Municipal Authority

The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.

 

The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.

  • Five members, serving five-year terms
  • Meetings are on the 2nd Monday of the month at 7:00 P.M.
  • All township meetings are held at the Township Building and open to the public
Authority Members Term Expiration Date
Kevin Cummings, Chairman 2026
John Stipe, Vice Chairman
2029
Dana Pizzarro, Secretary 2026
Sean Ellsworth, Assistant Secretary/Treasurer 2028
Walter Wujcik, Treasurer 2028
Pennoni Associates, Engineer
Patrick M. McKenna, Esq.
Peter Hicks, BoS Liaison
Kevin Miller, Staff Liaison

 

Municipal Authority Genealogy

Audits

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\04-10-23\April 2023 Agenda Materials\4-10-2023 Agenda.doc

EAST GOSHEN MUNICIPAL AUTHORITY

April 10, 2023

7:00

1. CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE a. Ask if anyone will be taping the meeting

2. CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS

3. SEWER REPORTS

a. Director of Public Work’s Report b. Pennoni Engineer’s Report c. Big Fish Environmental Report 4. APPROVAL OF MINUTES a. March 13, 2023 5. APPROVAL OF INVOICES

• Pennoni Invoice #1163612 $24,365.50 • Pennoni Invoice #1163613 $2,614.75 • Pennoni Invoice #1163615 $1,654.50 • Delaware River Basin Commission Invoice #232174 $715.00 (paid 4/3/23) • Maillie Invoice #93285 $8,000.00 (paid 4/3/23) • Gawthrop Greenwood Invoice #270489 $723.50 • PA Municipal Authorities Invoice #212 $880.25 (paid 1/27/23)

6. LIAISON REPORTS

7. FINANCIAL REPORTS a. March

8. OLD BUSINESS

F:\Data\Shared Data\Agendas\Municipal Authority Agendas\2023 MA Agendas\04-10-23\April 2023 Agenda Materials\4-10-2023 Agenda.doc

9. 2023 Goals: Goal Status

Ridley Creek plant compliance

January, February, & March were in compliance and met all requirements.

Continue to monitor upgrades at WGSTP and Westtown Way Pump Station

Ongoing. Generator and transformers are in place. Actively working on the building. Continue to implement infiltration and inflow for the sewer system

Ongoing. Caustic Soda Project

Pads poured and in process of running piping.

Replace sewer line - Hershey Mill Estate trunk line

Pipes are all installed. Still need to do restoration and mandrel and air tests. Two new meters for Ridley Creek collection

Blacksmith Shop (2023) Line Road – (2024)

10. NEW BUSINESS a. Reservoir Rd Sanitary Inspection Report from Pennoni (MA needs to approve.)

b. Supplee Valley CIPPL Scope and Cost Opinion Update from Pennoni

c. Acknowledge Chapter 94 Annual Reports: (1) Ridley Creek, (2) West Goshen,

(3) Westtown, (4) Hershey’s Mill Village & (5) Ridley Creek Willistown (see Mark Miller for reports) 11. CAPACITY REQUESTS

12. ANY OTHER MATTER 13. CORRESPONDENCE AND REPORTS OF INTEREST 14. PUBLIC COMMENT 15. ADJOURNMENT

AREA COD 610

692-7171

EAST GOSHEN MUNICIPAL AUTHORITY

EAST GOSHEN TOWNSHIP

1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

To: Municipal Authority From: Mark Miller Re: April 10, 2023, Monthly Report Monthly Flows: The average daily flow to West Goshen was 781,951 per day. Meters: The meters were read on a daily basis with no problems to report. C.C. Collection: The pump stations were visited on a daily basis. Routine maintenance was performed: we cleaned the wet well and checked oil levels on the generator and muffin monster. We received an odor complaint in White Chimneys. The crew went out and pulled two manholes and installed charcoal filters. As you may know, the Ashbridge Pump Station ties into that development and the effluent tends to go septic. That is the odor that they detect. C.C. Interceptor: Mike Ellis will be putting a package together for the repairs. R.C. Collection: The pump stations were visited on a daily basis. Wet was washed down and oil levels were checked in the equipment. We had one complaint for a loose manhole cover in Hunt Country. The riser ring was broken so we removed the ring and installed a new cover. Ridley Creek Plant: Routine maintenance was performed. We poured the pad for the caustic soda tank and we are waiting for the concrete to cure before we set the tank. The new sampler arrived last week and will be placed in service. Lenni Electric was called to investigate a power issue with the blowers and they found that a relay had gone bad. The relay was replaced and two were ordered for the shelf. Alarms: 17 were received and most were due to power outages. PA One Call: We received 116 PA One Calls for the month of March. Monthly Rainfall: 1.85 inches of rain for the month of March Lateral Repairs or Caps: We replaced six caps.

RCSTP Monthly Operations Report

April 2023

Executive Summary The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations regarding water quality for March 2023. All supplemental reports were submitted for the month of February 2023 with the eDMR Discharge to the Applebrook irrigation lagoon remaining offline Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminium sulphate solution volumes decreased slightly to a daily average of 71.6 compared to the previous month at 75.4 gpd to achieve phosphorus removal. No significant mechanical or operational issues were observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering increased from 401,730 to 553,982 gallons the month. There were no odor complaints during the month.

Table 1

Treatment Process Operation

Table 1 illustrates the final effluent composite sample data reported for outfall 001 March 2023. The month-to-date average total phosphorus was reported as 0.13 mg/L compared to the permit limitation of 0.50 mg/L. The TSS samples were consistently in single digits. The results remain below the weekly maximum of 15 mg/L. The draft month to date average TSS is reported as 7.2 mg/L compared to the discharge limitation of 10 mg/L.

The final effluent test results demonstrate that the biological treatment performed well during March. The sequencing batch reactors (SBRs) numbered 2, 3, and 4 were in service. Process monitoring of each SBR included ammonia as N, nitrite as N, Nitrate as N, COD, SSV, MLSS, and total phosphorus. Daily analysis of the final effluent flow equalization grab sample for total phosphorus is ongoing. Sample collection and analysis of the influent wastewater collected at the influent pump station wet well is ongoing.

Flow

MGD

Average mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month mg/L

lbs/

month

Geo

Mean

Geo

Mean

0.75 10 62 Report Report 10 62 2.5 44 0.5 3 200 1,000

Inst. Max 20 94 15 94 5 1

Sample Date

March 7, 2023 0.292 2.0 4.9 10.90 26.5 5.6 13.6 0.10 0.24 0.11 0.27 18 1.2553

March 14, 2023 0.313 2.0 5.2 6.20 16.2 8.8 23.0 0.10 0.26 0.14 0.37 10 1.0000

March 21, 2023

March 28, 2023

Average 0.303 2.0 5.0 8.55 21.4 7.2 18.3 0.10 0.25 0.13 0.32 14 1.1276

Minimum 0.292 2.0 4.9 6.20 16.2 5.6 13.6 0.10 0.24 0.11 0.27 10 1.0000

Maximum 0.313 2.0 5.2 10.90 26.5 8.8 23.0 0.10 0.26 0.14 0.37 18 1.2553

March 2023- Final Effluent - Outfall 001

NPDES Permit

Discharge Limitations

CBOD5 Total Nitrogen TSS NH4-N Total Phosphorus Fecal Coliform

Page 2 of 3

Discharge to the Applebrook irrigation lagoon, outfall 002 remains offline.

The influent wastewater pollutant concentrations and loading entering the wastewater treatment facility generally remained within the design concentration and organic loading values. The TSS and CBOD5 monthly average weekly concentrations were generally observed to be less than the design parameters for the treatment process.

Table 2 presents the pollutant data for the influent wastewater collected at the doghouse manhole during March 2023.

Table 2

The foam on the SBR surface remained consistent during March, with approximately 15% to 20% coverage of the surface area. The foam thickness is approximately 2 inches and is light to medium brown. These conditions may contribute to a decrease in clarity within the final effluent post-flow equalization basins; however, the clarity is improved after passing through the disc filters. The operation strategy is to lower the MLSS to maintain a F:M ratio of 0.06 while ensuring the ammonia effluent discharge concentration remains within the seasonal limit of 2.5 mg/L.

