Board of Supervisors
The Board of Supervisors acts as the legislative branch of Township government. They are responsible for adopting and amending ordinances and establishing Township policy. They approve all subdivision and land development plans, as well as any other matter requiring official action of the Township.
- Five members, serving six-year terms
- Meetings begin at 7:00 PM on the 1st and 3rd Tuesday of the month.
- Meetings will be held on the 2nd, 4th, and 5th Tuesday of the month as needed.
- All township meetings are held at the Township Building and are open to the public.
- View our meetings live via Zoom.
- View township meetings on YouTube.
- Executive Sessions are not public meetings
| Board of Supervisors | Term Expiration Date |
| Cody Bright, Chair | 2027 |
| Barbara Emery, Vice Chair | 2029 |
| Peter Hicks | 2029 |
| Ann Duffield | 2031 |
| Larry Massaro | 2031 |
Visit our YouTube Channel for meeting video recordings.
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
To Join Zoom Meeting:
AGENDA EAST GOSHEN TOWNSHIP
BOARD OF SUPERVISORS
1580 Paoli Pike, 2nd Floor Tuesday, July 5, 2022
7:00PM
Link: https://us02web.zoom.us/j/84114380322 Passcode: 465803 Dial In Number: 1 929 205 6099 Meeting ID: 841 1438 0322
During this hybrid BOS meeting, public comment will be handled as follows:
• The Zoom public is asked to remain muted during the meeting when the Board is talking. • If you do not wish to be seen on the Board Room TVs or the Y ouTube Recording, your camera must be turned off via Zoom. • In-person public participants will be given the first opportunity to comment and ask questions on each agenda item that requires a Board vote. • The Zoom public participants will be given the second opportunity to comment and ask questions on each agenda item that requires a Board vote.
►Zoom participants wishing to comment must raise their hand icon, state their name,
and must speak one at a time.
1. Call to Order (7:00 PM) 2. Pledge of Allegiance 3. Moment of Silence Announce that this meeting is being recorded via Zoom. A recording will be uploaded later to the Township's YouTube channel for viewing.
4.
Chairman's Report (7:05 PM to 7:10 PM) • Yard waste will not be picked up on July 6th. Please hold all yard waste that week until the July 13th pickup. • The board met in executive session prior to tonight's meeting to personnel matters.
5. Public Hearings -None 6. Emergency Services Reports a. WEGO -None b. Goshen Fire Co -None c. Malvern Fire Co -None d. Good Fellowship -None e. Fire Marshal -None 7. Financial Report -None 8. Approval of Minutes and Treasurer's Report (7:10 PM to 7:15 PM) a. Minutes -June 7, 2022 and June 21, 2022 b. Treasurer's Report-June 16, 2022 to June 30, 2022 9. Old Business -None 10. New Business a. Consider preliminary approval of Malvern Institute land development application. (7:15 PM to 7:45 PM)
AGENDA Page -1- July 5, 2022
b. Consider 2022 Sewer Rates and a proposed capital plan. (7:45 PM to 8:0 5 PM) c. Consider 2022-2023 Deer Management Hunting Program Resolution. (8 :0 5 PM to 8:1 0 PM) d. Consider 2 nd and final escrow release for 1303 Goshen Parkway (J abil). (8 :1 0 PM
to 8:1 5 PM) e. Consider escrow release for 932 N. Chester Road. (8 :1 5 PM to 8:2 0 PM) f. Consider replacement of sewer cleaner machine. (8 :2 0 PM to 8:2 5 PM) g. Consider purchase of new fire alarm/control panel. (8 :2 5 PM to 8:3 0 PM) h. Consider purchase of Park cameras. (8 :3 0 PM to 8:3 5 PM) 1. Consider removing October 4 th meeting date from calendar ( Conflict with Yorn Kippur and following four consecutive board meetings).(8:35 PM to 8:40 PM) 11. Standing Issues/Projects (8:40 PM to 8:45 PM) a. Hershey's Mill Dam Project b. Milltown Dam Project 12. Any Other Matter 13. Public Comment (8:45 PM to 9:05 PM) 14 . Liaison Reports - none 15. Correspondence, Reports of Interest. 16. Adjournment (9:05 PM)
Meetings & Dates of Importance
Date Meetinf! Julv 5 Board of Supervisors Julv 13 Conservancy Board July 14 Pipeline Task Force July 14 Historical Commission Julv 19 Board of Supervisors July 21 Futurist Committee July 25 Sustainability Advisory Committee August2 Board of Supervisors August3 Planning Commission August4 Park & Rec Commission August 8 Municipal Authority Au1rnst 10 Conservancy Board August 11 Pioeline Task Force Aus:mst 11 Historical Commission Au=st 16 Board of Supervisors August 18 Futurist Committee August22 SAC September I Park & Rec Commission September 5 Labor Dav - Township Closed September 6 Board of Supervisors September 7 Planning Commission September 8 Pipeline Task Force September 8 Historical Commission
Newsletter Deadline for Summer 2022: May 23 .
AGENDA Page -2-
Time 7:00 pm 7:00 nm 5:30 pm 7:00 nm 7:00 pm 7:00 pm 7:00 pm 7:00 pm 7:00 pm 7:00 pm 7:00 pm 7:00pm 5:30 nm 7:00 om 7:00 om 7:00 om 7:00 pm 7:00 pm ---------- 7:00 pm 7:00pm 5:30 pm 7:00 pm
July S, 2022
The Chairperson, in his or her sole discretion, shall have the authority to rearrange the agenda accommodate the needs of other board members, the public or an applicant.
Public Comment- Pursuant to Section 710.1 of the Sunshine Act the Township is required to include an opportunity for public comment which is intended to allow residents and/or taxpayers to comment on matters of concern, official action or deliberation which are or may be before the Board of Supervisors. Matters of concern which merit additional research will be placed on the agenda for the next meeting. The Board of Supervisors will allocate a maximum of 30 minutes for public comment at each meeting.
Constant Contact - Want more information about the latest news in the Township and sunounding area? East Goshen Township and Chester County offer two valuable resources to stay informed about important local issues. East Goshen communicates information by email about all Township news through Constant Contact. To sign up, go to www.eastgoshen.org, and click the "E-notification & Emergency Alert" button on the left side of the homepage.
ReadyChesco - Chester County offers an emergency notification system called ReadyChesco, which notifies residents about public safety emergencies in the area via text, email and cell phone call. Signing up is a great way to keep you and your loved ones safe when disaster strikes. Visit www.readychesco.org to sign up today!
Smart 911- Smart 911 is a new service in Chester County that allows you to create a Safety Profile at www .smart91 l .com that includes details you want the 9-1-1 center and public safety response teams to know about your household in an emergency. When you dial 9-1-1, from a phone associated with your Safety Profile that information automatically displays to the 9-1-1 call taker allowing them to send responders based on up-to-date location and emergency information. With your Safety Profile, responders can arrive aware of many details they would not otherwise know. Fire crews can arrive knowing exactly how many people live in your home and where the bedrooms are located. EMS personnel can know family members' allergies or specific medical conditions. And police can access a photo of a missing family member in seconds rather than minutes or hours, helping the search start faster.
Westtown East Goshen Regional Police Department Do you want to get the latest news about what is happening with the Westtown-East Goshen (WEGO) Police Department? WEGO has an online tool called CRIME WATCH that gives the public direct access to crime and public safety related information happening in our community. Local residents are encouraged to visit the website and connect with the police department social media sites. To sign up for CRIME WATCH, https://chester.crimewatchpa.com/wegopd/53548/content/links.
F:\Data\Shared Data\Agendas\Board of Supervisors\2022\2022-07-05 _Board of Supervisors Agenda with time.doc
AGENDA Page -3- July 5, 2022
I EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, JUNE 7, 2022 5 DRAFT MINUTES 6 7 Note: This meeting was held in person at the East Goshen Township Board Room. This was a 8 hybrid meeting conducted via Zoom. 9 10 Present: Chairman Michele Truitt; Vice Chairman John He1izog; Members: Cody Bright, 11 David Shuey; Township Manager Derek Davis; Finance Director Dave Ware; Senior Staff 12 Accountant Chris Boylan; Erich Meyer (Conservancy); Christi Marshall (Sustainability Advisory 13 Committee). 14 15 Absent: Mike Lynch 16 17 Call to Order & Pledge of Allegiance: 18 Michele Truitt called the meeting to order at 7:02 p.m. and led the Pledge of Allegiance. 19 20 David asked for a moment of silence for families in America impacted by gun violence in our 21 country and the 4,700 civilians, including 272 children, who have lost their lives in Ukraine as a 22 result of the war. 23 24 Michele stated the meeting is being recorded via Zoom and will be available on the Township 25 website. 26 27 Chairman's Report: 28 Michele announced: 29 • The Board met in Executive Session prior to tonight's meeting to discuss personnel and 30 legal matters. 31 • Community Day will take place on Saturday, June 25th. Sta1ting at 5:00 PM until 32 Fireworks. Rain date Sunday, June 26th• 33 • Chester County Commissioners awarded a $60,063 grant to East Goshen Township for 34 park improvements. 35 36 Public Hearings: None
37 38 Emergency Services Reports: None 39 40 Financial Report: None 41 42 Approval of Minutes: 43 Cody made a motion to approve the minutes of May 3, 2022 & May 24, 2022. 44 45 John seconded. 46
6/7/22 June 7, 2022
1 David noted a spelling correction on the May 3, 2022 minutes. 2 3 Motion carried 4-0. 4 5 Treasurer's Report: 6 Dave explained the interest rates on cmTent debt service; 2003 General Fund 4.3%, retires in 7 2023; 2017 General Fund Bonds 2.7%, retires in 2037; 2008 Sewer 4%, retires in 2032; 2013 8 Sewer 3 .1 % retires 203 3; and 2017 Sewer GO Bonds 2. 7 %, retires in 203 7. John asked Dave if 9 he looked into refunding this debt. Dave responded. 10 11 Dave Ware presented the June 2, 2022 Treasurer's Report. 12 13 David made a motion to accept the receipts and approve the expenditures as presented in the 14 Expenditure Register and as summarized in the June 2, 2022 Treasurer's Report. 15 16 John seconded. 17 18 Michele asked about an expenditure for Cohen Law Group, $2,640. Dave responded this is the 19 second out of three payments to redo Comcast. Michele noted Brandywine SPCA expense was 20 $1,564 for 13 stray animals picked up in the month. Dave added that we received reimbursement 21 for two return-to-owner strays. 22 23 Motion canied 4-0. 24 25 Old Business: 26 Discussion of possible noise and nuisance ordinance changes. 27 Derek stated the Board discussed this in the past and it was decided to now hone in on particular 28 areas, specifically the timeframe that construction is permitted. The recommendation is to 29 remove the noise standards from zoning ordinance and prepare a noise/nuisance ordinance to be 30 presented at the June 21 rd meeting. Attorney Christman added details regarding the current 31 provisions and zoning ordinance. 32 33 John asked for clarification on Attorney Christman's proposal. Attorney Christman responded. 34 3 5 David accepts pulling the noise ordinance out of the zoning ordinance and is in favor of 36 overhauling the noise ordinance. David spoke about vibration and measurements, what and how 3 7 they are enforced, and feels the criteria for enforcement should be specified, along with the 3 8 definition of a nuisance, and the allowable time for noise. Derek suggested 7 AM - 7PM on 39 weekdays and 9AM- 5PM on Saturdays and nothing on Sundays, 40 41 John asked if we have nuisance in the ordinance now. Attorney Christman read the specific 42 wording. John suggested pulling out the noise and noise/vibration wording out of the zoning 43 ordinance and defer to the Zoning Hearing Board (ZHB). Derek disputed this because it would 44 be administratively enforced. Christman explained the ZHB is not expe1is in nuisance. John 45 explained ZHB has three attorneys and one alternate attorney on it and feels they can handle it.
6/7/22 June 7, 2022 2
1 David made a motion to authorize staff and solicitor to move forward with a draft of the 2 following three ordinance changes: Chapter 156 Noise, with changes petiaining to noise levels 3 and specific times of day and general review of the ordinance language, Chapter 240 Zoning, to 4 remove noise standards from this chapter, and a new nuisance ordinance that would regulate 5 disturbances beyond noise 6 7 John seconded. 8 9 Motion carried 4-0. 10 11 New Business: 12 Discussion of the Sustainability Advisory Committee's (SAC) possible transition to an 13 Environmental Advisory Council (EAC). 14 Derek invited Christi Marshall to speak on this topic and thanked her for the research that she did 15 on this possible transition. Ms. Marshall thanked the Board for inviting her to participate in the 16 next stage. She consulted with WeConservePA to clarify if it would it be ok to be called an 17 EAC/SAC. They confirmed there is nothing in the law to prohibit this. Ms. Marshall will send 18 wording for ordinance to Derek. 19 20 David feels a combined name is excellent idea. Attorney Christman gave his opinion. Michele 21 thanked Ms. Marshall for researching this topic. 22 23 David made a motion to authorize staff and solicitor to move forward with a draft ordinance to 24 develop an ESAC. 25 26 Cody seconded. 27 28 Motion canied 4-0. 29 30 Consider request for shoring equipment by Public Works. 31 Michele stated this is a safety issue, this equipment would stabilize the walls, and the cost is fully 32 budgeted. 33 34 David made a motion to approve the purchase of a new waler system for trench shoring. 35 36 John seconded. 37 38 Motion carried 4-0. 39 40 41 Consider appointment of Derek Davis as Zoning Officer. 42 Derek stated that Mark Gordon resigned and his last day is this Friday. Derek wished Mark well 43 in his future endeavors. 44 45 David made a motion to appoint Derek Davis as Interim Zoning Officer. 46
6/7/22 June 7, 2022 3
I Cody seconded. 2 3 Motion carried 4-0. 4 5 Standing Issues/Projects: 6 Hershey's Mill Dam Project - Derek stated that its progressing, should be done by end of 7 summer. Dave added that we received $250K in grant funding and the total cost is $1.765M 8 total cost. 9 Milltown Dam Project - no update on permit. David commented that we made efforts with IO contacting legislators to move this along. There is no reason for DEP to hold this up. David 11 will reach out to Carolyn Comitta. 12 13 Any Other Matter: None 14 15 Public Comment: 16 Russ Frank, 451 Gateswood, asked if the live Board meetings were taken offYouTube. Derek 17 responded. Mr. Frank stated that the Township website calendar of events does not have a link 18 to the agenda. Derek will look into this. Mr. Frank asked if he could see the Paoli Pike Trail 19 total expenses. Dave responded that the total expense is $5,482,593. Just over $3M was grant 20 money and the remaining $2,410,844 as of now. Michele asked how much over budget this 21 project is. Dave responded that it is $2M over the original budget. Feeder trails are not in the 22 budget. Mr. Frank asked if we are misleading the Futurist Committee regarding feeder trails. 23 Michele commented the Futurist Committee understands clearly about the feeder trails and that 24 the feeder trails are not budgeted, regardless of what was asked in the survey. Taking out 25 Segments A&B (that was budgeted together) since we haven't done Segment B, Dave added that 26 we are really only $SOOK over the original budget. This does not account for Segment A as Dave 27 does not have a direct comparison for Segment A as a stand-alone. Mr. Frank asked if the 28 alternate routes will add to the over budget amount. Dave stated going the cheapest alternate 29 route would put the project on budget. John confirmed the feeder trails were something to be 30 considered at a later date. David commented due to permitting, easements, engineering and other 31 work needed, this process takes a lot of time. 32 33 Liaison Reports: None 34 35 Correspondence, Reports of Interest: None 36 37 Adjournment: 38 There being no further business, Cody made a motion to adjourn at 7:48 pm.
39 40 John seconded. 41 42 Motion carried 4-0. 43 44 Respectfully submitted, 45 Chris Boylan 46 Recording Secretary 47 48 Attached: June 2, 2022 Treasurer's Report
6/7/22 June 7, 2022 4
TREASURER'S REPORT May 17, 2022 -June 2, 2022 RECEIPTS AND BILLS
I GENERAL FUND
Real Estate Tax $0.00 Accounts Payable $514,384.23 Earned Income Tax $265,800.00 Electronic Pmts: Local Service Tax $16,200.00 Credit Card $15,605.01 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $1,317.56 Debt Service $2,726.08 Total Other Revenue $240,400.09 Payroll $237,267.43
Total General Fund Receipts: $523,717.65 Total Expenditures: $769,982. 75
lsTATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.36 Total State Liquid Fuels Receipts: $0.36 Total Expenditures: $0.00
!CAPITAL RESERVE FUND
Receipts $0,00 Accounts Payable $84,226.34 Interest Earned $178.50 Credit Card $0.00 Total Capital Reserve Fund Receipts: $178.50 Total Expenditures: $84,226.34
I TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.01 Total Transportation Fund Receipts: $0.01 Total Expenditures: $0.00
I SEWER OPERATING FUND
Receipts $352,349.97 Accounts Payable $34,570.42 Interest Earned $251.10 Electronic Pmts:
Credit Card $1,291.37 Debt Service $22,290.16 Total Sewer Operating Fund Receipts: $352,601.07 Total Expenditures: $58,151.95 I REFUSE FUND
Receipts $137,456.70 Accounts Payable $1,869.57 Interest Earned $125.52 Credit Card $12,757.47 Total Refuse Fund Receipts: $137,582.22 Total Expenditures: $14,627.04
jBOND FUND
Receipts $0,00 Accounts Payable $0.00 Interest Earned $196.79 Total Bond Fund Receipts: $196.79 Total Expenditures: $0.00 I SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $11.57 Total Sewer Capital Reserve Fund Receipts: $11.57 Total Expenditures: $0.00
I OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.13 Total Operating Reserve Fund Receipts: $0.13 Total Expenditures: $0.00
[INFRASTRUCTURE SUSTAINABILITY FUND
Receipts $0,00 Accounts Payable $0.00 Interest Earned $0.08 Total Infrastructure Sustainability Fund Receipts: $0.08 Total Expenditures: $0.00
IARPA R COVID RELIEF FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $47.90 1 Total ARPA R COVID Relief Fund Receipts: $47.90 Total Expenditures: $0.00
6/7/22 June 7, 2022 5
I EAST GOSHEN TOWNSHIP 2 BOARD OF SUPERVISORS MEETING 3 1580 PAOLI PIKE 4 TUESDAY, JUNE 21, 2022 5 DRAFT MINUTES 6 7 Note: This meeting was held in person at the East Goshen Township Board Room. This was a 8 hybrid meeting conducted via Zoom. 9 IO Present: Chairman Michele Truitt; Vice Chairman John Hertzog; Members: Cody Bright, Mike 11 Lynch, David Shuey; Township Manager Derek Davis; Finance Director Dave Ware; Senior Staff 12 Accountant Chris Boylan: Chief Brenda Bernot; Goshen Fire Executive Director Grant Everhart; 13 Erich Meyer (Conservancy); Brian Sweet (Sustainability). 14 15 Call to Order & Pledge of Allegiance: I 6 Michele Truitt called the meeting to order at 7 :00 p.m. and led the Pledge of Allegiance. 17 18 Michele asked for a moment of silence for the 20,624 people who died from gun-related deaths in 19 the United States since January] 5', of those, 11,352 were suicide or other mental health issues. 20 21 Michele explained the meeting is being recorded via Zoom and will be available on the Township 22 website. 23 24 Chairman's Report: 25 Michele announced: 26 • Community Day will take place on Saturday, June 25th Fireworks. Rain date Sunday, June 27 26th. 28 • Township Closed on Monday, July 4th in recognition oflndependence Day. 29 • Yard waste will not be picked up on July 6th, Please hold all yard waste that week until 30 the July 13th pickup. 31 • The Board met in executive session prior to tonight's meeting to discuss legal and 3 2 personnel matters. 33 34 Public Hearings: None 35 36 Emergency Services Reports: 37 WEGO - Chief Brenda Bernot presented May 2022 activities in East Goshen Township. 38 39 Grant Everhart presented the Goshen Fire Company May 2022 monthly report. Mike 40 acknowledged the nice sign at Boot and Greenhill. 41 42 Derek presented the Good Fellowship May 2022 report. There is no report from Malvern Fire 43 Company. 44 45 Financial Report: 46 Dave Ware presented the May, 2022 financial report.
6/2 l/22 June 21, 2022
1 Approval of Minutes: None 2 3 Treasurer's Report: 4 Dave Ware presented the June 2 - 16, 2022 Treasurer's Report. 5 6 Cody made a motion to accept the receipts and approve the expenditures as presented in the 7 Expenditure Register and as summarized in the June 16, 2022 Treasurer's Report. 8 9 John asked about charges from Buckley Brion and where we stand with the unwinding. Derek 10 replied. Mike clarified that this is relative to the Hicks Farm. 11 12 Michele asked about the AMS charge. Dave explained this is for the existing financial software 13 system. 14 15 David seconded. 16 17 Motion catTied 5-0. 18 19 Old Business: 20 Brian Sweet, Sustainability Committee, commended Christi Marshall's effotis on this topic. 21 Attorney Bill Christman elaborated on the current structure and pointed out the overlap in duties 22 of the cmTent Conservancy Board and the proposed ESAC. David and Michele added that the 23 ESAC will work with Conservancy. Discussion followed. Attorney Christman noted that once 24 the ESAC is created, the SAC would no longer exist. 25 26 David made a motion to authorize the Township Manager and Township Solicitor to advertise the 27 creation of a new chapter in the township code titled "Environmental and Sustainability Advisory 28 Council" which creates and provides operating procedures and powers for a new Environmental 29 and Sustainability Advisory Council as well as repeals any ordinance or resolution establishing 30 the East Goshen Sustainability Advisory Committee (SAC, with the suggested amendment 17-6J 31 to that subdivision and land development plans be reviewed by the Board). 32 33 Mike seconded.
34
35 Resident Brittany Schugsta, 917 Warrior, asked if this topic would have gone to the ESAC. Board 3 6 confirmed. 37 38 Motion canied 5-0. 39 40 New Business: 41 Consider resolution revisions from pension audit. 42 Derek explained the minor issue with resolutions that were passed in 2018 and 2019. 43 44 David made a motion to authorize signing revised Resolutions 2018-61 and 2019-61 to properly 45 reference Resolution 2014-60.
6/21/22 June 21, 2022 2
1 Mike seconded. 2 3 Motion carried 5-0. 4 5 Consider a "catch-all" provision for the East Goshen's Zoning Ordinance. 6 Derek explained the purpose of this provision. Attorney Christman elaborated. Further discussion 7 followed. A recommendation will be presented at a future meeting. 8 9 Consider authorizing the Township Manager to retain an environmental/Mosquito 10 Company for the purposes of alleviating the Milltown Damn Reservoir area from excessive 11 mosquito activity. 12 Derek explained the purposed of this suggestion. Mike inquired about a more organic solution 13 rather than pesticides. John offered a description of an organic product called Bacillus 14 thuringiensis israelensis. This is a bacteria that kills mosquitos, black flies, and gnats only. It is
15 an all-natural and inexpensive method that John feels we should consider. John elaborated on the 16 application process of this product. Derek will speak with Public Works about using this option. 17 18 Standing Issues/Projects: 19 Hershey's Mill Dam Project- Mike commended the Public Works Department for the work 20 they accomplished in one day. Derek further explained the work done to prevent erosion and 21 staiied the boardwalk. 22 Milltown Dam Project - Derek explained that permit is still in process. David reached out to 23 Carolyn Comitta' s Chief of Staff for assistance. 24 25 New Business: 26 Long Range Plan Presentation: 27 Dave Ware presented the General Fund long range plan. 28 29 Mike explained the required 20% of revenues fund balance policy. Cody asked what the 2017 30 Bond money would be used for ifwe receive grant money. Dave responded. John asked if there 31 is a reserve required for the Sewer Fund. Mike and Dave responded no. John asked if we could 32 get grant money for Milltown Dam. Dave replied that we were awarded $915K in State funds and 33 he applied to the County for $1.5M in ARPA funds. This will cover Michele and Mike suggested 34 fu1iher discussion about the Sewer Fund at the next meeting. The Board and Dave had discussion 35 about tax millage. 36 37 Any Other Matter: 38 David mentioned that Energy Transfer has notifies the PUC that they will not be putting NGL 39 through Mariner I. They ceased Mariner I activity and it is filled with inert gases. This is a direct 40 result of the work of the Safety Seven and supported by our Board. David thanked the Board and 41 Pipeline Taskforce's work with the Safety Seven. 42 43 Derek apologized for technical issues at the beginning of the meeting. 44 45 Dave noted the Pension audit went smoothly.
6/21/22 June 21, 2022 3
1 Public Comment: 2 Bryan Nowak, 1590 Wine berry, submitted a comment online that he is 100% in favor of moving 3 forward with a Township tax increase. 4 5 Liaison Reports: None
7 Correspondence, Reports of Interest: None 8 9 Adjournment: 10 There being no fmiher business, Cody made a motion to adjourn at 8:55 pm. 11 12 John seconded. 13 14 Motion carried 5-0. 15 16 Respectfully submitted, 17 Chris Boylan 18 Recording Secretary 19 20 Attached: June 16 2022 Treasurer's Report
6/21/22 June 21, 2022 4
TREASURER'S REPORT June 2, 2022 Ŧ June 16, 2022 RECEIPTS AND BILLS
jGENERAL FUND
Real Estate Tax $81,210.91 Accounts Payable $475,299.06 Earned Income Tax $328,668.60 Electronic Pmts: Local Service Tax $8,625.05 Credit Card $5,931.45 Transfer Tax $91,678.22 Postage $0.00 General Fund fnterest Earned -$2.03 Debt Service $0,00 Total Other Revenue $18,117.09 Payroll $193,109.24
Total General Fund Receipts: $528,297.84 Total Expenditures: $674,339.75
!STATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0,00 Interest Earned $0.00 Total State Liquid Fuels Receipts: $0.00 Total Expenditures: $0.00
I CAPITAL RESERVE FUND
Receipts $250,000.00 Accounts Payable $0.00 Interest Earned -$1.00 Credit Card $0.00 Total Capital Reserve Fund Receipts: $249,999.00 Total Expenditures: $0.00
!TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0,00 Total Transportation Fund Receipts: $0.00 Total Expenditures: $0.00
!SEWER OPERATING FUND
Receipts $28,690.37 Accounts Payable $14,763.13 Interest Earned $1.02 Electronic Pmts:
Credit Card $854.10 Debt Service $0.00 Total Sewer Operating Fund Receipts: $28,691.39 Total Expenditures: $15,617.23 I REFUSE FUND
Receipts $13,159.26 Accounts Payable $76,194.01 Interest Earned $1.01 Credit Card $8,556.61 Total Refuse Fund Receipts: $13,160.27 Total Expenditures: $84,750.62
!BONO FUND
Receipts $0.00 Accounts Payable $80.00 Interest Earned $0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $80.00
!SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Sewer Capital Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
I OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Operating Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
!INFRASTRUCTURE SUSTAINABILITY FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0,00 Total Infrastructure Sustalnablllty Fund Receipts: $0.00 Total Expenditures: $0.00
!ARPA - COVIO RELIEF FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 1 Total ARPA- COVID Relief Fund Receipts: $0.00 Total Expenditures: $0.00
6/21/22 June 21, 2022 5
TO:
FROM:
SUBJECT:
DATE:
EAST GOSHEN TOWNSHIP
M EMORANDUM
BOARD OF SUPERVISORS
DAVE WARE
PROPOSED PAYMENTS OF BILLS
JUNE 30, 2022
Attached please find the Treasurer's Report for the weeks of June 16, 2022 - June 30, 2022.
