Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
February 9, 2015
- CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting?
- CHAIRMAN’S REPORT/OTHER MEMBERS REPORTS
- SEWER REPORTS Director of Public Works Report; Pennoni Engineer’s Report; Big Fish Environmental Inc. Report with DMR’s; East Goshen Township Flows
- APPROVAL OF MINUTES January 12, 2015
- APPROVAL OF INVOICES Pennoni Invoice #623589 $5,300.00; Pennoni Invoice #623591 $ 82.50; Pennoni Invoice #623592 $ 565.00; Pennoni Invoice #623593 $ 464.00; Pennoni Invoice #623594 $ 661.25; Pennoni Invoice #623595 $2,053.75; Pennoni Invoice #623596 $1,827.50
- LIAISON REPORTS
- FINANCIAL REPORTS January 2015 Report
- OLD BUSINESS
- GOALS Submit an article for each newsletter – Due date for newsletter Need by 1/30/15 – Jack - Completed Need by 5/1/15 Need by 8/31/15 Need by 10/30/15
F:\Data\Shared Data\Agendas\Municipal Authority\2015\2-9-15.doc
- Obtain construction permits for the Reservoir Road Pump Station – December 31, 2015 2/6 – Test boring done, meeting with Mike to review preliminary site plan and discuss control options.
- Attend West Goshen Meetings quarterly – more often if needed. 1 st Quarter 2 nd Quarter 3 rd Quarter 4 th Quarter
- Respond to capacity requests in 45 days or less.
- Continue to implement I & I Plan
- Operate RCSTP in compliance with NPDES Permit
- NEW BUSINESS Comp Plan Task Force meeting conflict
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
F:\Data\Shared Data\Agendas\Municipal Authority\2015\2-9-15.doc
AREA CODE 610
692-7171
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 4, 2015
To: Municipal Authority
From: Mark Miller
Re: January 2015 Monthly Report
Meters: All meters were read on a daily basis. I met with John Scott with regards to converting the shared meters over to remote monitoring. The total cost is $8000 dollars which would be split in half. This will be a significant savings to the township.
C.C. Collection: The pumping stations were visited on a daily basis. With no problems to report.
MGK completed the new rail system at the Barkway Pump Station, it is a great improvement.
We were notified of two lateral back-ups for the month of January, both were cleared.
R.C. Collection: Pump Stations were visited on a daily basis with no problems to report.
R.C. Plant: No problems to report.
Alarms: We responded to 17 alarms for January.
PA One Calls: We received 57 PA One calls since January.
EGMA 1501
Pennoni
MEMORANDUM
TO: East Goshen Municipal Authority Board
Rick Smith, Township Manager
FROM: Michael Ellis, P.E.
Authority Engineer
DATE: February 6, 2015
SUBJECT: Engineer’s Report
Invoices
- Invoices with summaries are provided under separate cover.
Reservoir Road Pump Station
- We attended a tour of the new Mill Lane Pump Station in East Whiteland Township with the PW staff to evaluate scoping preferences for the Reservoir Road Pump Station.
- Two geotechnical borings at the proposed pump station site were performed on January 15. We observed the borings, and prepared a geotechnical report and boring logs which will be submitted to the Township. Bedrock was encountered at a depth of 22’ in both borings, although there were shallower layers of “rippable” material.
- We prepared a 1 st draft of a concept design consisting of: a pump station site sketch plan including conceptual diversion details and diversion piping profiles, a written outline of pump station controls and critical features, and a ballpark construction cost estimate. We met with Rick Smith and Mark Miller to review the 1 st draft. A 2 nd draft of the site plan is being prepared and will be presented to the Municipal Authority at the February 9 th meeting.
- Once the concept scope is agreed upon, a permit pre-application meeting with PADEP will be set up, likely in March.
- The existing conditions field survey work is scheduled to commence the week of February 23 and will take 2-3 weeks to complete.
Chapter 94 Reports
- We initiated work on the 2014 Chapter 94 Reports. We anticipate submitting drafts of the reports to the Township for review by early March.
Page 1 of 3
P:\Projects\EGMA\Memos to Board\2015\Memo to EGMA Board 2015-02-06.docx
EGMA 1501
Lockwood Chase STP Groundwater Monitoring
The LCSTP Closure Plan approval from PADEP required that groundwater monitoring at the LCSTP site continue on a quarterly basis for five years following the plant closure. Reports must be submitted to PADEP.
As requested, we reviewed the 2013 and 2014 Annual Groundwater Monitoring Reports prepared by Brickhouse Environmental. The quarterly monitoring results have been reviewed to identify any impacts to groundwater quality as a result of the closure of the LCSTP. A summary of our review follows:
- Quarterly testing of the ground monitoring wells is a condition of PADEP Permit No. 1580430 Amendment #1, dated December 28, 2010, and must be performed in accordance with the LCSTP Closure Plan that was approved by PADEP on December 8, 2011. Brickhouse began the required quarterly monitoring of wells MW#3 and MW#4 on March 29, 2012. Samples have not been collected from wells MW#1 and MW#5 because these wells have been dry at the time of Brickhouse’s sampling events. Similarly, MW#4 was not sampled in the months of June, September, and December of 2012 because it was also dry.
- The analytical data in the reports do not indicate any water quality impacts between 2012-2014 as a result of the LCSTP operation or its decommissioning. The results of the quarterly monitoring were compared to the EPA’s Maximum Contaminant Limits (MCLs) for drinking water, as defined by the Safe Drinking Water Act. The majority of the target compounds did not exceed the MCLs or the laboratory method detection limits in the groundwater samples, with the exception of Nitrate-Nitrogen and Fecal Coliform in a few instances. Nitrate-Nitrogen concentration in MW#4 was 11.0 mg/L in March 2012 before the plant closure. It has fluctuated from 5.8 to 13.7 mg/L since the plant was closed with no discernable trend. The MCL is 10.0 mg/L.; Fecal Coliform has been detected on occasion, however this may be a result of the close proximity to surface waters and other groundwater conditions not associated with the plant. Fecal Coliform has not been detected in the month of March sampling since 2012. It has been highest in the summer months of 2013 and 2014. Since it has been at non-detectable levels since the plant was closed, it does not appear the plant closure is causing the Fecal Coliform presence.
- The report states that testing is planned to continue through December 2015, at which point the amended permit will expire and the wells will be abandoned and monitoring discontinued. However, the approved STP Closure Plan stated that quarterly groundwater monitoring will be conducted for five years following final grading of the treatment plant site to ensure sludge is not causing an adverse impact on groundwater. The plant was demolished and the lagoons were filled in fall 2012. The monitoring therefore needs to continue through the end of 2017.
Lockwood Chase STP Closure NPDES Permit N.O.T.
- We are coordinating with the Township to perform a site visit to the former LCSTP site to evaluate the consistency of as-built conditions with the permit plans, so that the
Page 2 of 3
P:\Projects\EGMA\Memos to Board\2015\Memo to EGMA Board 2015-02-06.docx
EGMA 1501
NPDES Permit Notice of Termination paperwork can be finalized and submitted to the Chester County Conservation District.
Hershey’s Mill PS and Marydell PS Diversions
- The 2-year Maintenance Bonds on the Hershey’s Mill PS and Marydell PS Diversions expire on July and August respectively. We recommend warranty inspections be performed by May.
Hershey’s Mill PS Muffin Monster
- We notified PADEP that the comminutor has been installed in the pump station for their field evaluation as required by the permit.
Page 3 of 3
P:\Projects\EGMA\Memos to Board\2015\Memo to EGMA Board 2015-02-06.docx
Big Fish Environmental Services Inc.
Monthly Operations Report: January 2015
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit. There was no discharge to Applebrook, which is identified as outfall 002. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of the sludge dewatering equipment. The variable speed drives for influent pump numbers 2 and 3 failed during the month and were replaced by Lenni Electric. The facility was functioning intended at the close of the month.
Treatment Process Operation
During December 2014, there were no exceedances of the final effluent discharge limitations for outfall 001. The total phosphorus monthly average concentration of 0.15 mg/L as compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the December 2014 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.10 mg/L to 0.24 mg/L. The aluminum sulfate daily average remained consistent during December at 74.0 gpd.
