Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN MUNICIPAL AUTHORITY

July 11, 2022

7:00

I. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE

a. Ask if anyone will be taping the meeting

2. CHAIRMAN'S REPORT/OTHER MEMBERS REPORTS

3. SEWER REPORTS

a. Director of Public Works Rep01i. b. Pennoni Engineer's Report. c. Big Fish Environmental Report

4. APPROVAL OF MINUTES

a. June 13, 2022

5. APPROVAL OF INVOICES

Pennoni Invoice # 1126019 Pennoni Invoice # 1126021 Pennoni Invoice #1113012 Gawthrop Invoice #259154 Colonial Invoice #14642609 Tracom Invoice #80016

6. LIAISON REPORTS

7. FINANCIAL REPORTS

a. June Financial Report

8. OLD BUSINESS

a.

F:\Data\Shared Data\Agendas\Municipal Authority\2022\ 7M 11 M2022.doc

$ 1,051.25 $ 791.50 $ 2,537.25 Paid 6/15 $ 1,420.00 $ 3,055.60 $ 18,730.00

9. 2022 Goals:

Goal Status January,February,March,April and May were in compliance and met all requirements *Note DEP Ridley Creek Plant Compliance Annual lnsp.

Continue to Monitor Upgrades at WGSTP and On-going Westtown Way Pump Station Continue to Implement Infiltration and Inflow On-going for the Sewer System Caustic Soda Project

Equipment order Replace sewer line Hershey Mill Estate trunk line replacement Engineer will bring you up to date under old business. Hunt Country Pump Station Mag Meter

On Hold Hunt Country Pump Station Muffin Monster Replacement On Hold

Hunt Country Pump Station Bypass Pump On Hold Hibberd Lane is on line. Ridley Creek Plant is the next Three new meters for Ridley Creek Collection meter, in the process of replacing the meter at the plant. • Ridley Meter installed

I 0. NEW BUSINESS

a.

11. CAPACITY REQUESTS

12. ANY OTHER MATTER

13. CORRESPONDENCE AND REPORTS OF INTEREST

14. PUBLIC COMMENT

15. ADJOURNMENT

F:\Data\Shared Data\Agendas\Municipal Authority\2022\761 l 62022.doc

AREA CODE 610

692-7171

To:

From:

Re:

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIK£, WEST CHESTER, PA 19380-6199

Municipal Authority

Mark Miller

July 8, 2022 Monthly Report

Monthly Flows: The average daily flow to West Goshen was 701,682 per day.

Meters: The meters were read on a daily basis. We had to utilize Lenni Electric to

replace three of the meter cabinets due to rust. We even had to replace the pole and electric service at the Ellis Lane meter.

C.C. Collection: We visited all the station where routine maintenance was performed. There were no problems to report for the month.

C.C. Interceptor: We had to remove six large Ash trees that were dead in the right of way. The work was performed by the Public Works crew and completed in a timely manner.

R.C. Collection: The pumping stations were visited on a daily basis. We did receive a call on June 18th for sewage coming from a manhole. Crews were on site within the hour and spent several hours as we encountered heavy grease build up. In addition, the sewer line was off the road and the ground was very wet. These lines were cleaned a year and a half ago. I have scheduled Pipe Data View to come and clean the lines. Attached is the letter from the property owner and some photos. DEP was notified of the carry over per protocol and area was cleaned up and covered with lime.

Ridley Creek Plant: Last week we started the installation of the new metering station for Ridley. Once the excavation was completed we installed a trench box 16'x16'x18', we then formed up the concrete pad for the metering pit to mount. We came in at midnight to make the tie in when there was very little flow. A section of pipe was cut out so we could mount the metering pit. The pit was lowered into the hole and connected to the pipe.

Once we complete the final grading, we will lay out an elevated walkway to the meter. We hope to have the meter on line by the end of July.

(Photos attached)

Alarms: We responded to 26 alarms for June, most of them storm related.

PA 1 Calls: We responded to over 78 PA One Calls for the month June.

Monthly Rainfall: 3.80 inches of rain for the month of June.

Lateral repairs or Caps: 8 laterals repaired for the month of June.

Mark Miller

From: Sent: To:

Cc: Subject:

Andrew Marshall <ancmarshall@gmail.com> Monday, June 20, 2022 10:33 AM Michele Truitt; Mike Lynch; Cbright@eastgoshe.org; John Hertzog; David Shuey; Derek

Davis Mark Miller; Mike Burns Exemplary Service to the Community by Public Works Group

Dear Michele and Board Members,

I wanted to thank you all for the great Public Works Group you have assembled for East Goshen Township. I had an emergency early last Saturday the 11th. The group was so responsive, understanding and hard working even though it was their day off and the job was frankly horrible.

The Township has a neighborhood Sewer line running from Forest Lane to Paoli Pike parallel to Line Road and a few feet from Ridley Creek. This has two Manhole covers on my property at 110 Tramore Circle. Early

Saturday morning, 7.45am, one of the manhole covers began to seep out water, which within 30 minutes became a significant outflow of waste / sewage water.

I tried calling the Township but there was no emergency number. I did have Mark Miller's email so I shot him an urgent note. He was back to me via email and phone in five minutes, stating that he was gathering his crew together and would be on site within 40 minutes. By 8.45am it seemed that half the Township was here! Everyone was so polite and hard working throughout the 3 hours it took to unblock the Mains and clean up.

This could have been a horrible situation for the twelve houses on my street, the 63 houses of Rossmore Association and of course a mess for Ridley Creek. That day our street had one wedding party and one graduation party so imagine the difficulty we could have been in. Mark and his team really saved the day and again I want to thank you all, Mark and his team for supporting the Township in the way you all do. Our Township is fortunate to have you all.

Sincerely, Andrew & Cindy Marshall

Andrew Marshall 6 [ 0-246-4834 ( C)

1

[Photograph of an open, water-filled manhole containing a submerged ladder and an orange hose inserted into the basin.]

Clogged Manhole

Photograph of three workers in a grassy area near the tree line standing next to a utility vehicle and a yellow O'Brien trailer-mounted sewer jetter (labeled "EAST GOSHEN TOWNSHIP", "O'BRIEN", "800-638-1901") hitched to a blue tractor.

Jetting the Line

Photograph of a muddy trail through the woods with an open sewer manhole in the foreground beside a blue marker post (labeled "CAUTION SEWER PIPELINE BEFORE DIGGING CALL") and a worker standing near equipment in the distance.

Jetting from Line road to Tramore

[Photograph of a yellow Caterpillar 316F L excavator positioned above a large excavation pit with standing water and exposed underground piping.]

Excavation for Meter Pit

Photograph looking down into a shored excavation pit (labeled "TRENCH TECH SHORING SOLUTIONS 1-800-443-6832") showing a green pipe passing through a square wooden concrete form with crushed stone bedding and a rebar grid.

Formed up Pad

Photograph looking down a ladder into a shored excavation pit (labeled "TRENCH TECH SHORING SOLUTIONS 1-800-443-6832") where three workers in high-visibility yellow shirts are cutting out a section of green pipe on a concrete pad.

3AM Cut pipe out for Pit

Nighttime photograph of a red crane truck (boom labeled "LIFTING THE COMMUNITY - SINCE 1917 -") hoisting a tall white cylindrical pit structure (base labeled "FLOW") beside a yellow CAT 316F L excavator and three workers in high-visibility yellow vests/shirts at the edge of an excavation trench.

3AM Getting Ready to install Pit

Photograph looking down into a shored excavation pit (labeled "TRENCH TECH SHORING SOLUTIONS 1-800-443-6832") with the white cylindrical pit structure (labeled "FLOW") set in place and coupled to the green pipe, a worker crouching beside it, and an excavator bucket overhead.

Pit in Place

Nighttime photograph of a work site lit by a portable light tower, with a yellow CASE backhoe loader on the left, an excavator, a red crane truck, a MAGNUM light tower trailer in the foreground, a white cylindrical tank beside a shored excavation, and a worker standing nearby.

Crane boom label: LIFTING THE COMMUNITY

EAST GOSHEN MUNICIPAL AUTHORITY

ENGINEER'S REPORT

July 8, 2022

Ridley Creek Sewage Treatment Plant (RCSTP)

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

T: 302-655-4451

F: 302-654-2895

www.pennoni.com

• Caustic Soda Conversion - We notified Pyrz Water (supplier) of the approval of their Costars quotes for the chemical tank and the chemical feed pumps. They are preparing shop drawings that will be submitted for review.

• UV Disinfection System - Glasco provided the design submittal for the system. We reviewed and returned it with comments on July 7. They will provide a revised submittal for review, which we will review with the Township and operator.

They have previously indicated the lead time for the equipment is about 4 months following approval of submittals. Assuming approval by the end of July, the equipment would be delivered in the

November-December timeframe. Please note that this is approximately 1.5 months later than originally planned because the submittal from the manufacturer was provided about 1.5 months later than originally scheduled.

The installation of the system and other electrical and controls work is tentatively planned to occur in late early winter once awards for the Commonwealth Financing Authority (CFA) Local Share Account (LSA) grants are announced. Bid documents for the mechanical and electrical construction contracts will be finalized this summer for bidding to occur in fall; the schedule will be refined over the next couple months pending updates on the CFA's schedule for grant award announcements.

Ridley Creek Collection System Permanent Meters

• We provided consultation during the installation of the new RCSTP influent flow metering manhole.

Westtown Way Pump Station

No update since our last report.

Sanitary Sewer Pipe Rehab

• Supplee Valley- No activity since our last report.

• Hershey's Mill Estates- No activity since our last report.

Since a LSA grant application was submitted for this project, construction contracts cannot be

awarded if/until the grant is "approved". We therefore currently plan to bid the project in the late fall-early winter with construction projected in early to mid-2023.

However, we have been informed by suppliers that the lead time for ductile iron pipe is 9-12 months. We are therefore evaluating the possibility of the Township ordering the pipe now through a costars contract in advance of construction bidding.

• Ridley Creek Exposed Sewer Rehab - There is a ductile iron sewer main exposed in the Ridley Creek stream bed immediately north of N. Boot Road near Bellingham. We previously initiated preparation of a draft DEP emergency General Permit application to encase the pipe in concrete and add rip rap to

the immediately upstream stream bed.

