Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

November 9, 2015

7:00PM

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting?

2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS

3. SEWER REPORTS a. Director of Public Works Report b. Pennoni Engineer's Report c. Big Fish Environmental Inc. Report with DMR's d. East Goshen Township Flows

3. APPROVAL OF MINUTES

a. October 12, 2015

4. APPROVAL OF INVOICES

a. Pennoni b. Pennoni c. Pennoni

5. LIAISONREPORTS

6 . FINANCIAL REPORTS

a. October 2015 Report

7. OLD BUSINESS

a. Mircobeads

Invoice #660830 Invoice #660831 Invoice #660832

b. Chester Creek Interceptor Sewage Test Results

8. GOALS

$ 431.25 $ 221.25 $7,240.75

a. Submit an article for each newsletter - Due date for newsletter

Need by 1/30/15 - Jack - Completed Need by 5/1/15 - Dana - Completed Need by 8/31/15 - Ed - Completed Need by 10/30/15 - Dana - Completed

F:\Data\SharedData\Agendas\Municipa!Authority\2015\11-09-15.doc

b. Obtain construction permits for the Reservoir Road Pump Station - December 31,

2015 2/6-Test boring done, meeting with Mike to review preliminary site plan and discuss control options. 3/9 concept design completed, met with PA DEP. 5/11 stormwater perc test completed, scheduled to meet with CCCD on 5/21 6/8 Nothing unusual from our meeting with CCCD. Rick and Mark need to met with WG to discuss control process. 6/22 WG is ok with proposed control process

c. Attend West Goshen Meetings quarterly - more often if needed.

1st Quarter - Jack - Completed 2nd Quarter - Jack - Completed 3rd Quarter - Ed - Completed 4th Quarter

d. Respond to capacity requests in 45 days or less.

e. Continue to implement I & I Plan 5/11 meeting with Mike on 5/13 to review plan

f. Operate RCSTP in compliance with NPDES Permit February, April, May, June, July, August, September

9. NEW BUSINESS

a. Consider 2016 ABC Goals b. Appointment of Solicitor

10. CAPACITY REQUESTS

a. 3 & 5 School Lane request sewer service and grinder pump b. 930 North Chester Road request sewer service and grinder pump

11. ANY OTHER MATTER

12. CORRESPONDENCE AND REPORTS OF INTEREST

a. October 27, 2015 Subdivision Letter 930 North Chester Road b. Acknowledge Kroll AAA bond rating

13. PUBLIC COMMENT

14. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2015\11-09-15.doc

AREA CODE 61 0 692-7171

November 4, 2015

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

t SBO PAOLI PIKE, WEST CHESTER, PA 1 9380-61 99

To: Municipal Authority

From: Mark Miller

Re: October 2015 Monthly Report

Meters:

C.C. Collection:

R.C. Collection:

R.C. Plant:

Re-sale Inspections:

Alarms:

PA One Calls:

All meters were read on a daily basis. The new recording system is working.

We were notified of three sewer clogs. Two were caused by the cleanouts getting pushed up by the frost. The third one was caused by debris in the clean out. We replaced three manhole castings and lids.

Was visited on a routine basis with no problems to report.

Was visited on a routine basis with no problems to report.

We responded to 3 alarms for October.

We received 28 PA One calls for October.

EGMA 1501

TO:

FROM:

DATE:

SUBJECT:

Invoices

MEMORANDUM

East Goshen Municipal Authority Board Rick Smith, Township Manager

Michael Ellis, P.E. Authority Engineer

November 5, 2015

Engineer's Report

• Invoices with summaries are provided under separate cover.

Ridley Creek Sewage Treatment Plant (RCSTP)

• No activity since the last report.

Reservoir Road Pump Station

• We submitted the Small Projects Joint Pennit Application for the Pump Station Site and Chester Creek Utility Crossing to DEP, including the Chapter 106 Floodplain Management Site Restoration Permit Application. We also submitted the GP-5 "Utility Line Stream Crossings" and GP-8 "Temporary Road Crossings (across streams)" permit applications for the Ridley Creek Utility Crossing to DEP.

• The Individual NPDES Permit application for Stormwater Discharges Associated with Constrnction Activities is nearly complete. We anticipate submitting to DEP by November 11.

• Upon receipt of comments from the Township Codes Department on the approx. 90% progress design plan submission, we will finalize and submit the Water Quality Management (WQM) Part II Permit Application to DEP.

• The Township Engineer's staff perfom1ed a peer review of the stonnwater design, and issued a letter that the design is in compliance with the EGT St01mwater Ordinance.

• 12 rock borings were performed in the open space area between Bow Tree Drive and the Ridley Creek (around the pond) in the proposed force main alignment at approx. 100 intervals. Botings were to a depth of 14 feet, and bedrock was not encountered. Weathered rock was encountered at 13 feet in two of the borings.

• Soft dig test pits at proposed petroleum and gas pipeline crossings in/along N. Chester Road and Strasburg Road are scheduled the week of November 9-13.

Page 1of2

P:\Projects\EGMA\Memos to Board\2015\Memo to EGMA Board 2015-11-05.docx

EGMA 1501

• The tentative schedule follows:

Estimated Date

o Submit NPDES permit applications ............................... November 11, 2015

o Soft digs for utilities .......................................... Week of November 9, 2015

o Submit WQM Part II permit application ....................... November 20, 2015

o Submit PennDOT Highway Occupancy Permit application for

proposed force main ................................................................. January 2016

o P ADEP and PennDOT pe1mit issuance ..................... February-March 2016

Semi-Annual I&I Reports

• We provided comments on the first three weeks of portable meter data for the relocated and recalibrated meters to the Township PW Dept, and we coordinated with them to evaluate apparent calibration issues on some of the meters. We have requested additional meter data be provided by the end of November so that we can analyze and prepare a semi- aimual I&I Repmt by the end of December.

Page 2of2

P:\Projects\EGMA\Memos to Board\2015\Memo to EGMA Board 2015-11-05.docx

Monthly Operations Report: October 2015

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 achieved compliance with the

NPDES discharge permit during September 2015. Discharge to Applebrook continued during October. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment.

Treatment Process Operation

During September 2015, there were no exceedances of the final effluent discharge limitations for outfall 001. Additional TSS samples were collected twice per week to allow for a means to calculate a weekly average. The total phosphorus monthly average concentration of 0.30 mg/Las compared to the permitted limitation of 0.50 mg/L. Table 1 illustrates the final effluent composite sample data reported for the August 2015 eDMR. During the month, the final effluent total phosphorus concentration discharged ranged from 0.13 mg/L to 0.39 mg/L. The aluminum sulfate daily average slightly increased to 81.0 gpd as compared to August's average of 80.2 gpd.

Table 1

September 2015 - Final Effluent - Out Fall 001

Phosphorus, Total

Flow CBOD5 TSS NH4-N , mg/L Fecal Coliform NPDES Permit lbs/ lbs/ lbs/ lbs/ Geo Geo Discharge Limitations MGDAverage mg/L month mg/L month mg/L month mg/L month Mean Mean 0.75 20 125 21 131 7 44 0.5 3 200 1,000 Instantaneous

Maximum 40 42 Sample Date September 1, 2015 0.167 2.0 2.8 4 6 0.100 0.14 0.13 0.18 1 0.0000 September 3, 2015 0.206 3 5 September 8, 2015 0.165 2.0 2.8 5 7 0.482 0.66 0.32 0.44 1 0.0000 September 10, 2015 0.181 3 5 September 22, 2015 0.150 2.6 3.3 5 6 3.72 4.65 0.37 0.46 1 0.0000 September 24, 2015 0.164 5 7 September 29, 2015 0.154 2.0 2.6 5 6 0.159 0.20 0.39 0.50 1 0.0000

Average 0.170 2.2 2.8 4 6 1.115 1.42 0.30 0.40 1 0.0000 Minimum 0.150 2.0 2.6 3 5 0.100 0.14 0.13 0.18 1 0.0000 Maximum 0.206 2.6 3.3 5 7 3.720 4.65 0.39 0.50 1 0.0000

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 1 of8

Environmental Services Inc.

Discharge to Applebrook, Outfall 002, continued during September 2015. Table 1 illustrates the final effluent composite sample data reported for the September 2015 eDMR. There were exceedances of the permitted discharge limitations for Outfall 002. Table 2

September 2015 · Applebrook ·Out Fall 002

Phosphorus, Total

Flow CBOD5 TSS NH4-N , mg/L Fecal Coliform

NPDES Permit lbs/ lbs/ lbs/ lbs/ Geo Geo

Discharge Limitations MGDAverage mg/L month mg/L month mg/L month mg/L month Mean Mean

0.75 20 125 21 131 7 44 0.5 3 200 1,000

Instantaneous

Maximum 40 42

Sample Date September 1, 2015 0.138 2.0 2.8 4.0 5.6 0.100 0.1 0.13 0.2 1.0 0.0 September 3, 2015 0.104 3.0 5.2 September 8, 2015 0.140 2.0 2.8 5.0 6.9 0.482 0.7 0.32 0.4 1.0 0.0 September 10, 2015 0.136 3.0 4.5 September22, 2015 0.129 2.6 3.3 5.0 6.3 3.72 4.7 0.37 0.5 1.0 0.0

September24, 2015 0.134 5.0 6.8 September29, 2015 0.118 2.0 2.6 5.0 6.4 0.159 0.2 0.39 0.5 1.0 o:o

Average 0.1282 2.2 2.8 4 5.9 1.12 1.42 0.30 0.40 1 0.0000

Minimum 0.1035 2.0 2.6 3 4.5 0.10 0.139 0.13 0.18 1 0.0000

Maximum 0.1398 2.6 3.3 5 6.9 3.72 4.65 0.39 0.50 1 0.0000

Table 3 illustrates the influent wastewater pollutant loadings for September 20115. The influent loadings remained within the treatment facility design loadings.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 2of8

Environmental Services Inc.

Table 3

September 2015 -Influent Wastewater

Phosphorus, Total,

Flow 8005 TSS NH4-N TKN, mg/l mg/l Design Basis mg/l lbs/day mg/l lbs/day mg/l lbs/day mg/l lbs/day mg/l lbs/day

MGDAverage 335 2,098 320 2,001 32 200 48 301 9.1 57 Sample Date

September 1, 2005 0.331 240 663 250 691 38.2 106 56.0 155 6.8 19 September 8, 2015 0.313 146 403 200 552 41.7 115 47.8 125 4.8 13

September 22, 2015 0.320 193 533 247 682 38.7 107 50.3 134 5.5 15 September 29, 2015 0.317 131 362 111 307 37.3 103 47.3 125 4.9 14

Average 0.320 178 490 202 558 39.0 108 50.4 135 5.5 15

Minimum 0.313 131 362 111 307 37.3 103 47.3 125 4.8 13

Maximum 0.331 240 663 250 691 41.7 115 56.0 155 6.8 19

Table 4 presents the available Outfall 001 final effluent data for the month of October 2015. During October, the presence of foam conditions on the surface of the SBRs increased slightly ranging from 10% to 20% of the surface area. This is attributed to decreasing water temperatures. Increasing the F:M ratio and decreasing MLSS concentrations is employed to assist in managing the increase in filamentous growth.

During October, there are no anticipated exceedances of the permitted limitations for Outfalls 001 and 002. Split sampling of the composite sample collected by Applied Laboratory Services (ALS) is ongoing for comparative analysis and daily results.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 3of8

(aig Fish

Environmental Services Inc.

Table 4

October 2015 - Final Effluent - Out Fall 001

Phosphorus, Total

Flow CBOD5 TSS NH4-N ,mg/L Fecal Coliform NPDES Permit lbs/ lbs/ lbs/ lbs/ Geo Discharge Limitations MGDAverage mg/L month mg/L month mg/L month mg/L month Mean 0.75 20 125 10 131 7 44 0.5 3 200 Instantaneous

Maximum 40 42 Sample Date October6, 2015 0.188 2.0 3.1 4 6 0.971 1.52 0.33 0.52 1 Octobers, 2015 0.177 4 6 October 13, 2015 0.178 2.3 3.4 4 6 1.650 2.45 0.39 0.58 1 October 15, 2015 0.194 6 10 October 20, 2015 0.206 2.0 3.4 5 9 4.57 0.27 0.46 1 October 22, 2015 0.182 October 27, 2015 0.191 0.35 0.56 October 29, 2015 0.292 0.0 0.00

Average 0.201 2.1 2.5 5 7 1.311 2.14 0.34 0.53 1 Minimum 0.177 2.0 0.0 4 6 0.971 0.00 0.27 0.46 1 Maximum 0.292 2.3 3.4 6 10 1.650 4.57 0.39 0.58 1

During October 2015, discharge of treated effluent to Applebrook. Table 5 illustrates the available data for outfall 002.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4of8

Geo Mean

1,000

0.0000

0.0000

0.0000

0.0000 0.0000 0.0000

(s~ Fish

Environmental Services Inc.

Table 5 October 2015-Applebrook- Out Fall 002

Phosphorus, Total

Flow CBOD5 TSS NH4-N ,mg/L Fecal Coliform

NPDES Permit lbs/ lbs/ lbs/ lbs/ Geo Geo Discharge Limitations MGDAverage mg/L month mg/L month mg/L month mg/L month Mean Mean 0.75 20 125 21 131 7 44 0.5 3 200 1,000 Instantaneous

Maximum 40 42 Sample Date October 6, 2015 a.134 2.a 3.1 4.a 6.3 a.971 1.5 a.33 a.5 1.a a.a October 8, 2015 a.128 4.a 5.9 October 13, 2015 a.133 2.3 3.4 4.a 5.9 1.65a 2.4 0.39 a.6 1.a a.a October 15, 2015 a.128 6.a 9.7 October20, 2015 a.114 October 22, 2015 a.118 2.a 3.4 5.a 8.6 a.aa 4.6 a.27 a.5 1.a a.a October 27, 2015 a.126 October 29, 2015 a.108 Average 0.1235 2.1 3.3 5 7.3 0.87 2.85 0.33 0.52 1 0.0000 Minimum 0.1080 2.0 3.1 4 5.9 0.00 1.522 0.27 0.46 1 0.0000 Maximum 0.1336 2.3 3.4 6 9.7 1.65 4.57 0.39 0.58 1 0.0000

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility remained within the design concentrations and

loadings. Composite samples are collected at the influent doghouse manhole and influent wet well. The influent flow meter reading is collected from the influent flow meter located prior to the Screening Building, excluding the internal recycle flows.