Table 1
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus, Total , mg/L |
Fecal Coliform | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean |
Geo Mean |
|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum |
40 | 42 | |||||||||
| Sample Date | |||||||||||
| December 2, 2014 | 0.299 | 2.0 | 5.0 | 4 | 10 | 0.182 | 0.45 | 0.12 | 0.30 | 1 | 0.0000 |
| December 9, 2014 | 0.311 | 3.9 | 10.1 | 3 | 8 | 0.114 | 0.30 | 0.14 | 0.36 | 1 | 0.0000 |
| December 16, 2014 | 0.342 | 2.7 | 7.7 | 4 | 11 | 0.345 | 0.98 | 0.15 | 0.43 | 1 | 0.0000 |
| December 23, 2014 | 0.319 | 2.4 | 6.4 | 4 | 11 | 0.10 | 0.27 | 0.24 | 0.64 | 1 | 0.0000 |
| December 30, 2014 | 0.396 | 2.0 | 6.6 | 5 | 17 | 0.19 | 0.62 | 0.10 | 0.33 | 1 | 0.0000 |
| Average | 0.333 | 2.6 | 7.2 | 4 | 11 | 0.186 | 0.52 | 0.15 | 0.41 | 1 | 0.0000 |
| Minimum | 0.299 | 2.0 | 5.0 | 3 | 8 | 0.100 | 0.27 | 0.10 | 0.30 | 1 | 0.0000 |
| Maximum | 0.396 | 3.9 | 10.1 | 5 | 17 | 0.345 | 0.98 | 0.24 | 0.64 | 1 | 0.0000 |
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 1 of 9
Big Fish Environmental Services Inc.
There was no discharge from Outfall 002 to Applebrook during December 2014.
Table 2
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus, Total, mg/L |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| December 2, 2014 | 0.404 | 258 | 869 | 186 | 626 | 31.8 | 107 | 51.5 | 173 | 5.3 | 18 |
| December 9, 2014 | 0.371 | 295 | 993 | 190 | 640 | 27.9 | 94 | 39.1 | 132 | 4.1 | 14 |
| December 16, 2014 | 0.423 | 136 | 458 | 74 | 249 | 33.7 | 113 | 41.9 | 141 | 4.1 | 14 |
| December 23, 2014 | 0.410 | 242 | 815 | 173 | 583 | 35.2 | 119 | 40.2 | 135 | 4.7 | 16 |
| December 30, 2014 | 0.436 | 207 | 697 | 359 | 1,209 | 40.7 | 137 | 55.2 | 186 | 5.5 | 19 |
| Average | 0.409 | 228 | 784 | 196 | 525 | 33.9 | 108 | 45.6 | 145 | 4.7 | 15 |
| Minimum | 0.371 | 136 | 458 | 74 | 249 | 27.9 | 94 | 39.1 | 132 | 4.1 | 14 |
| Maximum | 0.436 | 295 | 993 | 359 | 640 | 40.7 | 119 | 55.2 | 173 | 5.5 | 18 |
Table 2 illustrates the influent wastewater pollutant loadings for December 2014. The influent loadings remained within the treatment facility design loadings.
Table 3 presents the available Outfall 001 final effluent data for the month of January 2015. There are no anticipated exceedances of the permitted limitations for the month. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 2 of 9
Big Fish
Environmental Services Inc.
| Table 3 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| January 2015 - Final Effluent - Out Fall 001 | |||||||||||
| NPDES Permit Discharge Limitations |
Flow | CBOD5 | TSS | NH4-N | Phosphorus,Total , mg/L |
Fecal Coliform | |||||
| MGD Average | mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
mg/L | lbs/ month |
Geo Mean |
Geo Mean |
|
| 0.75 | 20 | 125 | 21 | 131 | 7 | 44 | 0.5 | 3 | 200 | 1,000 | |
| Instantaneous Maximum |
40 | 42 | |||||||||
| Sample Date | |||||||||||
| January 6, 2015 | 0.404 | 3.6 | 12.1 | 5 | 17 | 0.731 | 2.46 | 0.21 | 0.71 | 1 | 0.0000 |
| January 13, 2015 | 0.358 | 2.6 | 7.8 | 4 | 12 | 0.906 | 2.71 | 0.27 | 0.81 | 1 | 0.0000 |
| January 20, 2015 | 0.919 | 2.2 | 16.9 | 6 | 46 | 0.113 | 0.87 | 0.10 | 0.77 | 2 | 0.3010 |
| January 28, 2015 | 0.372 | 2.00 | 6.2 | 0.37 | 1.15 | 0.23 | 0.71 | 1 | 0.0000 | ||
| Average | 0.513 | 2.6 | 10.7 | 5 | 25 | 0.531 | 1.80 | 0.20 | 0.75 | 1 | 0.0753 |
| Minimum | 0.358 | 2.0 | 6.2 | 4 | 12 | 0.113 | 0.87 | 0.10 | 0.71 | 1 | 0.0000 |
| Maximum | 0.919 | 3.6 | 16.9 | 6 | 46 | 0.906 | 2.71 | 0.27 | 0.81 | 2 | 0.3010 |
During January 2015, there was no discharge of treated effluent to Applebrook. The pump has been placed in the off mode during the winter months.
The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.
Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during January 2015.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 3 of 9
Big Fish
Environmental Services Inc.
| Table 4 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| January 2015 - Influent Wastewater | |||||||||||
| Design Basis | Flow | BOD5 | TSS | NH4-N | TKN, mg/L | Phosphorus,Total, mg/L |
|||||
| mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | mg/L | lbs/day | ||
| MGD Average | 335 | 2,098 | 320 | 2,001 | 32 | 200 | 48 | 301 | 9.1 | 57 | |
| Sample Date | |||||||||||
| January 6, 2015 | 0.446 | 162 | 603 | 71 | 264 | 32.6 | 121 | 44.0 | 164 | 4.6 | 17 |
| January 13, 2015 | 0.398 | 188 | 699 | 149 | 554 | 27.1 | 101 | 40.2 | 150 | 4.7 | 17 |
| January 20, 2015 | 0.452 | 153 | 569 | 65 | 242 | 32.8 | 122 | 36.3 | 135 | 4.3 | 16 |
| January 28, 2015 | 0.436 | 111.0 | 413 | 82.0 | 305 | 34.2 | 127 | 42.1 | 157 | 4.7 | 17 |
| Average | 0.433 | 154 | 571 | 92 | 341 | 31.7 | 118 | 40.7 | 151 | 4.6 | 17 |
| Minimum | 0.398 | 111 | 413 | 65 | 242 | 27.1 | 101 | 36.3 | 135 | 4.3 | 16 |
| Maximum | 0.452 | 188 | 699 | 149 | 554 | 34.2 | 127 | 44.0 | 164 | 4.7 | 17 |
Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during December and January.
Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations increased slightly during November and December. The average coverage of the surface area was estimated at 50%. Increased sludge wasting rates were maintained to manage the MLSS concentrations and F:M ratio within the desired goals. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.
Addition of aluminum sulfate solution to the SBRs to assist with phosphorus removal continued. The volume of aluminum sulfate solution to the SBRs remained consistent at a daily average of 74.0 gpd during January and December. During January, the soda ash daily addition average remained consistent at 435 lbs. per day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 4 of 9
Big Fish
Environmental Services Inc.
SBR No. 2 remains out of service as a treatment unit. Minor repairs will be scheduled as weather conditions permit.
Solids Dewatering and Disposal: January 2015
| Sludge Dewatering Summary | |
|---|---|
| Gallons of sludge dewatered | 240,518 |
| Average Dewatered Total Solids, % | NA |
| Wet Tons | NA |
| Dry Tons | NA |
| Number of dumpsters | 4 |
*Sixteen (16) days of centrifuge operation
Flow data:
| Flow Meter Location | January 2015 | Daily Maximum Flow, gpd |
|
|---|---|---|---|
| Total Volume for Month, MG |
Average Daily Flow, gpd |
||
| Influent Wastewater to Screening Building* | 13.877 | 447,642 | 780,300 |
| Influent Wastewater to SBRs | 13.907 | 448,625 | 633,856 |
| Internal Recycle | 0.399 | 12,894 | 54,008 |
| Treated Effluent to Disc Filters | 13.344 | 430,439 | 685,216 |
| Final Effluent Discharge | 12.520 | 403,871 | 919,000 |
| Applebrook Golf Course | 0 | 0 | 0 |
*The final effluent daily maximum flow of 919,000 is attributed to the result of an erroneous level meter reading. The transducer and v-notch weir were cleaned and the subsequent flow measurements recorded were within the anticipated range.