We are awaiting the results of a bog turtle habitat survey assessment from a 3rd party "Qualified Bog

EGMAU22001 East Goshen Municipal Authority

July 8, 2022 Page 2 Engineer's Report

Turtle Surveyor (QBTS)" to address the associated requirement in the PNDI Search. If the QBTS does not identify habitat within 300 feet, approval from the US Fish and Wildlife Service (USFWS) is not

required. The emergency permit application will be submitted to PADEP upon clearance of the bog turtle habitat.

l&I Program

• No activity since our last report.

New Connections

• Sewer Extension Study - No activity since our last report.

• 1344 Morstein Road - We discussed the construction approach with the contractor for the low pressure sewer lateral to connect to the public sewer in Eastwick Circle, and we are reviewing a revised approach intended to avoid a drop connection in the manhole.

Industrial Pretreatment Ordinance

• No activity since our last report. As discussed at the May 2021 MA meeting, a headworks study with sampling at the RCSTP can be conducted to set contaminant limits.

END OF REPORT

C: \ U sers\ssm ith \Ap pData \Loca I\M icrosoft\ Wind ows\l NetCache \Content. Outlook\ENZRJ KSC\Engi neers Report 2022-07-08.docx

r,3ig Fish

RCSTP Monthly Operations Report

July 2022

Environmental Services Inc.

Executive Summary

The Ridley Creek sewage treatment plant outfall 001 and 002 achieved compliance with all effluent limitations regarding water quality. The parameter regarding ultraviolet light intensity is being addressed with PA DEP. All supplemental reports were submitted for the month of April with the DMR. Discharge to the Applebrook irrigation lagoon remained in service .. Chemical usage utilized for pH and total alkalinity remained consistent with previous months. Aluminium sulfate solution volumes were slightly increased to a daily average of 64.4 as compared to the previous month at 58.5 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during operation of sludge dewatering equipment or SBR treatment process. Sludge dewatering has been increased to avoid potential odors during the sludge holding tank decanting process. There were no odor complaints during the month.

Treatment Process Operation Table 1 illustrates the final effluent composite sample data reported for outfafl 001 June 2022. The results listed for the week of June 28th are draft values to be confirmed.

June 2022- Final Effluent-Outfall 001

Flow CBOD5 Total Nitrogen TSS NHrN Total Phosphorus Fecal Coliform Ultraviolet

NPDES Permit lbs/ lbs/ lbs/ lbs/ lbs/ light

Copper, MGD Geo Geo Discharge Limitations Average mg/L month mg/L month mg/L month

Total mg/L month mg/L month Mean Mean intesity

0.75 10 62 Report Report 10 62 2.5 44 0,5 3 200 1,000

Inst. Max 20 94 15 94 5 1 Report Report

Sample Date

June 7, 2022 0.259 2.0 4.3 1.43 3.09 4.0 8.6 0.10 0.22 0.18 0.39 2 0.3010 NS NS

June 14, 2022 0.250 2.0 4.2 6.52 13.59 4.4 NS 0.10 0.21 0.12 0.25 1 0.0000 NS NS

June 21, 2022 0.264 2.0 4.4 6.36 14.00 4.0 8.8 0.10 0.22 0.14 0.31 20 1.3010 NS NS

June 28, 2022 0.249 2.0 4.2 5.59 11.61 5.0 10.4 0.10 0.21 6 0.7782 NS NS

Average 0.256 2,0 4.3 4.98 10.6 4.4 9 0.10 0.21 0.15 0.32 7 0.5951 NA NA

Minimum 0.249 2.0 4.2 1.43 3.1 4.0 8.6 0.10 0.21 0.12 0.25 1 0.0000 NA NA

Maximum 0.264 2.0 4.4 6.52 14.0 5.0 10 0.10 0.22 0.18 0.39 20 1.3010 NA NA

The month to date average total phosphorus was reported as 0.15 mg/L as compared to the permit limitation of 0.5 mg/L. The TSS samples were consistently in single digits and well below the weekly maximum of 15 mg/L. The monthly average TSS was reported as 4.4 mg/L as compared to the discharge limitation of 10 mg/L. The TSS weekly averages are presented below in Table 2.

Zinc,

Total

Report

NS

NS

NS

NS

NA

NA

NA

Table 2

June 2021 Final Effluent Weeklv TSS Averaaes

Week 1 <4.0 ma/L Week2 4.4 mq/L Week3 <4.0 mq/L Week4 5.0 mg/L

The final effluent test results demonstrate that the biological treatment process performed well during June. Sequencing batch reactors (SBRs) numbered 2 , 3 and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Discharge to the Applebrook irrigation lagoon, outfall 002 continued through June 2022.

Table 3 presents the available pollutant data for the Applebrook discharge reported as outfall 002 on the June 2022 DMR.

Table 3 June 2022 • Applebrook • Out Fall 002

Flow CBOD1 Total Nitrogen TSS NH4-N Phosphorus,Total Fecal Coliform

NPDES Permit MGD lbs/ lbs/ lbs/ lbs/ lbs/ Geo Geo Discharge limitations Average mg/L month mg/L month mg/L month mg/L month mg/L month Mean Mean 0.135 25 Report Report 30 7.0 44 0.5 3 200 1,000 40 45 June 7, 2022 0.0401 2.0 0.67 1.43 3.09 4.0 1.34 0.10 0.03 0.18 0.06 2 0.3010 June 14, 2022 0.0412 2.0 0.69 6.52 2.24 4.4 1.51 0.10 0.03 0.12 0.04 1 0.IXXXl June 21, 2022 0.0418 2.0 0.70 6.36 NS 4.0 1.39 0.10 0.03 0.14 0.05 20 1.3010 June 28, 2022 0.0406 2.0 0.68 5.59 1.89 5.0 1.69 0.10 0.03 6 0.7782 Average 0.0409 2.0 0.68 4.98 2.41 4.4 1.5 0.10 0.03 0.15 0.05 7 0.5951 Minimum 0.0401 2.0 0.67 1.43 1.89 4.0 1.3 0.10 0.03 0.12 0.04 1 0.IXXXl Maximum 0.0418 2.0 0.70 6.52 3.09 5.0 1.7 0.10 0.03 0.18 0.06 20 1.3010

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.

Table 4 presents the available pollutant data for the influent wastewater collected at the doghouse manhole during June 2022.

Page 2 of4

Table 4

June 2022 - Influent Wastewater

Phosphorus,Total Flow BOD5 CBOD5 TSS NH,-N TKN, mg/L , mg/L Design Basis mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day MGD Average 335 2,098 NA NA 320 2,001 32 200 48 301 9.1 Sample Date June 7, 2022 0.331 220 607 202 558 230 635 15.2 42 53.0 146 5.25 June 14, 2022 0.444 319 1,182 231 856 267

989

23.8 88 54.4 202 6.24 June 21, 2022 0.428 254 906 284 1,014 280 999 28.3 101 55.3 197 5.70 June 28, 2022 0.402 277 928 228 764 285

955

26.0 87 6.38 Average 0.4012 268 906 236 798 266 895 23 80 54.2 182 5.9 Minimum 0.3310 220 607 202 558 230 635 15 42 53.0 146 5.3 Maximum 0.4442 319 1,182 284 1,014 285 999 28 101 55.3 202 6.4

The foam on the SBR surface reduced to approximately 15% to 25% coverage of the surface area. The foam thickness is approximately 2 inches with a light to medium brown color. These conditions may contribute to a decrease in clarity within the final effluent post flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.

PA DEP

Discussions are ongoing regarding measuring and Ultraviolet light intensity.

Pennoni Associates

No activity

Chemical Usage:

June 2022

Chemical Daily Average Total Monthly

Soda Ash, pounds 281 8,700

Aluminium Sulfate solution, gal 64.4 1,991

Centrifuge sludge dewatering, 19,155* 574,643** gallons

The centrifuge Is not operated on a daily basis throughout the month. **There was an increase of 208,773 gallons of sludge dewatered during June

Page 3 of4

57

14.5 23.1 20.3 21.4 19.8 14.5 23.1

Flow data:

June 2022

Flow Meter Location Total Volume for Average Daily Daily Maximum Month, MG Flow, gpd Flow, gpd

Influent Wastewater to 11.933 397,777 507,360 Screening Building*

Influent Wastewater to 12.894 429,798 515,200 SBRs*

Internal Recycle** 1.169 37,716 130,390

Treated Effluent to Disc 13.059 435,290 489,344 Filters

Final Effluent Discharge

8.071 269,000 316,000

Applebrook Golf Course 1.285 42,848 48,176

During June, the average monthly influent wastewater flow measured at the "field" flow meter was 397,777 gallons/day as compared to the influent flow into the SBRs as 429,798 gallons/day. The difference between the daily averages is 32,021 gpd, which is consistent with the average daily volume of internal recycle flow. These values are considered typical as the flows to the SBR should be greater due to including all the internal recycle flows.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly

Cleaned buildings and laboratory

Significant Rainfall

During June, there were nine (9) days when rainfall occurred. There were two (2) events of rainfall meeting or exceeding 0.50 inches. Total rainfall for the month was recorded as 4.31 inches.

June 9th

June 12th

1.1 o inches

1.50 inches

Page 4 of 4

I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

DRAFT EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY

MEETING MINUTES

June 13, 2022

The East Goshen Township Municipal Authority held their regular meeting on Monday, June 13, 2022 at 7:00 pm. at the Township Building. Members in attendance are indicated in BOLD: Walter Wujcik, Chairman Kevin Cummings, Vice Chairman Phil Mayer Dana Pizarro Jack Yahraes

Also in attendance were: Mark Miller (Director of Public Works), Dave Ware (Director of Finance), Patrick McKenna (Attorney) and Scott Towler (via phone).

COMMON ACRONYMS: EFES - Big Fish Environmental Services BOS - Board a/Supervisors CB - Conservancy Board DEF - Department of Environmental Protection EPA - Environmental protection Agency HC -Historical Commission !&I -Inf/ow & Infiltration LCSTP - Lockwood Chase Sewer Treatment Plant

Call to Order & Pledge of Allegiance

MA- Municipal Authority NP DES -National Pollutant Discharge Elimination System PC - Planning Commission PM -Prevention Maintenance PR-Park & Recreation Board

RCSTP - Ridley Creek Sewer Treatment Plant SER - Sequencing Batch Reactor SSO - Sanita,y System Ove1flow

WAS- Waste Activated Sludge

Phil called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. He asked for a moment of silence for our First Responders, Military and Chester Co. EMTs. He asked if anyone would be recording the meeting. There was no response.