General Fund revenue over this period was driven by Quarterly Reimbursements and Earned Income Tax receipts. Expenses for this period include annual Community Day expenses,
Applebrook Golf Day, traffic signal maintenance and inspections, tree removal, paving materials, and ongoing operating expenses.
The Capital Reserve Fund incurred expenses of $55K for the balance due for an approved replacement boom mower, $22K for construction on Hershey's Mill Dam, and $16K for implementation costs of the new Edmunds GovTech financial software.
The Bond Fund incurred expenses of$47K for East Goshen's portion of West Goshen Sanitary Treatment Plant improvements, $7K for Milltown Dam engineering, and $5K for Hershey's Mill Dam engineering.
Recommended motion: Madam Chair, I move that we graciously accept the receipts and approve the expenditures as presented in the Expenditure Register and as summarized in the Treasurer's Rep01i.
TREASURER'S REPORT June 16, 2022 -June 30, 2022 RECEIPTS AND BILLS
/GENERAL FUND
Real Estate Tax $0.00 Accounts Payable $104,490.09 Earned Income Tax $42,600.00 Electronic Pmts: Local Service Tax $0.00 Credit Card $11,380.85 Transfer Tax $0.00 Postage $0.00 General Fund Interest Earned $0.00 Debt Service $2,726.08 Total Other Revenue $625,775.91 Payroll $170,409.51
Total General Fund Receipts: $668,375.91 Total Expenditures: $289,006.53
[STATE LIQUID FUELS FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total State Liquid Fuels Receipts: $0.00 Total Expenditures: $0.00
[CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $93,888.62 Interest Earned $0.00 Credit Card $0.00 Total Capital Reserve Fund Receipts: $0.00 Total Expenditures: $93,888.62
[TRANSPORTATION FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Transportation Fund Receipts: $0.00 Total Expenditures: $0.00
[SEWER OPERATING FUND
Receipts $39,045.32 Accounts Payable $157,848.33 Interest Earned $0.00 Electronic Pmts:
Credit Card $1,560.74 Debt Service $427,290.16 Total Sewer Operating Fund Receipts: $39,045.32 Total Expenditures: $586,699,23
[REFUSE FUND
Receipts $18,530.38 Accounts Payable $18,097.89 Interest Earned $0.00 Credit Card $14,749.00 Total Refuse Fund Receipts: $18,530.38 Total Expenditures: $32,846.89
[BOND FUND
Receipts $0.00 Accounts Payable $59,454.14 Interest Earned $0.00 Total Bond Fund Receipts: $0.00 Total Expenditures: $59,454.14
[SEWER CAPITAL RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Sewer Capital Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
[OPERATING RESERVE FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Operating Reserve Fund Receipts: $0.00 Total Expenditures: $0.00
[INFRASTRUCTURE SUSTAINABILITY FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total Infrastructure Sustainability Fund Receipts: $0.00 Total Expenditures: $0.00
[ARPA -COVID RELIEF FUND
Receipts $0.00 Accounts Payable $0.00 Interest Earned $0.00 Total ARPA - COVID Relief Fund Receipts: $0.00 Total Expenditures: $0.00
East Goshen Township Fund Accounting
Report Date 06/21/22 Expenditures Register GL-2206-83829
BATCH 1 OF 6
PAGE 1
Vendor Reg# Budget# Sub# Description ----- 01 GENERAL FUND
4234 M>!ERICAN FIREWORKS COMPANY 68892 1 01452 3204 COMMUNITY DAY Bl\LANCE DUE FOR FIREWORKS
4550 BIG BABY BAND 68893 1 01452 3204 COMMUNITY DAY COMMUNITY DAY BAND PERFORMI\NCE -----
4136 FIRSTNET - #287290606505 68894 1 01401 3210 COMMUNICATION EXPENSE MAY 2022 -----
4131 FIRSTNET - #281290608802 68895 1 01401 3210 COMMUNICATION EXPENSE MAY 2022 -----
2952 ONE STOP PARTY SHOP 68896 1 01452 3204 COMMUNITY DAY Bl\LANCE DUE - BOUNCY HOUSES & TRACK LESS TRAIN -----
-----
FUND SUMMARY
Fund Bank Account Amount Description
01 01 9,421.49 GENERl\L FUND
9,421.49
PERIOD SUMMARY
Period Amount
2206 9,421.49
9,421.49
Legend: Expenditures Register Previewing to your screen Print those ready to UPDATE Sorting by vendor
Invoice Number Reg Date Check Dte Recpt Dte Check# Amount
2022-490-2 06/21/22 06/21/22 06/21/22 23195 5,125.00
5,125.00
062022 06/21/22 06/21/22 06/21/22 23196 800.00
800.00
505X06082022 06/21/22 06/21/22 06/21/22 23191 855.12
855.12
802X06082022 06/21/22 06/21/22 06/21/22 23198 641.31
641.31
9602-2 06/21/22 06/21/22 06/21/22 23199 2,000.00
2,000.00
9,421.49 5 Printed, totaling 9,421.49
East Goshen Township Fund Accounting BATCH 2 OF 6
Report Date 06/23/22 Ex'enditures Register PAGE 1 GL-2 06-83887
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount --- 01 GENERAL FUND
2898 AQUASCAPES UNLIMITED 68904 1 01454 3711 POND TREATMENT 4293 06/23/22 06/23/22 1,456.00 POND SERVICE 6/10/22 --- 1,456.00
2695 BRICKHOUSE ENVIRONMENTAl 68907 1 01454 3000 GENERAl EXPENSE 5276 06/23/22 06/23/22 331. 66 MAY 2022 SERVICES - WATER SAMPLING
331. 66
3488 CINTAS CORPORATION #287 68908 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 41218711830 06/23/22 06/23/22 60. 61 WEEK END 6/8/22 CLEAN MATS 68908 2 01487 1910 UNIFORMS 41218711830 06/23/22 06/23/22 732.38 WEEK END 6/8/22 CLEAN UNIFORMS 68909 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 4123163250 06/23/22 06/23/22 60. 61 WEEK END 6/22/22 CLEAN MATS 68909 2 01487 1910 UNIFORMS 4123163250 06/23/22 06/23/22 732.38 WEEK END 6/22/22 CLEAN UNIFORMS
1,585.98
2491 COMCAST 8499-10-109-0107472 68911 1 01401 3210 COMMUNICATION EXPENSE 061022 06/23/22 06/23/22 29.47 0107472 6/17-7/16/22 PW TV --- 29.47
3490 COMCAST 8499-10-109·0111284 68910 1 01401 3210 COMMUNICATION EXPENSE 060422 06/23/22 06/23/22 48.45 0111284 6/9-7/8/22 SPEC.VIDEO PW
48. 45
4552 CUCINOTTA, VAlERIE 68912 1 01367 3508 ART 1608584 06/23/22 06/23/22 250.00 REFUND RE: CANCELLED ART CLASS
250.00
3872 EAGLE TERMITE & PEST CONTROL 68915 1 01454 3100 PROFESSIONAl SERVICES 238085 06/23/22 06/23/22 25.00 PEST CONTROL JUNE 2022 68916 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 238079 06/23/22 06/23/22 105.00 PEST CONTROL JUNE 2022 68918 1 01409 3745 PW BUILDING - MAINT REPAIRS 238081 06/23/22 06/23/22 45.00 PEST CONTROL JUNE 2022
East Goshen Township Fund Accounting BATCH 2 OF 6
Report Date 06/23/22 Ex9enditures Register PAGE 2 GL-2 06-83887
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
3872 EAGLE TERMITE & PEST CONTROL 68919 1 01409 3840 DISTRICT COURT EXPENSES 238082 06/23/22 06/23/22 50.00 PEST CONTROL JUNE 2022
225. 00
2836 FAMILY STAGES 68921 1 01452 2020 SUMMER PROGRAM - ENTERTAINMENT 042522 06/23/22 06/23/22 475.00 HANSEL & GRETEL PERFORMANCE
475.00
3131 GREAT AMERICA FINANCIAL SERVICES 68922 1 01401 3840 RENTAL OF EQUIP. -OFFICE 31830324 06/23/22 06/23/22 160.00 LANIER MP C6004ex - JUNE 2022 ----- 160.00
598 HANSON AGGREGATES PENNSYLVANIA LLC 68924 1 01454 3740 PARK MAINTENANCE & REPAIR 4124532 06/23/22 06/23/22 277.21 16.55 TONS PRODUCT 57
277.21
2717 HIGGINS & SONS INC., CHARLES A. 68925 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. 56567 06/23/22 06/23/22 4,970.00 TRAFFIC LIGHT MAINT./INSPECTION ALL INTERSECTIONS 68926 1 01433 2500 MAINT, REPAIRS.TRAFF.SIG. 56572 06/23/22 06/23/22 178.00 TRAF.LIGHT REPAIR - N.CHESTER & GREENHILL 68927 1 01433 2500 MAINT. REPAIRS.TRAFF.SIG. 56571 06/23/22 06/23/22 76. 75 TRAF.LIGHT REPAIR - PAOLI & AIRPORT
5,224.75
627 HIGHWAY MATERIALS INC. 68928 1 01454 3740 PARK MAINTENANCE & REPAIR 27461 06/23/22 06/23/22 1,541.81 26.15 TONS 19mm,0.3<30 B - PATCH PAVING TRAIL/APPLEBROOK PARK 68928 2 01454 3740 PARK MAINTENANCE & REPAIR 27461 06/23/22 06/23/22 4,892.57 73.85 TONS 9.5mm,0.3<30 H - PATCH PAVING TRAIL/APPLEBROOK PARK
6,434.38
East Goshen Township Fund Accounting BATCH 2 OF 6
Report Date 06/23/22 Ex#enditures Register PAGE 3 GL-2 06-83887
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ----- 638 HOME DEPOT CREDIT SERVICES 68929 1 01454 3740 PIIRK MAINTENANCE & REPAIR 061322 06/23/22 06/23/22 209.00 SWING CHAINS FOR PIIRK BENCHES
209.00
719 KEEN COMPRESSED GAS COMPANY 68930 1 01430 2330 VEHICLE MAINT AND REPAIR 30976617 06/23/22 06/23/22 97. 97 CARTRIDGE FOR PLAZMA CUTTER 68931 1 01437 2460 GENERAL EXPENSE - SHOP 83375108 06/23/22 06/23/22 88.46 VARIOUS CYLINDERS OF GASES ----- 186.43
2442 KENT AUTOMOTIVE 68932 1 01430 2330 VEHICLE MAINT AND REPAIR 9309618859 06/23/22 06/23/22 164.09 BULKBLACK BUNDLE TIES
164.09
3838 IINIGHT BROS. INC. 68933 1 01438 2460 TREE REMOVAL 15855 06/23/22 06/23/22 11,760.00 MISC.TREE SERVICE - GRANDOAK 5/9- 5/31/22 ----- 11,760.00
739 IINOX EQUIPMENT RENTALS INC. 68934 1 01438 2460 TREE REMOVAL 100247 .1. 2 06/23/22 06/23/22 316.80 ROLLER RENTAL 6/8/22
316.80
3990 LANGS LAWNCARE & TREECARE 68935 1 01454 3710 LANDSCAPING 392669 06/23/22 06/23/22 299.00 LATE SPRING CRABGRASS CONTROL ----- 299.00
765 LEC - LENN! ELECTRIC CORPORATION 68936 1 01409 3745 PW BUILDING - MAINT REPAIRS 220602 06/23/22 06/23/22 896.61 NEW WIRES FOR NEW VAC SYSTEM
896.61
East Goshen Township Fund Accounting BATCH 2 OF 6 Report Date 06/23/22 Ex#enditures Register PAGE 4 GL-2 06-83887
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
4553 MCCAULEY, BECKY 68937 1 01367 3240 PARK FEES 062122 06/23/22 06/23/22 100.00 REFUND RE: CAACELED PAVILION RENTAL
100.00
827 NEW ENTERPRISE STONE & LIME INC. 68944 1 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 7828187 06/23/22 06/23/22 2,023.04 72. 64 TONS AASHTO #1. 3 1/2"
2,023.04
1554 CDP BUSINESS SOLUTIONS LLC 68945 1 01401 2100 MATERIALS & SUPPLIES 247469705001 06/23/22 06/23/22 59.31 RETRACTABLE PENS, BINDER CLIPS, ASST. DIVIDERS & TAPE 68946 1 01401 2100 MATERIALS & SUPPLIES 249193916001 06/23/22 06/23/22 417.56 HP TONER
476.87
2091 PERON, KELLY 68950 1 01452 2020 SUMMER PROGRAM - ENTERTAINMENT 062122 06/23/22 06/23/22 250.00 MAGIC SHOW FOR SUMMER CAMP 7/7/22
250. 00
3101 PONY RIDES BY DONNA 68948 1 01452 3204 COMMUNITY DAY 1-062222 06/23/22 06/23/22 1,500.00 PONY RIDES & FACEPAINTING COMM.DAY
1,500.00
2039 PREMIUM FIRE & SECURITY LLC 68949 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 14078 06/23/22 06/23/22 840.00 PLANK & BLACKSMITH SHOPS AANUAL CENTRAL STATION MONITORING
840.00
1300 SEI STEPHENSON EQUIPMENT INC. 68951 1 01430 2330 VEHICLE MAINT AND REPAIR 1262531 06/23/22 06/23/22 375.10 RAM BALL MOUNTS & RAM MOUNT ARMS -----
375.10
East Goshen Township Fund Accounting
Report Date 06/23/22 Expenditures Register GL-2206-83887
BATCH 2 OF 6
PAGE 5
Vendor Req # Budget# Sub# Description
2893 TOTALLY ABSORBENT 68952 l 01452 2000 SUMMER PROGRAM SUPPLIES DEFIB, JIED PADS & BATTERIES
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
3949 06/23/22 06/23/22 2,307.80
2,307.80
East Goshen Township Fund Accounting
Report Date 06/23/22 Expenditures Register GL-2206-83887
BATCH 2 OF 6
PAGE 6
Vendor Reg# Budget# Sub# Description Invoice Number Reg Date Check Dte Recpt Dte Check# Amount
03 CAPITAL RESERVE FUND
4490 EDMUNDS GOVTECH 68920 1 03407 7400 CAPITAL REPLACEMENT - SOFTWARE IMPLEMENTATION NEW SOFTWARE
22-IN1644 06/23/22 06/23/22 --- ------------------------ --- ---
4548 MESSICK'S
4412
68939 1 03430 7400 CAPITAL REPLACEMENT - HWY EQUIP NEW POWERSTAR 90 TRACTOR
TOTAL SITE DEVELOPMENT INC. 68953 1 03457 7450 CAPITAL - HERSHEY MILL REPAIR APPLIC. #14 - HERSHEY MILL DAM
ELI-47945 06/23/22 06/23/22
APPLIC.#14 06/23/22 06/23/22
16,125.00
16,125.00
55,153.00
55,153.00
20,353.75
20,353.75
East Goshen Township Fund Accounting BATCH 2 OF 6 Report Date 06/23/22 Ex$enditures Register PAGE 7 GL-2 06-83887
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount --- 05 SEWER OPERATING
4045 ACE DISPOSAL CORPORATION 68899 l 05422 3701 R.C. COLLEC.-MAINT,& REPR 183842 06/23/22 06/23/22 212.50 STAND BY TIME - 5/20/22 HERSH.MILL 68900 l 05420 3705 ASHBRIDGE-MAINT.&REPR 183843 06/23/22 06/23/22 212.50 STAND BY TIME - 5/20/22 ASHBRIDGE 68901 l 05420 3706 BARKWAY -MAINT.& REPR. 183844 06/23/22 06/23/22 212.50 STAND BY TIME - 5/20/22 BARKWAY 68902 l 05422 3701 R.C. COLLEC.-MAINT.& REPR 183845 06/23/22 06/23/22 362. 50 STAND BY TIME - 5/3 - 5/31/22 HUNT COUNTRY 68903 l 05422 3700 R,C. STP-MAINT.& REPAIRS 183846 06/23/22 06/23/22 212.50 STAND BY TIME - 5/20/22 RCSTP ---
1,212.50
139 BFMC INC. 68905 l 05429 3400 ADMIN. - PRINTING 25131 06/23/22 06/23/22 777. 25 V-FOLDED PRESSURE SEAL BILLS
777.25
2695 BRICKHOUSE ENVIRONMENTAL 68906 l 05422 3700 R,C, STP-MAINT.& REPAIRS 5273 06/23/22 06/23/22 1,713.13 MAY 2022 SERVICES - APPLBRK CC/GW
1,713.13
3872 EAGLE TERMITE & PEST CONTROL 68913 l 05420 3705 ASHBRIDGE-MAINT.&REPR 238083 06/23/22 06/23/22 25.00 PEST CONTROL JUNE 2022 68914 l 05422 3701 R.C. COLLEC.-MAINT.& REPR 238084 06/23/22 06/23/22 25.00 PEST CONTROL JUNE 2022 68917 l 05422 3700 R,C. STP-MAINT.& REPAIRS 238080 06/23/22 06/23/22 45.00 PEST CONTROL JUNE 2022 ---
95.00
583 HACH COMPANY 68923 l 05422 3700 R.C. STP-MAINT.& REPAIRS 13076462 06/23/22 06/23/22 987. 70 TNT - NITRATE & PHOSPHORUS
987.70
East Goshen Township Fund Accounting BATCH 2 OF 6 Report Date 06/23/22 Ex%enditures Register PAGE 8 GL-2 06-83887
Vendor Reg# Budget# Sub# Description Invoice Number Reg Date Check Dte Recpt Dte Check# Amount
827 NEW ENTERPRISE STONE & LIME INC. 68943 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 7817725 06/23/22 06/23/22 1,995.76 71.79 TONS AASHT0#57 STONE 68943 2 05422 3701 R.C. COLLEC.-MAINT.& REPR 7817725 06/23/22 06/23/22 1,995.76 71.79 TONS AASHT0#57 STONE
3,991.52
1082 PIPE DATA VIEW 68947 1 05422 3701 R.C. COLLEC.-MAINT.& REPR 21268 06/23/22 06/23/22 12,475.68 CLEAN & TELEVISE SEWER LINES - BOW TREE & CLOCKTOWER
12,475.68
1385 UNIVAR USA INC. 68954 1 05422 2440 R.C. STP- CHEMICALS 50321649 06/23/22 06/23/22 4,112.80 160 BAGS SODA ASH LITE 68955 1 05422 2440 R.C. STP- CHEMICALS 50321650 06/23/22 06/23/22 980 .25 2 CONTAINERS ALUM.SULFATE 48%
5,093.05
2439 VERIZON -7041 68956 1 05422 3601 R.C. COLLEC.-UTILITIES 6524805-060622 06/23/22 06/23/22 222.93 6/7/22 - 7/6/22
222.93
3843 WEST GOSHEN SEWER AUTHORITY 68958 1 05420 3850 C,C. WEST GOSHEN OPER/MAINT EG21-T 06/23/22 06/23/22 23,533.20 2021 TAPPING FEE FUND EXPENSES
23,533.20
1431 WEST GOSHEN TOWNSHIP 68957 1 05420 3850 C.C. WEST GOSHEN OPER/MAINT EG-2021-0&M 06/23/22 06/23/22 4,752.57 OPERATIONS & MAINT. - BAL. DUE 2021 -----
4,752.57
550 XYLEM DEWATERING SOLUTIONS INC. 68959 1 05420 3702 C.C. COLLEC.-MAINT.& REPR. 401171514 06/23/22 06/23/22 1,007.97 HEAVY DUTY HOSES 68959 2 05422 3701 R.C. COLLEC.-MAINT.& REPR 401171514 06/23/22 06/23/22 1,007.97 HEAVY DUTY HOSES 68959 3 05422 3700 R.C. STP-MAINT.& REPAIRS 401171514 06/23/22 06/23/22 1,007.96 HEAVY DUTY HOSES -----
3,023.90
East Goshen Township Fund Accounting
Report Date 06/23/22
Vendor Req # Budget# Sub#
05 SEWER OPERATING
Description
1983 YALE ELECTRIC SUPPLY CO 68960 1 05420 3705 ASHBRIDGE-MAINT,&REPR
Expenditures Register GL-2206-83887
BATCH 2 OF 6
PAGE 9
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
S120819764.001 06/23/22 06/23/22 17, 86 CORD CONNECTORS - ASHBRIDGE
17.86
East Goshen Township Fund Accounting
Report Date 06/23/22 Expenditures Register GL-2206-83887
BATCH 2 OF 6
PAGE 10
Vendor Req # Budget# Sub#
06 REFUSE
139 BFMC INC.
Description
68905 2 06427 3400 :ADVERTISING & PRINTING V-FOLDED PRESSURE SEAL BILLS
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
25131 06/23/22 06/23/22 777 .25
777 .25
East Goshen Township Fund Accounting
Report Date 06/23/22 Expenditures Register GL-2206-83887
BATCH 2 OF 6
PAGE 11
Vendor Req # Budget# Sub# Description
08 BOND FUNDS (CAPITAL PROJECTS)
3551 MCMAHON ASSOCIATES INC. 68938 1 08459 6006 SEGMENTS F&G REIMBURSEMENTS ENGINEERING SERV. MAY 2022 PAOLI PK TRAIL
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
185066 06/23/22 06/23/22 250.00
--- ----- -------------------------------
FUND SUMMARY
Fund Bank Account Amount Description
01 01 03 03 05 05 06 06 08 08
38,202.64 GENERAL FUND 91,631.75 CAPITAL RESERVE FUND 57,896.29 SEWER OPERATING
Legend:
777.25 REFUSE 250.00 BOND FUNDS (CAPITAL PROJECTS)
188,757.93
PERIOD SUMMARY
Period Amount
2206 188,757.93
188,757.93
Expenditures Register Spooling to Windows Printers Print those ready to pay Sorting by vendor Printing for GL Period 2206 Doing a page break Creating a CSV File MARP05 run by BARBARA 3 48 PM
250.00
188,757.93 0 Printed, totaling 188,757.93
East Goshen Township Fund Accounting
Report Date 06/28/22 Expenditures Register GL-2206-83914
BATCH 3 OF 6
PAGE 1
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ---- --- -- ------------- ------------ --- 01 GENERAL FUND
67 APPLEBROOK GOLF CLUB 68961 1 01452 3505 GOLF DAY - APPLEBROOK 062822 6/28/22 GOLF OUTING 32 W/CADDIES 68961 2 01452 3505 GOLF DAY - APPLEBROOK 062822 6/28/22 GOLF OUTING 58 W/0 CADDIES --- --- -- -------------------
FUND SUMMARY
Fund Bank Account Amount Description
01 01
Legend:
11,950.00 GENERAL FUND
11,950.00
PERIOD SUMMARY
Period Amount
2206 11,950.00
11,950.00
Expenditures Register Spooling to Windows Printers Print those ready to UPDATE Sorting by vendor Printing for GL Period 2206 Doing a page break MARPOS run by BARBARA 9: 25 AM
06/28/22 06/28/22 06/28/22 23229
06/28/22 06/28/22 06/28/22 23229
Printed, totaling
5,280.00
6,670.00
11,950.00
11,950.00 11,950.00
East Goshen Township Fund Accounting
Report Date 06/28/22 Procurement Card Entries
Per Budget# Sub# Description ----------------- 2206 CREDIT CARD PAYMENT 06421 4502 WEEK 6/16/22 · 6/22/22 05422 4502 WEEK 6/16/22 · 6/22/22 06421 4502 WEEK 6/8/22 · 6/14/22 05422 4502 WEEK 6/8/22 · 6/14/22 01430 2320 148.60 GAIS. GASOLINE 01430 2320 516.10 GAIS, DIESEL 01430 2320 411.40 GAIS DIESEL 01430 2320 198.10 GAIS. GASOLINE -----------------
-----------------
GENERA! LEDGER SUMMARY
Vendr Vendor Name
241 C.C. SOLID WASTE AUTHORITY 241 C.C. SOLID WASTE AUTHORITY 241 C.C. SOLID WASTE AUTHORITY 241 C.C, SOLID WASTE AUTHORITY 1161 REILLY & SONS INC 1161 REILLY & SONS INC 1161 REILLY & SONS INC 1161 REILLY & SONS INC
GL Account I Debit Credit Description
014XX·XXXX 01101-1010 054XX·XXXX 05100-1005 064XX·XXXX 06100-1005
Legend:
6,226.64
1,560.74
14,749.00
GENERAL FUND Expense Account 6,226.64 GENERA! FUND Bank Account SEWER OPERATING Expense Account 1,560.74 SEWER OPERATING Bank Account REFUSE Expense Account 14,749.00 REFUSE Bank Account
Procurement Card Entries Spooling to Windows Printers Printing for GL Period 2206 Printing for Status N Creating a CSV Spreadsheet file. MARPl1 run by BARBARA 3 : 23 PM
BATCH 4 OF 6 PAGE 1
Invoice # Inv Date Credit Srce Trx I I U ----
64133-R 06/22/22 1,980.35 PC 83950 1 64133-S 06/22/22 746.06 PC 83950 2 64060-R 06/15/22 6,768.65 PC 83950 3 64060-S 06/15/22 814.68 PC 83950 4 12748980 06/15/22 685.34 PC 83950 5 12748931 06/15/22 2,611.47 PC 83950 6 12790150 06/22/22 2,061.11 PC 83950 7 12790151 06/22/22 868.72 PC 83950 8 ---- 22,536.38
---- 22,536.38
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 1
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# l\mount
01 GENERAL FUND
6 ABC PAPER & CHEMICAL INC
1657
4217
113
119
68964 1 01454 3000 GENERAL EXPENSE JUMBO TOILET TISSUE
120841A
68965 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS 120841 PINE SOL, JUMBO TOILET TISSUE,TRASH CAN LINERS & HAND SOAP 68965 2 01409 3745 PW BUILDING - MAINT REPAIRS 120841 PINE SOL, JUMBO TOILET TISSUE,TRASH CAN LINERS & HAND SOAP 68965 3 01409 3840 DISTRICT COURT EXPENSES 120841 PINE SOL, JUMBO TOILET TISSUE,TRASH CAN LINERS & HAND SOAP
AQUA PA 68967 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 062422 BS 000309801 0309801 5/24-6/22/22 BS 68968 1 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 062322 PW 000496917 0309798 5/19-6/17/22 PW 68969 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 062322 TB 000309828 0309828 5/19-6/17/22 TB 68970 1 01409 3600 TWP. BLDG. - FUEL, LIGHT, WATER 062322 FR 000309820 0309820 5/19-6/17/22 FR ---
AQUA PA 68977 1 01411 3630 HYDRANT & WATER SERVICE 062822 HM34 000348603 0348603 3/31-6/27/22 HM34 68978 1 01411 3630 HYDRANT & WATER SERVICE 062822 HY18 000310033 0706109 3/31-6/27/22 HY18 ---
BARTLETT TREE EXPERTS 68979 1 01438 2460 TREE REMOVAL 40383016-0 PROVIDE TREATMENT TO PIN OAKS ON GRAND OAK LANE ---
BEE.NET INTERNET SERVICES 68980 1 01401 3210 COMMUNICATION EXPENSE 202207003 BEEMAIL ACCTS. JULY 2022
06/29/22 06/30/22 06/29/22 23233
06/29/22 06/30/22 06/29/22 23233
06/29/22 06/30/22 06/29/22 23233
06/29/22 06/30/22 06/29/22 23233
06/29/22 06/30/22 06/29/22 23234
06/29/22 06/30/22 06/29/22 23234
06/29/22 06/30/22 06/29/22 23234
06/29/22 06/30/22 06/29/22 23234
06/29/22 06/30/22 06/29/22 23235
06/29/22 06/30/22 06/29/22 23235
06/29/22 06/30/22 06/29/22 23236
06/29/22 06/30/22 06/29/22 23237
216.72
279.75
279.75
279.75
1,055.97
23.58
227.34
347.73
243.40
842.05
2,763.37
1,625.51
4,388.88
942.50
942.50
800.00
800.00
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 2
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
320 EAGLE POWER TURF & TRACTOR
3407
1668
68983 1 01430 2330 VEHICLE MAINT AND REPAIR REGULATORS (2)
ETS EQUIPMENT TRADE SERVICE CO. 68986 1 01430 2330 VEHICLE MAINT AND REPAIR WATER LANCE THREAD, WATER GUNS & HOSE COUPS ---
EXETER SUPPLY COMPANY INC 68987 1 01438 2455 MATER. & SUPPLY-RESURFAC, MAN HOLE RISERS
P10251
INC.
