Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
July, 09, 2012
Monday 7:00 PM
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- APPROVAL OF MINUTES June 11, 2012
- APPROVAL OF INVOICES a. Pennoni #511381 $ 2,125.00 b. Pennoni #511382 $ 707.25 c. Pennoni #511383 $ 1,142.00 d. Pennoni #511384 $ 7,009.25 e. Pennoni #511385 $ 3,050.25 f. Gawthrop Greenwood #99747 $ 570.00 g. Mallie, Falconiero & Co. #1000016943 $ 7,900.00 h. Chester County Conservation - Reserve $ 250.00 i. Chester County Conservation – HM PS $ 250.00 j. Xylem Godwin #400230917 $ 4,780.00 k. Power Pro Equipment #P42685 $ 450.00 l. Lenni Electric #120640 $ 352.68
- LIAISON REPORTS
- FINANCIAL REPORTS June 2012 Report; Memo on Lochwood plant Closing labor Costs
- OLD BUSINESS Project update for Marydell, Reserve and Hershey Mill sewer deversions
- GOALS June Goals
- NEW BUSINESS Consider Resolution 31
- CAPACITY REQUESTS Goshen Meadows Cond. Use Application
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report
F:\Data\Shared Data\Agendas\Municipal Authority\2012\7-9-2012 .doc
- Big Fish Environmental Inc Report with DMR’s
- East Goshen Township Flows for June 2012
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Meetings & Dates of Importance
| July 09, 2012 | Municipal Authority | 7:00 PM |
|---|---|---|
| July 11, 2012 | Planning Commission | 9-12:00PM |
| July 11, 2012 | Conservancy Board | 7:00 PM |
| July 12, 2012 | Historical Com. | 7:00PM |
| July 12, 2012 | Farmers Market | 3-7:00PM |
| July 16, 2012 | Commerce Dev. Comm. | 7:00 PM |
| July 17, 2012 | Board of Supervisors CU App. Goshen Meadows | 7:00 PM |
| July 30 – Aug. 4, 2012 | Goshen Country Fair Station 54 Fairgrounds |
Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:
| Article Due Date | Website Posting Date |
|---|---|
| Aug 1, 2012 | Oct. 1, 2012 |
F:\Data\Shared Data\Agendas\Municipal Authority\2012\7-9-2012 .doc
draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
June 11, 2012
The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday, June 11, 2012 at 7:00pm at the East Goshen Township building. Members in attendance were: Vice Chairman Fran Beck, Joe McCawley, Jack Yahraes, and Kevin Cummings. Also in attendance were: Rick Smith (Township Manager), Mark Miller (Director of Public Works), Jon Altshul (Township CFO), Walter Wujick (Conservancy Board), and Dan Barbato (Pennoni).
Call to Order & Pledge of Allegiance
Fran called the meeting to order at 7:00pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops. Fran asked if anyone would be recording the meeting and there was no response.
Chairman’s Report/Other Members’ Reports
- Joe was not able to attend the West Goshen Municipal Authority meeting in May.
- Community Day on Saturday June 23, 2012 was discussed. It was decided that a poster will be provided describing what the Municipal Authority does.
Approval of Minutes
The Chairman noted that the minutes of the May 14, 2012 meeting were approved as corrected.
Approval of Invoices
Joe moved to approve payment of the following Pennoni invoices:
| a. Pennoni #501145 | $ | 920.25 |
|---|---|---|
| b. Pennoni #507185 | $ | 498.50 |
| c. Pennoni #507186 | $ | 320.50 |
| d. Pennoni #507187 | $ | 289.75 |
| e. Pennoni #507188 | $ | 6,049.00 |
| f. Pennoni #507189 | $ | 558.00 |
Jack seconded the motion. There was no further discussion. The motion passed unanimously.
Joe moved to approve payment of the SMJ Construction Payment #1 Lockwood Div. for $105,473.97. Jack seconded the motion. Kevin liked the format they used for the billing. There was no further discussion. The motion passed unanimously.
Liaison Reports
- Conservancy Board – Walter reported that the Board worked with Mark Miller to identify invasives along East Boot Road which the Public Works Department removed. In the Fall, the Board will start planting this area. On their agenda for this month’s meeting is discussion about the proposal to build a house at 1410 Linden Lane.
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
1
- Historical Commission – Ellen asked Jack to report that Living History Day on Saturday, June 2, 2012 was a huge success. The estimate that there was 550 – 600 guests and there were 50 people helping.
Financial Reports – Jon Altshul, CFO, announced that he invited an auditor who will come to the July meeting. Jon reviewed the May 21st letter from the auditors. The $5,000 limit given to Rick and Mark for emergencies, was discussed. Kevin feels there should be something more than a mention in the minutes about this. Rick will check and, if there is no resolution, he will prepare one.
Jon reviewed his memo which outlined basic internal financial controls. Fran and the members thanked Jon for his report. They agree with his recommendations. Rick and Kevin will work on an outline about how the Municipal Authority does business.
Jon mentioned the required Statement of Financial Interest that each board member has to complete every year. The members all stated that they turned one in for this year.
Old Business
- Clinger Invoice – Rick had the revised Clinger invoice #M11143-R for $1,228.08 which reflects the journeyman’s hourly rate of $102.3. Jack moved to approve payment. Kevin seconded the motion. The motion passed unanimously.
Goals
- Newsletter – Dana will do an article for Fall.
- Jack suggested putting new items in BOLD.
New Business
- Hershey’s Mill Pump Station Grinder – Pennoni’s proposal was reviewed. Mark mentioned that, with Lockwood closed, the debris has doubled and the trash rack must be cleaned daily. The Muffin Monster will take care of this. They will purchase the Muffin Monster from the manufacturer JWC Environmental. They will also sign up for the service program which supplies a replacement machine while the other is being repaired so there is no down time. The total cost will be $74,000. Joe moved to approve the proposal and purchase the Muffin Monster. Fran seconded the motion. The motion passed unanimously.
- Meter Quote from Allied Control Services – Mark explained the purpose of the Flo-Dar Sensor. The cost will be $15,460. Jack moved to approve the purchase of the Flo-Dar Sensor. Joe seconded the motion. The motion passed unanimously.
Capacity Requests
None.
Sewer Reports
- Mark Miller, Director of Public Works Report: Meters: Were read on a daily basis, adjustments were made to Ellis Lane. Chester Creek Collection: We replaced all the manhole castings in Marydell a total of (44); while replacing the castings each manhole was checked for infiltration. We televised and cleaned the Ashbridge Farms development; we located one leaky lateral which was repaired on June 5. The crew found a broken tee and a cracked clean-out.
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
2
The crew also televised the drop manhole in Hershey Mill; the one the contractor tied into for the Lockwood project. The drop was ok. We pulled pump number one, a total of 8150 feet were televised and cleaned.
Ridley Creek Collection: We also televised pipe along Paoli Pike where we located two breaks; rather than digging we will be installing a slip liner. We also found a leaking lateral which we already repaired.
Lockwood Project: The contractor is currently doing restoration work installing curb, raking and seeding. The plant operator is spraying on a daily basis. I located a contractor who needs to get rid of 5000 yards of fill dirt; his job should start in about 3 weeks. Matt from Pennoni still has to air test and vacuum test the lines. The contractor also has to grout the old lines. That work is scheduled for one day next week.
Ridley Creek: In your packet is the quote for the new flow meter from Allied Control; the meter is being supplied from HACH who is on COSTARS for state pricing. I would recommend going with the meter Allied quoted. Also in your packet is the cost for the new sampler.
PA 1 Calls: We responded to 88 PA 1 calls for the month of May.
Alarms: We responded to 23 alarms in May that ranged from power outages to pump failure.
Mark also reported that the request for Plant Operator is out and several companies were shown the facility.
- Pennoni Engineer’s Report - Dan Barbato provided the following report: Invoices - With summaries were provided under separate cover. Ridley Creek Sewage Treatment Plant – No activity this period. We will assist with supporting and reviewing warranty claims and with plant troubleshooting as requested. LCSTP Elimination The contractor, SJM Construction Company, has completed construction of all new sewers and manholes. All effected residences have had their laterals tied into the new sewers, and the entire Lockwood Chase neighborhood now flows through the new sewers. All but two new sewer runs have been pressure tested and passed. The remaining two runs are planned for pressure testing by Friday, June 8.; Remaining work generally includes final restoration, abandoning existing sewers and manholes in-place with flowable fill, paving, curb replacement, installation of cast-iron boxes and lids on cleanouts, manhole vacuum testing, mandrel testing and televising of new sewers, and preparation of as-built plans. We anticipate the majority of this work will be completed by Friday, June 15. The required contract completion date is July 2, 2012.; We have performed on-site, part-time construction inspection services throughout the duration of this work. We have also provided in-office construction to resolve utility conflicts and other unforeseen issues.; We reviewed Invoice #1 and forwarded our recommendation to the township. Hershey Mill PS Diversion, Reserve PS Elimination Planning As reported previously, we have prepared draft plans and draft applications for DEP General Permits (GP) for Stream Crossings. The PNDI Receipt for
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
3
the Hershey’s Mill PS Diversion identified potential threats to endangered plant species. We prepared and submitted the required documents to DCNR for their comments/approval regarding the potential threats. DCNR responded that a qualified botanist must perform an on-site evaluation of a variety of plants commonly found in serpentine soils. We provided additional information and coordinated with DCNR to resolve their concerns without involving a botanist. They have since rescinded the requirement for further investigation, and they issued a letter stating that no impacts are anticipated. We are also coordinating with the Township to determine how to tie into the existing downstream manhole for the Reserve Pump Station diversion because there are elevation conflicts with the depth of sewer across the creek and tying into the existing manhole. We expect to resolve these conflicts and submit both the Reserve PS and the Hershey’s Mill PS General Permit application to DEP the week of June 11/15.
Marydell PS Elimination Planning
- As reported previously, we have prepared draft plans and a draft PennDOT Highway Occupancy Permit (HOP) application. We are continuing attempts to coordinate with PECO regarding mitigation of impacts to overhead utility poles given the proximity of the proposed sewer to the poles. The PECO coordination may impact the HOP application, such as modifications to the exact sewer location. Upon resolution of any such PECO issues, we will finalize and submit the HOP application. We have also submitted the draft plans to Verizon, and we have requested information from them on the exact location of their conduits in Paoli Pike because it may be less problematic to install the sewer under the edge of pavement (as opposed to the currently designed route on the shopping center side of the PECO utility poles) pending PECO comments and to avoid significant tree disturbance along the shopping center frontage.
Hershey’s Mill PD Capacity Evaluation
- We performed drawdown testing at the pump station and an analysis of pump and system curves to verify the station has capacity to handle peak instantaneous flows following the Lockwood Chase diversion. One pump was found to have inadequate capacity. The township quickly replaced the pump. We will perform a follow-up drawdown test on Monday, June 11, to confirm the replaced pump has adequate capacity.
Hershey’s Mill Grinder
- We performed a site visit to evaluate the potential for installation of a comminutor (grinder) in the pump station to replace the existing trash rack. We prepared a budgetary cost estimate for the work which we forwarded to the Township along with a professional services proposal to prepare construction drawings and a bid package.
Chapter 94 Reports
- PA DEP responded to the Ridley Creek Chapter 94 Report submission. One comment notes that documentation should be provided to show that the pump station can convey maximum flows with any one pump out of service. This documentation was not required for the current submittal and DEP noted on their letter that no additional information is required to be submitted at this time. This analysis will be provided in the 2013 submission.
- Big Fish Environmental Services, Inc. Scott Towler submitted the following report on plant operations for May 2012:
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
4
Treatment Process Operation – Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of May. SBR #2 remains out of service with the majority of the contents transferred to the aerobic sludge holding tanks.
It is regrettable to report permit exceedances for total suspended solids and total phosphorus during the month of April. Split samples between the contract laboratory and the in-house laboratory were analyzed. Observations of the final effluent appeared to have no visible solids readily identifiable as mixed liquor solids carryover, however, the in-house suspended solids test appeared to indicate a measureable concentration of colloidal solids. Total phosphorus is related to the suspended solids concentration, therefore, as the suspended solids concentration increases, the total phosphorus concentration is anticipated to increase. Steps were implemented with the laboratory to improve access to laboratory reports, specifically with phosphorus results. In addition, continued split sampling and comparison of the in-house test results and contract laboratory results is on-going. Preliminary data for the month of May anticipates full compliance with the discharge permit. A summary of the influent and effluent sample data for the month of March 2012 is attached for review. The eDMR and supplemental reports for April 2012 have been prepared and submitted PA DEP by BFESI through the electronic eDMR system.
Solids Dewatering and Disposal
The centrifuge was placed in service for 4 days during April. Two dumpsters were removed from the site during April. The centrifuge remained out of service during the month of May 2012.
Alarm/Emergency Responses
During the month of May, continued alarms were received for the failure of CV-34 to open. This item is currently being address by Worth & Co as a warranty item. May 16, 2012 all 3 Watson Marlow pumps failed as the result of over current. The pumps were reset and returned to service. May 20, 2012 SBR #3 effluent valve failed to close resulting in the loss of 4.71 feet (60,594 gallons) of the SBR contents (MLSS) into the post EQ tanks. The actuator valve was adjusted and the valve returned to function as designed. May 21, 2012 alum tank alarm for high level was activated. The alarm was reset and cleared.
Maintenance, Repairs and Warranty
Outstanding: Centrifuge replacement parts – Worth & Co to replace parts used for warranty repair
Outstanding: JWC fine screen has a failed UPS – Worth & Co informed
Completed: JWC fine screen upstream transducer – replacement connection scheduled for installation
Outstanding: SBR and Centrifuge MCC panel hour meters – Worth & Co informed
Completed: Leaking PVC valves for alum piping to SBRs
Outstanding: Sludge holding tank aeration piping paint is failing.
Any Other Matter - None
Correspondence and Reports of Interest - None
Public Comment – None
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
5
Adjournment
There being no further business, Joe moved to adjourn the meeting. Kevin seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:30pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority\2012\MA 06-11-12 draft.doc
6
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 511381
Invoice Date : 06/28/2012
Project : EGMA1107
Project Name : HersheyMill &Reserve PS Div Des Per
For Services Rendered through: 06/17/2012
Alternatives analysis and design for Reserve PS stream crossing, manhole connection, and bench modification. On-site meeting with client to review options. Response to DCNR concern for Serpentine impacts along Hershey Mill PS Diversion route. Preparation of DEP GP-5 applications for Reserve PS and Hershey Mill PS Diversions.
Phase : 1 -- Design
| Total Phase : 1 -- Design | Labor : | 971.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 971.25 |
Phase : 6 -- PADEP General Permits
| Total Phase : 6 -- PADEP General Permits | Labor : | 1,153.75 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,153.75 |
| Fee : | 60,200.00 | Amount Due This Invoice | $2,125.00 |
|---|---|---|---|
| Prior Billings : | 14,686.00 | ||
| Current Billings : | 2,125.00 | ||
| Total Billings : | 16,811.00 | ||
RS 7/6/12
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per Invoice # : 511381
...Continued from previous page
Phase : 1 -- Design
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 110.00 | 82.50 |
| Project Engineer | 8.75 | 93.00 | 813.75 |
| Technical Specialist | 1.00 | 75.00 | 75.00 |
| Labor Total: | 10.50 | 971.25 |
| Total Phase : 1 -- Design | Labor : | $971.25 |
|---|---|---|
| Expense : | $0.00 |
Phase : 6 -- PADEP General Permits
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 6.75 | 93.00 | 627.75 |
| Associate Engineer | 5.75 | 83.00 | 477.25 |
| Engineering Technician I | 0.75 | 65.00 | 48.75 |
| Labor Total: | 13.25 | 1,153.75 |
| Total Phase : 6 -- PADEP General Permits | Labor : | $1,153.75 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1107 -- HersheyMill &Reserve PS Div Des Per | Labor : | $2,125.00 |
|---|---|---|
| Expense : | $0.00 |
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Pennoni Associates Inc. Page: 2
East Goshen Municipal Authority
EGMA1107 Invoice Summary
| Project: | EGMA1107 | ||
|---|---|---|---|
| Pennoni Job No.: | Hershey Mill & Reserve PS Div Des Per | ||
| Invoice No: | 511381 | ||
| Invoice Period: | 5/14/2012 | to | 6/17/2012 |
| Initial Authorization: | $ 60,200.00 | Date: | 7/7/2011 |
| Contract Amount: | $ 60,200.00 | ||
| Previously Invoiced: | $ 14,686.00 | ||
| Current Invoice: | $ 2,125.00 | ||
| Invoiced to Date ($): | $ 16,811.00 | ||
| Invoiced to Date (%): | 28% | ||
| Remaining Budget ($): | $ 43,389.00 | ||
| Remaining Budget (%): | 72% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Hershey Mill & Reserve |
| Phase Budget: | $ 60,200.00 |
| Previously Invoiced: | $ 14,686.00 |
| Current Invoice: | $ 2,125.00 |
| Invoiced to Date ($): | $ 16,811.00 |
| Invoiced to Date (%): | 28% |
| Remaining Budget ($): | $ 43,389.00 |
| Remaining Budget (%): | 72% |
Comments: Alternatives analysis and design for Reserve PS stream crossing, manhole connection, and bench modification. On-site meeting with client to review options. Response to DCNR concern for Serpentine impacts along Hershey Mill PS Diversion route. Preparation of DEP GP-5 applications for Reserve PS and Hershey Mill PS Diversions.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 511382
Invoice Date : 06/28/2012
Project : EGMA1109
Project Name : Marydell Pump Station Diversion
For Services Rendered through: 06/17/2012
Field meeting with client to discuss sewer location along Paoli Pike and utility conflicts. Correspondence with PECO and Verizon regarding utility conflicts and existing conditions.
