Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

April 8, 2013
Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. APPROVAL OF MINUTES March 11, 2013
  4. APPROVAL OF INVOICES a. Pennoni #540995 $ 2,026.50 b. Pennoni #540996 $ 535.25 c. Pennoni #540997 $ 497.50 d. Pennoni #540998 $ 752.00 e. Pennoni #540999 $ 4,995.75 f. Pennoni #541000 $ 2,580.50 g. Pennoni #541001 $ 6,327.75 h. Gawthrop, Greenwood #107114 $ 1,661.12 i. Big Fish Environmental Ser. #13-040130-2 $ 11,825.00 j. Lochwood Plant labor Costs $ 913.20 k. Plymar Invoice – MaryDell Deversion $ 23,000.00
  5. LIAISON REPORTS
  6. FINANCIAL REPORTS March 2013 Report
  7. OLD BUSINESS Amend the 2013 Budget; Comp. Plan Goals Status Report
  8. GOALS March Goals
  9. NEW BUSINESS Acceptance of Pulte Development Sewer Lines
  10. CAPACITY REQUESTS

F:\Data\Shared Data\Agendas\Municipal Authority\2013\4-8-2013 .doc

  1. SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc Report with DMR’s; East Goshen Township Flows for March 2013
  2. ANY OTHER MATTER
  3. CORRESPONDENCE AND REPORTS OF INTEREST
  4. PUBLIC COMMENT
  5. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Website Posting Date

F:\Data\Shared Data\Agendas\Municipal Authority\2013\4-8-2013 .doc

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
March 11, 2013

The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, Marach 11, 2013 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Fran Beck, Jack Yahraes, Dana Pizarro and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio, (Township Supervisor), Mark Miller (Director of Public Works), Bob Adams, (Solicitor), Dan Barbato (Pennoni), Scott Towler (BFES), and Walter Wujcik (Conservancy Board).

COMMON ACRONYMS:

BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lochwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance

Fran called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Fran asked if anyone would be recording the meeting and there was no response.

Chairman’s Report

Ed McAssey reported that he attended the West Goshen meeting on March 6, 2013. Most of the meeting was devoted to Goose Creek. They feel that by mid-May they will know if it will go to trial or not. They are going to send a notice to their customers.

Approval of Minutes

The Chairman noted that the minutes of the February 11, 2013 meeting were approved as corrected.

Approval of Invoices

  1. Jack moved to approve payment of 5 Pennoni invoices: #537504 $5,033.00 #537505 $2,167.75 #537506 $ 570.00 #537507 $2,494.00 #537508 $2,496.75 Dana seconded the motion. The motion passed unanimously.

Liaison Reports

  1. Conservancy Board – Walter reported that they staked the locations for the dogwood trees to be planted along E Boot Rd. Woodlawn is the contractor and will start in April. They will

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

1

fertilize the area based on the soil report. They will review their goals in the Comprehensive Plan.

2. Board of Supervisors – Carmen reported that the Township’s finances are in good shape and the Comprehensive Plan Task Force had its first meeting.

Financial Reports

1. Jon Altshul, CFO, provided reports with the following comment: The Municipal Authority recorded $19,794.15 in expenses and $32,118.39 in revenues (mostly from a $30,000 transfer from the sewer capital reserve fund, but also from the Pine Rock repayment) in the month of February, a difference of $12,324.24. The Fund balance is now $55,234.11. He also attached a worksheet for the 2013 quarterly administrative charge back of $7,980.36.
Dana noted that the 2 pump stations are over budget. Rick will mention it to Jon but the Capital Reserve should cover that. Fran spoke to Brian McCool about the options that are available to residents for paying their sewer bill. Rick verified that they can use a check, automatic payment from their checking account or a credit card which has a processing fee. Fran and Dana feel that these haven’t been explained and are confusing. Rick will put something in the next newsletter. Dana requested a detailed account breakdown with the financial reports.

Old Business

None

Goals

1. All of the Authority members think that the use of “Goals” by the Supervisors and “Action Items” in the Comprehensive Plan are confusing. One or the other should be used, not two different terms. Rick explained that the BOS wants the Authority to review the Action Items. Rick will prepare a list for the next meeting. Jack commented that the first 2 items on the Goals list should be in BOLD type since they are completed.

New Business

1. Rick reported that the Township received a letter from the EPA. He noted that East Goshen does not accept anything from shale gas and only accepts domestic sewage.
2. The new NPDES inspector, Michael Brenner, met with Scott Fowler and went through the Ridley Creek plant. The Authority reviewed his report and was very pleased.
3. The agreement with Willow Pond was previously signed, but due to an error, it has to be re-signed. Rick gave the copies to Fran and Ed to sign.

Capacity Requests

None

Sewer Reports

  1. Mark Miller, Director of Public Works , provided the following report for February: Meters – The meters have been installed and are working well. We had a problem with the portable meter at Reservoir and Strasburg Road. Allied Control found the main board had failed. The meter was pulled and sent out for repair. Pump Stations – Were visited on a daily basis. Bar screens were cleaned and the walls were cleaned. The Mary Dell pump station called in several alarms last Sunday. We

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

2

found a bad float which was replaced. We contacted Aqua Wastewater to vac the wet well due to heavy grease build up.
CC Collection: We were notified of a lateral backup at 1448 Linden Lane. We made several attempts to clear the clog; unfortunately the cog was in the trap. We utilized the jetter to clean the main. Once that was done, we dropped the camera in the main and televised the 8” line which was clear. However, when we looked at the lateral connection, we could see heavy root buildup. We made several more attempts to clear the roots to no avail. We excavated the lateral and found the trap completely blocked. We installed a new trap and clean out. We televised the lateral prior to backfilling and everything is ok.
We were notified of a manhole over flowing on Paoli Pike. It turned out to be a Verizon manhole.
R.C. Collection: We did televising of some lines at Pulte homes to investigate for sump pump tie-ins. We found no evidence of sump pumps.
R.C. Plant: The plant operator notified us of heavy grit build up in front of the muffin monster. I contacted Aqua Wastewater for a vac truck. The line was completely cleaned. Lenni Electric was utilized to install four – 220 outlets for the pressure washer at various locations at the plant. We are in the process of fabricating three pipe stands for the filtration pumps. This will allow us to remove pumps for servicing.
Pipe Data View cleaned and televised 20,000 feet of pipe between both systems during the month. No pipe problems to report; however, we needed to replace several manhole castings.
Alarms: We received a total of 26 alarms
PA One Calls: We received 58 PA One calls for the month of February.
Mark commented that with the abandonment of the Reserve pump station, he wants to pull the equipment and put it in Hunt Country. Some items are no longer available. The building will have to be modified to fit the equipment but that can be done “in house”.

  1. Pennoni: Dan Barbato provided the following engineer’s report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP) – Pennoni continues to coordinate with the Plant Operator and will provide operations assistance as needed. No issues were brought to our attention in February. Our review of the monthly operations report does not indicate any concerns. Marydell PS Elimination – We attended a pre-construction meeting with the Township and Ply-Mar Construction (Contractor) and a follow-up pre-construction meeting with the Township, Ply-Mar, PennDOT and PECO. We issued a contract award letter to Ply-Mar. We have also reviewed Ply-Mar’s contract documents and have coordinated with them to have their insurance coverage revised to comply with contract requirements. They informed us they are in the process of having their insurance revised, but they do not yet have a revised insurance certificate to submit for review and approval. Pending approval of the insurance, we intend to issue the Notice to Proceed with Construction on March 18, 2013. Ply-Mar intends to mobilize later that week and begin construction on March 25. They estimate 6-8 weeks to complete the project.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

3

We continued attempts to coordinate with the various affected utility providers. PECO will brace utility poles during the work, but we are awaiting a determination from them as to how exactly they will brace them. We have submitted plans to Sunoco and Verizon, and are still awaiting feedback from them.
We prepared a Construction Issue set of plans and specifications incorporating changes from the four addenda, and the documents were issued to Ply-Mar and the Township. We also prepared a CAD file and plan with critical survey information for the Contractor’s use in construction layout. Additionally, we reviewed a partial submission of shop drawings from the Contractor.
Hershey’s Mill PS Diversion: We issued a contract award letter to the Contractor, Delaware Valley Utility Contractors (DVUC). We have also reviewed DVUC’s contract documents and have coordinated with them to have their insurance coverage revised to comply with contract requirements.
DVUC proposes to begin work on May 6, 2013. We intend to issue the Notice to Proceed with Construction by early April. They estimate approximately one month to complete the project.
We prepared a Construction Issue set of plans and specifications incorporating changes from the two addenda, and the documents were issued to the Township. We are also in the process of reviewing shop drawings from the Contractor.
Reserve PS Elimination – We completed near-final Bid Plans and submitted them to the Township for review. The specifications will be completed and submitted for Township review. The specifications will be completed and submitted to the Township for review by March 15.
The project will be put out to bid after the Reserve at Spring Meadows HOA has granted the easement and rock borings are performed.
Chapter 94 Annual Reports – We have continued to collect data and information required to prepare the reports. We analyzed portable and permanent meter data from calendar year 2012, and we are in the process of preparing the reports for the Ridley Creek, West Goshen, and Westtown Service Areas. DEP previously informed us that a full report is not required for the Lockwood Chase STP.

  1. Big Fish Environmental Services, Inc. , Scott Towler presented a report for February 2013. The following is a summary: Treatment Process Operation During February, there were no exceedances of the final effluent discharge limitations for outfall 001. There was no discharge from outfall 002. The monthly average total phosphorus concentration was 0.20 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from <0.14 mg/L to .026 mg/L. Sequencing Batch Reactors (SBRs) number 1, 3, and 4 were in service during the month of February. Process monitoring of each SBR included ammonia as N, nitrite as N, nitrate as N, COD, SSV, MLSS and total phosphorus. Microscopic examinations and physical observation of the SBR MLSS and foam color is ongoing. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

4

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was largely consistent through February with increasing uniformity during the month. The addition of Aluminum Sulfate Solution, using the LMI chemical feed pump, prior to the disc filters has assisted with improving total phosphors from the final effluent outfall.
SBR No 2 remains out of service. The remaining contents are continuously mixed and are aerated (blower in hand mode at reduced speed) to prevent odors. Transfer of the remaining mixed liquor will occur as freezing conditions are minimized.
Process Monitoring On-Line Instrumentation – Kershner Technologies installed a ChemScan phosphate analyzer on January 29, 2013. Comparison data from the online analyzer and on site testing is ongoing.
Representatives from the Hach Chemical Company have requested an opportunity to conduct a pilot study demonstrating their online phosphorus monitoring system. Coordination of a pilot study is planned to begin late March or April.
The flow meter appears to have malfunctioned as observed through recording significantly higher flow volumes than the influent flow meter to the SBR. Allied Control Services (ACS) was contacted to address the malfunction.
Solids Dewatering and Disposal – During the month, the centrifuge dewatering system was placed in service. Sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No.1 was in service. The level at the beginning of the month was 4.93 feet and the level at the end of the month was 12.28 feet. The initial total solids concentration was 0.66% and ended the month as 0.80% total solids. Zero (0) gallons of supernatant were decanted during the month.
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 14.48 feet and the level at the end of the month was 2.53 feet. The initial total solids concentration was 0.87% and ended the month as 0.70% total solids. 27,475 gallons of supernatant were decanted. Sludge was dewatered using the centrifuge.
Significant Storm Events – During February there were no significant precipitation events impacting the treatment process.
Minor repairs and Preventative Maintenance:

  • ACS repaired influent flow chart recorder.
  • ACS provided a flow meter signal cable and connected the new influent “field” flow meter to allow for flow proportioned composite sampling.
  • Centrifuge gear box was inspected for routine O&M. No metal filings were observed.
  • Centrifuge rear bearing is operating at a higher temperature than the front bearing. The bearing temperature is generally around 150°F. Emergency shutdown is 212°F. Centrifuge operators recommend corrective actions should the temperature rise above 180°F.
  • Filed influent composite sampler controller failed. The controller from another sampler was temporarily installed until the repaired unit is returned. A spare unit is planned for purchase.

Mark asked Scott if they will have to put the sodash in the top. When Scott answered yes, Mark mentioned that he wants to cut a path to make the process more efficient.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

5

Scott feels that is a good idea but in the future maybe they should look at a Dry Feed System.

Any Other Matter

1. Rick reported that Westtown is in the process of approving the demolition of the old gas station, WAWA, and current PNC Bank at Rts. 3 & 352. The PNC Bank will build a new building at the corner and a Rite Aid pharmacy will be built on the other lots. Their sewer use is based on a percentage.

Correspondence

None

Adjournment

There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 03-11-13 draft.doc

6

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :540995
Invoice Date :03/27/2013
Project :EGMA1107
Project Name :HersheyMill &Reserve PS Div Des Per

For Services Rendered through: 3/17/2013

Hershey's Mill PS Diversion - Issued contract award letter to contractor; reviewed contractor's Form of Agreement, contract bonds, and insurance; issued Notice to Proceed.
Reserve PS Diversion - Updated PA One Call ticket; revised bid plans and submitted to Township for review.

