The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
MA Minutes 01/11/2010 1
EAST GOSHEN TOWNHIP MUNICIPAL AUTHORITY 1 MEETING MINUTES 2 January 11, 2010 3 4 The East Goshen Township Municipal Authority held their regularly scheduled meeting on Monday 5 January 11, 2010 at 7:00 p.m. at the East Goshen Township building. Members in attendance were: 6 Fran Beck, Jack Yahraes, Dana Pizarro, Joseph McCawley and Michael Steinberger. Also in 7 attendance were: Rick Smith, Township Manager; Mark Miller, Director of Public Works; Dave 8 Evans and Scott Towler from Brickhouse Environmental; Evan Andrews, Authority Engineer; Bob 9 Adams, Authority Solicitor; Carmen Battavio, Township Supervisor; and Megan Hedgecock, 10 Planning Commission. 11 12 COMMON ACRONYMS: 13 MA- Municipal Authority I&I – Inflow & Infiltration 14 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 15 PC – Planning Commission LCSTP – Lochwood Chase Sewer Treatment Plant 16 CB – Conservancy Board DEP – Department of Environmental Protection 17 PR – Park & Recreation Board EPA – Environmental protection Agency 18 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 19 SSO – Sanitary System Overflow WAS – Waste Activated Sludge 20 21 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 22 Chairman Fran Beck called the meeting to order at 7:00 p.m. and led those present in the 23 Pledge of Allegiance. There was a moment of silence to remember our Armed Forces. 24 Fran announced that the Authority members will go into Executive Session to discuss 25 pending legal matters at the end of the public meeting. 26 27 2. RCSTP REPORTS 28 a. Scott reported that the construction of the Ridley Creek Sewage Treatment Plant 29 (RSCTP) has largely shifted in focus from the exterior and yard work towards the 30 mechanical and electrical equipment located within the new treatment building as well as 31 continued progress towards the electrical work within the existing control building. During 32 December there were several mechanical components including completion of the 33 installation of the blower intake and discharge piping, installation of the flow meter, 34 installation of the UV finger weirs and UV lamp assemblies, floc tank mixer and the FRP 35 grating on the floc tank, effluent collection tank and screen building influent flow channels. 36 Exterior work included the installation of the hand rails along the perimeter of the SBR 37 basins and hydrants for the utility water system. Electrical work is progressing well and 38 includes pulling wires through conduits to connect the various Motor control and equipment 39 panels. 40 The project schedule has been adjusted to include a detailed SBR Start-up and Temporary 41 Operation of the SBRs during demolition and refurbishment of the existing treatment tanks. 42 A detailed schedule, including equipment start-up dates and representation from the 43 respective manufacturer, is included. Siemens has been tentatively scheduled to visit the 44 facility to perform a dry and wet start up on February 15th and March 8th respectively. A key 45 date in the schedule is the confirmation from PECO for the connection of the new electric 46 service. This connection has been confirmed for January 22nd. Coordination among the 47 contractors, facility operator and design engineers has been progressing in a cooperative 48 spirit. 49
Administrative and contractual items on task for presentation to the Authority Board members include discussion of the proposed path to resolve the issues raised in the Clinger letter dated November 11, 2009 and the proposed change orders and credits with respect to Worth and Company, Inc. Attachments for discussion are included with the monthly report.
b. Pennoni – Their letter dated November 4, 2009 requesting an estimated additional fee of $99, 700.00 was tabled last month. Joe moved to approve additional increase to Pennoni for construction of Ridley Creek as requested in November 4, 2009 letter. Jack seconded the motion. Discussion – Mike asked for a proposal for the remainder of the project. Currently June 30th is the completion date and July 30th is the close out date. Rick explained that there is $189,000.00 remaining for unbudgeted items. The $99,700.00 would come out of this. The only variables are administrative. Evan said the labor rates per hour are fixed. He will provide a detailed breakdown on the invoices showing the monthly average hours, where this stands compared to budgeted hours and will note any expected problems. There was no further discussion or public comment. The motion passed unanimously.
c. Pennoni – In their letter dated December 22, 2009, they propose a rate adjustment of about 3% for 2010 (except the Authority Engineer which remains unchanged) as follows:
| Authority Engineer | $105/hr |
|---|---|
| Senior Engineer | $105/hr |
| Project engineer | $90/hr |
| Staff engineer | $85/hr |
| Associate Engineer | $80/hr |
| Graduate Engineer | $70/hr |
| Engineering Technician II | $72/hr |
| Engineering Technician I | $65/hr |
As part of their responsibilities to the Authority, they will provide the following professional services:
Preparation of the Annual Municipal Wasteload Management (Chapter 94) report to DEP (note that DEP has required that individual reports be prepared for the Ridley Creek STP, Lochwood Chase STP, the West Goshen Service Area, and the Westtown Service Area):
Participation in monthly meetings of the Authority Board; and,
Consultation on issues on behalf of the Authority.