147715
370956
2903 FRANKLIN CLEANING EQUIP. & SUPPLY CO. 68988 1 01430 2330 VEHICLE MAINT AND REPAIR Sl020821 REPAIR FLOOR SCRUBBER - PARTS & LABOR
06/29/22 06/30/22 06/29/22 23238
06/29/22 06/30/22 06/29/22 23239
06/29/22 06/30/22 06/29/22 23240
06/29/22 06/30/22 06/29/22 23241
--- --------------- ------ --- --- ---
2631 GRAPHIC IMPRESSIONS OF AMERICA INC. 68989 1 01452 2000 SUMMER PROGRAM SUPPLIES 22-3081
1849 68994 1
4547 68995 1
68995 2
68996 1
SUMMER CAMP T-SHIRTS
HICKS HAY COMPANY 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS 21 SMALL BALES OF STRAW ---
HONEY BROOK HARDWARE LLC 01437 2460 GENERAL EXPENSE - SHOP CHAIN SHARPENING 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS PROPANE REFILL 01438 2450 MATERIALS & SUPPLIES-HIGHWAYS PROPANE REFILL ---
17786
IN41772
IN41772
IN41777
06/29/22 06/30/22 06/29/22 23242
06/29/22 06/30/22 06/29/22 23243
06/29/22 06/30/22 06/29/22 23244
06/29/22 06/30/22 06/29/22 23244
06/29/22 06/30/22 06/29/22 23244
141. 40
141. 40
168.05
168.05
4,013.70
4,013.70
718.42
718.42
161.00
161. 00
203.00
203.00
280.00
31. 98
15.99
327. 97
East Goshen Township Fund Accounting BATCH 5 OF 6
Report Date 06/30/22 Ex$enditures Register PAGE 3 GL-2 06-83970
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
3707 JUST TENNIS LLC. 68997 1 01452 3701 LADIES & YOUTH TENNIS 183 06/29/22 06/30/22 06/29/22 23245 4,539.00 TENNIS INSTRUCTION WEEK OF 6/20/22
& JUNE ADULT EVENING INSTRUCTION
4,539.00
3718 KERSCHNER, GARY 68998 1 01462 2485 BLACKSMITH SUPPLIES 062822 06/29/22 06/30/22 06/29/22 23246 37 .10 REIMBURSEMENT FOR VINTAGE FLAX COMB
37 .10 739 KNOX EQUIPMENT RENTALS INC. 69000 1 01438 3840 EQUIPMENT RENTAL 100346.1.3 06/29/22 06/30/22 06/29/22 23247 275,00 LIGHT BANK RENTAL 6/9-6/16/22 69001 1 01438 3840 EQUIPMENT RENTAL 100344.1.2 06/29/22 06/30/22 06/29/22 23247 169.57 DIESEL LOADER RENTAL 6/7/22
444.57
3990 LANGS LAWNCARE & TREECARE 69002 1 01454 3723 BALL FIELDS 393908 06/29/22 06/30/22 06/29/22 23248 135.00 LATE SPRG LAWN TREATMENT - FIELD A 69003 1 01454 3723 BALL FIELDS 393909 06/29/22 06/30/22 06/29/22 23248 170.00 LATE SPRG LAWN TREATMENT - FIELD B 69004 1 01454 3723 BALL FIELDS 393910 06/29/22 06/30/22 06/29/22 23248 209.00 LATE SPRG LAWN TREATMENT - FIELD C --- 514.00
827 NEW ENTERPRISE STONE & LIME INC, 69005 1 01454 3723 BALL FIELDS 7830254 06/29/22 06/30/22 06/29/22 23249 1,267.98 35.92 TONS DIAMOND-TEX 69006 1 01436 2450 STORMWl\TER MATERIALS & SUPPLIES 7830678 06/29/22 06/30/22 06/29/22 23249 3,392.28 84.28 TONS R-5 RIP RAP
4,660.26
1554 ODP BUSINESS SOLUTIONS LLC 69007 1 01401 2100 MATERIALS & SUPPLIES 248781485001 06/29/22 06/30/22 06/29/22 23250 28.17 DESK PAD, POST-IT NOTES & CORRECT. TAPE 69008 1 01401 2100 MATERIALS & SUPPLIES 248821924001 06/29/22 06/30/22 06/29/22 23250 18.79 RUBBERBANDS 69009 1 01401 2100 MATERIALS & SUPPLIES 248821926001 06/29/22 06/30/22 06/29/22 23250 11. 99 LETTER SIZE FILE FOLDERS --- 58.95
East Goshen Township Fund Accounting BATCH 5 OF 6
Report Date 06/30/22 Ex¥enditures Register PAGE 4 GL-2 06-83970
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
01 GENERAL FUND
1555 PECO - 45168-01609 69010 1 01409 3840 DISTRICT COURT EXPENSES 062122 06/29/22 06/30/22 06/29/22 23251 44,16 45168-01609 5/19-6/20/22 DC-GAS 69010 2 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 062122 06/29/22 06/30/22 06/29/22 23251 509.65 45168-01609 5/19-6/20/22 PW-ELEC --- 553.81
2592 PECO - 45951-30004 69011 1 01454 3600 UTILITIES 062122 06/29/22 06/30/22 06/29/22 23252 42.50 45951-30004 5/19-6/20/22 RESTROOMS
42 ,so
1052 PENNONI ASSOCIATES INC, 69012 1 01408 3130 ENGINEERING SERVICES 1124447 06/29/22 06/30/22 06/29/22 23253 231. 00 SERVICES THRU 5/29/22 GEN.CONSULT 69013 1 01408 3130 ENGINEERING SERVICES 1124448 06/29/22 06/30/22 06/29/22 23253 1,895.00 SERV, THRU 5/29/22 PAOLI PK.TRAIL 69014 1 01408 3130 ENGINEERING SERVICES 1124449 06/29/22 06/30/22 06/29/22 23253 33.00 SERV. THRU 5/29/22 ROSSMORE GRADING 69015 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124450 06/29/22 06/30/22 06/29/22 23253 3,055.50 SERV. THRU 5/29/22 MALVERN INST. 69016 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124451 06/29/22 06/30/22 06/29/22 23253 132.00 SERV. THRU 5/29/22 ABGC DRIVING RANGE 69017 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124452 06/29/22 06/30/22 06/29/22 23253 198.00 SERV, THRU 5/29/22 HERSHEY MILL FARMS 69018 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124453 06/29/22 06/30/22 06/29/22 23253 99.00 SERV. THRU 5/29/22 GLOSSON 69019 1 01408 3131 ENGINEER,& MISC.RECHARGES 1124454 06/29/22 06/30/22 06/29/22 23253 33.00 SERV, THRU 5/29/22 ABGC MTCE 1604
PAOLI PIKE 69020 1 01408 3131 ENGINEER,& MISC.RECHARGES 1124455 06/29/22 06/30/22 06/29/22 23253 339.50 SERV. THRU 5/29/22 KODY 69021 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124456 06/29/22 06/30/22 06/29/22 23253 33.00 SERV. THRU 5/29/22 HERSH.MILL ROAD 69022 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124457 06/29/22 06/30/22 06/29/22 23253 97 .00 SERV. THRU 5/29/22 706 HEMLOCK 69023 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124458 06/29/22 06/30/22 06/29/22 23253 1,050.50 SERV. THRU 5/29/22 -HERSH.MILL SWM 69024 1 01408 3131 ENGINEER.& MISC.RECHARGES 1124459 06/29/22 06/30/22 06/29/22 23253 132.00 SERV. THRU 5/29/22 - 14 LOCUST
7,328.50
East Goshen Township Fund Accounting BATCH 5 OF 6
Report Date 06/30/22 Ex&enditures Register GL-2 06-83970
PAGE 5
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
1065 PETTY CASH 69025 1 01116 1000 CLEARING ACCOUNT 062722 06/29/22 06/30/22 06/29/22 23254 -31.97 REIMB. FROMM.MILLER RE: COMCAST EXPENSE 69025 2 01380 0100 MISCELLANEOUS 062722 06/29/22 06/30/22 06/29/22 23254 -2 .00 PURCHASE OF ZONING MAP 69025 3 01401 3000 GENERAL EXPENSE 062722 06/29/22 06/30/22 06/29/22 23254 9.99 GIAN'r-CANDY FOR BOS 69025 4 01401 3000 GENERAL EXPENSE 062722 06/29/22 06/30/22 06/29/22 23254 33.13 DOLLAR TREE - SUPPLIES FORM.GORDON PARTY 69025 5 01401 3000 GENERAL EXPENSE 062722 06/29/22 06/30/22 06/29/22 23254 93. 69 GIAN'r - CAKE & DRINKS FOR M.GORDON PARTY 69025 6 01401 3250 POSTAGE 062722 06/29/22 06/30/22 06/29/22 23254 12.14 UPS STORE - SHIPMNT OF WATER SAMPLE 69025 7 01437 2460 GENERAL EXPENSE - SHOP 062722 06/29/22 06/30/22 06/29/22 23254 28.33 GIAN'r - FOOD FOR PW ---
143. 31
1087 PIPE XPRESS INC. 69027 1 01436 2450 STORMWATER MATERIALS & SUPPLIES 120475 06/29/22 06/30/22 06/29/22 23255 281. 00 HIGHWAY SOLID PIPE ---
281. 00
2539 PRECISION MECHANICAL SERVICES 69029 1 01409 3740 TWP. BLDG. - MAINT & REPAIRS SC-21685 06/30/22 06/30/22 06/30/22 23256 763.56 REPAIR CEILING HEATER ---
763.56
3823 QUADRIENT LEASING USA INC. 69031 1 01401 3840 RENTAL OF EQUIP. -OFFICE N9460199 06/30/22 06/30/22 06/30/22 23257 506.97 POSTAGE MACHINE RENTL 7/20-10/19/22
506. 97
3181 ROTHWELL DOCUMENT SOLUTIONS 69032 1 01401 3840 RENTAL OF EQUIP. -OFFICE 184142 06/30/22 06/30/22 06/30/22 23258 1,173.77 LANIER/MPC6004ex CONTRACT CHARGE 3/18-6/17/22 69032 2 01401 3840 RENTAL OF EQUIP. ·OFFICE 184142 06/30/22 06/30/22 06/30/22 23258 22.87 LANIER/ SP83000N CONTRACT CHARGE 3/18-6/17/22 69032 3 01401 3840 RENTAL OF EQUIP. ·OFFICE 184142 06/30/22 06/30/22 06/30/22 23258 88.00 LANIER/ SP83000N BASE RATE 6/18 - 9/17/22 ---
1,284.64
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 6
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# l\mount
01 GENERAL FUND
2121 SHERWIN-WILLIAMS CO. 69033 l 01409 3740 TWP. BLDG. - MAINT & REPAIRS PUMP PROTECTOR - 320Z CONTAINERS
2108 SIDELINES SPORTSWEAR & PROMOTIONS
8007-2
69034 1 01487 1910 UNIFORMS 9452 SHORT & LONG SLEEVE SHIRTS-K.ROWLEY
3834 STi\NDARD INSURANCE CO. , THE 69035 l 01486 1560 HEALTH,ACCID, & LIFE JULY 2022 PREMIUM 69035 2 01213 1010 VOL. LIFE INSURANCE W/H JULY 2022 PREMIUM
061722
061722
3883 TRI-STATE TRAINING & SAFETY CONSULTING 69036 1 01452 2025 SUMMER PROGRAM GENERAL EXPENSE 062722 CAMP STAFF TRAINING
06/30/22 06/30/22 06/30/22 23259
06/30/22 06/30/22 06/30/22 23260
06/30/22 06/30/22 06/30/22 23261
06/30/22 06/30/22 06/30/22 23261
06/30/22 06/30/22 06/30/22 23262 --- --- ------------ ------ ------ ---
2273 VERIZON - 0527
25.58
25.58
331. 60
331.60
3,802.51
78.08
3,880.59
540.00
540.00
69038 l 01409 3605 PW BLDG - FUEL,LIGHT,SEWER & WATER 7504491-061422 06/30/22 06/30/22 06/30/22 23263 201.84
4485
2868
6/15/22 - 7/14/22 --- --- ------------ ----- -----------
VERIZON - 542413545-00001 69039 1 01401 3210 COMMUNICATION EXPENSE 9909361930 CELL PHONES - D.DAVIS & BOS 5/22-
6/21/22
VERIZON-1420
06/30/22 06/30/22 06/30/22 23264
69037 1 01409 3840 DISTRICT COURT EXPENSES 6/16/22 - 7/15/22 7504490-061522 06/30/22 06/30/22 06/30/22 23265
201. 84
168.76
168.76
81. 68
81.68
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 7
Vendor Req # Budget# Sub# Description
1727 WEAVER MULCH LLC 69041 1 01454 3000 GENERAL EXPENSE 10 TONS RIVER ROCK - BOCCI COURTS
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
562308
69042 1 01436 2450 STORMWATER MATERIALS & SUPPLIES 563418
06/30/22 06/30/22 06/30/22 23266
06/30/22 06/30/22 06/30/22 23266
750.00
412.50 15 CYDS SCREENED TOPSOIL
1576 WEIGAND INC., H.A. 69044 1 01433 2450 MATERIALS & SUPPLIES - SIGNS GREEN & WHITE REFLECTORS & MISC. ROAD SIGNS
1,162.50
119987 06/30/22 06/30/22 06/30/22 23267 2,932.50
2,932.50
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 8
Vendor Req # Budget# Sub# Description
03 CAPITAL RESERVE FUND
4229 ESCH'S FENCING LLC 68984 1 03457 7450 CAPITAL - HERSHEY MILL REPAIR TREATED SPLIT RAIL LINE POSTS & RAILS - HERSHEY MILL DAM 68985 1 03457 7450 CAPITAL - HERSHEY MILL REPAIR TREATED SPLIT RAIL GATES, POSTS, RAILS & GATE HARDWARE - HERSHEY MILL DAM
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
155198 06/29/22 06/30/22 06/29/22 1504 1,422.25
57292 06/29/22 06/30/22 06/29/22 1504 719.62
--- -- ------------- --------- --- --- 2,141.87
East Goshen Township Fund Accounting BATCH 5 OF 6
Report Date 06/30/22 Ex%enditnres Register GL-2 06-83970
PAGE 9
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount
05 SEWER OPERA TING
1658 AQUA PA 68971 l 05422 3601 R.C. COLLEC.-UTILITIES 062422 TWN 06/29/22 06/30/22 06/29/22 5176 69.00 001533998 1087842 5/24-6/22/22 TWN 68972 l 05420 3602 C.C. COLLECTION -UTILITIES 062422 TH 06/29/22 06/30/22 06/29/22 5176 22.24 000309826 0309826 5/24-6/22/22 TH 68973 l 05420 3602 C.C. COLLECTION -UTILITIES 062322 GH 06/29/22 06/30/22 06/29/22 5176 20.51 000300141 0300141 5/19-6/17/22 GH 68974 l 05420 3604 MILL VAL,/BARKWAY UTILITIES 062322 BK 06/29/22 06/30/22 06/29/22 5176 20.51 000363541 0357724 5/19-6/17/22 BK 68975 l 05420 3602 C.C. COLLECTION -UTILITIES 062722 WW 06/29/22 06/30/22 06/29/22 5176 35.20 000305003 0305003 5/25-6/23/22 WW
167.46
151 BLOSENSKI DISPOSAL CO, CHARLES 68981 l 05422 4502 R.C. SLUDGE-LAND CHESTER 183250 06/29/22 06/30/22 06/29/22 5177 219.00 SWITCH 20 YDS WITH LINER 6/13/22 68982 l 05422 4502 R.C. SLUDGE-LAND CHESTER 183247 06/29/22 06/30/22 06/29/22 5177 219.00 SWITCH 20 YDS WITH LINER 6/20/22 ---
438.00
583 HACH COMPANY 68993 l 05422 3700 R.C. STP-MAINT.& REPAIRS 13083057 06/29/22 06/30/22 06/29/22 5178 758.80 AMMONIA TNT
758.80
739 KNOX EQUIPMENT RENTALS INC. 68999 l 05420 3701 C.C. INTERCEPT.-MAINT.&REP 100051. l, 4 06/29/22 06/30/22 06/29/22 5179 1,155.00 GRINDER RENTAL 6/6-6/9/22 REMOVE TREES ---
1,155.00
1087 PIPE XPRESS INC. 69026 l 05422 3701 R.C. COLLEC.-MAINT.& REPR 120335 06/29/22 06/30/22 06/29/22 5180 1,276.00 PVC CONDIUTS ---
1,276.00
4354 POSM SOFTWl\RE 69028 l 05420 3702 C.C, COLLEC.-MAINT.& REPR. 2325 06/29/22 06/30/22 06/29/22 5181 250.00 ONE YEAR SUPPORT CONTRACT 69028 2 05422 3701 R.C. COLLEC.-MAINT.& REPR 2325 06/29/22 06/30/22 06/29/22 5181 250.00 ONE YEAR SUPPORT CONTRACT 69028 3 05422 3700 R.C. STP-MAINT,& REPAIRS 2325 06/29/22 06/30/22 06/29/22 5181 250.00 ONE YEAR SUPPORT CONTRACT
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 10
Vendor Req # Budget# Sub# Description
1385 UNIVAR USA INC. 69040 1 05422 2440 R.C. STP- CHEMICALS 1500 GALS. ALUM.SULFATE
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
750.00
50341692 06/30/22 06/30/22 06/30/22 5182 2,725.00 --- -- - ------------ --------- --- ---
1983 YALE ELECTRIC SUPPLY CO 69046 1 05420 3701 C.C. INTERCEPT.-MAINT.&REP VARIOUS ELECTRICAL PARTS FOR FLOW METER
Sl20850357.001 06/30/22 06/30/22 06/30/22 5183
--- -- - ------------ ----- --- ---- ----
2,725.00
308.50
308.50
East Goshen Township Fund Accounting
Report Date 06/30/22
Vendor Req # Budget# Sub# Description
07 MUNICIPAL AUTHORITY
1065 PETTY CASH 69025 8 07424 3000 MISCELLANEOUS EXPENSE
Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 11
Invoice Number Req Date Check Dte Recpt Dte Check# Amount
062722 06/29/22 06/30/22 06/29/22 3321 125.00 PA MUNIC, AUTH,WORKSHOP - W.WUJCIK
125.00
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditures Register GL-2206-83970
BATCH 5 OF 6
PAGE 12
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# llmount
08 BOND FUNDS (CAPITAL PROJECTS)
1970 GANNETT FLEMING INC. 68990 l 08454 6060 HERSHEY'S MILL CONSTRUCTION PROF.SERVICES - HERSHEY MILL DAM
0000010334
68991 l 08454 6060 HERSHEY'S MILL CONSTRUCTION 0000010332
Fund ---
Ol 03 05 07 08
Legend:
PROF.SERVICES - HERSH.MILL DAM BID & CONSTRUCTION 4/2-6/3/22 68992 l 08454 6010 MILLTOWN DAM ENGINEERING 0000010333 PROF.SERVICES - MILLTOWN DAM BID 4/2-6/3/22
FUND SUJ,11,00lY
Bank Account Amount Description
Ol 03 05 07 08
44,246.16 GENERAL FUND 2 , l4 l. 87 CAPITAL RESERVE FUND 7,578.76 SEWER OPERATING 125.00 MUNICIPAL AUTHORITY 12,014.15 BOND FUNDS (CAPITAL PROJECTS)
66,105.94
PERIOD SUJ,11,00lY
Period Amount
2206 66,105.94
66,105.94
Expenditures Register Spooling to Windows Printers Print those ready to UPDATE Sorting by vendor Printing for GL Period 2206 Doing a page break MARP05 run by BARBARA 10: 39 AM
06/29/22 06/30/22 06/29/22 1077
06/29/22 06/30/22 06/29/22 1077
06/29/22 06/30/22 06/29/22 1077
2,500.00
2,514.15
7,000.00
12,014.15
66,105.94 46 Printed, totaling 66,105.94
East Goshen Township Fund Accounting BATCH 6 OF 6
Report Date 06/30/22 Ex#enditures Register PAGE 1 GL-2 06-83972
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount --- 05 SEWER OPERATING
4554 BEAUSANG, ELLEN 69053 l 05364 1000 REVENUE - SEWER FEES 063022 06/30/22 06/30/22 06/30/22 5184 73.19 REFUND RE: OVERPAYMENT OF UTILITY INVOICE
73.19
425 EAST GOSHEN TOWNSHIP - GENERAL 69052 l 05420 1400 C.C. METERS -WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 4,378.23 QTR.2-2022 REIMBURSEMENT 69052 2 05420 2510 C.C. METERS -VEHICLE OPER. 062922-S 06/30/22 06/30/22 06/30/22 5185 3,252.07 QTR.2-2022 REIMBURSEMENT 69052 3 05420 1402 C.C. COLLECTION - WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 6,479.15 QTR.2-2022 REIMBURSEMENT 69052 4 05420 2512 C.C. COLLEC.-VEHICLE OPER. 062922-S 06/30/22 06/30/22 06/30/22 5185 3,503.03 QTR,2-2022 REIMBURSEMENT 69052 5 05420 1405 ASHBRIDGE WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 2,903. 7l QTR,2-2022 REIMBURSEMENT 69052 6 05420 2515 ASHBRIDGE - VEHICLE OPER 062922-S 06/30/22 06/30/22 06/30/22 5185 l,237, 08 QTR,2-2022 REIMBURSEMENT 69052 7 05420 1406 MILL VALLEY - WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 2,903. 7l QTR.2-2022 REIMBURSEMENT 69052 8 05420 2516 MILL VALLEY - VEHICLE OPER 062922-S 06/30/22 06/30/22 06/30/22 5185 l,237.08 QTR,2-2022 REIMBURSEMENT 69052 9 05422 1401 R,C, COLLEC.- WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 6,728.20 QTR.2-2022 REIMBURSEMENT 69052 lO 05422 25ll R.C. COLLEC-VEHICLE OPER. 062922-S 06/30/22 06/30/22 06/30/22 5185 3,117.05 QTR.2-2022 REIMBURSEMENT 69052 ll 05422 1400 R.C. STP- WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 4,342.42 QTR.2-2022 REIMBURSEMENT 69052 12 05422 2510 R.C. STP-VEHICLE OPER. 062922-S 06/30/22 06/30/22 06/30/22 5185 2,008.73 QTR,2-2022 REIMBURSEMENT 69052 13 05429 1401 PA ONE CALL - WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 l,537,0l QTR.2-2022 REIMBURSEMENT 69052 14 05429 1400 ADMIN.- WAGES 062922-S 06/30/22 06/30/22 06/30/22 5185 25,819.54 QTR.2-2022 REIMBURSEMENT 69052 15 05429 3500 ADMIN.- INSURANCE 062922-S 06/30/22 06/30/22 06/30/22 5185 10,870.41 QTR.2-2022 REIMBURSEMENT 69052 16 05429 3730 ADMIN.-BLDG.OVERHEAD 062922-S 06/30/22 06/30/22 06/30/22 5185 10,934.00 QTR.2-2022 REIMBURSEMENT
91,251.42
East Goshen Township Fund Accounting
Report Date 06/30/22 Expenditnres Register GL-2206-83972
BATCH 6 OF 6
PAGE 2
Vendor Req # Budget# Sub# Description Invoice Number Req Date Check Dte Recpt Dte Check# Amount ----- 06 REFUSE
425 EAST GOSHEN TOWNSHIP - GENERAL 69050 1 06427 1400 REFUSE - WAGES QTR.2-2022 REIMBURSEMENT 69050 2 06427 3730 l\DMIN.BLDG.OVERHEl\D QTR.2-2022 REIMBURSEMENT
07 MUNICIPAL AUTHORITY
425 EAST GOSHEN TOWNSHIP - GENERAL 69049 1 07424 1400 l\DMINISTRATIVE WAGES QTR.2-2022 REIMBURSEMENT
08 BOND FUNDS (CAPITAL PROJECTS)
3843 WEST GOSHEN SEWER AUTHORITY 69054 1 08429 6000 WEST GOSHEN STP IMPROVEMENTS 16.67% COSTS RE: W.GOSHEN SEWER AUTHORITY PROJECTS
FUND SUMMARY
Fund Bank Account Amount Description
05 05 06 06 07 07 08 08
Legend:
91,324.61 SEWER OPERATING 16,329.48 REFUSE 8,372.05 MUNICIPAL AUTHORITY 47,189.99 BOND FUNDS (CAPITAL PROJECTS)
163,216.13
PERIOD SUMMARY
Period Amount
2206 163,216.13
163,216.13
Expenditures Register Spooling to Windows Printers Print those ready to UPDATE Sorting by vendor Printing for GL Period 2206 MARP05 run by BARBARA 11 : 21 AM
062922-R 06/30/22 06/30/22 06/30/22 819 14,401.32
062922-R 06/30/22 06/30/22 06/30/22 819 1,928.16
16,329.48
062922 06/30/22 06/30/22 06/30/22 3322 8,372.05
8,372.05
EG21-B 06/30/22 06/30/22 06/30/22 3004 47,189.99
47,189.99
163,216.13 5 Printed, totaling 163,216.13
EAST GOSHEN TOWNSHIP MONTHLY DEBT PAYMENT BREAKDOWN
June 25, 2022
GENERAL FUND:
Interest Principal Year of Loan Original Remaining Retirement Avg Interest
payment payment Issuance Description loan amount Principal Date Rate
$2,726.08 $0.00 2003 Multi purpose $5,500,000.00 $ 759,000.00 2023 4.3% 9 projects
$0.00 $0.00 2017 G Playground, Dams, $5,310,000.00 $5,290,000.00 2037 2.7% & Paoli Pike Trail
SEWER FUND:
Interest Principal Loan Original Remaining Retirement Retirement
payment payment Description loan amount Principal Date Date
$18,011.40 $405,000.00 2008 RCSTP 9,500,000.00 $5,053,000.00 2032 4.0%
Expansion
$4,278.76 $0.00 2013 Diversion 2,500,000.00 $1,684,000.00 2033 3.1% Projects
$0.00 $0.00 2017 5 West Goshen STP 2,840,000.00 $2,465,000.00 2037 2.7%
ACH DEBITS TO GENERAL FUNDS EXPENSE REPORT Attachment 2 OF 2 Meeting Date 7/5/2022
5/1/22 - 5/31/22
Fund Fee Charged Name Month Covered Description
01 34.90 AUTHNET FEES May 2022 CRED.CARD BANK CHARGES
GENERAL 347.40 BANKCARD FEES May 2022 CRED.CARD BANK CHARGES
FUND 287.50 M&T MONTHLY FEE May 2022 POSITIVE PAY & ACH MONITOR
$669.80
03 May2022
CAPITAL 115.00 M&T MONTHLY FEE May2022 POSITIVE PAY & ACH MONITOR
RESERVE $11S.00 May 2022
05 933.67 REIMBURSMENT of Credit Card Fee May2022 Paymentus
SEWER 115.00 M&T MONTHLY FEE May 2022 POSITIVE PAY & ACH MONITOR
FUND $1,048.67 May 2022
06 933.66 REIMBURSMENT of Credit Card Fee May 2022 Paymentus
REFUSE 57.50 M&T MONTHLY FEE May 2022 POSITIVE PAY & ACH MONITOR
FUND $991.16
TOTAL $2,824.63
DATE DESCRIPTION
DEREK DAVIS
4/28/2022 Quadrient • Ink cartridges for postal machine 5/1/2022 GOTOMYPC • Logmein 5/3/2022 B&H PHOTO • Battery backups 5/5/2022 AMAZON • Belt phone holsters 5/7/2022 AMAZON• Keyboards (spares) 5/11/2022 AMAZON • Car mat holders 5/12/2022 AMAZON - internet cables, ties & tape 5/12/2022 AMAZON - Cable clips & car cable organizers 5/17/2022 PATELMOS PIZZERIA· Pizza Donation - WEGO 5/24/2022 APPLE.COM • lcloud
$885.09 MARK MILLER
5/2/2022 OISCOUNTFILTERS.COM • Aqua Water filters for the park 5/2/2022 MATLACK FLORIST· Flowers for Susan D'Amore 5/3/2022 ESCH'S - Parts for tennis court gate 5/5/2022 ALLIED ELECTRONICS - Super Vac 5/13/2022 TRUCKNTOW.COM • Binders 5/13/2022 TRUCKNTOW.COM - Tie down straps/ binders 5/21/2022 MOULTRIE MOBILE - Park Cameras 5/21/2022 HONEY BROOK HARDWARE - Hose pumps for watering 5/23/2022 ALLIED ELECTRONICS - Relay 5/25/2022 LANDS END - Qtr. Zip Pullovers
$3,589.17 JASON LANG
4/28/2022 HOBBY LOBBY· Rocket Camp Supplies 4/29/2022 PA CHILO ABUSE CERTIFICATIONS - Background checks 5/4/2022 TOYPRO LLC • Robotics Legos 5/5/2022 TOYPRO LLC - Tax refund 5/5/2022 PARTY CITY· BeeKeeping Supplies 5/11/2022 PAYPAY PLAQUES· Eagle Scout Plaques 5/11/2022 KRAPFS COACHES - Deposit for NYC trip 5/14/2022 IDENTOGO - Fingerprints A.Bottaro 5/23/2022 IDENTOGO • Fingerprints K. Bentley 5/23/2022 IDENTOGO - Fingerprints A. Mahmood 5/23/2022 IOENTOGO • Fingerprints D. Steele 5/25/2022 COMMONWEALTH FINANCE· Grant application Pickleball
