Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
October 13, 2014
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s August; East Goshen Township Flows
- APPROVAL OF MINUTES September 8, 2014
- APPROVAL OF INVOICES Pennoni Invoice #607606 $ 141.25; Pennoni Invoice #607607 $ 441.25; Pennoni Invoice #607608 $ 649.75; Pennoni Invoice #607609 $ 75.00; Gawthrop Invoice #123359 $ 400.00 Paid
- LIAISON REPORTS
- FINANCIAL REPORTS September 2014 Report
- OLD BUSINESS
- GOALS Review current mission statement and provide the Board of Supervisors with changes, if needed – June 1, 2014 May 8 – The MA does not have a current mission statement. A first draft included in the packet. June 9 – Changed “lease” to “leasee”. Mission Statement approved by MA on June 9 - Completed; Submit an article for each newsletter – Due date for newsletter
F:\Data\Shared Data\Agendas\Municipal Authority\2014\10-13-14 -.doc
Need by 1/31/14 – Dana Completed
Need by 4/30/14 – Jack Completed
Need by 7/1/14 - Kevin Completed
Need by 10/31/14 – Ed Completed
- Obtain PA DEP approval for the Act 537 Plan revision for the Reservoir Road Pump Station – December 31, 2014 May 8 - Revisions submitted to EGMA, EGPC, WGSTP, CCHD, and CCPC July 14 – BOS scheduled to adopt resolution at their meeting on August 19. Resolution adopted and Plan revision sent to PA DEP on August 25.
- Develop a recommendation on covers for the SBRs – August 1, 2014 May 8 – Draft memo distributed. June 9 – Final memo in packet - Completed
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack- Completed 2 nd Quarter (June) – Ed- Completed 3 rd Quarter (September) Ed - Completed 4 th Quarter (December)
- Respond to capacity requests in 45 days or less. 211 Ellis Lane – 1 EDU existing house, 195 Wyllpen Place – 1 EDU existing house, 3 Lucas Lane – 44 EDUs.
- Continue to implement I & I Plan April 14 – Status Report received October 8 – Status Report Received
- Operate RCSTP in compliance with NPDES Permit January, February, March, May, June, July, August
- NEW BUSINESS Pulte- Applebrook sewer line dedication; 2015 Municipal Authority Proposed Budget; I & I report
- CAPACITY REQUESTS
- ANY OTHER MATTER
F:\Data\Shared Data\Agendas\Municipal Authority\2014\10-13-14 -.doc
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2014\10-13-14 -.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
October 2, 2014
| To: | Municipal Authority |
|---|---|
| From: | Mark Miller |
| Re: | September 2014 Monthly Report |
Meters: Were read on a daily basis. We were having problems with the portable meters reading negative flows. Allied Control was notified and the problems have been corrected.
C.C. Collection: All pump stations were visited on a daily basis, no problems to report. We were notified of a lateral clog on Cooper Circle, the trap was plunged which cleared the clog. We inspected two lateral connections on the system; both were located on Manley Road; one required us to have a public works employee on site; since they were digging around the Ash Bridge force main. We replaced all the manhole castings on Wilson Drive and Morstein Road as part of our paving program. Three of the casting showed signs of inflow. We televised a thousand feet of sewer line on Reservoir Road, there were no problems to report.
R.C. Collection: The pumping station was visited on a daily basis; we did have a problem at the Hershey Mill Pump Station when a circuit board shorted out. We had a spare board in stock which was changed out and the station was returned to normal operation. We inspected two lateral installations on Cornwallis Drive. The sewer right of ways were mowed.
R.C. Plant: No problems to report.
Lateral Repairs:
404 Barker Drive replaced clean- out and traps.
903 Fairway, Found trap and clean- out filled with insulation and foam (picture enclosed).
201 Lockwood Lane, new caps.
We also repaired a dozen clean- out pipes on both collection systems.
Alarms: We responded to 18 alarms for the month of August.
PA One Calls: We received 89 PA One calls in August
[Photograph showing sewer clean-out pipes, metal caps, and yellow insulation/expanding foam debris removed from a trap and clean-out on the ground.]
EGMA 1401
[Logo: Pennoni]
MEMORANDUM
| TO: | East Goshen Municipal Authority Board Rick Smith, Township Manager |
|---|---|
| FROM: | Michael Ellis, P.E. Authority Engineer |
| DATE: | October 9, 2014 |
| SUBJECT: | Engineer’s Report |
Invoices
- Invoices with summaries are provided under separate cover.
Reservoir Road Pump Station Act 537 Plan
- The Act 537 Plan Update was submitted to PADEP on August 25, 2014. PADEP has reviewed the Plan Update, and they provided two comments which we are in the process of addressing: We expect to submit revised Plan Update pages to address a project scheduling comment by October 14.; The second comment sis that U.S. Fish & Wildlife Service (USFWS) approval is required. It is our understanding that Conestoga-Rovers & Associates resubmitted revised plans to USFWS around July 10 to address their bog turtle protection comments at the Chester Creek crossing. We are still awaiting USFWS’s formal approval, and we have contacted them again to request a written approval.
- Tentative Act 537 Planning schedule: Estimated Date Submission to PADEP August 25, 2014 Address PADEP Comments by October 31, 2014 PADEP Review and Approval (120 days) by December 23, 2014
Semi-Annual Sewer Status Report
- We analyzed permanent and portable meter data for the past six-month period. We met with the Township Manager and PW Director to discuss conclusions and recommendations. We also met with the meter service company and PW staff at several portable meter manhole locations to observe meter installations, manhole conditions, and calibrations. A semi-annual status memo was forwarded to the Township.
Page 1 of 2
P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-10-09.docx
EGMA 1401
Sewer Ordinance Updates
- We prepared proposed revisions to the Building Sewer and Grinder Pump sections of the Township’s Sewers Ordinance. We also prepared a new typical building sewer detail. We met with the Township Manager and PW Director to review the proposed revisions. A second set of ordinance revisions was made thereafter and was forwarded to the Township for review, along with an example grinder pump operations and maintenance agreement.
New Sewer Connections
- We received a revised grinder pump plan submission for a proposed house at 610 Reservoir Road that is scheduled for review.
Page 2 of 2
P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-10-09.docx
[Logo: Big Fish Environmental Services Inc.]
Monthly Operations Report: September 2014
Treatment Process Operation
During August 2014, there were no exceedances of the final effluent discharge limitations for outfall 001 and discharge from Outfall 002. The total phosphorus monthly average concentration of 0.25 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the August 2014 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.23 mg/L to 0.27 mg/L. A daily average of 99 gpd of aluminum sulfate solution was used as compared to the 92 gpd average for July.
Table 1
August 2014 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| August 5, 2014 | 0.180 | 5.4 | 8.1 | 4 | 6 | 0.253 | 0.38 | 0.15 | 0.23 | 1 | 0.0000 |
| August 12, 2014 | 0.175 | 3.4 | 5.0 | 3 | 4 | 0.170 | 0.25 | 0.18 | 0.26 | 530 | 2.7243 |
| August 19, 2014 | 0.217 | 2.0 | 3.6 | 2 | 4 | 0.161 | 0.29 | 0.15 | 0.27 | 1 | 0.0000 |
| August 26, 2014 | 0.169 | 2.0 | 2.8 | 2.0 | 3 | 0.293 | 0.41 | 0.17 | 0.24 | 1 | 0.0000 |
| Average | 0.185 | 3.2 | 4.9 | 3 | 4 | 0.219 | 0.33 | 0.16 | 0.25 | 5 | 0.6811 |
| Minimum | 0.169 | 2.0 | 2.8 | 2 | 3 | 0.161 | 0.25 | 0.15 | 0.23 | 1 | 0.0000 |
| Maximum | 0.217 | 5.4 | 8.1 | 4 | 6 | 0.293 | 0.41 | 0.18 | 0.27 | 530 | 2.7243 |
A total of 4,028,004 gallons, which represented a daily average of 134,267 gpd, of treated effluent was discharged to Applebrook, Outfall 002. Table 2 represents the final effluent water quality data used to prepare the DMR for outfall 002.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 7
[Logo: Big Fish Environmental Services Inc.]
Table 2
August 2014 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| August 5, 2014 | 0.1108 | 5.4 | 5.0 | 4 | 4 | 0.253 | 0.23 | 0.15 | 0.14 | 1 | 0.0000 |
| August 12, 2014 | 0.1202 | 3.4 | 3.4 | 3 | 3 | 0.170 | 0.17 | 0.18 | 0.18 | 530 | 2.7243 |
| August 19, 2014 | 0.1352 | 2.0 | 2.3 | 2 | 2 | 0.161 | 0.18 | 0.15 | 0.17 | 1 | 0.0000 |
| August 26, 2014 | 0.1102 | 2.0 | 1.8 | 2 | 2 | 0.293 | 0.27 | 0.17 | 0.16 | 1 | 0.0000 |
| Average | 0.1191 | 0.0 | 3.1 | 3 | 3 | 0.219 | 0.21 | 0.16 | 0.16 | 133 | 0.6811 |
| Minimum | 0.1102 | 2.0 | 1.8 | 2 | 2 | 0.161 | 0.17 | 0.15 | 0.14 | 1 | 0.0000 |
| Maximum | 0.1352 | 5.4 | 5.0 | 4 | 4 | 0.293 | 0.27 | 0.18 | 0.18 | 530 | 2.7243 |
Table 3 illustrates the influent wastewater pollutant loadings for August 2014. The influent loadings remained within the treatment facility design loadings. A discussion of the influent ammonia as nitrogen concentrations and loadings are provided in an attached memorandum as an appendix to this report.