Table 6 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during October 2015.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 5 of8

(a~ Fish

Environmental Services Inc.

Table 6

October 2015- Influent Wastewater

Phosphorus, Total,

Flow BOD5 TSS NH4·N TKN, mg/l mg/L Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

MGDAverage 335 2,098 320 2,001 32 200 48 301 9.1 57 Sample Date

October 6, 2015 0.344 118 339 146 419 35.4 102 43.9 126 5.5 October 13, 2015 0.374 134 384 103 296 36.3 104 46.3 145 4.9

October 20, 2015 0.376 95.9 275 102 293 39.0 112 51.9 163 4.7 October 27, 2015 0.350

Average 0.361 116 333 117 336 36.9 106 47.4 144 5.0

Minimum 0.344 96 275 102 293 35.4 102 43.9 126 4.7

Maximum 0.376 134 384 146 419 39.0 112 51.9 163 5.5

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during October. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

16

14

13

14

13

16

Addition of aluminum sulfate solution to the SB Rs to assist with phosphorus removal

continued. The volume of aluminum sulfate solution to the SBRs increased to 89.9 gpd. Soda ash daily addition increased from 424 lbs. /day to 439 lbs. /day. Soda ash assists towards maintaining SBR pH concentrations above 7.0 standard units and assists to replenish alkalinity consumed during the nitrification process and aluminum sulfate solution addition.

SBR No. 2 remains out of service as a treatment unit. Minor repairs will be scheduled as weather conditions permit.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 6of8

Solids Dewatering and Disposal: October 2015

Sludge Dewatering Summary Gallons of sludge dewatered I 317,674 Number of dumpsters 14 *seventeen (17) days of centrifuge operation

Flow data:

October 2015 Flow Meter Location Total Volume Average Daily Daily Maximum for Month, MG Flow, gpd Flow, gpd Influent Wastewater to 11.535 372,085 611,410 Screening Building* Influent Wastewater to 12.328 397,675 588,608 SB Rs Internal Recycle 0.927 29,915 67,230

Treated Effluent to Disc 12.310 397,091 481,472 Filters Final Effluent Discharge 6.441 207,774 348,000

Applebrook Golf Course 3.645 121,500 144,500

Ch . IU em1ca saae:

October 2015 Chemical Daily Average Total Monthly Soda Ash 439 13,200 Aluminum Sulfate solution 89.9 2,788 Polymer (centrifuQe) 0.84 14.30 *seventeen (17) days of centrifuge operation

During October, sludge wasting to the sludge holding tanks and decanting of the sludge holding tanks was ongoing. Process monitoring included pH, total alkalinity and total solids.

Sludge holding tank No. 1 was in service. The level at the beginning of October was 14.34 feet and the level at the end of the month was 9.27 feet. The average pH concentration was 6.78 S.U. and average total alkalinity concentration was 197 mg/L. Zero gallons of supernatant were decanted during the month. Zero pounds of soda

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 7of8

Environmental Services Inc.

ash were added. An average total solids concentration of the sludge in the sludge holding tanks was 0.84%

Sludge holding tank No. 2 was in service. The level at the beginning of the month was 7.90 feet and the level at the end was 7.67. The average pH concentration was 6.662 S.U. and average total alkalinity concentration was 132 mg/L. Zero pounds of soda ash were added. Zero gallons of supernatant were decanted. An average total solids concentration of the sludge in the sludge holding tanks was 0.47%

Significant Storm/Hydraulic Loading Events

During October, there were four (4) storm events resulting in daily precipitation amounts equal to or greater than 0.5 inches measured during a 24 hour period. These events occurred on October 1st with 0.48 inches, October 2nd 1.66 inches, October gth with 0.72 inches and October 281h with 2.38 inches. A total of 5.35 inches of rainfall was measured at the facility during October. Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for Outfalls 001 and 002.

Minor Repairs and Preventative Maintenance

No unscheduled minor repairs or equipment failures were experienced during October.

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 8 of8

2015 OCTOBER 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

Precip WESTTOWN WAY ELLIS LANE PAOLI PIKE WILSON DRIVE SUMMIT NET

DATE READING GPO READING GPO READING GPO READING GPO GPO FLOWS DATE 0.75 10/01/15 2, 178,365 869,000 9,677,237 84,900 6,070,423 50,800 5,301,640 75,100 24,000 658,200 10/01/15 1.00 10/02115 2, 179,394 1,029,000 9,689,787 125,500 6,077,153 67,300 5,308,982 73,420 24,000 762,780 10/02115 0.00 10/03/15 762,780 10/03/15 0.00 10/04/15 762,780 10/04/15 0.00 10/05/15 2, 182,381 995,667 9,716,997 90,700 6,093,853 55,667 5,329,272 67,633 24,000 781,667 10/05/15 0.00 10/06/15 2,183,287 906,000 9,723,827 68,300 6,098,563 47,100 5,335,888 66,160 24,000 724,440 10/06/15 0.00 10/07/15 2,184,160 873,000 9,730,687 68,600 5,341 ,536 56,480 24,000 747,920 10/07/15 0.00 10/08/15 2,185,041 881,000 9,737,497 68,100 5,347,623 60,870 24,000 752,030 10/08/15 0.75 10/09/15 2,185,925 884,000 9,746,027 85,300 6, 112,690 47,090 5,353,490 58,670 24,000 692,940 10/09/15 0.00 10/10/15 692,940 10/10/15 0.00 10/11/15 692,940 10/11/15 0.00 10/12/15 2, 188,623 899,333 9,768,257 74,100 5,368,663 50,577 24,000 774,657 10/12115 0.00 10/13/15 2,189,507 884,000 9,774,837 65,800 5,374,438 57,750 24,000 760,450 10/13/15 0.00 10/14/15 2, 190,398 891,000 9,781,407 65,700 5,380,520 60,820 24,000 764,480 10/14/15 0.00 10/15/15 2, 191,274 876,000 9,787,617 62,100 5,386,037 55,170 24,000 758,730 10/15/15 0.00 10/16/15 2, 192, 132 858,000 9,793,361 57,440 6,144,781 53,485 5,393,259 72,220 24,000 674,855 10/16/15 0.00 10/17/15 674,855 10/17/15 0.00 10/18/15 674,855 10/18/15 0.00 10/19/15 2, 194,718 862,000 9,813,723 67,873 6,157,547 42,553 5,408,358 50,330 24,000 701 ,243 10/19/15 0.00 10/20/15 2, 195,610 892,000 9,819,953 62,300 6,162,051 45,040 5,415,003 66,450 24,000 718,210 10/20/15 0.00 10/21/15 2, 196,501 891,000 9,825,933 59,800 6,166,628 45,770 5,421 ,717 67,140 24,000 718,290 10/21/15 0.00 10/22/15 2,197,375 874,000 9,831,937 60,040 6,171,110 44,820 5,427,723 60,060 24,000 709,080 10/22115 0.00 10/23/15 2, 198,261 886,000 9,838,282 63,450 6,1 75,769 46,590 5,433,806 60,830 24,000 715, 130 10/23/15 0.00 10/24/15 1,288, 130 10/24/15 0.00 10/25/15 1,288,130 10/25/15 0.00 10/26/15 2,200,848 862,333 9,856,664 61,273 6, 189,001 44,107 5,452,261 61,517 24,000 695,437 10/26/15 0.00 10/27/15 2,201,732 884,000 9,862,744 60,800 6, 193,481 44,800 5,459,302 70,410 24,000 707,990 10/27/15 1.50 10/28/15 2,202,705 973,000 9,868,455 57,110 6, 199,821 63,400 5,469,074 97,720 24,000 754,770 10/28/15 0.75 10/29/15 2,204, 132 1,427,000 9,875,857 74,020 6,206,271 64,500 5,479,053 99,790 24,000 1, 188,690 10/29/15 0.00 10/30/15 2,205, 137 1,005,000 9,896,819 209,620 6,210,887 46,160 5,485,714 66,610 24,000 682,610 10/30/15 0.00 10/31/15 10/31/15

Dav Ava 927,379 76,947 50,574 66,169 24,000 776,067 Dav Tot 20,402,333 1,692,827 809,182 1,455,727 528,000 23,282,008 Dav Count 22 22 16 22 22 30

EGTWP

MONTH TO DATE 4.75 NORMAL MONTH TO DATE YEAR TO DATE 37.26 NORMAL YEAR TO DATE

2007 flowmeters -all-stations separate month worksheets.xis

2015 OCTOBER 4TH QUARTER- METERS FROM WEST GOSHEN - CC COLLECTION

HERSHEY'S MILL ASH BRIDGE HICKS METER RESERVOIR BARKWAY

READING GPO READING GPO READING GPO READING GPO READING GPO 44,760,496 52,808 2,212,213 71,000 24,467,486 258,620 81,285,735 632,130 3,750,193 8,610 44,840,428 79,932 2,212,697 48,400 24,492, 150 246,640 81,347, 134 613,990 3,751,067 8,740

44,997,776 52,449 2,214,840 71,433 24,558,810 222,200 81,548,225 670,303 3,754,071 10,013 45,051,744 53,968 2,215,422 58,200 24,583,742 249,320 81 ,612,433 642,080 3,754,947 8,760 45,109,776 58,032 2,216,047 62,500 24,608,908 251,660 81,676,724 642,910 3,755,885 9,380 45,158,208 48,432 2,216,604 55,700 24,634,454 255,460 81,734,085 573,610 3,756,753 8,680 45,211,200 52,992 2,217,202 59,800 24,654,262 198,080 81 ,794,875 607,900 3,757,676 9,230

45,373,348 54,049 2,219,030 60,933 24,711,514 190,840 81,971,460 588,617 3,760,487 9,370 45,427,288 53,940 2,219,633 60,300 24,733,556 220,420 82,031 ,395 599,350 3,761,597 11,100 45,477,798 50,510 2,220,222 58,900 24,756,762 232,060 82,091,552 601,570 3,762,440 8,430 45,528,000 50,202 2,220,801 57,900 24,779,360 225,980 82,150,699 591,470 3,763,261 8,210 45,579,064 51,064 2,221,367 56,600 24,801 ,882 225,220 82,208,780 580,810 3,764,060 7,990

45,746,512 55,816 2,223, 177 60,333 24,855,586 179,013 82,374,668 552,960 3,766,917 9,523 45,800,176 53,664 2,223,789 61,200 24,879,030 234,440 82,436,315 616,470 3,767,922 10,050 45,848,852 48,676 2,224,385 59,600 24,903,246 242,160 82,496,711 603,960 3,768,760 8,380 45,898,750 49,898 2,224,973 58,800 24,926,222 229,760 82,557,412 607,010 3,769,518 7,580 45,950,096 51,346 2,225,542 56,900 24,949,454 232,320 82,616,729 593,170 3,770,490 9,720

46, 112,900 54,268 2,227,389 61,567 25,006,232 189,260 82,785,516 562,623 3,773,332 9,473 46, 164,028 51,128 2,227,983 59,400 25,030,448 242,160 82,847,871 623,550 3,774,999 5,557 46,212,544 48,516 2,228,560 57,700 25,053,976 235,280 82,909,080 612,090 3,775,089 300 46,282,220 69,676 2,229,429 86,900 25,089,876 359,000 83,007,750 986,700 3,776,145 3,520 46,340,888 58,668 2,230,067 63,800 25, 117,334 274,580 83,083,075 753,250 3,777,216 3,570

54,547 61,267 236,112 629,842 8,008 1,200,035 1,347,867 5,194,473 13,856,523 176, 187 22 22 22 22 22

2007 flowmeters -all-stations separate month worksheets.xis

2015 SUMMARY OF METER READINGS

JANUARY FEBRUARY MARCH APRIL

MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER

(Total Flows

WESTTOWN

WAY

1,037,476 1,023,411 1,212,666 1,035, 131 950,383 973,259 936,889 865,647 876,374 927,379

ELLIS PAOLI LANE PIKE

93,837 60,552 90,015 59,017 123,312 70,912 96,381 64,670 83,945 62,532 88,786 70,960 87,530 49,868 71,847 42,991 73,884 48,951 76,947 50,574

WILSON SUMMIT DRIVE

66,143 24,000 64,695 24,000 70,480 24,000 58,196 24,000 56,242 24,000 87,499 24,000 83,662 24,000 77,279 24,000 85,057 24,000 66,169 24,000

IMonthly Ave I 983,8621 88,6481 58,1031 71,5421 -24,000I

October Precip. 4. 75 - 2015

1.6 .../

1.4 ..v

1.2 _v

1 _v

ci.

·~ 0.8 .... c.

0.6 f/ -

t-

0.4 _v • t-

0.2 ..v •

0 v -

t-

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

snow/rain

• October

Ln .-1 0 N

c 0 ·-..., cu ..., ·-c. ·-u Q) ~ 0. ~ .c ..., c

0 ~

.-i Ill a.I ·;: a.I Vl •

.,,~

9tv.

~..)

~o

.,,~

9tv.

~'1.

°11

.,,~

90>0 0

.,,~

9tv.

~;.

~ ;$'

;J'..,

~ '/>-

-v..,

:;t'

~~

~/'

~

~

UI

-== 0 u:::

Flowmeters October 2015

1400000 -.--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1200000 -+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--<>---+~~~~~~~

1000000 -+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-----~~---~~~-----~

800000 +-~~~~~--,-~~~~~~~~~~~~~~~~~~~~~~~--,1--~~-.~~-#~----'t--

600000 +-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

400000 +-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

200000 +-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

0 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Day of the Month

...,._October

(.) Cl) c

I c: ca ...,

U') T"" 0 N .!!l. ca - ~ ~ .c: - c: 0 ::!:

0 0 0 0 0 co ..-

0 0 0 0 0 """ ..-

0 0 0 0 0 N ..-

0 0 0 0 0 0 0 0 0 0 0 co ..-

SJaJaWMOl::I

0 0 0 0 0 co

0 0 0 0 0 """

0 0 8 0 N

0

.,..ti)

9~ (i)v ()lo

.,..ti)

9~ ()1-1.

~

.,..ti)

9~ "o

.,..())

9~ ~ ~ U'

.1.s--1

~ 'f>,.

-v-1 ;n .c: .... c: 0 ~

ti)~

~

~

~

-<v91 'f>,.

