Park & Recreation Commission
| Park & Recreation Members | Term Expiration Date |
| Debbie Snyder, Chair | 2028 |
| Karen Battavio, Vice Chair | 2030 |
| Anne Marie Fletcher-Moore | 2028 |
| Doug Staffelbach | 2029 |
| William Quinn | 2029 |
| Eric Tobin | 2026 |
| Peter Knupp | 2030 |
| Kishor Thakarar | 2027 |
| Jessica Bottaro, | 2026 |
| Alternate – Vacant | 2030 |
| Alternate – Vacant | 2030 |
| Ann Duffield, BOS Liaison | |
| Jason Lang, Staff Liaison |
Documents
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
Park Commission
Agenda
Thursday, September 1, 2022, 7pm
1. Call to Order 2. Pledge of Allegiance 3. Ask if anyone is recording the meeting 4. Approval of January, March and April, May, June 2022 meeting minutes 5. Chairperson’s Report
6. New Business
a. Review – Community Day, Summer Camp, Flash Mob b. Recognize – Jaiden Slifer & Rian Gionfriddo (Eagle Scout projects) c. Discussion – future Eagle Scout potential projects d. Review – potential Park Permit update e. Discussion – Hershey’s Mill Dam Park, opening
7. Old Business
a. Discussion – Paoli Pike Trail, Alternate B Route Options b. Update – Chesco Art Walk, 65 Artists, Park Commission support c. Update – Tennis/Pickleball court updates
8. Park and Recreation Director Report
a. Upcoming programming
i. Applebrook Resident Plus Guest Golf Outing – Sept 14 ii. Yard Sale – Sept 17 iii. NRPA Gold Medal Announcement, Phoenix – Sept 20 iv. Chesco Art Walk – Sept 24 v. Pumpkin Festival & Food Truck Festival – Oct 15 vi. Toddler Trick or Treat on playground – Oct 28
b. Maintenance Report
i. Installation of EGT Park cameras, early Sept. 9. Liaison Reports 10. Another other matter 11. Public Comment 12. Meeting Adjournment
PRC 1-6-22 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 Park & Recreation Commission Meeting 3 January 6, 2022 4 5 The regular meeting of the East Goshen Township Park and Recreation Commission was held on 6 Thursday, January 6, 2022 at the Township Building. 7 Commission members present are highlighted: 8 Daniel Leicht, Chairman 9 Deborah Snyder, Vice Chairman 10 Karen Battavio 11 Jessica Bottaro 12 Ann Marie Fletcher-Moore 13 Peter Knupp 14 Doug Staffelbach 15 Kishor Thakarar (on phone) 16 Eric Tobin 17 Joseph Zulli 18 19 Others present were: 20 Jason Lang, Director of Recreation 21 John Hertzog, Township Supervisor 22 23 CALL TO ORDER/PLEDGE OF ALLEGIANCE 24 Dan called the meeting to order at 7 pm. 25 Dan led the Pledge of Allegiance. 26 Dan asked for a moment of silence to remember our military and veterans, police and first responders and 27 those still fighting COVID-19. 28 Dan asked if anyone would be recording the meeting. There was no response 29 30 APPROVAL OF MINUTES 31 The minutes of the December 2, 2021 meeting were approved as amended. 32 33 CHAIRMAN’S REPORT 34 35 NEW BUSINESS 36 1. Reorganization – Dan nominated Debbie for Chairman. Eric seconded the nomination. Debbie accepted the 37 nomination. The vote was unanimous. Dan nominated Peter for Vice Chairman. Debbie nominated Eric for Vice 38 Chairman. Ann Marie seconded the nomination for Eric. Eric was elected for Vice Chairman. Karen will serve 39 are Secretary. 40 2. Review Reindeer event – Dan commented that the reindeer event went off very well. It brought in $2,700. The 41 only complaint he heard was that the Santa line was too slow. Ann Marie suggested that next year the position of 42 the band be changed because it was hard for them to hear people as they were checking in. 43 Jason said the survey was all good. They also mentioned the line for Santa. There were 150 families with 47 44 seconds per family allowed with the reindeer. Jason emailed the photos to the families. He also asked if they 45 wanted morning again or evening. It was definitely morning. 46 3. Review Tree Lighting event – Jason felt this was the best tree lighting so far. There was great attendance. The 47 dancers and chorus were great. Next year the tree lighting will be Saturday December 3 in the evening. In the 48 morning we will have the Reindeer event from 10-12. 49 4. Review Toy Drive – Jason reported that the Toy Drive was far more than expected. The total toys donated was 50 203. The card club gave a morning to wrapping all the toys. Jason met with the East Goshen Elementary counselor 51 and made a list of children and toys to donate. Next year Jason is thinking of having a list of toys and have 52 residents select which ones they want to donate. 53 5. 2022 Program Calendar – Jason reviewed the 2022 program calendar and explained some of the new events. He 54 is hoping to have full day camp. He is waiting for permission from the school district. It will be at East Goshen 55
PRC 1-6-22 draft 2
Elementary. He wants to have representatives from other ABCs at some of the events so residents can meet them; 1 i.e., a Pumpkin Challenge at the Pumpkin Festival. Jason reviewed the history of the farmers’ market. The last 2 year was 2018. He received approval to install windscreens and a divider at the tennis courts. 3 6. End of Year Report – Jason reviewed the report and commented that revenue of 107% is good. In 2021 the 4 revenue was 120%. A good year. 5 6 OLD BUSINESS 7 1. Annual ABC Meeting – This annual meeting will be held on Tuesday January 25, 2022 at 6:30 p.m. Jason 8 reviewed the 2021 Accomplishments and 2022 Goals report for this meeting. 9 10 RECREATION DIRECTOR REPORT 11 12 1. Upcoming Events - 13 a. Teen MLK Day of Service with West Chester Communities that Care – Jan 17. Teens will do a day of service. 14 Krapf will provide a bus for transportation. 15 e. 2022 Township ABC Kickoff meeting – Tuesday January 25, evening 16 17 2. Park Maintenance Report 18 The Veterans Pavilion is closed for the winter. Also, the ball fields are closed. Jason hopes to open by April 1st. 19 20 LIAISON REPORTS 21 22 ANY OTHER MATTER 23 24 ADJOURNMENT 25 There being no further business, Dan moved to adjourn the meeting. Ann Marie seconded the motion. The 26 meeting was adjourned at 8:30 pm. The next regular meeting will be held on Thursday February 3, 2022 at 7:00 27 p.m. in person at the Township Building. 28 29 Respectfully submitted, 30 31 32 33 Ruth Kiefer, Recording Secretary 34
