13/18 433.15 99193-01302 12/22/17-1/31/18

5, 031. 24

9

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

BATCH 4 OF 5

PAGE 10

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

1800 PELLE'S AUTOMOTIVE

2986

54103 1 01430 2330 VEHICLE MAINT AND REPAIR VEHICLE INSPECT.- 2012 FORD ESCAPE

PENNBOC REGION 1 54106 1 01487 4600 TRAINING & SEMINARS-EMPLY G.ALTHOUSE & V.DIMARTINI - TRAINING COURSE 3/8/18

1005 PENNSYLVANIA ONE CALL SYSTEM 54104 1 01438 3840 EQUIPMENT RENTAL MONTHLY ACTIVITY FEE - JAN.2018

22314 02/13/18 ' 02/13/18 51.60

51. 60

020618 02/13/18 02/13/18 50.00

50.00

0000757027 02/13/18 02/13/18 24.89

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

24.89

1785 PENNSYLVANIA STATE POLICE 54105 1 01401 3000 GENERAL EXPENSE 020218 02/13/18 I 02/13/18 22.00 R19202356 BKGRND CK.- SEJDA 54105 2 01401 3000 GENERAL EXPENSE 020218 02/13/18 I 02/13/18 22.00 R19202428 BKGRND CK.- BREWER 54105 3 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 R19202469 BKGRND CK.- CLARK 54105 4 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 R19202516 BKGRND CK.- CUADRADO 54105 5 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 Rl9202559 BKGRND CK.- BROADBENT 54105 6 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 Rl9202606 BKGRND CK.- ROBBINS 54105 7 01401 3000 GENERAL EXPENSE 020218 02/13/18 I 02/13/18 22.00 Rl9202685 BKGRND CK.- BIRD-KELLY 54105 8 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 R19221172 BKGRND CK.- HOLLINGSWORTH 54105 9 01401 3000 GENERAL EXPENSE 020218 02/13/18 02/13/18 22.00 R19221368 BKGRND CK.- HAMILTON

198.00

2674 PROVANTAGE CORPORATION 54107 1 01407 2130 COMPUTER EXPENSE 8083422 02/13/18 . 02/13/18 234.40 HP LASER JET PRINTER 54108 1 01407 2130 COMPUTER EXPENSE 8076248 02/13/18 02/13/18 160.57 DUAL WAN VPN ROUTER 54109 1 01407 2130 COMPUTER EXPENSE 8072493 02/13/18 02/13/18 1,118 .60 PROSAFE STACKABLE SMART SWITCHES

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 1IM

Expenditures Register

GL-1802-61923

BATCH 4 OF 5

PAGE 11

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1876 RANSOME RENTAL COMPANY LP 54110 1 01432 3840 SNOW - EQUIPMENT RENTAL K2371702 WHEEL LOADER & BUCKET RENTAL 11/20-

12/20/17

1161 REILLY & SONS INC 54111 1 01430 2320 VEHICLE OPERATION - FUEL 137516 348.6 GALLONS DIESEL 54112 1 01430 2320 VEHICLE OPERATION - FUEL 137517 301.2 GALLONS GASOLINE 54113 1 01430 2320 VEHICLE OPERATION - FUEL 137056 438.4 GALLONS DIESEL

1212 SAYRE INC. I G.L. 54114 1 01430 2330 VEHICLE MAINT AND REPAIR 1-280240106 LIGHT MARKER AMBER LED 54115 1 01430 2330 VEHICLE MAINT AND REPAIR 1-280240107 LAMP-CLRNC/MARKER AMBER (2)

2108 SIDELINES SPORTSWEAR & PROMOTIONS 54117 1 01487 1910 UNIFORMS 5950 SPRUCE GREEN PARKA

1896 SPRINGER BROTHERS INC

3842

54118 1 01409 3745 PW BUILDING - MAINT REPAIRS REPAIR ROOF OVER PW PARTS ROOM

STACEY AUTOMOTIVE 54119 1 01430 2330 VEHICLE MAINT AND REPAIR HYSTER 560X2 - SAND BLAST & PAINT

16285

012418

1,513.57

02/13/18 02/13/18 4,411.00

4,411.00

02/13/18 02/13/18 810.15

02/13/18 02/13/18 631.92

02/13/18 02/13/18 1,038.13

2,480.20

02/13/18 02/13/18 99.80

02/13/18 02/13/18 203.32

303.12

02/13/18 ~ 02/13/18 137.90

137.90

02/13/18 02/13/18 625.00

625.00

02/13/lB 02/13/18 750.00

750.00

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

BATCH 4 OF 5

PAGE 12

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1783 STATE WORKERS INSURANCE FUND

