Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 7-13-15 final.doc 1
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
July 13, 2015
The East Goshen Township Municipal Authority held their regular public meeting on Monday, July 13, 2015 at 7:00 pm at the East Goshen Township building. Members in attendance were: Chairman Kevin Cummings, Jack Yahraes, Fran Beck, and Ed McAssey. Also in attendance were: Rick Smith (Township Manager), Mike Ellis (Pennoni), and Jessica Wiesak (Attorney). COMMON ACRONYMS: BFES – Big Fish Environmental Services MA- Municipal Authority BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System CB – Conservancy Board PC – Planning Commission DEP – Department of Environmental Protection PM – Prevention Maintenance EPA – Environmental protection Agency PR – Park & Recreation Board HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow WAS – Waste Activated Sludge Call to Order & Pledge of Allegiance Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. There was a moment of silence to remember the troops and all veterans. Kevin asked if anyone would be recording the meeting and there was no response. Chairman’s Report/Other Members’ Reports 1. Ed reported that he attended the West Goshen meeting. They hope to submit a report to the DEP in the fall. They are still trying to find solutions to meet the required levels. Sewer Reports 1. Director of Public Works No report 2. Pennoni Engineer’s Report Mike Ellis provided the following report: Invoices: Invoices with summaries are provided under separate cover. Ridley Creek Sewage Treatment Plant (RCSTP): No activity since the last report. Reservoir Rd Pump Station: We continued with the stormwater management design, and we will submit a proposal for the Final Design and Permitting scope of work prior to the July 13th Authority meeting. Hershey’s Mill PS and Marydell PS Diversions The 2-year maintenance Bonds on the Hershey’s Mill PS and Marydell PS Diversions expire on July and August respectively. We recommend warranty inspections be performed ASAP if they have not already been done.
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 7-13-15 final.doc 2
New Connections We performed field inspections during construction of the grinder pump and low pressure service piping at 1414 Bramble Lane. 3. Big Fish Environmental Services – Scott reported that the Ridley Creek sewage treatment plant outfall 001 achieved compliance with the NPDES discharge permit during May 2015. Discharge to Applebrook continued in May. Chemical usage utilized for total phosphorus removal, pH and total alkalinity remained consistent with previous months. No mechanical or operational issues were observed during operation of sludge dewatering equipment. Approval of Minutes Jack moved to accept the minutes of June 8, 2015. Fran seconded the motion. The motion passed unanimously. Approval of Invoices 1. Ed moved to approve payment of the following Pennoni invoices: a. Pennoni #642371 $ 933.75 b. Pennoni #642372 $ 333.75 c. Pennoni #642373 $10,071.50 d. Pennoni #642374 $ 770.00 Jack seconded the motion. The motion passed unanimously. 2. Fran moved to approve payment of the following Gawthrop invoices: a. Gawthrop #133458 $ 380.00 b. Gawthrop #132427 $ 860.00 (Invoice has been paid) Financial Reports Jon Altshul provided the following report: In June, the Municipal Authority recorded $41,287 in revenues (two Chester Creek Tap-In fees and the DCED Act 537 grant in the amount of $37,162) and $21,024 in expenses (including $9,250 for Reservoir Rd Pump Station engineering and $8,292 for the quarterly administrative chargeback) for a positive variance of $21,024. As of June 30th, the fund balance was $1,539,374, of which $1,499,162 is in the construction account. Note that I applied the grant to the construction account not the general operating account. Goals Ed will provide a newsletter article by 8/31/15. Ed will attend the 3rd quarter West Goshen meeting. New Business Mike presented a proposal for professional services for Phase 3 – Final design and permitting. He provided a summary of tasks 1 through 10 and fees. They are ready to initiate Phase 3 which includes Task 11 Final Design; and Task 12 Permitting. He provided a tentative schedule and total cost of $63,200 for these two tasks. Jack moved to approve services 11 and 12 at a cost of $63,200. Fran seconded the motion. The motion passed unanimously.
F:\Data\Shared Data\Minutes\Municipal Authority\2015\MA 7-13-15 final.doc 3
Adjourment There being no further business, Jack moved to adjourn the meeting. Ed seconded the motion. The motion passed unanimously. The meeting was adjourned at 7:27 pm. The August meeting will be held on Monday, August 10 at 7:00 pm. Respectfully submitted, Ruth Kiefer Recording Secretary