PRC 3-3-22 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 Park & Recreation Commission Meeting 3 March 3, 2022 4 5 The regular meeting of the East Goshen Township Park and Recreation Commission was held on 6 Thursday, March 3, 2022 at the Township Building. 7 Commission members present are highlighted: 8 Deborah Snyder, Chairman via phone 9 Eric Tobin, Vice Chairman 10 Karen Battavio 11 Jessica Bottaro 12 Ann Marie Fletcher-Moore via phone 13 Peter Knupp 14 Daniel Leicht 15 Doug Staffelbach 16 Kishor Thakarar 17 Joseph Zulli 18 19 Others present were: 20 Jason Lang, Director of Recreation 21 Cody Bright, Township Supervisor 22 23 CALL TO ORDER/PLEDGE OF ALLEGIANCE 24 Peter called the meeting to order at 7 pm. 25 Peter led the Pledge of Allegiance. 26 Jason asked for a moment of silence to remember the Ukrainian people, our military and veterans, police 27 and first responders and medical staffs. 28 Peter asked if anyone would be recording the meeting. There was no response 29 30 APPROVAL OF MINUTES 31 The minutes of the February 3, 2022 meeting were approved. 32 33 CHAIRMAN’S REPORT 34 35 NEW BUSINESS 36 1. Bee Hives - Jason reported that the first Bee Hive program will start in April. He asked Carmen Battavio about 37 another location for hives. They looked at the Supplee Valley open space on Reservoir Road. There will be 4-6 38 hives which will be different from the ones for the public at the Blacksmith Shop. Signage will be provided. The 39 purpose is to provide a honeybee habitat, increase plants, and later some students from the university may be able to 40 determine what flowers the bees used to make the honey. Peter made a motion to use this location for beehives. 41 Jessica seconded the motion. The motion passed unanimously. 42 43 2. Summer Camp – The camp will be held at East Goshen Elementary School. It is full – 100 children each day 44 and staff to work there. He hired 6-8 new aides. The camp is from 8am to 5:30 pm and costs $200/week. 45 46 3. Movie in the Park – This will be held on June 4, 2022. It will be sponsored by the Gary Mercer Group. 47 48 4. Governor’s Award – Jason mentioned that East Goshen received this award for the Teen Film Makers 49 Showcase. It was for an innovative partnership. The award will be presented on April 13, 2022. This year the 50 Friends of East Goshen will pay for a second theater and sell tickets for the general public. There will be 50 seats 51 at $15 – 20 each. Any revenue will be donated to the Ukraine film maker. 52 53 54 55
PRC 3-3-22 draft 2
OLD BUSINESS 1 1. Community Day – The BOS has approved Saturday June 25, 2022 for this event. 2 3 2. Recreation Program Coordinator – Jason reported that 2 of the candidates he selected took other jobs. 4 5 3. Pickle Ball/Tennis Courts - The hitwall, which is a scout project, will be done in a month. Jason spoke to the 6 residents about the wind screens. It was decided that they will be forest green, 6 feet high on the outside and 9 feet 7 high on the inside. The BOS will approve this next week. Jason spoke about all of the tennis leagues that use the 8 courts. There will be 3 Pickle Ball tournaments this year. 9 10 RECREATION DIRECTOR REPORT 11 12 1. Upcoming Events - 13 a. Seasonal staff hiring – on going 14 b. Permitted parties begin in mid March. There are about 350 parties in the park. 15 c. Organized sports begin in late March. 16 c. Egg Hunt will be held on April 9th. 17 d. Junior Beekeeping Program will start in late April. The classes will be from 3-4pm and 4-5 pm. There 18 will 6 kids ages 7-10 years old in each class. They will receive certificates. Sophia will be the Bee Ambassador. 19 Here mother studies insects. 20 21 2. Park Maintenance Report 22 The ball parks are getting ready. Two driveways that were dirt paths have been paved. One by the Basketball 23 courts and the other by the Veterans Pavilion. 24 25 LIAISON REPORTS 26 27 ANY OTHER MATTER 28 1. Grants - The Pa Horse Race Game made a lot of money and is making funds available to all Pa counties. Jason 29 will submit a grant application for this. 30 2. SAC Expo - The Sustainability Advisory Committee will be holding an expo at the Township building on 31 Sunday April 24, 2022 from 10 am to 2pm. and it is free. 32 3. Paoli Pike Trail – The BOS is considering alternate routes for the trail along Paoli Pike instead of the Hicks 33 property. 34 35 ADJOURNMENT 36 There being no further business, Peter moved to adjourn the meeting. Jessica seconded the motion. The meeting 37 was adjourned at 8:15 pm. The next regular meeting will be held on Thursday April 7, 2022 at 7:00 p.m. in person 38 at the Township Building. 39 40 Respectfully submitted, 41 42 43 44 Ruth Kiefer, Recording Secretary 45
PRC 4-7-22 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 Park & Recreation Commission Meeting 3 April 7, 2022 4 5 The regular meeting of the East Goshen Township Park and Recreation Commission was held on 6 Thursday, April 7, 2022 at the Township Building. 7 Commission members present are highlighted: 8 Deborah Snyder, Chairman 9 Eric Tobin, Vice Chairman 10 Karen Battavio 11 Jessica Bottaro 12 Ann Marie Fletcher-Moore 13 Peter Knupp 14 Daniel Leicht 15 Doug Staffelbach 16 Kishor Thakarar 17 Joseph Zulli 18 19 Others present were: 20 Jason Lang, Director of Recreation 21 Cody Bright, Township Supervisor 22 23 CALL TO ORDER/PLEDGE OF ALLEGIANCE 24 Deborah called the meeting to order at 7 pm. 25 Deborah led the Pledge of Allegiance. 26 Deborah asked for a moment of silence to remember firefighters, first responders, police and all who are 27 still affected by COVID. 28 Deborah asked if anyone would be recording the meeting. There was no response 29 30 APPROVAL OF MINUTES 31 Approval of the minutes of the January 6 and March 3, 2022 meetings will have to be delayed until next month 32 since there is not a quorum. 33 34 CHAIRMAN’S REPORT 35 Deborah congratulated Jason for the Governor’s Award for Innovative Partnerships for our SE PA Teen 36 Filmmakers Showcase. She thanked him for all his hard work. 37 38 NEW BUSINESS 39 1. Egg Hunt – The egg hunt will be held this Saturday April 9, rain date April 10. 2022. Jason will send out 40 emails tomorrow with instructions. He has 10,000 eggs that are divided by age. So far 175 have registered in each 41 of the two youngest groups. About 85 in the other two groups. Boys from the Phelps School will be coming to 42 assist. The scouts will be doing face painting. Christopher Moore will be the Easter Bunny. Please come at 8 am 43 to help set things up. 44 2. Milltown Park – Jason will send out a flyer to the residents and then contact the ones in the immediate area of 45 the park to get feedback. 46 3. Gov. Wolf Excellence Award – This award is for the Teen Filmmakers Showcase. Jason and a few others will 47 go to Harrisburg next Wednesday April 13 to accept the award. 48 49 50 OLD BUSINESS 51 1. Recreation Program Coordinator – Jason reported that the first 4 interviews did not work out. He has 4 new 52 people to interview next week for this position. 53 2. Bee Hives – The placement of bee hives at Supplee Valley was approved. 54
