Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

September 17, 2009
THURSDAY, 7:00 PM

NOTE: 6:00 PM – Meeting at the Ridley Creek Sewer Plant, 1751 Towne Drive for a tour.

  1. CALL TO ORDER/PLEDGE OF ALLEGIANCE Announce that the Recording Secretary will be taping the meeting for her use and that the tape will be erased when the minutes for that meeting have been approved.; Ask if anyone will be taping the meeting?
  2. RIDLEY CREEK REPORTS Brickhouse Environmental August 2009; Pennoni; Artesian; Worth & Company Change Orders; Summary
  3. RIDLEY CREEK INVOICES a. Brickhouse Environmental, Inc. #4941, 9/1/09 $ 7,762.50 b. Harmony Hill Nurseries, LLC, 8/25/09 $ 1,855.00 c. Wm. H Clinger Corp, CEG800, 8/30/09 $ 10,855.98 d. Gawthrop Greenwood, #73156, 8/31/09 $ 836.00 e. Worth and Company, P28001, 8/31/09 $ 679,793.40 f. Artesian Utility Dev., #09-297, 8/21/09 $ 12,922.35
  4. CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
  5. APPROVAL OF MINUTES August 10, 2009
  6. ENGINEER’S REPORT Pennoni report
  7. APPROVAL OF INVOICES a. Artesian Utility, inv #09-296, 8/21/09 $ 1,236.00 b. Gawthrop, #72729, 7/31/09 $ 741.00 c. Gawthrop, #72730, 7/31/09 $ 532.00 d. Gawthrop, #73155, 8/31/09 $ 1,292.00 e. Pennoni, #416201, 8/24/09 $ 577.50 f. Pennoni, #416200, 8/24/09 $ 630.00 g. Pennoni, #416203, 8/24/09 $ 387.50 h. Pennoni, #416202, 8/24/09 $ 1,890.00
  8. LIAISON REPORTS
  9. FINANCIAL REPORTS
  10. GOALSs
  11. OLD BUSINESS
  12. NEW BUSINESS A. DEP Sewage Chapter 94 Annual Report—RCSTP
  13. CAPACITY REQUESTS

THURSDAY, September 17, 2009

- 1 -

  1. SEWER REPORTS Lochwood Chase Operations Report – August 2009; Director of Public Works Report – August 2009
  2. ANY OTHER MATTER
  3. CORRESPONDENCE AND REPORTS OF INTEREST Letter – Worth & Com re: Role of Project Mgr.; Ridley Creek Expansion Project; DLI – Grant of $464,195.00
  4. PUBLIC COMMENT
  5. ADJOURNMENT

Reminder – NEWSLETTER ARTICLE SUBMISSION DUE DATES:

Article Due Date Delivery date
11/10/09 1/1/10

THURSDAY, September 17, 2009

- 2 -

[Handwritten: 2. RIDLEY CREEK RPT
a.
2 pgs]

Brickhouse Environmental

Project Accomplishments
B E Project No. 09-2532-0
East Goshen / Ridley Creek Sewage Treatment Plant Upgrade / Expansion
August 2009

The following Project Management tasks were performed for the Ridley Creek Wastewater Treatment Plant Expansion project:

  • 8-3-09 Site progress visit observation of SBR Tank 2 leak testing. 2 leaks on Tank 3 west wall.
  • 8-4-09 Review of Dutchland e-mail correspondence and responses to Twp. and Pennoni that Dutchland is not to proceed w/ covering the 107 w/ CIM.
  • 8-4-09 Site progress visit observation of filters set on pad and bitumastic coating on Tank 4.
  • 8-5-09 Progress Meeting with extensive conversation w/ Dutchland rep regarding proposed sealing strategy and responsibilities.
  • 8-9-09 Prepared project managers report for July 2009.
  • 8-10-09 Attended Executive Session meeting. Worth is responsible for further dialogue and contacts pertaining to their subcontractors (including Dutchland). Attended the Authority meeting and presented project managers report.
  • 8-11-09 Site progress visit observation of Tank 2/3 wall weeping at new location and cracks in the 107 coating. Observed pull tests in Tank 1. SBR Backfilling. Telephone conversations w/ Worth’s Cantrell, Pennoni’s Andrews and Dutchland’s M. A. Stoltzfus.
  • 8-12-09 Telephone conversations w/ Worth’s Cantrell and Pennoni’s Andrews.
  • 8-13-09 Telephone conversations w/ : Worth’s Cantrell; & Pennoni’s Andrews & McAloon; and the Township’s R. Smith, M. Miller & J. McCawley.
  • 8-14-09 Prepared Site progress visit observation of: SBR #2 water filled; #4 being drained; arrangements being made for CIM application to #1 rib wall. Met after hours w/ M. McAloon to gather project updates and observe CIM application.
  • 8-17-09 Attended Worth meeting at Pennoni’s office. Reviewed the 9 points and Worth’s responses to the July 24 th letter to Worth.
  • 8-19-09 Site progress visit observation of SBR Tank #1 full and leak test underway. Bituminous on SBR’s exterior completed. Heim Construction installing steel & forms within the Screen Building.

2 of 2

Brickhouse Environmental

  • 8-20-09 Prepared for and attended Progress Meeting.
  • 8-21-09 Site progress visit observation of leak testing. Disc filter feed piping & influent gate valves of SBR # 2, 3 & 4 passed pressure tests. Generator delivered to site.
  • 8-24-09 Site progress visit observation of SBR #1 passing leak test. Storm water being pumped from Screen Building to influent wet well / MH 1.
  • 8-25-09 Site progress visit. Attended PADEP tour at site.
  • 8-27-09 Site progress visit observation of: Treatment Building walls going up and PVC floor drains set; SBR Tank 3 filled for water test; Tank 2 east & west walls CIM coated Tank 4 floor & wall being sealed at seeps; Screen Building rebar and forms set in prep for channel pouring.
  • 8-28-09 Site progress visit observation of Screen Building wall at 5 block courses and Treatment Building at 25 courses. SBR Tank # 4 west wall with CIM.
  • 8-30-09 Site progress visit to confirm work completed in August.
  • 8-31-09 Site progress visit. Draft review of Clinger and Worth payment requests for August.

Note: As of August 31, 2009 the cumulative project management hours budgeted was 446. The actual cumulative hours were 308.

J:\092532.0\August 2009 Bullets.doc

[Handwritten: 2. RIDLEY CREEK RPT
C.
3 pgs]

ARTESIAN RESOURCES

Artesian Water Company | Artesian Wastewater Management | Artesian Utility Development | Artesian Water Maryland

100 YEARS OF SUPERIOR SERVICE

August 19, 2009

Mr. Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Ridley Creek Wastewater Treatment Facility
July 2009 Operations Report

Dear Mr. Miller:

The following is the July 2009 monthly operations report for East Goshen Township’s Ridley Creek Wastewater Treatment Facility.

Treatment plant operations were normal during the month of July 2009. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharged during the month was 8,847,700 gallons, which represents an average daily flow of 285,410 gallons per day.

The operations staff continued to visually inspect the manholes outside of the fence for signs of overflows. No evidence was found to indicate any overflows occurred during July 2009.

The influent area operated normally during the month of July. The muffin monster, both raw lift pumps and associated controls experienced no operational problems. Several “High Level” alarms were experienced during the month due to infiltration/inflow during rainfall events and problems caused by the chlorine contact tank drain line not being closed properly. The plant operator hosed down the catwalk and walls after the incident to return the wet well to normal. Debris was also removed from the influent transducer to ensure proper operations.

The flow equalization system operated normally during the month. The Rotomat unit was on line continuously and debris generated by the unit was disposed of via the dumpster. The forward flow pumps and associated controls experienced no operational problems. Soda ash continued to be added on a daily basis to control pH and alkalinity values.

On July 22, 2009, PreDoc, Inc. was utilized to replace the older solenoid valves on the Rotomat unit. The old valves had failed due to age and the increased water pressure from

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Hwy., Unit 4, Milton, DE 19968
e-mail: artesian@artesianwater.com Website: artesianwater.com

2 of 3

the public water supply system. Once replaced, the unit was returned to normal operations.

The package sewage treatment plant operated normally during the month. The aeration tanks were medium brown colored with light tan surface foam buildups. The clarifiers operated normally as well. The surfaces were skimmed daily and the weirs were power washed weekly to remove algae and solids buildups. The township assisted the operator on July 15, 2009 and again on July 22, 2009 power washing the entire plant with the township’s jetter unit and thoroughly clean the tankage. Sludge wasting continued to be accomplished to control the biomass. Weekly Mixed Liquor Suspended Solids (MLSS) sample analysis indicated solids concentrations remained slightly higher than targeted values. The sand filters were operational throughout the month with water still providing sand lifting assistance. Currently public water is being used in the #1 sand filter while recycled, treated water from the chlorine contact tank is being used on the #2 side. Blockages continue to be experienced in the washing compartments due to algae growth. The chlorine contact tank and ultraviolet light disinfection system were in service continuously during the month of July.

On July 24, 2009, the township cleaned the chlorine contact tank. The drain lines were opened to drain the tanks, sludge and solids were washed out and the walls were power washed to remove algae buildups. Due to the excessive amount of sludge accumulated in the bottom of the tank, regular bi-monthly cleaning has been scheduled. Once completed, the tank was returned to normal service.

The operations staff was required to make one (1) emergency call to the facility on July 28, 2009 due to a “Blower Failure” alarm caused by a power outage. The plant operator restarted the blowers and checked the facility’s other equipment to return the plant to normal operations.

The belt filter press was operated for two hundred ninety-seven (297) hours during the month of July to dewater approximately three hundred forty thousand (340,000) gallons of waste activated sludge to produce four (4) dumpster loads of dried sludge for disposal.

The Applebrooke subdivision transfer pump was utilized during the month of July to transfer effluent to the golf course for irrigation purposes, however, the flow meter used to measure the amount of water delivered was damaged during the plant expansion project and remains out of service.

The plant expansion project continued during the month. Projects involving the plant operator included routine progress meetings, continued review of the SBR tank wall issues, the reinstallation of the B1B blower and the removal of the B1C process blower.

Results of influent and final effluent samples collected during the month indicate compliance with current permit limitations.

3 of 3

Should you have any questions, please do not hesitate to contact me.

Sincerely,
Artesian Utility Development, Inc.

Thomas M. Horrex / bmr
Thomas M. Horrex, L.O., S. E.O.
Pennsylvania Operations Supervisor

TMH/bmr

cc: Mr. Evan Andrews - Pennoni Associates
File

[Handwritten: 3. RIDLEY CREEK
a.
3 pgs]

Brickhouse Environmental

Consultants and Engineers

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

Invoice number: 4941
Date: 9/1/2009
Client ID: 548

Contract: 09.2532
E Goshen Twp-Ridley CreekSewer
Scope of Work: Project No. 09-2532-0 E. Goshen/Ridley Creek Sewer Plant/WW Engineering
Attn: Mr. Rick Smith, Township Manager

SEE PROJECT ACCOMPLISHMENTS ATTACHED.

Professional Services Rendered Through the Month of August 2009.

Labor

Employee Type Hours Amount
Project Manager 67.50 7,762.50
Labor Total 67.50 7,762.50

Reimbursable

Amount
Expense Total 0.00
0.00
Invoice Total 7,762.50

[Handwritten: ok RS 9/9/09]

Payment Terms: Net Thirty (30) Days; Credit Cards Accepted

When Creativity & Experience Count

515 South Franklin Street
West Chester, PA 19382
Phone 610.692.5770
Fax 610.692.8650
www.brickhouse-environmental.com

2 of 3

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule

The original budget estimate assumed commencing the first week of May. Week 1 actually commenced 28-April-2009 (week ending 30-April). The schedule reflects this change for monthly comparison based on the agreed $115.00 hourly rate.

Week Ending Estimated Project Management Estimated Cumulative Hours Estimated Cumulative Fees Estimated Monthly Fees Actual Totals Project Management Actual Totals Cumulative Hours Actual Totals Cumulative Fees Actual Totals Monthly Fees
30-Apr-09 Week 1 (3 days) 0 0 $0 $0 18.5 18.5 $2,127.50 $2,127.50
3-May-09 Week 1 (2 days) 48 48 $5,520
10-May-09 Week 2 50 98 $11,270
17-May-09 Week 3 20 118 $13,570
24-May-09 Week 4 20 138 $15,870
31-May-09 Week 5 20 158 $18,170 $18,170 73.5 92.0 $10,580.00 $8,452.50
7-Jun-09 Week 6 20 178 $20,470
14-Jun-09 Week 7 20 198 $22,770
21-Jun-09 Week 8 20 218 $25,070
28-Jun-09 Week 9 20 238 $27,370
30-Jun-09 Week 10 (2 days) 8 246 $28,290 $10,120 67.8 159.8 $18,371.25 $7,791.25
5-Jul-09 Week 10 (3 days) 12 258 $29,670
12-Jul-09 Week 11 20 278 $31,970
19-Jul-09 Week 12 20 298 $34,270
26-Jul-09 Week 13 24 322 $37,030
31-Jul-09 Week 14 24 346 $39,790 $11,500 81.0 240.8 $27,686.25 $9,315.00
9-Aug-09 Week 15 24 370 $42,550
16-Aug-09 Week 16 24 394 $45,310
23-Aug-09 Week 17 24 418 $48,070
30-Aug-09 Week 18 24 442 $50,830
31-Aug-09 Week 19 (1 day) 4 446 $51,290 $11,500 67.5 308.3 $35,448.75 $7,762.50
6-Sep-09 Week 19 (4 days) 20 466 $53,590
13-Sep-09 Week 20 24 490 $56,350
20-Sep-09 Week 21 24 514 $59,110
27-Sep-09 Week 22 24 538 $61,870
30-Sep-09 Week 23 (3 days) 16 554 $63,710 $12,420
4-Oct-09 Week 23 (2 days) 8 562 $64,630
11-Oct-09 Week 24 24 586 $67,390
18-Oct-09 Week 25 24 610 $70,150
25-Oct-09 Week 26 24 634 $72,910
31-Oct-09 Week 27 24 658 $75,670 $11,960
8-Nov-09 Week 28 24 682 $78,430
15-Nov-09 Week 29 24 706 $81,190
22-Nov-09 Week 30 20 726 $83,490
29-Nov-09 Week 31 20 746 $85,790
30-Nov-09 Week 32 (1 day) 4 750 $86,250 $10,580
6-Dec-09 Week 32 (4 days) 20 770 $88,550
13-Dec-09 Week 33 24 794 $91,310
20-Dec-09 Week 34 20 814 $93,610
27-Dec-09 Week 35 20 834 $95,910
31-Dec-09 Week 36 (4 days) 16 850 $97,750 $11,500

092532.50/Schedule.xls

Page 1 of 2

3 of 3

Brickhouse Environmental

East Goshen Township: Ridely Creek Sewer Plant Expansion Project Management Schedule

The original budget estimate assumed commencing the first week of May. Week 1 actually commenced 28-April-2009 (week ending 30-April). The schedule reflects this change for monthly comparison based on the agreed $115.00 hourly rate.

Estimated Actual Totals
Week Ending Project Management Cumulative Hours Cumulative Fees Monthly Fees Project Management Cumulative Hours Cumulative Fees Monthly Fees
3-Jan-10 Week 36 (1 day) 4 854 $98,210
10-Jan-10 Week 37 20 874 $100,510
17-Jan-10 Week 38 20 894 $102,810
24-Jan-10 Week 39 24 918 $105,570
31-Jan-10 Week 40 24 942 $108,330 $10,580
7-Feb-10 Week 41 24 966 $111,090
14-Feb-10 Week 42 24 990 $113,850
21-Feb-10 Week 43 24 1,014 $116,610
28-Feb-10 Week 44 20 1,034 $118,910 $10,580
7-Mar-10 Week 45 20 1,054 $121,210
14-Mar-10 Week 46 20 1,074 $123,510
21-Mar-10 Week 47 20 1,094 $125,810
28-Mar-10 Week 48 20 1,114 $128,110
31-Mar-10 Week 49 (3 days) 16 1,130 $129,950 $11,040
4-Apr-10 Week 49 (2 days) 8 1,138 $130,870
11-Apr-10 Week 50 24 1,162 $133,630
18-Apr-10 Week 51 24 1,186 $136,390
25-Apr-10 Week 52 24 1,210 $139,150
30-Apr-10 Week 53 24 1,234 $141,910 $11,960
9-May-10 Week 54 20 1,254 $144,210
16-May-10 Week 55 20 1,274 $146,510
23-May-10 Week 56 20 1,294 $148,810
30-May-10 Week 57 20 1,314 $151,110
31-May-10 Week 58 (1 day) 4 1,318 $151,570 $9,660
6-Jun-10 Week 58 (4 days) 16 1,334 $153,410
13-Jun-10 Week 59 20 1,354 $155,710
20-Jun-10 Week 60 20 1,374 $158,010
27-Jun-10 Week 61 20 1,394 $160,310
30-Jun-10 Week 62 (3 days) 12 1,406 $161,690 $10,120
4-Jul-10 Week 62 (2 days) 8 1,414 $162,610
11-Jul-10 Week 63 20 1,434 $164,910
18-Jul-10 Week 64 24 1,458 $167,670
25-Jul-10 Week 65 24 1,482 $170,430
31-Jul-10 Week 66 20 1,502 $172,730 $11,040
8-Aug-10 Week 67 20 1,522 $175,030 $2,300

092532.S0/Schedule.xls

Page 2 of 2

Sep 08 09 01:27p p.2

[Handwritten: 3. RIDLEY CREEK b. 1 pg
23281 M.A.
OFFICE COPY]

HARMONY HILL NURSERIES, LLC COPY

43 BUCK ROAD
DOWNINGTOWN, PA 19335
(610)873-2495
info@hhnurseries.com

Invoice

DATE: 8/25/09
INVOICE #:
TERMS:
DUE DATE:

APPROVED BY:
DATE PAID:
CHECK #:
CHARGED TO: 07424, 7454

BILL TO

East Goshen Twnshp

AMOUNT DUE ENCLOSED

Please detach top portion and return with your payment

Activity Quantity Rate Amount
Acer saccarum 2-2.5" [Picked Up] 2 130/65.00 $ 130.00
Acer saccarum 2½-2" [Picked Up] 2 100/50.00 $ 100.00
Pinus strobus 8'-10' 1 130/65.00 $ 65.00
[Handwritten note: $295.00 due by 8/26/09 4:00pm] $295.00
Pinus strobus 8'-10' 12 130.00 $1,560.00
(Remaining Balance)
SUBTOTAL $1,855.00
TAX (6%)
TOTAL $ 1,855.00

[Handwritten: PAID CHECK # 464 $295.00]

[Signature]

[Handwritten: ok Per RS 9/9/09
RCSTP LANDSCAPING]

[Handwritten: 3. RIDLEY CREEK c. 15 pgs]

APPLICATION AND CERTIFICATION FOR PAYMENT

AIA DOCUMENT G702
PAGE 1 OF 2 PAGES

TO OWNER:
East Goshen Municipal Auth.
1580 Paoli Pike
West Chester, PA 19331
PROJECT:
Ridley Creek Sewage Treatment
Plant Upgrade & Expansion Project
APPLICATION NO: 5
PERIOD TO: 8/30/2009
PROJECT NOS: EGMA0707
Distribution to:
[X] OWNER
[X] ARCHITECT
[ ] CONTRACTOR
[ ] CONSTRUCTION MANAGER
FROM CONTRACTOR:
Wm. H. Clinger Corp.
736 Baltimore Pike, P.O. Box 158
Concordville, PA 19331
VIA ARCHITECT:
Pennoni Associates
One Drexel Plaza, 3001 Market St.
Philadelphia, PA 19104-2897
CONTRACT DATE: 11/5/2008 Our Job# CEG800

CONTRACT FOR: Electrical Contractor

CONTRACTOR’S APPLICATION FOR PAYMENT

Application is made for payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document G703, is attached.