Chemical Usage:
| Chemical | January 2015 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Soda Ash | 437 | 13,150 |
| Aluminum Sulfate solution | 73.3 | 2,273 |
| Polymer (centrifuge) | 0.84 | 13.44 |
*Sixteen (16) days of centrifuge operation
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 5 of 9
Big Fish
Environmental Services Inc.
During January, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.
Sludge holding tank No. 1 was in service. The level at the beginning of January was 13.82 feet and the level at the end of the month was 9.76 feet. The initial total solids concentration was 0.59% decreasing to 1.34% at the end of the month. The average pH concentration was 7.96 S.U. 57,600 gallons of supernatant were decanted during the month. A total of 200 pounds of soda ash were added.
Sludge holding tank No. 2 was in service. The level at the beginning of the month was 7.52 feet and the level at the end was 8.82. The initial total solids concentration was 0.85% total solids increasing to 0.84% at the end of the month. The average pH concentration was 7.52 S.U. and 300 pounds of soda ash was added. Zero gallons of supernatant were decanted.
Significant Storm/Hydraulic Loading Events
During January, there were three storm events resulting in daily precipitation amounts greater than 0.5 inches measured during a 24 hour period. A total of 3.43 inches of rainfall and 4.0 inches of snow were measured at the facility during January. Daily maximum amounts were 1.01 and 1.00 inches, measured on January 3rd and 18th, respectively. On January 17th through the 18th, a total of 1.39 inches were measured. The influent flows increased from 414,470 gpd to 780,300 gpd.
Figure 1 illustrates a flow rate range of 108% to 118% of the SBR design hydraulic loading for a sustained period of 15 hours. The elevated flow rates resulted in filled settle decants for several continuous hours.
Figure 2 illustrates a maximum flow rate of 217% of the SBR design hydraulic loading for a period of approximately 2-1/2 hours occurring on January 18th.
Figure 3 illustrates a sustained low rate of 92% of the SBR design hydraulic loading for a period of approximately 11 hours.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 6 of 9
Big Fish
Environmental Services Inc.
Figure 1 - January 12th SBR Influent Flow
[Screenshot of Ridley Creek WWTF SCADA software interface (Node Name: EGT_STP_CTRL, dated January 17, 2015) showing a trend chart from Jan 12 00:00:56 to Jan 13 20:00:56 for SBR1, SBR2, and SBR3 dissolved oxygen, step numbers, and calculated influent flow.]
Ridley Creek WWTF
January 17, 2015
Node Name: EGT_STP_CTRL
Operator: None | Level: 0
Log On | Log Off
Legend | SBR Overview | SBR Setpoints | Chem Pumps Setpoints | Alarms & Events | Alarm Database | Trend Chart | Data Extraction | ETMs Flow Totals
Jan 12 00:00:56 | Jan 12 11:00:56 | Jan 12 22:00:56 | Jan 13 09:00:56 | Jan 13 20:00:56
08:30:27 | 23:50:29
Waste Sludge | Filled Decant | Decant | Filled Settle | Settle | Vacflush | React | React Outfill | Filled Aerat. | Aerated Fill | Mixed Fill | Static Fill | Aerated Idle | Idle | Off | Failed Off
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 7 of 9
Big Fish
Environmental Services Inc.
Figure 2 - January 18th Peak Flow to SBRs
[Screenshot of Ridley Creek WWTF SCADA software interface (Node Name: EGT_STP_CTRL, dated January 25, 2015) showing a trend chart from Jan 18 00:00:56 to Jan 19 20:00:56 for SBR1, SBR2, and SBR3 dissolved oxygen, step numbers, and calculated influent flow.]
Ridley Creek WWTF
January 25, 2015
Node Name: EGT_STP_CTRL
Operator: None | Level: 0
Log On | Log Off
Legend | SBR Overview | SBR Setpoints | Chem Pumps Setpoints | Alarms & Events | Alarm Database | Trend Chart | Data Extraction | ETMs Flow Totals
Jan 18 00:00:56 | Jan 18 11:00:56 | Jan 18 22:00:56 | Jan 19 09:00:56 | Jan 19 20:00:56
14:08:22 | 16:32:15
Waste Sludge | Filled Decant | Decant | Filled Settle | Settle | Vacflush | React | React Outfill | Filled Aerat. | Aerated Fill | Mixed Fill | Static Fill | Aerated Idle | Idle | Off | Failed Off
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 8 of 9
Big Fish
Environmental Services Inc.
Figure 3 - January 22nd and 23rd SBR Influent Flow
[Screenshot of Ridley Creek WWTF SCADA software interface (Node Name: EGT_STP_CTRL, dated January 25, 2015) showing a trend chart from Jan 22 00:00:56 to Jan 23 20:00:56 for SBR1, SBR2, and SBR3 dissolved oxygen, step numbers, and calculated influent flow.]
Ridley Creek WWTF
January 25, 2015
Node Name: EGT_STP_CTRL
Operator: None | Level: 0
Log On | Log Off
Legend | SBR Overview | SBR Setpoints | Chem Pumps Setpoints | Alarms & Events | Alarm Database | Trend Chart | Data Extraction | ETMs Flow Totals
Jan 22 00:00:56 | Jan 22 11:00:56 | Jan 22 22:00:56 | Jan 23 09:00:56 | Jan 23 20:00:56
00:00:56 | 19:50:22
Waste Sludge | Filled Decant | Decant | Filled Settle | Settle | Vacflush | React | React Outfill | Filled Aerat. | Aerated Fill | Mixed Fill | Static Fill | Aerated Idle | Idle | Off | Failed Off
Minor Repairs and Preventative Maintenance
Replaced inlet air filters for the sludge holding tank and post flow equalization basin blowers.
Replaced variable speed drives for influent pumps 2 and 3.
BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382
Page 9 of 9
2015 January 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| Precip Inches | DATE | WESTTOWN WAY | ELLIS LANE | PAOLI PIKE | WILSON DRIVE | SUMMIT | NET | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | GPD | FLOWS | ||
| 0.00 | 01/01/15 | ||||||||||
| 0.00 | 01/02/15 | ||||||||||
| 0.70 | 01/03/15 | ||||||||||
| 0.34 | 01/04/15 | ||||||||||
| 0.00 | 01/05/15 | 1,915,206 | 1,017,400 | 7,253,841 | 98,070 | 4,511,754 | 59,682 | 3,473,880 | 52,372 | 24,000 | 807,276 |
| 0.15 | 01/06/15 | 807,276 | |||||||||
| 0.00 | 01/07/15 | 1,917,300 | 1,047,000 | 7,271,733 | 89,460 | 4,523,957 | 61,015 | 3,488,944 | 75,320 | 24,000 | 821,205 |
| 0.00 | 01/08/15 | 1,918,272 | 972,000 | 7,279,685 | 79,520 | 4,529,638 | 56,810 | 3,495,970 | 70,260 | 24,000 | 765,410 |
| 0.00 | 01/09/15 | 1,919,294 | 1,022,000 | 7,287,880 | 81,950 | 4,535,430 | 57,920 | 3,503,964 | 79,940 | 24,000 | 802,190 |
| 0.00 | 01/10/15 | 802,190 | |||||||||
| 0.00 | 01/11/15 | 802,190 | |||||||||
| 0.72 | 01/12/15 | 1,922,225 | 977,000 | 7,312,768 | 82,960 | 4,553,010 | 58,600 | 3,522,357 | 61,310 | 24,000 | 774,130 |
| 0.00 | 01/13/15 | 1,923,368 | 1,143,000 | 7,324,972 | 122,040 | 4,559,960 | 69,500 | 3,529,859 | 75,020 | 24,000 | 876,440 |
| 0.00 | 01/14/15 | 1,924,394 | 1,026,000 | 7,333,869 | 88,970 | 4,566,061 | 61,010 | 3,536,763 | 69,040 | 24,000 | 806,980 |
| 0.00 | 01/15/15 | 1,925,408 | 1,014,000 | 7,343,097 | 92,280 | 4,571,963 | 59,020 | 3,543,206 | 64,430 | 24,000 | 798,270 |