PRC 4-7-22 draft 2
3. Pickleball Project – Jason reported that the residents had a memorial at the end of March for one of the senior 1 players who passed away. A resident is taking courses to be a certified instructor for pickleball. 2 3 RECREATION DIRECTOR REPORT 4 5 1. Upcoming Events - 6 a. Seasonal staff hiring – on going 7 b. Organized sports began in late March. 8 c. Egg Hunt will be held on April 9th. 9 d. WCGC Flower Show – April 13, 12-4 pm 10 d. Junior Beekeeping Program will start in late April. 11 e. Pollinator Garden Clean Up – April 22 12 f. Spring Yard Sale – April 30 13 14 2. Park Maintenance Report 15 The ball parks are being maintained for the games. 16 17 LIAISON REPORTS 18 19 ANY OTHER MATTER 20 1. SAC Expo - The Sustainability Advisory Committee will be holding an expo at the Township building on 21 Sunday April 24, 2022 from 10 am to 2pm. and it is free. 22 23 ADJOURNMENT 24 There being no further business, Jessica moved to adjourn the meeting. Eric seconded the motion. The meeting 25 was adjourned at 7:30 pm. The next regular meeting will be held on Thursday May 5, 2022 at 7:00 p.m. in person 26 at the Township Building. 27 28 Respectfully submitted, 29 30 31 32 Ruth Kiefer, Recording Secretary 33
PRC 5-5-22 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 Park & Recreation Commission Meeting 3 May 5, 2022 4 5 The regular meeting of the East Goshen Township Park and Recreation Commission was held on 6 Thursday, May 5, 2022 at the Township Building. 7 Commission members present are highlighted: 8 Deborah Snyder, Chairman 9 Eric Tobin, Vice Chairman 10 Karen Battavio 11 Jessica Bottaro 12 Ann Marie Fletcher-Moore 13 Peter Knupp 14 Daniel Leicht 15 Doug Staffelbach 16 Kishor Thakarar 17 Joseph Zulli 18 19 Others present were: 20 Jason Lang, Director of Recreation 21 Cody Bright, Township Supervisor 22 Derek Davis, Township Manager 23 24 CALL TO ORDER/PLEDGE OF ALLEGIANCE 25 Deborah called the meeting to order at 7 pm. 26 Deborah led the Pledge of Allegiance. 27 Deborah asked for a moment of silence to remember firefighters, first responders, police and all who are 28 still affected by COVID. 29 Deborah asked if anyone would be recording the meeting. There was no response 30 31 APPROVAL OF MINUTES 32 Approval of the minutes of the January 6, March 3, and April 7 2022 meetings will have to be delayed until next 33 month since there is not a quorum. 34 35 CHAIRMAN’S REPORT 36 Deborah congratulated Jason for being recognized as a 2022 NRPA Gold Medal Finalist for the fourth consecutive 37 year. Jason thanked her for the kind words, but said it’s really the residents who make the park and rec experience 38 in East Goshen so special. Jason introduced Derek Davis, Township Manager, to the Park Commission. He thanked 39 the Park Commission for their efforts, noting that special events are only successful by volunteerism and the Park 40 Commission has always done an amazing job. He also mentioned that the Board of Supervisors would be sending 41 Paoli Pike Trial Alternative Route options to the Park Commission for review and recommendation at an upcoming 42 meeting. 43 44 NEW BUSINESS 45 1. Milltown Park Neighborhood Walk – Jason, Debbie, Danny Leicht and Michele Truitt spoke with Milltown 46 Park neighbors about a potential renovation to the park, speaking to 14 of a possible 50 (28%) of households. Jason 47 will do another round of walks to get that percentage to 80%. Input so far is overwhelmingly in favor of adding 48 more space appropriate play pieces for the children. There was also consensus to add more seating, picnic tables 49 and to clean up the hillside of dead trees and poison ivy. Given that an old schoolhouse sat on the property, one 50 resident suggested a historical sign with photos recognizing the site’s historical importance. Three residents on the 51 north side of the park were against a large project in favor of increased traffic. One resident who lives along the tree 52 line is considered that other neighborhood residents currently walk their dog off leash and come onto his property. 53 Jason noted that these issues could be addressed and still provide some new play pieces for the kids. Perhaps a 54 fence could be added at the end of Township property and/or signage. There is no timetable for 55
PRC 5-5-22 draft 2
construction/decisions at this time. Jason will continue to get neighborhood input, then draft a report for Park 1 Commission and Board of Supervisors review. 2 2. Update – Bocce Court, Eagle Scout Project – The Eagle Scout will be installing the bocce court near the 3 Veteran’s Pavilion over Memorial Day weekend. 4 3. Update – Community Day – The event is programmatically set except we are still in need of a National Anthem 5 singer. Event sponsors via the Friends of East Goshen has been strong and it does not anticipate a funding shortage. 6 7 8 OLD BUSINESS 9 1. Recreation Program Coordinator – Jason reported that Jessica Wilhelmy has accepted the position and will start 10 on May 16. She is very experienced and will be a great addition to the team. 11 2. Review – Egg Hunt, WCGC Flower Show, SAC Expo, Junior Beekeeper – Jason said the Egg Hunt was well 12 attended again, sold out with 800 participants and 2400 total people. The timed grouping is very efficient, a more 13 fun experience and will remain going forward. The WCGC Flower Show was a great first effort, nice additional to 14 our current special event offerings, and will benefit in 2023 from a full marketing campaign. The SAC Expo had 15 approximately 150 attendees and was well managed by the SAC. The inaugural Junior Beekeeper class graduated in 16 late April and the kids had a blast. In their full suits, they comfortably and confidently interacted with 100,000+ 17 bees. 18 3. Update – Pickleball/Tennis Court – Jason reported we should hear back about our $60,000 Chesco Municipal 19 Grant by the end of June and we’ll be applying for a DCED –GTRP grant by the end of May. Project on course for 20 a 2023 construction. 21 . 22 23 RECREATION DIRECTOR REPORT 24 25 1. Upcoming Events - 26 i. Toddler Storytime – Tuesdays, 10a 27 ii. Poetry Circle – Thursdays 28 iii. White Elephant Bingo - May 12, 1p 29 iv. Applebrook Resident Only Golf Outing – May 17 30 v. Nature Warriors – May through June 31 vi. Jason – WCU Career Extension – May 19 32 vii. Pollinator Garden Clean Up – May 20 33 viii. No spring bus trips 34 35 2. Park Maintenance Report 36 Public Works has been busy with regular park maintenance, has done work on the Hershey’s Mill Dam Park project 37 and will be doing some work on the upcoming bocce court project. 38 39 LIAISON REPORTS 40 41 ANY OTHER MATTER 42 43 ADJOURNMENT 44 There being no further business, Karen moved to adjourn the meeting. Ann Marie seconded the motion. The 45 meeting was adjourned at 7:47 pm. The next regular meeting will be held on Thursday June 2, 2022 at 7:00 p.m. in 46 person at the Township Building. 47 48 Respectfully submitted, 49 50 51 52 Ruth Kiefer, Recording Secretary 53
