Municipal Authority
The East Goshen Municipal Authority will acquire, hold, construct, improve, maintain, operate, own and lease, either in the capacity of lessor or leasee, sewers, sewer systems or parts thereof, sewage treatment works, including works for treating and disposing of industrial waste, for the Township of East Goshen and other such territory as it may be authorized to serve in a fiscally responsible and environmentally safe manner.
The Municipal Authority is an appointed board which functions independently of the others. The Municipal Authority owns the Township sewer system and is responsible for providing sewers to those areas deemed necessary by the Board of Supervisors.
- Five members, serving five-year terms
- Meetings are on the 2nd Monday of the month at 7:00 P.M.
- All township meetings are held at the Township Building and open to the public
| Authority Members | Term Expiration Date |
| Kevin Cummings, Chairman | 2026 |
| John Stipe, Vice Chairman |
2029 |
| Dana Pizzarro, Secretary | 2026 |
| Sean Ellsworth, Assistant Secretary/Treasurer | 2028 |
| Walter Wujcik, Treasurer | 2028 |
| Pennoni Associates, Engineer | |
| Patrick M. McKenna, Esq. | |
| Peter Hicks, BoS Liaison | |
| Kevin Miller, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN MUNICIPAL AUTHORITY
May 11, 2026
7:00
- 7:00pm CALL TO ORDER/PLEDGE OF ALLEGIANCE/MOMENT OF SILENCE Ask if anyone will be taping the meeting.
- CHAIRMAN’S REPORT/OTHER MEMBERS’ REPORTS
- LIAISON REPORTS
- SEWER REPORTS Director of Public Works’ Report; West Goshen Report; Pennoni Engineer’s Report; Big Fish Environmental Report
- APPROVAL OF MINUTES April 13, 2026
- APPROVAL OF INVOICES Company Invoice # Amount Paid? Pennoni 1323177 $3,354.00 Pennoni 1323178 $1,064.00 Pennoni 1323179 $2,663.50 Pennoni 1323180 $3,973.25 Pennoni 1323181 $1,220.50 Pennoni 1323182 $1,662.50 Gawthrop Greenwood Maillie 127792 $4,500.00 Xylem Water Solutions 3556E14139 $8,284.70 yes
Page 1 of 2
- FINANCIAL REPORTS April 2026
- OLD BUSINESS Morstein Rd Sewer Extension Progress Plans (Mike Ellis)
- 2026 Goals:
| Goal | Status |
|---|---|
| Ridley Creek Plant compliance | January through April 2026 were in compliance with PADEP permit requirements. |
| Continue to implement infiltration and inflow for the sewer system | Ongoing. |
| Municipal Authority representative to attend West Goshen MA meetings. West Goshen MA meets 1st Wed of each month at 6pm at the West Goshen Township Building. | Attend meetings on an as-needed basis. |
| Long-term sustainability | Ongoing: (1) Sewer rate increase implemented July 2024. (2) Development of 20-year+ Capital Improvement Plan underway. (3) Continue to study sewer rates. |
- NEW BUSINESS RCSTP MCC-1 Replacement Design Proposal (Mike Ellis)
- CAPACITY REQUESTS
- ANY OTHER MATTER
- CORRESPONDENCE AND REPORTS OF INTEREST
- PUBLIC COMMENT
- ADJOURNMENT
Page 2 of 2
EAST GOSHEN MUNICIPAL AUTHORITY
EAST GOSHEN TOWNSHIP
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
610-692-7171
| Date: | May 11, 2026 |
|---|---|
| To: | Municipal Authority |
| From: | Mark Miller |
| Re: | Monthly Report |
Monthly Flows: The average daily flow to West Goshen was 526,491 gallons per day.
Monthly Rainfall: 2.87
Meters:
- Read on a daily basis. No problems to report. Meter calibrations were done on 5/7/26 with minor adjustments.
C.C. Collection:
- The pumping stations were checked on a daily basis.
- As part of our preventive maintenance program, pumps were pulled and sent to the motor shop to be checked over.
- Wet wells were cleaned at all stations.
- Replaced half dozen manhole castings & lids that were damaged over the winter by the plows.
- We began cleaning and televising Mill Valley.
Ridley Creek Collection:
- Stations were visited daily.
- We’ve been having seal failure alarms at Hershey Mill Pump Station. We pulled both pumps and sent them to be repaired.
Page 1 of 2
Ridley Creek Plant:
- Matthew, the plant operator, along with his grandfather, tore down the centrifuge and rebuilt the unit. It was back in service on Sunday night, 5/3/26.
- Lenni rebuilt the motors that operate louvers.
- Replaced control switch for the a/c unit in the lab.
- All surge protectors are up to date.
- There was a terminal block in the Number 2 blower.
Alarms: 15
PA One Calls: 182
Lateral Repairs/Caps: 3 caps
Page 2 of 2
West Goshen April 2026 Sewer Report
General Notes:
- For the month of March, the plant operated in compliance with its NPDES permit.
- WWTP monthly average daily flow – 3.47 mgd.
- WWPS monthly average daily flow – 1.112 mgd.
- Monthly estimated average total phosphorus discharge concentration was <0.02 mg/L.
- Sludge to landfill – 312 wet tons.
Grant Projects:
- 2024 LSA-Statewide Grant: WWTP Pump Replacements. The WGSA has been awarded a grant of $250,000 for this project.
Ongoing Projects:
- WWTP Transformer Replacement - Transformer and Gear have been ordered. Submittals were received and have been approved. Anticipated equipment delivery – 4 th qtr, 2026.
- Primary Clarifier No. 2 Rehab – The mechanism has been ordered and is under fabrication. 100% of order has been delivered. Installation expected during 2 nd qtr, 2026.
- Return Activated Sludge (RAS) line project. The project involves installing an insertion valve on the force main and replacing several existing sludge valves – Anticipated completion, 2 nd qtr, 2026.
Michael Moffa
Director of Wastewater
West Goshen Township
848 S. Concord Road
West Chester, PA 19382
610-696-0900
Pennoni
EAST GOSHEN MUNICIPAL AUTHORITY
ENGINEER'S REPORT
May 7, 2026
Ridley Creek Sewage Treatment Plant (RCSTP)
- Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
- SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
- Motor Control Center (MCC) #1 – Replacement of the MCC is proposed for design in 2026 and construction in 2027. We submitted a proposal for engineering and design services for consideration at the May MA meeting.
- RCSTP NPDES Permit Renewal – We are compiling information for and preparing the NPDES permit renewal application package. Additional sampling is required for the application, and the sampling is underway. The application is due to PADEP by October 2, 2026.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are still awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
- Waterview Pipe Lining – The project was awarded to SWERP at the April MA meeting. We sent an award letter to the contractor. They provided bonds and insurance documents, which were found acceptable. We are coordinating with the Township to sign the agreement. A pre-construction meeting will be scheduled thereafter.
We also evaluated other asbestos cement pipes to line with the remaining ±$80,000 of budget. It was determined that the Meadows neighborhood (Meadow Drive and Hollyberry Lane) should be able to be added within the budget. That is the next priority neighborhood on the pipe lining Capital Improvement Plan. A change order to add these pipe quantities will be pursued with SWERP.
Pump Stations
- Hunt Country Pump Station – Pennoni previously conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, and a topographic survey of the site. Blood Hound also previously performed utility locating of the existing force main, and our survey crew surveyed the force main mark outs. Existing conditions plans have been prepared, and we are continuing preparation of design and proposed conditions plans.
- Barkway Pump Station – We analyzed pump run times, cycling frequency, and flow rates from the recently installed SCADA system. This allows for live observation of instantaneous flow and other data, as well as all historical data since the system was installed. One of the pumps was identified to be pumping at a very low rate. We notified Mark Miller for the pump to be inspected.
- Ashbridge Pump Station – We also analyzed SCADA data for this pump station. Both pumps are operating as designed.
Christiana Executive Campus
121 Continental Drive, Suite 207
Newark, DE 19713
T: 302-655-4451
www.pennoni.com
Page 1 of 2
EGMAU26001
East Goshen Municipal Authority May 7, 2026 Engineer's Report
Page 2 of 2
Sewer Extensions
- Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. An approx 75% complete progress plan set was provided to the Township and MA. We are making some updates to the progress plan to propose a few sewer runs at shallower depths. The initially authorized effort for the plan preparation will then be complete. We will then provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
- Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
- 1152 N. Chester Road – No activity since our last report. We previously performed a cursory evaluation of possible sewer extension alternatives to service potential new residential development at the property. Depending upon the route of the selected alternative, this would potentially enable connections from other properties along a portion of N. Chester Road and also from Ivy Lane, Old Orchard Lane, and/or Raewyck Drive. It is our understanding that the potential applicant is still in the early stages of site planning and has not initiated the formal Land Development process yet.
New Connections
- 1344 Morstein Road – No activity since our last report. One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We previously coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
- 1354 Paoli Pike – No activity since our last report. The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump.
- 1535 West Chester Pike (Westtown Triangle) – The Westtown Township Sewer Engineer contacted East Goshen to confirm sewer system capacity for redevelopment of the Rite Aid site with a proposed car wash with an estimated sewer flow of 5,992 gpd, which is an increase over the existing use's flow. The property's wastewater already flows through East Goshen. We reviewed the capacity of the Ashbridge Pump Station as noted above and determined there is adequate capacity for the increased flows at both the pump station and in East Goshen's gravity conveyance system.
Other
- GIS Mapping – We have updated the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We will present it to Public Works to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
END OF REPORT
Big Fish Environmental Services Inc.
RCSTP Monthly Operations Report
May 2026
Executive Summary
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for April 2026. All supplemental reports were submitted for March 2026. Caustic usage decreased to 58.48 gallons per day from 62.26 gallons per day last month. Aluminum sulfate solution volumes daily average decreased to 60.60 gallons per day from 63.34 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
TABLES
CERTIFIED LAB RESULTS- FINAL EFFLUENT April 2026
| DATE | FLOW Gallons Final EFF/Applebrook | Ammonia as N 7mg/L monthly | CBOD 15mg/L | Total Phosphorus 0.5mg/L | Total Suspended Solids 15mg/L | Fecal Coliform 200 coliforms/100mL |
|---|---|---|---|---|---|---|
| 4/7/26 | 348,000/0 | <0.10 | 2.9 | 0.27 | 13.8 | 2 |
| 4/10/2026 | 271,000/0 | N/A | N/A | N/A | 4.6 | N/A |
| 4/14/2026 | 255,000/0 | 0.13 | <2.0 | 0.21 | 8.2 | 1 |
| 4/24/2026 | 276,000/4,208 | 0.14 | 4.5 | 0.15 | 8.8 | <1 |
CERTIFIED LAB RESULTS- FINAL EFFLUENT April 2026 Non-Report tests
| DATE | FLOW Final EFF/Applebrook | NO2-NO3 (mg/L) | TKN (mg/L) | TN (mg/L) |
|---|---|---|---|---|
| 4/7/2026 | 348,000/0 | 3.4 | 1.56 | 4.96 |
| 4/10/2026 | 271,000/0 | N/A | N/A | N/A |
| 4/14/26 | 255,000/0 | 6.67 | 1.57 | 8.22 |
| 4/24/26 | 276,000/4,208 | 4.06 | 1.09 | 5.15 |
CERTIFIED LAB RESULTS- INFLUENT April 2026
| DATE | FLOW | Ammonia as N | BOD | CBOD | TKN | Total Phosphorus | Total Suspended Solids |
|---|---|---|---|---|---|---|---|
| 4/7/2026 | 350,190 | 35.5 | 257 | 234 | 49.7 | 5.14 | 200 |
| 4/14/2026 | 297,760 | 38.3 | 234 | 199 | 51.8 | 5.51 | 238 |
| 4/21/2026 | 285,540 | 56.3 | 202 | 212 | 78.9 | 8.12 | 222 |
*Effluent was partially cloudy on 4/7, signifying higher TSS levels than normal. To ensure we remained below the weekly average limit I took an additional composite sample on 4/10 out of precaution. That is why 4/10 is only showing a result for TSS
TKN = Total Kleidahl Nitrogen
TN= Total Nitrogen
NO2-NO3= Nitrogen, Nitrate-Nitrite
The Tables above show the certified lab results from samples collected once a week by Suburban Testing Labs as required by our DEP permit. The influent samples are collected by a composite sampler located at the doghouse manhole where the influent enters the plant. The final effluent data is from a combination of a composite sampling and grab sampling, both performed at the end of the UV channel weirs. We remained below all of the weekly average discharge limits for the month of April.
PA DEP
Nothing to report
Pennoni Associates
Nothing to report
Significant Rainfall
During April, there were nine (9) days where precipitation occured. There was 1 day where precipitation accumulation was greater than 0.50".
4/26: 0.79"
Total precipitation for the month was 2.14" rain
*dates shown are the dates that the rain gauge was observed, not necessarily the day the rain occurred
Chemical Data
| Chemical | April 2026 | |
|---|---|---|
| Daily Average | Total Monthly | |
| Caustic Soda, gal | 58.48 | 1754.37 |
| Aluminum Sulfate solution, gal | 60.60 | 1818.00 |
| Sludge Dewatering, gal* | 15,114 | 332,518 |
*22 days of sludge dewatering
There was a decrease of 36,775 gallons of sludge dewatering during the month of March compared to February.
Page 2 of 6
Minor Preventative Maintenance
Flushed chemical feed lines to the SBRs.
Cleaned final effluent weir trough daily.
Skimmed surface of disc filters daily
Drained and cleaned disc filters bi-weekly.
Cleaned buildings and laboratory.
Major Repairs or Upgrades
Centrifuge major overhaul (pictures on pages 4,5, and 6)
The centrifuge did show some signs of wear which is expected for a machine of this age. It is suggested that the machine be sent out roughly this time next year to have the wear surfaces built back up with weld or replaced
Upcoming Repairs or Upgrades
Nothing to report
Flow Data
| Flow Meter Location | April 2026 | ||
|---|---|---|---|
| Total Volume for Month, MG | Average Daily Flow, gpd | Daily Maximum Flow, gpd | |
| Influent Wastewater to Screening Building | 8.922 | 297,397 | 385,220 |
| Influent Wastewater to SBRs | 11.304 | 376,788 | 479,936 |
| Internal Recycle | 2.382 | 79,391 | 129,746 |
| Treated Effluent to Disc Filters | 10.669 | 355,634 | 444,384 |
| Final Effluent Discharge | 7.953 | 265,000 | 348,000 |
| Applebrook Golf Course | 335,158 | 30,469 | 39,058 |
The plant hydraulic design loading is 745,000 gpd.
*Applebrook pump was turned on 4/20
Page 3 of 6
There were no high flow events during the month of April 2026
The above photo shows the bowl and the conveyor still mated, while the gearbox (orange) is at the bottom of the frame. These are the three main components of the centrifuge rotating assembly.
Page 4 of 6
This photo shows the wear tiles installed in the feed zone of the centrifuge conveyor. This spins inside of the bowl and is what moves the solids to the discharge side of the machine. In the front row you can see one tile appears to be chipped. There were a couple other tiles in similar shape. This is one of things that would require the rotating assembly to be sent out within the next year or so.
Page 5 of 6
This photo shows the other end of the conveyor, where instead of replaceable wear tiles, you can see hardfacing weld on the conveyor flight. The picture shows one of the multiple spots that the hardfacing has chipped off. This is one of the other things that within a year or so will require the rotating assembly to be sent out. While the rotating assembly is in the shop they will inspect it, repair anything that is worn down, and then they will rebalance the assembly.
Page 6 of 6
Draft
EAST GOSHEN TOWNSHIP MUNICIPAL AUTHORITY
MEETING MINUTES
April 13, 2026
The East Goshen Township Municipal Authority held their regular meeting on Monday, April 13, 2026 at 7:00 pm. at the Township Building.
Members in attendance are indicated in BOLD:
Kevin Cummings – Chairman
John Stipe – Vice Chairman
Sean Ellsworth
Dana Pizarro
Walter Wujcik
Also in attendance were:
Mark Miller (Director of Public Works),
Mike Ellis (Pennoni).