3120

2055

1393

2829

54120 1 01411 6000 VOLUNTEER FIREFIGHTER WORKERS COMP 020218 POLICY # 05918452 INSTALLMT 3 OF 11

STTC SERVICE TIRE TRUCK CTRS INC. 54121 1 01430 2330 VEHICLE Ml\.INT AND REPAIR 0-RING & DAY ROAD CALL SERVICE

UNIVEST CORP 54123 1 01454 7301 HERSHEY MILL DAM - GENERAL HERSHEY'S MILL DAM GEN. LIABILITY

US POSTMl\.STER 54124 1 01403 2200 R.E. TAX COLLECT - MISC EXPENSE REPLENISH POSTAGE DUE ACCT.

Y22044-17

5345

021218

02/13/1&

02/13/18

02/13/18

02/13/18

VERIZON - TWP.FIOS 0001-74 54128 1 01401 3210 COMMUNICATION EXPENSE 1/28/18 - 2/27/18 FIOS - TWP 000174-012718 02/13/18

2942

3791

VERIZON WIRELESS 16809-00001 54127 1 01401 3210 COMMUNICATION EXPENSE 12/21/17 - 1/20/18 WIRELESS

VERIZON WIRELESS 16809-00002 54126 1 01401 3210 COMMUNICATION EXPENSE 12/21/17 - 1/20/18 WIRELESS

1576 WEIGAND INC. / H.A. 54130 1 01433 2450 Ml\.TERIALS & SUPPLIES - SIGNS SPEED HUMP SIGNS

9800215325 02/13/18

9800215326 02/13/18

111275 02/13/18

02/13/18 5, 779.00

5,779.00

02/13/18 172.50

172.50

)2/13/18 5,345.00

5,345.00

02/13/18 70.00

70.00

02/13/18 93.99

93.99

02/13/18 968.53

968.53

02/13/18 137.60

137.60

02/13/18 540.00

540.00

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Vendor Req # Budget# Sub# Description

3933 WILDFLOWER BAND LLC 54134 1 01452 3601 MISCELLANEOUS EVENTS

Expenditures Register

GL-1802-61923

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

020218 02/13/18 02/13/18 200.00 DEPOSIT RE: EGT FOOD TRUCK FESTIVAL

3392 WILSON FORKLIFT SERVICES LLC

2940

54135 1 01430 2330 VEHICLE Ml\.INT AND REPAIR DECAL KIT

WIRELESS ZONE 54136 1 01437 2460 GENERAL EXPENSE - SHOP OTTERBOX PHONE CASES

1512 ZEP SALES & SERVICE 54137 1 01432 2500 SNOW - MAINTENANCE & REPAIRS ZEP TNT 55 GALLONS

7210

W1285IN6618

9003231718

200.00

02/13/18 02/13/18 27.40

27.40

02/13/18 02/13/18 99.90

99.90

02/13/18 02/13/18 399.99

399.99

13

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 AM

Expenditures Register

GL-1802-61922

BATCH 40F 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

03 SINKING FUND

366 DELL MARKETING L.P. 54030 1 03401 7400 CAPITAL REPLACEMENT - OFFICE EQUIP 10219032063 02/13/18 02/13/18 1,782.00 VLA OFFICE STD (6) 54030 2 03401 7400 CAPITAL REPLACEMENT - OFFICE EQUIP 10219032063 02/13/18 02/13/18 1,320.00 VLA ACROBAT STANDARD (5) 54031 1 03401 7400 CAPITAL REPLACEMENT - OFFICE EQUIP 10219471610 02/13/18 02/13/18 7,723.55 POWER EDGE T630 SERVER 54032 1 03401 7400 CAPITAL REPLACEMENT - OFFICE EQUIP 10219266774 02/13/18 02/13/18 8,280.00 BASE,AIO,OPTI,7450,CTO,WW (8)