Phase : 1 -- Design

Labor :1,717.75
Expense :0.00
Total Phase : 1 -- Design Phase Total :1,717.75

Phase : 7 -- Bid Assistance

Labor :308.75
Expense :0.00
Total Phase : 7 -- Bid Assistance Phase Total :308.75
Amount Due This Invoice$2,026.50
Fee :69,200.00
Prior Billings :61,580.75
Current Billings :2,026.50
Total Billings :63,607.25

[Handwritten note: ok MAM 4/6/2013]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per

Invoice # : 540995

...Continued from previous page

Phase : 1 -- Design

Labor

Class Hours/Units Rate Amount
Project Engineer 10.00 95.00 950.00
Graduate Engineer 0.50 73.00 36.50
Engineering Technician 1 11.25 65.00 731.25
Labor Total: 21.75 1,717.75
Labor :$1,717.75
Expense :$0.00
Total Phase : 1 -- Design

Phase : 7 -- Bid Assistance

Labor

Class Hours/Units Rate Amount
Project Engineer 3.25 95.00 308.75
Labor Total: 3.25 308.75
Labor :$308.75
Expense :$0.00
Total Phase : 7 -- Bid Assistance
Labor :$2,026.50
Expense :$0.00
Total Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 2

East Goshen Municipal Authority

EGMA1107 Invoice Summary

Invoice Date 03/17/2013

Project :Hershey Mill & Reserve PS Diverse Design & Permitting
Pennoni Job No. :EGMA1107
Invoice No. :540995
Invoice Period :2/11/2013to3/17/2013
Initial Authorization :$ 60,200.00Date :7/7/2012
Changes :$ 9,000.00Date :
Contract Amount :$ 69,200.00
Previously Invoiced :$ 61,580.75
Current Invoice :$ 2,026.50
Invoiced to Date ($) :$ 63,607.25
Invoiced to Date (%) :92%
Remaining Budget ($) :$ 5,592.75
Remaining Budget (%) :8%

Budget by Phase :

Phase No.01
Phase Name :Hershey Mill & Reserve PS
Phase Budget :$ 69,200.00
Previousy Invoiced :$ 61,580.75
Current Invoice :$ 2,026.50
Invoiced to Date ($) :$ 63,607.25
Invoiced to Date (%) :92%
Remaining Budget ($) :$ 5,592.75
Remaining Budget (%) :8%

Comments : Hershey's Mill PS Diversion - Issued contract award letter to contractor; reviewed contractor's Form of Agreement, contract bonds, and insurance; issued Notice to Proceed. Reserve PS Diversion - Updated PA One Call ticket; revised bid plans and submitted to Township for review.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :540996
Invoice Date :03/27/2013
Project :EGMA1109
Project Name :Marydell Pump Station Diversion

For Services Rendered through: 3/17/2013

Issued contract award letter to contractor; reviewed contractor's Form of Agreement, contract bonds, and insurance; coordinated revisions to insurance to include Pollution Liability; issued Notice to Proceed.

Phase : 2 -- Sewer Stakeout and Easements

Labor :47.50
Expense :0.00
Total Phase : 2 -- Sewer Stakeout and Easements Phase Total :47.50

Phase : 3 -- PaDEP Closure Plan

Labor :23.75
Expense :0.00
Total Phase : 3 -- PaDEP Closure Plan Phase Total :23.75

Phase : 4 -- PennDOT Highway Occupancy Permits

Labor :297.75
Expense :0.00
Total Phase : 4 -- PennDOT Highway Occupancy Permits Phase Total :297.75

Phase : 6 -- Additional Meetings

Labor :166.25
Expense :0.00
Total Phase : 6 -- Additional Meetings Phase Total :166.25
Amount Due This Invoice$535.25
Fee :36,100.00
Prior Billings :33,676.75
Current Billings :535.25
Total Billings :34,212.00

[Handwritten note: ok MAM 4/6/2013]

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1109 -- Marydell Pump Station Diversion

Invoice # : 540996

...Continued from previous page

Phase : 2 -- Sewer Stakeout and Easements

Labor

Class Hours/Units Rate Amount
Project Engineer 0.50 95.00 47.50
Labor Total: 0.50 47.50
Labor :$47.50
Expense :$0.00
Total Phase : 2 -- Sewer Stakeout and Easements

Phase : 3 -- PaDEP Closure Plan

Labor

Class Hours/Units Rate Amount
Project Engineer 0.25 95.00 23.75
Labor Total: 0.25 23.75
Labor :$23.75
Expense :$0.00
Total Phase : 3 -- PaDEP Closure Plan

Phase : 4 -- PennDOT Highway Occupancy Permits

Labor

Class Hours/Units Rate Amount
Project Engineer 2.75 95.00 261.25
Graduate Engineer 0.50 73.00 36.50
Labor Total: 3.25 297.75
Labor :$297.75
Expense :$0.00
Total Phase : 4 -- PennDOT Highway Occupancy Permits

Phase : 6 -- Additional Meetings

Labor

Class Hours/Units Rate Amount
Project Engineer 1.75 95.00 166.25
Labor Total: 1.75 166.25
Labor :$166.25
Expense :$0.00
Total Phase : 6 -- Additional Meetings
Labor :$535.25
Expense :$0.00
Total Project : EGMA1109 -- Marydell Pump Station Diversion

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 2

East Goshen Municipal Authority

EGMA1109 Invoice Summary

Invoice Date 03/17/2013

Project :Marydell Pump Station Diversion
Pennoni Job No. :EGMA1109
Invoice No. :540996
Invoice Period :2/15/2012to3/17/2013
Initial Authorization :$ 45,100.00Date :2/22/2012
Changes :$ -Date :
Contract Amount :$ 36,100.00
Previously Invoiced :$ 33,676.75
Current Invoice :$ 535.25
Invoiced to Date ($) :$ 34,212.00
Invoiced to Date (%) :95%
Remaining Budget ($) :$ 1,888.00
Remaining Budget (%) :5%

Budget by Phase :

Phase No.01
Phase Name :Marydell Pump Station
Phase Budget :$ 36,100.00
Previousy Invoiced :$ 33,676.75
Current Invoice :$ 535.25
Invoiced to Date ($) :$ 34,212.00
Invoiced to Date (%) :95%
Remaining Budget ($) :$ 1,888.00
Remaining Budget (%) :5%

Comments : Issued contract award letter to contractor; reviewed contractor's Form of Agreement, contract bonds, and insurance; coordinated revisions to insurance to include Pollution Liability; issued Notice to Proceed.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # :540997
Invoice Date :03/27/2013
Project :EGMA1301
Project Name :2013 General Services

For Services Rendered through: 3/17/2013

Engineer's reports and attendance at February and March MA meetings, and respond to cost estimate questions from march meeting.

Phase : **** -- Professional Services

Labor :947.50
Expense :0.00
Total Phase : **** -- Professional Services Phase Total :947.50
Amount Due This Invoice$947.50
Fee :10,000.00
Prior Billings :908.75
Current Billings :947.50
Total Billings :1,856.25

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Authority Engineer 7.75 110.00 852.50
Project Engineer 1.00 95.00 95.00
Labor Total: 8.75 947.50
Labor :$947.50
Expense :$0.00
Total Phase : **** -- Professional Services
Labor :$947.50
Expense :$0.00
Total Project : EGMA1301 -- 2013 General Services

[Handwritten note: ok MAM 4/6/2013]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1301 Invoice Summary
Invoice Date 03/17/2013

Project : 2013 General Services
Pennoni Job No. : EGMA1301
Invoice No. : 540997
Invoice Period : 2/11/2013 to 3/17/2013
Initial Authorization : $ 10,000.00 Date : 1/9/2013
Changes : $ - Date :
Contract Amount : $ 10,000.00
Previously Invoiced : $ 908.75
Current Invoice : $ 947.50
Invoiced to Date ($) : $ 1,856.25
Invoiced to Date (%) : 19%
Remaining Budget ($) : $ 8,143.75
Remaining Budget (%) : 81%

Budget by Phase :

Phase No. ****
Phase Name : 2013 General Services
Phase Budget : $ 10,000.00
Previousy Invoiced : $ 908.75
Current Invoice : $ 947.50
Invoiced to Date ($) : $ 1,856.25
Invoiced to Date (%) : 19%
Remaining Budget ($) : $ 8,143.75
Remaining Budget (%) : 81%

Comments : Engineer's reports and attendance at February and March MA meetings, and respond to cost estimate questions from March meeting.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 540998
Invoice Date : 03/27/2013
Project : EGMA1302
Project Name : 2013 Semi-Annual I&I Reports

For Services Rendered through: 3/17/2013

Initiated meter analysis and preparation of March 2013 semi-annual I/I Report; coordinated potential portable meter relocations w/ M. Miller.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 752.00
Expense : 0.00
Phase Total : 752.00
Amount Due This Invoice $752.00
Fee : 10,000.00
Prior Billings : 2,494.00
Current Billings : 752.00
Total Billings : 3,246.00

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Project Engineer 1.00 95.00 95.00
Graduate Engineer 9.00 73.00 657.00
Labor Total: 10.00 752.00
Total Phase : **** -- Professional Services Labor : $752.00
Expense : $0.00
Total Project : EGMA1302 -- 2013 Semi-Annual I&I Reports Labor : $752.00
Expense : $0.00

ok
MSM 4/6/2013

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1302 Invoice Summary
Invoice Date 03/17/2013

Project : 2013 Semi-Annual I&I Reports
Pennoni Job No. : EGMA1302
Invoice No. : 540998
Invoice Period : 2/11/2013 to 3/17/2013
Initial Authorization : $ 10,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 10,000.00
Previously Invoiced : $ 2,494.00
Current Invoice : $ 752.00
Invoiced to Date ($) : $ 3,246.00
Invoiced to Date (%) : 32%
Remaining Budget ($) : $ 6,754.00
Remaining Budget (%) : 68%

Budget by Phase :

Phase No. ****
Phase Name : 2013 Semi-Annual I&I
Phase Budget : $ 10,000.00
Previousy Invoiced : $ 2,494.00
Current Invoice : $ 752.00
Invoiced to Date ($) : $ 3,246.00
Invoiced to Date (%) : 32%
Remaining Budget ($) : $ 6,754.00
Remaining Budget (%) : 68%

Comments : Initiated meter analysis and preparation of March 2013 semi-annual I/I Report; coordinated potential portable meter relocations w/ M. Miller.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 540999
Invoice Date : 03/27/2013
Project : EGMA1303
Project Name : 2012 Chapter 94 Report

For Services Rendered through: 3/17/2013

Continued preparation, analyses, and obtaining information for Ridley Creek STP, West Goshen (Chester Creek), and Westtown Chapter 94 Reports.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 4,995.75
Expense : 0.00
Phase Total : 4,995.75
Amount Due This Invoice $4,995.75
Fee : 14,000.00
Prior Billings : 2,496.75
Current Billings : 4,995.75
Total Billings : 7,492.50

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Authority Engineer 0.75 110.00 82.50
Project Engineer 3.50 95.00 332.50
Graduate Engineer 62.75 73.00 4,580.75
Labor Total: 67.00 4,995.75
Total Phase : **** -- Professional Services Labor : $4,995.75
Expense : $0.00
Total Project : EGMA1303 -- 2012 Chapter 94 Report Labor : $4,995.75
Expense : $0.00

ok
MSM 4/6/2013

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1303 Invoice Summary
Invoice Date 03/17/2013

Project : 2012 Chapter 94 Report
Pennoni Job No. : EGMA1303
Invoice No. : 540999
Invoice Period : 2/11/2013 to 3/17/2013
Initial Authorization : $ 14,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 14,000.00
Previously Invoiced : $ 2,496.75
Current Invoice : $ 4,995.75
Invoiced to Date ($) : $ 7,492.50
Invoiced to Date (%) : 54%
Remaining Budget ($) : $ 6,507.50
Remaining Budget (%) : 46%

Budget by Phase :

Phase No. ****
Phase Name : 2012 Chapter 94 Report
Phase Budget : $ 14,000.00
Previousy Invoiced : $ 2,496.75
Current Invoice : $ 4,995.75
Invoiced to Date ($) : $ 7,492.50
Invoiced to Date (%) : 54%
Remaining Budget ($) : $ 6,507.50
Remaining Budget (%) : 46%

Comments : Continued preparation, analyses, and obtaining information for Ridley Creek STP, West Goshen (Chester Creek), and Westtown Chapter 94 Reports.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 541000
Invoice Date : 03/27/2013
Project : EGMA1304
Project Name : Hershey Mill PS Div Construction Ph

For Services Rendered through: 3/17/2013

Prepared and issued Construction Issue plans and specifications; reviewed partial submission of shop drawings.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 2,580.50
Expense : 0.00
Phase Total : 2,580.50
Amount Due This Invoice $2,580.50
Fee : 20,000.00
Prior Billings : 0.00
Current Billings : 2,580.50
Total Billings : 2,580.50

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Project Engineer 9.00 95.00 855.00
Graduate Engineer 8.50 73.00 620.50
Engineering Technician I 17.00 65.00 1,105.00
Labor Total: 34.50 2,580.50
Total Phase : **** -- Professional Services Labor : $2,580.50
Expense : $0.00
Total Project : EGMA1304 -- Hershey Mill PS Div Construction Ph Labor : $2,580.50
Expense : $0.00

ok
MSM 4/6/2013

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1304 Invoice Summary
Invoice Date 03/17/2013

Project : Hershey Mill PS Div Construction Ph
Pennoni Job No. : EGMA1304
Invoice No. : 541000
Invoice Period : 2/11/2013 to 3/17/2013
Initial Authorization : $ 20,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 20,000.00
Previously Invoiced : $ -
Current Invoice : $ 2,580.50
Invoiced to Date ($) : $ 2,580.50
Invoiced to Date (%) : 13%
Remaining Budget ($) : $ 17,419.50
Remaining Budget (%) : 87%

Budget by Phase :

Phase No. ****
Phase Name : Hershey Mill PS Div
Phase Budget : $ 20,000.00
Previousy Invoiced : $ -
Current Invoice : $ 2,580.50
Invoiced to Date ($) : $ 2,580.50
Invoiced to Date (%) : 13%
Remaining Budget ($) : $ 17,419.50
Remaining Budget (%) : 87%

Comments : Prepared and issued Construction Issue plans and specifications; reviewed partial submission of shop drawings.