The estimated fee for annual services is $10,000 to be billed on an hourly basis at the above rates.
Mike moved to accept the new fee schedule. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
RCSTP CHANGE ORDERS (Worth)
3. RCSTP INVOICES
A. Invoice for total of $374,772.62. Mike moved to approve payment. Jack seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
B. Clinger invoice for $94,727.00. Jack moved to approve payment. Dana seconded the motion. There was no further discussion or public comment. The motion passed unanimously.
MA Minutes 01/11/2010 2
MA Minutes 01/11/2010 3
C. Brickhouse invoice for $7,762.50. Joe moved to approve payment. Dana seconded the 1 motion. There was no further discussion or public comment. The motion passed 2 unanimously. 3 D. Pennoni, #427379, 12/30/09 for $16,482.50. Joe moved to approve payment. Jack 4 seconded the motion. There was no further discussion or public comment. The motion 5 passed unanimously. 6 7 4. CHAIRMAN’S REPORT 8 a. Fran provided a copy of the Preliminary Draft of the article he wrote for the Spring 9 Newsletter. He also used this in his presentation at the annual planning meeting last 10 Saturday. He reviewed it with Mark Miller who made some changes and suggested that 11 some of his photos be included. 12 b. 2010 Election of Officers - Jack moved to approve the officers for 2010 as follows: 13 Jack Yahraes – Chairman 14 Joe McCawley – Vice Chairman 15 Dana Pizarro – Secretary 16 Mike Steinberger – Treasurer 17 Fran Beck – Asst. Secretary/Treasurer 18 Joe seconded the motion. There was no further discussion or public comment. The motion 19 passed unanimously 20 21 5. APPROVAL OF MINUTES 22 The minutes for December 14, 2009 were reviewed. Joe moved to accept the minutes as 23 corrected. Mike seconded the motion. There was no further discussion or public comment. 24 The motion passed unanimously. Two new Acronyms will be added to the list at the 25 beginning of the minutes. 26 27 6. ENGINEER’S REPORT 28 Evan reported that construction phase services at RCSTP continue as planned. Current 29 project schedule anticipates substantial completion in June 2010. A breakdown of effort 30 expended in December by Pennoni is provided with the invoice detail. 31 I/I Metering Project – Metering at the intersection of Saratoga Dr. and Paoli Pk.; Tallmadge 32 Dr. and Paoli Pk.; and the Ridley Creek Interceptor immediately upstream of the 8-inch 33 sewer from Achom Drive continues. Review of the first few weeks of data indicated that the 34 meters are working properly. 35 Ridley Creek Consent Order – Temporary flow meters have been installed by the Township 36 at the locations noted above under “I/I Metering Project”. The next deadline is the Semi- 37 Annual Report due March 31, 2010. 38 Chapter 94 Reporting – Preparation of Chapter 94 Reports has started with the collection of 39 data and breaking down the single township-wide report to individual reports for RSCTP, 40 LCESP, West Goshen Service Area, and the southern portion of the Township that goes to 41 Westtown. The reports are due to DEP on March 31, 2010. 42 LCSTP and Pump Station Diversion Planning – Stake-out of the diversions is scheduled for 43 January 14th. Once staked, the survey will be conducted (scheduled for week of January 44 18th). 45 Marydell Pump Station Diversion Planning – Field survey along Paoli Pike conducted 46 January 7th. 47 48
MA Minutes 01/11/2010 4
