Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY
January 13, 2014
Monday 7:00 PM

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
  2. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  3. APPROVAL OF MINUTES December 9, 2013
  4. APPROVAL OF INVOICES Invoices paid in 2013 Pennoni #573697 $ 663.75; Pennoni #573698 $ 605.75; Pennoni #573699 $ 13,994.25
  5. LIAISON REPORTS
  6. FINANCIAL REPORTS December 2013 Reports
  7. OLD BUSINESS
  8. GOALS November Goals
  9. NEW BUSINESS Review Reservoir Road Pump Station Savings Analysis; Review Reservoir Road Project Update #1- in front pocket;
  10. CAPACITY REQUESTS
  11. SEWER REPORTS Director of Public Works Report – verbal report at meeting; Pennoni Engineer’s Report; Big Fish Environmental Inc Report with DMR’s; East Goshen Township Flows for December 2013 – still having issues with new meters, I will have them next month.
  12. ANY OTHER MATTER
  13. CORRESPONDENCE AND REPORTS OF INTEREST

F:\Data\Shared Data\Agendas\Municipal Authority\2014\1-13-14.doc

  1. PUBLIC COMMENT
  2. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Website Posting Date

F:\Data\Shared Data\Agendas\Municipal Authority\2014\1-13-14.doc

draft

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

December 9, 2013

The East Goshen Township Municipal Authority held their regular public meeting on Monday, December 9, 2013 at 7:00 pm at the East Goshen Township building. Members in attendance were: Vice Chairman Jack Yahraes, Dana Pizarro, Ed McAssey, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Scott Towler (BFES), Mike Ellis (Pennoni), Dan Barbato (Pennoni), and Walter Wojcik, Conservancy Board.

COMMON ACRONYMS:

Acronym Acronym
BFES – Big Fish Environmental Services MA- Municipal Authority
BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System
CB – Conservancy Board PC – Planning Commission
DEP – Department of Environmental Protection PR – Park & Recreation Board
EPA – Environmental protection Agency RCSTP – Ridley Creek Sewer Treatment Plant
HC – Historical Commission SBR – Sequencing Batch Reactor
I&I – Inflow & Infiltration SSO – Sanitary System Overflow
LCSTP – Lockwood Chase Sewer Treatment Plant WAS – Waste Activated Sludge

Call to Order & Pledge of Allegiance
Jack called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.

Chairman’s Report/Other Member’s Reports
Ed reported that he attended the West Goshen meeting. The agreement is close to being approved. The Riverkeepers have approved the agreement. .5 will take 5 years to achieve.

Approval of Minutes
Dana moved to accept the minutes of November 11, 2013 as corrected. Kevin seconded the motion. The motion passed unanimously.

Approval of Invoices
1. Kevin moved to approve payment of the following Gawthrop Greenwood invoices:

  1. Gawthrop Greenwood #113959 $ 500.00
  2. Gawthrop Greenwood #113960 $ 831.71

Dana seconded the motion. The motion passed unanimously.

2. Dana moved to approve payment of the following Pennoni invoices:

  1. Pennoni #569529 $ 367.50
  2. Pennoni #569530 $ 401.50
  3. Pennoni #569531 $ 3,031.25
  4. Pennoni #569532 $ 4,376.50

Ed seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

1

Liaison Reports
Conservancy Board – Walter reported that, on Saturday, November 16, 2013, they completed the planting on E. Boot Road across from Bellingham. The spraying in the open spaces was done in October. The Board will consider the new sign designed for the east entrance to the Township at Paoli Pike and Line Road. It will have “Welcome to East Goshen Township, Clymer’s Woods Reforestation” on it.

Financial Reports
Jon Altshul’s December 5, 2013 Financial Report for November 2013:
The Municipal Authority recorded $40,337 in revenues and $61,114 in expenses in November, a difference of -$20,778 (rounded). The fund balance is now $1,635,119.
$39,686 of the expenses was related to the Reserve Pump Station and an additional $18,057 were engineering costs associated with the Reservoir Road Pump Station. Most of the revenue came from a $40,000 transfer from the sewer sinking fund.
Note that the beginning fund balance was revised downwards by $12 from what was reported to you as the ending fund balance last month. This was due to a $12 incoming wire fee assessed by Susquehanna Bank on the proceeds of the DelVal note that was not recorded until last month.

Goals
1. Dana will provide an article for the next newsletter, which is due the last week of January.
2. Jack will attend the West Goshen meeting in March.
3. Items to add to the Goals list for 2014:

  1. Obtain Act 537 plans for Reservoir Road
  2. Investigate cost of tank covers for odor maintenance.

New Business
1. Consider Pennoni 2014 Proposal – The proposal for 2014 contained a 3 to 4% increase in some hourly rates. Some rates have not been increased since 2011. Matt is rated as an Engineering Technician II. Alternate routes for the Reservoir Road project were discussed. A written outline will be ready for January. The estimated total fee for annual services is $35,000. Dana moved to reappoint Pennoni for 2014. Kevin seconded the motion. The motion passed unanimously.

2. Consider Proposed Budget for 2014
Jon Altshul’s Review of 2014 proposed budget:
Revenues: This budget proposes revenues of $147,471 including $124,000 from Chester Creek Tapping Fees (Goshen Meadows) and $21,444 from Ridley Creek Tapping Fees (Colonial La). Because of the projected tapping fees, no transfer from the sewer operating fund is necessary to cover administrative expenses.
Interest income is projected to increase sharply as a result of the proceeds of the 2013 notes that will not be spent until 2015.
Expenses: Auditing expenses in 2014 are expected to increase to $10,800 to reflect additional work surrounding the sale of the 2013 DelVal notes.
$35,525 is budgeted for miscellaneous operating engineering services.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

2

$75,000 is budgeted for engineering for the new Reservoir Road pump station project, which will be paid for from the proceeds of the 2013 bonds.
The projected fund balance at the end of 2014 is expected to be $1,632,577. The majority of this amount ($1.525 million) will represent the remaining balance of the proceeds from the 2013 notes, which will be spent on the Reservoir Road pump station construction in 2015.
The $75,000 for Reservoir Road project costs were discussed. Kevin moved to approve the budget for 2014 as proposed. Ed seconded the motion. The motion passed unanimously.

3. Authorize Chairman to execute Fifth Supplemental Lease - Ed moved to authorize the Vice-Chairman to sign the lease. Kevin seconded the motion. The motion passed unanimously. Jack will sign. In answer to Kevin’s question about insurance, Rick commented that the Township’s Errors and Omission’s insurance covers ABCs members. Kevin would like something in writing.

Sewer Reports
1. Mark Miller, Director of Public Works -
Meters: All meters were read on a daily basis. The portable flow meters are scheduled to be installed next week at their new locations as discussed with Mike Ellis.
Pump Stations: Were visited on a daily basis.
C.C. Collection: We found two significant breaks two weeks ago; one on Baldwin Drive approximately 25 to 30,000 gallons per day. The other was on the Interceptor line 75 to 100,000 gallons per day. I found another one last week which could be another 15 to 20,000 gallons a day.
The break on the Interceptor turned out to be rather challenging. When we excavated the manhole and the line, we found that the manhole had a significant crack that ran ¾’s of the way around the manhole. We also found that the manhole did not have an anti-floater device and the manhole has actually tilted causing the 8” pipe to break.
Rick and I decided to backfill the manhole and order a new manhole and piping. Prior to backfilling, we installed a sump pump and pipe to begin dewatering around the clock with a 4” diesel powered pump until the new manhole was delivered.
Once the manhole was delivered, we built a dam in the Chester Creek to bypass the stream to alleviate the chance of the stream coming into our hole. While we made the repairs, a 12” pump was utilized from Godwin Pump along with a 6” pump to bypass the Interceptor line. The crew did a good job replacing the manhole and piping which began at 8:00 am Wednesday and finished at 5:30 pm.
Prior to the work taking place, Mike Ellis applied for an emergency repair permit from the DEP who came out to the site to make an inspection. Mike and I met them on site to go over the scope of work. One of the inspectors had a problem with us making a temporary road thru the wetlands. I explained it was necessary to get materials in and that we would restore the property when we were done.
While preparing Grand Oak and Bittersweet Developments for paving, we noticed several holes missing sewer caps. Several needed new piping. We replaced 8 caps.
R.C. Collection: we will begin grouting and raising manholes next week.
R.C. Plant: We had to pull pump #2 on the utility water system. The pump was sent to Deckmans for repairs.
Alarms: we received a total of 28 alarms in November.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

3

PA One Calls: We received 85 PA One Calls for the month of October.
Lateral Repairs: 8 Cap Replacements for the C.C. Collection.

2. Pennoni – Mike Ellis gave the following report for November:
RCSTP – Pennoni continues to provide operations assistance as needed. No issues were brought to our attention in October.
Reserve PS Elimination – We are awaiting several contract closeout documents from the contractor before we will recommend final payment including as –built plans, a letter from the geotechnical engineer confirming adequate backfill compaction within the detention basin berm, written notification that they will return in the spring to remove the filter sock along the creek, contractor’s release, statement of surety, and maintenance bond.
Reservoir Road Pump Station Act 537 Plan – We completed the topographic and existing conditions field survey of the proposed pump station parcel and proposed force main route to the tentatively proposed gravity sewer connection in Bow Tree (along Strasburg Rd and N Chester Rd.). We are coordinating with the various utility providers to obtain copies of their utility plans. Once these plans are received, we will finalize the existing conditions plan.
We met with Rick Smith and Mark Miller to evaluate force main routing alternatives. The preferred approach is a variation of Alternative 2 from our November 8, 2013 alternatives memo. This alternative involves running the force main an additional approximately 3,000 l.f. to tie directly into the Ridley Creek interceptor sewer. An odor control chemical feed system would not be needed under this alternative. A cost-benefit analysis will be performed to evaluate the savings from not having an odor control system over an approximately 20 year timeframe versus the additional construction cost for a 3,000 l.f. longer force main.
A couple variations of the originally proposed force main route between the pump station site and Bow Tree will be evaluated. There are numerous major utility conflicts at the intersection of Strasburg Road and N. Chester Road, so we are evaluating other force main routes to avoid this intersection that will not significantly increase construction cost ( and may actually be less costly) via existing easements and/or rights-of-way. Additionally, we will be contacting the utility companies to determine what the restrictions would be for crossing and/or running parallel to their pipes and conduits.
Chester Creek Interceptor Manhole Replacement – We assisted the Township with scope determination and emergency permitting with PADEP for the replacement of the cracked manhole on the Chester Creek interceptor sewer. Permitting included temporary stream diversion of the East Branch Chester Creek via bypass pumping.

3. Big Fish Environmental Services – The following is a summary of Scott’s report for November 2013:
Treatment Process Operation- During October 2013, there were no exceedances of the final effluent discharge limitations for Outfall 001 and Outfall 002.
The monthly average total phosphorus concentration was 0.28 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.16 mg/L to 0.34 mg/L.
Flow to Applebrook, Outfall 002, continued until mid-October.
In October, Mike Brenner, Water Quality Specialist from PA DEP was on site to conduct a facility inspection. No Violations were observed.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

4

During the month of November 2013, there are no anticipated exceedances of the permitted effluent discharge limitations.
During November, there was no discharge to Applebrook.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
SBRs #1, 3 and 4 were in service during the month of November. SBR #2 was periodically placed in service during the week of November 25th to assist with managing influent flows when SBR #3 effluent valve actuator was malfunctioning.
Process monitoring of each SBR included ammonia as N, Nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remained around the same concentration as during October. Present surface area coverage during React Phase ranges from approximately 60 to 80%. The foam color remains as light to medium brown in color and averages 2 to 4 inches in depth.
Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was decreased at during November. The addition of soda ash to the SBRs to assist with maintain desired pH concentrations above 7.0 standard units continued during the month.
SBR #2 remains out of service as a treatment unit.
During the month, the decanter for SBR 3 was observed to have been extended above the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence ranged from one to several occurrences during the month. If an effluent nozzle is partially or completely opened at all times, the entry of air within the decanter could occur resulting with the decanter extending above the water level. The SBR is planned to be removed from service during mid-December for inspection of the effluent decanter nozzles.
Process Monitoring On-Line Instrumentation: Representatives from the Hach Co. will be on site on December 17, 2013 at 9:00 am to discuss the proposed pilot study of the RTC online analyzer.
Solids Dewatering and Disposal: November 2013
During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids. Sludge holding tank #1 was in service. The level at the beginning of the month was 9.82 feet and the level at the end of the month was 6.73 feet. The initial total solids concentration was 0.92% and ended the month as 0.63% total solids. Zero gallons of supernatant were decanted during the month. A total of 400 pounds of soda ash were added during the month for pH adjustment.
Sludge holding tank #2 was in service. The level at the beginning of the month was 9.28 feet and the level at the end of the month was 10.15 feet. The initial total solids concentration was 0.79% and ended the month as 0.86% total solids. A total of 91,875 gallons of supernatant were

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

5

decanted during the month. A total of 650 pounds of soda ash were added during the month for pH adjustment.
Significant storm events in November – None
Minor Repairs and Preventive Maintenance

  1. On Nov. 9, 2013, the utility water system was removed to service. We identified no power to control panel. When power was applied, the control panel immediately tripped off. Mark Miller arranged for Lenni Electric to correct the problem.
  2. On Nov. 9, 2013, replaced the sensor caps for LDO probes in SDBRs 1, 3, and 4. Calibrated LDO meters.
  3. On Nov. 18, 2013, Lenni Electric on site to repair the utility water electric failure. The utility water system was returned to service with on pump online.
  4. On Nov. 19, 2013, responded to Siemens panel alarm, checked home computer SBR#3 effluent valve failed to open. We placed SBR 2 on-line during troubleshooting and implementation of corrective actions. Valve returned to intended operational mode.
  5. On Nov. 21, 2013, responded to Siemens panel alarm for SBR 3 effluent valve failed to close. Adjusted valve and returned valve appeared to be operational.
  6. On Nov. 25, 2013, responded to Siemens panel alarm for SBR 4 maximum decant alarm.
  7. On Nov. 27, 2013, responded to Siemens panel alarm for SBR 3 effluent valve failed to open. Valve failed to open or close through manual operation. Adjusted valve and confirmed operation on hand mode. We remained on site to observe valve operate in automatic mode. Valve was observed to be functioning as intended.
  8. On Nov. 29, 2013, SBR 3 valve failed to open. SBR 2 placed online. We contacted Tri-State to arrange for a technician to report to the facility to assist with repairing the actuator. Tri-State repaired the valve. During the visit, the motor for SBR 2 effluent actuator was determined to require replacement (SBR 2 actuator was previously the actuator from SBR 3).