0 0 0 0 0 CD ..--

0 0 0 0 0 '<:t" ..--

0 0 0 0 0 N ..--

0 0 0 0 0 0 ..--

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co CD '<:t" N

sJaiawM01.::1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Draft EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

October 12, 2015

The East Goshen Township Municipal Authority held their regular public meeting on Monday, October 12, 2015 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Y ahraes, Fran Beck, Dana Pizarro and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Mike Ellis (Pennoni), Pat McKenna (Attorney) and Walter Wujcik (Conservancy Board).

COMMON ACRONYMS: EFES - Big Fish Environmental Sen1ices BOS - Board of Supervisors CB - Consen1ancy Board DEP - Department of Environmental Protection EPA - Environmental protection Agency HC - Historical Commission I&J - Inflow & bifiltration LCSTP - Lockwood Chase Sewer Treatment Plm1t

Call to Order & Pledge of Allegiance

MA- Municipal Authority

NP DES - National Pollutant Discharge Elimination System PC - Planning Commission PM - Prevention Maintenance PR - Park & Recreation Board RCSTP - Ridley Creek Sewer Treatment Plant SER - Sequencing Batch Reactor SSO - Sanitmy System Ove1flow

WAS - Waste Activated Sludge

Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response.

Sewer Reports 1. Director of Public Works Meters: All meters were read on a daily basis. The meter at Westtown Way went down for 2 weeks and is now back up and running.

C.C. Collection: All pumping stations were visited on a routine basis. We are still preparing Cooper Cir. and Supplee Valley for road resurfacing.

RC. Collection: Was visited on a routine basis. Wentworth Development was cleaned and televised. Also Cornwallis Dr. and Colonial Dr. and a small portion of Paoli Pike was cleaned and televised.

RC.Plant: Was visited on a routine basis with no problems to report Alarms: We responded to 4 alarms for September PA One Calls: We received 23 PA One calls for September.

2. Pennoni Engineer's Report Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP):

No activity since the last report. Reservoir Rd Pump Station:

We completed an approximately 90% progress design plan submission that was submitted to the Township Codes and PW Departments for review.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 draft.doc

1

1 We met with the Township Codes Officer and Township Manager on September 2nd to 2 present the progress design plans, obtain feedback on the stormwater management design 3 concept, discuss general building code compliance for the control building, and determine 4 floodplain permitting process and requirements. 5 We have scheduled an internal review of the stormwater design for compliance with the 6 EGT Stormwater Ordinance. 7 We initiated a limited floodplain filling impact analysis to quantify any floodplain 8 impacts, which has been determined to be necessary for local and DEP floodplain permitting. 9 We coordinated with the DEP and Township on the permit application approach for the 10 two P ADEP GP-5 "Utility Line Stream Crossing" permits, on P ADEP GP-8 "Temporary Road 11 Crossings (across streams)" permit, and floodplain filling permit. We continued with preparation 12 of these permit applications as well as the NPDES permit application. 13 We submitted a PennDOT HOP application for soft dig test pits to locate petroleum and 14 gas pipelines in and along N. Chester Road and Strasburg Road that are proposed to be crossed 15 with the new force main. We received comments from PennDOT and submitted additional 16 information to address the comments. We are expecting the permit to be issued within the next 2 17 weeks. 18 The tentative schedule has been extended one month to allow time to address local and 19 DEP floodplain filling permit requirements, including a limited H&H analysis: 20 Estimated Date 21 * Submit PADEP permit applications Mid-October 2015 22 * Rt. 352 soft digs for utilities September-October 2015 23 * Submit PennDOT Highway Occupancy Permit 24 Application for proposed force main January 2016 25 * PADEP and PennDOT permit issuance Mid-February 2016 26 Semi-Annual I&I Report: 27 We received the first three weeks of portable meter data for the relocated and recalibrated 28 meters. The data is currently under review. 29 30 3. Big Fish Environmental Services - Scott reported that the Ridley Creek sewage treatment 31 plant outfall 001 achieved compliance with the NPDES discharge permit during August 2015. 32 Discharge to Applebrook continued during September. Chemical usage utilized for total 33 phosphorus removal, pH and total alkalinity remained consistent with previous months. No 34 mechanical or operational issues were observed during operation of sludge dewatering 35 equipment. 36 During September there were 2 Storm events resulting in daily precipitation amounts greater 37 than 0.5 inches measured during a 24 hour period. These events occurred on September 10 and 38 29 with precipitation volumes recorded as 0. 73 and 2.13 inches, respectively. A total of 3.62 39 inches of rainfall was measured at the facility during September. Plant operations were adjusted 40 to manage the precipitation to prevent exceedances of the permitted discharge limitations for 41 outfalls 001 and 002. 42 43 Approval of Minutes 44 Jack moved to accept the minutes of August 10, 2015. Dana seconded the motion. The motion 45 passed unanimously. There was no meeting in September. 46

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 draft.doc

2

1 Approval of Invoices 2 1. Ed moved to approve payment of the following Pennoni invoices: 3 a. Pennoni #655756 $ 230.00 4 b. Pennoni #655757 $ 411.25 5 c. Pennoni #655832 $34,515.75 6 d. Pennoni #642374 $ 770.00 7 Jack seconded the motion. The motion passed unanimously. 8 2. Ed moved to approve payment of the following Gawthrop invoice: 9 a. Gawthrop #135684 $ 260.00 10 Fran Seconded the motion. The motion passed unanimously. 11 3. Since there was no meeting in September, Rick needs approval for the following invoices: 12 Dana moved to approve the September payments: 13 a. Pennoni #650758 $ 316.25 14 b. Pennoni #650759 $ 143.75 15 c. Pennoni #650760 $11,709.00 16 d. Gawthrop #134498 $ 300.00 17 Jack seconded the motion. The motion passed unanimously. 18 19 Liaison Reports 20 Conservancy Board - Walter reported that they will receive some trees from a developer who 21 had to remove trees to build. They are waiting to find out how many so they can mark where to 22 plant them. The spraying of invasives has been done. 23 24 Financial Reports 25 Jon Altshul provided the following report: 26 In September, the Municipal Authority recorded $23,725 in revenues (including tap-in fees for 27 Goshen Meadows and for 1606 Atlee Drive) and $19,836 in expenses (including $7,667 for the 28 quarterly chargeback for administrative overhead and $11, 709 Reservoir Road Pump Station 29 engineering), for a positive variance of $3,889. As of September 30, the fund balance was 30 $1,536,091, of which $1,472,271 is in the main construction account. 31 32 Old Business 33 House Lateral Inspections-For 6 months the Public Works Department has done these I&I 34 inspections when properties are sold. The program will be implemented with one modification. 35 The building inspectors will include this in their regular U&O inspection. If they observe 36 evidence of I&I, they will notify PW who will TV the lateral. 37 38 Goals 39 Dana will write the article for the newsletter which is due 10/30/15, explaining the smoke testing 40 and the new lateral inspections .. 41 42 New Business 43 a. Budget - The proposed budget was reviewed. Ed pointed out that the 2013 actual and 44 expenses don't add up. Jack moved to approve the 2016 budget as proposed. Dana 45 seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 draft.doc

3

1 b. 3 & 5 School Lane, Milltown - The request for sewer service and grinder pump for these 2 2 new homes was reviewed. Jack moved to approve the request. Ed seconded the 3 motion. The motion passed unanimously. Rick will send a letter. 4 c. PMAA Region I request for dues for 2016 was discussed. 5 d. Discussion about the article about microbeads in the water was tabled to the next 6 meeting. 7 8 9 Adjourment 10 There being no further business, Dana moved to adjourn the meeting. Fran seconded the motion. 11 The motion passed unanimously. The meeting was adjourned at 7:30 pm. The next meeting will 12 be held on Monday, November 9 at 7:00 pm. 13 14 Respectfully submitted, 15 16 17 Ruth Kiefer 18 Recording Secretary

f!'::\l)a\~\~ i}a\<1\Minutes\Municipal Authority\2015\MA I 0-12-15 draft.doc

4

INVOICE

Newark, DE Remit Payment To: 302-655-4451 Fax: 302-654-2895 Pennoni P .0. Box 827328 Philadelphia, PA 19182-7328

East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr.

For Services Rendered through: 10/18/2015

Prepared for and attended October MA meeting.

Phase : **** -- Professional Services

Total Phase : ""'"' -- Professional Services

Invoice # : 660830 Invoice Date : 10/28/2015

Project : EGMA 1501 Project Name : 2015 General Services

Labor : Expense Phase Total :

431.25 0.00 -- - ---- -- - - ---·

431.25

Amount Due This Invoice $431.25

Fee: Prior Billings : Current Billings :

Total Billings :

Phase : """" -- Professional Services

Labor Class

Authority Engineer

Labor Total:

12,000.00 8,846.50 431.25 9,277.75

Total Phase : """" -- Professional Services

Total Project: EGMA1501 - 2015 General Services

Hours!

Units

3.75

3.75

Rate 115.00

Labor :

Expense :

Labor :

Expense :

Amount

431 .25

431.25

$431.25

$0.00

$431.25

$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date($): Invoiced to Date(%): Remaining Budget ($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):

East Goshen Municipal Authority

EGMA1501 Invoice Summary

Invoice Date 10/28/2015

EGMA1501

2015 General Services 660830

9/21/2015 to $ 12,000.00 Date: $ 12,000.00 $ 8,846.50 $ 431.25 $ 9,277.75

77% $ 2,722.25

23%

2015 General Services $ 12,000.00 $ 8,846.50 $ 431.25 $ 9,277.75 77% $ 2,722.25 23%

Comments: Prepared for and attended October MA meeting.

10/18/2015 10/28/2015

INVOICE

Newark, DE Remit Payment To: 302-655-4451 Fax: 302-654-2895 Pennoni P .0. Box 827328 Philadelphia, PA 19182-7328

East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr.

For Services Rendered through: 10/18/2015

Invoice#: 660831 Invoice Date : 10/28/2015

Project : EGMA 1502 Project Name : 2015 Semi-Annual l&I Reports

Continued limited analysis of 1st month of new portable meter data from August 5-28, 2015 and prepared summary email to Township.

Phase : *"'*"' -- Professional Services

Total Phase:**** -- Professional Services

Fee: Prior Billings : Current Billings :

Total Billings :

Phase : "*** -- Professional Services

Labor Class

Authority Engineer

Associate Engineer

Labor Total:

10,500.00 7,377.50 221 .25 7,598.75

Total Phase: **** -- Professional Services

Amount Due This Invoice

Hours/

Units Rate 1.00 115.00

1.25 85.00

2.25

Total Project: EGMA1502 - 2015 Semi-Annual l&I Reports

Labor : Expense Phase Total :

Labor :

Expense :

Labor :

Expense :

221.25 . 0.00 221.25

$221.25

Amount

115.00

106.25

221.25

$221.25

$0.00

$221.25

$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%): Remaining Budget ($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):

East Goshen Municipal Authority

EGMA1502 Invoice Summary

Invoice Date 10/28/2015

EGMA1502 2015 Semi-Annual l&I Reports 660831

$ $ $ $ $

9/21/2015 10,500.00 10,500.00 7,377.50 221.25 7,598.75

72% $ 2,901.25 28%

to Date:

2015 Semi-Annual l&I Reports $ 10,500.00 $ 7,377.50 $ 221.25 $ 7,598.75

Remaining Budget($): $

72% 2,901.25 28% Remaining Budget(%):

10/18/2015 10/28/2015

Comments: Continued limited analysis of 1st month of new portable meter data from August 5-28, 2015 and prepared summary email to Township.

INVOICE

Newark, DE Remit Payment To: 302-655-4451 Fax: 302-654-2895 Pennoni P .0. Box 827328 Philadelphia, PA 19182-7328

East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199 Attention: Louis F. Smith, Twp Mgr.

For Services Rendered through: 10/18/2015

Invoice#: 660832 Invoice Date : 10/28/2015

Project : EGMA 1504 Project Name : Reservoir Rd PS Design &

Permitting

Phase 11 - Coordinated soft dig utility test pits scope and schedule with PPL, Sunoco, Williams-Transco, and Township; progressed to approx 95% complete stormwater management calculations, report, and BMP design; Township Engineer staff performed peer review of stormwater management design and issued letter that design is in accordance with the Township's Stormwater Management Ordinance; continued preparation of bid document and specifications; and continued preparation of architectural building details.

Phase 12 Contract Effort - Continued with preparation of PADEP Chapter 105 GP-5 "Utility Line Stream Crossings" and GP-8 "Temporary Road Crossings (across streams)" permit application for Ridley Creek; and submitted response to PennDOT's comments on HOP application for pipeline soft dig test pits.

Phase 12 Supplemental Effort - Performed pre- and post-development floodplain filling hydraulic analysis of pump station site, prepared and submitted hydraulic analysis letter report to the Township's Certified Floodplain Manager (CFM), coordinated with CFM on Chapter 106 floodplain certification form sign-off, and continued preparation of Chapter 105 and 106 General

Permit & Joint Permit application for Chester Creek utility crossing and floodplain impact. Supplemental effort on this invoice = $2,063.25

Phase : 11 -- Final Design

Total Phase : 11 -- Final Design

Phase : 12 -- Permitting

Total Phase : 12 -- Permitting

Fee: Prior Billings : Current Billings :

Total Billings :

Continued on next page .. .