Peter Hicks (Supervisor
Kelly Brophy, Finance Director
Patrick McKenna (Attorney)
Theodore Speedy (Attorney)
Stacey Fuller (Attorney)
COMMON ACRONYMS:
| ATS – Automatic Transfer Switch | MA- Municipal Authority |
|---|---|
| BFES – Big Fish Environmental Services | NPDES – National Pollutant Discharge Elimination System |
| BOS – Board of Supervisors | PC – Planning Commission |
| CB – Conservancy Board | PM – Prevention Maintenance |
| DEP – Department of Environmental Protection | PR – Park & Recreation Board |
| EPA – Environmental protection Agency | RCSTP – Ridley Creek Sewer Treatment Plant |
| HC – Historical Commission | SBR – Sequencing Batch Reactor |
| I&I – Inflow & Infiltration | SSO – Sanitary System Overflow |
| LCSTP – Lockwood Chase Sewer Treatment Plant | WAS – Waste Activated Sludge |
| PWD – Public Works Department |
Call to Order & Pledge of Allegiance
Kevin called the meeting to order at 7:00 pm and led those present in the Pledge of Allegiance.
Kevin asked for a moment of silence for our First Responders and Military.
Kevin asked if anyone would be recording the meeting. There was no response.
New Business
1152 N. Chester Rd. – Possible Low Pressure Pump Station – TR Moser explained that they may put about 12 carriage or townhouses on this 4.5 acre property. He wanted input from the Authority members about tying into Public Sewer. Mike Ellis provided maps of the area for everyone. Kevin pointed out that there are other homes in this area that may want to tie into public sewer. Dana spoke about where he lives in this area and how he has tried to get on public sewer. Discussion followed. The MA is interested in his plan.
MA 4-13-26 draft 1
Chairman’s Report/Other Members Report
Kevin spoke about the Biennial Meeting. The main question was the cost to go to West Goshen. There were no problems with the rate increase.
Liaison Reports
1. Conservancy Board – Walter mentioned that Keep East Goshen Beautiful day is April 25. PECO Arbor Day will be Friday, April 24, 2026.
2. Planning Commission – John spoke about 3 lots on Manley Road. Mark is familiar with this.
SEWER REPORTS
1. Director of Public Works, Mark Miller’s report for April 13, 2026.
Monthly Flows – The average daily flow to West Goshen was 586,452 gallons per day.
Monthly Rainfall - 4.96”.
Meters: Read on a daily basis. No problems to report.
C.C.Collection
- Pumping stations were checked on a daily basis.
- Gallagher Septic System Pumping was utilized to clean the grease at all pump stations. Wet Wells were pumped all the way down so grease could be removed.; At that time, the floats were checked out to make sure they were operational.; We utilized our confined space entry gear. Happy to report that all members participated in the operation.; We saw cut and jackhammered out the large piece of concrete that supported the generator, which is now located outside of the control building.
Ridley Creek Collection:
- The station wet well was pumped down so the grit could be removed. Floats were cleaned and pumps were checked for wear. We found no problems with the equipment.
Ridley Creek Plant:
- On March 26 th , we plugged the influent line to the plant. The guys went in and pulled the grit from the line, then vacuumed all the grit and other debris that had collected since the last cleaning.
- Muffin monster was pulled and cleaned thoroughly; we also flushed and cleaned the Roto-Mat.
- Lenni completed the electrical inspection at the plant.
Alarms: 27 alarms. The new alarm system is working very well.
PA One Calls: 166
Lateral Repairs/Caps:
- Public Works was contacted to check a lateral blockage in Millcreek Development. The guys plunged the trap and were able to clear the line.
MA 4-13-26 draft 2
- I stopped by a home in Clocktower Development when I saw a contractor working around a lateral. I introduced myself to the worker who said that the lateral cleanout had pulled out from the tee. They installed a new cleanout and all joints were glued. He said he had done a few in East Goshen so I gave him my card and asked that he contact me when working in the township.
Note: Mark took Sean on a tour of the plant. Sean thanked Mark for the tour and was very impressed with it.
2. West Goshen Report
The phosphorus number was discussed. Things look good. Kevin feels the new pumps are working well.
3. Pennoni Engineer’s Report dated April 13, 2026
Ridley Creek Sewage Treatment Plant (RCSTP)
- Surge Suppression Inventory – The surge suppression inventory report identifying the protected downstream equipment in the plant is being finalized.
- SBR Tank Inspections – No updates since our last report. Inspections of SBRs #1 and #2 were performed in 2025. Inspections of SBRs #3 and #4 are tentatively planned to occur in spring 2026. The rehabilitation contracting approach and schedule (one year vs. multiple years) will be determined after we inspect the remaining two tanks.
- Motor Control Center (MCC) #1 – Replacement of the MCC is proposed for design in 2026 and construction in 2027. We are preparing a proposal for engineering and design services for consideration at the May MA meeting.
- RCSTP NPDES Permit Renewal – We have begun to compile information for and to prepare the NPDES permit renewal application package. After we compile available information, we will determine if additional sampling is required for the application. The application is due to PADEP by October 2, 2026.
Sanitary Sewer Pipe Rehab
- Supplee Valley Pipe Lining – The contractor, Vortex Services, performed corrective action punchlist work on the one 370 LF pipe run that has blisters (small bubbles) throughout the installed liner on April 6. They lightly grinded out approximately 15 blisters that were projecting into the pipe approximately 1 inch and that appeared to be holding water. We observed the punchlist work on-site and are awaiting their post-rehab video for review and confirmation of liner condition. We anticipate a final payment application will be submitted thereafter.
- Waterview Pipe Lining – We finalized the bid document and administered the construction
MA 4-13-26 draft 3
solicitation. The project was advertised for bid on March 13 and 17, and bids were due on April 3. Six bids were received. We conducted the bid opening, reviewed bids, prepared a bid tabulation, and submitted an award recommendation letter.
Pump Stations
- Hunt Country Pump Station – Pennoni conducted an existing conditions survey of the interior of the Hunt Country Pump Station building, including electrical components, on February 18 and a topographic survey of the site on February 25. Blood Hound performed utility locating of the existing force main on March 4. Our survey crew surveyed the force main mark outs on March 5. Existing and proposed conditions design and plans are currently being prepared.
Sewer Extensions
- Morstein Road and Great Oak Circle – We continued preparation of the concept design and plan for the sewer extensions. We will provide a list of locations for Public Works to perform soft dig test pits for rock depths based upon the conceptually designed sewer depths. After we complete the concept design, we will develop an updated construction cost opinion.
- Charter Chase and Goshen Downs – No updates since our last report. The results of the sewer extension interest survey in 2025 were that 58 properties are definitely interested, 23 properties are interested depending on costs, 42 properties are not interested, and 31 properties did not respond.
MA 4-13-26 draft 4
Chapter 94 Reports
We completed the 2025 reports for the Ridley Creek STP (RCSTP), West Goshen (Chester Creek), and Westtown systems. We submitted the RCSTP report to PADEP on March 31. The West Goshen and Westtown Tributary reports were submitted to West Goshen Township and Westtown Township respectively on March 30.
East Goshen’s existing and projected treatment and conveyance needs for all three systems are all well within available and permitted capacities. A summary of the RCSTP and West Goshen reports follows:
- RCSTP Service Area: The RCSTP’s average influent flow was 381,000 gpd in 2025. For reference, the average influent flow was 418,000 gpd in 2024. Flows remain well within the 750,000 gpd permitted average capacity of the plant. The 2025 flows are equivalent to 189 gpd/EDU, which is less than the Township’s planning flow rate of 225 gpd/EDU. See Table 1 in the RCSTP Chapter 94 Report for a tabulation of 5-year flow history.; The projected future 5-year average and maximum monthly flows to the RCSTP are 424,000 gpd and 473,000 gpd, which is below the permitted capacity of the plant. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.; The RCSTP’s average organic loading was 922 lbs BOD 5 /day in 2025. For reference, the average organic loading was 1,342 lbs BOD 5 /day in 2024. Organic loadings remain well within the 2,098 lbs/day permitted capacity. See Table 3 in the RCSTP Chapter 94 Report for a tabulation of 5-year organic loading history.; The 5-year projected average and maximum monthly organic loading to the plant is 932 lbs BOD 5 /day and 1,341 lbs BOD 5 /day, which is within the permitted capacity. Refer to the attached Chart 2 excerpt for a graph of the 5-year historical and 5-year projected organic loadings.; The Hershey’s Mill and Hunt Country Pump Stations operated within their permitted hydraulic capacities in 2025, and they are projected to continue to do so in the future due to little to no projected upstream connections in the next couple years. See Table 8 in the RCSTP Chapter 94 Report for a summary of 2025 pump station flows versus capacities.
- West Goshen Service Area: East Goshen’s average daily flow was 529,000 gpd in 2025. For reference, the average daily flow was 706,000 gpd in 2024. The actual flow rate in 2025 was 149 gpd/EDU, which is well under the planning flow rate of 225 gpd/EDU. See Table 1 in the West Goshen Chapter 94 Report for a tabulation of 5-year flow history.; The projected future 5-year average and maximum monthly flows to West Goshen are 650,000 gpd and 774,000 gpd, which is well within the intermunicipal capacity of 1 MGD. Refer to the attached Chart 1 excerpt for a graph of the 5-year historical and 5-year projected flows.
MA 4-13-26 draft 5
- The Barkway and Ashbridge Pump Stations operated within their permitted hydraulic capacities in 2025 and are projected to continue to do so due to no projected upstream connections in the next couple years. See Table 8 in the West Goshen Chapter 94 Report for a summary of 2025 pump station flows versus capacities.
New Connections
- 1344 Morstein Road – One new home is proposed with a grinder pump and low pressure sewer lateral through an easement across an existing residential property to the existing sewer main in Eastwick Circle. We coordinated with the Township and design consultant for submission of the Sewage Facilities Planning Mailer to PADEP. Sewer design is otherwise complete.
- 1354 Paoli Pike – The property owner is proposing an easement through the abutting property at 642 Meadow Drive to connect to an existing sewer main along Meadow Drive via grinder pump. No activity since our last report.
- 1152 N. Chester Road – We performed a cursory evaluation of a possible sewer extension to service potential new residential development at the property. The extension would run approximately 1,950 LF to an existing sanitary sewer manhole in Tanglewood Lane. It could be constructed entirely as a low pressure system with grinder pumps or as a combination of gravity and low pressure sewers. This would potentially enable connections from other properties along that stretch of N. Chester Road and also from Ivy Lane, Old Orchard Lane, and Raewyck Drive. Sewer from the manhole on Tanglewood Drive to Greenhill Road could be gravity sewer instead of low pressure, but all sewers to the east of Greenhill Road would need to be low pressure due to topography.
Other
- GIS Mapping – We are updating the Township-wide sewer system mapping in GIS to begin to make it a functional asset management tool for the Public Works Department. We intend to present it to Public Works in April and to discuss additional information (such as pipe materials, manhole elevations, repair history), features and enhancements that can be added, options for web hosting so that it can be available in the field for use by Public Works on repairs and PA One Call locating amongst other things, and the capability for Township staff to update manhole and pipe information themselves.
3. Big Fish Environmental Services –
The Ridley Creek sewage treatment plant outfall 001 met all effluent limitations regarding water quality for March 2026. All supplemental reports were submitted for February 2026. Caustic usage increased to 62.26 gallons per day from 51.85 gallons per day last month. Aluminum sulfate solution volumes daily average decreased slightly to 63.34 gallons per day from 68.90 gallons per day. No significant mechanical or operational issues were observed during the SBR treatment process. Sludge dewatering did not encounter any significant mechanical or operational issues. There were no odor complaints during the month.
MA 4-13-26 draft 6
Approval of Minutes
The minutes of the March 9, 2026 meeting were approved as amended by Sean and John.
Approval of Invoices
- Sean moved to approve payment of Pennoni Invoices: #1319278 in the amount of $15,658.75 #1319279 in the amount of $ 7,608.50 Dana seconded the motion. The motion passed unanimously.
- Walter moved to approve payment of Pennoni invoice #1319280 in the amount of $9,700.25. John seconded the motion. The motion passed unanimously.
- John moved to approve payment of the Gawthrop Greenwood invoice #222091490 in the amount of $338.10. Dana seconded the motion. The motion passed unanimously.
- John moved to approve payment of the Maillie invoice #126946 in the amount of $7,500.00. Sean seconded the motion. The motion passed unanimously.
- Dana moved to approve payment of Xylem Water Solutions invoice #3556E12877 in the amount of $15,524.69. Walter seconded the motion. The motion passed unanimously.
Waterview Sanitary Sewer Pipe Lining - Mike spoke about the proposal for this project. Walter moved to accept Pennoni’s proposal for engineering costs of $30,000.00. Sean seconded the motion. The motion passed unanimously.
Financial Reports
Dana Gieder provided the following report: YTD March 2026, the Municipal Authority recorded $81,445.19 in revenues (primarily from Sewer Capital Reserve, Sewer Operating transfers and collecting tapping fees) and $67,656.81 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, and legal and engineering expenses). The net result of operations is $13,788.38. As of March 31, 2026, the fund balance was $42,155.60.
Old Business -
None
Goals
In the second goal insert - Continue to implement “reduction of” infiltration………
New Business –
1. Waterview Pipe Lining Bid Award Recommendation – Mike mentioned that the reason for the reduction compared to last year’s project is that there is no easement involved. Bids were reviewed. Walter moved to award the bid for Waterview Sanitary Sewer Pipe Lining Contract No. WVPL-2026 to SWERP Incorporated in the amount of $187,781. Dana seconded the motion. The motion passed unanimously.
MA 4-13-26 draft 7
Any Other Matter -
1.Dana mentioned that he received information about litigation by the PUC. The PUC reported that a municipal authority gave service outside of their service area and need to make retroactive payments.
2. Walter and Kevin will not be at the June meeting.
Correspondence- None
Public Comment - None
Adjournment
There being no further business Sean moved to adjourn the meeting. Dana seconded the motion. The motion passed unanimously. The meeting was adjourned at 8:00 pm.
The next regular meeting will be held on Monday, May 11, 2026 at 7:00 p.m.
Respectfully submitted,
Ruth Kiefer, Recording Secretary
MA 4-13-26 draft 8
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323177
Invoice Date : 05/01/2026
Project : EGMAU25004
Project Name : Hunt Country Pump Station Upgrade
For Services Rendered Through 04/19/2026
Subcontractor, Blood Hound LLC, fee for subsurface utility locating and stakeout. Pennoni continued preparation of design and plans.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- Survey | NTE $11,400.00 | $9,966.25 | 99.78% | $11,375.25 | $1,409.00 |
| 02 -- Design | NTE $50,100.00 | $6,170.50 | 16.20% | $8,115.50 | $1,945.00 |
| 03 -- Permitting | NTE $12,800.00 | $0.00 | 0.00% | $0.00 | $0.00 |
| 04 -- Bid Services | NTE $6,300.00 | $0.00 | 0.00% | $0.00 | $0.00 |
| Total : | $80,600.00 | $16,136.75 | $19,490.75 | $3,354.00 |
Phase: 01 -- Survey
Consultants
Engineering Servs-direct
| 3/4/2026 | Blood Hound LLC/PULS, Inc. | Engineering Services | 1,409.00 | |
|---|---|---|---|---|
| Total Consultants | 1,409.00 | 1,409.00 | ||
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 1,409.00 | 9,966.25 | 11,375.25 |
| Limit | 11,400.00 | ||
| Remaining | 24.75 |
Phase Subtotal: $1,409.00
Phase: 02 -- Design
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 0.50 | 166.00 | 83.00 |
| Staff Professional | 14.00 | 133.00 | 1,862.00 |
| Labor | 1,945.00 | ||
Billing Limits
| Current | Prior | To-Date | |
|---|---|---|---|
| Total Billings | 1,945.00 | 6,170.50 | 8,115.50 |
| Limit | 50,100.00 | ||
| Remaining | 41,984.50 |
APPROVED BY: KB
DATE PAID:
CHECK #:
CHARGED TO: 07-424-3700
Phase Subtotal: $1,945.00
Continued on next page...