7. APPROVAL OF INVOICES 1 A. Pennoni, #427377, 12/30/09, $387.50. Mike moved to approve payment. Fran 2 seconded the motion. There was no further discussion or public comment. The motion 3 passed unanimously 4 B. Pennoni, #427378, 12/30/09, $157.50. Joe moved to approve payment. Fran seconded 5 the motion. There was no further discussion or public comment. The motion passed 6 unanimously 7 C. Pennoni, #427380, 12/30/09, $142.50. Joe moved to approve payment. Fran seconded 8 the motion. There was no further discussion or public comment. The motion passed 9 unanimously 10 D. Pennoni, #427381, 12/30/09, $186.50. Mike moved to approve payment. Dana 11 seconded the motion. There was no further discussion or public comment. The motion 12 passed unanimously 13 E. Pennoni, #427383, 12/30/09, $544.00. Joe moved to approve payment. Fran seconded 14 the motion. There was no further discussion or public comment. The motion passed 15 unanimously 16 The other items on the Agenda are regular operating costs that the Township staff should 17 process. 18 19 8. LIAISON REPORTS 20 Planning Commission – Meghann Hedgecock reported that the request by Liberty Towers to 21 construct a cell tower behind the Wawa on Paoli Pike was denied. 22 Board of Supervisors – Carmen Battavio reported that Don McConathy will be the 23 Chairman and Carmen will be the Police Commissioner for 2010. ABC appointments will 24 be made on January 19th. 25 26 9. FINANCIAL REPORTS 27 Mike had the following comments regarding the Year End Financials: 28 Revenue was +$42,000 due to interest earned 29 Expenses was +$143,000 due to legal services, etc. 30 Chester Creek capital collection was under budget 31 Engineering was over budget 32 Capital Expansions – Mike pointed out that this started at $450,000 and only $12,000 33 was used so the total remaining should be more than the $225,000 shown. Rick will 34 check this. 35 36 10. GOALS 37 Fran thanked Rick for preparing the goals for 2010. 38 Jack assigned Newsletter Articles for 2010. First Newsletter Fran has done. Second to Jack, 39 third to Joe and fourth to Dana. 40 Jack assigned West Goshen meetings for 2010. First to Fran, 2nd to Dana, 3rd to Joe, and 4th 41 to Jack. 42 43 11. OLD BUSINESS 44 Budget for 2010 – Tabled until the February meeting. 45 46 47 48
MA Minutes 01/11/2010 5
12. NEW BUSINESS 1 A. BFW Associates tapping fee reimbursement for $4,470.20. Fran moved to approve 2 payment. Mike seconded the motion. There was no further discussion or public comment. 3 The motion passed unanimously. 4 5 13. CAPACITY REQUESTS 6 None 7 8 14. SEWER REPORTS 9 Mark Miller reported that meters were read on a daily basis. The portable meters are in 10 operation and are read once a week. They have been cleaning and televising the sewer lines. 11 They located 2 areas of pipe that had a minor infiltration. Both areas were repaired. The 12 lateral connections were inspected for missing lateral caps. They are looking into 13 performing smoke testing on the collection systems. This will allow them to locate missing 14 lateral caps. Pumping stations were visited on a daily basis. Due to the heavy rainfall, they 15 have very high levels. All stations kept up with the flows. 16 The Lochwood plant was visited on a daily basis. There was a problem with the grinder at 17 the head of the plant. This caused a back-up and a carry-over. They used the Jetter to clear 18 the clog. DEP was notified. 19 Ridley Creek Plant had some problems during the heavy rain and snow melt, which caused 20 the plant to overflow into the wetland. 21 One overflow was caused when EQ pump became clogged. They also had a problem in tank 22 #1 when the return line from the clarifier became clogged. The jetter was utilized to clear 23 the blockage. All overflows were reported to the DEP. 24 25 15. ANY OTHER MATTER 26 Rick provided copies of an email for Ross Unruh regarding PMAA. 27 28 16. CORRESPONDENCE 29 None 30 31 17. PUBLIC COMMENT 32 None 33 34 18. ADJOURNMENT 35 There being no further business, Joe moved to adjourn the meeting. Dana seconded the 36 motion. There was no further discussion or public comment. The motion passed unanimously. The 37 public meeting was adjourned at 8:22 p.m. and the Authority went into Executive Session. The 38 Executive Session was adjourned at 9:00 p.m. 39 40 Respectfully submitted, 41 42 43 Ruth Kiefer, Recording Secretary 44 45 C:\Documents and Settings\Owner\My Documents\My Word\Municipal Authority\MA 2009 2010\MA 01-11-10 Draft.doc 46