Chairman's Report

I. West Goshen - Phil attended the recent meeting. Their plant is in compliance for May. They reviewed their IO year Capital Improvement Plan which includes contributing townships. He reviewed the project/cost list and pointed out East Goshen. The Westtown Way Pump Station will have a 4-6 week delay for the switch board. They are pouring a pad under the Pump Station. Phil repmted that they mentioned a development of about 20 homes that is still on on-site sewer systems. It will cost $40,000 each to connect to the sewer system and half of them don't want it.

SEWER REPORTS

1. Director of Public Works, Mark Miller's report for May 2022 Monthly Flows - The average daily flow to West Goshen was 709,470 per day.

Meters: The meters were calibrated by Allied Control on May 15, 2022. No repairs were needed. The meters have been read on a daily basis.

MA 6-13-22 draft I

I C.C. Collection: The Public Works Department televised the sanitary sewers in Waterview Farms. 2 This was done to make sure there were no problems after Aqua installed new lines. All of the Pump 3 Stations were visited on a daily basis. The Public Works Department also vacuumed the wet wells 4 and cleaned the floats and FOG rods. 5 6 R.C. Collection: The pumping stations were visited on a daily basis. The Public Works Department 7 vacuumed out the wet wells and cleaned the floats and FOG rods. We had a problem at the Hunt 8 Country Pump Station when PECO lost a phase. The station was on backup power for 8 hours until 9 PECO made repairs. 10 11 Ridley Creek Plant: Routine maintenance was perfotmed at the plant. John Laidley was on site to 12 install the new remote control for the Filter Feed Controls so the operator can turn equipment on and 13 off during storm events remotely. Our generator contractor was on site. While performing routine 14 maintenance to the generator he noticed that the generator was low on antifreeze. Upon further 15 investigation, Paul found that the lower hose failed, and the generator had shut down. We are going 16 to have John Laidley install a dialer on both generators that will call out in the event of an equipment 17 failure. 18 The equipment cabinet air conditioner on the Centrifuge quit working. We received quotes to replace 19 the air conditioner unit. Prices range from $6,800 to $8,180. I called Lenni and Jimmy found a unit 20 for $5,500 which was ordered. The new unit is two weeks out and Lenni will take care of the 21 installation. 22 23 Alarms: We responded to 15 alarms for May. 24 25 PA One Calls: We responded to over 90 PA One Calls for the month of May. 26 27 Monthly Rainfall: 6.85 inches of rain for the month of May. 28 29 Lateral Repairs or Caps: 2 laterals were repaired on Madison Drive due to a landscaper hitting the 30 clean outs. 4 additional repairs were done in May. 31 32 Phil asked about a bog tmile test at the exposed pipe on E. Boot Road. Mark explained how he will 33 repair it. Also Mark mentioned that there was a clog at Rossmore again due to grease. 34 35 36 37 2. Pennoni Engineer's Report dated June 10, 2022 38

39 Ridley Creek Sewage Treatment Plant (RCSTP)

40 • Caustic Soda Conversion - We confirmed tank fill pipe sizing with the chemical supplier and 41 obtained an updated quote for the tank with larger fill (4") and vent (6") penetration from 42 Pyrz Water.

43 • UV Disinfection System - Glasco is preparing the design submittal. They initially expected to 44 submit it by the end of May, but we have not received it, and we are awaiting a schedule and 45 update from them.

MA 6-13-22 draft 2

1 The overall lead time for the Glasco equipment was initially estimated to be approximately 5 2 months (including submittals) from contract execution on April 8, so equipment delivery was 3 expected around September 2022. However, this schedule may be extended pending the 4 design submittal timeline.

5 The installation of the system and other electrical and controls work is tentatively planned to 6 occur in late fall-early winter once awards for the Commonwealth Financing Authority (CFA) 7 Local Share Account (LSA) grants are announced. Bid documents for the mechanical and 8 electrical construction contracts will be finalized this summer for bidding to occur in fall; the 9 schedule will be refined over the next couple months pending updates on the CF A's schedule 10 for grant award announcements.

11 • NPDES Permit Renewal - The permit renewal was officially issued, effective April !, 2022 12 and runs through March 31, 2027. We are coordinating with Big Fish on the new treatment 13 plant sampling requirements in the renewed permit.

14 Ridley Creek Collection System Permanent Meters

15 • No activity since our last report.

16 Westtown Way Pump Station

17 • No update since our last report. The following update is from HRG in our May report:

18 Excavation and subgrade preparation for the exterior electrical pad has been completed, and interior 19 work such as initial pump removal tasks has also commenced. Unsuitable soils and concrete deposits 20 were encountered underground for the electrical pad and had to be removed and replaced with 2 l suitable materials. A change order is expected.

22 All equipment is currently expected to be delivered on schedule with the exception of the electrical 23 switchboard which is tentatively delayed until early 2023. The switchboard delay may extend the 24 entire project since they may not be able to install the new VFDs, and thereby install new pumps, until 25 the switchboard is installed. The entire project may therefore be extended until mid-2023. The 26 contractors have been asked to provide updated schedules at the next Township progress meeting 27 later this month [May}.

28 Sanitary Sewer Pipe Rehab

29 • Supplee Valley - No activity since our last report.

30 • Hershey's Mill Estates - The PADEP General Pennit GP-11 "Stream Obstructions" was 31 approved, and the permit is attached.

32 Since a LSA grant application was submitted for this project, construction contracts cannot be 33 awarded if/until the grant is "approved". We therefore cunently plan to bid the project in the 34 late fall-early winter with construction projected in early to mid-2023.

3 5 • Ridley Creek Exposed Sewer Rehab - There is a ductile iron sewer main exposed in the 36 Ridley Creek stream bed immediately north ofN. Boot Road near Bellingham. We previously 37 initiated preparation of a draft DEP emergency General Permit application to encase the pipe 3 8 in concrete and add riprap to the immediately upstream stream bed.

39 A bog turtle habitat survey will be conducted by a 3rd party "Qualified Bog Turtle Surveyor 40 (QBTS)" to address the associated requirement in the PNDI Search. The survey is scheduled

MA 6-13-22 draft 3

1 for June 16. If the QBTS does not identify habitat within 300 feet, approval from the US Fish 2 and Wildlife Service (USFWS) is not required. The emergency permit application will be 3 submitted to P ADEP upon clearance of the bog turtle habitat.

4 l&I Program

5 • No activity since our last report.

6 New Connections

7 • Sewer Extension Study - No activity since our last report.

8 • 1344 Morstein Road - We reviewed a contractor's sketch for a low pressure sewer lateral to 9 connect the subject property to the public sewer in Eastwick Circle. We have comments and 10 concerns on the proposed approach, and we are contacting the contractor to discuss.

11 Industrial Pretreatment Ordinance

12 • No activity since our last report. As discussed at the May 2021 MA meeting, a headworks 13 study with sampling at the RCSTP can be conducted to set contaminant limits. 14 15 16 3. Big Fish Environmental Services - 17 The Ridley Creek sewage treatment plant outfall 001 and 002 reported non-compliance with three 18 parameters identified as only "Report" with no effluent limitations regarding water quality. The 19 parameters listed are effluent total nitrogen, Ultraviolet light intensity and influent CBOD. The non- 20 compliance was the result of the NPDES permit becoming effective April 1 2022. All supplemental 21 reports were submitted for the month of April with the DMR. Discharge to the Applebrook iITigation 22 lagoon remained in service. Chemical usage utilized for pH and total alkalinity remained consistent 23 with previous months. Aluminium sulfate solution volumes were reduced to a daily average of 58.5 24 as compared to the previous month at 67.6 gpd to achieve phosphorus removal. No significant 25 mechanical or operational issues were observed during operation of sludge dewatering equipment or 26 SBR treatment process. There were no odor complaints during the month. 27 Phil mentioned that the Members had a nice tour of the plant today. 28 29 Approval of Minutes 30 The minutes of the May 9, 2022 meeting were approved. The April minutes will have to be approved 31 at the next meeting. 32 33 34 Approval of Invoices 3 5 1. The invoices were reviewed particularly the Maillie Invoice. It was determined that $7,000 was 36 paid and $3,250 was still due. The Pennoni invoices were discussed, and it was discovered that 37 Invoice #1113819 in the amount of$13,564.75 was included in the packet but not on the 38 Agenda. Dana made a motion to add the Pennoni Invoice #1113819 in the amount of$13,564.57 39 to the agenda. Jack seconded the motion. The motion passed unanimously. 40 2. Dana made a motion to approve payment of the 7 Pennoni invoices as shown on the agenda and 41 the added invoice. Phil seconded the motion. The motion passed unanimously.

MA 6-13-22 draft 4

I 3. Dana made a motion to approve payment of the Deckman, Teledyde Instruments, Te!Tek 2 Colonial Electric and 2 Gawthrop invoices as shown on the Agenda. Jack seconded the motion. 3 The motion passed unanimously. 4 5 Liaison Reports 6 None 7 8 Financial Reports 9 1. April Financial Report - Dave Ware provided the following report: 10 In April 2022, the Municipal Authority recorded $36,415 in revenues (transfers from Sewer 11 Operating and Sewer Capital Reserve) and $36,414 in expenses (General Engineering Services, 2 12 Rebuilt Fairbanks Pumps for the Ashbridge Pump Station, Engineering for Hershey's Mill Estates 13 Sewer Replacement and Engineering for RCSTP UV Replacement), for a net result of operations of 14 $0. As of April 30, 2022, the fund balance was $9,128. 15 2. May Financial Report -Dave Ware provided the following repmi: 16 In May 2022, the Municipal Authority recorded $10,576 in revenues (transfers from Sewer Operating 17 and Sewer Capital Reserve plus Tapping Fees) and $10,276 in expenses (General Engineering 18 Services, Legal Services, and Engineering for RCSTP UV Replacement) for a net result of operations 19 of$300. As of May 31, 2022 the fund balance was $9,428. 20 3. Dave led a discussion of total sewer debt service and additional capital needs. Mark Miller 21 provided an inventory of the RCSTP. The total need is $4.6m, $3.3m is the cun-ent reserve. He 22 reviewed cun-ent projects and funding needed for them. He reviewed sewer rates over the next I 0 23 years. He feels that a fixed rate of $60 per year starting in 2023 would cover the need over IO years. 24 He is hoping to get grants for some of the projects. Dana feels we need to compare rates to a system 25 and township about the same size as East Goshen. Mark suggested contacting FEMA for this. Dave 26 will take their comments under consideration. The members thanked Dave for his report. 27 28

29

Old Business 30 1. Connection for 1344 Morstein Road - Patrick has been working with their attorney on the 31 easement agreement. Mike Ellis is fine with the agreement but has concerns about the construction. 32 Mark explained the details of what needs to be done. Jack made a motion to approve the connection. 33 Dana seconded the motion. The motion passed unanimously.