PRC 6-2-22 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 Park & Recreation Commission Meeting 3 June 2, 2022 4 5 The regular meeting of the East Goshen Township Park and Recreation Commission was held on 6 Thursday, June 2, 2022 at the Township Building. 7 Commission members present are highlighted: 8 Deborah Snyder, Chairman 9 Eric Tobin, Vice Chairman 10 Karen Battavio 11 Jessica Bottaro 12 Ann Marie Fletcher-Moore 13 Peter Knupp 14 Daniel Leicht 15 Doug Staffelbach 16 Kishor Thakarar 17 Joseph Zulli 18 19 Others present were: 20 Jason Lang, Director of Recreation 21 Jess Wilhelmy, Recreation Program Coordinator 22 Cody Bright, Township Supervisor 23 Derek Davis, Township Manager 24 25 CALL TO ORDER/PLEDGE OF ALLEGIANCE 26 Deborah called the meeting to order at 7 pm. 27 Deborah led the Pledge of Allegiance. 28 Deborah asked for a moment of silence to remember firefighters, first responders, police, all who are still 29 affected by COVID, and all those in Uvalde, Tx. 30 Deborah asked if anyone would be recording the meeting. There was no response 31 32 APPROVAL OF MINUTES 33 Approval of the minutes of the January 6, March 3, and April 7, and May 5, 2022 meetings will have to be delayed 34 until next month since there is not a quorum. 35 36 CHAIRMAN’S REPORT 37 Deborah congratulated Jason for receiving a grant of $60,000+ for the pickleball courts. She also acknowledged 38 the video about East Goshen that Jason created for submission to the NRPA awards. 39 Deborah introduced Jess Wilhelmy our new Recreation Program Coordinator. Jason also spoke about what she will 40 be doing plus working on the township newsletter. She has been here 3 weeks and has many new ideas. 41 42 NEW BUSINESS 43 1. Paoli Pike Trail Alternative Route options - Jason reviewed the 3 options for Segment B of the Paoli Pike Trail 44 that the Board of Supervisors are considering. Joe commented that boardwalks are not good for bikes. The options 45 were discussed including an option of crossing to the south side of Paoli Pike up to the intersection at East High 46 School. This will be discussed further at the August meeting and recommendations will be sent to the BOS. 47 2. NRPA Video – Jason spoke about the video of East Goshen that is complete and ready for submission. 48 3. Summer Newsletter Article – Jason asked the Commission members to review the article he prepared for the 49 newsletter. The Summer edition goes out next week. Deborah mentioned that the Seniors Activities should be on 50 the Township Web Site to make it easier for people to find. Jason commented that Jess will create several new 51 templates for the newsletter. 52 4. Pickleball Courts – Jason mentioned that the township received a Chester County grant of $60,000+ for 53 expansion of the Pickleball courts. He also received a second quote for the construction of $80,000 which is less 54 than the first quote of $120,000. 55
PRC 6-2-22 draft 2
5. Windscreens – The windscreens were installed this week at the tennis courts. 1 6. Hit Wall – The hit wall was installed and completed by an Eagle Scout. 2 7. Bocce Courts – The Bocce Courts have been installed next to the Veterans Pavilion. The full court is 13 x 91’ 3 and the practice court is 13 x 16’. It was an Eagle Scout project, but Public Works did most of the installation. In 4 the future Eagle Scout projects will not include Public Works. 5 6 OLD BUSINESS 7 1. Update – Community Day – This will be held on Saturday June 25th. Jason will send out a notice for volunteers. 8 2. Chesco Art Walk – This event will be held on September 24th. This year with assistance from the Chesco Art 9 Association, there will be 85 artists. They will be on the trail from the Township Building parking lot to the East 10 Goshen Park parking lot. 11 12 RECREATION DIRECTOR REPORT 13 14 1. Upcoming Events - 15 i. Toddler Trick or Treat – Friday, June 3, 10 am - Jess will wear a milk shake costume 16 ii. Toddler Storytime – Tuesdays, 10am 17 iii. Poetry Circle – Thursdays 18 iv. Robotic Lego Camp – June 20 19 v. Sumer camp begins – June 27 20 vi. Applebrook Resident Plus Guest Golf Outing – June 28 21 vii. Nature Warriors – May through June 22 23 2. Park Maintenance Report 24 Public Works has been busy with regular park maintenance. 25 26 LIAISON REPORTS 27 28 ANY OTHER MATTER 29 30 ADJOURNMENT 31 There being no further business, Karen moved to adjourn the meeting. Jessica Bottaro seconded the motion. The 32 meeting was adjourned at 8:00 pm. The next regular meeting will be held on Thursday August 4, 2022 at 7:00 p.m. 33 in person at the Township Building. There will be no meeting in July. 34 35 Respectfully submitted, 36 37 38 39 Ruth Kiefer, Recording Secretary 40 41
East Goshen Township Department of Parks and Recreation
1580 Paoli Pike West Chester, PA 19380
(610) 692-7171
Pavilion Rental FAQ
Pavilion Rental Season - March 1 to December 31. Rentals can only be made for the current
calendar year. Group Size: Groups larger than 25 are required to submit a permit. Any organized group no
matter the size wanting to use the pavilion for a specific date must submit a permit to guarantee the pavilion. Pavilion Locations: Ira Hicks Pavilion is near the playground and the preferred pavilion for
children’s birthday parties. Veterans Pavilion is near the football field and is better for privacy and ADA Bathroom needs. Both pavilions have picnic tables, grills, electric, water access and are close to a bathroom facility. Grills are for charcoal only. No propane grills are permitted. Time: We offer two time slots (9:00am to 2:00pm or 3:00pm to Dusk) or renting it for the