For 2014, Scott will recommend having a supply of spare parts on hand so down time for repairs will be shorter. He also suggests a pilot study to look at alternative chemicals to reduce costs.
Kevin feels the plant should run for at least 1 year using the chemicals that it was designed to use. He would like to get unit operations under control first. The plant is at only 50% of capacity. In April 2013, the Authority members agreed to wait 1 year to see how things go. Kevin would like to wait until April 2014. Everyone agreed.

Any Other Matter
1. Jack proposed the following slate of officers for consideration for January’s meeting:
Chairman – Jack Yahares
Vice Chairman – Kevin Cummings
Secretary – Dana Pizarro
Treasurer – Ed McAssey
Assistant Sec/Treas – Fran Beck
This is based on the normal rotation used in the past.

2. Rick reported that the Board of Supervisors approved the Township’s 2014 Budget last Tuesday. There is no tax increase for 2014. The trash collection days will change in January. Letters were sent to the residents.

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

6

Adjournment
There being no further business, Kevin moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:25 pm.

Respectfully submitted,

Ruth Kiefer
Recording Secretary

F:\Data\Shared Data\Minutes\Municipal Authority\2013\MA 12-09-13 draft.doc

7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

INVOICE

Newark, DE
302-655-4451 Fax: 302-654-2895

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

Client Invoice Info
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 573697
Invoice Date : 12/23/2013
Project : EGMA1301
Project Name : 2013 General Services

For Services Rendered through: 12/8/2013

Prepared Engineers Reports for November and December Municipal Authority meetings, attended November Municipal Authority meeting, and initiated preparation of NPDES Notice of Termination documentation and plans for Lockwood Chase STP Closure.

Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
Labor : 663.75
Expense : 0.00
Phase Total : 663.75

Amount Due This Invoice: $663.75

Billing Summary Amount
Fee : 13,000.00
Prior Billings : 10,767.50
Current Billings : 663.75
Total Billings : 11,431.25

Phase : **** -- Professional Services
Labor

Class Hours/Units Rate Amount
Senior Engineer 4.50 105.00 472.50
Senior Enviromental Scientist 2.25 85.00 191.25
Labor Total: 6.75 663.75

Total Phase : **** -- Professional Services
Labor : $663.75
Expense : $0.00

Total Project : EGMA1301 -- 2013 General Services
Labor : $663.75
Expense : $0.00

Ok RS 12/24
7424-3130

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1301 Invoice Summary

Invoice Date 12/23/2013

Project:EGMA1301
Pennoni Job No.:2013 General Services
Invoice No:573697
Invoice Period:8/12/2013to12/8/2013
Initial Authorization:$ 10,000.00Date:1/1/2013
Contract Amount:$ 13,000.00
Previously Invoiced:$ 10,767.50
Current Invoice:$ 663.75
Invoiced to Date ($):$ 11,431.25
Invoiced to Date (%):88%
Remaining Budget ($):$ 1,568.75
Remaining Budget (%):12%

Budget by Phase:

Phase No. ****

Phase Name:2013 General Services
Phase Budget:$ 13,000.00
Previously Invoiced:$ 10,767.50
Current Invoice:$ 663.75
Invoiced to Date ($):$ 11,431.25
Invoiced to Date (%):88%
Remaining Budget ($):$ 1,568.75
Remaining Budget (%):12%

Comments: Prepared Engineers Reports for November and December Municipal Authority meetings attended November Municipal Authority meeting, and initiated preparation of NPDES Notice of Termination documentation and plans for Lockwood Chase STP Closure.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #:573698
Invoice Date :12/23/2013
Project :EGMA1306
Project Name :Reserve PS Diversion Construction P

For Services Rendered through: 12/8/2013

Reviewed and processed Pay Application #2; prepared copy of pre-construction video as requested by Township Manager to confirm damage to curbing was not caused by contractor; and coordinated with a manhole lining contractor for pricing and schedule to rehab (via interior lining) previous force main discharge manhole that is deteriorated due to apparent hydrogen sulfide.

Phase : **** -- Professional Services

Total Phase : **** -- Professional Services

Labor :605.75
Expense :0.00
Phase Total :605.75

Amount Due This Invoice $605.75

ok RS 12/26

7428-1000

Fee :20,000.00
Prior Billings :13,529.75
Current Billings :605.75
Total Billings :14,135.50

Phase : **** -- Professional Services

Labor

Class Hours/Units Rate Amount
Senior Engineer3.75105.00393.75
Technical Specialist0.5075.0037.50
Graduate Engineer1.5073.00109.50
Engineering Technician I1.0065.0065.00
Labor Total:6.75605.75
Total Phase : **** -- Professional ServicesLabor :$605.75
Expense :$0.00
Total Project : EGMA1306 -- Reserve PS Diversion Construction PLabor :$605.75
Expense :$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA1307 Invoice Summary

Invoice Date 12/23/2013

Project:EGMA1306
Pennoni Job No.:Reserve PS Diversion Construction P
Invoice No:573698
Invoice Period:10/14/2013to12/8/2013
Initial Authorization:$ 20,000.00Date:1/16/2013
Contract Amount:$ 20,000.00
Previously Invoiced:$ 13,529.75
Current Invoice:$ 605.75
Invoiced to Date ($):$ 14,135.50
Invoiced to Date (%):71%
Remaining Budget ($):$ 5,864.50
Remaining Budget (%):29%

Budget by Phase:

Phase Name:Reserve PS Diversion Construction Phase
Phase Budget:$ 20,000.00
Previously Invoiced:$ 13,529.75
Current Invoice:$ 605.75
Invoiced to Date ($):$ 14,135.50
Invoiced to Date (%):71%
Remaining Budget ($):$ 5,864.50
Remaining Budget (%):29%

Comments: Reviewed and processed Pay Application #2; prepared copy of pre-construction video as requested by Township Manager to confirm damage to curbing was not caused by contractor; and coordinated with a manhole lining contractor for pricing and schedule to rehab (via interior lining) previous force main discharge manhole that is deteriorated due to apparent hydrogen sulfide.

Pennoni

PENNONI ASSOCIATES INC.

CONSULTING ENGINEERS

INVOICE

Newark, DE

302-655-4451 Fax: 302-654-2895

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Attention: Louis F. Smith, Twp Mgr.

Invoice #:573699
Invoice Date :12/23/2013
Project :EGMA1307
Project Name :Reservoir Rd PS Act 537 Planning

For Services Rendered through: 12/8/2013

Completed field survey of existing conditions and topography along proposed force main route on Strasbug Rd and Rt 352 and of proposed pump station parcel, continued preparation of existing conditions plan, requested utility plans from utility providers, prepared and issued first force main routing & interceptor upgrade alternatives memo with cost estimates, attended routing alternatives meeting with Township Manager and PW Director, initiated cost/benefit analysis of additional force main length vs. odor control systems savings, and initiated cost savings estimate of decreased flows to West Goshen.

Phase : 02 -- Existing Conditions Survey

Total Phase : 02 -- Existing Conditions Survey

Labor :11,490.50
Expense :0.00
Phase Total :11,490.50

Phase : 03 -- Act 537 Plan Update

Total Phase : 03 -- Act 537 Plan Update

Labor :2,503.75
Expense :0.00
Phase Total :2,503.75

Amount Due This Invoice $13,994.25

ok RS 12/24

7428-1000

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning

Invoice #: 573699

...Continued from previous page

Phase : 02 -- Existing Conditions Survey

Labor

Class Hours/Units Rate Amount
Principal Surveyor12.50105.001,312.50
Senior Survey Technician47.0082.003,854.00
Survey Technician93.0068.006,324.00
Labor Total:152.5011,490.50
Total Phase : 02 -- Existing Conditions SurveyLabor :$11,490.50
Expense :$0.00

Phase : 03 -- Act 537 Plan Update

Labor

Class Hours/Units Rate Amount
Senior Engineer16.50105.001,732.50
Project Engineer7.0095.00665.00
Senior Environmental Scientist1.2585.00106.25
Labor Total:24.752,503.75
Total Phase : 03 -- Act 537 Plan UpdateLabor :$2,503.75
Expense :$0.00
Total Project : EGMA1307 -- Reservoir Rd PS Act 537 PlanningLabor :$13,994.25
Expense :$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc.

Page: 2

East Goshen Municipal Authority

EGMA1307 Invoice Summary

Invoice Date 12/23/2013

Project:EGMA1307
Pennoni Job No.:Reservoir Rd PS Act 537 Planning
Invoice No:573699
Invoice Period:10/14/2013to12/8/2013
Initial Authorization:$ 77,400.00Date:1/16/2013
Contract Amount:$ 77,400.00
Previously Invoiced:$ 24,452.75
Current Invoice:$ 13,994.25
Invoiced to Date ($):$ 38,447.00
Invoiced to Date (%):50%
Remaining Budget ($):$ 38,953.00
Remaining Budget (%):50%

Budget by Phase:

Phase Name:Reservoir Rd PS Act 537 Planning
Phase Budget:$ 77,400.00
Previously Invoiced:$ 24,452.75
Current Invoice:$ 13,994.25
Invoiced to Date ($):$ 38,447.00
Invoiced to Date (%):50%
Remaining Budget ($):$ 38,953.00
Remaining Budget (%):50%

Comments: Completed field survey of existing conditions and topography along proposed force main route on Strasbug Rd and Rt 352 and of proposed pump station parcel, continued preparation of existing conditions plan, requested utility plans from utility providers, prepared and issued first force main routing & interceptor upgrade alternatives memo with cost estimates, attended routing alternatives meeting with Township Manager and PW Director, initiated cost/benefit analysis of additional force main length vs. odor control systems savings, and initiated cost savings estimate of decreased flows to West Goshen.

Memo

To:Municipal Authority
From:Jon Altshul
Re:MA December Financial Reports
Date:January 9, 2014

The Municipal Authority recorded $23,140 in revenues and $59,989 in expenses in December, a difference of -$36,849. The fund balance is now $1,598,270.

In addition to Pennoni charges for general engineering and work on the Reserve Pump Station and the Reservoir Road Pump Station projects, the following two expenses were recorded in December:

  • $26,723 is for the chargeback of 28% of the principal and interest of the 1998 DelVal note
  • $7,980 is for the quarterly chargeback of administrative overhead

A complete list of all monthly expenses is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA

Municipal Authority

December 2013

MUNICIPAL AUTHORITY BEGINNING FUND BALANCE: 1,635,119.17

RCSTP BUDGET

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
INTEREST EARNED - RCSTP EXPANSION 07341 1020 50.00 138.70 408.84
GRANT REVENUE 07392 0800 0.00 0.00 0.00
TOTAL REVENUE 50.00 138.70 408.84
EXPENSES
R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00
R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00
R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00
R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00
R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00
TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 877,000.00
TRANSFER TO AUTHORITY CAP FUND 07492 0990 992,470.00 0.00 0.00
TOTAL EXPENSES 992,470.00 0.00 877,000.00
RCSTP NET RESULT (992,420.00) 138.70 (876,591.16)

U:\bmccool\2013\Municipal Authority\2013 - 12 - Municipal Authority Report.xlsx Page 1 of 3 01/07/2014

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA

Municipal Authority

December 2013

OPERATING BUDGET

88,000.00
Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
INTEREST EARNINGS 07341 1000 50.00 1.41 28.04
C.C. TAPPING FEES 07364 1100 128,000.00 0.00 200.00
R.C.TAPPING FEES 07364 1110 2,000.00 0.00 13,292.00
CONNECTION FEES - SEWER 07364 1130 0.00 0.00 1,689.64
MISCELLANEOUS REVENUE 07380 1000 1,000.00 0.00 423.36
TRANSFER FROM SEWER OPERATING 07392 0500 121,696.00 23,000.00
TOTAL REVENUE 252,746.00 23,001.41 103,633.04
EXPENSES
ADMINISTRATIVE WAGES 07424 1400 33,547.00 7,980.36 31,921.44
MISCELLANEOUS EXPENSE 07424 3000 5,000.00 0.00 1,690.13
MUNIC.AUTH.-AUDITING 07424 3110 8,843.00 0.00 8,100.00
ENGINEERING SERVICES 07424 3130 35,000.00 3,277.75 40,584.00
LEGAL SERVICES 07424 3140 7,000.00 0.00 12,212.73
M.C.-DVRFA-DEBT SERVICE 07471 1000 20,720.00 20,720.00 20,720.00
M.C.-DVRFA-INTEREST PAYMN 07472 1000 6,003.00 6,003.00 6,003.00
M.C.-DVRFA-INTEREST PAYMN 07472 1010 5,583.00 0.00 0.00
TOTAL EXPENSES 121,696.00 37,981.11 121,231.30
OPERATING NET RESULT 131,050.00 (14,979.70) (17,598.26)

U:\bmccool\2013\Municipal Authority\2013 - 12 - Municipal Authority Report.xlsx Page 2 of 3 01/07/2014

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA

Municipal Authority

December 2013

CAPITAL BUDGET

Account Title Acct # Annual Budget Month To Date Actual Year To Date Actual
REVENUE
LOAN PROCEEDS-SEWER PROJECT 07393 1001 992,470.00 0.00 2,477,000.00
TRANSFER FROM SEWER CAP RESERVE 07392 0900 829,769.00 0.00 662,000.00
TOTAL REVENUE 1,822,239.00 0.00 3,139,000.00
EXPENSES
MARYDELL PUMP STATION - ENGINEER 07425 1000 31,000.00 0.00 51,303.74
MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 250,000.00 0.00 228,317.41
MANHOLE COVER REPLACEMENTS 07424.7405 17,000.00 0.00 0.00
C.C. CAPITAL - COLLECTION 07424.7420 100,000.00 0.00 0.00
LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 5,562.75
LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 55,769.00 0.00 49,796.16
LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 12,165.62
HERSHEY MILL STATION - ENGINEER 07426 1000 35,000.00 0.00 25,349.99
HERSHEY MILL STATION - CONSTRUCTION 07426 2000 180,000.00 0.00 167,012.62
RESERVE PUMP STATION - ENGINEER 07427 1000 25,000.00 3,637.00 33,729.51
RESERVE PUMP STATION - CONSTRUCTION 07427 2000 125,000.00 0.00 96,739.78
RESERVOIR PUMP STATION - ENGINEER 07428 1000 0.00 18,370.75 38,447.00
RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00
TOTAL EXPENSES 818,769.00 22,007.75 708,424.58
CAPITAL NET RESULT 1,003,470.00 (22,007.75) 2,430,575.42

MUNICIPAL AUTHORITY ENDING FUND BALANCE: 1,598,270.42

U:\bmccool\2013\Municipal Authority\2013 - 12 - Municipal Authority Report.xlsx Page 3 of 3 01/07/2014