34 35 36 Goals 37 The goals were reviewed. The items on hold are on the inventory list. 38 39 New Business 40 1. UV Replacemen Project - Regarding an email from Mike Ellis about adding a budget item, Dana 41 made a motion to increase the budget for UV engineering by $30,000. Jack seconded the motion. 42 The motion passed unanimously. 43 2. Pyrz Ooute - Mark explained that the increase in the price is due to the increase in size - a 6" line. 44 Jack made a motion to accept the updated quote to $34,365. Dana seconded the motion. The motion 45 passed unanimously. 46 3. The Hershey's Mill sewer PA DEP permit was reviewed.

MA 6-13-22 draft 5

1 4. Proposal for Phase 1 Bog Turtle Survey - A proposal was received from GHD to conduct a bog 2 turtle habitat assessment for a proposed sanitary sewer rehabilitation project along the east branch of 3 the Ridley Creek. Cost is estimated at $2,500. Jack made a motion to accept this proposal from 4 GHD for $2,500 for a bog turtle survey. Dana seconded the motion. The motion passed 5 unanimously. 6 7 Capacity Request - None 8 9 10 Any Other Matter - None 11 12 Correspondence- None 13 14 Public Comment - None 15 16 17 Adjournment 18 There being no further business Jack moved to adjourn the meeting. Dana seconded the motion. The 19 motion passed unanimously. The meeting was adjourned at 8:30 pm. 20 The next regular meeting will be held on Monday, July 11, 2022 at 7:00 pm. 21 22 Respectfully submitted, 23 24 25 Ruth Kiefer, Recording Secretary

MA 6-13-22 draft 6

INVOICE

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

For Services Rendered Through 06/19/2022

Remit Payment To: Pennoni Associates Inc.

P .0. Box 827328 Philadelphia, PA 19182-7328

Invoice No : 1126019 Invoice Date : 06/30/2022

Project : EGMAU22001 Project Name : 2022 General

Services

June Engineer's Report; reviewed RCSTP operator's report; reviewed proposed 1344 Morstein Rd sewer connection sketch and easement, and provided comments to M. Miller, Solicitor, and contractor; cursory review of Moser development sewer concept plans and associated upgrades for the downstream Hershey's Mill Pump Station; coordinated with Big Fish on sampling under new NPDES permit; and coordinated for bog turtle habitat investigation for Boot Road creek crossing sewer rehab permitting.

Billing Limits

Total Billings

Limit Remaining

Labor

Authority Engineer Senior Professional Associate Professional Graduate Professional

Totals Total Labor

Current 1,051.25

Hours

4.75 1.00 1.00 1.50 8.25

Prior 13,320.75

Rate 141.00 134.00 105.00 95.00

To-Date 14,372.00 35,000.00 20,628.00

Amount

669.75 134.00 105.00 142.50 1,051.25

Total this Invoice

1,051.25

$11051.25

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date (%): Remaining Budget($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date (%):

2022 General Services EGMAU22001 Invoice Summary

Invoice Date 6/30/2022

EGMAU22001 2022 General Services 1126019 5/16/2022 $ 35,000.00 $ 35,000.00 $ 13,320.75 $ 1,051.25 $ 14,372.00 41% $ 20,628.00 59%

2022 General Services $ 35,000.00 $ 13,320.75 $ 1,051.25 $ 14,372.00

to Date:

Remaining Budget($): $

41% 20,628.00 59% Remaining Budget(%):

6/19/2022 6/30/2022

Comments: June Engineer's Report; reviewed RCSTP operator's report; reviewed proposed 1344 Morstein Rd sewer connection sketch and easement, and provided comments to M. Miller, Solicitor, and contractor; cursory review of Moser development sewer concept plans and associated upgrades for the downstream Hershey's Mill Pump Station; coordinated with Big Fish on sampling under new NPDES permit; and coordinated for bog turtle habitat investigation for Boot Road creek crossing sewer rehab permitting.

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

INVOICE Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice No : 1126021 Invoice Date : 06/30/2022

Project : EGMAU22004 Project Name : RCSTP UV

Replacement

For Services Rendered Through 06/19/2022

Initiated review of Glasco's UV design submittal, initiated structural design of UV channel wall raising, and performed field visits for channel and wall measurements to assist in submittal review and structural design.

Billing Limits

Total Billings

Limit Remaining

Labor

Authority Engineer Senior Professional Sr. Eng Tech

Totals Total Labor

Outstanding Invoices

Number 1113012DUP Total

Date 6/21/2022

Current

791.50

Hours

.50 4.25 1.50 6.25

Prior 18,323.50

Rate 141.00 134.00 101.00

To-Date 19,115.00 30,000.00 10,885.00

Amount

70.50 569.50 151.50 791.50

Total this Invoice

791.50

$791.50

s duplicate paid - we are applying this $791.50

towards that credit balance. Remaining Credit Balance $1,745.75

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

RCSTP UV Replacement EGMAU22004 Invoice Summary

Invoice Date 6/30/2022

Project: Pennon/ Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date (%):

EGMAU22004 RCSTP UV Replacement

1126021 5/16/2022 $ 30,000.00 $ 30,000.00 $ 18,323.50 $ 791.50 $ 19,115.00

Remaining Budget($): $ Remaining Budget(%):

64% 10,885.00 36%

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date (%):

RCSTP UV Replacement

$ 30,000.00 $ 18,323.50 $ 791.50 $ 19,115.00

Remaining Budget($): $ Remaining Budget(%):

64% 10,885.00 36%

to Date:

6/19/2022 6/30/2022

Comments: Initiated review of Glasco's UV design submittal, initiated structural design of UV channel wall raising, and performed field visits for channel and wall measurements to assist in submittal review and structural design.

Mark Miller East Goshen Municipal Authority 1580 Paoli Pike West Chester, PA 19380-6199

For Services Rendered Through 01/16/2022

INVOICE Remit Payment To: Pennoni Associates Inc.

P.O. Box 827328 Philadelphia, PA 19182-7328

Invoice Date : 03/25/2022

Project : EGMAU22004 Project Name : RCSTP UV

Replacement

RCSTP UV Replacement - Obtained and reviewed reduced cost quote for Trojan system, evaluated technical capabilities and features of Glasco vs. Trojan systems including additional vendor meetings, prepared and submitted cost comparisonto MA, evaluated feasibility of a 4th UV system from Kershner, prepared scope and specifications for separate electrical construction work, submitted scope to Lenni for cost quote, design of temporary bypass system, and evaluated viability of FEMA disaster recovery grant application with operator and M. Miller.

Labor

Authority Engineer Senior Professional Associate Professional

Totals Total Labor

.. s ku\/) J hwr<-

CA.. J.JJ-h - CYYtl/ w, \l (vv-. o.. -\-

Hours

1.75 12.00 6.50 20.25

\? c..<--PJVti I ->--k ,k

Rate Amount 141.00 246.75 134.00 1,608.00 105.00 682.50 2,537.25 2,537.25

Total this Invoice $22537.25

APPROVED BY DATE PA\D:-,=---

CHECK _:_ 674· "15') cHARGEOTO: 1/Ylz

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project: Pennoni Job No.: Invoice No: Invoice Period:

Initial Authorization: Contract Amount: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%): Remaining Budget($): Remaining Budget(%):

Budget by Phase:

Phase Name: Phase Budget: Previously Invoiced: Current Invoice: Invoiced to Date ($): Invoiced to Date(%):

RCSTP UV Replacement EGMAU22004 Invoice Summary

Invoice Date 1/27/2022

EGMAU22004 RCSTP UV Replacement

1113012 NTP $ $ $ $ 2,537.25 $ 2,537.25 0.00 $

RCSTP UV Replacement

$ $ $ 2,537.25 $ 2,537.25

0

to Date:

Remaining Budget($): $ Remaining Budget(%):

1/16/2022 1/27/2022

Comments: RCSTP UV Replacement - Obtained and reviewed reduced cost quote for Trojan system, evaluated technical capabilities and features of Glasco vs. Trojan systems including additional vendor meetings, prepared and submitted cost comparisonto MA, evaluated feasibility of a 4th UV system from Kershner, prepared scope and specifications for separate electrical construction work, submitted scope to Lenni for cost quote, design of temporary bypass system, and evaluated viability of FEMA disaster recovery grant application with operator and M. Miller.

(Gi

Gawthrop Greenwood, PC

A 1/orneys at Law

•17 East Gay Street, Suite 100 I

(p) 610-696-822` West Chesler, PA 19381-0562 (f) 610-344-092, gglaw@gnwthrop.com www.gawthrop.c,

Please Note: Gll\11lnlfl Gr«r.wtK'kl. re

ArtMll),oll.,.t Please Mail checks to:

P.O. Box 562 West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit: https://secure.lawpay.com/pages/gawthrop/operating

East Goshen Municipal Authority 1580 Paoli Pike West Chester PA 19380

General Authority Services

05/05/2022 PMM

05/09/2022 SLF

05/13/2022 PMM

05/15/2022 PMM

05/16/2022 PMM

05/17/2022 PMM

05/18/2022 EBK PMM

Email from S. Smith with meeting agenda and materials.

Preparation for and attendance at meeting

Emails (3) from/to S. Smith regarding 1344 Morstein sewer easement.

Email to M. Miller regarding easement agreement for Kyong-Aie Thomas.