19,105.55

1

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 l\M

Expenditures Register

GL-1802-61922

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

05 SEWER OPERATING

3140 ACE DISPOSAL CORP 53989 1 05422 3700 R.C. STP-MAINT.& REPAIRS 129438

2918

1658

151

241

3872

PORTABLE TOILETS - RCSTP 1/19/18

ALS ENVIRONMENTAL 53992 1 05422 4500 R.C. STP-CONTRACTED SERV. 40-2224439 LAB TESTING-RCSTP 12/12-12/19/17

AQUA PA 53998 1 05420 3602 C.C. COLLECTION -UTILITIES 0305003 0305003 12/28/17-1/24/18 WW 53999 1 05420 3602 C.C. COLLECTION -UTILITIES 0309826 0309826 12/27/17-1/23/18 TH 54000 1 05422 3601 R.C. COLLEC.-UTILITIES 1533998 1087842 12/27/17-1/23/18 TW

BLOSENSKI DISPOSAL CO, CHARLES 54004 1 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 1/29/18 54005 1 05422 4502 R.C. SLUDGE-LAND CHESTER SWITCH 20 YDS WITH LINER 1/22/18

C.C. SOLID WASTE AUTHORITY 54007 2 05422 4502 R.C. SLUDGE-LAND CHESTER WEEK 1/23/18 - 1/30/18

EAGLE TERMITE & PEST CONTROL 54036 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. EXTERM.SERVICE - JAN.2018 ASHBRDG 54038 1 05422 3700 R.C. STP-MAINT.& REPAIRS EXTERM.SERVICE - JAN.2018 RCSTP

012618 WW

012518 TH

012518 TWN

16356

16355

49675

191858

191855

02/13/18 02/13/18 112.50

112.50

02/13/18 02/13/18 210.00

210.00

02/13/18 02/13/18 28.88

02/13/18 02/13/18 55.65

02/13/18 02/13/18 59.54

144.07

02/13/18 02/13/18 181.00

02/13/18 02/13/18 181. 00

362.00

02/13/18 02/13/18 534.66

534.66

02/13/18 02/13/18 25.00

02/13/18 02/13/18 45.00

70.00

2

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 AM

Expenditures Register

GL-1802-61922

BATCH 4 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1747 EAST WHITELAND TOWNSHIP

594

54045 1 05429 4520 CONTR. SERV. MALVERN INSTITUTE QTR.4-2017 SEWER

HAMMOND & MCCLOSKEY INC . 54052 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. REPLACE LEAKING BACKFLOW - BARKWAY

765 LENNI ELECTRIC CORPORATION

3043

3675

54065 1 05420 3700 C.C. METERS-MAINT.& REPRS. REPAIR FLOW METER RE: POWER LOSS

MAIN POOL & CHEMICAL COMP. INC. 54069 1 05422 2440 R.C. STP- CHEMICALS 1800 GALLONS ALUMINUM SULFATE & 196 50LB BAGS SODIUM CARBONATE LITE

NETCARRIER TELECOM INC. 67889 54080 1 05420 3602 C.C. COLLECTION -UTILITIES 2/1/18 - 2/28/18

3676 NETCARRIER TELECOM INC. 67890

3677

3678

54081 1 05422 3600 R.C STP -UTILITIES 2/1/18 - 2/28/18

NETCARRIER TELECOM INC. 67887 54084 1 05420 3602 C.C. COLLECTION -UTILITIES 2/1/18 - 2/28/18

NETCARRIER TELECOM INC. 67888 54082 1 05420 3602 C.C. COLLECTION -UTILITIES 2/1/18 - 2/28/18

020718

8528

180129

1865888

498177

498178

498175

498176

02/13/18 02/13/18 1,786.40

1,786.40

02/13/18 02/13/18 648. 90

648.90

02/13/18 02/13/18 160.50

160.50

02/13/18 02/13/18 5,842.40

5,842.40

02/13/18 02/13/18 49.60

49.60

02/13/18 02/13/18 49.60

49.60

02/13/18 02/13/18 49.77

49. 77

02/13/18 02/13/18 49.79

49.79

3

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 AM

Vendor Req # Budget# Sub# Description

3725

1031

1005

3944

NETCARRIER TELECOM INC. 68255 54083 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 2/1/18 - 2/28/18