  1. ORIGINAL CONTRACT SUM : $974,000.00
  2. Net change by Change Orders : $0.00
  3. CONTRACT SUM TO DATE (Line 1 ± 2) : $974,000.00
  4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) : $154,738.10
  5. RETAINAGE: a. 10 % of Completed Work (Column D + E on G703): $15,473.82; b. % of Stored Material (Column F on G703): $ Total Retainage (Lines 5a + 5b or Total in Column I of G703): $15,473.82
  6. TOTAL EARNED LESS RETAINAGE (Line 4 Less Line 5 Total) : $139,264.28
  7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) : $128,408.30
  8. CURRENT PAYMENT DUE : $10,855.98
  9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) : $834,735.72
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS
Total changes approved in previous months by Owner
Total approved this Month
TOTALS
NET CHANGES by Change Order $0.00

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

CONTRACTOR: Wm. H. Clinger Corp.
By: Michael V. Clinger, President
Date: 9/1/2009

State of: Pennsylvania, County of: Delaware
Subscribed and sworn to before me this 1st day of September, 2009.
Notary Public: Amy E. Bell
My Commission expires: 7/23/2012

[NOTARIAL SEAL: AMY E BELL Notary Public CONCORD TWP, DELAWARE COUNTY My Commission Expires Jul 23, 2012]

ARCHITECT’S CERTIFICATE FOR PAYMENT

In accordance with the Contract Documents, based on on-site observations and the data comprising the application, the Architect certifies to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.

AMOUNT CERTIFIED: $ 10,855.98

(Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and on the Continuation Sheet that are changed to conform to the amount certified.)

ARCHITECT:
By: Eric Wolff Date: 9/3/09

This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

[Handwritten: ok RS 9/8]

AIA DOCUMENT G702 • APPLICATION AND CERTIFICATION FOR PAYMENT • 1992 EDITION • AIA • ©1992
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, DC 20006-5292

[Handwritten: 2 of 15]

CONTINUATION SHEET

AIA DOCUMENT G703
PAGE 2 OF 2 PAGES

AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification is attached.
In tabulations below, amounts are stated to the nearest dollar.
Use Column I on Contracts where variable retainage for line items may apply.

Wm. H. Clinger Corp.
APPLICATION NO: 5
APPLICATION DATE: 9/1/2009
PERIOD TO: 8/30/2009
ARCHITECT'S PROJECT NO: EGMA0707

A
ITEM NO.
B
DESCRIPTION OF WORK
C
SCHEDULED VALUE
D
WORK COMPLETED FROM PREVIOUS APPLICATION (D + E)
E
WORK COMPLETED THIS PERIOD
F
MATERIALS PRESENTLY STORED (NOT IN D OR E)
G
TOTAL COMPLETED AND STORED TO DATE (D+E+F)
%
(G ÷ C)
H
BALANCE TO FINISH (C - G)
I
RETAINAGE
*** SEE ATTACHED 0
Total: GRAND TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AIA DOCUMENT G703 • CONTINUATION SHEET FOR G702 • 1992 EDITION • AIA • ©1992
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W. WASHINGTON, D.C. 20006-5232
G703-1992

7 [Handwritten: 3 of 15]

CUST: EAST GOSHEN MUNICIPAL AUTH.
1580 PAOLI PIKE
WEST CHESTER PA 19331
JOB: Rid.Creek Sewage Trtmnt. Plnt. APPLICATION NO: 5
PERIOD ENDING: 09/30/09
INVOICE NO: 4124
Page: 1
FROM: William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331
ARCHITECT: PENNONI ASSOCIATES
One Drexel Plaza
3001 Market Street
Philadelphia PA 19104-2897
CONTRACT NO:
CONTRACT DATE: 11/13/08

JOB DESCRIPTION: Rid.Creek Sewage Trtmnt. Plnt.
OUR JOB #: CEG800

CHANGE ORDERS CONTRACT SUMMARY
ADDITIONS DEDUCTIONS ORIGINAL CONTRACT AMOUNT $ 974,000.00
PREVIOUS TOTAL .00 .00 TOTAL CHANGE ORDER AMOUNT $ .00
CURRENT TOTAL CONTRACT INCLUDING CHANGE ORDERS $ 974,000.00
Number Date AMOUNT COMPLETED TO DATE $ 154,738.10
RETAINAGE - 10.00% OF WORK COMPLETED
                10.00% OF STORED MATERIAL
$ 15,473.82
COMPLETED TO DATE LESS RETAINAGE $ 139,264.28
PREVIOUS AMOUNT BILLED $ 128,408.30
SALES TAX $ .00
CURRENT AMOUNT DUE $ 10,855.98
TOTALS TO DATE .00 .00 AMOUNT REMAINING $ 834,735.72
NET AMOUNT .00
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number2
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
1DIRECT COST
1Labor-Field.00
.00
.00.00.00.000.00.00
3Materials.00
.00
.00.00.00.000.00.00
4Subcontractor.00
.00
.00.00.00.000.00.00
5Equipment Rental.00
.00
.00.00.00.000.00.00
6Small Tools.00
.00
.00.00.00.000.00.00
7Other Charges.00
.00
.00.00.00.000.00.00
PMLabor-Proj. Mgr..00
.00
.00.00.00.000.00.00
Total DIRECT COST.00.00.00.00.000.00.00
MOBMobilization
1Mobilization-Labor2,772.00
.00
2,772.00.00.002,772.00100.00277.20
3Mobilization-Material5,611.00
.00
5,611.00.00.005,611.00100.00561.10
5Equipment Rental.00
.00
.00.00.00.000.00.00
Total Mobilization8,383.008,383.00.00.008,383.00100.00838.30
DEMODemo
1Demo-Labor18,775.00
.00
.00.00.00.00018,775.00.00
Total Demo18,775.00.00.00.00.00018,775.00.00
TEMPTemporay Power
1Temporay Power-Labor10,820.00
.00
7,574.001,623.00.009,197.00851,623.00919.70
3Temporay Power-Material12,000.00
.00
12,000.00.00.0012,000.00100.001,200.00
Total Temporay Power22,820.0019,574.001,623.00.0021,197.00931,623.002,119.70
11000Aerial Work
1Aerial Work-Labor486.00
.00
364.50.00.00364.5075121.5036.45
3Aerial Work-Material.00
.00
.00.00.00.000.00.00
4Aerial Work-Subcontractor6,172.00
.00
4,629.00.00.004,629.00751,543.00462.90
Total Aerial Work6,658.004,993.50.00.004,993.50751,664.50499.35
11100Site Work
1Site Work-Labor7,160.00
.00
5,370.00716.00.006,086.00851,074.00608.60
3Site Work-Material5,985.00
.00
5,985.00.00.005,985.00100.00598.50
4Site Work-Subcontractor24,449.00
.00
18,336.752,444.90.0020,781.65853,667.352,078.17
Total Site Work37,594.0029,691.753,160.90.0032,852.65874,741.353,285.27
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number3
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
11200Underground Conduit
1Underground Conduit-Labor25,984.00
.00
20,787.20.00.0020,787.20805,196.802,078.72
3Underground Conduit-Mater7,530.00
.00
7,530.00.00.007,530.00100.00753.00
Total Underground Conduit33,514.0028,317.20.00.0028,317.20845,196.802,831.72
11210Underground Cable
1Underground Cable-Labor28,179.00
.00
2,817.90.00.002,817.901025,361.10281.79
3Underground Cable-Materia62,338.00
.00
6,233.80.00.006,233.801056,104.20623.38
Total Underground Cable90,517.009,051.70.00.009,051.701081,465.30905.17
11220Underground Terms
1Underground Terms-Labor12,762.00
.00
.00.00.00.00012,762.00.00
3Underground Terms-Materia2,272.00
.00
.00.00.00.0002,272.00.00
Total Underground Terms15,034.00.00.00.00.00015,034.00.00
11230Underground Equip
1Underground Equip-Labor7,276.00
.00
3,638.001,819.00.005,457.00751,819.00545.70
3Underground Equip-Materia1,234.00
.00
617.00308.50.00925.5075308.5092.55
Total Underground Equip8,510.004,255.002,127.50.006,382.50752,127.50638.25
11300Trt.Bldg.Pwr Cond
1Trt.Bldg.Pwr Cond-Labor49,464.00
.00
12,366.00.00.0012,366.002537,098.001,236.60
3Trt.Bldg.Pwr Cond-Materia40,442.00
.00
10,110.50.00.0010,110.502530,331.501,011.05
Total Trt.Bldg.Pwr Cond89,906.0022,476.50.00.0022,476.502567,429.502,247.65
11310Trt.Bldg.Pwr Cables
1Trt.Bldg.Pwr Cables-Labor20,672.00
.00
.00.00.00.00020,672.00.00
3Trt.Bldg.Pwr Cables-Mater5,874.00
.00
.00.00.00.0005,874.00.00
Total Trt.Bldg.Pwr Cables26,546.00.00.00.00.00026,546.00.00
11320Trt.Bldg.Pwr Terms
1Trt.Bldg.Pwr Terms-Labor6,352.00
.00
.00.00.00.0006,352.00.00
3Trt.Bldg.Pwr Terms-Materi1,029.00
.00
.00.00.00.0001,029.00.00
Total Trt.Bldg.Pwr Terms7,381.00.00.00.00.0007,381.00.00
11330Trt.Bldg. Equip
1Trt.Bldg. Equip-Labor25,754.00
.00
.005,150.80.005,150.802020,603.20515.08
3Trt.Bldg. Equip-Material90,861.00
.00
.00.00.00.00090,861.00.00
Total Trt.Bldg. Equip116,615.00.005,150.80.005,150.804111,464.20515.08
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number4
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
11340Trt.Bldg.Branch Cond
1Trt.Bldg.Branch Cond-Labo18,940.00
.00
.00.00.00.00018,940.00.00
3Trt.Bldg.Branch Cond-Mate11,570.00
.00
.00.00.00.00011,570.00.00
Total Trt.Bldg.Branch Cond30,510.00.00.00.00.00030,510.00.00
11350Trt.Bldg.Branch Wire
1Trt.Bldg.Branch Wire-Labo2,772.00
.00
.00.00.00.0002,772.00.00
3Trt.Bldg.Branch Wire-Mate997.00
.00
.00.00.00.000997.00.00
Total Trt.Bldg.Branch Wire3,769.00.00.00.00.0003,769.00.00
11360Trt.Bldg.Branch Dev
1Trt.Bldg.Branch Dev-Labor4,157.00
.00
.00.00.00.0004,157.00.00
3Trt.Bldg.Branch Dev-Mater1,459.00
.00
.00.00.00.0001,459.00.00
Total Trt.Bldg.Branch Dev5,616.00.00.00.00.0005,616.00.00
11370Trt.Bldg.Ltg.Cond
1Trt.Bldg.Ltg.Cond-Labor22,289.00
.00
.00.00.00.00022,289.00.00
3Trt.Bldg.Ltg.Cond-Materia12,545.00
.00
.00.00.00.00012,545.00.00
Total Trt.Bldg.Ltg.Cond34,834.00.00.00.00.00034,834.00.00
11380Trt.Bldg.Ltg.Wire
1Trt.Bldg.Ltg.Wire-Labor1,790.00
.00
.00.00.00.0001,790.00.00
3Trt.Bldg.Ltg.Wire-Materia669.00
.00
.00.00.00.000669.00.00
Total Trt.Bldg.Ltg.Wire2,459.00.00.00.00.0002,459.00.00
11390Trt.Bldg.Lt.fixt
1Trt.Bldg.Lt.fixt-Labor7,391.00
.00
.00.00.00.0007,391.00.00
3Trt.Bldg.Lt.fixt-Material204,093.00
.00
.00.00.00.000204,093.00.00
Total Trt.Bldg.Lt.fixt211,484.00.00.00.00.000211,484.00.00
21300Inflt. Pmp.St Pwr Cond
1Inflt. Pmp.St Pwr Cond-La6,698.00
.00
.00.00.00.0006,698.00.00
3Inflt. Pmp.St Pwr Cond-Ma3,460.00
.00
.00.00.00.0003,460.00.00
Total Inflt. Pmp.St Pwr Cond10,158.00.00.00.00.00010,158.00.00
21310Inflt. Pmp.St Pwr Cab
1Inflt. Pmp.St Pwr Cab-Lab7,565.00
.00
.00.00.00.0007,565.00.00
3Inflt. Pmp.St Pwr Cab-Mat2,249.00
.00
.00.00.00.0002,249.00.00
Total Inflt. Pmp.St Pwr Cab9,814.00.00.00.00.0009,814.00.00
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number5
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
21320Inflt. Pmp.St Pwr Term
1Inflt. Pmp.St Pwr Term-La1,763.00
.00
.00.00.00.0001,763.00.00
3Inflt. Pmp.St Pwr Term-Ma313.00
.00
.00.00.00.000313.00.00
Total Inflt. Pmp.St Pwr Term2,076.00.00.00.00.0002,076.00.00
21330Inflt. Pmp.St Equip.
1Inflt. Pmp.St Equip.-Labo973.00
.00
.00.00.00.000973.00.00
3Inflt. Pmp.St Equip.-Mate355.00
.00
.00.00.00.000355.00.00
Total Inflt. Pmp.St Equip.1,328.00.00.00.00.0001,328.00.00
21340Inflt. Pmp.St Ltg.Cond
1Inflt. Pmp.St Ltg.Cond-La3,951.00
.00
.00.00.00.0003,951.00.00
3Inflt. Pmp.St Ltg.Cond-Ma4,846.00
.00
.00.00.00.0004,846.00.00
Total Inflt. Pmp.St Ltg.Cond8,797.00.00.00.00.0008,797.00.00
21350Inflt. Pmp.St Ltg.Wire
1Inflt. Pmp.St Ltg.Wire-La2,431.00
.00
.00.00.00.0002,431.00.00
3Inflt. Pmp.St Ltg.Wire-Ma1,979.00
.00
.00.00.00.0001,979.00.00
Total Inflt. Pmp.St Ltg.Wire4,410.00.00.00.00.0004,410.00.00
21360Inflt. Pmp.St Ltg.Fixt
1Inflt. Pmp.St Ltg.Fixt-La2,006.00
.00
.00.00.00.0002,006.00.00
3Inflt. Pmp.St Ltg.Fixt-Ma11,578.00
.00
.00.00.00.00011,578.00.00
Total Inflt. Pmp.St Ltg.Fixt13,584.00.00.00.00.00013,584.00.00
31300Screen Bldg Pwr Cond
1Screen Bldg Pwr Cond-Labo13,397.00
.00
3,349.25.00.003,349.252510,047.75334.93
3Screen Bldg Pwr Cond-Mate9,566.00
.00
2,391.50.00.002,391.50257,174.50239.15
Total Screen Bldg Pwr Cond22,963.005,740.75.00.005,740.752517,222.25574.08
31310Screen Bldg Pwr Cab
1Screen Bldg Pwr Cab-Labor2,067.00
.00
.00.00.00.0002,067.00.00
3Screen Bldg Pwr Cab-Mater645.00
.00
.00.00.00.000645.00.00
Total Screen Bldg Pwr Cab2,712.00.00.00.00.0002,712.00.00
31320Screen Bldg Pwr Term
1Screen Bldg Pwr Term-Labo486.00
.00
.00.00.00.000486.00.00
3Screen Bldg Pwr Term-Mate75.00
.00
.00.00.00.00075.00.00
Total Screen Bldg Pwr Term561.00.00.00.00.000561.00.00
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number6
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
31330Screen Bldg. Eq
1Screen Bldg. Eq-Labor2,310.00
.00
.00.00.00.0002,310.00.00
3Screen Bldg. Eq-Material879.00
.00
.00.00.00.000879.00.00
Total Screen Bldg. Eq3,189.00.00.00.00.0003,189.00.00
41300Sldg Dewat Bld Pwr Cond
1Sldg Dewat Bld Pwr Cond-L17,554.00
.00
.00.00.00.00017,554.00.00
3Sldg Dewat Bld Pwr Cond-M9,283.00
.00
.00.00.00.0009,283.00.00
Total Sldg Dewat Bld Pwr Cond26,837.00.00.00.00.00026,837.00.00
41310Sldg Dewat Bld Pwr Cab
1Sldg Dewat Bld Pwr Cab-La6,813.00
.00
.00.00.00.0006,813.00.00
3Sldg Dewat Bld Pwr Cab-Ma2,673.00
.00
.00.00.00.0002,673.00.00
Total Sldg Dewat Bld Pwr Cab9,486.00.00.00.00.0009,486.00.00
41320Sldg Dewat Bld Pwr Term
1Sldg Dewat Bld Pwr Term-L8,661.00
.00
.00.00.00.0008,661.00.00
3Sldg Dewat Bld Pwr Term-M1,403.00
.00
.00.00.00.0001,403.00.00
Total Sldg Dewat Bld Pwr Term10,064.00.00.00.00.00010,064.00.00
41330Sldg Dewat Bld Equip
1Sldg Dewat Bld Equip-Labo13,397.00
.00
.00.00.00.00013,397.00.00
3Sldg Dewat Bld Equip-Mate1,150.00
.00
.00.00.00.0001,150.00.00
Total Sldg Dewat Bld Equip14,547.00.00.00.00.00014,547.00.00
41400Control Rm Bra Cond
1Control Rm Bra Cond-Labor13,859.00
.00
6,929.50.00.006,929.50506,929.50692.95
3Control Rm Bra Cond-Mater6,526.00
.00
3,263.00.00.003,263.00503,263.00326.30
Total Control Rm Bra Cond20,385.0010,192.50.00.0010,192.505010,192.501,019.25
41410Control Rm Bra Wire
1Control Rm Bra Wire-Labor2,431.00
.00
.00.00.00.0002,431.00.00
3Control Rm Bra Wire-Mater781.00
.00
.00.00.00.000781.00.00
Total Control Rm Bra Wire3,212.00.00.00.00.0003,212.00.00
41420Control Rm Equip
1Control Rm Equip-Labor2,067.00
.00
.00.00.00.0002,067.00.00
3Control Rm Equip-Material631.00
.00
.00.00.00.000631.00.00
Total Control Rm Equip2,698.00.00.00.00.0002,698.00.00
Job Number: CEG800 Rid.Creek Sewage Trtmnt. Plnt.Application No.:5Period From:07/01/09Page Number7
Project #:Invoice Number:4124Thru:09/30/09
ITEM NUMBERDESCRIPTION OF WORKSCHEDULED VALUEWORK COMPLETEDSTORED MATERIALSCOMPLETED AND STORED TO DATE%BALANCE TO FINISHRETAINAGE
PREVIOUS APPLICATIONTHIS PERIOD
41430Control Rm Ltg Cond
1Control Rm Ltg Cond-Labor14,262.00
.00
.00.00.00.00014,262.00.00
3Control Rm Ltg Cond-Mater6,526.00
.00
.00.00.00.0006,526.00.00
Total Control Rm Ltg Cond20,788.00.00.00.00.00020,788.00.00
41440Control Rm Ltg Wire
1Control Rm Ltg Wire-Labor2,431.00
.00
.00.00.00.0002,431.00.00
3Control Rm Ltg Wire-Mater781.00
.00
.00.00.00.000781.00.00
Total Control Rm Ltg Wire3,212.00.00.00.00.0003,212.00.00
41450Control Rm Ltg Fixt
1Control Rm Ltg Fixt-Labor2,918.00
.00
.00.00.00.0002,918.00.00
3Control Rm Ltg Fixt-Mater9,336.00
.00
.00.00.00.0009,336.00.00
Total Control Rm Ltg Fixt12,254.00.00.00.00.00012,254.00.00
Job Totals974,000.00142,675.9012,062.20.00154,738.1016819,261.9015,473.82