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 1

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07341-1000INTEREST EARNINGS0.00
1301JE360100.7402/05/13INTERESTINTEREST EARNED JANUARY 2013 07 FUND
0.000.74-0.74
1302363960.4803/04/13INTERESTINTEREST EARNED FEB. 2013 07 FUND
0.000.48-1.22
1303367590.9204/02/13INTERESTINTEREST EARNED MARCH 2013 07 FUND
0.000.92-2.14
1304371773.2005/01/13INTERESTINTEREST EARNED APRIL 2013 07100.1000
371785.6005/01/13INTERESTINTEREST EARNED APRIL 2013 07 CONTRUCTION FUND
0.008.80-10.94
1305377101.5206/04/13INTERESTINTEREST EARNED MAY 2013 07 FUND
0.001.52-12.46
1306381505.2407/02/13INTERESTINTEREST EARNED JUNE 2013 07 FUND
0.005.24-17.70
1307385932.1508/02/13INTERESTINTEREST EARNED JULY 2013 07100.1000
0.002.15-19.85
1308390122.3009/03/13INTERESTINTEREST EARNED AUGUST 2013 07100.1000
0.002.30-22.15
1309394011.5210/01/13INTERESTINTEREST EARNED SEPTEMBER 2013 07100.1000
0.001.52-23.67
1310398041.3811/01/13INTERESTINTEREST EARNED OCTOBER 2013 07 FUND
0.001.38-25.05
1311401351.5812/02/13INTERESTINTEREST EARNED NOVEMBER 2013 7100.1000
0.001.58-26.63
1312406161.4101/06/14INTERESTINTEREST EARNED DECEMBER 2013 07 FUND
0.001.41-28.04
0.001.41-28.04

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 2

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
0.0028.04-28.04
07341-1020INTEREST EARNED - RCSTP EXPANSION0.00
1301360113.9702/05/13INTERESTINTEREST EARNED JANUARY 2013 07 CONSTRUCTION FUND
0.003.97-3.97
1302363974.9103/04/13INTERESTINTEREST EARNED FEB.2013 07 CONSTRUCTION FUND
0.004.91-8.88
1303367603.9704/02/13INTERESTINTEREST EARNED MARCH 2013 07 CONSTRUCTION FUND
0.003.97-12.85
13053771122.2606/04/13INTERESTINTEREST EARNED MAY 2013 07 CONSTRUCTION FUND
0.0022.26-35.11
13063795317.8806/20/13ADJUSTMENTADJUSTMENT TO MAY 2013 INTEREST
381513.9607/02/13INTERESTINTEREST EARNED JUNE 2013 07 CONSTRUCTION FUND
17.883.96-21.19
1307385944.6608/02/13INTERESTINTEREST EARNED JULY 2013 07 CONSTRUCTION FUND
0.004.66-25.85
1308390134.2509/03/13INTERESTINTEREST EARNED AUGUST 2013 07 CONSTRUCTION FUND
0.004.25-30.10
1309394024.3710/01/13INTERESTINTEREST EARNED SEPTEMBER 2013 07 CONSTRUCTION FUND
0.004.37-34.47
131039805100.6111/01/13INTERESTINTEREST EARNED OCTOBER 2013 07 CONTSTRUCTION FUND
0.00100.61-135.08
131140136135.0612/02/13INTERESTINTEREST EARNED NOVEMBER 2013 07 CONSTRUCTION FUND
0.00135.06-270.14
131240617138.7001/06/14INTERESTINTEREST EARNED DECEMBER 2013 07 CONSTRUCTION FUND
0.00138.70-408.84
0.00138.70-408.84

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 3

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
17.88426.72-408.84
07364-1100C.C. TAPPING FEES0.00
1305CR376103,600.003,600.0005/29/1394 2245181 CHESTER SPRINGS DEVELOPMENT CO
3,600.003,600.000.00
131139954200.0011/14/13315879431 1637 MANLEY RD - O'NEILL
0.00200.00-200.00
3,600.003,800.00-200.00
07364-1110R.C.TAPPING FEES0.00
1301JE359312,000.0001/30/13REV TRXREVERSE TRX #32779 TAP IN FEE FOR 913 SORRELL HILL
359342,000.0001/30/13REV TRXRE-REVERSE TRX 35931 FOR 913 SORRELL HILL TAP IN FEES
2,000.002,000.000.00
1303RE364302,000.0003/05/1336430 1TAP IN FEE - 916 SORRELL HILL
364312,000.0003/05/1336431 1TAP IN FEE - 911 SORRELL HILL
0.004,000.00-4,000.00
1305375627,148.0005/23/1337562 1TAP IN FEE FOR 1598 WINEBERRY
0.007,148.00-11,148.00
1309CR393732,144.0009/30/13101378751 SUNNY RIDGE FARMS LLC
0.002,144.00-13,292.00
2,000.0015,292.00-13,292.00
07364-1130CONNECTION FEES - SEWER0.00
130236075423.0002/08/1326471951 JACOBS, ROBERT & CHERYL
423.0002/08/1375571931 GEORGE SMITH & CHRISTINA CONLE
***0.00846.00***
36147423.0002/13/131165771 PAPPANO, JOSEPH & PATRICIA
421.0002/13/131171961 PAPPANO, JOSEPH & PATRICIA
***0.00844.00***
36193423.0002/15/13217371941 STOFFLET, MICHAEL
JE36174282.2402/14/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
36194141.1202/15/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
423.362,113.00-1,689.64
423.362,113.00-1,689.64
07380-1000MISCELLANEOUS REVENUE0.00
36174282.2402/14/13PINE ROCKANNUAL PINE ROCK INSTALLMENT

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 4

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07380-10001302JE36194141.1202/15/13PINE ROCKANNUAL PINE ROCK INSTALLMENT
0.00423.36-423.36
0.00423.36-423.36
07392-0500TRANSFER FROM SEWER OPERATING0.00
13053736639,000.0005/14/13DEPOSITDEPOSIT FUNDS FROM SEWER TO MA TO COVER OPERATING EXPENSE
0.0039,000.00-39,000.00
13103960126,000.0010/16/13DEPOSITDEPOSIT INTO MA ACCT. FROM 05
0.0026,000.00-65,000.00
13124041313,000.0012/19/13DEPOSITXFER FROM SEWER OPERATING TO MA AUTH. TO COVER EXPENSES
4047610,000.0012/24/13DEPOSITDEPOSIT $ TO MA FROM SEWER OPERATING TO COVER EXPENSES
0.0023,000.00-88,000.00
0.0088,000.00-88,000.00
07392-0900TRANSFER FROM SEWER CAP RESERVE0.00
13023618730,000.0002/15/13XFERXFER $ FROM 9100.1000 TO 7100. 1000 TO COVER MA EXPENSES
0.0030,000.00-30,000.00
13043684150,000.0004/08/13XFERXFER $ FROM 9100.1000 TO 7100.1000
3690560,000.0004/11/13XFERXFER $ FROM 9100.1000 TO 7100.1000
0.00110,000.00-140,000.00
13053736153,000.0005/14/13XFERXFER FUNDS FROM 9100.1000 TO 7100.1000 TO COVER CAP.EXP.
0.0053,000.00-193,000.00
130637789250,000.0006/10/13DEPOSITDEPOSIT TO MUN.AUTHORITY ACCT. 7100.1000
0.00250,000.00-443,000.00
13073815850,000.0007/02/13XFERXFER $ TO COVER MUN.AUTHORITY CAPITAL EXPENSES
0.0050,000.00-493,000.00
13083871570,000.0008/13/13XFERXFER FROM SEWER CAPITAL RES. TO MUNICIPAL AUTHORITY
0.0070,000.00-563,000.00

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 5

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07392-09001310JE3957534,000.0010/15/13XFERXFER $ FROM 09 TO 07 TO COVER MA CAPITAL EXPENSES
3960125,000.0010/16/13DEPOSITDEPOSIT INTO MA ACCT. FROM 05
0.0059,000.00-622,000.00
13113997340,000.0011/15/13XFERXFER FUNDS FROM SEWER SINKING FUND TO MA GENERAL 11/15
0.0040,000.00-662,000.00
0.00662,000.00-662,000.00
07393-1001LOAN PROCEEDS-SEWER PROJECT0.00
1310RE397022,477,000.0010/24/1339702 12013 DELVAL PROCEEDS
0.002,477,000.00-2477000.00
0.002,477,000.00-2477000.00
07424-1400ADMINISTRATIVE WAGES0.00
1303CD367117,980.3603/28/132166425EAST GOSHEN TOWNSHIP 1ST QTR.2013 REIMBURSMNT TO GENE FUND
7,980.360.007,980.36
1306380677,980.3606/27/132189425EAST GOSHEN TOWNSHIP 2ND QTR. 2013 REIMBURSEMENT TO GENERAL FUND
7,980.360.0015,960.72
1309393427,980.3609/26/132210425EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR. 2013 REIMBURSMNT TO GEN FUND
7,980.360.0023,941.08
1312404487,980.3612/20/132223425EAST GOSHEN TOWNSHIP - GENERAL 4TH QTR. REIMBURSEMENT FROM MA
7,980.360.0031,921.44
31,921.440.0031,921.44
07424-3000MISCELLANEOUS EXPENSE0.00
130135598500.0001/03/1321532737DEP - COMMONWEALTH OF PA NPDES PERMIT - 2013 MINOR SEWAGE FACILITY
35783950.0001/18/1321582132PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2013 ACTIVE MEMBERSHIP DUES
1,450.000.001,450.00

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 6

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
07424-30001309CD39089128.1309/10/1322083110COMMONWEALTH OF PENNSYLVANIA APPLICATION FEE TO DCED - MUNICI AUTHORITY DEBT ISSUANCE ($2.5M)
128.130.001,578.13
131039630100.0010/17/132214425EAST GOSHEN TOWNSHIP - GENERAL REIMBURSE GEN.FUND FOR CREDIT CA PURCHASE FOR MA EXPENSES
JE3991812.0011/13/13BANK FEEWIRE FEE 10/15/13
112.000.001,690.13
1,690.130.001,690.13
07424-3110MUNIC.AUTH.-AUDITING0.00
1307CD382728,100.0007/12/132195808MAILLIE FALCONIERO & CO. EXAM.OF MA FINANCIAL STMTS. - 20
8,100.000.008,100.00
8,100.000.008,100.00
07424-3130ENGINEERING SERVICES0.00
1301356953,264.7501/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 2012 GEN.SERV
3,264.750.003,264.75
1302361191,538.7502/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 GEN.SERVICES 2
1,538.750.004,803.50
1304368896,695.2504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 GENERAL SE
368905,560.7504/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 GENERAL SER
12,256.000.0017,059.50
1305373578,215.2505/14/1321751052PENNONI ASSOCIATES INC. SERV.THRU 4/14/13 GENERAL SERVIC
8,215.250.0025,274.75
130637787795.2506/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 2013 GENER
795.250.0026,070.00
1307381223,072.2507/02/1321921052PENNONI ASSOCIATES INC. SERVICES THRU 6/16/13 GENERAL SE
3,072.250.0029,142.25
1308387611,843.7508/15/1322051052PENNONI ASSOCIATES INC. GENERAL SERVICES

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 7

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1,843.750.0030,986.00
1309391321,160.2509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 GENERA SERVICES
1,160.250.0032,146.25
1310395623,120.5010/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 2013 SEMI-ANN I&I REPORTS
3,120.500.0035,266.75
1311399332,039.5011/13/1322171052PENNONI ASSOCIATES INC. SERVICE THRU 10/13/13 - GEN.SERV
2,039.500.0037,306.25
131240282769.0012/11/1322201052PENNONI ASSOCIATES INC. SERV.THRU 11/3/13 - GENERAL SERV
40504663.7512/27/1322241052PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 GEN.SERVIC
405121,845.0012/27/1322271052PENNONI ASSOCIATES INC. SERVICES THRU 12/8/13 - OPER.SUP
3,277.750.0040,584.00
40,584.000.0040,584.00
07424-3140LEGAL SERVICES0.00
1301356953,289.1001/15/132155528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 11/9-11/30/12 GEN.AU
3,289.100.003,289.10
1302361191,406.8002/12/132161528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - JAN. 2013 GEN.AU
1,406.800.004,695.90
1304368891,661.1204/10/132170528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 2/4-2/25/13 GEN.A
1,661.120.006,357.02
1305373573,364.0005/14/132174528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 3/7-3/25/13 GEN.A
3,364.000.009,721.02
130738122700.0007/02/132191528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 5/13-5/29/13 GEN.AUT
700.000.0010,421.02
130838761240.0008/15/132204528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 6/21-6/26/13

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 8

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
240.000.0010,661.02
131039562220.0010/15/132211528GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 9/9/13 GEN.AUTHOR
220.000.0010,881.02
131139933500.0011/13/132216528GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 10/11-10/14/13 GEN.A
JE40079831.7111/25/13RECLASSRECLASS GAWTHROP INV.113960 PAYMENT
1,331.710.0012,212.73
12,212.730.0012,212.73
07424-7475LOCHWOOD ABANDONMENT ENGINEER0.00
1301CD35695511.5001/15/1321561052PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 HERSHEY M PUMP STATION MUFFIN MONSTER
511.500.00511.50
130236119574.5002/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 H.MILL PS MUF MONSTER DESIGN
574.500.001,086.00
13053735747.5005/14/1321751052PENNONI ASSOCIATES INC. SERV.THRU 4/14/13 H.MILL PS MUFF MONSTER'
47.500.001,133.50
1306377874,429.2506/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 H.M.PS DIV CONSTRUCTION
4,429.250.005,562.75
5,562.750.005,562.75
07424-7476LOCHWOOD ABANDONMENT CONSTRUCTION0.00
130135598246.0101/03/132152317CONTRACTOR'S CHOICE ORANGE SAFETY FENCE, STAKES & PA
356951,482.4001/15/132154425EAST GOSHEN TOWNSHIP LOCHWOOD PLANT CLOSING COSTS-LAB
35698-1,482.4001/15/132154425EAST GOSHEN TOWNSHIP VOID CK. 2154 - DUPLICATE PAYMEN
246.010.00246.01
13043684030,769.0004/08/1321692128JWC ENVIRONMENTAL CONTROLLER ASSEMBLY, HPP, & REP SUPPLIED EQUIPMENT