PECO - 99193-01204 54095 1 05420 3602 C.C. COLLECTION -UTILITIES 99193-01204 12/29/17-1/31/18 54095 2 05420 3600 C.C. METERS - UTILITIES 99193-01204 12/29/17-1/31/18 54095 3 05422 3601 R.C. COLLEC.-UTILITIES 99193-01204 12/29/17-1/31/18 54095 4 05422 3600 R.C STP -UTILITIES 99193-01204 12/29/17-1/31/18

PENNSYLVANIA ONE CALL SYSTEM 54104 2 05420 3701 C.C. INTERCEPT.-MAINT.&REP MONTHLY ACTIVITY FEE - JAN.2018 54104 3 05420 3702 C.C. COLLEC.-MAINT.& REPR. MONTHLY ACTIVITY FEE - JAN.2018

SEALGUARD INC . 54116 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. DUAL COMPONENT GROUT

1393 US POSTMASTER

1395

3529

54124 2 05429 3250 ADMIN.- POSTAGE REPLENISH POSTAGE DUE ACCT.

USA BLUE BOOK 54122 1 05422 3700 R.C. STP-MAINT.& REPAIRS TREATMENT PLANT LOG BOOKS

VERIZON - MODEMS 54125 1 05420 3601 C.C. INTERCEPTOR-UTILITIES 12/26/17 - 1/25/18 MODEMS

Expenditures Register

GL-1802-61922

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

498373 02/13/18 02/13/18 50.92

50.92

020718 02/13/18 02/13/18 1,200.92

020718 02/13/18 02/13/18 9.60

020718 02/13/18 02/13/18 495.56

020718 02/13/18 02/13/18 13,810.17

15,516.25

0000757027 02/13/18 02/13/18 24.88

0000757027 02/13/18 02/13/18 24.88

49.76

11-04144 02/13/18 02/13/18 1,925.01

1,925.01

021218 02/13/18 02/13/18 70.00

70.00

454431 02/13/18 02/13/18 101.22

101.22

9800564287 02/13/18 02/13/18 80.84

80.84

4

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 AM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

2773 VERIZON - PW FIOS 0001-15 54129 1 05422 3601 R.C. COLLEC.-UTILITIES 1/28/18 - 2/27/18 FIOS - PW

1431 WEST GOSHEN TOWNSHIP

1470

54131 1 05420 3850 C.C. WEST GOSHEN OPER/MAINT 4TH QTR.2017 OPERATIONS & MGMT.

WESTTOWN TOWNSHIP 54132 1 05429 4500 CONTR. SERV. SUMMIT HOUSE QTR.1-2018 SEWER - SUMMIT 54133 1 05429 4510 CONTR. SERV. CIDER KNOLL QTR.1-2018 SEWER - CIDER KNOLL

Expenditures Register

GL-1802-61922

BATCH 4 OF 5

PAGE

Invoice Nwnber Req Date Check Dte Recpt Dte Check# Amount

000115-012718 02/13/18 02/13/18 89.99

89.99

012918 02/13/18 02/13/18 171,160.70

171,160.70

012518-S 02/13/18 02/13/18 83,070.00

012518C 02/13/18 02/13/18 18,720.00

101,790.00

5

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 07 AM

Vendor Req # Budget# Sub# Description

06 REFUSE

2762 AJB A.J. BLOSENSKI INC. 53990 1 06427 4500 CONTRACTED SERV. RESIDENTIAL P/U FEB.2018

241 C.C. SOLID WASTE AUTHORITY 54007 1 06427 4502 LANDFILL FEES WEEK 1/23/18 - 1/30/18 54008 1 06427 4502 LANDFILL FEES WEEK 2/05/18 - 2/07/18