Email from M. Miller regarding easement agreement for Kyong-Aie.

Telephone conference with M. Miller regarding easement agreement for Kyong-Aie; Emails (2) to/from M. McKean regarding same; Email to M. Miller regarding review of legal description.

Review of Yoegel sewer easement Emails (3) from M. Miller regarding sewer easement for Kyong-Aie; Emails (3) to/from M. McKean regarding same; Email from S. Smith regarding same.

For Current Services Rendered

Recapitulation

Client No: Invoice No.

Hours

0.20

1.50

0.60

0.20

0.20

0.80

0.40

1.40

5.30

Timekeeper Stacey L. Fuller

Hours

1.50 Hourly Rate

$200.00

Page: 1 06/09/2022 6604-001M 259154

40.00

300.00

120.00

40.00

40.00

160.00

80.00

280.00

1,060.00

Iotal $300.00

East Goshen Municipal Authority

General Authority Services

Timekeeper

Patrick M. McKenna Ellen Koopman

Previous Balance

Total Current Charges

Balance Due

Hours

3.40 0.40

To ensure proper credit, please write your client number on

your check when returning payment. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Client No: Invoice No.

Hourly Rate

200.00 200.00

Page: 2 06/09/2022 6604-001M 259154

Total 680.00 80.00

1,060.00

$1,420.00

Divisions of Colonial Electric: Original Invoice INVOICE colonial electric supply company, inc. Since 1972 ... Powered By Excel/errce/ 201 W. Church Road A colonial - maior proiec/s

colonialelectric.com/cmp lilTek

colonialteltek.com

King of Prussia, PA 19406 610-312-8100 ,_jtili·www.colonialelectric.com Bright Light '.!:'!-! Annapolis Lighting

Colonial Electric Supply Company, Inc. PO BOX 414564 = - =

LINEJ

-

brightlightdesigncenter.com

BILLING ADDRESS 5191 1 MB 0.485 E0049X !0092 D9225318658 S2 P9073788 00D1:0001

l'''l•11111ll1l•l11111111•11111111111•111111lll11111111111111•11•

EAST GOSHEN TOWNSHIP ATTN: ACCOUNTS PAYABLE 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

CUSTOMER PO ORDER DATE ORDERED BY RIDLEY FLOW METER 05/25/22

COMMENTS CO. UNIT/WH ENTERED BY 02 / DC CUSTOMER SKU _ _i_ DESCRIPTION 10 60000015520 HAY716080 7/8 STAINLESS 20 60000006865 HAYN821-3/8SS SPRING NUT SS 30 60000010230 HAYF213-304SS 4H FLAT T 40 MESSAGE ABOVE IS A 4-HOLE FLAT T 50 MESSAGE QTY:1 IN STK BALANCE

2-WEEKS 60 MESSAGE *************************** ***

70 60000023025 HAYF214-304SS 4H FLAT 90

DNR 80 NS8888 62398038690 HMND 1418N4SSS16 48X36X16

ENCL 90 MESSAGE DELIVERY:2-WEEKS

I PPROVED BY:

ATE PAID:

HECK#: HARGEDTO:

annapolislighting.com Boston MA 02241-4564

1

Billing Questions? Call: THOMAS KARACKAI 484-679-2295

SHIPPING ADDRESS

EAST GOSHEN TOWNSHIP 1580 PAOLI PIKE WEST CHESTER PA 19380-6107

SHIP DATE SHIPPED VIA 06/07/22 ACCOUNT ID ORIGINAL INVOICE

QT217988

FREIGHT TERM

SALESPERSON

I ORD QTY I SHIP QTY I BO QTY I UNIT PRICE lI EXTENDED AMT

20 20 0 866.44 C 173.29 4 4 0 579.13 C 23.17 2 2 0 26.57 E 53.14

2 2 0 18.00 E 36.00

0 2770.00 E 2770.00

(([

3055.60

Invoices not paid within 30 days from the billing date are subject to a late fee of 1.5% per month. All sales are subject to Colonial's standard terms and conditions of sale in effect as of the date of the placement of an order. Colonial objects to any proposed term that is inconsistent with its standard terms of sale. Colonial's current standard terms and conditions of sale can be found at http:// www.colonialelectric.com/termsofsale or a copy can be obtained from Colonial's Customer Financial Services Dept. All terms and conditions are subject to change without notice. To ensure proper customer service, Colonial Electric records all calls for quality and training.

S&H CHGS

0.00% TAX 0.00

0001:0001

For a Complete List of Locations

Please Visit www.colonialelectric.com

www.BrightLightDeslgnCenter.com www.AnnapolisLlghtlng.com

Accepted By 3055.60

CUMMINS Page 1 of 1

colonial

electric supply

Corporate Office 201 W.Church Road PACKING LIST

Invoice No. Date Page Since 1972 ... Powered By Excellence!

King of Prussia, PA 19406 Phone: (610) 312-8100 Fax: (610) 312-8131 14642609 06/06/22 1 of 1

www.colonialelectric.com

Downingtown (610) 873-6400 Reading (610) 374-2134

Glenolden (610) 870-0160 Warminster (215) 672-5600

Myerstown (717) 376-3039 Vineland (856) 462-63009 Collegeville (610) 489-7600

Lancaster (717) 405-3101 Hammonton (609) 704-99501 Pleasantville (609) 645-811 O

Allentown (610) 435-9691 Brooklyn (718) 210-0590 Wilmington (302) 998-9993

Northeast Philadelphia (215) 464-0800 Center City Philadelphia (215) 928-0800 Cape May Court House (609) 465-7144

Ship To EAST GOSHEN TOW NSHIP

1580 PAOLI PIKE [F)

WEST CHESTER

-sold To

EAST GOSHEN TOWNSHIP

ATTN: ACCOUNTS PAYABLE

1580 PAOLI PIKE

WEST CHESTER

Line Sku WH Location 10 60000015520 Pipe

20 60000006865 30 60000010230

40 MESSAGE

50 MESSAGE 60 MESSAGE 70 60000023025

80 NS8888

90 MESSAGE

Picked by Cartons Packages Reels

Coils Pieces Bundles Skids

PA

PA

Customer PO Date Ordered

RIDLEY FLOW METER 05/25/22

19380-6107 Shipped Via Freight Source Co. Unit / WH

PAD cc 02 I DC I QT;17988 I I E163 0001

Original Invoice Salesperson Comments

Job No Contact

RECEIVING Phone: 610-692-7171 19380

Description Ordered HAY716080 7/8 STAINLESS 20

HAYN821-3/8SS SPRING NUT SS 4

HAYF213-304SS 4H FLATT 2

ABOVE IS A 4-HOLE FLATT

QTY:1 IN STK BALANCE 2-WEEKS ******************************

HAYF214-304SS 4H FLAT 90 DNR 2

HMND 1418N4SSS16 48X36X16 ENCL 1 CUST SKU: 62398038690

DELIVERY:2-WEEKS , \?PROVED BY.·

)A1EPAID:

C'HECK#:

C HARGEDTO:

Back Ordered

u

0 0 0

0 0

. ,4

. '

. ·' ,.

Shipped

20 4 2

2

1/c . .

.,

Ordered By Date Required

JIM 06/07/22

Entered By Account ID

9795 E163

I

Payment Terms

N30D

Unit Price UM Extended Amt 866.44 C 173.29 579.13 C 23.17 26.57 E 53.14

18.00 E 36.00

/

2770.00 E 2770.00

1/2 i_

CA\

►

M< .. J'<.(' 'N -e t.\ Flow

RETURNS POLICY: All returns must have prior authorization. Returns under $25.00 will not be TP: 1 Subtotal 3055.60

accepted. No cash refunds will be given for material re!Llrned. Returns must be undamaged 22:13:36 in manufacturers original carton and may be subject to a restocking fee. Transportation 0.00 SPECIAL ORDERS: A deposit is required on special order merchandise, and these orders are non-cancelable and non-returnable. .0% Tax 0.00 TERMS & CONDITIONS: Colonial's current standard terms and conditions of sale can be found at 11 1111 1;1 111111 1

www.colonialelectric.comrrermsOfSale or a copy can be obtained from Colonial's Customer Total 3055.60 Financial Services Dept. All terms and conditions are subject to change.

Colonial Electric Supply Company, Inc. ROUTE MANIFEST ROUTE: F STOP: 5 06/07/22

Time Comm/ShipNotes

CT:1 SK:1

Inv# Ship Addr

14642609 1580 PAOLI PIKE [F] WEST CHESTER, PA 19380-6107

[X-Dock] CT:1 SK:1

Page: 4 of 15

Cust Name I Site Name

EAST GOSHEN TOWNSHIP

Contact· RECEIVING Pbone: 610-692-7171 --- '"-

I ' ',

TRACOM, Inc. 6575-A Industrial Way Alpharetta, GA 30004 1.877.435.8637 maryann@tracomfrp.com www.tracomfrp.com

-- INVOICE# r 80016

-BILLTCY

Mr Mark Miller East Goshen Township 1580 Paoli Pike West Chester, PA 19380

DATE - I 06/0112022

TOTAL DUE - T18,730.00 ------

'SHIPTO . - . East Goshen Township Mark Miller 1580 Paoli Pike I West Chester, PA 19380

Invoice

! ____________ ___,

TERMS

Net 30

ENCLOSED

PROJECT NAME SHIP DATE 06/01/2022 SHIP VIA Matson

P.O. NUMBER

422-3700 East Goshen Township

ACTIVITY DESCRIPTION

MH-4H20 Packaged H-20 Fiberglass Manhole, 4'-0" 0, with: -13'-0" deep (inlet invert to grade ring bench) -Fiberglass tube, 1/2" nominal thickness, Polyester Resin and Gel Coat 1

(white) -Integral base with 4" external mounting flange -Polystyrene pad for placement between slab and manhole

-

1 -H-20 Highway Loading Cone (grade rings, cover, and frame by others)

-31" I.D. / 32" O.D. opening

MH-I-PB-18 Palmer-Bowlus flume, 4D+ 1" style, 18" throat

-Inlet and Outlet Bulkheads -Resin, lsophthalic polyester, 1/4" thick -Gel coat with U.V. inhibitors, grey cloud, textured finish, 15mil

FAB-2"NPT 2" 0 NPT fitting / coupling / tap

FAS-LADDER Ladder, FRP, 1.5" 0 reinforced rungs, non-slip top surface, S.S. hardware P-18 Pipe Stub, 18" 0 x 6" L x 1/4" Thick, FRP

C-CON-18

FLOW-ULT­ FIXED-1

Freight Out

Coupling, concentric, 18" 0 for C.1./PVC, flexible PVC with S.S. clamps i

i Ultrasonic mounting bracket, 304SS, Fixed arm (HA)

J©eiª«t ____________________ _

QTY

I 1 I 161 I

2

2

1 I

__ 1_1__ -···.

AMOUNT

16,880.00,

I 1,850.00

Prompt Payment is appreciated. BALANCE DUE $18,730.00

._, n_\d _J 1(l/L APPROVED BY:ff'\ _ DATE PAID: C.etf(t1d R t C . f I C(,f'\,t

-------- CHECK#: CHARGED_T_O_: ___ _

VYle,ter·

TRACOM, Inc. 6 575-A Industrial Way Alpharetta, GA 30004

1.877.435.86 37 maryann@tracomfrp.com www.tracomfrp.com

INVOICE# 80016

e1LLT0 Mr Mark Miller East Goshen Township 1580 Paoli Pike West Chester, PA 19380

DATE 06/01/2022 TOTAL DUE $18,730.00

··

'sHiPtd

East Goshen Township Mark Miller 1580 Paoli Pike , West Chester, PA 19380

TERMS.