$679.95
GRAND TOTAL
J/E's made
Add to Master Cred.Card List
ATTACHMENT l OF 2
TOTAL 1116.1000 1401.3000 1401.3250 1407.2130 1430.2330 5422.3701
272.00 44.00 132.96 29.97 79.00 65.99 70.38 10.44 179.36 0.99
73.88 241.95 13.33 1,831.68 359.96 239.96 45.56 233.90 307.40 307.40 241.55
84.78 39.00 91.34 -5.17 10.60 160.00 100.00 24.85 24.85 24.85 24.85 100.00
5,154.21 307.40 E8
272.00 44.00 132.96
79.00 65.99 70.38 10.44 179.36 0.99
241.95
1,831.68 359.96 239.96
39.00
460.31 272.00 327.33 2,508.03
307.40 I To be reimbursed by 05 fund.
7/5/2022
1437.2460 1452.2025 1452.3000 1452.3020 1452.3509 1452.3519 1452.3725 1452.3730 1454.3716 1454.3740 1487.1910
29.97
73.88
13.33
45.56 233.90
241.55
84.78
91.34 -5.17
10.60 160.00 100.00 24.85 24.85 24.85 24.85 100.00
29.97 99.40 160.00 100.00 86.17 84.78 10.60 100.00 13.33 353.34 241.55
5,154.21
MEMO
Date: June 30, 2022 From: Derek Davis, Township Manager
Board of Supervisors To: Re: Malvern Institute Land Development Preliminary Approval - Document Enclosure List
The following is a list of the documents contained in this meeting packet regarding the proposed land development:
• Plan sheet for overall proposal and plan sheet for landscaping plan ( All other plan sheets available at the meeting and via Zoom on screen share as needed).
• Architectural renderings of the proposed building addition and ren,dering of the proposed floor plan.
• A letter from Kristin Camp (Township attorney on this issue) regarding the process followed thus far on this land development as well as a potential draft motion for the board to consider for preliminary approval.
• A letter from previous Zoning Officer Mark Gordon explaining the Planning Commission's position coming out of the June 1 st meeting and recommendations.
• Letter from Chester Valley Engineers (Malvern Institute Engineer) dated April 25, 2022 outlining the land development.
• Response letter from Pennoni (Township Engineer) regarding recommendations for the land development after review.
• Letter from Township Fire Marshall and Fire Code Inspector dated June 27, 2022 outlining recommendations for fire safety improvements.
• Letter from the East Goshen Conservancy Board dated September 28, 2021 giving landscaping recommendations.
• Review letter from Chester County Planning Commission dated July 28, 2021.
U:\DDavis\Board Meetings\Board Memos\2022\20220705 Board Meeting\Malvernlnstitute_Memo.docx
/ ,. ,,.,,.., ----
;,.,.,..., -----
z N 0 l'I
LANDSCAPE PLAN
PRELIMINARY/LAND DEVELOPMENT PLAN FOR MALVERN INSTITUTE 2ND STORY BUILDING ADDITION
EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
[Engineering and landscape site plan drawing showing existing and proposed contours, existing building and parking areas along King Road (SR 2022) and Madeline Drive, proposed 2-story building addition, proposed stone infiltration bed, proposed woodchip path, fencing, retaining wall, and landscape tree and shrub plantings across the municipal boundary of East Goshen Township, East Whiteland Township, and Willistown Township.]
Title Block & Plan Metadata
- Engineer: Chester Valley Engineers, Inc. (CVE), Paoli, PA
- Project No.: 21465
- Scale: 1"=30'
- Date: 10/30/20
- Revision 1: 05/20/22 - REVISED PER TOWNSHIP COMMENTS 09/15/21
- Sheet: SHEET 09 OF 12
- Uniform Parcel Identifier: 53-2-16, 53-2M-15
- Pennsylvania One Call System, Inc.: Call 3 Working Days Before You Dig, 1-800-242-1776
NOTE: THIS PLAN TO BE USED FOR LANDSCAPING PURPOSES ONLY. SEE SHEET 11 FOR LANDSCAPE DETAILS AND NOTES.
EXISTING FEATURES LEGEND
- EXISTING 10' CONTOUR (310)
- EXISTING 2' CONTOUR (302)
- EXISTING SPOT ELEVATION (+ 258.50)
- EXISTING PIPE LINE
- EXISTING EDGE OF PAVING
- EXISTING ADJACENT PROPERTY LINE
- EXISTING EASEMENT LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING TRACT BOUNDARY LINE
- EXISTING CURB
- EXISTING FENCE
- EXISTING GUARD RAIL
- EXISTING DEED LINE
- SOIL TYPE BOUNDARY
- SOIL SYMBOL (EdB2 / BaA)
- EXISTING LIGHT POLE
- STREAM LINE
- EXISTING STORM INLET AND PIPE
- EXISTING STORM MANHOLE AND PIPE
- EXISTING STORM ENDWALL AND PIPE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING WELL
- EXISTING UNDERGROUND WATER MAIN
- EXISTING UNDERGROUND ELECTRIC LINE
- EXISTING UNDERGROUND TELEPHONE LINE
- EXISTING OVERHEAD UTILITY LINE
- EXISTING SANITARY SEWER LINE
- EXISTING FIRE HYDRANT
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING TREE & SHRUB LINE
- EXISTING UTILITY EASEMENT (SANITARY, GAS, WATER, ELECTRIC, TELEPHONE, CABLE)
- BUILDING SETBACK LINE
- 100-YEAR FLOODPLAIN (FEMA / FIA)
- CALCULATED 100-YEAR FLOODPLAIN BOUNDARY
- MUNICIPAL BOUNDARY LINE
- EXISTING HANDICAP PARKING SPACES
- STEEP SLOPES 15-25%
- VERY STEEP SLOPES 25% AND GREATER
PROPOSED FEATURES LEGEND
- PROPOSED 10' CONTOUR (320)
- PROPOSED 2' CONTOUR (322)
- PROPOSED GRADING
- PROPOSED PAVING
- PROPOSED CURB
- PROPOSED FENCE
- PROPOSED RETAINING WALL
- PROPOSED HANDICAP PARKING SPACES
- PROPOSED WOODCHIP PATH
- PROPOSED TRASH/RECYCLING ENCLOSURE
- PROPOSED SIGN & LABEL
Key Map Labels & Boundaries
- KING ROAD SR 2022 (N68°15'00"E 899.77')
- MADELINE DRIVE
- EAST WHITELAND TOWNSHIP / EAST GOSHEN TOWNSHIP / WILLISTOWN TOWNSHIP
- S05°00'30"E 592.79'
- S87°20'00"W 217.51'
- S60°55'30"W 106.66'
- S62°20'50"W 6.13'
- S62°25'50"W 32.01' (71.76')
- S76°25'10"W 309.45'
- N03°24'56"W 491.94'
- PROPOSED 2 STORY BUILDING ADDITION
- PROPOSED STONE INFILTRATION BED
- PROPOSED WOODCHIP PATH
- PROPOSED 6' TALL BLACK ALUMINUM FENCE
- PROPOSED 6' TALL SOLID VINYL FENCE
.-.00'311nJ0lUH:>i:tVllD11'1''MMM ¥
1000·,o,·n, /tl61 Vd 'VUldUOVllHd
1:nHl'S ""' HHlOS C:Lr
3HilJ.:::>3J.IH:::>H"\f .LIHWV
z 0 E 0 0 <( a: 0
u.
-0
C "' 0 w Cf) 0 a. 0 a: a. u. 0 15 > -' <( :::, I- a. w (.) z 0 (.)
z 0 ;::
0 z w a: z a: <( Q) 0 w Cf) 0 a. 0 a: a. u. 0 i5 > -' <( :::, I- a. w (.) z 0 (.)
991::6 I ltd 'UJ9AIB0 'p8O1:J flUJ)l IS0M 0176 a1nmsu1 u1aA1e0 041 041 1e urns 041
:OI SUOJl8AOU91:J
i5 >
<!) z ;:: Cf)
z a: <( Q) u. 0 i5 >
<!) z ;:: Cf)
SMOKING PAVILION
- n1 I nil
I I t3-=- if rt
DETOX I MAIN WING BLDG
PROPOSED 1st FLOOR
PROPOSED 2nd FLOOR
DETOXIMAIN WING BLDG
= II IIUCtllll
A-14
PROPOSED BARN 2nd FLOOR
PROPOSED BARN GROUND FLOOR
PROPOSED BARN LOWER LEVEL
, 0 ;;; iJ m ¥ .
E-i: -::,... i:Q i
I
;r_
<ii ::;; "',::i - "' Zo .. a:
0 C: 0 -- C: !: 0 "' - i5 ::;; 3: c:: a>O (l).C:,,. Ct: ,-. "' I . ; .. · . _.-xi:-.'·. I
cuNtCAL/ THERAPY SPACE
-
PATIENT ACTIVITY SPACE
[:=J ADMINISTRATIVE/OTHER
2nd FLOOR ADDITION
BUCKLEY BRION MCGUHU, t• Moruus LLI'
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
June 30, 2022
KRISTIN S. CAMP p: 610.436.4400 Ext# 1050
f: 610.436.8305 e: kcamp@buckleyllp.com 118 W. Market Sh·eet, Suite 300 West Chester, PA 19382-2928
Re: Draft Motion of Approval for Preliminary Land Development Application and Plans submitted by the Malvern Institute for Improvements at 940 King Road
Dear Board Members:
After receiving the necessary zoning relief in the Zoning Hearing Board's Decision and Order dated December 1, 2020 ("Zoning Decision"), Malvern Institute submitted a preliminary land development application and plans in order to build the following improvements to their existing treatment facility at 940 King Road:
1. A second story addition to the existing single-story building; 2. A new smoking pavilion in the front of the main building; 3. A new greenhouse at the rear of the main building;
4. Associated parking lot and driveway expansions; 5. Stmmwater management facilities; 6. Other improvements required by the Zoning Hearing Board Decision and Order including fencing, landscaping and lighting.
In addition to requesting preliminary land development approval, Applicant is requested a waiver from §240-38.10 of the Zoning Ordinance which requires it to submit a Historic Resources Impact Study because the main building on the property is designated a historic resource. I have enclosed a copy of that section of the Zoning Ordinance which allows the Board to waive the requirement for the HRIS. Staff and the Planning Commission had no objection to this waiver request due to the fact that the historic resource has already been modified over the years prior to the adoption of the historic preservation provisions in the Zoning Ordinance.
At the June 1, 2022 Planning Commission meeting, the Planning Commission unanimously recommended that the Board approve the preliminary plan and the waivers requested subject to various conditions outlined in the letter dated June 2, 2022 from Mark Gordon (copy attached.)
Based on the Planning Commission's recommendation, I drafted the following Motion for the Board's consideration at the July 5, 2022 meeting where Applicant will appear to present the preliminary plan.
June 30, 2022
Page Two
"I move to grant preliminary land development approval for the preliminmy land development plan prepared for Malvern Institute, by Chester Valley Engineers, dated June 28, 2021, last revised April 20, 2022, subject to the following conditions:
1. All comments outlined in the Pennoni Associates review letter dated May 25, 2022 shall be addressed to the satisfaction of the Township engineer and Board and be reflected in the final plan.
2. Applicant shall submit and present the final landscape plan to the Township Conservancy Board for its review and comment prior to presenting the final plan to the Planning Commission. The landscape plan shall address the comments in the Conservancy Board's review letter dated September 28, 2021.
3. Applicant shall connect existing roof drains on the front of the main building into the proposed stormwater management system. Applicant shall also connect the roof drains from the back left corner of the main building to an infiltration bed that Applicant designs and installs consistent with the Simplified Approach of the Stormwater Code. The design of these connections and facilities shall be approved as part of the final plan.
4. Applicant shall include the written protocols required by conditions 25 and 27 of the Zoning Decision on the final plan.
5. All conunents outlined in the Township Fire Marshall's review letter dated June 27, 2022 shall be addressed to the satisfaction of the Fire Marshall and Board and be reflected in the final plan."
I will be in attendance at the July 5, 2022 Board meeting and am available in advance if any members of the Board have questions on the application.
KSC/jak Enclosures cc: Derek Davis, Manager via email Nathan Cline, P.E. Pennoni via email
Very tmly yours,
Kristin S. Camp
Chapter 240. Zoning
Article VI. Historic Preservation
§ 240-38.10. Historic resource impact study.
[Amended 10-17-2006 by Ord. No. 129-F-06]
Township of East Goshen, PA
Wednesday, June 29, 2022
A. Applicability. An historic resource impact study (HRIS), prepared by a registered architect specializing in historic preservation and adaptive reuse of historic buildings and structures, shall be submitted to the Township, unless waived or modified by the Board of Supervisors, in the following situations:
(1) As part of a preliminary plan submission for any subdivision or land development application
which proposes new construction of buildings, structures, roads, driveways, parking areas, or other land disturbance within 250 feet of the exterior walls of any Class I or II historic resource.
(2) As part of a tentative plan submission for any application for a planned residential
development (prd) which proposes new construction of buildings, structures, roads, driveways, parking areas, or other land disturbance within 250 feet of the exterior walls of any Class I or II historic resource.
(3) As part of a demolition permit application.
(4) As part of a conditional use application.
B. Contents. The HRIS shall contain the following information, unless waived or modified by the Board of Supervisors:
(1) Background information:
(a) If not otheiwise provided by the applicant, a general description of the site subject to the application, Including topography, watercourses, vegetation, landscaping, existing drives, etc.
(b) A general description and classification of the historic resources located within 250 feet of
any proposed land development or land disturbance.
(c) A physical description of the interior and exterior of the historic resource(s), including an
interior floor plan.
(d) A narrative description of the historical significance of the historic resource, relative to
both the Township and to the region In general, including the names of past owners and their significance to the Township, region or nation.
(e) A sufficient number of four-inch-by-six-inch photographs lo show the exterior of the
historic resource in its setting and, if the applicant is the owner, then photographs of the interior.
{2) An assessment of potential impacts to the historic resources.
(a) A description of potential impact(s) to each historic resource with regard to architectural
integrity, historic setting, and future use.
(3) Mitigation measurers: suggested approaches to mitigate potentially negative impacts to
historic resources, Including design alternatives, buffering, landscaping, conservation of existing vegetation, and any other appropriate measurers permitted under the terms of this chapter and other Township ordinances.
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN 'TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 2, 2022
East Goshen Township Board of Supervisors 1580 Paoli Pike West Chester, Pa. 19380
Re: Malvern Institute/ Preliminary Land Development Application
Dear Board Members:
The Planning Commission has reviewed the Preliminary Land Development Application and Plan as well as the associated Zoning Hearing Board approval for the
Malvern Institute, granting Special Exception and Zoning Variances for the expansion of the use. The expansion of the use consists of the following:
1. Second story addition to the existing single-story wing at the rear of the property 2. A new smoking pavilion In the front of the property 3. A new greenhouse at the rear of the main building 4. Associated parking lot and driveway expansions 5. Associated Improvements as ordered by the Zoning Hearing Board within the Special Exception and Zoning Variance Decision and Order. The applicant has requested a waiver from the Historic Resources Impact Study requirement (§240-38.10), which may be waived by the Board of Supervisors. The Planning Commission had no objection to this waiver request due to the modifications that have already been made to this historic resource over the years, and prior to the adoption of the Historic Preservation Ordinance.
The Planning Commission unanimously passed the following motion at their meeting on June 1, 2022.
Mr. Chairman, I move that the Planning Commission recommend that the Board of Supervisors grant preliminary land development approval for the Preliminary Land Development application and plan prepared for Malvern Institute, by Chester
Valley Engineers, dated June 28, 2021, last revised Aprll 20, 2022, with the following conditions:
1. All comments outlined In the Pennon/ Associates plan review letter dated May 25, 2022 are addressed and reflective in the Final Plan submission.
F:\Oala\Shared Data\Property Management\53-2153-2-18 (940 King Rd)\2021 Land Dev. App\PC Rec. to BOS 06022022.doc
2. The Malvern Institute shall submit and present a revised landscape plan to the Township Conservancy Board for their review and comment, prior to presenting the final plan to the Planning Commission. 3. The Malvern Institute shall evaluate opportunities to mitigate and/or reduce the storm water discharge from the site to the Southwest corner of the property, Including potentially connecting the roof drains from the proposed 2nd story addition to the proposed on Jot seepage bed. 4. The Malvern Institute shall Include the written protocols required by conditions 25 and 27 of the ZHB D&O, on the final plan. 5. The Township Fire Marshall shall review and comment on the pre/Im/nary plan and App/leant shall address those comments as part of the final plan submission. 6. The App/leant shall provide a plan detail of the Fire Department Connection as part of the Final Plan submission, for review and approval by the Township Fire Marshal.
Mark A. Gordon Township Zoning Officer
F:\Data\Shared Data\Property Management\53-2153-2-18 (940 King Rd)\2021 Land Dev. App\PC Rec, to BOS 06022022.doc
May 25, 2022
EGOST 00124
Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
RE: Malvern Institute, LLC, 940 West King Road Preliminary Land Development - 2nd Submission
Dear Marl<:
One Soutll'Church Street
. Second Flocir West Chester, PA 19382
T: 610-429-8907 F: 610-429-8918
www.pennonl.com
As requested, we have reviewed the following information, prepared by Chester Valley Engineers, Inc. regarding the referenced submission:
• "Preliminary Land Development Plans for Malvern Institute" (15 sheets) dated June 28, 2021, revised · April 20, 2022;
• "Storm water Calculations Worksheet" dated June 28, 2021, revised April 20, 2022;
• "WB-40 Delivery Vehicle Exhibit!' dated April 21, 2022; and
• Engineer's response letter dated April 25, 2022.
The applicant/owner, Malvern Institute, is proposing various improvements to UPI 53-2-18 (9.6 acres) which
includes a 2nd story building addition, greenhouse, smoking pavilion, additional parking spaces, fence with associated landscaping, lighting and stormwater management. The site is located on the south side of King Road (SR 2022) opposite Madeline Drive, within the R-2 Residential District. A small portion of the site UPI 53- 2B-13 (1.0 acre) is located within Willistown Township however no improvements are proposed on this parcel. The property is served by public water and public sanitary sewer.
The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December 1, 2020 for the following:
1. A special exception from §240-40.C(2)(e) to expand the floor area of the main building on the property serving the Applicant's legal nonconforming use; 2. A variance from the maximum 25% increase in total floor area of structures devoted to a nonconforming use per §240-40.C{2)(c) in order to permit a 34.04% floor area expansion p\Jrsuant to the initial (original) proposal or a 52.92% floor area expansion pursuant to the alternate (revised) proposal; 3. A variance from the four foot (4') maximum height limitations of §240-32.E(2) in order to construct a six foot (6') tall estate fence in the front yard of the property; 4. A variance from the 24-foot driveway minimum width regulation of §240-33.C(l0)•in order to permit a 22-foot wide driveway for two-way traffic at night; 5. A variance from the 250-foot minimum setback requirement of §240-31.C(2)(mm) in order to permit the first floor of the new building made the subject of the revised proposals to be setback 45.1 feet from the neighboring residential properties;
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 2 Malvern Institute
6. A variance from the 18-rnonth time limit In §240-58.D so that any relief here granted will not lapse or
become null and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and 7. Such other relief necessary and appropriate to permit the Applicant's proposed expansion of its nonconforming use.
We offer the following comments (new comments are in bold/italics):
,DECISION AND ORDER
1. The Applicant shall restrict and limit the treatment program at the King Road fac//ity (the "Facility") to in-patient treatment only.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of 80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and correct copy of the submission shall be provided to the parties hereto.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged, Sheet 13 includes the entire Decision and Order,
3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of Incoming and outgoing persons and vehicles. The location of all video cameras shall be depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that any vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times In addition, the Applicant shall Implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Note the locations of the required cameras are not indicated on the plans, as required.
Acknowledged. Sheet 13 includes the entire Decision and Order.
Outstanding. We were not able to locate the proposed video camera locations on the plans.
4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than 180 days from final, unappealable and unappealed zoning approval.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 3 Malvern Institute
The Township confirmed the application was accepted in a timely fashion on June 28, 2021.
5. l(ing Road is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development pion review, along the entire western and southern boundaries of the Property except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color{s) shall be fully revealed during the land development plan review.
Pending. The required fence is indicated per the above; the detail for the fence is indicated on Sheet 12A. Board of Supervisors approval is required.
6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling of any and all land development plan review proceedings conducted by the Township Planning Commission and Board of Supervisors pursuant to this Order.
The Township confirmed a letter was sent to all property owners within 1000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.
7. The Applicant shall submit and implement a landscape plan in accordance with §240-27.C/2) for the western and southern portions of the property except for any areas within the floodplain.
Pending. A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed
landscaping is robust and appears to meet the intent of the Code and the Decision and Order. See additional comments below, and via the Conservancy Board.
8. The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C{3), for so long as the Prop;rty is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard
landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet in height. These plantings are intended to mitigate the view of the B1oot fence from the neighboring properties. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present Its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant's landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence.
Pending. A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as 10-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. See additional comments below, and via the Conservancy Board.
9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the
eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans submitted with the land development application for the review of the Board of Supervisors as part of the land development approval.
EGOST 00124 May 25, 2022 Mark A. Gordon, Zoning Officer
Note: a, The fence and landscaping are indicated as required.
Page 4 Malvern Institute
b, It may be appropriate to substitute a more deer resistant species for the proposed mountain
laurel; please review with the Conservancy Board,
c. We will defer to the Conservancy Board for additional comments. Pending (a-c}. See additional comments regarding landscaping below, and via the Conservancy Board. d. The applicant shall submit the fencing plan to Willistown Township for review and comment and a determination if any permits are required. Pending. Applicant indicates fencing details will be coordinated with Willistown Township pending preliminary approval by East Goshen.
10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the 8-foot fence and the
estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility,
Resolved. The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.
11. All proposed fencing shall be shown in detail in the land development plan and shall be continually maintained by the owner.
Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.
Pending, The applicant notes maintenance requirements will be provided with the final plan.
12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style, The location of all proposed fencing shall be shown In plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, If available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the improvements for which financial security must be posted by the Applicant.
Note:
• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted. • Fence manufacturer for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier
Pending. Sheet 13 includes the entire Decision and Order, and additional information is to be provided.
13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western property lines other than the garden, the greenhouse, and the pedestrian walking paths.
EGOST00124 Mark A. Gordon, Zoning Offlcer
May 25, 2022 Page 5 Malvern Institute
We recommend the applicant address this condition as a narrative response, to be included on the
plan and recorded with the final plan.
Acknowledged, Sheet 13 includes the entire Decision and Order, and nothing is proposed in these
areas.
14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as ore necessary to mitigate potential noise form these facilities,
Resolved. Sufficient buffers/screens appear to be provided for these existing and proposed areas, Future areas appear to be passive in nature.
15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion. Staff and visitors
shall be restricted to smoking in the front of the building.
We recommend the applicant address this condition as a narrative response, to be Included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.
Acknowledged, Sheet 13 includes the entire Decision and Order,
16. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and filtration system to minimize the effects of smoke on the surrounding property.
We recommend the applicant address this condition as a narrative response, to be included on the
plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Pending. The "Smoke Eater" is identified on the plan, and the applicant indicates additional details will be provided at a later date.
17. The Applicant shall screen the new smoking pavilion from the neighboring properties to the west and north with the 8-foot fence described above.
Resolved. The required fence is indicated.