entire day. Your allotted time includes set up and clean up. Fee: Groups 25 or larger have the following fee
o Time Slot (9:00am to 2:00pm or 3:00pm to Dusk)
$100 - East Goshen Township Resident $200 - Non- Resident or Organization/Business o All Day (9:00am to Dusk)
$200 - East Goshen Township Resident $400 - Non- Resident or Organization/Business Payments: Checks only. Please make checks to East Goshen Township. Refunds: A refund will be given if you notify East Goshen Township Parks and Recreation by
email the night prior to your rental. How to reserve a pavilion: We will hold your time and date for one week. After one week if
we do not have your completed application and payment you are forfeiting your date and time slot. Other Facility Request: Tennis/ Pickle Ball Courts, Bocce Court, Basketball Court and Ball
Fields require a separate permit and fees if you want to use it during your rental. Third Party Vendors: You may have moon bounces and other inflatables from a third party
vendor. You need to provide copy of their Liability Insurance naming East Goshen as an Additional Insured. Day of rental: We recommend that you bring your approved pavilion rental application the day
of the rental in case there is someone in the pavilion. If there are others using the pavilion and refusing to leave call
To check pavilion availability or if you have questions about pavilion rentals please contact Jessica
Wilhelmy at jwilhelmy@eastgoshen.org or 610-692-7171
Organization Name
East Goshen Township Department of Parks and Recreation
1580 Paoli Pike West Chester, PA 19380
(610) 692-7171
Pavilion Permit Application
(Revised 2022) Type of Organized Group:
___Resident of East Goshen ___Non-Resident ___Organization: ______________________
Applicant Name: ________________________________________________
Address: ______________________________ City: ________________ State: ______ Zip: ______
Phone Number: ______________________ Email Address: ________________________________
Pavilion Request: _____Ira Hicks _____Veterans Date of Rental: _____________________
Time: ___ 9:00am-2:00pm ___ 3:00pm- Dusk ___ All Day
Number of People: _____________
Purpose of Request: _______________________________________________________________
Will sound equipment be used? _____Yes _____No
Percent of Organization participants who are East Goshen Residents: ______________________
Will you be using a third party vendor: _____Yes _____ No
Do you have an additional facility request (Tennis/Pickle ball Court, Bocce, Ball Field or Stage):
__Yes __ No
Approved permitted activities must adhere to all applicable COVID-19 regulations _____ (Initial)
HOLD HARMLESS AGREEMENT Permittee agrees to indemnify and hold harmless the East Goshen Park and Recreation Board and East Goshen Township and its employees for any and all claims from bodily injury or property damage, including costs and expenses arising out of the use of the Park and its facilities. If hosting an event serving minors, the permittee agrees to comply with all federal and state laws regarding background checks for paid staff and volunteers. On behalf of the Organization, I have read the Rules and Regulations (attached or on back of application), understand them and agree to comply.
Signature ______________________________________ Date _____________________ NOTE: FAILURE TO PARK IN DESIGNATED AREAS OR ORGANIZATIONAL USE OF FIELDS WHEN RED FLAG IS UP AT PARK ENTRANCE WILL CANCEL PARK PERMIT. FOR EAST GOSHEN TOWNSHIP Pavilion Permit APPROVED DENIED Certificate of Insurance: _______ Fee: ____________ Payment: ____________ Initial: ____________________ Date: _________
PARK RULES AND REGULATIONS -Subject to revision
by January 2015 Very Important: Red flags flying at the east Park entrance and adjacent to the fields at the west end mean that all Park fields have been closed for that day due to ground conditions. Green flags means that the fields may be used.
Violation of this rule can cancel your Permit.
1. The park shall be open to Township residents and their accompanied guests between sunrise and sunset. 2. No one shall injure, deface, remove, cut or damage trees, shrubs, structures or fixtures in the park. 3. No one shall climb, stand upon, remove, or relocate any bench, seat or table from the Park without written permission for the Park and Recreation Board. 4. No person shall conduct himself within the park in a boisterous, immoral, indecent manner as to annoy any other person using the Park. 5. No meeting or gathering of more than 25 persons shall be held in the park without permission from the Park and Recreation Board one week in advance. 6. The sponsors of any gatherings requiring police security must assume the cost of such security. 7. The Township may require a deposit from a sponsoring organization or party not to exceed $300. 8. Parking or driving on Park property is prohibited except in authorized areas. Driving and parking on the grass is prohibited. 9. No sound amplification equipment is permitted in the park without the consent of the Park and Recreation Board. 10. No one shall set up any booth, table, or structure within the park without consent of the Park and Recreation Board. There shall be no solicitation of any kind for profit with the parks. 11. No person other than an office of the law shall carry or discharge a harmful weapon within the limits of the park. 12. No one shall dispose of waste/garbage in the park except in proper containers. 13. No one shall injure, deface or destroy any notice, rule, or regulation posted within the park. Nor shall any person post any notices or placards in the park without permission of the Park and Recreation Board 14. Swimming or boating is prohibited in the parks. 15. The possession or use of fireworks in the park is prohibited other than by special permission of the Park and Recreation Board. 16. The possession or use of alcoholic beverages within the park is prohibited. 17. All pets must be leashed and all owners are required to clean up after their pets. 18. No one shall set or maintain any fire in the parks, except in authorized fireplaces and/or grills. 19. The foregoing rules and regulations are excerpted from Ordinance No. 70 of East Goshen Township and violation of any of them subjects the violator to a fine of $300.00 for each and every offense. In addition, the police shall be authorized to issue citations for parking in undesignated areas.