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 1

For Week Starting: 06/29/2009 Ending: 07/05/2009

Job Classification
Name & Address
Exmp,Soc.Sec.#,Minority
Mon.
29
Tue.
30
Wed.
01
Thu.
02
Fri.
03
Sat.
04
Sun.
05
Total HoursHourly RateGross PayDeductionsTax.Gross
Non-Txble
Tot Ded's
Net Pay
Check No.
JourneymanP.00.00.00.00.00.00.00.00.00.00Fed. W/T311.711584.00
COPE.80
O.00.00.00.00.00.00.00.00.00.00FICA121.18.00
DUES85.54
S10.00.00.00.00.00.00.0010.0039.60396.00State W/T48.63680.69
CREDIT UNI95.04
MATTHEW J BURKE
846 DOWNINGTOWN PIKE
WEST CHESTER PA 19380
S-0,XXX-XX-4590,White Male
EMPLOYER PAID BENEFITS ......... 198.34
HRS & GROSS THIS JOB 10.00 ..... 396.00Local W/T15.84903.31
EXPENSE & PER DIEM THIS JOB ..... .00SDI/SUI.95013625
TOTAL ..... 594.34Direct Dep1.00

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 2

For Week Starting: 06/29/2009 Ending: 07/05/2009

Job Totals:

Total HoursRegularOvertimePremiumTotal
Mon10.00.00.0010.00
Tue.00.00.00.00
Wed.00.00.00.00
Thu.00.00.00.00
Fri.00.00.00.00
Sat.00.00.00.00
Sun.00.00.00.00
TOTAL HOURS FOR WEEK10.00.00.0010.00
TOTAL EMPLOYER PAID BENEFITS FOR WEEK198.34
.00
TOTAL GROSS FOR WEEK396.00
TOTAL EXPENSE & PER DIEM.00
TOTAL FOR WEEK594.34

Wages And Deductions

Total Pay1584.00
FICA121.18
Federal Tax311.71
State & Local Taxes65.42
Misc. Deductions1.00
Union Dues181.38
Total Deductions680.69
Net Pay903.31

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 1

For Week Starting: 08/03/2009 Ending: 08/09/2009

Job Classification
Name & Address
Exmp,Soc.Sec.#,Minority
Mon.
03
Tue.
04
Wed.
05
Thu.
06
Fri.
07
Sat.
08
Sun.
09
Total HoursHourly RateGross PayDeductionsTax.Gross
Non-Txble
Tot Ded's
Net Pay
Check No.
JourneymanP.00.00.00.00.00.00.00.00.00.00Fed. W/T311.711584.00
COPE.80
O.00.00.00.00.00.00.00.00.00.00FICA121.18.00
DUES85.54
S.00.00.00.003.00.00.003.0039.60118.80State W/T48.63680.69
CREDIT UNI95.04
MATTHEW J BURKE
846 DOWNINGTOWN PIKE
WEST CHESTER PA 19380
S-0,XXX-XX-4590,White Male
EMPLOYER PAID BENEFITS ......... 59.52
HRS & GROSS THIS JOB 3.00 ..... 118.80Local W/T15.84903.31
EXPENSE & PER DIEM THIS JOB ..... .00SDI/SUI.95013814
TOTAL ..... 178.32Direct Dep1.00

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 2

For Week Starting: 08/03/2009 Ending: 08/09/2009

Job Totals:

Total HoursRegularOvertimePremiumTotal
Mon.00.00.00.00
Tue.00.00.00.00
Wed.00.00.00.00
Thu.00.00.00.00
Fri3.00.00.003.00
Sat.00.00.00.00
Sun.00.00.00.00
TOTAL HOURS FOR WEEK3.00.00.003.00
TOTAL EMPLOYER PAID BENEFITS FOR WEEK59.52
.00
TOTAL GROSS FOR WEEK118.80
TOTAL EXPENSE & PER DIEM.00
TOTAL FOR WEEK178.32

Wages And Deductions

Total Pay1584.00
FICA121.18
Federal Tax311.71
State & Local Taxes65.42
Misc. Deductions1.00
Union Dues181.38
Total Deductions680.69
Net Pay903.31

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 1

For Week Starting: 08/17/2009 Ending: 08/23/2009

Job Classification
Name & Address
Exmp,Soc.Sec.#,Minority
Mon.
17
Tue.
18
Wed.
19
Thu.
20
Fri.
21
Sat.
22
Sun.
23
Total HoursHourly RateGross PayDeductionsTax.Gross
Non-Txble
Tot Ded's
Net Pay
Check No.
JourneymanP.00.00.00.00.00.00.00.00.00.00Fed. W/T478.032178.00
COPE1.00
O.00.00.00.00.00.00.00.00.00.00FICA166.62.00
DUES117.61
S.00.00.003.00.00.00.003.0039.60118.80State W/T66.86984.89
CREDIT UNI130.68
MATTHEW J BURKE
846 DOWNINGTOWN PIKE
WEST CHESTER PA 19380
S-0,XXX-XX-4590,White Male
EMPLOYER PAID BENEFITS ......... 59.52
HRS & GROSS THIS JOB 3.00 ..... 118.80Local W/T21.781193.11
EXPENSE & PER DIEM THIS JOB ..... .00SDI/SUI1.31013904
TOTAL ..... 178.32Direct Dep1.00

William H. Clinger Corp.
PO Box 158, 736 Baltimore Pike
Concordville, PA 19331

JOB: CEG800 Rid.Creek Sewage Trtmnt. Plnt.
Contract No:

Certified Payroll Report
Page: 2

For Week Starting: 08/17/2009 Ending: 08/23/2009

Job Totals:

Total HoursRegularOvertimePremiumTotal
Mon.00.00.00.00
Tue.00.00.00.00
Wed.00.00.00.00
Thu3.00.00.003.00
Fri.00.00.00.00
Sat.00.00.00.00
Sun.00.00.00.00
TOTAL HOURS FOR WEEK3.00.00.003.00
TOTAL EMPLOYER PAID BENEFITS FOR WEEK59.52
.00
TOTAL GROSS FOR WEEK118.80
TOTAL EXPENSE & PER DIEM.00
TOTAL FOR WEEK178.32

Wages And Deductions

Total Pay2178.00
FICA166.62
Federal Tax478.03
State & Local Taxes89.95
Misc. Deductions1.00
Union Dues249.29
Total Deductions984.89
Net Pay1193.11

Gawthrop Greenwood, PC Attorneys at Law COPY

17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com

(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Page: 1
08/31/2009
Client No: 6604-06M
Statement No. 73156

Ridley Creek Treatment Plant Upgrades/ Expansion

Fees

DateTimekeeperDescriptionHoursAmount
08/07/2009RFAReview message from Evan Andrews regarding Dutchland SBR tank repair proposal.0.30
08/10/2009RFATelephone conference with Carmen Battavio regarding security for tank walls; attend executive session regarding SBR tank walls.1.30
For Current Services Rendered1.60304.00

Recapitulation

TimekeeperHoursHourly RateTotal
Robert F. Adams1.60$190.00$304.00
Previous Balance$532.00
Total Current Charges304.00
Balance Due$836.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Application and Certificate For Payment

Page 1

To Owner:East Goshen Municipal Authorit
1580 Paoli Pike
West Chester, PA 19380
Project:Ridley Creek WWTP
1751 Towne Road
Fred Papiernik 267-278-6108
West Chester, PA 19380
Application No:8Date:08/31/2009
From (Contractor):Worth and Company, Inc.
6263 Kellers Church Road
Pipersville, PA 18947
Contractor Job Number:P28001Period To:08/31/09Architect's Project No:
Phone:267 362-1100Via (Architect):Contract Date:10/22/08Contract For:

Contractor's Application For Payment

Change Order SummaryAdditionsDeductions
Change orders approved in previous months by owner
Change orders approved this monthNumber | Date Approved
Totals
Net change by change orders
Original contract sum7,865,400.00
Net change by change orders0.00
Contract sum to date7,865,400.00
Total completed and stored to date3,896,885.47
Retainage
10.0% of completed work343,615.95
10.0% of stored material46,072.60
Total retainage389,688.55
Total earned less retainage3,507,196.92
Less previous certificates of payment2,827,403.52
Current payment due679,793.40
Balance to finish, including retainage4,358,203.08

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief the work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

Contractor: [Signed] Date: 9/1/09
State of: PA County of: Bucks
Subscribed and sworn to before me this 1st day of September 2009 (year).
Notary public: Linda D. Nelson
My commission expires: Notarial Seal, Linda D. Nelson, Notary Public, Plumstead Twp., Bucks County, My Commission Expires Sept. 19, 2010

Architect's Certificate for Payment

In accordance with the Contract Documents, based on on-site observations and the data comprising the above application the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.

Amount Certified: $ 679,793.40

Architect: [Signed] Date: 9/3/09
By: [Signed]

This Certification is not negotiable. The Amount Certified is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

2 of 11

Application and Certificate For Payment -- page 2

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-000 Site Work & Yard Piping
G1-001 Bonds 160,000.00 160,000.00 0.00 0.00 160,000.00 100.00 0.00 16,000.00
G1-002 Insurance 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 5,000.00
G1-003 Mobilization 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 10,000.00
G1-004 Pre-Planning/Schedule 20,000.00 15,000.00 0.00 0.00 15,000.00 75.00 5,000.00 1,500.00
G1-005 Submittals - Dutchland 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00
G1-006 Submittals - Jet Tech 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00
G1-007 E & S Controls 25,000.00 11,250.00 0.00 0.00 11,250.00 45.00 13,750.00 1,125.00
G1-008 Strip Topsoil 50,000.00 50,000.00 0.00 0.00 50,000.00 100.00 0.00 5,000.00
G1-009 Temporary Seed 5,000.00 2,500.00 0.00 0.00 2,500.00 50.00 2,500.00 250.00
G1-010 Bioretention Basin 1 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G1-011 Bioretention Basin 2 20,000.00 0.00 5,000.00 0.00 5,000.00 25.00 15,000.00 500.00
G1-012 Temporary Fence 9,000.00 4,500.00 900.00 0.00 5,400.00 60.00 3,600.00 540.00
G1-013 Influent Force Main 85,000.00 68,000.00 0.00 0.00 68,000.00 80.00 17,000.00 6,800.00
G1-014 Filter Feed Force Main 85,000.00 21,250.00 59,500.00 0.00 80,750.00 95.00 4,250.00 8,075.00
G1-015 Filter Effluent 55,000.00 27,500.00 13,750.00 0.00 41,250.00 75.00 13,750.00 4,125.00
G1-016 System Effluent 55,000.00 13,750.00 0.00 0.00 13,750.00 25.00 41,250.00 1,375.00
G1-017 Filter Feed Pump Suction 25,000.00 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00
G1-018 Filter Feed Pump Discharge 25,000.00 0.00 25,000.00 0.00 25,000.00 100.00 0.00 2,500.00
G1-019 Flocculation Tank to Filters 50,000.00 0.00 12,500.00 0.00 12,500.00 25.00 37,500.00 1,250.00
G1-020 4" WAS 45,000.00 0.00 0.00 0.00 0.00 0.00 45,000.00 0.00
G1-021 Yard Drain 70,000.00 21,000.00 21,000.00 0.00 42,000.00 60.00 28,000.00 4,200.00
G1-022 Sludge Pump Suction 25,000.00 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00
G1-023 Relocate Air Lines 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G1-024 Influent 45,000.00 40,500.00 0.00 0.00 40,500.00 90.00 4,500.00 4,050.00
G1-025 Utility Water 75,000.00 0.00 0.00 0.00 0.00 0.00 75,000.00 0.00

3 of 11

Application and Certificate For Payment -- page 3

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G1-026 Apple Brook Discharge 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-027 PVC Chemical Carrier Pipe 25,000.00 0.00 2,500.00 0.00 2,500.00 10.00 22,500.00 250.00
G1-028 Potable Water 45,000.00 0.00 0.00 0.00 0.00 0.00 45,000.00 0.00
G1-029 8" Underdrain 40,000.00 20,000.00 0.00 0.00 20,000.00 50.00 20,000.00 2,000.00
G1-030 1" Compressed Air 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-031 Sidewalks 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-032 Generator Pad 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-033 Rock/Pumps 15,000.00 0.00 0.00 0.00 0.00 0.00 15,000.00 0.00
G1-034 Block 1,000.00 1,000.00 0.00 0.00 1,000.00 100.00 0.00 100.00
G1-035 Chain Link Fence 30,000.00 0.00 0.00 0.00 0.00 0.00 30,000.00 0.00
G1-036 Demo Existing Fence 10,000.00 5,000.00 0.00 0.00 5,000.00 50.00 5,000.00 500.00
Subtotal 1,375,000.00 641,250.00 140,150.00 0.00 781,400.00 56.83 593,600.00 78,140.00
G2-000 Pump Station & Valve Vault
G2-001 Excavate Pump Station 52,000.00 52,000.00 0.00 0.00 52,000.00 100.00 0.00 5,200.00
G2-002 Install Precast Pump Station 68,000.00 68,000.00 0.00 0.00 68,000.00 100.00 0.00 6,800.00
G2-003 Install Anti-Flotation Collar 3,500.00 3,500.00 0.00 0.00 3,500.00 100.00 0.00 350.00
G2-004 Backfill Pump Station 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00 0.00 1,200.00
G2-005 Excavate Valve Vault 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00
G2-006 Install Valve Vault 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00 0.00 2,800.00
G2-007 Backfill Valve Vault 7,500.00 5,625.00 0.00 0.00 5,625.00 75.00 1,875.00 562.50
G2-008 Painting 9,000.00 0.00 0.00 0.00 0.00 0.00 9,000.00 0.00
G2-009 Pipe/Valves/Fittings 15,000.00 13,500.00 0.00 0.00 13,500.00 90.00 1,500.00 1,350.00
G2-010 Influent Pumps 65,000.00 58,500.00 0.00 0.00 58,500.00 90.00 6,500.00 5,850.00
Subtotal 275,000.00 256,125.00 0.00 0.00 256,125.00 93.14 18,875.00 25,612.50
G3-000 Screen Building
G3-001 Excavate Screen Bldg; Elev 13' 38,000.00 38,000.00 0.00 0.00 38,000.00 100.00 0.00 3,800.00