Phase : 1 -- Design
| Total Phase : 1 -- Design | Labor : | 707.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 707.25 |
| Fee : | 45,100.00 | Amount Due This Invoice | $707.25 |
|---|---|---|---|
| Prior Billings : | 5,816.75 | ||
| Current Billings : | 707.25 | ||
| Total Billings : | 6,524.00 | ||
Phase : 1 -- Design
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 2.25 | 93.00 | 209.25 |
| Associate Engineer | 6.00 | 83.00 | 498.00 |
| Labor Total: | 8.25 | 707.25 |
| Total Phase : 1 -- Design | Labor : | $707.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1109 -- Marydell Pump Station Diversion | Labor : | $707.25 |
|---|---|---|
| Expense : | $0.00 |
RS 7/6/12
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1109 Invoice Summary
| Project: | EGMA1109 | ||
|---|---|---|---|
| Pennoni Job No.: | Marydell Pump Station Diversion | ||
| Invoice No: | 511382 | ||
| Invoice Period: | 5/14/2012 | to | 6/17/2012 |
| Initial Authorization: | $ 45,100.00 | Date: | 2/22/2012 |
| Contract Amount: | $ 45,100.00 | ||
| Previously Invoiced: | $ 5,816.75 | ||
| Current Invoice: | $ 707.25 | ||
| Invoiced to Date ($): | $ 6,524.00 | ||
| Invoiced to Date (%): | 14% | ||
| Remaining Budget ($): | $ 38,576.00 | ||
| Remaining Budget (%): | 86% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Marydell Pump Station Diversion |
| Phase Budget: | $ 45,100.00 |
| Previously Invoiced: | $ 5,816.75 |
| Current Invoice: | $ 707.25 |
| Invoiced to Date ($): | $ 6,524.00 |
| Invoiced to Date (%): | 14% |
| Remaining Budget ($): | $ 38,576.00 |
| Remaining Budget (%): | 86% |
Comments: Field meeting with client to discuss sewer location along Paoli Pike and utility conflicts. Correspondence with PECO and Verizon regarding utility conflicts and existing conditions.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 511383
Invoice Date : 06/28/2012
Project : EGMA1201
Project Name : 2012 General Services
For Services Rendered through: 06/17/2012
Mike Ellis attendance at May MA meeting. Engineer's report for May. FloDAR meter research. Review packet and attend June MA meeting.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 1,142.00 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 1,142.00 |
| Fee : | 10,000.00 | Amount Due This Invoice | $1,142.00 |
|---|---|---|---|
| Prior Billings : | 1,774.75 | ||
| Current Billings : | 1,142.00 | ||
| Total Billings : | 2,916.75 | ||
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 7.00 | 110.00 | 770.00 |
| Project Engineer | 4.00 | 93.00 | 372.00 |
| Labor Total: | 11.00 | 1,142.00 |
| Total Phase : **** -- Professional Services | Labor : | $1,142.00 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1201 -- 2012 General Services | Labor : | $1,142.00 |
|---|---|---|
| Expense : | $0.00 |
RS 7/6/12
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1201 Invoice Summary
| Project: | EGMA1201 | ||
|---|---|---|---|
| Pennoni Job No.: | 2012 General Services | ||
| Invoice No: | 511383 | ||
| Invoice Period: | 5/14/2012 | to | 6/17/2012 |
| Initial Authorization: | $ 10,000.00 | Date: | 2/22/2012 |
| Contract Amount: | $ 10,000.00 | ||
| Previously Invoiced: | $ 1,774.75 | ||
| Current Invoice: | $ 1,142.00 | ||
| Invoiced to Date ($): | $ 2,916.75 | ||
| Invoiced to Date (%): | 29% | ||
| Remaining Budget ($): | $ 7,083.25 | ||
| Remaining Budget (%): | 71% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | 2012 General Services |
| Phase Budget: | $ 10,000.00 |
| Previously Invoiced: | $ 1,150.80 |
| Current Invoice: | $ 1,142.00 |
| Invoiced to Date ($): | $ 2,292.80 |
| Invoiced to Date (%): | 23% |
| Remaining Budget ($): | $ 7,707.20 |
| Remaining Budget (%): | 77% |
Comments: Mike Ellis attendance at May MA meeting. Engineer's report for May. FloDAR meter research. Review packet and attend June MA meeting.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 511384
Invoice Date : 06/28/2012
Project : EGMA1204
Project Name : Lockwood Chase Construction Phase S
For Services Rendered through: 06/17/2012
Review and markup of contractor payment request #1. Field meeting to discuss pond dewatering at plant. On-site inspection and observation of construction as requested by the Authority. Coordination and management of project activities and inspections.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 7,009.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 7,009.25 |
| Fee : | 19,000.00 | Amount Due This Invoice | $7,009.25 |
|---|---|---|---|
| Prior Billings : | 10,004.50 | ||
| Current Billings : | 7,009.25 | ||
| Total Billings : | 17,013.75 | ||
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 13.50 | 93.00 | 1,255.50 |
| Technical Specialist | 76.50 | 75.00 | 5,737.50 |
| Engineering Technician I | 0.25 | 65.00 | 16.25 |
| Labor Total: | 90.25 | 7,009.25 |
| Total Phase : **** -- Professional Services | Labor : | $7,009.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1204 -- Lockwood Chase Construction Phase S | Labor : | $7,009.25 |
|---|---|---|
| Expense : | $0.00 |
RS 7/6/12
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1204 Invoice Summary
| Project: | EGMA1204 | ||
|---|---|---|---|
| Pennoni Job No.: | Lockwood Chase Construction Phase S | ||
| Invoice No: | 511384 | ||
| Invoice Period: | 5/14/2012 | to | 6/17/2012 |
| Initial Authorization: | $ 16,000.00 | Date: | 2/22/2012 |
| Contract Amount: | $ 19,000.00 | ||
| Previously Invoiced: | $ 10,004.50 | ||
| Current Invoice: | $ 7,009.25 | ||
| Invoiced to Date ($): | $ 17,013.75 | ||
| Invoiced to Date (%): | 90% | ||
| Remaining Budget ($): | $ 1,986.25 | ||
| Remaining Budget (%): | 10% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | Construction Phase S |
| Phase Budget: | $ 19,000.00 |
| Previously Invoiced: | $ 10,004.50 |
| Current Invoice: | $ 7,009.25 |
| Invoiced to Date ($): | $ 17,013.75 |
| Invoiced to Date (%): | 90% |
| Remaining Budget ($): | $ 1,986.25 |
| Remaining Budget (%): | 10% |
Comments: Review and markup of contractor payment request #1. Field meeting to discuss pond dewatering at plant. On-site inspection and observation of construction as requested by the Authority.
Coordination and management of project activities and inspections.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice #: 511385
Invoice Date : 06/28/2012
Project : EGMA1205
Project Name : Hershey Mill PS Comminutor Cost Est
For Services Rendered through: 06/17/2012
Pump station wetwell drawdown testing on two occassions, before and after replacement of Pump #1. Analysis of pumping capacity and recommendations. Correspondence with DEP regarding permit requirements for Muffin Monster. Determine location for Muffin Monster installation. Evaluate Muffin Monster power supply alternatives and locations with Mark Miller.
Phase : **** -- Professional Services
| Total Phase : **** -- Professional Services | Labor : | 3,050.25 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 3,050.25 |
| Fee : | 4,000.00 | Amount Due This Invoice | $3,050.25 |
|---|---|---|---|
| Prior Billings : | 558.00 | ||
| Current Billings : | 3,050.25 | ||
| Total Billings : | 3,608.25 | ||
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Project Engineer | 26.75 | 93.00 | 2,487.75 |
| Technical Specialist | 7.50 | 75.00 | 562.50 |
| Labor Total: | 34.25 | 3,050.25 |
| Total Phase : **** -- Professional Services | Labor : | $3,050.25 |
|---|---|---|
| Expense : | $0.00 |
| Total Project : EGMA1205 -- Hershey Mill PS Comminutor Cost Est | Labor : | $3,050.25 |
|---|---|---|
| Expense : | $0.00 |
OK RS 7/6/12
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1205 Invoice Summary
| Project: | EGMA1205 | ||
|---|---|---|---|
| Pennoni Job No.: | Hershey Mill PS Comminutor Cost Est | ||
| Invoice No: | 511385 | ||
| Invoice Period: | 5/14/2012 | to | 6/17/2012 |
| Initial Authorization: | $ 4,000.00 | Date: | 5/15/2012 |
| Contract Amount: | $ 4,000.00 | ||
| Previously Invoiced: | $ 558.00 | ||
| Current Invoice: | $ 3,050.25 | ||
| Invoiced to Date ($): | $ 3,608.25 | ||
| Invoiced to Date (%): | 90% | ||
| Remaining Budget ($): | $ 391.75 | ||
| Remaining Budget (%): | 10% |
Budget by Phase:
| Phase No. | **** |
|---|---|
| Phase Name: | PS Comminutor Cost Est |
| Phase Budget: | $ 4,000.00 |
| Previously Invoiced: | $ 558.00 |
| Current Invoice: | $ 3,050.25 |
| Invoiced to Date ($): | $ 3,608.25 |
| Invoiced to Date (%): | 90% |
| Remaining Budget ($): | $ 391.75 |
| Remaining Budget (%): | 10% |
Comments: Pump station wetwell drawdown testing on two occassions, before and after replacement of Pump #1. Analysis of pumping capacity and recommendations. Correspondence with DEP regarding permit requirements for Muffin Monster. Determine location for Muffin Monster installation. Evaluate Muffin Monster power supply alternatives and locations with Mark Miller.
Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com
East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380
Page: 1
05/31/2012
Client No: 6604-01M
Invoice No. 99747
General Authority Services
Fees
| Date | Description | Hours | Amount |
|---|---|---|---|
| 05/14/2012 RFA |
Review packet for Authority meeting of 5/14/12; attend regular meeting of Authority and tour of RCSTP. For Current Services Rendered |
3.00 3.00 |
570.00 |
Recapitulation
| Timekeeper | Hours | Hourly Rate | Total |
|---|---|---|---|
| Robert F. Adams | 3.00 | $190.00 | $570.00 |
| Previous Balance | $703.00 |
|---|---|
| Total Current Charges | 570.00 |
| 05/16/2012 Fee Payment | -703.00 |
| Balance Due | $570.00 |
OK RS 6/15
To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.
MAILLIE, FALCONIERO & COMPANY, LLP
Certified Public Accountants and Business Counselors
P.O. Box 680 | Oaks, PA 19456-0680
Phone: (610) 935-1420 | E-mail: firm@maillie.com | Web: www.maillie.com
Client Number: 2500
East Goshen Municipal Authority
Attn: Mr. Rick Smith
1580 Paoli Pike
West Chester, PA 19380-6107
Invoice: 1000016943
Date: 06/18/2012
Due Date: 07/18/2012
| For examination of the financial statements of the Authority for the year ended December 31, 2011 and assistance with preparation of Management Discussion and Analysis report | $7,900.00 |
|---|---|
| Billed Time & Expenses | $7,900.00 |
| Invoice Total | $7,900.00 |
APPROVED BY: RS
DATE PAID:
CHECK #:
CHARGED TO: 01424.3110
| 06/18/2012 | 05/31/2012 | 04/30/2012 | 03/31/2012 | 02/29/2012+ | Total |
|---|---|---|---|---|---|
| 7,900.00 | 0.00 | 0.00 | 0.00 | 0.00 | $7,900.00 |
Please return this portion with payment.
Invoice: 1000016943
ID: 2500
East Goshen Municipal Authority
(610)692-7171
Date: 06/18/2012
Due Date: 07/18/2012
Amount Due: $7,900.00
Amount Enclosed: $________
Finance charges of 1 1/2% per month will be added to the unpaid balance of accounts over 30 days from invoice date. Annual percentage rate of 18%.
Chester County Conservation District
688 Unionville Road, Suite 200, Kennett Square, PA 19348
(610) 925-4920 ~ Fax: (610) 925-4925 ~ www.chesco.org/conservation
APPLICATION FOR DISTRICT SERVICES – Revised 06.01.12
- Application will not be accepted unless signed and completed in its entirety.
- Please update the information on this form with each submission.
- Only folded plans will be accepted.
E&SPC Submission: [X] New [ ] 1st Revision [ ] *2nd Revision [ ] *3rd Revision [ ] *4th Revision *Note -Additional Fee Due
NPDES Submission: [ ] New [ ] Revision [ ] *Renewal [ ] *Major Amendment *Note- Additional Fee Due
Project Name: Hershey Mill Pump Station Diversion Date: July 5, 2012
Project Site Location: 970 to 972 Cornwallis Drive Municipality: East Goshen Township Tax Parcel ID: Multiple
Project Acres: 0.62 acres Total Cumulative Acres Disturbed Over Project Life: <0.62 acres
Development Type: [ ] Residential: _____ # of Units [ ] Industrial/Commercial/Institutional/Townhouses/Condominiums [ ] Timber Harvest [X] Municipal
[ ] Miscellaneous: [ ] Small Agricultural [ ] Large Agricultural [X] Chapter 105 [ ] Pond/Stream Work
Other Info: Linear construction - sewer force main installation via horizontal directional drilling
Applicant (Owner/Firm): East Goshen Municipal Authority Name: Rick Smith, Township Manager
Applicant Mailing Address: 1580 Paoli Pike Email: rsmith@eastgoshen.org
City: West Chester State: PA Zip Code: 19380 Phone: 610-692-7171 Fax: 610-692-8950
Plan Designer (Firm): Pennoni Associates Inc. Name: Michael Ellis, PE
Plan Designer Mailing Address: 121 Continental Drive, Suite 207 Email: mellis@pennoni.com
City: Newark State: DE Zip Code: 19713 Phone: 302-655-4451 Fax: 302-654-2895
E&SPC Fees: Base Fee: $ 250.00 Tier II Fee: $ N/A Emergency Review Fee: $ N/A
E&SPC fees are payable to Chester County Conservation District - Submit two checks: one check for Base Fee and Tier II, if applicable, and one check for Emergency Review, if applicable.
Refer to District Services Fee Schedule, and check appropriate Tier II:
[ ] 9% or more slopes [ ] deficient infiltration of 2 year storm [ ] more than 25% total area disturbance
[ ] less than 100 foot buffer [ ] adjacent property discharge
NPDES Fees: Base Fee: $ N/A Disturbed Acreage Fee: $ N/A
Base Fee is payable to Chester County Conservation District Clean Water Fund
Disturbed Acreage Fee is payable to Commonwealth of PA Clean Water Fund
Complete the following:
Receiving Stream Name: Ridley Creek Designation (HQ, EV, etc): HQ-TSF, MF
| Fee Attached | [X] | Act 2 Site (requires Individual NPDES Permit) | [ ] |
|---|---|---|---|
| Stormwater Narrative | [ ] | Emergency Prep. Plan | [X] |
| Stormwater Management | [ ] | E&S Narrative | [X] |
| Post Construction Stormwater Plans & Details | [ ] | E&S Calculations E&S Plans & Details |
[ ] [X] |
Incentive BMPs: [ ] Green Roof [ ] Community Redevelopment
[ ] Use of Spent Mushroom Compost as a soil amendment, for stabilization, and/or wetland creation
Plan Information -- Check if the project contains any of the following:
| Stream Crossing | [X] | Public Sewer | [X] |
|---|---|---|---|
| Wetlands | [ ] | On Site Septic | [ ] |
| Flood Plain | [ ] | Steep Slopes | [ ] |
| Water Encroachment | [ ] | Open Space | [ ] |
Permits Required -- Enclose copies if applicable:
| NPDES Individual Permit | [ ] | General Permit (Chapter 105) | [X] |
|---|---|---|---|
| NPDES General Permit | [ ] | Water Encroachment | [ ] |
| Joint Permit 401/404 | [ ] |
Fees and plans showing the required information are to be submitted with this application. Any additional plans or information required by the Chester County Conservation District should be submitted promptly. Emergency plan reviews require an additional request form that can be found on our website. There is a 25% review fee reduction incentive for Best Management Practices. The request for this reduction must be submitted in writing and attached with this submission. Please see our website for more information. The undersigned agrees to comply with all of the requirements of TITLE 25, CHAPTER 102, EROSION AND SEDIMENTATION CONTROL RULES AND REGULATIONS as set forth by the Pennsylvania Department of Environmental Protection, and further agrees to obtain all necessary permits in connection with the above referenced project. District Service Fees are non-refundable.
[Signature: L. Smith] Twp Mgr
(Applicant Signature)
CHECK REQUEST FORM
| Date form submitted: 6-28-12 |
Approved: Rick Date Paid: Check #: Charged to: 07426-1000 |
|---|---|
| Date & time check needed: 7-5-12 |
Pay to the order of: CHESTER COUNTY CONSERVATION DISTRICT
Mailing Address: ____________________________________________________
____________________________________________________
____________________________________________________
Amount of check: 250 00
Special Instructions:
(check one)
[ ] Mail check: regular mail.
[ ] Mail check: express mail.
[X] Return check to requester.
[ ] Hold check until: ____________________
Explanation of Expenses:
(attach invoice, slips, etc.)
PERMIT FEE
HM PS PROJECT
____________________________________________________
Request submitted by: Rick
Rick Smith
From: Ellis, Michael <MEllis@Pennoni.com>
Sent: Wednesday, June 27, 2012 5:04 PM
To: rsmith@eastgoshen.org
Subject: CCCD permit fees, Paoli Pk utilities
Hi Rick,
We expect to make E&S plan submissions to the Conservation District next week for the Hershey Mill and Reserve diversions. Even though we're less than 1 ac disturbance on each, we have to get their E&S approval as part of the General Permit for stream crossings. I expect to make both submissions to them next week. The District's application fee is $250.00 for Chapter 105 (General Permit) projects. There is no reduced fee for municipal authorities. Can the Township/Authority provide two $250.00 checks as part of these submissions next week?
On a separate subject, we found out today from the utility locator that the red mark-out along the edge of Paoli Pike is a gas anode line. We will reach out to PECO's gas division to get more info on it. I do not expect that it will prevent us from putting the sewer there, but we may need to slightly relocate the anode line as part of the project. Verizon informed us that they own the ductbank along Paoli Pike. AT&T has cables inside Verizon's ductbank there. The ductbank is apparently NOT encased in concrete. They're going to send us plans and details of the ductbank.
Mike
Michael J. Ellis, PE
Pennoni Associates Inc.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
Office 302-655-4451 x5236 | Direct 302-351-5236
Fax 302-654-2895 | Mobile 302-561-4235
http://www.pennoni.com | mellis@pennoni.com
Consulting Engineers providing...
Environmental – Geotechnical – Inspection & Testing – Land Development – MEP
Landscape Architecture – Structural – Survey – Transportation – Water/Wastewater
2 CHECKS
1
Chester County Conservation District
688 Unionville Road, Suite 200, Kennett Square, PA 19348
(610) 925-4920 ~ Fax: (610) 925-4925 ~ www.chesco.org/conservation
APPLICATION FOR DISTRICT SERVICES – Revised 06.01.12
- Application will not be accepted unless signed and completed in its entirety.
- Please update the information on this form with each submission.
- Only folded plans will be accepted.