18. The Applicant shall demonstrate during the land development application review that the "Smoke Eater" can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan, Nothing appears to have been provided to address this condition.
Pending. The "Smoke Eater" is identified on the plan, and the applicant indicates additional details will be provided at a later date.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page6 Malvern Institute
19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Pending. Sheet 13 includes the entire Decision and Order, and they applicant Indicates details will be provided to the Township.
20. The following site improvements shall be completed prior to issuance of a building permit for the vertical building addition or barn renovations:
a. Parking lot renovations; b. Installation of estate fence and the 8-footfence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures,· d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.
We recommend the applicant address these conditions as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
21. The Applicant shall construct and maintain all walking paths with pervious wood chips.
No modifications to the trail are proposed. However, we recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.·
Resolved. Sheet 13 includes the entire Decision and Order,
22. The Applicant shall comply with the parking a/location presented on the Plan.
Resolved. The parking appears to meet Code requirements (see Sheet 4)
23. The Applicant shall agree to permit the outdoor patient activities on the property only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between 10 p.m. and 11:30 p.m. A maximum of 4 patients dt any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between 11:30 p.m. and 7 a.m.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any further expansion of the treatment center for a period of 30 years. The deed restriction shall be
EGOST00124 Mark A. Gordon, 2oning Officer
May 25, 2022 Page 7 . Malvern Institute
enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.
Nothing appears to have been provided to address this condition. We recommend that a draft document be submitted to the Township forthe Township Solicitor's review prior to recording.
Acknowledged. Sheet 13 includes the entire Decision and Order, and the applicant Indicates a draft deed restriction will be submitted under separate cover; defer to Township Solicitor.
25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors' calls.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Acknowledged. Sheet 13 includes the entire Decision and Order; note further the applicant's response regarding specifics,
26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status
of the expansion project, identify any issues that the Facility has encountered in the last year with
neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by mail of the scheduling of this annual presentation.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order.
27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient's identity or to require the police to respond but simply to advice the police that someone has left the Facility.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. Sheet 13 includes the entire Decision and Order; note further the applicant's response regarding specifics.
28. Applicant shall obtain a building permit for the vertical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.
The Township confirmed that the applicant shall secure a building permit for the vertical building addition no later than December 31, 2023 and the barn renovations no later then December 31, 2024.
EGOST00124 Mark A. Gordon. Zoning Officer
May 25, 2022 Page 8 Malvern Institute
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged, Sheet 13 includes the entire Decision and Order. Note the building application deadline for the second story is approximately 18-months away.
ZONING
1. The applicant is reminded of the general performance standards of §240-24.
Acfcnowledged.
2, A permit is required from the Township for any construction within the identified floodplain. (§240- 26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as 'future1
•
Resolved, It has been clarified that improvements labeled as Juture' are not to be implemented at
this time.
3, Please clarify specific ADA ramp details to be utilized in accordance with PENN DOT standard details. (§240-33.B(7)(b))
Resolved. Details have been provided (Sheet 12A).
4. Per §240-33,C(lO), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.
Resolved. The island has been modified to provide a minimum 22-foot-wide lane.
5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a
loading and unloading space for the vehicle. (§240-33,0(2))
Resolved. An adequate truck turning exhibit has been provided,
SUBDIVISION AND LAND DEVELOPMENT
6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(S))
Resolved, Note #2 on Sheet 2 has been revised.
7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.
Pending. No sidewalks are proposed; defer to Planning Commission, Conservancy Board and Board of Supervisors.
STORMWATER MANAGEMENT
8. Please indicate the line of Interest/Point on Analysis on the drainage area plan.
Resolved. The Point of Analysis has been clarified.
EGOST00124 Mark A. Gordon, Zoning Officer
May 25, 2022 Page 9 Malvern Institute
9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)
Outstanding. Soils testing is currently being completed.
10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.
Outstanding. See Comment No. 9, above.
11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and subgrade stability. The applicant should provide soils tests for the infiltration BMP. (§195-20.1)
Outstanding. See Comment No. 9, above.
12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system. (§195-20.N)
Outstanding. Permanent inlet filters upstream of the infiltration BMP are to be installed; please indicate these inlets on the PCSM plan.
13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.
Resolved. The elevations have been clarified.
14. The Peak Rate calculations appear to consider only SWM #1 outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§195-22)
Resolved. The Point of Analysis has been clarified.
15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by, the Conservation District or municipality (as applicable) for a determination of adequacy prior to construction of the revised features. (§195-27 .A(3))
Resolved. The statement has been provided {Sheet 1).
16. The applicant should provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))
Resolved. The signature block hos been provided {Sheet 1).
17. The applicant should provide an easement around the stormwater management BMP's; alternately a blanket easement can be provided. (§195-27.B(lB)(c)
Resolved. A blanket easement is proposed.
EGOST00124 Mark A. Gordon. Zoning Officer
May 25, 2022 Page 10 Malvern Institute
18. The applicant should provide the documents required per §195-27.F and §195-37 regarding a Stormwater Operations & Management Plan and Agreement, to be recorded.
Pending. The applicant indicates this will be provided prior to plan recording.
19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP's. (§195-37)
Outstanding. Please include O&M procedures which address maintenance of the inlet filters.
20. Please provide a sediment barrier downslope ofSW108.
Resolved. This is now indicated.
21. The limit of disturbance does not include any fencing, landscaping improvements nor 'future' improvements.
Outstanding. We will defer to the Chester County Conservation District's recommendation.
GENERAL
22. Multiple improvements are indicated as 'future'. It is unclear if they are intended to be Included as part of the overall approval.
Resolved. The applicant confirmed that all improvements labeled as 'future' are not to be
implemented at this time.
23. We recommend adding an additional arrow at the circle In addition to ONE WAY signage.
Resolved. Striping, signage and a detail are provided.
24. The applicant shall confirm the height of the proposed walls, if more than four (4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.
Pending, These may be provided at the building permit stage; the Township will require a structural review by Pennoni and a separate building permit for the retaining wall.
25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.
Acknowledged.
26. We recommend a detail for the dumpster enclosure be provided.
Resolved. A trash enclosure detail is provided {Sheet 12A)
27. An additional 'decorative fence' is indicated within the interior of the site; please provide a detail for this fence.
Pending. The applicant will provide additional clarity regarding fencing.
28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.
EGOST00l24 May 25, 2022 Mark A. Gordon. Zoning Officer
Pending. The applicant will provide additional clarity regarding fencing.
29. Fencing sound attenuation details should be provided.
Pending, The applicant will provide additional clarity regarding fencing.
30. Please additionally note the status of the following reviews/permits:
Page 11 Malvern Institute
a. NPDES Permit (PADEP/CCCD) (§195-15.((2), -16.A, -17.A); (limit of disturbance is indicated as 0.90 acres)
Not applicable; pending resolution of Comment No. 21, above,
b. Planning Module (PADEP) (§240-24.F, §205-33.B(22)(a)) - Resolved.
c. Sanitary Sewer (Municipal Authority) - Correspondence has not yet been received,
d. On-lot Wells (CCHD) - Not applicable
e. Highway Occupancy Permit (Penn DOT) - Not applicable
f. Fire/Emergency- Correspondence has not yet been received.
g. Historic Resource (Historical Comm.)-SeeSeptember 28, 2021 comments.
h. Landscaping (Conservancy Board) - See September 28, 2021 comments.
i. County Planning -See July 28, 2021 correspondence.
j. Willistown Township - Correspondence has not yet been received; see D&O Comment No. 9d .
. NEW COMMENTS
31. Unless otherwise permitted by the township (e.g.,for safety, security, or all-night operations), lighting shall be controlled by automatic switching devices, such as time clocks or combination motion detectors and photocells to permit extinguishing or output reduction as required in the latest edition of the Energy Conservation Code.
32. We recommend substitutions for Mountain laurel and Blue Holly; it is our opinion that in this area, these plants are not deer tolerant/resistant, and both have a harder time rejuvenating after being deer browsed extensively.
33. The Plant Legend has two (2) different plants indicated as "PO"; please adjust.
34. We recommend a substitute for Douglas Fir; it is susceptible to two forms of needlecast in this area and if untreated will cause premature death.
35, Comment No. 1 from the Conservancy Board states that the applicant shall provide additional landscaping in the parking Jot islands and on the east and west side of the parking lot; please clarify the additional landscaping proposed.
36, Access gates into the fenced buffer area are recommended along the south and west property lines areas for maintenance.
EGOST00124 May 2S, 2022 Mark A. Gordon. Zoning Officer
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PEN NONI
Nathan M. Cline, PE Township Engineer
cc: Derek Davis, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) Brian Nagle, Esq., MacElree Harvey (via e-mail) Malvern Institute for Psychiatric & Alcoholic Studies (via e-mail) Rick Stratton, PE, Chester Valley Engineers, Inc. (via e-mail) Kristin Camp, Esq., Buckley Brion (via e-mail)
Page 12 Malvern Institute
ChesterVal ley
\ i ! ' I L' I 1 t'
April 25, 2022
Mr. Mark Gordon Director of Code Enforcement East Goshen Township
I 580 Paoli Pike West Chester, PA l 9380
Re: Preliminary Land Development Plan Malvern Institute - 940 King Road CYE Project No. 21465-0000
Dear Mr. Gordon:
83 Chestnut Road P.O. Sox 447 Paoli, PA 19301
610-644-4623 6108893143 Fax
www.chesterv.com
On behalf of our client, Malvern Institute for Psychiatric & Alcoholics Studies, we are submitting the following response in support of an application for a Preliminary Land Development. The following documents have been enclosed in support of the application:
• Eleven (I I) copies ofa Preliminary Land Development Plan for Malvern Institute, dated June 28, 2021, last revised on April 20, 2022; • Eleven (11) copies of a Stormwater Calculations Worksheet, dated June 28, 2021, last revised April 20, 2022. • Eleven (11) copies of a WB-40 Delivery Vehicle Exhibit, dated April 21, 2022.
We offer the following responses to the review comments from the Pennoni review letter dated August 16, 2021. Comments are repeated below and responses to each follow in bold, italicized text:
The applicant was granted relief by the Zoning Hearing Board via an order dated November 25, 2020 and issued December I, 2020 for the following: I. A special exception from §240-40,C(2)(e) to expand the floor area of the main building on
the property serving the Applicant's legal nonconforming use;
2. A variance from the maximum 25% increase in total floor area of stt'llctures devoted to a nonconforming use per §240-40.C(2)(c) in order to permit a 34.04% floor area expansion pursuant to the initial (original) proposal or a 52.92% floor area expansion pursuant to the alternate (revised) proposal;
3, A variance from the four foot (4 ') maximum height limitations of §240-32.E(2) in 01·der to construct a six foot (6') tall estate fence in the front yard of the property;
Eat. 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 2
4. A variance from the 24-foot driveway minimum width regulation of §240-33.C(l0) in order to pe1mit a 22-foot wide driveway for two-way traffic at night;
5. A variance from the 250-foot minimum setback requirement of §240-3 l .C(2)(mm) in order to permit the first floor of the new building made the suȽject of the revised proposals to be setback 45. I feet from the neighboring residential properties;
6. A variance from the 18-month time limit in §240-58.D so that any relief here granted will not lapse or become null and void so long as zoning permits are obtained and actual construction is commenced not later than 15 years from the date of this decision; and
7. Such other relief necessary and appropriate to pe1mit the Applicant's proposed expansion of its nonconforming use.
Decision and Order
I. The Applicant shall restrict and limit the treatment program at the King Road facility (the "Facility") to in-patient treatment only.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). It should be noted that Malvern Institute is licensed
only for in-patient treatment. To the extent that a narrative response is requested, the responses in this letter shall constitute the narrative response.
2. The Applicant shall limit the number of patients receiving treatment at the Facility to a maximum of80 patients on-site at any one time. The Applicant shall, by formal and binding submission to the appropriate licensing agency, restrict and limit the licensing of the Facility to 80-paitnets. A true and c01rnct copy of the submission shall be provided to the parties hereto.
We recommend the applicant address this condition as a nairntive response, to be included on the plan and recorded with the final plan.
The condition is acknowledged and will be adhe1·ed to and has been made part of the plan (see sheet 13 of the plans).
3. The Applicant shall install additional video cameras at the front entrance and at locations along the main driveway entrance to supplement its existing video security system. The video cameras shall be continuously monitored so as to alert staff and security personnel of incoming and outgoing persons and vehicles. The location of all video cameras shall be
E,t 19.fS PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Pre!iminmy Land Development Application Page 3
depicted on the preliminary and final land development plans. The eastern parking lot gate shall be closed by 11 p.m. each day to ensure that any vehicle entering the site much approach the main building. The Applicant shall no less than one security guard on site at all times in addition, the Applicant shall implement and maintain the use of the security cameras which shall be continuously monitored by properly trained staff.
We recommend the applicant address this condition as a na1rntive response, to be included on the plan and recorded with the final plan, Note the locations of the required cameras are not indicated on the plans, as required.
The condition is acknowledged and will be adhered to and has been made part of the plan (see sheet 13 of the plans). During the ovemight hours, 9pm to lam, security
se1·vices are provided by Stonegate Services Group. During all other times, Malvem Institute has an on-staff security guard on site. Proposed video camera locations are
shown on the plan. The viieo monitoring station is staffed at all times.
4. The Applicant shall submit a land development application depicting the improvements to the Property hereby approved and consistent with the testimony and exhibits admitted into the record of these proceedings. The said land development plan shall be submitted to the Township by the Applicant not more than I 80 days from final, unappealable and unappealed zoning approval.
This condition has been met.
5. The Township confirmed the application was accepted in a timely fashion on June 28, 2021. King Road is assumed to run in an east-west direction for the purpose of the following conditions. The Applicant shall install and maintain an 8-foot high fence, approved by the Board of Supervisors during the land development plan review, along the entire western and southern boundaries of the Prope1ty except for any areas within the floodplain. The nature of this fence including its dimensions, style, structure, materials, and color(s) shall be fully revealed during the land development plan review.
The required fence is indicated per the above; the detail for the fence is indicated on Sheet
12A. Board of Supervisors approval is required.
Acknowledgei.
6. Neighboring property owners within 1,000 feet of the Facility in the Township shall be notified by mail of the scheduling of any and all land development plan review proceedings conducted by the Township Planning Commission and Board of Supervisors pursuant to this Order.
E,l 195S PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 4
The Township confirmed a letter was sent to all property owners within [ 000 feet of the subject property on August 12, 2021, notifying them of the application and the scheduled meeting dates when the application will be discussed.
Acknowledgetl.
7. The Applicant shall submit and implement a landscape plan in accordance with §240- 27.C(2) for the western and southern po1tions of the property except for any areas within the floodplain.
A landscaping plan (Sheet 9) and details (Sheet 11) have been provided. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order, We will defer to the Conservancy Board for additional comments.
Acknowletlged.
8, The Applicant and its successors in interest shall plant and maintain the aforesaid buffer yard landscaping in accordance with §240-28.C(3), for so long as the Property is devoted to non residential use, subject to accommodation of the fence and wood chip walking path within said buffer yard landscaping. The required high-level screen shall consist of a combination of evergreen and deciduous trees planted with specimens no less than ten feet in height. These plantings are intended to mitigate the view of the 8-foot fence from the neighboring propetties. As part of the land development plan approval process, the Applicant shall meet with the Conservancy Board or present its proposed landscape plan. The Conservancy Board shall provide recommendations to the Board of Supervisors as to whether the Applicant's landscape plan provides a completely planted visual barrier or landscape screen to mitigate the view of the fence,
A landscaping plan (Sheet 9) and details (Sheet 11) have been provided and the evergreens are specified as 10-feet in height. The proposed landscaping is robust and appears to meet the intent of the Code and the Decision and Order. We will defer to the Conservancy Board for additional comments.
Acknowledged.
9. The Applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern propetty boundary in accordance with Willistown Township regulations. The Applicant shall install deer resistant understory landscape buffer plantings in the wooded area on the eastern side of the Property prior to the installation of any proposed walking paths and/or mediation areas on the east side of the Ridley Creek. The fencing and landscaping shall be shown on the landscape plans
E,t 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 5
submitted with the land development application for the review of the Board of Supervisors as part of the land development approval. Note:
a. The fence and landscaping are indicated as required.
Acknowledged.
b. It may be appropriate to substitute a more deer resistant species for the proposed mountain laurel; please review with the Conservancy Board.
Tlte native species of Mountain laurel (Klllmia latifolill} is noted to be deer resistant I tolemnt. Deer will eat almost anything when they are hung1y enough. Kalmia is able to withstand the tleer browse should the deer chose to eat the plant. We would recommend retaining the Mountllin laU1·el as an evergreen component to the property buffer.
c. We will defer to the Conservancy Board of additional comments.
Acknowledged.
d. The applicant shall submit the fencing plan to Willistown Township for review and comment and a dete1mination if any permits are required.
The fence details will be coordinated with Willlvtown Township upon receipt of Preliminaiy Approval Ji-om East Goshen Township.
10. The Applicant shall install 6-foot high estate fencing along the right of way line for King Road. The fencing shall go around the pump station. The fencing shall be connected to the
8-foot fence and the estate fencing referred to above. The purpose of the fencing referred to in this condition and condition 9 above are to limit ingress and egress to the main entrance of the Facility.
The required fence is indicated along the right of way line of King Road. The detail for the fence is indicated on Sheet 12A.
Aclmowledged.
11. All proposed fencing shall be shown in detail in the land development plan and shall be continually maintained by the owner.
PAOLI
Details for the proposed fence are indicated on Sheet 12A. It may be appropriate for the record plan to note maintenance requirements.
E,t 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page6
Acknowledgetl. Maintenance requirements will be provided with the Final Plan.
12. The applicant shall identify in its preliminary land development plan submission all proposed fencing including location, height and general type and style. The location of all proposed fencing shall be shown in plan view with the height, type, style, colors and materials shown in a detailed plan attachment which shall also identify the fence manufacturer and a location, if available, where a similar fence may be inspected. The estimated cost of all proposed fencing shall be included in the improvements for which financial security must be posted by the Applicant.
Note:
• Details for the proposed fence are indicated on Sheet 12A. • We will confirm the fence is included in the financial security at such time it is submitted.
• Fence manufacture for the proposed solid PVC fence shall be provided • Sample locations for both fences should be provided • It may be appropriate to provide shop drawings, or similar, of each proposed fence from a fencing contractor or supplier
Acknowledgetl.
13. The Applicant shall actively prohibit all patient activity in the area between the existing building and the southern and western prope1iy lines other than the garden, the greenhouse, and the pedestrian walking paths.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Patient activities in these areas is limited to the greenhouse, the garden, and the walking path.
14. The Applicant shall identify all existing and proposed active recreation areas on the land development plan which shall be reviewed by the Township Engineer who shall recommend the installation of appropriate sound attenuation measures as are necessary to mitigate potential noise form these facilities.
To be discussed further with all parties.
Acknowledgetl.
E,,t 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 7
15. The Facility shall be restricted to one outdoor smoking area for patients (smoking pavilion). The Applicant shall agree to require all patients to smoke within the smoking pavilion.
Staff and visitors shall be restricted to smoking in the front of the building.
We recommend the applicant address this condition as a nanative response, to be included on the plan and recorded with the final plan. Note the plans indicate a proposed smoking pavilion just in front of the main building.
The condition is acknowledged and will be adhered to ani has been made part of the plan (see sheet 13 of the plans). Upon installation of the smoking pavilion, patients will
be informed of the rule that all smoking shall occur within the designated ai·ea. Staf
f
will be employed to enforce the rule.
I 6. The smoking pavilion shall be equipped with a "Smoke Eater" type of ventilation and
filtration system to minimize the effects of smoke on the surrounding property.
We recommend the applicant address this condition as a nanative response, to be included on the plan and recorded-with the final plan. Nothing appears to have been provided to address this condition.
The smoke-eater is indicated on the plans. Details for the smoke-eater, which was shown and explained during the proceedings, will also be included in the architectural package.
17. The Applicant shall screen the new smoking pavilion from the neighboring propetties to the west and north with the 8-foot fence described above.
The required fence is indicated.
Acknowleiged.
18. The Applicant shall demonstrate during the land development application review that the "Smoke Eater" can effectively ventilate and filter cigarette smoke in the proposed smoking pavilion.
PAOLI
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Details for the smoke-eater, which was shown and explained during the proceedings,
will also be includei in the architectural package. Additional information ji'om the smolw-eater manufacturer will be provided to the Township. 111e project architect is seeking confirmation ft'om a pl'Ope1· installation contractor that the unit will function as
E,t 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 8
intended upon installation. This will be pl'ovided pl'iol' to final land development appl'oval.
19. The Applicant shall install sound attenuation blankets or similar sound dampening material inside the existing emergency generator fencing to mitigate noise from the generator.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
Details fol' the sound attenuation fol' the new genel'atol' will be pl'ovided to the Township.
20. The following site improvements shall be completed prior to issuance of a building permit for the vertical building addition or barn renovations:
a. Parking lot renovations; b. Installation of estate fence and the 8-foot fence; c. Installation of the smoking pavilion, including the installation of screening and smoke mitigation measures; d. Installation of sound blankets inside the generator fencing; e. Installation of plantings as required on the landscape plan that is approved as part of the land development plans.
We recommend the applicant address these conditions as a narrative response, to be
included on the plan and recorded with the final plan.
Acknowledged. It is recommended that the Township inspect the impl'ovements listed
abol'e as they are implemented on site.
21. The Applicant shall construct and maintain all walking paths with pervious wood chips ..
No modifications to the trail are proposed. However, we recommend the applicant address
this condition as a narrative response, to be included on the plan and recorded with the final plan.
The walking path is shown on the plans. The path will be maintained in good Ol'del' by the Malvern Institute staff and landscaping contractol' which is on site 011 a weekly b11sis dul'ing the spring, summel' and fall seasons.
22. The Applicant shall comply with the parking allocation presented on the Plan.
PAOLI
The parking appears to meet Code requirements (see Sheet 4)
E,t 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 9
Acknowledged.
23. The Applicant shall agree to pe1mit the outdoor patient activities on the prope1iy only between the hours of 7 a.m. and 10 p.m., with the follow exceptions. A maximum of 8 patients at any one time, with active staff supervision shall be permitted to use the smoking pavilion between IO p.m. and 11 :30 p,m, A maximum of 4 patients at any one time, with active supervision from the staff shall be permitted to use the smoking pavilion between
11 :30 p.m. and 7 a.m.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged outdoor patient activity will be limited between the /tours of 1 OP111 and
7AM and will be conducted under staff supervision during these hours.
24. The Applicant shall record a deed restriction with the Chester County Recorder of Deeds that prohibits any further expansion of the treatment center for a period of 30 years. The deed restriction shall be enforceable by the Township. This condition does not imply that any further expansion will be permitted at any time.
Nothing appears to have been provided to address this condition. We recommend that a draft document be submitted to the Township for the Township Solicitor's review prior to recording.
A draft deed restriction will be submitted under sepamte cover.
25. The applicant shall establish and adhere to a written protocol acceptable to the Township following review and comment by the neighbors who contact the Facility to complain about adverse impacts from the operation of the Facility. This protocol shall require that a properly trained employee respond appropriately to neighbors' calls.
PAOLI
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan. Nothing appears to have been provided to address this condition.
During business /tours M-F 8A-4:30P a contact hierarchy has been established to
communicate to leaders/tip on site consisting of Executive Director, Clinical Director, and the shift supervisor. Outside of these /tours the shift supe1·visor/clinical lead designee will be properly trained to respond 11ppmpriately to neighbors' calls.
E,t 1955
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 10
26. The Applicant shall annually make a presentation to the Board of Supervisors at a public meeting to provide an update on the state of affairs at the Facility. This report shall advise the Board of the status of the expansion project, identify any issues that the Facility has encountered in the last year with neighboring property owners and identify any new programs or policies that the Facility has implemented to improve the relationship with the neighbors. Neighbors within 1000 feet of the facility in the Township shall be notified by
mail of the scheduling of this annual presentation.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged. The executive dil'ector or other assigned staff will present the report on an annual basis.
27. When the Applicant becomes aware that a patient has left the Facility AWOL, it shall notify the Westtown East Goshen Regional Police Department of this fact provided that such notification does not violate any patient privacy laws. The intent of this notification is not to reveal the patient's identity or to require the police to respond but simply to advice the police that someone has left the Facility.
We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledge«. Malvern Treatment Center will alert Westtown East Goshen Regional
Police Department of AWOL discharges by calling the radio room at 610-692-5100 and
requesting to make not(fication that there was a volunteer walk-off. This is the 1·equested method of communication as directed by the Westtown East Goshen Regional Police Department.
28. Applicant shall obtain a building permit for the vertical building addition within three years from the date of an unappealed and unappealable zoning decision and shall obtain a building permit for the barn renovations within four years from the date of an unappealed and unappealable zoning decision.
The Township confirmed that the applicant shall secure a building permit for the vertical building addition no later than December 3 I, 2023 and the barn renovations no later then December 31, 2024. We recommend the applicant address this condition as a narrative response, to be included on the plan and recorded with the final plan.
Acknowledged.
Zoninr;
Est 1955 PAOLI EAGE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 11
1. The applicant is reminded of the general performance standards of §240-24.
The applicant acknowledges the general performance standards of §240-24.
2. A permit is required from the Township for any construction within the identified floodplain. (§240-26.B((2)(b)) There are multiple improvements indicated within the floodplain that are labeled as 'future'.
J111prove111e11ts formerly indicated as "ft1ture" are not planned to be implemented at this
time. In the event that the Applicant chooses to install them in the future, all necessmy permits will be obtained by the Township and other applicable agencies.
3. Please clarify specific ADA ramp details to be utilized in accordance with PENNDOT standard details. (§240-33.B(7)(b))
The specific ADA ramp detail proposed for the site has been added to revised plans on sheet 12A.
4. Per §240-33.C(!O), 22 feet is required for one-way traffic. The circle does not maintain that width for its entirety; it may be feasible to modify island to meet this dimension.
The geomelly of the island and one-way drive has been revised to provide a minimum 22 foot wide dl"ive lane near theji·ont door of the building.
5. The applicant shall indicate the largest loading vehicle that accesses the site and confirm there is a loading and unloading space for the vehicle. (§240-33.0(2))
The largest vehicle that delivers to the Malvern Institute is a WB-40 trailer. The loading area for this vehicle is 011 the east side of the building. An exhibit demonstrating the
maneuvering of a WB-40 h"ailer is enclosed with this submission.
Subdivision And Land Development
6. Please provide a location and elevation of the benchmark utilized. (§205-30.B(S))
Langu•ge in note #2 on sheet 2 has been revised to provide information about the site
benchmark.
7. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed nor were sidewalks a condition of the Zoning Hearing Board.
E,l 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvem Institute Preliminary Land Development Application Page 12
There are no sidewalks or paths proposed along the public ROW by this plan.
Stormwater Management
8. Please indicate the Line of Interest/Point on Analysis on the drainage area plan.
The basis for analyses of project stormwater is that the ou(flow Ji-om SWM #1, when combined with runoff from buildout site disturbance that bypasses the basin, meets or exceeds ordinance criteria. Since the project is a proposed re-development, it is not necessary lo control rate or volume of runoff from existing site areas that will not be made impervious in connection with the project. See Note 4 on page 1 of the Stormwater Report for a more detailed discussion of the calculational basis for the analysis and
design of the proposed stormwater control system.