Table 3
August 2014 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| August 5, 2014 | 0.323 | 175 | 471 | 268 | 721 | 26.3 | 71 | 37.8 | 102 | 4.1 | 11 |
| August 12, 2014 | 0.385 | 150 | 404 | 151 | 406 | 36.8 | 99 | 52.5 | 141 | 6.2 | 17 |
| August 19, 2014 | 0.394 | 347 | 934 | 317 | 853 | 33.2 | 89 | 53.1 | 143 | 6.6 | 18 |
| August 26, 2014 | 0.343 | 520 | 1,399 | 968 | 2,604 | 34.2 | 92 | 67.6 | 182 | 9.3 | 25 |
| Average | 0.361 | 298 | 802 | 426 | 1146 | 32.6 | 88 | 52.8 | 142 | 6.6 | 18 |
| Minimum | 0.323 | 150 | 404 | 151 | 406 | 26.3 | 71 | 37.8 | 102 | 4.1 | 11 |
| Maximum | 0.394 | 520 | 1399 | 968 | 2604 | 36.8 | 99 | 67.6 | 182 | 9.3 | 25 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 7
[Logo: Big Fish Environmental Services Inc.]
Table 4 presents the available Outfall 001 final effluent data for the month of September 2014. There are no anticipated exceedances of the permitted limitations for the month of September. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
Table 4
September 2014 - Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| September 2, 2014 | 0.173 | 2.0 | 2.9 | 2 | 3 | 0.157 | 0.23 | 0.18 | 0.26 | 1 | 0.0000 |
| September 8, 2014 | 0.230 | 2.4 | 4.6 | 6 | 11 | 0.191 | 0.37 | 0.53 | 1.02 | 1 | 0.0000 |
| September 16, 2014 | 0.134 | 2.0 | 2.2 | 2 | 2 | 0.194 | 0.22 | 0.39 | 0.44 | 1 | 0.0000 |
| September 23, 2014 | 0.138 | 0.00 | 0.24 | 0.28 | 1 | 0.0000 | |||||
| September 30, 2014 | 0.136 | 0.00 | 0.21 | 0.24 | |||||||
| Average | 0.162 | 2.1 | 3.2 | 3 | 6 | 0.181 | 0.16 | 0.31 | 0.45 | 1 | 0.0000 |
| Minimum | 0.134 | 2.0 | 2.2 | 2 | 2 | 0.157 | 0.00 | 0.18 | 0.24 | 1 | 0.0000 |
| Maximum | 0.230 | 2.4 | 4.6 | 6 | 11 | 0.194 | 0.37 | 0.53 | 1.02 | 1 | 0.0000 |
During September 2014, treated effluent was discharged to Applebrook continuously. The data is presented in Table 5.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 7
[Logo: Big Fish Environmental Services Inc.]
Table 5
September 2014 - Applebrook - Out Fall 002
| NPDES Permit Discharge Limitations | Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L | Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | mg/L | lbs/ month | Geo Mean | Geo Mean | |
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample Date | |||||||||||
| September 2, 2014 | 0.1270 | 2.0 | 2.1 | 2 | 2 | 0.157 | 0.17 | 0.18 | 0.19 | 1 | 0.0000 |
| September 8, 2014 | 0.1123 | 2.4 | 2.2 | 6 | 6 | 0.191 | 0.18 | 0.53 | 0.50 | 1 | 0.0000 |
| September 16, 2014 | 0.1232 | 2.0 | 2.1 | 2 | 2 | 0.194 | 0.20 | 0.39 | 0.40 | 1 | 0.0000 |
| September 23, 2014 | 0.1121 | 0.24 | 0.22 | 1 | 0.0000 | ||||||
| September 30, 2014 | 0.1269 | 0.21 | 0.22 | ||||||||
| Average | 0.1203 | 0.0 | 2.1 | 3 | 3 | 0.181 | 0.18 | 0.31 | 0.31 | 1 | 0.0000 |
| Minimum | 0.1121 | 2.0 | 2.1 | 2 | 2 | 0.157 | 0.17 | 0.18 | 0.19 | 1 | 0.0000 |
| Maximum | 0.1270 | 2.4 | 2.2 | 6 | 6 | 0.194 | 0.20 | 0.53 | 0.50 | 1 | 0.0000 |
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during September.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 7
Big Fish Environmental Services Inc.
Table 6
September 2014 - Influent Wastewater
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| September 2, 2014 | 0.316 | 328 | 863 | 358 | 942 | 38.0 | 100 | 49.5 | 130 | 8.1 | 21 |
| September 8, 2014 | 0.275 | 191 | 503 | 234 | 616 | 42.1 | 111 | 57.4 | 151 | 6.9 | 18 |
| September 16, 2014 | 0.285 | 312 | 821 | 266 | 700 | 29.3 | 77 | 49.1 | 129 | 6.5 | 17 |
| September 23, 2014 | 0.241 | ||||||||||
| September 30, 2014 | 0.293 | ||||||||||
| Average | 0.282 | 277 | 729 | 286 | 753 | 36.5 | 96 | 52.0 | 137 | 7.2 | 19 |
| Minimum | 0.241 | 191 | 503 | 234 | 616 | 29.3 | 77 | 49.1 | 129 | 6.5 | 17 |
| Maximum | 0.316 | 328 | 863 | 358 | 942 | 42.1 | 111 | 57.4 | 151 | 8.1 | 21 |
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during August and September.
Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations decreased slightly during September to as low as 40% coverage of the surface area. Increased sludge wasting rates were maintained to manage the MLSS concentrations and F:M ratio within the desired goals. Aeration time was remained at a minimum of 230 minutes to provide for a total of approximately 63% of aeration during the 360 minute treatment cycle. The extended aeration period assists to offset the oxygen demand after extended periods of idle time between treatment cycles.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 7
Big Fish Environmental Services Inc.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was slightly increased from a daily average of 92 gpd during July to 99 gpd during September to assist with total phosphorus removal. The aluminum sulfate dosages prior to filtration remained constant during August and September. The increase in alum addition, as well as the increased idle times, resulted in an increase in soda ash addition. During August, the soda ash addition average decreased slightly to approximately 435 lbs./day, as compared to 416 lbs./day during July. Soda ash assists towards maintaining pH concentrations above 7.0 standard units continued during the month.
SBR No. 2 remains out of service as a treatment unit, however, partially filled with MLSS which continuously mixed and aerated.
Flow data:
| Flow Meter Location | September 2014 | Daily Maximum Flow, gpd | |
|---|---|---|---|
| Total Volume for Month, MGD | Average Daily Flow, gpd | ||
| Influent Wastewater to Screening Building* | 10.390 | 346,328 | 513,980 |
| Influent Wastewater to SBRs | 11.582 | 386,057 | 536,864 |
| Internal Recycle | 1.192 | 39,729 | 136,566 |
| Treated Effluent to Disc Filters | 11.323 | 378,265 | 487,088 |
| Final Effluent Discharge | 4.220 | 162,308 | 334,000 |
| Applebrook Golf Course | 4.028 | 134,267 | 161,164 |
*The final effluent flow meter data represents 27 days of flow measurements. The flow meter was repaired on September 9, 2014
Chemical Usage:
| Chemical | September 2014 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 435 | 13,050 |
| Magnesium Hydroxide | 0 | 0 |
| Aluminum Sulfate solution | 99 | 2,972 |
| Polymer (centrifuge) | 0.84 | 15.96 |
*Nineteen (19) days of centrifuge operation
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 7
Big Fish Environmental Services Inc.
Solids Dewatering and Disposal: September 2014
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 330,129 |
| Average Dewatered Total Solids, % | Laboratory results are not available at this time |
| Wet Tons | 39.88 |
| Dry Tons | Laboratory results are not available at this time |
| Number of dumpsters | 5 |
*A total of five (5) dumpsters were filled and five (5) dumpsters were removed during September.
During August, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No. 1 was in service. The level at the beginning of the month was 8.19 feet and the level at the end of the month was 7.93 feet. The initial total solids concentration was 0.74% and ended the month as 0.67% total solids. The average pH concentration was 7.40 S.U. and total alkalinity of 285 mg/L. Zero gallons of supernatant were decanted during the month. A total of 100 pounds of soda ash were added during the month for pH adjustment.