E&SPC Submission: [X] New [ ] 1st Revision [ ] *2nd Revision [ ] *3rd Revision [ ] *4th Revision *Note -Additional Fee Due
NPDES Submission: [ ] New [ ] Revision [ ] *Renewal [ ] *Major Amendment *Note- Additional Fee Due
Project Name: Reserve Pump Station Diversion Date: July 5, 2012
Project Site Location: Vicinity of 929 Forest Lane Municipality: East Goshen Township Tax Parcel ID: Multiple
Project Acres: 0.45 acres Total Cumulative Acres Disturbed Over Project Life: 0.45 acres
Development Type: [ ] Residential: _____ # of Units [ ] Industrial/Commercial/Institutional/Townhouses/Condominiums [ ] Timber Harvest [X] Municipal
[ ] Miscellaneous: [ ] Small Agricultural [ ] Large Agricultural [X] Chapter 105 [ ] Pond/Stream Work
Other Info: Linear construction - gravity sewer installation with open cut stream crossing
Applicant (Owner/Firm): East Goshen Municipal Authority Name: Rick Smith, Township Manager
Applicant Mailing Address: 1580 Paoli Pike Email: rsmith@eastgoshen.org
City: West Chester State: PA Zip Code: 19380 Phone: 610-692-7171 Fax: 610-692-8950
Plan Designer (Firm): Pennoni Associates Inc. Name: Michael Ellis, PE
Plan Designer Mailing Address: 121 Continental Drive, Suite 207 Email: mellis@pennoni.com
City: Newark State: DE Zip Code: 19713 Phone: 302-655-4451 Fax: 302-654-2895
E&SPC Fees: Base Fee: $ 250.00 Tier II Fee: $ N/A Emergency Review Fee: $ N/A
E&SPC fees are payable to Chester County Conservation District - Submit two checks: one check for Base Fee and Tier II, if applicable, and one check for Emergency Review, if applicable.
Refer to District Services Fee Schedule, and check appropriate Tier II:
[ ] 9% or more slopes [ ] deficient infiltration of 2 year storm [ ] more than 25% total area disturbance
[ ] less than 100 foot buffer [ ] adjacent property discharge
NPDES Fees: Base Fee: $ N/A Disturbed Acreage Fee: $ N/A
Base Fee is payable to Chester County Conservation District Clean Water Fund
Disturbed Acreage Fee is payable to Commonwealth of PA Clean Water Fund
Complete the following:
Receiving Stream Name: Ridley Creek Designation (HQ, EV, etc): HQ-TSF, MF
| Fee Attached | [X] | Act 2 Site (requires Individual NPDES Permit) | [ ] |
|---|---|---|---|
| Stormwater Narrative | [ ] | Emergency Prep. Plan | [X] |
| Stormwater Management | [ ] | E&S Narrative | [X] |
| Post Construction Stormwater Plans & Details | [ ] | E&S Calculations E&S Plans & Details |
[ ] [X] |
Incentive BMPs: [ ] Green Roof [ ] Community Redevelopment
[ ] Use of Spent Mushroom Compost as a soil amendment, for stabilization, and/or wetland creation
Plan Information -- Check if the project contains any of the following:
| Stream Crossing | [X] | Public Sewer | [X] |
|---|---|---|---|
| Wetlands | [X] | On Site Septic | [ ] |
| Flood Plain | [X] | Steep Slopes | [ ] |
| Water Encroachment | [X] | Open Space | [ ] |
Permits Required -- Enclose copies if applicable:
| NPDES Individual Permit | [ ] | General Permit (Chapter 105) | [X] |
|---|---|---|---|
| NPDES General Permit | [ ] | Water Encroachment | [ ] |
| Joint Permit 401/404 | [ ] |
Fees and plans showing the required information are to be submitted with this application. Any additional plans or information required by the Chester County Conservation District should be submitted promptly. Emergency plan reviews require an additional request form that can be found on our website. There is a 25% review fee reduction incentive for Best Management Practices. The request for this reduction must be submitted in writing and attached with this submission. Please see our website for more information. The undersigned agrees to comply with all of the requirements of TITLE 25, CHAPTER 102, EROSION AND SEDIMENTATION CONTROL RULES AND REGULATIONS as set forth by the Pennsylvania Department of Environmental Protection, and further agrees to obtain all necessary permits in connection with the above referenced project. District Service Fees are non-refundable.
[Signature: L. Smith] Twp Mgr
(Applicant Signature)
CHECK REQUEST FORM
Date form submitted: 6-28-12
Date & time check needed: 7-5-12
Approved: TCS
Date Paid:
Check #:
Charged to: 07427-1000
Pay to the order of: CHESTER COUNTY CONSERVATION DISTRICT
Mailing Address:
Amount of check: 250.00
Special Instructions: (check one)
- [ ] Mail check: regular mail.
- [ ] Mail check: express mail.
- [x] Return check to requester.
- [ ] Hold check until: .
Explanation of Expenses: (attach invoice, slips, etc.)
PERMIT FEE
RESERVE P S PROJECT
Request submitted by: Rick
Rick Smith
From: Ellis, Michael <MEllis@Pennoni.com>
Sent: Wednesday, June 27, 2012 5:04 PM
To: rsmith@eastgoshen.org
Subject: CCCD permit fees, Paoli Pk utilities
Hi Rick,
We expect to make E&S plan submissions to the Conservation District next week for the Hershey Mill and Reserve diversions. Even though we're less than 1 ac disturbance on each, we have to get their E&S approval as part of the General Permit for stream crossings. I expect to make both submissions to them next week. The District's application fee is $250.00 for Chapter 105 (General Permit) projects. There is no reduced fee for municipal authorities. Can the Township/Authority provide two $250.00 checks as part of these submissions next week?
On a separate subject, we found out today from the utility locator that the red mark-out along the edge of Paoli Pike is a gas anode line. We will reach out to PECO's gas division to get more info on it. I do not expect that it will prevent us from putting the sewer there, but we may need to slightly relocate the anode line as part of the project. Verizon informed us that they own the ductbank along Paoli Pike. AT&T has cables inside Verizon's ductbank there. The ductbank is apparently NOT encased in concrete. They're going to send us plans and details of the ductbank.
Mike
Michael J. Ellis, PE
Pennoni Associates Inc.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
Office 302-655-4451 x5236 | Direct 302-351-5236
Fax 302-654-2895 | Mobile 302-561-4235
http://www.pennoni.com | mellis@pennoni.com
Consulting Engineers providing...
Environmental – Geotechnical – Inspection & Testing – Land Development – MEP
Landscape Architecture – Structural – Survey – Transportation – Water/Wastewater
2 CHECKS
1
xylem
Let's Solve Water
godwin FLYGT
Invoice
Sold by:
Branch 001
84 Floodgate Road
Bridgeport, NJ 08014-0191
Tel: 856-467-3636
Fax: 856-467-4841
Remit to:
P.O. Box 935152
Atlanta, GA 31193-5152
Phone: 856-467-3636
[Handwritten: 33074]
APPROVED BY: [Signature]
DATE PAID:
CHECK #: 07424, 7477
CHARGED TO: 05423 3702
[Handwritten: $4780.00]
| Cust. No. | 00005093 | Invoice Date | 06-11-2012 | Invoice No. | 400230917 |
|---|---|---|---|---|---|
| Page 1 of 2 | |||||
| SOLD TO | SHIP TO |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester PA 19380-6107 |
East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6107 |
| Customer PO | Ordered By | Contract Date | Date Shipped | Sale Contract # | Sales Representative | Order Taken By | Payment Terms |
|---|---|---|---|---|---|---|---|
| Lockwood Chase | Mr. Mark Miller | 06-07-2012 | 06-11-2012 | 201031186 | Daniel R. Pulcher | Mark Griffith | Net 30 |
| ITEM | DESCRIPTION | QTY ORDERED | QTY SHIPPED | QTY B/O'd | SELL PRICE | EXTENDED SELL |
|---|---|---|---|---|---|---|
| ESDW0025VA000 | Godwin Sub-Prime GSP25-HV Submersible Pump • 3" Male NPT Discharge • 2.5 HP Electric Motor • 230 Volt, 1 phase S/N: 0850101 E-Code: 82802716 |
1 | 1 | 0 | 2,800.00 | 2,800.00 |
| CPCA1P0122900 | Godwin Auto Control Panel • Maximum Overload 12 Amps • 1 Phase S/N: BZ-400089 E-Code: 18948 |
1 | 1 | 0 | 1,080.00 | 1,080.00 |
| CAPTNA016 | N/O' Mechanical Pilot Float Switch • 65' Cord Length |
2 | 2 | 0 | 0.00 | 0.00 |
| AD030030CFFPA0 | 3" Female Cam & Groove x 3" Female NPT Adapter | 1 | 1 | 0 | 0.00 | 0.00 |
| HSDS030050CGD | 3" x 50' Heavy Duty Layflat Hose with Cam & Groove Fittings | 3 | 3 | 0 | 300.00 | 900.00 |
ALL PAST DUE INVOICES ARE SUBJECT TO 1 1/2% PER MONTH SERVICE CHARGE
xylem
Let's Solve Water
godwin FLYGT
Invoice
Sold by:
Branch 001
84 Floodgate Road
Bridgeport, NJ 08014-0191
Tel: 856-467-3636
Fax: 856-467-4841
Remit to: Xylem Dewatering Solutions, Inc.
P.O. Box 935152
Atlanta, GA 31193-5152
Phone: 856-467-3636
| Cust. No. | 00005093 | Invoice Date | 06-11-2012 | Invoice No. | 400230917 |
|---|---|---|---|---|---|
| Page 2 of 2 | |||||
| SOLD TO | SHIP TO |
|---|---|
| East Goshen Township 1580 Paoli Pike West Chester PA 19380-6107 |
East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6107 |
| Customer PO | Ordered By | Contract Date | Date Shipped | Sale Contract # | Sales Representative | Order Taken By | Payment Terms |
|---|---|---|---|---|---|---|---|
| Lockwood Chase | Mr. Mark Miller | 06-07-2012 | 06-11-2012 | 201031186 | Daniel R. Pulcher | Mark Griffith | Net 30 |
| ITEM | DESCRIPTION | QTY ORDERED | QTY SHIPPED | QTY B/O'd | SELL PRICE | EXTENDED SELL |
|---|---|---|---|---|---|---|
| DZONE02PICKUP | Delivery Zone 2 - Pickup Truck | 1 | 1 | 0 | 0.00 | 0.00 |
| Merchandise | $ 4,780.00 | Labor | $ 0.00 | Shipping | $ 0.00 | Misc. Charges | $ 0.00 | Taxes | $ 0.00 | Total Invoice | $ 4,780.00 |
|---|
ALL PAST DUE INVOICES ARE SUBJECT TO 1 1/2% PER MONTH SERVICE CHARGE
PowerPro EQUIPMENT
□ NEW HOLLAND, PA 17557 (717) 354-4241
□ WEST CHESTER, PA 19380 (610) 738-9000
□ ALLENTOWN, PA 18106 (610) 395-6499
REMIT TO:
POWER PRO EQUIPMENT
780 EAST MAIN STREET
NEW HOLLAND, PA 17557
[Handwritten: 33043]
APPROVED BY: [Signature]
DATE PAID:
CHECK #:
CHARGED TO: 07424 7477
| Customer | 080067 | INVOICE | Invoice | P42685 | Pg | 1 |
|---|---|---|---|---|---|---|
| NET 30 | 6/21/12 |
| Sold To | Ship To |
|---|---|
| EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 610/692-7171 |
EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380 610/692-7171 |
| Br | Trk | Make | Model | Serial | Equipment | Meter | Sls | Customer P.O. |
|---|---|---|---|---|---|---|---|---|
| 002 | 57 | LOCKWOOD SEWER |
Taken By: KS Shipped: 6/21/12
| Ordr | Ship | B/O | Description | Each | Amount |
|---|---|---|---|---|---|
| 50 | 50 | CS 74102003 HYDRATED WHITE LI | 9.00 | 450.00 | |
| TOTAL PARTS | 450.00 | ||||
| NON TAX - GOVT NT-GOVT | .00 | ||||
| Total | 450.00 | ||||
-=< THANK YOU FOR YOUR BUSINESS >=-
WWW.POWERPROEQUIPMENT.COM
TERMS: A 1 1/2% PER MONTH LATE CHARGE IS ADDED TO THE UNPAID BALANCE ON ACCOUNTS PAST DUE PER TERMS REFERENCED ABOVE. THIS IS AN 18% ANNUAL PERCENTAGE RATE. PAST DUE ACCOUNTS WILL BE REFERRED FOR COLLECTION AND CUSTOMER IS LIABLE FOR LEGAL COSTS. ALL CLAIMS AND RETURNED GOODS MUST BE ACCOMPANIED BY THIS INVOICE. THERE IS A 15% RESTOCKING CHARGE AFTER SEVEN (7) DAYS. STORAGE CHARGE 30 DAYS AFTER NOTIFICATION.
We accept all major credit cards
LENNI ELECTRIC CORPORATION
Service Invoice
Invoice#: 120640
Date: 06/20/2012
[Handwritten: 33008]
APPROVED BY: MAM
DATE PAID:
CHECK #:
CHARGED TO: 07424 7477
| Billed To: | East Goshen Township 1580 Paoli Pike West Chester PA 19380 |
Project: | 31253 LOCKWOOD STATION 923 DOLPHIN DR WEST CHESTER PA 19380 |
|---|
| Scheduled: | 06/18/2012 | Employee: | Order#: | ||
|---|---|---|---|---|---|
| Time: | |||||
| Description | UM | Quantity | Price | Ext Price |
|---|---|---|---|---|
|
LOCKWOOD - TEMP PUMP |
||||
| ELECTRICIAN - 2 MEN, 2 HRS EA | HR | 4.00 | 69.00 | 276.00 |
| SERVICE TRUCK | HR | 2.00 | 20.00 | 40.00 |
| 70' 12-2 ROMEX, MISC HDWRE | LS | 1.00 | 36.68 | 36.68 |
Notes:
Terms are Net 30 days.
Balances over 30 days are subject to a finance charge of 2% per month.
Thank you for your prompt payment!
| Non-Taxable Amount: | 352.68 |
|---|---|
| Taxable Amount: | 0.00 |
| Sales Tax: | 0.00 |
| Amount Due | 352.68 |
1020 Andrew Drive West Chester, PA 19380 (610) 436-9922 Fax (610) 436-9926
Memo
| To: | Municipal Authority |
|---|---|
| From: | Jon Altshul |
| Re: | July 2012 Financial Report |
| Date: | July 6, 2012 |
Attached please find the June Financial Report for the Municipal Authority. Total expenses were $129,812.67, compared with total revenue of $102,016.71 (primarily due to a $100,000 transfer from the sewer capital reserve fund), for a net change in fund balance of -$27,795.96.
Note also that the beginning fund balance of $107,480.84 is slightly higher by $16.62 than the May ending fund balance, due to interest income that posted after the May report was prepared.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2012
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 107,480.84 *See Below | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 0.00 | 9.67 | 54.56 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 9.67 | 54.56 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 1,228.08 | 1,228.08 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 1,228.08 | 1,228.08 | |
| RCSTP NET RESULT | 0.00 | (1,218.41) | (1,173.52) | |
| OPERATING BUDGET | ||||
| REVENUE | ||||
U:\bmccool\2012\Municipal Authority\2012 - 06 Financial Report.xlsx Page 1 of 3 07/03/2012
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2012
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 0.00 | 7.04 | 20.37 |
| C.C. TAPPING FEES | 07364 1100 | 2,000.00 | 0.00 | 0.00 |
| R.C.TAPPING FEES | 07364 1110 | 2,000.00 | 2,000.00 | 4,000.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 0.00 | 845.64 |
| MISCELLANEOUS REVENUE | 07380 1000 | 1,000.00 | 0.00 | 423.36 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 125,000.00 | 0.00 | 30,700.00 |
| TOTAL REVENUE | 130,000.00 | 2,007.04 | 35,989.37 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 37,669.00 | 8,391.94 | 16,783.88 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 4,162.00 | 0.00 | 950.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 8,843.00 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 37,066.00 | 289.75 | 21,165.00 |
| LEGAL SERVICES | 07424 3140 | 12,485.00 | 0.00 | 3,611.68 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 19,600.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 6,981.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 126,806.00 | 8,681.69 | 42,510.56 | |
| OPERATING NET RESULT | 3,194.00 | (6,674.65) | (6,521.19) | |
U:\bmccool\2012\Municipal Authority\2012 - 06 Financial Report.xlsx Page 2 of 3 07/03/2012
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
June 2012
| Account Title | Acct # | Annual Budget | Month To Date Actual | Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07392 0804 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 828,000.00 | 100,000.00 | 200,000.00 |
| TOTAL REVENUE | 828,000.00 | 100,000.00 | 200,000.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 51,764.00 | 320.50 | 2,552.50 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 170,000.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 37,553.00 | 7,527.25 | 27,373.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 411,000.00 | 105,473.97 | 105,473.97 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 5,582.68 | 5,582.68 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 29,069.00 | 748.50 | 6,002.75 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 46,000.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 29,069.00 | 250.00 | 4,245.00 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 93,000.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 867,455.00 | 119,902.90 | 151,229.90 | |
| CAPITAL NET RESULT | (39,455.00) | (19,902.90) | 48,770.10 | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 79,684.88 | |||
*June Beginning Balance does not equal May Ending Balance because $16.62 was posted in interest after the May report was prepared.