Given the above, the designated POI could be al any point on the creek downstream of all proposed disturbance (for the purposes of stormwater analyses and erosion control, areas of proposed landsc11pe e11ha11ce111e11t only are not conside,·ed "disturbance").
Therefore, we could designate the creek just downstream of the outlet /01· SW 108 (see Stormwater Calculation Worksheet) as the POI ifnecessa,y In designate such.
9. The volume calculations appear to meet water quality and infiltration requirements; however, the applicant should provide soils testing to verify. (§195-19, §195-20)
Soils testing will be provided with the final stormwater design prior to Final Land Development Approval.
10. The report (page 2) indicates 3,010 CF infiltrated, but the calculations on Page A3 indicate 3,326 CF; please clarify.
PAOLI
Since infiltmtion testing at the site ha,/n 'tyet been undertaken at the time the stonnwater system was designed, the outlet works was designed lo retain, at the lowest opening (IE 527.37 ft. ms[, see Sheet SA, Detail: Outlet Conlrol@SW 103) a volume (3,010 CF, see Stormwate1· Report, page A19) exceeding the required infiltration volume (2,991 CF, Stormwater Report, page 2) to ensure compliance without reliance 011 infiltration
occurring during the 2-yr. design rainfall event. The indicated Pl'Oposed Infiltration
Volume 3,010 CF 011 page 2 can be considered conservative. The volume calculated within HydroCAD 011 page A3 (3,326 CF) is the infiltration volume that would be realized if the measured field infiltration rate yields a design infiltration rate of 0.11 in/hr. The actual 2 -yr. infiltration will be al least 3,010 CF, but could be theoretically as high as 5,340 CF (entire 2-yr. SWM #1 inflow volume) if the design infiltration rate is high enough.
E,L 19S5
EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 13
11. A detailed soils evaluation of the site shall be conducted by a qualified professional and at a minimum shall address soil permeability, depth to bedrock, and subgrade stability. The applicant should provide soils tests for the infiltration BMP. (§ 195-20 .l)
Soils testing will be provided with the final stormwater design prior to Final Land Development Approval.
12. Where sediment transport in the stormwater runoff is anticipated to reach the infiltration system, appropriate permanent measures to prevent or collect sediment shall be installed prior to discharge to the infiltration system.(§ 195-20.N)
Permanent inlet filters are proposed for the new drainage inlets upstream of the
infiltration basin. A detail for the inlet filters has been added to sheet BB.
13. The runoff elevation within the infiltration BMP is 527.48. The top of the BMP is 527.00. The BMP appears to operate above the volume capacity during the 2-year storm.
As indicated on page A17 of Stormwater Report, the top of aggregate of SWM #I is IE
525. 75' + 3.42'= 529.17'. This is consistent with the elevations indicated for SWM#1 011 Sheet 5 of 15, Grading & Utilities Plan,· Sheet BA of 15, Post Construction Stormwater Management Details, Detail: SWM#1, and on the Stormwater Calculation Worksheet.
The 2-yr. peak elevation (527.48) within SWJl1 #1, as indicated on Page A3, while (slightly) above the inve,·t (527.37) of the lowest opening in the outlet control at SW 103, is below the top of wall within SW 103, and is well below the top of aggregate of SWM #1.
Furthermore, given the basin's footprint of 3,922 SF [(58' x 55') + (24' x 30.5')] and a storage volume (3010 Cl:<] below the lowest opening (527.37) in the outlet control, the
hydraulic head (of infiltration) is 9.2", and for total storage (6109 CF) at top of bed (529.17), the hydraulic head is 18. 7", both well below the DEP recommended maximum depth of 24" ou page 16 of 21, Appendix C of the PENNSYLVANIA Stormwater BMP Manual December 30, 2006.
14. The Peak Rate calculations appear to consider only SWM #1 outflow. The applicant should provide calculations for the site at a common Point of Analysis. (§ 195-22)
PAOLI
The basis of analyses for project stormwater is explained in the response to comment 8. The Table, Peak Rate Control, 011 page 2 of the Stormwater Report lists proposed and existing peak flows j)-om project (ie, new impervious sU1faces) area, as well as allowable flow fi'om project area given ordinance criteria. The enclosed revised Stormwater
Calculation Worksheet has been revised to identify the areas of new impervious and the areas where existing impervious cover is being redeveloped with impervious cover. 11ie
E, 1955
EAGLE
Mr. Mark Gordon April 25, 2022 Malvern Institute
Chester Valley Engineers
Preliminary Land Development Application Page 14
difference between proposed and allowable project peak flows is the required attenuation of peak flow to SWM #1 to ensure that the peak sum of bypass flow and SWM #1 discharge will meet ordinance requirements at the POL lt can be seen that the actual peak outflow ft·om SWM #1 is less than allowable peak SWM #1, pm·ticularly for ft·equent storms (]-JO-years). See pages A2-A8 of the Stormwater Repo1·t for the data
presented in the referenced table.
15. The applicant should provide a statement, signed by the applicant, acknowledging that any revision to the approved S WM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to,
and approved by, the Conservation District or municipality (as applicable) for a dete1mination of adequacy prior to construction of the revised features. (§ 195-27 .A(3))
A statement by the applicant certifying compliance with this requirement has been added
to the cover sheet of tlte 1·evised plans.
l 6. The applicant should provide the required signature block signed and sealed by the
qualified licensed professional responsible for the preparation of the SWM site plan. ( § 195- 27.A( 4))
The required signature block has been added to the cover sheet.
17. The applicant should provide an easement around the stormwater management BMP's; alternately a blanket easement can be provided. (§ 195-27 .B(l 8)(c)
A note has been added to the cover sheet providing a blanket easement to East Goshen
Township to. inspect the stormwater management facilities.
18. The applicant should provide the documents required per§ 195-27.F and § 195-37 regarding a Sto1mwater Operations & Management Plan and Agreement, to be recorded.
The Stormwater Operations & Management and Agreement will be provided fo1· review and approval by the Township prior to plan recordation.
19. The applicant should provide an Operations and Maintenance Plan for the proposed stormwater management BMP's. (§195-37)
Operations and Maintenance notes are provided within the plan set. This will serve as the Operations and Maintenance Plan upon recordation of the Final Land Development Plan.
20. Please provide a sediment barrier downslope of SW 108.
E,t. 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 15
Compost filter sock has been added downslope of SWl 08.
21. The limit of disturbance does not include any fencing, landscaping improvements nor 'future' improvements.
Installation of the fencing and landscaping will not alter the grading and is therefore
not included in the LOD. Improvements identified on the plan as "future" are not planned to be implemented at this time. In the event that the Applicant chooses to install them in the future, necessary permits will be obtained from the Township and other applicable agencies.
,General
22. Multiple improvements are indicated as 'future'. It is unclear if they are intended to be included as part of the overall approval.
I111prove111e11ts identified 011 the pla11 as "future" are 1101 plmmed to be implemented at this time. 111 the eve11l lhal the Applicant chooses lo i11stall lhem in the future, necessa,y
permits will be obtai11edfrom the Township and other applicable agencies.
23. We recommend adding an additional arrow at the circle in addition to ONE WAY signa,ge.
A directio11al arrow and sig11 have been added to the circle and a 011e-way sign detail has
bee11 added to sheet 12A on the revised plan.
24. The applicant shall confirm the height of the proposed walls, if more than four ( 4) feet, retaining wall plans and calculations, designed be a Pennsylvania register engineer shall be submitted for Township review prior to construction.
Final wall designs will be provided prior lo Filial La11d Development Approval.
25. Any non-regulatory signs will be reviewed and permitted separately by Township staff.
Acknowledged.
26. We recommend a detail for the dumpster enclosure be provided.
A trash enclosure detail has been added to sheet 12A of the revised plans.
27, An additional 'decorative fence' is indicated within the interior of the site; please provide a detail for this fence.
E,t 1955 PAOLI EAGLE
Chester Valley Engineers
Mr. Mark Gordon April 25, 2022 Malvern Institute Preliminary Land Development Application Page 16
Final fence and wall details will be provided prior to Final Land Development Approval.
28. The specific limits of each type of fence should be more clearly indicated on the plan, including those areas of fencing to be provide with sound attenuation.
Proposed fence along the westem property bounda,y and behind the southwestern
portion of the main building are intended to be sound attenuation fencing. The limits of
sound attenuation fencing will be established prior to final Land Development Approval.
29. Fencing sound attenuation details should be provided.
A detail for sound attenuation fencing is provided on the plans. Specifications for the
sound attenuation fencing will be provided prior to final Land Development Approval.
30. Please additionally note the status of the following reviews/permits:
PAOLI
a. NPDES Permit (PADEP/CCCD) (§195-15.C(2), -16.A, -17.A) - Not applicable
(limit of disturbance is indicated as 0.88 acres) Not applicable. b. Planning Module (P ADEP) (§240-24.F, §205-33.B(22)(a)) - Correspondence has
not yet been received. There are no additional EDU's required for the improvements proposed by this plan. c. Sanitary Sewer (Municipal Authority) - Correspondence has not yet been received
Not applicable. d. On-lot Wells (CCHD) - Not applicable.
Not 11pplicable. e. Highway Occupancy Permit (PennDOT) -Not applicable Not applicable. f. Fire/Emergency - Correspondence has not yet been received Acknowledged. g. Historic Resource (Historical Comm.) - Correspondence has not yet been received
Acknowledged. h. Landscaping (Conservancy Board) - Correspondence has not yet been received.
Acknowledged. i. County Planning - See July 28, 202 l correspondence Acknowledged. The County comments will be taken under advisement. j. Willistown Township - Correspondence has not yet been received Acknowledged.
Eal 19.'iS
EAGLE
Mr, Mark Gordon April 25, 2022
Malvern Institute
Chester Valley Engineers
Preliminary Land Development Application Page 17
We trust the above items constitute a complete submission adequate for your review. Should you have any questions or require additional information, I can be reached at 610-644-4623 xl03 or by email at rstratton@chesterv.com.
Very truly yours, Chester Valley Engineers, Inc.
Richard F. Stratton, P.E. Senior Project Man11ger
Enclosures: as noted
cc: Kevin Williams, Malvern Institute Brian L. Nagle, MacElree Harvey, Ltd,
E,l 1955 PAOLI EAGLE
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSIDP
CHESTER COUNTY 1580 PAOLI PIKE. WEST CHESTER. PA 19380-6199 AREA CODE 610-692-7171
MEMORANDOM
To: East Goshen Board of Supervisors
East Goshen Planning Commission
From: East Goshen Township Fire Marshal
Date: June 27, 2022
Subject: The Malvern Institute / East Goshen Township
Land Development Application Fire Marshal Review
During the review process of the preliminary land development plans for the second-floor addition of the Malvern Institute the following items were noted:
❖ The fire department connection was not shown on the plan. The location wjlJ be reviewed and approved by the first due Fire Chief. IFC 2015 Edition section 912. ❖ A fire apparatus access road not shown on plan. A fire access road is required within 150 feet of all portions of the building and all exterior walls of the first floor. IFC 2015 Edition section 503.1.1. ❖ No Parking - Fire Lane signs shall be provided. IFC 2015 Edition section 503.3. ❖ Fire apparatus access road surface shall meet IFC 2015 Edition section 503.2.2. ❖ Fire apparatus access road design Information must be provided. ❖ Fire apparatus access road shall meet the IFC 2015 Edition for turns and dead-end requirements sections 503.2.4 and 503.2.5. ❖ Fire apparatus access road Section 503.1.1 Building and facilities does have some options - exception 1. The fire code official is authorized to increase the dimension of 150 feet when the building is equipped throughout with an approved automatic sprinkler system or the road cannot be installed because of location and an approved alternative means of fire protection is provided as noted in section 503.1.1 exceptions: 1.2, ❖ Fire apparatus exhibit plan does not show all routes of travel and ingress and egress from property. A new plan must be provided showing a completed route entering and existing the property. The plan must show from each route of travel. ❖ Security gates are shown on plan. Provide information that shows gates meet the requirements of IFC 2015 Edition section 503.6. ❖ Fire protection water supplles·IFC 2015 Edition section 507. Provide the following information:
• Provide available water supply from existing hydrant and water main. • Provide water main location and size.
❖ Project may require additional fire hydrants to meet the requirements of IFC 2015 Edition section 507 Fire Protection Water Supplies and Appendix C. ❖ Project may require fire flow testing. ❖ Provide the required fire flow information for this property. ❖ Provide building height of new second floor addition. Provide height from grade to eave of roof.
If you have any questions, please feel free to email dbrady@eastgoshen.org or call me at 610-692-7171 ext. 3203
Thank you,
'8attaut<J-
Carmen Battavio East Goshen Township Fire Marshal =t;J:%
East Goshen Township Building Code Official Assistant Zoning Officer Assistant Fire Marshal
EAST GOSHEN
CONSERVANCY
September 28, 2021
East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380
Re: 940 King Rd./ Malvern Institute LD Recommendation Landscaping
Dear Commission Members:
At their meeting on September 8, 2021, the Conservancy Board voted unanimously In favor of the following motion:
Mr. Chairman, I move that the Conservancy Board recommend that the Planning Commission approve the landscaping plan proposed for the Malvern Institute Land Development application as submitted with the following conditions:
1. The applicant shall provide additional landscaping within the parking lot Island and along the western and eastern side of the parking areas, similar to what they propose along the northern side of the parking area. 2. The applicant shall Increase the diversity of the proposed evergreen species In order to help Improve the resiliency of the evergreen planting buffer. 3. The applicant agree to a condition that should the landscape buffer cease to provide a visual screen of the sound fence in the future the applicant will replace dead and thinning landscape material at the direction of the Township.
Sl;?L
Mark A. Gordon Zoning Officer
F:\Data\Shared Data\Property Managemenl\53-2\53-2-18 (940 King Rd)\2021 Land Dev. App\CB Rec to PC
5 °i20i021-i0c A o L t p I K E , W E S T C H E S T E R , P A • 1 9 3 8 0
THE COUNTY OF CHESTER
COMMISSIONERS Marian D. Moskowitz Josh Maxwell Michelle Kichline
Brian N. O'Leary, AICP Executive Director
Derek Davis, Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
PLANNING COMMISSION Government Services Center, Suite 270 601 Westtown Road P. 0. Box 2747
West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515
July 28, 2021
Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition (Revised) # East Goshen Township- LD-07-21-16804
Dear Mr. Davis:
A Preliminary Land Development Plan entitled "Malvern Institute 2nd Story Building Addition", prepared by Chester Valley Engineers Inc., and dated June 28, 2021, was received by this office on June 29, 2021. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.
PROJECT SUMMARY:
Location: Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use: New Parking Spaces: Municipal Land Use Plan Designation: UPI#:
PROPOSAL:
south side of King Road, west of Line Road 10.50 1 Lot 5,400 Expansion of existing medical facility 33 Low Density Residential 53-2B-13, 53-2-18, 54-2-127
The applicant proposes the construction of a 5,400 square foot second floor addition to the existing facility, along with the construction of 33 additional parking spaces (81 parking spaces, including 4 handicapped-accessible spaces, will be provided). No new sewage disposal or water supply is proposed as part of this project. The project site is located in the R-2 Low Density Suburban Residential zoning district. The easternmost portion of the site is situated in Willistown Township, which is zoned R-1 Residence.
RECOMMENDATION: The County Planning Commission recommends that the issues raised in this
letter should be addressed, and all Township issues should be resolved before action is taken on this land development plan.
email: ccplanning@chesco.org • website: www.chescoplanning.org
Page: 2 Re: #
Preliminary Land Development - Malvern Institute 2nd Story Building Addition East Goshen Township- LD-07-21-16804
I
LD-07 -21-1680 9
Parcel Info: Paree&): 53-28-13, 53-2-16; 54-2-127
(Mato) Address: 940 Klng Rd Municlpaty: East Gos.hen Twp
I I
,,,iJ]I,, --1
! ,, '
I I '
Image lnro; Date Taken. 2011
Source: CCPC, 2021
c:JParcels
Other Parcels
N +
NO!o: The CCPC m••u«•'Y e!bll lO •••• ,. r,;, m•p ;, ,, .. of""'''' hu! aou ••I gu•ranroe tie mop o, 110 ruto,n 10 u •lWly or lM1po™1y """,.!•
Site Plan Detail, Sheet I: Preliminary Land Development- Malvern Institute 2"d Story Building Addition
Page: 3 Re: Preliminary Land Development - Malvern Institute 2nd Story Building Addition # East Goshen Township- LD-07-21-16804
COUNTY POLICY:
LANDSCAPES:
1. The project site is located within the Suburban Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Landscape is predominantly residential communities with locally-oriented commercial uses and facilities, accommodating growth at a medium density that retains a focus on residential neighborhoods, with enhancements in housing diversity and af ordability. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. The proposed land development is consistent with the objectives of the Suburban Landscape.
WATERSHEDS:
2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the Ridley Creek watershed. Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, protect vegetated riparian corridors, and protect/enhance water-based recreation, cultural, historic resources and public access.
Watersheds can be accessed at www.chesco.org/water.
PRIMARY ISSUES:
3. The Township should verify that the design of the proposed outdoor lighting plan (Sheet 10) conforms to Township ordinance requirements. The illumination should be directed inward from the periphery of the site and be oriented to reduce glare and visual impact on the adjoining roadways and land uses.
4. While we acknowledge that Sheet 9-Landscape Plan depicts that extensive landscaping will be provided along the northern, western, and southern parcel boundaries (west of the existing floodplain area), we recommend that the applicant and Township consider planting additional trees, shrubs, and ground cover in areas currently covered by lawn within and adjacent to the parking areas. Landscapes3 recommends that developments in the Suburban Landscape include extensive
landscaping in parking areas (page 39).
5. The site contains land within the 100 year flood plain. Although it does not appear that any development activity will encroach into the floodplain, we note that the County Planning Commission does not support development in the floodplain, and the Federal Emergency Management Agency and Pennsylvania Depattment of Environmental Protection regulate filling or development in the floodplain. Development within a floodplain can increase the magnitude and frequency of normally minor floods, and present health and safety problems.
6. The site contains delineated wetlands. Although it does not appear that any development activity will encroach into the delineated wetland area, the applicant should be aware that placement of fill in wetlands is regulated by the Corps of Engineers in accordance with Section 404 of the Clean
Water Act (I 977) and the Department of Environmental Protection under Chapter 105 Rules and Regulations for the Bureau of Dams and Waterway Management.
Page: Re: #
4 Preliminary Land Development - Malvern Institute 2nd Story Building Addition East Goshen Township - LD-07-21-16804
ADMINISTRATIVE ISSUES:
7. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 stormwater management ordinance standards adopted by each municipality.
8. Sheet 13-Decision and Order Letter indicates that the Township Zoning Hearing Board granted approval for this project with 28 conditions of approval. We note that the conditions of approval include the following:
• The applicant shall install and maintain an 8-foot high fence along the entire western and southern property boundaries except for any areas within the floodplain ( condition #5); • The applicant shall install a 6-foot high estate fence and deer resistant landscaping to buffer the fencing along the eastern property boundary in accordance with Willistown Township regulations ( condition #9); • The applicant shall install 6-foot high estate fencing along the right of way line for King Road (condition #10); and • The applicant shall record a deed restriction that prohibits any further expansion of the treatment center for a period of 30 years, which shall be enforceable by the Township (condition #24).
The Township should verify that all applicable conditions of approval have been incorporated into the final plan. The date of the Zoning Hearing Board's decision should be identified on the approved plan. We note that the Township application form indicates that the Zoning Hearing Board order is dated November 25, 2020 and issued on December I, 2020.
9. A site plan note incorrectly identifies the UPI-Uniform Parcel Identifier number of the portion of the project site in Willistown Township as 54-2B-127, rather than 54-2-127. This should be corrected by the applicant. The Chester County Recorder of Deeds Office requires that the correct UPI numbers be identified on all subdivision and land development plans submitted for recording.
10. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to pe1mit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.
This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.
Sincerely, cu&_P
Paul Farkas Senior Review Planner
cc: Malvern Institute For Psychiatric & Alcoholics Studies Chester Valley Engineers Inc. Sally A. Slook, Manager, Willistown Township
Memo
To:
From: Re:
Date:
Board of Supervisors Dave Ware Consider 2022 Sewer Rates and a Proposed Capital Plan June 30, 2022
An updated Inventory List for Ridley Creek Sanitary Treatment Plant (including Pump Stations and Collection System) indicates that East Goshen Township should have just over $4.6M already in reserve to replace all of the capital items currently in operation. Our current Sewer Capital Reserve Fund balance is $2.3M. I believe the primary reason for this funding gap is due to the calculation of sewer rates based on the current budget year, rather than additionally accounting for un-capitalized sewer assets, future projects, etc...Additionally, the average single family household's quarterly bill increased roughly 4% total, or 0.5% per year, over the 8 year period 2012 through 2019. In contrast, the average annual inflation over that same period increased 13% total, or 1.6% per year.
The current aging sewer infrastructure is in need of maintenance and replacement as illustrated by the
Hershey's Mill Estates Sewer Replacement project, with a cost estimate of $1.54M. While we are fortunate to use federal ARPA funds of nearly $1M for this project, another $SOOK plus is needed.
Unfortunately, there is a likelihood that more of these projects could emerge at any given time, and the Township is ill-prepared to fund them and has been for years. Many townships have underfunded their sewer systems for years and due to lack of maintenance and increased costs are now selling their systems to AQUA, effectively turning over control of rates and customer service.
After consultation with the Municipal Authority, I am proposing a sewer capital plan staged over the coming four years to address these issues. The total additional revenue needed to fully fund the current sewer projects as well as the treatment plant and pump stations is $3.4M (see attached rate calculation), which amounts to about $520 per unit. For July 2022 I propose maintaining the sewer
variable rate of $9.70 per thousand gallons, while increasing the fixed rate by $40/quarter to $75.61. Each July, the new quarterly fixed rate of $75.61 would decrease by $5 until 2026 when we should be fully funded. At that point the fixed rate would return to $35.61/quarter. This plan is based on our current best information and will be reassessed each July to review funding progress, variable usage,
ongoing projects, status of sewer infrastructure, and may be subject to change at the Board's discretion.
Analysis of Sewer Rate Options
Key Statistics-East Goshen Township Sewer Rates, 2012-2022
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Fixed Rate $ 26.15 $ 26.20 $ 26.56 $ 30.07 $ 27.26 $ 27.26 $ 27.02 $ 33.74 $ 32.41 $ 35.61 Variable Rate (perTG) $ 7.97 $ 7.51 $ 7.68 $ 7.90 $ 8.38 $ 8.38 $ 8.74 $ 8.42 $ 9.13 $ 9.70 Avg 5FD Quarterly Bill $140.44 $135.24 $139.34 $143.34 $146.15 $146.26 $148.37 $146.01 $152.62 $169.84 *2022 Average Single Family Dwelling assumes no change in usage for variable cost.
1
2022 $ 75.61 $ 9.70 $ 209.84
Comparison to nearby municipalities At the proposed rates, the average sewer bills in East Goshen wills remain in line with those in many nearby communities, as shown below.
$300
$250
$200
$150
$100
$50
$0
- - - ----- ----- Quarterly Sewer Bills for Average Single Family Household*
$251
$210
Willistown East Goshen Westtown West Chester East Whiteland West Goshen
*For townships that use metered water consumption as the basis for bills (Willistown, West Chester and East Goshen), we assumed 13,838 gallons used per quarter (the average 2022 single family consumption in East Goshen); for townships with different rates based on service districts (Willistown, Westtown, Uwchlan and East Whiteland), we used the highest rate. For townships that do not bill quarterly (Tredyffrin, West Chester and West Whiteland), annual or monthly bills were adjusted to a quarterly basis.
Recommended Motion: Madam Chair, I move that we adopt Resolution 2022-13, revising the fee schedule, to amend the Township's sewer rates to $75.61 per quarter fixed and $9.70 per thousand gallons variable.
2
EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA
RESOLUTION 2022-13
A RESOLUTION ESTABLISHING AND CONSOLIDATING
THE VARIO US FEES AND CHARGES IMPOSED PURSUANT TO THE CODE OF THE TOWNSHIP
WHEREAS, the Code of East Goshen Township authorizes the Board of Supervisors to establish various fees and charges by resolution, and:
WHEREAS, the Board of Supervisors believes that it's in the best interests of the Township to consolidate all of the fees and charges into a single resolution.
BE IT RESOLVED THAT the East Goshen Township Board of Supervisors hereby establishes the following fee schedule.
1. Building/Zoning Permit Fees
a. Residential Dwelling Units - includes all types ofresidential buildings.
1. New Construction - Calculated using the ICC method with a minimum charge of$200.00.
ii. Accessory Buildings - $200.00.
iii. Building Additions - Calculated using the ICC method with a minimum
charge of$200.00.
1v. Decks, Patios, Terraces
I. 150 square feet or smaller - $150.00
2. Greater than 150 square feet - $200.00
3. Re-decking of surface materials and or replacement of railings or steps - $100.00
v. New and replacement plumbing, HVAC, and sprinkler systems; any other
permanent system; re-roofing; and re-siding shall be calculated at 1 % of the project cost with a minimum pennit fee of$100.00.
v1. Flagpoles - all permit fees shall be waived for the installation of a flagpole
on any residential lot.
vii. Alarms - New and replacement monitored alarm systems - $50.00 permit.
viii. Zoning Permit - Any project which increases the footprint of a residential
structure or adds a structure to the property requires a zoning permit -
$75.00
U:\DDavis\Board Meetings\Board Materials\2022\20220705 Board Meeting\2022-13 Fee Schedu!e.docx 1
NOTES:
• All measurements and calculations shall be outside dimensions.
• The above fee includes the residential building code plan review, all required inspections, Certificate of Occupancy and the Building Energy Act if applicable.
• The ICC permit fee method and construction costs tables are published in the ICC Building Safety Journal.
• The Township Permit Fee Multiplier used to calculate the ICC Permit Fee shall be .011.
b. Non-Residential Buildings - Includes commercial, industrial, and institutional
buildings.
1. New Construction and Additions - Calculated using the ICC method with a minimum charge of$200.00
11. New plumbing, HVAC, alarm and sprinkler systems shall be calculated @ 1 % of the project value with a minimum charge of $200.00.
iii. Replacement plumbing, HV AC, alarm and sprinkler systems; any other
permanent systems; re-roofing; and re-siding shall be calculated @ 1 % of the project value with a minimum charge of $200.00.
1v. Alterations and fitting out of space - Calculated using the ICC method with a minimum charge of $200.00
v. Flagpoles - All permit fees shall be waived for the installation of a flagpole on any commercial or industrial lot.
v1. Zoning Permit - Any project which increases the footprint of a commercial
building structure or adds a structure requires a zoning permit - $250.00
NOTES:
• The above fee includes the commercial building code plan review, all required inspections, Certificate of Occupancy and the Building Energy Act if applicable. • The Township Pe1mit Fee Multiplier used to calculate the ICC Permit Fee shall be
.011.
c. Miscellaneous Categories
1. Swimming Pools
1. In-Ground - $300.00
2. Above-Ground- $100.00
3. Jacuzzi or Hot Tub - $75.00
11. Demolitions
,.,
I. Residential - $50.00
2. Commercial - Shall be calculated at 1 % of estimated cost with a minimum of$100.00.
111. Impervious Surfaces - $75.00 plus engineering, sto1mwater management permit and inspection costs: includes new driveways, widening of existing driveways, parking lots, tennis courts, etc. Driveways with new homes excluded.