East Goshen Township Department of Parks and Recreation
1580 Paoli Pike West Chester, PA 19380
(610) 692-7171 Athletic Facility Permit Guidelines Facility Use Dates All grass athletic fields can be reserved from April 1 to Thanksgiving. All
other athletic facilities can be reserved all year. You can only reserve the facility for the current calendar year. Fee: $12 per court/field per hour Payments: We only accept checks made out to East Goshen Township. Refunds will be given if you notify East Goshen Township Parks and Recreation by email the
night prior to your rental. Certificate of Insurance: You need to provide a copy of your Organization’s Liability
Insurance naming East Goshen as an Additional Insured. Waivers: Receipt of a signed Participant Waiver Form from each participant. Minors must have
their form signed by a parent or guardian. Ground Conditions: Red flags flying at the east Park entrance and adjacent to the fields at the
west end mean that all Park fields have been closed for that day due to ground conditions. Green flags means that the fields may be used. Violation of this rule can cancel your Permit. Group Size: Groups larger than 25 are required to submit a permit. Any organized group no
matter the size wanting to use a specific facility for a specific date must submit a permit to guarantee the pavilion. Refunds: A refund will be given if you notify East Goshen Township Parks and Recreation by
email the night prior to your rental. How to reserve a pavilion: We will hold your time and date for one week. After one week if
we do not have your completed application and payment you are forfeiting your date and time slot. Pavilions: If you would like to use a pavilion during your facility request you must submit a
Pavilion Rental Permit along with the Athletic Facility Permit. Third Party Vendors: You may have moon bounces, inflatables and other third party vendors.
You need to provide copy of their Liability Insurance naming East Goshen as an Additional Insured. Day of use: We recommend that you bring your approved pavilion rental application the day of
the rental in case there is someone in the pavilion. If there are others using the pavilion and refusing to leave call
To check athletic facility availability or if you have questions about pavilion rentals please
contact Jessica Wilhelmy at jwilhelmy@eastgoshen.org or 610-692-7171
East Goshen Township Department of Parks and Recreation
1580 Paoli Pike West Chester, PA 19380
(610) 692-7171
Athletic Facility Permit
(Revised 2022) Organized Group: ______________________________________
Applicant Name: _______________________________________
Address: __________________________ City: ________________ State: ______ Zip: ______
Phone Number: ______________________ Email Address: ________________________________
Facility Request: _____ Tennis Court _____ Pickle ball Court _____ Basketball Court
____Baseball Field ____ Football Field _____ Bocce Court Other: ________________
Dates requested (attach separate sheet if necessary): _____________________________________
__________________________________________________________________________________
Time: ____________________________ Number of People: _____________
Purpose of Request: _______________________________________________________________
Will sound equipment be used? _____Yes _____No
Percent of Organization participants who are East Goshen Residents: ______________________
Will you be using a third party vendor: _____Yes _____ No
Approved permitted activities must adhere to all applicable COVID-19 regulations _____ (Initial)
HOLD HARMLESS AGREEMENT Permittee agrees to indemnify and hold harmless the East Goshen Park and Recreation Board and East Goshen Township and its employees for any and all claims from bodily injury or property damage, including costs and expenses arising out of the use of the Park and its facilities. If hosting an event serving minors, the permittee agrees to comply with all federal and state laws regarding background checks for paid staff and volunteers. On behalf of the Organization, I have read the Rules and Regulations (attached or on back of application), understand them and agree to comply.
Signature ______________________________________ Date _____________________ NOTE: FAILURE TO PARK IN DESIGNATED AREAS OR ORGANIZATIONAL USE OF FIELDS WHEN RED FLAG IS UP AT PARK ENTRANCE WILL CANCEL PARK PERMIT. FOR EAST GOSHEN TOWNSHIP Facility Request: APPROVED DENIED Certificate of Insurance: _______ Waivers: _______ Fee: ____________ Payment: ____________ Initial: ____________________ Date: _________
PARK RULES AND REGULATIONS -Subject to revision
by January 2015 Very Important: Red flags flying at the east Park entrance and adjacent to the fields at the west end mean that all Park fields have been closed for that day due to ground conditions. Green flags means that the fields may be used.
Violation of this rule can cancel your Permit.
1. The park shall be open to Township residents and their accompanied guests between sunrise and sunset. 2. No one shall injure, deface, remove, cut or damage trees, shrubs, structures or fixtures in the park. 3. No one shall climb, stand upon, remove, or relocate any bench, seat or table from the Park without written permission for the Park and Recreation Board. 4. No person shall conduct himself within the park in a boisterous, immoral, indecent manner as to annoy any other person using the Park. 5. No meeting or gathering of more than 25 persons shall be held in the park without permission from the Park and Recreation Board one week in advance. 6. The sponsors of any gatherings requiring police security must assume the cost of such security. 7. The Township may require a deposit from a sponsoring organization or party not to exceed $300. 8. Parking or driving on Park property is prohibited except in authorized areas. Driving and parking on the grass is prohibited. 9. No sound amplification equipment is permitted in the park without the consent of the Park and Recreation Board. 10. No one shall set up any booth, table, or structure within the park without consent of the Park and Recreation Board. There shall be no solicitation of any kind for profit with the parks. 11. No person other than an office of the law shall carry or discharge a harmful weapon within the limits of the park. 12. No one shall dispose of waste/garbage in the park except in proper containers. 13. No one shall injure, deface or destroy any notice, rule, or regulation posted within the park. Nor shall any person post any notices or placards in the park without permission of the Park and Recreation Board 14. Swimming or boating is prohibited in the parks. 15. The possession or use of fireworks in the park is prohibited other than by special permission of the Park and Recreation Board. 16. The possession or use of alcoholic beverages within the park is prohibited. 17. All pets must be leashed and all owners are required to clean up after their pets. 18. No one shall set or maintain any fire in the parks, except in authorized fireplaces and/or grills. 19. The foregoing rules and regulations are excerpted from Ordinance No. 70 of East Goshen Township and violation of any of them subjects the violator to a fine of $300.00 for each and every offense. In addition, the police shall be authorized to issue citations for parking in undesignated areas.