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 11.57 feet and the level at the end was 5.77. The initial total solids concentration were 0.69% and ended the month as 0.68% total solids. The average pH concentration was 7.23 S.U. and total alkalinity of 355 mg/L. A total of 55,440 gallons of supernatant were decanted during the month. A total of 350 pounds of soda ash were added during the month for pH adjustment.
Significant Storm/Hydraulic Loading Events
There were no significant storm events during the month of August.
Minor Repairs and Preventative Maintenance
- ACS replaced a failed level transducer for the final effluent flow meter.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 7
2013 FLOWMETERS
2014 SEPTEMBER 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT GPD | NET FLOWS | DATE | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | |||||
| 0.00 | 09/01/14 | 09/01/14 | ||||||||||
| 0.15 | 09/02/14 | 1,796,358 | 1,682,500 | 6,247,741 | 163,855 | 3,762,060 | 111,950 | 2,361,859 | 106,910 | 24,000 | 1,299,785 | 09/02/14 |
| 0.00 | 09/03/14 | 1,797,289 | 931,000 | 6,255,547 | 78,060 | 3,768,051 | 59,910 | 2,370,364 | 85,050 | 24,000 | 707,980 | 09/03/14 |
| 0.00 | 09/04/14 | 1,798,191 | 902,000 | 6,263,165 | 76,180 | 3,774,054 | 60,030 | 2,377,995 | 76,310 | 24,000 | 689,480 | 09/04/14 |
| 0.00 | 09/05/14 | 1,799,080 | 889,000 | 6,270,387 | 72,220 | 3,780,080 | 60,260 | 2,385,234 | 72,390 | 24,000 | 684,130 | 09/05/14 |
| 0.07 | 09/06/14 | 684,130 | 09/06/14 | |||||||||
| 0.00 | 09/07/14 | 684,130 | 09/07/14 | |||||||||
| 0.00 | 09/08/14 | 684,130 | 09/08/14 | |||||||||
| 0.00 | 09/09/14 | 1,802,616 | 884,000 | 6,301,263 | 77,190 | 3,803,436 | 58,390 | 2,411,149 | 64,788 | 24,000 | 683,633 | 09/09/14 |
| 0.00 | 09/10/14 | 665,845 | 09/10/14 | |||||||||
| 0.00 | 09/11/14 | 1,804,371 | 877,500 | 6,316,131 | 74,340 | 3,815,001 | 57,825 | 2,427,047 | 79,490 | 24,000 | 668,633 | 09/11/14 |
| 0.00 | 09/12/14 | 1,805,251 | 880,000 | 6,323,485 | 73,540 | 3,820,882 | 58,810 | 2,434,620 | 75,730 | 24,000 | 671,920 | 09/12/14 |
| 0.30 | 09/13/14 | 671,920 | 09/13/14 | |||||||||
| 0.00 | 09/14/14 | 671,920 | 09/14/14 | |||||||||
| 0.00 | 09/15/14 | 1,807,862 | 870,333 | 6,346,772 | 77,623 | 3,838,587 | 59,017 | 2,450,987 | 54,557 | 24,000 | 679,137 | 09/15/14 |
| 0.05 | 09/16/14 | 1,808,741 | 879,000 | 6,354,494 | 77,220 | 3,844,170 | 55,830 | 2,456,747 | 57,600 | 24,000 | 688,350 | 09/16/14 |
| 0.00 | 09/17/14 | 1,809,610 | 869,000 | 6,361,709 | 72,150 | 3,849,967 | 57,970 | 2,462,266 | 55,190 | 24,000 | 683,690 | 09/17/14 |
| 0.00 | 09/18/14 | 683,690 | 09/18/14 | |||||||||
| 0.00 | 09/19/14 | 1,811,353 | 871,500 | 6,375,777 | 70,340 | 3,861,652 | 58,425 | 2,472,987 | 53,605 | 24,000 | 689,130 | 09/19/14 |
| 0.00 | 09/20/14 | 689,130 | 09/20/14 | |||||||||
| 0.10 | 09/21/14 | 689,130 | 09/21/14 | |||||||||
| 0.00 | 09/22/14 | 689,130 | 09/22/14 | |||||||||
| 0.00 | 09/23/14 | 689,130 | 09/23/14 | |||||||||
| 0.15 | 09/24/14 | 689,130 | 09/24/14 | |||||||||
| 0.50 | 09/25/14 | 689,130 | 09/25/14 | |||||||||
| 0.00 | 09/26/14 | 689,130 | 09/26/14 | |||||||||
| 0.00 | 09/27/14 | 689,130 | 09/27/14 | |||||||||
| 0.00 | 09/28/14 | 689,130 | 09/28/14 | |||||||||
| 0.00 | 09/29/14 | 689,130 | 09/29/14 | |||||||||
| 0.00 | 09/30/14 | 1,820,649 | 845,091 | 6,457,263 | 74,078 | 3,925,057 | 57,641 | 2,533,807 | 55,291 | 24,000 | 658,081 | 09/30/14 |
| Day Avg | 948,410 | 82,233 | 63,005 | 69,743 | 24,000 | 1,194,300 | ||||||
| 1.32 | Day Tot | 12,329,335 | 1,069,030 | 819,062 | 906,653 | 312,000 | ||||||
| Day Count | 13 | 13 | 13 | 13 | 13 | |||||||
| MONTH TO DATE | 1.32 |
|---|---|
| NORMAL MONTH TO DATE | |
| YEAR TO DATE | 40.00 |
| NORMAL YEAR TO DATE |
EG TWP
f/data/users/joanna/2003 flowmeters
10/1/2014 11:14 AM
2013 FLOWMETERS
2014 SEPTEMBER 3RD QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | BARKWAY | |||||
|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD |
| 19,582,870 | 1,074,300 | 1,965,459 | 108,550 | 14,687,868 | 385,870 | 55,440,477 | 1,106,065 | 3,335,170 | 18,925 |
| 19,638,862 | 559,920 | 1,966,000 | 54,100 | 14,715,693 | 278,250 | 55,505,109 | 646,320 | 3,336,168 | 9,980 |
| 19,693,590 | 547,280 | 1,966,518 | 51,800 | 14,742,848 | 271,550 | 55,567,900 | 627,910 | 3,337,097 | 9,290 |
| 19,747,108 | 535,180 | 1,967,044 | 52,600 | 14,769,748 | 269,000 | 55,629,336 | 614,360 | 3,337,984 | 8,870 |
| 19,963,666 | 541,395 | 1,969,195 | 53,775 | 14,868,310 | 246,405 | 55,869,065 | 599,323 | 3,342,182 | 10,495 |
| 20,069,022 | 526,780 | 1,970,222 | 51,350 | 14,920,499 | 260,945 | 55,989,901 | 604,180 | 3,344,142 | 9,800 |
| 20,121,850 | 528,280 | 1,970,755 | 53,300 | 14,946,724 | 262,250 | 56,049,964 | 600,630 | 3,345,111 | 9,690 |
| 20,283,782 | 539,773 | 1,972,407 | 55,067 | 15,012,750 | 220,087 | 56,216,980 | 556,720 | 3,348,421 | 11,033 |
| 20,333,424 | 496,420 | 1,972,932 | 52,500 | 15,037,656 | 249,060 | 56,276,145 | 591,650 | 3,349,467 | 10,460 |
| 20,383,196 | 497,720 | 1,973,471 | 53,900 | 15,062,047 | 243,910 | 56,333,809 | 576,640 | 3,350,500 | 10,330 |
| 20,483,280 | 500,420 | 1,974,554 | 54,150 | 15,111,886 | 249,195 | 56,448,823 | 575,070 | 3,352,504 | 10,020 |
| 21,056,196 | 520,833 | 1,980,597 | 54,936 | 15,362,385 | 227,726 | 57,052,065 | 548,402 | 3,363,477 | 9,975 |
| 528,956 | 53,424 | 183,533 | 443,679 | 17,998 | |||||
| 7,397,257 | 749,452 | 3,347,781 | 8,090,949 | 146,866 | |||||
| 13 | 13 | 13 | 13 | 13 | |||||
f:/data/users/joanna/
2003 flowmeters
10/1/201411:14 AM
2014 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,120,955 | 112,631 | 63,436 | 80,890 | 24,000 | 255,116 | 795,376 | |||
| FEBRUARY | 1,249,173 | 138,449 | 68,472 | 88,803 | 24,000 | 287,831 | 881,433 | |||
| MARCH | 1,182,533 | 126,933 | 67,479 | 84,197 | 24,000 | 860,074 | 75,186 | 291,520 | 827,109 | 28,696 |
| APRIL | 1,242,798 | 143,329 | 76,736 | 88,674 | 24,000 | 1,029,229 | 79,139 | 300,256 | 806,253 | 12,331 |
| MAY | 1,542,161 | 175,112 | 95,766 | 94,501 | 24,000 | 1,337,536 | 117,391 | 357,808 | 937,139 | 20,786 |
| JUNE | 1,117,632 | 118,019 | 66,596 | 96,366 | 24,000 | 718,059 | 68,339 | 287,327 | 744,579 | 11,081 |
| JULY | 965,691 | 100,935 | 55,946 | 86,968 | 24,000 | 613,087 | 57,604 | 261,340 | 676,846 | 9,610 |
| AUGUST | 901,782 | 84,377 | 54,933 | 67,878 | 24,000 | 546,913 | 54,394 | 242,828 | 616,910 | 9,213 |
| SEPTEMBER | 948,410 | 82,233 | 63,005 | 69,743 | 24,000 | 528,956 | 53,424 | 183,533 | 443,679 | 17,998 |
| OCTOBER | ||||||||||
| NOVEMBER | ||||||||||
| DECEMBER | ||||||||||
| Total Flows | ||||||||||
| Monthly Ave | 1,141,237 | 120,224 | 68,041 | 84,224 | 24,000 | 804,836 | 72,211 | 274,173 | 747,703 | 15,674 |
To West Goshen: 868,748
2014 flowmeters -all-stations separate month worksheets.xlsxSUMMARY
September Precip. 1.32 - 2014
[Bar chart showing daily precipitation in September 2014 across days 1 to 32, with bars on day 3 (0.15), day 7 (0.07), day 14 (0.3), day 17 (0.05), day 22 (0.1), day 25 (0.15), and day 26 (0.5).]