PA DEP

No activity

Pennoni Associates

Continued to provide for the Chapter 94 report.

Flow

mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

335 2,098 NA NA 320 2,001 32 200 48 301 9.1 57

March 7, 2023 0.351 270 790 219 641 250 732 34.9 102 47.3 138 5.5 16.0

March 14, 2023 0.424 220 778 225 796 198 700 31.7 112 43.3 153 5.03 17.8

March 21, 2023

March 28, 2023

Average 0.388 245 784 222 718 224 716 33 107 45.3 146 5.25 16.9

Minimum 0.351 220 778 219.0 641 198 700 32 102 43.3 138 5.03 16.0

Maximum 0.424 270 790 225 796 250 732 35 112 47.3 153 5.47 17.8

Sample Date

MGD

Average

March 2023 - Influent Wastewaster

Design Basis

BOD5 CBOD5 TSS NH4-N TKN, mg/L

Phosphorus,Total,

mg/L

Page 3 of 3

Chemical Usage:

March 2023

Chemical Daily Average Total Monthly

Soda Ash, pounds 285 9,150

Aluminium Sulfate solution, gal 71.4 2,221

Sludge Dewatering, gal* 20,181 443,982

*The centrifuge was operated 22 days during the month.

Minor Preventative Maintenance

Flushed chemical feed lines to the SBRs.

Cleaned final effluent weir trough daily

Skimmed surface of disc filters daily

Drained and cleaned disc filters bi-weekly

Cleaned buildings and laboratory.

March 2023 - Influent Wastewater

Design Basis

Flow BOD5 CBOD5 TSS NH4-N

MGD Average

mg/L lbs/day mg/L lbs/day mg/L lbs/day mg/L lbs/day

335 2,098 NA NA 320 2,001 32 200 Sample Date

March 7, 2023 0.351 270 790 219 641 250 732 34.9 102 March 14, 2023 0.424 220 778 225 796 198 700 31.7 112 March 21, 2023 March 28, 2023

Average 0.388 245 784 222 718 224 716 33 107 Minimum 0.351 220 778 219.0 641 198 700 32 102 Maximum 0.424 270 790 225 796 250 732 35 112

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

T: 302-655-4451 F: 302-654-2895

www.pennoni.com EAST GOSHEN MUNICIPAL AUTHORITY

ENGINEER’S REPORT

April 5, 2023

Ridley Creek Sewage Treatment Plant (RCSTP)

• Caustic Soda Conversion – We will provide assistance as needed during the Township’s construction of the system.

• UV Disinfection System – The system is being fabricated, and delivery was originally planned in late February or early March 2023. We have re-requested a schedule update from the supplier so that we can coordinate bidding for the construction installation work.

An updated tentative schedule for the mechanical and electrical contracts’ bidding follows; this schedule is subject to change depending upon the supplier’s scheduling.

• Bid Advertisement – mid-to-late April • Bids Due – mid-to-late May • Award Consideration – June 12, 2023 at the Municipal Authority Meeting

• Generator #2 Replacement – We reviewed and approved a revised equipment submittal from the supplier, Premium Power Services for the Cummins’ 500 kW diesel generator on March 8. The generator was released for fabrication thereafter. The lead times on the generator and ATS are 43 weeks and 22 weeks respectively so we expect delivery of the entire system around January 2024. We will prepare design for the electrical installation and any slab replacement/modifications in the summer 2023.

• Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of the RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided financial data that we will analyze, and we will provide our observations upon completion of the analysis.

Sanitary Sewer Pipe Rehab

• Chester Creek Sewer Rehab – We updated the construction scope and cost estimate for pipe lining the remainder of the asbestos cement sewers in the Supplee Valley neighborhood. A summary email with map and cost opinion was submitted to the Township.

We also reviewed the inspection videos of a portion of the Chester Creek interceptor along Reservoir Road that was recently televised. Our observations and recommendations were separately submitted to the Township.

We had previously intended to bid the Supplee Valley project in March 2023; however the project approach is being modified based upon the Chester Creek interceptor investigation. There is severe infiltration in several locations in the interceptor that are now the primary priority since we are not aware of any severe leaks in Supplee Valley. It should be noted that the most recent videos in Supplee Valley are three years old, so there could be issues that have emerged, but the interceptor work is the immediate priority.

The Township is going to commission a TV investigation of the remainder of the Chester Creek interceptor to at least West Chester Pike in April. We will review and identify any additional needed

EGMAU23001 April 5, 2023 Page 2 East Goshen Municipal Authority Engineer’s Report

P:\Projects\EGMA\Memos to Board\2023\Engineers Report 2023-04-05.docx

repairs. A bid package will then be developed for manhole-to-manhole pipe lining, pipe lining point repairs, pipe and manhole injection grouting, and other applicable rehabilitation along the Chester Creek interceptor. Pipe lining in Supplee Valley will be included to the extent that budget is available, likely as Add Items in the bid.

It is our understanding that there is $300,000 available for the work this year ($150,000 in 2023 and $150,000 carried over from 2022). We are currently anticipating that the interceptor work could be half of the budget, leaving approximately $150,000 for Supplee Valley. This would address approximately half of the remaining unlined sewers in the neighborhood. The budget and scope will be defined more precisely upon completion of the remaining interceptor TV inspection.

• Hershey’s Mill Estates – Sanitary sewer piping and manhole installations were completed on March 3. The storm sewer construction and temporary restoration was completed the following week. We performed inspections during the work, and we performed a punchlist inspection thereafter. The contractor is planning to return the week of April 10 to perform manhole vacuum testing, sewer pipe pressure testing and TV inspections, punchlist work, and permanent restoration.

We received Payment Application #2, which is currently under review.

As previously discussed, a significant quantity of additional stone bedding and backfill was authorized for use during construction to overexcavate to a suitable subgrade material and to provide more protection above the piping. The total as-built purchased volume of stone was approximately $105,000 as compared to an original estimate of $38,000. The project is still within budget, and the additional stone will provide improved pipe protection, stability, and life expectancy.

• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared and will be submitted to PADEP in follow-up to the emergency authorization now that construction has been completed.

New Connections

• 1010 Hershey Mill Road (Moser) – We responded to questions from the design consultant regarding the procedure for the Sewage Facilities Planning Module submission and review.

• 301 Reservoir Road (5-Lot Residential Subdivision) – The design consultant submitted a plan for the proposed gravity sewer extension that we are currently reviewing.

Chapter 94 Reports

• We completed the 2022 reports for the Ridley Creek, Chester Creek (West Goshen), and Westtown systems. We submitted the Ridley Creek directly report to DEP, and we submitted the Chester Creek and Westtown Tributary reports to West Goshen Township and Westtown Township respectively. East Goshen’s existing and projected treatment and conveyance needs for all three systems are all well within available and permitted capacities.

END OF REPORT

MA 3-13-23 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY 2 MEETING MINUTES 3 March 13, 2023 4 5 The East Goshen Township Municipal Authority held their regular meeting on Monday, 6 March 13, 2023 at 7:00 pm. at the Township Building. Members in attendance are indicated in 7 BOLD: 8 Kevin Cummings, Chairman 9 Dana Pizarro, Vice Chairman 10 Jack Yahraes 11 Carmen Battavio 12 Walter Wujcik 13 14 Also in attendance were: Mark Miller (Director of Public Works), Mike Ellis (Pennoni 15 representative), Ellen Koopman (Attorney), Dave Ware (Finance Director), Michael Lynch 16 (Township Supervisor) and Scott Towler (Big Fish) on the phone. 17 18 19 COMMON ACRONYMS: 20 BFES – Big Fish Environmental Services MA- Municipal Authority 21 BOS – Board of Supervisors NPDES – National Pollutant Discharge Elimination System 22 CB – Conservancy Board PC – Planning Commission 23 DEP – Department of Environmental Protection PM – Prevention Maintenance 24 EPA – Environmental protection Agency PR – Park & Recreation Board 25 HC – Historical Commission RCSTP – Ridley Creek Sewer Treatment Plant 26 I&I – Inflow & Infiltration SBR – Sequencing Batch Reactor 27 LCSTP – Lockwood Chase Sewer Treatment Plant SSO – Sanitary System Overflow 28 PWD – Public Works Department WAS – Waste Activated Sludge 29 30 Call to Order & Pledge of Allegiance 31 Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance. 32 He asked for a moment of silence for our First Responders and Military. 33 He asked if anyone would be recording the meeting. There was no response. 34 35 36 Chairman’s Report 37 1. Jack mentioned that the Authority should send a letter to Sue Smith, Mark’s Administrative 38 Assistant, thanking her for her years of helping Mark and congratulations on her retirement. 39 40 41 SEWER REPORTS 42 1. Director of Public Works, Mark Miller’s report for March 13, 2023 43 Monthly Flows – The average daily flow to West Goshen was 795,00 per day. 44 45 Meters: The meters were read on a daily basis. The meter cabinet at Westtown Way was changed 46 out due to its poor condition. 47 48

