Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 7-14-14 final.doc 1
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 14, 2014
The East Goshen Township Municipal Authority held their regular public meeting on Monday, July 14, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Kevin Cummings, Dana Pizarro, Ed McAssey and Fran Beck. Also in attendance were: Rick Smith (Township Manager), and Mike Ellis (Pennoni). COMMON ACRONYMS: BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PR – Park & Recreation Board EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant HC – Historical Commission SBR – Sequencing Batch Reactor I&I – Inflow & Infiltration SSO – Sanitary System Overflow LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response. Chairman’s Report/Other Members’ Reports Jack reported that he and Rick attended the West Goshen meeting. Rick received a letter from Max Stoner. New Business 1. Troutbeck Farm, Willistown Township, Proposed Tie-in to East Goshen Sewer – William Lucas was present to represent the Chance Family Trust and Estate, of which he is a member. They own approximately 68 acres near the Willow Pond Subdivision. This subdivision is presently treated by East Goshen and 14 of the houses are in Willistown. He met a year ago with Rick Smith and it is his understanding that there is capacity for the 44 units they are planning for the Troutbeck Farm property. They will be 1 acre lots with a common force main and grinder pumps at the individual lots. Willistown has a program to maintain the grinder pumps. Ed made a motion to send a letter to Mr. Lucas stating that there is capacity but formal approval from Willistown is needed first. Fran seconded the motion. The motion passed unanimously. Sewer Reports 1. Director of Public Works Mark Miller reported for June 2014: Meters: All meters were read on a daily basis. We are waiting on Allied Control to schedule the installation of the portable meters. CC Collection: The pump stations were visited on a daily basis. All pumps were pulled for routine maintenance at each station. Ashbridge pump station was on emergency power for 3 days.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 7-14-14 final.doc 2
RC Collection: The Hunt Country pump station was on emergency power for three days due to a power failure. RC Plant: We reinstalled pump 3 at the lift station. Applebrook pumps were turned on last week. I&I: Pipe Data View will be in the last week of July to clean and televise. Alarms: We responded to 37 alarms for the month of May. PA One Calls: We received 119 PA calls in May. 2. Pennoni Engineer’s Report Mike Ellis gave the following report: Invoices: Invoices with summaries are provided under separate cover. Reserve Pump Station Elimination: We coordinated with the contractor to perform the outstanding site work punchlist items: removal of the filter sock along the creek and re- topsoiling & re-seeding the alwn area at the old pump station driveway and building. We performed an inspection of the work after it was completed. We are still awaiting resubmission of as-built plans with surveyed manhole elevations. Reservoir Rd Pump Station Act 537 Plan: We revised the construction schedule in the Act 537 Plan to address West Goshen’s comments for compliance with the intermunicipal agreement. We received Act 537 Plan review forms from the East Goshen Municipal Authority, East Goshen Township Planning Commission and Chester County Health Department. We are awaiting Act 537 Plan review forms to be completed and returned from the West Goshen Township Planning Commission and Chester County Planning Commission. Reviews were due by July 9. It is our understanding that the West Goshen Sewer Authority approved the Act 537 at their meeting on July 3 and that they will be sending an approval letter. We received feedback from the U.S. Fish & Wildlife Services (USFWS) on the Phase 1 bog turtle habitat survey report. To address their comments, we revised the plans and Act 537 narrative to propose the Chester Creek stream crossing be constructed via open cut instead of the previously proposed directional drilling. We provided the plans to Conestoga-Rovers & Associates to resubmit to USFWS for approval. We expect to receive USFWS approval the week of July 14-18. Tentative Act 537 Planning schedule (assuming no Phase 2 bog turtle screening): Estimated Date County & Township Agency Review Comments Due July 9, 2014 Complete plan revisions to address agency comments July 14, 2014 Begin 30-Day Public Comment Period July 17, 2014 USFWS Bog Turtle Habitat Formal approval/comments July 18, 2014 End 30-day Public Comment Period August 15, 2014 East Goshen Twp. Adoption August 19, 2014 Submission to PADEP August 22, 2014 PADEP Review and Approval (120 Days) December 21, 2014 New Sewer Connections We completed a review of the revised design plan and report submission for a new private wastewater pump station for Acero Precision at 1340 Enterprise Drive, issued a comment letter, and discussed comments with the design consultant.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 7-14-14 final.doc 3
Fairway Village Manhole Lining Abel Recon performed the construction demonstration of the SprayWall monolithic polyurethane interior manhole lining system on June 10, 2014. Sewer Ordinance and Detail Updates We prepared draft updates to the Township’s building sewer/lateral connection detail and sanitary sewer ordinance text. 3. Big Fish Environmental Services – Rick reported that the plant was in compliance for June. Approval of Minutes Fran moved to accept the minutes of June 9, 2014. Dana seconded the motion. The motion passed unanimously. Approval of Invoices 1. Kevin moved to approve payment of the following Pennoni invoices: a. Pennoni #594993 $ 309.00 b. Pennoni #594994 $ 430.00 c. Pennoni #594995 $ 1,521.25 Dana seconded the motion. The motion passed unanimously. 2. Dana moved to approve payment of the Gawthrop invoice #121393 for $2,000.00. Fran seconded the motion. The motion passed unanimously. 3. Dana moved to approve payment of the Maillie invoice #1000036708 for $10,800.00. Fran seconded the motion. The motion passed unanimously. Liaison Reports None Financial Reports 1. Jon Altshul’s July 8, 2014 Financial Report for June 2014: The Municipal Authority recorded $130.00 in revenues (interest) and $17,429 in expenses in June, a difference of -$17,299. The fund balance is now $1,571,983. June expenses included the quarterly administrative charge bank ($8,043), engineering services ($3,005) and engineering services on the Reservoir Road Pumping Station ($5,761). 2. The 2013 Audit Report from Maillie will be reviewed next month. Goals 1. Ed will attend the West Goshen 3rd Quarterly Meeting in September. Any Other Matter 1. Jack mentioned that Bob Adams, Municipal Authority Solicitor for many years, is retiring at the end of the year. The members agreed to give him a gift of appreciation.
F:\Data\Shared Data\Minutes\Municipal Authority\2014\MA 7-14-14 final.doc 4
Adjourment There being no further business, Dana moved to adjourn the meeting. Fran seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:40 pm. Respectfully submitted, Ruth Kiefer Recording Secretary