Net 30

Invoice

ENCLOSED

SHIP DATE 06/01/2022 SHIP VIA Matson

P.O.NUMBER 422-3700 PROJECT NAME

ACTIVITY

MH-4H20

MH+PB-18

FAB-2"NPT

FAB-LADDER

P-18

C-CON-18

FLOW-ULT­ FIXED-I

' Freight Out

DESCRIPTI.ON

Packaged H-20 Fiberglass Manhole, 4'-0" 0, with: -13'-0" deep (inlet invert to grade ring bench) -Fiberglass tube, 1/2" nominal thickness, Polyester Resin and Gel Coat (white) -Integral base with 4" external mounting flange -Polystyrene pad for placement between slab and manhole -H-20 Highway Loading Cone (grade rings, cover, and frame by others)

-31" LD. / 32" O.D. opening

Palmer-Bowlus flume, 4D+ 1" style, 18" throat

-Inlet and Outlet Bulkheads -Resin, lsophthalic polyester, 1 /4" thick -Gel coat with U.V. inhibitors, grey cloud, textured finish, 15mil 2" 0 NPT fitting/ coupling/ tap

Ladder, FRP, 1.5" 0 reinforced rungs, non-slip top surface, S.S. hardware Pipe Stub, 18" 0 x 6" L x 1 /4" Thick, FRP

Coupling, concentric, 18" 0 for C.IJPVC, flexible PVC with S.S. clamps

Ultrasonic mounting bracket, 304SS, Fixed arm (HA)

Freight

Prompt Payment is appreciated. BALANCE DUE

East Goshen Township

QTY

16

2

2

AMOUNT:

16,880.00

1,850.00 $18,730.00

Memo

To: Municipal Authority From: Dave Ware Re: MA June 2022 Financial Report Date: July 7, 2022

In June 2022, the Municipal Authority recorded $15,563 in revenues (transfers from Sewer Operating and Sewer Capital Reserve) and $24,060 in expenses (General Engineering Services, Legal Services, and Engineering for RCSTP UV Replacement, Ashbridge Pump Station for Electrical Panel Replacement), for a net result of operations of <$8,497>. As of June 30, 2022, the fund balance was $931.

A complete list of 2022 full year MA revenues and expenses is attached.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Other Funds

June 2022 Municipal Authority

Annual Y·T·D Y-T-D Y·l·D M-l·D M·l·D M-1-D Account Title Acct I Budget Budget Actual Variance Budget Actual variance

REVENUE

INTEREST EARNINGS 07341 1000 0.88 0.88 0.10 0.10 DCED GRANT 07354 0400 152,980 c.c. TAPPING ms 07364 1100 2,000 2,000 (2,000.00) R.C.!APPING ms 07364 lllO 2,000 358 300.00 (58.01) 358 (358.01) CONNECTION FEES • SEWER 07364 lllO 1,000 335 281.88 (52.92) MISCELLANEOUS REVENUE 07380 1000 141.12 141.12 TRANSFER FROM SEWER OPERATING 07392 0500 130,000 50,990.55 50,990.55 6,989.50 6,989.50 TRANSFER FROM SEWER CAP RESERVE 07392 0900 416,930 413,125 66,511.15 (346,613.54) 29,301 8,513.90 (20,132.14)

TOTAL REVENUE 164,910 415,818 118,225.58 (297,591.92) 29,665 15,563.50 (14,101.15)

EXPENSES

ADMINISTRATIVE WAGES 07424 1400 30,529 14,154 16,144.10 (1,990.20) 1,413 8,372.05 (898.65) MISCELL!NEOUS EXPENSE 07424 3000 1,500 1,345 1,665.25 (320.21) 125.00 (125.00) MUNIC,AUTH, ·AUUIIING 07424 lllO 10,300 10,300 10,250.00 50.00 ENGINEERING SERVICES 07424 lllO 45,000 19,946 28,468.25 (8,522.55) 3,281 2,610.50 670.14 LEGAL SERVICES 07424 3140 8,000 5,038 2,360.00 2,611.14 2,186 360.00 1,826.11 R,C, CAPITAL-SIP 07424 1440 315,000 CAP.REPLACEMENT R.C. 07424 1490 41,400 RELINING 01426 3001 130,000 BARKWAY PUMP STATION CAPITAL 01429 1501 2,215.00 (2,215.00) ASHBRIDGE PUMP STATION CAPITAL 07429 1502 11,493.05 (11,493.05) 2,861.05 (2,861.05) HERSHEYS MILL PUMP STATION CAPITAL 01429 1503 29,390.11 (29,390.11) 121.60 (121.60) HUNT CO PUMP STATION CAPITAL 01429 1504 1,870.00 (1,810.00) RCSIP CAPITAL 01429 1505 46,891 63,458 24,458.50 38,999.81 6,681 9,610.25 (2,922.95) WEST GOSHEN CAPITAL 07429 6100 136,284

TOTAL EXPENSES 164,910 114,841 128,914.32 (14,073.63) 19,628 24,060.45 (4,432.94)

NET RESULT FROM OPERATIONS 300,911 (10,688.14) (lll,665.55) 10,031 (8,496.95) (18,534.09)

PAGE 8

Report Date 2206 01 /01 /22 9 : 53 AM

MUNICIPAL AUTHORITY June 30, 2022 YTD Financials

I Account# loesaiption !Per lsrc ITrx# loebits leredits !Balance loate !Check# 110# !Name I Description I Description 2

07341-1000 BEGINNING BALANCE 0 07341-1000 INTEREST EARNINGS 2201 JE 82114 0.19 0 1/31/2022 INTEREST INTEREST EARNED JANUARY 2022 07 FUND 07341-1000 INTEREST EARNINGS 2202 JE 82467 0.18 0 2/28/2022 INTEREST INTEREST EARNED FEBRUARY 2022 7100.1035 07341-1000 INTEREST EARNINGS 2203 JE 82815 0.17 0 3/31/2022 INTEREST INTEREST EARNED MARCH 2022 07 FUND

07341-1000 INTEREST EARNINGS 2204 JE 83206 O.lS 0 4/30/2022 INTEREST INTEREST EARNED APRIL 2022 7100 07341-1000 INTEREST EARNINGS 2205 JE 83641 0.09 0 5/31/2022 INTEREST INTEREST EARNED MAY 2022 07 FUND 07341-1000 INTEREST EARNINGS 2206 JE 84003 0.10 0 6/30/2022 INTEREST INTEREST EARNED JUNE 2022 07 FUND 07364-1110 BEGINNING BALANCE 0 07364-1110 R.C.TAPPING FEES 2205 RE 83419 300.00 0 5/18/2022 83419 1 706 HEMLOCK HILL SEWER INSPECT R.C.TAPPING FEES 07364-1130 BEGINNING BALANCE 0 07364-1130 CONNECTION FEES - SEWER 2202 CR 82091 423.00 0 2/2/2022 2714 012430 1 STOFFLET, MICHAEL 07364-1130 CONNECTION FEES - SEWER 2202 JE 82092 141.12 0 2/2/2022 PINE RK ANNUAL PINK ROCK INSTALLMENT INTEREST PORTION - STOFFLET 07380-1000 BEGINNING BALANCE 0 07380-1000 MISCELLANEOUS REVENUE 2202 JE 82092 141.12 0 2/2/2022 PINE RK ANNUAL PINK ROCK INSTALLMENT INTEREST PORTION - STOFFLET 07392-0500 BEGINNING BALANCE 0 07392-0500 TRANSFER FROM SEWER OPERATING 2201 JE 81851 5,497.00 0 1/13/2022 XFER XFER $ TO MA FROM SEWER & SEWER CAP.RE: DEC.EXPENSES 07392-0500 TRANSFER FROM SEWER OPERATING 2202 JE 82281 6,324.50 0 2/16/2022 XFER XFER $ FROM OS & 09 RE: JAN. 2022 MA EXPENSES 07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82519 660.00 0 3/8/2022 XFER XFER $ FROM SEWER & SEWER CAPITAL TO MA 07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82561 360.00 0 3/11/2022 XFER XFER $ FROM OS TO 07 MA AUTH. 07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82627 7,000.00 0 3/18/2022 XFER XFER $ FROM OS TO 07 RE: 07 EXPENSES 07392-0500 TRANSFER FROM SEWER OPERATING 2203 JE 82773 8,372.05 0 3/30/2022 XFER XFER $ FROM OS TO 07 TO COVER MA EXPENSE - EGT QTR.1 07392-0500 TRANSFER FROM SEWER OPERATING 2204 JE 82986 10,814.00 0 4/14/2022 XFER MA XFER $ FROM OS & 09 TO MA RE: APRIL EXPENSES 07392-0500 TRANSFER FROM SEWER OPERATING 2205 JE 8321B 3,690.00 0 5/4/2022 XFER XFER $ FROM OS TO MA TO COVER EXPENSES 07392-0500 TRANSFER FROM SEWER OPERATING 2205 JE 83370 1,283.50 0 5/13/2022 XFER XFER $TO MA RE: MAY EXPENSES FROM OS &09 07392-0500 TRANSFER FROM SEWER OPERATING 2206 JE 83682 1,283.50 5,302.50 0 6/7/2022 CORRECT CORRECT MA$ XFER TRX 83370 5/13/2022 07392-0500 TRANSFER FROM SEWER OPERATING 2206 JE 83789 2,970.50 0 6/16/2022 XFER TO MA XFER FUNDS TO MA FROM SEWER & SEWER CAPITAL -JUNE 2022 07392-0500 TRANSFER FROM SEWER OPERATING 2207 JE 83995 8,372.05 0 7/1/2022 XFER XFER $ FROM OS TO 07 TO COVER MA EXPENSES 07392-0900 BEGINNING BALANCE 0 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2201 JE 81851 18,986.13 0 1/13/2022 XFER XFER $ TO MA FROM SEWER & SEWER CAP.RE: DEC.EXPENSES 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2202 JE 82281 1,217.25 0 2/16/2022 XFER XFER $ FROM OS & 09 RE: JAN. 2022 MA EXPENSES 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2203 JE 82519 6,831.00 0 3/8/2022 XFER XFER $ FROM SEWER & SEWER CAPITAL TO MA 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2204 JE 82986 25,600.37 0 4/14/2022 XFER MA XFER $ FROM OS & 09 TO MA RE: APRIL EXPENSES 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2205 JE 83370 5,302.50 0 5/13/2022 XFER XFER $TO MA RE: MAY EXPENSES FROM OS &09 07392-0900 TRANSFER FROM SEWER CAP RESERVE 2206 JE 83682 5,302.50 1,283.50 0 6/7/2022 CORRECT CORRECT MA$ XFER TRX 83370 5/13/2022