MA 3-13-23 draft 2

C.C. Collection: All pump stations were visited on a daily basis. Wet wells were washed down and 1 equipment oil levels were checked. We had no interruptions in service. We cleaned and televised the 2 White Chimneys and Waterview Farms systems. Both were ok and we did not locate any INI. 3 4 C.C. Interceptor: We were able to clean and televise the creek crossing at Reservoir and Strasburg 5 roads. A sag was noticed in the line next to the single bridge, which required additional cleaning. No 6 INI was found. We still need to get together with Mike Ellis to come up with a plan of attack for the 7 interceptor repairs. 8 9 R.C. Collection: The pump stations were visited on a daily basis and wet wells were cleaned. Since 10 the replacement of the Hershey Mill trunk line, the flows have dropped. 11 12 Ridley Creek Plant: Public Works performed various maintenance items. The guys have started on 13 the pad for the caustic soda tank. 14 15 Alarms: 20 were received and all were weather related. 16 17 PA 1 Calls: We received 100 PA One Calls for the month of February. Five were for lateral repairs 18 by local plumbers. 19 20 Monthly Rainfall: 2.55 inches of rain for the month of February. 21 22 Lateral Repairs or Caps: 11 23 24 25 2. Pennoni Engineer’s Report dated March 6, 2023 26 27

Ridley Creek Sewage Treatment Plant (RCSTP) 28

• Caustic Soda Conversion – We will provide assistance as needed during the Township’s 29 construction of the system. 30

• UV Disinfection System – The system is being fabricated, and delivery was originally planned in late 31 February or early March 2023. We have requested a schedule update from the supplier and will 32 request delivery occur in the May timeframe per the schedule below. 33

The tentative schedule for the mechanical and electrical contracts’ bidding follows; this schedule is 34 subject to being extended depending upon the supplier’s scheduling. 35

• Bid Advertisement – mid-March 36 • Bids Due – early April 37 • Award Consideration – April 10, 2023 at the Municipal Authority Meeting 38

• Generator #2 Replacement – The generator was ordered in February. We reviewed the equipment 39 submittals from the supplier, Premium Power Services for the Cummins’ 500 kW diesel generator, 40 and we returned comments. A supplemental submittal was provided that is currently under review. 41 The lead times on the generator and ATS are 43 weeks and 22 weeks respectively. 42

MA 3-13-23 draft 3

• Operating Cost Analysis – As requested by the MA, we are evaluating the operating costs of the 1 RCSTP in an effort to benchmark against other WWTP’s. Dave Ware has provided financial data that 2 we will analyze, and we will provide our observations upon completion of the analysis. 3

Westtown Way Pump Station 4

• No update since our last report. 5

Sanitary Sewer Pipe Rehab 6

• Supplee Valley – We have updated the construction scope and construction cost estimate for 7 pipe lining the remainder of the asbestos cement sewers in the neighborhood and will submit 8 to the Township for review. We anticipate bidding the project in March 2023 with 9 construction in mid-2023. 10

• Hershey’s Mill Estates – We reviewed additional shop drawings, coordinated with the Township to 11 purchase additional piping and fittings, and provided additional pre-construction and construction 12 coordination assistance. We performed part-time inspections during site preparation and nearly full- 13 time inspection during pipe and manhole installation work. 14

The contractor, Joao & Bradley, mobilized on January 16 and started pipe installation at the 15 downstream end on February 8. They completed all of the sanitary sewer piping and manhole 16 installations on March 3, well ahead of the projected schedule. A significant quantity of additional 17 stone bedding and backfill has been used to overexcavate to a suitable subgrade material and to 18 provide more protection above the piping. The additional quantity of stone is approximately 2.2 19 times that which was originally designed. The additional stone material cost is approximately 20 $50,000, which is borne directly by the Township. It does not have any impact on the contractor’s 21 construction cost. 22

They began construction of the storm sewer headwall and other storm sewer replacements on 23 March 6. They expect to be complete storm sewer work and most site restoration by March 24 10. 25

We also processed Payment Application #1. 26

• Ridley Creek Exposed Sewer Rehab – A full PADEP permit application has been prepared 27 and will be submitted to PADEP in follow-up to the emergency authorization now that 28 construction has been completed. 29

• Chester Creek Interceptor – Mark provided TV videos of the recent cleaning and televising of 30 the downstream end of the interceptor that we will review to evaluate need for repairs. 31

New Connections 32

• No activity by Pennoni since our last report. 33

Chapter 94 Reports 34

• We continued preparation of the 2022 reports for the Ridley Creek, Chester Creek (West Goshen), 35 and Westtown systems. 36

37

MA 3-13-23 draft 4

1 2 3. Big Fish Environmental Services – 3 The Ridley Creek sewage treatment plant outfall 001 is anticipated to meet all effluent limitations 4 regarding water quality for February 2023. All supplemental reports were submitted for the month of 5 January 2023 with the eDMR. Discharge to the Applebrook irrigation lagoon remains offline. 6 Chemical usage utilized for total alkalinity remained consistent with previous months. Aluminum 7 sulfate solution volumes increased slightly to a daily average of 75.4 compared to the previous month 8 at 74.4 gpd to achieve phosphorus removal. No significant mechanical or operational issues were 9 observed during the sludge dewatering equipment or SBR treatment process. Sludge dewatering was 10 reduced from 524,613 to 401,730 gallons per month. There were no odor complaints during the 11 month. 12 13 Approval of Minutes 14 The minutes of the February 13, 2023 meeting were approved as amended. 15 16 Approval of Invoices 17 1. Dana moved to approve payment of the following Pennoni invoices: 18 a. Pennoni Invoice #1158745 $ 4,144.21 19 b. Pennoni Invoice #1158746 $ 6,936.75 20 c. Pennoni Invoice #1158747 $ 3,482.75 21 d. Pennoni Invoice #1158748 $ 2,246.00 22 Walter seconded the motion. The motion passed unanimously. 23 2. Carmen moved to approve payment of the following Gawthrop Greenwood invoices: 24 a. Gawthrop Greenwood Invoice #268729 $ 1,203.00 (paid) 25 b. Gawthrop Greenwood Invoice #269208 $ 1,009.50 26 Jack seconded the motion. The motion passed unanimously. 27 3. Walter moved to approve payment of the Maillie invoice #92230 in the amount of $1,793.00. 28 Dana seconded the motion. The motion passed unanimously. 29 30 31 Liaison Reports 32 None 33 34 Financial Reports 35 Dave mentioned that we are on point with the budget for Hershey Mill Estates which is the largest 36 item. He spoke about grants which are being delayed. 37 The Municipal Authority has an article in the next newsletter which will be available in April. 38 Dave wants to do a 10 year projection. Dana pointed out that Mark has a timeframe on the inventory. 39 Carmen asked if some items can be pulled out so not everything hits at the same time. 40 41 Old Business 42 None 43 44 Goals 45 The Goals were reviewed. 46 47

MA 3-13-23 draft 5

New Business 1 1. Maillie Audit – Dave commented that there were no issues and everything was ok in their 2 management letter. 3 4 Capacity Requests 5 None 6 7 Any Other Matter – 8 Mark was thanked for interfacing with the residents of Hershey Mill Estates. Several notes of thanks 9 were received. 10 11 Correspondence- None 12 13 14 Public Comment - None 15 16 17 Adjournment 18 There being no further business Jack moved to adjourn the meeting. Walter seconded the motion. 19 The motion passed unanimously. The meeting was adjourned at 7:35 pm. 20 The next regular meeting will be held on Monday, April 10, 2023 at 7:00 pm. 21 22 Respectfully submitted, 23 24 25 Ruth Kiefer, Recording Secretary 26

Pennoni

INVOICE

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

Mark Miller

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Invoice No : 1163612

Invoice Date : 04/05/2023

Project : EGMAU21004

Project Name : HM Estates Sewer Design & Permitting

For Services Rendered Through 03/19/2023

Construction Admin & Inspections: Performed daily on-site construction observation during sanitary pipe and manhole replacement/installation, storm sewer work, and restoration; monitored stone delivery quantities and costs during construction and office engineering support; processed Pay Application #1; and designed field change for stormwater endwall footing enlargement.