| 0.00 | 01/16/15 | 1,926,367 | 959,000 | 7,351,724 | 86,270 | 4,577,526 | 55,630 | 3,549,439 | 62,330 | 24,000 | 754,770 |
| 0.00 | 01/17/15 | 754,770 | |||||||||
| 1.25 | 01/18/15 | 754,770 | |||||||||
| 0.00 | 01/19/15 | 754,770 | |||||||||
| 0.00 | 01/20/15 | 1,930,837 | 1,117,500 | 7,398,841 | 117,793 | 4,602,262 | 61,840 | 3,571,383 | 54,860 | 24,000 | 883,008 |
| 0.10 | 01/21/15 | 1,931,869 | 1,032,000 | 7,408,610 | 97,690 | 4,607,111 | 48,490 | 3,578,183 | 68,000 | 24,000 | 817,820 |
| 0.00 | 01/22/15 | 1,932,894 | 1,025,000 | 7,417,736 | 91,260 | 4,614,058 | 69,470 | 3,584,445 | 62,620 | 24,000 | 801,650 |
| 0.25 | 01/23/15 | 1,933,891 | 997,000 | 7,426,759 | 90,230 | 4,620,361 | 63,030 | 3,591,295 | 68,500 | 24,000 | 775,240 |
| 0.50 | 01/24/15 | 775,240 | |||||||||
| 0.00 | 01/25/15 | 775,240 | |||||||||
| 0.03 | 01/26/15 | 1,937,112 | 1,073,667 | 7,460,383 | 112,080 | 4,639,579 | 64,060 | 3,607,563 | 54,227 | 24,000 | 843,300 |
| 0.07 | 01/27/15 | 1,938,277 | 1,165,000 | 7,470,909 | 105,260 | 4,646,428 | 68,490 | 3,614,840 | 72,770 | 24,000 | 918,480 |
| 0.00 | 01/28/15 | 1,939,291 | 1,014,000 | 7,479,583 | 86,740 | 4,652,221 | 57,930 | 3,621,141 | 63,010 | 24,000 | 806,320 |
| 0.00 | 01/29/15 | 1,940,332 | 1,041,000 | 7,487,811 | 82,280 | 4,658,077 | 58,560 | 3,628,329 | 71,880 | 24,000 | 828,280 |
| 0.02 | 01/30/15 | 1,941,364 | 1,032,000 | 7,496,232 | 84,210 | 4,663,964 | 58,870 | 3,634,797 | 64,680 | 24,000 | 824,240 |
| 0.00 | 01/31/15 | ||||||||||
| Day Avg | 1,037,476 | 93,837 | 60,552 | 66,143 | 24,000 | 816,945 | |||||
| 4.13 | Day Tot | 18,674,567 | 1,689,063 | 1,089,927 | 1,190,569 | ||||||
| Day Count | 18 | 18 | 18 | 18 | |||||||
| EG TWP | |
|---|---|
| MONTH TO DATE | 4.13 |
| NORMAL MONTH TO DATE | |
| YEAR TO DATE | 4.13 |
| NORMAL YEAR TO DATE | |
2015 flowmeters -all-stations separate month worksheets.xls
2015 January 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION
| DATE | HERSHEY'S MILL | ASHBRIDGE | HICKS METER | RESERVOIR | BARKWAY | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| READING | GPD | READING | GPD | READING | GPD | READING | GPD | READING | GPD | |
| 1/1/2015 | ||||||||||
| 1/2/2015 | ||||||||||
| 1/3/2015 | ||||||||||
| 1/4/2015 | ||||||||||
| 1/5/2015 | 26,754,636 | 707,492 | 2,037,245 | 63,940 | 17,862,080 | 123,804 | 63,436,221 | 661,398 | 3,468,807 | 12,802 |
| 1/6/2015 | ||||||||||
| 1/7/2015 | 26,890,456 | 679,100 | 2,038,413 | 58,400 | 17,916,996 | 274,580 | 63,582,628 | 732,035 | 3,471,038 | 11,155 |
| 1/8/2015 | 26,954,102 | 636,460 | 2,038,948 | 53,500 | 17,941,984 | 249,880 | 63,649,428 | 668,000 | 3,472,073 | 10,350 |
| 1/9/2015 | 27,020,412 | 663,100 | 2,039,513 | 56,500 | 17,968,600 | 266,160 | 63,719,359 | 699,310 | 3,473,276 | 12,030 |
| 1/10/2015 | ||||||||||
| 1/11/2015 | ||||||||||
| 1/12/2015 | 27,229,278 | 696,220 | 2,041,313 | 60,000 | 18,039,104 | 235,013 | 63,912,019 | 642,200 | 3,476,683 | 11,357 |
| 1/13/2015 | 27,297,596 | 683,180 | 2,041,959 | 64,600 | 18,062,556 | 234,520 | 63,991,353 | 793,340 | 3,477,842 | 11,590 |
| 1/14/2015 | 27,360,396 | 628,000 | 2,042,577 | 61,800 | 18,088,514 | 259,580 | 64,061,235 | 698,820 | 3,478,899 | 10,570 |
| 1/15/2015 | 27,425,218 | 648,220 | 2,043,140 | 56,300 | 18,114,586 | 260,720 | 64,131,115 | 698,800 | 3,479,964 | 10,650 |
| 1/16/2015 | 27,487,104 | 618,860 | 2,043,686 | 54,600 | 18,138,754 | 241,680 | 64,196,279 | 651,640 | 3,480,948 | 9,840 |
| 1/17/2015 | ||||||||||
| 1/18/2015 | ||||||||||
| 1/19/2015 | ||||||||||
| 1/20/2015 | 27,776,812 | 724,270 | 2,046,657 | 74,275 | 18,236,698 | 244,860 | 64,490,711 | 736,080 | 3,485,893 | 12,363 |
| 1/21/2015 | 27,843,070 | 662,580 | 2,047,225 | 56,800 | 18,263,111 | 264,130 | 64,562,560 | 718,490 | 3,486,926 | 10,330 |
| 1/22/2015 | 27,909,638 | 665,680 | 2,047,802 | 57,700 | 18,290,092 | 269,810 | 64,632,660 | 701,000 | 3,488,037 | 11,110 |
| 1/23/2015 | 27,973,456 | 638,180 | 2,048,371 | 56,900 | 18,316,330 | 262,380 | 64,701,760 | 691,000 | 3,489,047 | 10,100 |
| 1/24/2015 | ||||||||||
| 1/25/2015 | ||||||||||
| 1/26/2015 | 28,186,508 | 710,173 | 2,050,300 | 64,300 | 18,387,554 | 237,413 | 64,917,081 | 717,737 | 3,492,783 | 12,453 |
| 1/27/2015 | ########## | 767,600 | 2,050,981 | 68,100 | 18,416,108 | 285,540 | 64,996,541 | 794,600 | 3,494,124 | 13,410 |
| 1/28/2015 | 28,331,568 | 683,000 | 2,051,559 | 57,800 | 18,440,244 | 241,360 | 65,064,927 | 683,860 | 3,495,252 | 11,280 |
| 1/29/2015 | 28,398,334 | 667,660 | 2,052,119 | 56,000 | 18,469,046 | 288,020 | 65,137,347 | 724,200 | 3,496,322 | 10,700 |
| 1/30/2015 | 28,464,632 | 662,980 | 2,052,732 | 61,300 | 18,497,200 | 281,540 | 65,207,965 | 706,180 | 3,497,348 | 10,260 |
| 1/31/2015 | ||||||||||
| 674,598 | 60,156 | 251,166 | 706,594 | 11,242 | ||||||
| 12,142,755 | 1,082,815 | 4,520,991 | 12,718,690 | 202,350 | ||||||
| 18 | 18 | 18 | 18 | 18 | ||||||
2015 flowmeters -all-stations separate month worksheets.xls
January Precip. 4.13 - 2015
[Bar chart (oriented sideways) showing daily snow/rain precipitation in inches for days 1 through 32 of January 2015, with axis values from 0 to 1.4 inches.]
precip.
0 | 0.2 | 0.4 | 0.6 | 0.8 | 1 | 1.2 | 1.4
snow/rain
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
January
[Bar chart showing 2015 Monthly Precipitation from January to December, with a bar for January above 4]
2015 Monthly Precipitation
Legend: Series1
Y-axis values: 0, 0.5, 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5
X-axis labels: January, February, March, April, May, June, July, August, September, October, November, December
[Line chart showing Flowmeters January 2015 daily flow values from Day 5 to Day 30]
Flowmeters January 2015
Legend: January
Y-axis label: Flow's
Y-axis values: 0, 100000, 200000, 300000, 400000, 500000, 600000, 700000, 800000, 900000, 1000000
X-axis label: Day of the Month
X-axis values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
[Bar chart showing Monthly Totals 2015 Jan-Dec Flowmeters with daily bars clustered in January]
Monthly Totals 2015 Jan-Dec
Y-axis label: Flowmeters
Y-axis values: 0, 100000, 200000, 300000, 400000, 500000, 600000, 700000, 800000, 900000, 1000000
X-axis label: Month
X-axis labels: January, February, March, April, May, June, July, August, September, October, November, December
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
January 12, 2015
The East Goshen Township Municipal Authority held their regular public meeting on Monday, January 12, 2015 at 6:00 pm at the East Goshen Township building. Members in attendance were: Chairman Jack Yahraes, Kevin Cummings, and Dana Pizarro. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Scott Towler (Big Fish), Mike Ellis (Pennoni), Patrick McKenna (Attorney) and Jessica Wiesak (Attorney).