Y-axis label: Precip. (values: 0, 0.05, 0.1, 0.15, 0.2, 0.25, 0.3, 0.35, 0.4, 0.45, 0.5)
X-axis label: snow/rain (values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32)
Legend: September
2013 Monthly Precipitation
[3D bar chart rotated sideways showing 2013 Monthly Precipitation for January through December on the horizontal axis and precipitation values from 0 to 8 on the vertical axis, with legend entry Series1.]
Vertical Axis Labels: 0, 1, 2, 3, 4, 5, 6, 7, 8
Horizontal Axis Labels: January, February, March, April, May, June, July, August, September, October, November, December
Legend: Series1
Flowmeters September 2014
[Line chart rotated sideways showing Flowmeters September 2014 with Day of the Month from 1 to 30 on the horizontal axis and Flow's from 0 to 1400000 on the vertical axis, with legend entry September.]
Vertical Axis Label: Flow's (0, 200000, 400000, 600000, 800000, 1000000, 1200000, 1400000)
Horizontal Axis Label: Day of the Month (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30)
Legend: September
Monthly Totals 2012 Jan-Dec
[Bar chart rotated sideways showing Monthly Totals 2012 Jan-Dec with Month from January to December on the horizontal axis and Flowmeters from 0 to 2500000 on the vertical axis.]
Vertical Axis Label: Flowmeters (0, 500000, 1000000, 1500000, 2000000, 2500000)
Horizontal Axis Label: Month (January, February, March, April, May, June, July, August, September, October, November, December)
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
September 8, 14
The East Goshen Township Municipal Authority held their regular public meeting on Monday, September 8, 2014 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Kevin Cummings, Dana Pizarro, and Fran Beck. Also in attendance were: Rick Smith (Township Manager), Patrick McKenna (Attorney), and Mike Ellis (Pennoni).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services | MA- Municipal Authority |
|---|---|
| BOS – Board of Supervisors | NPDES – National Pollutant Discharge Elimination System |
| CB – Conservancy Board | PC – Planning Commission |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
Call to Order & Pledge of Allegiance
Jack Yahraes called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.
Sewer Reports
Director of Public Works Mark Miller made his report for August 2014. Mark said that they have been doing a lot of televising and have found some crushed pipe on Forest Lane as well as on the south side. Kevin asked what is crushing the pipe. Mark stated that this pipe was not installed properly.
Chairman’s Report/Other Members’ Reports
Jack recommended that the members should read an article in the Authority Magazine regarding I&I. He noted that the author makes some recommendations regarding laterals.
Dana summarized his attendance at the PMAA convention. He noted that authority can charge a fee for stormwater management.
Pennoni Engineer’s Report
Mike Ellis gave the following report: Mike reported that the Reservoir Road Act 537 Plan had been submitted and hopes to hear from DEP in the next few weeks. Mike also noted that the contractor for the Reserve Pump Station Project as attempted to restore the pump station driveway. Rick stated that some of the Homeowner Association still has some concerns about the driveway and that the Township will complete the work.
3. Big Fish Environmental Services
Scott Towler noted that although some of the lab test had to be rerun the plant was in compliance for the month of July and August 2014.
Scott also noted that there has been a lot of dewatering in July and August and they are in the process of draining SBR-2. He also said that they have plans in place to drop and clean all of the tanks in the future.
Scott also assured all that Mark Miller is taking care of the issues that we have with a Flo-meter and transducer and that are not impeding the flows and all the PMs were fine.
Scott also addressed Dana’s concerns about influent ammonia concentration. Scott explained how it works and after reviewing the previous data assured him all is fine.
Jack had concerns about the charges and mix-ups by the lab. Scott said that safety measures are in place.
Scott’s report is attached.
Approval of Minutes
Kevin moved to accept the minutes of August 2014 as corrected. Fran seconded the motion. The motion passed unanimously.
Dana moved to approve payment of the following Pennoni invoices:
| a. | Pennoni #603380 | $ 111.25 |
|---|---|---|
| b. | Pennoni #603381 | $ 781.25 |
| c. | Pennoni #603382 | $ 556.00 |
Fran seconded the motion. The motion passed unanimously.
Financial Reports
Jack suggested that the Board approve the budget at next month’s meeting. Rick mentioned that we are still waiting for a proposal from the engineer.
Goals
Rick noted that someone needs to provide an article for the newsletter. The members agreed that Ed McAssey would write the article.
Adjourment
There being no further business, Fran moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:29 pm.
Respectfully yours,
Barbara L. Phillips
Recording Secretary
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 607606 |
|---|---|
| Invoice Date : | 09/23/2014 |
| Project : | EGMA1306 |
| Project Name : | Reserve PS Diversion Construction |
For Services Rendered through: 9/14/2014
Reviewed revised as-built plan and coordinated approach to resolve ongoing inadequate restoration work with Township staff.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 141.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 141.25 |
Amount Due This Invoice: $141.25
| Fee : | 20,000.00 |
|---|---|
| Prior Billings : | 15,954.50 |
| Current Billings : | 141.25 |
| Total Billings : | 16,095.75 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 1.25 | 113.00 | 141.25 |
| Labor Total: | 1.25 | 141.25 |
| Total Phase : **** -- Professional Services | Labor : | $141.25 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1306 -- Reserve PS Diversion Construction | Labor : | $141.25 |
| Expense : | $0.00 |
ok rcs 10/10/14
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1306 Invoice Summary
Invoice Date 09/23/2014
| Project: | EGMA1306 |
|---|---|
| Pennoni Job No.: | Reserve PS Diversion Construction P |
| Invoice No: | 607606 |
| Invoice Period: | 8/11/2014 to 9/14/2014 |
| Date: | 9/23/2014 |
| Initial Authorization: | $ 20,000.00 |
| Contract Amount: | $ 20,000.00 |
| Previously Invoiced: | $ 15,954.50 |
| Current Invoice: | $ 141.25 |
| Invoiced to Date ($): | $ 16,095.75 |
| Invoiced to Date (%): | 80% |
| Remaining Budget ($): | $ 3,904.25 |
| Remaining Budget (%): | 20% |
Budget by Phase:
| Phase Name: | Reserve PS Diversion Construction Phase |
|---|---|
| Phase Budget: | $ 20,000.00 |
| Previously Invoiced: | $ 15,954.50 |
| Current Invoice: | $ 141.25 |
| Invoiced to Date ($): | $ 16,095.75 |
| Invoiced to Date (%): | 80% |
| Remaining Budget ($): | $ 3,904.25 |
| Remaining Budget (%): | 20% |
Comments: Reviewed revised as-built plan and coordinated approach to resolve ongoing inadequate restoration work with Township staff.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 607607 |
|---|---|
| Invoice Date : | 09/23/2014 |
| Project : | EGMA1307 |
| Project Name : | Reservoir Rd PS Act 537 Planning |
For Services Rendered through: 9/14/2014
Finalized, assembled, and issued Act 537 Plan submission to PADEP; and followed-up with PADEP for status update on review.