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 9

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
30,769.000.0031,015.01
130537649424.0005/31/132180489FISHER & SON COMPANY INC 4 50LB BAGS - COMMERCIAL SEED
111.6505/31/132181739KNOX EQUIPMENT COMPANY MULCHER RENTAL 5/16-5/17/13
5,560.0005/31/132182800MACANGA INC. TRUCKS & TRACK HOE USE - HAUL DI FROM WESTTOWN WAY 5/13 & 5/14/13
8,010.7505/31/1321831876RANSOME RENTAL COMPANY LP STANDARD TRACK RENTAL 5/13-5/20/
***14,106.400.00***
14,106.400.0045,121.41
13063777199.7506/07/1321841849HICKS BROTHERS LLC 21 SMALL BALES STRAW
38067525.0006/27/1321881556CONVERY, MATTHEW GPS - RIDLEY CREEK LINE - LOCHWO CHASE AND OPEN SPACE
624.750.0045,746.16
1308386654,050.0008/09/1321981556CONVERY, MATTHEW GPS OF R.C. SEWER LINE- 6/24 & 6
4,050.000.0049,796.16
1310396307,250.0010/17/1322153136MGK INDUSTRIES INC. INSTALLATION OF GRINDER FRAME AT HERSHEY MILL PUMP STATION
JE398147,250.0011/04/13RECLASSRECLASS PAYMENT FOR GRINDER PUMP.
7,250.007,250.0049,796.16
57,046.167,250.0049,796.16
07424-7477LOCHWOOD ELIMINATION PHASE 20.00
1301CD35872379.9001/24/1321592762A.J. BLOSENSKI INC. 30 YDS. ROLLOFF HAULING & LANDFI FEE
379.900.00379.90
130236189200.0002/15/1321652762A.J. BLOSENSKI INC. 30 YARD ROLLOFF HAULING FEE
JE36105379.9002/11/13VOID CHECKVOID CK. 2159 - OVERCHARGED BY VENDOR - RETURNED CHECK
200.00379.90200.00
1303CD367111,894.9103/28/132167425EAST GOSHEN TOWNSHIP 1/1-3/27/13 REIMBURSE GENERAL FU FOR LOCHWOOD PLANT CLOSING LABOR

East Goshen Township General Ledger

Report Date 01/09/14 GL Transaction Details PAGE 10

MGRP18 run by BRIAN 10 : 38 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref # ID # Name/Description
1,894.910.002,094.91
13063806710,070.7106/27/132190425EAST GOSHEN TOWNSHIP 2ND QTR.2013 REIMBURSMT TO GENER RE: LOCHWOOD PLANT CLOSING LABOR
10,070.710.0012,165.62
12,545.52379.9012,165.62
07425-1000MARYDELL PUMP STATION - ENGINEER0.00
1301356955,493.7501/15/1321561052PENNONI ASSOCIATES INC. SERVICES THRU 12/9/12 MARYDELL
5,493.750.005,493.75
1302361195,988.7502/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 MARYDELL PS
5,988.750.0011,482.50
1304368896,863.0004/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 MARYDELL P
368902,167.7504/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 MARYDELL
9,030.750.0020,513.25
1305373577,168.0005/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 MARYDELL PS
375484,089.2105/22/1321783084PA DEPARTMENT OF TRANSPORTATION MARY DELL DIVERSION INSPECTION
11,257.210.0031,770.46
1306377877,301.0006/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 MARYDELL P DIVERSION
7,301.000.0039,071.46
1307381225,803.5007/02/1321921052PENNONI ASSOCIATES INC. SERV.THRU 6/16/13 MARYDELL PS DI
5,803.500.0044,874.96
1308387611,653.7508/15/1322051052PENNONI ASSOCIATES INC. MARYDELL PS
388813,671.0008/23/1322063084PA DEPARTMENT OF TRANSPORTATION HIGHWY OCCUPANCY PERMITS - MARYD DIVERSION
5,324.750.0050,199.71
130939088235.2809/10/1322073084PA DEPARTMENT OF TRANSPORTATION HWY OCCUPANCY PERMITS - MARY DEL DIVERSION

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 11

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07425-10001309CD39132868.7509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 MARYDELL PS DIVERSION
1,104.030.0051,303.74
51,303.740.0051,303.74
07425-2000MARYDELL PUMP STATION -CONSTRUCTION0.00
1304367462,351.3504/01/1321683050PECO ENERGY TWO MAN PECO CREW- BRACE PECO PO
3688920,700.0004/10/1321723059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PUMP STATION DIVERSION
23,051.350.0023,051.35
13053735779,704.0005/14/1321763059PLY-MAR CONSTRUCTION CO.INC. APP.#2 MARYDELL PS DIVERSION
79,704.000.00102,755.35
13063778750,608.0006/10/1321873059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PS DIVERSION APP.3
50,608.000.00153,363.35
13073812231,620.7507/02/1321933059PLY-MAR CONSTRUCTION CO.INC. MARYDELL DIVERSION - APP.#4
38181220.0007/03/132194765LENNI ELECTRIC CORPORATION MARYDELL STATION FEED
31,840.750.00185,204.10
1308385711,980.0008/01/1321971022PATTERSON, MICHAEL J. WOOD STOCKADE FENCE INSTALLATION
3874641,133.3108/15/1321993059PLY-MAR CONSTRUCTION CO.INC. MARYDELL PUMP STATION DIVERSION
43,113.310.00228,317.41
228,317.410.00228,317.41
07426-1000HERSHEY MILL STATION - ENGINEER0.00
1301356952,047.1201/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 HERSHEY MILL
35783250.0001/18/132157263CHESTER COUNTY CONSERVATION DISTRICT PERMIT FEE - HERSHEY MILL DAM
2,297.120.002,297.12
1302361192,600.0002/12/1321602911EARTHCORE SERVICES LLC MOBILIZATION ATV RIG-HMPS DIVERS
2,932.6202/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 HERSHEY MILL
***5,532.620.00***

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 12

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
5,532.620.007,829.74
1304368893,593.7504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 HERSHEY MI
368902,516.5004/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 HRSHEY MILL
6,110.250.0013,939.99
1305373571,539.7505/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 HERSHEY MILL
1,539.750.0015,479.74
1307381227,301.5007/02/1321921052PENNONI ASSOCIATES INC. SERV. THRU 6/16/13 HERSHEY MILL
7,301.500.0022,781.24
1308387611,653.7508/15/1322051052PENNONI ASSOCIATES INC. HERSHEY MILL PS
1,653.750.0024,434.99
130939132607.5009/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 HERS.M PS DIV. CONSTRUCTION
607.500.0025,042.49
131039562307.5010/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/22/13 HERSHEY MILL
307.500.0025,349.99
25,349.990.0025,349.99
07426-2000HERSHEY MILL STATION - CONSTRUCTION0.00
130637787135,130.4906/10/1321853092DELAWARE VALLEY UTILITY CONTRACTORS INC. HERSHEY MILL PROJ. APPLICATION 1
135,130.490.00135,130.49
1307384022,535.0007/19/132196425EAST GOSHEN TOWNSHIP - GENERAL REIMBURSE GEN. FUND FOR MA CREDI CARD PURCHASE - HERSHEY MILL
2,535.000.00137,665.49
13083876122,097.1308/15/1322033092DELAWARE VALLEY UTILITY CONTRACTORS INC. HERSHEY MILL PROJ. APPLICATION 2
22,097.130.00159,762.62
1310JE398147,250.0011/04/13RECLASSRECLASS PAYMENT FOR GRINDER PUMP.
7,250.000.00167,012.62

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 13

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
167,012.620.00167,012.62
07427-1000RESERVE PUMP STATION - ENGINEER0.00
1301CD356952,047.1301/15/1321561052PENNONI ASSOCIATES INC. SERV.THRU 12/9/12 RESERVE PS
2,047.130.002,047.13
1302361192,932.6302/12/1321621052PENNONI ASSOCIATES INC. SERV.THRU 1/13/13 RESERVE PS
1,000.0002/12/1321633027SCHRODER, JOHN SEWER RIGHT OF WAY
1,000.0002/12/1321643029WILLOW POND HOMEOWNERS ASSOCIATION SEWER RIGHT OF WAY
***4,932.630.00***
4,932.630.006,979.76
1304368891,013.2504/10/1321711052PENNONI ASSOCIATES INC. SERVICES THRU 3/17/13 RESERVE PU
368902,516.5004/10/1321731052PENNONI ASSOCIATES INC. SERVICE THRU 2/20/13 RESERVE PS
3,529.750.0010,509.51
130537357563.2505/14/1321751052PENNONI ASSOCIATES INC. SERV. THRU 4/14/13 RESERVE PS
1,455.0005/14/1321773075SPRING MEADOWS HOMEOWNERS ASSOCIATION SEWER RIGHT OF WAY
***2,018.250.00***
376492,600.0005/31/1321792911EARTHCORE SERVICES LLC ATV RIG PROBES - 1 DAY
4,618.250.0015,127.76
130637787427.5006/10/1321861052PENNONI ASSOCIATES INC. SERVICE THRU 5/12/13 - RESERVE P
427.500.0015,555.26
1307381222,770.7507/02/1321921052PENNONI ASSOCIATES INC. SERVICES THRU 6/16/13 RESERVE PS
2,770.750.0018,326.01
130838761714.2508/15/1322051052PENNONI ASSOCIATES INC. RESERVE PS
714.250.0019,040.26
130939132553.7509/11/1322091052PENNONI ASSOCIATES INC. SERVICE THRU 8/11/13 2013 HERS.M & RESERVE PS.
553.750.0019,594.01
1310395622,900.7510/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 RESERVE PS DI

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 14

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
2,900.750.0022,494.76
1311399327,597.7511/13/13100061052PENNONI ASSOCIATES INC. SERVICES THRU 10/13/13 - RESERVE DIVERSION CONSTRUCTION
39945-7,597.7511/14/13100061052PENNONI ASSOCIATES INC. VOID CK. 010006
399477,597.7511/14/1322181052PENNONI ASSOCIATES INC. SERV.THRU 10/13/13 - RESERVE PS
7,597.750.0030,092.51
1312402823,031.2512/11/1322201052PENNONI ASSOCIATES INC. SERV.THRU 11/3/13 RESERVE PS DIV CONTRUCTION
40515605.7512/27/13100111052PENNONI ASSOCIATES INC. SERVICE THRU 12/8/13 RESERVE PS
3,637.000.0033,729.51
33,729.510.0033,729.51
07427-2000RESERVE PUMP STATION - CONSTRUCTION0.00
13103956264,651.0710/15/1322133133SMITH INC., RONALD APPLIC.#1 RESERVE PS SEWER DIVE
64,651.070.0064,651.07
13113993232,088.7111/13/13100073133SMITH INC., RONALD APPLICATION #2 RESERVE PS
39945-32,088.7111/14/13100073133SMITH INC., RONALD VOID #010007
3994732,088.7111/14/1322193133SMITH INC., RONALD RESERVE PS - APP.#2
32,088.710.0096,739.78
96,739.780.0096,739.78
07428-1000RESERVOIR PUMP STATION - ENGINEER0.00
1310395622,019.7510/15/1322121052PENNONI ASSOCIATES INC. SERV.THRU 9/15/13 RESERVOIR RD
2,019.750.002,019.75
13113993218,056.5011/13/13100061052PENNONI ASSOCIATES INC. SERVICES THRU 10/13/13 - RESERVO RD. ACT 537 PLANNING
39945-18,056.5011/14/13100061052PENNONI ASSOCIATES INC. VOID CK. 010006
3994618,056.5011/14/13100081052PENNONI ASSOCIATES INC. SERV.THRU 10/13/13 RESERVOIR RD
18,056.500.0020,076.25

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 15

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description
07428-10001312CD402834,376.5012/11/13100091052PENNONI ASSOCIATES INC. SERV.THRU 11/3/13 RESERVOIR RD ACT 537
4051513,994.2512/27/13100111052PENNONI ASSOCIATES INC. SERV.THRU 12/8/13 RESERVOIR RD.P
18,370.750.0038,447.00
38,447.000.0038,447.00
07429-3166DIVERSION PROJ.- LEGAL0.00
131139932831.7111/13/1310005528GAWTHROP GREENWOOD & HALSTED LEGAL SERV.- 10/15-10/23/13 DEL. VALLEY REGIONAL FINANCE
JE40079831.7111/25/13RECLASSRECLASS GAWTHROP INV.113960 PAYMENT
831.71831.710.00
831.71831.710.00
07471-1000M.C.-DVRFA-DEBT SERVICE0.00
1312CD4040020,720.0012/19/132222430EAST GOSHEN TWP - SEWER M.C. DVRFA - DEBT SERVICE 28% P& ON 1998 MA NOTE
20,720.000.0020,720.00
20,720.000.0020,720.00
07472-1000M.C.-DVRFA-INTEREST PAYMN0.00
6,003.0012/19/132222430EAST GOSHEN TWP - SEWER M.C. DVRFA - DEBT SERVICE 28% P& ON 1998 MA NOTE
6,003.000.006,003.00
6,003.000.006,003.00
07492-0550TRF TO SEWER SINKING FUND0.00
1310JE39704877,000.0010/24/13REIMBURSEREIMB.FR: 7105.1000 TO SEWER CAP.RESERVE FOR DIVERSION COST TRF TO SEWER CAPITAL RESERVE FUN
877,000.000.00877,000.00
877,000.000.00877,000.00
Beg Bal0.001,721,158.733,257,544.73-1536386

East Goshen Township General Ledger

Report Date 01/09/14

GL Transaction Details

PAGE 16

MGRP18 run by BRIAN 10 : 38 AM

Acct #PerSrcTrx #DebitsCreditsBeg/End BalDateCheck/Ref #ID #Name/Description

EAST GOSHEN MUNICIPAL AUTHORITY GOALS JANUARY 2014

ON-GOING

  1. Submit an article for each newsletter. Need by 1/31/14 - Dana; Need by 4/30/14; Need by 7/1/14; Need by 10/31/14;
  2. Attend West Goshen Meetings quarterly – more often if needed. 1st Quarter (March) - Jack; 2nd Quarter (June); 3rd Quarter (September); 4th Quarter (December)
  3. Respond to capacity requests in 45 days or less.
  4. Continue to implement I & I Plan
  5. Operate RCSTP in compliance with NPDES Permit

PROJECTS

  1. Reservoir Road Pump Station – Obtain Act 537 Plan approval
  2. Investigate feasibility of tank covers at RCSTP.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2014\011313.doc

Pennoni (logo)

PENNONI ASSOCIATES INC. CONSULTING ENGINEERS

MEMORANDUM

TO: Rick Smith, Mark Miller

CC: East Goshen Municipal Authority

FROM: Michael J. Ellis, P.E. (handwritten initials)

DATE: January 7, 2014

SUBJECT: Payback Period From West Goshen Intermunicipal Agreement Cost Savings – Reservoir Road Pump Station

As requested by the Municipal Authority, we reviewed the East Goshen–West Goshen Intermunicipal Agreement cost history from 2012. Final invoice and flow data for 2013 is not yet available. We created the attached table to estimate the cost benefit for the reduction of flow to West Goshen that may occur as a result of the Reservoir Road Pump Station Diversion. Treatment and conveyance costs vary from year to year based on actual flow. Decreasing the flow to West Goshen by 300,000 gpd would have reduced the intermunicipal cost by approximately $163,000 by reducing East Goshen's percentage of flow at the Westtown Way Meter (and ultimately at the West Goshen Sewage Treatment Plant). The ballpark capital expenditure for the pump station diversion is $2,000,000 (including all construction, engineering, permitting, legal, and land acquisition fees), so the payback period would be approximately 12 years.

