Pipeline Task Force

The Pipeline Task Force’s mission is to advise the Board of Supervisors on pipeline infrastructure matters affecting or impacting East Goshen Township and its residents.

Board Members Term Expiration Date
Gerald Sexton, Chair 2027
Mary McCloskey, Vice Chair 2028
Judi DiFonzo 2026
David Shuey 2028
Vacant 2027
Ann Duffield, BOS Liaison
Ashley Nowak, Staff Liaison

Documents

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

East Goshen Township
Pipeline Task Force
Meeting Agenda
Thursday, December 20, 2018
5:00 PM

Comment – Since the members of the Task Force deferred electing a Chair and Vice Chair at their meeting on November 12, 2018, Supervisor Liaison David Shuey will facilitate the meeting in the interim.

  1. Call to Order
  2. Pledge of Allegiance
  3. Moment of Silence
  4. Ask if anyone is recording the meeting
  5. Approval of Minutes November 27, 2018
  6. Chairman’s Report
  7. Staff Reports
  8. Old Business Determine future meeting dates. (Tuesday, 1/22/19 is not available)
  9. New Business Presentation/Discussion regarding Pipeline Air Quality Monitoring with Bill Turner from Emergency Services and Kevin Miller, Emergency Management Coordinator in EGT.
  10. Public Comment
  11. Adjourn Meeting

F:\Data\Shared Data\Agendas\Pipeline\2018\2018-12-20_Pipeline Task Force Agenda.docx

11/27/18 November 27, 2018 1

EAST GOSHEN TOWNSHIP 1 PIPELINE TASK FORCE MEETING 2 1580 PAOLI PIKE 3 MONDAY, NOVEMBER 27, 2018 4 DRAFT MINUTES 5 6 Present: Members: Judi DiFonzo, Caroline Hughes, Russ Frank, Karen Miller, Bill 7 Wegemann; David Shuey, Liaison and Township Supervisor; Rick Smith, Township 8 Manager 9 10 Call to Order & Pledge of Allegiance 11 David called the meeting to order at 5:03 p.m. and led the pledge of allegiance. 12 David is serving as the facilitator of the Pipeline meetings until a chairperson/vice 13 chairperson is elected. 14 15 Moment of Silence 16 David called for a moment of silence. 17 18 Recording 19 None. 20 21 Approval of Minutes 22 Judi made a motion to approve the minutes of the November 12, 2018 meeting as 23 submitted. Karen seconded. The motion passed 5-0. 24 25 Chairman’s Report 26 None. 27 28 Old Business 29 Select Meeting Dates: Gerald Sexton, 1612 Bow Tree Drive, stated that no task 30 force meetings are scheduled past 12/20/18. After discussion about future meeting 31 dates, it was determined that all Thursdays (except for 1st of month) and the 2nd & 32 4th Tuesdays are best. Caroline stated she will send out a google poll to see what 33 dates/times will work best for all. It was agreed that the task force will meet 2 times 34 a month at first and then meet once a month subsequently. 35 36 Prioritize May 16, 2018 Actions Summary 37 Rick suggested that the task force set priority (high, medium, low) to the actions in 38 order to determine what tasks to focus on. Russ questioned if the items are still 39 relevant since they are from May. 40 41 Rick explained that Sunoco is reevaluating all the HDD sites. If Sunoco would choose 42 to do open cut for Mariner 2, they would need new technical permits from DEP and 43 involve Penndot to allow access. Rick stated that Sunoco is almost ready with the 12 44 inch pipe. 45 46

11/27/18 November 27, 2018 2

1. Resident Preparedness and Communication 1 Improve public communication regarding pipeline issues and activity 2 The task force agreed that this is a HIGH priority. There was discussion that it 3 is important that residents receive accurate information on the pipeline 4 activities and status. E.g., Sunoco’s 20 inch pipe is 100% installed and 99% 5 tested. Actually, only approximately 10% of the 20 inch pipe is installed in 6 East Goshen and nothing yet in West Goshen and Westtown. 7 8 Bill asked if Rick had a contact that provided updated pipeline information. 9 Rick stated that his knowledge is acquired from reading articles and 10 information posted on the appropriate websites. 11 12 Rick suggested that the task force can improve public awareness via: 13 o Constant Contact – Not all residents sign up for this and not all that 14 are signed up are residents 15 o Website – Not all residents have internet access 16 o Newsletter – History shows that people do read the newsletter. 17 However, information is at least 6 weeks behind. 18 o Mailings – Effective but costly 19 20 There was discussion about calling 811 and the process behind it. 21 22 Facilitate or join a “community advocacy network “ 23 The task force agreed this is a LOW priority. Members of task force are 24 involved in community advocacy. 25 26 Examine the impact of pipeline construction on property values. 27 The task force agreed this is a LOW priority. David stated that this is a topic 28 that continually is asked by residents. To date, there is no evidence that 29 statistically supports this statement. 30 31 2. Pipeline Monitoring 32 Conduct air quality monitoring at valve locations 33 The task force agreed that this is a HIGH priority. Rick explained that Sunoco 34 has not proposed a valve in East Goshen for Mariner 2. There are 3 existing 35 valves in East Goshen; Buckeye (1) and Transcontinental (2). Rick continued 36 that since these exist on private property, an easement agreement would be 37 needed to install monitoring devices. This would also include obtaining 38 power and Wi-Fi access. 39 40 Conduct air quality monitoring HDD construction sites. 41 The task force agreed that this is also a HIGH priority. Rick explained that the 42 emergency dispatch follows a script in order to determine how to prioritize 43 and disseminate incoming calls. There is a script for pipeline problems. David 44 suggested that Bill Turner, Emergency Services, be invited to the next 45