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25004 Hunt Country Pump Station Upgrade Invoice: 1323177
Amount Due This Invoice: $3,354.00
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Page 2
| Project: | EGMAU25004 | ||
|---|---|---|---|
| Pennoni Job No.: | Hunt Country Pump Station Upgrade | ||
| Invoice No: | 1323177 | ||
| Invoice Period: | 3/23/2026 | to | 4/19/2026 |
| Initial Authorization: | $ 80,600.00 | Date: | 5/1/2026 |
| Contract Amount: | $ 80,600.00 | ||
| Previously Invoiced: | $ 16,136.75 | ||
| Current Invoice: | $ 3,354.00 | ||
| Invoiced to Date ($): | $ 19,490.75 | ||
| Invoiced to Date (%): | 24% | ||
| Remaining Budget ($): | $ 61,109.25 | ||
| Remaining Budget (%): | 76% |
Budget by Phase:
| Phase Name: | Hunt Country Pump Station Upgrade |
|---|---|
| Phase Budget: | $ 80,600.00 |
| Previously Invoiced: | $ 16,136.75 |
| Current Invoice: | $ 3,354.00 |
| Invoiced to Date ($): | $ 19,490.75 |
| Invoiced to Date (%): | 24% |
| Remaining Budget ($): | $ 61,109.25 |
| Remaining Budget (%): | 76% |
Comments: Subcontractor, Blood Hound LLC, fee for subsurface utility locating and stakeout. Pennoni continued preparation of design and plans.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323178
Invoice Date : 05/01/2026
Project : EGMAU25006
Project Name : Morstein Rd Sewer Design and Permitting
For Services Rendered Through 04/19/2026
Continued concept design and preparation of plans including site plans, sewer main profiles, and construction details.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,064.00 | 20,883.00 | 21,947.00 |
| Limit | 25,000.00 | ||
| Remaining | 3,053.00 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Staff Professional | 8.00 | 133.00 | 1,064.00 |
| Totals | 8.00 | 1,064.00 | |
| Total Labor | 1,064.00 | ||
| Total this Invoice | $1,064.00 |
APPROVED BY: KLS
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25006
Pennoni Job No.: Morstein Rd Sewer Design and Permitting
Invoice No: 1323178
Invoice Period: 2/16/2026 to 4/19/2026
Date: 5/1/2026
| Initial Authorization: | $ 25,000.00 |
|---|---|
| Contract Amount: | $ 25,000.00 |
| Previously Invoiced: | $ 20,883.00 |
| Current Invoice: | $ 1,064.00 |
| Invoiced to Date ($): | $ 21,947.00 |
| Invoiced to Date (%): | 88% |
| Remaining Budget ($): | $ 3,053.00 |
| Remaining Budget (%): | 12% |
Budget by Phase:
Phase Name: Morstein Rd Sewer Design and Permitting
| Phase Budget: | $ 25,000.00 |
|---|---|
| Previously Invoiced: | $ 20,883.00 |
| Current Invoice: | $ 1,064.00 |
| Invoiced to Date ($): | $ 21,947.00 |
| Invoiced to Date (%): | 88% |
| Remaining Budget ($): | $ 3,053.00 |
| Remaining Budget (%): | 12% |
Comments: Continued concept design and preparation of plans including site plans, sewer main profiles, and construction details.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323179
Invoice Date : 05/01/2026
Project : EGMAU25007
Project Name : Waterview Pipe Lining
For Services Rendered Through 04/19/2026
Provided bid assistance including responding to prospective bidders' questions, preparation of Addendum #1, conducting bid opening, review of bids, low bidder reference checks, and preparing bid tabulation and award recommendation letter. Issued award letter to contractor following MA award. Evaluated potential additional sewers for pipe lining with remaining budget.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| .. Waterview Pipe Lining est. | $30,000.00 | $7,608.50 | $10,272.00 | $2,663.50 | |
| Total : | $30,000.00 | $7,608.50 | $10,272.00 | $2,663.50 |
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 5.50 | 166.00 | 913.00 |
| Staff Professional | 10.50 | 133.00 | 1,396.50 |
| Senior Engineering Tech | 3.00 | 118.00 | 354.00 |
| Labor | 2,663.50 | ||
| Amount Due This Invoice | $2,663.50 |
APPROVED BY: KLS
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-429-3780
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU25007
Pennoni Job No.: Waterview Pipe Lining
Invoice No: 1323179
Invoice Period: 3/23/2026 to 4/19/2026
Date: 5/1/2026
| Initial Authorization: | $ 30,000.00 |
|---|---|
| Contract Amount: | $ 30,000.00 |
| Previously Invoiced: | $ 7,608.50 |
| Current Invoice: | $ 2,663.50 |
| Invoiced to Date ($): | $ 10,272.00 |
| Invoiced to Date (%): | 34% |
| Remaining Budget ($): | $ 19,728.00 |
| Remaining Budget (%): | 66% |
Budget by Phase:
Phase Name: Waterview Pipe Lining
| Phase Budget: | $ 30,000.00 |
|---|---|
| Previously Invoiced: | $ 7,608.50 |
| Current Invoice: | $ 2,663.50 |
| Invoiced to Date ($): | $ 10,272.00 |
| Invoiced to Date (%): | 34% |
| Remaining Budget ($): | $ 19,728.00 |
| Remaining Budget (%): | 66% |
Comments: Provided bid assistance including responding to prospective bidders' questions, preparation of Addendum #1, conducting bid opening, review of bids, low bidder reference checks, and preparing bid tabulation and award recommendation letter. Issued award letter to contractor following MA award. Evaluated potential additional sewers for pipe lining with remaining budget.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323180
Invoice Date : 05/01/2026
Project : EGMAU26001
Project Name : 2026 General Services
For Services Rendered Through 04/19/2026
Prepared April Engineer's Report. Reviewed April RCSTP Operator's Report. Attended April MA meeting.
2025 Supplee Valley Pipe Lining: Coordinated with contractor, Vortex, for repair of dimpled pipe liner. On-site observation of repairs.
Gravity flow meter near Blacksmith Shop: obtained and reviewed vendor quotes for metering manhole and meter.
Discussion with Goshen Downs resident regarding their questions on potential sanitary sewer extensions.
| Phase Code / Name | Contract Amount | Previously Billed | % Complete | Complete To Date | Amount This Invoice |
|---|---|---|---|---|---|
| 01 -- General Engineering Services NTE | $45,925.25 | $9,625.50 | 29.61% | $13,598.75 | $3,973.25 |
| 02 -- Grants NTE | $74.75 | $74.75 | 100.00% | $74.75 | $0.00 |
| Total : | $46,000.00 | $9,700.25 | $13,673.50 | $3,973.25 |
Phase: 01 -- General Engineering Services
Labor
| Class | Hours | Rate | Amount |
|---|---|---|---|
| Authority Engineer | 9.50 | 166.00 | 1,577.00 |
| Staff Professional | 12.25 | 133.00 | 1,629.25 |
| Senior Engineering Tech | 6.50 | 118.00 | 767.00 |
| Labor | 3,973.25 | ||
| Phase Subtotal | $3,973.25 | ||
| Amount Due This Invoice | $3,973.25 |
APPROVED BY: KLS
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU26001
Pennoni Job No.: 2026 General Services
Invoice No: 1323180
Invoice Period: 3/23/2026 to 4/19/2026
Date: 5/1/2026
| Initial Authorization: | $ 46,000.00 |
|---|---|
| Contract Amount: | $ 46,000.00 |
| Previously Invoiced: | $ 9,700.25 |
| Current Invoice: | $ 3,973.25 |
| Invoiced to Date ($): | $ 13,673.50 |
| Invoiced to Date (%): | 30% |
| Remaining Budget ($): | $ 32,326.50 |
| Remaining Budget (%): | 70% |
Budget by Phase:
Phase Name: 2026 General Services
| Phase Budget: | $ 46,000.00 |
|---|---|
| Previously Invoiced: | $ 9,700.25 |
| Current Invoice: | $ 3,973.25 |
| Invoiced to Date ($): | $ 13,673.50 |
| Invoiced to Date (%): | 30% |
| Remaining Budget ($): | $ 32,326.50 |
| Remaining Budget (%): | 70% |
Comments: Prepared April Engineer's Report. Reviewed April RCSTP Operator's Report. Attended April MA meeting.
2025 Supplee Valley Pipe Lining: Coordinated with contractor, Vortex, for repair of dimpled pipe liner. On-site observation of repairs.
Gravity flow meter near Blacksmith Shop: obtained and reviewed vendor quotes for metering manhole and meter.
Discussion with Goshen Downs resident regarding their questions on potential sanitary sewer extensions.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323181
Invoice Date : 05/01/2026
Project : EGMAU26002
Project Name : 2025 Chapter 94 Reports
For Services Rendered Through 04/19/2026
Finalized and submitted West Goshen (Chester Creek) and Westtown Chapter 94 Reports to the respective townships. Finalized and submitted RCSTP Chapter 94 Report to PADEP.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,220.50 | 2,635.00 | 3,855.50 |
| Limit | 7,500.00 | ||
| Remaining | 3,644.50 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Authority Engineer | 5.75 | 166.00 | 954.50 |
| Staff Professional | 2.00 | 133.00 | 266.00 |
| Totals | 7.75 | 1,220.50 | |
| Total Labor | 1,220.50 | ||
| Total this Invoice | $1,220.50 |
APPROVED BY: KLS
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU26002
Pennoni Job No.: 2025 Chapter 94 Reports
Invoice No: 1323181
Invoice Period: 2/16/2026 to 4/19/2026
Date: 5/1/2026
| Initial Authorization: | $ 7,500.00 |
|---|---|
| Contract Amount: | $ 7,500.00 |
| Previously Invoiced: | $ 2,635.00 |
| Current Invoice: | $ 1,220.50 |
| Invoiced to Date ($): | $ 3,855.50 |
| Invoiced to Date (%): | 51% |
| Remaining Budget ($): | $ 3,644.50 |
| Remaining Budget (%): | 49% |
Budget by Phase:
Phase Name: 2025 Chapter 94 Reports
| Phase Budget: | $ 7,500.00 |
|---|---|
| Previously Invoiced: | $ 2,635.00 |
| Current Invoice: | $ 1,220.50 |
| Invoiced to Date ($): | $ 3,855.50 |
| Invoiced to Date (%): | 51% |
| Remaining Budget ($): | $ 3,644.50 |
| Remaining Budget (%): | 49% |
Comments: Finalized and submitted West Goshen (Chester Creek) and Westtown Chapter 94 Reports to the respective townships. Finalized and submitted RCSTP Chapter 94 Report to PADEP.
Pennoni
INVOICE
Remit Payment To:
Pennoni Associates Inc.
P.O. Box 827328
Philadelphia, PA 19182-7328
Mark Miller
East Goshen Municipal Authority
1580 Paoli Pike
West Chester, PA 19380-6199
Invoice No : 1323182
Invoice Date : 05/01/2026
Project : EGMAU26003
Project Name : RCSTP NPDES Permit Renewal
For Services Rendered Through 04/19/2026
Began compiling data and information and preparing renewal application documents.
| Billing Limits | Current | Prior | To-Date |
|---|---|---|---|
| Total Billings | 1,662.50 | 0.00 | 1,662.50 |
| Limit | 7,500.00 | ||
| Remaining | 5,837.50 |
Labor
| Hours | Rate | Amount | |
|---|---|---|---|
| Staff Professional | 12.50 | 133.00 | 1,662.50 |
| Totals | 12.50 | 1,662.50 | |
| Total Labor | 1,662.50 | ||
| Total this Invoice | $1,662.50 |
APPROVED BY: KLS
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3130
INVOICES DUE ON RECEIPT. Invoices outstanding over 30 days will have a Service Charge of 1 1/2% per month.
Project: EGMAU26003
Pennoni Job No.: RCSTP NPDES Permit Renewal
Invoice No: 1323182
Invoice Period: 3/23/2026 to 4/19/2026
Date: 5/1/2026
| Initial Authorization: | $ 7,500.00 |
|---|---|
| Contract Amount: | $ 7,500.00 |
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,662.50 |
| Invoiced to Date ($): | $ 1,662.50 |
| Invoiced to Date (%): | 22% |
| Remaining Budget ($): | $ 5,837.50 |
| Remaining Budget (%): | 78% |
Budget by Phase:
Phase Name: RCSTP NPDES Permit Renewal
| Phase Budget: | $ 7,500.00 |
|---|---|
| Previously Invoiced: | $ - |
| Current Invoice: | $ 1,662.50 |
| Invoiced to Date ($): | $ 1,662.50 |
| Invoiced to Date (%): | 22% |
| Remaining Budget ($): | $ 5,837.50 |
| Remaining Budget (%): | 78% |
Comments: Began compiling data and information and preparing renewal application documents.
Maillie
ACCOUNTANTS • ADVISORS
500 N Lewis Rd
Limerick, PA 19468
(610) 935-1420
EIN: 23-1518888
Web: www.maillie.com
Email: firm@maillie.com
Kelly Brophy
East Goshen Municipal Authority
1580 PAOLI PIKE
WEST CHESTER, PA 19380-6107
| Date | 3/31/2026 |
|---|---|
| Invoice Number: | 127792 |
| Client: | 2500.000 |
| Due Date: | Upon Receipt |
Billing for time incurred from March 1, 2026 to March 31, 2026 for the following services:
Final billing on December 31, 2025 audit
Invoice Total: $4,500.00
APPROVED BY: KLB
DATE PAID: ________
CHECK #: ________
CHARGED TO: 07-424-3110
Please return this portion with payment.