U:\bmccool\2012\Municipal Authority\2012 - 06 Financial Report.xlsx Page 3 of 3 07/03/2012
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 1
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 INTEREST EARNINGS | 0.00 | |||||||||
| 1201 | JE | 31221 | 0.62 | 02/07/12 | INTEREST | INTEREST EARNED JAN. 2012 7100.1000 |
||||
| 0.00 | 0.62 | -0.62 | ||||||||
| 1202 | 31655 | 0.25 | 03/14/12 | INTEREST | INTEREST EARNED FEB. 2012 7100.1000 |
|||||
| 0.00 | 0.25 | -0.87 | ||||||||
| 1203 | 31930 | 0.56 | 04/04/12 | INTEREST | INTEREST EARNED MARCH 2012 7100.1000 |
|||||
| 0.00 | 0.56 | -1.43 | ||||||||
| 1204 | 32293 | 4.97 | 05/02/12 | INTEREST | INTEREST EARNED APRIL 2012 7100.1000 |
|||||
| 0.00 | 4.97 | -6.40 | ||||||||
| 1205 | 32709 | 6.93 | 06/05/12 | INTEREST | INTEREST EARNED MAY 2012 7100.1000 |
|||||
| 0.00 | 6.93 | -13.33 | ||||||||
| 1206 | 33106 | 7.04 | 07/03/12 | INTEREST | INTEREST EARNED JUNE 2012 7100.1000 |
|||||
| 0.00 | 7.04 | -20.37 | ||||||||
| 0.00 | 20.37 | -20.37 | ||||||||
| 07341-1020 INTEREST EARNED - RCSTP EXPANSION | 0.00 | |||||||||
| 1201 | 31222 | 0.40 | 02/07/12 | INTEREST | INTEREST EARNED JAN. 2012 7105.1000 |
|||||
| 31223 | 7.80 | 02/07/12 | INTEREST | INTEREST EARNED JAN. 2012 7109.2000 |
||||||
| 31270 | 0.05 | 02/09/12 | INTEREST | INTEREST EARNED JAN.2012 7105.1500 |
||||||
| 0.00 | 8.25 | -8.25 | ||||||||
| 1202 | 31656 | 0.30 | 03/14/12 | INTEREST | INTEREST EARNED FEB. 2012 7105.1000 |
|||||
| 31657 | 7.30 | 03/14/12 | INTEREST | INTEREST EARNED FEB. 2012 7109.2000 |
||||||
| 0.00 | 7.60 | -15.85 | ||||||||
| 1203 | 31931 | 0.15 | 04/04/12 | INTEREST | INTEREST EARNED MARCH 2012 7105.1000 |
|||||
| 31932 | 9.54 | 04/04/12 | INTEREST | INTEREST EARNED MARCH 2012 7109.2000 |
||||||
| 0.00 | 9.69 | -25.54 | ||||||||
| 1204 | 32294 | 0.14 | 05/02/12 | INTEREST | INTEREST EARNED APRIL 2012 7105.1000 |
|||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 2
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1020 | 1204 | JE | 32295 | 9.52 | 05/02/12 | INTEREST | INTEREST EARNED APRIL 2012 7109.2000 |
|||
| 0.00 | 9.66 | -35.20 | ||||||||
| 1205 | 32710 | 0.14 | 06/05/12 | INTEREST | INTEREST EARNED MAY 2012 7105.1000 |
|||||
| 32711 | 9.55 | 06/05/12 | INTEREST | INTEREST EARNED MAY 2012 7109.2000 |
||||||
| 0.00 | 9.69 | -44.89 | ||||||||
| 1206 | 33107 | 0.15 | 07/03/12 | INTEREST | INTEREST EARNED JUNE 2012 7105.1000 |
|||||
| 33108 | 9.52 | 07/03/12 | INTEREST | INTEREST EARNED JUNE 2012 7109.2000 |
||||||
| 0.00 | 9.67 | -54.56 | ||||||||
| 0.00 | 54.56 | -54.56 | ||||||||
| 07364-1110 R.C.TAPPING FEES | 0.00 | |||||||||
| 1205 | RE | 32596 | 2,000.00 | 05/25/12 | 32596 | 1 | TAP IN FEE FOR 1636 MANLEY RD | |||
| 0.00 | 2,000.00 | -2,000.00 | ||||||||
| 1206 | 32779 | 2,000.00 | 06/11/12 | 32779 | 1 | TAP IN FEE FOR 913 SORRELL HIL R.C.TAPPING FEES |
||||
| 0.00 | 2,000.00 | -4,000.00 | ||||||||
| 0.00 | 4,000.00 | -4,000.00 | ||||||||
| 07364-1130 CONNECTION FEES - SEWER | 0.00 | |||||||||
| 1202 | CR | 31243 | 423.00 | 02/08/12 | 197 | 6576 | 1 JACOBS, ROBERT & CHERYL | |||
| 31437 | 423.00 | 02/27/12 | 2103 | 6575 | 1 STOFFLET, MICHAEL | |||||
| JE | 31244 | 141.12 | 02/08/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 31438 | 141.12 | 02/27/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 282.24 | 846.00 | -563.76 | ||||||||
| 1203 | CR | 31489 | 423.00 | 03/01/12 | 730 | 6574 | 1 GEORGE SMITH & CHRISTINA CONLE | |||
| JE | 31490 | 141.12 | 03/01/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -845.64 | ||||||||
| 423.36 | 1,269.00 | -845.64 | ||||||||
| 07380-1000 MISCELLANEOUS REVENUE | 0.00 | |||||||||
| 1202 | 31244 | 141.12 | 02/08/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 31438 | 141.12 | 02/27/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | ||||||
| 0.00 | 282.24 | -282.24 | ||||||||
| 1203 | 31490 | 141.12 | 03/01/12 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 3
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 | 141.12 | -423.36 | ||||||||
| 0.00 | 423.36 | -423.36 | ||||||||
| 07392-0500 | TRANSFER FROM SEWER OPERATING | 0.00 | ||||||||
| 1202 | 31428 | 15,000.00 | 02/24/12 | XFER | XFER FROM 5100.1000 TO 7100.1000 | |||||
| 0.00 | 15,000.00 | -15,000.00 | ||||||||
| 1203 | 31612 | 15,700.00 | 03/13/12 | XFER | XFER FROM 5100.1000 TO 7100.1000 TO COVER MA EXP. | |||||
| 0.00 | 15,700.00 | -30,700.00 | ||||||||
| 0.00 | 30,700.00 | -30,700.00 | ||||||||
| 07392-0900 | TRANSFER FROM SEWER CAP RESERVE | 0.00 | ||||||||
| 1204 | 32045 | 100,000.00 | 04/12/12 | XFER | XFER $ FROM SEWER CAP.RESERVE TO MUN.AUTHORITY GEN.ACCT. | |||||
| 0.00 | 100,000.00 | -100,000.00 | ||||||||
| 1206 | 32839 | 100,000.00 | 06/15/12 | XFER | XFER FUNDS TO MA FROM SEWER CAPITAL RES. 5/14/12 | |||||
| 0.00 | 100,000.00 | -200,000.00 | ||||||||
| 0.00 | 200,000.00 | -200,000.00 | ||||||||
| 07424-1400 | ADMINISTRATIVE WAGES | 0.00 | ||||||||
| 1203 | CD | 31601 | 8,391.94 | 03/13/12 | 2085 | 425 | EAST GOSHEN TOWNSHIP 1ST QTR.2012 MUNICIPAL AUTHORITY EXPENSES | |||
| 8,391.94 | 0.00 | 8,391.94 | ||||||||
| 1206 | 32849 | 8,391.94 | 06/15/12 | 2094 | 425 | EAST GOSHEN TOWNSHIP 2ND QTR 2012 MUNICIPAL AUTHORITY EXPENSES | ||||
| 8,391.94 | 0.00 | 16,783.88 | ||||||||
| 16,783.88 | 0.00 | 16,783.88 | ||||||||
| 07424-3000 | MISCELLANEOUS EXPENSE | 0.00 | ||||||||
| 1201 | 30772 | 950.00 | 01/06/12 | 2081 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2012 ACTIVE MEMBERSHIP DUES | ||||
| 950.00 | 0.00 | 950.00 | ||||||||
| 950.00 | 0.00 | 950.00 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 4
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-3130 | ENGINEERING SERVICES | 0.00 | ||||||||
| 1202 | 31393 | 220.00 | 02/22/12 | 2084 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 1/15/12 2011 ANNUAL SE | ||||
| 220.00 | 0.00 | 220.00 | ||||||||
| 1203 | 31608 | 1,182.50 | 03/13/12 | 2086 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/11/12 2011 ANN SERVICES | ||||
| 1,182.50 | 0.00 | 1,402.50 | ||||||||
| 1204 | 32043 | 4,971.75 | 04/12/12 | 2088 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/18/12 2012 GEN.S | ||||
| 4,971.75 | 0.00 | 6,374.25 | ||||||||
| 1205 | 32450 | 14,501.00 | 05/15/12 | 2090 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 4/15/12 2011 CHAP.9 | ||||
| 14,501.00 | 0.00 | 20,875.25 | ||||||||
| 1206 | 32809 | 289.75 | 06/14/12 | 2092 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/13/12 GENERAL SE | ||||
| 289.75 | 0.00 | 21,165.00 | ||||||||
| 21,165.00 | 0.00 | 21,165.00 | ||||||||
| 07424-3140 | LEGAL SERVICES | 0.00 | ||||||||
| 1202 | 31393 | 1,825.68 | 02/22/12 | 2083 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 12/12/11 - GEN.AUTH. | ||||
| 1,825.68 | 0.00 | 1,825.68 | ||||||||
| 1204 | 32043 | 1,083.00 | 04/12/12 | 2087 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 2/7-2/29/12 GEN.AU | ||||
| 1,083.00 | 0.00 | 2,908.68 | ||||||||
| 1205 | 32450 | 703.00 | 05/15/12 | 2089 | 528 | GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 3/12-3/21/12 GEN.AUT | ||||
| 703.00 | 0.00 | 3,611.68 | ||||||||
| 3,611.68 | 0.00 | 3,611.68 | ||||||||
| 07424-7453 | R.C. CAP EXPANSION - ELECTRICAL | 0.00 | ||||||||
| 1206 | 32809 | 1,228.08 | 06/14/12 | 2091 | 2696 | CLINGER CORP., WM. H. REPAIR TANK MIXER CONTROL CIRCUI FAULT | ||||
| 1,228.08 | 0.00 | 1,228.08 | ||||||||
| 1,228.08 | 0.00 | 1,228.08 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 5
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07424-7475 | LOCHWOOD ABANDONMENT ENGINEER | 0.00 | ||||||||
| 1202 | 31393 | 2,600.00 | 02/22/12 | 2082 | 2911 | EARTHCORE SERVICES LLC MOBILIZATION, ATV RIG, AUGER PRO LOCKWOOD ENGINEERING | ||||
| 4,315.00 | 02/22/12 | 2084 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 1/15/12 LCSTP FINAL D | ||||||
| *** | 6,915.00 | 0.00 | *** | |||||||
| 6,915.00 | 0.00 | 6,915.00 | ||||||||
| 1203 | 31608 | 7,440.50 | 03/13/12 | 2086 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/11/12 LCSTP FI DESIGN | ||||
| 7,440.50 | 0.00 | 14,355.50 | ||||||||
| 1204 | 32043 | 1,366.00 | 04/12/12 | 2088 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/18/12 LOCHWOOD | ||||
| 1,366.00 | 0.00 | 15,721.50 | ||||||||
| 1205 | 32450 | 4,124.25 | 05/15/12 | 2090 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 4/15/12 LCSTP | ||||
| 4,124.25 | 0.00 | 19,845.75 | ||||||||
| 1206 | 32809 | 7,527.25 | 06/14/12 | 2092 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/31/12 TO ACCOMADATE INCREASE IN FLOW TO P | ||||
| 7,527.25 | 0.00 | 27,373.00 | ||||||||
| 27,373.00 | 0.00 | 27,373.00 | ||||||||
| 07424-7476 | LOCHWOOD ABANDONMENT CONSTRUCTION | 0.00 | ||||||||
| 105,473.97 | 06/14/12 | 2093 | 2947 | SJM CONSTRUCTION CO. INC. APPLICATION 1 OF CONTRACT | ||||||
| 105,473.97 | 0.00 | 105,473.97 | ||||||||
| 105,473.97 | 0.00 | 105,473.97 | ||||||||
| 07424-7477 | LOCHWOOD ELIMINATION PHASE 2 | 0.00 | ||||||||
| 33040 | 352.68 | 06/29/12 | 2095 | 765 | LENNI ELECTRIC CORPORATION SET UP TEMPORARY PUMP - LOCHWOOD | |||||
| 450.00 | 06/29/12 | 2096 | 2342 | POWERPRO EQUIPMENT 50 HYDRATED WHITE - LOCHWOOD PLA CLOSURE | ||||||
| 4,780.00 | 06/29/12 | 2097 | 550 | XYLEM DEWATERING SOLUTIONS INC. (GODWIN) GODWIN SUBMERSIBLE PUMP & CONTRO PANEL, HEAVY DUTY LAYFLAT HOSE | ||||||
| *** | 5,582.68 | 0.00 | *** | |||||||
| 5,582.68 | 0.00 | 5,582.68 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 6
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 5,582.68 | 0.00 | 5,582.68 | ||||||||
| 07425-1000 MARYDELL PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1203 | 31608 | 810.00 | 03/13/12 | 2086 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/11/12 MARYDELL |
||||
| 810.00 | 0.00 | 810.00 | ||||||||
| 1204 | 32043 | 1,422.00 | 04/12/12 | 2088 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/18/12 MARYDELL P |
||||
| 1,422.00 | 0.00 | 2,232.00 | ||||||||
| 1206 | 32809 | 320.50 | 06/14/12 | 2092 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/13/12 MARYDELL |
||||
| 320.50 | 0.00 | 2,552.50 | ||||||||
| 2,552.50 | 0.00 | 2,552.50 | ||||||||
| 07426-1000 HERSHEY MILL STATION - ENGINEER | 0.00 | |||||||||
| 1203 | 31608 | 2,336.75 | 03/13/12 | 2086 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/11/12 HERSHEY |
||||
| 2,336.75 | 0.00 | 2,336.75 | ||||||||
| 1205 | 32450 | 2,917.50 | 05/15/12 | 2090 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 4/15/12 HERSHEY MIL |
||||
| 2,917.50 | 0.00 | 5,254.25 | ||||||||
| 1206 | 32809 | 498.50 | 06/14/12 | 2092 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 5/13/12 HERSHEY MI |
||||
| 33047 | 250.00 | 06/29/12 | 2099 | 263 | CHESTER COUNTY CONSERVATION DISTRICT PERMIT FEE HM PS PROJECT |
|||||
| 748.50 | 0.00 | 6,002.75 | ||||||||
| 6,002.75 | 0.00 | 6,002.75 | ||||||||
| 07427-1000 RESERVE PUMP STATION - ENGINEER | 0.00 | |||||||||
| 1203 | 31608 | 605.00 | 03/13/12 | 2086 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/11/12 RESERVE |
||||
| 605.00 | 0.00 | 605.00 | ||||||||
| 1204 | 32043 | 472.50 | 04/12/12 | 2088 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 3/18/12 RESERVE PU |
||||
| 472.50 | 0.00 | 1,077.50 | ||||||||
| 1205 | 32450 | 2,917.50 | 05/15/12 | 2090 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 4/15/12 RESERVE PS |
||||
| 2,917.50 | 0.00 | 3,995.00 | ||||||||
East Goshen Township General Ledger
Report Date 07/03/12 GL Transaction Details PAGE 7
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07427-1000 | 1206 | CD | 33047 | 250.00 | 06/29/12 | 2098 | 263 | CHESTER COUNTY CONSERVATION DISTRICT PERMIT FEE RESERVE PS PROJECT |
||
| 250.00 | 0.00 | 4,245.00 | ||||||||
| 4,245.00 | 0.00 | 4,245.00 | ||||||||
| Beg Bal | 195,391.90 | 236,467.29 | -41,075.39 | 0.00 | ||||||
Memo
| To: | Municipal Authority |
|---|---|
| From: | Tia Piccolo |
| Date: | July 5, 2012 |
| Re: | Lochwood Plant Closing Labor Costs as of 6/30/12 |
Please note that as of 6/30/12 $7,780.40 has been reported in labor and equipment costs related to the closing of the Lochwood Plant.
We recommend that the Municipal Authority approve these charges.
| Employees | Reg | OT |
|---|---|---|
| Total Hours | 127 | 12 |
| Total Cost | 3,954.36 | 560.10 |
| Equipment | |
|---|---|
| Total Hours | 55.5 |
| Total Cost | 3,265.94 |
Rick Smith
| From: | Ellis, Michael <MEllis@Pennoni.com> |
|---|---|
| Sent: | Thursday, July 05, 2012 10:36 AM |
| To: | rsmith@eastgoshen.org |
| Cc: | Barbato, Daniel; Mark Miller (mmiller@eastgoshen.org) |
| Subject: | Sewer Diversion Schedules |
Rick,
Following are projected schedules for the Marydell, Reserve, and Hershey Mill sewer diversions.
Marydell
- Test pits = by July 31, 2012
- HOP application for sewer installation = by July 31, 2012
- DEP Closure Plan submission = July 31, 2012
- HOP permit issuance = by August 31, 2012
- DEP Closure Plan approval (90-120 days) = October-November 2012
- Additional Easement from shopping center = October-November 2012
- Advertise = December 2012
- Bids Due = January 2013
- Contract Execution (after bonding and insurance) = February 2013
- Start Construction = March 2013
- Complete Construction (say 120 days) = July 2013
Hershey Mill
- GP-5 application to DEP for stream crossing = Done (June 22, 2012)
- E&S submission to CCCD = July 6, 2012
- Rock borings = by July 31, 2012
- DEP Part 2 WQM Permit Amendment submission = by July 31, 2012
- CCCD E&S approval (±60 days) = September 2012
- DEP GP-5 approval (following CCCD approval) = September 2012
- DEP Part 2 WQM Permit Amendment approval (120 days) = November 2012
- Advertise = December 2012
- Bids Due = January 2013
- Contract Execution (after bonding and insurance) = February 2013
- Start Construction = March 2013
- Complete Construction (say 120 days) = July 2013
Reserve
- GP-5 application to DEP for stream crossing = Done (June 27, 2012)
- E&S submission to CCCD = July 6, 2012
- Rock borings = by July 31, 2012
- DEP Closure Plan submission = by July 31, 2012
- CCCD E&S approval (±60 days) = September 2012
- DEP GP-5 approval (following CCCD approval) = September 2012
- DEP Closure Plan approval (90-120 days) = October-November 2012
- 3-4 MONTH HOLD FOR OTHER PROJECTS TO BID AND BE AWARDED*
- Advertise = March 2013
1
- Bids Due = April 2013
- Contract Execution (after bonding and insurance) = May 2013
- Start Construction = June 2013
- Complete Construction (say 120 days) = October 2013
*We have previously discussed the potential to bid Marydell and Reserve under one contract for economy of scale. After further consideration, I suggest they be bid separately. The contract duration would have to be extended to 6-8+ months if they are done together versus approx 4 months for only one project. The contractor may also not be able to handle both projects concurrently, and separate contracts would diversify the risk in case there are any performance issues with one contractor. Further, if Reserve is bid out after Marydell is awarded, there is still a potential for economy of scale as the Marydell contractor could bid the Reserve project anyway at economical costs since he will already be in the township. I'm therefore proposing the Reserve bidding be pushed back 3-4 months so that there are not 3 projects out to bid at the same time (for conflicts/delays with contractual issues, coordination, inspections, etc.), and to allow the same contractors to bid and not have to work the entirety of both jobs concurrently.