Phase Code / Name Contract Amount Previously Billed % Complete Complete To Date Amount This Invoice
01 -- Wetland & Watercourse Investigation $6,750.00 $6,750.00 100.00% $6,750.00 $0.00
02 -- Phase I Bog Turtle Habitat Assessment $6,750.00 $6,750.00 100.00% $6,750.00 $0.00
03 -- Survey $17,200.00 $17,200.00 100.00% $17,200.00 $0.00
04 -- Design $26,100.00 $26,100.00 100.00% $26,100.00 $0.00
05 -- Permitting $8,000.00 $8,000.00 100.00% $8,000.00 $0.00
06 -- Property Line Stakeout est. $5,000.00 $7,520.50 $7,520.50 $0.00
07 -- Geotechnical NTE $10,000.00 $6,271.25 62.71% $6,271.25 $0.00
08 -- Bid Assistance NTE $9,690.50 $9,690.50 100.00% $9,690.50 $0.00
09 -- Construction Admin & Inspection NTE $60,000.00 $17,013.25 68.96% $41,378.75 $24,365.50
Total : $149,490.50 $105,295.50 $129,661.00 $24,365.50

Phase: 09 -- Construction Admin & Inspection

Labor

Class Hours Rate Amount
Authority Engineer 6.25 149.00 931.25
Senior Professional 1.50 145.00 217.50
Project Professional 1.50 128.00 192.00
Staff Professional 8.50 117.00 994.50
Associate Professional 132.75 111.00 14,735.25
Sr. Eng Tech 62.50 107.00 6,687.50
Engineering Tech 6.75 90.00 607.50
Labor 24,365.50
Phase Subtotal $24,365.50
Amount Due This Invoice $24,365.50

4/6/23 ok

Continued on next page...

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Project EGMAU21004 HM Estates Sewer Design & Permitting Invoice 1163612

Outstanding Invoices

Number Date Balance
1150405 12/29/2022 2,951.60
Total 2,951.60

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

Page 2

West Goshen HM Estates Sewer Design Permitting

EGMAU21004 Invoice Summary

Invoice Date 4/5/2023

Project: EGMAU21004

Pennoni Job No.: HM Estates Sewer Design & Permitting

Invoice No: 1163612

Invoice Period: 2/13/2023 to 3/19/2023

Date: 4/5/2023

Initial Authorization: $ 64,800.00

Contract Amount: $ 149,490.50

Previously Invoiced: $ 105,295.50

Current Invoice: $ 24,365.50

Invoiced to Date ($): $ 129,661.00

Invoiced to Date (%): 87%

Remaining Budget ($): $ 19,829.50

Remaining Budget (%): 13%

Budget by Phase:

Phase Name: HM Estates Sewer Design & Permitting

Phase Budget: $ 149,490.50

Previously Invoiced: $ 105,295.50

Current Invoice: $ 24,365.50

Invoiced to Date ($): $ 129,661.00

Invoiced to Date (%): 87%

Remaining Budget ($): $ 19,829.50

Remaining Budget (%): 13%

Comments: Construction Admin & Inspections: Issued Notice to Proceed with Construction; reviewed construction submittals; calculated estimated design stone quantities for monitoring purposes; coordinated with Township for purchase of additional quantities of pipe materials; monitored stone delivery quantities during construction; finalized and submitted GP-8 permit application to PADEP for additional wetlands crossing; construction schedule coordination; responded to contractor's RFIs; and performed daily on-site construction observation for mobilization and site preparation from 1/16/2023 thru 2/7/2023 and for sewer pipe and manhole construction from 2/8/2023 thru 2/10/2023.

Pennoni

INVOICE

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

Mark Miller

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Invoice No : 1163613

Invoice Date : 04/05/2023

Project : EGMAU23001

Project Name : 2023 General Services

For Services Rendered Through 03/19/2023

March Engineer's Report; reviewed March RCSTP operator's report. Reviewed and approved vendor responses to RCSTP Generator #2 replacement equipment shop drawings for fabrication initiation. Reviewed sewer inspection videos for Chester Creek Interceptor and evaluated repair alternatives. Coordinated with Design Consultant for 301 Reservoir Rd 5-lot residential development sewer connection concept design.

Billing Limits

Current Prior To-Date
Total Billings 2,614.75 5,776.75 8,391.50
Limit 42,000.00
Remaining 33,608.50

Labor

Class Hours Rate Amount
Authority Engineer 8.00 149.00 1,192.00
Senior Professional 6.00 145.00 870.00
Staff Professional 4.25 117.00 497.25
Associate Professional .50 111.00 55.50
Totals 18.75 2,614.75
Total Labor 2,614.75
Total this Invoice $2,614.75

4/6/23 ok

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

2023 General Services

EGMAU23001Invoice Summary

Invoice Date 4/5/2023

Project: EGMAU23001

Pennoni Job No.: 2023 General Services

Invoice No: 1163613

Invoice Period: 2/13/2023 to 3/19/2023

Date: 4/5/2023

Initial Authorization: $ 42,000.00

Contract Amount: $ 42,000.00

Previously Invoiced: $ 5,776.75

Current Invoice: $ 2,614.75

Invoiced to Date ($): $ 8,391.50

Invoiced to Date (%): 20%

Remaining Budget ($): $ 33,608.50

Remaining Budget (%): 80%

Budget by Phase:

Phase Name: 2023 General Services

Phase Budget: $ 42,000.00

Previously Invoiced: $ 5,776.75

Current Invoice: $ 2,614.75

Invoiced to Date ($): $ 8,391.50

Invoiced to Date (%): 20%

Remaining Budget ($): $ 33,608.50

Remaining Budget (%): 80%

Comments: March Engineer's Report; reviewed March RCSTP operator's report. Reviewed and approved vendor responses to RCSTP Generator #2 replacement equipment shop drawings for fabrication initiation. Reviewed sewer inspection videos for Chester Creek Interceptor and evaluated repair alternatives. Coordinated with Design Consultant for 301 Reservoir Rd 5-lot residential development sewer connection concept design.

Pennoni

INVOICE

Remit Payment To:

Pennoni Associates Inc.

P.O. Box 827328

Philadelphia, PA 19182-7328

Mark Miller

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380-6199

Invoice No : 1163615

Invoice Date : 04/05/2023

Project : EGMAU23002

Project Name : 2022 Chapter 94 Reports

For Services Rendered Through 03/19/2023

Continued preparation of Chapter 94 reports

Billing Limits

Current Prior To-Date
Total Billings 1,654.50 2,246.00 3,900.50
Limit 9,000.00
Remaining 5,099.50

Labor

Class Hours Rate Amount
Authority Engineer 1.50 149.00 223.50
Staff Professional 7.25 117.00 848.25
Associate Professional 5.25 111.00 582.75
Totals 14.00 1,654.50
Total Labor 1,654.50
Total this Invoice $1,654.50

4/6/23 ok

INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.