1393 US POSTMASTER 54124 3 06427 3250 POSTAGE REPLENISH POSTAGE DUE ACCT.

Expenditures Register

GL-1802-61922

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

82100150 02/13/18 02/13/18 57,910.03

57,910.03

49675 02/13/18 02/13/18 5,468.41

49752 02/13/18 02/13/18 4,012.01

9,480.42

021218 02/13/18 02/13/18 70.00

70.00

6

East Goshen Township Fund Accounting

Report Date 02/14/18

MARP05 run by BARBARA 10 23 AM

Expenditures Register

GL-1802-61923

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

09 Sewer Capital Reserve Fund

2917 ALFA LAVAL INC. 53991 1 09429 7400 MACHINERY/EQUIPMENT - REPLACEMENT 278001907 REBUILT CENERFUGE

765 LENNI ELECTRIC CORPORATION 54063 1 09429 7400 MACHINERY/EQUIPMENT - REPLACEMENT 180113 REPLACE ENTIRE INNER HEATER WITH EXPLOSION PROOF HEATER

FUND StJMl.IARY

Fund Bank Account Amount Description

01 01 03 03 05 05 06 06 09 09

181,849.40 GENERAL FUND 19,105.55 SINKING FUND 300,904.88 SEWER OPERATING 67,460.45 REFUSE 8,525.48 Sewer Capital Reserve Fund

577,845.76

PERIOD StJMl.IARY

Period Amount

1802 577,845.76

577,845.76

02/13/18

02/13/18

02/13/18 4,005.58

4,005.58

02/13/18 4,519.90

4,519.90

577,845.76 106 Printed, totaling 577,845.76

20

East Goshen Township Fund Accounting

Report Date 02/15/18

MARP05 run by BARBARA 4 21 PM

Expenditures Register

GL-1802-61951

BATCH 50F 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

01 GENERAL FUND

3927 CARGILL INC.

3249

54147 1 01432 2460 SNOW - MATERIALS & SUPPLIES 25.40 TONS DEICER SALT

COMCAST 8499-10-109-0107712 54148 1 01401 3210 COMMUNICATION EXPENSE 0107712 2/5-3/4/18 EG PARK LED

3945 FELDSHER, DIANE

525

54150 1 01367 3712 YOGA CLASSES REFUND - CANCELED MEDITATION CLASS

GARDEN STATE HWY. PRODUCT 54151 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. SINGLE FACED WHITE/GREEN SIGNS

594 HAMMOND & MCCLOSKEY INC. 54152 1 01409 3745 PW BUILDING - MAINT REPAIRS INSTALL NEW TOILET - PW LOCKER ROOM

3947 MATHESON, BARBARA

2417

54153 1 01367 3712 YOGA CLASSES REFUND - CANCELED MEDITATION CLASS

PPC LUBRICANTS EAST 54155 1 01430 2330 VEHICLE MAINT AND REPAIR HALDEMAN SWIVEL & BALCRANK AUTO NOZZLE

2903898772

020418

821156

127519

8544

821157

1491296

02/15/18 02/15/18 1,496.57

1,496.57

02/15/18 02/15/18 115. 75

115.75

02/15/18 02/15/18 60.00

60.00

02/15/18 02/15/18 99.90

99.90

02/15/18 02/15/18 691.00

691.00

02/15/18 02/15/18 60.00

60.00

02/15/18 02/15/18 239.40

------ --------- ------- ---- ----------------------------------- --------------- -------- --------- --------- ------ ------------