4 of 11

Application and Certificate For Payment -- page 4

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G3-002 Stone Underslab 5,000.00 2,500.00 0.00 0.00 2,500.00 50.00 2,500.00 250.00
G3-003 Form/Pour 18" Thick Slab 39,000.00 39,000.00 0.00 0.00 39,000.00 100.00 0.00 3,900.00
G3-004 Form/Pour Exterior Walls 65,000.00 65,000.00 0.00 0.00 65,000.00 100.00 0.00 6,500.00
G3-005 Backfill 12,000.00 3,000.00 7,800.00 0.00 10,800.00 90.00 1,200.00 1,080.00
G3-006 Excavate Footers; Elev 2'8" 7,000.00 7,000.00 0.00 0.00 7,000.00 100.00 0.00 700.00
G3-007 Form/Pour Footers 12,000.00 6,000.00 6,000.00 0.00 12,000.00 100.00 0.00 1,200.00
G3-008 Install Masonry Frost Wall 9,000.00 0.00 6,750.00 0.00 6,750.00 75.00 2,250.00 675.00
G3-009 Pour Slab 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00
G3-010 Form/Pour Channel Walls 50,000.00 0.00 37,500.00 0.00 37,500.00 75.00 12,500.00 3,750.00
G3-011 Install Exterior Masonry Walls 30,000.00 0.00 7,500.00 0.00 7,500.00 25.00 22,500.00 750.00
G3-012 Structural Steel 3,000.00 0.00 0.00 0.00 0.00 0.00 3,000.00 0.00
G3-013 Misc Metals 8,000.00 5,630.00 0.00 0.00 5,630.00 70.38 2,370.00 563.00
G3-014 Rough Carpentry 24,000.00 0.00 0.00 0.00 0.00 0.00 24,000.00 0.00
G3-015 Dryvit 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.00 0.00
G3-016 FRP Grating 4,000.00 0.00 0.00 0.00 0.00 0.00 4,000.00 0.00
G3-017 Hollow Metal & FRP Doors 1,500.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.00
G3-018 Overhead Doors 2,500.00 0.00 0.00 0.00 0.00 0.00 2,500.00 0.00
G3-019 Trolley & Hoist 2,000.00 0.00 0.00 0.00 0.00 0.00 2,000.00 0.00
G3-020 Plumbing 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 0.00
G3-021 HVAC 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
G3-022 Painting 12,000.00 0.00 0.00 0.00 0.00 0.00 12,000.00 0.00
Subtotal 365,000.00 166,130.00 65,550.00 0.00 231,680.00 63.47 133,320.00 23,168.00
G4-000 Grinder w/RotatingScreen&Auger
G4-001 Screen 180,000.00 162,000.00 0.00 0.00 162,000.00 90.00 18,000.00 16,200.00
Subtotal 180,000.00 162,000.00 0.00 0.00 162,000.00 90.00 18,000.00 16,200.00
G5-000 PrecastPost TensionedSBR Tanks

5 of 11

Application and Certificate For Payment -- page 5

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G5-001 Bulk Excavate SBR Structure 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00 0.00 10,000.00
G5-002 Stone Underslab-SBR Structure 30,000.00 30,000.00 0.00 0.00 30,000.00 100.00 0.00 3,000.00
G5-003 Concrete Base Slab for SBR 690,000.00 690,000.00 0.00 0.00 690,000.00 100.00 0.00 69,000.00
G5-004 Backfill Tank 20,000.00 0.00 15,000.00 0.00 15,000.00 75.00 5,000.00 1,500.00
G5-005 Walls & Walkways 750,000.00 525,000.00 37,500.00 0.00 562,500.00 75.00 187,500.00 56,250.00
G5-006 Misc Metals 60,000.00 0.00 0.00 0.00 0.00 0.00 60,000.00 0.00
Subtotal 1,650,000.00 1,345,000.00 52,500.00 0.00 1,397,500.00 84.70 252,500.00 139,750.00
G6-000 Treatment Building
G6-001 Excavate Footers 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00 0.00 4,000.00
G6-002 Pour Footers 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00
G6-003 Pour Pier Footers 10,000.00 10,000.00 0.00 0.00 10,000.00 100.00 0.00 1,000.00
G6-004 Pour Piers 8,000.00 7,600.00 400.00 0.00 8,000.00 100.00 0.00 800.00
G6-005 Masonry Frost Walls 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00
G6-006 Backfill 8,000.00 6,400.00 0.00 0.00 6,400.00 80.00 1,600.00 640.00
G6-007 Stone Under Slab 6,000.00 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00
G6-008 Plumbing Under Slab 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
G6-009 Concrete Slab 18,000.00 1,800.00 0.00 0.00 1,800.00 10.00 16,200.00 180.00
G6-010 Precast Flocculation Tank 35,000.00 0.00 0.00 0.00 0.00 0.00 35,000.00 0.00
G6-011 Precast Effluent Storage Tank 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G6-012 Poured In Place UV Channel 25,000.00 22,500.00 0.00 0.00 22,500.00 90.00 2,500.00 2,250.00
G6-013 Masonry 72,000.00 0.00 36,000.00 0.00 36,000.00 50.00 36,000.00 3,600.00
G6-014 Structural Steel & Deck 28,000.00 0.00 0.00 0.00 0.00 0.00 28,000.00 0.00
G6-015 Misc Metals 25,000.00 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00
G6-016 FRP Grating 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
G6-017 Dryvit 35,000.00 0.00 0.00 0.00 0.00 0.00 35,000.00 0.00
G6-018 EPDM Roofing 40,000.00 0.00 0.00 0.00 0.00 0.00 40,000.00 0.00

6 of 11

Application and Certificate For Payment -- page 6

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G6-019 Caulking 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 0.00
G6-020 Hollow Metal & FRP Doors 2,500.00 0.00 0.00 0.00 0.00 0.00 2,500.00 0.00
G6-021 Overhead Doors 4,500.00 0.00 0.00 0.00 0.00 0.00 4,500.00 0.00
G6-022 Painting 35,000.00 0.00 0.00 0.00 0.00 0.00 35,000.00 0.00
G6-023 Top Entry Mixer 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G6-024 Plumbing 23,000.00 0.00 0.00 0.00 0.00 0.00 23,000.00 0.00
G6-025 HVAC 50,000.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00
Subtotal 560,000.00 118,300.00 36,400.00 0.00 154,700.00 27.63 405,300.00 15,470.00
G7-000 SBR/Chem Feed & Process Piping
G7-001 SBR Equipment 790,000.00 452,754.47 0.00 0.00 452,754.47 57.31 337,245.53 45,275.45
G7-002 Polymer Feed System 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.00 0.00
G7-003 Chem Feed Pumps & Piping 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.00 0.00
G7-004 Inline Static Mixers 25,500.00 0.00 0.00 0.00 0.00 0.00 25,500.00 0.00
G7-005 Inline Grinder 8,500.00 0.00 0.00 0.00 0.00 0.00 8,500.00 0.00
G7-006 Utility Water Pumps & Controls 80,000.00 0.00 0.00 0.00 0.00 0.00 80,000.00 0.00
G7-007 Instrumentation & Controls 127,000.00 0.00 0.00 0.00 0.00 0.00 127,000.00 0.00
G7-008 FRP Chemical Tank 25,000.00 0.00 0.00 14,774.00 14,774.00 59.10 10,226.00 1,477.40
G7-009 Process Piping 245,000.00 0.00 0.00 0.00 0.00 0.00 245,000.00 0.00
G7-010 Relocated Apple Brook Pump 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00
Subtotal 1,345,000.00 452,754.47 0.00 14,774.00 467,528.47 34.76 877,471.53 46,752.85
G8-000 Filtration & UV System
G8-001 Disk Filters 470,000.00 0.00 0.00 445,952.00 445,952.00 94.88 24,048.00 44,595.20
G8-002 Filter Feed Pumps 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
G8-003 UV System 180,000.00 0.00 0.00 0.00 0.00 0.00 180,000.00 0.00
Subtotal 660,000.00 0.00 0.00 445,952.00 445,952.00 67.57 214,048.00 44,595.20
G9-000 Sludge Digestion & Post EQTank

SEE ATTACHED

7 of 11

Application and Certificate For Payment -- page 7

To Owner: East Goshen Municipal Authorit

From (Contractor): Worth and Company, Inc.

Project: Ridley Creek WWTP

Application No: 8

Date: 08/31/09

Period To: 08/31/09

Contractor's Job Number: P28001

Architect's Project No:

Item Number Description Scheduled Value Work Completed Previous Application Work Completed This Period Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
G9-001 Demo Interior 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G9-002 Sandblasting & Painting 160,000.00 0.00 0.00 0.00 0.00 0.00 160,000.00 0.00
G9-003 Course Bubble Diffuser 30,000.00 0.00 0.00 0.00 0.00 0.00 30,000.00 0.00
G9-004 Centrifugal Blower Recondition 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
G9-005 Aeration Tank Rehabilitation 45,000.00 0.00 0.00 0.00 0.00 0.00 45,000.00 0.00
Subtotal 275,000.00 0.00 0.00 0.00 0.00 0.00 275,000.00 0.00
GG10-000 Sludge Dewatering BldgAddition
GG10-001 Demo Centrifuge 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00
GG10-002 Demo Building 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
GG10-003 Sawcut Floor 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00
GG10-004 Excavate Footers 12,000.00 0.00 0.00 0.00 0.00 0.00 12,000.00 0.00
GG10-005 Form & Pour Footers 8,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 0.00
GG10-006 Masonry Frost Walls 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
GG10-007 Backfill 6,000.00 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00
GG10-008 Underslab Plumbing 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 0.00
GG10-009 Misc Metals 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
GG10-010 Pour Concrete Slab 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 0.00
GG10-011 Masonry Walls 35,000.00 0.00 0.00 0.00 0.00 0.00 35,000.00 0.00
GG10-012 Dryvit 25,000.00 0.00 0.00 0.00 0.00 0.00 25,000.00 0.00
GG10-013 Frames & Doors 1,500.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.00
GG10-014 Overhead Doors 6,000.00 0.00 0.00 0.00 0.00 0.00 6,000.00 0.00
GG10-015 Trolley & Hoist 4,000.00 0.00 0.00 0.00 0.00 0.00 4,000.00 0.00
GG10-016 Carpentry 39,000.00 0.00 0.00 0.00 0.00 0.00 39,000.00 0.00
GG10-017 Painting 20,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 0.00
GG10-018 Plumbing 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 0.00
GG10-019 HVAC 7,500.00 0.00 0.00 0.00 0.00 0.00 7,500.00 0.00

Application and Certificate For Payment -- page 8

To Owner: East Goshen Municipal Authorit
From (Contractor): Worth and Company, Inc.
Project: Ridley Creek WWTP
Application No: 8
Date: 08/31/09
Period To: 08/31/09
Contractor's Job Number: P28001
Architect's Project No:

8 of 11

Item Number Description Scheduled Value Work Completed Materials Presently Stored Completed and Stored to Date % Balance to Finish Retention Memo
Previous Application This Period
GG11-000 Sludge DewateringSystem & Pipe
GG11-001 Centrifuge 525,000.00 0.00 0.00 0.00 0.00 0.00 525,000.00 0.00
GG11-002 Progressive Conveying System 7,000.00 0.00 0.00 0.00 0.00 0.00 7,000.00 0.00
GG11-003 Sludge Conveying System 18,000.00 0.00 0.00 0.00 0.00 0.00 18,000.00 0.00
GG11-004 Process Pipe 200,000.00 0.00 0.00 0.00 0.00 0.00 200,000.00 0.00
GG12-000 Site Paving
GG12-001 Lump Sum 50,000.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00
GG13-000 Engineered Fill
GG13-001 Lump Sum 4,400.00 0.00 0.00 0.00 0.00 0.00 4,400.00 0.00
GG14-000 Flowable Fill
GG14-001 Lump Sum 11,000.00 0.00 0.00 0.00 0.00 0.00 11,000.00 0.00
GG18-000 Alternate G-18
GG18-001 Lump Sum 125,000.00 0.00 0.00 0.00 0.00 0.00 125,000.00 0.00
Subtotal 1,180,400.00 0.00 0.00 0.00 0.00 0.00 1,180,400.00 0.00
Application Total 7,865,400.00 3,141,559.47 294,600.00 460,726.00 3,896,885.47 49.54 3,968,514.53 389,688.55

Worth & Company, Inc.
Mechanical Contractor
6263 Kellers Church Road
Pipersville, PA 18947
Tel: (267) 362-1100 Fax: (267) 362-1130
www.worthandcompany.com

Partial Release of Liens and All Claims

FROM: Aqua-Aerobic Systems, Inc.
(The Person or Firm Giving Release)
TO: Worth & Company, Inc.
(The Contractor)
PROJECT: Ridley Creek WWTP
(Name)
P28001
(Number)
(General Description of Property)
1751 Towne Road West Chester, PA 19380
(Address of Project)
OWNER: East Goshen Township

  1. The undersigned does hereby release all Mechanic's Liens Rights, Miller Act Claims (40 U.S.C. 270), Stop Notices, Equitable Liens and Labor and Material Bond Rights resulting from any contract balances or credits owed to it for any labor and/or materials, subcontract work, equipment or other work, rents, services or supplies heretofore, furnished in, and, for the construction, design, improvement, alteration, additions to or repair of the above described project, pursuant to the contract between the Parties, dated ___________________ (the "Contract").
  2. This partial release is given for and in consideration of the sum of $ 445,952.00 (amount of current payment) and other good and valuable consideration.
  3. In further consideration of the payment made or to be made as set forth above, and to induce the contractor to make said payment, the undersigned agrees to defend and hold harmless the owner, contractor and/or lender, and/or the principal and surety from any claim or claims, hereinafter made by the undersigned and/or its material suppliers, subcontractors or employees, insurers, servants, agents or assigns of such persons against the project. The undersigned agrees to indemnify or reimburse all persons so relying upon this partial release for any and all sums, including attorney's fees and costs, which may be incurred as the result of any such claims.
  4. It is acknowledged that the designation of the above project constitutes an adequate description of the property and improvements for which the undersigned has received consideration for this release.

9 of 11

Page 1 of 2

Page 2 - Partial Release of Liens and All Claims

  1. It is further warranted and represented that all such claims against the undersigned or the undersigned's subcontractors and/or material suppliers' have been paid or that arrangements, satisfactory to the owner and contractor, have been made for such payments.
  2. It is acknowledged that this release is for the benefit of and may be relied upon by the owner, the contractor, any construction lender and the principal and surety on any labor and material bond for the project.
  3. In addition to the foregoing, this instrument shall constitute a partial release of all debts, rights, claims, damages and demands of the undersigned against the contractor, owner and surety, if any, in law or in equity arising out of or pertaining to the above referenced project. All rights and claims on the project are released with respect to any Contract balances or credits owed to subcontractor thus far.

Dated this 1st day of Sept., 2009

FIRM: Aqua-Aerobic Systems, Inc.
BY: Sandra Lundwall
TITLE: Credit Manager, CCP, CAC

STATE OF :
COUNTY OF : :SS

The foregoing release was subscribed and sworn to before me this 1st day of Sept, 2009 by Sandra Lundwall (as Credit Manager of Aqua-Aerobic Systems, Inc.

Sara J Sudds
Notary Public
My Commission expires: 6-16-12

"OFFICIAL SEAL"
SARA J SUDDS
Notary Public, State of Illinois
My Commission Expires 6/16/2012

10 of 11

Page 2 of 2

Aqua - Aerobic Systems, Inc.
6306 North Alpine Road • Rockford, IL 61130-0026
815/654-2501 • FAX 815/654-2508

INVOICE

Invoice No.: 979229
Date: 07/30/09
Cust ID: DH000113
Page 1 of 1

Remit To:
Aqua-Aerobic Systems, Inc.
6060 Reliable Parkway
Chicago, IL 60686-0060

Bill To:
WORTH AND COMPANY, INC.
6263 KELLERS CHURCH ROAD
MECHANICAL CONSTRUCTION
PIPERSVILLE, PA 18947

Ship To:
WORTH & COMPANY
C/O RIDLEY CREEK WWTP
1751 TOWNE ROAD
WEST CHESTER, PA 19380

Ship Via: RBR-Prepaid

S/O # Project Type Customer PO # Order Date Terms F.O.B.
54168 109439 SALE 43138 10/28/08 RET-2/45 FOB JOB SITE
Order Qty. Ship Qty. UM Part Number / Description Unit Price Ext. Price
DISK FILTER EQUIPMENT - RIDLEY CREEK STP UPGRADE, PA 445,952.00
ORDER TOTAL 445,952.00
SALES TAX 0.00
BALANCE DUE > $445,952.00

COMMENTS: RIDLEY CREEK WWTP, PA

PAYMENT TERMS: 90% OF THE TOTAL PURCHASE PRICE PAYABLE NET 45 DAYS FROM EACH SHIPMENT. A MAXIMUM OF 10% RETAINAGE SUBJECT TO REDUCTION TO 5% IN ACCORDANCE WITH THE CONTRACT PAYMENT TERMS AND PAYABLE UPON RECEIPT OF RETAINAGE PAYMENT FROM OWNER OR THE FINAL COMPLETION DATE, WHICHEVER FIRST SHALL OCCUR.