2022 Chapter 94 Reports

EGMAU23002Invoice Summary

Invoice Date 4/5/2023

Project: EGMAU23002

Pennoni Job No.: 2022 Chapter 94 Reports

Invoice No: 1163615

Invoice Period: 2/13/2023 to 3/19/2023

Date: 4/5/2023

Initial Authorization: $ 9,000.00

Contract Amount: $ 9,000.00

Previously Invoiced: $ 2,246.00

Current Invoice: $ 1,654.50

Invoiced to Date ($): $ 3,900.50

Invoiced to Date (%): 43%

Remaining Budget ($): $ 5,099.50

Remaining Budget (%): 57%

Budget by Phase:

Phase Name: 2022 Chapter 94 Reports

Phase Budget: $ 9,000.00

Previously Invoiced: $ 2,246.00

Current Invoice: $ 1,654.50

Invoiced to Date ($): $ 3,900.50

Invoiced to Date (%): 43%

Remaining Budget ($): $ 5,099.50

Remaining Budget (%): 57%

Comments: Continued preparation of Chapter 94 Reports.

DELAW045

Delaware River Basin Commission

P.O. Box 7360

West Trenton, NJ 08628-0360

(609) 883-9500

www.drbc.gov

DELAWARE • NEW JERSEY • PENNSYLVANIA • NEW YORK • UNITED STATES OF AMERICA

Letter Date: 03/01/2023

Invoice ID: 232174

Docket Number: D-2000-030 CP

Customer ID: 10348

Amount Due: $715.00

Due Date: 04/01/2023

March 1, 2023

East Goshen Municipal Authority

Accounts Payable

1580 PAOLI PIKE

WEST CHESTER, PA 19380-6107

For additional information:

Website: www.drbc.gov/fees

Email: annualfee@drbc.gov

Dear Docket Holder:

In accordance with Delaware River Basin Commission (DRBC) Resolution No. 2016-09, codified in relevant part at 18 CFR 401.43, each withdrawal and/or discharge project for which a water allocation and/or wastewater discharge approval has been issued pursuant to the Delaware River Basin Compact and implementing regulations ("Approval") is subject to DRBC's annual monitoring and coordination fee ("annual fee"). The annual fee corresponds to the volume of the monthly allocation and/or daily discharge capacity - whether express or implicit - established by the Approval. The allocation/discharge volumes and corresponding fees are shown in the schedule on the reverse of this invoice.

If an entity has received an Approval (or Approvals) for both water allocation and wastewater discharge activities, separate invoices will be issued for these separate activities. This invoice includes the annual fee for the facility and activity identified below for calendar year 2023. The invoiced amount was calculated based on the monthly allocation (in MGM) or daily discharge capacity (in MGD) approved as of January 1, 2023.

This invoice pertains to the Daily Discharge Capacity approved by D-2000-030 CP and is based on an amount of 0.75 MGD.

Note: Please complete and submit the online Annual Fees Billing Information Update Request Form at www.drbc.gov/fees for address, contact name, phone number, and/or email changes regarding your annual fee billing. Email us at annualfee@drbc.gov with any billing questions.

Detach here and return coupon with payment

East Goshen Municipal Authority

Letter Date: 03/01/2023

Invoice ID: 232174

Docket Number: D-2000-030 CP

Customer ID: 10348

Amount Due: $715.00

Due Date: 04/01/2023

PAID

Make check payable to

Delaware River Basin Commission

Amount Enclosed: $ 07424 3000

Delaware River Basin Commission

PO Box 788801

Philadelphia, PA 19178-8801

4/3/23

000001034850000232174990000000401202300000000715004

2023 ANNUAL MONITORING AND COORDINATION FEE

Category Annual Fee Allocation / Capacity Range
Water Allocation $352 < 4.99 mgm
$528 5.00 to 49.99 mgm
$762 50.00 to 499.99 mgm
$967 500.00 to 9,999.99 mgm
$1,172 > or = to 10,000 mgm
Daily Discharge Capacity $352 < 0.05 mgd
$715 0.05 to 0.9 mgd
$961 1 to 10 mgd
$1,172 > 10 mgd

PAID

Maillie ACCOUNTANTS • ADVISORS

500 N Lewis Rd

Limerick, PA 19468

(610) 935-1420

EIN: 23-1518888

Web: www.maillie.com

Email: firm@maillie.com

David Ware

East Goshen Municipal Authority

1580 PAOLI PIKE

WEST CHESTER, PA 19380-6107

Date: 2/28/2023

Invoice Number: 93285

Client: 2500.000

Due Date: Upon Receipt

Billing for time incurred from February 1 through February 28, 2023 for the following services:

Progress billing on December 31, 2022 audit

Invoice Total: $8,000.00

APPROVED BY: 4/3/23

DATE PAID:

CHECK #:

CHARGED TO: 07 - 424 - 3110

PAID

Please return this portion with payment.

ID: 2500

East Goshen Municipal Authority

Date: 2/28/2023

Due Date: Upon Receipt

Invoice: 93285

Amount Due: $8,000.00

Amount Enclosed: $

Please make checks payable to Maillie LLP.

From: David Ware To: Lynn Werkheiser; Dana Gieder Subject: Fwd: Invoice from Gawthrop Greenwood, PC Date: Wednesday, April 5, 2023 10:07:38 AM Attachments: Invoice dated April 4, 2023.pdf

For MA meeting…

Dave Ware Finance Director East Goshen Township dware@eastgoshen.org 610-692-7171

Begin forwarded message:

From: Allison Samson <ASamson@gawthrop.com> Date: April 4, 2023 at 3:35:41 PM EDT To: David Ware <dware@eastgoshen.org> Subject: Invoice from Gawthrop Greenwood, PC

Hi Dave!  Please see the attached (2 page) invoice from Patrick.  Please mail all checks to our P.O. Box address which can be found on the invoice and as can be seen below.  Thank you! Rose Brown, Bookkeeper Gawthrop Greenwood, PC P.O. Box 562 West Chester, PA 19381-0562 Allison Samson, Administrative Assistant Gawthrop Greenwood, PC 17 East Gay Street, Suite 100 P.O. Box 562 West Chester, PA  19381-0562 Telephone:     610-696-8225 x1620 Facsimile:        610-344-0922 E-mail:             asamson@gawthrop.com We are on the web at www.gawthrop.com

Please Note: Please Mail checks to:

P.O. Box 562 West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit: https://secure.lawpay.com/pages/gawthrop/operating

Page: 1 East Goshen Municipal Authority 04/04/2023 1580 Paoli Pike Client No: 6604-001M West Chester PA 19380 Invoice No. 270489

General Authority Services

Fees

Hours 03/07/2023 PMM Email from L. Werkheiser regarding meeting agenda and packet. 0.20 41.00

03/10/2023 EBK Review and analyze monthly meeting materials 0.50 97.50

03/13/2023 EBK Travel to/from and attend monthly meeting 1.50 292.50

For Current Services Rendered 2.20 431.00

Recapitulation Timekeeper Hours Hourly Rate Total Patrick M. McKenna 0.20 $205.00 $41.00 Ellen Koopman 2.00 195.00 390.00

Previous Balance $1,302.00

Total Current Charges 431.00

03/31/2023 Payment -620.00 03/31/2023 Payment (P McKenna time) -389.50

Total Payments -1,009.50

Balance Due $723.50

To ensure proper credit, please write your client number on your check when returning payment. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Please Note: Please Mail checks to:

P.O. Box 562 West Chester, PA 19381-0562

To Make a Payment with a Credit Card, please visit: https://secure.lawpay.com/pages/gawthrop/operating

Page: 1 East Goshen Municipal Authority 04/04/2023 1580 Paoli Pike Client No: 6604M West Chester PA 19380

Previous Balance Fees Expenses Payments Balance

6604-001 General Authority Services 1,302.00 431.00 0.00 -1,009.50 $723.50

To ensure proper credit, please write your client number on your check when returning payment. A finance charge of 1.25% per month (15% annually) may be charged on balances not paid 60 days after the invoice date.

Pennsylvania Municipal Authorities Association

1000 North Front Street, Suite 401

Wormleysburg, PA 17043

Phone: 717-737-7655 * Fax: 717-737-8431

E-mail: info@municipalauthorities.org

Website: www.municipalauthorities.org

PENNSYLVANIA MUNICIPAL A

1000 N FRONT ST STE 401

WORMLEYSBURG, PA. 17043-

717-737-7655

SALE

REF#: 00000001

Batch #: 228

01/27/23 12:02:09

AVS: Z CVV2: M

APPR CODE: 025979

Trace: 1

MASTERCARD Manual CNP

************0358 **/**

AMOUNT $880.25

12/15/2022

ID: 212

East Goshen Municipal Authority

1580 Paoli Pike

West Chester, PA 19380

INVOICE

Description Current Bal. Adjustments Balance Due
2023 ACTIVE MEMBERSHIP DUES $880.25 $0.00 $880.25

We would appreciate payment within 60 days. If you pay by check, please remit a copy of invoice with payment. We accept Visa, Master Card, and Discover. If you DO NOT wish to renew your membership, please send a written notice to our office. Thank you for your prompt response.