239.40

1

East Goshen Township Fund Accounting

Report Date 02/15/18

MARP05 run by BARBARA 4 21 PM

Expenditures Register

GL-1802-61951

BATCH 5 OF 5

PAGE

Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount

1876 RANSOME RENTAL COMPANY LP 54156 1 01438 3840 EQUIPMENT RENTAL W2578901

3392

EXT. STICK BACKHOE & BUCKET RENTAL

WILSON FORKLIFT SERVICES LLC 54157 1 01430 2330 VEHICLE MAINT AND REPAIR REPAIR FORKLIFT

5296

02/15/18

02/15/18

02/15/18 761. 00

761.00

02/15/18 261.21

261. 21

2

East Goshen Township Fund Accounting

Report Date 02/15/18

MARP05 run by BARBARA 4 21 PM

Vendor Req # Budget# Sub# Description

05 SEWER OPERATING

1087 PIPE XPRESS INC. 54154 1 05420 3704 C.C. COLLECT.-MAINT & REP - I&I 4X20' PVC PIPE

FUND SUMMARY

Fund Bank Account Amount Description

01 01 05 05 3,784.83 GENERAL FUND 143.40 SEWER OPERATING

3,928.23

PERIOD SUMMARY

Period Amount

1802 3,928.23

3,928.23

BATCH 5 OF 5

Expenditures Register

GL-1802-61951

Invoice Number Req Date Check Dte Recpt Dte Check#

89796 02/15/18 02/15/18

0 Printed, totaling

PAGE

Amount

143.40

143.40

3,928.23 3,928.23

3

East Goshen Township Fund Accounting

Report Date 02/07/18

MARP05 run by BARBARA 11 42 AM

Vendor Req # Budget# Sub# Description

01 GENERAL FUND

182 BROWN, JEFFREY 53968 1 01401 3000 GENERAL EXPENSE

3931 HENNESSY ESQ. , BRENDAN D. 53969 1 01404 3140 LEGAL - ADMIN LEGAL SERVICE - JAN.2018

FUND SUMMARY

Fund Bank Account Amount Description

01 01 33,993.00 GENERAL FUND

33,993.00

PERIOD SUMMARY

Period Amount

1802 33,993.00

33,993.00

Expenditures Register

GL-1802-61821

BATCH 5A OF 5

PAGE

Invoice Number Req Date Check Dte Recpt Dte Check# Amount

020218 02/07/18 02/07/18 21,493.00

21,493.00

020218 02/07/18 02/07/18 12,500.00

12,500.00

33,993.00 0 Printed, totaling 33,993.00

1

ACH DEBITS TO GENERAL FUNDS

01 TRX#

61758

05 TRX#

61759

06 TRX#

61769

Amount

Charged

$80.00

$350.00

$350.00

Date

2/10/2018

2/3/2018

2/3/2018

ATTACHMENT 1of1

Meeting Date

2/20/2018

2/1/18 - 2/15/18

Name Description

PRIMEPAY MISC. EMPLOYEE BENEFITS

LOCKBOX FEES - JAN.2018 LOCKBOX FEES FOR S/R ACCT.

LOCKBOX FEES - JAN.2018 LOCKBOX FEES FOR S/R ACCT.

U:\BPhillips\EXPENSE REPT. ATTACH\MEETING DATE 2-20-18.xlsx

9TH SENATORIAL DISTRICT STATE SENATOR TOM KllLLBON

SENATE Box 203009 HARRISBURG, PA 17120-3009

717-787-4712 FAX 717-783-7490 TOLL FREE 1-888-9TH-01ST

4110 EDGMONT AVENUE BROOKHAVEN, PA 19015

610-447-3163 FAX 610-447-5848

780 E. MARKET STREET, SUITE 140 WEST CHESTER, PA 19380

61 0-436-3320 FAX 610-436-6983

January 30, 2018

Mr. Louis F. Smith, Jr. Township Manager

East Goshen Township 1580 Paoli Pike West Chester, PA 19382

Re: Senate Bill 656

Dear Mr. Smith:

:§:rtttttr nf Jruunyluauia

~OMMHTTIEIES

STATE GOVERNMENT, VICE CHAIR

APPROPRIATIONS

BANKING & INSURANCE

COMMUNICATIONS & TECHNOLOGY

CONSUMER PROTECTION &

PROFESSIONAL LICENSURE

URBAN AFFAIRS & HOUSING

MAJORITY POLICY

senatorkillion.com

tkillion@pasen.gov

Thank you for your letter dated January 24, 2018 in opposition to "proposed amendments" to Senate Bill 656, legislation that would amend Chapter 56 (relating to municipal authorities) of Title 53 (Municipalities Generally) to authorize a governmental unit to use public funds for the replacement or remediation of private water laterals and private sewer laterals that are connected to public systems.