Phase : 03 -- Act 537 Plan Update
| Total Phase : 03 -- Act 537 Plan Update | Labor : | 441.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 441.25 |
Amount Due This Invoice: $441.25
Phase : 03 -- Act 537 Plan Update
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 2.50 | 110.00 | 275.00 |
| Project Engineer | 1.75 | 95.00 | 166.25 |
| Labor Total: | 4.25 | 441.25 |
| Total Phase : 03 -- Act 537 Plan Update | Labor : | $441.25 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning | Labor : | $441.25 |
| Expense : | $0.00 |
ok rcs 10/10/14
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 09/23/2014
| Project: | EGMA1307 |
|---|---|
| Pennoni Job No.: | Reservoir Rd PS Act 537 Planning |
| Invoice No: | 607607 |
| Invoice Period: | 8/11/2014 to 9/14/2014 |
| Date: | 9/23/2014 |
| Initial Authorization: | $ 77,400.00 |
| Contract Amount: | $ 87,900.00 |
| Previously Invoiced: | $ 72,275.50 |
| Current Invoice: | $ 441.25 |
| Invoiced to Date ($): | $ 72,716.75 |
| Invoiced to Date (%): | 83% |
| Remaining Budget ($): | $ 15,183.25 |
| Remaining Budget (%): | 17% |
Budget by Phase:
| Phase Name: | Reservoir Rd PS Act 537 Planning |
|---|---|
| Phase Budget: | $ 87,900.00 |
| Previously Invoiced: | $ 72,275.50 |
| Current Invoice: | $ 441.25 |
| Invoiced to Date ($): | $ 72,716.75 |
| Invoiced to Date (%): | 83% |
| Remaining Budget ($): | $ 15,183.25 |
| Remaining Budget (%): | 17% |
Comments: Finalized, assembled, and issued Act 537 Plan submission to PADEP; and followed-up with PADEP for status update on review.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 607608 |
|---|---|
| Invoice Date : | 09/23/2014 |
| Project : | EGMA1401 |
| Project Name : | 2014 General Services |
For Services Rendered through: 9/14/2014
Prepared for and attended August and September Municipal Authority meetings, prepared September Engineer's Report, and provided engineering project fee estimates to Twp Manager for 2015 budgeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 649.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 649.75 |
Amount Due This Invoice: $649.75
| Fee : | 10,300.00 |
|---|---|
| Prior Billings : | 7,798.50 |
| Current Billings : | 649.75 |
| Total Billings : | 8,448.25 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.75 | 113.00 | 649.75 |
| Labor Total: | 5.75 | 649.75 |
| Total Phase : **** -- Professional Services | Labor : | $649.75 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1401 -- 2014 General Services | Labor : | $649.75 |
| Expense : | $0.00 |
ok rcs 10/10/14
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 09/23/2014
| Project: | EGMA1401 |
|---|---|
| Pennoni Job No.: | 2014 General Services |
| Invoice No: | 607608 |
| Invoice Period: | 8/11/2014 to 9/14/2014 |
| Date: | 9/23/2014 |
| Initial Authorization: | $ 10,300.00 |
| Contract Amount: | $ 10,300.00 |
| Previously Invoiced: | $ 7,798.50 |
| Current Invoice: | $ 649.75 |
| Invoiced to Date ($): | $ 8,448.25 |
| Invoiced to Date (%): | 82% |
| Remaining Budget ($): | $ 1,851.75 |
| Remaining Budget (%): | 18% |
Budget by Phase:
| Phase Name: | 2014 General Services |
|---|---|
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 7,798.50 |
| Current Invoice: | $ 649.75 |
| Invoiced to Date ($): | $ 8,448.25 |
| Invoiced to Date (%): | 82% |
| Remaining Budget ($): | $ 1,851.75 |
| Remaining Budget (%): | 18% |
Comments: Prepared for and attended August and September Municipal Authority meetings, prepared September Engineer's Report, and provided engineering project fee estimates to Twp Manager for 2015 budgeting.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
| Invoice # : | 607609 |
|---|---|
| Invoice Date : | 09/23/2014 |
| Project : | EGMA1402 |
| Project Name : | 2014 Semi-Annual I&I Reports |
For Services Rendered through: 9/14/2014
Initiated analysis of portable sewer meter data.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 75.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 75.00 |
Amount Due This Invoice: $75.00
| Fee : | 10,300.00 |
|---|---|
| Prior Billings : | 5,828.50 |
| Current Billings : | 75.00 |
| Total Billings : | 5,903.50 |
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Graduate Engineer | 1.00 | 75.00 | 75.00 |
| Labor Total: | 1.00 | 75.00 |
| Total Phase : **** -- Professional Services | Labor : | $75.00 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1402 -- 2014 Semi-Annual I&I Reports | Labor : | $75.00 |
| Expense : | $0.00 |
ok rcs 10/10/14
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 09/23/2014
| Project: | EGMA1402 |
|---|---|
| Pennoni Job No.: | 2014 Semi-Annual I&I Reports |
| Invoice No: | 591752 |
| Invoice Period: | 7/14/2014 to 9/14/2014 |
| Date: | 9/23/2014 |
| Initial Authorization: | $ 10,300.00 |
| Contract Amount: | $ 10,300.00 |
| Previously Invoiced: | $ 5,828.50 |
| Current Invoice: | $ 75.00 |
| Invoiced to Date ($): | $ 5,903.50 |
| Invoiced to Date (%): | 57% |
| Remaining Budget ($): | $ 4,396.50 |
| Remaining Budget (%): | 43% |
Budget by Phase:
| Phase Name: | 2014 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 5,828.50 |
| Current Invoice: | $ 75.00 |
| Invoiced to Date ($): | $ 5,903.50 |
| Invoiced to Date (%): | 57% |
| Remaining Budget ($): | $ 4,396.50 |
| Remaining Budget (%): | 43% |
Comments: Initiated analysis of portable sewer meter data.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100 | (p) 610-696-8225
West Chester, PA 19381-0562 | (f) 610-344-0922
gglaw@gawthrop.com | www.gawthrop.com
Page: 1
08/31/2014
Client No: 6604-001M
Invoice No. 123359
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
General Authority Services
Fees
| Date | Timekeeper | Description | Hours | Amount |
|---|---|---|---|---|
| 08/11/2014 | RFA | Review packet for meeting of 8/11/14; attend regular meeting of Municipal Authority. | 2.00 | |
| For Current Services Rendered | 2.00 | 400.00 | ||
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 2.00 | $200.00 | $400.00 |
| Previous Balance | $80.00 |
|---|---|
| Total Current Charges | 400.00 |
| 08/14/2014 Payment | -80.00 |
| Balance Due | $400.00 |
9/15 OK TO PAY RS
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA September Financial Reports
Date: October 8, 2014
The Municipal Authority recorded $21,730 in revenues (mostly from Tapping Fees from Goshen Meadow) and $10,306 in expenses in September (mostly from the quarterly administrative chargeback for $8,043), a difference of +$11,424. The fund balance is now $1,607,921.
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
September 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,596,496.86 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 2,000.00 | 128.30 | 1,185.18 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 2,000.00 | 128.30 | 1,185.18 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 2,000.00 | 128.30 | 1,185.18 | |
U:\bm...\2014\Municipal Authority\2014 - 09 - Municipal Authority Report.xlsx Page 1 of 3 10/06/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
September 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 27.00 | 1.53 | 10.74 |
| C.C. TAPPING FEES | 07364 1100 | 124,000.00 | 21,600.00 | 88,600.00 |
| R.C.TAPPING FEES | 07364 1110 | 21,444.00 | 0.00 | 10,288.80 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 1,127.52 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 0.00 | 564.48 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 0.00 | 0.00 | 21,000.00 |
| TOTAL REVENUE | 145,471.00 | 21,601.53 | 121,591.54 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 32,768.00 | 8,043.02 | 24,129.06 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 4,000.00 | 0.00 | 1,450.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,800.00 | 0.00 | 10,800.00 |
| ENGINEERING SERVICES | 07424 3130 | 35,525.00 | 556.00 | 27,537.00 |
| LEGAL SERVICES | 07424 3140 | 7,000.00 | 400.00 | 6,240.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 22,120.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 5,115.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 117,328.00 | 8,999.02 | 70,156.06 | |
