Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 final.doc 1

EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

October 12, 2015

The East Goshen Township Municipal Authority held their regular public meeting on Monday, October 12, 2015 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Fran Beck, Dana Pizarro and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Mike Ellis (Pennoni), Pat McKenna (Attorney) and Walter Wujcik (Conservancy Board). COMMON ACRONYMS: BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response. Sewer Reports 1. Director of Public Works Meters: All meters were read on a daily basis. The meter at Westtown Way went down for 2 weeks and is now back up and running. C.C. Collection: All pumping stations were visited on a routine basis. We are still preparing Cooper Cir. and Supplee Valley for road resurfacing. R.C. Collection: Was visited on a routine basis. Wentworth Development was cleaned and televised. Also Cornwallis Dr. and Colonial Dr. and a small portion of Paoli Pike was cleaned and televised. R.C.Plant: Was visited on a routine basis with no problems to report Alarms: We responded to 4 alarms for September PA One Calls: We received 23 PA One calls for September. 2. Pennoni Engineer’s Report Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP): No activity since the last report. Reservoir Rd Pump Station: We completed an approximately 90% progress design plan submission that was submitted to the Township Codes and PW Departments for review.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 final.doc 2

We met with the Township Codes Officer and Township Manager on September 2nd to present the progress design plans, obtain feedback on the stormwater management design concept, discuss general building code compliance for the control building, and determine floodplain permitting process and requirements. We have scheduled an internal review of the stormwater design for compliance with the EGT Stormwater Ordinance. We initiated a limited floodplain filling impact analysis to quantify any floodplain impacts, which has been determined to be necessary for local and DEP floodplain permitting. We coordinated with the DEP and Township on the permit application approach for the two PADEP GP-5 “Utility Line Stream Crossing” permits, on PADEP GP-8 “Temporary Road Crossings (across streams)” permit, and floodplain filling permit. We continued with preparation of these permit applications as well as the NPDES permit application. We submitted a PennDOT HOP application for soft dig test pits to locate petroleum and gas pipelines in and along N. Chester Road and Strasburg Road that are proposed to be crossed with the new force main. We received comments from PennDOT and submitted additional information to address the comments. We are expecting the permit to be issued within the next 2 weeks. The tentative schedule has been extended one month to allow time to address local and DEP floodplain filling permit requirements, including a limited H&H analysis: Estimated Date * Submit PADEP permit applications Mid-October 2015 * Rt. 352 soft digs for utilities September-October 2015 * Submit PennDOT Highway Occupancy Permit Application for proposed force main January 2016 * PADEP and PennDOT permit issuance Mid-February 2016 Semi-Annual I&I Report: We received the first three weeks of portable meter data for the relocated and recalibrated meters. The data is currently under review. 3. Big Fish Environmental Services – Scott’s report showed that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during August 2015. Discharge to Applebrook continued during September. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment. During September there were 2 Storm events resulting in daily precipitation amounts greater than 0.5 inches measured during a 24 hour period. These events occurred on September 10 and 29 with precipitation volumes recorded as 0.73 and 2.13 inches, respectively. A total of 3.62 inches of rainfall was measured at the facility during September. Plant operations were adjusted to manage the precipitation to prevent exceedances of the permitted discharge limitations for outfalls 001 and 002. Approval of Minutes Jack moved to accept the minutes of August 10, 2015. Dana seconded the motion. The motion passed unanimously. There was no meeting in September.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 final.doc 3

Approval of Invoices 1. Ed moved to approve payment of the following Pennoni invoices: a. Pennoni #655756 $ 230.00 b. Pennoni #655757 $ 411.25 c. Pennoni #655832 $34,515.75 d. Pennoni #642374 $ 770.00 Jack seconded the motion. The motion passed unanimously. 2. Ed moved to approve payment of the following Gawthrop invoice: a. Gawthrop #135684 $ 260.00 Fran Seconded the motion. The motion passed unanimously. 3. Since there was no meeting in September, Rick needs approval for the following invoices: Dana moved to approve the September payments: a. Pennoni #650758 $ 316.25 b. Pennoni #650759 $ 143.75 c. Pennoni #650760 $11,709.00 d. Gawthrop #134498 $ 300.00 Jack seconded the motion. The motion passed unanimously. Liaison Reports Conservancy Board – Walter reported that they will receive some trees from a developer who had to remove trees to build. They are waiting to find out how many so they can mark where to plant them. The spraying of invasives has been done. Financial Reports Jon Altshul provided the following report: In September, the Municipal Authority recorded $23,725 in revenues (including tap-in fees for Goshen Meadows and for 1606 Atlee Drive) and $19,836 in expenses (including $7,667 for the quarterly chargeback for administrative overhead and $11,709 Reservoir Road Pump Station engineering), for a positive variance of $3,889. As of September 30, the fund balance was $1,536,091, of which $1,472,271 is in the main construction account. Old Business House Lateral Inspections – For 6 months the Public Works Department has done these I&I inspections when properties are sold. The program will be implemented with one modification. The building inspectors will include this in their regular U&O inspection. If they observe evidence of I&I, they will notify PW who will TV the lateral. Goals Dana will write the article for the newsletter which is due 10/30/15, explaining the smoke testing and the new lateral inspections. . New Business

a. Budget - The proposed budget was reviewed. Ed pointed out that the 2013 actual and

expenses don’t add up. Jack moved to approve the 2016 budget as proposed. Dana seconded the motion. The motion passed unanimously.

F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 10-12-15 final.doc 4

b. 3 & 5 School Lane, Milltown – The request for sewer service and grinder pump for these

2 new homes was reviewed. Jack moved to approve the request. Ed seconded the motion. The motion passed unanimously. Rick will send a letter. c. PMAA Region I request for dues for 2016 was discussed. d. Discussion about the article about microbeads in the water was tabled to the next

meeting. Adjourment There being no further business, Dana moved to adjourn the meeting. Fran seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:30 pm. The next meeting will be held on Monday, November 9 at 7:00 pm. Respectfully submitted, Ruth Kiefer Recording Secretary