EXEMPT * ORDER COMPLETE *

[Stamp: RECEIVED AUG 10 2009 WORTH & COMPANY]

ORIGINAL

11 of 11

3 RIDLEY CREEK 1 pg

ARTESIAN UTILITY DEVELOPMENT, INC.
664 Churchmans Road
Newark, DE 19702

Invoice # 09-297
Invoice Date 8/21/09
Terms Due Upon Receipt

INVOICE

Bill to:
Mr. Mark Miller
East Goshen Township - Ridley Creek
1580 Paoli Pike
West Chester, PA 19380

Description: Total:
East Goshen Township - Ridley
Services relating to the Wastewater Treatment Facility-2009
July $ 2,234.00
Additional Services
Emergency response to "Blower Failure" alarm on July 28, 2009;
reset blowers and check other equipment and return to normal operations
Certified Operator: 1.5 hours @ $47.50 per hour (after hours rate)
$ 71.25
Coordinate and assist in power washing tankage with township jetter and assistance
Certified Operator: 4 hours @ $47.50 per hour
$ 190.00
Coordinate and assist subcontractor in replacing Rotomat solenoid valves and return to normal operations
Certified Operator: 2 hours @ $47.50 per hour
$ 95.00
Construction surveillance work on plant expansion project
Certified Operator: 12 hours @ $47.50 per hour
$ 570.00
Miscellaneous Expenses
Additional influent sample analysis (CBOD5, TSS, NH3, Total Phosphorus - 1/week)
5 sample analysis @ $73.00 each
$ 365.00
Additional MLSS sample analysis (5 sets @ $68.00 per set) $ 340.00
Additional final effluent sample analysis (Total Phosphorus - 1/week)
$20.70 per sample
$ 103.50
Composite sampler tubing & scrub brush $ 43.60
Belt Filter Press
Operation and Maintenance of Belt Filter Press including routine supervision and clean up requirements
Certified Operator: 297 hours @ $30.00 per hour
$ 8,910.00
Applebrook Subdivision
Total Due to Artesian Utility Development, Inc. $ 12,922.35

PAYMENT DUE UPON RECEIPT
PLEASE INCLUDE COPY OF INVOICE WITH REMITTANCE
PLEASE REFER TO INVOICE NUMBER ON REMITTANCE
THANK YOU

DATE RECEIVED
APPROVED BY [signature] 9/2/09

For Office Use Only
Please Credit AC# 30-1-143003
4740480003-0122

5. Minutes

MA
Minutes
(?)
8/10/09

7. INVOICES
a.
1 pg

ARTESIAN UTILITY DEVELOPMENT, INC.
664 Churchmans Road
Newark, DE 19702

Invoice # 09-296
Invoice Date 8/21/09
Terms Due Upon Receipt

INVOICE

Bill to:
East Goshen Township - Lochwood Chase
Mr. Mark Miller
1580 Paoli Pike
West Chester, PA 19380

Description: Total:
East Goshen Township - Lochwood Chase

Monthly Fee
Services relating to the Wastewater Treatment Facility-2009
July $ 960.00
Additional Services
Miscellaneous Expenses
Twelve (12) containers of Sodium Hypochlorite @ $23.00 each
$ 276.00
Total Due to Artesian Utility Development, Inc. $ 1,236.00

PAYMENT DUE UPON RECEIPT
PLEASE INCLUDE COPY OF INVOICE WITH REMITTANCE
PLEASE REFER TO INVOICE NUMBER ON REMITTANCE
THANK YOU

DATE RECEIVED
APPROVED BY [signature] 9/1/2009

For Office Use Only
Please credit AC#30-1-143003
4740480004-0123

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

COPY

Page: 1
07/31/2009
Client No: 6604-01M
Statement No. 72729

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

General Authority Services

Fees

Date / ID Description Hours Amount
07/13/2009
RFA
Review packet for Authority meeting of 7/13/09; attend regular meeting of Authority; review project manager report of 7/10/09 and memo of special meeting regarding SBR basin walls. 2.90
07/17/2009
RFA
Review message from Evan Andrews and attached status report required by consent order and agreement. 0.40
07/21/2009
RFA
Review letter from Evan Andrews. 0.30
07/31/2009
RFA
Review message from Mark Miller with photos of sewer repair. 0.30
For Current Services Rendered 3.90 741.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 3.90 $190.00 $741.00
Previous Balance $1,406.00
Total Current Charges 741.00
07/16/2009 Fee Payment -1,292.00
07/27/2009 Fee Payment -114.00
Total Payments -1,406.00
Balance Due $741.00

[Handwritten note next to Total Current Charges: ok RS 8/19]

Page: 2
07/31/2009
Client No: 6604-01M
Statement No. 72729

East Goshen Municipal Authority
General Authority Services

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

COPY

Page: 1
07/31/2009
Client No: 6604-06M
Statement No. 72730

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

Ridley Creek Treatment Plant Upgrades/ Expansion

Fees

Date / ID Description Hours Amount
07/01/2009
RFA
Review message from Mark Miller regarding cracks in tank walls. 0.30
07/09/2009
RFA
Review message from Rick Smith regarding Dutchland/Pennoni meeting on SBR tanks. 0.30
07/17/2009
RFA
Review message from Rick Smith regarding SBR tank issues; Message to Rick Smith regarding special meeting of Authority. 0.60
07/20/2009
RFA
Review message from Evan Andrews regarding SBR wall evaluation. 0.30
07/22/2009
RFA
Attend special meeting of Municipal Authority regarding SBR tank walls. 1.00
07/31/2009
RFA
Review message from Mark Miller with photos of SBR tank repairs and screen building. 0.30
For Current Services Rendered 2.80 532.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 2.80 $190.00 $532.00
Previous Balance $437.00
Total Current Charges 532.00

[Handwritten note next to Total Current Charges: ok RS 8/19]

Page: 2
07/31/2009
Client No: 6604-06M
Statement No. 72730

East Goshen Municipal Authority
Ridley Creek Treatment Plant Upgrades/ Expansion

07/16/2009 Fee Payment -437.00
Balance Due $532.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Gawthrop Greenwood, PC
Attorneys at Law
17 East Gay Street, Suite 100
West Chester, PA 19381-0562
gglaw@gawthrop.com
(p) 610-696-8225
(f) 610-344-0922
www.gawthrop.com

COPY

Page: 1
08/31/2009
Client No: 6604-01M
Statement No. 73155

East Goshen Municipal Authority
1580 Paoli Pike
West Chester PA 19380

General Authority Services

Fees

Date / ID Description Hours Amount
08/06/2009
RFA
Telephone conference with Jesse Goldberg regarding consent order. 0.30
08/10/2009
RFA
Telephone conference with Rick Smith in quarterly I&I report; telephone conference with Evan Andrews regarding I&I report submission; review packet for Authority meeting; attend regular meeting of Authority. 3.10
08/20/2009
RFA
Review message from Rick Smith regarding consent order compromise; Message to Pat McKenna regarding mailing presumption; review message from Pat McKenna regarding "mailbox rule" presumption of mailing. 0.90
08/20/2009
PMM
Review and analyze mailbox rule regarding submission of quarterly reports to DEP. Draft email memo to R Adams regarding same. 1.50
08/24/2009
RFA
Message to Rick Smith regarding presumption of receipt of mailed report to DEP; review message from Smith regarding proposed settlement terms for alleged consent order violation. 0.70
08/27/2009
RFA
Review letter from Rick Smith. 0.30
For Current Services Rendered 6.80 1,292.00

Recapitulation

Timekeeper Hours Hourly Rate Total
Robert F. Adams 5.30 $190.00 $1,007.00
Patrick M. McKenna 1.50 190.00 285.00
Previous Balance $741.00

Page: 2
08/31/2009
Client No: 6604-01M
Statement No. 73155

East Goshen Municipal Authority
General Authority Services

Total Current Charges 1,292.00
Balance Due $2,033.00

To ensure proper credit, please write client number on your check when returning payment. Thank You.
A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Pennoni Associates Inc.
Consulting Engineers
Philadelphia, PA
215-222-3000 Fax: 215-222-3588

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 416201
Invoice Date : 08/24/2009
Project : EGMA0704
Project Name : Pump Station Special Study

For Services Rendered through: 08/16/2009

Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater from diverted pump stations. Consultation with Township regarding same.

Phase : 01 -- Planning Study

Total Phase : 01 -- Planning Study Labor : 577.50
Expense : 0.00
Phase Total : 577.50
Amount Due This Invoice $577.50
Fee : 14,000.00
Prior Billings : 8,964.75
Current Billings : 577.50
Total Billings : 9,542.25

Phase : 01 -- Planning Study

Labor

Class Hours/Units Rate Amount
Authority Engineer 5.50 105.00 577.50
Labor Total: 5.50 577.50
Total Phase : 01 -- Planning Study Labor : $577.50
Expense : $0.00
Total Project : EGMA0704 -- Pump Station Special Study Labor : $577.50
Expense : $0.00

[Handwritten note: ok RS 8/27]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0704 Invoice Summary

Invoice Date 08-24-2009

Project: Hershey Mill and Reserve Pump Station Diversion Special Planning Study
Pennoni Job No.: EGMA0704
Invoice No: 416201
Invoice Period: 3/2/2009 to 8/16/2009
Initial Authorization: $ 14,000.00 Date: 7/9/2007
Changes: $ - Date:
Contract Amount: $ 14,000.00
Previously Invoiced: $ 8,964.75
Current Invoice: $ 577.50
Invoiced to Date ($): $ 9,542.25
Invoiced to Date (%): 68%
Remaining Budget ($): $ 4,457.75
Remaining Budget (%): 32%

Budget by Phase:

Phase No. 01 02
Phase Name: Act 537 Special Study Meetings Allowance
Phase Budget: $ 12,500.00 $ 1,500.00
Previously Invoiced: $ 8,964.75 $ -
Current Invoice: $ 577.50 $ -
Invoiced to Date ($): $ 9,542.25 $ -
Invoiced to Date (%): 76% 0%
Remaining Budget ($): $ 2,957.75 $ 1,500.00
Remaining Budget (%): 24% 100%

Comments: Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater from diverted pump stations. Consultation with Township regarding same.

Pennoni Associates Inc.
Consulting Engineers
Philadelphia, PA
215-222-3000 Fax: 215-222-3588

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 416200
Invoice Date : 08/24/2009
Project : EGMA0703
Project Name : LCSTP Decommissioning Planning

For Services Rendered through: 08/16/2009

Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater from LCSTP. Consultation with Township regarding same.

Phase : 02 -- Act 537 Plan Update

Total Phase : 02 -- Act 537 Plan Update Labor : 630.00
Expense : 0.00
Phase Total : 630.00
Amount Due This Invoice $630.00
Fee : 23,700.00
Prior Billings : 17,028.00
Current Billings : 630.00
Total Billings : 17,658.00

Phase : 02 -- Act 537 Plan Update

Labor

Class Hours/Units Rate Amount
Authority Engineer 6.00 105.00 630.00
Labor Total: 6.00 630.00
Total Phase : 02 -- Act 537 Plan Update Labor : $630.00
Expense : $0.00
Total Project : EGMA0703 -- LCSTP Decommissioning Planning Labor : $630.00
Expense : $0.00

[Handwritten note: ok RS 8/27]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0703 Invoice Summary

Invoice Date 08-24-2009

Project: LCSTP Decommissioning Planning
Pennoni Job No.: EGMA0703
Invoice No: 416200
Invoice Period: 3/2/2009 to 8/16/2009
Initial Authorization: $ 23,700.00 Date: 5/14/2007
Changes: $ - Date:
Contract Amount: $ 23,700.00
Previously Invoiced: $ 17,028.00
Current Invoice: $ 630.00
Invoiced to Date ($): $ 17,658.00
Invoiced to Date (%): 75%
Remaining Budget ($): $ 6,042.00
Remaining Budget (%): 25%

Budget by Phase:

Phase No. 01 02
Phase Name: DEP Coordination Act 537 Plan Update
Phase Budget: $ 3,700.00 $ 20,000.00
Previously Invoiced: $ 2,583.75 $ 14,444.25
Current Invoice: $ - $ 630.00
Invoiced to Date ($): $ 2,583.75 $ 15,074.25
Invoiced to Date (%): 70% 75%
Remaining Budget ($): $ 1,116.25 $ 4,925.75
Remaining Budget (%): 30% 25%

Comments: Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater.

Pennoni Associates Inc.
Consulting Engineers
Philadelphia, PA
215-222-3000 Fax: 215-222-3588

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 416203
Invoice Date : 08/24/2009
Project : EGMA0809
Project Name : Marydell Diversion Planning

For Services Rendered through: 08/16/2009

Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater from the diversion.

Phase : 02 -- Draft Update Revision

Total Phase : 02 -- Draft Update Revision Labor : 387.50
Expense : 0.00
Phase Total : 387.50
Amount Due This Invoice $387.50
Fee : 11,500.00
Prior Billings : 5,635.25
Current Billings : 387.50
Total Billings : 6,022.75

Phase : 02 -- Draft Update Revision

Labor

Class Hours/Units Rate Amount
Authority Engineer 0.50 105.00 52.50
Graduate Engineer 5.00 67.00 335.00
Labor Total: 5.50 387.50
Total Phase : 02 -- Draft Update Revision Labor : $387.50
Expense : $0.00
Total Project : EGMA0809 -- Marydell Diversion Planning Labor : $387.50
Expense : $0.00

[Handwritten note: ok RS 8/27]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0809 Invoice Summary

Invoice Date 08-24-2009

Project: Marydell Pump Station Diversion Project Planning
Pennoni Job No.: EGMA 0809
Invoice No: 416203
Invoice Period: 6/1/2009 to 8/16/2009
Initial Authorization: $ 11,500.00 Date: 12/8/2008
Changes: $ - Date:
Contract Amount: $ 11,500.00
Previously Invoiced: $ 5,635.25
Current Invoice: $ 387.50
Invoiced to Date ($): $ 6,022.75
Invoiced to Date (%): 52%
Remaining Budget ($): $ 5,477.25
Remaining Budget (%): 48%

Budget by Phase:

Phase No. 01 02 03 04 05
Phase Name: DEP Coordination Draft Update Revision Final Update Revision DEP Approval & Cost Recovery Add'l Meeting Allowance
Phase Budget: $ 1,100.00 $ 5,300.00 $ 3,300.00 $ 1,300.00 $ 500.00
Previously Invoiced: $ 650.00 $ 4,985.25 $ - $ - $ -
Current Invoice: $ 387.50 $ - $ - $ -
Invoiced to Date ($): $ 650.00 $ 5,372.75 $ - $ - $ -
Invoiced to Date (%): 59% 101% 0% 0% 0%
Remaining Budget ($): $ 450.00 $ (72.75) $ 3,300.00 $ 1,300.00 $ 500.00
Remaining Budget (%): 41% -1% 100% 100% 100%

Comments: Communication with DEP and file review at DEP regarding permits for constructed sewers that would receive wastewater from the diversion.

Pennoni Associates Inc.
Consulting Engineers
Philadelphia, PA
215-222-3000 Fax: 215-222-3588

INVOICE

Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328

East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.

Invoice # : 416202
Invoice Date : 08/24/2009
Project : EGMA0808
Project Name : WG Diversion Project Planning

For Services Rendered through: 08/16/2009

Review of sewer area flows and identification/evaluation of diversion locations. Consultation with Township regarding same.

Phase : 02 -- Diversion Conceptual Design

Total Phase : 02 -- Diversion Conceptual Design Labor : 1,890.00
Expense : 0.00
Phase Total : 1,890.00
Amount Due This Invoice $1,890.00
Fee : 25,200.00
Prior Billings : 956.00
Current Billings : 1,890.00
Total Billings : 2,846.00

Phase : 02 -- Diversion Conceptual Design

Labor

Class Hours/Units Rate Amount
Authority Engineer 3.00 105.00 315.00
Project Engineer 17.50 90.00 1,575.00
Labor Total: 20.50 1,890.00
Total Phase : 02 -- Diversion Conceptual Design Labor : $1,890.00
Expense : $0.00
Total Project : EGMA0808 -- WG Diversion Project Planning Labor : $1,890.00
Expense : $0.00

[Handwritten note: ok RS 8/27]

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

East Goshen Municipal Authority

EGMA0808 Invoice Summary

Invoice Date 08-24-2009

Project: West Goshen Diversion Planning
Pennoni Job No.: EGMA 0808
Invoice No: 416202
Invoice Period: 3/30/2009 to 8/16/2009
Initial Authorization: $ 25,200.00 Date: 12/8/2008
Changes: $ - Date:
Contract Amount: $ 25,200.00
Previously Invoiced: $ 956.00
Current Invoice: $ 1,890.00
Invoiced to Date ($): $ 2,846.00
Invoiced to Date (%): 11%
Remaining Budget ($): $ 22,354.00
Remaining Budget (%): 89%

Budget by Phase:

Phase No. 01 02 03 04 05 06
Phase Name: DEP Coordination Diversion Concept Design Draft Update Revision Final Update Revision DEP Approval & Cost Recovery Add'l Meeting Allowance
Phase Budget: $ 1,100.00 $ 7,500.00 $ 9,400.00 $ 3,900.00 $ 1,800.00 $ 1,500.00
Previously Invoiced: $ 798.50 $ - $ - $ - $ - $ -
Current Invoice: $ 157.50 $ 1,890.00 $ - $ - $ - $ -
Invoiced to Date ($): $ 956.00 $ 1,890.00 $ - $ - $ - $ -
Invoiced to Date (%): 87% 25% 0% 0% 0% 0%
Remaining Budget ($): $ 144.00 $ 5,610.00 $ 9,400.00 $ 3,900.00 $ 1,800.00 $ 1,500.00
Remaining Budget (%): 13% 75% 100% 100% 100% 100%

Comments: Review of sewer area flows and identification/evaluation of diversion locations. Consultation with Township regarding same.

10. GOALS
2 pg

2009
EAST GOSHEN MUNICIPAL AUTHORITY GOALS
SEPTEMBER REPORT

ON-GOING

  1. Submit an article for each newsletter. Need by 2/11/08 Mike Completed; Need by 5/13/09 Fran Completed; Need by 8/12/09 Joe Not Completed; Need by 11/9/08 Dana
  2. Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter (3/4/09) Mike Completed; 2 nd Quarter (6/309) Jack Completed; 3 rd Quarter (9/2/09) Dana; 4 th Quarter (12/2/09) Fran
  3. Respond to capacity requests in 45 days or less. Angelini, 957 Cornwallis Drive 1 EDU - 14 days
  4. Implement I& I Plan – Currently on Schedule
  5. Conduct an annual facilities tour in June. Put on hold until after construction is complete

RIDLEY CREEK PROJECT

Monitor Construction – Excavation and steel complete for SBR slab. SBR panels are currently being poured by Dutchland. Slab poured, commenced excavation for lift station. Lift station installed, Valve Vault installed. SBR panels installed. Poles moved, SBR tank almost completed. Project Manager on board on 4/28. Screen Building under construction. Repairs being done on SBR Walls. Treatment Building under construction. SBR Wall Tank testing in progress.