07392-0900 TRANSFER FROM SEWER CAP RESERVE 2206 JE 83789 12,592.90 0 6/16/2022 XFER TO MA XFER FUNDS TO MA FROM SEWER & SEWER CAPITAL - JUNE 2022 07424-1400 BEGINNING BALANCE 0 07424-1400 ADMINISTRATIVE WAGES 2203 CD 82771 8,372.05 0 3/30/2022 3311 425 EAST GOSHEN TOWNSHIP - GENERAL QTR.1 - 2022 REIM BU RSM ENT 07424-1400 ADMINISTRATIVE WAGES 2206 CD 83972 B,372.05 0 6/30/2022 3322 425 EAST GOSHEN TOWNSHIP - GENERAL QTR.2-2022 REIMBURSEMENT 07424-3000 BEGINNING BALANCE 0 07424-3000 MISCELLANEOUS EXPENSE 2201 CD 81850 880.25 0 1/13/2022 3303 2132 PENNSYLVANIA MUNICIPAL AUTHORITIES ASSOC 2022 ACTIVE MEMBERSHIP DUES 07424-3000 MISCELLANEOUS EXPENSE 2203 CD 82517 660.00 o 3/8/2022 3306 3871 DELAWARE RIVER BASIN COMMISSION ANNL MONITORING & COORDINATION FEE 07424-3000 MISCELLANEOUS EXPENSE 2206 CD 83970 125.00 o 6/30/2022 3321 1065 PETTY CASH PA MUNIC. AUTH.WORKSHOP - W.WUJCIK

07424-3110 BEGINNING BALANCE 0 07424-3110 MUNIC.AUTH.-AUDITING 2203 CD 82626 7,000.00 0 3/18/2022 3310 808 MAILLIE FALCONIERO & CO. MUNICIPAL AUTH.2021 FINANCIAL AUDIT 07424-3110 MUNIC.AUTH.-AUDITING 2205 CD 83214 3,250.00 0 5/3/2022 3314 808 MAILLIE FALCONIERO & CO. FINAL BIWNG - 2021 MUNICIPAL AUTH FINANCIAL STATEMENTS

07424-3130 BEGINNING BALANCE 0 07424-3130 ENGINEERING SERVICES 2201 CD 81850 4,076.75 0 1/13/2022 3302 1052 PENNON I ASSOCIATES INC. SERVICES THRU 12/19/21 2021 GEN.SER

07424-3130 ENGINEERING SERVICES 2202 CD 82280 5,664.50 0 2/16/2022 3305 1052 PENNON I ASSOCIATES INC. SERVICES THRU 1/16/22 - GEN.SERVICE

07424-3130 ENGINEERING SERVICES 2204 CD 82985 10,814.00 0 4/14/2022 3313 1052 PENNON I ASSOCIATES INC. SERVICES THRU 3/20/22 2022 GEN.SERV 07424-3130 ENGINEERING SERVICES 2205 CD 83360 5,302.50 0 5/12/2022 3316 1052 PEN NONI ASSOCIATES INC. SERVICES THRU 4/17 /22 2022 GEN.SERV

07424-3130 ENGINEERING SERVICES 2206 CD 83788 2,610.50 0 6/16/2022 3319 1052 PEN NONI ASSOCIATES INC. SERV. THRU S/15/22 2022 GEN.SERVICE

07424-3140 BEGINNING BALANCE 0 07424-3140 LEGAL SERVICES 2201 CD 81850 540.00 0 1/13/2022 3300 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - NOVEMBER 2021 07424-3140 LEGAL SERVICES 2202 CD 82280 660.00 0 2/16/2022 3304 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE - DEC.2021 GEN.AUTH. 07424-3140 LEGAL SERVICES 2203 CD 82560 360.00 0 3/11/2022 3308 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE FEB.2022 GEN.AUTH. 07424-3140 LEGAL SERVICES 2205 CD 83217 440.00 o S/4/2022 3315 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 3/11-3/14/22 GEN.AUTH 07424-3140 LEGAL SERVICES 2206 CD 83788 360.00 0 6/16/2022 3318 528 GAWTHROP GREENWOOD & HALSTED LEGAL SERVICE 4/8-4/11/22 GEN.AUTH. 07429-1501 BEGINNING BALANCE 0 07429-1501 BARKWAY PUMP STATION CAPITAL 2201 CD 81850 2,215.00 0 1/13/2022 3299 356 DECKMAN MOTOR & PUMP INC. REBUILT HYDROMATIC PUMP 07429-1502 BEGINNING BALANCE 0

U:\0Ware\Municipal Authority\2022\06 June\June 2022 YTD Ftnancials.xlsx

MUNICIPAL AUTHORITY June 30, 2022 YTD Financials

I Account# I Description I Per lsrc jTrx# joebits jeredits I Balance I Date I check# 110# jName I Description j Description" 2 07429-1502 ASH BRIDGE PUMP STATION CAPITAL 2204 CD 82985 8,632.00 0 4/14/2022 3312 356 DECKMAN MOTOR & PUMP INC. 2 REBUILT FAIRBANKS PUMPS 07429-1502 ASHBRIDGE PUMP STATION CAPITAL 2206 CD 83788 2,861.05 0 6/16/2022 3317 293 COLONIAL ELECTRIC SUPPLY REPLACE DISCONNECTED ELEC.PANEL 07429-1503 BEGINNING BALANCE 0 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2201 CD 81850 2,709.00 0 1/13/2022 3299 356 DECKMAN MOTOR & PUMP INC. 2 - REBUILT HYDROMATIC PUMPS 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2201 CD 81850 11,255.01 0 1/13/2022 3301 2128 JWC ENVIRONMENTAL MUFFIN MONSTER 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2201 CD 81850 3,852.69 0 1/13/2022 3302 1052 PENNON I ASSOCIATES INC. SERVICES THRU 12/19/21 HM ESTATES 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2202 CD 82280 1,217.25 0 2/16/2022 3305 1052 PENNON I ASSOCIATES INC. SERVICES THRU 1/16/22 - HM ESTATES 07429-1S03 HERSHEYS MILL PUMP STATION CAPITAL 2203 CD 82517 6,831.00 0 3/8/2022 3307 717 KAPPE ASSOCIATES MAGNETIC FLOW METER 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2203 CD 82617 (11,255.01) 0 3/17/2022 3301 2128 JWC ENVIRONMENTAL VOID CK.#3301- LOST IN MAIL 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2203 CD 82617 11,255.01 0 3/17/2022 3309 2128 JWC ENVIRONMENTAL REPLACEMENT CK.FOR 3301 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2204 CD 82985 3,403.62 0 4/14/2022 3313 1052 PEN NONI ASSOCIATES INC. SERVICES THRU 3/20/22 HM ESTATES 07429-1503 HERSHEYS MILL PUMP STATION CAPITAL 2206 CD 83788 121.60 0 6/16/2022 3319 1052 PEN NONI ASSOCIATES INC. SERV. THRU 5/15/22 HERSHEY MILL ESTATES SEWER DESIGN 07429-1504 BEGINNING BALANCE 0 07429-1504 HUNT CO PUMP STATION CAPITAL 2201 CD 81850 1,870.00 0 1/13/2022 3299 356 DECKMAN MOTOR & PUMP INC. REBUILT HYDROMATIC PUMP 07429-1505 BEGINNING BALANCE 0 07429-1505 RCSTP CAPITAL 2204 CD 82985 13,564.75 0 4/14/2022 3313 1052 PENNON! ASSOCIATES INC. SERVICES THRU 3/20/22 RCSTP UV REP. 07429-1505 RCSTP CAPITAL 2205 CD 83360 1,283.50 0 5/12/2022 3316 1052 PENNON! ASSOCIATES INC. SERVICES THRU 4/17/22 RCSTP UV 07429-1505 RCSTP CAPITAL 2206 CD 83788 4,005.25 0 6/16/2022 3319 1052 PENNONI ASSOCIATES INC. SERV. THRU 5/15/22 RCSTP CAUSTIC SODA CONVERSION 07429-1505 RCSTP CAPITAL 2206 CD 83788 5,605.00 0 6/16/2022 3320 4390 TELEDYNE INSTRUMENTS INC. ULTRASONIC FLOW METER

U:\OWare\Municipal Authorlty\2022\06 June\June 2022 YTD Flnancials.xlsx

Memo

To:

From: Re: Date:

Municipal Authority Dave Ware Sewer Rate Calculation July 2022 & Proposed Capital Plan July 7, 2022

At the Board of Supervisors meeting Tuesday, July 5, 2022 I presented a proposal for increasing sewer rates as well as a 4 year capital plan to fully fund the sewer capital reserve for the Ridley Creek Sewer Treatment Plan and Pump Stations. The Board felt there was not enough notice for rate payers of the increase and that the year one impact beginning with the July 2022 billing may be overly burdensome given the current inflationary climate.