| OPERATING NET RESULT | 28,143.00 | 12,602.51 | 51,435.48 | |
U:\bm...\2014\Municipal Authority\2014 - 09 - Municipal Authority Report.xlsx Page 2 of 3 10/06/14
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
September 2014
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 111.25 | 5,372.41 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 75,000.00 | 1,195.25 | 37,597.50 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 75,000.00 | 1,306.50 | 42,969.91 | |
| CAPITAL NET RESULT | (75,000.00) | (1,306.50) | (42,969.91) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,607,921.17 | |||
U:\bm...\2014\Municipal Authority\2014 - 09 - Municipal Authority Report.xlsx Page 3 of 3 10/06/14
East Goshen Township General Ledger
Report Date 10/06/14 | GL Transaction Details | PAGE 1
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 INTEREST EARNINGS | 0.00 | |||||||||
| 1401 | JE | 41027 | 0.58 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 FUND | ||||
| 0.00 | 0.58 | -0.58 | ||||||||
| 1402 | 41391 | 1.33 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07100.1000 | |||||
| 0.00 | 1.33 | -1.91 | ||||||||
| 1403 | 41840 | 1.71 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 FUND | |||||
| 0.00 | 1.71 | -3.62 | ||||||||
| 1404 | 42321 | 1.21 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 07100.1000 | |||||
| 0.00 | 1.21 | -4.83 | ||||||||
| 1405 | 42739 | 0.90 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07100.1000 | |||||
| 0.00 | 0.90 | -5.73 | ||||||||
| 1406 | 43211 | 0.75 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07100.1000 | |||||
| 0.00 | 0.75 | -6.48 | ||||||||
| 1407 | 43716 | 1.11 | 08/04/14 | INTEREST | INTEREST EARNED JULY 2014 07 FUND | |||||
| 0.00 | 1.11 | -7.59 | ||||||||
| 1408 | 44102 | 1.62 | 09/03/14 | INTEREST | INTEREST EARNED AUGUST 2014 07100.1000 | |||||
| 0.00 | 1.62 | -9.21 | ||||||||
| 1409 | 44521 | 1.53 | 10/01/14 | INTEREST | INTEREST EARNED SEPTEMBER 2014 07100.1000 | |||||
| 0.00 | 1.53 | -10.74 | ||||||||
| 0.00 | 10.74 | -10.74 | ||||||||
| 07341-1020 INTEREST EARNED - RCSTP EXPANSION | 0.00 | |||||||||
| 1401 | 41028 | 137.33 | 02/04/14 | INTEREST | INTEREST EARNED JANUARY 2014 07 CONSTRUCTION FUND | |||||
| 0.00 | 137.33 | -137.33 | ||||||||
| 1402 | 41392 | 123.56 | 03/04/14 | INTEREST | INTEREST EARNED FEBRUARY 2014 07 CONSTRUCTION FUND | |||||
| 0.00 | 123.56 | -260.89 |
East Goshen Township General Ledger
Report Date 10/06/14 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1020 | 1403 | JE | 41841 | 136.07 | 04/01/14 | INTEREST | INTEREST EARNED MARCH 2014 07 CONSTRUCTION FUND |
|||
| 0.00 | 136.07 | -396.96 | ||||||||
| 1404 | 42322 | 131.45 | 05/02/14 | INTEREST | INTEREST EARNED APRIL 2014 CONSTRUCT.FUNDS |
|||||
| 0.00 | 131.45 | -528.41 | ||||||||
| 1405 | 42740 | 134.59 | 06/02/14 | INTEREST | INTEREST EARNED MAY 2014 07 FUND - CONSTRUCTION |
|||||
| 0.00 | 134.59 | -663.00 | ||||||||
| 1406 | 43212 | 129.00 | 07/01/14 | INTEREST | INTEREST EARNED JUNE 2014 07 CONSTRUCTION FUNDS |
|||||
| 0.00 | 129.00 | -792.00 | ||||||||
| 1407 | 43718 | 132.61 | 08/04/14 | INTEREST | INTEREST EARNED JULY 2014 07 CONTRUC.FUND |
|||||
| 0.00 | 132.61 | -924.61 | ||||||||
| 1408 | 44103 | 132.27 | 09/03/14 | INTEREST | INTEREST EARNED AUGUST 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 132.27 | -1,056.88 | ||||||||
| 1409 | 44522 | 128.30 | 10/01/14 | INTEREST | INTEREST EARNED SEPTEMBER 2014 07 CONSTRUCTION FUND |
|||||
| 0.00 | 128.30 | -1,185.18 | ||||||||
| 0.00 | 1,185.18 | -1,185.18 | ||||||||
| 07364-1100 C.C. TAPPING FEES | 0.00 | |||||||||
| 1401 | CR | 40976 | 12,600.00 | 01/31/14 | 3034 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 0.00 | 12,600.00 | -12,600.00 | ||||||||
| 1402 | 41258 | 5,400.00 | 02/24/14 | 3553 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | ||||
| RE | 41263 | 2,000.00 | 02/24/14 | 41263 | 1 | TAP IN FEE - 211 ELLIS LANE | ||||
| 0.00 | 7,400.00 | -20,000.00 | ||||||||
| 1405 | 42661 | 2,000.00 | 05/29/14 | 42661 | 1 | TAP IN FEE FOR 195 WYLLPEN PL | ||||
| 0.00 | 2,000.00 | -22,000.00 | ||||||||
| 1407 | CR | 43276 | 21,600.00 | 07/03/14 | 21 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 43434 | 21,600.00 | 07/21/14 | 26 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||||
| RE | 43312 | 1,800.00 | 07/08/14 | 43312 | 1 | TAP IN FEE FOR 1637 MANLEY RD | ||||
| 0.00 | 45,000.00 | -67,000.00 | ||||||||
| 1409 | CR | 44456 | 21,600.00 | 09/26/14 | 46 | 8069 | 1 GOSHEN MEADOWS INVESTORS L.P. | |||
| 0.00 | 21,600.00 | -88,600.00 | ||||||||
East Goshen Township General Ledger
Report Date 10/06/14 GL Transaction Details PAGE 3
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 88,600.00 | -88,600.00 | ||||||||
| 07364-1110 R.C.TAPPING FEES | 0.00 | |||||||||
| 1402 | RE | 41280 | 2,000.00 | 02/25/14 | 41280 | 1 | TAP IN FEE-903 SORELL HILL LT2 | |||
| 0.00 | 2,000.00 | -2,000.00 | ||||||||
| 1403 | 41553 | 2,000.00 | 03/13/14 | 41553 | 1 | TAP IN FEE FOR 909 SORRELL LT4 | ||||
| 41608 | 2,000.00 | 03/17/14 | 41608 | 1 | TAP IN FEE-905 SORRELL LOT 3 | |||||
| 0.00 | 4,000.00 | -6,000.00 | ||||||||
| 1405 | CR | 42355 | 4,288.80 | 05/06/14 | 130 | 6499 | 1 BOWER, JUDITH | |||
| 0.00 | 4,288.80 | -10,288.80 | ||||||||
| 0.00 | 10,288.80 | -10,288.80 | ||||||||
| 07364-1130 CONNECTION FEES - SEWER | 0.00 | |||||||||
| 1402 | 41044 | 423.00 | 02/04/14 | 350 | 8035 | 1 JACOBS, ROBERT & CHERYL | ||||
| 41124 | 423.00 | 02/14/14 | 774 | 8033 | 1 GEORGE SMITH & CHRISTINA CONLE | |||||
| JE | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 282.24 | 846.00 | -563.76 | ||||||||
| 1403 | CR | 41402 | 423.00 | 03/04/14 | 2307 | 8034 | 1 STOFFLET, MICHAEL | |||
| JE | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -845.64 | ||||||||
| 1405 | CR | 42378 | 423.00 | 05/07/14 | 1021 | 8036 | 1 PAPPANO, JOSEPH & PATRICIA | |||
| JE | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -1,127.52 | ||||||||
| 564.48 | 1,692.00 | -1,127.52 | ||||||||
| 07380-1000 MISCELLANEOUS REVENUE | 0.00 | |||||||||
| 1402 | 41045 | 141.12 | 02/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 41125 | 141.12 | 02/14/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 0.00 | 282.24 | -282.24 | ||||||||
| 1403 | 41407 | 141.12 | 03/04/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -423.36 | ||||||||
| 1405 | 42380 | 141.12 | 05/07/14 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 0.00 | 141.12 | -564.48 | ||||||||
| 0.00 | 564.48 | -564.48 | ||||||||
East Goshen Township General Ledger
Report Date 10/06/14 GL Transaction Details PAGE 4
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07392-0500 TRANSFER FROM SEWER OPERATING | 0.00 | |||||||||
| 1401 | 40674 | 1,000.00 | 01/08/14 | DEPOSIT | DEPOSIT $ INTO MA GENERAL FROM 05 FUND | |||||
| 40747 | 20,000.00 | 01/14/14 | XFER | XFER $ FROM SEWER TO MA TO COVER EXPENSES | ||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 0.00 | 21,000.00 | -21,000.00 | ||||||||
| 07424-1400 ADMINISTRATIVE WAGES | 0.00 | |||||||||
| 1403 | CD | 41815 | 8,043.02 | 03/31/14 | 2237 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 1ST QTR.2014 MUN.AUTH. REIMBURSM |
|||
| 8,043.02 | 0.00 | 8,043.02 | ||||||||
| 1406 | 43192 | 8,043.02 | 06/30/14 | 2243 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2014 MUN. AUTH.REIMBURSM |
||||
| 8,043.02 | 0.00 | 16,086.04 | ||||||||
| 1409 | 44443 | 8,043.02 | 09/26/14 | 2252 | 425 | EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR.2014 MUN.AUTH. REIMBURSM |
||||
| 8,043.02 | 0.00 | 24,129.06 | ||||||||
| 24,129.06 | 0.00 | 24,129.06 | ||||||||
| 07424-3000 MISCELLANEOUS EXPENSE | 0.00 | |||||||||
| 1401 | 40597 | 500.00 | 01/06/14 | 2228 | 2737 | DEP - COMMONWEALTH OF PA NPDES PERMITS - CHAPTER 92A 2014 |
||||
| 950.00 | 01/06/14 | 2229 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2014 ACTIVE MEMBERSHIP DUES |
||||||
| *** | 1,450.00 | 0.00 | *** | |||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 07424-3110 MUNIC.AUTH.-AUDITING | 0.00 | |||||||||