135,800.00 99,212.50 7,240.75 106,453.25

Amount Due This Invoice

Labor : Expense Phase Total :

Labor : Expense Phase Total :

4,556.25 0.00 4,556.25

2,684.50 0.00 2,684.50

$7,240.75

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: EGMA1504 -- Reservoir Rd PS Design & Permitting

... Continued from previous page

Phase: 11 -- Final Design

Labor

Class

Authority Engineer

Township Engineer

Project Engineer

Staff Engineer

Associate Engineer

Engineering Technician II

Engineering Technician I

Labor Total:

Total Phase: 11 -- Final Design

Phase: 12 - Permitting

Labor Class

Authority Engineer

Senior Enviromental Scientist

Associate Engineer

Engineering Technician 11

Labor Total:

Total Phase: 12 -- Permitting

Hours/

Units Rate 0.25 115.00

0.25 115.00

18.75 97.00

9.50 90.00

13.00 85.00

5.00 77.00

5.00 67.00

51.75

Hours/

Units Rate 10.00 115.00

15.25 90.00

1.00 85.00

1.00 77.00

27.25

Total Project: EGMA1504 - Reservoir Rd PS Design & Permitting

Invoice # : 660832

Labor :

Expense :

Labor :

Expense :

Labor :

Expense :

Amount

28.75

28.75

1,818.75

855.00

1,105.00

385.00

335.00

4,556.25

$4,556.25

$0.00

Amount 1,150.00

1,372.50

85.00

77.00

2,684.50

$2,684.50

$0.00

$7,240.75

$0.00

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Pennoni Associates Inc. Page: 2

Project:

Pennoni Job No.: Invoice No:

Invoice Period:

Initial Authorization:

Contract Amount:

Previously Invoiced:

Current Invoice:

Invoiced to Date ($):

Invoiced to Date(%):

Remaining Budget ($):

Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget:

Previously Invoiced:

Current Invoice:

Invoiced to Date ($):

Invoiced to Date(%):

East Goshen Municipal Authority

EGMA1504 Invoice Summary

Invoice Date 10/28/2015

EGMA1504 Reservoir Rd PS Design & Permitting

660832 9/21/2015 to $ 167,120.00 Date: $ 167,120.00 $ 121,160.25 $ 7,240.75 $ 128,401.00 77% $ 38,719.00 23%

Final Design Phase 11 $ 47,400.00 $ 39,225.50 $ 4,556.25 $ 43,781.75

Remaining Budget($): $ Remaining Budget(%):

92% 3,618.25 8%

10/18/2015 10/28/2015

Comments: Phase 11 - Coordinated soft dig utility test pits scope and schedule with PPL, Sunoco, Williams- Transco, and Township; progressed to approx 95% complete stormwater management calculations, report, and BMP design; Township Engineer staff performed peer review of stormwater management design and issued letter that design is in accordance with the Township's Stormwater Management Ordinance; continued preparation of bid document and specifications; and continued preparation of architectural building details.

Project:

Pennoni Job No.: Invoice No:

Invoice Period:

Initial Authorization:

Contract Amount:

Previously Invoiced: Current Invoice:

Invoiced to Date ($):

Invoiced to Date (%):

Remaining Budget ($):

Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget:

Previously Invoiced:

Current Invoice:

Invoiced to Date ($): Invoiced to Date(%):

Remaining Budget($):

Remaining Budget(%):

East Goshen Municipal Authority

EGMA1504 Invoice Summary

Invoice Date 10/28/2015

EGMA1504

Reservoir Rd PS Design & Permitting

660832

9/21/2015 to $ 167,120.00 Date: $ 167,120.00 $ 121,160.25 $ 7,240.75 $ 128,401.00

77% $ 38,719.00

23%

Permitting Phase 12 $ 15,800.00 $ 8,944.50 $ 2,684.50 $ 11,629.00 74% $ 4,171.00 26%

10/18/2015 10/28/2015

Comments: Phase 12 Contract Effort - Continued with preparation of PADEP Chapter 105 GP-5 "Utility Line Stream Crossings" and GP-8 "Temporary Road Crossings (across streams)" permit application for Ridley Creek; and submitted response to PennDOT's comments on HOP application for pipeline soft dig test pits.

Phase 12 Supplemental Effort - Performed pre- and post-development floodplain filling hydraulic analysis of pump station site, prepared and submitted hydraulic analysis letter report to the Township's Certified Floodplain Manager (CFM}, coordinated with CFM on Chapter 106 floodplain certification form sign-off, and continued preparation of Chapter 105 and 106 General Permit & Joint Permit application for Chester Creek utility crossing and floodplain impact. Supplemental effort on this invoice= $2,063.25.

Memo

To: Municipal Authority From: Jon Altshul Re: MA October Financial Reports Date: November 6, 2015

In October, the Municipal Authority recorded $128 in revenues (all from interest) and $37,667 in expenses (including $36,766 for Reservoir Road Pump Station engineering), for a negative variance of $37,539. As of October 31st, the fund balance was $1,498,552, of which $1,435,629 is in the main construction account.

A complete list of all year-to-date expenses and revenues is provided.

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA Municipal Authority

October 2015

Annual Month To Date Year To Date

Account Title Acct# Budget Actual Actual

MUNICIPAL AUTHORITY BEGINNING FUND BALANCE 1,536,091.21

RCSTP BUDGET

REVENUE

INTEREST EARNED - RCSTP EXPANSION 073411020 1,600.00 126.53 1,270.83

GRANT REVENUE 07392 0800 0.00 0.00 0.00

TOTAL REVENUE 1,600.00 126.53 1,270.83

EXPENSES

R.C.-CAP. PROJ.-ENGINEER 07424 7451 0.00 0.00 0.00

R.C. CAP EXPANSION GEN'L CONTRACTOR 07424 7452 0.00 0.00 0.00

R.C. CAP EXPANSION - ELECTRICAL 07424 7453 0.00 0.00 0.00

R.C. CAP EXP CONTINGENCY CAPITAL 07424 7454 0.00 0.00 0.00

R.C. CAP EXP CONTINGENCY ONGOING 07424 7455 0.00 0.00 0.00

R.C. CAP EXP ADDITIONAL CONTINGENCY 07424 7456 0.00 0.00 0.00

TRANSFER TO SEWER SINKING FUND 07492 0550 0.00 0.00 0.00

TRANSFER TO AUTHORITY CAP FUND 07492 0990 0.00 0.00 0.00

TOTAL EXPENSES 0.00 0.00 0.00

RCSTP NET RESULT 1,600.00 126.53 1,270.83

OPERATING BUDGET

U:\bmccool\2015\Municipal Authority\2015 -10 - Municipal Authority Report.xlsx Page 1of3 11/04/2015

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA

Municipal Authority

October 2015

Annual Month To Date Year To Date

Account Title Acct# Budget Actual Actual

REVENUE

INTEREST EARNINGS 073411000 15.00 1.28 8.97

C.C. TAPPING FEES 073641100 0.00 0.00 27,600.00

R.C.TAPPING FEES 073641110 14,296.00 0.00 16,296.00

CONNECTION FEES- SEWER 073641130 0.00 0.00 1,268.64

M ISCELLANEOUS REVENUE 073801000 0.00 0.00 423.36

TRANSFER FROM SEWER OPERATING 07392 0500 105,105.00 0.00 20,000.00

TOTAL REVENUE 119,416.00 1.28 65,596.97

EXPENSES

ADMINISTRATIVE WAGES 074241400 33,323.00 0.00 24,251.00

MISCELLANEOUS EXPENSE 074243000 3,000.00 0.00 1,468.05

MUNIC.AUTH.-AUDITING 07424 3110 10,984.00 0.00 8,900.00

ENGINEERING SERVICES 074243130 37,300.00 641.25 32,613.25

LEGAL SERVICES 07424 3140 9,000.00 260.00 2,940.00

M .C.-DVRFA-DEBT SERVICE 074711000 23,240.00 0.00 0.00

M.C.-DVRFA-INTEREST PAYMN 074721000 4,169.00 0.00 0.00

M .C.-DVRFA-INTEREST PAYMN 074721010 0.00 0.00 0.00

TOTAL EXPENSES 121,016.00 901.25 70,172.30

OPERATING NET RESULT (1,600.00) (899.97) (4,575.33)

CAPITAL BUDGET

U:\bmccool\2015\Municipal Authority\2015 -10 - Municipal Authority Report.xlsx Page 2 of 3 11/04/2015

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE

WEST CHESTER, PA Municipal Authority

October 2015

Annual Month To Date Year To Date

Account Title Acct# Budget Actual Actual

REVENUE

DCED GRANT 073540400 0.00 0.00 37,162.00

LOAN PROCEEDS-SEWER PROJECT 073931001 0.00 0.00 0.00

TRANSFER FROM SEWER CAP RESERVE 07392 0900 0.00 0.00 0.00

TOTAL REVENUE 0.00 0.00 37,162.00

EXPENSES

MARYDELL PUMP STATION - ENGINEER 07425 1000 0.00 0.00 0.00

MARYDELL PUMP STATION -CONSTRUCTION 07425 2000 0.00 0.00 0.00

MANHOLE COVER REPLACEMENTS 07424.7405 0.00 0.00 0.00

C.C. CAPITAL- COLLECTION 07424.7420 0.00 0.00 0.00

LOCHWOOD ABANDONMENT ENGINEER 07424 7475 0.00 0.00 0.00

LOCHWOOD ABANDONMENT CONSTRUCTION 07424 7476 0.00 0.00 0.00

LOCHWOOD ELIMINATION PHASE 2 07424 7477 0.00 0.00 0.00

HERSHEY MILL STATION - ENGINEER 074261000 0.00 0.00 0.00

HERSHEY MILL STATION - CONSTRUCTION 07426 2000 0.00 0.00 0.00

RESERVE PUMP STATION - ENGINEER 074271000 0.00 0.00 0.00

RESERVE PUMP STATION - CONSTRUCTION 07427 2000 0.00 0.00 0.00

RESERVOIR PUMP STATION - ENGINEER 074281000 100,000.00 36,765.75 124,482.00

RESERVOIR PUMP STATION CONSTRUCTION 07428 2000 0.00 0.00 0.00

TOTAL EXPENSES 100,000.00 36,765.75 124,482.00

CAPITAL NET RESULT (100,000.00) (36,765.75) (87,320.00) -- MUNICIPAL AUTHORITY ENDING FUND BALANCE 1,498,552.02

U:\bmccool\2015\Municipal Authority\2015 - 10 - Municipal Authority Report.xlsx Page 3 of 3 11/04/2015

East Goshen Township General Ledger

Report Date 11/04/15

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits

07341-1000 INTEREST EARNINGS 1501 JE 46156

1501

1502 46526

1502

1503 46944

1503

1504 47407

1504

1505 47825

1505

1506 48334

1506

1507 48782

1507

1508 49202

1508

1509 49635

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

GL Transaction Details

Credits Beg/End Bal Date Check/Ref #

0.00 1. 44 02/03/15 INTEREST

1.44 -1. 44

1.17 03/02/15 INTEREST

1.17 -2.61

1. 03 04/02/15 INTEREST

1. 03 -3.64

0.61 05/04/15 INTEREST

0.61 -4.25

0.75 06/01/15 INTEREST

0.75 -5.00

0.64 07/02/15 INTEREST

0.64 -5.64

0.56 08/03/15 INTEREST

0.56 -6.20

0.64 09/01/15 INTEREST

0.64 -6.84

0.85 10/02/15 INTEREST

ID #

PAGE 1

Name/Description

INTEREST EARNED JANUARY 2015 07 FUND

INTEREST EARNED FEBRUARY 2015 07 FUND

INTEREST EARNED MARCH 2015 07 FUND

INTEREST EARNED APRIL 2015 07 FUND

INTEREST EARNED MAY 2015 07 FUND

INTEREST EARNED JUNE 2015 07 FUND

INTEREST EARNED JULY 2015 07 FUND

INTEREST EARNED AUGUST 2015 07 FUND

INTEREST EARNED SEPT.2015 07 FUND

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

1509 0.00 0.85 -7.69

1510 50108 1.28 11/03/15 INTEREST

1510 0.00 1.28 -8.97

07341-1000 **** *** ***** 0.00 8.97 -8.97

07341-1020 INTEREST EARNED - RCSTP EXPANSION 0.00 1501 46156 131. 97 02/03/15 INTEREST

1501 0.00 131.97 -131. 97

1502 46526 119. 08 03/02/15 INTEREST

1502 0.00 119. 08 -251.05

1503 46944 131.27 04/02/15 INTEREST

1503 0.00 131. 27 -382.32

1504 47407 125.90 05/04/15 INTEREST

1504 0.00 125.90 -508.22

1505 47825 128.37 06/01/15 INTEREST

1505 0.00 128.37 -636.59

1506 48334 124.75 07/02/15 INTEREST

1506 0.00 124.75 -761. 34

ID #

PAGE 2

Name/Description

INTEREST EARNED OCTOBER 2015 07 FUND

INTEREST EARNED JANUARY 2015 07 FUND

INTEREST EARNED FEBRUARY 2015 07 FUND

INTEREST EARNED MARCH 2015 07 FUND

INTEREST EARNED APRIL 2015 07 FUND

INTEREST EARNED MAY 2015 07 FUND

INTEREST EARNED JUNE 2015 07 FUND

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

07341-1020 1507 JE 48782

1507

1508 49202

1508

1509 49635

1509

1510 50108

1510

07341-1020 **** *** *****

07354-0400 DCED GRANT 1506 RE 48107

1506

07354-0400 **** *** *****

07364-1100 C.C. TAPPING FEES 1505 47736

1505

1506

1506

47853 47991

129.80

0.00 129.80 -891.14

128.91

0.00 128.91 -1,020.05

124.25

0.00 124.25 -1,144.30

126.53

0.00 126.53 -1,270.83

0.00 1,270.83 -1,270.83

0.00 37,162.00

0.00 37,162.00 -37,162.00

0.00 37,162.00 -37,162.00

0.00 2,000.00

0.00 2,000.00 -2,000.00

0.00

2,000.00 2,000.00

4,000.00 -6,000.00

08/03/15 INTEREST

09/01/15 INTEREST

10/02/15 INTEREST

11/03/15 INTEREST

06/17/15 48107 1

05/27/15 47736 1

06/03/15 47853 1 06/10/15 47991 1

ID #

PAGE

Name/Description

INTEREST EARNED JULY 2015 07 FUND

INTEREST EARNED AUGUST 2015 07 FUND

INTEREST EARNED SEPT.2015 07 FUND

3

INTEREST EARNED OCTOBER 2015 07 FUND

GRANT - RESERVOIR RD PUMP STA

TAP IN FEE - 1334 A PARK AVE

TAP-IN FEE FOR 1414 BRAMBLE LN TAP IN FEE FOR 14 RESERVOIR RD

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

07364-1100 1509 CR 49458

1509

07364-1100 **** *** *****

07364-1110 R.C.TAPPING FEES 1504 47236 47278

1504

1509 RE 49423

1509

07364-1110 **** *** *****

21,600.00

0.00 21,600.00 -27,600.00

0.00 27,600.00 -27,600.00

7,148.00 7,148.00

0.00

0.00 14,296.00 -14,296.00

2,000.00

0.00 2,000.00 -16,296.00

0.00 16,296.00 -16,296.00

07364-1130 CONNECTION FEES - SEWER 1501 CR 45967 423.00 0.00

JE 45968

1501

1502 CR 46296 46479 JE 46297 46480

1502

1505 CR 47731

1505

141.12

141.12

141.12 141.12

282.24

0.00

423.00

423.00 423.00

846.00

423.00

-281.88

-845.64

423.00 -1,268.64

07364-1130 **** *** ***** 423.36 1,692.00 -1,268.64

07380-1000 MISCELLANEOUS REVENUE 0.00

09/21/15 249

04/21/15 1123 04/23/15 1128

09/18/15 49423 1

01/16/15 789 01/16/15 PINE ROCK

02/13/15 248 02/26/15 2381 02/13/15 PINE ROCK 02/26/15 PINE ROCK

05/27/15 1124

PAGE 4

ID # Name/Description

8069 1 GOSHEN MEADOWS INVESTORS L.P.