Hershey Mill will be bid separate of the other two because it is a directional drill contract and is expected to involve a different, specialty prime contractor than the other two diversions.
Mike
Michael J. Ellis, PE
Pennoni Associates Inc.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713-4310
Office 302-655-4451 x5236 | Direct 302-351-5236
Fax 302-654-2895 | Mobile 302-561-4235
http://www.pennoni.com | mellis@pennoni.com
Consulting Engineers providing...
Environmental – Geotechnical – Inspection & Testing – Land Development – MEP
Landscape Architecture – Structural – Survey – Transportation – Water/Wastewater
2
JULY 2012
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
ON-GOING
- Submit an article for each newsletter. Need by 2/8/12 - Kevin - Completed; Need by 5/2/12 –Jack - Completed; Need by 8/1/12 - Dana; Need by 11/7/12; February 2013
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (March) – Jack - Completed; 2 nd Quarter (June) – Joe – Not completed; 3 rd Quarter (September) - Dana; 4 th Quarter (December) - Kevin
- Respond to capacity requests in 45 days or less.
- Implement I & I Plan
- Conduct a sewer facilities tour after RCSTP construction is complete – Have tour in September
PROJECTS
- Lockwood Bid – Bid awarded 2/20 – Contract executed 3/12; Pipe Installation - Notice to proceed issued 3/20, Pipe work completed. Restoration work in progress
- Abandon Plant – Treatment pond filled in. Currently pumping down the and filling in the storage lagoon.
- Marydell Pump Station Design/Permit – In Progress; Bid; Pipe Installation; Abandon Pump Station
- Hershey Mill Pump Station Design/Permit – In Progress; Bid; Pipe Installation
- Reserve Pump Station - In Progress Design/Permit; Bid; Pipe Installation; Abandon Pump Station
F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2012\070912.doc
RESOLUTION 31
OF THE EAST GOSHEN MUNICIPAL AUTHORITY
CHESTER COUNTY, PENNSYLVANIA
A RESOLUTION THAT DECLARES THE OFFICIAL INTENT OF THE EAST GOSHEN MUNICIPAL AUTHORITY (THE “MUNICIPAL AUTHORITY”) TO ADOPT CERTAIN FINANCIAL POLICIES AND PRODECURES.
WHEREAS, the “Municipal Authority” was created pursuant to the provisions of the Municipality Authorities Act, approved May 2, 1945 (P.L. 382, No. 164, as amended); and
WHEREAS, the “Municipal Authority” was issue a Certificate of Incorporation by the Commonwealth of Pennsylvania on May 23, 1967 and pursuant to said Certificate shall exist for a term of 50 years; and
WHEREAS, the “Municipal Authority” was issued a Certificate of Amendment by the Commonwealth of Pennsylvania on August 6, 1998 and that extended the term until July 1, 2048; and
WHEREAS, the Municipal Authority is subject to the provisions of the Municipality Authorities Act, as well as various other state and federal laws and/or regulations that impose financial requirements on the Municipal Authority: and
WHEREAS, the Municipal Authority has previously authorized the Township Manager to incur expenses of a maximum of five thousand dollars ($5,000.00) on behalf of the Municipal Authority; and
WHEREAS, the Municipal Authority has determined that it should formally adopt policies and procedures for various financial activities.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF THE EAST GOSHEN MUNICIPAL AUTHORITY, THAT:
- The Township Manager is authorized to incur a maximum of $5,000 of expenses on behalf of the Authority. The Township shall advise the Municipal Authority of any such incurrence at their next scheduled meeting.
- The Municipal Authority will adhere to purchasing and bidding requirements established by the Commonwealth of Pennsylvania.
- The Municipal Authority shall, at a public meeting, approve all invoices prior to payment, except for Debt Service payments.
- The Township Manager is authorized to receive and open sealed bids on behalf of the Municipal Authority.
- All Resolutions or parts of resolutions not in accord with this Resolution are hereby repealed insofar as they conflict herewith.
IN WITNESS WHEREOF, we, the undersigned authorized officials of the East Goshen Municipal Authority, Chester County, Commonwealth of Pennsylvania, have hereunto set our signatures and affixed hereto the Seal of the Municipal Authority.
Dated: July ________, 2012
_____________________________________
Dana Pizarro
Chairman
East Goshen Municipal Authority
[Seal]
ATTEST:
_____________________________________
Secretary
East Goshen Municipal Authority
F:\Data\Shared Data\ABC'S\Municipal Authority\Resolutions\Reimbursement Resolution 31 061912.docx
2
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org
Date: 6/21/2012
To: Municipal Authority
From: Mark Gordon, Township Zoning Officer mab
Re: Goshen Meadows / Cond. Use Application / 1325 West Chester Pike
Please review the Conditional Use plan for 1325 West Chester Pike. The applicant has requested sewage flow allocation for the new 64 unit Apartment Community.
I have forwarded the allocation request and exemption request and supporting information to Mr. Scott at West Goshen for his review. The Municipal Authority needs to approve the allocation and verify the conveyance is adequate for the proposed flows.
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Conditional Use 2012\Memo to MA 06212012.doc
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
June 21, 2012
West Goshen Township
ATTN: Mr. John Scott
1025 Paoli Pike
West Chester, Pa. 19380-4699
COPY
Re: Sewer Capacity / Goshen Meadows Apartments
Dear Mr. Scott:
East Goshen Township is currently reviewing a Conditional Use application for a new Apartment Community at 1325 West Chester Pike. The applicant, Goshen Meadows Investors LP., proposes to develop the five acre site adjacent to the existing Goshen Meadows Apartment Community. The plan proposes to add five (5) apartment buildings consisting of sixty (60), two bedroom apartment units and convert the existing historic home into four (4), one bedroom apartment units.
Please review the enclosed request for sewer capacity and the sewer facilities planning module exemption request from the applicant. As you know the Township will need a letter from your office along with the completed forms in order to move forward with the plan review process.
The East Goshen Municipal Authority will meet on July 9, 2012 to make a recommendation on this application and the Planning Commission will make a final recommendation on this application to the Board of Supervisors at their meeting on July 11, 2012. Please contact me if you have any questions.
Sincerely,
Mark A. Gordon
Township Zoning Officer
F:\Data\Shared Data\Property Management\53-6\53-6-56 (1325 WC Pike)\Conditional Use 2012\Ltr to J Scott 06212012.doc
610-356-9550
FAX 610-356-5032
Herbert E. MacCombie, Jr., P.E.
CONSULTING ENGINEERS & SURVEYORS, INC.
1000 PALMERS MILL ROAD
MEDIA, PA 19063
James W. MacCombie, P.E., P.L.S.
Herbert E. MacCombie, III, Technician
REPLY TO:
P.O. BOX 118
BROOMALL, PA 19008-0118
RECEIVED
BY:
JUN 15 2012
June 15, 2012
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
East Goshen Township Municipal Authority
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Attn: Mark A. Gordon, Director of Code Enforcement, Zoning Officer
Re: Sewage Flow Allocation
Plan of Proposed Planned Apartment Development - Smith Tract
West Chester Pike
East Goshen Township, Chester County, PA
Dear Mr. Gordon:
Please be advised that our client, Goshen Meadows L.P., has made application to East Goshen Township for Conditional Use Approval for a proposed planned apartment development. In accordance with Act 537, as amended by Act 149, it is hereby respectfully requested that consideration be given to granting an exemption from submitting Sewage Facilities Planning Modules. It is further requested that provisions for appropriate flow allocation for the proposed development also be considered.
The proposed development proposes 60 two-bedroom luxury apartments in five buildings and the adaptive reuse of the existing historic structure with four one-bedroom luxury apartments. The proposed development of 64 units will generate 200 GPD per unit for a total of 12,800 GPD. Please refer to the enclosed letter from PaDEP to Pennsylvania American Water Company, dated May 29, 2008 regarding the allocation of flow for planning purposes. All of the proposed sewage will ultimately enter the East Goshen Township sanitary sewer system. A copy of the Plan of Proposed Improvements is included for your use.
June 15, 2012
Proposed Planned Apartment Development - Smith Tract
Page 2
Also enclosed, please find the completed PaDEP mailer for signature by the Township at the appropriate time, completed PNDI review and USGS Quad Map.
Please contact our office if you have any questions.
Very truly yours,
_____________________________________
Dennis F. O'Neill, P.E.
Copy: Scott Fagan
Mark Thompson, Esq.
3800-CD-WSFR0359 Rev. 5/2010
- Development Information Name of Development: Prop. Apartment Complex Smith Tract Developer Name: Goshen Meadows Investors, L.P. Address: C/O Scott Fagan, P.O. Box 446 Narberth, PA 19072 Telephone # 610-667-1700 x 305 Email: asf@mmcrent.com
- Location of Development a. County: Chester b. Municipality: East Goshen Township c. Address or Coordinates: West Chester Pike at Mary Fran Drive d. Tax Parcel # 53-06-56.1 e. USGS Quad Name: West Chester inches up 16.6 over 6.8 from bottom right corner of map. f. Located in a High Quality/Exceptional Value watershed? [ ] Yes [X] No
- Type of Development Proposed (check appropriate box) [ ] Residential [X] Multi-Residential Describe: 60 2 bedroom apartments in five proposed building - conversion of ex bldg into 4 1 bedroom apart. [ ] Commercial [ ] Institutional Describe: ____________________________________________________ [ ] Brownfield Site Redevelopment [ ] Other (specify): ___________________________________________
- Size a. # of lots 1 # of EDUs 64 b. # of lots since 5/15/72 1 c. Development Acreage 5.12 d. Remaining Acreage 0
- Sewage Flows 12,800 gpd
- Proposed Sewage Disposal Method (check applicable boxes) a. [X] Sewerage System [ ] Existing (connection only) [X] New (extension) [X] Public [ ] Private [ ] Pump Station(s)/Force Main [X] Gravity Name of existing system being extended: East Goshen Municipal Authority Interceptor Name: ____________________________________________ Treatment Facility Name: ______________________________________ NPDES Permit # ______________________________________________ b. [ ] Construction of Treatment Facility [ ] With Stream Discharge [ ] With Land Application (not including IRSIS) [ ] Other [ ] Repair? Name of waterbody where point of discharge is proposed (if stream discharge): ______________________________________________ c. [ ] Onlot Sewage Disposal Systems (check appropriate box) [ ] Individual onlot system(s) (including IRSIS) [ ] Community onlot system [ ] Large-Volume onlot system d. [ ] Retaining tanks Number of Holding Tanks: ____________ Number of Privies: ____________
- [ ] Request Sewage Facilities Planning Module forms in electronic format
- Request for Planning Exemption a. Protection of rare, endangered or threatened species Check one: [X] The "PNDI Project Environmental Review Receipt" is attached. or [ ] A completed "PNDI Project Planning & Environmental Review Form," (PNDI Form) is attached. I request DEP staff to complete the required PNDI search for my project. I realize that my planning exemption will be considered incomplete and that the DEP processing of my planning exemption request will be delayed, until a "PNDI Project Environmental Review Receipt" and all supporting documentation from jurisdictional agencies (when necessary) is/are received by DEP. Applicant or Consultant Initials: ________ b. [X] Plot Plan Attached [X] Site Reports Attached c. Onlot Disposal Systems (1) I certify that the Official Plan shows this area as an onlot service area. _________________________________ / ____________ (Signature of Municipal Official) Date _________________________________ / ____________ Name (Print) Title Municipality (must be same as in 2.b.) _____________________ Telephone # ________________________ (2) I certify that each lot in this subdivision has been tested and is suitable for both a primary and replacement sewage disposal system. _________________________________ / ____________ Signature of SEO Date _________________________________ / ____________ Name (Print) Certification # Telephone # ________________________ (3) I certify that each lot in this subdivision is at least 1 acre in size _________________________________ / ____________ (Signature of Project Applicant/Agent) Date d. Public Sewerage Service (i.e., ownership by municipality or authority) Based upon written documentation, I certify that the facilities proposed for use have capacity and that no overload exists or is projected within 5 years. (Attach documents.) _________________________________ / ____________ (Signature of Municipal Official) Date Rick Smith / Township Manager Name (Print) Title East Goshen Township Municipality (must be same as in 2.b.) Telephone # 610-692-7171
- 6 -
Return Correspondence/Forms to:
____________________________________
____________________________________
____________________________________
____________________________________
DEPARTMENT OF ENVIRONMENTAL PROTECTION
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
| DEP USE | |
|---|---|
| Components Sent | |
| Onlot Disposal | [ ] |
| Collection and Treatment | [ ] |
| Planning Agency Review | [ ] |
| Exempt from Planning | [ ] |
| Code | ____________________ |
| Date | ____________________ |
"Fold Here"
WEST CHESTER QUADRANGLE PENNSYLVANIA
7.5 MINUTE SERIES (TOPOGRAPHIC)
75°30' 456 2 630 000 FEET 4 25 FE 44' 44' NEWTOWN SQUARE 5.4 MI.
PA. TURNPIKE (INTERCHANGE NO. 24) 11 MI. MALVERN 4.6 MI. 455 32'30" 2.8 MI. TO U.S. 30 (352) SE (RN)
MN GN 9 1/2° 169 MILS 0°22' 6 MILS
UTM GRID AND 1973 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET
SCALE 1:24000
1 1/2 0 1 MILE
1000 0 1000 2000 3000 4000 5000 6000 7000 FEET
1 .5 0 1 KILOMETER
CONTOUR INTERVAL 10 FEET
NATIONAL GEODETIC VERTICAL DATUM OF 1929
Sugartown BM 500 512 450 500 507 WILLISTOWN Dutton Mill 400 420 350 377 350 345 396 3 342 350 400 ROAD 488 435 454 LINE 450 ROAD 400 437 Creek ROAD 400 DUTTON 437 451 MILL ROAD 300 ROAD 375 350 EAST GOSHEN 450 STRASBURG 478 Rocky Hill 352 450 415 400 509 400 450 East Res 400 PIPE 350 437 434 PIKE 450 400 467 350 354 Water Milltown 390 WESTTOWN WAY SITE 458 469 PAOLI 494 406 420 Woodcrest Goshen 428 Cem 400 3 400 400 450
Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
May 29, 2008
Southeast Regional Office
Phone: 484-250-5970
Fax: 484-250-5971
Mr. Wayne G. "Ted" Reed, Manager
Pennsylvania American Water
100 Cheshire Court, Suite 104
Coatesville, PA 19320
Re: Request for Revised EDU Capacity
PAWC – Coatesville WWTP
City of Coatesville
Chester County
Dear Mr. Reed:
This is in response to your January 24, 2008, request for a revision of the flow assigned per Equivalent Dwelling Unit (EDU) type as it relates to sewer capacity in the expanded Coatesville WWTP. Your request included a year-long flow study for two subdivisions and an apartment complex within your service area. Based on meter readings from these three study sites, Pennsylvania American Water Company (PAWC) requested approval to use the following flow per EDU:
- All Single Family Units 200 gpd
- Senior Housing 150 gpd
- Townhouses (1-2 Bedroom) 175 gpd
- All Apartment Units 175 gpd
The Department of Environmental Protection (Department) has reviewed your data, your conclusions, and the justifications for reducing the flow per EDU for the various types of dwellings listed above. We agree that the new pipe standards, installation, and testing methods combined with the requirement for low flow fixtures in new construction can reduce the expected flow per unit. However, long-term performance and maintenance of this pipe material also play an integral role in determining future flows. In addition, local enforcement of ordinances prohibiting residents from directing roof leaders and sump pumps into the sewage collection system is an important aspect to consider in determining planning flows.
An Equal Opportunity Employer | www.dep.state.pa.us | Printed on Recycled Paper
Mr. Wayne G. "Ted" Reed, Manager - 2 - May 29, 2008
Based on these uncertain factors and based also on the fact that the planning process is intended to provide for adequate capacity for years into the future, we suggest that the following minimum flow per EDU may be approved in planning for the Coatesville STP in lieu of the 262.5 gpd/EDU previously required by policy:
- All Single Family Units 225 gpd
- Senior Housing 200 gpd
- Townhouses (1-2 Bedroom) 200 gpd
- All Apartment Units 200 gpd
The Department believes that this reduction in flow per EDU below 262.5 gpd/EDU will meet both the needs of PAWC and contributing municipalities, as well as the intent of the sewage planning program. We appreciate the opportunity to work with PAWC on this issue. We hope that these flow numbers will enable PAWC and the contributing municipalities to work towards a regional 537 plan update that will provide for exceptional sewer service for many years.
If you have any questions, please contact myself or Ms. Elizabeth Mahoney at 484-250-5177.
Sincerely,
Keith Dudley, P.E.
Environmental Engineer Manager
Municipal Planning and Finance Section
Water Management
cc: Mr. DeBalko, P.E. – PAWC
Mr. Corbett – URS Corporation
Mr. Feola – DEP
Ms. Fields, P.E. – DEP
Ms. Mahoney – DEP
Re 30 (GJS08)149
PNDI Project Environmental Review Receipt Project Search ID: 20120614359364
1. PROJECT INFORMATION
Project Name: Goshen Meadows 2
Date of review: 6/14/2012 11:03:59 AM
Project Category: Development,Residential,Subdivision containing more than 2 lots and/or 2 single-family units
Project Area: 6.6 acres
County: Chester Township/Municipality: East Goshen
Quadrangle Name: WEST CHESTER ~ ZIP Code: 19382
Decimal Degrees: 39.966595 N, -75.549330 W
Degrees Minutes Seconds: 39° 57' 59.7" N, -75° 32' 57.6" W
[Map: Google Map excerpt showing project boundary polygon along W Chester Pike and Valley Dr, near Rose Hill Apartment; Map data ©2012 Google]
2. SEARCH RESULTS
| Agency | Results | Response |
|---|---|---|
| PA Game Commission | No Known Impact | No Further Review Required |
| PA Department of Conservation and Natural Resources | No Known Impact | No Further Review Required |
| PA Fish and Boat Commission | No Known Impact | No Further Review Required |
| U.S. Fish and Wildlife Service | No Known Impact | No Further Review Required |
As summarized above, Pennsylvania Natural Diversity Inventory (PNDI) records indicate no known impacts to threatened and endangered species and/or special concern species and resources within the project area. Therefore, based on the information you provided, no further coordination is required with the jurisdictional agencies. This response does not reflect potential agency concerns regarding impacts to other ecological resources, such as wetlands.