Name on Card: ___________________________ Type of Credit Card: _______________

Credit Card No.: ___________________________ Exp.: ____________________

3 Digit Security Code on reverse side of credit card: __________

PAID

pd. MC

1/27/23

$880.25

Barbara Phillips

From: Sue Smith

Sent: Friday, January 20, 2023 10:59 AM

To: Barbara Phillips; David Ware

Subject: Municipal Auth. Assoc. paid on Mark's card

Barb and Dave,

I paid the 2023 PA Municipal Auth. Assoc. yearly fee on Mark's Master card $880.25. 1/20/23

Sue Smith

1

Memo

To: Municipal Authority

From: Dave Ware

Re: MA March 2023 Financial Report

Date: April 3, 2023

YTD March 2023, the Municipal Authority recorded $309,433 in revenues (primarily from Sewer Operating and Sewer Capital Reserve transfers) and $310,349 in expenses (Engineering Services, Audit Fees, Administrative Wages, Hershey's Mill Estates Sewer costs, , and capital costs at the Ridley Creek Sanitary Treatment Plant), for a net result of operations of ($915). As of March 31, 2023, the fund balance was $4,256.

Attached is a complete list of 2023 full year MA revenues and expenses.

U:\dware\municipal authority\

EAST GOSHEN TOWNSHIP

Municipal Authority Fund

March 2023

Account Id Account Description Annual Budget Current YTD Prior YTD
REVENUE
07-341-1000 INTEREST EARNINGS 0.00 8.97 0.54
07-354-0400 DCED GRANT 152,980.00 0 0
07-364-1100 C.C. TAPPING FEES 2,300.00 0.00 0.00
07-364-1110 R.C.TAPPING FEES 2,000.00 893.52 0.00
07-364-1130 CONNECTION FEES - SEWER 1,000.00 563.76 281.88
07-380-1000 MISCELLANEOUS REVENUE 282.24 282.24 141.12
07-392-0500 TRANSFER FROM SEWER OPERATING 100,000.00 35,903.09 28,213.55
07-392-0900 TRANSFER FROM SEWER CAP RESERVE 1,471,553.00 271,781.89 27,034.38
Total Revenue 1,730,115.24 309,433.47 55,671.47
EXPENSES
07-424-1400 ADMINISTRATIVE WAGES 32,055.45 8,944.84 8,372.05
07-424-3000 MISCELLANEOUS EXPENSE 1,748.79 1,595.25 1,540.25
07-424-3110 MUNIC.AUTH.-AUDITING 10,815.00 9,793.00 7,000.00
07-424-3130 ENGINEERING SERVICES 47,250.00 11,407.50 9,741.25
07-424-3140 LEGAL SERVICES 8,400.00 1,592.50 1,560.00
07-424-7440 R.C. CAPITAL-STP 355,793.00 0 0
07-424-7490 CAP.REPLACEMENT R.C. 488,847.00 0 0.00
07-426-3001 RELINING 260,000.00 0 0
07-429-1501 BARKWAY PUMP STATION CAPITAL 0.00 0.00 2,215.00
07-429-1503 HERSHEYS MILL PUMP STATION CAPITAL 78,000.00 10,240.62 25,864.95
07-429-1504 HUNT CO PUMP STATION CAPITAL 0.00 0.00 1,870.00
07-429-1505 RCSTP CAPITAL 260,000.00 62,692.11 0.00
07-429-1510 HERSHEY'S MILL ESTATES PROJECT 0.00 88,720.71 0.00
07-429-6100 WEST GOSHEN CAPITAL 187,206.00 115,362 0
Total Expenses 1,730,115.24 310,348.79 58,163.50
Net Result From Operations 0.00 -915.32 -2,492.03

Municipal Authority
YTD Revenues and Expenses thru 3/31/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-341-1000INTEREST EARNINGS01/31/23Revenue JournalINTEREST EARNED JAN 20232.65
07-341-1000INTEREST EARNINGS02/28/23Revenue JournalINTEREST EARNED FEBRUARY 20236.32
07-364-1110R.C.TAPPING FEES01/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES02/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1110R.C.TAPPING FEES03/01/23Revenue Journal1577 COLONIAL LN297.84
07-364-1130CONNECTION FEES - SEWER01/27/23Revenue JournalCONNECTION FEE INSTALLMENT INV# 12838281.88
07-364-1130CONNECTION FEES - SEWER03/23/23Revenue JournalCONNECTION FEE INSTALLMENT INV# 12839281.88
07-380-1000MISCELLANEOUS REVENUE01/27/23Revenue JournalPINE ROCK INTEREST PORTION - STOFFLET141.12
07-380-1000MISCELLANEOUS REVENUE03/23/23Revenue JournalPINE ROCK INTEREST PORTION - PAPPANO141.12
07-392-0500TRANSFER FROM SEWER OPERATING01/20/23Revenue JournalXFER TO 07 FROM 05 RE: MA EXPENSES3,384.75
07-392-0500TRANSFER FROM SEWER OPERATING01/30/23Revenue JournalXFER $ TO MA07 FROM 05-SEWER14,572.43
07-392-0500TRANSFER FROM SEWER OPERATING01/31/23Revenue JournalXFER $ FROM 05 TO 07 RE: MA EXPENSES3,000.00
07-392-0500TRANSFER FROM SEWER OPERATING02/17/23Revenue JournalXFER TO 07 FROM 05 RE: EXPENSES36,455.37
07-392-0500TRANSFER FROM SEWER OPERATING02/23/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA2,877.00
07-392-0500TRANSFER FROM SEWER OPERATING03/22/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA715.00
07-392-0500TRANSFER FROM SEWER OPERATING03/23/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA880.25
07-392-0500TRANSFER FROM SEWER OPERATING03/24/23Revenue JournalXFER TO 07 FROM 05 RE: EXPENSES6,738.25
07-392-0500TRANSFER FROM SEWER OPERATING03/29/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,000.00
07-392-0500TRANSFER FROM SEWER OPERATING03/31/23Revenue JournalXFER FROM 05 SEWER OPERATING TO 07 MA8,944.84
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/12/23Revenue JournalXFER $ FROM 09 TO 07 TO COVER CAP.EXP.41,381.95
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/20/23Revenue JournalXFER TO 07 FROM 09 RE: MA EXPENSES11,730.76
07-392-0900TRANSFER FROM SEWER CAP RESERVE01/30/23Revenue JournalXFER $ TO MA07 FROM 09- SEWER CAP5,221.00
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/10/23Revenue JournalFROM 09 SEWER CAP RESERVE TO 07 MA115,362.26
07-392-0900TRANSFER FROM SEWER CAP RESERVE02/23/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA8,690.50
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/01/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA20,201.84
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/09/23Revenue JournalXFER $ TO 07 FROM 091,264.96
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/22/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA1,961.86
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/24/23Revenue JournalXFER TO 07 FROM 09 RE: EXPENSES11,080.96
07-392-0900TRANSFER FROM SEWER CAP RESERVE03/29/23Revenue JournalXFER FROM 09 SEWER CAP TO 07 MA5,221.00
309,433.47
07-424-1400ADMINISTRATIVE WAGES03/31/23Pay Check: 340223-00878 QTR 1 2023 MA CHARGE BACK8,944.84
07-424-3000MISCELLANEOUS EXPENSE03/22/23Pay Check: 339523-00707 2023 ANNUAL DAILY DISCHARGE CA715.00
07-424-3000MISCELLANEOUS EXPENSE03/23/23ExpdREIMBURSE 01 FOR 07 CC EXPENSE880.25
07-424-3110MUNIC.AUTH.-AUDITING02/15/23Pay Check: 338923-00406 PROGRESS BILLING EGT MUA1231221,793.00
07-424-3110MUNIC.AUTH.-AUDITING03/29/23Pay Check: 340123-00870 PROGRESS BILLING AUD EGT MUA8,000.00
07-424-3130ENGINEERING SERVICES01/20/23Pay Check: 337923-00111 SERV.THRU 12/18/22 GEN.SERV.223,384.75
07-424-3130ENGINEERING SERVICES02/23/23Pay Check: 339223-00443 SERV THRU 011523 GEN SERVICES2,294.00
07-424-3130ENGINEERING SERVICES03/24/23Pay Check: 339923-00816 SERV THRU 021223 CHAPTER 94 RE2,246.00
07-424-3130ENGINEERING SERVICES03/24/23Pay Check: 339923-00815 SERV THRU 021223 GENERAL SERVI3,482.75