Senate Bill 656 was approved by the full Senate on June 21, 2017; was unanimously approved by the House Local Government Committee on June 28, 2017; given first consideration in the House of

Representatives on that same date; ahd was re-referred to the House Consumer Affairs Committee on December 12, 2017.

Should the current version of the bill be amended in Committee or in the full House, it would then need to come back to the Senate for concurrence. I appreciate being aware of your position in opposition to "proposed amendments" to the current version of the bill, and my staff will be sure to keep me informed of any amended version.

If you have not done so already, I encourage you to contact Representative Comitta regarding your position.

Again, thank you for taking the time to contact me. If you have any additional questions or concerns, please do not hesitate to contact me again.

Sincerely, ~

'~ION SENATOR, gth DISTRICT

TK/kih

Mr. Senya D. Isayeff Chair, Board of Supervisors East Goshen Township

1580 Paoli Pike West Chester, Pennsylvania 19380

Dear Mr. Isayeff:

January 30, 2018

U.S. Department of Homeland Security Region III ' One Independence Mall, Sixth Floor 615 Chestnut Street Philadelphia, PA I 9106-4404 FEMA . I

r Municipality: East Goshen Township m

(E [Cf ~-a· County, State: Chester, PA

-' Lf; W rem. Adoption Date: 5/1712016 FEB · GJ· Dat~ A_pproved: 1/7/2016

· '51 2018 Exprratlon Date: 116/2021 ~

The Hazard Mitigation Plan for your community has been approved by the FeHeral ,Emergency Management Agency (FEMA). Your community is now eligible to apply for federal disaster assistance until the plan expires.

The plan was reviewed and approved based on the criteria contained in 44 Code of Federal Regulations, Part 201, as authorized by the Disaster Mitigation Act of 2000 (DMA2K). These criteria address the planning process, risk assessment (including hazard identification), mitigation strategy and plan maintenance process requirements. Enclosed is a list of specific recommendations for improving the plan. FEMA encourages communities to improve and update their plans as well as take mitigation actions by implementing strategies within the plan.

Some resources to assist you include:

Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards http://www.(ema.gov/library/viewRecord.do?id=6938

Integrating Hazard Mitigation Into Local Planning: Case Studies and Tools for Community Officials http://www.(ema.gov/library/viewRecord.do?id=7130

If you have questions, please contact Ernie Szabo, State Hazard Mitigation Planner, at (717) 651- 2159. I commend you for your dedication demonstrated in preparing and adopting a strategy to reduce future disaster losses.

Sincerely,

Janice P. Barlow Acting Director, Mitigation Division Enclosure Cc: Thomas Hughes, State Hazard Mitigation Officer, PEMA

Ernie Szabo, Mitigation Planner, PEMA Robert J. Kagel, Director, Department of Emergency Services, Chester County

www.fema.gov

FYI

To: From: Re: Date:

Board of Supervisors Jason Lang, Director of Parks & Recreation 2018 NRP A National Summer Camp Dance February 15, 2018

In 2015, the East Goshen REC Camp started a collaborative camp activity called the "Mid- Atlantic Summer Camp Dance". With a few other camp programs in PA, MD and VA, we piloted this activity to see if it was feasible on a larger scale. Essentially, the Parks & Recreation Director created a simple choreographed dance to "Walking on Sunshine" by Katrina and the Waves (copyright secured) and then a staff training video. Partner summer camps could view, download and use the staff training video during their own camp staff training events. From there, the dance was introduced to the campers however each municipality saw fit. On one specific day, all the camps danced "simultaneously" as we danced across the Mid-Atlantic. The P & R Director merged media into one collective video for all participants to enjoy that is posted to our YouTube channel. MACD goals are:

1) Unite municipal summer camp programs through a collective "turn-key" programmatic effort

2) Encourage kids to be active, healthy and well

3) Have fun!

I met with representatives from the National Recreation and Parks Association (NRP A) in December about adding this activity to Parks and Recreation month in July. They were excited by the idea and we are moving forward with it. It' II officially be renamed the NRP A National Summer Camp Dance and will appear in marketing/advertising efforts sometime in late spring. NRPA is located outside Washington DC, and at a TBD date I'll head down there to shoot the promo video and staff training video. I plan to wear my East Goshen Township polo on camera for all to see! Our 2018 goal is 200 municipal camp programs and 20,000 kids!