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 541001
Invoice Date : 03/27/2013
Project : EGMA1305
Project Name : Marydell PS Diversion Construction

For Services Rendered through: 3/17/2013

Prepared and issued Construction Issue plans and specifications; prepared and issued construction stakeout CAD file and plan to contractor; reviewed partial submissions of shop drawings; set up and attended pre-construction meeting with Township and contractor; set up and attended separate pre-construction meeting with Township, contractor, PennDOT, and PECO; coordinated pole bracing w/PECO, plan review and utility locating w/Sunoco, and plan approval w/ Verizon.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services Labor : 6,327.75
Expense : 0.00
Phase Total : 6,327.75
Amount Due This Invoice $6,327.75
Fee : 20,000.00
Prior Billings : 0.00
Current Billings : 6,327.75
Total Billings : 6,327.75

Phase : **** -- Professional Services
Labor

Class Hours/
Units
Rate Amount
Project Engineer 30.75 95.00 2,921.25
Technical Specialist 8.00 75.00 600.00
Graduate Engineer 21.75 73.00 1,587.75
Engineering Technician I 18.75 65.00 1,218.75
Labor Total: 79.25 6,327.75
Total Phase : **** -- Professional Services Labor : $6,327.75
Expense : $0.00
Total Project : EGMA1305 -- Marydell PS Diversion Construction Labor : $6,327.75
Expense : $0.00

ok
MSM 4/6/2013

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority
EGMA1305 Invoice Summary
Invoice Date 03/17/2013

Project : Marydell PS Diversion Construction
Pennoni Job No. : EGMA1305
Invoice No. : 541001
Invoice Period : 2/11/2013 to 3/17/2013
Initial Authorization : $ 20,000.00 Date : 1/16/2013
Changes : $ - Date :
Contract Amount : $ 20,000.00
Previously Invoiced : $ -
Current Invoice : $ 6,327.75
Invoiced to Date ($) : $ 6,327.75
Invoiced to Date (%) : 32%
Remaining Budget ($) : $ 13,672.25
Remaining Budget (%) : 68%

Budget by Phase :

Phase No. ****
Phase Name : Marydell PS Diversion
Phase Budget : $ 20,000.00
Previousy Invoiced : $ -
Current Invoice : $ 6,327.75
Invoiced to Date ($) : $ 6,327.75
Invoiced to Date (%) : 32%
Remaining Budget ($) : $ 13,672.25
Remaining Budget (%) : 68%

Comments : Prepared and issued Construction Issue plans and specifications; prepared and issued construction stakeout CAD file and plan to contractor; reviewed partial submissions of shop drawings; set up and attended pre-construction meeting with Township and contractor; set up and attended separate pre-construction meeting with Township, contractor, PennDOT, and PECO; coordinated pole bracing w/PECO, plan review and utility locating w/Sunoco, and plan approval w/Verizon.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | West Chester, PA 19381-0562 | gglaw@gawthrop.com | (p) 610-696-8225 | (f) 610-344-0922 | www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
02/28/2013
Client No: 6604-001M
Invoice No. 107114

General Authority Services

Fees

Date / Timekeeper Description Hours
02/04/2013
RFA
Telephone conference with A Zarro regarding dedication of sewer lines in Pulte's Applebrook project; telephone conference with R Smith regarding form of maintenance security for sewer lines. 0.60
02/05/2013
RFA
Review message from R Smith with bid tabulation for Marydell pump station diversion project. 0.30
RFA Review messages from D Barbato, R Smith and Authority Board members regarding bid tabulation discrepancies; draft additional language for dedication document for Pulte Applebrook project; Message to A Zarro Esq regarding dedication of Pulte sewer lines and right-of-way agreement. 2.10
02/06/2013
RFA
Review message from M Ellis regarding bid tabulation for Hershey's Mill pump station diversion project; review message from R Smith regarding bid tabulation for Hershey's Mill project; review message from A Zarro regarding dedication of Applebrook sewer lines (Pulte project). 0.90
02/08/2013
RFA
Review message from M Ellis regarding bid award letter; review Pennoni's tabulation of bids and bid bond submitted by Ply-Mar Const. Co. 0.70
RFA Review packet for 2/11/13 meeting of Municipal Authority. 0.50
02/11/2013
RFA
Review message from M Ellis transmitting Hershey's Mill pump station diversion project bid tabulation and engineer's recommendation letter; review Delaware Valley Utility Contractors, Inc. bid documents; 0.70
02/13/2013
RFA
Review message from M Ellis to successful bidder (Delaware Valley Utility Contractors) on Hershey's Mill pump station

East Goshen Municipal Authority
General Authority Services

Page: 2
02/28/2013
Client No: 6604-001M
Invoice No. 107114

Date / Timekeeper Description Hours Amount
diversion project regarding insurance and bonding requirements. 0.40
02/14/2013
RFA
Review letter from M Ellis regarding Marydell pump station; review letter from M Ellis regarding Hershey's Mill pump station. 0.60
02/22/2013
RFA
Review messages from Alyson Zarro regarding maintenance security agreement revision to reflect cash escrow; Message to A Zarro accepting cash escrow concept. 0.70
02/25/2013
RFA
Review proposed maintenance security agreement, ROW and deed of dedication for public sewer lines at Applebrook; Message to A Zarro regarding cash escrow for pulte dedication. 0.80
For Current Services Rendered 8.30 1,660.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 8.30 $200.00 $1,660.00

Expenses

Postage 1.12
Total Expenses Thru 02/28/2013 1.12
Previous Balance $1,406.80
Total Current Charges 1,661.12
02/13/2013 Cost Expense Payment -6.80
02/13/2013 Fee Payment -1,400.00
Total Payments -1,406.80
Balance Due $1,661.12

ok RS
3/12/13

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Big Fish Environmental Services, Inc.c/o
Scott A. Towler
801 General Sterling Drive
West Chester, PA 19382

Invoice # 13-040130-2
Invoice Date 4/5/2013
Terms Due Upon Receipt

INVOICE

Bill to:
Mr. Rick Smith
Township Manager
East Goshen Township
c/o RCSTP & Lochwood
1580 Paoli Pike
West Chester, PA 19380

Services relating to the
Ridley Creek Sewage Treatment Plant for the
Month of March 2013

Unit Rate Fee
RCSTP O&M Fee, effective 9/1/2012 Lump Sum $8,250.00 $8,250.00

Emergency Response

No. of Hours Rate Fee
No emergency resposne during March 2013 NA NA $0.00

Sludge Dewatering

No. of Hours Rate Fee
Three (3) 20-yard dumpsters were filled and removed for disposal. Manifest numbers 00376, 00377 and 00378. 176,271 gallons of sludge were dewatered. 65.00 $55.00 $3,575.00
Total $11,825.00

Total Due to Scott A. Towler, PE SEO, LO

PAYMENT DUE UPON RECEIPT
PLEASE INCLUDE COPY OF INVOICE WITH REMITTANCE
PLEASE REFER TO INVOICE NUMBER ON REMITTANCE
THANK YOU

OK RS
4-5-13

Page 1 of 2

Big Fish Environmental Services, Inc.c/o
Scott A. Towler
801 General Sterling Drive
West Chester, PA 19382

Invoice # 13-040130-2
Invoice Date 4/5/2013
Terms Due Upon Receipt

RCSTP SLUDGE DEWATERING

Contractor Date Beginning Time End Time Total Hours
Jim Ross 3/6/2013 3:30 PM 10:30 PM 7.00
Matt Mullin 3/10/2013 8:15 AM 5:15 PM 9.00
Matt Mullin 3/12/2013 3:30 PM 7:00 PM 3.50
Matt Mullin 3/15/2013 3:20 PM 10:50 PM 7.50
Jim Ross 3/16/2013 4:00 PM 12:00 AM 8.00
Jim Ross 3/20/2013 2:00 PM 10:30 PM 8.50
Matt Mullin 3/23/2013 7:00 AM 4:00 PM 9.00
Jim Ross 3/27/2013 3:30 PM 10:00 PM 6.50
Matt Mullin 3/29/2013 2:45 PM 8:45 PM 6.00
Total 65.00

Page 2 of 2

Memo

To: Municipal Authority
From: Tia Piccolo
Date: April 4, 2013
Re: Lochwood Plant Closing Labor Costs as of 03/27/13

Please note that from 1/1/13 - 3/27/13, $1,894.91 has been reported in labor and equipment costs related to the closing of the Lochwood Plant.

We recommend that the Municipal Authority approve these charges.

Employees Reg OT
Total Hours 40 0
Total Cost 981.71 0
Equipment
Total Hours 17
Total Cost 913.20

AIA Document G703™ – 1992

Continuation Sheet

AIA Document G702™-1992, Application and Certificate for Payment, or G732™-2009, Application and Certificate for Payment, Construction Manager as Adviser Edition, containing Contractor's signed certification is attached.
In tabulations below, amounts are in US dollars.
Use Column I on Contracts where variable retainage for line items may apply.

APPLICATION NO: 1
APPLICATION DATE: 4/2/13
PERIOD TO: 3/29/13
ARCHITECT'S PROJECT NO: MES-2013

A

ITEM NO.
B

DESCRIPTION OF WORK
C

SCHEDULED VALUE
D

WORK COMPLETED
F

MATERIALS PRESENTLY STORED
(Not in D or E)
G

TOTAL COMPLETED AND STORED TO DATE
(D+E+F)
%
(G÷C)
BALANCE TO FINISH
(C-G)
RETAINAGE
(If variable rate)
FROM PREVIOUS APPLICATION
(D+E)
THIS PERIOD
1 Site Preparation (1 LS) $44,000.00 $0.00 $22,000.00 $22,000.00 50% $22,000.00 $2,200.00
2 E & S Controls (1 LS) $3,000.00 $0.00 $1,000.00 $1,000.00 33% $2,000.00 $100.00
3 6" Main in Paved Area (0-10') (296 LF) $31,080.00 $0.00 $0.00 $0.00 0% $31,080.00 $0.00
4 8" Main Paved Area (10-15') (88 LF) $11,440.00 $0.00 $0.00 $0.00 0% $11,440.00 $0.00
5 8" Main Un-Paved (0-10') (114 LF) $5,130.00 $0.00 $0.00 $0.00 0% $5,130.00 $0.00
6 8" Main Un-Paved (10-15') (255 LF) $11,475.00 $0.00 $0.00 $0.00 0% $11,475.00 $0.00
7 MH-6 to EXMH-201 (82 LF) $24,600.00 $0.00 $0.00 $0.00 0% $24,600.00 $0.00
8 J & B Boot Road (118 LF) $27,140.00 $0.00 $0.00 $0.00 0% $27,140.00 $0.00
9 Manhole (0-10') (3 EA) $9,000.00 $0.00 $0.00 $0.00 0% $9,000.00 $0.00
10 Manhole (10-15') (2 EA) $7,000.00 $0.00 $0.00 $0.00 0% $7,000.00 $0.00
11 4" Service Lateral (1 EA) $1,000.00 $0.00 $0.00 $0.00 0% $1,000.00 $0.00
12 Low Pressure Sewer Lat. (1 LS) $1,000.00 $0.00 $0.00 $0.00 0% $1,000.00 $0.00
13 Full Depth Paving (275 SY) $22,000.00 $0.00 $0.00 $0.00 0% $22,000.00 $0.00
14 Demo Pump Station (1 LS) $6,500.00 $0.00 $0.00 $0.00 0% $6,500.00 $0.00
15 Traffic Maintenance (1 LS) $2,000.00 $0.00 $0.00 $0.00 0% $2,000.00 $0.00
16 Mill & Overlay Paoli Pike (75 SY) $2,250.00 $0.00 $0.00 $0.00 0% $2,250.00 $0.00
17 Curb Replacement (30 LF) $1,500.00 $0.00 $0.00 $0.00 0% $1,500.00 $0.00
18 Misc Exc. & 2A Backfill (20 CY) $1,200.00 $0.00 $0.00 $0.00 0% $1,200.00 $0.00
19 Misc. Exc. & Soil Backfill (20 CY) $600.00 $0.00 $0.00 $0.00 0% $600.00 $0.00
20 Concrete Encasement (20 LF) $1,000.00 $0.00 $0.00 $0.00 0% $1,000.00 $0.00
21 Mill & Overlay Paoli Pike (455 SY) $10,920.00 $0.00 $0.00 $0.00 0% $10,920.00 $0.00
22 Soft Dig Test Pits (3 EA) $6,000.00 $0.00 $0.00 $0.00 0% $6,000.00 $0.00
GRAND TOTAL $229,835.00 $0.00 $23,000.00 $23,000.00 $206,835.00 $2,300.00

CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured.
AIA Document G703™ – 1992. Copyright © 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org.

Mary Dell Diversion Project – Plymar Invoice

Memo

To: Municipal Authority
From: Jon Altshul
Re: MA February Financial Report
Date: April 4, 2013

The Municipal Authority recorded $9,875.27 in expenses and $4,004.89 in revenues (primarily from tap-in fees at Sorrell Hill) in the month of March, a difference of $5,870.38. The fund balance is now $49,363.73.

The expenses were due to the quarterly administrative chargeback and further labor and equipment costs incurred for Lockwood Elimination (see Tia's memo).