COMMON ACRONYMS:
| BFES – Big Fish Environmental Services BOS – Board of Supervisors CB – Conservancy Board DEP – Department of Environmental Protection EPA – Environmental protection Agency HC – Historical Commission I&I – Inflow & Infiltration LCSTP – Lockwood Chase Sewer Treatment Plant |
MA- Municipal Authority NPDES – National Pollutant Discharge Elimination System PC – Planning Commission PM – Prevention Maintenance PR – Park & Recreation Board RCSTP – Ridley Creek Sewer Treatment Plant SBR – Sequencing Batch Reactor SSO – Sanitary System Overflow WAS – Waste Activated Sludge |
|---|
Call to Order & Pledge of Allegiance
Jack called the meeting to order at 6:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Jack asked if anyone would be recording the meeting and there was no response.
Chairman’s Report/Other Members’ Reports
- Reorganization - The officers for 2015 assigned by rotation are: Kevin Cummings - Chairman Dana Pizarro – Vice Chairman Ed McAssey – Secretary Fran Beck – Treasurer Jack Yahraes – Asst. Secretary/Treasurer
- Kevin reported that he presented the goals and objectives for 2015 at the Annual ABC meeting on Saturday, January 10, 2015. After the meeting he went on the 2 hour bus tour of the Township. They saw where the major parcels are that can be developed and discussed possible uses.
- Kevin mentioned that in the latest MA magazine there is an article about underground cameras and storm water management.
Sewer Reports
- Director of Public Works Mark Miller reported for December 2014: Meters: Were read on a daily basis. The temporary meters were visited once a week. No problems to report. C.C. Collection: The pump stations were visited on a daily basis, no problems to report. We were notified of three lateral backups. We responded to all three and cleared the blockage. Once we cleared the blockage we televised the line to make sure there were no
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 1-12-15 draft.doc
1
tree roots in the line. We were asked to repair 5 lateral caps that were sheared off by lawn mowers. We raised the cleanout pipes and installed new caps.
R.C.Collection: The Hunt Country Pump Station was visited on a daily basis with no problems to report.
R.C. Plant: No problems to report.
Alarms: We responded to 19 alarms for the month of December.
PA One Calls: We received 43 PA One calls in December.
- Pennoni Engineer’s Report Mike Ellis gave the following report: Invoices: Invoices with summaries are provided under separate cover. Reservoir Rd Pump Station: The Act 537 Plan Update was approved by PADEP on January 7, 2015.; We are initiating work on the pump station concept design. We expect to have a draft concept design of the diversion, a sketch plan of the pump station site, and an outline of the controls concept completed by the Municipal Authority meeting on February 9. We would like to schedule a review meeting with all interested parties (Township staff, RCSTP operator, ect.) the following week.; Geotechnical investigative drilling at the proposed pump station site is scheduled for Thursday, January 15, weather permitting.; The existing conditions field survey work is expected to commence by mid-February Semi-Annual I&I Report – We analyzed December 2014 portable meter data, and we finalized and submitted the semi-annual I&I report that had been originally drafted in October 2014. The full report was not completed in October due to numerous metering issues that needed to be resolved. Chapter 94 Reports – We will initiate work on the 2014 Chapter 94 Reports the week of January 12.
Mike reviewed the Semi-Annual Sewer System Status Report #12 and provided a map of East Goshen Township showing the location of the portable meters.
- Big Fish Environmental Services – Scott reported that the plant was in compliance for November & December. The total Phosphorous is less the .5. They had to reprogram an allen pump. They average 3 million gallons per month of sludge. In the winter they use more sodash. He is getting pricing for decanter tubes for the SBR2. There were no minor repairs or preventative maintenance needed.
Approval of Minutes
Dana moved to accept the minutes of December 8, 2014. Jack seconded the motion. The motion passed unanimously.
Approval of Invoices
- Dana moved to approve payment of the following Pennoni invoices: a. Pennoni #618400 $ 137.50 b. Pennoni #618401 $ 612.50 Jack seconded the motion. The motion passed unanimously.
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 1-12-15 draft.doc
2
- Jack moved to approve payment of the Gawthrop Invoice #126447 for $400.00. Dana seconded the motion. The motion passed unanimously.
Liaison Reports
Board of Supervisors – Carmen reported that the first meeting of the new Comprehensive Plan Task Force is at 7:00 tonight. Next Tuesday the BOS will interview candidates for the ABCs.
Financial Reports
Jon Altshul provided the following report:
In December, the Municipal Authority recorded $21,734 in revenues, primarily from Goshen Meadows tapping fees, and $35,678 in expenses including $8,043 for administrative overhead and $27,235 for the Municipal Authority’s 28% share of the debt service on the 1998 note. For the year, the MA recorded $148,775 in revenues and $157,869 in expenses. The fund balance was $1,589,177 as of 12/31/14. Of this amount, $1,521,706 is in the capital account, primarily from the proceeds of the 2013 note.
Goals
Jack will do an article for the Township newsletter.
Adjournment
There being no further business, Jack moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 6:35 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 1-12-15 draft.doc
3
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623589
Invoice Date : 01/29/2015
Project : EGMA1504
Project Name : Reservoir Rd PS Design & Permitting
For Services Rendered through: 1/18/2015
Initiated evaluation of concept design alternatives for the diversion vault and valving and pump station controls; prepared first draft of conceptual site plan taking into account site constraints including riparian buffer, floodway, clear sight triangle, and Zoning setbacks, amongst other criteria; subcontracted with geotechnical drilling firm and coordinated scheduling with Township staff; on-site observation, documentation, and visual soils analysis of two borings; summarized results to Township via email; and initiated preparation of boring logs. Invoice includes subcontractor's fee to perform the borings.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice | |
|---|---|---|---|---|---|---|
| 01 -- Concept Design | est. | $13,700.00 | $0.00 | $2,267.50 | $2,267.50 | |
| 02 -- PADEP WQM Permit Pre-Application Mt | est. | $1,400.00 | $0.00 | $0.00 | $0.00 | |
| 03 -- Existing Conditions Survey | $23,300.00 | $0.00 | 0.00% | $0.00 | $0.00 | |
| 04 -- Sewer Stakeout in Easement Areas | est. | $3,600.00 | $0.00 | $0.00 | $0.00 | |
| 05 -- 1636 Bow Tree Dr Bndry Survey & Eas | $4,020.00 | $0.00 | 0.00% | $0.00 | $0.00 | |
| 06 -- Add'l Boundary Survey & Easement | est. | $9,000.00 | $0.00 | $0.00 | $0.00 | |
| 07 -- Geotechnical Borings | $4,000.00 | $0.00 | 75.82% | $3,032.80 | $3,032.80 | |
| 08 -- Install Permanent Survey Benchmarks | est. | $4,000.00 | $0.00 | $0.00 | $0.00 | |
| Total : | $63,020.00 | $0.00 | $5,300.30 | $5,300.30 |
Amount Due This Invoice: $5,300.30
ok RS - 26-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1504 Invoice Summary
Invoice Date 01/29/2015
| Project: | EGMA1504 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Design & Permitting | ||
| Invoice No: | 623589 | ||
| Invoice Period: | NTP | to | 1/18/2015 |
| Initial Authorization: | $ 63,020.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 63,020.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 5,300.30 | ||
| Invoiced to Date ($): | $ 5,300.30 | ||
| Invoiced to Date (%): | 8% | ||
| Remaining Budget ($): | $ 57,719.70 | ||
| Remaining Budget (%): | 92% |
Budget by Phase:
| Phase Name: | 2015 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 63,020.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 5,300.30 |
| Invoiced to Date ($): | $ 5,300.30 |
| Invoiced to Date (%): | 8% |
| Remaining Budget ($): | $ 57,719.70 |
| Remaining Budget (%): | 92% |
Comments: Initiated evaluation of concept design alternatives for the diversion vault and valving and pump station controls; prepared first draft of conceptual site plan taking into account site constraints including riparian buffer, floodway, clear sight triangle, and Zoning setbacks, amongst other criteria; subcontracted with geotechnical drillling firm and coordinated scheduling with Township staff; on-site observation of two borings; summarized results to Township via email; and initiated preparation of boring logs. Invoice includes subcontractor's fee to perform the borings.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623591
Invoice Date : 01/29/2015
Project : EGMA1307
Project Name : Reservoir Rd PS Act 537 Planning
For Services Rendered through: 1/18/2015
FINAL INVOICE
Coordination with PADEP for final Act 537 Plan review status, reviewed PADEP approval letter and forwarded to Township.