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907 F: 610-429-8918
www.pennoni.com April 26, 2022
EGOST00022 Derek Davis, Township Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380 RE: Paoli Pike Trail Segment B - Alternate Routes Dear Derek: Over the preceding months we have at your request explored alternative routes for connecting the remaining gap (Segment B) of the Paoli Pike Trail. After considering alternatives, the Township’s preference was to more closely investigate “Option C” for the trail corridor to be located through Goshen Corporate Park. In February 2021 we presented potential alignments related to Option C. After consideration, the Township narrowed the possibilities and has asked us to investigate the remaining choices more closely. Accordingly, please see attached diagrams and further analysis of this option.
Trail Alignment Options
As shown on Diagram 1, remaining options being considered are as follows (each option begins at the intersection of Reservoir Road and Paoli Pike, and ends at the terminus of Goshen Parkway):
• Option C1 follows Paoli Pike, cuts generally through parking lots of the corporate center, then along the rear of the Hicks Property south of Linden Drive.
Advantages: Reduces the cost of construction by utilizing an existing paved surface to substantially reduce the length of boardwalk necessary. Also, engineering design has already been prepared for the portion of this route along Paoli Pike.
Disadvantages: Trail shares vehicular drive lanes within the QVC parking lot. While this can be designed safely with the use of pavement markings and signage, it is less desirable than a separate pathway solely dedicated to ped/bike use. This will also require coordination with and permission from the property owner and/or tenant.
• Option C2 follows Paoli Pike, travels alongside the existing stream on the Hicks property, then along the rear of the Hicks Property south of Linden Drive.
Advantages: No shared space with vehicular traffic. Right-of-way along Paoli Pike section has already been obtained.
Disadvantages: Significantly more costly due to the increased length of boardwalk necessary.
• Option C3 is located through the Corporate Park, in landscaped spaces alongside Reservoir Drive and Enterprise Drive, then cuts generally through parking lots and along the rear of the Hicks Property south of Linden Drive.
Advantages: Ample room for off-road segment within the landscaped space to the side of Enterprise Drive. Avoids the low-lying wet area in the SE corner of the park.
EGOST00022 April 26, 2022 Page 2 Derek Davis, Township Manager Paoli Pike Trail Segment B Alt. Routes
Disadvantages: Trail strays sooner from Paoli Pike, which may be the more desirable route for trail users.
As shown on Diagram 2, Options C1 and C2 encounter areas within the 100-yr floodplain of the East Branch of Chester Creek, and likely contains regulated wetlands. A boardwalk-type structure will be needed to traverse the wetlands and flood-prone areas, and a stream crossing will be necessary. Easements will be required along the western edge of the Corporate Park, and along the back edge of the Hicks property and neighboring property that borders Goshen Parkway.
Diagram 3 shows that individual segments (numbered 1 through 5) can be combined to create a desired route. For instance:
• Segments 1 and 2 can be combined to create an independent loop within the southeast quadrant of the corporate park (also shown on Sheet 1 as “Enterprise Loop”).
• A complete trail route can be created by combining either segment 1 or 2 with either segment 3 or 4, along with segment 5.
Potential costs
A rough order-of-magnitude estimate for cost of design and construction is shown in the attached table. Costs are associated with the individual trail segments 1 though 5 shown on Diagram 3.
• The least expensive complete route is a combination of segments 1, 3, and 5, approximately $1.5 million. • The most expensive complete route is a combination of segments 2, 4, and 5, approximately $4.3 million.
Next Steps
• Outreach to property owners along the selected route, to obtain necessary easements. • Identification of potential grant opportunities to fund design and construction. • Topographic survey for selected route. • Wetland delineation along relevant portions of the selected route.