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
March 2013

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 55,234.11
RCSTP BUDGET
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 50.00 3.97 12.85
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 50.00 3.97 12.85
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 992,470.00 0.00 0.00
TOTAL EXPENSES 992,470.00 0.00 0.00
RCSTP NET RESULT (992,420.00) 3.97 12.85

U:\bmccool\2013\Municipal Authority\2013 - 03 - Municipal Authority Report.xlsx
Page 1 of 3
04/04/2013

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
March 2013

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
OPERATING BUDGET
REVENUE
INTEREST EARNINGS 07341 1000 50.00 0.92 2.14
C.C. TAPPING FEES 07364 1100 128,000.00 0.00 0.00
R.C.TAPPING FEES 07364 1110 2,000.00 4,000.00 4,000.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 1,689.64
MISCELLANEOUS REVENUE 07380 1000 1,000.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 121,696.00 0.00 0.00
TOTAL REVENUE 252,746.00 4,000.92 6,115.14
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 33,547.00 7,980.36 7,980.36
MISCELLANEOUS EXPENSE 07424 3000 5,000.00 0.00 1,450.00
MUNIC.AUTH.-AUDITING 07424 3110 8,843.00 0.00 0.00
ENGINEERING SERVICES 07424 3130 35,000.00 0.00 4,803.50
LEGAL SERVICES 07424 3140 7,000.00 0.00 4,695.90
M.C.-DVRFA-DEBT SERVICE 07471 1000 20,720.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 6,003.00 0.00 0.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 5,583.00 0.00 0.00
TOTAL EXPENSES 121,696.00 7,980.36 18,929.76
OPERATING NET RESULT 131,050.00 (3,979.44) (12,814.62)

U:\bmccool\2013\Municipal Authority\2013 - 03 - Municipal Authority Report.xlsx
Page 2 of 3
04/04/2013

EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
March 2013

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
CAPITAL BUDGET
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07392 0804 992,470.00 0.00 0.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 556,769.00 0.00 30,000.00
TOTAL REVENUE 1,549,239.00 0.00 30,000.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 25,000.00 0.00 11,482.50
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 170,000.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 1,086.00
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 55,769.00 0.00 246.01
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 1,894.91 2,094.91
HERSHEY MILL STATION - ENGINEER 07426 1000 25,000.00 0.00 7,829.74
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 46,000.00 0.00 0.00
RESERVE PUMP STATION - ENGINEER 07427 1000 25,000.00 0.00 6,979.76
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 93,000.00 0.00 0.00
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0.00 0.00 0.00
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 439,769.00 1,894.91 29,718.92
CAPITAL NET RESULT 1,109,470.00 (1,894.91) 281.08
MUNICIPAL AUTHORITY ENDING FUND BALANCE 49,363.73

U:\bmccool\2013\Municipal Authority\2013 - 03 - Municipal Authority Report.xlsx
Page 3 of 3
04/04/2013

East Goshen Township General Ledger
Report Date 04/04/13
GL Transaction Details
PAGE 1
MGRP18 run by BRIAN 10 : 39 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000 INTEREST EARNINGS 0.00
1301 JE 36010 0.74 02/05/13 INTEREST INTEREST EARNED JANUARY 2013
07 FUND
0.00 0.74 -0.74
1302 36396 0.48 03/04/13 INTEREST INTEREST EARNED FEB. 2013
07 FUND
0.00 0.48 -1.22
1303 36759 0.92 04/02/13 INTEREST INTEREST EARNED MARCH 2013
07 FUND
0.00 0.92 -2.14
0.00 2.14 -2.14
07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00
1301 36011 3.97 02/05/13 INTEREST INTEREST EARNED JANUARY 2013
07 CONSTRUCTION FUND
0.00 3.97 -3.97
1302 36397 4.91 03/04/13 INTEREST INTEREST EARNED FEB.2013
07 CONSTRUCTION FUND
0.00 4.91 -8.88
1303 36760 3.97 04/02/13 INTEREST INTEREST EARNED MARCH 2013
07 CONSTRUCTION FUND
0.00 3.97 -12.85
0.00 12.85 -12.85
07364-1110 R.C.TAPPING FEES 0.00
1301 35931 2,000.00 01/30/13 REV TRX REVERSE TRX #32779 TAP IN FEE
FOR 913 SORRELL HILL
35934 2,000.00 01/30/13 REV TRX RE-REVERSE TRX 35931 FOR 913
SORRELL HILL TAP IN FEES
2,000.00 2,000.00 0.00
1303 RE 36430 2,000.00 03/05/13 36430 1 TAP IN FEE - 916 SORRELL HILL
36431 2,000.00 03/05/13 36431 1 TAP IN FEE - 911 SORRELL HILL
0.00 4,000.00 -4,000.00
2,000.00 6,000.00 -4,000.00
07364-1130 CONNECTION FEES - SEWER 0.00
1302 CR 36075 423.00 02/08/13 264 7195 1 JACOBS, ROBERT & CHERYL
423.00 02/08/13 755 7193 1 GEORGE SMITH & CHRISTINA CONLE
*** 0.00 846.00 ***

East Goshen Township General Ledger

Report Date: 04/04/13      GL Transaction Details      PAGE 2

MGRP18 run by BRIAN      10 : 39 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07364-1130 1302 CR 36147 423.00 02/13/13 11 6577 1 PAPPANO, JOSEPH & PATRICIA
421.00 02/13/13 11 7196 1 PAPPANO, JOSEPH & PATRICIA
*** 0.00 844.00 ***
36193 423.00 02/15/13 2173 7194 1 STOFFLET, MICHAEL
JE 36174 282.24 02/14/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
36194 141.12 02/15/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
423.36 2,113.00 -1,689.64
423.36 2,113.00 -1,689.64
07380-1000 MISCELLANEOUS REVENUE 0.00
36174 282.24 02/14/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
36194 141.12 02/15/13 PINE ROCK ANNUAL PINE ROCK INSTALLMENT
0.00 423.36 -423.36
0.00 423.36 -423.36
07392-0900 TRANSFER FROM SEWER CAP RESERVE 0.00
36187 30,000.00 02/15/13 XFER XFER $ FROM 9100.1000 TO 7100. 1000 TO COVER MA EXPENSES
0.00 30,000.00 -30,000.00
0.00 30,000.00 -30,000.00
07424-1400 ADMINISTRATIVE WAGES 0.00
1303 CD 36711 7,980.36 03/28/13 2166 425 EAST GOSHEN TOWNSHIP 1ST QTR.2013 REIMBURSMNT TO GENE FUND
7,980.36 0.00 7,980.36
7,980.36 0.00 7,980.36
07424-3000 MISCELLANEOUS EXPENSE 0.00
1301 35598 500.00 01/03/13 2153 2737 DEP - COMMONWEALTH OF PA NPDES PERMIT - 2013 MINOR SEWAGE FACILITY
35783 950.00 01/18/13 2158 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2013 ACTIVE MEMBERSHIP DUES
1,450.00 0.00 1,450.00
1,450.00 0.00 1,450.00
07424-3130 ENGINEERING SERVICES 0.00
35695 3,264.75 01/15/13 2156 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 2012 GEN.SERV

East Goshen Township General Ledger

Report Date: 04/04/13      GL Transaction Details      PAGE 3

MGRP18 run by BRIAN      10 : 39 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
3,264.75 0.00 3,264.75
1302 36119 1,538.75 02/12/13 2162 1052 PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 GEN.SERVICES 2
1,538.75 0.00 4,803.50
4,803.50 0.00 4,803.50
07424-3140 LEGAL SERVICES 0.00
1301 35695 3,289.10 01/15/13 2155 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 11/9-11/30/12 GEN.AU
3,289.10 0.00 3,289.10
1302 36119 1,406.80 02/12/13 2161 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN. 2013 GEN.AU
1,406.80 0.00 4,695.90
4,695.90 0.00 4,695.90
07424-7475 LOCHWOOD ABANDONMENT ENGINEER 0.00
1301 35695 511.50 01/15/13 2156 1052 PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 HERSHEY M PUMP STATION MUFFIN MONSTER
511.50 0.00 511.50
1302 36119 574.50 02/12/13 2162 1052 PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 H.MILL PS MUF MONSTER DESIGN
574.50 0.00 1,086.00
1,086.00 0.00 1,086.00
07424-7476 LOCHWOOD ABANDONMENT CONSTRUCTION 0.00
1301 35598 246.01 01/03/13 2152 317 CONTRACTOR'S CHOICE ORANGE SAFETY FENCE, STAKES & PA
35695 1,482.40 01/15/13 2154 425 EAST GOSHEN TOWNSHIP LOCHWOOD PLANT CLOSING COSTS-LAB
35698 -1,482.40 01/15/13 2154 425 EAST GOSHEN TOWNSHIP VOID CK. 2154 - DUPLICATE PAYMEN
246.01 0.00 246.01
246.01 0.00 246.01
07424-7477 LOCHWOOD ELIMINATION PHASE 2 0.00
35872 379.90 01/24/13 2159 2762 A.J. BLOSENSKI INC. 30 YDS. ROLLOFF HAULING & LANDFI FEE

East Goshen Township General Ledger

Report Date: 04/04/13      GL Transaction Details      PAGE 4

MGRP18 run by BRIAN      10 : 39 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
379.90 0.00 379.90
1302 36189 200.00 02/15/13 2165 2762 A.J. BLOSENSKI INC. 30 YARD ROLLOFF HAULING FEE
JE 36105 379.90 02/11/13 VOID CHECK VOID CK. 2159 - OVERCHARGED BY VENDOR - RETURNED CHECK
200.00 379.90 200.00
1303 CD 36711 1,894.91 03/28/13 2167 425 EAST GOSHEN TOWNSHIP 1/1-3/27/13 REIMBURSE GENERAL FU FOR LOCHWOOD PLANT CLOSING LABOR
1,894.91 0.00 2,094.91
2,474.81 379.90 2,094.91
07425-1000 MARYDELL PUMP STATION - ENGINEER 0.00
1301 35695 5,493.75 01/15/13 2156 1052 PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 MARYDELL
5,493.75 0.00 5,493.75
1302 36119 5,988.75 02/12/13 2162 1052 PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 MARYDELL PS
5,988.75 0.00 11,482.50
11,482.50 0.00 11,482.50
07426-1000 HERSHEY MILL STATION - ENGINEER 0.00
1301 35695 2,047.12 01/15/13 2156 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 HERSHEY MILL
35783 250.00 01/18/13 2157 263 CHESTER COUNTY CONSERVATION DISTRICT PERMIT FEE - HERSHEY MILL DAM
2,297.12 0.00 2,297.12
1302 36119 2,600.00 02/12/13 2160 2911 EARTHCORE SERVICES LLC MOBILIZATION ATV RIG-HMPS DIVERS
2,932.62 02/12/13 2162 1052 PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 HERSHEY MILL
*** 5,532.62 0.00 ***
5,532.62 0.00 7,829.74
7,829.74 0.00 7,829.74
07427-1000 RESERVE PUMP STATION - ENGINEER 0.00
1301 35695 2,047.13 01/15/13 2156 1052 PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 RESERVE PS
2,047.13 0.00 2,047.13

East Goshen Township General Ledger

Report Date: 04/04/13      GL Transaction Details      PAGE 5

MGRP18 run by BRIAN      10 : 39 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07427-1000 1302 CD 36119 2,932.63 02/12/13 2162 1052 PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 RESERVE PS
1,000.00 02/12/13 2163 3027 SCHRODER, JOHN SEWER RIGHT OF WAY
1,000.00 02/12/13 2164 3029 WILLOW POND HOMEOWNERS ASSOCIATION SEWER RIGHT OF WAY
*** 4,932.63 0.00 ***
4,932.63 0.00 6,979.76
6,979.76 0.00 6,979.76
Beg Bal 0.00 51,451.94 38,931.25 12520.69

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: April 4, 2013
To: Municipal Authority
From: Rick Smith, Township Manager
Re: 2013 Budget

Now that we have firm numbers for the Marydell Pump Station Diversion Project and the Hershey Mill Pump Station Diversion Project it would be appropriate to amend the Budget.

Suggested Motion: I move that we amend the 2013 Municipal Authority Budget as follows:

2013 Adopted Change 2013 Revised
Transfer from Sewer Cap Reserve $556,769 +$230,000 $786,769
Marydell Pump Station - Engineer $25,000 +$6,000 $31,000
Marydell Pump Station - Construction $170,000 +$80,000 $250,000
Hershey Mill Pump Station - Engineer $25,000 +$10,000 $35,000
Hershey Mill Pump Station - Construction $46,000 +$134,000 $180,000

F:\Data\Shared Data\Finance Dept\Budget\MA Request 040413.docx

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: April 4, 2013
To: Municipal Authority
From: Rick Smith, Township Manager
Re: 2013 Goals and Action Items

Goals - The Municipal Authority has 3 goals for 2013. Status of each task that needs to be completed to achieve the goal is as follows:

Marydell Pump Station Elimination Project– Complete construction

Engineering, Permitting, ROW Acquisition and Bidding Project are complete. The Notice to Proceed has been issued and the project is currently under construction.

Hershey Mill Pump Station Diversion Project – Complete construction

Engineering, Permitting, ROW Acquisition and Bidding Project are complete. The Notice to Proceed has been issued although the actual construction has not started.

Reserve Pump Station Elimination Project – Complete construction

Engineering and Permitting are complete. Still need to obtain ROW from the Reserve at Spring Meadows. One ROW still needs to be acquired we need to conduct test borings then go out to bid. Bid Documents are being finalized.

Comprehensive Plan - The Comp Plan lists 4 Recommendations that are applicable to the Authority and the Action Items needed to address each and their status are as follows:

7B-3 Evaluate the Township Act 537 Plan (1997) and update as needed to address areas lacking service in the Township.

Review the Township Act 537 Plan to ensure consistency with the Comprehensive Plan (Immediate and High)

The Authority completed a Wastewater Needs Evaluation in 2007 that concluded that the RCSTP should be expanded and that several diversion projects should be implemented.

Based on the review of the Act 537 Plan, implement recommendations and update as necessary (Immediate and Medium)

The Authority has been working to implement the recommendations in the 2007 Needs Evaluation. These include revising the Act 537 Plan as required and the construction of the following improvements: The expansion of the RCSTP is completed. Lockwood STP and been decommissioned and the flow diverted, the Marydell and Hershey Mill PS projects are under construction. The Reserve PS is ready for bidding once the final ROW has been acquired. Act 537 Planning on the Reservoir Road PS will start in 2014.

Review Township Act 537 Plan at a minimum of bi-annually or as often as necessary (On-going and Medium)

This is done on an as-needed basis

7B-4 Evaluate the need to provide sewer service across Township boundaries

Consider the cost-effectiveness of extending services to area outside the Township (On-going and High)

This was looked at during the 2007 Needs Evaluation. The Authority responded positively to a capacity request from the developer of a Willistown property in 2010

7B-5 Provide for the upgrading of existing public sewer lines and wastewater treatment facilities

Evaluate new technologies and existing equipment needs. (On-going and Medium)

The RCSTP was expanded and upgraded.