As noted in previous studies and planning documents, the cost savings is not the only benefit of the Reservoir Road Pump Station Diversion. Other substantial benefits are anticipated improvements to the operating efficiency of the RCSTP from the additional flow, reducing the reliance on the West Goshen STP, and creating capacity for expansion of customer base and future development within the Chester Creek collection system.

END OF MEMO

Attachments: Wastewater Treatment and Collection Yearly Cost Evaluation
West Goshen Invoice for 2012 (dated June 10, 2013)

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\West Goshen Cost Savings Analysis\EGMA WG MEMO 2014-01-07.docx

January 7, 2014

East Goshen Municipal Authority
Intermunicipal Agreement with West Goshen Township
Wastewater Treatment and Collection Yearly Cost Evaluation
Reservoir Road Pump Station Diversion

Part 1 - Treatment CostsActual 2012Estimated System with DiversionNote
Administration and Treatment Cost Proportion17.419%11.832%proportion reduced
EGMA Average Daily Flow824,677524,677
WG WWTP Avg. Daily Flow4,734,3334,434,333
Sewer Authority Capital Cost Proportion16.667%16.667%proportion unchanged
EGMA Average Daily Flow1,000,0001,000,000
WG WWTP Avg. Daily Flow6,000,0006,000,000
WG Actual Administration Costs$ 362,221.35$ 362,221.35
WG Actual Treatment Costs$ 2,089,213.81$ 2,089,213.81
Transfer Cost$ 44,977.00$ 44,977.00
WGSA Capital Costs$ 184,472.13$ 184,472.13
EGMA Calculated Cost Share$ 465,597.25$ 326,124.62
Part 2 - Conveyance CostsActual 2012Estimated System with DiversionNote
Administration and Collection Cost Proportion54.386%43.136%proportion reduced
EGMA Average Daily Flow824,677524,677
WG WWTP Avg. Daily Flow1,516,3331,216,333
Sewer Authority Capital Cost Proportion54.795%54.795%proportion unchanged
EGMA Average Daily Flow1,000,0001,000,000
WG Westtown Way P.S. Capacity1,825,0001,825,000
WG Actual Administration Costs$ 12,890.25$ 12,890.25
WG Actual Collection Costs$ 198,381.61$ 198,381.61
WGSA Capital Costs$ 47,669.83$ 47,669.83
EGMA Calculated Cost Share$ 141,023.34$ 117,254.61
ItemActual 2012Estimated System with Diversion
EGMA Total Cost Share$ 606,620.60$ 443,379.24
Estimated Annual Cost Savings Created by DiversionAmount
EGMA Treatment Share$ 139,472.63
EGMA Collection Share$ 23,768.73
Estimated Total Savings*$ 163,241.36

*estimated total cost savings will be similar if using full capacity of Intermunicipal Agreement

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\West Goshen Cost Savings Analysis\EGMA WG CostEvaluation.xlsx

Logo: West Goshen Township seal (circular seal with the text WEST GOSHEN TOWNSHIP 1817). Handwritten note: 36435

Wastewater Treatment Plant

JOHN M. SCOTT
Plant Manager

848 S. Concord Rd.
West Chester, PA 19382
610-696-0900
Fax: 610-429-9360

INVOICE

Bill To: Board of Supervisors
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Invoice No: EG-6-2013
Date: June 10, 2013

(handwritten initials: RJ)

DescriptionAmount
For East Goshen's share of the Annual Lease Rental on the present sewage treatment plant and a portion of the collection system as per Article VI., Section 6.04(a)(1) of the Agreement dated September 6, 1977.
For the period of January 1, 2013 to June 30, 2013:
$215,000.00 * 9.522% * 50% =
10,236.15
Total$10,236.15
SUMMARY
Customer Name:East Goshen Township
Invoice #:EG-6-2013
Bill Date:June 10, 2013
Amount Due:$10,236.15

Terms: Balance due in 30 days.
Provided by West Goshen Township

APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: 05420.385 (handwritten)

EGMA 1401

Pennoni (logo)

MEMORANDUM

TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager

FROM: Michael Ellis, P.E.
Authority Engineer

DATE: January 9, 2014

SUBJECT: Engineer's Report

Invoices

  • Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

  • Pennoni continues to provide operations assistance as needed. No issues were brought to our attention in December.

Reserve PS Elimination

  • We are still awaiting several contract closeout documents from the contractor before final payment can be made including as-built plans, a letter from the geotechnical engineer confirming adequate backfill compaction within the detention basin berm, written notification that they will return in the spring to remove the filter sock along the creek, contractor's release, statement of surety, and maintenance bond. The contractor has indicated they intend to provide the documents in time for final payment at the February MA meeting.

Reservoir Road Pump Station Act 537 Plan

  • We analyzed the potential annual cost savings on sewer fees to West Goshen that will result from the diversion. We estimated the payback period to be 12 years, and we forwarded a summary memo to the Township.
  • We performed a comprehensive evaluation of alternative pump station locations and force main routes. We prepared a memo with our recommendations, including detailed rationale for the recommendations, that we forwarded to the Township. We still recommend the pump station be located at the intersection of Reservoir Road and Strasburg Road. We recommend the force main be run all the way to the Ridley Creek interceptor via Misak Drive and Anne Drive to avoid the intersection of Strasburg Road and S.R. 0352 and numerous utility conflicts.

Page 1 of 2

P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-01-09.docx

EGMA 1401

  • We conducted an updated PNDI Search on the proposed pump station location and force main route. The results require that we perform a Phase 1 bog turtle habitat survey and also submit documentation to DCNR for a potential threat to a special concern plant species, the "Tooth-cup".
  • We request direction/approval from the Township and Authority on the force main route at January's MA meeting. We will then make submissions to DCNR, PHMC (for cultural and historic resources as required by the Act 537 Planning process), and coordinate with PADEP and/or the Army Corps to perform the bog turtle survey. We anticipate the agencies will take at least 60 days to respond to the submissions and perform the bog turtle survey. PADEP and/or the Army Corps may require additional in-field wetlands delineation of the extended force main route prior to the bog turtle survey.
  • The altered and additional force routing will require additional field survey beyond our original scope; however, we do not recommend any further surveying be performed until the design phase, after the Act 537 Plan is approved by PADEP.

Page 2 of 2

P:\Projects\EGMA\Memos to Board\2014\Memo to EGMA Board 2014-01-09.docx

Big Fish Environmental Services Inc. (logo)

Monthly Operations Report: December 2013

Treatment Process Operation

During November 2013, there were no exceedances of the final effluent discharge limitations for outfall 001 and Outfall 002. Table 1 illustrates the final effluent composite sample data reported for the November 2013 eDMR.

Table 1

November 2013 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations / Sample DateFlowCBOD5 mg/LCBOD5 lbs/monthTSS mg/LTSS lbs/monthNH4-N mg/LNH4-N lbs/monthPhosphorus, Total, mg/LPhosphorus, Total, lbs/monthFecal Coliform Geo MeanFecal Coliform Geo Mean
MGD Average
0.7520125211317440.532001,000
Instantaneous Maximum4042
Sample Date
November 5, 20130.3532.05.9390.1200.350.310.9110.0000
November 12, 20130.3182.66.95130.100.270.340.9010.0000
November 19, 20130.3952.06.63100.1760.580.250.8210.0000
November 26, 20130.4032.06.78270.100.340.290.9710.0000
Average0.36732.26.55150.1240.380.300.9010.0000
Minimum0.31802.05.9390.1000.270.250.8210.0000
Maximum0.40302.66.98270.1760.580.340.9710.0000

The monthly average total phosphorus concentration was 0.30 mg/L as compared to the discharge limitation of 0.5 mg/L. During the month, the final effluent total phosphorus concentration discharged ranged from 0.25 mg/L to 0.34 mg/L.

There was no discharge to Applebrook, Outfall 002, during November 2013.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 1 of 7

Big Fish Environmental Services Inc. (logo)

Table 2 illustrates the influent wastewater pollutant loadings for November 2013. The influent loadings remained within the treatment facility design loadings.

Table 2

November 2013 - Influent Wastewater
Design Basis / Sample DateFlowBOD5 mg/LBOD5 lbs/dayTSS mg/LTSS lbs/dayNH4-N mg/LNH4-N lbs/dayTKN, mg/LTKN lbs/dayPhosphorus, Total, mg/LPhosphorus, Total lbs/day
MGD Average3352,0983202,00132200483019.157
Sample Date
November 5, 20130.34413438530687829.48459.1170720
November 12, 20130.30019556016848225.87441.21184.613
November 19, 20130.32120458524269430.48750.91466.920
November 26, 20130.46518753729484432.99458.71687.120
Average0.357518051725372529.68552.51516.418
Minimum0.300313438516848225.87441.21184.613
Maximum0.464620458530687832.99459.11707.120

During the month of December 2013, there are no anticipated exceedances of the permitted effluent discharge limitations. Table 3 presents the final effluent data for the month of December 2013.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 2 of 7

Big Fish Environmental Services Inc. (logo)

Table 3

December 2013 - Final Effluent - Out Fall 001
NPDES Permit Discharge Limitations / Sample DateFlowCBOD5 mg/LCBOD5 lbs/monthTSS mg/LTSS lbs/monthNH4-N mg/LNH4-N lbs/monthPhosphorus, Total, mg/LPhosphorus, Total, lbs/monthFecal Coliform Geo MeanFecal Coliform Geo Mean
MGD Average
0.7520125211317440.532001,000
Instantaneous Maximum4042
Sample Date
December 3, 20130.3712.06.25150.1000.310.190.5910.0000
December 10, 20130.4922.08.23120.100.410.200.8210.0000
December 17, 20130.4492.07.55190.1000.370.381.4210.0000
December 23, 20130.4542.07.67270.170.650.230.8710.0000
December 30, 20130.4982.08.35.0210.180.7510.0000
Average0.45282.07.65190.1180.440.240.8910.0000
Minimum0.37102.06.23120.1000.310.180.5910.0000
Maximum0.49802.08.37270.1710.650.381.4210.0000

During December, there was no discharge to Applebrook.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 3 of 7

Big Fish Environmental Services Inc. (logo)

Table 4

December 2013 - Influent Wastewater
Design Basis / Sample DateFlowBOD5 mg/LBOD5 lbs/dayTSS mg/LTSS lbs/dayNH4-N mg/LNH4-N lbs/dayTKN, mg/LTKN lbs/dayPhosphorus, Total, mg/LPhosphorus, Total lbs/day
MGD Average3352,0983202,00132200483019.157
Sample Date
December 3, 20130.35210631123268133.79951.21506.920
December 10, 20130.40223468728884528.885421235.616
December 17, 20130.39622265224271027.38039.91176.318
December 23, 20130.41719156114241725.7755.115
December 30, 20130.4051273732166346.820
Average0.394317651722465728.98544.41306.118
Minimum0.351910631114241725.77539.91175.115
Maximum0.417423468728884533.79951.21506.920

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of December.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations remained around the same concentration as during November. Present surface area coverage during React Phase ranges from approximately 90 to 100%. The foam color changed to a light tan color and averages 3 to 4 inches in depth

Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs was consistent during December. The addition of soda ash to the SBRs to assist with maintain desired pH concentrations above 7.0 standard units continued during the month.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4 of 7

Big Fish Environmental Services Inc. (logo)

SBR No. 2 remains out of service as a treatment unit.

During the month, the decanter for SBR 3 was observed to have been extended above the water level. The effluent knife valve was routinely closed and the decanter filled with water to assist with lowering the decanter within the water level. The frequency of occurrence ranged from one to several occurrences during the month

Process Monitoring On-Line Instrumentation:

Representatives from the Hach Company were on site on December 17, 2013 to discuss the proposed pilot study of the RTC online analyzer.

Flow data:

December 2013
Flow Meter LocationTotal Volume for Month, MGDAverage Daily Flow, gpd
Influent Wastewater to Screening Building12.351398,404
Influent Wastewater to SBRs14.736475,340
Internal Recycle2.28075,553
Treated Effluent to Disc Filters14.235459,199
Final Effluent Discharge13.866447,290
Applebrook Golf Course00

Chemical Usage:

December 2013
ChemicalDaily AverageTotal Monthly
Soda Ash33410,350
Magnesium Hydroxide00
Aluminum Sulfate solution581,803
Polymer (centrifuge)7.5*108 gallons

*Fifteen (15) days of centrifuge operation

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 5 of 7

Big Fish Environmental Services Inc. (logo)

Solids Dewatering and Disposal: November 2013

Sludge Dewatering Summary
ItemValue
Gallons of sludge dewatered239,579 gallons
Average Dewatered Total Solids, %19.9%
Wet Tons27.2
Dry Tons5.397
Number of dumpsters3

Solids Dewatering and Disposal: December 2013

Sludge Dewatering Summary
ItemValue
Gallons of sludge dewatered254,585 gallons
Average Dewatered Total Solids, %NA+
Wet Tons41.79
Dry TonsNA+
Number of dumpsters4

*A total of four (4) dumpsters were removed during December,.

+The solids handling data from the laboratory was unavailable at the time of preparing this report.

During the month, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of the month was 7.03 feet and the level at the end of the month was 9.74 feet. The initial total solids concentration was 0.70% and ended the month as 0.94% total solids. 108,850 gallons of supernatant were decanted during the month. A total of 100 pounds of soda ash were added during the month for pH adjustment.

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 9.46 feet and the level at the end of the month was 13.58 feet. The initial total solids concentration were 0.88% and ended the month as 0.54% total solids. Zero gallons of supernatant were decanted during the month. A total of 250 pounds of soda ash were added during the month for pH adjustment.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6 of 7

Big Fish Environmental Services Inc. (logo)

Significant Storm Events

No significant storms were experienced during the month of December 2013.