If you need further assistance, please feel free to contact me. Sincerely, PENNONI Nathan Cline, PE Township Engineer U:\Accounts\EGOST\EGOST00022 - Paoli Pike Trail Segment B Alt Rte Feasi\DOC PREP
MEMO Date: May 26, 2022 From: Derek Davis, Township Manager To: Parks and Recreation Commission Re: Paoli Pike Alternate Trail – Segment B Dear Commission Members, At their May 3rd board meeting, the board decided that they would like various ABCs to review the very preliminary options laid out by Pennoni for a possible Paoli Pike Alternate Route for Segment B. Attached are the latest conceptual plans from Pennoni that reflect those conversations they’ve had as a board thus far. Again, this is very early on in the process so the board would like any and all comments so that they can all be taken under consideration. A short memo back to the board with some bullet points on the overall thoughts of the commission would be helpful. If the Commission would like to take a month to review and bring back comments next meeting that would be fine as well. Thank you. U:\DDavis\ABCs\Parks and Recreation Commission\PaoliPikeAltTrail - SegmentB.docx
PAOLI PIKE TRAIL EAST GOSHEN TOWNSHIP, PA Opinion of Probable Construction Cost Item Unit Cost Unit Quantity Cost Quantity Cost Quantity Cost Quantity Cost Quantity Cost Quantity Cost Quantity Cost Quantity Cost Pavement markings over existing asphalt paving 15 $ LF 900 13,500 $ - - $ 900 13,500 $ - - $ - - $ 900 13,500 $ - - $ - - $ New Trail: Asphalt paved at grade 130 $ LF 2,550 331,500 $ 2,550 331,500 $ 3,350 435,500 $ 2,400 312,000 $ 1,600 208,000 $ 150 19,500 $ - - $ 850 110,500 $ New Trail: boardwalk condition 1,000 $ LF 1,150 1,150,000 $ 1,700 1,700,000 $ 250 250,000 $ - - $ 750 750,000 $ - - $ 850 850,000 $ 250 250,000 $ New Trail: at-grade/wet area condition 250 $ LF - - $ 700 175,000 $ - - $ - - $ - - $ - - $ 600 150,000 $ - - $ Earthwork/Grading 5,000 $ LS 4 20,000 $ 8 40,000 $ 2 10,000 $ 1 5,000 $ 2 10,000 $ 1 5,000 $ 4 20,000 $ 2 10,000 $ Landscaping 5,000 $ LS 3 15,000 $ 2 10,000 $ 1 2,500 $ 1 5,000 $ 1 5,000 $ - $ 2 10,000 $ 2 10,000 $ Clearing (additional) 5,000 $ LS - - $ 2 10,000 $ - - $ - - $ - - $ - - $ 2 10,000 $ 1 5,000 $ ADA Ramps 6,500 $ EA 2 13,000 $ 2 13,000 $ 6 39,000 $ 4 26,000 $ 2 13,000 $ 1 6,500 $ - - $ 1 6,500 $ Post/rail fence 25 $ LF 1,200 30,000 $ 1,500 37,500 $ 700 17,500 $ - - $ 600 15,000 $ 50 1,250 $ 150 3,750 $ 1,100 27,500 $ Signage (specialty) 3,000 $ LS 1 3,000 $ 1 3,000 $ 1 3,000 $ 1 3,000 $ - $ - $ - $ - $ Stormwater Management 25,000 $ LS 1 25,000 $ 1 25,000 $ 2 50,000 $ 1 25,000 $ 1 25,000 $ - - $ 1 25,000 $ 1 25,000 $ Wetland Mitigation 25,000 $ LS 1 25,000 $ 3 75,000 $ - - $ - - $ 1 25,000 $ - - $ 2 50,000 $ 1 25,000 $ Trail Head Amenities 5,000 $ EA 1 5,000 $ 1 5,000 $ 1 5,000 $ 1 5,000 $ - - $ - - $ 1 5,000 $ 1 5,000 $ Mobilization 50,000 $ LS 1 50,000 $ 1 50,000 $ 1 50,000 $ 20,000 $ 20,000 $ 5,000 $ 20,000 $ 10,000 $
Subtotal 1,667,500 $ 2,475,000 $ 862,500 $ 401,000 $ 1,071,000 $ 37,250 $ 1,143,750 $ 484,500 $
Contingency 20% 333,500 $ 495,000 $ 172,500 $ 80,200 $ 214,200 $ 7,450 $ 228,750 $ 96,900 $ General Conditions 10% 166,750 $ 247,500 $ 86,250 $ 40,100 $ 107,100 $ 3,725 $ 114,375 $ 48,450 $ Subtotal Construction 2,167,750 $ 3,217,500 $ 1,121,250 $ 521,300 $ 1,392,300 $ 48,425 $ 1,486,875 $ 629,850 $
Soft Costs (20%) 433,550 $ 643,500 $ 224,250 $ 104,260 $ ** 160,000 $ 9,685 $ 297,375 $ 125,970 $ Construction Admin (5%) 108,388 $ 160,875 $ 56,063 $ 26,065 $ 69,615 $ 2,421 $ 74,344 $ 31,493 $
TOTAL PER SEGMENT 2,709,688 $ 4,021,875 $ 1,401,563 $ 651,625 $ 1,621,915 $ 60,531 $ 1,858,594 $ 787,313 $
OPTION C1 OPTION C2 OPTION C3 SEGMENT 5 SEGMENT 1 SEGMENT 2 SEGMENT 3 SEGMENT 4
April 26, 2022
Current Trail Segments
Potential Trail Alignment (off-street)
Potential Trail Alignment (on-street)
Enterprise Loop
Option C: Corporate Park Alignment
West Goshen
East Goshen
Connect to West Goshen
Linden Ln.
Wrights Ln.
Sycamore Dr.
Draft 02.09.2022
East Goshen Township
Paoli Pike Trail DIAGRAM 1 o4.26.2022
Draft 02.09.2022
Boardwalk condition Approx. 750 l.f.
Trail shares space with parking and driveway Approx. 900 l.f.
Boardwalk condition Approx. 1,400 l.f.
Trail Alignment
Trail Alignment - boardwalk
Easement Needed
Floodway
100-yr floodplain
200-yr floodplain
Option C: Corporate Park Alignment
Boardwalk and stream crossing
Approx. 250 l.f.
Pinch point
Hicks Property
Boardwalk condition Approx. 150 l.f.
Asphalt paving Approx. 1,600 l.f.
Asphalt paving Approx. 850 l.f.
East Goshen Township
Paoli Pike Trail
Goshen Corporate
Park
04.26.2022 DIAGRAM 2
Off-road paved trail – 2,400 l.f.
Enterprise Drive
Paoli Pike
Parking Lot
Streamside
Hicks Rear Lot
Corporate Park Alignment Individual Segments
West Goshen
East Goshen
Connect to West Goshen
(future)
Linden Ln.
Wrights Ln.
Sycamore Dr.
Draft 02.09.2022
East Goshen Township
Paoli Pike Trail DIAGRAM 3 o4.26.2022
[Event flyer with colorful vertical brushstrokes in rainbow colors in the background, promoting the 2022 Chester County Art Walk.]
2022 Chester County Art Walk
SEPT 24 10A-2P
EAST GOSHEN TWP PARK, TWP BLDG AND PAOLI PIKE TRAIL
1580/1661 PAOLI PIKE
WEST CHESTER, PA 19380
RAIN DATE: SEPT 25
HOSTED BY THE CHESTER COUNTY ART ASSOCIATION & EGT PARKS AND RECREATION
ARTISTS FEATURED INCLUDES:
|
|
|
|---|
ART FANS SCAN HERE TO SHARE THE FB EVENT!
[QR code to share the Facebook event]
[Logo: EAST GOSHEN TOWNSHIP Department of Parks & Recreation - In the business of making memories...]
[Logo: CCAA art CHESTER COUNTY ART ASSOCIATION]
65+ ARTISTS | LIVE MUSIC | FOOD TRUCKS | LIVE DEMONSTRATIONS
picasso
Rembrandt