Evaluate the existing sewer system lines and connections to ensure that the system it is free of stormwater infiltration and other problems (On-going and High)

The Authority has an on-going program to identify and correct I&I problems. Semiannual reports are provided to the Authority.

9D-1 Review and update the mission statement for each of the Townships Authorities, Boards and Commissions

ABC’s should review their mission statements as required (On-going and High)

The Authority’s mission (purpose) statement is set forth in the Articles of Incorporation.

Provide an annual report including activities and decisions by each of the ABCs. (On-going and High)

The Authority provides an annual update at the Annual Planning Session in January.

ABC shall develop by-laws to cover day to day operations (Immediate and High)

The Authority adopted by-laws in 1997 and has adopted several resolution that address other operational issues.

F:\Data\Shared Data\ABC'S\Planning Session\Municipal Authority 040413.docx

APRIL 2013
EAST GOSHEN MUNICIPAL AUTHORITY GOALS

ON-GOING

  1. Submit an article for each newsletter. Need by 3/1/13 - Jack; Need by 6/1/13; Need by 9/1/13; Need by 12/1/13
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) - Ed; 2 nd Quarter (June); 3 rd Quarter (September); 4 th Quarter (December)
  3. Respond to capacity requests in 45 days or less.
  4. Continue to implement I & I Plan March Report is in the Packet
  5. Operate RCSTP in compliance with NPDES Permit January, February, March

PROJECTS

  1. Lockwood – Final Restoration
  2. Marydell Pump Station – Construction - Bid awarded, Notice to proceed issued and construction has commenced
  3. Hershey Mill Pump Station – Construction - Bid awarded, Notice to proceed issued and construction has not commenced
  4. Reserve Pump Station – Construction – Waiting on easement from the Reserve
  5. Borrowing – Reimburse Capital Reserve for design and construction funds.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2013\040813.doc

Memo

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org

Date: April 5, 2013
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Pulte Project

Pulte is in the process of finishing up their project at Applebrook. Attached are the legal documents that need to be executed so that the Authority can accept dedication of the sewer lines.

Bob Adams and Mike Ellis are finalizing their review of the documents, and I expect to have final copies at the meeting.

Suggested Motion: I move that we authorize the execution of the easement agreement and maintenance bond for the sewer lines in the Pulte Development at Applebrook subject to confirmation from the Authority Solicitor and Engineer that they are acceptable.

F:\Data\Shared Data\Property Management\53-4\53-4-89 (Pulte)\Sewer\Memo 040513.docx

NAME OF DEVELOPMENT: PRESERVE AT APPLEBROOK

AMOUNT OF SECURITY: $24,566.25

TYPE OF SECURITY: ( x ) CASH ESCROW ( ) LETTER OF CREDIT
( ) BOND WITH SURETY

MAINTENANCE SECURITY AGREEMENT

THIS AGREEMENT, made this _____ day of __________________, 2013, by PULTE HOMES OF PA, LIMITED PARTNERSHIP, a Michigan corporation, 222 Mt. Airy Road, Suite 210, Basking Ridge, New Jersey 07920 (hereinafter called “Developer”) and EAST GOSHEN MUNICIPAL AUTHORITY, Chester County, Pennsylvania, 19380 (hereinafter called “Authority”).

WHEREAS, the Developer has heretofore applied for and obtained permission to develop and/or subdivide certain lands, more fully described in the publicly recorded subdivision and land development plan, as more fully appears in the Office for the Recording of Deeds in and for Chester County, in accordance with the terms and conditions of the final approval of the subdivision and land development plan designated as “Preliminary/Final Subdivision/Land Development Plan for Applebrook” prepared by Chester Valley Engineers, Inc. dated February 23, 2005 and last revised October 18, 2005; and

WHEREAS, the Developer has installed, constructed, and completed certain sanitary sewer public improvements, in accordance with the aforesaid plan and approval, which are listed as items 8 through 11 on Exhibit “A” attached hereto and made a part hereof (“Improvements”); and

WHEREAS, the Developer has offered to dedicate said Improvements to the Authority; and

1      306384.2

WHEREAS, the Developer and East Goshen Township (“Township”) have executed a “Subdivision and Land Development Improvement and Maintenance Agreement” (hereinafter called “the Agreement”), whereby Developer is obligated to repair or replace all defects in workmanship and materials appearing in the public Improvements and to repair all defects and damages caused by lack of structural integrity or failure of the Improvements to function in accordance with the design and specifications as depicted on the final plan and the accompanying approval documents, where said defects appear within eighteen (18) months from the date thereof; and

WHEREAS, it is a condition of the aforesaid Agreement that the Developer must deposit with the Authority financial security in the sum of fifteen percent (15%) of the cost of the public Improvements as described and established in the Agreement.

NOW, THEREFORE, intending to be legally bound hereby, the parties hereto do agree as follows:

1. The Developer agrees to keep, reiterates and reaffirms its obligations of maintenance of the Improvements, as more fully set forth in the Agreement, between Developer and Township, the terms of which are incorporated herein by reference.

2. Simultaneously with the execution of this Maintenance Security Agreement, the Developer has provided for the deposit with the Authority of financial security in the sum of Twenty-Four Thousand Five Hundred Sixty-Six and 24/100 ($24,566.25) Dollars, which amount is equal to fifteen percent (15%) the cost of the required public Improvements and which the financial security is herewith posted by the establishment of a cash escrow

2      306384.2

account subject to the terms and conditions of this Agreement. The Authority hereby acknowledges the receipt of said financial security.

3. Although the financial security is limited to fifteen (15%) percent of the cost of said public Improvements, the Developer shall be liable, nevertheless, for the full cost of repair or replacement due to defects in workmanship and materials appearing in the public Improvements and for the full cost of repair of all defects or damage caused by lack of structural integrity or failure of the improvement to function in accordance with the design and specifications as depicted on the final plan, where said defects appear within eighteen (18) months from the date hereof.

4(a). Except as provided by subsection (b) hereof, the Authority shall not proceed against the Developer under this agreement unless notice describing any defective condition or failure of the Improvements to function in accordance with the final plans has been given. The Authority shall give said notice to the Developer as soon as practical after the Authority has actual notice of the said condition. The Developer shall inform the Authority in writing within ten (10) days after receipt of the aforesaid notice from the Authority of a condition(s) requiring repair work or replacement of material, stating the Developer's intention to proceed with such repair or replacement, or both, as applicable. If the Developer's communication is not received within that time, the Authority may proceed against the established escrow account.

The Developer shall have thirty (30) days from the Authority's notice within which to commence any repair work or replacement of materials. If said work or replacement is not commenced within said thirty (30) days or if said work is not diligently pursued and continued, the Authority, in addition to any

3    306384.2

other legal or equitable remedies it has, may draw down the required financial security and cure the Developer's default by withdrawing from the established security so much thereof as is necessary to cure the Developer's default, up to the full amount thereof.

4(b). Where the Authority reasonably determines that an emergency exists which requires immediate corrective action and makes prior notification of the Developer pursuant to subsection (a) impracticable under the circumstances, the Authority may take appropriate corrective measures and proceed to recover the costs thereof against the Developer by withdrawing from the established financial security so much thereof as is necessary to cure such default. The Authority will attempt to notify the Developer at the address listed in paragraph 4(c) below by phone or by written notice of the existence of the emergency as soon as possible after the same comes to the Authority's attention, but failure of the Authority to successfully notify the Developer shall have no affect upon the Authority's right to proceed against the escrow. Authority may take this action without the prior consent or approval of the Developer or the Escrow Agent.

4(c). All notices given hereunder shall be by regular mail. The addresses for service of notice are as follows:

DEVELOPER: Pulte Homes of PA, Limited Partnership
222 Mt. Airy Road, Suite 210
Basking Ridge, New Jersey 07920

Authority: East Goshen Municipal Authority
1580 Paoli Pike
West Chester, Pennsylvania 19380

4    306384.2

5. The financial security remaining after the completion and acceptance of any maintenance work required under the terms of the referenced Agreement, and upon completion of all of the conditions of said Agreement, including the expiration of the eighteen (18) month period thereof, shall be released to the Developer, within a reasonable period of time after the Authority determines compliance with all provisions of the Agreement.

6. In addition to the remedies provided herein, Authority may pursue any other legal or equitable remedies which it may have against Developer to enforce Developer's obligations hereunder.

IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals or caused this agreement to be duly executed by their respective duly authorized officers the day and year first above written.

(Signatures on the next page)

5    306384.2

WITNESS:

DEVELOPER

PULTE HOMES OF PA, LIMITED PARTNERSHIP, a Michigan limited partnership
By: PH 50 LLC, a Michigan limited liability company, its general partner

_____________________________

By: _____________________________
Name:
Title:

Address: 222 Mt. Airy Road, Suite 210
Basking Ridge, New Jersey 07920

Telephone Number: Attn. Bill Creeger, 215-778-7194

ATTEST:

EAST GOSHEN MUNICIPAL AUTHORITY

_____________________________
Secretary

_____________________________
Chairman

6    306384.2

Page 1 of 1

EXHIBIT "A"

February 4, 2013

Maintenance Bond

EAST GOSHEN TOWNSHIP, 1580 PAOLI PIKE, WEST CHESTER, PA 19380

PROJECT NAME: Applebrook

DEVELOPER: Pulte Home Corporation

TELEPHONE: 215-680-3686

ITEM NO. DESCRIPTION ORIGINAL ESCROWED AMOUNTS QTY ORIGINAL ESCROWED AMOUNTS UNITS ORIGINAL ESCROWED AMOUNTS UNIT COST ORIGINAL ESCROWED AMOUNTS TOTAL Maintenance QTY Maintenance TOTAL
DEMOLITION
1.Conc Curbing3,150LF$ 6.00$ 18,900.000$0.00
2.Pavements6,450SY$ 2.85$ 18,382.500$0.00
Sub-Total Demolition$ 37,282.50$0.00
EROSION CONTROLS
3.LOD Delineation5455LF$ 2.00$ 10,910.000$0.00
4.SF-30"2,065LF$ 2.20$ 4,543.000$0.00
5.Bafflewalls695LF$ 15.00$ 10,425.000$0.00
6.Construction Entrances2EA$ 2,400.00$ 4,800.000$0.00
7.RTS/RSM ROW's60,000SF$ 0.35$ 21,000.000$0.00
Sub-Total Erosion Controls$ 51,678.00$0.00
SANITARY SEWER
8.8" SDR1985LF$ 38.00$ 75,430.001,985$75,430.00
9.Structures12EA$ 2,600.00$ 31,200.0012$31,200.00
10.Laterals56EA$ 950.00$ 53,200.0056$53,200.00
11.Tie-Ins3EA$ 1,315.00$ 3,945.003$3,945.00
Sub-total Sanitary Sewer$ 163,775.00$163,775.00
STORM SEWER
12.15" RCP260LF$ 26.50$ 6,890.000$0.00
13.18" RCP1,225LF$ 29.00$ 35,525.000$0.00
14.24" RCP577LF$ 32.00$ 18,464.000$0.00
15.30" RCP250LF$ 38.00$ 9,500.000$0.00
16.36" RCP232LF$ 46.00$ 10,672.000$0.00
17.42" RCP225LF$ 72.00$ 16,200.000$0.00
18.15" PEP1,145LF$ 27.00$ 30,915.000$0.00
19.Inlets Type C29EA$ 2,600.00$ 75,400.000$0.00
20.Inlets Type M6EA$ 2,600.00$ 15,600.000$0.00
21.MH Structures5EA$ 2,950.00$ 14,750.000$0.00
20.EW's1EA$ 1,800.00$ 1,800.000$0.00
Sub-total Interior Storm Sewer$ 235,716.00$0.00
PAVING
21.Fine Grade9,110SY$ 1.15$ 10,476.500$0.00
22.Base9,110SY$ 11.25$ 102,487.500$0.00
23.Binder9,110SY$ 6.15$ 56,026.500$0.00
24.Wearing9,110SY$ 5.10$ 46,461.000$0.00
Sub-total Paving$ 215,451.50$0.00
MISCELLANEOUS
25.Concrete Curbing5,475LF$ 14.00$ 76,650.00$0.00
26.Pedestrian Bridge1LS$ 100,000.00$ 100,000.00$0.00
27.Site Lighting Standards19EA$ 3,150.00$ 59,850.00$0.00
28.Monuments8EA$ 300.00$ 2,400.00$0.00
Sub-total Internal Roadway$ 238,900.00$0.00
LANDSCAPING
29.Street Trees109EA$ 405.00$ 44,145.00$0.00
30.Buffer Plantings -- Trees258.00EA$ 330.00$ 85,140.00$0.00
31.Buffer Plantings -- Shrubs716.00EA$ 45.00$ 32,220.00$0.00
Sub-Total Planting$ 161,505.00$0.00
SUBTOTAL$ 1,104,308.00$ 163,775.00
15% maintenance$ 55,215.4015%
Second Subtotal$ 1,159,523.40$ 24,566.25
10% Additional Security$ 115,952.34
TOTAL MAINTENANCE SECURITY$ 1,275,475.74$ 24,566.25

Engineering easement plan drawing showing a proposed 20-foot-wide sanitary sewer easement over Lot 2 of the Applebrook Subdivision and East Goshen Township parcel UPI 53-4-89.1 along Hibberd Lane, Grist Mill Lane, East Boot Road, and Ridley Creek.