7875 1 SUNNY RIDGE FARMS LLC 7875 1 SUNNY RIDGE FARMS LLC

TAP IN FEE FOR 1606 ATLEE DR

8648 1 GEORGE SMITH & CHRISTINA CONLE ANNUAL PINE ROCK INSTALLMENT

8650 1 JACOBS, ROBERT & CHERYL 8649 1 STOFFLET, MICHAEL ANNUAL PINE ROCK INSTALLMENT ANNUAL PINE ROCK INSTALLMENT

8651 1 PAPPANO, JOSEPH & PATRICIA

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

1501 JE 45968

1501

1502

1502

46297 46480

07380-1000 **** *** *****

0.00

0.00

0.00

07392-0500 TRANSFER FROM SEWER OPERATING

141.12

141.12

141.12 141.12

282.24

423.36

-141.12

-423.36

-423.36

0.00 1507 48567 20,000.00

1507 0.00 20,000.00 -20,000.00

07392-0500 **** *** ***** 0.00 20,000.00 -20,000.00

07424-1400 ADMINISTRATIVE WAGES 0.00 1503 CD 46874 8,292.10

1503 8,292.10 0.00 8,292.10

1506 48284 8,292.10

1506 8,292.10 0.00 16,584.20

1509 49529 8,292.10

49551 -8,292.10

49552 7,666.80

1509 7,666.80 0.00 24,251.00

07424-1400 **** *** ***** 24,251.00 0.00 24,251.00

01/16/15 PINE ROCK

02/13/15 PINE ROCK 02/26/15 PINE ROCK

07/16/15 DEPOSIT

03/30/15 2267

06/30/15 2273

09/25/15 2280

09/25/15 2280

09/25/15 2281

ID #

PAGE 5

Name/Description

ANNUAL PINE ROCK INSTALLMENT

ANNUAL PINE ROCK INSTALLMENT ANNUAL PINE ROCK INSTALLMENT

DEPOSIT $ FROM SEWER ACCT.

425 EAST GOSHEN TOWNSHIP - GENERAL lST QTR.2015 REIMBURS. FR: MUN.A

425 EAST GOSHEN TOWNSHIP - GENERAL 2ND QTR.2015 REIMBURSMT FR:MUN.A

425 EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR 2015 REIMBURSEMNT FR: MA 425 EAST GOSHEN TOWNSHIP - GENERAL VOID CK.2280 425 EAST GOSHEN TOWNSHIP - GENERAL 3RD QTR.2015 REIMBURSEMNT FR: MA

East Goshen Township General Ledger

Report Date 11/04/15

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits

07424-3000 MISCELLANEOUS EXPENSE 1501 45777 950.00

46110 500.00

1501

1506 JE 48342 18.05

1506 18.05

07424-3000 **** *** *****

07424-3110 MUNIC.AUTH.-AUDITING 1507 CD 48553 8,900.00

1507

07424-3110 **** *** ***** 8,900.00

07424-3130 ENGINEERING SERVICES 1501 45953 621.50

46013 640.00

1501

1502 46311 5,571.50

1502

1503 46649 5,685.00

1503

GL Transaction Details

Credits Beg/End Bal Date Check/Ref #

0.00 01/02/15 2260

01/29/15 2263

07/02/15 BANK FEE

0.00 1,468.05

0.00 07/16/15 2275

0.00 01/15/15 2261

01/22/15 2262

02/13/15 2264

03/12/15 2266

0.00 12,518.00

PAGE 6

ID # Name/Description

2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2015 ACTIVE MEMBERSHIP DUES 2737 COMMONWEALTH OF PA ANNUAL FEE - NPDES PERMIT -CHAP.

DEPOSIT SLIP ORDER 6/6/15

808 MAILLIE FALCONIERO & CO. EXAM.FINANCIAL STATEMENTS 12/31/

1052 PENNON! ASSOCIATES INC. SERVICES THRU 12/7/14 GENERAL 1052 PENNON! ASSOCIATES INC. SERVICE THRU 11/9/14 GEN.SERVICE

1052 PENNON! ASSOCIATES INC. SERVICES THRU 1/18/15 2014 CHAP.

1052 PENNON! ASSOCIATES INC. SERVICES THRU 2/15/15 2014 CHAP.

East Goshen Township General Ledger

Report Date 11/04/15

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits

07424-3130 1504 CD 47119 4,718.75

1504 4,718.75

1505 47583 10,136.50

1505 10,136.50

1506 47984 1,843.75

1506 1,843.75

1507 48553 1,921.25

1507 1,921.25

1508 48772 373.75

1508 373.75

1509 49338 460.00

1509 460.00

1510 49748 641.25

1510 641. 25

07424-3130 **** *** ***** 32,613.25

07424-3140 LEGAL SERVICES 1503 46649 300.00

1503 300.00

GL Transaction Details

Credits Beg/End Bal Date Check/Ref #

04/15/15 2269

0.00 17,236.75

05/14/15 2270

0.00 27,373.25

06/10/15 2272

0.00 29,217.00

07/16/15 2276

0.00 31,138.25

08/03/15 2277

0.00 31,512.00

09/11/15 2279

0.00 31,972.00

10/13/15 2283

0.00 32,613.25

0.00 32,613.25

0.00 03/12/15 2265

0.00 300.00

PAGE 7

ID # Name/Description

1052 PENNON! ASSOCIATES INC. SERV. THRU 3/22/15 2015 GEN.SER

1052 PENNON! ASSOCIATES INC. SERV.THRU 4/19/15 2015 GEN.SERV

1052 PENNON! ASSOCIATES INC. SERVICE THRU 5/17/15 2015 GEN.SE

1052 PENNON! ASSOCIATES INC. SERV.THRU 6/21/15 2015 SEMI-ANN

1052 PENNON! ASSOCIATES INC. SERVICES THRU 7/19/15 2015 GEN.S

1052 PENNON! ASSOCIATES INC. SERVICE THRU 8/16/15 2015 GEN.SE

1052 PENNON! ASSOCIATES INC. SERV.THRU 9/20/15 2015 SEMI-ANN

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - 1/12/15 GEN.AUT

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

07424-3140 1504 CD 47119 840.00 04/15/15 2268

1504 840.00 0.00 1,140.00

1506 47984 860.00 06/10/15 2271

1506 860.00 0.00 2,000.00

1507 48553 380.00 07/16/15 2274

1507 380.00 0.00 2,380.00

1508 48918 300.00 08/12/15 2278

1508 300.00 0.00 2,680.00

1510 49748 260.00 10/13/15 2282

1510 260.00 0.00 2,940.00

07424-3140 **** *** ***** 2,940.00 0.00 2,940.00

07428-1000 RESERVOIR PUMP STATION - ENGINEER 0.00 1501 45954 137.50 01/15/15 10029

46014 852.50 01/22/15 10030

1501 990.00 0.00 990.00

1502 46312 5,382.80 02/13/15 10031

1502 5,382.80 0.00 6,372.80

ID#

PAGE 8

Name/Description

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 2/6-2/9/15 GEN.AUT

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERV. 4/7-4/13/15 GEN.AUT

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 6/3-6/8/15 GEN.AU

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 7/13/15 GEN.AUTH

528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICES 8/10/15 GEN.AUTH.

1052 PENNONI ASSOCIATES INC. SERV.THRU 12/7/14 RESERV.RD ACT 1052 PENNONI ASSOCIATES INC. SERVICE THRU 11/9/14 RESERVOIR R ACT.537

1052 PENNONI ASSOCIATES INC. SERV.THRU 1/18/15 RESERVOIR RD.P ACT 537 PLANNING

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

07428-1000 1503 CD 46650 10,394.70 03/12/15 10032

1503 0.00 16,767.50

1504 47120 18,607.75 04/15/15 10033

1504 0.00 35,375.25

1505 47584 15,825.75 05/14/15 10034

1505 0.00 51,201.00

1506 47990 9,249.50 06/10/15 10035

1506 0.00 60,450.50

1507 48554 10,841.50 07/16/15 10036

1507 0.00 71,292.00

1508 48773 4,715.25 08/03/15 10037

1508 0.00 76,007.25

1509 49341 11,709.00 09/11/15 10038

1509 0.00 87,716.25

1510 49749 34,515.75 10/13/15 10039

JE 50127 2,250.00 11/04/15 RECLASS

1510 36,765.75 0.00 124,482.00

PAGE 9

ID# Name/Description

1052 PENNON! ASSOCIATES INC. SERV. THRU 2/15/15 RESERVOIR RD.

1052 PENNON! ASSOCIATES INC. SERV. THRU 3/22/15 RESERVOIR RD. DESIGN & PERMITTING

1052 PENNON! ASSOCIATES INC. SERV.THRU 4/19/15 RESERVOIR RD. DESIGN & PERMITTING

1052 PENNON! ASSOCIATES INC. SERV.THRU 5/17/15 RESERVOIR RD

1052 PENNON! ASSOCIATES INC. SERV.THRU 6/21/15 - RESERVR.RD P DESIGN & PERMITTING

1052 PENNON! ASSOCIATES INC. SERV.THRU 7/19/15 RESERVOIR RD

1052 PENNON! ASSOCIATES INC. SERVICES THRU 8/16/15 RESERV.RD

1052 PENNON! ASSOCIATES INC. SERV. THRU 9/20/815 RESERVR RD RECLASS EARTHCORE INV.6865 PYMT. 10/22 CK.10040

East Goshen Township General Ledger

Report Date 11/04/15 GL Transaction Details

MGRP18 run by BRIAN 11 : 18 AM

Acct # Per Src Trx # Debits Credits Beg/End Bal Date Check/Ref #

07428-1000 **** *** ***** 124,482.00 0.00 124,482.00

07428-2000 RESERVOIR PUMP STATION CONSTRUCTION 0.00

CD 49947 2,250.00 10/22/15 10040

JE 50127 2,250.00 11/04/15 RECLASS

1510 2,250.00 2,250.00 0.00

07428-2000 **** *** ***** 2,250.00 2,250.00 0.00

Grand Total 197,327.66 106,703.16 90,624.50

PAGE 10

ID # Name/Description

2911 EARTHCORE SERVICES LLC TRUCK RIG MOBILIZATION, SKIDSTEE TRACK RIG, AUGER PROBES RECLASS EARTHCORE INV.6865 PYMT. 10/22 CK.10040

8 trillionmicrobeads pollute United States' waterways - CNN.com http://V}Ww.cnn.com/2015/09/19/us/8-trillion-microbeads-pollute-wat. ..

B 8 trillion microbeads pollute U.S. aquatic habitats daily

By Jareen Imam, CNN R C9 Updated 8:11 AM ET, Tue September 22, 2015 I Video

Source: CNN

Story highlights

Eight trillion microbeads are entering the United

States' aquatic habitats daily, a new study

says

Microbeads are tiny plastic beads that can be

found in hundreds of personal care products

Scientists are calling for a total ban

{CNN}-Not to alarm you, but your daily morning regimen might be harming the planet's oceans.

What's the culprit? Microbeads. They are tiny, plastic beads that many companies have added to body scrubs, cosmetics, soaps -- essentially hundreds of products, to create an exfoliating sensation for users.

There's more than eight trillion microbeads entering aquatic habitats every day in the United States alone, according to a new study published in Environmental Science & Technology. It's enough microbeads to cover 300 tennis courts daily.

A microbead is any plastic that is smaller than 1 mm, about the size of a pinhead. They are designed to wash down drains, but have added to the increased microplastic debris littering the Earth's oceans and many freshwater lakes, the study states. Due to their size, plastic microbeads are difficult to clean Lip on a large scale.

Microbeads have even been subtly added to products like toothpaste. Despite their tiny size, they still pose a threat, according to Stephanie Green of Oregon State University and co-author of the study.

"Part of this problem can now start with brushing your teeth in the morning," she said. "Contaminants like these microbeads are not something our waste-water treatment plants were built to handle, and the overall amount of contamination is huge," she said.

The eight trillion microbeads entering the United States' aquatic habitats on a daily basis is only a fraction of what is being dumped in waste-water treatment facilities. Eight hundred trillion of these plastic beads settle into a sludge and transform into a runoff from sewage plants and go on to pollute the waterways.

10/6/?.0Vi 9:07 AM

8 trillionmicrobeads pollute United States' waterways - CNN.com http://www.cnn.com/2015/09/19/us/8-trillion-microbeads-pollute-wat. ..

"We're facing a plastic crisis and don't even know it," Green explained.

Some species of marine life mistake the small plastic particles for food, and scientists are currently examining how microplastics are affecting marine life once ingested and whether those chemicals can be transferred to humans if people consume these marine species later on, according to the National Oceanic and Atmospheric Administration (NOAA).

Chelsea Rochman of the University of California, Davis and lead author of the study, said microbeads were one of many types of microplastics to be found in the gut content of the marine wildfire that they examined.

"We've demonstrated in previous studies that microplastic of the same type, size and shape as many microbeads can transfer contaminants to animals and cause toxic effects," Rochman said. "We argue that the scientific evidence regarding microplastic supports legislation calling for a removal of plastic microbeads from personal care products."

Scientists from the study are calling for a complete ban on microbeads. They say that public support for the effort is also growing. Companies such as Unilever and Johnson & Johnson have pledged to phase out the use of microbeads in their personal care products.

In June 2014, the state of Illinois became the first state to ban the production, manufacture and sale of products that contain plastic microbeads, according to NOAA. Although the study argues that the legislation does not go far enough to eliminate microbeads that claim to be "biodegradable" but are not. Connecticut, New Jersey, Colorado have implemented regulations or bans on the plastic products as well.

Authors of the study are calling for new wording in micro bead legislation that will ensure a total ban on materials that are "persistent, bioaccumulative, or toxic" to be added to products that are meant to be wash down the drain.

CNN left a message Saturday with the Personal Care Products Council, an industry group.