Minor Repairs and Preventative Maintenance

  • The pump tube for the alum feed pump for the SBVRs was replaced.
  • Influent pump number 1 was removed and sent to Deckman Electric for rebuild.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 7 of 7

2013 FLOWMETERS

2013 DECEMBER 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip InchesDATEWESTTOWN WAY READINGWESTTOWN WAY GPDELLIS LANE READINGELLIS LANE GPDPAOLI PIKE READINGPAOLI PIKE GPDWILSON DRIVE READINGWILSON DRIVE GPDSUMMIT FLOWSNET
012/01/130
012/02/131,939,47496,97417,971,75756,19620,400-153,170
012/03/131,945,25457,80017,978,65068,93020,400-126,730
012/04/131,951,17159,17017,985,95473,04020,400-132,210
0.0512/05/131,491,893953,3333,007,60089,9621,956,71555,44017,993,10471,50020,400736,431
0.1312/06/1320,4000
012/07/1320,4000
0.512/08/1320,4000
012/09/1320,4000
0.0312/10/1320,4000
012/11/131,498,3761,080,5003,077,827117,0451,995,36264,41218,036,74572,73520,400-1,334,692
012/12/131,499,353977,0003,086,98791,6002,001,19658,34018,044,80180,56020,400-1,207,500
012/13/1320,4000
0.1312/14/1320,4000
012/15/1320,4000
012/16/131,503,7431,097,5003,133,292115,7632,026,67263,69018,072,71669,78820,400-1,346,740
012/17/131,504,7721,029,0003,143,26099,6802,032,52458,52018,080,95382,37020,400-1,269,570
012/18/131,505,8531,081,0003,153,287100,2702,038,80462,80018,089,84188,88020,400-1,332,950
012/19/1320,4000
012/20/1320,4000
012/21/1320,4000
0.2512/22/1320,4000
012/23/131,511,1361,056,6003,206,866107,1582,069,69861,78818,127,84776,01220,400-1,301,558
012/24/1320,4000
012/25/1320,4000
012/26/131,514,5871,150,3333,245,025127,1972,088,94664,16018,147,99467,15720,400-1,408,847
0.0312/27/131,515,6621,075,0003,255,892108,6702,094,69057,44018,154,53465,40020,400-1,306,510
012/28/1320,4000
1.2512/29/1320,4000
012/30/131,518,9991,112,3333,292,054120,5402,113,70163,37018,175,01468,26720,400-1,364,510
012/31/1320,4000
2.34Day Avg-870,593107,78863,37772,37220,400-372,534
Day Tot-8,705,9331,077,884823,903940,834612,000-11,548,555
Day Count101013133031
EG TWP
MONTH TO DATE2.34
NORMAL MONTH TO DATE
YEAR TO DATE51.17
NORMAL YEAR TO DATE

2013 FLOWMETERS

2013 DECEMBER 1ST QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT FLOWS NET
0 12/01/13 0
0 12/02/13 1,939,474 96,974 17,971,757 56,196 20,400 -153,170
0 12/03/13 1,945,254 57,800 17,978,650 68,930 20,400 -126,730
0 12/04/13 1,951,171 59,170 17,985,954 73,040 20,400 -132,210
0.05 12/05/13 1,491,893 953,333 3,007,600 89,962 1,956,715 55,440 17,993,104 71,500 20,400 736,431
0.13 12/06/13 20,400 0
0 12/07/13 20,400 0
0.5 12/08/13 20,400 0
0 12/09/13 20,400 0
0.03 12/10/13 20,400 0
0 12/11/13 1,498,376 1,080,500 3,077,827 117,045 1,995,362 64,412 18,036,745 72,735 20,400 -1,334,692
0 12/12/13 1,499,353 977,000 3,086,987 91,600 2,001,196 58,340 18,044,801 80,560 20,400 -1,207,500
0 12/13/13 20,400 0
0.13 12/14/13 20,400 0
0 12/15/13 20,400 0
0 12/16/13 1,503,743 1,097,500 3,133,292 115,763 2,026,672 63,690 18,072,716 69,788 20,400 -1,346,740
0 12/17/13 1,504,772 1,029,000 3,143,260 99,680 2,032,524 58,520 18,080,953 82,370 20,400 -1,269,570
0 12/18/13 1,505,853 1,081,000 3,153,287 100,270 2,038,804 62,800 18,089,841 88,880 20,400 -1,332,950
0 12/19/13 20,400 0
0 12/20/13 20,400 0
0 12/21/13 20,400 0
0.25 12/22/13 20,400 0
0 12/23/13 1,511,136 1,056,600 3,206,866 107,158 2,069,698 61,788 18,127,847 76,012 20,400 -1,301,558
0 12/24/13 20,400 0
0 12/25/13 20,400 0
0 12/26/13 1,514,587 1,150,333 3,245,025 127,197 2,088,946 64,160 18,147,994 67,157 20,400 -1,408,847
0.03 12/27/13 1,515,662 1,075,000 3,255,892 108,670 2,094,690 57,440 18,154,534 65,400 20,400 -1,306,510
0 12/28/13 20,400 0
1.25 12/29/13 20,400 0
0 12/30/13 1,518,999 1,112,333 3,292,054 120,540 2,113,701 63,370 18,175,014 68,267 20,400 -1,364,510
0 12/31/13 20,400 0
2.34 Day Avg -870,593 107,788 63,377 72,372 20,400 -372,534
Day Tot -8,705,933 1,077,884 823,903 940,834 612,000 -11,548,555
Day Count 10 10 13 13 30 31

EG TWP

Metric Value
MONTH TO DATE 2.34
NORMAL MONTH TO DATE
YEAR TO DATE 51.17
NORMAL YEAR TO DATE

2013 FLOWMETERS

2013 DECEMBER - CC COLLECTION - METERS FROM WEST GOSHEN

DATE HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
READING GPD READING GPD READING GPD READING GPD READING GPD READING GPD
12/1/2013
12/2/20137,511,108223,33434,862,904683,940
12/3/20137,536,840257,32034,930,474675,700
12/4/20137,562,967261,27034,997,092666,180
12/5/20137,588,293253,26035,061,158640,660
12/6/2013
12/7/2013
12/8/2013
12/9/2013
12/10/2013
12/11/20137,738,480250,31235,508,030744,787
12/12/20137,764,228257,48035,577,589695,590
12/13/2013
12/14/2013
12/15/2013
12/16/20137,861,043242,03835,877,912750,808
12/17/20137,888,484274,41035,951,930740,180
12/18/20131,781,64653,4517,916,741282,57036,028,329763,9903,013,49211,685
12/19/2013
12/20/2013
12/21/2013
12/22/2013
12/23/20138,092,231350,98036,390,493724,328
12/24/2013
12/25/2013
12/26/20138,114,85175,40036,631,169802,253
12/27/20138,138,708238,57036,705,740745,710
12/28/2013
12/29/2013
12/30/20138,204,780220,24036,931,099751,197
12/31/2013
#DIV/0!53,451245,168721,948#DIV/0!11,685
053,4513,187,1839,385,322011,685
01131301

2013 FLOWMETERS

2013 DECEMBER - CC COLLECTION - METERS FROM WEST GOSHEN

DATE HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
READING GPD READING GPD READING GPD READING GPD READING GPD READING GPD
12/1/2013
12/2/20137,511,108223,33434,862,904683,940
12/3/20137,536,840257,32034,930,474675,700
12/4/20137,562,967261,27034,997,092666,180
12/5/20137,588,293253,26035,061,158640,660
12/6/2013
12/7/2013
12/8/2013
12/9/2013
12/10/2013
12/11/20137,738,480250,31235,508,030744,787
12/12/20137,764,228257,48035,577,589695,590
12/13/2013
12/14/2013
12/15/2013
12/16/20137,861,043242,03835,877,912750,808
12/17/20137,888,484274,41035,951,930740,180
12/18/20131,781,64653,4517,916,741282,57036,028,329763,9903,013,49211,685
12/19/2013
12/20/2013
12/21/2013
12/22/2013
12/23/20138,092,231350,98036,390,493724,328
12/24/2013
12/25/2013
12/26/20138,114,85175,40036,631,169802,253
12/27/20138,138,708238,57036,705,740745,710
12/28/2013
12/29/2013
12/30/20138,204,780220,24036,931,099751,197
12/31/2013
#DIV/0!53,451245,168721,948#DIV/0!11,685
053,4513,187,1839,385,322011,685
01131301

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY1,277,069120,48160,16563,67120,40089,99270,106922,3777,36311,147
FEBRUARY1,297,700101,95556,21677,81120,40089,50064,950387,898936,3687,66910,544
MARCH1,285,156105,48868,63685,60720,40079,41666,580292,895594,0403,8997,122
APRIL1,127,72892,81469,14668,49620,40073,24559,483365,1081,030,7555,3109,527
MAY1,109,53095,30670,37269,50020,40081,41265,970335,818864,8506,66111,011
JUNE939,067145,96176,45182,54720,40095,38368,653307,972773,7415,75911,576
JULY1,167,686118,58972,476103,44120,40085,25864,865288,723698,4625,57210,464
AUGUST1,124,593117,11571,35687,43820,40081,97264,039273,343788,0676,1999,700
SEPTEMBER918,26589,62464,27868,39820,400263,145688,202
OCTOBER930,55681,62359,52774,11620,400248,191660,718
NOVEMBER59,94083,35020,400268,836658,461
DECEMBER870,593107,78863,37772,37220,40053,451245,168721,94811,685
Total Flows
Monthly Ave1,204,794117,67471,99585,15922,25584,52272,262327,710848,9086,05411,597

To

West Goshen 929,967

2013 flowmeters -all-stations separate month worksheets.xlsxSUMMARY

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT HERSHEY MILL ASHBRIDGE HICKS RESERVOIR SHERMAN BARKWAY
JANUARY1,277,069120,48160,16563,67120,40089,99270,106922,3777,36311,147
FEBRUARY1,297,700101,95556,21677,81120,40089,50064,950387,898936,3687,66910,544
MARCH1,285,156105,48868,63685,60720,40079,41666,580292,895594,0403,8997,122
APRIL1,127,72892,81469,14668,49620,40073,24559,483365,1081,030,7555,3109,527
MAY1,109,53095,30670,37269,50020,40081,41265,970335,818864,8506,66111,011
JUNE939,067145,96176,45182,54720,40095,38368,653307,972773,7415,75911,576
JULY1,167,686118,58972,476103,44120,40085,25864,865288,723698,4625,57210,464
AUGUST1,124,593117,11571,35687,43820,40081,97264,039273,343788,0676,1999,700
SEPTEMBER918,26589,62464,27868,39820,400263,145688,202
OCTOBER930,55681,62359,52774,11620,400248,191660,718
NOVEMBER59,94083,35020,400268,836658,461
DECEMBER870,593107,78863,37772,37220,40053,451245,168721,94811,685
Total Flows
Monthly Ave1,204,794117,67471,99585,15922,25584,52272,262327,710848,9086,05411,597

To

West Goshen 929,967

2013 flowmeters -all-stations separate month worksheets.xlsxSUMMARY

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT
JANUARY1,277,069120,48160,16563,67120,400
FEBRUARY1,297,700101,95556,21677,81120,400
MARCH1,285,156105,48868,63685,60720,400
APRIL1,127,72892,81469,14668,49620,400
MAY1,109,53095,30670,37269,50020,400
JUNE939,067110,33466,83174,60520,400
JULY1,167,686118,58972,476103,44120,400
AUGUST1,124,593117,11571,35687,43820,400
SEPTEMBER918,26589,62464,27868,39820,400
OCTOBER930,55681,62359,52774,11620,400
NOVEMBER59,94083,35020,400
DECEMBER870,953107,78863,37772,37220,400
Total Flows
Monthly Ave1,095,300103,73865,19377,40020,400

2013 SUMMARY OF METER READINGS

WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT
JANUARY1,277,069120,48160,16563,67120,400
FEBRUARY1,297,700101,95556,21677,81120,400
MARCH1,285,156105,48868,63685,60720,400
APRIL1,127,72892,81469,14668,49620,400
MAY1,109,53095,30670,37269,50020,400
JUNE939,067110,33466,83174,60520,400
JULY1,167,686118,58972,476103,44120,400
AUGUST1,124,593117,11571,35687,43820,400
SEPTEMBER918,26589,62464,27868,39820,400
OCTOBER930,55681,62359,52774,11620,400
NOVEMBER59,94083,35020,400
DECEMBER870,953107,78863,37772,37220,400
Total Flows
Monthly Ave1,095,300103,73865,19377,40020,400

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 1 - Reservoir Road PS FM to Bow Tree Drive Manhole (No Interceptor Replacement)

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
5,875HDD 8" HDPE Pipe Force MainL.F.$ 100$ 587,500
150Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 37,500
018" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ -
0Doghouse Manhole at InterceptorEA.$ 10,000$ -
0Reconnect to Ex. ManholesEA.$ 2,500$ -
3Manhole LiningEA.$ 3,500$ 10,500
3Bypass PumpingDAYS$ 1,500$ 4,500
610Pavement Restoration (State and Local Roads)S.Y.$ 90$ 54,900
0Creek Crossing AllowanceL.S.$ 35,000$ -
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 25,000$ 25,000
Subtotal$ 1,179,900
Construction ContingencyPercent25.00%$ 295,000
Subtotal$ 1,474,900
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 1,474,900

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt1-FM Tab

1 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 2 - Reservoir Road PS FM to Interceptor (No Interceptor Replacement) via S.R. 352

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
8,200HDD 8" HDPE Pipe Force MainL.F.$ 100$ 820,000
450Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 112,500
018" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ -
1Doghouse Manhole at InterceptorEA.$ 10,000$ 10,000
0Reconnect to Ex. ManholesEA.$ 2,500$ -
3Manhole LiningEA.$ 3,500$ 10,500
3Bypass PumpingDAYS$ 1,500$ 4,500
940Pavement Restoration (State and Local Roads)S.Y.$ 90$ 84,600
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 35,000$ 35,000
Subtotal$ 1,572,100
Construction ContingencyPercent25.00%$ 393,000
Subtotal$ 1,965,100
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 1,965,100

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt2-FM to Interceptor Tab

2 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 2A - Reservoir Road PS FM to Interceptor (No Interceptor Replacement) via Misak Drive

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
8,280HDD 8" HDPE Pipe Force MainL.F.$ 100$ 828,000
150Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 37,500
018" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ -
1Doghouse Manhole at InterceptorEA.$ 10,000$ 10,000
0Reconnect to Ex. ManholesEA.$ 2,500$ -
3Manhole LiningEA.$ 3,500$ 10,500
3Bypass PumpingDAYS$ 1,500$ 4,500
700Pavement Restoration (State and Local Roads)S.Y.$ 90$ 63,000
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 25,000$ 25,000
Subtotal$ 1,473,500
Construction ContingencyPercent25.00%$ 368,000
Subtotal$ 1,841,500
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 1,841,500

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt2A-FM to Interceptor Tab

3 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 3 - Reservoir Road PS FM to Bow Tree Drive Manhole Including Interceptor Replacement

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
5,875HDD 8" HDPE Pipe Force MainL.F.$ 100$ 587,500
150Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 37,500
1,20318" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ 192,480
0Doghouse Manhole at InterceptorEA.$ 10,000$ -
4Reconnect to Ex. ManholesEA.$ 2,500$ 10,000
3Manhole LiningEA.$ 3,500$ 10,500
20Bypass PumpingDAYS$ 1,500$ 30,060
610Pavement Restoration (State and Local Roads)S.Y.$ 90$ 54,900
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 25,000$ 25,000
Subtotal$ 1,442,940
Construction ContingencyPercent25.00%$ 361,000
Subtotal$ 1,803,940
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 1,803,940