EASEMENT PLAN

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER LANDS N/F LOT 2 OF THE APPLEBROOK SUBDIVISION & OF THE TOWNSHIP OF EAST GOSHEN (UPI 53-4-89.1)

SITUATED IN EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

PREPARED FOR PULTE HOMES OF PA, L.P. 1100 NORTHBROOK DRIVE TREVOSE, PENNSYLVANIA 19053

Carroll Engineering Corporation, 949 Easton Road, Warrington, PA 18976, Phone: 215-343-5700, Fax: 215-343-0875; 105 Raider Blvd., Suite 206, Hillsborough, NJ 08844, Phone: 908-874-7500, Fax: 908-874-7502; www.carrollengineering.com

DSG BY SSM | DWN BY SSM | CKD BY | DATE 03-01-13 | JOB NO 05-1791 | SCALE 1" = 50' | DRAWER NUMBER | FILE | CADD FILE 0517910033 | SHEET 1 OF 1 SHEETS | DRAWING NUMBER 1

COMMONWEALTH OF PENNSYLVANIA STEPHEN R. MURPHY REGISTERED PROFESSIONAL LAND SURVEYOR SU-036907-E | STEPHEN R. MURPHY SU036907 | 3-11-13 DATE

GENERAL NOTES

  1. INTENT OF THIS PLAN IS TO SHOW A PROPOSED 20' WIDE SANITARY SEWER EASEMENT BASED ON THE AS-CONSTRUCTED SANITARY SEWER LOCATION.
  2. INFORMATION SHOWN ON THIS PLAN IS BASED ON THE FOLLOWING PLANS AND SURVEYS: SET OF PLANS PREPARED BY CHESTER VALLEY ENGINEERS, INC., TITLED "RESERVE AT APPLEBROOK BY PULTE HOMES, CHESTER COUNTY, PA, PLANS", DATED 6/7/00, AND LAST REVISED 8/29/01. THIS PLAN SET SHOWS A 20' WIDE SANITARY SEWER EASEMENT FOR THE PROPOSED SANITARY SEWER. THE SANITARY SEWER WAS NOT INSTALLED WITHIN CERTAIN PORTIONS OF THE EASEMENT SHOWN AS OF 2013 AND MUST BE EASEMENTED NOW.; AS-CONSTRUCTED UTILITY SURVEY PERFORMED BY CARROLL ENGINEERING CORPORATION, PERFORMED IN 2010.

Plan Labels and Parcels

EAST BOOT ROAD (T-385) RIGHT-OF-WAY | CLOCK TOWER DRIVE | HIBBERD LANE | GRIST MILL LANE | RIDLEY CREEK | POB

LOT 2 AREA = 16.387 ACS. (GROSS) 15.576 ACS. (NET)

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER LOT 2 AREA = 51,416 SQ. FT.

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER UPI 53-4-89.1 AREA = 2,003 SQ. FT.

20' WIDE ACCESS & UTILITY EASEMENT | EX. 20' WIDE SANITARY SEWER EASEMENT

53-4-131.01 N/F LORETTA RUDOLPH D.B. 2807, PG. 234 | 53-4-131 N/F JAMES & GERALDINE HOKEY D.B. 1348, PG. 513 | 53-4-417 N/F JOSEPH & SUSAN NAPLES D.B. 4094, PG. 537 | 53-4-89.02 N/F DAVID M. & CAROL A. BERGER D.B. 3548, PG. 1649 | 53-4-89.03A N/F HENRY S. BELBER II D.B. 5751, PG. 0358 | 53-4-89.03 N/F SCOTT & RUTH SPURGEON D.B. 5099, PG. 1580 | UPI 53-4-89.1 N/F EAST GOSHEN TOWNSHIP D.B. 4707, PG. 2135 | 53-4-89.00 N/F APPLEBROOK ASSOCIATES, L.P. D.B. 4705, PG. 1670 | LOT 1 UPI 53-4-89.2 N/F BRANDYWINE OPERATING PARTNERSHIP L.P. D.B. 4707, PG. 2147

334.80' | S 58°58'33" W | S 31°51'27" E | 265.36' | 240.03' | 25.33' | 453.86' | 453.99' | S 59°02'48" W | 24.77' | 772.06' | 796.83' | 442.85' | S 29°53'12" E | 245.88' | S 54°25'50" E | S 45°49'45" E 27.18' | N 44°10'14" E 157.13' | N 58°17'56" E 113.28' | R=302.50' L=78.48' N 73°34'32" E 211.18' | N 72°05'06" E | R=222.50' L=73.40' N 1°03'40" E | N 0°10'28" E 74.33' | N 70°53'08" W 110.99' | N 69°35'59" E 255.47' | S 84°47'41" W 220.62' | N 32°11'02" W | 373.18' S 68°22'40" W | 147.19' S 68°22'40" W

LEGEND

  • PROPOSED SANITARY EASEMENT OVER LOT 2
  • PROPOSED SANITARY EASEMENT OVER UPI 53-4-89.1
  • EXISTING SANITARY EASEMENT

GRAPHIC SCALE (IN FEET) 1 inch = 50 ft.

COPYRIGHT © 2013 CARROLL ENGINEERING CORPORATION - ALL RIGHTS RESERVED.

PREPARED BY & RETURN TO:
Riley Riper Hollin & Colagreco
Attn.: Alyson M. Zarro, Esquire
717 Constitution Drive, Suite 201
P.O. Box 1265
Exton, PA 19341
(610) 458-4400

UPI No. 53-4-719

RIGHT-OF-WAY AGREEMENT AND DEDICATION OF SEWAGE FACILITIES

THIS AGREEMENT, made this ________ day of ________________, 2013, between EAST GOSHEN MUNICIPAL AUTHORITY ("Authority"), a body corporate and politic organized and existing under and by virtue of the laws of the Commonwealth of Pennsylvania, in East Goshen Township, Chester County, Pennsylvania, and PULTE HOMES OF PA, LIMITED PARTNERSHIP, a Michigan limited partnership with an address of 222 Mt. Airy Road, Suite 210, Basking Ridge, New Jersey 07920 ("Owner").

WITNESSETH:

WHEREAS, the Owner owns a tract or land situate at the north side of East Boot Road in East Goshen Township, Chester County, Pennsylvania, as acquired by deed dated August 19, 2005 and recorded in Deed Book 6592, page 1284, in the office of the Recorder of Deeds of Chester County, Pennsylvania; and

WHEREAS, the Owner has constructed an extension to the Authority sewer system to serve its tract and to facilitate the future connection of other lands in the Authority to the public sewer system; and

WHEREAS, the Owner intends hereby to transfer title to the sewage facilities it has constructed on its tract to the Authority and to create the necessary sanitary sewer easements on its tract for the use and benefit of the Authority.

NOW, THEREFORE, in consideration of the mutual covenants hereinafter contained, and other good and valuable consideration, receipt of which is hereby acknowledged by the Owner, the Authority and the Owner, each intending to be legally bound hereby, do agree as follows:

1    306374.2

  1. Definitions. The term "sewer lines" when used in this instrument shall refer to a sanitary sewer pipe, conduit, manhole, drain, marker, service connection and other appurtenances to be constructed by the Owner, meeting the specifications of the consulting engineers of the Authority, as approved by the Authority for use in the aforesaid sewer system within the sanitary sewer easement on Owner's property, as shown on an Easement Plan prepared by Carroll Engineering, Inc. dated March 1, 2013, marked Exhibit "A," attached hereto and made a part hereof.
  2. Grant to Authority. The Owner hereby gives and grants to the Authority the free and uninterrupted right, liberty and privilege: To install, construct, reconstruct, replace, remove, enlarge, inspect, operate, repair, make connections with and maintain perpetually such sewer lines, their accessories and appurtenances, as the Authority may from time to time require, consisting of underground pipes, conduits, manholes, drains, markers, mains, service connections and other appurtenances upon, over and under a strip of land twenty (20) feet wide, more or less, across the aforesaid tract of land belonging to Owner as shown on Exhibit "A", and as more particularly described by metes and bounds on Exhibit "B"; provided, however, that such Grant shall not include the right, liberty or privilege to install, construct or place any structure above the surface of the land of Owner.; To carry away and dispose of sewage through said sewer lines regardless of the source of such sewage.; The Owner hereby grants, dedicates, sells, transfers, assigns and delivers to the Authority the sewer lines located within the sanitary sewer easement on Owner's tract as shown on Exhibit "A" and as further described in Exhibit "B" attached hereto and made a part hereof.; The Owner agrees also to provide financial security to secure the structural integrity of the sewer lines hereby dedicated to the Authority and the functioning thereof in accordance with their design and specifications for a term not to exceed eighteen (18) months from the date of the Authority's execution of this Agreement and in an amount equal to fifteen percent (15%) of the actual cost of the installation of such improvements. The Owner shall be liable for the full cost of repair or replacement of defects and damages caused by the lack of structural integrity of the sewer lines caused by improper installation or failure of the sewer lines to function in accordance with the design and specification therefor, where such defects appear within eighteen (18) months from the date of such dedication. Owner shall execute a maintenance security agreement in the form required by the Authority to secure its obligations hereunder.
  3. To have and to hold the same perpetually to the Authority and its successors or assigns, together with the right and privilege at any and all times to enter the said premises, or any part thereof, provided that the Authority gives to the Owner reasonable advance

2    306374.2

notification of the nature of any intended work on the premises and the expected duration of such work, for the purpose of installing, constructing, reconstructing, replacing, removing, enlarging, inspecting, operating, repairing, maintaining, and/or making connections with the sewer lines or other appropriate means of access to the sewer lines; all upon the condition that the Authority will at all times during the construction, reconstruction, replacement, removal, repair or maintenance of the sewer lines cause every reasonable means to be used to protect from injury or damage all property, including lawns, trees, shrubbery, fences, buildings, walls, roads, water courses, natural features, or any existing improvement thereto, and the business activities of any business serviced by the sewer lines located on Owner's tract of land, and will at all times after doing any work in connection with the construction, reconstruction, replacement, removal, repair or maintenance of the sewer lines, cause the said premises to be restored to the condition in which the same were found before such work was undertaken, including replacement and/or repair of damaged property, to the extent reasonably possible under the circumstances and consistent with the rights and privileges herein granted.

4. Covenants of the Owner.

  1. The Owner does hereby release, remise, quitclaim and discharge the Authority, the Township and their several agents, servants, contractors and employees from any claim or right to damages or other emolument of value for the rights, liberties and privileges and the sewer lines given and granted to the Authority under this Indenture. This release is not intended to foreclose Owner's right to assert and collect damages from the Authority for any breach by the Authority of its obligations hereunder which may occur after the date of this Indenture.
  2. The Owner does hereby covenant that it is lawfully seized and possessed of a good and marketable title in fee simple to the aforesaid tract of land and that it has a good and lawful right to grant the rights and privileges herein granted to the Authority, and it further covenants that it will execute or procure any additional necessary assurances of the rights and privileges herein granted.
  3. The Owner does hereby expressly consent to any transfer, conveyance, pledge, lease or mortgage by the Authority of the said sewer lines.
  4. The Owner does hereby covenant that no structure or other obstruction shall be erected or permitted on the aforesaid strip of land.
  5. The provisions of this Indenture shall be binding upon and inure to the benefit of the Authority, its successors and assigns, and the Owner, its successors and assigns.

4. Covenants of Authority. Any liability for personal injury or to any worker employed by the Authority or its agents for construction, maintenance or repair purposes pursuant to this Agreement or to third persons, as well as any liability for damage to the property

3    306374.2

where this easement is located which arises as a result of construction, repair, maintenance or other activity pursuant to this agreement, shall be borne entirely by the Authority or its successors or assigns. The Authority agrees to indemnify and hold harmless Owner from and against any and all loss or liability for personal injury or property damage when such inquiry or damage shall result from, arise out of or be attributable to any construction, repair or maintenance undertaken or pursuant to this agreement. Such indemnification shall include all costs of defending any threatened or actual lawsuit, including, without limitation. expert witness fees, attorneys' fees and any other related matters.

IN WITNESS WHEREOF, the parties hereto have caused this Indenture to be duly executed on the day and year first above written.

ATTEST: EAST GOSHEN MUNICIPAL AUTHORITY
____________________________________ By: ____________________________________
, Chairman
WITNESS: PULTE HOMES OF PA, LIMITED PARTNERSHIP,
a Michigan limited partnership
By: PH 50 LLC, a Michigan limited liability company,
its general partner
____________________________________ By: ____________________________________
Name:
Title:

4

306374.2

COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF CHESTER : SS.

ON THIS _______ day of ________________________, 2013, before me, a notary public, duly commissioned in and for said County and Commonwealth, personally appeared ________________________, who acknowledged himself to be the Chairman of EAST GOSHEN MUNICIPAL AUTHORITY, and that he, as such, being authorized to do so, executed the foregoing instrument for the purposes therein contained.

____________________________________

STATE OF NEW JERSEY :
COUNTY OF SOMERSET : SS.

ON THIS _______ day of ________________________, 2013, before me, a notary public, duly commissioned in and for said County and Commonwealth, personally appeared ________________________ who acknowledged himself to be the ________________________ of PH 50 LLC, a Michigan limited liability company, general partner of PULTE HOMES OF PA, LIMITED PARTNERSHIP, a Michigan limited partnership, and that he, as such, being authorized to do so, executed the foregoing instrument for the purposes therein contained.

____________________________________

5

306374.2

Engineering easement plan drawing labeled Exhibit "A" showing a proposed 20-foot-wide sanitary sewer easement over Lot 2 of the Applebrook Subdivision and East Goshen Township parcel UPI 53-4-89.1 along Hibberd Lane, Grist Mill Lane, East Boot Road, and Ridley Creek.