Phase : 03 -- Act 537 Plan Update
| Total Phase : 03 -- Act 537 Plan Update | Labor : | 82.50 |
|---|---|---|
| Expense : | 0.00 | |
| Phase Total : | 82.50 |
Amount Due This Invoice: $82.50
Phase : 03 -- Act 537 Plan Update
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.75 | 110.00 | 82.50 |
| Labor Total: | 0.75 | 82.50 |
| Total Phase : 03 -- Act 537 Plan Update | Labor : | $82.50 |
|---|---|---|
| Expense : | $0.00 | |
| Total Project : EGMA1307 -- Reservoir Rd PS Act 537 Planning | Labor : | $82.50 |
| Expense : | $0.00 |
ok RS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1307 Invoice Summary
Invoice Date 1/29/2015
| Project: | EGMA1307 | ||
|---|---|---|---|
| Pennoni Job No.: | Reservoir Rd PS Act 537 Planning | ||
| Invoice No: | 623591 | ||
| Invoice Period: | 12/8/2015 | to | 1/18/2015 |
| Initial Authorization: | $ 77,400.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 87,900.00 | ||
| Previously Invoiced: | $ 73,954.75 | ||
| Current Invoice: | $ 82.50 | ||
| Invoiced to Date ($): | $ 74,037.25 | ||
| Invoiced to Date (%): | 84% | ||
| Remaining Budget ($): | $ 13,862.75 | ||
| Remaining Budget (%): | 16% |
Budget by Phase:
| Phase Name: | Reservoir Rd PS Act 537 Planning |
|---|---|
| Phase Budget: | $ 87,900.00 |
| Previously Invoiced: | $ 73,954.75 |
| Current Invoice: | $ 82.50 |
| Invoiced to Date ($): | $ 74,037.25 |
| Invoiced to Date (%): | 84% |
| Remaining Budget ($): | $ 13,862.75 |
| Remaining Budget (%): | 16% |
Comments: FINAL INVOICE
Coordination with PADEP for final Act 537 Plan review status, reviewed PADEP approval letter and forwarded to Township.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623592
Invoice Date : 01/29/2015
Project : EGMA1401
Project Name : 2014 General Services
For Services Rendered through: 1/18/2015
FINAL INVOICE
Preparation for December's MA meeting including discussing outcome of RCSTP SBR #2 inspection w/ M. McAloon, reviewing USFWS' bog turtle approval conditions for Reservoir Rd PS, and reviewing RCSTP operator's November report; attended December's MA meeting; and assembled 610 Reservoir Rd grinder pump plans and email to PW Director as requested.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 565.00 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 565.00 |
| Fee : | 10,312.75 |
|---|---|
| Prior Billings : | 9,747.75 |
| Current Billings : | 565.00 |
| Total Billings : | 10,312.75 |
Amount Due This Invoice $565.00
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.00 | 113.00 | 565.00 |
| Labor Total: | 5.00 | 565.00 |
Total Phase : **** -- Professional Services
| Labor : | $565.00 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1401 -- 2014 General Services
| Labor : | $565.00 |
|---|---|
| Expense : | $0.00 |
ok LFS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1401 Invoice Summary
Invoice Date 1/29/2015
| Project: | EGMA1401 | ||
|---|---|---|---|
| Pennoni Job No.: | 2014 General Services | ||
| Invoice No: | 623592 | ||
| Invoice Period: | 12/8/2014 | to | 1/18/2015 |
| Initial Authorization: | $ 10,300.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 10,300.00 | ||
| Previously Invoiced: | $ 9,747.75 | ||
| Current Invoice: | $ 565.00 | ||
| Invoiced to Date ($): | $ 10,312.75 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ (12.75) | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | 2014 General Services |
|---|---|
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 9,747.75 |
| Current Invoice: | $ 565.00 |
| Invoiced to Date ($): | $ 10,312.75 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ (12.75) |
| Remaining Budget (%): | 0% |
Comments: FINAL INVOICE
Preparation for December's MA meeting including discussing outcome of RCSTP SBR #2 inspection w/ M. McAloon, reviewing USFWS' bog turtle approval conditions for Reservoir Rd PS, and reviewing RCSTP operator's November report; attended December's MA meeting; and assembled 610 Reservoir Rd grinder pump plans and email to PW Director as requested.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623593
Invoice Date : 01/29/2015
Project : EGMA1402
Project Name : 2014 Semi-Annual I&I Reports
For Services Rendered through: 1/18/2015
FINAL INVOICE
Analyzed October-December 2014 portable meter data; prepared Semi-Annual Sewer System Status Report #12. Analysis and report preparation was completed in Project EGMA1502.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 464.00 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 464.00 |
| Fee : | 10,326.75 |
|---|---|
| Prior Billings : | 9,862.75 |
| Current Billings : | 464.00 |
| Total Billings : | 10,326.75 |
Amount Due This Invoice $464.00
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.25 | 113.00 | 28.25 |
| Associate Engineer | 5.25 | 83.00 | 435.75 |
| Labor Total: | 5.50 | 464.00 |
Total Phase : **** -- Professional Services
| Labor : | $464.00 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1402 -- 2014 Semi-Annual I&I Reports
| Labor : | $464.00 |
|---|---|
| Expense : | $0.00 |
ok LFS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1402 Invoice Summary
Invoice Date 1/29/2015
| Project: | EGMA1402 | ||
|---|---|---|---|
| Pennoni Job No.: | 2014 Semi-Annual I&I Reports | ||
| Invoice No: | 623593 | ||
| Invoice Period: | 11/10/2014 | to | 1/18/2015 |
| Initial Authorization: | $ 10,300.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 10,300.00 | ||
| Previously Invoiced: | $ 9,862.75 | ||
| Current Invoice: | $ 464.00 | ||
| Invoiced to Date ($): | $ 10,326.75 | ||
| Invoiced to Date (%): | 100% | ||
| Remaining Budget ($): | $ (26.75) | ||
| Remaining Budget (%): | 0% |
Budget by Phase:
| Phase Name: | 2014 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 10,300.00 |
| Previously Invoiced: | $ 9,862.75 |
| Current Invoice: | $ 464.00 |
| Invoiced to Date ($): | $ 10,326.75 |
| Invoiced to Date (%): | 100% |
| Remaining Budget ($): | $ (26.75) |
| Remaining Budget (%): | 0% |
Comments: FINAL INVOICE
Analyzed October-December 2014 portable meter data; prepared Semi-Annual Sewer System Status Report #12. Analysis and report preparation was completed in Project EGMA1502.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623594
Invoice Date : 01/29/2015
Project : EGMA1501
Project Name : 2015 General Services
For Services Rendered through: 1/18/2015
Prepared January's MA report, reviewed meeting packet, reviewed RCSTP operator's monthly report, attended MA meeting, and followed-up to meeting with staff regarding RCSTP SBR repairs status and Hershey's Mill PS and Marydell PS Diversions 2-yr warranty inspections schedule.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 661.25 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 661.25 |