| ID: 2500 East Goshen Municipal Authority |
Date: 3/31/2026 Due Date: Upon Receipt |
Invoice: 127792 Amount Due: $4,500.00 |
|---|
Amount Enclosed: $________
Please make checks payable to Maillie LLP.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD., MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO: 26717 Network Place, Chicago, IL 60673-1267
INVOICE
| INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | YOUR PURCHASE ORDER | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 3556E14139 | F50733 | 3/17/26 | K51740 | 26-00104 | 3/17/26 | C1 | 130 | 100% N30 FROM INVOICE |
Customer No. 213828 | Global No. 5230853
Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
| FREIGHT TERMS | DELIVERY TERMS | ORDER PROCESSED BY | SHIP VIA | ORDER TEXT | CUSTOMER TEXT |
|---|---|---|---|---|---|
| Jobsite | No S & H Charge | FLYGT-PHILADELPHIA,PA BRA | Customer Pick Up | East Goshen T#4532 | Jennifer LaPorte |
Quote# R2026-MAL-0015
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED UM | UNIT PRICE DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 001 | 0000000824061 WASHER,SS 24.5MM ID 35MM OD Reduction by Set $ Value | 1 EA | 7.40 / 1.33 | 6.069 | 6.07 |
| 002 | 0000000830201 SCREW,ALLEN M8 X 25 SS Reduction by Set $ Value | 1 EA | 4.70 / .85 | 3.854 | 3.85 |
| 003 | 0000000942102 CABLE,SUBCAB AWG 14/7 19MM Reduction by Set $ Value | 50 FT | 18.00 / 3.24 | 14.760 | 738.00 |
| 004 | 0000003978800 SLEEVE,SS Reduction by Set $ Value | 1 EA | 142.00 / 25.56 | 116.440 | 116.44 |
| 005 | 0000005950101 HOUSING,OIL BOTTOM CI | 1 EA | 937.00 | 768.341 | 768.34 |
PAID
Cont on 2
APPROVED BY: ML KCB | DATE PAID: | CHECK #: | CHARGED TO: 07-429-1500 Sludge Pump Aeration Pump Tank 2
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD., MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO: 26717 Network Place, Chicago, IL 60673-1267
INVOICE - Page 2
| INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | YOUR PURCHASE ORDER | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 3556E14139 | F50733 | 3/17/26 | K51740 | 26-00104 | 3/17/26 | C1 | 130 | 100% N30 FROM INVOICE |
Customer No. 213828 | Global No. 5230853
Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
| FREIGHT TERMS | DELIVERY TERMS | ORDER PROCESSED BY | SHIP VIA | ORDER TEXT | CUSTOMER TEXT |
|---|---|---|---|---|---|
| Jobsite | No S & H Charge | FLYGT-PHILADELPHIA,PA BRA | Customer Pick Up | East Goshen T#4532 | Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED UM | UNIT PRICE DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 005 | 0000005950101 Reduction by Set $ Value | 168.66 | |||
| 006 | 0000006525300 WASHER,SUPPORTING SS Reduction by Set $ Value | 1 EA | 19.00 / 3.42 | 15.581 | 15.58 |
| 007 | 0000007779400 KIT,ROTOR UNIT Reduction by Set $ Value | 1 EA | 1,150.00 / 207.00 | 943.000 | 943.00 |
| 008 | 0000007359002 KIT,RETROFIT N462 3085 P/S/F Reduction by Set $ Value | 1 EA | 4,681.00 / 842.58 | 3,838.421 | 3,838.42 |
| 009 | 0000006018927 KIT,REPAIR BASIC 3085.092/.182 Reduction by Set $ Value | 1 EA | 1,313.00 / 1,313.00 | ||
| 010 | 0000000841794 GROMMET,NBR 21ID 35OD 26L | 1 EA | 36.00 |
Cont on 3
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD., MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO: 26717 Network Place, Chicago, IL 60673-1267
INVOICE - Page 3
| INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | YOUR PURCHASE ORDER | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 3556E14139 | F50733 | 3/17/26 | K51740 | 26-00104 | 3/17/26 | C1 | 130 | 100% N30 FROM INVOICE |
Customer No. 213828 | Global No. 5230853
Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
| FREIGHT TERMS | DELIVERY TERMS | ORDER PROCESSED BY | SHIP VIA | ORDER TEXT | CUSTOMER TEXT |
|---|---|---|---|---|---|
| Jobsite | No S & H Charge | FLYGT-PHILADELPHIA,PA BRA | Customer Pick Up | East Goshen T#4532 | Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED UM | UNIT PRICE DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| 010 | 0000000841794 Reduction by Set $ Value | 36.00 | |||
| 011 | 0000006785820 CLIP,CABLE PLASTIC Reduction by Set $ Value | 1 EA | 24.00 / 24.00 | ||
| 012 | 1400000690002A LABOR,SVC FLYGT,NO TAX Z3-TP MODELS: 3000,6000,7000,8000 | 12 EA | 145.00 | 145.000 | 1,740.00 |
| 013 | 1400000690021A ENV FEE 0-10HP NO TAX TP ENVIRONMENTAL FEE | 1 EA | 60.00 | 60.000 | 60.00 |
| 014 | 1400000690024 SHOP SUPPLIES-SMALL PUMPS TP MISC SHOP SUPPLIES FOR REPAIR | 1 EA | 55.00 | 55.000 | 55.00 |
| SUB-TOTAL OF POSITIONS (ADD NO S & H CHARGES) | 8,284.70 |
Cont on 4
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Xylem Water Solutions U.S.A., Inc.
2330 YELLOW SPRINGS RD., MALVERN, PA 19355
Tel.(610)647-6620 Fax:(610)647-5563
REMIT TO: 26717 Network Place, Chicago, IL 60673-1267
INVOICE - Page 4
| INVOICE NO. | FUS NO. | DATE SHIPPED | DELIVERY NOTE | YOUR PURCHASE ORDER | INVOICE DATE | TRN | WHS | PAYMENT TERMS |
|---|---|---|---|---|---|---|---|---|
| 3556E14139 | F50733 | 3/17/26 | K51740 | 26-00104 | 3/17/26 | C1 | 130 | 100% N30 FROM INVOICE |
Customer No. 213828 | Global No. 5230853
Sold To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
Ship To: East Goshen TWP, 1580 PAOLI PIKE, WEST CHESTER PA 19380-6107
| FREIGHT TERMS | DELIVERY TERMS | ORDER PROCESSED BY | SHIP VIA | ORDER TEXT | CUSTOMER TEXT |
|---|---|---|---|---|---|
| Jobsite | No S & H Charge | FLYGT-PHILADELPHIA,PA BRA | Customer Pick Up | East Goshen T#4532 | Jennifer LaPorte |
| LINE | ITEM/DESCRIPTION | QUANTITY SHIPPED UM | UNIT PRICE DISCOUNT/CHARGE | NET PRICE | EXTENDED AMOUNT |
|---|---|---|---|---|---|
| NET AMOUNT BEFORE TAXES USD | 8,284.70 | ||||
| ORDER TOTAL USD | 8,284.70 |
IMPORTANT - This invoice is governed by and subject to TERMS AND CONDITIONS OF SALE - XYLEM AMERICAS. Different terms are hereby rejected unless expressly assented to in writing. Terms are accessible at http://www.xylem.com/en-us/Pages/terms-conditions-of-sale.aspx. Please contact Xylem at the number listed on this invoice within 72 hours should you have any issues or concerns pertaining to this invoice.
Memo
| To: | Municipal Authority |
|---|---|
| From: | Dana Gieder |
| Re: | MA April 2026 YTD Financial Report |
| Date: | May 6, 2026 |
YTD April 2026, the Municipal Authority recorded $125,808.47 in revenues (primarily from Sewer Capital Reserve and Sewer Operating transfers, collecting inspection and tapping fees) and $109,247.11 in expenses (Hershey Mill pump station mission alarm panel installation, Aeration pump repair, MA Quarterly recharges, audit expenses, Flygt sludge pump repair, legal and engineering expenses). The net result of operations is $16,561.36. As of April 30, 2026, the fund balance was $44,928.58.
Attached is a complete list of 2026 YTD detailed MA revenues and expenses.
U:\dware\municipal authority\
EAST GOSHEN TOWNSHIP
Municipal Authority Fund
YTD APRIL 2026
| Account Id | Account Description | Annual Budget | Current YTD | Prior YTD |
|---|---|---|---|---|
| REVENUE | ||||
| 07-341-1000 | INTEREST EARNINGS | 0.00 | 61.36 | 115.33 |
| 07-364-1100 | C.C. TAPPING FEES | 2,300.00 | 0 | 0 |
| 07-364-1110 | R.C.TAPPING FEES | 4,332.72 | 16,500.00 | 0 |
| 07-364-1130 | CONNECTION FEES - SEWER | 563.76 | 0 | 0 |
| 07-380-1000 | MISCELLANEOUS REVENUE | 282.24 | 0 | 0 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 319,438.19 | 73,577.72 | 52,014.90 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 1,033,650.00 | 35,669.39 | 334,610.07 |
| Total Revenue | 1,360,566.91 | 125,808.47 | 386,740.30 | |
| EXPENSES | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 47,871.20 | 12,569.62 | 11,967.80 |
| 07-424-3000 | MISCELLANEOUS EXPENSE | 1,645.71 | 0 | 780.00 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 12,000.00 | 7,500.00 | 12,000.00 |
| 07-424-3130 | ENGINEERING SERVICES | 61,000.00 | 35,942.75 | 3,487.25 |
| 07-424-3140 | LEGAL SERVICES | 6,500.00 | 1,428.60 | 1,973.50 |
| 07-424-3700 | CHESTER CREEK ENGINEERING | 42,000.00 | 0 | 5,777.50 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 95,000.00 | 16,136.75 | 0 |
| 07-424-7431 | CAPITAL PROJ.-ENGINEERING | 60,000.00 | 0 | 0 |
| 07-424-7490 | CAP.REPLACEMENT R.C. | 126,000.00 | 0 | 6,413.85 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 0.00 | 4,251.50 | 20,850.00 |
| 07-429-1504 | HUNT CO PUMP STATION CAPITAL | 515,550.00 | 0 | 0 |
| 07-429-1505 | RCSTP CAPITAL | 50,000.00 | 23,809.39 | 69,223.04 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 343,000.00 | 7,608.50 | 244,537.03 |
| Total Expenses | 1,360,566.91 | 109,247.11 | 377,009.97 | |
| Net Result From Operations | 0.00 | 16,561.36 | 9,730.33 | |
Municipal Authority
YTD Revenues and Expenses thru 4/30/2026
Page 1 of 2
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-341-1000 | INTEREST EARNINGS | 01/31/26 | Revenue Journal | INTEREST EARNED JANUARY 2026 | 12.81 |
| 07-341-1000 | INTEREST EARNINGS | 02/28/26 | Revenue Journal | INTEREST EARNED FEBRUARY 2026 | 12.04 |
| 07-341-1000 | INTEREST EARNINGS | 03/31/26 | Revenue Journal | INTEREST EARNED MARCH 2026 | 13.53 |
| 07-341-1000 | INTEREST EARNINGS | 04/30/26 | Revenue Journal | INTEREST EARNED APRIL 2026 | 22.98 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1427 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1427 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1411 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1411 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | INSPECTION FEE R.C. 1417 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 02/20/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1417 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/11/26 | Revenue Journal | INSPECTION FEE 301 RESERVOIR RD LOT 5 | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/11/26 | Revenue Journal | SEWER INSPECTION FEE 301 RESERVOIR LOT5 | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/31/26 | Revenue Journal | INSPECTION FEE R.C. 1415 MILLSTONE | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 03/31/26 | Revenue Journal | SEWER INSPECTION FEE R.C. 1415 MILLSTONE | 750.00 |
| 07-364-1110 | R.C.TAPPING FEES | 04/06/26 | Revenue Journal | INSPECTION FEE R.C. 1406 TIMBERMILL LN | 2,000.00 |
| 07-364-1110 | R.C.TAPPING FEES | 04/06/26 | Revenue Journal | SEWER INSPECT FEE R.C.1406 TIMBERMILL LN | 750.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 01/21/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 612.50 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 02/10/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 19,333.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/10/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,864.75 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/17/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 7,500.00 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 03/27/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 12,569.62 |
| 07-392-0500 | TRANSFER FROM SEWER OPERATING | 04/15/26 | Revenue Journal | XFER FROM 05 SEWER OPERATING TO 07 MA | 25,697.10 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 01/21/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 4,251.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 03/31/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 15,524.69 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/15/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 7,608.50 |
| 07-392-0900 | TRANSFER FROM SEWER CAP RESERVE | 04/15/26 | Revenue Journal | XFER FROM 09 SEWER CAP TO 07 MA | 8,284.70 |
| Total Revenue | 125,808.47 | ||||
| 07-424-1400 | ADMINISTRATIVE WAGES | 03/27/26 | Pay Check: 715 | 26-00698 QTR 1 2026 MA CHARGE BACK | 12,569.62 |
| 07-424-3110 | MUNIC.AUTH.-AUDITING | 03/17/26 | Pay Check: 3587 | 26-00635 PROGRESS BILLING AUDIT EGT MUA | 7,500.00 |
| 07-424-3130 | ENGINEERING SERVICES | 02/10/26 | Pay Check: 3584 | 26-00338 SERV THRU 123125 2025 GEN SERV | 4,835.25 |
| 07-424-3130 | ENGINEERING SERVICES | 02/10/26 | Pay Check: 3584 | 26-00339 SERV THRU 123125 MORSTEIN RD | 14,225.50 |
| 07-424-3130 | ENGINEERING SERVICES | 03/10/26 | Pay Check: 3586 | 26-00549 SERV THRU 021526 25 CHAPTER 94 | 2,635.00 |
| 07-424-3130 | ENGINEERING SERVICES | 03/10/26 | Pay Check: 3586 | 26-00550 SERV THRU 021526 MORSTEIN RD | 4,546.75 |
| 07-424-3130 | ENGINEERING SERVICES | 04/14/26 | Pay Check: 3591 | 26-00867 SERV THRU 032226 2026 GEN SERV | 9,700.25 |
| 07-424-3140 | LEGAL SERVICES | 01/21/26 | Pay Check: 3581 | 26-00116 LEGAL SERV DEC 2025 GEN AUTH | 612.50 |
| 07-424-3140 | LEGAL SERVICES | 02/10/26 | Pay Check: 3583 | 26-00337 LEGAL SERV JAN 2026 GEN AUTH | 273.00 |
| 07-424-3140 | LEGAL SERVICES | 03/10/26 | Pay Check: 3585 | 26-00548 LEGAL SERV FEB 2026 GEN AUTH | 205.00 |
Municipal Authority
YTD Revenues and Expenses thru 4/30/2026
| Account Number | Account Description | Date | Type | Transaction Data/Comment | Amount |
|---|---|---|---|---|---|
| 07-424-3140 | LEGAL SERVICES | 04/14/26 | Pay Check: 3590 | 26-00868 LEGAL SERV MARCH 2026 GEN AUTH | 338.10 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 03/10/26 | Pay Check: 3586 | 26-00551 SERV THRU 021526 HUNT CTRY PUM | 478.00 |
| 07-424-3705 | HUNT COUNTY ENGINEERING | 04/14/26 | Pay Check: 3591 | 26-00865 SERV THRU 032226 HUNT CTRY PUM | 15,658.75 |
| 07-429-1503 | HERSHEYS MILL PUMP STATION CAPITAL | 01/21/26 | Pay Check: 3582 | 26-00147 HERSHEY MILLS PUMP ST- MISSION | 4,251.50 |
| 07-429-1505 | RCSTP CAPITAL | 03/31/26 | Pay Check: 3588 | 26-00757 AERATION PUMP REPAIR- FLYGT Z3 | 15,524.69 |
| 07-429-1505 | RCSTP CAPITAL | 04/14/26 | Pay Check: 3589 | 26-00819 SLUDGE PUMP REPAIR-FLYGT Z3-TP | 8,284.70 |
| 07-429-3700 | CHESTER CREEK CAPITAL | 04/14/26 | Pay Check: 3591 | 26-00866 SERV THRU 032226 WATERVIEW PIP | 7,608.50 |
| Total Expense | 109,247.11 | ||||
| Net Operating | 16,561.36 | ||||
Page 2 of 2
Lynn Werkheiser
| From: | Michael Ellis <MEllis@Pennoni.com> |
|---|---|
| Sent: | Wednesday, May 6, 2026 11:30 PM |
| To: | Mark Miller; Lynn Werkheiser |
| Cc: | Derek Davis; Erika Addison; Nathan M. Cline |
| Subject: | Morstein Rd Sewer Extension Progress Plans |
| Attachments: | DRAFT Cost Estimates 2025-05-09.pdf; Morstein Rd Sewer Extension Progress Plans 2026-04-22.pdf |
Hi Mark and Lynn,
Attached are progress plans for the subject project. These plans are estimated to be approx 75% complete, which is the level of completion for which the MA has initially authorized. We anticipate a few sewer runs can be slightly shallower, and we will be updating the plans accordingly to complete this initial design scope.
Also attached is our pre-design cost opinions from 2025. The current design is similar to that of Alternative 2 in the cost opinions except that sewer is now proposed along Waterford Rd also. Waterford was not considered in that cost opinion. Assuming around $1.9M (±$400K extra for Waterford beyond the original cost opinion) for 30 properties, this would cost roughly $65,000/property. We will update the cost opinions after the aforementioned plan updates are complete.
I suggest these plans and cost opinions be provided to the MA for a progress update discussion at Monday's meeting.
Mike
Michael Ellis, PE
Municipal Division Manager
Pennoni
Christiana Executive Campus, 121 Continental Drive, Suite 207 | Newark, DE 19713
Direct: +1 302-351-5236 | Mobile: +1 302-561-4235
www.pennoni.com | MEllis@Pennoni.com
Celebrating 60 Years!