EXHIBIT "A"

EASEMENT PLAN

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER LANDS N/F LOT 2 OF THE APPLEBROOK SUBDIVISION & OF THE TOWNSHIP OF EAST GOSHEN (UPI 53-4-89.1)

SITUATED IN EAST GOSHEN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

PREPARED FOR PULTE HOMES OF PA, L.P. 1100 NORTHBROOK DRIVE TREVOSE, PENNSYLVANIA 19053

Carroll Engineering Corporation, 949 Easton Road, Warrington, PA 18976, Phone: 215-343-5700, Fax: 215-343-0875; 105 Raider Blvd., Suite 206, Hillsborough, NJ 08844, Phone: 908-874-7500, Fax: 908-874-7502; www.carrollengineering.com

DSG BY SSM | DWN BY SSM | CKD BY | DATE 03-01-13 | JOB NO 05-1791 | SCALE 1" = 50' | DRAWER NUMBER | FILE | CADD FILE 0517910033 | SHEET 1 OF 1 SHEETS | DRAWING NUMBER 1

COMMONWEALTH OF PENNSYLVANIA STEPHEN R. MURPHY REGISTERED PROFESSIONAL LAND SURVEYOR SU-036907-E | STEPHEN R. MURPHY SU036907 | 3-11-13 DATE

GENERAL NOTES

  1. INTENT OF THIS PLAN IS TO SHOW A PROPOSED 20' WIDE SANITARY SEWER EASEMENT BASED ON THE AS-CONSTRUCTED SANITARY SEWER LOCATION.
  2. INFORMATION SHOWN ON THIS PLAN IS BASED ON THE FOLLOWING PLANS AND SURVEYS: SET OF PLANS PREPARED BY CHESTER VALLEY ENGINEERS, INC., TITLED "RESERVE AT APPLEBROOK BY PULTE HOMES, CHESTER COUNTY, PA, PLANS", DATED 6/7/00, AND LAST REVISED 8/29/01. THIS PLAN SET SHOWS A 20' WIDE SANITARY SEWER EASEMENT FOR THE PROPOSED SANITARY SEWER. THE SANITARY SEWER WAS NOT INSTALLED WITHIN CERTAIN PORTIONS OF THE EASEMENT SHOWN AS OF 2013 AND MUST BE EASEMENTED NOW.; AS-CONSTRUCTED UTILITY SURVEY PERFORMED BY CARROLL ENGINEERING CORPORATION, PERFORMED IN 2010.

Plan Labels and Parcels

EAST BOOT ROAD (T-385) RIGHT-OF-WAY | CLOCK TOWER DRIVE | HIBBERD LANE | GRIST MILL LANE | RIDLEY CREEK | POB

LOT 2 AREA = 16.387 ACS. (GROSS) 15.576 ACS. (NET)

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER LOT 2 AREA = 51,416 SQ. FT.

PROPOSED 20' WIDE SANITARY SEWER EASEMENT OVER UPI 53-4-89.1 AREA = 2,003 SQ. FT.

20' WIDE ACCESS & UTILITY EASEMENT | EX. 20' WIDE SANITARY SEWER EASEMENT

53-4-131.01 N/F LORETTA RUDOLPH D.B. 2807, PG. 234 | 53-4-131 N/F JAMES & GERALDINE HOKEY D.B. 1348, PG. 513 | 53-4-417 N/F JOSEPH & SUSAN NAPLES D.B. 4094, PG. 537 | 53-4-89.02 N/F DAVID M. & CAROL A. BERGER D.B. 3548, PG. 1649 | 53-4-89.03A N/F HENRY S. BELBER II D.B. 5751, PG. 0358 | 53-4-89.03 N/F SCOTT & RUTH SPURGEON D.B. 5099, PG. 1580 | UPI 53-4-89.1 N/F EAST GOSHEN TOWNSHIP D.B. 4707, PG. 2135 | 53-4-89.00 N/F APPLEBROOK ASSOCIATES, L.P. D.B. 4705, PG. 1670 | LOT 1 UPI 53-4-89.2 N/F BRANDYWINE OPERATING PARTNERSHIP L.P. D.B. 4707, PG. 2147

334.80' | S 58°58'33" W | S 31°51'27" E | 265.36' | 240.03' | 25.33' | 453.86' | 453.99' | S 59°02'48" W | 24.77' | 772.06' | 796.83' | 442.85' | S 29°53'12" E | 245.88' | S 54°25'50" E | S 45°49'45" E 27.18' | N 44°10'14" E 157.13' | N 58°17'56" E 113.28' | R=302.50' L=78.48' N 73°34'32" E 211.18' | N 72°05'06" E | R=222.50' L=73.40' N 1°03'40" E | N 0°10'28" E 74.33' | N 70°53'08" W 110.99' | N 69°35'59" E 255.47' | S 84°47'41" W 220.62' | N 32°11'02" W | 373.18' S 68°22'40" W | 147.19' S 68°22'40" W

LEGEND

  • PROPOSED SANITARY EASEMENT OVER LOT 2
  • PROPOSED SANITARY EASEMENT OVER UPI 53-4-89.1
  • EXISTING SANITARY EASEMENT

GRAPHIC SCALE (IN FEET) 1 inch = 50 ft.

COPYRIGHT © 2013 CARROLL ENGINEERING CORPORATION - ALL RIGHTS RESERVED.

Carroll Engineering Corporation

DESCRIPTION OF A
PROPOSED 20' WIDE SANITARY SEWER EASEMENT
OVER LANDS N/L OF
LOT 2 OF THE APPLEBROOK SUBDIVISION
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA

March 1, 2013

ALL THAT CERTAIN tract of land situate in East Goshen Township, Chester County, Pennsylvania, said land being a Proposed 20' Wide Sanitary Sewer Easement over Lands N/L of Lot 2 of the Applebrook Subdivision in the Applebrook Subdivision, as shown on a plan prepared by Carroll Engineering Corporation titled "Easement Plan - Proposed 20' Wide Sanitary Sewer Easement Over Lands N/L of Lot 2 of the Applebrook Subdivision & of the Township of East Goshen (UPI 53-4-89.1)", dated March 1, 2013.

BEGINNING at a point in Lot 2 of the Applebrook Subdivision at a corner of an Existing 20' Wide Sanitary Sewer Easement. Said point being the following two courses from the northwesterly corner of Lands N/L of Scott & Ruth Spielman (UPI 53-4-89.03):

  • Along the westerly line of said existing easement, North 31°51'27" West, 10.18';
  • Thence, continuing along said line, North 34°41'16" West, 9.84' to the point of beginning of said Proposed Easement;

Thence through Lot 2 of the Applebrook Subdivision the following courses:

  1. North 34°41'16" West, 58.41';
  2. North 57°18'22" West, 9.42';
  3. South 34°37'25" West, 138.64';
  4. South 34°06'04" West, 148.82';
  5. South 43°38'35" West, 131.81';
  6. North 46°21'25" West, 20.00';
  7. North 43°38'35" East, 121.70';
  8. North 42°02'23" West, 131.22';
  9. North 28°20'42" West, 172.04';
  10. North 37°48'20" West, 175.55';
  11. North 32°41'35" West, 122.35';
  12. South 67°51'17" West, 33.21';
  13. North 85°11'46" West, 168.37';
  14. North 04°48'14" East, 20.00';
  15. South 85°11'46" East, 163.58';
  16. North 67°51'17" East, 25.12';
  17. North 30°39'35" West, 64.35';
  18. North 81°27'00" West, 232.75' to a point along the line of Lands N/L of the Township of East Goshen (UPI 53-4-89.1);
  19. Thence, along said line, North 09°35'59" East, 8.73' to a point;
  20. Thence, continuing along said line, North 04°22'59" East 11.31' to a point;

Today's Commitment to Tomorrow's Challenges

Corporate Office:
949 Easton Road
Warrington, PA 18976
215.343.5700

630 Freedom Business Center
Third Floor
King of Prussia, PA 19406
610.489.5101

101 Lindenwood Drive
Suite 225
Malvern. PA 19355
3075

105 Raider Boulevard
Suite 206
Hillsborough, NJ 08844
908.874.7500

05-1791.00 (0517910034.DOC)

EXHIBIT "B"

Page 2 of 2
Proposed 20' Wide Sanitary Sewer Easement
Over Lot 2 of the Applebrook Subdivision

Thence, re-entering Lot 2 of the Applebrook Subdivision the following courses:

  1. South 81°27'00" East, 234.38';
  2. North 57°09'37" East, 70.26';
  3. North 16°52'43" East, 24.87' to a point along the line of Lands N/L of Brandywine Operating Partnership L.P. (Lot 1 of UPI 53-4-89.2);
  4. Thence, along said line, North 72°00'56" East, 24.37' to a point;

Thence, re-entering Lot 2 of the Applebrook Subdivision the following courses:

  1. South 16°52'43" West, 15.33';
  2. North 73°19'33" East, 171.05';
  3. North 88°26'24" East, 155.48';
  4. South 61°03'26" East, 154.40';
  5. South 30°04'55" East, 153.42';
  6. South 08°48'00" East, 89.77';
  7. South 81°12'00" West, 20.00';
  8. North 08°48'00" West, 86.02';
  9. North 30°04'55" West, 144.12';
  10. North 61°03'26" West, 143.41';
  11. South 88°26'24" West, 147.37';
  12. South 73°19'33" West, 184.02';
  13. South 39°51'29" West, 17.00';
  14. South 57°09'37" West, 58.44';
  15. South 30°39'35" East, 70.90';
  16. South 32°41'35" East, 129.59';
  17. South 37°48'20" East, 176.31'
  18. South 28°20'42" East, 171.29';
  19. South 42°02'23" East, 125.32';
  20. North 34°06'04" East, 135.31';
  21. North 34°37'25" East, 147.44';
  22. North 23°42'15" East, 134.63';
  23. South 66°17'45" East, 20.00';
  24. South 23°42'15" West, 127.04';
  25. South 57°18'22" East, 14.54';
  26. South 34°41'16" East, 63.69' to the northerly line of the aforementioned existing 20' wide sanitary sewer easement;
  27. Thence, along said easement line, South 58°58'33" West, 20.04' to the first mentioned point and place of BEGINNING .

Containing 51,416 square feet of land, more or less. Said area represents a Proposed 20' Wide Sanitary Sewer Easement over Lot 2 of the Applebrook Subdivision.

Stephen R. Murphy P.L.S.
PA License #SU056907

[Professional Land Surveyor Seal: Stephen R. Murphy, Commonwealth of Pennsylvania, Registered Professional Land Surveyor, SU056907]

EXHIBIT "B"

05-1791.00 (0517910034.DOC)

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

April 3, 2013

To: Municipal Authority
From: Mark Miller
Re: March 2013 Monthly Report

Meters: Meters were calibrated on April 8, 2013. Minor adjustments were made to Wilson Drive. The portable flow meters were pulled and will be re-installed this week. We will be monitoring the sewer flows between Rt. 3 and Paoli Pike.

Pump Stations: Were visited on a daily basis

C.C. Collection: On March 17th we received an alarm at the Hershey Mill Pump Station for a pump failure. While I was enroute I received a high level alarm. We found that all the pumps had tripped as well as the VFD's, we reset the breakers to get the pumps to run. It turns out that the block heather on the generator shorted out which tripped the circuit breakers.

R.C. Collection: Joann received a call from a resident at 202 Applebrook Drive who reported sewage coming thru his basement toilet. We arrived at 202 Applebrook Drive and started to pull manholes. We found manholes plugged with grease, as we worked to clear the clog we found that two drop manholes were completely clogged and had to use shovels and pry bars to release the grease. The crew was able to get the line opened to alleviate the backup. I explained to the homeowner that the lines were not part of the Township system. I contacted the management company to advise them that they had a serious problem that needed immediate attention. (Photos Attached)
We checked the other manholes to make sure they were clear before we left and we also worked our way back to the clubhouse where we found the main line with a 75% blockage. Applebrook called Pipe Data View in to clear their lines. The management company is having all the lines cleared. We met with the Apple Brook Golf Course

R.C. Plant: Nothing to report at this time.

Alarms: We received a total of 17 alarms.

PA One Calls: We received 47 PA One calls for the month of March.

Photograph of the interior of a clogged drop manhole showing a blocked channel and water pooling at the bottom pipe, with a handwritten sticky note at the top left.

This is a drop manhole that is clogged. Channel is blocked

Photograph looking down into a concrete manhole showing ladder rungs and a bottom channel blocked with solid grease, with a handwritten sticky note at the top left.

2nd Manhole Channel is blocked. with Solid Grease.

[Photograph inside a sewer manhole showing an orange mesh strainer basket placed below an inlet pipe to catch grease debris.]

Sticky note text: "Twp Strainer to catch grease."

Photograph looking down into a shored excavation pit with a ladder and a contractor operating jack and bore equipment, with a handwritten sticky note at the top left.

Contractor Jack and bore under Paoli Pike. MaryDell Sewer

Photograph looking down into an excavated trench showing a casing pipe and manhole structure with gravel bedding and a shovel, with a handwritten sticky note at the top right.

Casing & Manhole on Saratoga Dr.

Photograph looking down into an excavated pit showing an auger and casing emerging through the earth wall with gravel and a shovel below, with a handwritten sticky note at the top left.

Auger & Casing comes out on the other side Mary Dell - Sewer

EGMA 1301

Pennoni

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E. for Daniel Barbato, P.E.
Authority Engineer
DATE: April 4, 2013
SUBJECT: Engineer's Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Pennoni continues to coordinate with the Plant Operator and will provide operations assistance as needed. No issues were brought to our attention in March.

Marydell PS Elimination

  • We coordinated with Ply-Mar to have their insurance coverages revised to comply with contract requirements, and an acceptable insurance certificate was provided. We also reviewed additional shop drawing submissions.
  • Notice to Proceed with Construction was issued effective March 18. The contract completion date is July 15.
  • Ply-Mar began construction on March 26. Ply-Mar originally estimated 6-8 weeks to complete the project. We have performed construction field observation and office support during the construction including but not limited to field meetings and coordination with PECO to brace utility poles, coordination with Sunoco for required soft dig test pits of gas mains in Boot Road, observation of Paoli Pike jack and boring, and resolution of Paoli Pike jack and boring casing misalignment.
  • We reviewed the contractor's first payment request and forwarded our recommendation to the Township.

Hershey's Mill PS Diversion

  • We issued Notice to Proceed with Construction effective April 1, 2013. The contract completion date is July 29, 2013. The contractor, Delaware Valley Utility Contractors, proposes to begin work on May 6. They estimate approximately one month to complete the project. A pre-construction meeting is tentatively scheduled for April 16 or 17.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-04-04.docx

EGMA 1301

  • We are also in the process of reviewing partial shop drawings from the contractor.