11/27/18 November 27, 2018 3

meeting (12/20/18). Rick will contact Bill and also Kevin Miller, Emergency 1 Management Coordinator in EGT, to attend our next meeting. Caroline will 2 create a Google Doc to collect questions from the task force for Bill and Kevin 3 prior to the meeting. 4 5 David stated that Thornbury Township met with the manufacturer of the 6 monitoring equipment. He will reach out to get technical contact information 7 for future reference. 8 9 3. Legislation 10 Support State and Federal legislation regarding safety, siting, density, public 11 awareness, etc. 12 The task force agreed this is a HIGH priority. Bill reported about his meeting 13 with Senator Killion, Comitta and Dinniman. All bills that Senator Rafferty 14 worked on need to be reintroduced once the Senate regroups. He was 15 advised to review the Rafferty bills and list which are important. It was noted 16 that Sunoco will be grandfathered with any new legislation introduced. 17 Advocate that the State revoke 102 and 105 permits. 18 Caroline stated that this is a HIGH priority; however, it would be difficult to 19 have these revoked since it would have to be done at the Governor level. She 20 also stated that there are sections on these permits that were not complete 21 siting a DEP violation. Rick explained that DEP had to issue these technical 22 permits. 23 24 4. PUC Regulatory Issues 25 Explore the valve location issue for safety considerations 26 This was discussed but not ranked. Gerald Sexton stated that there is a 27 balanced risk of having more valves installed and the material flowing 28 through them. He asked that if there is a breach, is the material removed or is 29 it burned off. David explained that both valves would not be closed and the 30 unignited material will be push forward. Gerald stated that if the breach is 31 large, this approach will not help. Gerald questioned are there enough 32 existing valves and is it safer to not add additional valves? The task force 33 agreed that they need to consult someone with expertise. Russ stated that he 34 has a contact that he will reach out to about these topics: adding monitors, 35 adding valves and space recommendations between values. 36 File an EGT complaint with the PUC similar to Wes Whiteland focus on EGT 37 This was discussed but not ranked. 38 39 Caroline explained that she will be attending a PUC Hearing in Harrisburg on 40 Thursday (11/29) and Friday (11/30). She and 6 other community members 41 have filed a Petition for Emergency Relief. Rick stated that the Board could be 42 asked to file for a Petition to Intervene with the complaint. 43 44 45

11/27/18 November 27, 2018 4

1 New Business 2 Rick stated that the following 3 items are areas that the task force could investigate 3 and make recommendations. 4 a. Consider recommendation for an addition valve 5 b. Consider recommendation regarding the IMP. 6 c. Consider recommendation on confidential information. 7 It was agreed that these 3 items would be tabled until next meeting. 8 9 Public Comment 10 No additional comments. 11 12 Adjournment 13 There being no further business, the meeting was adjourned at 6:55 pm. 14 15 The next meeting is Thursday, December 20, 2018 at 5:00 pm. 16 17 Respectfully submitted, 18 19 Susan D’Amore 20

[Logo: pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION]

[Stamp: FYI]

December 5, 2018

Mr. Matthew L. Gordon
Sunoco Pipeline, L.P.
535 Fritztown Road
Sinking Spring, PA 19608

Re: Hydrogeological Re-Evaluation Report and Supplemental Information Review
Strasburg Road/Bow Tree Drive, Horizontal Directional Drill (HDD)
Location (S3-0520)
PA DEP Permit No. E15-862
East Goshen Township
Chester County

Dear Mr. Gordon:

The Department of Environmental Protection (DEP) has reviewed the Hydrogeological Re-Evaluation Report and Supplemental Information associated with the Horizontal Directional Drill (HDD) Analysis submitted for the Strasburg Road/Bow Tree Drive Crossing, S3-0520, acknowledged in PA DEP Permit No. E15-862, and posted on DEP’s Mariner East 2 pipeline portal’s webpage on October 29, 2018.

DEP acknowledges the incorporation of the following best management practices to minimize the risk of Inadvertent Returns (IRs) and to minimize impacts to public and private water supplies during the construction phases of the HDD, and as detailed in your October 29, 2018, submission, Sunoco Pipeline, L.P. (SPLP), will:

  1. Prior to the start of drilling activities, perform a geophysics analysis over the length of the profile for the S3-0520 HDD.
  2. Incorporate proactive measures to prevent IRs and annulus subsidence, including continuous monitoring of the tool face pressure, record the drilling fluid pressures through the use of an annular pressure monitor, and by tracking the volume of the cuttings removed in both the pilot and reaming stages of the drill.
  3. Incorporate annulus grouting procedures described in your submission to stabilize the borehole.

Considering the aforementioned, the Supplemental Information adequately addresses DEP’s comments on the Hydrogeological Re-Evaluation Report. DEP has determined that no permit modifications are necessary. You may proceed with the permitted HDD activity in the

Southeast Regional Office
2 East Main Street | Norristown, PA 19401-4915 | 484.250.5160 | Fax 484.250.5971 | www.dep.pa.gov

[Stamp: FYI]

Mr. Matthew L. Gordon          - 2 -          December 5, 2018

manner proposed in your reevaluation and in accordance with all applicable permit terms and conditions.

If you have additional questions, please contact me at the telephone number located in the first page footer.

Sincerely,

[Signature: John Hohenstein]

John Hohenstein, P.E.
Acting Regional Manager
Waterways and Wetlands

cc: Ms. Styles - Sunoco Pipeline, L.P.
Mr. Embry - Sunoco Pipeline, L.P.
Mr. Simsik, P.E. - Tetra Tech
Mr. Mulray, P.G. - GES
Mr. Waldrop, P.G. - GES
U.S. Army Corps of Engineers, Philadelphia District
Chester County Conservation District
Re 30 (GJS18WAW)339-4