| 1407 | 43405 | 10,800.00 | 07/16/14 | 2246 | 808 | MAILLIE FALCONIERO & CO. 2013 FINANCIAL STMTS. EXAMINATIO |
||||
| 10,800.00 | 0.00 | 10,800.00 | ||||||||
| 10,800.00 | 0.00 | 10,800.00 | ||||||||
| 07424-3130 ENGINEERING SERVICES | 0.00 | |||||||||
East Goshen Township General Ledger
Report Date 10/06/14 GL Transaction Details PAGE 5
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 1401 | CD | 40653 | -663.75 | 01/06/14 | 2224 | 1052 | PENNONI ASSOCIATES INC. VOID CK. DUE TO PRINTER PROBLEM |
|||
| 40743 | 663.75 | 01/14/14 | 2230 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 GENERAL S |
|||||
| JE | 40746 | 1,845.00 | 01/14/14 | REFUND | PENNONI REFUND DUE TO DUPLICATE PAYMENT | |||||
| 0.00 | 1,845.00 | -1,845.00 | ||||||||
| 1402 | CD | 41103 | 2,236.50 | 02/11/14 | 2233 | 1052 | PENNONI ASSOCIATES INC. SERVICES THROUGH 1/12/14 GEN.SER |
|||
| 2,236.50 | 0.00 | 391.50 | ||||||||
| 1403 | 41540 | 6,887.25 | 03/12/14 | 2236 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 2/9/14 2013 CHAP. |
||||
| 6,887.25 | 0.00 | 7,278.75 | ||||||||
| 1404 | 42153 | 8,808.25 | 04/23/14 | 2239 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 CHAP.94 RE |
||||
| 8,808.25 | 0.00 | 16,087.00 | ||||||||
| 1405 | 42462 | 6,198.50 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 4/13/14 2013 CHAP. |
||||
| 6,198.50 | 0.00 | 22,285.50 | ||||||||
| 1406 | 42952 | 3,004.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 2014 SEMI-ANN |
||||
| 3,004.75 | 0.00 | 25,290.25 | ||||||||
| 1407 | 43405 | 1,521.25 | 07/16/14 | 2247 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 GEN.SERVIC |
||||
| 1,521.25 | 0.00 | 26,811.50 | ||||||||
| 1408 | 43811 | 169.50 | 08/12/14 | 2249 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 2014 SEMI-ANN I&I |
||||
| 169.50 | 0.00 | 26,981.00 | ||||||||
| 1409 | 44268 | 556.00 | 09/16/14 | 2250 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 8/10/14 2014 GEN.S |
||||
| 556.00 | 0.00 | 27,537.00 | ||||||||
| 29,382.00 | 1,845.00 | 27,537.00 | ||||||||
| 07424-3140 LEGAL SERVICES | 0.00 | |||||||||
| 1402 | 41310 | 800.00 | 02/27/14 | 2234 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES - NOV.2013 GEN.AU |
||||
| 800.00 | 0.00 | 800.00 | ||||||||
East Goshen Township General Ledger
Report Date 10/06/14 | GL Transaction Details | PAGE 6
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3140 | 1403 | CD | 41540 | 700.00 | 03/12/14 | 2235 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - FEB.2014 GEN.AUT | ||
| 700.00 | 0.00 | 1,500.00 | ||||||||
| 1404 | 42074 | 960.00 | 04/16/14 | 2238 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - MARCH 2014 GEN.A | ||||
| 960.00 | 0.00 | 2,460.00 | ||||||||
| 1405 | 42462 | 1,300.00 | 05/14/14 | 2240 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE APRIL 2014 GEN.AUT | ||||
| 1,300.00 | 0.00 | 3,760.00 | ||||||||
| 1407 | 43291 | 520.00 | 07/07/14 | 2244 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE MAY 2014 - GEN.AUT | ||||
| 43405 | 1,480.00 | 07/16/14 | 2245 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE JUNE 2014 - GEN.AU | |||||
| 2,000.00 | 0.00 | 5,760.00 | ||||||||
| 1408 | 43811 | 80.00 | 08/12/14 | 2248 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 7/3-7/14/14 GEN.AU | ||||
| 80.00 | 0.00 | 5,840.00 | ||||||||
| 1409 | 44372 | 400.00 | 09/22/14 | 2251 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 8/11/14 GEN. AUTH. | ||||
| 400.00 | 0.00 | 6,240.00 | ||||||||
| 6,240.00 | 0.00 | 6,240.00 | ||||||||
| 07424-7460 LOCHWOOD - CAPITAL -STP | 0.00 | |||||||||
| 1401 | 40739 | 1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC.201 | ||||
| 40744 | -1,290.00 | 01/14/14 | 10012 | 2695 | BRICKHOUSE ENVIRONMENTAL VOID CK. - INCORRECT CASH ACCT.U | |||||
| 40745 | 1,290.00 | 01/14/14 | 2231 | 2695 | BRICKHOUSE ENVIRONMENTAL LOCHWOOD CHASE PROJECT - DEC. 20 | |||||
| JE | 40820 | 1,290.00 | 01/22/14 | DEPOSIT | DEPOSIT TO REIMBURSE 07 MA FOR 05 EXPENSE | |||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 1,290.00 | 1,290.00 | 0.00 | ||||||||
| 07427-1000 RESERVE PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1405 | CD | 42462 | 197.25 | 05/14/14 | 2241 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 4/123/14 RESERVE PS | |||
| 197.25 | 0.00 | 197.25 |
East Goshen Township General Ledger
Report Date 10/06/14 | GL Transaction Details | PAGE 7
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07427-1000 | 1406 | CD | 42888 | 7,316.82 | 06/11/14 | 10019 | 3133 | SMITH INC., RONALD APPLIC.# 3 RESERVE PS DIVERSION | ||
| 42952 | 619.75 | 06/12/14 | 2242 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 5/11/14 RESERVE PS | |||||
| 43217 | -7,316.82 | 06/30/14 | 10019 | 3133 | SMITH INC., RONALD VOID CK.10019 PAYMENT AMT.TO BE REDUCED | |||||
| 619.75 | 0.00 | 817.00 | ||||||||
| 1407 | 43229 | 3,658.41 | 07/02/14 | 10020 | 3133 | SMITH INC., RONALD APPL.#3 RESERVE PS DIVERSION -FI | ||||
| 43405 | 309.00 | 07/16/14 | 2247 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 6/15/14 RESERVE PS DIVERSION CONSTRUCTION | |||||
| 3,967.41 | 0.00 | 4,784.41 | ||||||||
| 1408 | 43811 | 476.75 | 08/12/14 | 2249 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVE PS DI CONSTRUCTION | ||||
| 476.75 | 0.00 | 5,261.16 | ||||||||
| 1409 | 44268 | 111.25 | 09/16/14 | 2250 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 8/10/14 RESERVE PS | ||||
| 111.25 | 0.00 | 5,372.41 | ||||||||
| 5,372.41 | 0.00 | 5,372.41 | ||||||||
| 07428-1000 RESERVOIR PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1402 | 41107 | 10,687.50 | 02/11/14 | 10013 | 1052 | PENNONI ASSOCIATES INC. SERV.THROUGH 1/12/14 RESERVE PS | ||||
| 10,687.50 | 0.00 | 10,687.50 | ||||||||
| 1403 | 41541 | 4,431.25 | 03/12/14 | 10014 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 2/9/14 RESERV.RD. PS | ||||
| 4,431.25 | 0.00 | 15,118.75 | ||||||||
| 1404 | 42154 | 5,909.00 | 04/23/14 | 10015 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/16/14 RESERV.RD | ||||
| 5,909.00 | 0.00 | 21,027.75 | ||||||||
| 1405 | 42463 | 4,724.50 | 05/14/14 | 10016 | 1052 | PENNONI ASSOCIATES INC. SERV. THRU 4/13/14 RESERVOIR RD. | ||||
| 42514 | 3,150.00 | 05/16/14 | 10017 | 3312 | CONESTOGA & ASSOCIATES PROF.SERVICE THRU 3/30/14 RESERV RD. PS - BOG TURTLE HABITAT | |||||
| 7,874.50 | 0.00 | 28,902.25 | ||||||||
| 1406 | 42888 | 5,761.25 | 06/11/14 | 10018 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 5/11/14 RESERVOIR RD. |
East Goshen Township General Ledger
Report Date 10/06/14 GL Transaction Details PAGE 8
MGRP18 run by BRIAN 11 : 25 AM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 5,761.25 | 0.00 | 34,663.50 | ||||||||
| 1407 | 43406 | 430.00 | 07/16/14 | 10021 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 6/15/14 RESERVOIR RD. |
||||
| 43421 | 100.00 | 07/18/14 | 10022 | 3353 | COMMONWEALTH FINANCING AUTHORITY GRANT APPLICATION FOR DCED SEWAG FACILITIES GRANT FOR ACT 537 PLANNING FOR RESERVOIR RD P/S |
|||||
| 530.00 | 0.00 | 35,193.50 | ||||||||
| 1408 | 43810 | 1,208.75 | 08/12/14 | 10023 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 7/13/14 RESERVOIR RD P ACT 537 PLANNING |
||||
| 1,208.75 | 0.00 | 36,402.25 | ||||||||
| 1409 | 44269 | 414.00 | 09/16/14 | 10024 | 3312 | CONESTOGA-ROVERS & ASSOCIATES PROF.SERV.THRU 7/27/14 BOG TURTL HABITAT ASSESSMENT |
||||
| 781.25 | 09/16/14 | 10025 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 8/10/14 RESERVOIR RD P |
||||||
| *** | 1,195.25 | 0.00 | *** | |||||||
| 1,195.25 | 0.00 | 37,597.50 | ||||||||
| 37,597.50 | 0.00 | 37,597.50 | ||||||||
| Beg Bal | 0.00 | 116,825.45 | 126,476.20 | -9,650.75 | ||||||
Memo
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice (610) 692-7171
Fax (610) 425-8950
E-mail rsmith@eastgoshen.org
Date: October 9, 2014
To: Municipal Authority
From: Rick Smith, Township Manager
Re: Pulte – Applebrook Preserve
On April 2013 Pulte dedicated the sewer lines in the Applebrook Preserve to the Authority. At that time they posted an 18 month maintenance bond.