1
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 1
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
5/9/2025
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $60,500.00 | $60,500 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $10,000.00 | $10,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $83,000 | |||
| SANITARY SEWER | ||||
| Low Pressure Sewer | 2,850 | LF | $150.00 | $427,500 |
| 8" Gravity Sewer | 200 | LF | $225.00 | $45,000 |
| Manhole | 2 | EA | $9,000.00 | $18,000 |
| Grinder Pump | 19 | EA | $15,000.00 | $285,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| SUBTOTAL | $784,500 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $5,000.00 | $5,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base & 2.5" Binder) | 311 | SY | $100.00 | $31,111 |
| 1.5" Mill & Wearing Course Overlay | 467 | SY | $25.00 | $11,667 |
| SUBTOTAL | $56,278 | |||
| CONSTRUCTION SUBTOTAL | $923,778 | |||
| 20% CONTINGENCY | $184,756 | |||
| 15% ENGINEERING & INSPECTIONS | $138,567 | |||
| TOTAL | $1,247,100 | |||
| TOTAL (rounded) | $1,248,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\EGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 3 of 5
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 2
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
5/9/2025
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $71,300.00 | $71,300 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $15,000.00 | $15,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $98,800 | |||
| EAST MORSTEIN LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 880 | LF | $150.00 | $132,000 |
| Grinder Pump | 6 | EA | $15,000.00 | $90,000 |
| SUBTOTAL | $222,000 | |||
| GREAT OAK CIRCLE LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 780 | LF | $150.00 | $117,000 |
| Grinder Pump | 5 | EA | $15,000.00 | $75,000 |
| SUBTOTAL | $192,000 | |||
| GRAVITY SANITARY SEWER | ||||
| 8" Gravity Sewer | 1,390 | LF | $225.00 | $312,750 |
| Sewer Lateral | 400 | LF | $150.00 | $60,000 |
| Manhole | 5 | EA | $9,000.00 | $45,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| SUBTOTAL | $426,750 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $5,000.00 | $5,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base and 2.5" Binder) | 872 | SY | $100.00 | $87,222 |
| 1.5" Mill & Wearing Course Overlay | 1,953 | SY | $25.00 | $48,833 |
| SUBTOTAL | $149,556 | |||
| CONSTRUCTION SUBTOTAL | $1,089,106 | |||
| 20% CONTINGENCY | $217,821 | |||
| 15% ENGINEERING & INSPECTIONS | $163,366 | |||
| TOTAL | $1,470,293 | |||
| TOTAL (rounded) | $1,471,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\EGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 4 of 5
EAST GOSHEN MUNICIPAL AUTHORITY
MORSTEIN ROAD SANITARY SEWER EXTENSION
ALTERNATIVE 3
BUDGETARY OPINION OF PROBABLE CONSTRUCTION COSTS
5/9/2025
| Description | Quantity | Units | Unit Price | Total |
|---|---|---|---|---|
| GENERAL | ||||
| Mobilization & Demobilization | 1 | LS | $69,800.00 | $69,800 |
| Survey & Layout | 1 | LS | $5,000.00 | $5,000 |
| Site Preparation and Erosion & Sediment Controls | 1 | LS | $5,000.00 | $5,000 |
| Traffic Control | 1 | LS | $15,000.00 | $15,000 |
| Miscellaneous Excavation & Backfill | 25 | CY | $100.00 | $2,500 |
| SUBTOTAL | $97,300 | |||
| EAST MORSTEIN LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 880 | LF | $150.00 | $132,000 |
| Grinder Pump | 6 | EA | $15,000.00 | $90,000 |
| SUBTOTAL | $222,000 | |||
| GREAT OAK CIRCLE LOW PRESSURE SEWER | ||||
| Low Pressure Sewer | 780 | LF | $150.00 | $117,000 |
| Grinder Pump | 5 | EA | $15,000.00 | $75,000 |
| SUBTOTAL | $192,000 | |||
| GRAVITY SANITARY SEWER | ||||
| 8" Gravity Sewer | 1,375 | LF | $225.00 | $309,375 |
| Sewer Lateral | 400 | LF | $150.00 | $60,000 |
| Manhole | 7 | EA | $9,000.00 | $63,000 |
| Doghouse Manhole | 1 | EA | $9,000.00 | $9,000 |
| Connection to Existing Manhole | 2 | EA | $3,500.00 | $7,000 |
| Easements | TBD | TBD | ||
| SUBTOTAL | $448,375 | |||
| RESTORATION | ||||
| Grading/Lawn/Site Restoration | 1 | LS | $10,000.00 | $10,000 |
| Driveway Restoration | 100 | SY | $85.00 | $8,500 |
| Roadway Restoration (5" Base and 2.5" Binder) | 572 | SY | $100.00 | $57,222 |
| 1.5" Mill & Wearing Course Overlay | 1,233 | SY | $25.00 | $30,833 |
| SUBTOTAL | $106,556 | |||
| CONSTRUCTION SUBTOTAL | $1,066,231 | |||
| 20% CONTINGENCY | $213,246 | |||
| 15% ENGINEERING & INSPECTIONS | $159,935 | |||
| TOTAL | $1,439,411 | |||
| TOTAL (rounded) | $1,440,000 | |||
NOTE: An engineering opinion of probable construction cost is made by an engineer, and not by a professional construction cost estimator or construction contractor. The accuracy of the engineering opinion cannot be guaranteed.
U:\Accounts\EGMA\EGMAU25001 - 2025 General Services\DOCUMENTS\Morstein Rd-Charter Chase Subdivision\DRAFT Cost Estimates 2025-05-02
Page 5 of 5
Engineering cover sheet plan drawing and maps (Sheet G0001, Sheet 1 of 12) for the Morstein Road Sanitary Sewer Extension Design Plans in East Goshen Township, Chester County, Pennsylvania, including a symbol legend, location map, USGS map, general notes, and sheet index.
MORSTEIN ROAD SANITARY SEWER EXTENSION
DESIGN PLANS
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
APRIL 2026
PREPARED FOR: OWNER/DEVELOPER
EAST GOSHEN MUNICIPAL AUTHORITY
1580 PAOLI PIKE, WEST CHESTER, PA 19380, (610) 692-7171
LOCATION MAP
Scale: 1" = 1000' | SITE
USGS MAP
Scale: 1" = 1000' | Labels: 500, 550, AMSTEL WAY, TULIP DR, COLLEGEVIEW DR, ANTHONY, MORSTEIN RD, SITE, UPTON, WATERFORD RD, MARY JANE LN, PHIPPS RD, CHANDLER DR
PREPARED BY: PENNONI ASSOCIATES INC., Pennoni, Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
LEGEND (EXISTING / PROPOSED / DESCRIPTION)
- PROPERTY CORNERS
- CURB
- EDGE OF PAVEMENT
- PROPERTY LINE
- EDGE OF CONCRETE
- EDGE OF SIDEWALK
- METAL FENCE
- WOOD FENCE
- BUILDING
- CONCRETE
- ASPHALT
- GRAVEL/RIPRAP
- OVERHEAD ELECTRIC (OE)
- UNDERGROUND ELECTRIC (UE)
- ELECTRIC TRANSFORMER
- TELEPHONE PEDESTAL
- TELEPHONE JUNCTION BOX
- ELECTRIC JUNCTION BOX
- ELECTRIC POWER BOX
- UTILITY POLE
- GUY WIRE
- LIGHT POLE
- GUY POLE
- POST/BOLLARD
- SIGN
- MAILBOX
- MINOR CONTOUR (101)
- MAJOR CONTOUR (100)
- DECIDUOUS/CONIFEROUS TREE
- BUSH
- SANITARY SEWER MANHOLE (S)
- UNDERGROUND SANITARY SEWER (S)
- SANITARY SEWER FORCE MAIN (FM)
- SANITARY SEWER CLEAN-OUT
- TELEPHONE MANHOLE (T)
- UNDERGROUND COMMUNICATION (UC)
- STORM SEWER INLET/CATCH BASIN
- STORM SEWER MANHOLE (D)
- UNDERGROUND STORM SEWER (D)
- FIRE HYDRANT
- WATER METER
- UNDERGROUND WATER (W)
- WATER VALVE
- WATER METER (W)
- UNDERGROUND GAS (UG)
- GAS METER
- GAS VALVE
- GAS MARKER
- UNDERGROUND UNKNOWN (UNK)
- STREAM
- FLOODPLAIN
- LIMIT OF DISTURBANCE
- STORM SEWER INLET PROTECTION
PENNSYLVANIA ONE CALL SYSTEM INC. STOP - CALL BEFORE YOU DIG! 1-800-242-1776
CALL BEFORE YOU DIG: BEFORE YOU DIG ANYWHERE IN PENNSYLVANIA CALL 1-800-242-1776. PA. ACT 287 OF 1974 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST. PENNSYLVANIA ONE-CALL SYSTEM, INC. SERIAL NUMBER(S): 20252953226
GENERAL NOTES
- PARCEL BOUNDARIES AND BUILDING FOOTPRINTS ARE BASED UPON CHESCOVIEWS GIS DATA AVAILABLE FROM CHESTER COUNTY.
- TOPOGRAPHIC INFORMATION SHOWN ARE BASED UPON A FIELD SURVEY PERFORMED BY PENNONI ASSOCIATES INC. ON 12/8/2025-12/11/2025 REFERENCING THE FOLLOWING DATUMS: 2.1. HORIZONTAL: PENNSYLVANIA STATE PLANE COORDINATES, SOUTH ZONE; NAD 1983/2011. 2.2. VERTICAL: NORTH AMERICAN VERTICAL DATUM OF 1988; NAVD 88. 2.3. PROJECT BENCHMARK: PUMP HOUSE FF, ELEVATION 526.2 (USF).
- THIS PROJECT IS NOT LOCATED WITHIN A FLOOD HAZARD AREA, AS DETERMINED BY FEMA PANEL 42029C0155G, DATED SEPTEMBER 29, 2017.
- UNLESS SPECIFICALLY STATED OR SHOWN HEREON TO THE CONTRARY, THIS SURVEY IS MADE SUBJECT TO AND DOES NOT LOCATE OR DETERMINE: 4.1. RIGHTS OR INTERESTS OF THE UNITED STATES OF AMERICA OR COMMONWEALTH OF PENNSYLVANIA IN OR TO ANY LANDS FORMERLY FLOWED BY TIDEWATER BUT NO LONGER VISIBLE OR PHYSICALLY EVIDENT, OR LANDS CONTAINING ANY ANIMAL, MARINE, OR BOTANICAL SPECIES REGULATED BY OR UNDER THE JURISDICTION OF ANY FEDERAL, STATE, OR LOCAL AGENCY. 4.2. THE JURISDICTION OF ANY FEDERAL, STATE, OR LOCAL AGENCY, BUILDING SETBACK LINES, ZONING REGULATIONS OR LINES ESTABLISHED BY ANY FEDERAL, STATE OR LOCAL AGENCY WHICH MAY AFFECT THE BUILDING OR DEVELOPMENT POTENTIAL OF THE SUBJECT PROPERTIES. 4.3. ANY SUBSURFACE OR SUBTERRANEAN CONDITION, EASEMENTS OR RIGHTS INCLUDING BUT NOT LIMITED TO MINERAL OR MINING RIGHTS, OR THE LOCATION OF OR RIGHTS TO ANY SUBSURFACE STRUCTURES, CONTAINERS OR FACILITIES OR ANY OTHER NATURAL OR MAN-MADE SUBSURFACE CONDITION WHICH MAY OR MAY NOT AFFECT THE USE OR DEVELOPMENT POTENTIAL OF THE SUBJECT PROPERTIES.
- LOCATIONS OF UTILITIES AS SHOWN ARE APPROXIMATE AND MAY OR MAY NOT BE COMPLETE. THE NATURE AND EXACT LOCATION OF EXISTING UTILITIES MUST BE VERIFIED PRIOR TO INITIATING ANY ACTIVITY THAT MAY AFFECT THEIR USE OR LOCATION. 5.1. THE LOCATION OF THE EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN HAVE BEEN TAKEN FROM SURFACE OBSERVATION OF THE SITE, PLANS OF APPROXIMATE UTILITY LOCATIONS PROVIDED BY UTILITY OWNERS, LEVEL A UTILITY DESIGNATION BY EAST GOSHEN MUNICIPAL AUTHORITY ON 11/20/2025. 5.2. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED. 5.3. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES WITHIN THE WORK AREA VIA THE PENNSYLVANIA ONE CALL SYSTEM, INC. (800-242-1776) A MINIMUM OF 3 WORKING DAYS BEFORE THE START OF EXCAVATION. 5.4. THE CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK.
- THE WORD "CERTIFY" AS USED IN ITS VARIOUS FORMS HEREON, IS UNDERSTOOD TO BE AN EXPRESSION OF PROFESSIONAL OPINION BY THE SURVEYOR, WHICH IS BASED ON HIS BEST KNOWLEDGE, INFORMATION AND BELIEF. AS SUCH, IT CONSTITUTES NEITHER A GUARANTEE OR WARRANTY, EITHER EXPRESSED OR IMPLIED.
- THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING THE BYPASS PUMP AND ASSOCIATED PIPING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF WASTEWATER FLOW AT ALL TIMES IN THE SEWER SYSTEM. THE CONTRACTOR SHALL PROVIDE BYPASS PUMPING OR FLUMING TO MAINTAIN FLOW AND SHALL PROVIDE A FLOW MAINTENANCE PLAN TO THE OWNER FOR APPROVAL AT LEAST 7 DAYS PRIOR TO THE START OF CONSTRUCTION. BYPASS PUMPING DURING NON-WORK HOURS SHALL BE AVOIDED TO THE MAXIMUM EXTENT PRACTICAL, SUCH AS BY RE-CONNECTING EXISTING PIPE TO NEW PIPE.
- ANY EXCAVATION MUST BE BACKFILLED TO GRADE AT THE END OF EACH DAY.
- ALL EXCAVATION SHALL BE CONSIDERED UNCLASSIFIED.
SHEET INDEX
| SHT. | DWG. | TITLE |
|---|---|---|
| 1 | G0001 | COVER SHEET |
| 2 | C0001 | SITE REFERENCE PLAN |
| 3 | C0201 | EXISTING CONDITIONS PLAN |
| 4 | C1701 | PLAN AND PROFILE |
| 5 | C1702 | PLAN AND PROFILE |
| 6 | C1703 | PLAN AND PROFILE |
| 7 | C1704 | PLAN AND PROFILE |
| 8 | C1705 | PLAN AND PROFILE |
| 9 | C6051 | CONSTRUCTION DETAILS |
| 10 | C6052 | CONSTRUCTION DETAILS |
| 11 | C8001 | EROSION & SEDIMENT CONTROL PLAN |
| 12 | C8501 | EROSION & SEDIMENT CONTROL NOTES |
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: 1"=50' | DRAWN BY: ELA | APPROVED BY: MJE | G0001 | SHEET 1 OF 12
Aerial photograph and engineering site reference plan map (Sheet C0001, Sheet 2 of 12) for the Morstein Road Sanitary Sewer Extension showing sheet boundaries, streets, and proposed sanitary sewer manholes and force mains.
MORSTEIN ROAD SANITARY SEWER EXTENSION
SITE REFERENCE PLAN
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
Plan Callouts and Labels
- Roads: 202, Amstel Way, Morstein Rd, Eastwick Circle, Great Oak Circle, Barkway Dr, Waterford Rd, Highgate Rd, Allan Ln, NORTH
- Sheet References: SEE SHEET C1701, SEE SHEET C1702, SEE SHEET C1703, SEE SHEET C1704, SEE SHEET C1705
- Manholes and Facilities: NEW SSMH 6, NEW SSMH 5, NEW SSMH 4, NEW SSMH 3, NEW SSMH 2, NEW SSMH 1, SSMH #102, SSMH #101, NEW SSMH 101A, MUFFIN MONSTER SSMH, BARKWAY PUMP STATION, NEW SSMH 7, NEW SSMH 8, NEW SSMH 9
- Scale: 0, 100', 200'
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: 1"=100' | DRAWN BY: ELA | APPROVED BY: MJE | C0001 | SHEET 2 OF 12
Engineering existing conditions plan drawing (Sheet C0201, Sheet 3 of 12) for the Morstein Road Sanitary Sewer Extension showing property boundaries, parcel owner blocks, buildings, septic systems, cleanouts, and existing utilities along Morstein Road, Great Oak Circle, Waterford Road, Highgate Road, Allan Lane, Barkway Lane, and S. Tulip Drive.