| Fee : | 12,000.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 661.25 |
| Total Billings : | 661.25 |
Amount Due This Invoice $661.25
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.75 | 115.00 | 661.25 |
| Labor Total: | 5.75 | 661.25 |
Total Phase : **** -- Professional Services
| Labor : | $661.25 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1501 -- 2015 General Services
| Labor : | $661.25 |
|---|---|
| Expense : | $0.00 |
ok LFS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1501 Invoice Summary
Invoice Date 01/29/2015
| Project: | EGMA1501 | ||
|---|---|---|---|
| Pennoni Job No.: | 2015 General Services | ||
| Invoice No: | 623594 | ||
| Invoice Period: | NTP | to | 1/18/2015 |
| Initial Authorization: | $ 12,000.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 12,000.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 661.25 | ||
| Invoiced to Date ($): | $ 661.25 | ||
| Invoiced to Date (%): | 6% | ||
| Remaining Budget ($): | $ 11,338.75 | ||
| Remaining Budget (%): | 94% |
Budget by Phase:
| Phase Name: | 2015 General Services |
|---|---|
| Phase Budget: | $ 12,000.00 |
| Previously Invoiced: | $ 14,400.00 |
| Current Invoice: | $ - |
| Invoiced to Date ($): | $ 881.50 |
| Invoiced to Date (%): | 7% |
| Remaining Budget ($): | $ 11,118.50 |
| Remaining Budget (%): | 93% |
Comments: Prepared January's MA report, reviewed meeting packet, reviewed RCSTP operator's monthly report, attended MA meeting, and followed-up to meeting with staff regarding RCSTP SBR repairs status and Hershey's Mill PS and Marydell PS Diversions 2-yr warranty inspections schedule.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623595
Invoice Date : 01/29/2015
Project : EGMA1502
Project Name : 2015 Semi-Annual I&I Reports
For Services Rendered through: 1/18/2015
Completed analysis of October-December 2014 portable meter data; edited, finalized, and submitted Semi-Annual Sewer System Status Report #12 (draft report had been prepared in September 2014); prepared I&I maps and verbal summary for January's MA meeting; and researched frozen ground impact on I&I as requested by MA.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 2,053.75 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 2,053.75 |
| Fee : | 10,500.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 2,053.75 |
| Total Billings : | 2,053.75 |
Amount Due This Invoice $2,053.75
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Authority Engineer | 4.00 | 115.00 | 460.00 |
| Associate Engineer | 18.75 | 85.00 | 1,593.75 |
| Labor Total: | 22.75 | 2,053.75 |
Total Phase : **** -- Professional Services
| Labor : | $2,053.75 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1502 -- 2015 Semi-Annual I&I Reports
| Labor : | $2,053.75 |
|---|---|
| Expense : | $0.00 |
ok LFS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1502 Invoice Summary
Invoice Date 01/29/2015
| Project: | EGMA1502 | ||
|---|---|---|---|
| Pennoni Job No.: | 2015 Semi-Annual I&I Reports | ||
| Invoice No: | 623595 | ||
| Invoice Period: | NTP | to | 1/18/2015 |
| Initial Authorization: | $ 10,500.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 10,500.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 2,053.75 | ||
| Invoiced to Date ($): | $ 2,053.75 | ||
| Invoiced to Date (%): | 20% | ||
| Remaining Budget ($): | $ 8,446.25 | ||
| Remaining Budget (%): | 80% |
Budget by Phase:
| Phase Name: | 2015 Semi-Annual I&I Reports |
|---|---|
| Phase Budget: | $ 10,500.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 2,053.75 |
| Invoiced to Date ($): | $ 2,053.75 |
| Invoiced to Date (%): | 20% |
| Remaining Budget ($): | $ 8,446.25 |
| Remaining Budget (%): | 80% |
Comments: Completed analysis of October-December 2014 portable meter data; edited, finalized, and submitted Semi-Annual Sewer System Status Report #12 (completed draft report that was prepared in September 2014; prepared I&I maps and verbal summary for January's MA meeting; and researched frozen ground impact on I&I.
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
INVOICE
Newark, DE
302-655-4451 Fax: 302-654-2895
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Attention: Louis F. Smith, Twp Mgr.
Invoice # : 623596
Invoice Date : 01/29/2015
Project : EGMA1503
Project Name : 2014 Chapter 94 Reports
For Services Rendered through: 1/18/2015
Initiated preparation of RCSTP Chapter 94 Report.
Phase : **** -- Professional Services
Total Phase : **** -- Professional Services
| Labor : | 1,827.50 |
|---|---|
| Expense : | 0.00 |
| Phase Total : | 1,827.50 |
| Fee : | 14,800.00 |
|---|---|
| Prior Billings : | 0.00 |
| Current Billings : | 1,827.50 |
| Total Billings : | 1,827.50 |
Amount Due This Invoice $1,827.50
Phase : **** -- Professional Services
Labor
| Class | Hours/ Units |
Rate | Amount |
|---|---|---|---|
| Associate Engineer | 21.50 | 85.00 | 1,827.50 |
| Labor Total: | 21.50 | 1,827.50 |
Total Phase : **** -- Professional Services
| Labor : | $1,827.50 |
|---|---|
| Expense : | $0.00 |
Total Project : EGMA1503 -- 2014 Chapter 94 Reports
| Labor : | $1,827.50 |
|---|---|
| Expense : | $0.00 |
ok LFS 2-6-15
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
East Goshen Municipal Authority
EGMA1503 Invoice Summary
Invoice Date 01/29/2015
| Project: | EGMA1503 | ||
|---|---|---|---|
| Pennoni Job No.: | 2015 Chapter 94 Reports | ||
| Invoice No: | 623596 | ||
| Invoice Period: | NTP | to | 1/18/2015 |
| Initial Authorization: | $ 14,800.00 | Date: | 1/29/2015 |
| Contract Amount: | $ 10,500.00 | ||
| Previously Invoiced: | $ - | ||
| Current Invoice: | $ 1,827.50 | ||
| Invoiced to Date ($): | $ 1,827.50 | ||
| Invoiced to Date (%): | 17% | ||
| Remaining Budget ($): | $ 8,672.50 | ||
| Remaining Budget (%): | 83% |
Budget by Phase:
| Phase Name: | 2015 Chapter 94 Reports |
|---|---|
| Phase Budget: | $ 10,500.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,827.50 |
| Invoiced to Date ($): | $ 1,827.50 |
| Invoiced to Date (%): | 17% |
| Remaining Budget ($): | $ 8,672.50 |
| Remaining Budget (%): | 83% |
Comments: Initiated preparation of RCSTP Chapter 94 Report.
Memo
To: Municipal Authority
From: Jon Altshul
Re: MA January Financial Reports
Date: February 4, 2015
In January, the Municipal Authority recorded $556.41 in revenues and $3,702 in expenses, for a variance of -$3,145. As of January 31, the fund balance was $1,586,031, of which $1,520,845 is in the construction account.
A complete list of all year-to-date expenses and revenues is provided.