EGT REC Campers learning about the dance in 2015. Computer/H:/East Goshen Township/Budget

National Recreation and Park Association

~PS

P'NNSYLVONIO Recreation & Park Soclet,y

Office of the Governor 22 January 2018 508 Main Capitol Building, Harrisburg, PA 17120 Re: opioid epidemic

Governor Tom Wolf:

On behalf of the Pennsylvania Recreation and Park Society (PRPS) and its 2,000 members, we commend the Wolf Administration for declaring the heroin and opioid epidemic a statewide disaster emergency. Recent figures place

Pennsylvania among the states with the highest rates of drug use, overdose and death associated with heroin and opioid use. This declaration is a concrete step forward, positioning the Commonwealth to best tackle this problem through collective efforts.

The declaration's thirteen key initiatives clearly set directives and goals that can improve emergency response coordination, help those suffering from substance use disorders get into treatment, and ultimately, save lives. PRPS represents 334 Pennsylvania municipalities that provide park and recreation to their citizens, striving to improve the Commonwealth's residential quality of life through access to park facilities and innovative recreational programming opportunities. In light of our unique role within our communities, we would like to extend our expertise and resources to help fight the heroin and opioid epidemic alongside the Administration.

Park and recreation departments can support prevention initiatives. We are chief stewards of traditional disease prevention measures through physical health and wellness programs. Regarding opioid use, we interact daily with at risk populations and can assist other state organizations to gain access and influence through prevention efforts.

Additionally, those coming out of recovery can benefit from positive, defined recreational programs to regain self- esteem, self-confidence and create healthy social relationships. Pennsylvania municipal parks and recreation departments provide just such opportunities for their communities, and can easily transition and incorporate new efforts to meet additional challenges. For example, East Goshen Township in West Chester has begun collaborating with the Chester County Department of Drug and Alcohol Services to bolster countywide recovery efforts, including:

• Scholarships for those in recovery to attend park and recreation trips, classes and clinics • Public viewing parties of dependency/recovery documentaries • Stakeholder meetings with county officials, community leaders and concerned citizens • Naloxone trainings

Ultimately, the opioid crisis will be solved only through a comprehensive effort that incorporates leaders from a myriad of fields. Park and recreation departments stand ready to provide programmed recreational opportunities and prevention initiative support to help these Pennsylvania residents realize once again that they are accepted, valued residents that have tremendous self-worth.

We applaud the Administration for galvanizing statewide forces through this declaration. The heroin and opioid epidemic is a formidable problem; but it is one we can solve together. PRPS welcomes any opportunities to support the Administration in its efforts going forward.

Sincerely,

~k_

Tim Herd, CPRE CEO

2131 SllNDY DRIV~ • STllH ('QLLCC~ • PrnNSYLVllNlll • 16903 • 9111-2311-11272 • PRPS.ORC

FYI

To: Board of Supervisors From: Jason Lang, Director of Park and Recreation Re: Opioid Epidemic - Park & Recreation Support Date: February 1st, 2018

Board of Supervisors-

One of the main objectives of a successful parks and recreation department is promoting and providing health and wellness opportunities for its residents. In keeping with this objective, the Parks and Recreation Department has partnered with the Chesco Department of Drug & Alcohol Services to support county opioid efforts. Some current partnership examples are:

• Held a stakeholder panel with Rep. Comitta, Chesco Department ofD & A, WEGO Police, various community organizations and the general public • Viewing of the documentary "Generation Found" - how the city of Houston positively addresses the opioid crisis • Naloxone Training (March 3rd)

I'll be presenting at the PRPS State Conference in late March, with the goal of increasing P & R's willingness and ability to support local efforts. I also penned the recent PRPS Statement to Governor Wolfregarding his opioid declaration that highlights East Goshen Township's efforts (attached). In light of the above, PRPS has asked that I chair the newly formed PRPS Opioid Task Force (OTF). The OTF's goal will be to communicate how municipal park and recreation departments can support county-wide opioid prevention and recovery efforts across Pennsylvania.

Computer/H:/East Goshen Township/Budget