Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 6-8-15 final.doc 1

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

June 8, 2015

The East Goshen Township Municipal Authority held their regular public meeting on Monday, June 8, 2015 at 6:00 pm at the East Goshen Township building. Members in attendance were: Vice Chairman Dana Pizarro, Jack Yahraes, Fran Beck, and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Carmen Battavio (Township Supervisor), Mike Ellis (Pennoni), and Jessica Wiesak (Attorney). COMMON ACRONYMS: BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Dana called the meeting to order at 6:08 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Dana asked if anyone would be recording the meeting and there was no response. Chairman’s Report/Other Members’ Reports 1. No Report. Sewer Reports 1. Director of Public Works Mark Miller reported for May 2015: Meters: All meters were read on a daily basis. There were no problems to report for the month. Temporary meters will be pulled and sent out. C.C. Collection: All pumping stations were visited on a routine basis. We did have a problem with the Hershey Mill pump station. The pumps kept tripping out. John Laidly was called in to trouble shoot. An electronic relay switch was replaced. We had Pipe Data View in to clean and televise Supplee Valley, Cooper Circle, Reservoir Road, Waterford Development, Highland and Taylor Roads, and Vista Farms. They located several breaks in Supplee Valley. I have asked them to make 4 point repairs. We will have to excavate one of the repairs. R.C.Collection: Was visited on a routine basis with no problems to report. R.C. Plant: Was visited on a routine basis with no problems to report. Re-sale Inspections: Alarms: We responded to 17 alarms for the month of May. PA One Calls: We received 46 PA One calls in May 2. Pennoni Engineer’s Report

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 6-8-15 final.doc 2

Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP): 1. No activity since the last report. Reservoir Rd Pump Station: We are nearing completion of the approximately 70% “progress design” scope of work including plan preparation, updating the PA One Call ticket, initiating coordination with the various pipeline companies whose utilities will be crossed. The progress design plans were reviewed with the Township Manager and PW Director on May 13th. There were no significant concerns or comments. We attended a NPDES Stormwater pre-application meeting with PADEP and the Chester Co Conservation District on May 21st. We revised the progress design plans to address certain comments after the meeting and we initiated stormwater design calculations. Semi-Annual I&I Reports: We met with the Township Manager and PW Director on May 13th to review the April 2015 Semi-Annual I&I report and to determine proposed portable metering and investigation locations for the next 6 months. The report was revised accordingly and reissued on May 19th. Hershey’s Mill PS and Marydell PS Diversions The 2-year maintenance Bonds on the Hershey’s Mill PS and Marydell PS Diversions expire on July and August respectively. We recommend warranty inspections be performed ASAP if they have not already been done. New Connections We performed field inspections during construction of the grinder pump and low pressure service piping at 610A Reservoir Rd. including directionally drilling under the roadway directly into a Township manhole. We reviewed 3 interactive submissions for a proposed grinder pump at 1414 Bramble Lane, and the final submission was approved. Construction is scheduled to begin on June 5th and we will perform inspections during the work. Mike mentioned that the Northern Long-Eared Bat has been added to the endangered list. We will have to review the previous report. 3. Big Fish Environmental Services – Scott reported that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during April 2015. Discharge to Applebrook commenced on May 4th and is identified as outfall 002. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment. Completion of the filter media replacement for disc filter #2 was completed. Several UV lamps and one (1) ballast were replaced. Approval of Minutes Jack moved to accept the minutes of May 11, 2015 as corrected. Fran seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 6-8-15 final.doc 3

Approval of Invoices 1. Ed moved to approve payment of the following Pennoni invoices: a. Pennoni #638119 $ 1,400.00 b. Pennoni #638120 $ 443.75 c. Pennoni #638121 $ 9,249.50 Jack seconded the motion. The motion passed unanimously. Liaison Reports Board of Supervisors – Carmen updated the members on the status of the Comprehensive Plan. Financial Reports Jon Altshul provided the following report: In May, the Municipal Authority recorded $2,552 in revenues (including a Chester Creek tap-in fee on Park Avenue) and $25,962 in expenses (including $15,826 for Reservoir Rd Pump Station engineering and $10,137 for general engineering), for a variance of -$23,410. As of May 31st, the fund balance was $1,518,350, of which $1,471,128 is in the construction account. Goals Ed will provide a newsletter article by 8/31/15. Ed will attend the 3rd quarter West Goshen meeting. New Business Mike presented a proposal to consider expanding the scope of Reservoir Road Pump station Engineering – Phase 09. He expects that there will be approx. $12K remaining in the Phase 9 Progress Design budget. He proposed to use that over the next month to continue with the next phase of work, which would include, coordinating with the pipeline companies, progressing the electrical and controls designs from an approx. 40% to 70% design, and initiating the stormwater design and calcs and taking them to 40-50% design. Then a formal proposal can be provided for the July meeting. Ed moved to approve the proposal as presented in the email. Jack seconded the motion. The motion passed unanimously. Adjournment There being no further business, Jack moved to adjourn the meeting. Fran seconded the motion. The motion passed unanimously. The meeting was adjourned at 6:40 pm. Respectfully submitted, Rick Smith Township Manager