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt3-FM&GravityRep Tab

4 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 4 - Reservoir Road PS FM to Interceptor Including Interceptor Replacement

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
8,280HDD 8" HDPE Pipe Force MainL.F.$ 100$ 828,000
150Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 37,500
1,20318" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ 192,480
1Doghouse Manhole at InterceptorEA.$ 10,000$ 10,000
4Reconnect to Ex. ManholesEA.$ 2,500$ 10,000
3Manhole LiningEA.$ 3,500$ 10,500
20Bypass PumpingDAYS$ 1,500$ 30,060
700Pavement Restoration (State and Local Roads)S.Y.$ 90$ 63,000
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 25,000$ 25,000
Subtotal$ 1,701,480
Construction ContingencyPercent25.00%$ 425,000
Subtotal$ 2,126,480
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 2,126,480

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt4-FM&GravityRep Tab

5 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 5 - Reservoir Road PS FM to RCSTP Along Gravity Sewer Main and Interceptor (No Interceptor Replacement)

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
9,250HDD 8" HDPE Pipe Force MainL.F.$ 100$ 925,000
150Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 37,500
018" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ -
1Doghouse Manhole at InterceptorEA.$ 10,000$ 10,000
0Reconnect to Ex. ManholesEA.$ 2,500$ -
0Manhole LiningEA.$ 3,500$ -
2Bypass PumpingDAYS$ 1,500$ 3,000
700Pavement Restoration (State and Local Roads)S.Y.$ 90$ 63,000
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 25,000$ 25,000
Subtotal$ 1,558,500
Construction ContingencyPercent25.00%$ 390,000
Subtotal$ 1,948,500
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 1,948,500

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt5-ParallelGravity Tab

6 of 7

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

Reservoir Road Pump Station and Force Main
Alternatives Cost Analysis

EGMA1307
January 8, 2014

Alternative 6 - Reservoir Road PS FM to RCSTP Along E. Strasburg Rd. and Gas Right-of-way (No Interceptor Replacement)

Quantity Description Unit Unit Price Cost
1Flow Diversion VaultEA.$ 100,000$ 100,000
10.30 MGD (1.0 MGD Peak) Pump StationEA.$ 350,000$ 350,000
11,450HDD 8" HDPE Pipe Force MainL.F.$ 100$ 1,145,000
700Open Cut 8" HDPE at Pipelines and PennDOT IntersectionsL.F.$ 250$ 175,000
018" SanititeHP Pipe Interceptor ReplacementL.F.$ 160$ -
1Doghouse Manhole at InterceptorEA.$ 10,000$ 10,000
0Reconnect to Ex. ManholesEA.$ 2,500$ -
0Manhole LiningEA.$ 3,500$ -
2Bypass PumpingDAYS$ 1,500$ 3,000
1,440Pavement Restoration (State and Local Roads)S.Y.$ 90$ 129,600
1Creek Crossing AllowanceL.S.$ 35,000$ 35,000
1State Highway Crossing AllowanceL.S.$ 10,000$ 10,000
1Traffic Control AllowanceL.S.$ 60,000$ 60,000
Subtotal$ 2,017,600
Construction ContingencyPercent25.00%$ 504,000
Subtotal$ 2,521,600
Contractor Overhead and Profit(Included in Unit Prices)$ -
Opinion of Probable Construction Costs$ 2,521,600

NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\AlternateEstimates.xlsx; Alt6-ParallelGas Tab

7 of 7

CUSTOM ENVIRONMENTAL TECHNOLOGY

Specialty Chemicals for Industrial and Municipal Wastewater Treatment

December 6, 2013

East Goshen Township
1580 Paoli Pike
West Chester PA 19380

Mark Miller
Director Of Public Works

Mark,

Thank you for your time yesterday to evaluate and recommend odor control for your pump station. ZetaLyte Odor Oxidizer 3275 currently utilized at your Ashbridge pump station will be recommended for this application. Based on a flow of 350,000 gallons per day the dosage will be approximately 15 gallons per day with an increase to 20 gallons per day during the months of July through September.

A metering pump will be required capable of 40 gallon per day feed with a degassing head. The cost for this pump is $1329.00 and can be expected to last only 2-3 years because of the caustic nature of our product. The pump will require a 110 volt outlet wired so when the force main is energized the pump will also turn on.

CET would recommend our mini bulk delivery for this project because of your expected consumption in the warmer months. A 500 gallon double walled storage tank will cost $2989.00 plus applicable freight charge of approximately $ 600.00. The dimensions of this tank are 59 inches X 71inches and will have to be stored inside or on a cement pad which will have to be certified.

The cost of ZetaLyte Odor Oxidizer delivered to your facility by mini bulk will be $ 14.35 per gallon. Total cost per day for chemical will be approximately $ 251.10.

Thank you,

Kevin Jacoby
Sales Representative

CUSTOM ENVIRONMENTAL TECHNOLOGY, INC.

8 Iron Bridge Drive • Collegeville, PA 19426 • Phone: (610) 409-8210 Fax: (610) 409-8212

Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS

MEMORANDUM

TO: Rick Smith
Mark Miller

CC: East Goshen Municipal Authority

FROM: Michael J. Ellis, P.E.

DATE: January 8, 2014

SUBJECT: UPDATE #1
FORCE MAIN ROUTING & SEWER UPGRADE ALTERNATIVES
RESERVOIR ROAD PUMP STATION

In November 2013, we prepared a memo summarizing our research and initial analyses of feasible alternatives for force main routing and potential gravity sewer upgrades. Following issuance of that memo, dated November 8, 2013, the Authority and Township staff requested we revisit the location of the pump station and consider variations of a few of the force main routing alternatives due to new information such as floodplain extents, utility conflicts and restrictions, cost/benefit analysis of use of an odor control chemical feed system, and other existing conditions. This memo is an updated and more in-depth analysis of alternatives.

Executive Summary Recommendation

We still recommend the pump station be located along the Chester Creek interceptor sewer at the intersection of Reservoir Road and Strasburg Road. We recommend the proposed Alternative 2A force main routing in which the force main is run all the way to the Ridley Creek interceptor sewer via Misak Drive and Anne Drive (to avoid the intersection of Strasburg Road and S.R. 0352).

Pump Station Location

Pennoni Associates prepared a memo in 2009 titled “West Goshen Diversion Project Identification and Evaluation of Potential Diversion Locations” which evaluated six diversion concepts and recommended the a “slip-stream” diversion concept with a new pump station near the intersection of Reservoir Road and Strasburg Road. The memo is attached. We revisited the six concepts and considered a few other diversion options, including analyses based upon current meter data, and we still recommend the “slip-stream” diversion with a pump station at the intersection of Reservoir Road and Strasburg Road.

The estimated daily flows for the diversions noted in the 2009 memo are generally still consistent with current metered flows. Without using the “slip-stream” diversion, three of the diversions considered in the 2009 memo would need to be implemented in order to divert 300,000 gpd to the Ridley Creek Sewage Treatment Plant (RCSTP) due to the limited flow within each tributary area. The total construction cost of three diversions would be at least double the estimated cost of the single “slip-stream” diversion. Additionally, the three diversions would require two or three new

EGMA1307
East Goshen MA

January 8, 2014

Page 2 of 6
Reservoir Road Pump Station

pump stations, which would result in higher future operation and maintenance costs than the one pump station proposed as part of the “slip-stream” diversion. Therefore, the Additional Diversion Areas #1 through #5 in the 2009 memo are still not recommended.

There are no neighborhoods or isolated subareas within the Township’s Chester Creek service area that generate an average of 300,000 gpd. In fact, the largest subarea (Additional Diversion Area #4 from the 2009 memo) only generates approximately half that flow. Therefore, the “slip-stream” pump station must be located along the Chester Creek interceptor sewer at a point where there is at least 300,000 gpd every day, not just an annual or monthly average of 300,000 gpd, to ensure that total volume is available for diversion every day.

The “slip-stream” diversion should be along the interceptor south of Paoli Pike. Meter data from February-September 2013 at the Hicks Meter on the interceptor (one manhole north of Paoli Pike) indicates there is an average of 327,000 gpd there, but the average flows in July-September only ranged from 250,000-274,000 gpd. Therefore, this location on the interceptor does not have adequate daily flow. We do not know the exact location on the interceptor where the flow first exceeds 300,000 gpd every day, but we estimate it is at least seven manholes downstream of Paoli Pike. There is over 400,000 gpd of flow in the interceptor by the time it reaches Baldwin Drive and over 500,000 gpd at Strasburg Road according to 2013 portable meter data.

The pump station should therefore be located along the interceptor between the Meadows and Strasburg Road, as highlighted in yellow in attached Figure 2. A pump station south of Strasburg Road would require a longer force main to reach the Ridley Creek Collection System and would thereby have a greater construction cost. There would be no apparent long-term benefit of a pump station south of Strasburg Road to offset the additional upfront cost. The proposed portion of the interceptor north of Baldwin Drive is at least partially, if not entirely, within or bounded by wetlands. Construction of the pump station in wetlands would likely involve extensive permitting and creation of new wetlands to offset the lost wetlands. Therefore, a pump station in this portion of the interceptor should be avoided.

The two closest locations to connect a new force main from a pump station on the proposed/highlighted portion of the interceptor to the Ridley Creek Collection System are along Paoli Pike near Boot Road or in the Bow Tree development along S.R. 0352 (North Chester Road):

  • The force main could be connected to the new sewers along Paoli Pike that were installed during the Marydell Pump Station Diversion project. Depending upon the exact location of the pump station, this would be a 20-25 percent shorter force main, but it would be connecting into a lengthy stretch of 8” and 10” gravity sewers. As noted hereafter in the “Force Main Routing” discussion, it is not desirable to tie the 300,000 gpd force main into 8” sewers even if they are modeled to have adequate capacity during normal conditions. Further, the gravity sewer system runs through the Township building parcel, alongside a school, and adjacent to a residential neighborhood and could create odor issues at those properties due to the additional wastewater loading. The distance to run the force main all the way to the interceptor along the existing Paoli Pike gravity sewer system would be nearly 10 percent longer than through Bow Tree.

EGMA1307
East Goshen MA

January 8, 2014

Page 3 of 6
Reservoir Road Pump Station

  • The recommended option is therefore to run the force main to or through the Bow Tree development. Regardless of the location of the pump station on the proposed/highlighted portion of the interceptor, the length of force main to run to Bow Tree is similar (within 10 percent variation). The shortest length that does not appear to involve acquiring new easements or new property is with a pump station located at the intersection of Reservoir Road and Strasburg Road. It also appears that a force main from this location would have the fewest number of bends, thereby facilitating more efficient pump operations. One shortcoming of this location is that it is within a 100-year floodplain (outside of the floodway). PADEP will allow pump stations within floodplains, subject to approval of a floodplain encroachment permit. The pump station footprint will need to be elevated to the approximate elevation of the Reservoir Road cartway (likely via isolated site grading) so that the building, hatches/lids, and driveway are above the 100-year flood elevation.

Force Main Routing

We revisited the alternatives presented in our November 8, 2013 memorandum to consider slightly altered routes to avoid work at the intersection of Strasburg Road and S.R. 0352 and along S.R. 0352 in favor of crossing S.R. 0352 at Bow Tree Drive and Anne Drive. In particular, we evaluated the following three adjustments to Alternative 2:

Alternative 2A – Run force main along Strasburg Road to Misak Drive, along the entire length of Misak Drive, through an existing sewer easement alongside and behind residential properties from Misak Drive to Anne Drive, and from Anne Drive across S.R. 0352 to Bow Tree Drive. The remainder of the force main routing to the interceptor would be the same as Alternative 2. This routing is entirely through existing rights-of-way and sewer easements so no new permanent easements are envisioned for this route. In addition to avoiding the numerous utility conflicts, traffic control challenges, and alleged shallow bedrock at the intersection of Strasburg Road and S.R. 0352, this also avoids crossing both the Williams Transco pipeline and PECO electric duct bank just east of the intersection. This alternative is considered very viable and is projected to be less costly with less construction risk than Alternative 2. An opinion of probable construction cost and a map have been prepared and are attached for this alternative.

Alternative 2B – Run force main along Strasburg Road approximately halfway to Misak Drive, then through an existing sewer easement behind existing residential properties parallel to Strasburg Road, exit the sewer easement onto Misak Drive, and the remainder of the routing is the same as Alternative 2A. This alternative is also considered viable but less desirable than Alternative 2A since it requires construction alongside and through additional residential properties. It would also require two additional 90 degree bends in the force main which would increase head loss in the pipe. Since this alternative is expected to create more disturbance to residential properties and increase head loss with little to no cost savings from Alternative 2A, we are not recommending this route and have not prepared a cost estimate or map for it.

Alternative 2C – Run force main through the existing Williams Transco pipeline right-of-way (ROW) that bypasses the intersection of Strasburg Road and S.R. 0352. Pipeline easements are typically exclusive, so the Township would probably have to obtain approval from Williams to install the force main within their pipeline easement, which pipeline companies are reluctant to allow. Williams’ ROW restrictions state that they do not want any encroachments in their ROW.

EGMA1307
East Goshen MA

January 8, 2014

Page 4 of 6
Reservoir Road Pump Station

They also have additional ROW restrictions and requirements that are extensive including casing all pipes and no vibratory compaction. If Williams were to approve this route, it would be very costly due to the casing pipe and all open cut work (some of which would have to be soft dig/hand excavating). The route would also require design approvals from Williams which may take an extensive amount of time to obtain. Further, construction scheduling would need to be coordinated with Williams since they would need to have an inspector on-site at all times at the cost of the Township. The Township would then have to comply with these same restrictions for future maintenance of the force main. We do not recommend this route so we have not prepared a cost estimate or map for it.

A few additional updates to other alternatives have also been made:

  • The routing of the existing gravity sewer along Bow Tree Drive that was the basis of the prior point of connection of the force main was determined to be incorrect during the existing conditions field survey. The exhibits have been revised accordingly to correctly show the existing sewer layout. The force main in Alternatives 1 and 3 is now proposed to run approximately 700 LF longer to connect to an existing manhole further east on Bow Tree Drive.
  • The proposed force main routing for Alternatives 1, 3, 4, and 5 has been revised to run along Misak Drive to Anne Drive (same as Alternative 2A) since we now recommend this route to avoid the intersection of Strasburg Road and S.R. 0352.
  • Costs have been updated based upon new utility crossing restrictions and construction requirements obtained from the pipeline companies. Namely, work in the vicinity of the Strasburg Road and S.R. 0352 intersection is now expected to be all open cut with soft digging to expose existing pipelines and duct banks, which will increase construction costs.