Page 1 of 4
PNDI Project Environmental Review Receipt Project Search ID: 20120614359364
Note that regardless of PNDI search results, projects requiring a Chapter 105 DEP individual permit or GP 5, 6, 7, 8, 9 or 11 in certain counties (Adams, Berks, Bucks, Carbon, Chester, Cumberland, Delaware, Lancaster, Lebanon, Lehigh, Monroe, Montgomery, Northampton, Schuylkill and York) must comply with the bog turtle habitat screening requirements of the PASPGP.
RESPONSE TO QUESTION(S) ASKED
Q1: Accurately describe what is known about wetland presence in the project area or on the land parcel by selecting ONE of the following. "Project" includes all features of the project (including buildings, roads, utility lines, outfall and intake structures, wells, stormwater retention/detention basins, parking lots, driveways, lawns, etc.), as well as all associated impacts (e.g., temporary staging areas, work areas, temporary road crossings, areas subject to grading or clearing, etc.). Include all areas that will be permanently or temporarily affected -- either directly or indirectly -- by any type of disturbance (e.g., land clearing, grading, tree removal, flooding, etc.). Land parcel = the lot(s) on which some type of project(s) or activity(s) are proposed to occur.
Your answer is: 3. Someone qualified to identify and delineate wetlands has investigated the site, and determined that NO wetlands are located in or within 300 feet of the project area. (A written report from the wetland specialist, and detailed project maps should document this.)
Q2: Describe how wastewater (effluent) will be handled (select one). For the purpose of this question, wastewater/effluent does not include stormwater runoff. If the project involves solely the renewal or modification of an existing discharge permit (e.g., NPDES permit), select from options 3, 4, 5, or 6 below.
Your answer is: 2. All wastewater/effluent from this project/activity will be routed to an existing municipal wastewater treatment plant.
Q3: Are there any perennial or intermittent waterways (rivers, streams, creeks, tributaries) in or near the project area, or on the land parcel?
Your answer is: 2. No
Q4: Which of the following closest describes the proposed project?
Your answer is: 2. The proposed project will be connected to, and entirely serviced by, an existing, off-site water delivery and supply line (e.g., operated by a municipality or water company).
3. AGENCY COMMENTS
Regardless of whether a DEP permit is necessary for this proposed project, any potential impacts to threatened and endangered species and/or special concern species and resources must be resolved with the appropriate jurisdictional agency. In some cases, a permit or authorization from the jurisdictional agency may be needed if adverse impacts to these species and habitats cannot be avoided.
These agency determinations and responses are valid for one year (from the date of the review), and are based on the project information that was provided, including the exact project location; the project type, description, and features; and any responses to questions that were generated during this search. If any of the following change: 1) project location, 2) project size or configuration, 3) project type, or 4) responses to the questions that were asked during the online review, the results of this review are not valid, and the review must be searched again via the PNDI Environmental Review Tool and resubmitted to the jurisdictional agencies. The PNDI tool is a primary screening tool, and a desktop review may reveal more or fewer impacts than what is listed on this PNDI receipt. The jurisdictional agencies strongly advise against conducting surveys for the species listed on the receipt prior to consultation with the agencies.
Page 2 of 4
PNDI Project Environmental Review Receipt Project Search ID: 20120614359364
PA Game Commission
RESPONSE: No Impact is anticipated to threatened and endangered species and/or special concern species and resources.
PA Department of Conservation and Natural Resources
RESPONSE: No Impact is anticipated to threatened and endangered species and/or special concern species and resources.
PA Fish and Boat Commission
RESPONSE: No Impact is anticipated to threatened and endangered species and/or special concern species and resources.
U.S. Fish and Wildlife Service
RESPONSE: No impacts to federally listed or proposed species are anticipated. Therefore, no further consultation/coordination under the Endangered Species Act (87 Stat. 884, as amended; 16 U.S.C. 1531 et seq. is required. Because no take of federally listed species is anticipated, none is authorized. This response does not reflect potential Fish and Wildlife Service concerns under the Fish and Wildlife Coordination Act or other authorities.
4. DEP INFORMATION
The Pa Department of Environmental Protection (DEP) requires that a signed copy of this receipt, along with any required documentation from jurisdictional agencies concerning resolution of potential impacts, be submitted with applications for permits requiring PNDI review. For cases where a "Potential Impact" to threatened and endangered species has been identified before the application has been submitted to DEP, the application should not be submitted until the impact has been resolved. For cases where "Potential Impact" to special concern species and resources has been identified before the application has been submitted, the application should be submitted to DEP along with the PNDI receipt. The PNDI Receipt should also be submitted to the appropriate agency according to directions on the PNDI Receipt. DEP and the jurisdictional agency will work together to resolve the potential impact(s). See the DEP PNDI policy at http://www.naturalheritage.state.pa.us.
Page 3 of 4
PNDI Project Environmental Review Receipt Project Search ID: 20120614359364
5. ADDITIONAL INFORMATION
The PNDI environmental review website is a preliminary screening tool. There are often delays in updating species status classifications. Because the proposed status represents the best available information regarding the conservation status of the species, state jurisdictional agency staff give the proposed statuses at least the same consideration as the current legal status. If surveys or further information reveal that a threatened and endangered and/or special concern species and resources exist in your project area, contact the appropriate jurisdictional agency/agencies immediately to identify and resolve any impacts.
For a list of species known to occur in the county where your project is located, please see the species lists by county found on the PA Natural Heritage Program (PNHP) home page (www.naturalheritage.state.pa.us). Also note that the PNDI Environmental Review Tool only contains information about species occurrences that have actually been reported to the PNHP.
6. AGENCY CONTACT INFORMATION
PA Department of Conservation and Natural Resources
Bureau of Forestry, Ecological Services Section
400 Market Street, PO Box 8552, Harrisburg, PA. 17105-8552
Fax:(717) 772-0271
U.S. Fish and Wildlife Service
Endangered Species Section
315 South Allen Street, Suite 322, State College, PA. 16801-4851
NO Faxes Please.
PA Fish and Boat Commission
Division of Environmental Services
450 Robinson Lane, Bellefonte, PA. 16823-7437
NO Faxes Please
PA Game Commission
Bureau of Wildlife Habitat Management
Division of Environmental Planning and Habitat Protection
2001 Elmerton Avenue, Harrisburg, PA. 17110-9797
Fax:(717) 787-6957
7. PROJECT CONTACT INFORMATION
Name: __________________________________________________________________
Company/Business Name: _________________________________________________
Address: _______________________________________________________________
City, State, Zip: __________________________________________________________
Phone: (______) _____________________ Fax: (______) _____________________
Email: __________________________________________________________________
8. CERTIFICATION
I certify that ALL of the project information contained in this receipt (including project location, project size/configuration, project type, answers to questions) is true, accurate and complete. In addition, if the project type, location, size or configuration changes, or if the answers to any questions that were asked during this online review change, I agree to re-do the online environmental review.
___________________________________________________ ______________________
applicant/project proponent signature date
Page 4 of 4
610-356-9550
FAX 610-356-5032
Herbert E. MacCombie, Jr., P.E.
CONSULTING ENGINEERS & SURVEYORS, INC.
1000 PALMERS MILL ROAD
MEDIA, PA 19063
James W. MacCombie, P.E., P.L.S.
Herbert E. MacCombie, III, Technician
REPLY TO:
P.O. BOX 118
BROOMALL, PA 19008-0118
June 15, 2012
Gary Horne, New Business Representative
AQUA Pennsylvania, Inc.
762 W. Lancaster Avenue
Bryn Mawr, PA 19010
Re: Water Availability
Plan of Proposed Planned Apartment Development - Smith Tract
West Chester Pike
East Goshen Township, Chester County, PA
Dear Mr. Horne:
Please be advised that our client, Goshen Meadows L.P., has made application to East Goshen Township for Conditional Use Approval for a proposed planned apartment development. It is hereby respectfully requested that consideration be given to Aqua's ability and wiliness to provide domestic and fire service water for the proposed development.
The proposed development proposes 60 two-bedroom luxury apartments in five buildings and the adaptive reuse of the existing historic structure with four one-bedroom luxury apartments. The proposed development of 64 units will generate 200 GPD per unit for a total of 12,800 GPD. Please refer to the enclosed letter from PaDEP to Pennsylvania American Water Company, dated May 29, 2008 regarding the allocation of flow for planning purposes. All of the proposed sewage will ultimately enter the East Goshen Township sanitary sewer system. A copy of the Plan of Proposed Improvements is included for your use.
June 15, 2012
Water Availability
Proposed Planned Apartment Development - Smith Tract
Page 2
Please contact our office if you have any questions.
Very truly yours,
_____________________________________
Dennis F. O'Neill, P.E.
Copy: Scott Fagan
Mark Thompson, Esq.
Mark A. Gordon, Director of Code Enforcement, Zoning Officer ✓
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
July 5, 2012
To: Municipal Authority
From: Mark Miller
Re: June Monthly Report
The Public Works Department started the closure of the Lockwood Plant on June 18th when we fabricated a floating dock for the pump. The actual earth moving began June 21st; we have hauled in approximately 12,000 yards at no cost to the Authority with the exception of the heavy equipment. He had to hire dump trucks to move the 3000 yards of dirt that we had stock piled in Milltown which took two days to move. We brought in 136 tons of lime to cover the sludge from the first pond. So far the job has gone very well and the neighbors have been very cooperative. We have stayed in contact with the Homeowners Association explaining what we are doing on a weekly basis; we have not received any complaints. Photos are attached.
Meters: Have been read with no problems to report.
C.C. Collection: Pumping Stations have been visited on a daily basis, bar screens were cleaned and the wet well was washed down. We were notified of three lateral backups, each was cleared with the use of the trap plunger.
R.C. Collection: No problems to report.
Ridley Creek Plant: The meter has been ordered that we had approved last month.
I met with Mike Ellis regarding the Muffin monster that was approved last month to discuss the installation. Rick and I have decided to install the unit in-house rather than bidding out. We will have Lenni Electric complete the electric and Public Works install the unit.
PA- One Calls: We responded to 131 PA One Calls for June.
We installed a dozen caps on the systems.
F:\Data\Shared Data\Public Works Dept\Monthly Reports\2012 Municipal\June 2012 monthly report for Municipal Authority .docx
Put lime on exposed
Sludge
Before
DAY 1
DAY. 1
ready for Dirt Delivery
Setting up Pump
for By Pass Pumping
Mark - Mike Setting up
Floating Pump
Setting up Hose for
Bypass Pumping
Ready for Dirt
delivery
[Photograph showing a yellow bulldozer earthmover working along the dirt berm embankment of an aeration lagoon or treatment pond, with aerators operating in the water.]
[Handwritten note:] Backfilling
Crew Pushing Dirt to
Pond.
1st day of backfilling
There used to be 3000 yds of dirt.
Pond 1
Just about done Pond 1
[Photograph showing an elongated pond or lagoon with algae-covered water, bordered by dense woods and an earthen berm with a fence line along one side.]
[Handwritten note:] Pond 2
Dirt for Pond 2
EGMA 1200
[Pennoni logo]
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Daniel Barbato, P.E.
Authority Engineer
DATE: July 5, 2012
SUBJECT: Engineer's Report
Invoices
- Invoices with summaries are provided under separate cover.
Ridley Creek Sewage Treatment Plant (RCSTP)
- No activity this period. We will assist with supporting and reviewing warranty claims and with plant troubleshooting as requested.
LCSTP Elimination
- All sewers and manholes have been tested and televised. Restoration has also been performed including grading, seeding, mulching, paving, and curb replacement.
- Remaining work includes abandoning existing sewers and manholes in-place with flowable fill, preparation of as-built plans, and minor punchlist work (such as one cast-iron box may still need to be installed over one cleanout). The flowable fill work is scheduled for Thursday, July 12.
- We have performed on-site, part-time construction inspection services throughout the duration of this work. We have also continued to provide in-office construction support as needed.
- We anticipate the contractor will submit Invoice #2 by Friday, July 6. We have already measured quantities for the invoice with the contractor.
Hershey's Mill PS Diversion and Reserve PS Elimination
- We submitted the Reserve PS and the Hershey's Mill PS GP-5 "General Permit for Utility Line Stream Crossing" applications to DEP on June 27 and June 22 respectively.
- We will make Erosion and Sedimentation Control submissions for both projects to the Chester County Conservation District by Friday, July 6.
- We are preparing a Closure Plan for the Reserve PS and a Part 2 WQM Permit Amendment for the Hershey's Mill PS, now that the details of construction (i.e. manhole
Page 1 of 3
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-07-05.docx
EGMA 1200
connections, pipe materials, sewer routing, etc.) have generally been agreed-upon, and we expect to submit both to DEP by the end of July.
Marydell PS Elimination
- We met with PECO on-site on June 26 to discuss overhead and underground utility locations and conflicts. If any part of a trench is within 4 feet of a utility pole, the pole must be braced by PECO. We are tentatively planning to revise the route of the new sewer to be directly under the edge of the Paoli Pike shoulder instead of on the shopping center side of the utility poles in order to avoid clearing 5+ trees and to minimize construction challenges associated with the overhead electric lines. However, there is an underground gas anode line that may be in the exact location of the revised sewer, although the sewer would be significantly deeper.
- We have also received additional information and utility plans from Verizon about their telecommunications ductbank that was marked-out just inside the Paoli Pike travel lane (just inside the white line). Verizon has informed us that the ductbank is not concrete encased. They have also informed us that they own the conduits, but AT&T runs lines through them.
- To determine with certainty if this revised location is feasible for the sewer, we have coordinated with the Township to perform three soft-dig exploratory test pits along the Paoli Pike shoulder. We prepared a PennDOT Highway Occupancy Permit (HOP) application for the test pits, and the permit was issued on July 3.
- We have also prepared a separate HOP application for the sewer construction, but it has not yet been submitted. Depending upon when the test pits are scheduled, we may submit the HOP application before performing the test pits to get PennDOT's review process underway. This application proposes a jack & bore (trenchless) installation across Boot Road and open-cut trenching for the remainder of the work. The Paoli Pike crossing at Saratoga Drive is proposed to occur at night with a full road closure and detour.
- We are preparing a Closure Plan for the Marydell PS that we expect to submit to DEP by the end of July, pending final determination of the sewer location.
Hershey's Mill PS Capacity Evaluation
- We previously performed drawdown testing at the pump station and an analysis of pump and system curves to verify the station has capacity to handle peak instantaneous flows following the Lockwood Chase diversion. One pump was found to have inadequate capacity. The Township quickly replaced the pump. We performed a follow-up drawdown test on June 11. During the test, the flow meter showed that the replaced pump was still not pumping at required capacity, but our follow-up calculations indicate that it likely does have adequate capacity.
Hershey's Mill Muffin Monster
- We expect to have a concept design completed by the end of July. We will then set up a meeting on-site with all applicable parties (Pennoni, Township and Public Works, the Township's controls contractor, and the Muffin Monster supplier) to review the concept
Page 2 of 3
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-07-05.docx
EGMA 1200
and determine who will perform the construction (Public Works or a contractor) and how the materials will be acquired (direct purchase by Authority or by contractor).
Page 3 of 3
P:\Projects\EGMA\Memos to Board\2012\Memo to EGMA Board 2012-07-05.docx
BIG FISH ENVIRONMENTAL SERVICES, INC.
June 2012 - Ridley Creek and Lockwood Sewage Treatment Plant Operations Report
Executive Summary
Treatment Process Operation
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during the month of June. SBR No. 2 remains out of service with a proximately a mixture of 1 foot of sludge and rainwater within the tank. Efforts to clean the tank using a submersible pump rated with a TDH of 100 ft resulted in tripping the 20 amp circuit breaker. Replacement of the 20-amp circuit with a 30-amp circuit is in progress. Upon installation of the 30-amp circuit breaker, cleaning of SBR No. 2 will be scheduled to transfer the contents to sludge holding tank No. 2.
During the month of May, there were no exceedances of the permitted effluent limitations. On site analysis of split, samples with the certified contract laboratory are on going. Trend data indicates consistent patterns of the onsite analysis test results are generally greater than the contract laboratory, with the exception of total suspended solids. Steps to improve the precision of onsite analysis included rinsing all glassware used for phosphorus analysis with a 10% v/v solution of hydrochloric acid solution. Duplicate sample analysis is ongoing and purchase of a NIST standard (and associated glassware) is under investigation.
Adjustments to the SBR process during June include lowering the mixed liquor concentration (MLSS) to lower the food to mass ratio (F:M ratio) to eliminate the conditions of a long sludge age and low F:M ratio. Filamentous bacteria identified as Microthrix parvicella thrives under the conditions of long SRT and low F:M ratios. Adjusting the SBR control set points to adjust for the increased ambient temperatures (effluent temperatures around 23°C), increased settle times and management of extended anoxic/anaerobic conditions resultant of settle and idle times (100 to 120 minutes).
A summary of the flow data for May and June 2012 is presented for review.
Flow data:
| Flow Meter Location | May 2012 Total Volume for Month, MGD |
Average Daily Flow, gpd |
|---|---|---|
| Influent Wastewater | 10.664 | 344,001 |
| Treated Effluent to Disc Filters | 10.313 | 332,698 |
| Final Effluent Discharge | 4.833 | 155,903 |
| Applebrook Golf Course | 2.052 | 66,210 |
BIG FISH ENVIRONMENTAL SERVICES, INC.
June 2012 - Ridley Creek and Lockwood Sewage Treatment Plant Operations Report
| June 2012 | ||
|---|---|---|
| Flow Meter Location | Total Volume for Month, MGD | Average Daily Flow, gpd |
| Influent Wastewater | 9.652 | 321,730 |
| Treated Effluent to Disc Filters | 9.232 | 307,735 |
| Final Effluent Discharge | 4.248 | 141,600 |
| Applebrook Golf Course | 2.090 | 69,653 |
Chemical Usage: June 2012
| Chemical | Daily Average | Total Monthly |
|---|---|---|
| Soda Ash | 122 lbs./day | 3,650 pounds |
| Magnesium Hydroxide | 13 gpd | 390 gallons |
| Alum | 31 gpd | 922 gallons |
Solids Dewatering and Disposal
The centrifuge dewatering system was not operated during the month of June. During the month, sludge wasting and decanting of the sludge holding tanks was ongoing. The sludge holding tank sludge was monitored for pH and alkalinity on average twice per week and total solids once per week.