The 18 month period expires this month. Mark televised the sewer lines last fall and everything looked ok. He recently pulled some manholes and did not see any problems.
Accordingly, we would suggest that they Authority approve a motion authorizing the release of the maintenance bond.
F:\Data\Shared Data\Property Management\53-4\53-4-89 (Pulte)\Sewer\Memo 100914.docx
Memo
To: Municipal Authority
From: Jon Altshul
Re: 2015 Municipal Authority Proposed Budget
Date: September 24, 2014
Attached please find a revised proposed 2015 budget for the Municipal Authority.
Revenues
- This budget proposes revenues of $121,016, including $105,105 as a transfer from the sewer operating fund and $14,296 from two Ridley Creek tap-in fees on Colonial Lane.
Expenses
- Expenses reflect $9,000 for legal fees and $37,300 for engineering, of which $12,000 is anticipated for general engineering, $10,500 for I&I reports and $14,800 for Chapter 94 reports.
- The remaining expenses include $10,800 for auditing, $33,323 for administrative overhead, and $27,409 for the Municipal Authority's share of debt service on the 1998 notes.
- The budget also reflects $100,000 in engineering costs for the Reservoir Road pump station project (new). These expenses will be paid form the proceeds of the 2013 notes.
The projected fund balance at the end of 2015 is expected to be $1,470,894, the majority of which represents the remaining balance of the proceeds from the 2013 notes.
I recommend that the Municipal Authority approve the proposed budget prior to the end of the calendar year.
Municipal Authority
| Account Title | Acct # | 2011 Actual | 2012 Actual | 2013 Actual | 2014 Budget | Y/E Projection | 2015 Budget |
|---|---|---|---|---|---|---|---|
| BEGINNING FUND BALANCE | |||||||
| 1,598,270 | 1,570,894 | ||||||
| REVENUE | |||||||
| INTEREST EARNINGS | 07341 1000 | (4) | 23 | 28 | 27 | 27 | 15 |
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 478 | 76 | 409 | 2,000 | 1,573 | 1,600 |
| C.C. TAPPING FEES | 07364 1100 | - | - | 200 | 124,000 | 124,000 | - |
| R.C.TAPPING FEES | 07364 1110 | 2,715 | 4,000 | 13,292 | 21,444 | 21,444 | 14,296 |
| CONNECTION FEES - SEWER | 07364 1130 | 1,130 | 846 | 1,690 | - | 1,128 | - |
| MISCELLANEOUS REVENUE | 07380 1000 | 1,778 | 423 | 423 | - | 564 | - |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 151,000 | 71,766 | 88,000 | - | 21,000 | 105,105 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 26,094 | 450,000 | 662,000 | - | - | - |
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | - | - | 2,477,000 | - | - | - |
| TOTAL REVENUE | 183,191 | 527,133 | 3,243,042 | 147,471 | 169,736 | 121,016 | |
| EXPENSES | |||||||
| ADMINISTRATIVE WAGES | 07424 1400 | 33,568 | 33,568 | 31,921 | 32,768 | 32,768 | 33,323 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 1,835 | 950 | 1,690 | 4,000 | 4,000 | 3,000 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 13,000 | 7,900 | 8,100 | 10,800 | 10,800 | 10,984 |
| ENGINEERING SERVICES | 07424 3130 | 37,131 | 34,063 | 40,584 | 35,525 | 35,525 | 37,300 |
| LEGAL SERVICES | 07424 3140 | 6,820 | 7,165 | 12,213 | 7,000 | 7,000 | 9,000 |
| R.C. CAPITAL-STP | 07424 7440 | 7,579 | - | - | - | - | - |
| R.C. CAPITAL - COLLECTION | 07424 7450 | 1,968 | - | - | - | - | - |
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 117,726 | - | - | - | - | - |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 250,324 | - | - | - | - | - |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 270,036 | 1,228 | - | - | - | - |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 34,279 | - | - | - | - | - |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 56,447 | 44,111 | 5,563 | - | - | - |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | - | 177,281 | 49,796 | - | - | - |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | - | 105,987 | 12,166 | - | - | - |
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 3,317 | 17,962 | 51,304 | - | - | - |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | - | - | 228,317 | - | - | - |
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
MEMORANDUM
TO: Rick Smith, Township Manager
Mark Miller, PW Director
CC: East Goshen Municipal Authority
FROM: Mike Ellis and AJ DiBiase
DATE: October 8, 2014
SUBJECT: Semi-Annual Sewer System Status Report Progress Update
The portable metering investigation shifted focus to the Ridley Creek Service Area during the current period from March 2014 through August 2014. The meter data from the current period indicates inflow and infiltration (I/I) occurs in the Ridley Creek Service Area, but we question the accuracy of the some of the data.
Six of the portable meters were relocated to the Ridley Creek Service Area in early August 2014, so there is only approximately two months of data available for those meters. A significant rainfall event did not occur while those portable meter were in place, so it cannot be determined if the continuous base flow is correlated with rainfall. A brief summary of the portable meter flows from the current period are provided below:
Reservoir Road Interceptor, MH C-036: Data from the current period indicates peak flows occur during storm events, likely due to inflow. The 3.5-inch rainstorm on April 30th, 2014 resulted in a daily volume of 1,640,952 gpd, which is the highest daily flow recorded at this location since the temporary meter was installed in November 2012. Flows during this period were lower than previous periods, but the metered data from the current period does not reflect the significant reduction that was expected after a major leak was repaired along the interceptor upstream. Additionally, the portable meter flows are significantly less than the immediate downstream permanent Reservoir Road meter so we recommend a portable meter be installed immediately downstream of the permanent meter to evaluate the inconsistencies.
Line Road, MH R-238: Flows were relatively consistent and are believed to be accurate considering the number of upstream connections. The continuous base flow is only 10 gpm which indicates there is limited infiltration in upstream sewers during dry weather periods.
East Boot Road, MH R-013: Flows at this location were relatively consistent from August 2014 through September. The average base comprises nearly 40% (28 gpm) of the total flow at this location, which may be evidence of upstream I/I.
Ashcom, MH R-638: We question the accuracy of the portable meter data since flows at this location are significantly lower than expected considering the number of upstream connections.
Blacksmith Shop, MH R-021 / East Boot Road, MH R-018 / Tegler, MH R-003: We question the accuracy of these portable meters. Since the upstream metered flows at the Blacksmith Shop are significantly more than the downstream meters on the Ridley Creek Interceptor and none are consistent with influent flows to the RCSTP.
We met in the field with a flow metering service representative and East Goshen Public Works staff on October 1, 2014 to inspect several portable meters that produced questionable data. We discovered several of the meters needed to be recalibrated which was completed by adjusting the meter using a hand measurement of the flow depth in the pipe.
The Blacksmith Shop portable meter was installed backwards so the velocities were negative values. Additionally, the meter produced high flows after being calibrated, but this may have been due the time of day, approximately 8 A.M., when peak flows are expected. We also observed high turbulent flows in the manhole which was not observed in other manholes with portable meters. The turbulent flow at this manhole could be affecting the accuracy of the meter, so after further analysis we may recommend moving the meter one manhole upstream if the data continues to be inaccurate.
We suggest that the meters be recalibrated during each weekly visit to download the flow data. We recommend that all of the portable meters remain in the same locations over the next six months. We will analyze recalibrated meter data from all the portable meters over the next two months and issue Sewer System Status Report #12 by the end of the year.
- - End of Memo - -
W:\PROJECTS\EGMA\EGMA1402-2014 Semi-Annual II Reports\CORRESPONDENCE\SENT\Sewer System Status Report Memo.docx