MORSTEIN ROAD SANITARY SEWER EXTENSION
EXISTING CONDITIONS PLAN
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
Plan Labels
- Roads: AMSTEL WAY, MORSTEIN ROAD, GREAT OAK CIRCLE, WATERFORD ROAD, HIGHGATE ROAD, ALLAN LANE, BARKWAY LANE, S. TULIP DRIVE, NORTH
- Existing Features: BARKWAY PUMP STATION, MUFFIN MONSTER SSMH, SEPTIC SYSTEM, NOT PERMITTED ON PROPERTY, CANNOT OPEN, CO TOP, TANK TOP, FF, GAR, SHED, BLDG
- Scale: 0, 80', 160'
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: 1"=80' | DRAWN BY: ELA | APPROVED BY: MJE | C0201 | SHEET 3 OF 12
Engineering plan and profile drawing (Sheet C1701, Sheet 4 of 12) for the Morstein Road Sanitary Sewer Extension showing the SSMH 6 to SSMH 3 Plan View, SSMH 6 to SSMH 3 Profile View (STA. -0+25 to 8+00), and Location Map.
MORSTEIN ROAD SANITARY SEWER EXTENSION
PLAN AND PROFILE (C1701)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
SSMH 6 TO SSMH 3 PLAN VIEW (SCALE: 1" = 40')
- Roads and Match Lines: MORSTEIN ROAD, GREAT OAK CIRCLE, WATERFORD ROAD, MATCH LINE TO SHEET C1704, MATCH LINE TO SHEET C1702, MATCH LINE TO SHEET C1703, NORTH, LOCATION MAP (SCALE: 1" = 500')
- NEW SSMH 6: RIM=578.24, INV IN A=571.30, INV IN B=571.80, INV OUT C=571.10
- 237 LF 8" SDR-26 @ 1.87% SLOPE
- NEW SSMH 5: RIM=576.28, INV IN A=567.15, INV OUT B=566.86
- 250 LF 8" SDR-26 @ 1.68% SLOPE
- NEW SSMH 4: RIM=572.75, INV IN A=562.80, INV OUT B=562.66
- 278 LF 8" SDR-26 @ 3.60% SLOPE
- NEW SSMH 3: RIM=563.00, INV IN A=552.60, INV IN B=554.89, INV IN B (DROP)=552.60, INV OUT C=552.40
- 315 LF 8" SDR-26 @ 0.41% SLOPE, CLEANOUT, COULD NOT FIND SEPTIC SYSTEM
SSMH 6 TO SSMH 3 PROFILE VIEW: STA. -0+25 - 8+00 (HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 10')
- Elevations: 540, 550, 560, 570, 580
- Stations: -0+25, 0+00, 1+00, 2+00, 3+00, 4+00, 5+00, 6+00, 7+00, 8+00
- Profile Labels: NEW SSMH 6, NEW SSMH 5, NEW SSMH 4, NEW SSMH 3, EXISTING GRADE, 1305 MORSTEIN RD LATERAL (6" PVC SDR-26), 1306 MORSTEIN RD LATERAL, 1308 MORSTEIN RD LATERAL, 237 LF 8" SDR-26 @ 1.87% SLOPE, 250 LF 8" SDR-26 @ 1.68% SLOPE, 278 LF 8" SDR-26 @ 3.60% SLOPE, 344 LF 8" SDR-26 @ 7.56% SLOPE, 2" GAS LINE, 1" GAS LINE, 3" ELECTRIC LINE
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C1701 | SHEET 4 OF 12
Engineering plan and profile drawing (Sheet C1702, Sheet 5 of 12) for the Morstein Road Sanitary Sewer Extension showing the SSMH 3 to SSMH 101A Plan View, SSMH 3 to SSMH 101A Profile View (STA. 7+50 to 13+00), and Location Map.
MORSTEIN ROAD SANITARY SEWER EXTENSION
PLAN AND PROFILE (C1702)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
SSMH 3 TO SSMH 101A PLAN VIEW (SCALE: 1" = 40')
- Roads and Match Lines: MORSTEIN ROAD, WATERFORD ROAD, BARKWAY LANE, MATCH LINE TO SHEET C1703, MATCH LINE TO SHEET C1701, MATCH LINE TO SHEET C1705, NORTH, LOCATION MAP (SCALE: 1" = 500')
- NEW SSMH 3: RIM=563.00, INV IN A=552.60, INV IN B=554.89, INV IN B (DROP)=552.60, INV OUT C=552.40
- 344 LF 8" SDR-26 @ 7.56% SLOPE
- NEW SSMH 2: RIM=533.28, INV IN A=526.40, INV IN B=526.40, INV OUT C=526.20
- 155 LF 8" SDR-26 @ 3.56% SLOPE
- NEW SSMH 1: RIM=528.13, INV IN A=520.70, INV OUT B=520.50
- 13 LF 8" SDR-26 @ 3.60% SLOPE
- NEW SSMH 101A: RIM=527.77, INV IN A=514.96, INV IN B=520.00, INV IN B (DROP)=514.96, INV OUT B=514.96
- Facilities: SSMH #101, SSMH #102, MUFFIN MONSTER SSMH, BARKWAY PUMP STATION, 812 LF 4" PVC SDR-26 FORCE MAIN, GRINDER PUMP, CLEANOUT
SSMH 3 TO SSMH 101A PROFILE VIEW: STA. 7+50 - 13+00 (HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 10')
- Elevations: 510, 520, 530, 540, 550, 560, 570
- Stations: 7+50, 8+00, 9+00, 10+00, 11+00, 12+00, 13+00
- Profile Labels: NEW SSMH 3, NEW SSMH 2, NEW SSMH 1, NEW SSMH 101A, EXISTING GRADE, 278 LF 8" SDR-26 @ 3.60% SLOPE, 344 LF 8" SDR-26 @ 7.56% SLOPE, 155 LF 8" SDR-26 @ 3.56% SLOPE, 13 LF 8" SDR-26 @ 3.60% SLOPE, 1310 MORSTEIN RD LATERAL, 1402 MORSTEIN RD LATERAL, 4" FORCE MAIN
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C1702 | SHEET 5 OF 12
Engineering plan and profile drawing (Sheet C1703, Sheet 6 of 12) for the Morstein Road Sanitary Sewer Extension showing the SSMH 9 to SSMH 3 Plan View, SSMH 9 to SSMH 3 Profile View (STA. -0+25 to 9+50), and Location Map.
MORSTEIN ROAD SANITARY SEWER EXTENSION
PLAN AND PROFILE (C1703)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
SSMH 9 TO SSMH 3 PLAN VIEW (SCALE: 1" = 40')
- Roads and Match Lines: WATERFORD ROAD, MORSTEIN ROAD, HIGHGATE ROAD, MATCH LINE TO SHEET C1701 & C1702, NORTH, LOCATION MAP (SCALE: 1" = 500')
- NEW SSMH 9: RIM=566.12, INV IN A=558.28, INV IN B=558.08, INV OUT C=558.08
- 315 LF 8" SDR-26 @ 0.41% SLOPE
- NEW SSMH 8: RIM=567.45, INV IN A=556.83, INV OUT B=556.63
- 309 LF 8" SDR-26 @ 0.41% SLOPE
- NEW SSMH 7: RIM=571.00, INV IN A=555.39, INV OUT B=555.19
- 315 LF 8" SDR-26 @ 0.41% SLOPE
- NEW SSMH 3: RIM=563.00, INV IN A=552.60, INV IN B=554.89, INV IN B (DROP)=552.60, INV OUT C=552.40
- Laterals and Notes: CLEANOUT, COULD NOT FIND SEPTIC SYSTEM, CANNOT OPEN
SSMH 9 TO SSMH 3 PROFILE VIEW: STA. -0+25 - 9+50 (HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 10')
- Elevations: 540, 550, 560, 570, 580
- Stations: -0+25, 0+00, 1+00, 2+00, 3+00, 4+00, 5+00, 6+00, 7+00, 8+00, 9+00, 9+50
- Profile Labels: NEW SSMH 9, NEW SSMH 8, NEW SSMH 7, NEW SSMH 3, EXISTING GRADE, 315 LF 8" SDR-26 @ 0.41% SLOPE, 309 LF 8" SDR-26 @ 0.41% SLOPE, 315 LF 8" SDR-26 @ 0.41% SLOPE, 1222 WATERFORD RD LATERAL, 1223 WATERFORD RD LATERAL, 1224 WATERFORD RD LATERAL, 1225 WATERFORD RD LATERAL, 1226 WATERFORD RD LATERAL, 1227 WATERFORD RD LATERAL, 1228 WATERFORD RD LATERAL, 1229 WATERFORD RD LATERAL, 1230 WATERFORD RD LATERAL, 1231 WATERFORD RD LATERAL
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C1703 | SHEET 6 OF 12
Engineering plan and profile drawing (Sheet C1704, Sheet 7 of 12) for the Morstein Road Sanitary Sewer Extension showing the Great Oak Circle Low Pressure Force Main Plan View, Profile View (STA. -0+25 to 8+00), and Location Map.
MORSTEIN ROAD SANITARY SEWER EXTENSION
PLAN AND PROFILE (C1704)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
GREAT OAK CIRCLE LOW PRESSURE FORCE MAIN PLAN VIEW (SCALE: 1" = 40')
- Roads and Match Lines: GREAT OAK CIRCLE, MORSTEIN ROAD, MATCH LINE TO SHEET C1701, NORTH, LOCATION MAP (SCALE: 1" = 500')
- NEW SSMH 6: RIM=578.24, INV IN A=571.30, INV IN B=571.80, INV OUT C=571.10
- NEW SSMH 5: RIM=576.28, INV IN A=567.15, INV OUT B=566.86
- 755 LF 2" PVC SDR-26 FORCE MAIN, GRINDER PUMP, CLEANOUT, NOT PERMITTED ON PROPERTY, COULD NOT FIND SEPTIC SYSTEM
GREAT OAK CIRCLE LOW PRESSURE FORCE MAIN: STA. -0+25 TO 8+00 (HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 10')
- Elevations: 550, 560, 570, 580
- Stations: -0+25, 0+00, 1+00, 2+00, 3+00, 4+00, 5+00, 6+00, 7+00, 8+00
- Profile Labels: NEW SSMH 6, EXISTING GRADE, 755 LF 2" PVC SDR-26 FORCE MAIN, 3' COVER MIN., 1304 A MORSTEIN RD LATERAL, 1241 GREAT OAK CIR LATERAL, 1239 GREAT OAK CIR LATERAL, 1237 GREAT OAK CIR LATERAL, 1238 GREAT OAK CIR LATERAL, 45° BEND (TYP), 22.5° BEND (TYP), 11.25° BEND (TYP)
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C1704 | SHEET 7 OF 12
Engineering plan and profile drawing (Sheet C1705, Sheet 8 of 12) for the Morstein Road Sanitary Sewer Extension showing the Morstein Road Low Pressure Force Main Plan View, Profile View (STA. -0+25 to 9+00), and Location Map.
MORSTEIN ROAD SANITARY SEWER EXTENSION
PLAN AND PROFILE (C1705)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
MORSTEIN ROAD LOW PRESSURE FORCE MAIN PLAN VIEW (SCALE: 1" = 40')
- Roads and Match Lines: MORSTEIN ROAD, BARKWAY LANE, MATCH LINE TO SHEET C1702, NORTH, LOCATION MAP (SCALE: 1" = 500')
- NEW SSMH 2: RIM=533.28, INV IN A=526.40, INV IN B=526.40, INV OUT C=526.20
- NEW SSMH 1: RIM=528.13, INV IN A=520.70, INV OUT B=520.50
- NEW SSMH 101A: RIM=527.77, INV IN A=514.96, INV IN B=520.00, INV IN B (DROP)=514.96, INV OUT B=514.96
- MUFFIN MONSTER SSMH, BARKWAY PUMP STATION, 812 LF 4" PVC SDR-26 FORCE MAIN, GRINDER PUMP, CLEANOUT
MORSTEIN ROAD LOW PRESSURE FORCE MAIN: STA. -0+25 TO 9+00 (HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 10')
- Elevations: 490, 500, 510, 520, 530, 540
- Stations: -0+25, 0+00, 1+00, 2+00, 3+00, 4+00, 5+00, 6+00, 7+00, 8+00, 9+00
- Profile Labels: NEW SSMH 2, EXISTING GRADE, 812 LF 4" PVC SDR-26 FORCE MAIN, 3' COVER MIN., 1406 MORSTEIN RD LATERAL, 1408 MORSTEIN RD LATERAL, 1410 MORSTEIN RD LATERAL, 1412 MORSTEIN RD LATERAL, 1414 MORSTEIN RD LATERAL, 1416 MORSTEIN RD LATERAL, 45° BEND (TYP)
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C1705 | SHEET 8 OF 12
Engineering construction details drawing (Sheet C6051, Sheet 9 of 12) for the Morstein Road Sanitary Sewer Extension showing sanitary sewer laterals, manholes, trench plugs, force main discharge, and low pressure lateral and clean-out connections.