Reserve PS Elimination

  • We completed the Bid Plans and near-final specifications. The plans and specifications were submitted to the Reserve at Spring Meadows HOA per their request. The project will be put out to bid after the Reserve at Spring Meadows HOA has granted the easement and rock borings are performed.

Chapter 94 Annual Reports

  • We prepared and submitted the reports for the Ridley Creek, West Goshen, and Westtown Service Areas to DEP. We also prepared and submitted a letter to DEP stating that the Lockwood Chase STP was decommissioned in 2012 and that a Chapter 94 Report for that Plant is therefore not necessary.

Semi-Annual I/I Report

  • We analyzed permanent and portable (temporary) meter data from the preceding six months, and we met with Township staff to review the metering and discuss locations for metering and investigations over the next six months. We prepared the semi-annual report and submitted it to the Township.

Applebrook Sewer Easements

  • We reviewed the easement plan and legal description, and we provided minor comments to the Township.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2013\Memo to EGMA Board 2013-04-04.docx

Big Fish Environmental Services Inc.

Monthly Operations Report: March 2013

Treatment Process Operation

During February 2013, there were no exceedances of the final effluent discharge limitations for outfall 001. There was no discharge from outfall 002. Table 1 illustrates the final effluent composite sample data reported during February.

Table 1
February 2013 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
March 5, 2013 0.271 2.0 4.5 5 11 0.10 0.23 0.14 0.32 1 0.0000
March 14, 2013 0.239 2.0 4.0 5 10 0.19 0.38 0.26 0.52 1 0.0000
March 19, 2013 0.235 2.0 3.9 5 10 0.26 0.51 0.19 0.37 1 0.0000
March 26, 2013 0.228 2.0 3.8 5 10 0.10 0.19 0.21 0.40 1 0.0000
Average 0.2433 2.0 4 5 10 0.162 0.33 0.20 0.40 1 0.0000
Minimum 0.2280 2.0 4 5 10 0.100 0.19 0.14 0.32 1 0.0000
Maximum 0.2710 2.0 5 5 11 0.258 0.51 0.26 0.52 1 0.0000

The monthly average total phosphorus concentration was 0.20 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.14 mg/L to 0.26 mg/L.

Table 2 present the influent wastewater pollutant concentrations and loading entering the wastewater treatment facility. Composite samples are collected at the influent doghouse manhole. The influent flow meter reading is collected from the SBR influent flow meter due to in accuracies with the field influent flow meter.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 6

Big Fish Environmental Services Inc.

Table 2
February 2013 - Influent Wastewater
Design Basis Flow BOD5 TSS NH4-N TKN, mg/L Phosphorus, Total, mg/L
MGD Average mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day
335 2,098 320 2,001 32 200 48 301 9.1 57
Sample Date
March 5, 2013 0.3833 168 537 72 230 29.5 94 40 128 4.8 15
March 14, 2013 0.3080 138 354 64 164 30.7 79 84.6 217 4.4 11
March 19, 2013 0.3369 85.2 239 980 2,754 45.7 128 79.5 223 35.6 100
March 26, 2013 0.3215 304 815 230 617 33.9 91 48.8 131 6.3 17
Average 0.3374 174 487 337 941 35 98 63 175 13 36
Minimum 0.3080 85 239 64 164 30 79 40 128 4 11
Maximum 0.3833 304 815 980 2754 46 128 85 223 36 100

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of March. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Microscopic examinations and physical observation of the SBR MLSS and foam color is ongoing. Foam concentrations increased in concentration of surface area coverage during the month. The foam remains as light brown in color and averages 3 to 4 inches in depth. The F:M ratios for SBR 3 and 4 decreased slightly. Increased sludge wasting rates were gradually implemented during the last week of the month and will continue during April to increase the F:M ratio and lower the MLSS.

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was largely consistent through March. Graph 1 illustrates the daily volume of alum used during the month.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 6

Big Fish Environmental Services Inc.

[Graph 1: Line chart titled "March 2013 Gallons of Alum" tracking daily gallons of alum used from March 1, 2013 to March 31, 2013, with values fluctuating generally between 20.00 and 40.00 gallons.]

Graph 1

March 2013 Gallons of Alum

SBR No. 2 remains out of service. Transfer of the remaining mixed liquor will be implemented during the month of April to drain the tank.

Table 3 presents the March 2013 final effluent data used for DMR preparation.

Table 3
March 2013 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations Flow CBOD5 TSS NH4-N Phosphorus, Total, mg/L Fecal Coliform
MGD Average mg/L lbs/month mg/L lbs/month mg/L lbs/month mg/L lbs/month Geo Mean Geo Mean
0.75 20 125 21 131 7 44 0.5 3 200 1,000
Instantaneous Maximum 40 42
Sample Date
March 5, 2013 0.288 2.0 4.8 5 12 0.10 0.24 0.16 0.38 1 0.0000
March 14, 2013 0.273 2.0 4.6 5 11 0.13 0.29 0.37 0.84 1 0.0000
March 19, 2013 0.283 2.0 4.7 5 12 0.10 0.24 0.29 0.68 1 0.0000
March 26, 2013 0.263 0.32 0.70 1 0.0000
Average 0.2768 2.0 5 5 12 0.109 0.26 0.29 0.65 1 0.0000
Minimum 0.2630 2.0 5 5 11 0.100 0.24 0.16 0.38 1 0.0000
Maximum 0.2880 2.0 5 5 12 0.127 0.29 0.37 0.84 1 0.0000

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 6

Big Fish Environmental Services Inc.

The facility is anticipated to achieve compliance with the permitted effluent limitations.

Process Monitoring On-Line Instrumentation:

The ChemScan phosphate analyzer remains on line. Comparison testing for reactive (ortho) and total phosphorus is ongoing. On site comparison, monitoring is measuring a significant difference among the analyzer data as compared to the onsite laboratory data. Dave Kershner was contacted confirm calibration of the analyzer and adjust if needed. Suspended solids within the post final effluent feed to the flow floc tank and filters may be fouling the analyzer.

Presented below is a summary of the flow data for March 2013:

Flow data:

Flow Meter Location March 2013
Total Volume for Month, MGD Average Daily Flow, gpd
Influent Wastewater to Screening Building – Meter is inaccurate 14.571 470,047
Influent Wastewater to SBRs 10.636 343,102
Internal Recycle NA NA
Treated Effluent to Disc Filters 10.309 322,559
Final Effluent Discharge 7.547 243,452
Applebrook Golf Course 0 0

Chemical Usage:

Chemical March 2013
Daily Average Total Monthly
Soda Ash 203 lbs./day 6,300 pounds
Magnesium Hydroxide 0 gpd 0 gallons
Polyaluminum chloride solution 0 gpd 0 gallons
Polymer (centrifuge) 4.5* 41 gallons

*Nine (9) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 6

Big Fish Environmental Services Inc.

Solids Dewatering and Disposal: March 2013

During the month, the centrifuge dewatering system was placed in service. Presented below is a summary of the solids processing activity:

Sludge Dewatering Summary
Gallons of sludge dewatered 176,271 gallons
Average Dewatered Total Solids, % 18%* (estimated on-site data)
Wet Tons Data not available at time of report preparation
Dry Tons Data not available at time of report preparation
Number of dumpsters 3

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of the month was 12.99 feet and the level at the end of the month was 14.14 feet. The initial total solids concentration was 0.77% and ended the month as 0.81% total solids. A total of 141,225 gallons of supernatant was decanted during the month.

Sludge holding tank No. 2 was out of service. The level at the beginning of the month was 2.57 feet and the level at the end of the month was 1.60 feet. This sludge tank is planned to be utilized during the month of April to drain SBR 2 and assist to handle the increase sludge wasting rates.

Significant Storm Events

During March there were no significant rainfall events contributing to excessive influent wastewater flows to the treatment facility.

Minor Repairs and Preventative Maintenance

  • ACS was contacted to schedule repair of the influent flow chart recorder.
  • ACS installed flow meter signal cable connecting the new influent "field" flow meter to the influent sampler located at the doghouse manhole. The influent sample collection is a flow-proportioned sample.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 6

Big Fish Environmental Services Inc.

  • Jeff Bush from Worth & Company was contacted to replace the failed analog hour meters (previous warranty issue left unresolved by Worth & Company).
  • The spider gear for the centrifuge polymer feed system failed. The gear from the disc filter polymer feed system was used to return the centrifuge to service. Replacement parts will be ordered.
  • The rear bearing of the centrifuge continues to be closely monitored as the temperature has been observed to increase to 180°F. A temperature of 212°F activates a high temperature alarm and results in the machine failure.
  • Disc Filter Number 2 cloth media was cleaned. There have been no high vacuum alarms observed since completing the cleaning procedure.
  • The Township coordinated with Aqua Wastewater Management to remove grit from the influent flow channel.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 6

2012 FLOWMETERS

2013 MARCH 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.0003/01/13191,9011,297,000164,88899,460113,69070,43015,961,09680,84020,4001,046,270
003/02/130
0.0003/03/130
0.0003/04/13195,6561,251,667193,57295,613133,14864,86015,980,11663,40020,4001,027,793
0.0003/05/130
0.1003/06/13198,1161,230,000211,47289,500146,13464,93015,997,12185,02520,400990,545
0.0003/07/13199,3691,253,000221,06095,880152,55364,19016,005,96388,42020,4001,004,510
0.0003/08/13200,5891,220,000230,25491,940159,54569,92016,014,22882,65020,400975,490
0.0003/09/130
0.0003/10/130
0.0803/11/130
0.8503/12/13205,4281,209,750267,08792,083186,11166,41516,040,70766,19820,400985,055
0.0003/13/13206,9421,514,000281,948148,610194,48583,74016,050,709100,02020,4001,181,630
0.0003/14/13208,2381,296,000292,468105,200201,53670,51016,059,59088,81020,4001,031,480
0.0003/15/13209,5211,283,000302,554100,860208,17666,40016,068,49989,09020,4001,026,650
0.1703/16/130
0.0003/17/130
0.5503/18/13213,2821,253,667332,05998,350228,17066,64716,092,85981,20020,4001,007,470
0.0703/19/13214,6891,407,000345,440133,810233,34551,75016,103,031101,72020,4001,119,720
0.0203/20/130
0.0003/21/13217,2971,304,000368,465115,125249,27479,64516,124,514107,41520,4001,001,815
0.0003/22/130
0.0003/23/130
0.0003/24/130
0.4503/25/13222,1781,220,250407,62297,893275,86666,48016,156,48779,93320,400975,945
0.0503/26/13223,4931,315,000419,117114,950283,34574,79016,165,20487,17020,4001,038,090
0.0003/27/13224,7161,223,000429,421103,040290,22868,83016,173,42682,22020,400968,910
0.0003/28/13
0.0003/29/13
0.0003/30/13
0.0703/31/13
2.41Total Flow1,285,156105,48868,63685,6071,025,425
EG TWP Value
MONTH TO DATE2.41
NORMAL MONTH TO DATE
YEAR TO DATE8.10
NORMAL YEAR TO DATE

2013 flowmeters -all-stations separate month worksheets.004.xlsMAR

4/3/201311:16 AM

2012 FLOWMETERS

2013 MARCH 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

DATE HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
READING GPD READING GPD READING GPD READING GPD READING GPD READING GPD
3/1/2013518,344400,56013,881,888944,750
3/2/2013
3/3/2013
3/4/2013623,480350,45314,146,221881,110
3/5/2013
3/6/2013698,532375,26014,324,023889,010
3/7/201325,676,30883,8441,617,01465,829736,563380,31014,414,250902,2701,008,8215,8742,716,38810,463
3/8/2013774,566380,03014,502,542882,920
3/9/2013
3/10/2013
3/11/2013
3/12/2013913,679347,78314,844,080853,845
3/13/2013957,225435,46014,951,6311,075,510
3/14/201325,734,12682,5971,621,63065,943996,369391,44015,045,238936,0701,013,4576,6232,723,64510,367
3/15/20131,034,562381,93015,136,792915,540
3/16/2013
3/17/2013
3/18/20131,139,596350,11315,401,432882,133
3/19/20131,181,551419,55015,504,9461,035,140
3/20/2013
3/21/201325,781,35367,4671,626,35767,5291,265,117417,83015,704,588998,2101,017,2425,4072,731,12010,679
3/22/2013
3/23/2013
3/24/2013
3/25/20131,413,808371,72816,070,582914,985
3/26/201325,823,23083,7541,629,70867,0201,458,527447,19016,173,17725,4902,736,73311,226
3/27/20131,499,354408,27016,268,915957,3801,019,987
3/28/2013
3/29/2013
3/30/2013
3/31/2013
79,41666,580292,895594,0403,8997,122

2013 flowmeters -all-stations separate month worksheets;004.xlsMAR 4/3/201311:16 AM

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY1,277,069120,48160,16563,67120,40089,99270,106922,3777,36311,147
FEBRUARY1,297,700101,95556,21677,81120,40089,50064,950387,898936,3687,66910,544
MARCH1,285,156105,48868,63685,60720,40079,41666,580292,895594,0403,8997,122
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave1,286,642109,30861,67275,69620,40086,30367,212340,397817,5956,3109,604

To West Goshen 1,039,965

2013 flowmeters -all-stations separate month worksheets;004.xlsSUMMARY

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT
JANUARY1,277,069120,48160,16563,67120,400
FEBRUARY1,297,700101,95556,21677,81120,400
MARCH1,285,156105,48868,63685,60720,400
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave1,286,642109,30861,67275,69620,400

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT
JANUARY1,277,069120,48160,16563,67120,400
FEBRUARY1,297,700101,95556,21677,81120,400
MARCH1,285,156105,48868,63685,60720,400
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave1,286,642109,30861,67275,69620,400