Rick Smith

From: Sent: To: Cc: Subject: Attachments:

Good Morning,

Andrew Dibiase <ADibiase@Pennoni.com> Thursday, November 05, 2015 8:57 AM rsmith@eastgoshen.org; scott_towler@comcast.net; mmiller@eastgoshen.org Michael Ellis Chester Creek Interceptor Sample Data Chester Creek Interceptor Sampling Data 11-10-14.pdf

The Chester Creek Interceptor sampling results are attached.

AJ

AJ DiBiase Associate Engineer

Pennoni Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713-4310 Direct: 302-351-5225 I Cell: 732-492-1756 adibiase@pennoni.com

www.pennoni.com

Engineers, Scientists, Surveyors, and Planners

1

Table 6

November 2014 -Influent Wastewater

Phosphorus, Total,

Flow BODs TSS N~-N TKN,mg/L mg/L Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

MGDAverage 335 2,IJIJS 320 2,001 32 zoo 48 301 9.1 57

Sample Date

November4, 2014 0.353 258 760 222 654 34.4 101 40.1 118 6.4 19 November 11, 2014 0.396 278 819 380 1,120 34.1 100 48 141 6.6 19

November 18, 2014 0.385 216 636 288 849 30.9 91 42.8 126 5.8 17 November 25, 2014 0.366 140 413 282 831 29.9 88 46.9 138

Average 0.375 223 657 293 863 32.3 95 44.S 131 6.3 lB

Minimum 0.353 140 413 222 654 29.9 88 40.1 118 5.8 17

Maximum 0.396 278 819 380 1120· 34.4 101 48.0 141 6.6 19 2014 On November 10,..za+&at 3:05 PM, a grab sample was collected at the manhole located at the intersection of Strasburg and Reservoir Roads. The results of the sample are as follows:

- Influent Wastewater: Strasburg & Reservoir Roads SBR Influent Ammonia as BOD, mg/L Phosphorus, TKN, mg/L TSS, mg/l Average Daily N, mall Total, mall Design Value 32 335 9.1 48 320 Nov. 10,2014 43.3 228 9.1 67.3 190

Sequencing batch reactors (SBRs) numbered 1, 3 and 4 were in service during October and November.

Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Foam concentrations decreased slightly during September to as low as 40% coverage of the surface area. Increased sludge wasting rates ·were maintained to manage the MLSS concentrations and F:M ratio within the desired goals. Daily monitoring of the influent and final effluent 24-hour composites samples for total phosphorus is ongoing. Daily analysis of the final effluent flow equalization grab sample is total phosphorus is ongoing. Sample

BIG FISH ENVIRONMENTAL SERVICES, INC. 801 General Sterling Drive, West Chester PA 19382

Page 4 of8

Memo

East Goshen Township

E-mail rsmith@eastgoshen.org

Date: October 28, 2015 To: Commerce Commission, Conservancy Board, Futurist Committee, Historical Commission Municipal Authority, Park and Rec Commission arid Planning Commission From: Rick Smith, Township Manager Re: ABC Goals

At their meeting on Tuesday, October 27, 2015 the Board approved the following tentative ABC Goals for 2016. The Board intends to finalize the list of goals at the Annual Planni11g Session which will be held on Saturday January 9, 2016.

In addition the new Comprehensive Plan and the Parks, Recreation and Open Space Plan (Plans), both of which are posted on the Township web site, each have a number of action items with an "On-Going" priority. The Board's expectation is that each ABC will continue to implement these action items going forward.

If you have any comments, questions or concerns about your respective ABC's Goal(s) please provide them to me by December 30, 2015. Additional information about these goals and their method of implementation can be found in the Plans which are posted on the Township web site.

Comprehensive Plan Board of Supervisors Goal 7.3 Allowing for new uses and smaller incubator businesses in the corporate parks and industrial park Goal 6.2 Transforming the Paoli Pike Corridor into a walkable, connected artery.

Commerce Commission Goal 7.3 Allowing for new uses and smaller incubator businesses in the corporate parks and industrial park. Goal 6.1 Transforming the Town Center into a viable, walkable, visitable Place. Senya agreed to act as the liaison from the BOS.

Conservancy Board Goal 11.5 Continuing riparian buffer plantings throughout the Township. Goal 11.8 Reviewing and updating tree replacement standards as needed.

Futurist Commission Goal 6.1 Transforming the Town Center into a viable, walkable, visitable Place. Senya agreed to act as the liaison from the BOS.

Historic Commission Goal 13.6 Considering simplified Historic Preservation standards Goal 13.5 Considering simplified Historic Preservation requirements

Park and Recreation Commission Goal 9.2 Developing the Paoli Pike Trail to create the linkage between West Chester and Malvern, through East Goshen from West Goshen to Willistown. In addition the Board suggested the Commission also consider the potential for "feeder" trails from the various developments to the Paoli Pike trail.

Goal 8.6 Increasing pedestrian circulation along Paoli Pike, especially in the form of a "Paoli Pike Promenade" with Sidewalks and Crosswalks, as well as increasing pedestrian circulation and pedestrian safety along Greenway, with Trails, Walkways and Crosswalks.

Planning Commission Goal 6.2 Transforming the Paoli Pike Corridor into a walkable, connected artery.

Parks, Recreation and Open Space Plan

Board of Supervisors Goal 1.lA Adopt the parkland standard of 28.20 acres per 1,000 residents Goal 1.lB Adopt a Mandatory Dedication of Parkland Ordinance

Conservancy Board Goal 1.5 Develop a public education program to increase public awareness, appreciation and engagement in managing natural resources and park features.

F:\Data\Shared Data\ABC'S\Goals\Memo to ABCs 102815.doc

'l

9/10 /1r- East Goshen Township Comprehensive Plan

16.. Implementation Strategies:

Our implementation strategies are consistent with our overarching view of: protecting the health, safety, and welfare of our residents; maintaining East Goshen's overall economic prosperity; enhancing the Township's built environment; protecting natural and historic environments; sustaining successful recreational programs; and protecting and improving the quality of life that we all enjoy.

Priority: Implementation steps include one of three levels of priority, as follows:

1 - Higher Priority Initiatives include those that the Task Force feels are the most urgent and achievable;

2 - Medium Priority Initiatives do not rise to the level of being a top priority, but are recognized as being important; and

3 - Lower Priority Initiatives include actions that are considered to be useful, but are not as critical as #1 and #2.

Completion Time Frame: is meant as an estimate of the time frame in which a specific Initiative can be completed. ·

Responsibility: identifies which of the East Goshen Township ABC's are most responsible for overseeing the Implementation of each Initiative.

Implementation Method: identifies whether the Initiative will require such actions as an ordinance amendment, physical improvement, special study, meetings, workshops, plan review, or development.

Potential Funding Source: addresses potential funding sources that could be used to supple- ment Township funds. These include state funding sources - the Department of Conservation and Natural Resources (DCNR), the Department of Community & Economic Development (DCED), the Department of Environmental Protection (DEP), grants from federal Community Developm~nt funds , and grants from the Chester County Board of Commissioners.

The Board of Supervisors should use this Implementation Matrix as a guide to monitor progress on the various Initiatives. Therefore, the Board of Supervisors should periodically review and update the Implementation Matrix to reflect current Township priorities.

Notes: 1. The Initiatives listed in this Section are supplemented by expanded lists in the Appendices. 2. Whenever there is an "On-Going" initiative, an asterisk ( *) is indicated as these items are constant.

~-· ... ---·~

' .,

PQ15 r (

I

Implementation Matrix

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary other (3) Sources (2)

5. Housing Plan

Encouraging the 5.1. maintenance and * on-going PS Development, PS Improvement of the Plan Review existina housina stock Continuing to provide * 5.2. opportunities for a variety on-going BOS PC zo PS of housina tvoes. Encouraging infill opportunities by providing 5.3. for additional dwening * on.going PC BOS, FC ZO,SLDO, PS units, without adversely Plan Review impacting the character of existina neighborhoods. Redeveloping selected : properties along West Development, 5.4. Chester Pike in order to 3 2to10 years PS PS provide for new housing Plan Review

opportunities. Encouraging mixed uses * 5.5. and mixed housing types on-going BOS PC zo PS where aoorooriate.

(

: Encouraging the ,,,..,., ! Redevelopment of vacant ~ I 5.6. and/or underperforrning 3 5to10years PC PS Development,

lots to create new housing Plan Review

opportunities. I Fostering opportunities for zo,/ : 5.7. 2 2to 10 years Eios PC PS, CCC I aalna in olace.

-

./' 6. Land Use Plan ; / Transforming the Town

BOS, Pf~ Plan Review, 6.1. Center into a viable, 1 1to10 years PS Development PS,PT walkable, visitable Place. Transforming the Paoli G

@T, 6.2. Pike Corridor info a 1 1to10 years Special Study PT, DVRPC walkable, connected, CCC arterv. Transforming the West 6.3. Chester Pike Corridor into 2 2to 20years PS BOS, Special study PT, PS, DVRPC a more functional and PC,PT attractive arterv. Continuing to receive 6.4. guidance from the * on-going BOS

lets~

Meetings, Workshops GF Authorities, Boards and BC'~ Commissions (ABC's). Continuing effeclive 6.5. governance by the East * on-going BOS Meetings, Hearings GF Goshen Township Board of Supervisors. Continuing to accommodate a diverse 6.6. mix of residential, * on-going BOS PC,FC ZO, Plan Review PS commercial, institutional, ... light industrial, and recreational uses.

Notes: (1) The Township can use this Implementation Matrix as a guide to monitor progress on various Initiatives. Therefore, this Implementation Matrix should be periodically reviewed and updated to reflect current Township priorities.

(2) BOS = Board of Supervisors; PC = Planning Commission; PR= Parks & Recreation Commission; MA =Municipal Authority; CB = Conservancy Board; HG = Historic Commission; CC = Commerce Commission; FC = Futurist Committee; (

PS= Private Sector; PT= Penn DOT; DCNR: PA Department of Conservation and Natural Resources; I

DCED =PA Department of Community & Economic Development; DEP = Department of Environmental Protection; CCC= Chemter County Commissioners; DVRPC =Delaware Valley Regional Planning Commission.

(3) zo =Zoning Ordinance; SLDO =Subdivision and Land Development Ordinance; GF = General Fund

(

(

~015 Ir--------------. !

Completion Responsibility Method of Potential Objective Priority Time Frame (2) Implementation Funding (1) Primary Other (3) Sources (2)

8. Transportation & Circulation Systems Plan (continued)

Increasing pedestrian circulation along Paoli Pike, especially in the fonn of a "Paoli Pike Promenade" with Sidewalks and pc€) Special Study, GF, CCC._ 8.6. Crosswalks, as well as 1 1 to 10 years BOS DVRPC, if.lcreasing pedestrian ZO, SlDO DCNR circulation and pedestrian safety along Greenway, with Trails, Walkways, and Crosswalks. Implementing the East * 8.7. Goshen Township Act on-going BOS PC Plan Review PS - 209 Transportation Plan

9. Community Facilities and Services Plan

Maintaining and 9_1. expanding the Open 2 2 to 20 years BOS PC,PR, Special Study GF, CCC, DCNR Space, Recreation, and CB Trails Network. Developing the Paoli Pike Trail to create the linkage between West PC~ GF, PT, CCC, 9.2. Chester and MaJvern, 1 1 to 10 years BOS PT, Speclal Study DCNR through East Goshen, from West Goshen to WillistoWn. Maintaining and * Maintenance, 9.3. upgrading East Goshen on-going BOS PR Rec Fee in Lieu GF,DCNR Park. Continuing to provide * 9:4. high quality Recreation on-going BOS PR Programs GF,DCNR Services. Continuing to provide * 9.5. high quality Police, Fire on-going BOS Maintenance GF,DCED and EMS services. .............. Continuing the !"'' provisions of effective * 9.6. administrative, puolk: on-going BOS ~

Maintenance GF works, and related services. Continuing to support :> 9.7. important and viable * on-going BOS PR Maintenance GF Community Facilities.

10. Utilities Plan

Continuing to provide 3

effective sewage 10.i. disposal and wastewater * on·-going BOS Development PS treatment with oversight of the Municipal Authority. Continuing to provide

~~ 10.2. effective solid waste * on-going BOS Maintenance GF disposal, and recycling services. Maintaining the role of G

the East Goshen 10.3. Township Municipal * on-going BOS Special Study, PS Authority for evaluating Plan Review sewered and unsewered areas. -

Gawthrop Greenwood, PC

Attorneys at Law

Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380-6199

17 East Gay Street, Suite 100, P.O. Box 562 p. 610.696.8225 West Chester, PA 19381- 0562 www.gawthrop.com

October 27, 2015

Patrick M. McKenna 610.696.8225 x 155 610.344.0922 fax pmckenna@gawthrop.com

OCT 2 8 ZOb

Re: 2016 Fees For Legal Services

Dear Rick:

Please be advised that for 2016, Gawthrop Greenwood has no plans to change the rates or the terms of engagement under which we currently service East Goshen Municipal Authority.

The firm is pleased to have the continuing opportunity to provide legal services to the Municipal Authority in 2016 at our current rate of $200 per hour. I highly value our long-standing relationship with East Goshen Township and its officials and staff. I would expect that for purposes of budgeting you would be safe in assuming that our experience in 2016 will be similar to the amount of work we did in 2015.

Very truly yours,

r:pa!W'A M. ~

Patrick M. McKenna

PMM/ams

Rick Smith

From: Sent: To: Cc:

Rick Smith < rsmith@eastgoshen.org > Tuesday, November 03, 2015 8:06 AM 'Mark Miller'; 'Cokonis, Peter' 'Mark Gordon' Subject: RE: sanitary sewer service for 3&5 School Lane

Mr. Cokonis

The Manhole at the southeast corner of the property +-6 feet deep. The elevation on the as built plans is shown as 391.76.

The sewer line runs toward the north at 4.97%. The plans indicate the run is 310 feet.

The pipe is 8 inch SDR 35.

Manhole on Old West Chester Pike is+- 6 feet deep. The elevation is shown a 376.36.

The Municipal Authority will consider your request to connect these houses to the public sewer and use grinder pumps at their meeting on Monday November 9.

This is straightforward request and you do not need to attend the meeting.