Page 1 of 2

Municipal Authority
YTD Revenues and Expenses thru 3/31/2023

Account Number Account Description Date Type Transaction Data/Comment Amount
07-424-3140LEGAL SERVICES02/23/23Pay Check: 339123-00442 LEGAL SERV. JAN 2023 GEN AUTH583.00
07-424-3140LEGAL SERVICES03/24/23Pay Check: 339823-00812 LEGAL SERV FEB 2023 GEN AUTHOR389.50
07-424-3140LEGAL SERVICES03/24/23Pay Check: 339823-00813 LEGAL SERV DEC 2022 GEN AUTHOR620.00
07-424-7490CAP.REPLACEMENT R.C.01/27/23Pay Check: 338123-00148 WATER TIGHT CASTINGS & LIDS6,904.64
07-424-7490CAP.REPLACEMENT R.C.01/27/23Pay Check: 338223-00152 8"X8"WYE MAX ADAPTER 4" AND 8"5,025.79
07-424-7490CAP.REPLACEMENT R.C.02/06/23Pay Check: 338623-00364 PALLET 200' 8" FILTER SOXX430.00
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00429 PVC PIPE, ADPTR, 2WAY CLEANOUT1,708.22
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00412 PVC FITTINGS,ADPTR,BEND, REDCR17,817.91
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338723-00411 24" N12 HDPE PIPE3,771.00
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338823-00381 1 % DISCOUNT(65.65)
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 338823-00381 DIAMOND PLATE BLACK MATS6,564.64
07-424-7490CAP.REPLACEMENT R.C.02/15/23Pay Check: 339023-00415 AASHTO#1 48.32TON #57 146.33TN4,866.25
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL01/20/23Pay Check: 337923-00110 SERV.THRU 12/18/22 HM EST SEWR9,690.50
07-429-1503HERSHEYS MILL PUMP STATION CAPITAL02/06/23Pay Check: 338523-00331 STONE, AASHTO #57550.12
07-429-1505RCSTP CAPITAL01/10/23Pay Check: 337723-00030 CONDUITS, STRAPS, LOCKNUTS +1,161.95
07-429-1505RCSTP CAPITAL01/10/23Pay Check: 337823-00075 PULSAFEEDER - RCSPT CAUSTIC SO40,220.00
07-429-1505RCSTP CAPITAL01/20/23Pay Check: 337923-00109 SERV.THRU 12/18/22 RCSTP SODA861.51
07-429-1505RCSTP CAPITAL01/20/23Pay Check: 337923-00112 SERV.THRU 12/18/22 RCSTP UV1,178.75
07-429-1505RCSTP CAPITAL01/27/23Pay Check: 338023-00151 HELIFLOW 408 PD BLOWER5,221.00
07-429-1505RCSTP CAPITAL02/06/23Pay Check: 338423-00305 50HP 3540RPM BALDOR MOTOR4,683.69
07-429-1505RCSTP CAPITAL03/24/23Pay Check: 339923-00817 SERV THRU 021223 RCSTP CAU SOD4,144.21
07-429-1505RCSTP CAPITAL03/29/23Pay Check: 340023-00827 HELIFLOW 408 LHBD BLOWER5,221.00
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/21/23ExpdRECLASS HERSH.MILL EST. PURCH.23-001532,642.00
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/23/23Pay Check: 339223-00444 SERV THRU 011523 HM ESTATES SW8,690.50
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00536 STONE, AASHTO #57 329.79 TON8,244.78
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00534 STONE, AASHTO #57 251.05 TON6,276.27
07-429-1510HERSHEY'S MILL ESTATES PROJECT02/28/23Pay Check: 339323-00535 STONE, AASHTO #57 227.23 TON5,680.79
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/09/23Pay Check: 339423-00582 SPLIT COUPLERS305.40
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/09/23Pay Check: 339423-00581 SEWER HUB ADAPTERS,COUPLERS +959.56
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339623-00723 36" MARMAC POLYSEAL COUPLER803.20
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339723-00731 JOHN DEERE 550K RENTL 2/28-3/1434.50
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/22/23Pay Check: 339723-00730 JOHNDEERE 550K RENTL 2/23-2/24724.16
07-429-1510HERSHEY'S MILL ESTATES PROJECT03/24/23Pay Check: 339923-00814 SERV THRU 021223 HM ESTATES SE6,936.75
07-429-6100WEST GOSHEN CAPITAL02/06/23Pay Check: 338323-00366 WWPS PYMT LAST INSTALLMENT115,362.26
310,348.79

Page 2 of 2

RESERVOIR ROAD TELEVISING DATA

EAST GOSHEN MUNICIPAL AUTHORITY

SANITARY SEWER INSPECTION SUMMARY

MH C035 TO MH C026

MH C279 TO MH C030

March 28, 2023

Prepared By:

Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713

302-655-4451

THIS SUMMARY SHEET WAS PROVIDED BY EAST GOSHEN PUBLIC WORKS FOR TELEVISING PERFORMED ON 1/26 AND 1/27/2023.

Res 6- C029-C030

No laterals found

Couldn't make it more than 60ft Black top.

Res 7- C029- C027

214.6ft Lateral top of main

Res 8- C026-C027

52.7ft Lateral top of main

213.4ft Lateral right two o'clock

242.7ft Leak at joint Start 240 *

339.8ft Lateral top of main leaking

Township report indicated

leak in C036, but video of

this MH was not included

6) Leak around entire circumference of lateral connection to main at 193'

7) Heavy Runner/car wash located within lateral for house #18 Reservoir Rd. At

189' MH C030- C0279

1 – RUNNER IN METERING MH C033

2 – LIGHT GUSHER AT CONNECTION JOINT AT MH C031

3 – CHUNK OF ASPHALT 60 LF FROM MH C029

4 - HEAVY RUNNER/CAR WASH AT 20 LF FROM MH C027

5 – GUSHER AT JOINT 120 LF FROM MH C027

6 - LEAK AROUND ENTIRE CIRCUMFERENCE OF LATERAL CONNECTION TO MAIN @ 193 FT MH C031-C030 (LATERAL PROTRUDES INTO MAIN)

7 – HEAVY RUNNER/CAR WASH IN LATERAL (FROM HOUSE #18 RESERVOIR RD.) @ 189 FT MH C030-C279 (LEAK IS LOCATED SEVERAL FEET WITHIN LATERAL AND PICTURE QUALITY WAS POOR)

8 - MH C032-C033 – DRIPPER FROM AROUND LATERAL AT 62 FT (Not identified on map since no repair is recommended)

9 - MH C032-C031 - DRIPPER FROM AROUND LATERAL AT 120 FT (Not identified on map since no repair is recommended)

10 - MH C029-C027 – VERY LIGHT DRIPPER FROM AROUND LATERAL AT 214 FT (Not identified on map since no repair is recommended)

RECOMMENDED ACTIONS:

1) RUNNER IN METERING MH C033 Leak can be accessed from MH C033. Recommend repair by injection grouting. 2) LIGHT GUSHER AT CONNECTION JOINT AT MH C031 Leak can be accessed from MH C031. Recommend repair by injection grouting. 3) CHUNK OF ASPHALT IN PIPE 60 LF FROM MH C029 Remove asphalt from pipe and any other debris, if possible. 4) HEAVY RUNNER/CAR WASH AT 20 LF FROM MH C027 and 5) GUSHER AT JOINT 120 LF FROM MH C027 Recommend repair of leaks #4 and #5 by injection grouting to reduce infiltration followed immediately by cured-in-place pipe lining of the entire section of pipe between MH C027 and C026. 6) LEAK AROUND ENTIRE CIRCUMFERENCE OF LATERAL CONNECTION TO MAIN @ 193 FT MH C031-C030 Recommend repair of the sewer lateral connection to the main with top hat, if possible. The lateral does protrude into the main by several inches and may affect this repair option which will require further discussion with a contractor. 7) HEAVY RUNNER/CAR WASH IN LATERAL (FROM HOUSE #18 RESERVOIR RD.) @ 189 FT MH C030-C279 The leak is located several feet inside the lateral and there is poor visibility on the video. In addition to the leak, the flow coming from the lateral seemed to be substantial which suggests there could be an additional source(s) of infiltration further upstream in the pipe. Recommend considering a lateral liner or excavated replacement. 8) MH C032-C033 – DRIPPER FROM AROUND LATERAL AT 62 FT 9) MH C032-C031 - DRIPPER FROM AROUND LATERAL AT 120 FT 10) MH C029-C027 – VERY LIGHT DRIPPER FROM AROUND LATERAL AT 214 FT Since the dripping is very minor (less than 100 gpd each), it is recommended no repair action be taken at this time. 11) MH C036 Leak was indicated on the Township report, however, video was not included for our review. Additional investigation will be required.

From: Michael Ellis To: Mark Miller Cc: Lynn Werkheiser; David Ware; Derek Davis; Nathan M. Cline; Matthew McAloon Subject: Supplee Valley CIPPL Scope and Cost Opinion Update Date: Wednesday, April 5, 2023 2:37:59 PM Attachments: ATT00001.png Supplee Valley Pipe Lining Exhibit_2023-04-05.pdf Supplee Valley Pipe Lining Cost Opinion_Rev 2023-04-05.pdf

Hi Mark, There are 25 sanitary sewer pipe runs (approx 5,664 LF) in the Supplee Valley neighborhood that are un-lined asbestos cement. Approximately 4,860 LF of asbestos cement sewers in the neighborhood were rehabilitated with manhole-to-manhole cured-in-place pipe lining (CIPPL) in 2017. The aforementioned 25 pipe runs were televised before that construction, and no severe problems or leaks were present so they were not prioritized for CIPPL then due to budget limitations. However, they are still intended for CIPPL to restore them to a “new” condition and proactively mitigate any I&I or other problems. The attached exhibit depicts the pipes that were lined in 2017 and the remaining 25 un-lined pipe runs. An updated construction cost opinion is also attached for CIPPL of the un-lined pipes. We recommend any pipes to be lined be televised before the project is put out to bid to determine if there are any new defects to address. Provision of videos to bidders is also beneficial for obtaining competitively priced bids. Mike

Michael Ellis, PE

Municipal Division Manager

Pennoni 121 Continental Drive, Suite 207 | Newark, DE 19713 Direct: +1 (302) 351-5236 | Mobile: +1 (302) 561-4235 www.pennoni.com | MEllis@Pennoni.com

Addressing Localized Stormwater Flooding in Aston Township, PA

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!( !(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!( !(

!( !(

!(

!( !(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !( !(

!(

!( !(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

Ellis LA

Barker DR

Reservoir RD

E Strasburg RD

Baldwin DR

Mark DR

Cooper CI

Park AV

Bramble LA

N Lochwood LA

Margaret LA

Brian DR

Brooke DR

Ardleigh CI

Katherine LA

Gateswood DR

Richard DR

Hawthorn LA

C394

C400

C401

C418

C419 C415

C422 C423

C424

C301 C302 C303

C304

C305

C425

C409

C410

C405

C404

C363

C362

C307

C377

C375

C376

C310

C309

C308

C367

C364

C365

C373

C374

C383 C364

C363

C365

C367

C366

C311

C312

C313

C314

C315

C504 C505 C506

C508

C510

C509

C507

C298

C299 C300

C426

C454

C455

C331

C317

C494

C493

C492

C499 C491

C490

C489

C316

C332

C333

C335

C336 C337

C395

C396

C397

C398 C399

C393

C392

C391

C390

C389 C388

C387

C386

C385

C417

C288 C289

C414

C413

C412 C411

C406

C407 C408

C402 C403 C421

C420

C416

C045

C044

C043

C042

C041

C384 C040

C039

C038

C037

C036 C035

C042N

C042D C042C C042B C041A

C042L

C042M C042K C042J C042F C042G

C042H

C042I

EXHIBIT #2 SUPPLEE VALLEY PHASING

±

Legend

!( SANITARY MANHOLE

Sanitary Sewer Pipeline

Year One

Year Two

Year Three

Good Condition

Not Televised

Roads

Parcels

PONDS & LAKES

RIVERS

0 600 1,200 300 Feet

Televised: April 2015 Analyzed: August 2017

C042FF

SUPPLEE VALLEY SEWER PIPE LINING EXHIBIT #1

December 2020 East Goshen Township

C410

C400

C421C404

C422

C407

C389

C390

Pipes Lined in 2017

Proposed Pipe Lining

C042FF

Street Name Upstream

Manhole

Downstream

Manhole

Estimated Length (feet)

No. Laterals

Pipe Dia.

(inches) Pipe Material CIPPL Lateral Reinstatements Total

Mark Drive C042H C042G 155.8 4 8 Asbestos Cement $7,946 $1,000 $8,946 Easement C042F C042FF 255.1 2 8 Asbestos Cement $14,286 $500 $14,786 Mark Drive C042N C042M 308.9 6 8 Asbestos Cement $15,754 $1,500 $17,254 Mark Drive C042M C042L 134.6 3 8 Asbestos Cement $6,865 $750 $7,615 Mark Drive C042L C041A 309.0 6 8 Asbestos Cement $15,759 $1,500 $17,259 Easement C426 C425 188.0 1 8 Asbestos Cement $10,528 $250 $10,778 Easement C425 C424 205.0 2 8 Asbestos Cement $11,480 $500 $11,980 Easement C424 C423 56.0 0 8 Asbestos Cement $3,136 $0 $3,136 Easement C423 C422 204.0 0 8 Asbestos Cement $11,424 $0 $11,424 Easement C422 C421 398.0 0 8 Asbestos Cement $22,288 $0 $22,288 Baldwin Drive C421 C420 150.0 0 8 Asbestos Cement $7,650 $0 $7,650 Baldwin Drive C410 C404 50.4 0 8 Asbestos Cement $2,570 $0 $2,570 Katherine Lane C404 C403 92.6 1 8 Asbestos Cement $4,723 $250 $4,973 Katherine Lane C403 C402 340.5 3 8 Asbestos Cement $17,366 $750 $18,116 Easement C400 C038 220.0 0 8 Asbestos Cement $12,320 $0 $12,320 Mark Drive C414 C413 369.6 6 8 Asbestos Cement $18,850 $1,500 $20,350 Mark Drive C413 C412 138.8 3 8 Asbestos Cement $7,079 $750 $7,829 Mark Drive C412 C411 232.3 1 8 Asbestos Cement $11,847 $250 $12,097 Baldwin Drive C416 C415 288.5 4 8 Asbestos Cement $14,714 $1,000 $15,714 Mark Drive C415 C411 98.7 0 8 Asbestos Cement $5,034 $0 $5,034 Easement C420 C419 362.0 0 8 Asbestos Cement $20,272 $0 $20,272 Easement C419 C418 388.0 0 8 Asbestos Cement $21,728 $0 $21,728 Easement C418 C039 280.0 0 8 Asbestos Cement $15,680 $0 $15,680 Margaret Lane C409 C408 136.6 3 8 Asbestos Cement $6,967 $750 $7,717 Margaret Lane C408 C407 302.0 3 8 Asbestos Cement $15,402 $750 $16,152 Total 5664.4 48 $313,665

USE $315,000

Cost Opinion

East Goshen Municipal Authority Supplee Valley Sanitary Sewer Pipe Lining

Scope of Work

Updated: April 5, 2023 Budgetary Opinion of Probable Construction Costs