ACT 537 PLANNING

  1. Obtain Act 537 Plan approval for the Lockwood STP Abandonment Project – Board of Supervisors scheduled to adopt resolution on 2/17. BoS approved resolution on 3/3/09. Submitted to DEP on 3/5/09. Received 3/26/09 comment letter
  2. Obtain Act 537 Plan approval for the Greenhill PS Redirection and the Reserve PS Abandonment Project Board of Supervisors scheduled to adopt resolution on 2/17. BoS approved resolution on 3/3/09. Submitted to DEP on 3/5/09. Received 3/27/09 comment letter
  3. Obtain Act 537 Plan approval for the Marydell PS Abandonment project. Met with DEP to review project on 2/5. Submitted Task Activity Report to DEP on 2/9/09. Task Activity report approved by DEP on 2/27/09
  4. Obtain Act 537 Plan approval for the Reservoir Road PS Diversion Project. Submitted 2007 Sewer Study to DEP on 2/9/09. Received 3/3/09 comment letter from DEP.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2009\091709.doc

2 of 2

FUNDING

Apply for funding for above projects once Act 537 approval has been obtained. Started preparation of a PA H2O grant for RCSTP. Applied for H2O Grant on 2/11/09. Awarded a grant for $464,195 on 7/14/09.

F:\Data\Shared Data\ABC'S\Municipal Authority\Goals\2009\091709.doc

12. NEW BUSINESS
A
14 pgs

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
September 2, 2009

Southeast Regional Office
Phone: 484-250-5970
Fax: 484-250-5971
E-mail: cvanous@state.pa.us

RECEIVED
[illegible]

Mr. Francis X. Beck
Authority Chairman
East Goshen Municipal Authority
East Goshen Township Building
1580 Paoli Pike
West Chester, PA 19380

Ms. Dorothy E. McClintock
Willistown Township
688 Sugartown Road
Malvern, PA 19355

Re: Sewage
Chapter 94 Annual Report
Ridley Creek Sewage Treatment Plant
East Goshen Township
Chester County

Dear Mr. Beck and Ms. McClintock:

The Pennsylvania Department of Environmental Protection (“Department”) has conducted a preliminary review of the 2008 Municipal Wasteload Management Annual Report (“Chapter 94 Report”) for the Ridley Creek Sewage Treatment Plant (Ridley Creek STP). This letter is our review of the Chapter 94 Report submitted by East Goshen Municipal Authority (Authority), and our review of the reports submitted by each municipality that contributes sewage flows to the Ridley Creek STP. Municipalities that contribute sewage flows to a wastewater treatment plant (“plant”) are required under Section 94.12 of the Chapter 94 Municipal Wasteload Management regulations to submit information directly to the permittee of the plant in order to facilitate preparation of the Annual Report. This Annual Report is required under Section 94.12 of the Chapter 94 Municipal Wasteload Management regulations.

The Department has provided a checklist based on our review of each permittee’s portion of the Chapter 94 Report. Please refer to the appropriate checklist on the pages listed below for the items that require your attention and for the time frame by which the Department is requesting a response:

  1. The Authority’s Ridley Creek STP Checklist - pages 4–9
  2. Willistown Township Checklist - pages 10–14

An Equal Opportunity Employer | www.dep.state.pa.us | Printed on Recycled Paper

2 of 14

Ridley Creek Sewage Treatment Plant - 2 - September 2, 2009

We have noted in our review that even with the planned expansion, the Ridley Creek STP Organic Loadings graph, and table project that in 2010, the maximum month organic load will exceed the plant’s capacity, and that in 2011, the annual average organic load will meet the plant’s capacity. In addition, the annual average organic load will exceed capacity in 2012. This constitutes a projected organic overload. It will therefore be necessary for the Authority, as the permittee, to comply with Section 94.22 of Chapter 94 as stated below for the areas tributary to the Ridley Creek STP:

  1. Submit a report or Corrective Action Plan (CAP) to the regional office within 90 days, setting forth steps to be taken by the permittee to prevent the sewerage facilities from becoming organically overloaded. If the steps to be taken include planning, design, financing, construction, and operation of sewerage facilities, the facilities must be consistent with an official plan approved under the Pennsylvania Sewage Facilities Act (35 P.S. Section 750.1–750.20) and the regulations thereunder in Chapter 71 (relating to administration of the sewage facilities planning program) and consistent with the requirements of the Department and the federal government regarding area-wide planning and sewerage facilities.
  2. Limit new connections to and extensions of the sewerage facilities based upon remaining available capacity under a plan submitted in accordance with this section.

We request that the Authority submit, within 90 days of the date of this letter, a CAP and Connection Management Plan (CMP) for the sewer system tributary to the Ridley Creek STP.

Please be aware that systems in a projected organic overload cannot request exemptions from 537 sewage facilities planning. All Planning Modules provided to the Department should be within the authority’s sewer service area and must be consistent with the authority’s CMP.

Please be advised that in the underlined portions of Sections (a)(6) and (a)(7) of all checklists, the Department has requested that reports include a discussion of metered flow data for the permittee’s collection and conveyance system (including pump stations). This information is intended to provide a better understanding of the actual annual average and peak instantaneous flows experienced within your system, and to ensure compliance with Chapter 94 reporting requirements. The Department recommends that you consider what efforts and changes (if any) may be necessary to capture and record these flows within your collection and conveyance system. In the underlined portion of Section (a)(5) of the checklist, the Department is also requesting the submission of calibration reports for all flow measuring, indicating, and recording equipment within your collection and conveyance systems. The Department requests that this additional information, as requested in Sections (a)(5), (a)(6), and (a)(7) of the checklist, be included in your 2011 Chapter 94 Report, which is required to be submitted by March 31, 2012. If this information is available at an earlier date, please provide it in an earlier Chapter 94 Report, as appropriate. If you cannot meet this time frame, please inform the Department when you will address the requested information. Please note that 2009 Chapter 94 Reports, which are due March 31, 2010, are still required to contain, at a minimum, the information required in Chapter 94, Section 94.12 (Annual Report).

3 of 14

Ridley Creek Sewage Treatment Plant - 3 - September 2, 2009

Regarding the wastewater treatment plant, Chapter 94, Section 94.13 requires that plants receiving monthly average flows greater than 100,000 gallons per day (gpd) be equipped to continuously measure, indicate, and record the flow. Section 94.1 defines “load” as the rate of flow and organic strength of the wastewater, including infiltration, discharged to a plant, as measured at the influent of the plant or in the sewer system or a portion of it. Chapter 94 Reports, therefore, should report influent (not effluent) monthly average and annual average daily flows. Please note that effluent flow meters are a separate requirement of National Pollutant Discharge Elimination System (NPDES) or Water Quality Management Permits. Any wastewater treatment plant receiving more than 100,000 gpd should have an accurate influent flow meter, as required by Section 94.13 of the Department’s regulations. If such meter is not currently in place, the Department requests that an influent flow meter be installed and operational by January 1, 2010, in order to collect the required data for the submission of the 2010 Chapter 94 Report, which is due March 31, 2011. If you cannot meet this time frame, please inform the Department when you will address this request.

Also enclosed, please find a flyer entitled “Industrial Waste Discharge Reporting Information.” This flyer details the industrial waste discharge information that should be included with the 2009 Chapter 94 Report, as applicable, and which must be submitted by the permittee of the wastewater treatment plant. If you are a municipality that contributes sewage flows to a wastewater treatment plant, please advise the permittee regarding any IW dischargers in your municipality.

If you have any questions regarding the information required, please call me at 484-250-5133 or e-mail me at the above address.

Sincerely,
Courtney Vanous
Courtney Vanous
Sewage Planning Specialist 1
Water Management

Enclosures

cc: Mr. Smith - East Goshen Township
Mr. Andrews - Pennoni Associates, Inc.
Planning Section
Re 30 (joh09wqm)245

4 of 14

- 4 -

East Goshen Municipal Authority

Chapter 94 Report Checklist

Items marked YES are complete. Items marked NO are incomplete. Items marked NA are not applicable to this project, or are not applicable at this time.

YES NO NA Annual Report Requirements Comments
✓ 94.12 Annual Report
Section (a)
Chapter 94 Report was submitted in duplicate.
✓ The report was signed by the preparer and by the permittee of the wastewater treatment plant.
✓ Section (a)(1)
A line graph depicting monthly average flows (expressed in millions of gallons per day (MGD)) for each month for the past 5 years.
Please plot monthly average flows and not annual.
✓ The graph should include projected flows for the next 5 years.
✓ The graph shall include a line depicting the hydraulic design flow in MGD.
✓ Section (a)(2)
A line graph depicting monthly average organic loading (expressed in pounds per day of BOD5) for each month for the past 5 years.
Please plot monthly average flows and not annual.
✓ The graph shall include projected loadings for the next 5 years. Please see attached letter.
✓ The graph shall include a line depicting the organic loading design of the plant in lbs/day BOD5.
✓ Section (a)(3)
A discussion of the basis for the flow and organic loading projections to the plant as referred to in Sections a(1) and a(2).
✓ A description of the time needed to expand the plant to meet the load projections, if applicable. Please see attached letter.
✓ Data used to support the projections are included in an appendix to the report.
✓ Section (a)(4)
A map showing all sewer extensions constructed in the past calendar year.
✓ The map should show sewer extensions approved or exempted in the past year in accordance with 537 but not yet constructed.

5 of 14

- 5 -

East Goshen Municipal Authority

YES NO NA Annual Report Requirements Comments
✓ The map should show all known proposed projects that require public sewers but that are in the preliminary planning stages.
✓ A list accompanying the map summarizing each extension or project and the population to be served.
✓ The list should include any schedules describing how the project will be completed over time, and the effect that this built-out-rate will have on the populations served.
✓ Section (a)(5)
A discussion of the permittee’s program for sewer system monitoring, maintenance, repair and rehabilitation, including routine and special activities, personnel and equipment used, sampling frequency, quality assurance, data analyses, and infiltration/inflow monitoring.
✓ A calibration report shall be included for all flow measuring, indicating, and recording equipment within the collection and conveyance system. Calibrations should occur annually. Please ensure that the submitted calibration reports indicate the location of the site being calibrated. Please also provide the locations of all flow measuring, indicating, and recording equipment.
✓ A discussion of the maintenance and control of combined sewer regulators during the past year.
✓ Section (a)(6)
A discussion of the condition of the sewer system, including portions of the sewer system where conveyance capacity is being exceeded or is projected to be exceeded in the next 5 years.
Please provide, at minimum, SSO reports.
✓ Existing capacity should be documented with actual metering of present maximum flows. If not already existing, the permittee should consider the best placement of flow meters to document the capacity of major interceptors (greater than 10 inches in diameter) and/or where lines cross municipal borders. A discussion of present maximum flows should be documented with hourly or instantaneous peak readings taken during major storm events (greater than 1.0-inch of rain). Auto dialers may be installed to alert of high flow conditions. The Chapter 94 Report should compare the peak instantaneous flow for each

6 of 14

- 6 -

East Goshen Municipal Authority

YES NO NA Annual Report Requirements Comments
major storm event to the design hydraulic conveyance capacity of the sewer in order to determine whether sufficient capacity is available. The ratio of peak (hourly or instantaneous) to annual average flows should be determined to assess the actual peaking factor for the system.
✓ A discussion of portions of the system where rehabilitation or cleaning is needed or underway to maintain the integrity of the system and prevent or eliminate bypassing, combined sewer overflow, sanitary sewer overflow, excessive infiltration, and other system problems.
✓ Section (a)(7)
A discussion of the condition of sewage pumping stations, including:
A comparison of the maximum pumping rate with present maximum flows.
Average daily flows are provided, not maximum flows. Please explain how the average daily flows were derived, and provide maximum daily flow information if possible.
✓ Present maximum flows should be documented with the peak hourly or instantaneous readings taken during major storm events (greater than 1.0-inch of rain). Auto dialers may be installed to alert of high flow conditions.
✓ A discussion of metered flow data obtained during the report’s calendar year to illustrate the ratio of peak flow to annual average flow. The permittee should use these figures to determine the actual peaking factor for the pumping station.
✓ Provide documentation that the pump station can convey maximum flows with any one pump out of service.
✓ The projected two-year maximum flows for each station.
✓ The two-year projection should use the estimated new flows to the system (annual average flows), multiplied by the peaking factor derived from metered flow data.
✓ Section (a)(8)
A report of industrial wastes discharged into the sewer system.

7 of 14

- 7 -

East Goshen Municipal Authority

YES NO NA Annual Report Requirements Comments
✓ The report shall include:
(i) A copy of any ordinance or regulation governing industrial waste discharges into the sewer system, including a copy of any amendments adopted.
✓ (ii) A discussion of the permittee’s or municipality’s program for surveillance and monitoring of industrial waste discharges into the sewer system during the past year.
✓ (iii) A discussion of specific problems in the sewer system or at the plant, known or suspected to be caused by industrial waste discharges, including a summary of the steps being taken to alleviate or eliminate the problems, as well as pollution prevention techniques.
✓ The discussion shall include a list of industries known to be discharging wastes which create problems in the plant or in the sewer system and actions taken to eliminate the problem or prevent its recurrence.
✓ Section (a)(9)
A proposed plan to reduce or eliminate present or projected overloaded conditions under Chapters 94.21 and 94.22.
Please see attached letter.
✓ Section (b)
Permittees of sewer systems which contribute sewage flows to the plant shall submit information to the permittee of the plant as required to facilitate preparation of the annual report.
Willistown Township’s contribution to the report should be included.
✓ 94.13 Measuring, indicating and recording devices.
Section (a)
A plant which receives or will receive in the next five years, monthly average flows exceeding 100,000 gallons per day (gpd) shall be equipped to continuously measure, indicate, and record the flow.
An influent flow meter will be installed during the 2010 expansion of the plant. Please use influent flows in future reports when data becomes available.
✓ The permittee shall install the necessary equipment for those measurements within 6 months after the date when such a flow becomes evident.

8 of 14

- 8 -

East Goshen Municipal Authority

YES NO NA Annual Report Requirements Comments
✓ Section (b)
A calibration report shall be included in the annual report for flow measuring, indicating, and recording equipment. Calibrations should occur annually.

Additional Comments:

Please note that the Ridley Creek STP should be submitted as a separate report from the Lockwood Chase Sewage Treatment Plant. In addition, the information about the portions of East Goshen that are tributary to the West Goshen Treatment Plant should be submitted to West Goshen Township to be included in West Goshen’s report.

Please note that Chapter 94, Section 94.12(a)(2) requires influent organic loadings to be reported as pounds per day of BOD5. We request that you establish an influent sampling protocol for inclusion in your 2010 Chapter 94 report, which includes influent BOD5 sampling with a minimum sampling frequency of 2 times per month. Samples must be taken prior to all treatment units and must be 24-hour composite, flow proportioned, and representative of the actual influent loadings to the plant, including any hauled-in septage or supernatant loading that receives biological treatment at the plant. Documentation must be included indicating how the influent sampling reflects any septage and/or supernatant loadings.

We request that you submit the missing information and address the comments noted on this checklist to the Department by October 2, 2009 (90 days) so that we may complete our review. The Annual Report is required under Section 94.12 of the Chapter 94 Municipal Wasteload Management regulations.

9 of 14

- 9 -

Willistown Township

Tributary Municipality
Chapter 94 Report Checklist

Items marked YES are complete. Items marked NO are incomplete. Items marked NA are not applicable to this project, or are not applicable at this time.

YES NO NA Annual Report Requirements Comments
✓ 94.12 Annual Report
Section (a)
The tributary portion of the Chapter 94 Report was submitted in duplicate.
✓ The tributary portion of the report was signed by the preparer.
✓ Section (a)(1)
A line graph depicting monthly average flows (expressed in millions of gallons per day (MGD)) for each month for the past 5 years.
✓ The graph should include projected flows for the next 5 years.
✓ The graph shall include a line depicting the hydraulic design flow in MGD.
✓ Section (a)(2)
A line graph depicting monthly average organic loading (expressed in pounds per day of BOD5) for each month for the past 5 years.
✓ The graph shall include projected loadings for the next 5 years.
✓ The graph shall include a line depicting the organic loading design of the plant in lbs/day BOD5.
✓ Section (a)(3)
A discussion of the basis for the flow and organic loading projections to the plant as referred to in Sections a(1) and a(2).
✓ A description of the time needed to expand the plant to meet the load projections, if applicable.
✓ Data used to support the projections are included in an appendix to the report.

10 of 14

- 10 -

Willistown Township

YES NO NA Annual Report Requirements Comments
✓ Section (a)(4)
A map showing all sewer extensions constructed in the past calendar year.
✓ The map should show sewer extensions approved or exempted in the past year in accordance with 537 but not yet constructed.
✓ The map should show all known proposed projects that require public sewers but that are in the preliminary planning stages.
✓ A list accompanying the map summarizing each extension or project and the population to be served.
✓ The list should include any schedules describing how the project will be completed over time, and the effect that this built-out-rate will have on the populations served.
✓ Section (a)(5)
A discussion of the permittee’s program for sewer system monitoring, maintenance, repair and rehabilitation, including routine and special activities, personnel and equipment used, sampling frequency, quality assurance, data analyses, and infiltration/inflow monitoring.
✓ A calibration report shall be included for all flow measuring, indicating, and recording equipment within the collection and conveyance system. Calibrations should occur annually.
✓ A discussion of the maintenance and control of combined sewer regulators during the past year.
✓ Section (a)(6)
A discussion of the condition of the sewer system, including portions of the sewer system where conveyance capacity is being exceeded or is projected to be exceeded in the next 5 years.
✓ Existing capacity should be documented with actual metering of present maximum flows. If not already existing, the permittee should consider the best placement of flow meters to document the capacity of

11 of 14

- 11 -

Willistown Township

YES NO NA Annual Report Requirements Comments
major interceptors (greater than 10 inches in diameter) and/or where lines cross municipal borders. A discussion of present maximum flows should be documented with hourly or instantaneous peak readings taken during major storm events (greater than 1.0-inch of rain). Auto dialers may be installed to alert of high flow conditions. The Chapter 94 Report should compare the peak instantaneous flow for each major storm event to the design hydraulic conveyance capacity of the sewer in order to determine whether sufficient capacity is available. The ratio of peak (hourly or instantaneous) to annual average flows should be determined to assess the actual peaking factor for the system.
✓ A discussion of portions of the system where rehabilitation or cleaning is needed or underway to maintain the integrity of the system and prevent or eliminate bypassing, combined sewer overflow, sanitary sewer overflow, excessive infiltration, and other system problems.
✓ Section (a)(7)
A discussion of the condition of sewage pumping stations, including:
A comparison of the maximum pumping rate with present maximum flows.
✓ Present maximum flows should be documented with the peak hourly or instantaneous readings taken during major storm events (greater than 1.0-inch of rain). Auto dialers may be installed to alert of high flow conditions.
✓ A discussion of metered flow data obtained during the report’s calendar year to illustrate the ratio of peak flow to annual average flow. The permittee should use these figures to determine the actual peaking factor for the pumping station.
✓ Provide documentation that the pump station can convey maximum flows with any one pump out of service.
✓ The projected two-year maximum flows for each station.