1v. Renovations, alterations, structures, and facilities; including but not limited to porch enclosures, satellite dishes, silos and water towers, antenna towers, wind and solar energy systems, and the completion of unfinished areas shall be calculated at 1 % of estimated cost with a minimum permit fee of $100.00.
I. As per Section 108 of the ICC 2012, if, in the opinion of the building
official, the valuation of the pe1mit is under-estimated, the permit will be denied unless detailed estimates can be shown to meet the approval of the building official. The final building valuation will be set by the building official.
v. Missed Inspections - $25.00 per occmTence - All missed inspection fees
shall be paid prior to the issuance of the Certificate of Occupancy.
v1. Working without a Permit Fee - Any person who commences work on a
building, structure, electrical, gas, mechanical, or plumbing system prior to obtaining the necessary permits shall be subject to a $200.00 fee for residential and $300.00 for commercial in addition to the applicable building permit and/or zoning permit fee. The Township in its sole discretion may elect to issue a citation for violation of the applicable building code.
vn. PA UCC Continuing Education Fee of $4.50 for every Building Permit
Issued.
vm. Zoning Verification Fee - A fee of $100 shall be charged for a request to
the Township to conduct a property zoning verification.
d. Zoning Permits. Although a Building Permit is not required for the following
structures pursuant to the Uniform Construction Code (Act 45 of 1999), a Zoning Pe1mit is required. The Zoning Permit fee is $75.00.
i. The following structures if the structure has a building area less than 500 square feet and is accessory to a single family detached dwelling.
I. Carport 2. Detached Garage 3. Greenhouse 4. Sheds ii. An agricultural building as defined under section 103 of the Uniform
Construction Code (Act 45 of 1999).
U:\DDavis\Board Meetings\Board Materials\2022\20220705 Board Meeting\2022-13 Fee Schedule.docx 3
m. Manufactured or industrialized housing pursuant to section 901 of the
Uniform Construction Code (Act 45 of 1999)
2. Subdivision and Land Development Fees
a. Subdivision Review
1. 2 lots - $300.00 per plan
11. 3 or more lots on existing streets - $350.00 per plan
111. 3 or more lots requiring new streets - $500.00 per plan
b. Land Development Review
1. Less than 4 Acres - $300.00 per plan
11. 4 Acres to 24.99 Acres - $450.00 per plan
111. 25 Acres to 99.99 Acres - $700.00 per plan
1v. 100 Acres or More - $950.00 per plan
c. Lot Line and/or Minor Revision Review
i. $200.00 per plan
d. Additional costs for Subdivision, Land Development and Lot Line and/or Minor
Revision Reviews shall be as follows:
1. The applicant shall pay the review fees of the professional consultants utilized by the Township during its review of the subdivision or land development application. The applicant shall submit $2,000.00 to the Township at the time of the submission of the subdivision or land development application. This money shall be placed in an interest bearing account held by the Township and monies shall be disbursed from this account to pay the actual costs of the professional consultants. The Township shall provide the applicant with a breakdown of all monies disbursed from the account. If the account balance goes below $500.00 the applicant shall deposit additional monies sufficient to bring the account balance back up to $2,000.00. Upon approval or denial of the land development or subdivision application and payment of the final invoices from the professional consultants the balance of funds in the account plus any interest shall be returned to the applicant.
11. The applicant shall reimburse the Township for the actual cost of all legal, engineering, inspections and materials tests, incurred during construction and up to acceptance, by the Township, of the improvements.
m. The applicants shall pay all Chester County Planning Commission, Chester
County Health Department, Department of Environmental Protection, Chester County Soil Conservation District and Penn Dot review fees, and all recording costs.
e. Inspections
A
1. Township Engineer - prevailing rate
11. Township Engineer Inspector - prevailing rate
111. Township Inspector - prevailing rate
3. Public Heariugs before the Zoning Hearing Board and Board of Supervisors
a. The applicant shall deposit with the Township $550.00 to defray the cost of the following:
1. One half(½) the cost of preparation and publication of "Notice of Public Hearing".
11. Posting of the property by the Township Staff.
111. One half(½) of the appearance fee of the comi rep01ier.
1v. Other miscellaneous administrative charges.
v. The cost for mailing a hearing notice letter to all prope1iy owners within
1,000 feet of the property.
b. If the monies paid to the Township pursuant to Section a. are insufficient to insure payment of all costs incurred in the disposition of the application the Township shall require additional deposits in increments of one hundred dollars ($100.00). The failure of the Township to demand additional deposits from time to time shall not relieve the applicant from liability for all costs, charges, fees and expenses in excess of deposits.
c. Monies paid which are in excess of the actual costs shall be refunded to the applicant within 30 days ofreceipt of the written decision.
d. Refen-ing to b and c above; if the total costs exceed the monies paid by less than
$10.00 there will be no additional charge and conversely, there will be no refunds given for amounts under $10.00.
e. Conditional Use Professional Consultants - The applicant shall pay the review fees of the professional consultants utilized by the Township during its review of the conditional use application. The applicant shall submit $2,000.00 to the Township at the time of the submission of the application for a conditional use. This money shall be placed in an interest bearing account held by the Township and monies shall be disbursed from this account to pay the actual costs of the professional consultants. The Township shall provide the applicant with a breakdown of all monies disbursed from the account. If the account balance goes below $500.00 the applicant shall deposit additional monies sufficient to bring the account balance back up to $2,000.00. Upon approval or denial of the conditional use application and payment of the final invoices from the professional consultants the balance of funds in the account plus any interest shall be returned to the applicant.
f. Site Plan/ Act 167 Stormwater Management Plan Review - The applicant shall pay the review fees of the professional consultants utilized by the Township during its review of the Site Plan / Act 167 Stormwater Management application. The
applicant shall submit $2,000.00 to the Township at the time of the submission of the application for. This money shall be placed in an interest bearing account held by the Township and monies shall be disbursed from this account to pay the actual costs of the professional consultants. The Township shall provide the applicant with a breakdown of all monies disbursed from the account. If the account balance goes below $500.00 the applicant shall deposit additional monies sufficient to bring the account balance back up to $2,000.00. Upon approval or denial of the Site Plan/ Act 167 Sto1mwater Management application and payment of the final invoices from the professional consultants the balance of funds in the account plus any interest shall be returned to the applicant.
4. Sign Permits
a. Less than 32 Square Feet -$50.00
b. 32 Square Feet or More -$125.00
5. Hearings Before the International Code Council Board of Appeals and Stormwater Appeals Board
a. There shall be a filing fee of$100.00.
b. In addition, the applicant shall deposit with the Township $400.00 to defray the
cost of the following:
1. Preparation and mailing of the list and/or labels bearing the names of property owners to be notified.
ii. Preparation of the hearing notice and affidavit of certification.
iii. Publication of "Notice of Public Hearing".
1v. Posting of the prope1ty by the Building Inspector.
v. One half(½) of the appearance fee of the comt reporter.
v1. Other miscellaneous administrative charges.
vu. The cost for a copy of the transcript if requested by the applicant.
c. If the monies paid by the applicant pursuant to Section b are insufficient to insure payment of all costs incurred in the disposition of the application, the Township shall require additional deposits in increments of one hundred dollars ($100.00). The failure of the Township to demand additional deposits from time to time shall not relieve the applicant from liability for all costs, charges, fees and expenses in excess of deposits.
d. Monies paid which are in excess of the actual costs shall be refunded to the
applicant.
e. Referring to c and d above; if the total costs exceed the monies paid by less than $10.00 there will be no additional charge and conversely, there will be no refunds
given for amounts under $10.00.
6. Sewer, Refuse and Real Estate Tax Certification
a. Per Sewer Ce1iification - $15.00. Fee must be paid prior to certification being
issued. b. Per Refuse Ce1iification - $15.00. Fee must be paid prior to certification being
issued. c. Real Estate Certification is handled by the County.
7. Collection Procedures
a. The Township Manager is authorized to collect any monies due and payable to the Township under this resolution in the manner prescribed by law.
b. Any costs associated with the collection of these fees shall be the responsibility of
the applicant and/or prope1iy owner as applicable.
8. Returned Checks & ACH Payments
a. Any check or ACH payment received by the Township pursuant to this resolution or any other ordinance shall be deposited in the authorized Township depository (bank).
b. All checks or ACH payments returned by the Township depository (bank) to the
Township, for insufficient funds or any other reason shall have a letter written to the check writer or ACH payee advising that their check or ACH payment has been returned by the bank and that they should re-issue payment immediately.
c. The check writer or ACH payee's account shall be updated to indicate that a payment was not made.
d. Any check or ACH payment that is returned to the Township will result in the
imposition of a $20.00 fee in addition to any fees imposed by the Township depository (bank), both of which shall be applied to the appropriate account.
9. ParkFees
a. The following fees will be charged to those groups or individuals who reserve a facility for a specific date and time.
NOTES:
• The use of passive parks is limited to passive events only.
• Each day is divided into three time periods:
o Morning - 7 am to Noon o Afternoon - Noon to 5 pm o Evening - 5 pm to Dusk
• The West Chester Area School District is exempt from all fees.
• Separate checks shall be provided in the event a deposit is required.
• Deposit checks will be returned after the facility has been inspected and found to be in good condition.
1. Pavilion (per event):
I. 1 to 200 people - $200.00 rental fee. 2. Over 200 people - $1.00 rental fee per person.
ii. Volleyball Courts (cost per court):
1. $36.00 per time period
111. Passive Parks (all Township owned open space except for the 55 acre Township Park. Per event):
I. 1 event - $50.00 with $25.00 refundable deposit
1v. Baseball, Softball, Soccer Fields; excluding T-Ball ( cost per field/comi):
I. 1 field - $36.00
10. Copying of Township Records - the cost for the copying of Township records pursuant to the "Right to Know Law" Act 3 of 2008, as amended, shall be as follows:
a. Postage - the actual cost of mailing.
b. Duplication - The fees are based upon the duplication of records maintained and duplicated in black & white on standard 8 ½ by 11 inch paper, 8 ½ x 14 inch paper or 11 x 17 inch paper. All larger records, including but not limited to plans, maps and similar documents are "over-size records" for purposes of the fee schedule.
1. Photocopy - $0.25 per single sided copy
ii. Color Photocopy - $0.35 per single sided copy
m. Facsimile/Microfiche/Other Media - the Township's cost to duplicate the record original media.
iv. Conversion of electronic media only records to paper - if a record is only maintained in electronic media the fee shall be the lesser of: $ 0.25 per page (8½' x 11 '), or the Township's cost to duplicate the record in the electronic media.
v. Over-size Records - $4.00 per sheet
v1. Over-size Color Records - the Township's cost to duplicate the record.
vu. Cami Reporter Transcripts - Prior to the decision being "final, binding and
non-appealable" - $2.00 per page.
c. Certification of a record - $5.00 per certification.
d. Use of own copier or photographing a record - A requester may utilize their own copier provided the device is self-powered, (it may not be plugged into a Township
power outlet) or camera. Any duplication by the requester must be done with a Township employee present.
e. Direct access to the Township computer system is prohibited.
f. No original records may be removed from the Township Building by a requester.
g. Inspection of Redacted Records. If a requester seeks to inspect rather than receive copies which contain both public and non-public information, the Township shall redact the non-public information. While the Township may not charge the requester for the redaction itself, the Township will charge the requester for any copies it must make in order to securely redact the record before allowing the requester to view the record.
11. Code Books, Pamphlets and Zoning Maps
a. Complete Code Book (includes subscription service for amendments for the balance of the calendar year) - $150.00.
b. Code Book Subscription Service - $25.00 per year
c. Zoning Pamphlet with Zoning Map- $13.00
d. Subdivision Pamphlet - $7 .00
12. Re-Sale and Re-Occupancy Inspections
a. Residential - $60. 00
b. Non-Residential Building Less than 2,000 square feet- $150.00
c. Non-Residential Building 2,000 square feet-9,999 square feet-$250.00
d. Non-Residential Building I 0,000 square feet or more- $500.00
13. Contractor Registration
a. $25.00 - per year
14. Refuse charges pursuant to Section 194-8 of the Township Code
a. Single Family Residential b. Multi-family Residential
$100.00 per quarter $100.00 per quarter
15. Sewer Charges pursuant to Sections 188-3, 188-4, 188-5 and 188-25 of the Township Code
Fixed Rate per unit
a. Fixed rate b. Meter reading surcharge
$75.61 per quarter $ 8.00 per quarter
U:\DDavis\Board Meetings\Board Materials\2022\20220705 Board Meeting\2022-13 Fee Schedule.docx 9
Variable Rate
a. Variable Rate $9.70 per 1,000 gallons of water b. Variable Rate (East Whiteland) $6.20 per 1,000 gallons of water (East Whiteland is in agreement to sell their sewer system to AQUA by the end of 2021. Their rates would be frozen for 3 years under the agreement with AQUA)
Permits/Inspections
a. Sewer Laterals $300.00 per lateral b. Water Meter/Measuring Device $60.00 per meter/measuring device
On-Lot Sewage System Management Fee The fee of$10.00 is due and payable when the Township sends out the notice to pump the on-lot system.
16. Stormwater Management submissions pursuant to Ordinance 129-F-2013
a. Regulated activities that meet the criteria for the Simplified Approach shall be charged an application and plan review fee of $100.00.
b. Regulated activities that do not meet the criteria for the Simplified Approach shall reimburse the Township for the actual cost of all engineering, inspections and materials tests, incun-ed in the review of the plans and calculations, and in the inspection of the improvements during construction. These costs shall be billed at the Township Engineer's prevailing rate.
c. Post Construction Maintenance inspections shall be billed at the Township Engineer's prevailing rate.
d. The actual cost to record the stormwater agreement and plan.
17. Solicitation Fees
a. License Fee - (Except for those listed in § 169-6) $28.00
b. PA State Police Background Check Fee; (all applicants) $22.00
18. Wireless Telecommunications Carrier Fees
a. Annual Registration Fee -$25.00 per location. b. Penalty for untimely filing of Annual Report - $100.00 per location.
19. Alarm fees pursuant to Sections 81-12 and 81-13 of the Township Code
a. Section 81-12A- False Alarm Fee Schedule.
I. For the first false alarm, per rolling twelve months: a warning will be issued.
2. For the second false alarm, per rolling twelve months: a warning will be issued.
3. For the third through the fourth false alarm in any rolling twelve months: $100 for each false alatm.
4. For the fifth through the sixth false alatm in any rolling twelve months: $200 for each false alarm.
5. For the seventh false alarm and for each false alarm thereafter in any rolling twelve months: $500 for each false alarm.
b. Section 8 l-l 3A - False Fire Alarm Fee Schedule.
I. For the first false fire alarm, per rolling twelve months: a warning will be issued.
2. For the second false fire alatm, per rolling twelve months: a wm11ing will be issued.
3. For the third through the fourth false fire alarm in any rolling twelve months: $500 for each false fire alarm.
4. For the fifth through the sixth false fire alarm in any rolling twelve months: $1,000 for each false fire alarm.
5. For the seventh false fire alatm and for each false fire alarm thereafter in any rolling twelve months: $2,000 for each false fire almm.
20. Small Wireless Facilities: a. Application Cost (up to 5 Facilities) - $500
i. Additional Facilities - $100 each (up to 30) b. Application for new pole - $1,000 c. Annual Right-of-Way Access Fee - $200 per Facility d. Annual Fee if upon Township-Owned Pole - $70 per Facility 21. Effective Date
The fees outlined in this resolution shall be effective on July 5, 2022.
U:\DDavis\Board Meelings\Board Materials\2022\20220705 Board Meeting\2022-13 Fee Schedu!e.docx 11
RESOLVED AND ADOPTED, this 5th day of July, 2022.
ATTEST:
Derek J. Davis, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
Michele Truitt, Chairwoman
John Hertzog, Vice Chairman
Cody Bright, Member
Michael P. Lynch, Member
David E. Shuey, Member
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 6/9/2022 To: From:
Board of Supervisors .·,, //' Mark Gordon, Zoning Officer tltl{ Jc7 Re: Deer Management Groups for 2022 Archery Hunting Program 2022 - 2023 Deer Management Hunting Program Resolution
Dear Board Members:
The Township has received four applications for the 2022 Deer Management Archery Hunting Program {DMP). The Deer Management Group applications are enclosed for your review.
I have drafted the 2022-23 DMP Resolution for your review and approval. Three of the four groups from 2021 have submitted applications for the 2022 - 23 hunting season.
All three of these Deer Management groups have been supporting the program for more than a decade and they do so with professionalism, sportsmanship, and community service in mind at all times.
The one change this year is that Keystone Archers has requested to manage both the Bow Tree and Wentworth open space areas this year. Southeast PA Deer Management Association did not submit an application this year.
Keystone Archers has five township resident members who live adjacent to the Wentworth open space area. This should improve the deer harvest within the Wentworth open space.
The deer harvest for 2021-22 season was 28, I have included the harvest breakdown for your information.
I have reviewed the applications and recommend that the Board consider the following draft motion:
Draft Motion: Mr. Chairman, I move that we approve the 2021-22 DMP Resolution (resolution 2021-24) and the following Deer Management Groups to participate in the 2021 Township Archery Hunting program:
1. Chester County Trackers will manage the Grand Oak & Mill Creek open space area. 2. Main Line Whitetail Managers will manage the Supplee open space area. 3. Keystone Archers will manage the Bow Tree & Clocktower open space as well as the Wentworth open space area.
F:\Data\Shared Data\Code Dept\DEER\2022-23\Resoultion\Memo to BOS re. 2022 DMP 06012022.doc
EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA
RESOLUTION NO. 2022 - 12 A RESOLUTION ADOPTING SPECIFIC PROVISIONS
OFTHE DEER MANAGEMENT PROGRAM
FOR THE 2022-2023 SEASON
WHEREAS, Section 163-4B of the Code of the Township of East Goshen requires the Board of Supervisors to designate the areas of Township land to be utilized for hunting as part of the Deer Management Program; and
WHEREAS, Section 163-4D of the Code of the Township of East Goshen authorizes the Board of Supervisors to identify Deer Management Groups to participate in the program; and
WHEREAS, Section !63-4F of the Code of the Township of East Goshen requires the Board of Supervisors to designate the days and times when deer management activities may occur; and
WHEREAS, Section 163-40 of the Code of the Township of East Goshen requires the
Board of Supervisors to designate the procedure for reporting harvested deer; and
WHEREAS, Section 163-4H of the Code of the Township of East Goshen requires the Board of Supervisors to designate the procedure for reporting complaints; and
WHEREAS, Section 163-41 of the Code of the Township of East Goshen allows the Board of Supervisors to designate by resolution additional guidelines and procedures.
BE IT RESOLVED THAT the Board of Supervisors of the Township of East Goshen hereby adopts the following specific provisions for the 2022-2023 Deer Management Program:
Pursuant to Section 163-4B, the Board of Supervisors designates the open space in Bowtree/Clocktower, Supplee Valley East & West, Grand Oak/Millcreek and Wentworth
for hunting as part of the Deer Management Program.
Pursuant to Section 163-4D, the Board of Supervisors authorizes the following Deer Management Groups to participate in the program: Keystone Archers, Main Line Whitetail Managers, and Chester County Trackers.
Pursuant to Section 163-4F, the Board of Supervisors authorizes the following dates and times: September 17, 2022; until January 28, 2023, as permitted by Pennsylvania Game Laws, except that no hunting shall be permitted on November 24th and 25th, 2022, and December 12 - 25, 2022.
F:\Data\Shared Data\Code Dept\DEER\2022-23\Resoultion\2022 - 24 Deer Management Program ResL2022-23.doc
. Pursuant to Section 163-4G, the Board of Supervisors authorizes the following procedure
for reporting harvested deer: Each hunter shall complete the Deer Management Program Harvest Report form for each harvested deer and forward it to the Township electronically within 48 hours of harvesting a deer.
Pursuant to Section 163-4H, the Board of Supervisors authorizes the following procedure for reporting complaints: Complaints shall be filed in writing and hand delivered or emailed to the Township using the following email address: codes@eastgoshen.org. Complaints may also be made by dialing 911.
Pursuant to Section 163-41, the Board of Supervisors has no additional guidelines or procedures to designate at this time.
RESOLVED AND ADOPTED, this 5th day of July, 2022.
ATTEST:
Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
F:\Data\Shared Data\Code Dept\DEER\2022-23\Resoultion\2022 - 24 Deer Management Program Res_2022-23.doc
2021-2022 Deer Harvest Information
Hunting Area Date i'lale/Femal Antlered / Antlerless Weight Approx. Age Hunter
BOWTREE 9/30/21 F AL 100 2.5 Kovach, Dave
10/11/21 F AL 110 2.5 Kovach, Austin
10/11/21 F AL 105 2.5 Klinedinst, Todd
11/1/21 F AL 110 2.5 Ferry, Dan
11/5/21 M A 145 3.0 Wahn, Andrew
11/12/21 F AL 100 2.5 Klinedinst, Todd
11/15/21 F AL 100 2.5 Kovach, Austin
11/19/21 F AL 110 2.5 Kovach, Dave
11/23/21 M A 120 2.5 Ferry, Dan
12/9/21 F AL 120 2.5 Kovach, Dave
12/11/21 F AL 100 2.0 Ferry, Dan
1/7/22 F AL 120 2.5 Kovach, Dave
1/8/22 F AL 110 2.5 Klinedinst, Todd
1/18/22 F AL 110 2.5 O'Neill, Mark
1/20/22 M A 120 3.0 Malinchak, Mike
1/24/22 F AL 120 2.5 Kovach, Austin
1/24/22 F AL 110 2.0 Wahn, Andrew
1/24/22 F AL 110 2.0 Ferry, Dan
Bowtree Male Female
18 3 15
MILLCREEK 9/18/21 F AL 105 1.5 Brabson, Dan
10/9/21 F AL 105 1.5 Brabson, Dan
Millcreek Male Female
2 0 2
SUPPLEE
9/8/21 F AL 110 2.0 Storer, Nigel
9/20/21 M A 165 3.0 Jaeger, Ed
10/12/21 F AL 100 1.0 Jaeger, Ed
11/3/21 M A 145 2.5 Jaeger, Matt
11/14/21 F AL 110 2.0 Jaeger, Ed
Supplee Male Female
5 2 3
WENTWORTH 10/19/21 F AL 135 2.5 Price, Matt
1/7/22 F AL 115 1.5 Price, Jody
1/14/22 F AL 130 1.5 Price, Jody
Wentworth Male Female
3 0 3
Total Males Females
Total Deer Harvest 2021-22 28 5 23
6/9/2022 F:\Dala\Shared Dala\Code Dept\DEER\2021-22\Harvesl Reports\1 - Deer Harvest Report Tracking 2021-22.xls
Keystone
Archers
May 25, 2022
East Goshen Township Deer Management Committee 1580 Paoli Pike West Chester, PA 19380
Re: Formal Application for Keystone Archers to Hunt in East Goshen Township's Open Space Deer Management Program
Dear Committee Members:
This letter is to serve as a "free form" application for Keystone Archers to be included in the East Goshen Township's Open Space Deer Management Program for the 2022-2023 season.
As a re-introduction, Keystone Archers is an arche1y / deer management club, standing currently at 11 members with the goal of ultimately having 20 members in the club. We are presently expanding our group with a select group of new members to both replace some non-active hunters and to continue the growth of our group. All new members must adhere to the high standards that we have set for our group.
As our club membership has slightly expanded including our children becoming adult hunters, we are asking now to manage both the Bow Tree/ Clocktower area as well as the Wentworth area.
• In addition to having 4 members reside in the Bow Tree development, we have 5 members now that live in properties that are adjacent to the Wentworth area. • We feel we have proven to not only be successful harvesting deer out of Bow Tree, we also feel we have led by example in Bow Tree with our stewardship with the residents, our watching and cleaning of the area. • We believe we can mirror those same results in the Wentworth area as well. In 2021-2022, we harvested 18 deer from Bow Tree.
The club is presently comprised of approximately 50% East Goshen residents with the other 50% from neighboring adjacent townships. I have attached a copy of the Keystone Archers by-laws, as well as our tri-fold with information about the club. Our 11 current members have individually between 25 to 30 years of bow hunting experience. Our club abides by all the Pennsylvania Game Commission laws, as well as all the rules set forth by the East Goshen Township Deer Management Committee. Additionally, we have an East Goshen resident member who is also a retired Pennsylvania Game Commission warden.
Keystone Archers Hunting Club • 200 Berwyn Park, 920 Cassatt Rd., Suite 205 • Berwyn, PA 19312
May 25, 2022 Page 2
Keystone
Archers
Last year, 2021-2022, was our ninth year in the East Goshen Deer Management Program. We harvested 18 deer and all of the deer were average to above average size and very healthy. We had zero incidents, and continued our mission of facilitating good will with the surrounding Bow Tree and Clocktower development residents. We have completed our clean-up day of the Bow Tree Tract on March 20.
All members have passed our annual safety and marksmanship tests. All members are insured effective July 1st for $2,000,000 general aggregate and $1,000,000 per occurrence by Outdoors Insurance, Inc. None of our members have ever received a Game Commission violation or any felony or misdemeanor. Per our by-laws, any violations are subject to dismissal from our club. Any member who shows any form of poor judgment or disrespect while on Township property or surrounding areas will also be dismissed from our club.
All of our current active members have a vast array of community involvement in East Goshen and the surrounding areas, i.e., Great Valley Little League, West Chester Junior Boys Basketball, law enforcement, local churches, WCSD schools, etc. We all are extremely ethical and community-minded citizens.
Our members consist of various small business owners, retired executives, professionals and police officers, and those professions allow us the flexibility to hunt as much during the week as well as the weekends. Our archers practice 12 months a year on archery precision and skills, which affords us the ability to be very successful in the field. Typically, we hunt a 3-4 hour session in the morning or late afternoon, and focus our efforts when the weather conditions are favorable for a successful harvest. Unfortunately, the weather this past season did not present as many favorable hunting days as we would have liked to have seen.
Over the past nine seasons hunting Bow Tree, we have received very positive feedback from a number of Bow Tree and Clocktower residents with respect to the discreteness of our hunting presence and the caretaker approach that we take with these properties. If requested, we would be more than happy to provide you with references from these East Goshen developments supporting the overall comfort level of these residents with Keystone Archers.
In addition, we frequently walk and monitor these properties year-round to "keep an eye on things" and just do not show up when it's hunting season. With most of us being EGT residents, we have a vested interest in the overall condition and longevity of these open spaces and not just a sole interest in showing up and hunting them. We believe that we have proven this with our actions over the past nine seasons.
We would be pleased to hunt any parcel of the East Goshen's Open Space Deer Management Program that would be assigned to us, but would love the opportunity to continue with the Bow Tree Tract as well as adding Wentworth to our club also. As mentioned, we have 5 members that live adjacent to Wentworth and 4 members that live adjacent to the Bow Tree Tract. All of these members are longstanding residents of East Goshen Township.