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2015
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| MUNICIPAL AUTHORITY BEGINNING FUND BALANCE | 1,589,176.52 | |||
| RCSTP BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNED - RCSTP EXPANSION | 07341 1020 | 1,600.00 | 131.97 | 131.97 |
| GRANT REVENUE | 07392 0800 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 1,600.00 | 131.97 | 131.97 | |
| EXPENSES | ||||
| R.C.-CAP. PROJ.-ENGINEER | 07424 7451 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION GEN'L CONTRACTOR | 07424 7452 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXPANSION - ELECTRICAL | 07424 7453 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY CAPITAL | 07424 7454 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP CONTINGENCY ONGOING | 07424 7455 | 0.00 | 0.00 | 0.00 |
| R.C. CAP EXP ADDITIONAL CONTINGENCY | 07424 7456 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO SEWER SINKING FUND | 07492 0550 | 0.00 | 0.00 | 0.00 |
| TRANSFER TO AUTHORITY CAP FUND | 07492 0990 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 0.00 | 0.00 | 0.00 | |
| RCSTP NET RESULT | 1,600.00 | 131.97 | 131.97 | |
U:\bmccool\2015\Municipal Authority\2015 - 01 - Municipal Authority Report.xlsx Page 1 of 3 02/04/2015
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2015
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| OPERATING BUDGET | ||||
| REVENUE | ||||
| INTEREST EARNINGS | 07341 1000 | 15.00 | 1.44 | 1.44 |
| C.C. TAPPING FEES | 07364 1100 | 0.00 | 0.00 | 0.00 |
| R.C.TAPPING FEES | 07364 1110 | 14,296.00 | 0.00 | 0.00 |
| CONNECTION FEES - SEWER | 07364 1130 | 0.00 | 281.88 | 281.88 |
| MISCELLANEOUS REVENUE | 07380 1000 | 0.00 | 141.12 | 141.12 |
| TRANSFER FROM SEWER OPERATING | 07392 0500 | 105,105.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 119,416.00 | 424.44 | 424.44 | |
| EXPENSES | ||||
| ADMINISTRATIVE WAGES | 07424 1400 | 33,323.00 | 0.00 | 0.00 |
| MISCELLANEOUS EXPENSE | 07424 3000 | 3,000.00 | 1,450.00 | 1,450.00 |
| MUNIC.AUTH.-AUDITING | 07424 3110 | 10,984.00 | 0.00 | 0.00 |
| ENGINEERING SERVICES | 07424 3130 | 37,300.00 | 1,261.50 | 1,261.50 |
| LEGAL SERVICES | 07424 3140 | 9,000.00 | 0.00 | 0.00 |
| M.C.-DVRFA-DEBT SERVICE | 07471 1000 | 23,240.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1000 | 4,169.00 | 0.00 | 0.00 |
| M.C.-DVRFA-INTEREST PAYMN | 07472 1010 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 121,016.00 | 2,711.50 | 2,711.50 | |
| OPERATING NET RESULT | (1,600.00) | (2,287.06) | (2,287.06) | |
U:\bmccool\2015\Municipal Authority\2015 - 01 - Municipal Authority Report.xlsx Page 2 of 3 02/04/2015
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE
WEST CHESTER, PA
Municipal Authority
January 2015
| Account Title | Acct # | Annual Budget |
Month To Date Actual |
Year To Date Actual |
|---|---|---|---|---|
| CAPITAL BUDGET | ||||
| REVENUE | ||||
| LOAN PROCEEDS-SEWER PROJECT | 07393 1001 | 0.00 | 0.00 | 0.00 |
| TRANSFER FROM SEWER CAP RESERVE | 07392 0900 | 0.00 | 0.00 | 0.00 |
| TOTAL REVENUE | 0.00 | 0.00 | 0.00 | |
| EXPENSES | ||||
| MARYDELL PUMP STATION - ENGINEER | 07425 1000 | 0.00 | 0.00 | 0.00 |
| MARYDELL PUMP STATION -CONSTRUCTION | 07425 2000 | 0.00 | 0.00 | 0.00 |
| MANHOLE COVER REPLACEMENTS | 07424.7405 | 0.00 | 0.00 | 0.00 |
| C.C. CAPITAL - COLLECTION | 07424.7420 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT ENGINEER | 07424 7475 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ABANDONMENT CONSTRUCTION | 07424 7476 | 0.00 | 0.00 | 0.00 |
| LOCHWOOD ELIMINATION PHASE 2 | 07424 7477 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - ENGINEER | 07426 1000 | 0.00 | 0.00 | 0.00 |
| HERSHEY MILL STATION - CONSTRUCTION | 07426 2000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - ENGINEER | 07427 1000 | 0.00 | 0.00 | 0.00 |
| RESERVE PUMP STATION - CONSTRUCTION | 07427 2000 | 0.00 | 0.00 | 0.00 |
| RESERVOIR PUMP STATION - ENGINEER | 07428 1000 | 100,000.00 | 990.00 | 990.00 |
| RESERVOIR PUMP STATION CONSTRUCTION | 07428 2000 | 0.00 | 0.00 | 0.00 |
| TOTAL EXPENSES | 100,000.00 | 990.00 | 990.00 | |
| CAPITAL NET RESULT | (100,000.00) | (990.00) | (990.00) | |
| MUNICIPAL AUTHORITY ENDING FUND BALANCE | 1,586,031.43 | |||
U:\bmccool\2015\Municipal Authority\2015 - 01 - Municipal Authority Report.xlsx Page 3 of 3 02/04/2015
East Goshen Township General Ledger
Report Date 02/04/15 GL Transaction Details PAGE 1
MGRP18 run by BRIAN 1 : 52 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 07341-1000 INTEREST EARNINGS | 0.00 | |||||||||
| 1501 | JE | 46156 | 1.44 | 02/03/15 | INTEREST | INTEREST EARNED JANUARY 2015 07 FUND |
||||
| 0.00 | 1.44 | -1.44 | ||||||||
| 07341-1020 INTEREST EARNED - RCSTP EXPANSION | 0.00 | |||||||||
| 131.97 | 02/03/15 | INTEREST | INTEREST EARNED JANUARY 2015 07 FUND |
|||||||
| 0.00 | 131.97 | -131.97 | ||||||||
| 07364-1130 CONNECTION FEES - SEWER | 0.00 | |||||||||
| CR | 45967 | 423.00 | 01/16/15 | 789 | 8648 1 | GEORGE SMITH & CHRISTINA CONLE | ||||
| JE | 45968 | 141.12 | 01/16/15 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||
| 141.12 | 423.00 | -281.88 | ||||||||
| 07380-1000 MISCELLANEOUS REVENUE | 0.00 | |||||||||
| 141.12 | 01/16/15 | PINE ROCK | ANNUAL PINE ROCK INSTALLMENT | |||||||
| 0.00 | 141.12 | -141.12 | ||||||||
| 07424-3000 MISCELLANEOUS EXPENSE | 0.00 | |||||||||
| CD | 45777 | 950.00 | 01/02/15 | 2260 | 2132 | PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2015 ACTIVE MEMBERSHIP DUES |
||||
| 46110 | 500.00 | 01/29/15 | 2263 | 2737 | COMMONWEALTH OF PA ANNUAL FEE - NPDES PERMIT -CHAP. |
|||||
| 1,450.00 | 0.00 | 1,450.00 | ||||||||
| 07424-3130 ENGINEERING SERVICES | 0.00 | |||||||||
| 45953 | 621.50 | 01/15/15 | 2261 | 1052 | PENNONI ASSOCIATES INC. SERVICES THRU 12/7/14 GENERAL |
|||||
| 46013 | 640.00 | 01/22/15 | 2262 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 11/9/14 GEN.SERVICE |
|||||
| 1,261.50 | 0.00 | 1,261.50 | ||||||||
| 07428-1000 RESERVOIR PUMP STATION - ENGINEER | 0.00 | |||||||||
| 45954 | 137.50 | 01/15/15 | 10029 | 1052 | PENNONI ASSOCIATES INC. SERV.THRU 12/7/14 RESERV.RD ACT |
|||||
| 46014 | 852.50 | 01/22/15 | 10030 | 1052 | PENNONI ASSOCIATES INC. SERVICE THRU 11/9/14 RESERVOIR R ACT.537 |
|||||
East Goshen Township General Ledger
Report Date 02/04/15 GL Transaction Details PAGE 2
MGRP18 run by BRIAN 1 : 52 PM
| Acct # | Per | Src | Trx # | Debits | Credits | Beg/End Bal | Date | Check/Ref # | ID # | Name/Description |
|---|---|---|---|---|---|---|---|---|---|---|
| 990.00 | 0.00 | 990.00 | ||||||||
| Beg Bal | 0.00 | 3,842.62 | 697.53 | 3,145.09 | ||||||
Rick Smith
From: Rick Smith <rsmith@eastgoshen.org>
Sent: Wednesday, January 14, 2015 7:39 AM
To: jmorgan@eastgoshen.org; nscheiderman@eastgoshen.org
Subject: Comp Plane Task Force
Joanne
The Comp Plan Task Force is going to meet on
- Monday April 13, 2015 at 7 pm — CONFLICT
- Monday June 8, 2015 at 7 pm — CONFLICT
- Wednesday June, 10 2015 at 7 pm
- Thursday June 11, 2015 at 7 pm
- Monday August 10, 2015 at 7 pm — CONFLICT
We will need the big room.
Please put these in the book.
They will also meet on Thursday June 11 2015 at 8 am - This meeting will probably be held at Hershey Mill Golf Club.
Since these meeting conflict with some Authority, Conservancy Board and Historical Commission meeting we will need to work out some logistics. So we do not need to advertise just yet.
Rick
1
MA
Rick Smith
From: Rick Smith <rsmith@eastgoshen.org>
Sent: Wednesday, January 14, 2015 9:07 AM
To: 'Krcummings'; 'Walter Wujcik'; Chris Reardon (cr19380@yahoo.com)
Subject: Comp Plan Task Force
Gentlemen
The Comp Plan Task Force is going to meet on the following dates. We recognize that this will result in the conflicts noted below.
Monday April 13, 2015 at 7 pm - CPTK Meeting - conflict with MA
Monday June 8, 2015 at 7 pm - Stakeholder Meeting with Board of Supervisors - conflict with MA
Wednesday June, 10 2015 at 7 pm - Stakeholder Meeting with all ABCs - conflict with CB
Thursday June 11, 2015 at 7 pm - Stakeholder Meeting with residents - conflict with HC
Monday August 10, 2015 at 7 pm – CPTK Meeting - conflict with MA
They will also meet on Thursday June 11 2015 at 8 am - This meeting will probably be held at Hershey Mill Golf Club.
Given the importance of Comp Plan and the fact that it is critical that each ABC be represented at these meetings it may be prudent to reschedule your regular meeting.
Perhaps you can discuss this at an upcoming meeting.
Rick
1