12 of 14

- 12 -

Willistown Township

YES NO NA Annual Report Requirements Comments
✓ The two-year projection should use the estimated new flows to the system (annual average flows), multiplied by the peaking factor derived from metered flow data.
✓ Section (a)(8)
A report of industrial wastes discharged into the sewer system.
✓ The report shall include:
(i) A copy of any ordinance or regulation governing industrial waste discharges into the sewer system, including a copy of any amendments adopted.
✓ (ii) A discussion of the permittee’s or municipality’s program for surveillance and monitoring of industrial waste discharges into the sewer system during the past year.
✓ (iii) A discussion of specific problems in the sewer system or at the plant, known or suspected to be caused by industrial waste discharges, including a summary of the steps being taken to alleviate or eliminate the problems, as well as pollution prevention techniques.
✓ The discussion shall include a list of industries known to be discharging wastes which create problems in the plant or in the sewer system and actions taken to eliminate the problem or prevent its recurrence.
✓ Section (a)(9)
A proposed plan to reduce or eliminate present or projected overloaded conditions under Chapters 94.21 and 94.22.
✓ Section (b)
Permittees of sewer systems which contribute sewage flows to the plant shall submit information to the permittee of the plant as required to facilitate preparation of the annual report.

13 of 14

- 13 -

Willistown Township

YES NO NA Annual Report Requirements Comments
✓ 94.13 Measuring, indicating and recording devices.
Section (a)
A plant which receives or will receive in the next five years, monthly average flows exceeding 100,000 gallons per day (gpd) shall be equipped to continuously measure, indicate, and record the flow.
✓ The permittee shall install the necessary equipment for those measurements within 6 months after the date when such a flow becomes evident.
✓ Section (b)
A calibration report shall be included in the annual report for flow measuring, indicating, and recording equipment. Calibrations should occur annually.

Additional Comments:

Willistown Township is required to submit a report to the East Goshen Municipal Authority about the portion of its system that is treated by the Ridley Creek STP.

We request that you submit the missing information and address the comments noted on this checklist to the Department by October 2, 2009, so that we may complete our review. The Annual Report is required under Section 94.12 of the Chapter 94 Municipal Wasteload Management regulations.

14 of 14

Pennsylvania Department of Environmental Protection
2 East Main Street
Norristown, PA 19401
Revised: July 10, 2008

Southeast Regional Office
Phone: 484-250-5970
Fax: 484-250-5971

Industrial Waste Discharge Reporting Information

Requirements

The permittee shall provide industrial waste discharge information in the annual Municipal Wasteload Management Report, required under the provisions of Title 25 Pa. Code Chapter 94. Industrial waste dischargers served by the treatment facility may be subject to pretreatment standards adopted under Section 307(b) of the Clean Water Act. The permittee shall require all industrial waste dischargers, subject to pretreatment standards adopted under Section 307(b) of the Clean Water Act, to comply with the reporting requirements of Sections 204(b), 307, and 308 of the Clean Water Act and regulations thereunder.

Content for the 2009 Annual Report

The Annual Report must include a discussion of industrial waste contributions into the sewer system and any problems associated with those discharges, including all of the following information in addition to the items listed in Chapter 94, Section 94.12(a)(8):

  1. A new introduction of pollutants into the treatment facility from an industrial waste discharger which would be subject to Sections 301 and 306 of the Clean Water Act if it were directly discharging pollutants.
  2. Any substantial change in the volume or character of pollutants being introduced into the treatment facility by an industrial waste discharger introducing pollutants into the treatment facility since the time of issuance of the current National Pollutant Discharge Elimination System (NPDES) permit.
  3. Information on the quality and quantity of the effluent introduced into the treatment facility by an industrial waste discharger and the anticipated impact of the change in the quality and quantity of effluent to be discharged from the treatment facility.
  4. The identity of the industrial waste dischargers served by the Publicly Owned Treatment Works (POTW) which are subject to pretreatment standards adopted under Section 307(b) of the Clean Water Act; the POTW shall also specify the total volume of discharge and estimate concentration of each pollutant discharged into the POTW by the industrial waste discharger.

A copy of Chapter 94 and all of the Pennsylvania Department of Environmental Protection’s regulations can be found on-line at www.depweb.state.pa.us . From the main page, select “Water Topics,” “Water Management” and then “DEP Regulations and Other Proposals - Final regulations on-line.”

An Equal Opportunity Employer | www.dep.state.pa.us | Printed on Recycled Paper

12 SEWER RPT
b.
2 pgs

AREA CODE 610
692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP

CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

To Municipal Authority

From Mark Miller

Ref. Monthly Report

Chester Creek Collection: The pipe lining project has been completed by doing the work we eliminated between 50 to 70 thousand gallons of inflow a day from the system. We did have a problem while lining the manholes on Irene Dr. the contractor plugged the line which caused a backup into a resident’s basement. There was quite a bit of damage as the basement had about 16″ of raw sewage. When I arrived I contacted Belfore Restoration who responded right of way and began the task of cleaning up. The insurance companies have been notifed and are working with the homeowner. I have made several visits to the property to make sure the residents issues are being taken care of.

Pumping Stations: The stations were visited on a daily basis routine maintenance was performed by cleaning the baskets and checking the pump’s operation. We received and responded to 23 alarms for the

2 of 2

AREA CODE 610
692-7171
www.eastgoshen.org

BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Last month were contacted by Hershey Mill personel of a possible force main brake. The area in question was excavated so we could our inspect Our pipe.

Once we found our pipe we performed a die test in the wet well. The theory was that if our force main was broke the die would show up in the trench. The next morning the trench showed no signs of any die and was backfilled.

Ridley Creek Expantion: The electrical contractor has completed 80% of the underground conduit. They will be pulling off the job until the general contractor as the screen building andune the SBR building our out of the ground. They started on the screen building on June 3rd

The contractor doing the screen building has said he would need three weeks to get the screen building out of the ground.

Dutchland has been on site on a daily basis taking measurements. They started pressure washing the walls where they plan to make repairs.

12. SEWER RPT
b.
6 pgs

2008 FLOWMETERS

2009 AUGUST 3RD QUARTER

DATE HERSHEY'S MILL ASHBRIDGE HICKS METER RESERVOIR SHERMAN BARKWAY
READING GPD READING GPD READING GPD READING GPD READING GPD
08/01/09
08/02/09
08/03/09 16,709,479 71,253 544,111 78,933 OOS 71,169,110 936,073 192,634 6,497 1,143,288 14,307
08/04/09 16,715,308 58,290 545,074 96,300 OOS 71,245,166 760,560 193,095 4,610 1,144,244 9,560
08/05/09 16,721,212 59,040 545,722 64,800 OOS 71,320,074 749,080 193,679 5,840 1,145,144 9,000
08/06/09 16,726,728 55,160 546,317 59,500 OOS 71,394,563 745,090 194,086 4,070 1,146,152 10,080
08/07/09 16,732,187 54,590 546,918 60,100 OOS 71,466,353 718,000 194,538 4,520 1,147,011 8,590
08/08/09
08/09/09
08/10/09 16,749,675 58,293 549,144 74,200 OOS 71,692,362 753,263 196,078 5,133 1,150,247 10,787
08/11/09 16,755,554 58,790 549,862 71,800 OOS 71,775,535 831,730 196,582 5,040 1,151,259 10,120
08/12/09 16,760,947 53,930 550,483 62,100 OOS 71,850,781 752,460 196,997 4,150 1,152,300 10,410
08/13/09 16,767,023 60,760 551,292 80,900 OOS 71,929,005 782,240 197,759 7,620 1,153,416 11,160
08/14/09 16,773,078 60,550 552,503 121,100 OOS 72,021,662 926,570 198,257 4,980 1,154,470 10,540
08/15/09
08/16/09
08/17/09 16,790,798 59,067 554,974 82,367 OOS 72,239,883 199,759 5,007 1,157,980 11,700
08/18/09
08/19/09 16,802,162 56,820 556,381 70,350 OOS 72,388,274 741,955 200,795 5,180 1,160,049 10,345
08/20/09 16,807,842 56,800 557,084 70,300 OOS 72,464,193 759,190 201,354 5,590 1,161,051 10,020
08/21/09
08/22/09 61,265
08/23/09 56,610
08/24/09 16,825,756 58,210 560,504 85,500 OOS 72,754,456 725,658 203,677 5,808 1,165,364 10,783
08/25/09 16,831,577 55,480 561,309 80,500 OOS 72,827,563 731,070 204,298 6,210 1,166,452 10,880
08/26/09 16,837,125 55,600 562,046 73,700 OOS 72,897,964 704,010 205,052 7,540 1,167,555 11,030
08/27/09 16,842,685 57,220 562,783 73,700 OOS 72,969,183 712,190 205,662 6,100 1,168,678 11,230
08/28/09 16,848,407 55,060 563,495 71,200 OOS 73,039,907 707,240 206,163 5,010 1,169,779 11,010
08/29/09
08/30/09
08/31/09 16,871,803 59,633 565,947 81,733 OOS 73,245,346 684,797 207,695 5,107 1,173,096 11,057
64,338 76,794 722,167 5,474 10,664

8/31/20091:42 PM
f:/data/users/joanna/2003 flowmeters

2 of 6

2008 FLOWMETERS

2009 AUGUST 3RD QUARTER

Precip Inches DATE WESTTOWN WAY READING WESTTOWN WAY GPD ELLIS LANE READING ELLIS LANE GPD PAOLI PIKE READING PAOLI PIKE GPD WILSON DRIVE READING WILSON DRIVE GPD SUMMIT GPD NET FLOWS
0.00 08/01/09 20,400 0
2.50 08/02/09 20,400 0
0.00 08/03/09 1,259,105 1,528,667 10,091,750 151,920 5,691,689 63,903 6,853,558 87,133 20,400 1,225,710
0.00 08/04/09 1,260,274 1,169,000 10,102,138 103,880 5,696,213 45,240 6,863,066 95,080 20,400 924,800
0.00 08/05/09 1,261,422 1,148,000 10,111,719 95,810 5,700,709 44,960 6,873,542 104,760 20,400 902,470
0.40 08/06/09 1,262,553 1,131,000 10,120,993 92,740 5,705,217 45,080 6,883,913 103,710 20,400 889,470
0.00 08/07/09 1,263,657 1,104,000 10,130,072 90,790 5,709,601 43,840 6,893,341 94,280 20,400 875,090
0.00 08/08/09 20,400 0
2.25 08/09/09 20,400 0
0.00 08/10/09 1,267,295 1,212,667 10,166,488 121,387 5,724,433 49,440 6,923,971 102,100 20,400 939,740
0.00 08/11/09 1,268,560 1,265,000 10,177,720 112,320 5,728,930 44,970 6,936,939 129,680 20,400 978,030
0.25 08/12/09 1,269,706 1,146,000 10,187,228 95,080 5,733,202 42,720 6,949,345 124,060 20,400 884,140
0.66 08/13/09 1,270,926 1,220,000 10,197,025 97,970 5,737,785 45,830 6,961,335 119,900 20,400 956,300
0.00 08/14/09 1,272,438 1,512,000 10,211,746 147,210 5,743,406 56,210 6,973,591 122,560 20,400 1,186,020
0.00 08/15/09 20,400 0
0.00 08/16/09 20,400 0
0.00 08/17/09 1,275,976 1,179,333 10,243,413 105,557 5,757,498 46,973 7,005,351 105,867 20,400 920,937
0.70 08/18/09 20,400 0
0.33 08/19/09 1,278,271 1,147,500 10,262,077 93,320 5,766,579 45,405 7,026,635 106,420 20,400 902,355
0.00 08/20/09 1,279,442 1,171,000 10,271,491 94,140 5,771,443 48,640 7,038,220 115,850 20,400 912,370
0.42 08/21/09 20,400 0
1.00 08/22/09 20,400 0
0.00 08/23/09 20,400 0
0.00 08/24/09 1,284,287 1,211,250 10,314,640 107,873 5,790,130 46,718 7,072,514 85,735 20,400 970,925
0.00 08/25/09 1,285,475 1,188,000 10,324,332 96,920 5,794,578 44,480 7,081,264 87,500 20,400 959,100
0.00 08/26/09 1,286,601 1,126,000 10,333,394 90,620 5,798,974 43,960 7,089,821 85,570 20,400 905,850
0.00 08/27/09 1,287,743 1,142,000 10,342,570 91,760 5,803,474 45,000 7,098,720 88,990 20,400 916,250
0.33 08/28/09 1,288,877 1,134,000 10,351,725 91,550 5,807,939 44,650 7,106,811 80,910 20,400 916,890
0.84 08/29/09 20,400 0
0.00 08/30/09 20,400 0
0.00 08/31/09 1,292,387 1,170,000 10,384,262 108,457 5,822,333 47,980 7,123,348 55,123 20,400 958,440
9.68 1,205,548 104,700 47,158 99,749 1,006,938
Metric DAILY LOC INQUIRER EG TWP
MONTH TO DATE 9.68
NORMAL MONTH TO DATE
YEAR TO DATE 45
NORMAL YEAR TO DATE

f:/data/users/joanna/2003 flowmeters

8/31/20091:42 PM

2009 SUMMARY OF METER READINGS

WESTTOWN WAYELLIS LANEPAOLI PIKEWILSON DRIVESUMMITHERSHEY MILLASHBRIDGEHICKSRESERVOIRSHERMANBARKWAY
JANUARY1,277,48395,42642,39463,54720,40065,01667,836307,570763,6876,38612,279
FEBRUARY1,211,46487,51541,27060,70320,40063,38262,862292,756721,3275,85011,963
MARCH1,152,89382,51038,29456,90620,40055,33061,242300,092672,8975,53411,410
APRIL1,273,653106,23639,68558,07920,40059,61577,712314,679744,6046,09611,541
MAY1,304,080106,88164,48065,97020,40065,74483,088343,439792,6335,86911,521
JUNE1,320,702112,74460,86978,46520,40063,15287,581341,020807,2116,01011,736
JULY1,145,31092,56364,78670,50820,40057,93264,481314,779706,5525,99010,873
AUGUST1,205,548104,70047,15899,74920,40064,33876,794722,167722,1675,47410,664
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Total Flows
Monthly Ave1,236,39298,57249,86769,24120,40061,81472,700367,063741,3855,90111,498

To West Goshen: 1,018,712

2009 flowmeters -all-stations separate month worksheets.xlsSUMMARY

386

4 of 6

Flowmeters August 2009

August

Flow's: 1400000, 1200000, 1000000, 800000, 600000, 400000, 200000, 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

5 of 6

Monthly Totals 2009 Jan-Dec

Flowmeters: 1800000, 1600000, 1400000, 1200000, 1000000, 800000, 600000, 400000, 200000, 0

Month: January, February, March, April, May, June, July, August, September, October, November, December

6 of 6

August Precip. 9.68 - 2009

August

10 9 8 7 6 5 4 3 2 1 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

14. SEWER RPT
J.
2 pgs

ARTESIAN RESOURCES
100 YEARS OF SUPERIOR SERVICE
Artesian Water Company | Artesian Wastewater Management | Artesian Utility Development | Artesian Water Maryland

August 19, 2009

Mr. Mark Miller, Director of Public Works
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380

RE: Lochwood Chase Wastewater Treatment Facility
July 2009 Operations Report

Dear Mr. Miller:

The following is the July 2009 monthly operations report for East Goshen Township's Lochwood Chase Wastewater Treatment Facility.

Treatment plant operations were normal during the month of July 2009. Routine inspections and equipment preventative maintenance were completed as required. The total amount of wastewater treated and discharged during the month was 566,200 gallons, which represents an average daily flow of 18,265 gallons per day.

The influent area operated normally during the month. The comminutor unit was in service continuously and no problems were experienced with the unit's controls. The plant operator continued to remove rags and debris buildups from the unit's housing, clear the bypass bar screen and manually remove grit buildups from the bottom of the influent pit. Debris and grit accumulations were disposed of via the trash can.

The aeration pond operated normally during the month. The pond's color remained brownish with only minor surface scum and foam buildups. Both floating aerators continued to be operated in the automatic mode to minimize noise complaints and over-aeration problems.

The polishing pond operated normally as well during the month. The pond's color remained very green due to algae growth with moderate amounts of duckweed growth on the surface. The pond's level continued to fluctuate with discharge spraying requirements.

The chlorine contact tank and chlorine feed systems were operational throughout the month to meet disinfection requirements. Liquid chlorine continued to be added manually to the chlorine contact tank prior to the start of each spray event to improve

664 Churchmans Road, Newark, Delaware 19702, P.O. Box 15004 Wilmington, Delaware 19850 Phone: (302) 453-6900 Fax: (302) 453-6957
P.O. Box 177 Harbeson, Delaware 19951 Phone: (302) 684-2527 Fax: (302) 684-5164
28322 Lewes-Georgetown Hwy., Unit 4, Milton, DE 19968
e-mail: artesian@artesianwater.com Website: artesianwater.com

2 of 2

disinfection and minimize odor issues. The supply of liquid chlorine was replenished during the month with twelve (12) five (5) gallon containers refilled.

The discharge spray system was operational during the month of July. The #2 discharge pump was operated in the hand position with spray fields No.1 through No. 5 being opened manually to prevent excessive backpressure buildups on the pump. The plant operator continued to inspect and clean the spray heads in use to ensure proper operation.

Results of influent and final effluent samples collected during the month indicate compliance with current permit limitations.