MORSTEIN ROAD SANITARY SEWER EXTENSION
CONSTRUCTION DETAILS (C6051)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
Detail Diagrams and Labels
- SEWER LATERAL/BUILDING SEWER DETAIL (NOT TO SCALE): RIGHT-OF-WAY / EASEMENT, PVC SCREW TYPE CAP, CAST IRON FRAME & COVER, MORTAR TYPE-M, CONCRETE COLLAR, 6" PVC SDR 26 CLEANOUT, 6" PVC SDR 26 SWEEP TEE, AASHTO #57 STONE BACKFILL (6" MIN.), WYE FITTING (SEE DETAIL), SANITARY SEWER MAIN, 6" PVC SDR 26, 6" AASHTO #57 STONE, SEWER LATERAL, NEW BUILDING SEWER, MUSHROOM VENT CAP, PVC SDR 26 VENT STACK, 45° BEND, 90° ELBOW, GASKETED SOLID WALL TRANSITION COUPLING FROM PVC SDR 26 TO SCH 40 (DRESSER, ROMAC, OR APPROVED EQUAL), EXISTING BUILDING SEWER
- SANITARY SERVICE LATERAL (NOT TO SCALE): SHALLOW (LESS THAN 6'), DEEP (GREATER THAN 6' IN DEPTH), GRADE, SANITARY SEWER MAIN, WYE FITTING (6" WIDE), LATERAL SLOPE MIN. 2%, 6" DIA. PVC SDR 26, CONCRETE CRADLE, 45° BEND, VARIES 45° PREFERRED
- SEWER MAIN CONNECTION DETAIL (NOT TO SCALE): SEWER LATERAL, WYE SET IN DIRECTION OF FLOW, CONCRETE CRADLE
- FORCE MAIN DISCHARGE AT MANHOLE (NOT TO SCALE): 4" FORCE MAIN, MINIMUM RATIO S.S. MANHOLE CONNECTION PIPE SIZE WILL BE 2.0 X FORCE MAIN PIPE AREA, 4"x2" REDUCER, 12"-0", CORE DRILL OPENING IN EXISTING MANHOLE AND SEAL WITH LINK-SEAL OR APPROVED EQUAL (SEE CONCRETE WALL PENETRATION DETAIL, THIS SHEET), MANHOLE WALL
- TRENCH PLUG (NOT TO SCALE): SECTION VIEW, PROFILE VIEW, STANDARD COMPACTED BACKFILL, STACKED CLAY, BENTONITE OR CONCRETE-FILLED SACKS, TRENCH PLUG SPACING (L), TRENCH PLUG, SLOPE, PIPELINE, PIPE BEDDING, PIPE INVERT, TRENCH BOTTOM
- SANITARY SEWER MANHOLE (NOT TO SCALE): HALF PLANE OF TOP, PARTIAL SECTION A-A, CONE TOP, SLAB TOP (FOR MANHOLES 6' DEEP OR LESS), WATERTIGHT BOLT DOWN MANHOLE FRAME AND COVER, FINISH GRADE TOPSOIL SEEDED AND MULCHED, PRECAST CONCRETE GRADE RINGS FOR LEVEL ADJUSTMENT (6" MAX.), REDUCING SECTION FOR MANHOLES WITH DEPTHS GREATER THAN 6', OFFSET JOINT TO BE SEALED WITH RUBBER GASKET PER ASTM C443 OR WITH CONTINUOUS BUTYL SEALANT PER ASTM C990 (TYP. FOR ALL) AS SPECIFIED BY MANUFACTURER, EXTERIOR MANHOLE WATERPROOF COATING, CAST-IN-PLACE REINFORCED POLYPROPYLENE STEPS, CAST-IN-PLACE FLEXIBLE SEAL PER ASTM C923 APPROPRIATE TO SPECIFIED PIPE MATERIAL, PRECAST CONCRETE MANHOLE BASE (4000 PSI MINIMUM), FORMED CONCRETE CHANNEL, 2" OF AASHTO #57 STONE OVER 6" OF AASHTO #1 STONE PLACED ON UNDISTURBED SUBGRADE
- SANITARY SEWER DOGHOUSE MANHOLE (NOT TO SCALE): SIDE SECTION, ECCENTRIC CONE TOP, CAST-IN-PLACE REINFORCED POLYPROPYLENE STEPS, RISER OF STD. CONC. IN MULTIPLES OF 1, 2, 3 & 4 FOOT OR MOLD HEIGHT TO SUIT ANY DEPTH TO WITHIN 1 FOOT, PROVIDE TRANSITION SECTIONS ON 5' & 6' DIAMETER MANHOLES, JOINTS TO BE MANUFACTURER'S STD. "TYLOX" JOINT WITH APPROVED JOINT MATERIAL, POURED IN PLACE CONCRETE BASE, SET PRECAST MANHOLE SECTION INTO WET CONCRETE, NON-SHRINK NON-METALLIC GROUT, PIPE GASKET, #5 BARS @ 12" O.C. IN EACH DIRECTION
- SANITARY SEWER MANHOLE COVER (NOT TO SCALE): BOTTOM VIEW, SECTION VIEW, LOCK LUG ASSEMBLY, PICKBAR & LONG LUG HOLE DETAIL, SANITARY SEWER EAST GOSHEN TOWNSHIP, COVER PER ASTM A48, SS CAM BOLT (TYP.), SS PICKBAR (TYP.), 1/4" DIA. NEOPRENE GASKET
- SANITARY SEWER MANHOLE FRAME (NOT TO SCALE): HEAVY DUTY CAST IRON FRAME PER ASTM A48, BOLT TAB (TYP. FOR WATERTIGHT FRAMES ONLY), BOLT HOLE (TYP.), SUPPORT BRACE (TYP.), GASKET CHANNEL, MATCH DIMENSION WITH COVER, 24" MIN. OPENING
- LOW PRESSURE LATERAL CONNECTION (NOT TO SCALE): SECTION A-A, PLAN, PROFILE, THREADED END CAP, "SONO-LOC" FLUSHING MANHOLE (24"D x 30" DEEP) WITH HEAVY DUTY, TRAFFIC RATED, CAST IRON COVER, OR APPROVED EQUAL, FOAM INSULATION, FULL-PORT BALL VALVE, 45° BEND FITTING, CONCRETE SUPPORT PAD, AASHTO #57 STONE BACKFILL, CONCRETE THRUST BLOCK, 2" HDPE PIPE AND FITTINGS (TYP), BALL CHECK VALVE OVER AASHTO #57, CURB STOP AND VALVE BOX, H-20 RATED ADJUSTABLE VALVE BOX WITH CAST IRON LID ("SEWER"), LOW PRESSURE SEWER, TEE FITTING, FULL-PORT CURB STOP, CONCRETE OR CMU BLOCK
- LOW PRESSURE TERMINAL CLEAN-OUT (NOT TO SCALE): PLAN, PROFILE, 2" HDPE PIPE AND FITTINGS (TYP), CURB STOP AND VALVE BOX, FLOW, H-20 RATED ADJUSTABLE VALVE BOX WITH CAST IRON LID ("SEWER"), THREADED END CAP, "SONO-LOC" FLUSHING MANHOLE (24"D x 30" DEEP) WITH HEAVY DUTY, TRAFFIC RATED, CAST IRON COVER, OR APPROVED EQUAL, FOAM INSULATION, FULL-PORT BALL VALVE, FULL-PORT CURB STOP, 45° BEND FITTING, CONCRETE SUPPORT PAD, AASHTO #57 STONE BACKFILL, CONCRETE THRUST BLOCK, CHECK VALVE
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: NOT TO SCALE | DRAWN BY: ELA | APPROVED BY: MJE | C6051 | SHEET 9 OF 12
Engineering construction details drawing (Sheet C6052, Sheet 10 of 12) for the Morstein Road Sanitary Sewer Extension showing concrete thrust blocks, temporary and flexible pavement restoration details, trench restoration detail, and drop connections at SSMH 101A and SSMH 3.
MORSTEIN ROAD SANITARY SEWER EXTENSION
CONSTRUCTION DETAILS (C6052)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
CONCRETE THRUST BLOCKS FOR HORIZONTAL AND VERTICAL DOWNWARD THRUST (NOT TO SCALE)
Diagrams: ELEVATION (VERTICAL THRUST DOWNWARD), PLAN (HORIZONTAL THRUST), SECTION A'-A', SECTION A-A
Table: BEARING SURFACE REQUIRED - SQ. FT. THRUST BLOCKING FOR HORIZONTAL AND VERTICAL DOWNWARD THRUSTS - 200 PSI WORKING PRESSURE (Pipe Sizes: 6" AND 8", 10" AND 12", 14", 16" AND 20", 24"; Types of Bearing Material: SAND, SOFT CLAY, SAND & GRAVEL, CLAY, SOFT ROCK, ROCK; Degrees of Bend or Deflection: 22.5, 45, 90, D.E.)
- CONCRETE SHALL HAVE 3,000 P.S.I. MINIMUM 28-DAY COMPRESSIVE STRENGTH.
- REINFORCING STEEL SHALL BE ASTM A-615, GRADE 60.
- COVER ALL FITTINGS AND JOINTS WITH POLYETHYLENE FILM BEFORE PLACING CONCRETE.
- COAT ALL EXPOSED FERROUS SURFACES WITH TWO COATS EPOXY APPLIED PER MFG'S RECOMMENDATIONS.
- BEND REINFORCING BARS TO SHAPE SHOWN.
- KEEP CONCRETE CLEAR OF JOINTS AND LUGS.
- FORM UNSUPPORTED AREAS OF CONCRETE.
CONCRETE THRUST BLOCKS FOR VERTICAL UPWARD THRUST (NOT TO SCALE)
Diagrams: ELEVATION, SECTION (STD. A.C.I. 90 DEG. HOOK TYP.)
Table: MINIMUM THRUST BLOCKING DIMENSIONS FOR VERTICAL UPWARD THRUST - 200 P.S.I. TEST PRESSURE (Pipe Sizes: 6-8, 10-12, 14-16, 18-20, 24; Length (FT), Width (FT), Depth (FT) for 11.25, 22.5, 45 Degrees of Bend or Deflection)
- FOR 4" AND 6" PIPE, USE THREE #4 BARS OVER FITTING ONLY.
- FOR 8" THROUGH 20" PIPE, USE SIX #4 BARS WITH TWO OVER FITTINGS AND FOUR OVER PIPES.
- FOR 24" PIPE, USE SEVEN #7 BARS AS SHOWN.
- CONCRETE TO HAVE 3,000 P.S.I. MINIMUM 28-DAY COMPRESSIVE STRENGTH.
- REINFORCING STEEL TO BE ASTM A-615, GRADE 60.
- COVER ALL FITTINGS AND JOINTS WITH POLYETHYLENE FILM BEFORE PLACING CONCRETE.
- COAT ALL EXPOSED FERROUS SURFACES WITH TWO COATS BITUMASTIC APPLIED PER MFG'S RECOMMENDATIONS.
- BEND REINFORCING BARS TO U-SHAPE CONFORMING TO OUTSIDE PIPE DIAMETER.
- KEEP CONCRETE CLEAR OF JOINTS AND LUGS.
- FORM UNSUPPORTED AREAS OF CONCRETE.
TEMPORARY PAVEMENT RESTORATION - FIGURE 7-6 (NOT TO SCALE)
- DURING CONSTRUCTION, BACKFILL WITH COMPACTED 2A MODIFIED STONE TO THE ROAD SURFACE AND USE 2" HOT MIX FOR THE INITIAL TRENCH RESTORATION.
- AFTER CONSTRUCTION, MILL/EXCAVATE TO 4" DEPTH AND REPLACE WITH 2.5" OF 25.0 MM ASPHALT MIX FOR THE BINDER COURSE AND 1.5" OF 9.5 MM ASPHALT MIX FOR THE WEARING COURSE FOR THE FULL WIDTH OF THE ROAD.
Labels: 2" HOT MIX BITUMINOUS MATERIAL, EXISTING WEARING COURSE, EXISTING BASE COURSE, SUB-BASE (IF EXISTING), EXISTING SUB-GRADE, 6" MINIMUM SUB-BASE MATERIAL OR MATCH EXISTING WHICHEVER IS GREATER
FLEXIBLE PAVEMENT RESTORATION - FIGURE C8-1 (NOT TO SCALE)
Labels: HOT SEAL ALL EDGES W/ 12" WIDE PG 64S-22, SUPERPAVE ASPHALT MIXTURE DESIGN WEARING COURSE PG 64S-22 0.3 TO < 30 MILLION ESALS 9.5 MM MIX 1.5" DEPTH MATCH EXISTING SRL OR GREATER, SUPERPAVE ASPHALT MIXTURE DESIGN BINDER COURSE PG 64S-22 0.3 TO < 30 MILLION ESALS 19.0 MM MIX 2.5" DEPTH, SUPERPAVE ASPHALT MIXTURE DESIGN BASE COURSE PG 64S-22 0.3 TO < 30 MILLION ESALS 25.0 MM MIX 5" DEPTH, 1' SAW CUT TYP., 2A OR 3AC AS SPECIFIED IN PERMIT, NOTE: MATCH EXISTING DEPTHS IF GREATER.
TRENCH RESTORATION DETAIL (NOT TO SCALE)
Labels: NON-PAVED AREAS, PAVED AREAS, SOD OR SEED TO MATCH EXISTING CONDITIONS, SAW CUT EDGE AND SEAL (TYPICAL BOTH SIDES), 6" MIN. TOPSOIL SEED & MULCH, ACCEPTABLE NATIVE BACKFILL COMPACTED IN 8" LAYERS, SURFACE COURSE (SEE NOTE 2), BINDER COURSE (SEE NOTE 2), BASE COURSE (SEE NOTE 2), 2A COMPACTED STONE, AASHTO #57 STONE BEDDING AND BACKFILL, 48" + O.D. MAXIMUM ALLOWABLE TRENCH WIDTH
DROP CONNECTION AT SSMH 101A & DROP CONNECTION AT SSMH 3 (NOT TO SCALE)
Labels: CAST-IN-PLACE FLEXIBLE SEAL, 8" AASHTO #57 STONE, 45° WYE, INV IN = 520.00 (SSMH 101A), INV IN = 514.96 (SSMH 101A), INV IN = 554.89 (SSMH 3), INV IN = 552.60 (SSMH 3), 1/8" BEND, 6" MIN CONCRETE TO UNDISTURBED EARTH, 1/4" BEND, POURED IN PLACE CONCRETE BASE, 6" CRUSHED STONE UNDER CONCRETE
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: NOT TO SCALE | DRAWN BY: ELA | APPROVED BY: MJE | C6052 | SHEET 10 OF 12
Engineering erosion and sediment control plan drawing (Sheet C8001, Sheet 11 of 12) for the Morstein Road Sanitary Sewer Extension showing limits of disturbance, compost filter socks, inlet protection, and sanitary sewer alignment along Morstein Road, Great Oak Circle, Waterford Road, Highgate Road, Allan Lane, Barkway Lane, and S. Tulip Drive.
MORSTEIN ROAD SANITARY SEWER EXTENSION
EROSION & SEDIMENT CONTROL PLAN (C8001)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
Plan Labels
- Roads: AMSTEL WAY, MORSTEIN ROAD, GREAT OAK CIRCLE, WATERFORD ROAD, HIGHGATE ROAD, ALLAN LANE, BARKWAY LANE, S. TULIP DRIVE, NORTH
- Features: LIMIT OF DISTURBANCE, NEW SSMH 6, NEW SSMH 5, NEW SSMH 4, NEW SSMH 3, NEW SSMH 2, NEW SSMH 1, NEW SSMH 101A, NEW SSMH 7, NEW SSMH 8, NEW SSMH 9, MUFFIN MONSTER SSMH, BARKWAY PUMP STATION
- Scale: 0, 80', 160'
NOT FOR CONSTRUCTION | ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: 1"=80' | DRAWN BY: ELA | APPROVED BY: MJE | C8001 | SHEET 11 OF 12
Engineering erosion and sediment control notes and construction details drawing (Sheet C8501, Sheet 12 of 12) for the Morstein Road Sanitary Sewer Extension including Erosion and Sediment Control Notes, Sequence of Construction, Maintenance Notes, Pumped Water Filter Bag detail, Standard Construction Detail #4-1 Compost Filter Sock, and Standard Construction Detail #4-16 Filter Bag Inlet Protection - Type M Inlet.
MORSTEIN ROAD SANITARY SEWER EXTENSION
EROSION & SEDIMENT CONTROL NOTES (C8501)
MORSTEIN ROAD, WEST CHESTER, PA
EAST GOSHEN MUNICIPAL AUTHORITY, 1580 PAOLI PIKE, WEST CHESTER, PA 19380
PENNONI ASSOCIATES INC., Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713-4310, T 302.655.4451, F 302.654.2895
EROSION AND SEDIMENT CONTROL NOTES
- ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
- AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
- ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE TOWNSHIP PRIOR TO IMPLEMENTATION.
- AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
- CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
- EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
- IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE TOWNSHIP OR ENGINEER.
- ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
- ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
- THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
- UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
- A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
- SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
- ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
- AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
- ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
- ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
- FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR DECOMPOSABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
- FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
- FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
- SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
- ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
- IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
- PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
- E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE TOWNSHIP OR ENGINEER.
- UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE TOWNSHIP OR ENGINEER FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
- AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
- UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE TOWNSHIP OR ENGINEER TO SCHEDULE A FINAL INSPECTION.
- FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
- ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
- UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN UNTIL SUCH RESTORATION IS COMPLETE.
- CHANNELS HAVING RIPRAP, RENO MATTRESS, OR GABION LININGS MUST BE SUFFICIENTLY OVER-EXCAVATED SO THAT THE DESIGN DIMENSIONS WILL BE PROVIDED AFTER PLACEMENT OF THE PROTECTIVE LINING.
- EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER, WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
- FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS.
- ALL DISTURBED LAWN/GRASS AREA ARES TO BE RESTORED BY SEEDING IMMEDIATELY FOLLOWING COMPLETION OF DISTURBANCE. SEEDING SHALL BE ACCOMPLISHED THROUGH THE USE OF HYDRO-SEEDING TECHNIQUES OR CONVENTIONAL SEEDING AND MULCHING AT THE RATE OF 3.0 TONS/ACRE.
- POLLUTANTS SUCH AS FUELS, LUBRICANTS, BITUMENS, RAW SEWAGE AND OTHER HARMFUL MATERIALS SHALL NOT BE DISCHARGED ON THE LAND, BURIED, OR DRAIN INTO IMPOUNDMENTS, OR INTO NATURAL OR MANMADE CHANNELS LEADING THERETO.
- ALL APPLICABLE REGULATIONS OF FISH AND WILDLIFE AGENCIES AND STATUTES RELATING TO THE PREVENTION AND ABATEMENT OF POLLUTION SHALL BE COMPLIED WITHIN THE PERFORMANCE OF THE CONTRACT.
- PROVIDE FACILITIES FOR CLEANING TIRES. THE TIRES OF ALL VEHICLES SHALL BE CLEANED PRIOR TO LEAVING THE SITE AT THE DISCRETION OF THE INSPECTOR(S). THE CONTRACTOR SHALL CLEAN AND REMOVE ANY MUD OR SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC ROADS AND OUTSIDE THE LIMITS OF CONSTRUCTION.
- THE CONTRACTOR SHALL NOT STOCKPILE EQUIPMENT, TOPSOIL, MATERIALS, ETC. IN EXPOSED ROOT SYSTEM AREAS AND/OR TREE AREAS INDICATED FOR THE PRESERVATION OF EXISTING VEGETATION.
- IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THERE IS SUFFICIENT QUANTITIES OF SILT FENCE, FIBER LOGS, FILTER INLET PROTECTION, SILT SACKS, & PIPES.
- THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION CONTROL. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF CHAPTER 102, EROSION CONTROL OF THE ADMINISTRATIVE CODE TITLE 25 OF THE STATE OF PENNSYLVANIA.
- UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION CONTROLS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS AND DOCUMENTATION OF ALL EROSION AND SEDIMENTATION CONTROLS AFTER EACH STORM EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING, MUST BE PERFORMED IMMEDIATELY.
- ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL REMAIN EXPOSED FOR MORE THAN 14 DAYS MUST BE SEEDED AND MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE RECOMMENDED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1 YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEED MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED WITHIN 1 YEAR MUST BE SEEDED AND MULCHED WITH A PERMANENT SEED MIXTURE AND MULCH. AREA MULCHED DURING THE NON-GERMINATING PERIOD OF OCTOBER 15 THRU MARCH 15, MUST BE OVERSEEDED BY APRIL 15 AT FULL APPLICATION.
- THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE.
- ALL PUMPING OF SEDIMENT LADEN WATER OR POTENTIALLY SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG DISCHARGING OVER NON-DISTURBED AREAS. IF GROUNDWATER IS ENCOUNTERED DURING EXCAVATION, A PUMPED WATER FILTER BAG (SEE DETAIL) IS TO BE INSTALLED BEFORE EXCAVATION CAN PROCEED.
- UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
- AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED.
- BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE ENGINEER. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
SEQUENCE OF CONSTRUCTION
- CONDUCT A PRE-CONSTRUCTION MEETING WITH THE EAST GOSHEN MUNICIPAL AUTHORITY AND THE ENGINEER, AT LEAST 30 DAYS PRIOR TO COMMENCING CONSTRUCTION.
- NOTIFY THE EAST GOSHEN MUNICIPAL AUTHORITY AND THE ENGINEER AT LEAST TWO WEEKS PRIOR TO COMMENCING CONSTRUCTION.
- SITE LAYOUT SHALL BE CHECKED AGAINST THE PLAN. IDENTIFY PHYSICAL LAYOUT OF PROPERTY LINES, EASEMENT LINES, LIMIT OF DISTURBANCE, AND OTHER AREAS TO BE LEFT UNDISTURBED.
- CONTRACTOR SHALL SURVEY EXISTING ELEVATIONS OF EACH MANHOLE/VAULT AS PART OF THIS PROJECT AND REPORT THE RESULTS TO THE ENGINEER PRIOR TO ORDERING ANY NEW MANHOLES/VAULTS OR PROVIDING SHOP DRAWINGS.
- INSTALL EROSION AND SEDIMENT CONTROLS, INCLUDING INLET PROTECTION AND COMPOST FILTER SOCK, WHERE REQUIRED BY CONSTRUCTION AND AS INDICATED ON THE PLANS.
- INSTALL TRAFFIC CONTROLS, IF NEEDED.
- SET UP SANITARY SEWER BYPASS PUMPING EQUIPMENT.
- CONSTRUCT FORCE MAIN AND NEW GRAVITY SEWER. ONLY EXCAVATE AN EXTENT THAT CAN BE BACKFILLED THE SAME WORKDAY.
- CONNECT NEW FORCE MAIN AND GRAVITY SEWER TO EXISTING MANHOLE.
- TEST NEW FORCE MAIN AND GRAVITY SEWER/MANHOLES.
- CONSTRUCT BYPASS CONNECTION.
- REMOVE AND REPLACE FLOW METER AND ASSOCIATED ELECTRIC/CONTROLS.
- INSTALL NEW INFLUENT GRINDER AND ASSOCIATED ELECTRIC/CONTROLS.
- REMOVE AND REPLACE EXISTING PUMPS AND ASSOCIATED ELECTRIC/CONTROLS.
- REMOVE AND REPLACE EXISTING VALVE VAULT.
- CONSTRUCT ANY REMAINING ELECTRIC/CONTROLS/SCADA.
- TOPSOIL, SEED, AND REGRADE LAWN TO RESTORE TO PRE-EXISTING CONTOUR ELEVATIONS.
- RESTORE ANY OTHER SITE FEATURES THAT MAY HAVE BEEN DAMAGED DURING THIS WORK, INCLUDING CURBING AT THE ACCESS LOCATION.
- REMOVE TRAFFIC CONTROLS.
- REMOVE EROSION AND SEDIMENT CONTROLS.
MAINTENANCE NOTES
- THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL EROSION AND SEDIMENTATION BMPS SHALL BE DOCUMENTED ON A MONITORING LOG KEPT FOR THIS PURPOSE. THE COMPLIANCE ACTIONS AND THE DATE, TIME AND NAME WILL BE KEPT ON THE SITE AT ALL TIMES AND MADE AVAILABLE TO THE DISTRICT UPON REQUEST. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING, MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENTATION BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE NEEDED. WHERE BMPS ARE FOUND TO FAIL TO ALLEVIATE EROSION OR SEDIMENT POLLUTION THE INSPECTION REPORT LOG SHALL INCLUDE THE FOLLOWING INFORMATION: a. THE LOCATION AND SEVERITY OF THE BMP'S FAILURE AND ANY POLLUTION EVENTS. b. ALL STEPS TAKEN TO, REDUCE, ELIMINATE AND PREVENT THE RECURRENCE OF THE NON-COMPLIANCE. c. THE TIME FRAME TO CORRECT THE NON-COMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO COMPLIANCE.
- SEEDED AREAS THAT HAVE WASHED AWAY SHALL BE FILLED AND GRADED, AS NECESSARY, AND THEN RESEEDED. A STRAW COVER SHALL BE APPLIED TO RETAIN THE SEED ALONG WITH AN ANCHORING METHOD UNTIL IT HAS A CHANCE TO ROOT PROPERLY.
- SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL STOCKPILES.
Construction Details on Sheet
- PUMPED WATER FILTER BAG (NOT TO SCALE): DIRTBAG, TOP VIEW, SIDE VIEW, AGGREGATE OR STRAW UNDERLAYMENT, INSTALL COMPOST FILTER SOCK AS ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURE
- STANDARD CONSTRUCTION DETAIL #4-1: COMPOST FILTER SOCK (NOT TO SCALE): SECTION, PLAN VIEW, COMPOST FILTER SOCK, BLOWN/PLACED FILTER MEDIA, 2 IN. X 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER, DISTURBED AREA, UNDISTURBED AREA, EXISTING CONTOURS
- STANDARD CONSTRUCTION DETAIL #4-16: FILTER BAG INLET PROTECTION - TYPE M INLET (NOT TO SCALE): INSTALLATION DETAIL, ISOMETRIC VIEW, SECTION VIEW, PLAN VIEW, INLET GRATE, 1 IN. REBAR FOR BAG REMOVAL FROM INLET, EXPANSION RESTRAINT (1/4 IN. NYLON ROPE), 2 IN. X 2 IN. X 3/4 IN. RUBBER BLOCK, EARTHEN BERM TO BE STABILIZED WITH TEMPORARY OR PERMANENT VEGETATION
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR AND OWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | PROJECT: EGMAU25006 | DATE: 2026-04-29 | DRAWING SCALE: AS NOTED | DRAWN BY: ELA | APPROVED BY: MJE | C8501 | SHEET 12 OF 12
Pennoni
May 6, 2026
EGMAU26004P
East Goshen Municipal Authority
Attn: Mark Miller, Public Works Director
1580 Paoli Pike
West Chester, PA 19380
RE: Proposal for RCSTP MCC-1 Replacement Design Phase Services
Dear Mr. Miller:
Pennoni Associates Inc. (Pennoni) is pleased to submit the following proposal to the East Goshen Municipal Authority for the design phase services for the Ridley Creek Sewage Treatment Plant (RCSTP) Motor Control Center (MCC)-1 Replacement project.
Background
The existing 'MCC-1' at the RCSTP is an older Square-D model-4 7-section 480/277v 3-phase 4-Wire 400-amp Motor Control Center feeding 13 circuits. The MCC has 14 starters which are used to start and stop motors and other equipment. Currently, only four size 3 starters are being used. The rest of the starter compartments are not used or only the circuit breaker within the compartments is being used. The MCC also has an internal transformer which feeds an internal electrical panel. It has been recommended that the existing MCC should be replaced. The proposed replacement is to consist of the following:
- The existing MCC will be removed, the wall space behind the MCC will be painted to match the existing walls, and new electrical equipment will be mounted on the newly painted wall. The circuits being fed from breakers can be refed from breakers in a new 480/277v 3ph 4w panel instead of installing a new MCC, which will be less expensive.
- The new 480/277v panel will have a 400A main circuit breaker fed from ATS-1 which presently feeds MCC-1. The panel will have: Five 3-pole breakers to refeed five unit heaters; One 3-pole breaker to refeed the compressor in the sludge room; Four 3-pole breakers to feed four new size-3 starters mounted on the wall, which will feed and control four blower motors; One 3-pole breaker to feed a new 30kva 480-208Y/120v transformer, which will feed a new 208/120v 3ph 4w panel; One 1-pole 277v breaker to feed interior lighting; One 1-pole 277v breaker to feed exterior lighting
- Prior to demolition, a temporary 480v panel and temporary 208v transformer and panel will need to be installed approximately 10 feet away from MCC-1. A temporary connection with flexible cable will be installed between the load terminals in ATS-1 and the temporary 480v panel. The 480v circuits and 120-/208v circuits presently fed from MCC-1 will be temporarily refed from the temporary panels to allow MCC-1 to be de-energized and removed. The four new starters for the blower motors will be temporarily mounted next to the temporary 480v panel.
Christiana Executive Campus, 121 Continental Drive, Suite 207, Newark, DE 19713 | T: 302-655-4451 | www.pennoni.com
Page 1 of 4
EGMAU26004P
East Goshen Municipal Authority
May 6, 2026
RCSTP MCC-1 Replacement
Page 2 of 4
- Note: Depending on the time of year construction takes place, the five unit heaters circuits may not need to be temporarily re-fed if the temperature does not require the heaters to be operational.
- After MCC-1 is removed, the existing concrete pad under the MCC will be demolished because pad is expected to be non-compliant with a 42" flat clear floor space in front of the new, smaller equipment. Additionally, the wall space behind the MCC will be painted to match the existing walls, a new 480v panel will be installed, a new 30kva 480-208/120v transformer will be installed, and a new 208/120v 3ph 4w panel will be installed along the wall.
- After the new equipment is installed, the existing 480v feeder for MCC-1 will be connected to the new 480v panel which will feed the new 208/120v panel and feed the new starters. Once the new panels are energized, each of the 480v circuits will be relocated to the new 480v panel. Each starter for the blower motors and circuit will be relocated to the painted wall one at a time. Each 120/208v circuit will be relocated from the temporary panel to the new 208/120v panel.
- Once all circuits are permanently refed from the new permanent panels, the temporary feed installed between the load terminals in ATS-1 and the temporary 480v panel will be removed along with the temporary 480v panel and the temporary 208/120v panel.
Scope of Services
Pennoni will provide the following scope of services:
A. Design
- Prepare design and a construction plan set based on the above scope with the following expected plan sheets: Cover Sheet; Site Demolition Plan; Single Line Diagram Demolition Plan; Controls Demolition Plan; Proposed Site Plan; Proposed Single Line Diagram Plan; Proposed Panel Schedules; Proposed Controls Plan; Electrical Specifications and Details
- Facilitate two on-site meetings with the Township PW Department, RCSTP operator, and electrician during the design process to review the deliverables. One meeting is expected to occur after the 60% submission, and the second meeting is expected to occur after the final design submission.
- Provide the construction plans to a CoStars electrical contractor for them to provide a construction cost quotation. We will respond to contractor questions during their quotation process and will review the quotation. We assume no other bid or quotation assistance services are required.
B. Arc Flash Study
- Revise the existing Arc Flash Study for the RCSTP for the new equipment. The study will include contributions of large mechanical motor loads (> 5hp) that are not fed through variable frequency drives. These include air compressors, roof top units, etc.
EGMAU26004P
East Goshen Municipal Authority
May 6, 2026
RCSTP MCC-1 Replacement
Page 3 of 4
- Perform the study in accordance with IEEE 1584-2018. IEEE 1584-2018 includes the requirements of NFPA 70E. Equipment to be evaluated for arc flash include Switchboards, Panelboards, Industrial Control Panels, MCCs, Transformers and Disconnect Switches.
- Arc Flash Study with associated one-line drawings as modeled in our electrical study software, EasyPower 10.4 listing pertinent electrical system information, and select time-current characteristic curve sets illustrating the coordination between protective devices.
- The report shall present the worst case of three scenarios: system fed from utility source(s), at 100% and 50% fault, and one (1) generator backup source.
- Analyze the short circuit and arc flash calculations, and identify any equipment that is determined to be underrated or causes an abnormally high incident energy calculation.
- Prepare a revised summary of the results of the power system studies in a final written report. The report will revise the following sections as required: General Summary – A synopsis of our overall findings, methods, procedures, and assumptions used in preparing the studies.; Discussion – A discussion of each of the following power system analyses performed for this study: Short Circuit Analysis Reports Protective Device Coordination Arc Flash Hazard Analysis Results; Short Circuit Analysis Reports; Protective Device Coordination; Arc Flash Hazard Analysis Results; Recommendations – Recommendations to reduce the existing incident energy levels and to improve overall future maintenance and operation of the electrical distribution system.
- Deliver report in electronic pdf format.
- Print new labels on 4"x6" durable, weather resistant, labels for client installation.
Assumptions
- Construction services can be provided under a separate proposal.
- Existing electrical plans and information will be provided by East Goshen Township.
- We assume a cost opinion will not be required.
- The project will be contracted for construction through a CoStars electrical contractor; therefore, a bid document is not required.
- No permits will be required. Pennoni will provide notification and submission of the plans to PADEP. Should additional permitting become necessary during the course of the project, we will submit a separate proposal for such supplemental work.
- The Township's Code Department or third-party electrical reviewer will perform any electrical compliance review for issuance of a Township electrical permit. Pennoni will provide the plans to the Township or third-party reviewer. We assume any application fees will be paid by the Township.
- The existing utility fault information will be used for the Arc Flash Study.
- 208V panels fed from associated 125kVA or smaller transformers will not be included in the arc flash calculations, but generic labels will be provided.
EGMAU26004P
East Goshen Municipal Authority
May 6, 2026
RCSTP MCC-1 Replacement
Page 4 of 4
- Owner will install arc flash labels. If Owner requests assistance in applying labels, additional time will be billed in accordance with Pennoni's rate schedule.
Deliverables
Pennoni will provide two design plan submissions – a 60% design plan submission and Final design plan submission. Pennoni will also provide a revised Arc Flash Study and labels.
Schedule
Performance of services will commence upon receipt of Notice to Proceed. We anticipate the 60% design plans will be submitted approximately six weeks after the NTP. The final construction plans will be provided approximately four weeks after the 60% design plan review meeting. The Arc Flash Study will be provided following final construction plans.
Fee
We will provide the above scope of services for a total lump sum fee of Thirty-Four Thousand Seven Hundred Dollars ($34,700.00). The following table breaks down the scope of services fees:
| TASK | DESCRIPTION | FEE |
|---|---|---|
| A | Design | $26,700.00 |
| B | Arc Flash Study | $8,000.00 |
| TOTAL LUMP SUM | $34,700.00 | |
We have proposed a Scope of Services that satisfies our current understanding of the project. Should additional services be requested that are not included or listed in the above Scope of Services, we will provide a supplemental proposal.
Billing and Payment
Invoices will be submitted monthly. Payment is due within 30 days of invoicing.
Thank you for the opportunity to provide our professional services to East Goshen Municipal Authority. If you wish to discuss any of the above, please do not hesitate to contact Mike Ellis at 302-351-5236 or mellis@pennoni.com.
If this proposal is acceptable, please execute by signing and returning a copy to this office to serve as our Notice to Proceed.
Sincerely,
PENNONI ASSOCIATES INC.
Michael J. Ellis, PE
Associate Vice President
ACCEPTED BY:
Written Name: ___________________________________
East Goshen Municipal Authority
DATE: ___________________