Sludge holding tank No. 1 began the month as 0.71 % total solids and ended the month at 0.99% total solids.
Sludge holding tank No. 2 began the month as 0.78 % total solids and ended the month at 0.87% total solids.
The present rate of sludge thickening suggests a target sludge concentration of 1.0 to 1.2% total solids is anticipated during July, therefore providing adequate conditions for operation of the centrifuge sludge dewatering system.
Maintenance, Repairs and Warranty
Outstanding: Centrifuge replacement parts - Worth & Co. to replace parts used for warranty repair
ACTION: BFESI will provide Worth & Company a letter requesting resolution of the matter on or before October 1. 2012.
Outstanding: JWC fine screen has a failed UPS - Worth & Co. informed
ACTION: Corrected. BFESI personnel installed the replacement UPS provided by Worth & Company.
Outstanding: JWC fine screen upstream transducer - replacement connection scheduled for installation
BIG FISH ENVIRONMENTAL SERVICES, INC.
June 2012 - Ridley Creek and Lockwood Sewage Treatment Plant Operations Report
ACTION: BFESI personnel installed the replacement connector provided by the Township
Outstanding: SBR and Centrifuge MCC panel hour meters - Worth & Co. informed
ACTION: Pennoni Associates/Township to provide Worth & Company a copy of the short circuit study completed by Clinger Corporation.
Outstanding: Leaking PVC valves for alum piping to SBRs
ACTION: Worth repaired valve. Issue resolved.
Outstanding: Sludge holding tank aeration piping paint is failing
Unresolved
Outstanding: SBR No. 4 Alum valve fails to open.
Unresolved
Scheduled Maintenance/Repairs
Installed a vent pipe for the centrifuge drain line as recommended by former Alfa Laval Service Manager
Installed piping and valve to flush out polymer and sludge fed piping to the centrifuge from the centrifuge pump discharge piping.
Replaced the oil and extended sight tubes for all five (5) SBR blowers.
Replaced the UV lamps and quartz sleeves for UV Bank No, 1 Module 1. Removed all UV modules, cleaned and washed. Cleaned UV channel and returned all equipment to service.
3800-FM-WSFR0435 7/2009
pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION
SUPPLEMENTAL REPORT
DAILY EFFLUENT MONITORING
Facility Name: Ridley Creek Sewage Treatment Plant
Municipality: East Goshen Municipal Authority
County: Chester
Watershed: 3-G
Laboratories: ALS Environmental
Month: 5
Year: 2012
Permit No.: PA0050504
Outfall: 002
Renewal application due 180 days prior to expiration.
This permit will expire on: February 28, 2017
| Parameter | Flow | pH | pH | Dissolved Oxygen | Dissolved Oxygen | CBOD5 | CBOD5 | TSS | TSS | Fecal Coliform | Fecal Coliform | NH3-N | NH3-N | Total Phosphorus | Total Phosphorus | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Stage | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||
| Week | Day | Date | MGD | Q | S.U. | Q | mg/L | Q | mg/L | Q | mg/L | Q | mg/L | Q | mg/L | Q | CFU/100 ml | |
| 0.0 | ||||||||||||||||||
| 0.0 | ||||||||||||||||||
| 1 | Sun | 4/29/12 | 0.049 | 7.23 | 9.37 | |||||||||||||
| Mon | 4/30/12 | 0.084 | 7.33 | 9.34 | ||||||||||||||
| Tue | 5/1/12 | 0.038 | 7.29 | 8.73 | ||||||||||||||
| Wed | 5/2/12 | 0.061 | 7.27 | 7.86 | ||||||||||||||
| Thu | 5/3/12 | 0.063 | 7.07 | 9.04 | < | 2 | 12 | < | 1.0 | 0.424 | 0.23 | |||||||
| Fri | 5/4/12 | 0.085 | 7.04 | 8.96 | ||||||||||||||
| Sat | 5/5/12 | 0.065 | 7.15 | 8.15 | ||||||||||||||
| 2 | Sun | 5/6/12 | 0.041 | 6.89 | 8.17 | |||||||||||||
| Mon | 5/7/12 | 0.087 | 7.28 | 9.10 | ||||||||||||||
| Tue | 5/8/12 | 0.068 | 7.24 | 8.78 | ||||||||||||||
| Wed | 5/9/12 | 0.065 | 7.18 | 8.34 | ||||||||||||||
| Thu | 5/10/12 | 0.066 | 7.07 | 8.28 | < | 2 | 8 | < | 1.0 | 0.295 | 0.12 | |||||||
| Fri | 5/11/12 | 0.063 | 7.06 | 8.41 | ||||||||||||||
| Sat | 5/12/12 | 0.067 | 7.34 | 8.40 | ||||||||||||||
| 3 | Sun | 5/13/12 | 0.076 | 7.48 | 8.85 | |||||||||||||
| Mon | 5/14/12 | 0.071 | 7.85 | 8.91 | ||||||||||||||
| Tue | 5/15/12 | 0.06 | 7.86 | 8.96 | ||||||||||||||
| Wed | 5/16/12 | 0.068 | 7.82 | 8.97 | ||||||||||||||
| Thu | 5/17/12 | 0.063 | 7.78 | 8.69 | < | 2 | 6 | < | 1.0 | < | 0.010 | 0.87 | ||||||
| Fri | 5/18/12 | 0.096 | 7.75 | 8.78 | ||||||||||||||
| Sat | 5/19/12 | 0.054 | 6.89 | 8.70 | ||||||||||||||
| 4 | Sun | 5/20/12 | 0.075 | 6.88 | 8.60 | |||||||||||||
| Mon | 5/21/12 | 0.053 | 6.84 | 9.07 | ||||||||||||||
| Tue | 5/22/12 | 0.073 | 6.79 | 8.82 | ||||||||||||||
| Wed | 5/23/12 | 0.067 | 6.81 | 8.72 | ||||||||||||||
| Thu | 5/24/12 | 0.058 | 7.10 | 8.15 | < | 2 | 6 | < | 1.0 | 0.135 | < | 0.10 | ||||||
| Fri | 5/25/12 | 0.07 | 6.90 | 7.68 | ||||||||||||||
| Sat | 5/26/12 | 0.072 | 7.01 | 8.40 | ||||||||||||||
| 5 | Sun | 5/27/12 | 0.06 | 6.98 | 8.15 | |||||||||||||
| Mon | 5/28/12 | 0.092 | 7.14 | 8.09 | ||||||||||||||
| Tue | 5/29/12 | 0.036 | 6.95 | 8.23 | ||||||||||||||
| Wed | 5/30/12 | 0.081 | 7.22 | 8.54 | ||||||||||||||
| Thu | 5/31/12 | 0.056 | 6.98 | 8.26 | < | 2 | < | 5 | < | 1.0 | 0.193 | 0.11 | ||||||
| Fri | 6/1/12 | 0.072 | 7.08 | 8.39 | ||||||||||||||
| Sat | 6/2/12 | 0.063 | 6.84 | 8.46 |
Statistics for DMR
| Statistic | Flow | pH Q | pH S.U. | Dissolved Oxygen Q | Dissolved Oxygen mg/L | CBOD5 Q | CBOD5 mg/L | TSS Q | TSS mg/L | Fecal Coliform Q | Fecal Coliform mg/L | NH3-N Q | NH3-N mg/L | Total Phosphorus Q | Total Phosphorus CFU/100 ml |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Daily Minimum (Conc.): | 6.79 | 7.68 | < | 2 | < | 5 | < | 1 | < | 0.01 | < | 0.1 | |||
| Daily Maximum (Conc.): | 7.86 | 9.1 | < | 2 | 12 | < | 1 | 0.424 | 0.87 | ||||||
| Max Avg Weekly (Conc.): | 8.84 | < | 2 | 12 | < | 1 | 0.424 | ||||||||
| Avg Monthly (Conc.): | 8.54 | < | 2 | < | 7 | < | 1 | < | 0.211 | < | 0 | ||||
| Geometric Mean (Conc.): | |||||||||||||||
| Max Avg Weekly (Load): | 0.07 | 5 | < | 1 | 6 | < | 0.6 | 0.2 | |||||||
| Avg Monthly (Load): | 0.066 | 5 | < | 1 | < | 4 | < | 0.5 | < | 0.1 | |||||
| Total Monthly (Load): | 2.05 | 146 | < | 32 | < | 118 | < | 16 | < | 3 | |||||
| Daily Minimum (Load): | 0.036 | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! |
| Daily Maximum (Load): | 0.096 | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! |
I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Prepared By: Scott A. Towler
Title: Plant Operator
License No.: T0390
Date: 27-Jun-12
Month of May 2012
FINAL REPORT
East Goshen Township Municipal Authority
Ridley Creek Sewage Treatment Plant Monthly Operations Report
| Design Basis | Flow MGD Average | BOD5 mg/L | BOD5 lbs/day | TSS mg/L | TSS lbs/day | NH4-N mg/L | NH4-N lbs/day | TKN, mg/L mg/L | TKN, mg/L lbs/day | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/day |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample date | |||||||||||
| May 3, 2012 | 0.2891 | 151 | 364 | 391 | 943 | 8.48 | 20 | 15.2 | 37 | 3.1 | 7 |
| May 10, 2012 | 0.3406 | 152 | 367 | 477 | 1,150 | 2.95 | 7 | 7.6 | 18 | 2.2 | 5 |
| May 17, 2012 | 0.2821 | 283 | 528 | 506 | 1,220 | 27.8 | 67 | 48.7 | 117 | 8.4 | 20 |
| May 24, 2012 | 0.2845 | 488 | 354 | 1257 | 3,031 | 26.5 | 64 | 34.5 | 83 | 3.7 | 9 |
| May 31, 2012 | 0.2803 | 598 | 1,442 | 533 | 1,285 | 31.7 | 76 | 31 | 75 | 4.3 | 10 |
| Average | 0.2953 | 334 | 611 | 633 | 1526 | 19 | 47 | 27 | 66 | 4 | 10 |
| Minimum | 0.2803 | 151 | 354 | 391 | 943 | 3 | 7 | 8 | 18 | 2 | 5 |
| Maximum | 0.3406 | 598 | 1442 | 1257 | 3031 | 32 | 76 | 49 | 117 | 8 | 20 |
Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample date | |||||||||||
| May 3, 2012 | 0.1390 | 2.0 | 2 | 12 | 6 | 0.424 | 0.12 | 0.23 | 0.12 | 1 | 0.0000 |
| May 10, 2012 | 0.1640 | 2.0 | 2 | 8 | 9 | 0.295 | 0.34 | 0.12 | 0.14 | 1 | 0.0000 |
| May 17, 2012 | 0.1400 | 2.0 | 2 | 6 | 7 | 0.100 | 0.14 | 0.87 | 1.01 | 1 | 0.0000 |
| May 24, 2012 | 0.1340 | 2.0 | 2 | 6 | 7 | 0.135 | 0.16 | 0.10 | 0.12 | 1 | 0.0000 |
| May 31, 2012 | 0.1136 | 2.0 | 2 | 5 | 6 | 0.193 | 0.22 | 0.11 | 0.13 | 1 | 0.0000 |
| Average | 0.1381 | 2.0 | 2 | 7 | 7 | 0.229 | 0.19 | 0.29 | 0.30 | 1 | 0.0000 |
| Minimum | 0.1136 | 2.0 | 2 | 5 | 6 | 0.100 | 0.12 | 0.10 | 0.12 | 1 | 0.0000 |
| Maximum | 0.1640 | 2.0 | 2 | 12 | 9 | 0.424 | 0.34 | 0.87 | 1.01 | 1 | 0.0000 |
Page 1 of 1
Month of June 2012
DRAFT REPORT
East Goshen Township Municipal Authority
Ridley Creek Sewage Treatment Plant Monthly Operations Report
| Design Basis | Flow MGD Average | BOD5 mg/L | BOD5 lbs/day | TSS mg/L | TSS lbs/day | NH4-N mg/L | NH4-N lbs/day | TKN, mg/L mg/L | TKN, mg/L lbs/day | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/day |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | ||
| Sample date | |||||||||||
| June 7, 2012 | 0.2739 | 181 | 413 | 238 | 544 | 31.8 | 73 | 31.8 | 73 | 4.4 | 10 |
| June 14, 2012 | 0.2643 | 178 | 407 | 406 | 927 | 34.3 | 78 | 41.1 | 94 | 4.2 | 10 |
| June 21, 2012 | 0.2603 | ||||||||||
| June 28, 2012 | 0.2401 | ||||||||||
| Average | 0.2597 | 180 | 410 | 322 | 736 | 33 | 75 | 36 | 83 | 4 | 10 |
| Minimum | 0.2401 | 178 | 407 | 238 | 544 | 32 | 73 | 32 | 73 | 4 | 10 |
| Maximum | 0.2739 | 181 | 413 | 406 | 927 | 34 | 78 | 41 | 94 | 4 | 10 |
Final Effluent - Out Fall 001
| NPDES Permit Discharge Limitations | Flow MGD Average | CBOD5 mg/L | CBOD5 lbs/month | TSS mg/L | TSS lbs/month | NH4-N mg/L | NH4-N lbs/month | Phosphorus,Total, mg/L mg/L | Phosphorus,Total, mg/L lbs/month | Fecal Coliform Geo Mean | Fecal Coliform Geo Mean |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum | 40 | 42 | |||||||||
| Sample date | |||||||||||
| June 7, 2012 | 0.150 | 2.0 | 3 | 19 | 6 | 0.220 | 0.13 | 0.29 | 0.13 | 1 | 0.0000 |
| June 14, 2012 | 0.132 | 2.0 | 3 | 6 | 8 | 0.100 | 0.13 | 0.22 | 0.28 | 1 | 0.0000 |
| June 21, 2012 | 0.112 | ||||||||||
| June 28, 2012 | 0.110 | ||||||||||
| Average | 0.1260 | 2.0 | 3 | 13 | 7 | 0.160 | 0.13 | 0.26 | 0.20 | 1 | 0.0000 |
| Minimum | 0.1100 | 2.0 | 3 | 6 | 6 | 0.100 | 0.13 | 0.22 | 0.13 | 1 | 0.0000 |
| Maximum | 0.1500 | 2.0 | 3 | 19 | 8 | 0.220 | 0.13 | 0.29 | 0.28 | 1 | 0.0000 |
Page 1 of 1
3800-FM-WSFR0435 7/2009
pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION
SUPPLEMENTAL REPORT
DAILY EFFLUENT MONITORING
Facility Name: Ridley Creek Sewage Treatment Plant
Municipality: East Goshen Municipal Authority
County: Chester
Watershed: 3-G
Laboratories: ALS Environmental
Month: 5
Year: 2012
Permit No.: PA0050504
Outfall: 001
Renewal application due 180 days prior to expiration.
This permit will expire on: February 28, 2017
| Parameter | Flow | pH | pH | Dissolved Oxygen | Dissolved Oxygen | CBOD5 | CBOD5 | BOD5 | BOD5 | TSS | TSS | TSS | TSS | Fecal Coliform | Fecal Coliform | NH3-N | NH3-N | Total Phosphorus | Total Phosphorus | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Stage | 1 | 1 | 1 | 1 | 1 | 1 | 1 | RI | RI | 1 | 1 | RI | RI | 1 | 1 | 1 | 1 | 1 | 1 | ||
| Week | Day | Date | MGD | Q | S.U. | Q | mg/L | Q | mg/L | Q | mg/L | Q | mg/L | Q | 0 | Q | CFU/100 ml | Q | mg/L | Q | mg/L |
| 1 | Sun | 4/29/12 | 0.164 | 7.23 | 9.37 | ||||||||||||||||
| Mon | 4/30/12 | 0.172 | 7.33 | 9.34 | |||||||||||||||||
| Tue | 5/1/12 | 0.019 | 7.29 | 8.73 | |||||||||||||||||
| Wed | 5/2/12 | 0.127 | 7.27 | 7.86 | |||||||||||||||||
| Thu | 5/3/12 | 0.139 | 7.07 | 9.04 | 2 | 151 | 12 | 162 | 1 | 0.424 | 0.23 | ||||||||||
| Fri | 5/4/12 | 0.199 | 7.04 | 8.96 | |||||||||||||||||
| Sat | 5/5/12 | 0.165 | 7.15 | 8.15 | |||||||||||||||||
| 2 | Sun | 5/6/12 | 0.158 | 6.89 | 8.17 | ||||||||||||||||
| Mon | 5/7/12 | 0.203 | 7.28 | 9.10 | |||||||||||||||||
| Tue | 5/8/12 | 0.157 | 7.24 | 8.78 | |||||||||||||||||
| Wed | 5/9/12 | 0.157 | 7.18 | 8.34 | |||||||||||||||||
| Thu | 5/10/12 | 0.164 | 7.07 | 8.28 | < | 2 | 152 | 8 | 168 | 1 | 0.295 | 0.12 | |||||||||
| Fri | 5/11/12 | 0.095 | 7.06 | 8.41 | |||||||||||||||||
| Sat | 5/12/12 | 0.153 | 7.34 | 8.40 | |||||||||||||||||
| 3 | Sun | 5/13/12 | 0.213 | 7.48 | 8.85 | ||||||||||||||||
| Mon | 5/14/12 | 0.175 | 7.85 | 8.91 | |||||||||||||||||
| Tue | 5/15/12 | 0.194 | 7.86 | 8.96 | |||||||||||||||||
| Wed | 5/16/12 | 0.165 | 7.82 | 8.97 | |||||||||||||||||
| Thu | 5/17/12 | 0.140 | 7.78 | 8.69 | < | 2 | 283 | 6 | 215 | 1 | < | 0.010 | 0.87 | ||||||||
| Fri | 5/18/12 | 0.219 | 7.75 | 8.78 | |||||||||||||||||
| Sat | 5/19/12 | 0.139 | 6.89 | 8.70 | |||||||||||||||||
| 4 | Sun | 5/20/12 | 0.185 | 6.88 | 8.60 | ||||||||||||||||
| Mon | 5/21/12 | 0.138 | 6.84 | 9.07 | |||||||||||||||||
| Tue | 5/22/12 | 0.198 | 6.79 | 8.82 | |||||||||||||||||
| Wed | 5/23/12 | 0.144 | 6.81 | 8.72 | |||||||||||||||||
| Thu | 5/24/12 | 0.134 | 7.10 | 8.15 | < | 2 | 528 | 6 | 530 | 1 | 0.135 | < | 0.10 | ||||||||
| Fri | 5/25/12 | 0.162 | 6.90 | 7.68 | |||||||||||||||||
| Sat | 5/26/12 | 0.117 | 7.01 | 8.40 | |||||||||||||||||
| 5 | Sun | 5/27/12 | 0.136 | 6.98 | 8.15 | ||||||||||||||||
| Mon | 5/28/12 | 0.255 | 7.14 | 8.09 | |||||||||||||||||
| Tue | 5/29/12 | 0.091 | 6.95 | 8.23 | |||||||||||||||||
| Wed | 5/30/12 | 0.156 | 7.22 | 8.54 | |||||||||||||||||
| Thu | 5/31/12 | 0.136 | 6.98 | 8.26 | < | 2 | 354 | < | 5 | 228 | 1 | 0.193 | 0.11 | ||||||||
| Fri | 6/1/12 | 0.179 | 7.08 | 8.39 | |||||||||||||||||
| Sat | 6/2/12 | 0.163 | 6.84 | 8.46 |
Statistics for DMR
| Statistic | Flow | pH Q | pH S.U. | Dissolved Oxygen Q | Dissolved Oxygen mg/L | CBOD5 Q | CBOD5 mg/L | BOD5 Q | BOD5 mg/L | TSS 1 Q | TSS 1 mg/L | TSS RI Q | TSS RI 0 | Fecal Coliform Q | Fecal Coliform CFU/100 ml | NH3-N Q | NH3-N mg/L | Total Phosphorus Q | Total Phosphorus mg/L |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Daily Minimum (Conc.): | 6.79 | 7.68 | < | 2 | 151 | < | 5 | ### | 1 | < | 0.01 | < | 0.1 | ||||||
| Daily Maximum (Conc.): | 7.86 | 9.1 | 2 | 528 | 12 | ### | 1 | 0.424 | 0.87 | ||||||||||
| Max Avg Weekly (Conc.): | 8.84 | 2 | 528 | 12 | 0.4 | 0.9 | |||||||||||||
| Avg Monthly (Conc.): | 8.54 | < | 2 | 294 | < | 7 | < | 0.211 | < | 0.29 | |||||||||
| Geometric Mean (Conc.): | 1 | ||||||||||||||||||
| Max Avg Weekly (Load): | 0.178 | 13 | < | 3 | 590 | 14 | 0.5 | 1 | |||||||||||
| Avg Monthly (Load): | 0.156 | 11 | < | 2 | 341 | < | 9 | < | 0.3 | < | 0.3 | ||||||||
| Total Monthly (Load): | 4.833 | 345 | < | 74 | 10571 | < | 274 | < | 8 | < | 10.4 | ||||||||
| Daily Minimum (Load): | 0.019 | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! |
| Daily Maximum (Load): | 0.255 | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! | ### | #REF! |
I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. § 4904 (relating to unsworn falsification).