Keystone Archers Hunting Club • 200 Berwyn Park, 920 Cassatt Rd., Suite 205 • Berwyn, PA 19312
May 25, 2022 Page3
Keystone
Archers
Our group will offer 3-4 hours per archer that utilize the property to provide volunteer services to the Township. Our services could range from general cleanup to planting trees. Our service hours could also be utilized to educate specific homeowners within the Township that would like
us to explain the balance between the deer herd and the community.
We would also be pleased to set up additional tick tubes for residents or assist in posting Township properties. We are also available to advise the deer community as requested through the QDMA. Trash and rubbish cleanup on a parcel assigned to us could be another volunteer activity for us to partake in.
If selected by the Deer Management Committee to hunt on Township-owned land, we would follow all of the Township rules outlined in the Deer Management Program, including all the statistical tracking of the amount of time hunted and the amount of deer harvested by our club.
I speak on behalf of our entire club as I thank you for the opportunity to submit an application for our group to continue our devoted assistance with this program. As residents of the community, we are also stakeholders that understand the importance of making this deer management program a success and its reflection of the Township on all the residents of the Township.
Respectfully submitted,
David S. Kovach President Keystone Archers
Keystone Archers Hunting Club • 200 Berwyn Park, 920 Cassatt Rd., Suite 205 • Berwyn, PA 19312
May 24, 2022
East Goshen Township 1580 Paoli Pike West Chester, PA 19380
Re: Dear Management Application
To Whom It May Concern:
A Safe and Responsible Deer Management Association . ' . .
Chester County Trackers appreciated the opportunity to assist the Township in its Deer Management Initiative over the past several years and would like to renew our application for this upcoming year (2022-23). We do so believing that the deer management program is beneficial to the township, and we also believe that we are well equipped to assist in the endeavor for the following reasons. First, Chester County Trackers is a small group of carefully selected hunters. Second, we have had a good working relationship with the Township by participating in the management efforts for several years. During that time, we have responsibly managed the deer population by harvesting appropriate numbers of deer while also cooperating with the Township to report individuals poaching on the property. Third, due to our previous years of work with the township, members of our team living in East Goshen, and our travel routes surrounding township the property, we believe we have a superior knowledge of the property and travel patterns of deer on the Grand Oak/Mill Creek property. Below, you will find our association's purpose, management philosophy, membership, and code of conduct.
Purpose Chester County Trackers was established for the purpose of carefully and responsibly assisting landowners and organizations in the management of deer populations. Our purpose is derived in part from the increasing number of deer-related traffic accidents each year along with the high occurrence of Lyme disease located within the county.
Management Philosophy In seeking to manage any property, we strive to evaluate the land's capacity to sustain wildlife in a manner that reduces the possibility of animal starvation and population-related diseases. Furthermore, careful attention is given to the age and sex of deer located in a property. As has been proved, a primary factor in quality deer management is a proper ratio between bucks and does; consequently, we strive to harvest does and mature bucks, while protecting younger bucks.
Membership As an association, our membership consists of a small, carefully selected group of safe, responsible hunters. Most years, we are able to harvest an average of three deer per member per year with an estimated average of twenty-five hunting hours for each harvested deer. As a whole, members of our constituency have completed hunter safety education courses, have won various archery competitions, and have seven decades of bowhunting experience in multiple states.
Furthermore, none of our members have ever received PA Game Commission violations, nor have we received any complaints from our landowners and their surrounding neighbors. In joining our association, we ask that members successfully complete a proficiency test each year. For our purposes, each archer is required to shoot four arrows consecutively into a three inch target from a distance of twenty yards. Although stringent, we have found that this requirement ensures our accuracy and builds confidence in those who give us the privilege of managing the deer population on their property. Currently, the membership of our association is by invitation only with very limited invitations possible in the foreseeable future. Our current leadership is as follows:
Chris Ollis (President) 170 Cambridge Rd. Coatesville, PA 19320 610-659-1400
Dan Brabson (Vice President) EG Resident 1421 Clover Lane West Chester, PA 19380 610-662-7072
Code of Conduct Our goal as a deer management group is the safe, responsible harvesting of deer as needed to reduce and maintain deer populations. In keeping with this goal, we have established the following code of conduct. Members of Chester County Trackers will:
• maintain a high standard of excellence and ethics in bowhunting • be properly licensed for bowhunting both antlered and antlerless deer in the state of Pennsylvania and appropriate Wildlife Management Units as specified by the state. • hunt in a discreet manner so as to avoid disturbing residents when entering and exiting the woods, eviscerating harvested deer, and performing any other necessary hunting activities. • communicate with landowners regarding appropriate hunting times, parking locations, hunting practices, number of hunters, and any questions the landowner might have. • see that deer harvested are consumed or donated to families in need. • hunt from tree stands for safety and effectiveness. In order to further safety, we require that members wear safety harnesses and disable access to any tree stands permitted to remain on the property. (In situations where landowners prefer that tree stands be removed, we often use climbing tree stands.) • report harvested deer to the property owners and any other necessary parties. • reasonably assist the landowner in property maintenance by removing obvious pieces of small trash from the property when exiting. Our reasoning in doing so is the development of good relations with landowners and the protection of the environment for land and animals.
In this upcoming year, we would like to again maintain the Grand Oak/Mill Creek open space as we understand the unique challenges of that particular property. We look forward to a successful year as we continue to work with the Township in this endeavor.
Regarding our insurance, we carry the required $1,000,000 liability insurance for this year with the Quality Deer Management Association effective August 1, 2022 through August 1, 2023.
In closing, we would again like to thank the Township for consideration of our interest in helping East Goshen manage its deer population. Please let us know if there are any further questions regarding our association, practices, or proposal as outlined above.
Respectfully,
Chris Ollis President, Chester County Trackers 610-659-1400
May 20, 2022
East Goshen Township Deer Management Committee
1580 Paoli Pike West Chester, PA 19380
RE: Formal Application for Main Line Whitetail Managers to hunt in East Goshen Township's Open Space Deer Management Plan
All members have passed our annual safety and marksmanship tests. All members are insured effective August 1 for $lmillion per Occurrence, $2 million Aggregate by Outdoor Underwriters Inc. If a member shows any form of poor judgment while on township property or surrounding areas they will be dismissed.
Experience in East Goshen and nearby areas
• We were invited to hunt in East Goshen in 2007 on a property on North Chester Road. We found the area was used by deer, however, we could not get close enough to effectively hunt them due to safety zone requirements and lack of trees from which to hunt.
• We have been very efficient since 2002 in a 17-acre area in Thornbury Township, Chester County. We harvested over 100 deer since hunting in the area. Deer densities have stabilized and new deer do not move in as quickly now.
• We are effective on a property owned by The Brandywine Conservancy in Devon that two of our members hunt.
• We have been effective since 2008 in the open space at Supplee in East Goshen Township. This is not an easy area to bow hunt from trees. We log a respectable amount of hours and will continue to manage the herd.
• Our members volunteer with various outdoor activities such as riparian buffer planting, trash clean-up, and invasive plant control. Most of our members volunteer on the board of directors in various national groups such as Safari Club International and Quality Deer Management
Associates.
• We would be pleased to hunt any parcel assigned to us.
Main Line Whitetail Managers 435 Fox Meadow Ln • West Chester • PA • 19382 610 • 304 • 8922
•
•
Our members harvested between 3 and 9 deer each last season. Previous seasons have seen individual numbers as high as I 7.
Our archers typically spend IO - 15 archer hours per deer harvested. Our typical archer will hunt a 2 or 3-hour session in the morning or afternoon and harvest a deer every 4 or 5 hunts.
• We agree to abide by all PGC game laws as well as any limitations set forth by the township. We also abide to our strict code of ethics.
• Our group will offer 3 to 4 hours per archer that utilizes the property to provide volunteer services to the township. Our services could range from general cleanup to planting trees. Our service hours could also be utilized to educate specific homeowners within the township that would like us to explain the balance between the deer herd and community. We are also
available to advise the deer committee as requested through the QDMA. Trash and rubbish cleanup on a parcel assigned to us could be another volunteer activity for us to partake.
If selected to hunt on township owned land we would propose offering the following services to the township in addition to balancing the deer population:
• A detailed log outlining observations while hunting on the property such as number and sex of deer observed, time observed, approximate age and antler size of deer observed, weather conditions, and other pertinent information. • A detailed log of deer harvested including age, sex, weight, and doe lactating information. • Self-imposed limits restricting buck harvesting to only mature animals with the major emphasison significant doe reduction.
Respectfully Submitted,
James Benoit
Main Line Whitetail Managers
Page 2 of 2
610-692-7171
www.eastgoshen.org
June 24, 2024
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
To: Board of Supervisors
From: Mark Miller
Re: Escrow Release #2 -1303 Goshen Parkway Final Release
I have reviewed the request for escrow release #2 for 1303 Goshen Parkway in the amount of $12,245.00 with the engineer. We recommend the full release of $12,245.00. This release will be the final release and close out the account for the following:
Site Improvements and Contingency
The balance remaining in escrow after this release will be $0.00. This will close out the account. The total amount released will be $187,594.55.
F:\Data\Shared Data\Public Works Dept\Escrow releases\1303 Goshen Pkwy. Jabil\BOS letter escrow Release #2 June 24.doc
EGOST00131
Derek Davis Township Manager East Goshen Township 1 580 Paoli Pike West Chester, PA 19380
RE: JABIL, 1303 Goshen Parkway
Escrow Release No. 2 (Final)
Dear Derek:
June 23 , 2022
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
In coordination with Township staff and project representatives, approval to release $12 ,245.00 of the requested $12 ,245.00 is recommended.
The requested release Includes portions of site improvements and contingency.
Following approval of the recommended release, the total amount released will be $1 87, 594.55. The total amount remaining in escrow will be $0.00 , closing out the project.
Should you have any further questions or comments, please contact me.
Sincerely,
Nathan M. Cline, PE Township Engineer
cc: Mark Miller, Director of Public Works (via e-mail) Bill Christman, Esq., Lamb McErlane (via e-mail)
Dave Citro, PE, Mainstay Engineering Group, Inc (via e-mail) Todd McVoy, JABIL (via e-mail)
In accordance wilh the Townshlp-Bulkfers Escrow Agreement tor public Improvements tor the above referenced project, we hereby request public monies to be released from escrow for the fo!lo.....ing items of work which have been completed:
tern Description of Work
! a. b. c. d. ..
f.
§ite Prep, & Erosion controls
Construction Layout Tree Removal Clear& Grub 12Ж filter soek Inlet Protection Concrete wash-out g, Temp, Const. & Tree Prot. Fence h. Temporary Seeding ,. Main! of E&S measures j, LOO Stake out
Subtotal
Combined Site Prep. & Erosion Control This Period- Subtotal
!
a. Strip Topsoil
b. cut c. Remove excess material d. FMI e. Gradlna adl to Pads & Blda
Subtotal
Combined Earthwork This Period • Subtotal
3 storm sewers З- 6" HOPE Storm Drain
b, 4" PVC Cleanout
c. Inlets d, Yard Drains e. HOPE Flared End Sections
f. RfQ Rag
,!
Subtotal
Combined Storm Sewers This Period. Subtotal
Stor:mwater Basins a. Stone Basin b. 8" HOPE Pert c, 12" HOPE Perf d. Outlet Structure Modifications e. Filter Fabric
!!
Subtotal
Combined Stormwater Basins This Period - Subtotal
Sanitary Sewer a. 6" HOPE Pipe
b. 3" Ductile Iron Plpe c. 4" Ductile lron Pipe d, 6" Ductile Iron Pipe e, 4" PVC Cleanout
f. Precast MH 6'-10" g. Precast Lift Station h, Existing MH Connection
I. Pumps j. MH Vacuum Teslfng k, Line teslfng
Subtotal
Combined Sanitary Sewer This Period • Subtotal
§ Fire Water
a, Valve Pl!
b. 4" DIP Fire Main C. FDC Standpipe d, 4" Check Valve e, Pressure Testing
Subtotal
Combined Fire Water This Period • Subtotal
$ • $ $ $ $ $ $ • $ $
$ $ $ $ I
$
• $ $ $ $ $ $
$ $ $ • $ $
$ $ $ • $ $ $ $ $ $ $ $
$ • $ $ $ $
Scheduled
value
5,250.00 2,625.00 2,625.00 2,154.60 157.50 504.00 1,297.28 3,675.00 3,675.00 1 050,00 23,013.38
1,033.20 1,942.50 5,932,50 603.75 262.50 9,774.45
8,701.88 1,722.00 2.310.00 976,50 829.50 1,716.75 16,256.63
14,196.00 1,386.00 1,785.00 2,625,00 94.50 20,086.50
1,151.33 367,50 708.75 12,768.00 344.40 5,040.00 3,675.00 1,575.00 2,703.75 708,75 220.50 29,262,98
2,520.00 5,645.88 2,730.00 2,073.75 21100.00 15,269.63
1 of2
EGOST00131
6/23/2022
Previously This Total Balance to approved period completed finish • 5,250.00 • $ 5,250.00 • • 2,625,00 $ • 2,625.00 $ $ 2,625.00 $ $ 2,625.00 • $ 2,154.60 $ $ 2,154.60 $ • 157.50 $ $ 157.50 $ $ 504.00 $ $ 504.00 $ $ 1,297.28 $ $ 1,297.28 $ $ 3,675.00 $ $ 3,675.00 • $ 3,675.00 $ $ 3,675.00 $ $ 1 050.00 $ $ 1 050.00 $ $ 23,013.38 $ $ 23,013.38 $
$
$ 1,033.20 $ $ 1,033.20 $ • 1,942.50 $ $ 1,942.50 • $ 5,932.50 $ $ 5,932.50 $ $ 603.75 $ $ 603,75 $ $ 262.50 $ $ 262.50 $ $ 9,774.45 $ $ 9,774.45 $
$
$ 8,701.88 $ $ 8,701.88 $ $ 1,722.00 $ $ 1,722.00 $ $ 2,310.00 $ $ 2,310.00 $ $ 976.50 $ $ 976.50 $ $ 829.50 $ $ 829.50 $ $ 1,716.75 $ $ 1i716.75 $ $ 16,258.63 $ $ 16,256.63 $
$
$ 14,196.00 $ $ 14,196.00 $ $ 1,386,00 $ $ 1,386.00 $ $ 1,785.00 $ $ 1,785.00 $ $ 2,625.00 $ $ 2,625.00 $ $ 94.50 $ $ 94.50 $ $ 20,086.50 $ $ 20,086.50 $
$ • 1,151.33 $ $ 1,151,33 $ $ 387.50 $ $ 367.50 $ $ 708.75 $ $ 708,75 $ • 12,768,00 $ $ 12,768.00 $ $ 344.40 $ • 344.40 $ $ 5,040,00 $ $ 5,040.00 $ $ 3,675,00 $ $ 3,675,00 $ $ 1,575.00 $ $ 1,575.00 $ $ 2,703.75 $ $ 2,703.75 $ $ 708.75 $ $ 708.75 $ $ 220.50 $ $ 220.50 $ $ 29,262.98 $ $ 29,262.98 $
$
$ 2,520.00 $ $ 2,520.00 $ $ 5,845.88 $ $ 5,845.88 $ $ 2,730.00 $ $ 2,730.00 $ $ 2,073.75 $ $ 2,073.75 $ $ 2,100.00 $ $ 21100.00 $ $ 15,269.63 $ $ 15,269.63 $
$
EGOST00131 In accordance w!lh the Township-Builders Escrow Agreement for public Improvements for the above referenced project, we hereby request public monies to be released from
6/23/2022
escrow for the following Items of won< which have been completed:
tern Description of Work Scheduled Previously This Total Balance to value approved period completed finish Z Site Improvements
a. Depressed Concrete Curb $ 1,155,00 $ 1,155.00 $ $ 1, 155,00 $ b, Pavement Markings & Line Striping $ 2,625.00 $ 2,625.00 $ $ 2,825.00 $ c. Concrete Bollards $ 210.00 $ 210,00 $ $ 210.00 $ d. Slgns̟ EA $ 262.50 $ 262.50 $ $ 262.50 $ e. Concrete for Equip Pads & Thrust Blocks $ 2,709.00 $ 2,709.00 $ $ 2,709,00 $ f. Equipment Pad Reinforcement $ 3,071.25 $ 3,071.25 $ $ 3,071.25 $ g. Concrete walk $ 3,461.85 $ 3,461,85 $ $ 3,461,85 $ h. Sidewalk Reinforcement $ 279.83 $ 279,83 $ $ 279.83 $ I. Bollard lights $ 3,150,00 $ 3,150.00 $ $ 3,150.00 $ j. Emergency access Geogri<I $ 19,005.00 $ 19,005.00 $ $ 19,005.00 $ k. New Tree Plan!lngs $ 6,300.00 $ $ 6,300.00 $ 6,300.00 $ I. New Shrub Plantings $ 945.00 $ $ 945,00 $ 945,00 $ Subtotal $ 43,174.43 $ 35,929.43 $ 7,245.00 $ 43,174.43 $
Combined Site Improvements This Period • Subtotal $ 7,245.00
8 Miscellaneous -a. Final Site Stabilization $ 8,452,50 $ 8,452.50 $ $ 8,452.50 $ b. As-built Plans $ 2,625.00 $ 2,625.00 $ $ 2,625,00 $ c. BMP Jnseections & Certfficalion $ 21625.00 $ 21625,00 $ $ 21625.00 $ Subtotal $ 13,702.50 $ 13,702,50 $ $ 13,702.50 $
Combined Miscellaneous This Period -Subtotal $
SUBTOTAL (Items 1 through 8) $ 170,540.50 $ 163,295.50 $ 7,245.00 $ 170,540,50 $
10% CONTINGENCY $ 17,054.05 $ 12,054.05 $ 5,000.00 $ 17,054.05 $
TOTAL $ 187,694.65 I 175,349,65 $ 12,245.00 $ 187,594.55 $
APPROVED THIS RELEASE $ 12,246.00
2 or2
EGOST 00760
Mark A. Gordon Director of Code Enforcement/Zoning Officer 1580 Paoli Pike West Chester, PA 19380
RE: 932 N. Chester Road Financial Security
Dear Mark:
June 29, 2022
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
We have received a request for a reduction of the secured funds for the referenced project. Based upon field observations by our office, we recommend the following release in accordance with the attached documents:
Original Escrow Amount ...................... ..
Released to Date .................................. .
Balance Prior to This Release ............... .
Recommended by This Release ......... ..
Balance After This Release ................... .
$ $
$
$
$
90,573.13 00.00
90,573.13
90,573.13
00.00
Included in this release are survey layout, stormwater management, sanitary sewer, driveway, landscaping, and soil erosion & sediment control.
In providing this information as to the status of the construction, Pennoni Associates Inc. makes no representations (except where expressly stated herein to the contrary) as to the quality of the construction to date; its final conformance with applicable plans, specifications or municipal requirements; its ability to pass any applicable test requirements, or the cost or degree of future work, which will be required to complete the work to conform with applicable requirements. The information provided herein shall not be used by the recipient in determining any type of cost es ti mote except ot the recipients own risk, and Pennoni Associates Inc. expressly disclaims any and al/ liability for claims or damages arising from any construction deficiencies hereafter discovered.
Should you have any questions or comments, please contact the undersigned.
Sincerely,
PENNON
f1t, Nathan M. Cline, PE Township Engineer
cc: Derek Davis, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail) David Gibbons, PE, D.L. Howell (via e-mail) T.R. Moser (via e-mail)
U:\Accounts\EGOST\EGOST00760 - Gionfriddo, 932 N. Chester Road\DOC PREP\Moser 932 N. Chester Financial Security Final release 06-29- 2022.docx
In accordance with the Township-Builders Escrow Agreement for public Improvements for the above referenced project, we hereby request public monies lo be released from escrow for the following items of work which have been completed:
tern Description of Work
1 ,. b. c. d.
• ,. b. c. d.
Smvey Layout Construction Stakeout As-built Plans Monuments Pins Subtotal
Sutvey Layout This Period• Subtotal
Stromwater Management Infiltration bed 8" roof drain pipe 6" roof drain pipe Downseout connections Subtotal
Stormwater Management This Period. Subtotal
Sanitary Sewer a. Ginder pump - Allowance b. 1 1/4" force main, connect to existing sanita Subtotal
Sanitary Sewers This Period. Subtotal
1 Driveway a. 6" 2a modified stone base b. 2 1/2" 19mm suee!:Qave
Subtotal
Driveway This Period •Subtotal
!! Landscaping ,. Ornamental Trees b. Deciduous Shrubs
c. Evergreen Shrubs d. Rake, Seed, & Straw
Subtotal
Landscaping This Period. Subtotal
§ Soll Erosion & Sediment Control
a. Rock construction entrance b. 18" soil fence c. Orange plastic fence d. Curle:< S-75 e, Inlet protection
f. Temporary seed g. E&S Removal
Sublo!al
Soil Erosion & Sediment Control This Period" Subtotal
SUBTOTAL (Items 1 through 8)
10% CONTINGENCY
7% Inspection
TOTAL
APPROVED THIS RELEASE
$ $ $ $ $
$ $ $ $ $
$ $ $
$ $ $
$ $ $ $ $
$ $ $ $ $ $ $ $
$
$
$
$
Scheduled
value
3,200.00 $ 2,800.00 $ 400.00 $ 270.00 $ 6,670.00 $
17,811.00 $ 2,660.00 $ 1,618.75 $ 2,000.00 $ 24,089.75 $
9,850.00 $ 7,132.75 $ 16,982.75 $
6,591.72 $ 12,048.96 $ 18,640.68 $
450,00 $ 500.00 $ 500.00 $ 1,904.00 $ 3,354.00 $
1,385.00 $ 766.50 $ 2,581.25 $ 748,00 $ 145.00 $ 1,250,00 $ 800.00 $ 7,675.75 $
77,412.93 $
7,741.29 $
5,418.91 $
90,573.13 $
1 of 1
EGOST00760
6/29/2022
Previously This Total Balance to approved period completed finish
$ 3,200.00 $ 3,200.00 $ $ 2,800.00 $ 2,800.00 $ $ 400,00 $ 400,00 $ $ 270.00 $ 270.00 $ $ 6,670.00 $ 6,670.00 $
$ 6,670.00
$ 17,811.00 $ 17,811.00 $ $ 2,660.00 $ 2,660.00 $ $ 1,618.75 $ 1,618.75 $ $ 2,000.00 $ 2,000.00 $ $ 24,089.75 $ 24,089.75 $
$ 24,089,75
$ 9,850.00 $ 9,850.00 $ $ 7,132.75 $ 7,132.75 $ $ 16,982.75 $ 16,982.75 $
16,982.75
$ 6,591.72 $ 6,591.72 $ $ 12,048.96 $ 12,048.96 $ $ 18,640.68 $ 18,640.68 $
$ 18,640.68
$ 450.00 $ 450.00 $ $ 500,00 $ 500,00 $ $ 500.00 $ 500.00 $ $ 1,904.00 $ 1,904.00 $ $ 3,354.00 $ 3,354.00 $
$ 3,354.00
$ 1,385.00 $ 1,385.00 $ $ 766.50 $ 766,50 $ $ 2,581.25 $ 2,581.25 $ $ 748.00 $ 748.00 $ $ 145.00 $ 145.00 $ $ 1,250.00 $ 1,250.00 $ $ 800,00 $ 800.00 $ $ 7,675.75 $ 7,675.75 $
$ 7,675.75
$ 77,412.93 $ 77,412.93 $
$ 7,741.29 $ 7,741.29 $ 0.00
$ 5,418.91 $ 5,418.91 $ (0.00)
$ 90,573.13 $ 90,573.13 $ {0.00)
$ 90,573.13
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 24, 2022
To: Board of Supervisors
From: Mark Miller
Re: Sewer Cleaner
The sewer cleaner is due for replacement, this machine is used for cleaning the sanitary and storm sewers. This unit is designated for off road use as we have designed it to connect to our 4 x 4 tractors so we can take it thru our right-of-ways. We also use this machine for the sewers in the streets.
The current unit has been in service for 15 years and is fully depreciated.
I have reached out to two COSTAR vendors for pricing below are their costs.
I would add that the delivery time for the new unit is 10 months.
In today's market we should be able to get close to $50,000.00 for the old unit.
Golden Equipment:
Fredrickson Supply:
Motion:
$145,313.00
$155,828.00
Madame Chair - I recommend that bid to be awarded to Golden Equipment in the amount of $145,313.00
I need a motion from the Board to post the old sewer cleaner on Municibid.
F:\Data\Shared Data\Public Works Dept\Equipment Purchases 2022\letter to BOS for sewer cleaner24.docx
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Memo
To: Board of Supervisors
From: Mark Miller
Date: June 23, 2022
Subject: Fire Alarm/Control Panel
Dear Board of Supervisors,
The current fire panel we have installed is out of date and, due to this we have multiple alarms that are triggered by the components failing. What makes this specific panel unique is that it also acts as a jail cell escape alarm. The panel currently covers the District Court, Public Works Department, and the
Police Department.
Premium Fire & Security is our current security company, who gave us a proposal that it would be $8,000.00 to replace the panel, which is in the Capital Reserve Budget. I also received a verbal quote from The Protection Bureau, which was $10,000.00-$12,000.00. In addition to replacing the panel, it will also be relocated from the current location in the District Court to the Public Works Department. The reason for this is that currently when an alarm goes off, the Public Works employees have to wait for a Judge to come to the District Court to unlock the doors in order to reset the alarm. To avoid this step in the future, the panel will be located in the Public Works Department, which will allow us to reset the alarm quicker and easier.
Madame Chair, I need the Boards approval to purchase the new alarm panel in the amount of $8,000.00.
Memo
To: Board of Supervisors From: Re:
Departments of Public Works & Parks and Recreation Camera installation project in EGT Park Date: May 8, 2022
Public Works and Parks and Recreation are proposing we install a camera system in EGT Park. This project is needed so we can ensure the safety of park patrons, While EGT Park is an overwhelming safe park with a tremendous amount of use, the park does see "smash and grab" style robberies with some frequency. In 2021 and 2022, there have been a combined twelve "smash and grab" style car break-ins (source: WEGO Police). We currently remind park users to lock their car, remove expensive items from view and to be aware of their surrounding in email blasts and social media posts. The cameras will serve as a deterrent for future activity and as a recording device that WEGO Police could use to potentially catch perpetrators. EGT Park also has seen frequent restroom vandalism, and the cameras would deter this behavior as well. The cameras would be placed at each entrance, the bathrooms, playground and other areas of high activity.
The project budget would be (see attachments):
Four license plate cameras $1600 Eight IP cameras $2500 Two POE injectors $80 NVR with 8 TB hard drive $1960 Above includes vendor installation and 3 year warranty Public Works labor and 1200ft x 2" conduit $2240 including restoration
Project installation cost= $8380 Ongoing expense = $124.95 monthly Comcast cost
To conclude, EGT Park is the focal point of our community, where residents and the public meet to exercise, enjoy time with their families and make lifelong memories. While overall a very safe park, WEGO Police input shows there is an element of criminal behavior that we proactively address. The addition of cameras can deter current and future criminal activities and provide video evidence as needed.
Motion: I move to authorize $8380 for the camera installation project in EGT Park and the monthly Comcast expense.
Computer/H:/East Gashen Township/Budget