Grinder Pump requirements are in the Township Code (see link)

Rick Smith Township Manager

Chapter 188: Sewers § 188-33 Grinder pump connections.

http://ecode360.com/7250806

From: Mark Miller [mailto:mmiller@eastgoshen.org] Sent: Tuesday, November 03, 2015 7:05 AM To: 'Cokonis, Peter' Cc: 'Mark Gordon'; Rick Smith Subject: RE: sanitary sewer service for 3&5 School Lane

Mr. Cokonis

JI- 6 - IS-

Please send me the grinder pump information so our engineer can review your equipment. Please send your grading and storm water information to Mark Gordon for his review. Thanks Mark

1

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 10/29/2015 To:

From:

Municipal Authority "' / / Mark Gordon, Township Zoning Officer 17V1. (t7 53-4-55 I 930 N. Chester Rd. /Sewer Capacity Re:

Dear Authority Members,

Enclosed is a subdivision application for a 2 lot subdivision at 930 N. Chester Rd. The plan proposes to split the 4 ac parcel into two lots and develop a new Single Family home on the new lot. The new lot proposes to connect to the public sewer system and to use a grinder pump to convey the sewer to the sewer line in the ROW of N. Chester

Rd.

I would suggest that the Authority approve the capacity request and recommend that the Applicant consider connecting the existing home to the SS system or provide the appropriate lateral stub and, should lot 1 decide to connect to the sanitary sewer at a later date.

Draft Motion: I move that we approve the sewer capacity request and the sanitary sewer grinder pump installation and authorize staff to forward the sewer planning module exemption request to DEP with the following conditions:

1. The grinder pump installation details be reviewed and approved by the Municipal Authority Engineer.

2. The applicant should consider installing a sanitary sewer lateral stub for the future connection of lot 1.

F:\Data\Shared Data\Property Management\53-4\53-4-55 (930 N. Chester Rd.)\2015 Subdivision\Memo to MA 10292015.doc

L owe II Civil Engineering & Land Planning www.DLHowell.com

Ridley Creek Sewer Treatment Plant East Goshen Township Municipal Authority

1580 Paoli Pike West Chester, PA 19380

Attn: Mark Miller, Director of Public Works

RE: Sewage Facilities Planning Module- Exemption Request

Gary Moore Subdivision 930 North Chester Road East Goshen Township, Chester County

Dear Mr. Miller,

October 23, 2015

D.L. Howell & Associates, Inc. has submitted Subdivision Plans to East Goshen Township for the Gary Moore subdivision located at 930 North Chester Road in East Goshen Township, Chester County. The project involves the subdivision of an existing 4.053 acre lot into one 1.974 lot and one 2.097 acre lot. Lot 1 will contain the existing dwelling currently located on site and Lot 2 will contain a newly constructed residential dwelling. The proposed dwelling on Lot 2 will produce an estimated increase of sewage flows to the Ridley Creek Sewer Treatment Plant of 275 gallons per day. This letter serves as a request for East Goshen Township Municipal Authority verification that the treatment facility has capacity and the projected increase in sanitary wastewater will not create a projected organic or hydraulic overload within the next 5 years. Enclosed is a detailed narrative and plot plan which depicts the sewer line and connection point.

The proposed residential dwelling on Lot 2 will pump flow, via grinder pump, to an existing sewer main located southeast of the site along North Chester Road. Flow will exit the site along the southeastern boundary line and travel as part of the East Goshen Township sewer system, ultimately reaching the Ridley Creek Sewer Treatment Plant for treatment and disposal.

According to Chapter 94 Capacity and Flow Allocation regulations we are requesting written documentation from East Goshen Municipal Authority that the proposed project is in compliance with this requirement. Please provide us with the required letter or any comments you may have so that we can complete our contracted obligations for our client.

Additionally, please complete the included Chapter 94 Certification form. Please feel free to contact om office should you have question's, comments, or require additional information. Thank you for your cooperation with this proposed project.

Sincerely, nlff )(jflt_soc1ATES, INC.

Dave DiCecco Environmental Specialist

1250 Wright's Lane, West Chester, PA 19380 Phone: (610) 918-9002 - Fax: (610) 918-9003

www.dlhowell.com

610-692-7171

www.eastgoshen.org BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

October 27, 2015

Dear Property Owner:

The purpose of this letter is to inform you that the Township has received a Subdivision application for 930 N. Chester Rd., West Chester, PA 19380. The applicants, Gary and Paula Moore, are proposing to subdivide the existing 4 acre parcel into two lots.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when subdivision applications are received.

The meeting dates and times scheduled for the review, discussion and possible approval of this application are outlined below. These meeting dates and times are subject to change without further written notice.

November 4, 2015: Planning Commission meeting (7:00 PM

December 2, 2015: Planning Commission meeting (7:00 PM)

December 15, 2015: Board of Supervisors meeting (7:00 PM)

All meetings are held at the Township Building and are open to the public. The subdivision application and plan are available for review during normal business hours. Please give me a call at or email me at mgordon@eastgoshen.org if you have any questions or need additional information.

Sincerely,

Mark A. Gordon Township Zoning Officer

Cc: All Township Authorities, Boards and Commissions

F:\Data\Shared Data\Property Management\53-4\53-4-55 (930 N. Chester Rd.)\2015 Subdivision\1000 foot letter 53-4-55 10262015.doc

East Goshen Municipal Authority Township of East Goshen, PA

Executive Summary

Kroll Bond Rating Agency (KBRA) has affirmed the long-term rating of AAA with a stable outlook on East Goshen Municipal Authority (the Authority), Pennsylvania's General Obligation (GO) and GO guaranteed debt. The Authority's GO guaranteed debt consists of Guaranteed Sewer Revenue Notes which are first payable from the Authority's Sewer System revenues and are ultimately guaranteed by the full faith and credit tax pledge of East Goshen Township, PA (the Township). The KBRA rating is based on East Goshen Township's full faith and credit general obligation guarantee, backed by its unlimited taxing power, on scheduled principal and interest due on GO and GO guaranteed debt.

East Goshen Township's direct debt, which includes all GO and GO guaranteed debt, was approximately $15.9 million, as of December 31, 2014. This rating is based on KBRA's U.S. Local General Obligation Rating Methodology, published on May 31, 2012. KBRA's evaluation of the long-term credit quality of local general obligation bonds focuses on four key rating determinants:

• Governance and Management Structure and Policies, • Municipal Resource or Economic Base, • Debt and Additional Continuing Obligations, and • Financial Performance and Liquidity.

In the process of affirming the rating on the Township's outstanding debt, as described above, KBRA reviewed current information on East Goshen Township's operations in the context of the four key rating determinants outlined above and spoke with Township management. For a full discussion of the Key Rating Determinants please see KBRA's initial report on the Township, Township of East Goshen, PA Guaranteed Sewer Revenue Notes, 2013 Series A-D, published on October 17, 2013.

Security Provisions

The General Obligation and GO Guaranteed Notes were issued in connection with borrowings from the

Delaware Valley Regional Financing Authority (DelVal), a loan program which provides financing for Pennsylvania municipalities and school districts. The Notes are guaranteed by the Township's full faith and credit general obligation guarantee, backed by its unlimited taxing power on parity with Notes issued in

1998 and 2008. The Authority's Guaranteed Sewer Revenue Notes are first payable from the Township's annual lease rental payments to be paid to the Authority under the Lease Agreement. The Township makes lease payments out of its Sewer Revenue Fund from sewer rates and charges, and these lease payments are also secured by a full faith and credit obligation of the Township. Under state statutes, the Township has the power to levy ad valorem property taxes on all taxable property in the Township,

without limitation as to rate or amount, to pay debt service on the Notes.

The Authority is a component unit of the Township and was formed by the Township to finance its sewage collection and treatment system. Under the Lease Agreement between the Township and the Authority the Authority owns the sewer system. The system is leased back to the Township and the Township is

responsible for operating and maintaining the system and setting sewer charges to support operating costs and pay annual lease rental payments to the Authority for debt service on the Notes.

East Goshen Municipal Authority Township of East Goshen, PA Surveillance Report

October 20, 2015

• Strong financial management policies and procedures, which include frequent reporting of budget-to-actual performance and reporting financial results on a modified accrual basis. • High level of income per capita at approximately 180% of the Commonwealth and U.S. average in 2013. • Access to the employment markets of Philadelphia, Wilmington, and surrounding Chester

Count • Formalized five-year capital improvement plan that requires the Township to maintain sufficient capital reserves to replace all property, plant, and equipment assets • Available fund balance in FY 2014 was $4.8 million, or 54.2% of General Fund expenditures.

• Strong liquidity position in FY 2014 with 324 days cash on hand

• Funded ratio in the regional police pension plan was below 63.4% as of January 1, 2013.

• General Fund Revenue base is somewhat dependent on earned income taxes.

Rating Summary

KBRA views the Township's governance and management structure as extremely strong. In addition to a comprehensive budget process, East Goshen Township provides timely disclosure, maintains documented policies on reserves, and has a comprehensive five year capital improvement plan. The Township also releases a monthly report that monitors budget to actual performance within its governmental and enterprise funds. Beginning in FY 2014, the Township also maintains an additional operating reserve accounted for within its General Fund that is equal to a minimum of 5.0% of General Fund revenues.

East Goshen Township, with a population of 18,111, is a 10.1 square mile suburban community located 30 miles west of Philadelphia along the Delaware River. The Township, while primarily residential, has access to a diverse economic and employment base given its proximity to major metropolitan areas including

Philadelphia~ Wilmington, and the surrounding Chester County, PA. A number of large employers including Vanguard Group Inc. and Siemens Healthcare are headquartered in Chester County, PA. The Township is

nearly built out and consists of real estate primarily constructed during the 1970's to 1990's. KBRA views East Goshen Township's municipal resource base as very strong due to income per capita and educational attainment at levels higher than the Commonwealth and U.S., and low poverty levels. In addition, the Township's effective management practices, relatively low levels of debt, and strong financial performance further support the KBRA rating of the Township.

Despite a flat assessed value, KBRA continues to view the Township's municipal resource base as very strong. East Goshen Township's top ten taxpayers compose only 7.8% of assessed value, while full value per capita, as of 2013 was $134,942, which KBRA views as very strong. The Township has experienced consistent and steady population growth, which has increased by more than 7. 7% since 2000. The Township's income per capita of $50,423 is more than 175% of both the Commonwealth and the U.S

levels.

Additionally, East Goshen Township continues to maintain a low to moderate debt burden. The majority of the Township's debt is in the form of fixed rate loans from the Delaware Valley Regional Finance Authority.

KBRA considers the Township's overall debt per capita at $5,055 and overall debt as a percentage of 2013 full market property valuation at 3.7% to be moderate.

East Goshen Municipal Authority Township of East Goshen, PA

Page I 2 October 20, 2015

East Goshen Township also administers two defined benefit pension plans, for fire and non-uniform employees. The Township has contributed 100% of its annual minimum municipal obligation (MMO), most of which is funded from state aid. The Township has a shared interest in an additional defined benefit pension plan for uniformed police officers, for which it makes 100% of the required MMO. The fire, non- uniform, and police pension plans have funded ratios of 91.2%, 133.7%, and 63.4% respectively. East Goshen Township's total fixed costs in FY 2014, defined as debt service, pension payments, and pay-as- you-go OPEB payments, were $1.8 million and represented 17. 7% of total governmental expenditures.

KBRA continues to view East Goshen Township's financial performance and liquidity as very strong. In FY 2014, the Township ended the year with an operating surplus of $1.0 million. Due to the creation of an operating reserve within the Township's General Fund, unassigned fund balance declined by 29.0% from $6.3 million in FY 2013 to $4.8 million in FY 2014. This level of unassigned fund balance is equal to 54.2% of FY 2014 General Fund expenditures. KBRA still considers the Township's available fund balance, relative to its General Fund expenditures, to be very strong. As of August 31, 2015, FY 2015 is projected to end with an operating surplus of $243,171. FY 2015 revenues are projected to be higher than budgeted

primarily because of the unexpected sale of a large commercial property within the Township, which generated higher than budgeted Real Estate Transfer Tax revenues. FY 2015 expenditures are largely in line with budgeted expectations. The Earned Income Tax (EIT), a 1.0% tax on gross income, provides 47.0% of General Fund revenues with real estate taxes providing an additional 20.2%.

Based on a review of the four rating determinants included in the methodology, KBRA has assigned a rating to each determinant, summarized as follows.

• Governance, Management Structure and Policies: AAA

• Debt and Additional Continuing Obligations: AAA • Municipal Resource Base: AAA • Financial Performance and Liquidity Position: AAA

Outlook:

The stable outlook reflects KBRA's expectation that the Township will continue to manage its financial operations to maintain a structurally balanced budget, while maintaining strong reserve levels and liquidity.

In KBRA's view, the following factors may contribute to a downgrade of the rating:

• Trend of operating deficits in the General Fund. • Significant deterioration in General Fund reserve levels.

East Goshen Municipal Authority Township of East Goshen, PA

Page I 3 October 20, 2015

Key Rating Determinants Rating Determinant 1: Governance and Management Structure and Policies

KBRA views East Goshen Township's governance and management structure as very' strong and consistent with a AAA rating determinant rating. The Township has a formal budget process and has a history of accurately forecasting revenues and expenditures historically. Township administration has not changed since the time of KBRA's last report. In FY 2015, the Township continued to make a number of capital improvements to administration offices and buildings, parks, and other Township infrastructure.

In FY 2013, the Township implemented a written reserve policy, requiring fund balance to be equal to a minimum of 20% of operating expenditures. Additionally, the Township also created an operating reserve fund. The operating reserve, currently $2.5 million, must represent at least 5% of annual General Fund revenues. In the event that the Township must draw on this reserve, the Township Board of Supervisors is required to approve any appropriation to the General Fund. Additionally, East Goshen Township formalized a five year capital improvement plan. Updated annually, the capital improvement plan budgets for and specifies the source of funding for all capital upgrades. KBRA views both of these changes as credit positives. Furthermore, East Goshen Township formalized its policies on maintaining capital reserves. In FY 2013, the Township transferred net revenues of its General Fund to the capital reserve fund such that the capital reserve fund has sufficient financial resources to cover the full replacement costs of all Township-owned capital assets. This transfer is consistent with actions taken by the Township in previous years. In addition, the Township uses an accumulated depreciation formula to ensure that the capital reserve fund has sufficient assets to replace in full any capital purchased after FY 2013.