The alternatives and the updated probable costs are summarized in the following table:

Force Main (FM) and Sewer Upgrades Alternatives
Opinion of Probable Construction Cost

Alternative Scope Probable Cost
Alternative 1 FM to Bow Tree 8” Sewer, No Interceptor Upgrades $1,474,900
Alternative 2 FM to 15” Interceptor, No Interceptor Upgrades (via 352) $1,965,100
Alternative 2A FM to 15” Interceptor, No Interceptor Upgrades
(via Misak Drive)
$1,841,500
Alternative 3 FM to Bow Tree 8” Sewer, Upgrade Interceptor to 18” $1,803,940
Alternative 4 FM to 15” Interceptor, Upgrade Interceptor to 18” $2,126,480
Alternative 5 FM to RCSTP Influent Pipe along Existing Gravity Sewer Route, No Interceptor Upgrades $1,948,500
Alternative 6 FM to RCSTP Influent Pipe along Strasburg Rd and Gas Easement, No Interceptor Upgrades $2,521,600

The original/base concept for the Reservoir Road Pump Station force main is to connect to an existing gravity manhole within Bow Tree Drive (Alternative 1). Wastewater would then flow

EGMA1307
East Goshen MA

January 8, 2014

Page 5 of 6
Reservoir Road Pump Station

through the 8" diameter collection sewers in Bow Tree to the 15" diameter Ridley Creek Collection System (RCCS) interceptor and onto the Ridley Creek Sewage Treatment Plant (RCSTP).

We now anticipate an 8" diameter force main will be adequate with a pump rate between 300-400 gpm. Initial modeling indicates the existing 8" collection sewers and the 15" interceptor sewers have adequate capacity to convey 400 gpm from the pump station during dry and non-extreme wet weather periods as per recent average daily influent metering data at the RCSTP. However, the 15" interceptor sewers and the RCSTP may not have capacity to accommodate an additional 300-400 gpm during extreme rainfall events when several inches of precipitation occurs over a few hours. It is therefore unlikely that this pump station can be designed with a peaking factor that causes the pump rate to exceed 400 gpm. We need as-built slope information on the interceptor pipes and hourly/daily meter data from 2013 to finalize the modeling and confirm these initial results.

In our opinion, a design with a peaking factor is unnecessary since this pump station is not proposed to function with a peaking factor. The station would pump approximately 300,000 gpd at a pump rate of 300-400 gpm every day regardless of upstream usage increases or inflow/infiltration. All wastewater in this part of the Chester Creek system beyond 300,000 gpd will be conveyed to West Goshen. Further, the pump station is proposed to have controls to shut off the pumps (or close a diversion valve) when influent flows at the RCSTP reach a critical level that either the plant or RCCS sewer system cannot accommodate (possibly dictated by the water level in the influent wet well).

Alternative 1 (force main tie in at 8" collection sewer in Bow Tree), and Alternatives 2 and 2A (force main tie in at 15" RCCS interceptor), are based upon the flow control scenario in which no gravity sewers are upgraded. In the event the Township envisions utilizing this pump station for increased variability of flows or for accommodation of wet weather flows to the RCSTP, the interceptor will likely need to be upgraded as included in Alternatives 3 through 6. It is our understanding that there is no intent to increase the flow rate from this pump station because any increases would necessitate a further expansion of the RCSTP. Therefore, we do not recommend Alternatives 3 through 6.

We recommend Alternative 2A. It is projected to be less costly and less risky than Alternative 2 as noted above. Although the initial capital cost for Alternative 2A is more than Alternative 1, Alternative 2A avoids shortcomings associated with Alternative 1 and has a short payback period as explained below. In our opinion, the long-term cost savings and reduced risk of problems justify Alternative 2A over Alternative 1.

  • Long-Term Cost Savings – The Alternative 1 force main would connect to a collection sewer in a residential neighborhood, and there may be odor issues from the force main discharge. Odor control chemicals can be added at the pump station to proactively address odors as is done at other pump stations in the Township, but the addition of odor control equipment will significantly increase construction costs and normal operations costs. Odor control would not be needed with Alternative 2A since the force main would discharge directly into the RCCS interceptor a few manholes upstream of the RCSTP, so the odor control system costs would be avoided with Alternative 2A. The odor control system installation cost is only around $15,000, but the major cost of the odor control system would be the chemical material cost. As per Custom Environmental Technology, Inc., a chemical vendor, the

EGMA1307
East Goshen MA

January 8, 2014

Page 6 of 6
Reservoir Road Pump Station

estimated annual chemical material cost would be $91,250 (see attached quote). The estimated capital cost difference between Alternative 1 and 2A is $367,000, so the payback period for avoiding odor control with Alternative 2A is four years.

  • In Alternative 1, an 8" force main would be discharging into the same size gravity collection sewer, which is not ideal. Modeling indicates the 8" gravity sewer has capacity, but the pipe will be flowing quite full at most times, could become completely full if I/I increases, would have little capacity tolerance if any pipe blockages occur, and could cause a surcharge of flow into lateral connections.
  • There are nine manholes between the Alternative 1 force main tie-in and the interceptor sewer. These manholes will be subject to hydrogen sulfide deterioration. Although the attached cost estimate is based upon only lining three manholes to proactively address concrete corrosion, it is possible that more manholes would need to be lined in the future (or as part of the force main construction project).

Additional Planning

Alternative 2A will require additional planning effort for field survey and wetlands investigation beyond that which has already been performed for Alternative 1. The additional effort would include the route change along Misak Drive and Anne Drive as well as the extra approx. 3,100 LF to the interceptor. We expect wetlands will be encountered between Bow Tree and the interceptor near the creek. Future engineering design would include costs to prepare necessary permits as well as address design concerns imposed to avoid/mitigate impacts to wetlands and any other identified PNDI conflicts.

END OF MEMO

Attachments:

  • "West Goshen Diversion Project Identification and Evaluation of Potential Diversion Locations" memo (2009) including Figure 1
  • Figure 2
  • Concept Layout Exhibits of Alternatives 1-6
  • Cost Analyses for Alternatives 1-6
  • Custom Environmental Technology, Inc. odor control quote letter, dated 12/6/2013

W:\PROJECTS\EGMA\EGMA1307-Reservoir Rd PS Act 537 Planning\EXHIBITS\Force Main Alternatives Analysis\Update #1 1-8-14\Force Main Alternatives MEMO Update #1 2014-01-07.docx

(2009)

MEMORANDUM

TO: Rick Smith, Township Manager

From: Evan R. Andrews, P.E. Authority Engineer
Justin A. Scarth, P.E. Project Engineer

RE: West Goshen Diversion Project
Identification and Evaluation of Potential Diversion Locations

Background

As part of the Act 537 Special Study for the West Goshen Diversion Project, Pennoni reviewed the available flow information and sewer mapping to identify potential locations suitable to divert wastewater from the West Goshen (Chester Creek) service area to the Ridley Creek Sewage Treatment Plant (RCSTP). This diversion is intended to reduce and maintain East Goshen's wastewater discharge to West Goshen below the limit of 1.0 MGD established in the inter-municipal agreement between the two Townships.

The April 2007 "Wastewater Needs Evaluation" projected ultimate future wastewater production within East Goshen on the basis of full build-out of currently undeveloped land to local zoning limits. The evaluation projected an ultimate future wastewater production within the Ridley Creek and West Goshen service areas of approximately 1.7 MGD with approximately 1.3 MGD within the current West Goshen service area and 0.4 MGD within the Ridley Creek service area. The evaluation recommended diversion of approximately 0.3 MGD from the West Goshen service area to the Ridley Creek STP which is being upgraded and expanded to a capacity of 0.75 MGD.

There are three diversion projects currently in planning (Figure 1). These are the Hershey Mill Pump Station diversion with a capacity of approximately 62,000 GPD (includes diversion of the Reserve Pump Station), the Marydell Pump Station elimination and diversion with a capacity of approximately 7,000 GPD; and the Lochwood Chase STP elimination and diversion with a capacity of approximately 20,000 GPD. The total planned flow to be diverted to the RCSTP is approximately 85,000 GPD or 0.085 MGD.

Additional Diversion Areas

There are additional areas within the existing West Goshen drainage shed that could be diverted and treated by the RCSTP. Four individual areas have been identified as possible candidates for diversion. These areas combined could transfer up to 1,235 additional EDUs (at 225 GPD/EDU) to the Ridley Creek STP drainage shed or 0.278 MGD (Figure 1).

Additional Diversion Area #1

The first diversion option would entail construction of a new Pump Station near Wilson Drive where flows from West Goshen first enter into East Goshen Township. This option would

presumably take all current flows from West Goshen and transfer them to the Ridley Creak STP. East Goshen's meter at Wilson Drive indicates a diversion here would redirect an average of approximately 70,000 GPD. The pump station would need to be sized to not only account for the average flow but to handle the peak flows expected plus additional reserve capacity for foreseeable increases in flow. This proposal would require approximately 5,200 LF of forcemain assuming a connection on Buena Vista Lane and installation along Boot Road.

The new pump station and forcemain would be required to handle the peak flows generated by West Goshen Township as it enters East Goshen Township. Any future developments for flows generated upstream of the pump station in West Goshen would be subject to the capacity provided by this pump station and could at some point be restricted if capacity is not sufficient. It is estimated that this option would cost approximately $1.1 million to construct ($15.71/GPD).

Additional Diversion Area #2

The second area identified for diversion includes the area between Baker Drive and Chester Road from Strasburg Road to Gateswood Drive (approximately 50,000 GPD). Transferring sewage from this area would require a new pump station near the intersection of Reservoir Road and Strasburg Road. The proposed forcemain would be approximately 5,100 LF long and connect near the intersection of Beaumont Court and Bow Tree Drive.

The new pump station and forcemain would be required to handle the peak flows generated by the area served. Any developments or additional sewer flows generated would be subject to the capacity provided by the pump station. It is estimated that this option would cost approximately $1.1 million to construct ($22.00/GPD).

Additional Diversion Area #3

The third area identified includes the area served by the Ashbridge Pump Station. This area is generally bounded by N. Chester Road (SR 352), Strasburg Road, Hunter's Circle, and West Chester Pike (SR 3). This diversion would be approximately 70,000 GPD and would require rerouting the existing forcemain to the Ridley Creek Water shed. The proposed forcemain extension would be approximately 3,900 LF long and connect to the near the intersection of Beaumont Court and Bow Tree Drive.

Any developments or additional sewer flows generated by the service area would be subject to the capacity provided by the pump station. It is estimated that this option would cost approximately $0.62 million to construct ($8.86/GPD).

Additional Diversion Area #4

The fourth area identified includes the area generally bounded by Reservoir Road, N. Chester Road (SR 352), Strasburg Road and West Chester Pike (SR 3) and the area served by the Ashbridge Pump Station (Additional Diversion Area #3). This combined area would divert approximately 133,000 GPD. This would require a new pump station somewhere along the existing gravity line between Lochwood Lane and Chester Creek. The proposed forcemain would be approximately 7,300 LF long and connect to the Ridley Creek STP drainage shed near the intersection of Beaumont Court and Bow Tree Drive.

The new pump station and forcemain would be required to handle the peak flows generated by the area served. Any developments or additional sewer flows would be subject to the capacity provided by the pump station. It is estimated that this option would cost approximately $1.4 million to construct ($10.53/GPD).

Additional Diversion Area #5

A fifth area identified includes the area served by the area generally bounded by North Chester Road, the Marydell Pump Station service area, Gateswood Drive, and Baker Drive. This area produces approximately 22,500 GPD of wastewater. Transferring this area's flow would require a new pump station and approximately 2,700 LF of forcemain connected to an existing manhole north of the intersection between Paoli Pike and Boot Road.

The new pump station and forcemain would be required to handle the peak flows generated by the area served. Any developments or additional sewer flows would be subject to the capacity provided by the pump station. It is estimated that this option would cost approximately $0.82 million to construct ($36.44/GPD).

Slip Stream Diversion

An alternative to breaking out individual areas and rerouting them to the Ridley Creek service area would be to construct a "slip-stream" system. This arrangement would utilize a single pump station along the existing interceptor line that runs along Reservoir Road and take a portion of the flow (approximately 215,000 GPD)from the trunk line and pump it to the Ridley Creek service area. A presumed location would be near the intersection with Strasburg Road. The proposed forcemain from this location would be approximately 8,700 LF long. The forcemain would be routed to the existing interceptor along Ridley Creek since the existing 8-inch gravity sewer near the intersection of Beaumont Drive and Bow Tree Drive would not likely have adequate capacity.

One advantage of this type of system is that the pump station may not have to be sized to account for large peaks in flow. It could be sized at or near the desired flow capacity and then controlled with a variable speed drive to transfer only the desired amount to the RCSTP. This facility would not limit any future developments or sewer expansions in the drainage shed. It is estimated that the pump station and forcemain would cost approximately $1.55 million to construct ($7.18/GPD).

It must be noted that this alternative was presented to the Pa. DEP. During the discussion, the DEP stated that a "Slip Stream" diversion is not their preference as it can complicate intermunicipal agreements and responsibilities for infiltrations and inflow management.

Cost Summary

DiversionProjected Flow (GPD)Forcemain Length (FT)Forcemain CostPump Station CostEstimated Total CostEstimated $/GPD
Diversion #169,7505,200$ 624,000$ 500,000$ 1,124,000$ 15.71
Diversion #249,5005,100$ 612,000$ 500,000$ 1,112,000$ 22.00
Diversion #347,2503,900$ 468,0001$ 150,000$ 618,000$ 8.86
Diversion #4112,5007,300$ 876,000$ 500,000$ 1,376,000$ 10.53
Diversion #522,5002,700$ 324,000$ 500,000$ 824,000$ 36.44
Slip Stream215,0008,700$ 1,044,000$ 500,000$ 1,544,000$ 7.18

1 – Diversion #3 may require upgrades to the existing pump station

Recommendations

It is recommended that the Township pursue the Slipstream Diversion Alternative because it will provide the greatest flow diversion for the least amount of money. By diverting the flow from a single location, the Township will save the redundant capital costs associated with constructing multiple pump stations serving multiple areas with parallel forcemains. It is also estimated that the operation and maintenance costs would be less for one (larger) pump station as compared to multiple smaller pumping stations.

The following recommendations are made based on the evaluation of the identified diversion locations:

  • Review the existing intermunicipal agreement with West Goshen to determine if there are restrictions on adjusting flow discharges and the requirements to amend the agreement, if necessary.
  • Meet with West Goshen to review the evaluation and the preferred slip stream diversion alternative.
  • Present the recommendation to the PA DEP for their comment.
  • Complete the Special Study based on the outcome of the meetings with West Goshen and the PA DEP.