Prepared By: Scott A. Towler
Title: Plant Operator
License No.: T0390
Date: 27-Jun-12
2011 FLOWMETERS
2012 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY READING | WESTTOWN WAY 1000 GPD | ELLIS LANE READING | ELLIS LANE 10 GPD | PAOLI PIKE READING | PAOLI PIKE 10 GPD | WILSON DRIVE READING | WILSON DRIVE 10 GPD | SUMMIT GPD | NET FLOWS | DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.30 | 06/01/12 | 20,400 | 0 | 06/01/12 | ||||||||
| 0.00 | 06/02/12 | 20,400 | 0 | 06/02/12 | ||||||||
| 0.08 | 06/03/12 | 20,400 | 0 | 06/03/12 | ||||||||
| 0.17 | 06/04/12 | 2,556,068 | 1,484,333 | 24,962,075 | 142,577 | 12,404,919 | 88,167 | 13,994,531 | 80,620 | 20,400 | 1,172,970 | 06/04/12 |
| 0.00 | 06/05/12 | 2,557,282 | 1,214,000 | 24,978,228 | 161,530 | 12,410,556 | 56,370 | 13,999,398 | 48,670 | 20,400 | 947,430 | 06/05/12 |
| 0.00 | 06/06/12 | 20,400 | 0 | 06/06/12 | ||||||||
| 0.03 | 06/07/12 | 2,559,376 | 1,047,000 | 24,993,121 | 74,465 | 12,423,502 | 64,730 | 14,015,970 | 82,860 | 20,400 | 824,945 | 06/07/12 |
| 0.00 | 06/08/12 | 2,560,461 | 1,085,000 | 25,003,127 | 100,060 | 12,429,545 | 60,430 | 14,022,811 | 68,410 | 20,400 | 856,100 | 06/08/12 |
| 0.00 | 06/09/12 | 20,400 | 0 | 06/09/12 | ||||||||
| 0.00 | 06/10/12 | 20,400 | 0 | 06/10/12 | ||||||||
| 0.00 | 06/11/12 | 2,563,694 | 1,077,667 | 25,032,729 | 98,673 | 12,447,986 | 61,470 | 14,049,405 | 88,647 | 20,400 | 828,877 | 06/11/12 |
| 1.10 | 06/12/12 | 20,400 | 0 | 06/12/12 | ||||||||
| 0.00 | 06/13/12 | 20,400 | 0 | 06/13/12 | ||||||||
| 0.00 | 06/14/12 | 20,400 | 0 | 06/14/12 | ||||||||
| 0.00 | 06/15/12 | 2,568,405 | 1,177,750 | 25,077,415 | 111,715 | 12,472,214 | 60,570 | 14,097,626 | 120,553 | 20,400 | 884,913 | 06/15/12 |
| 0.00 | 06/16/12 | 20,400 | 0 | 06/16/12 | ||||||||
| 0.00 | 06/17/12 | 20,400 | 0 | 06/17/12 | ||||||||
| 0.00 | 06/18/12 | 2,571,550 | 1,048,333 | 25,106,082 | 95,557 | 12,489,699 | 58,283 | 14,126,922 | 97,653 | 20,400 | 796,840 | 06/18/12 |
| 0.00 | 06/19/12 | 2,572,648 | 1,098,000 | 25,115,626 | 95,440 | 12,495,689 | 59,900 | 14,138,738 | 118,160 | 20,400 | 824,500 | 06/19/12 |
| 0.00 | 06/20/12 | 2,573,732 | 1,084,000 | 25,125,060 | 94,340 | 12,501,775 | 60,860 | 14,150,573 | 118,350 | 20,400 | 810,450 | 06/20/12 |
| 0.00 | 06/21/12 | 20,400 | 0 | 06/21/12 | ||||||||
| 0.32 | 06/22/12 | 20,400 | 0 | 06/22/12 | ||||||||
| 0.00 | 06/23/12 | 20,400 | 0 | 06/23/12 | ||||||||
| 0.00 | 06/24/12 | 20,400 | 0 | 06/24/12 | ||||||||
| 0.00 | 06/25/12 | 20,400 | 0 | 06/25/12 | ||||||||
| 0.00 | 06/26/12 | 20,400 | 0 | 06/26/12 | ||||||||
| 0.00 | 06/27/12 | 20,400 | 0 | 06/27/12 | ||||||||
| 0.00 | 06/28/12 | 2,582,193 | 1,057,625 | 25,200,228 | 93,960 | 12,547,515 | 57,175 | 14,235,899 | 106,658 | 20,400 | 799,833 | 06/28/12 |
| 0.00 | 06/29/12 | 2,583,197 | 1,004,000 | 25,209,230 | 90,020 | 12,553,151 | 56,360 | 14,242,468 | 65,690 | 20,400 | 791,930 | 06/29/12 |
| 0.00 | 06/30/12 | 20,400 | 0 | 06/30/12 | ||||||||
| 0.00 | ||||||||||||
| 3.99 | 1,125,246 | 105,303 | 62,210 | 90,570 | 20,400 | 867,162 | ||||||
| EG TWP | ||||||||||||
| MONTH TO DATE | 3.99 | |||||||||||
| NORMAL MONTH TO DATE | ||||||||||||
| YEAR TO DATE | 18.41 | |||||||||||
| NORMAL YEAR TO DATE |
f:/data/users/joanna/
2003 flowmeters
7/5/201210:05 AM
2011 FLOWMETERS
2012 JUNE 2ND QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| HERSHEY'S MILL READING | HERSHEY'S MILL 10 GPD | ASHBRIDGE READING | ASHBRIDGE 100 GPD | HICKS METER READING | HICKS METER 10 GPD | RESERVOIR READING | RESERVOIR 10 GPD | SHERMAN READING | SHERMAN 10 GPD | BARKWAY READING | BARKWAY 10 GPD |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 23,596,663 | 73,376 | 1,440,729 | 65,260 | 822,824 | 6,842 | 2,429,041 | 10,798 | ||||
| 23,610,766 | 70,515 | 1,441,935 | 60,300 | 824,242 | 7,090 | 2,431,033 | 9,960 | ||||
| 23,661,865 | 63,874 | 1,446,362 | 55,338 | 828,950 | 5,885 | 2,438,196 | 8,954 | ||||
| 23,757,119 | 73,272 | 1,454,876 | 65,492 | 837,078 | 6,252 | 2,452,490 | 10,995 | ||||
| 70,259 | 61,597 | 0 | 0 | 6,517 | 10,177 |
f:/data/users/joanna/
2003 flowmeters
7/5/201210:05 AM
2012 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | HERSHEY MILL | ASHBRIDGE | HICKS | RESERVOIR | SHERMAN | BARKWAY | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| JANUARY | 1,296,433 | 152,585 | 69,729 | 69,440 | 20,400 | 73,086 | 90,225 | 67,846 | 909,322 | 6,922 | 12,327 |
| FEBRUARY | 1,172,663 | 140,579 | 61,074 | 65,911 | 20,400 | 63,555 | 73,939 | 295,466 | 1,019,637 | 6,561 | 11,350 |
| MARCH | 1,157,405 | 222,657 | 61,103 | 71,039 | 20,400 | 60,276 | 70,943 | 300,484 | 0 | 6,707 | 8,575 |
| APRIL | 1,059,167 | 186,208 | 53,353 | 57,578 | 20,400 | 58,987 | 63,358 | 285,508 | 285,613 | 6,407 | 10,305 |
| MAY | 1,144,546 | 167,830 | 63,648 | 81,622 | 20,400 | 55,378 | 60,690 | 304,075 | 652,083 | 6,354 | 10,862 |
| JUNE | 1,125,246 | 105,303 | 62,210 | 90,570 | 20,400 | 70,259 | 61,597 | 6,517 | 10,177 | ||
| JULY | |||||||||||
| AUGUST | |||||||||||
| SEPTEMBER | |||||||||||
| OCTOBER | |||||||||||
| NOVEMBER | |||||||||||
| DECEMBER | |||||||||||
| Total Flows | |||||||||||
| Monthly Ave | 1,159,243 | 162,527 | 61,853 | 72,693 | 20,400 | 63,590 | 70,125 | 250,676 | 573,331 | 6,578 | 10,599 |
To West Goshen: 862,170
2012 flowmeters -all-stations separate month worksheets;004.xlsSUMMARY
2012 SUMMARY OF METER READINGS
| WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | |
|---|---|---|---|---|---|
| JANUARY | 1,296,433 | 152,585 | 69,729 | 69,440 | 20,400 |
| FEBRUARY | 1,172,663 | 140,579 | 61,074 | 65,911 | 20,400 |
| MARCH | 1,157,405 | 222,657 | 61,103 | 71,039 | 20,400 |
| APRIL | 1,069,776 | 186,208 | 53,353 | 57,578 | 20,400 |
| MAY | 1,144,546 | 167,830 | 63,648 | 81,622 | 20,400 |
| JUNE | 1,125,246 | 105,303 | 62,210 | 90,570 | 20,400 |
| JULY | |||||
| AUGUST | |||||
| SEPTEMBER | |||||
| OCTOBER | |||||
| NOVEMBER | |||||
| DECEMBER | |||||
| Total Flows | |||||
| Monthly Ave | 1,161,012 | 162,527 | 61,853 | 72,693 | 20,400 |
Flowmeters June 2012
Flow#s
1400000 1200000 1000000 800000 600000 400000 200000 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Day of the Month
June
Monthly Totals 2012 Jan-Dec
Flowmeters
1400000 1200000 1000000 800000 600000 400000 200000 0 -200000
January February March April May June July August September October November December
Month
June Precip. 3.99 - 2012
Precip.
1.4 1.2 1 0.8 0.6 0.4 0.2 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
snow/rain
June
2012 Monthly Precipitation
6 5 4 3 2 1 0
January February March April May June July August September October November December
Series1
PMAA
PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOCIATION
1000 North Front Street, Suite 401 Wormleysburg, PA 17043
717-737-7655 * 717-737-8431(Fax)
www.municipalauthorities.org * info@municipalauthorities.org
FYI
TO: PMAA Region One Authorities
FROM: Douglas E. Bilheimer
Executive Director
DATE: June 15, 2012
Enclosed please find the official ballot, which indicates the names of the candidates, which have been nominated in your Region to assume the position of PMAA Director and Assistant Director for the next three-year period.
Your Authority, as an active PMAA Member, should vote for the candidates of your choice by marking the ballot in the appropriate block, have it certified by the Authority Secretary, and return the ballot in the envelope provided to the Wormleysburg office no later than Friday, August 17, 2012.
Please note that it is extremely important that the ballot be properly checked, certified by the Secretary, and returned to the Wormleysburg office. The special ballot envelope is enclosed.
BALLOT INSTRUCTIONS:
- Place an X in the block opposite to the nominees for whom your Authority casts its vote.
- Vote for only two candidates.
DEB/kaw
Enclosures
PMAA REGION ONE BALLOT
______ Director: Raymond J. Berry, North Wales Water Authority
______ Assistant Director: Michael Sullivan, Warwick Township Water & Sewer Authority
________________________________________________________________________________
Name of Authority
____________________________________ ____________________________________
Name Title
BY ____________________________________
VOTE FOR TWO CANDIDATES
Place an X in the space opposite the nominee for whom you cast your ballot. A vote for more than two candidates voids the ballot.
PLGIT
Pennsylvania Local Government Investment Trust
FYI
June 2012
Dear PLGIT Investor,
In March we alerted you to a change in PLGIT's operations in which PLGIT would begin to pass through costs for certain services. These charges are now effective, as of June 1, 2012 and are described in detail in PLGIT's Information Statement. We would like to take a moment to review the details of the charges and the reasons for them.
Importantly, for each of the services on which a fee will be assessed, there is generally a less costly alternative. We would be happy to help you determine if these alternatives would be appropriate for your specific needs.
What follows is an excerpt from our March letter about these costs:
Throughout its 30-year history, PLGIT has taken pride in the ability to provide services to investors with no out-of-pocket costs. However, due to the current low interest rate environment and in an attempt to control operating costs, it is necessary to inform you of fees that may be charged for certain services offered through PLGIT. These changes are being introduced as a way to reduce PLGIT operating costs and to potentially increase the net yield for investors on funds invested in PLGIT. Please be aware that the vast majority of PLGIT investors will continue to receive services with no out-of-pocket costs; however, investors that use high levels of certain services may incur a charge.
Right now, the country is facing a prolonged period of extremely low short-term interest rates. Near-zero yields on the types of investments that can be used in PLGIT portfolios, as well as the stated intention of the Federal Reserve to maintain low interest rates through 2014, have made it necessary for the PLGIT Board (the Board) to find ways to reduce the cost of operating PLGIT. The Board has asked all PLGIT service providers and sponsors to reduce contracted expenses.
Even after implementing these extensive cost-reduction measures, the Board decided it was necessary to charge for certain PLGIT services. When making its decisions about these charges, the Board had a number of objectives:
- When a fee is imposed, the Board tried to ensure whenever possible that there was an alternative action an investor could take to avoid the fee.
- Services will continue to be provided to a large segment of PLGIT investors at no out-of-pocket costs; any charges will affect those who have high levels of usage for a service.
This information does not represent an offer to sell or a solicitation of an offer to buy or sell any fund or other security. Investors should consider the investment objectives, risks, charges and expenses before investing in any of the Trust's portfolios. This and other information about the Trust's portfolios is available in each portfolio's current Information Statement, which should be read carefully before investing. Copies of these Information Statements may be obtained by calling 1-800-572-1472 or are available on the Trust's website at www.plgit.com. While the PLGIT and PLGIT/ARM portfolios seek to maintain a stable net asset value of $1.00 per share and the PLGIT/TERM portfolio seeks to achieve a net asset value of $1.00 per share at its stated maturity, it is possible to lose money investing in the Trust. An investment in the Trust is not insured or guaranteed by the Federal Deposit Insurance Corporation or any other government agency. Shares of the Trust's portfolios are distributed by PFM Fund Distributors, Inc., member Financial Industry Regulatory Authority (FINRA) (www.finra.org) and Securities Investor Protection Corporation (SIPC) (www.sipc.org). PFM Fund Distributors, Inc. is a wholly owned subsidiary of PFM Asset Management LLC.
A description of the PLGIT CD Purchase Program is contained in the PLGIT Information Statement. The Information Statement contains important information and should be read carefully before investing. Investors may purchase Certificates of Deposit through the PLGIT CD Purchase Program only by executing an investment advisory agreement with the Program's Investment Adviser, PFM Asset Management LLC.
SM PLGIT, PLGIT-Class Shares, PLGIT/PLUS-Class Shares, PLGIT/I-Class Shares, PLGIT/TERM, PLGIT-CD, PLGIT/ARM, PLGIT/SAM, and PLGIT-CAP are service marks of the Pennsylvania Local Government Investment Trust.
WEST GOSHEN TOWNSHIP
Wastewater Treatment Plant
JOHN M. SCOTT
Plant Manager
848 S. Concord Rd.
West Chester, PA 19382
610-696-0900
Fax: 610-429-9360
FYI
June 27, 2012
East Goshen Township
Attn: Mr. Mark A. Gordon
1580 Paoli Pike
West Chester, PA 19380-6199
RE: Sanitary Sewage Capacity Verification
Proposed Residential Apartment Complex
1325 West Chester Pike
Dear Mr. Gordon:
This letter shall serve to verify that there is sufficient capacity in the West Goshen Sewer Authority collection, conveyance, and treatment system at the current time to accept flows from the proposed above referenced project. That anticipated additional sewage flow of 12,800 gallons per day (gpd) from this project will not create a hydraulic, organic, or 5-year projected overload.
East Goshen still has sufficient sewer capacity allocation available for this proposed apartment complex as well.
Please do not hesitate to call if you are in need of anything further.
Sincerely,
John M. Scott
Plant Manager
cc: file