Rating Determinant 2: Municipal Resource Base

KBRA views the Township's municipal resource base as very strong and consistent with a AAA rating determinant rating. This rating level is primarily driven by a stable population, high per capita income, diverse tax base, and very high full market value. Proximity to major employment hubs in Philadelphia, Wilmington, and surrounding Chester County offers the Township relatively stable employment and low poverty rates. In addition, East Goshen Township's level of educational attainment is more than double the Commonwealth of Pennsylvania and the United States. Per data from the Pennsylvania State Tax

Equalization Board (STEB), East Goshen Township's full market value in 2013 was $2.44 billion while full value per capita declined slightly from $136,340 in 2012 to $134,932 in 2013. KBRA views the Township's full value per capita as very high.

The Township's population has grown 7.7% from 2000 to 2013, which is lower than the growth rate of

Chester County, but is higher than Pennsylvania's 2.7% growth rate statewide in the same period of time. KBRA views East Goshen Township's income per capita as very high, at 121% of the county and 177% and 179% of the Commonwealth and United States respectively. The Township's unemployment rate continues to decline from 6.2% in 2010 to 4.1 % in July 2015, which is in line with the Commonwealth and stronger than the United States.

East Goshen Municipal Authority Township of East Goshen, PA

Page I 4 October 20, 2015

Population with B.A. Degree or higher 57.1% 116.3% 27.5% 207.6% Poveity tevel2 3.5% ~1.5 !J0.0% 13.3% 0.9 26..3% Income per capita $50,423 6.5% 4.0% 120.8% $28,502 5.4% 176.9% Source: U.S. Census Bureau is used as the source in order to provide a consistent comparison among different units of government.

1 Age dependency ratio is the sum of the population under 18 yrs and over 65 yrs divided by persons age 18 to 64 yrs. 2 Year over year change shown as nominal change in percentage points

1228% 192.9% 15.8% 0.5 22.2% $28,184 8.2o/o 178.9%

East Goshen Township's full market value of the property tax base has shown an average annual increase of 2.5% since 2009, with a slight decline in 2013. During this same time period, the Township's assessed valuation has been largely flat, averaging a 0.3% annual decline. KBRA considers East Goshen Township's tax base as diverse with the top ten taxpayers accounting for 7.8% of assessed value in 2014. Major local employers include CTDI (telecommunications company) and Syntheses (division of Johnson & Johnson that manufactures medical equipment). Major companies including Vanguard Group Inc. and Siemens

Healthcare are also headquartered in Chester County, PA. Township tax collections averaged over 99% during the past five years.

Rating Determinant 3: Debt and Additional Continuing Obligations

KBRA continues to view the Township's overall debt burden as low to moderate and as being consistent with a AAA rating determinant rating, based on KBRA's view of low to moderate debt per capita. In FY

2014, East Goshen Township's direct and indirect debt per capita was approximately $5,055 which KBRA considers moderate. Overall debt to full value remains low at 3.7% while debt service as a percent of total governmental expenditures is also low at 7.6%. Amortization of direct debt is lower than prior years beginning in FY 2014. This is due to the issuance of the Series 2013 Guaranteed Sewer Notes in FY 2013 which increased the Township's direct debt outstanding and extended the debt service schedule. Inclusive of this additional debt, KBRA considers direct debt amortization to be average, with 53.8% of principal to be retired within 10 years and 94.1 % retired within 20 years.

Overall Direct and Overlapping Debt

As of December 31, 2014 the Township's total outstanding direct debt was $15.9 million. KBRA's total direct debt calculation of East Goshen Township includes the Township's debt of $5.2 million and the Municipal Authority's lease rental debt of $10.6 million. With the exception of the Township's share of the cost of construction of a shared regional police building with Westtown Township, approximately $1.0 million outstanding, all of the Township's debt is in the form of fixed rate loans from the Delaware Valley Regional Finance Authority. The Township's total overlapping debt of $75.6 million represents its allocable portion of Chester County, PA and West Chester School District's total debt outstanding. Management states that there are no current plans to issue further debt.

East Goshen Municipal Authority Township of East Goshen, PA

Page I 5 October 20, 2015

East Goshen Township Debt Ratios

Fiscal Year 2014

~~~1[~:~~"~~':;;;~ 1; ::::~~::: :e:;2y~~~:l~AT~~

Overall direct and indirect debt per capita

Overall debt as % of 2014 full market value of property

Direct debt service as a % of total governmental expernfrrures

$5,055

3.7%

7.6%

Source: East Goshen Township Audited Ffnanaal Statements FY 2014

Township Pension Plans and OPEB Liability

East Goshen Township has two pension plans for its fire, and non-uniformed employees along with a shared interest of a defined benefit pension plan for police. As of January 1, 2013 the Township's share of the police pension plan, consisting of 36 members, had a funded ratio of 63.4% and the fire pension plan, consisting of 10 members, had a funded ratio of 91.2%. The Township's non-uniform pension plan, consisting of 35 members, has been closed off to new entrants since December 31, 2010. The Township no longer contributes to the plan and it remains well funded at 133.7%. In FY 2013, the Township's annual pension cost for its two active defined benefit plans was $938,675 which represents 9.2% of total FY 2014 governmental expenditures. It is important to note, however, that state aid covers the entire minimum municipal obligation (MMO) for East Goshen Township's defined benefit pension plans.

The Regional Police Commission, which administers the joint police pension plan between East Goshen Township and Westtown Township, also administers medical and prescription drug benefits for eligible

retired employees and spouses (OPEB) through a defined benefit plan. The Township's annual actuarial required contribution (ARC) payment in FY 2014 was $80,619, or approximately 0.8% of total governmental expenditures. The Township's OPEB contribution was reduced by more than 75.0% from FY 2013 to FY 2014. The primary drivers of this decline were a renegotiated labor contract with police officers that included a higher deductible health plan which reduced Township health benefit payments, as well as a correction to the calculation that amortizes the Township's unfunded OPEB actuarial accrued liability. The calculation was corrected to appropriately account for restricted funds set aside by East Goshen Township, Westtown Township, and the Regional Police Commission for OPEB benefits. Township

management plans to request a new study of its OPEB benefits based on changes resulting from GASB 45. Beginning in FY 2016, the Township expects its annual required OPEB contribution to increase by approximately 60.0%, or approximately $130,000. East Goshen Township does not offer or provide any additional OPEB benefits.

Without consideration of state aid for pension payments, East Goshen Township's total fixed costs in FY 2014, defined as debt service, pension payments, and pay-as-you-go OPEB payments, were $1.8 million and represented 17. 7% of total governmental expenditures.

Delaware Valley Finance Authority

There are certain swap-related risks allocable to the Township in that DelVal can assess any swap termination costs of the program on a proportionate basis to East Goshen Township. The swap agreements with the various swap counterparties include rating downgrade triggers for automatic termination for the counterparties and DelVal. As of September 30, 2015, the aggregate mark-to-market

East Goshen Municipal Authority Township of East Goshen, PA

Page I 6 October 20, 2015

termination value allocable to the Township, in the event that all DelVal swaps were terminated, would be a positive $696,238.

Rating Determinant 4: Financial Performance and Liquidity

KBRA views the financial position of East Goshen Township as very strong and consistent with a AAA rating determinant rating. This rating determinant reflects the Township

1s history of operating surpluses, consistent growth of available fund balance, and historically balanced budgets. The Township's operations fared well during the most recent recession, with operating surpluses ranging from 6.1 % to 24.3% of total General Fund expenditures. East Goshen Township's operating results reflect conservative budgeting and a history of accurate revenue and expenditure projections.

FY 2014 Operations

The General Fund ended FY 2014 with an operating surplus of $1.0 million, or approximately 11.2% of total General Fund expenditures. After declining 9.7% between FY 2012 and FY 2013 due to statutory changes in tax collection procedures, Earned Income Tax (EIT) revenues, a percentage tax on gross income based on an individual's place of residence, remained level in FY 2014 and totaled $4.7 million. EIT continues to serve as the largest source of General Fund revenues, at 47.0% in FY 2014. Going forward, management expects that EIT revenues will come in as budgeted.

Total General Fund revenues increased year over year in FY 2014 by 4.9% while expenditures increased

by 8.8%. The increase in revenues was largely driven by increased property and real estate transfer tax collections. Expenditure growth was driven by wage increases, primarily related to public safety. After transfers, the total fund balance increased by 9.4% to $7.4 million. Due to the creation of an operating

reserve within the Township's General Fund, unassigned fund balance declined by 29.0% from $6.3 million in FY 2013 to $4.8 million in FY 2014. This level of unassigned fund balance is equal to 54.2% of FY 2014 General Fund expenditures. ·

General Fund Expenditures j:Jetcent dlange ·

surplus (Deficit) from Operations Total other Financing Sources (Uses)

~~·-~-:~---· . Total Fund Balance Nonspendable Unassigned Unassigned Fund Balance as a O/o of General Fund Ex enditures

Source: East Goshen Township Audited Financial Statements FY 2012 -FY 2014

FY 2015 Projections -

$8,925,769

1,002,868 ($362,990)

$7,436,793

$90,253 $4,840,923

54.2%

$8,205,183 $8,075,532 a:8% 1.6%

$6,796,915 $6,468,069 $18,845 $54,000 $6,263,062 $6,414,069

76.30/o 79.40/o

East Goshen Township

1s management team provides its Board of Supervisors and the general public a monthly report that monitors its budget to actual performance. As of August 31, 2015, both General Fund revenues and expenditures are higher than anticipated. Total General Fund expenditures are $57,177 over budget, which is primarily driven by a $202,686 positive variance in public works expenditures due to the

East Goshen Municipal Authority Township of East Goshen, PA

Page I 7 October 20, 2015

costs of resurfacing and plowing Township roads. Revenues are over budget by $446,188 due to the unexpected sale of a large commercial property within the Township, which generated higher than budgeted Real Estate Transfer Tax revenues. East Goshen Township is projected to end FY 2015 with a $243,171 surplus in its General Fund.

Liquidity Position

As of December 31, 2014, the Township's cash position in its governmental funds totaled just over $10

million. This equates to over 408 days cash, based on General Fund expenditures which KBRA views as a very strong liquidity position.

Bankruptcy Assessment

It is KBRA's understanding that to be a debtor under the municipal bankruptcy provisions of the U.S.

Bankruptcy Code (Chapter 9), an entity must, among other things, qualify under the definition of "municipality" in the Bankruptcy Code and must be specifically authorized to file a municipal bankruptcy

petition by the State in which it is located. It is KBRA's understanding that the Authority is a municipal authority and a body corporate and politic under the laws of Pennsylvania. Pennsylvania law does not include provisions permitting the Authority to file a Chapter 9 petition. While KBRA understands that Pennsylvania law includes provisions permitting "municipalities" and "political subdivisions," both as defined under State law, to file a Chapter 9 petition after seeking and receiving the permission of the Commonwealth, the applicable definitions of "municipality" and "political subdivision" do not include a municipal authority, such as the Authority. KBRA understands that such authorization would require new action by the Pennsylvania State legislature.

KBRA further understands that with respect to the Township, the Township qualifies as a "municipality" under the Bankruptcy Code. With respect to specific state authorization, Act 47 of the Commonwealth of Pennsylvania, known as the "Distressed Municipalities Act," governs the process, and thus the ability of the Township to declare bankruptcy under the Federal Bankruptcy Code. Act 47 includes specific conditions under which a municipality may file a municipal debt adjustment action pursuant to the Bankruptcy Code. Act 47. also contains provisions and circumstances under which a municipality may be declared to be in "financial distress," making it eligible for interest-free loans, grants, and/or administrative assistance from the State Department of Community and Economic Development (DCED). The DCED would have the authority to recommend a plan to increase taxes or other sources of revenues,

reduce services, or reschedule obligations and the Township would only be permitted under Pennsylvania law to file a Chapter 9 petition if it has sought and received the permission of the DCED to file such a petition. Thus, assuming the Township meets the conditions provided under Pennsylvania law to file a Chapter 9 petition, and meets the other eligibility requirements of Bankruptcy Code Section 109, KBRA understands that it would be permitted to file a Chapter 9 petition.

Conclusion:

Overall, KBRA has affirmed the long-term rating of AAA with a stable outlook on East Goshen Municipal Authority (the Authority), Pennsylvania's general obligation (GO) and GO guaranteed debt. The KBRA rating is based on East Goshen Township's full faith and credit general obligation guarantee, backed by its unlimited taxing power, on scheduled principal and interest due on GO and GO guaranteed debt.

East Goshen Municipal Authority Township of East Goshen, PA

Page I 8 October 20, 2015

Analytical Contacts:

Gopal Narsimhamurthy, Senior Analyst gnarsimhamurthy@kbra.com, (646) 731-2446

Andrew Clarke, Senior Director aclarke@kbra.com, (646) 731-2380

Related Publications:

" General Obligation Bonds Series 2013-A and 2013-E! " U.S. Local Government General Obligation Rating Methodology

© Copyright 2015, Kroll Bond Rating Agency, Inc., and/or its licensors and affiliates (together, "KBRA"). All rights reserved. All information contained herein is proprietary to KBRA and is protected by copyright and other intellectual property law, and none of such information may be copied or otherwise reproduced, further transmitted, redistributed, repackaged or resold, in whole or in part, by any person, without KBRA's prior express written consent. Ratings are licensed by KBRA under these conditions. Misappropriation or misuse of KBRA ratings may cause serious damage to KBRA for which money damages may not constitute a sufficient remedy; KBRA shall have the right to obtain an injunction or other equitable relief in addition to any other remedies. The statements contained in this report are based solely upon the opinions of KBRA and the data and information available to the authors at the time of publication of this report. All information contained herein is obtained by KBRA from sources believed by it to be accurate and reliable; however, KBRA ratings are provided "AS IS". No warranty, express or implied 1 as to the accuracy, timeliness, completeness 1 merchantability1 or fitness for any particular purpose of any rating or other opinion or information is given or made by KBRA. Under no circumstances shall KBRA have any liability resulting from the use of any such information1 including without limitation, for any indirect1 special, consequential, incidental or compensatory damages whatsoever (including without limitation, loss of profits1 revenue or goodwill), even if KBRA is advised of the possibility of such damages. The credit ratings, if any1 and analysis constituting part of the information contained herein are1 and must be construed solely as, statements of opinion and not statements of fact or recommendations to purchase, sell or hold any securities. KBRA receives compensation for its rating activities from issuers, insurers1 guarantors and/or underwriters of debt securities for assigning ratings and from subscribers to its website.

East Goshen Municipal Authority Township of East Goshen 1 PA

Page I 9 October 20 1 2015