Should you have any questions, please do not hesitate to contact me.

Sincerely,
Artesian Utility Development, Inc.

Thomas M. Horrex / bmr
Thomas M. Horrex, L.O., S.E.O.
Pennsylvania Operations Supervisor

TMH/bmr

cc: Mr. Evan Andrews - Pennoni Associates
File

16. CORRESPONDENCE
a.
2 pgs

AREA CODE 610
692-7171

EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

August 17, 2009

Steve Cantrell, Vice President Operation
Worth & Company, Inc.
6263 Kellers Church Road
Pipersville, PA 18947

Re: Brickhouse Environmental

Dear Steve:

I understand that there may be some confusion regarding Scott Towler and Dave Evans role on the Ridley Creek Project.

The Municipal Authority initially planned to have Mark Miller, Township Director of Public Works, with the assistance of me as necessary, fulfill the role of Project Manager for the Ridley Creek Project. However, in March it became apparent to the Authority that Mark and I could not perform the duties of Project Manager in addition to our normal Township duties. Accordingly, the Authority solicited proposals from qualified firms to provide Project Management services and on April 22, 2009 the Authority contracted with Brickhouse Environmental to provide these services. The following is an excerpt from the RFP for Project Manager.

Description of Work - The role of the Project Manager will be to oversee the completion of the Project in accordance with the approved plans and specifications, provide construction administration and verify that the construction is in general conformance with the Contract Documents and design intent. The Project Manager will be the Authority's representative for the construction. The individual will provide day-to-day contact and coordination with the Authority, Engineer's design project manager and technical office staff, the Contractors and regulatory agencies. The Project Manager will be on site as often as is deemed necessary to ensure that the Project, when completed will be in general conformance with the Contract Documents and design intent.

The Project Manager shall perform the following duties at a minimum:

  1. Oversee Engineer's inspector(s) to maintain or follow standard construction inspection procedures for observation of Contractor activities.
  2. Review and evaluate ongoing project issues to ensure that construction issues/concerns are being appropriately evaluated, investigated and resolved.
  3. Expedite the processing of Contractor requests for information (RFIs), clarifications, and interpretations as to the requirements of the Contract Documents.
  4. Provide timely input to existing field conditions to respond to items included in (3) above.
  5. Assist in formulating resolutions to problems encountered on site.
  6. Monitor the cost, schedule and progress information provided by the Contractors.

2 of 2

  1. Review the monthly schedule updates and provide critique and overview as required.
  2. Document and report observed discrepancies to the Contractors, Engineer and the Authority.
  3. Evaluate the need for construction modifications and preparation of the modifications, as necessary.
  4. Manage and negotiate all field orders.
  5. Manage and negotiate all change orders for approval by the Authority.
  6. Oversee the delivery and use of materials, tools, and equipment.
  7. Monitor equipment and material submittals to ensure that the work on the Project proceeds in a timely manner.
  8. Identify potential areas of risk with the Project.
  9. Consider Contractor's suggestions and/or recommendations, evaluate them, and discuss them with the Engineer and/or Authority as appropriate.
  10. Review all claims and disputes and make recommendations to the Authority regarding resolution of such issues.
  11. Maintain a current file of all disputed work items including, but not limited to, alleged extra work, delay, and potential claim items. Monitor resolution of these items.
  12. Attend all Progress Meetings, all safety meetings and all Municipal Authority meetings for the duration of the project. The Authority meets on the second Monday of each month at 7:00pm. Additional meeting will be scheduled as necessary to approve any potential change orders or if required. The Project Manager is not responsible for minutes.
  13. Attend the start up of each piece of equipment, or treatment process.
  14. Provide a monthly written report to the Authority. The report shall identify work performed, any issues or concerns that occurred and their resolution, for the previous month.
  15. Review and approve, in conjunction with the Engineer, all requests for payment from the Contractors prior to approval by the Authority.
  16. Prepare punch list at substantial completion and inspect punch list item work to establish satisfactory project completion.
  17. Review all documentation and plans submitted by the Contractors for the close out of the project.

Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.

Sincerely,
Rick Smith
Louis F. Smith, Jr.
Township Manager

Cc: Municipal Authority ✓
Evan Andrews, PE
Scott Towler, PE

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\General Mechanical\Letter to Worth re Project Manager 081709.doc

16. CORRESPONDENCE
b.
7 pgs

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK EXPANSION PROJECT
SUMMARY

August 17, 2009

NameBudget or Contract amt.This MonthTo DateBalance% of work completed
EXPENSES
Borrowing costs$52,250.00$0.00$52,250.00$0.00100.00%
Worth$7,865,400.00$138,217.50$2,827,403.52$5,037,996.4835.95%
change orders$8,753.00$0.00$0.00$8,753.000.00%
Clinger$974,000.00$0.00$115,840.84$858,159.1611.89%
change orders$5,106.00$0.00$0.00$5,106.000.00%
Pennoni (Inspection)$136,200.00$3,528.00$132,316.40$3,883.6097.15%
Pennoni (Rechargeable)$20,000.00$0.00$12,961.75$7,038.2564.81%
Brickhouse$175,000.00$9,315.00$27,686.25$147,313.7515.82%
Extras
Capital$247,595.00$1,481.00$36,252.53$211,342.4714.64%
Capital (Identified but not paid)$23,696.00$0.00$0.00$23,696.000.00%
Trailer, Phone, Porta Potty$12,000.00$95.00$4,421.23$7,578.7736.84%
EXPENSES TOTAL$9,520,000.00$152,636.50$3,209,132.52$6,310,867.4833.71%
RECEIPTS
Liquidated Damages$0.00$0.00$0.00$0.000.00%
Pennoni (Rechargeable)-$20,000.00$0.00$0.00-$20,000.00
NET COST$9,500,000.00$6,290,867.48

Retainage (10% until 50% of the project is done then it drops back to 5%)

Worth$314,155.9510%
Clinger$14,267.6010%
Total$328,423.55

We have identified $467,000 in potential extras which includes $110,000 for Township Labor
We have identified $71,000 in potential receipts if the project runs past November 2009

SUMMARY V2

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

2 of 7

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
DETAIL

August 17, 2009

DateAmountSubtotalsNameDescription
Worth
2/9/2009$561,150.00Worth & CompanyApplication #1
3/9/2009$480,825.00Worth & CompanyApplication #2
4/9/2009$768,780.00Worth & CompanyApplication #3
5/8/2009$125,352.90Worth & CompanyApplication #4
5/31/2009$485,103.12Worth & CompanyApplication #5
6/30/2009$267,975.00Worth & CompanyApplication #6
7/31/2009$138,217.50Worth & CompanyApplication #7
$2,827,403.52$2,827,403.52
Clinger
4/9/2009$22,152.64ClingerApplication #1
5/8/2009$15,714.77ClingerApplication #2
5/31/2009$77,973.43ClingerApplication #3
6/30/2009$12,567.46ClingerApplication #4
$128,408.30$128,408.30
Pennoni
?$712.50PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU ?
10/30/2008$943.50PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 10/19/08
12/5/2008$18,115.98PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 11/30/08
1/15/2009$12,929.00PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 12/28/08
2/5/2009$13,352.50PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009$31,288.00PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009$29,010.46PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009$22,436.46PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 4/26/09
7/29/2009$3,528.00PENNONI ASSOCIATES INC.RCSTP EXP PROJ SERV THRU 7/19/09
$132,316.40$132,316.40

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

3 of 7

DateAmountSubtotalsNameDescription
Pennoni (rechargeable)
2/5/2009$2,840.50PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 1/25/09
3/19/2009$4,934.75PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 3/1/09
4/8/2009$3,777.00PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 3/29/09
5/6/2009$1,409.50PENNONI ASSOCIATES INC.RCSTP EXP.PROJ. SERV. THRU 4/26/09
$12,961.75$12,961.75
Brickhouse
5/12/2009$2,127.50BRICKHOUSEApr-09
6/1/2009$8,452.50BRICKHOUSEMay-09
7/1/2009$7,791.25BRICKHOUSEJun-09
8/3/2009$9,315.00BRICKHOUSEJul-09
$27,686.25$27,686.25
Extras - Capital - Paid
12/22/2008$44.98EAST GOSHEN TOWNSHIPREIMBURSE GEN.FUND FOR OFFICE DEPOT
12/31/2008$88.00FASTSIGNSRED ON WHITE ALUM. SIGNS
1/12/2009$177.00FASTSIGNSSIGNS - PLEASE AVOID TOWNE DR....
12/1/2008$36.00GREAT VALLEY LOCKSHOPKEYS FOR CONTRACTOR
12/8/2008$160.80GREAT VALLEY LOCKSHOPPADLOCKS, REKEY CYLINDERS & KEYS
12/29/2008$474.82HANSON AGGREGATES INC36.95 TONS SUBBASE AGGREGATE
12/31/2008$908.00HANSON AGGREGATES INC70.66 TONS SUBGRADE 2 AGGREGATE
12/15/2008$2,089.39LENNI ELECTRIC CORPORATTEMP SERV. FOR TRAILER - RIDLEY CRK
12/31/2008$120.00LENNI ELECTRIC CORPORATSEWER PLANT - GUY WIRE RELOCATE
12/29/2008$7,865.00MACANGA INC.TRUCK & TRACKHOE RENTAL 12/5-12/18
12/1/2008$2,466.00PATTERSON, MICHAEL J.MATERIALS & LABOR - SPLIT RAIL FENCE
12/1/2008$4,907.72PIPE XPRESS INC.COPPER TUBING, BRASS COMP. COUPLING
12/15/2008$813.74PIPE XPRESS INC.BURIAL HYDRANT, BRASS CURB STOP, &
12/29/2008$129.00RAM-T CORPORATION2 FT. SILT FENCE
12/1/2008$1,183.00RANSOME RENTAL COMPANCATERPILLAR - TRUCK LOADER RENTAL
12/8/2008$3,960.00RANSOME RENTAL COMPANCATERPILLAR RENTAL 11/13-11/25/08
12/29/2008$908.00RANSOME RENTAL COMPANCATERPILLAR RENTAL 12/15 - 12/18/08
12/31/2008$1,044.85RANSOME RENTAL COMPANCATERPILLAR RENTAL 12/15-12/16/08
12/8/2008$119.95SAFETY SOLUTIONS INC.MEDICAL SUPPLIES
12/1/2008$635.60US MUNICIPAL SUPPLY INC.CUSTOM SIGNS - RIDLEY CREEK TREATMT
12/31/2008$157.50GAWTHROP GREENWOODLEGAL
1/31/2009$936.50GAWTHROP GREENWOODLEGAL
3/19/2009$1,246.64HAMMOND & MCCMLOSYWATER SERVICE
3/31/2009$1,254.00GAWTHROP GREENWOODLEGAL

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

4 of 7

DateAmountSubtotalsNameDescription
4/2/2009$274.21PIPE XPRESS INC.YARD HYDRANT #2
4/2/2009$1,910.28HAMMOND & MCCMLOSYWATER PIPING
5/11/2009$158.69US MUNICIPAL SUPPLY INC.3 SIGNS
4/30/2009$264.86LENNI ELECTRIC CORPORATWIRED HOT WATER HEATER
5/31/2009$133.00GAWTHROP GREENWOODLEGAL
6/30/2009$304.00GAWTHROP GREENWOODLEGAL
7/17/2009$1,481.00EAST GOSHEN TOWNSHIPBLOWER MOTOR (REPAIRED AND KEPT AS A SPARE)
$36,252.53$36,252.53
Extras - Capital - Identified capital extras that have not been paid
$20,396.00Driveway Restoration
$3,300.00Restoration of parking area
$23,696.00$23,696.00
Trailer, Phone, Porta Potty
12/15/2008$1,039.10ACTON MOBILE INDUSTRIESRENTAL MOBILE OFFICE
12/22/2008$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - THRU 1/19/09
1/21/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 1/20-2/20/09
2/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 2/20- 3/20/09
3/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 3/20 - 4/19
4/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFICE RENTAL - 4/20 - 5/19
5/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFCIE RENTAL 5-20 - 6/19
6/10/2009$239.10ACTON MOBILE INDUSTRIESMOBILE OFFCIE RENTAL 6/20 - 7/19
$2,712.80$2,712.80
12/15/2008$140.00POTTY QUEENRENTAL PORTABLE TOILET - RIDLEY CRK
12/22/2008$64.47POTTY QUEENRENTAL TOILET 12/23-1/10/08
2/8/2009$95.00POTTY QUEENRENTAL TOILET 2/8-3/7
3/8/2009$95.00POTTY QUEENRENTAL TOILET 3/8-4/4
4/5/2009$95.00POTTY QUEENRENTAL TOILET 4/5-5/2
5/5/2009$95.00POTTY QUEENRENTAL TOILET ????
7/26/2009$95.00POTTY QUEENRENTAL 7/26 TO 8/22
$679.47$679.47
12/22/2008$174.65VERIZON -7041NOVEMBER 25 - DECEMBER 6, 2008
1/7/2009$137.87VERIZON -7041BILLING DATE 1/07/09
2/7/2009$130.34VERIZON -7041BILLING DATE 2/07/09

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

5 of 7

DateAmountSubtotalsNameDescription
3/7/2009$133.97VERIZON -7041BILLING DATE 3/7/09
4/7/2009$136.00VERIZON -7041BILLING DATE 4/7/09
5/7/2009$137.66VERIZON -7041BILLING DATE 5/7/09
6/7/2009$178.47VERIZON -7041BILLINGDATE 6/7/2009
$1,028.96$1,028.96
$4,421.23

DETAIL

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

6 of 7

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
POTENTIAL EXTRAS

August 17, 2009

Potential capital extras

Pennoni (additional 6 months)$50,000
  Excavation$30,000
  Blower Repairs (2)$12,000
  Pipe conduit Conflicts$30,000
  Shoring at EQ tank (we will get a credit)$0
  Controls$10,000
  Sludge room retrofit$10,000
  Motor Control RetrofitClinger CO3
  HVAC Thermostats$5,000
  Cathode Protection$10,000
  Treatment Tanks$200,000
  Township Labor$110,000
Total potential extras$467,000$467,000

Potential Receipts

Worth Engineering recharges (6 months)-$50,000
Worth liquidated damages (6 months @ $100 day)-$21,000
Worth - Reduced excavation as a result of SBR tank shift?
Worth - Savings as a result of shifting screen building?
Total Potential Receipts-$71,000-$71,000

POTENTIAL EXTRAS

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

7 of 7

EAST GOSHEN MUNICIPAL AUTHORITY
RIDLEY CREEK CAPITAL EXPANSION PROJECT
CHANGE ORDERS

August 17, 2009

NO.AMOUNTAPPROVEDWORKSTATUSPAID
WORTH
1$3,210.002/24/09BLOWER #1 REPAIRAPPROVEDNO
2$5,543.005/11/09BLOWER #2 REPAIRAPPROVEDNO
Total$8,753.00
CLINGER
1$7,034.00DeniedEXTEND 34 KV LINESDENIED
3$5,106.007/1/09CORNER UNIT FOR MOTOR CONTROL CENTERAPPROVEDNO
Total$5,106.00

CHANGE ORDERS

F:\Data\Shared Data\Public Works Dept\Bids\RCSTP 2007\payments\RCSTP EXPANSION EXPENSES 081709.xls

16. CORRESPONDENCE
c.
2 pgs

COMMONWEALTH OF PENNSYLVANIA
GOVERNOR'S OFFICE OF GENERAL COUNSEL

August 28, 2009

Francis X. Beck, Chairman
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380

Re: Commonwealth Financing Authority H2O PA Water & Sewer Grant of $464,195 for Ridley Creek Sewer Plant upgrades at the property located in East Goshen Township c/o Francis X. Beck. Contract # C000045819.

Dear Mr. Beck:

The Bureau of Labor Law Compliance (Bureau) received information from the Commonwealth Financing Authority (CFA) indicating that this project is a public work requiring Pennsylvania prevailing wages. 43 P.S. §§ 165-2(5), 165-5. The Bureau will issue Pennsylvania prevailing wages for this project within 20 days unless sufficient documentary information is submitted demonstrating that Pennsylvania prevailing wages are not required. Pennsylvania prevailing wages are not required for work requiring federal Davis-Bacon prevailing wages. 43 P.S. § 165-15.

All contractors must comply with prevailing wage requirements for this project and pay workers for the actual work performed at the correct classifications. 43 P.S. §165-5; 34 Pa. Code § 9.103. A public body also has the duty of assuring that prevailing wage requirements are being complied with. 43 P.S. § 165-10, 34 Pa. Code §§ 9.104, 9.110.

Prevailing wage rates and information about compliance may be obtained from the Bureau at the following:

OFFICE OF CHIEF COUNSEL | DEPARTMENT OF LABOR & INDUSTRY
LABOR LAW COMPLIANCE DIVISION
651 BOAS STREET | 10TH FLOOR | HARRISBURG, PA 17121
Ph: 717-787-4186 | Fax: 717-783-5027 | www.dli.state.pa.us

pennsylvania
DEPARTMENT OF LABOR & INDUSTRY

2 of 2

Re: Commonwealth Financing Authority/Rates To Be Requested
August 28, 2009
Page 2

Bureau of Labor Law Compliance
1301 Labor & Industry Building
651 Boas Street
Harrisburg, PA 17121
717-787-4671
www.dli.state.pa.us
(Keywords “Prevailing Wage”)

If you have any information or questions concerning this letter, you may contact the following:

Gerald A. Barnett
Executive Assistant to Executive Deputy Secretary
Robert V. O'Brien
Room 1719-A Labor and Industry Building
651 Boas Street
Harrisburg, PA 17121
E-mail: gbarnett@state.pa.us
717-346-1497

Thank you for your cooperation.

FOR THE BUREAU OF LABOR
LAW COMPLIANCE

James A. Holzman
Deputy Chief Counsel

JAH/gab

cc: Robert V. O'Brien, Executive Deputy Secretary
A. Robert Risaliti, Director, Labor Law Compliance
Gerald A. Barnett, Executive Assistant to Robert V. O'Brien
Brian D. Eckert, DCED Center for Business Finance