Attached is what I submitted. I will be developing additional alternative options for the Board's consideration for the July 19, 2022 meeting.

U:\dware\municipal authority\

Memo

To:

From: Re:

Date:

Board of Supervisors Dave Ware Consider 2022 Sewer Rates and a Proposed Capital Plan June 30, 2022

An updated Inventory List for Ridley Creek Sanitary Treatment Plant (including Pump Stations and Collection System) indicates that East Goshen Township should have just over $4.6M already in reserve to replace all of the capital items currently in operation. Our current Sewer Capital Reserve Fund balance is $2.3M. I believe the primary reason for this funding gap is due to the calculation of sewer rates based on the current budget year, rather than additionally accounting for un-capitalized sewer assets, future projects, etc...Additionally, the average single family household's quarterly bill increased roughly 4% total, or 0.5% per year, over the 8 year period 2012 through 2019. In contrast, the average annual inflation over that same period increased 13% total, or 1.6% per year.

The current aging sewer infrastructure is in need of maintenance and replacement as illustrated by the

Hershey's Mill Estates Sewer Replacement project, with a cost estimate of $1.54M. While we are fortunate to use federal ARPA funds of nearly $1M for this project, another $SOOK plus is needed.

Unfortunately, there is a likelihood that more of these projects could emerge at any given time, and the Township is ill-prepared to fund them and has been for years. Many townships have underfunded their sewer systems for years and due to lack of maintenance and increased costs are now selling their systems to AQUA, effectively turning over control of rates and customer service.

After consultation with the Municipal Authority, I am proposing a sewer capital plan staged over the coming four years to address these issues. The total additional revenue needed to fully fund the current sewer projects as well as the treatment plant and pump stations is $3.4M (see attached rate calculation), which amounts to about $520 per unit. For July 2022 I propose maintaining the sewer variable rate of $9.70 per thousand gallons, while increasing the fixed rate by $40/quarter to $75.61.

Each July, the new quarterly fixed rate of $75.61 would decrease by $5 until 2026 when we should be fully funded. At that point the fixed rate would return to $35.61/quarter. This plan is based on our current best information and will be reassessed each July to review funding progress, variable usage, ongoing projects, status of sewer infrastructure, and may be subject to change at the Board's discretion.

Analysis of Sewer Rate Options

Key Statistics-East Goshen Township Sewer Rates, 2012-2022

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Fixed Rate $ 26.15 $ 26.20 $ 26.56 $ 30.07 $ 27.26 $ 27.26 $ 27.02 $ 33.74 $ 32.41 $ 35.61 Variable Rate (perTG) $ 7.97 $ 7.51 $ 7.68 $ 7.90 $ 8.38 $ 8.38 $ 8.74 $ 8.42 $ 9.13 $ 9,70 Avg SFD Quarterly Bill $140.44 $135.24 $139.34 $143.34 $146.15 $146.26 $148,37 $146.01 $152.62 $169.84 *2022 Average Single Family Dwelling assumes no change in usage for variable cost.

1

2022 $ 75.61 $ 9.70 $209.84

Comparison to nearby municipalities At the proposed rates, the average sewer bills in East Goshen wills remain in line with those in many nearby communities, as shown below.

$300

$250

$200

$150

$100

$SO

$0

Quarterly Sewer Bills for Average Single Family Household*

$251

$210

Willistown East Goshen Westtown West Chester East Whiteland West Goshen

*For townships that use metered water consumption as the basis for bills (Willistown, West Chester and East Goshen), we assumed 13,838 gallons used per quarter (the average 2022 single family consumption in East Goshen); for townships with different rates based on service districts (Willistown, Westtown, Uwchlan and East Whiteland), we used the highest rate. For townships that do not bill quarterly (Tredyffrin, West Chester and West Whiteland), annual or monthly bills were adjusted to a quarterly basis.

Recommended Motion: Madam Chair, I move that we adopt Resolution 2022-13, revising the fee schedule, to amend the Township's sewer rates to $75.61 per quarter fixed and $9.70 per thousand gallons variable.

2

Calculation of 2022 Sewer Rates

Re-estimated 2022 Fixed Costs $1,002,507.66 Re-estimated 2022 Variable Costs $2,863,626.04_ 2022 Projected Expenses: $3,866,133.71

Re-estimated Non Rental Sewer Revenue 2022 Total Sewer Rental through 6/2022 Total Sewer Rental Projected at Current Rates 7 /1-12/1 2022

2022 Projected Revenue with No Rate Change:

Total 2022 Re-estimated Revenue Shortfall

$144,311.00 $1,783,067.90 $1,783,067.90 $3,710,446.80

$155,686.91 **

Current Sewer Capital Reserves $2,299,857.34 Total Sewer Capital Reserves Needed $4,620,461.57 This is the total amount needed to replace all inventory ------=-------------------'-'-- --

Add t' I Sewer Reserves Needed for RCSTP & Pump Inventory $2,320,604.23 *****

Additional Long-Term & Project Specific Capital Costs NOT in Budget Ridley Creek Ultraviolet Disinfection System $185,000.00 West Goshen Sewer Authority Capital Improvements $215,000.00 Hershey's Mill Estates Sewer Replacement $550,000.00 Addt'I Sewer Reserves Needed for RCSTP & Pump Inventory $2,320,604.23 ***** Total Additional Reserves Needed: $3,270,604.23 Revenue Shortfall Projected: $155,686.91 ** Total Revenue Needed: $3,426,291.13

$125K Currently in Budget ($310K Total Estimate) This is the amount NOT funded by ARPA & Bond money

This is the amount NOT funded by ARPA money

Total Sewer Units 6,629 Amount Needed per Unit( ___ $_5-'-16-.-8ÄTotal Amount From July 2022 -July 2026

Proposed Increase from Current Fixed Rate Annualized Recd

$40.00; Updated Fixed Rate of $75.61 $1,060,640.00 2022/2023 Quarterly Increase; Avg SFD Rate $209.84 $3S.00; Updated Fixed Rate of $70.61 $928,060.00 2023/2024 Quarterly Increase; Avg SFD Rate $204.84 $30.00; Updated Fixed Rate of $65.61 $795,480.00 2024/2025 Quarterly Increase; Avg SFD Rate $199.84 $25.00; Updated Fixed Rate of $60.61 $662,900.00 2025/2026 Quarterly Increase; Avg SFD Rate $194.84 $0.00; Updated Fixed Rate of $35.61 $0.00 2026/2027 Quarterly Increase; Avg SFD Rate $169.84 Additional Revenue Received: $3,447,080.00 Amount Received per _u_n_it,__l __ __,;_$_5_20_ ._oo_,]1...v_e_ar 1- 4 ($160 + $140 + $120 + $100)

Current Quarterly Rates as of June 2022 Current fixed rate $35.61 Current variable rate Average SFD bill without rate change

New rate as of July 2022

Average SFD consumption Average SFD bill with rate change

!

Estimated Total 2022 Annualized Increase

Fixed Variable

$

$9. 70 per Thousand Gallons $169.84 per Quarter

$75.61

$9.70

13,838 $209.84

160.00

Tl1eAuthorities I

PENNSYl VAJ'-llA ivlUNIC:f'il.l . AUTHORITIES ASSOCiA:-101,,

Notification of Voter Delegate

TO:

FROM:

DATE:

PMAA Member Authorities

Douglas E. Bilheimer

Executive Director

June 1, 2022

The PMAA Board of Directors' voted April 18, 1994, to implement, by its resolution, certain administrative recommendations set forth by the PMAA By-Law Revision Committee. These do not require prior amendment of the By-Laws because the existing By-Laws (Article IX, Sections 1 and 2) do provide the basic authorization for voting at meetings: one vote per active member to be cast by a delegate chosen by its own board of directors. The procedures approved by the Board are as follows:

1. Fifteen days before the meeting, each member authority will notify the Executive Director of the name of its official voting at the meeting and also the name of an alternate delegate, both of whom have been approved by the members' Board of Directors. The delegates shall either be an elected or an appointed official of the applicable authority.

2. As part of the registration procedure at the Annual Meeting, the named delegate shall be handed a "card", which he or she may hold up to cast the vote of that authority. It shall be the responsibility of each delegate, in the event he or she is not on the floor, to hand the card to the appropriate alternate delegate.

3. The presiding officer at the Annual Meeting shall have the discretion in each vote to designate voting by · voice, by-a-show ofdelegat,Hlards, orby written ballot, unless upoh motion dlily made and aaopted the Body itself votes to require written ballots.

4. In pursuance of the powers of the presiding officer, the President may designate a time limit for floor remarks by each person speaking, which shall be stated by the presiding officer at the opening of the meeting.

Please note, this form does not need returned to our office if no one from your authority is attending the conference.

DEB/kaw Attachment

1000 Morth Front Street, Suite 40·J, Wormleysburg, P/-\ 17043

7·! 7-737" .. 7655 . ?·/ 7-T3Y.-8431 (t?, infe@n1tmicipc1L::,uthoriti1?.s.org wvvw.municipc, !outhoraies,org l i'acebook.corn/()arnunicioafa uthoritiP.,..; fffl iCn\ctci.rlin rnrnft•nm,,..,-:,,..,.,1,,., ..... ,..,, m:m:.nr• 1-· .. ,1.., -

Notification of Voting Delegate & Alternate

Our Authority's Board of Directors hereby name the following individuals to serve as Voting Delegate and Alternate Delegate:

Voting Delegate

Name:

Title:

Alternate Delegate

Name:

Title:

Authority submitting this information:

Authority: _______________ _

Address:

City: _______ _ State: -- Zip:--

Designated Voting Delegate or Alternate Delegate will receive an identification card at the Registration Booth at the PMAA Annual Conference.

Please note this form must be returned to the

PMAA office by Friday, August 26, 2022.